JP3335103B2 - Frame for forming legal frame and legal frame method using this frame - Google Patents

Frame for forming legal frame and legal frame method using this frame

Info

Publication number
JP3335103B2
JP3335103B2 JP11514297A JP11514297A JP3335103B2 JP 3335103 B2 JP3335103 B2 JP 3335103B2 JP 11514297 A JP11514297 A JP 11514297A JP 11514297 A JP11514297 A JP 11514297A JP 3335103 B2 JP3335103 B2 JP 3335103B2
Authority
JP
Japan
Prior art keywords
frame
reinforcing bar
mortar
horizontal
legal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP11514297A
Other languages
Japanese (ja)
Other versions
JPH1046595A (en
Inventor
和正 柴田
奉文 松本
泰良 藤嶋
要 堀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nisshoku Corp
Original Assignee
Nisshoku Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nisshoku Corp filed Critical Nisshoku Corp
Priority to JP11514297A priority Critical patent/JP3335103B2/en
Publication of JPH1046595A publication Critical patent/JPH1046595A/en
Application granted granted Critical
Publication of JP3335103B2 publication Critical patent/JP3335103B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、道路や造成地など
の法面の緑化に等に用いられる法枠形成用の枠体および
この枠体を用いた法枠工法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a frame for forming a legal frame used for greening slopes such as roads and lands, and a method of constructing a legal frame using the frame.

【0002】[0002]

【従来の技術】法面の緑化に際して、法面上に金網など
の網状体を敷設し、この網状体の上に鉄筋を格子状に配
置し、この鉄筋を埋め込むようにモルタルまたはコンク
リート(以下、モルタル等と言う)を吹き付けて格子状
の法枠を形成し、この法枠の格子内に、各種種子や肥料
などが配合された植生材料を吹き付け、あるいは、上記
の植生材料が装填された植生袋を配設して、上記の格子
状法枠によって植生材料の流亡を保護しながら、植生材
料に含まれる各種種子を法枠内で発芽・育成させる工法
(例えば特公昭58−20338号公報を参照)がとら
れつつある。
2. Description of the Related Art When greening a slope, a mesh such as a wire mesh is laid on the slope, and reinforcing bars are arranged in a grid on the mesh, and mortar or concrete (hereinafter, referred to as "metal") is buried in the reinforcing bar. Mortar, etc.) to form a grid-like legal frame, and spray a vegetation material containing various seeds and fertilizers into the lattice of this legal frame, or vegetation loaded with the vegetation material described above. A method of arranging a bag and germinating and growing various seeds contained in the vegetation material in the framing frame while protecting the vegetation material from flowing out by the above-mentioned lattice-shaped method frame (for example, Japanese Patent Publication No. 58-20338). See).

【0003】ところで、現行の土木基準では、上記の鉄
筋を覆うモルタル等の厚み(これを被り厚と言う)が鉄
筋のどの面からも5cm以上であることが、所要強度の
格子状法枠を得るための品質管理基準として義務付けら
れていることは周知の通りである。
By the way, according to the current civil engineering standards, the thickness of a mortar or the like that covers the above-mentioned reinforcing steel (this is referred to as “covering thickness”) must be 5 cm or more from any surface of the reinforcing steel. It is well known that it is required as a quality control standard to obtain.

【0004】[0004]

【発明が解決しようとする課題】しかし、モルタル等の
吹き付けが法面上の不安定な場所で行われることから、
鉄筋に対するモルタル等の吹き付け厚さや幅が不均一に
なりやすく、所定寸法の格子状法枠を形成するのに相当
の熟練度を要するとともに、格子状法枠の寸法や強度に
バラツキが生じることを避けることができなかった。
However, since the spraying of mortar and the like is performed at an unstable place on the slope,
The thickness and width of the mortar sprayed on the rebar are likely to be non-uniform, requiring considerable skill to form a grid-shaped frame with predetermined dimensions, and causing variations in the dimensions and strength of the grid-shaped frame. I couldn't avoid it.

【0005】また、鉄筋を法面からも5cm以上離す必
要があることから、網状体を浮かせたり或いはアンカー
ピンを用いたりして、上記の鉄筋を法面上に浮設させる
ようにしているが、モルタル等の吹き付け作業やその他
の作業を遂行する際に、どうしても網状体を踏ん付けて
しまうことから、或いは、不測にも鉄筋を曲げたりアン
カーピンを倒したりすることで、鉄筋の高さ位置を所定
通りに確定させることができず、更には、鉄筋まわりに
モルタル等の層が所定の厚みで形成されているか否かを
外部からは確認できないことが相まって、規格を満たさ
ない格子状法枠が稀に形成されることがあった。
[0005] Further, since it is necessary to separate the rebar from the slope by 5 cm or more, the rebar is floated on the slope by floating the net or using an anchor pin. When performing spraying work or other work on mortar, etc., the height position of the reinforcing bar is inevitably caused by stepping on the mesh, or by unexpected bending of the reinforcing bar or knocking down the anchor pin. Can not be determined as prescribed, and furthermore, it is not possible to check from the outside whether or not a layer of mortar or the like is formed with a predetermined thickness around the reinforcing bar, so that a lattice-shaped method frame that does not meet the standard Was occasionally formed.

【0006】本発明は、かゝる実情に鑑みて成されたも
のであって、規格寸法通りの格子状法枠を熟練を要する
ことなく簡単に形成でき、しかも、その際の鉄筋の位置
決めが確実にかつ容易に達成されることに加えて、法枠
強度の大幅アップを可能とした法枠形成用の枠体および
その枠体を用いる法枠工法を提供することを目的として
いる。
SUMMARY OF THE INVENTION The present invention has been made in view of such circumstances, and allows a grid-shaped method frame having a standard size to be easily formed without requiring skill, and furthermore, the positioning of a reinforcing bar at that time can be performed. It is an object of the present invention to provide a frame for forming a legal frame and a legal method for constructing the legal frame using the frame, in addition to being reliably and easily achieved.

【0007】[0007]

【課題を解決するための手段】上記目的を達成するに至
った本発明による法枠形成用の枠体は、法面上に格子状
に設置され且つモルタルまたはコンクリートが吹き付け
られて法枠を形成するために、モルタルまたはコンクリ
ートの吹き付け幅および吹き付け高さの目安となる枠体
であって、正面視で下方に屈曲する形状を有し、その屈
曲位置に、鉄筋を所定の高さ位置に持ち上げ保持させ、
かつ鉄筋の架設位置をその自重によって確定する鉄筋架
設部が形成される中間部、この中間部の両側の角部分か
ら下方に向けて延設された一対の脚体を備えた複数の横
線材と、この横線材の脚体どうしを互いに連結するよう
上下複数段配置された縦線材とから成ると共に、前記角
部分が、前記鉄筋架設部よりも高い位置に配置されてい
る点に特徴がある。
Means for Solving the Problems A frame for forming a legal frame according to the present invention, which has achieved the above object, is placed in a grid on a slope and mortar or concrete is sprayed to form the legal frame. A frame that serves as a measure of the spray width and spray height of mortar or concrete, and has a shape that bends downward when viewed from the front, and raises a reinforcing bar to a predetermined height position at the bending position. Let me hold
And an intermediate portion where a reinforcing bar erection portion for determining the erection position of the reinforcing bar by its own weight is formed, and a plurality of horizontal wires having a pair of legs extending downward from corner portions on both sides of the intermediate portion. It is characterized in that it comprises vertical wires arranged in a plurality of upper and lower stages so as to connect the legs of the horizontal wire to each other, and the corner portion is arranged at a position higher than the reinforcing bar erection portion.

【0008】そして、前記中間部に形成される鉄筋架設
部は2つであってもよい。また、前記横線材の形状が、
その中間部において上部に突出し、モルタル等の吹き付
け高さの目安となる一つの凸部と二つの凹部を有する凹
多角形であってもよい。
[0008] The number of the reinforcing bar erection portions formed in the intermediate portion may be two. Further, the shape of the horizontal wire is
It may be a concave polygon having one convex part and two concave parts that project upward at the middle part and serve as a measure of the spraying height of mortar or the like.

【0009】また、本発明は、前述した枠体を用いる法
枠工法であって、モルタルまたはコンクリートの吹き付
け幅および吹き付け高さの目安となる当該枠体を法面上
に格子状に設置するとともに、前記横線材の前記鉄筋架
設部に鉄筋を架設し、その後この鉄筋を含めて前記枠体
を埋め込むようにモルタルまたはコンクリートを吹き付
けて格子状の法枠を形成することを特徴とする法枠工法
を提供する。
The present invention also relates to a method for constructing a frame using the above-mentioned frame, wherein the frame, which is a measure of the spray width and spray height of mortar or concrete, is installed in a grid on the slope. A reinforcing bar is erected on the reinforcing bar erection portion of the horizontal wire, and then mortar or concrete is sprayed so as to embed the frame body including the reinforcing bar to form a grid-shaped legal frame. I will provide a.

【0010】尚、上記枠体の正面視形状は、横線材の形
状によって定まることは言うまでもない。そして、横線
材の形状は限定されるものではないが、横線材として例
えば、一対の脚体を、下方に屈曲する形状を有する中間
部の両側の角部分から斜め下方に向けて延設させたもの
とすれば、枠体は正面視で末広がりの略M字状となり、
前記脚体を、下方に屈曲する形状を有する中間部の両側
の角部分から垂直下方に向けて延設させたものとすれ
ば、枠体の外形は正面視で門型の形状となる。
It is needless to say that the shape of the frame in a front view is determined by the shape of the horizontal wire. And although the shape of the horizontal wire is not limited, for example, as the horizontal wire, a pair of legs is extended obliquely downward from both side corners of the intermediate portion having a shape bent downward. If it is assumed, the frame body becomes a substantially M-shape diverging in a front view,
If the leg extends vertically downward from both corners of the intermediate portion having a shape that is bent downward, the outer shape of the frame has a portal shape in a front view.

【0011】[0011]

【作用】上記の特徴構成によれば、枠体を所定のピッチ
で法面上に格子状に設置し、かつ、枠体を構成する各横
線材の、正面視で下方に屈曲する形状を有する中間部に
設けた屈曲位置に形成された鉄筋架設部に鉄筋を架設し
て、これらを埋め込むようにモルタル等を吹き付けるこ
とで、法面上に所定の格子状法枠が形成される。
According to the above-mentioned characteristic structure, the frame is installed in a grid pattern on the slope at a predetermined pitch, and each of the horizontal wires constituting the frame has a shape bent downward in a front view. Reinforcing bars are erected on the reinforcing bar erection portion formed at the bending position provided in the intermediate portion, and a mortar or the like is sprayed so as to embed them, whereby a predetermined grid-like method frame is formed on the slope.

【0012】このとき、前記鉄筋架設部に架設される鉄
筋は当該鉄筋架設部が下方に屈曲した横線材または鉄筋
架設材によって形成されているので、鉄筋の自重によっ
て架設位置が確定でき、取付工事が極めて容易に行え
る。
At this time, since the reinforcing steel erected on the reinforcing bar erection portion is formed by a horizontal wire or a reinforcing bar erection member whose bent portion is bent downward, the erection position can be determined by the own weight of the reinforcing bar, and Can be performed very easily.

【0013】また、枠体がモルタル等の吹き付け幅なら
びに吹き付け高さの目安になることから、枠体の高さ寸
法と幅寸法を、所要強度の格子状法枠を得るための品質
管理基準に基づいて予め設定しておけば、鉄筋を含め
て、単に縦横の枠体を埋め込むようにモルタル等を吹き
付けるだけで、所定寸法の被り厚で鉄筋を埋設した状態
の所定寸法および強度を有する格子状法枠を、熟練を要
することなく誰にでも簡単に形成することができる。
Further, since the frame serves as a measure of the spray width and the spray height of the mortar or the like, the height and width of the frame are defined as quality control standards for obtaining a grid-like method frame having a required strength. If it is set in advance based on the above, the mortar or the like, including the reinforcing bar, is simply sprayed so as to embed the vertical and horizontal frames, and the grid has a predetermined size and strength with the reinforcing bar buried with the predetermined thickness. The legal framework can be easily formed by anyone without skill.

【0014】尚、上述したように、枠体を正面視で末広
がりの略M字状とした場合は、枠体自体が法面上への設
置安定面で優れた機能を持つものとなり、更に、かゝる
構成は、枠体を重ね合わせて運搬する上で好適であるこ
とはいうまでもない。
As described above, when the frame is formed in a substantially M-shape that is widened in a front view, the frame itself has an excellent function in terms of stable installation on a slope, and furthermore, Needless to say, such a configuration is suitable for transporting the frames in an overlapping manner.

【0015】[0015]

【発明の実施の形態】以下、本発明の実施形態を図面に
基づいて説明する。図1は本発明の一実施形態に係る格
子状法枠1の形成途中の状態を示している。
Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 shows a state in the middle of forming a grid-like method frame 1 according to an embodiment of the present invention.

【0016】この格子状の法枠1は、その形成手順につ
いては後述するが、先ず、法面A上に金網などの網状体
2を敷設して、この網状体2上に所定のピッチで鉄筋3
を配置し、この鉄筋3を跨ぐように、それぞれ複数の枠
体4,5を縦横に設置して、これら縦横の枠体4,5に
よって格子枠体6を形成し、かつ、前記鉄筋3を所定の
高さ位置に持ち上げ保持させると共に、更に、縦横の枠
体4,5の上部に別の鉄筋7を配置し、これらの鉄筋
3,7を含めて縦横の枠体4,5を埋め込むように、モ
ルタル8等を吹き付けて形成される。
The lattice-shaped normal frame 1 will be described in detail later. First, a net 2 such as a wire mesh is laid on the slope A, and reinforcing bars are formed on the net 2 at a predetermined pitch. 3
Are arranged vertically and horizontally so as to straddle the reinforcing bar 3, and a grid frame 6 is formed by these vertical and horizontal frames 4 and 5, and the reinforcing bar 3 is In addition to lifting and holding at a predetermined height position, another reinforcing bar 7 is disposed above the vertical and horizontal frames 4, 5, and the vertical and horizontal frames 4, 5 including these reinforcing bars 3, 7 are embedded. Mortar 8 or the like.

【0017】このモルタル8等の吹き付けに際しては、
縦横の枠体4,5によって囲まれる格子状部分にシート
9を敷設して、モルタル8等の非吹き付け部分を養生す
ることが肝要である。
When spraying the mortar 8 or the like,
It is important that the sheet 9 is laid on the grid-like portion surrounded by the vertical and horizontal frames 4 and 5 to cure the non-sprayed portion such as the mortar 8.

【0018】そして、モルタル8等の吹き付後にシート
9を取り除いて、このシート9が取り除かれた養生部分
に、芝草や野草や花、低木類などの各種種子や肥料、そ
の他、土壌や有機質材、保水材(土壌改良材)などが配
合された植生材料10を吹き付けて、植生材料10の流
亡を格子状法枠1で保護しながら、植生材料10に含ま
れる各種種子を法枠1内で発芽させて育成させるのであ
る。尚、上記の養生部分に、植生材料を装填した植生袋
を配設する緑化形態がとられることもある。
Then, after spraying the mortar 8 or the like, the sheet 9 is removed, and on the cured part from which the sheet 9 has been removed, various seeds and fertilizers such as turfgrass, wild grass, flowers, shrubs, soil and organic materials are removed. A variety of seeds contained in the vegetation material 10 are sprayed in the grid frame 1 while spraying a vegetation material 10 containing a water retention material (soil improving material) and the like to protect the vegetation material 10 from running off with the grid-shaped frame 1. They are germinated and raised. It should be noted that a greening form in which a vegetation bag loaded with vegetation material is disposed in the above-mentioned curing portion may be adopted.

【0019】次に、上記の法枠工法に用いられる縦横の
枠体4,5の構成を、図2に基づいて説明する。図2は
一例として縦方向の枠体(以下、縦枠体という)4の一
部切断斜視図であるが、横方向の枠体(以下、横枠体と
いう)5の正面視形状は、縦枠体4と同じであるのでそ
の詳細な説明を省略する。
Next, the structure of the vertical and horizontal frames 4 and 5 used in the above-mentioned method will be described with reference to FIG. FIG. 2 is a partially cut perspective view of a vertical frame (hereinafter, referred to as a vertical frame) 4 as an example. The front view of a horizontal frame (hereinafter, referred to as a horizontal frame) 5 has a vertical shape. Since it is the same as the frame 4, its detailed description is omitted.

【0020】同図において枠体4は、法面Aへの設置姿
勢の安定面ならびに重ね合わせての運搬面で優れるよう
に、その形状が正面視で末広がりの略M字状に形成され
ている。すなわち、当該枠体4は、正面視で下方に屈曲
する形状を有し、その屈曲位置に鉄筋7を所定の高さ位
置に持ち上げ保持させる鉄筋架設部11cが形成される
中間部11a、この中間部11aの両側の角部分から斜
め下方に向けて正面視で末広がり状に延設された一対の
脚体11b,11bを備えた複数の横線材11と、この
横線材11の脚体11b,11bどうしを互いに連結す
るよう上下複数段配置された縦線材12…とから成って
いる。
In FIG. 1, the shape of the frame body 4 is formed in a substantially M-shape which is widened in a front view so as to be excellent in a stable surface of the installation posture on the slope A and a transportation surface in a superposed state. . That is, the frame body 4 has a shape that bends downward in a front view, and an intermediate portion 11a in which a reinforcing bar erected portion 11c that lifts and holds the reinforcing bar 7 at a predetermined height position is formed at the bent position. A plurality of horizontal wires 11 having a pair of legs 11b, 11b extending diagonally downward from the corners on both sides of the portion 11a in a front view, and legs 11b, 11b of the horizontal wires 11 Vertical wire members 12 arranged in a plurality of upper and lower stages so as to connect each other.

【0021】また、本実施形態では、前記横線材11の
一方の脚体11bには、一対の脚体11b,11bにわ
たる長さを有し、且つ、正面視において下方に屈曲する
形状を有し、その屈曲位置に鉄筋を所定の高さ位置に持
ち上げ保持させる鉄筋架設部13cを備えた鉄筋架設材
13が設けられており、当該鉄筋架設材13は鉄筋架設
部13cが前記横線材11の鉄筋架設部11cと法面A
との中間部に来るように遊動自在に設けられている。
In the present embodiment, one leg 11b of the horizontal wire 11 has a length extending over a pair of legs 11b, 11b, and has a shape bent downward in a front view. At the bending position, there is provided a reinforcing bar erection member 13 having a reinforcing bar erection portion 13c for lifting and holding the reinforcing bar at a predetermined height position. Construction part 11c and slope A
It is provided so as to be freely movable so as to come to an intermediate portion between the two.

【0022】具体的には、例えば横線材11の中間部1
1aの横方向の長さは18cm程度で、一対の脚体11
b,11bの下端間の寸法は30cm程度であり、その
高さは16cm程度であって、この横線材11は、縦線
材12の長さ方向に例えば20cm程度のピッチで溶接
されている。
Specifically, for example, the intermediate portion 1 of the horizontal wire 11
1a is about 18 cm in the lateral direction, and a pair of legs 11a is provided.
The dimension between the lower ends of b and 11b is about 30 cm, the height is about 16 cm, and the horizontal wires 11 are welded in the length direction of the vertical wires 12 at a pitch of, for example, about 20 cm.

【0023】縦線材12の長さ(これは即ち、縦横の枠
体4,5単体の長さである。)は、140〜240cm
程度のものであって、脚体11bの上端部とそれよりも
下方に3cm程度のピッチ置きに4本が溶接されてい
る。
The length of the vertical wire 12 (that is, the length of the vertical and horizontal frames 4, 5 alone) is 140 to 240 cm.
The four are welded at an interval of about 3 cm below the upper end of the leg 11b and below it.

【0024】鉄筋架設材13は、例えば枠体4の1スパ
ンの長さが150cmの場合、その長さ方向の中間部に
50cm程度のピッチで2本設けられるもので、所定の
横線材11の一方の脚体11bに対して、その一端側の
ループ13aまわりで矢印Bの方向に遊動可能に係着さ
れ、かつ、その他端側には、横線材11の他方の脚体1
1bに溶接した縦線材12に上方から係止連結される係
止部13bが形成されている。
For example, when the length of one span of the frame 4 is 150 cm, two reinforcing bars 13 are provided at an intermediate portion in the length direction at a pitch of about 50 cm. One leg 11b is movably engaged in the direction of arrow B around the loop 13a on one end, and the other leg 1 of the horizontal wire 11 is attached to the other end.
A locking portion 13b is formed on the vertical wire 12 welded to 1b and locked from above.

【0025】これら横線材11と縦線材12および鉄筋
架設材13は、例えば直径4mm程度の防錆加工を施し
た針金から成り、かつ、前記鉄筋架設材13は、これを
備えた縦横の枠体4を重ね合わせて運搬する際に邪魔に
ならないように、通常は番線などによって縦線材12に
沿う折り畳み姿勢に保持される。
The horizontal wire 11, the vertical wire 12, and the reinforcing bar mounting material 13 are made of, for example, a wire having a diameter of about 4 mm and subjected to a rust-proofing process, and the reinforcing bar mounting material 13 is provided with vertical and horizontal frame members provided with the same. Usually, it is held in a folded position along the vertical wire 12 by a number line or the like so as not to be in the way when the 4 is stacked and transported.

【0026】法面A上に格子状の法枠1を形成するに際
しては、図1に示すように、先ず予め整形された法面A
に目合いが例えば5〜6cm程度の菱形金網などの網状
体2を敷設し、この網状体2を図示しないアンカーによ
って適宜固定し、かつ、縦横の枠体4,5のスパン長さ
と枠体幅との合計寸法を基にしたピッチで水糸14を格
子状に張設して、この水糸14に沿わせて網状体2上に
鉄筋3を配置すると共に、水糸14を中心にして複数の
縦枠体4を設置し、この縦枠体4,4間に横枠体5を設
置して、これら縦横の枠体4,5によって格子枠体6を
形成する。
When forming the grid-shaped normal frame 1 on the side A, as shown in FIG.
A mesh 2 such as a rhombus wire mesh having a mesh size of, for example, about 5 to 6 cm is laid, the mesh 2 is appropriately fixed by an anchor (not shown), and the span length and the frame width of the vertical and horizontal frames 4 and 5 are set. The water threads 14 are stretched in a lattice pattern at a pitch based on the total size of the reinforcement 3 along the water threads 14 on the reticulated body 2. The vertical frame 4 is installed, and the horizontal frame 5 is installed between the vertical frames 4, 4. The vertical and horizontal frames 4, 5 form a lattice frame 6.

【0027】なお、図示してはいないが、横枠体5の長
さ方向一側には、これが相対峙する縦枠体4の脚体11
bとほぼ同一の傾斜角度とされた傾斜端部を形成し、ま
た、横枠体5の長さ方向他側には、この横枠体5を構成
する各縦線材12…を外方側に延出させた延出部を形成
している。従って、該横枠体5を縦枠体4,4間に設置
するときには、横枠体5の全体を持ち上げ、この横枠体
5の各縦線材12…の延出部を一方の縦枠体4の脚体1
1b内へと突入させ、この後、延出部の脚体11b内へ
の突入部位を中心に横枠体5の全体を下方側へと回動さ
せながら、この横枠体5の長さ方向一側に設けた傾斜端
部を、他方の縦枠体4の脚体11bと対向すれば、縦枠
体4,4間に横方向の枠体5を安定して設置できる。
Although not shown, a leg 11 of the vertical frame 4 is opposed to one side of the horizontal frame 5 in the longitudinal direction.
b are formed at substantially the same inclination angle as b, and on the other side in the longitudinal direction of the horizontal frame 5, each of the vertical wire members 12... An extended portion is formed. Therefore, when the horizontal frame 5 is installed between the vertical frames 4, 4, the entire horizontal frame 5 is lifted, and the extending portions of the vertical wires 12. 4 legs 1
1b. After that, the entire length of the horizontal frame 5 is rotated downward about the portion of the extension portion that enters the leg 11b, and the length of the horizontal frame 5 is reduced. If the inclined end provided on one side faces the leg 11b of the other vertical frame 4, the horizontal frame 5 can be stably installed between the vertical frames 4 and 4.

【0028】また、縦枠体4,4間に横枠体5を設置し
た後には、当該横枠体5の傾斜端部および延出部と縦枠
体4の脚体11bとの対向部分を線材などで結束するこ
とにより、縦枠体4,4と横枠体5とを結合一体化させ
るのである。
After the horizontal frame 5 is installed between the vertical frames 4, 4, the opposing portions of the inclined end and extension of the horizontal frame 5 and the legs 11 b of the vertical frame 4 are separated. By binding with a wire or the like, the vertical frame members 4 and 4 and the horizontal frame member 5 are combined and integrated.

【0029】次に、網状体2上に予め配置した鉄筋3を
持ち上げて、この鉄筋3の下方部位で鉄筋架設材13を
遊動させ、図3〜図5に示すように、この鉄筋架設材1
3の係止部13bを、横線材11の他方の脚体11bに
溶接した縦線材12に上方から係止連結する。このと
き、当該鉄筋架設材13の幅方向の中央の屈曲位置に
は、鉄筋3が、横線材11の鉄筋架設部11cと法面A
との中間に来るように載架されており、これにより、当
該鉄筋3の設置位置を、その自重によって所定の位置に
容易に保持することができる。
Next, the reinforcing bar 3 previously arranged on the mesh body 2 is lifted, and the reinforcing bar mounting member 13 is moved under the reinforcing bar 3, and as shown in FIGS.
The third locking portion 13b is locked and connected to the vertical wire 12 welded to the other leg 11b of the horizontal wire 11 from above. At this time, at the bending position at the center in the width direction of the reinforcing bar installation material 13, the reinforcing bar 3 is connected to the reinforcing bar installation portion 11 c of the horizontal wire 11 and the slope A.
Is mounted so as to be located in the middle of the above, whereby the installation position of the reinforcing bar 3 can be easily held at a predetermined position by its own weight.

【0030】その後に、別の鉄筋7を縦横の枠体4,5
の横線材11の鉄筋架設部11cに載架するのである
が、この場合にも、鉄筋7の設置位置は、その自重によ
って所定の位置に保持される。従って、鉄筋3,7の位
置決め時に、溶接や線材などによる結束を一切必要とせ
ず、施工が極めて容易に行える。
Thereafter, another reinforcing bar 7 is attached to the vertical and horizontal frames 4,5.
Is mounted on the reinforcing-bar erection portion 11c of the horizontal wire 11, but also in this case, the installation position of the reinforcing bar 7 is held at a predetermined position by its own weight. Therefore, when positioning the reinforcing bars 3 and 7, there is no need for any bundling by welding, wire, or the like, and the construction can be performed extremely easily.

【0031】そして、前記鉄筋3,7を含めて縦横の枠
体4,5を埋め込むように、例えば含水率が7〜8%程
度の低スランプのモルタル8等をモルタルガン機などに
よって吹き付けることで、格子状の法枠1を形成するの
である。
Then, a low-slump mortar 8 having a water content of about 7 to 8%, for example, is sprayed by a mortar gun machine or the like so as to embed the vertical and horizontal frames 4 and 5 including the reinforcing bars 3 and 7. Thus, a grid-like normal frame 1 is formed.

【0032】このとき、鉄筋3,7の位置が縦横の枠体
4,5によって確定されていることに加えて、縦横の枠
体4,5がモルタル8等の吹き付け幅の目安になってお
り、当該枠体4、5の角部分(一番上の縦線材12)の
位置が、鉄筋架設部11cより高い位置にあるので、鉄
筋3,7を含めて、単に縦横の枠体4,5を埋め込むよ
うにモルタル8等を吹き付けることで、必然的に所定寸
法の被り厚で鉄筋3,7を埋設することができ、所定寸
法および強度を有する格子状法枠1を極めて容易に形成
することができるのである。
At this time, in addition to the positions of the reinforcing bars 3 and 7 being determined by the vertical and horizontal frames 4 and 5, the vertical and horizontal frames 4 and 5 serve as a guide of the spray width of the mortar 8 or the like. Since the positions of the corner portions (uppermost vertical wire members 12) of the frame members 4, 5 are higher than the reinforcing bar erection portion 11c, the vertical frame members 4, 5 including the reinforcing bars 3, 7 are simply provided. By injecting a mortar 8 or the like so as to embed, the reinforcing bars 3 and 7 can be buried inevitably with a cover thickness of a predetermined size, and the grid-like method frame 1 having a predetermined size and strength can be formed very easily. You can do it.

【0033】即ち、この実施形態では、鉄筋架設材13
によって浮設される鉄筋3の法面Aからの高さ寸法を5
cmとし、かつ、上下の鉄筋3,7間の寸法が5cm以
上となるように、横線材11の鉄筋架設部11cによっ
て浮設される鉄筋7の法面Aからの高さ寸法を10cm
とし、そして、これらの鉄筋3,7の周囲がモルタル8
等によって所定厚みと所定幅(それぞれ5cm以上)で
囲まれるように、下端幅が30〜40cm程度で、高さ
が15〜18cm程度となる格子状法枠1を形成してい
るのである。
That is, in this embodiment, the reinforcing bar
Height of the reinforcing bar 3 suspended from the slope A is 5
cm, and the height from the side A of the reinforcing bar 7 to be suspended by the reinforcing bar erection portion 11c of the horizontal wire 11 is set to 10 cm so that the size between the upper and lower reinforcing bars 3 and 7 is 5 cm or more.
And the area around these reinforcing bars 3 and 7 is mortar 8
The grid-like method frame 1 having a lower end width of about 30 to 40 cm and a height of about 15 to 18 cm is formed so as to be surrounded by a predetermined thickness and a predetermined width (each 5 cm or more).

【0034】尚、上記実施形態では鉄筋架設材13の一
端側を、横線材11の一方の脚体11bに対して遊動可
能に係着させているが、図6、図7に示すように、この
鉄筋架設材13の一端側に係止部13bを形成し、これ
を、横線材11の長さ方向一方の縦線材12に着脱/遊
動自在に保持させると共に、鉄筋架設材13の他端側に
は、当該鉄筋架設材13を遊動させて横線材11の長さ
方向他方の縦線材12に係止させる係止部13bを形成
する構成としてもよい。
In the above-described embodiment, one end of the reinforcing bar erection member 13 is movably engaged with one leg 11b of the horizontal wire 11, but as shown in FIGS. An engaging portion 13b is formed at one end of the reinforcing bar material 13 and is detachably / movably held on one longitudinal wire 12 in the longitudinal direction of the horizontal wire 11, and the other end of the reinforcing steel material 13 is provided. Alternatively, a configuration may be adopted in which a locking portion 13b is formed to allow the rebar erection member 13 to move freely and to be locked to the other vertical wire 12 in the longitudinal direction of the horizontal wire 11.

【0035】このように、鉄筋架設材13を着脱/遊動
可能に係着させる構成にすれば、枠体4,5の形状を正
面視で末広がりの略M字状などにした場合に、鉄筋架設
材13を横線材11の脚体11b側に折り畳めば、枠体
4,5の重ね合わせ運搬面で好適であることは既述した
通りであるが、枠体4,5の形状がどうであれ、即ち、
枠体4,5が正面視で末広がりの形状であってもなくて
も、鉄筋架設材13を、枠体4,5の幅方向一方の脚体
11bと他方の脚体11bとにわたって固着したり、枠
体4,5の幅方向一方の脚体11bと他方の縦線材12
とにわたって固着したり、或いは、枠体4,5の幅方向
一方の縦線材12と他方の縦線材12とにわたって固着
したりして実施可能である。
As described above, if the reinforcing member installation material 13 is detachably / movably engaged, the frame members 4 and 5 can be erected in a substantially M-shape which is widened in a front view. As described above, if the material 13 is folded on the side of the leg 11b of the horizontal wire 11, it is suitable for the superimposed transport surface of the frames 4 and 5. That is,
Regardless of whether or not the frames 4 and 5 have a divergent shape in a front view, the reinforcing bar erection material 13 may be fixed across one leg 11b and the other leg 11b in the width direction of the frames 4 and 5. , One leg 11b in the width direction of the frames 4 and 5 and the other vertical wire 12
Or the first and second vertical wires 12 and 12 in the width direction of the frame members 4 and 5 can be fixed.

【0036】さらに、網状体2を法面Aに這わせるよう
に敷設するのでなく、図6に示すように、網状体2を持
ち上げて、これを結束線材17などによって当該鉄筋架
設材13の鉄筋架設部13cや鉄筋3に連結し、もっ
て、網状体2を浮設させたり、或いは、図7に示すよう
に、適宜のスペーサ22を用いて網状体2を浮設させる
などの変更が可能である。このスペーサ22としては、
例えば本願出願人に係る昭和63年意匠登録願第441
8号の「法面保護用ラススペーサー」や、本願出願人に
係る実公平5−42118号公報の「スペーサーピン」
が好適に実施可能である。
Further, instead of laying the net 2 so as to crawl on the slope A, as shown in FIG. 6, the net 2 is lifted and this is reinforced by the binding wire 17 or the like. By connecting to the erection portion 13c and the reinforcing bar 3, the net 2 can be floated, or as shown in FIG. 7, the net 2 can be floated by using an appropriate spacer 22. is there. As the spacer 22,
For example, the Design Application for Design Registration No. 441 of the present applicant
No. 8 “Laser spacer for slope protection” or “Spacer pin” of Japanese Utility Model Publication No. 5-42118 according to the present applicant.
Can be suitably implemented.

【0037】また、上記実施形態では、横線材11の一
対の脚体11b間に鉄筋架設部13cを備えた鉄筋架設
材13を設けているが、図8、図9に図示しているよう
に、横線材11の脚体11bにわたる方向に、正面視で
横線材11の左右両端から突き出すように鉄筋架設材1
3’を設け、この左右両端の突き出した鉄筋架設材1
3’と横線材11とによって2本の鉄筋3’,3’を載
架できるように構成してもよい。
Further, in the above-described embodiment, the reinforcing bar mounting member 13 having the reinforcing bar mounting portion 13c is provided between the pair of legs 11b of the horizontal wire 11 as shown in FIGS. 8 and 9. The reinforcing member 1 extends from the left and right ends of the horizontal wire 11 in a direction extending over the legs 11b of the horizontal wire 11 in a front view.
3 ′ is provided, and the left and right end protruding reinforcing bar
The structure may be such that two rebars 3 ′, 3 ′ can be mounted by 3 ′ and the horizontal wire 11.

【0038】なお、図8においては、鉄筋架設材13’
がほゞ直線状であるために、加工が簡単であるが、図9
のように、この鉄筋架設材13’を脚体11bとの接続
部分において上部に屈曲させることにより、前記鉄筋
3’,3’を安定して載架できる。またこれらの図にお
いて、図1〜5と同じ符号の部材は、同一または同等の
部材であるので、その詳細な説明を省略する。
In FIG. 8, the reinforcing steel erection material 13 'is shown.
Since the shape is almost straight, processing is easy.
As described above, the reinforcing bars 3 'and 3' can be stably mounted by bending the reinforcing bar erection material 13 'upward at the connection portion with the leg 11b. In these drawings, members having the same reference numerals as those in FIGS. 1 to 5 are the same or equivalent members, and thus detailed description thereof will be omitted.

【0039】この場合、枠体には鉄筋7に加えて2本の
鉄筋3’,3’を載架でき、合計3本の鉄筋を載架でき
ると共に、前記鉄筋架設材13’の端部を検測ピンとし
て用いることも可能となり、格子枠体の強度を上げると
共に、モルタル8等による鉄筋の被り厚が鉄筋3’,
3’,7のどの面からも5cm以上とすることができ
る。
In this case, two rebars 3 ', 3' can be mounted on the frame in addition to the rebar 7, so that a total of three rebars can be mounted. It can also be used as an inspection pin, increasing the strength of the grid frame and increasing the thickness of the reinforcing bar 3 ′,
The distance can be 5 cm or more from any of the surfaces 3 'and 7.

【0040】また、前記鉄筋架設材13’と脚体11b
との接続部分は溶接または結束線材による結束によって
接続可能であるが、この接続部分をU字フックにして、
この鉄筋架設材13’を縦線材12に係合するようにし
てもよい。さらに、前記鉄筋架設材13’の片方の係合
をループにして、この鉄筋架設材13’を脚体11bに
対して回動自在に設け、鉄筋架設材13’を折り畳み可
能にしてもよいことは言うまでもない。
Further, the reinforcing bar erection material 13 'and the leg 11b
Can be connected by welding or bundling with a binding wire, but this connection part is a U-shaped hook,
This reinforcing bar installation material 13 ′ may be engaged with the vertical wire 12. Further, one of the engagements of the reinforcing bar construction material 13 ′ may be formed as a loop, and the reinforcing bar construction material 13 ′ may be provided rotatably with respect to the leg 11 b so that the reinforcing bar construction material 13 ′ can be folded. Needless to say.

【0041】図1〜7のものでは、一対の脚体11b,
11bにわたる長さを有し、且つ、正面視において下方
に屈曲する形状を有し、その屈曲位置に鉄筋を所定の高
さ位置に持ち上げ保持させる鉄筋架設部13cを備えた
鉄筋架設材13を形成しているが、図10、図11に図
示しているように、この鉄筋架設材13を省略してもよ
い。この場合、上述した鉄筋3の浮設作業を省略でき、
施工がさらに容易になると共に、現行の土木基準で義務
付けられている品質管理基準に基づいて、モルタル8等
による鉄筋の被り厚が鉄筋のどの面からも5cm以上と
なるように寸法設定することは言うまでもない。なお、
同図において、図1〜5と同じ符号の部材は、同一また
は同等の部材であるので、その詳細な説明を省略する。
1 to 7, a pair of legs 11b,
11B, and has a shape that bends downward in a front view, and has a reinforcing bar erection member 13 having a reinforcing bar erection portion 13c at the bending position for lifting and holding a reinforcing bar at a predetermined height. However, as shown in FIGS. 10 and 11, the reinforcing bar erection material 13 may be omitted. In this case, the above-mentioned work of floating the reinforcing bar 3 can be omitted,
In addition to making the construction easier, based on the quality control standards required by the current civil engineering standards, it is not possible to set the dimensions so that the thickness of the rebar by mortar 8 etc. is 5 cm or more from any surface of the rebar. Needless to say. In addition,
In the drawing, members having the same reference numerals as those in FIGS. 1 to 5 are the same or equivalent members, and thus detailed description thereof will be omitted.

【0042】また、上記実施形態では、横枠体5の長さ
方向一側に傾斜端部を形成し、かつ、横枠体5の長さ方
向他側には延出部を形成したが、横枠体5の長さ方向の
両側を、共に傾斜端部に形成して、この横枠体5を上方
から縦枠体4,4間に挿入し、それぞれ横枠体5と縦枠
体4とを線材などで結束してもよい。
In the above-described embodiment, the inclined end is formed on one side in the length direction of the horizontal frame 5 and the extension is formed on the other side in the length direction of the horizontal frame 5. Both sides in the length direction of the horizontal frame 5 are formed at inclined end portions, and the horizontal frame 5 is inserted between the vertical frames 4 from above, and the horizontal frame 5 and the vertical frame 4, respectively. And may be bound with a wire or the like.

【0043】或いは横線材11として、一対の脚体11
b,11bを中間部11aの両側の角部分から垂直下方
に向けて延設させたものとすれば、枠体4,5の外形は
正面視で門型形状となることから、縦横の枠体4,5と
しては、側面視において単なる矩形状に形成すればよ
い。
Alternatively, as the horizontal wire 11, a pair of legs 11
If b and 11b extend vertically downward from the corners on both sides of the intermediate portion 11a, since the outer shapes of the frames 4 and 5 become gate-shaped in a front view, the vertical and horizontal frames are formed. 4 and 5 may be formed in a simple rectangular shape in a side view.

【0044】また、上記実施形態において前記鉄筋3,
7を両鉄筋架設部13c,11cに載架した状態で、当
該鉄筋3と鉄筋架設材13および/または鉄筋7と横線
材11とを線材等で結合一体化するようにしてもよく、
鉄筋3をアンカーピンなどによって法面Aに固定させる
こともできる。この場合、前記鉄筋3,7と両鉄筋架設
部13c,11cを結合したり、鉄筋3の設置を強固に
できるので、枠体4、5全体の強度を上げることができ
る。
In the above embodiment, the reinforcing bars 3
In a state in which the reinforcing member 7 is mounted on both the reinforcing bar erection portions 13c and 11c, the reinforcing bar 3 and the reinforcing bar erection member 13 and / or the reinforcing bar 7 and the horizontal wire 11 may be connected and integrated by a wire or the like.
The reinforcing bar 3 can be fixed to the slope A by an anchor pin or the like. In this case, since the reinforcing bars 3 and 7 can be connected to the reinforcing bars 3c and 11c and the reinforcing bars 3 can be firmly installed, the overall strength of the frames 4 and 5 can be increased.

【0045】さらに、上部側の鉄筋7に対して所定の被
り厚でモルタル8等を吹き付けるための指針となる検測
ピンを打設してもよく、そうすることによって、この検
測ピンを埋め込むように、前記モルタル8などを吹き付
けることにより前記上部側の鉄筋7に対する所定の被り
厚を確保することができる。
Further, a measuring pin serving as a guideline for spraying the mortar 8 or the like with a predetermined covering thickness on the upper reinforcing bar 7 may be provided, whereby the measuring pin is embedded. As described above, by spraying the mortar 8 or the like, a predetermined covering thickness for the reinforcing bar 7 on the upper side can be secured.

【0046】図12は、横線材11の形状が、その中間
部11aにおいて一つの凸部と二つの凹部を有する凹多
角形である本発明の別の実施形態を示す縦断面図であ
る。この図において図1〜図11に示すものと同じ符号
が付された部材は同一または同等の部材であるので、そ
の詳細な説明を省略する。つまり、同図において、横線
材11には、正面視で下方に屈曲する形状を隣接させて
ある中間部11aと、正面視で下方に屈曲する形状を隣
接させてある鉄筋架設材13が形成されている。すなわ
ち、中間部11aの2つの屈曲位置に所定の間隔を隔て
て2本の鉄筋7,7を設け、かつ、鉄筋架設材13の2
つの屈曲位置に、所定の間隔を隔てて2本の鉄筋3,3
を設けている。
FIG. 12 is a longitudinal sectional view showing another embodiment of the present invention in which the shape of the horizontal wire 11 is a concave polygon having one convex portion and two concave portions at the intermediate portion 11a. In this figure, members denoted by the same reference numerals as those shown in FIGS. 1 to 11 are the same or equivalent members, and thus detailed description thereof will be omitted. That is, in the same figure, the horizontal wire 11 is formed with an intermediate portion 11a adjacent to a shape bent downward in a front view and a reinforcing bar erected material 13 adjacent to a shape bent downward in a front view. ing. That is, two rebars 7, 7 are provided at two bending positions of the intermediate portion 11a at a predetermined interval, and two rebars 7
Two rebars 3, 3
Is provided.

【0047】11dは、前記横線材11の両端部に例え
ば外向きに折り曲げて形成された沈み防止部であり、前
記4本の鉄筋3,3、7,7を載架した状態でも、枠体
4,5は法面Aにめり込むことなく、前記鉄筋3,3、
7,7を規定の位置に保持できるように構成されてい
る。このように構成すると、枠体4,5内に4本の鉄筋
が挿入されるので、当該枠体4,5の強度を容易に上げ
ることができる。
Reference numeral 11d denotes an anti-sinking portion formed at both ends of the horizontal wire member 11 by, for example, bending outwardly. Even when the four rebars 3, 3, 7, 7 are placed on the frame member, a frame member 11d is provided. 4 and 5 do not sink into the slope A,
7, 7 can be held in a prescribed position. With this configuration, since four rebars are inserted into the frames 4, 5, the strength of the frames 4, 5 can be easily increased.

【0048】なお、沈み防止部11dは、外向きに折り
曲げることにより、枠体4,5の運搬時における重ね合
わせを容易にしているが、枠体4,5の長さ方向や内側
に折り曲げるなどの変更が可能である。
The anti-sunken part 11d is bent outward to facilitate the superposition of the frames 4 and 5 during transportation, but may be bent in the length direction of the frames 4 and 5 or inward. Can be changed.

【0049】また、図示は省略するが、前記横線材11
の中間部11aには1つの鉄筋架設部11c、鉄筋架設
材13には2つの鉄筋架設部13c,13cを形成し、
当該枠体4,5によって3本の鉄筋を載置するようにし
てもよく、逆に、横線材11の中間部11aには2つの
鉄筋架設部11c,11c、鉄筋架設材13には1つの
鉄筋架設部13cを形成してもよいことは言うまでもな
い。
Although not shown, the horizontal wire 11
In the intermediate portion 11a, one rebar erection portion 11c is formed, and in the rebar erection material 13, two rebar erection portions 13c, 13c are formed.
Three rebars may be placed by the frame members 4 and 5. Conversely, two rebar installation portions 11 c and 11 c are provided on the intermediate portion 11 a of the horizontal wire 11, and one rebar is provided on the rebar installation material 13. It goes without saying that the reinforcing bar erection part 13c may be formed.

【0050】図13は図12に示す実施形態の変形例で
あり、横線材11の形状が、その中間部11aにおいて
上部に突出した一つの凸部と二つの凹部を有する凹多角
形を構成している。すなわち、この変形例では横線材1
1の中間部11aにおいて上部に突出した一つの凸部1
1eを形成しているので、この枠体4,5の凸部11e
がモルタル等の吹き付け高さの目安とすることができ
る。従って、前記鉄筋架設部11c,11cの位置とこ
の凸部11eの位置を、所要強度の格子状法枠を得るた
めの品質管理基準に基づいて予め設定しておけば、検測
ピンのような部材が全く必要でなく、前記鉄筋3,3、
7,7を含めて、単に縦横の枠体4,5を埋め込むよう
にモルタル等を吹き付けるだけで、所定寸法の被り厚で
鉄筋を埋設した状態の所定寸法および強度を有する格子
状法枠を、熟練を要することなく誰にでも簡単に形成す
ることができる。
FIG. 13 shows a modification of the embodiment shown in FIG. 12, in which the shape of the horizontal wire 11 is a concave polygon having one convex portion and two concave portions projecting upward at an intermediate portion 11a. ing. That is, in this modification, the horizontal wire 1
One protruding portion 1 protruding upward in one intermediate portion 11a
1e, the projections 11e of the frame bodies 4 and 5 are formed.
Can be a measure of the spraying height of mortar or the like. Accordingly, if the positions of the reinforcing bars 11c, 11c and the positions of the protrusions 11e are set in advance based on a quality control standard for obtaining a lattice-shaped frame having a required strength, it can be used as a measuring pin. No members are required and the rebars 3,3,
By simply spraying mortar or the like so as to embed the vertical and horizontal frames 4 and 5 including 7 and 7, a grid-like method frame having a predetermined size and strength in a state where the reinforcing steel is buried with a predetermined thickness of covering is provided. It can be easily formed by anyone without skill.

【0051】さらに、法枠1の高さを低く抑えるために
は、図14にその断面図を示すように、前記鉄筋架設材
13および鉄筋3を省略して横線材11の中間部11a
に2つの鉄筋架設部11c,11cを設けて、当該鉄筋
架設部11c,11cに2本の鉄筋7を設ける形態とし
てもよいが、これら何れの形態にて法枠1を形成するに
しても、現行の土木基準で義務付けられている品質管理
基準に基づいて、モルタル8等による鉄筋の被り厚が鉄
筋7のどの面からも5cm以上となるように寸法設定す
ることは言うまでもない。
Further, in order to keep the height of the normal frame 1 low, as shown in a sectional view of FIG. 14, the reinforcing bar installation member 13 and the reinforcing bar 3 are omitted and the intermediate portion 11a of the horizontal wire 11 is omitted.
May be provided with two reinforcing bars 11c, 11c, and two reinforcing bars 7 may be provided on the reinforcing bars 11c, 11c. However, even if the legal frame 1 is formed in any of these forms, It goes without saying that, based on the quality control standards required by the current civil engineering standards, the dimensions are set so that the thickness of the reinforcing bar by the mortar 8 or the like is 5 cm or more from any surface of the reinforcing bar 7.

【0052】図15は図14に示す実施形態の変形例で
あり、この変形例では横線材11の中間部11aにおい
て上部に突出した一つの凸部11eを形成し、この凸部
11eの位置を、所要強度の格子状法枠を得るための品
質管理基準に基づいて予め設定しておけば、単に縦横の
枠体4,5を埋め込むようにモルタル等を吹き付けるだ
けで、所定寸法の被り厚で鉄筋を埋設した状態の所定寸
法および強度を有する格子状法枠を、熟練を要すること
なく誰にでも簡単に形成することができる。
FIG. 15 shows a modification of the embodiment shown in FIG. 14. In this modification, one convex part 11e projecting upward is formed in the middle part 11a of the horizontal wire 11, and the position of this convex part 11e is determined. If it is set in advance based on a quality control standard for obtaining a grid-shaped frame having a required strength, a mortar or the like is simply sprayed so as to embed the vertical and horizontal frames 4 and 5, and a covering thickness of a predetermined size is obtained. A grid-shaped method frame having a predetermined size and strength in a state in which a reinforcing bar is buried can be easily formed by anyone without requiring skill.

【0053】上記各実施形態においては、横線材の形状
として例えば一対の脚体を、正面視で下方に屈曲する形
状を有する中間部の両側の角部分から斜め下方に向けて
延設させたものについて説明しているが、本発明は当該
枠体の形状を制限するものではなく、枠体の形状は正面
視末広がりの略M字状だけでなく、下方に屈曲した中間
部の両側から垂直下方に向けて延設させた形状であって
もよい。また、前記横線材が、中間部において上部に突
出した一つの凸部と二つの凹部を有する凹多角形などの
形状であってもよく、さらに、図12,13に関連して
説明した内向きあるいは外向きの沈み防止部を図1〜図
11および図14,15等で示す他の実施形態において
も設けてもよいことはもとよりである。
In each of the above embodiments, for example, a pair of legs are formed obliquely downward from the corners on both sides of the intermediate portion having a shape bent downward in a front view as the shape of the horizontal wire. However, the present invention does not limit the shape of the frame body, and the shape of the frame body is not only a substantially M-shape diverging from the front but also vertically downward from both sides of the intermediate portion bent downward. It may be a shape extended toward. In addition, the horizontal wire may have a shape such as a concave polygon having one convex portion and two concave portions projecting upward at an intermediate portion, and furthermore, an inwardly facing shape described with reference to FIGS. Alternatively, the outward sink preventing portion may be provided in other embodiments shown in FIGS. 1 to 11 and FIGS.

【0054】[0054]

【発明の効果】以上説明したように、本発明にかゝる法
枠形成用の枠体およびその枠体を用いた法枠工法によれ
ば、枠体を所定のピッチで法面上に格子状に設置し、か
つ、枠体を構成する各横線材の、正面視で下方に屈曲す
る形状を有する中間部に設けた屈曲位置に形成された鉄
筋架設部に鉄筋を架設して、これらを埋め込むようにモ
ルタル等を吹き付けることで、法面上に所定の格子状法
枠が形成されるのであるが、このとき、前記鉄筋架設部
に架設される鉄筋は当該鉄筋架設部が下方に屈曲した横
線材または鉄筋架設材によって形成されているので、鉄
筋の自重によって架設位置が確定でき、取付工事が極め
て容易に行える。
As described above, according to the frame for forming the legal frame according to the present invention and the legal frame construction method using the frame, the frame is formed on the slope at a predetermined pitch. Installed in a shape, and, of each horizontal wire constituting the frame body, a reinforcing bar is erected on a reinforcing bar erection portion formed at a bending position provided at an intermediate portion having a shape bent downward in a front view, and these By spraying mortar or the like so as to embed, a predetermined lattice-shaped method frame is formed on the slope, but at this time, the reinforcing bar erected on the reinforcing bar erection portion is bent downward. Since it is formed of a horizontal wire or a reinforcing bar, the mounting position can be determined by the weight of the reinforcing bar, and the mounting work can be performed extremely easily.

【0055】加えて、枠体がモルタル等の吹き付け幅な
らびに吹き付け高さの目安になることから、枠体の高さ
寸法と幅寸法を、所要強度の格子状法枠を得るための品
質管理基準に基づいて予め設定しておけば、鉄筋を含め
て、単に縦横の枠体を埋め込むようにモルタル等を吹き
付けるだけで、所定寸法の被り厚で鉄筋を埋設した状態
の所定寸法および強度を有する格子状法枠を、熟練を要
することなく誰にでも簡単に形成することができる。
In addition, since the frame serves as a measure of the spraying width and the spraying height of the mortar or the like, the height and width of the frame are determined by quality control standards for obtaining a grid-like frame having the required strength. If it is set in advance based on the above, a grid having a predetermined size and strength in a state in which the reinforcing bar is buried with a covering thickness of a predetermined size by simply spraying mortar or the like so as to embed the vertical and horizontal frames including the reinforcing bar. The shape frame can be easily formed by anyone without skill.

【0056】また、前記横線材の中間部に2つの鉄筋架
設部を設けた場合には、前記横線材の中間部に横方向に
2本の鉄筋を架設することができ、前記格子状法枠の強
度を向上させることができる。
In the case where two reinforcing bars are provided in the middle of the horizontal wire, two reinforcing bars can be provided in the middle of the horizontal wire in a lateral direction. Can be improved in strength.

【0057】さらにまた、前記横線材の形状を、その中
間部において上部に突出した一つの凸部と二つの凹部を
有する凹多角形とすると、モルタル等の吹き付けるとき
には、この凸部を埋め込むようにモルタルを吹き付ける
だけで、鉄筋の上部における所定寸法の被り厚を確保で
き、極めて簡素な構造の枠体を用いて、容易にかつ確実
に所定寸法の被り厚で鉄筋を埋設する格子状法枠を形成
することができる。
Further, when the shape of the horizontal wire is a concave polygon having one convex portion and two concave portions projecting upward at an intermediate portion thereof, when the mortar or the like is sprayed, the convex portion is embedded. Just by spraying mortar, it is possible to secure the required thickness of the reinforcing bar at the upper part of the reinforcing bar, and use a frame with an extremely simple structure to easily and surely embed the reinforcing bar with the required thickness of the reinforcing bar. Can be formed.

【0058】そして、本発明による枠体を用いて形成さ
れた法枠は、その内部の所定位置に鉄筋が架設された枠
体が存することから、法枠強度のアップが達成される。
[0058] In the legal frame formed by using the frame according to the present invention, the strength of the legal frame is increased because a frame in which a reinforcing bar is erected is present at a predetermined position inside the legal frame.

【0059】しかも、枠体をモルタル等の吹き付けの目
安にすることができることから、所定寸法通りの強度を
有する格子状法枠を形成することができる。つまり、枠
体の高さ寸法と幅寸法を、所要強度の格子状法枠を得る
ための品質管理基準に基づいて予め設定しておけば、鉄
筋を含めて、単に縦横の枠体を埋め込むようにモルタル
等を吹き付けるだけで、所定寸法の被り厚で鉄筋を埋設
した状態の所定寸法および強度を有する格子状法枠を、
熟練を要することなく誰にでも簡単に形成することがで
きる。
Moreover, since the frame body can be used as a guide for spraying mortar or the like, a grid-like method frame having the strength as specified dimensions can be formed. That is, if the height and width dimensions of the frame are set in advance based on quality control standards for obtaining a grid-like frame with the required strength, it is possible to simply embed the vertical and horizontal frames, including the reinforcing bars. Just by spraying mortar, etc., a grid-shaped method frame with a predetermined size and strength in a state where the rebar is buried with a cover thickness of a predetermined size,
It can be easily formed by anyone without skill.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施形態に係る工法によって法面に
形成される格子状法枠の形成途中の状態を示す斜視図で
ある。
FIG. 1 is a perspective view showing a state in the middle of forming a grid-like method frame formed on a slope by a method according to an embodiment of the present invention.

【図2】前記法枠を形成する枠体の一部を省略図示した
斜視図である。
FIG. 2 is a perspective view in which a part of a frame forming the normal frame is omitted and illustrated.

【図3】前記枠体に鉄筋を載架した状態を示す斜視図で
ある。
FIG. 3 is a perspective view showing a state where a reinforcing bar is mounted on the frame.

【図4】前記法枠の一部を破断した部分斜視図である。FIG. 4 is a partial perspective view in which a part of the legal frame is broken.

【図5】前記法枠の縦断面図である。FIG. 5 is a longitudinal sectional view of the legal frame.

【図6】枠体の変形例を示す法枠の縦断面図である。FIG. 6 is a vertical sectional view of a normal frame showing a modification of the frame.

【図7】網状体をスペーサによって浮設させた法枠の縦
断面図である。
FIG. 7 is a vertical cross-sectional view of a legal frame in which a mesh body is floated by spacers.

【図8】鉄筋架設材の変形例を示す法枠の縦断面図であ
る。
FIG. 8 is a vertical cross-sectional view of a legal frame showing a modified example of a reinforcing bar installation material.

【図9】鉄筋架設材の別の変形例を示す法枠の縦断面図
である。
FIG. 9 is a longitudinal sectional view of a legal frame showing another modification of the reinforcing bar erection material.

【図10】本発明に係る別実施形態の法枠の一部を破断
した部分斜視図である。
FIG. 10 is a partial perspective view in which a part of a legal frame of another embodiment according to the present invention is broken.

【図11】前記法枠の縦断面図である。FIG. 11 is a longitudinal sectional view of the legal frame.

【図12】本発明のまた別の実施形態に係る法枠を示す
縦断面図である。
FIG. 12 is a longitudinal sectional view showing a legal frame according to another embodiment of the present invention.

【図13】前記法枠の変形例を示す縦断面図である。FIG. 13 is a longitudinal sectional view showing a modification of the legal frame.

【図14】本発明のさらに異なる別実施形態を示す法枠
の縦断面図である。
FIG. 14 is a vertical sectional view of a legal frame showing still another embodiment of the present invention.

【図15】前記法枠の変形例を示す縦断面図である。FIG. 15 is a longitudinal sectional view showing a modification of the legal frame.

【符号の説明】[Explanation of symbols]

1…法枠、7…鉄筋、4,5…枠体、8…コンクリート
またはモルタル、11…横線材、11a…中間部、11
b…脚体、11c…中間部に形成された鉄筋架設部、1
2…縦線材、A…法面。
DESCRIPTION OF SYMBOLS 1 ... Legal frame, 7 ... Rebar, 4, 5 ... Frame, 8 ... Concrete or mortar, 11 ... Horizontal wire, 11a ... Middle part, 11
b ... leg, 11c ... reinforcement erection part formed in the middle part, 1
2: Vertical wire, A: Slope.

───────────────────────────────────────────────────── フロントページの続き 審査官 吉村 和彦 (56)参考文献 特開 昭57−224(JP,A) (58)調査した分野(Int.Cl.7,DB名) E02D 17/20 104 ──────────────────────────────────────────────────続 き Continuing from the front page Examiner Kazuhiko Yoshimura (56) References JP-A-57-224 (JP, A) (58) Fields investigated (Int. Cl. 7 , DB name) E02D 17/20 104

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 法面上に格子状に設置され且つモルタル
またはコンクリートが吹き付けられて法枠を形成するた
めに、モルタルまたはコンクリートの吹き付け幅および
吹き付け高さの目安となる枠体であって、正面視で下方
に屈曲する形状を有し、その屈曲位置に、鉄筋を所定の
高さ位置に持ち上げ保持させ、かつ鉄筋の架設位置をそ
の自重によって確定する鉄筋架設部が形成される中間
部、この中間部の両側の角部分から下方に向けて延設さ
れた一対の脚体を備えた複数の横線材と、この横線材の
脚体どうしを互いに連結するよう上下複数段配置された
縦線材とから成ると共に、前記角部分が、前記鉄筋架設
部よりも高い位置に配置されていることを特徴とする法
枠形成用の枠体。
1. A frame body which is installed in a grid pattern on a slope and which is used as a measure of a spray width and a spray height of mortar or concrete to be sprayed with mortar or concrete to form a legal frame, An intermediate portion having a shape that bends downward in a front view, at the bending position, the reinforcing bar is lifted to a predetermined height position and held, and a reinforcing bar erection portion for determining the erection position of the reinforcing bar by its own weight is formed. A plurality of horizontal wires having a pair of legs extending downward from the corners on both sides of the intermediate portion; and vertical wires arranged in a plurality of upper and lower stages so as to connect the legs of the horizontal wires to each other And the corner portion is disposed at a position higher than the reinforcing bar erection portion.
【請求項2】 前記中間部に形成される鉄筋架設部は2
つであることを特徴とする請求項1に記載された法枠形
成用の枠体。
2. The reinforcing bar erection part formed in the intermediate part is 2
The frame for forming a legal frame according to claim 1, wherein:
【請求項3】 前記横線材の形状が、その中間部におい
て上部に突出し、モルタル等の吹き付け高さの目安とな
る一つの凸部と二つの凹部を有する凹多角形である請求
項2に記載された法枠形成用の枠体。
3. The shape of the horizontal wire material according to claim 2, wherein the shape of the horizontal wire material is a concave polygon having one convex portion and two concave portions projecting upward at an intermediate portion thereof and serving as a measure of a spraying height of mortar or the like. Frame for forming a legal frame.
【請求項4】 前記請求項1〜3のいずれかに記載の枠
体を用いる法枠工法であって、モルタルまたはコンクリ
ートの吹き付け幅および吹き付け高さの目安となる当該
枠体を法面上に格子状に設置するとともに、前記横線材
の前記鉄筋架設部に鉄筋を架設し、その後この鉄筋を含
めて前記枠体を埋め込むようにモルタルまたはコンクリ
ートを吹き付けて格子状の法枠を形成することを特徴と
する法枠工法。
4. A method for constructing a frame using the frame according to any one of claims 1 to 3, wherein the frame serving as a measure of the spray width and spray height of mortar or concrete is placed on the slope. While installing in a grid, a reinforcing bar is erected on the reinforcing bar erection portion of the horizontal wire, and thereafter, mortar or concrete is sprayed so as to embed the frame including the reinforcing bar to form a grid-shaped normal frame. Characteristic construction method.
JP11514297A 1997-04-16 1997-04-16 Frame for forming legal frame and legal frame method using this frame Expired - Fee Related JP3335103B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11514297A JP3335103B2 (en) 1997-04-16 1997-04-16 Frame for forming legal frame and legal frame method using this frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11514297A JP3335103B2 (en) 1997-04-16 1997-04-16 Frame for forming legal frame and legal frame method using this frame

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP6186598A Division JP2694332B2 (en) 1994-07-16 1994-07-16 Frame for forming legal frame and legal frame method using this frame

Publications (2)

Publication Number Publication Date
JPH1046595A JPH1046595A (en) 1998-02-17
JP3335103B2 true JP3335103B2 (en) 2002-10-15

Family

ID=14655346

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11514297A Expired - Fee Related JP3335103B2 (en) 1997-04-16 1997-04-16 Frame for forming legal frame and legal frame method using this frame

Country Status (1)

Country Link
JP (1) JP3335103B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3170487B2 (en) * 1998-11-30 2001-05-28 日本植生株式会社 Frame body for forming legal frame

Also Published As

Publication number Publication date
JPH1046595A (en) 1998-02-17

Similar Documents

Publication Publication Date Title
JP3335103B2 (en) Frame for forming legal frame and legal frame method using this frame
JP3527059B2 (en) Inspection frame for forming legal frame and legal frame construction method using it
JP2694332B2 (en) Frame for forming legal frame and legal frame method using this frame
JP2748259B2 (en) Frame for forming legal frame and legal method using the frame
JP2627264B2 (en) Frame for forming legal frame and legal method using the frame
JP3008623U (en) Frame for forming legal frame
JP3008144U (en) Inspection frame for forming a legal frame with a reinforcing bar holding member
JP3443275B2 (en) Inspection frame for forming legal frame and legal frame method using it
JP2855263B2 (en) A frame for forming a legal frame and a legal frame method using the same
JP3014435U (en) Frame for forming legal frame
JP2694327B2 (en) Cast-in-place method
JP2694326B2 (en) Cast-in-place method
JP3061358B2 (en) Cast-in-place method
JP3119291B2 (en) Construction method of cast-in-place frame
JP2694331B2 (en) Inspection frame for legal frame formation and legal frame construction method using it
JP2573157B2 (en) Leg frame method and gauge formwork used in the method
JP3658060B2 (en) Inspection frame for on-site casting frame formation
JP3527058B2 (en) Inspection frame for forming legal frame and legal frame construction method using it
JP2694330B2 (en) Inspection frame for legal frame formation and legal frame construction method using it
JP3332309B2 (en) Cast-in-place method
JP3451055B2 (en) Horizontal frame for forming a legal frame
JP3008215U (en) Inspection frame for forming a legal frame provided with a reinforcing bar holding member
JP2627879B2 (en) Cast-in-place method
JP3025094U (en) Frame for forming legal frame
JP2627877B2 (en) Cast-in-place method

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20070802

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080802

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090802

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090802

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100802

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110802

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110802

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120802

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130802

Year of fee payment: 11

LAPS Cancellation because of no payment of annual fees