JP3251262B2 - PC board mounting method and mounting structure - Google Patents

PC board mounting method and mounting structure

Info

Publication number
JP3251262B2
JP3251262B2 JP13824899A JP13824899A JP3251262B2 JP 3251262 B2 JP3251262 B2 JP 3251262B2 JP 13824899 A JP13824899 A JP 13824899A JP 13824899 A JP13824899 A JP 13824899A JP 3251262 B2 JP3251262 B2 JP 3251262B2
Authority
JP
Japan
Prior art keywords
board
fastener
concrete
skeleton
fixing bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP13824899A
Other languages
Japanese (ja)
Other versions
JP2000328701A (en
Inventor
岸  正弘
博 増川
美亀雄 小林
新之輔 相場
秀機 池田
博行 鈴木
卓郎 矢口
賢一 河野
計一 鹿児島
敏男 井田
保 武村
晴義 岡本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP13824899A priority Critical patent/JP3251262B2/en
Publication of JP2000328701A publication Critical patent/JP2000328701A/en
Application granted granted Critical
Publication of JP3251262B2 publication Critical patent/JP3251262B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、構造物外壁に配設
するプレキャストコンクリートのパネル板(以下PC板
という)を用いたカーテンウォールの取付け方法および
取付け構造に関し、特に鉄筋コンクリート構造の躯体に
対するPC板の取付け方法および取付け構造に関するも
のである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method and a structure for mounting a curtain wall using a precast concrete panel plate (hereinafter referred to as a "PC plate") disposed on an outer wall of a structure, and particularly to a PC plate for a reinforced concrete structure. And a mounting structure.

【0002】[0002]

【従来の技術】鉄骨構造(S構造)の建築物の外壁を構
成するPC板の取付け構造が従来より各種提案されてい
る(例えば実公昭54−5533号公報、実公昭54−
20806号公報、実公昭59−20491号公報
等)。このような従来の鉄骨構造に対するPC板の取付
け構造は、ラーメン構造の建物躯体を構成するH型鋼材
等の鉄骨材の上面に躯体付け金物を溶接により接合し、
この躯体付け金物から位置決めボルトを突出させ、この
位置決めボルトに対し、PC板側に埋設した取付け部材
を嵌め込んで上下方向のレベル(高さ)および壁面に直
角方向の出入り調整を行ってPC板を躯体側に取付けて
いた。
2. Description of the Related Art Various types of mounting structures for a PC board constituting an outer wall of a building having a steel structure (S structure) have conventionally been proposed (for example, Japanese Utility Model Publication No. 54-5533, Japanese Utility Model Publication No. 54-54).
No. 20806, Japanese Utility Model Publication No. 59-20490, etc.). In such a conventional mounting structure of a PC board to a steel frame structure, a frame-attached metal body is welded to an upper surface of a steel frame material such as an H-shaped steel material constituting a building frame having a rigid frame structure,
The positioning bolts are projected from the metal fittings, and a mounting member buried in the PC board is fitted into the positioning bolts to adjust the level (height) in the vertical direction and the direction perpendicular to the wall surface to adjust the PC board. Was attached to the skeleton side.

【0003】このようなPC板は、地震等による層間変
位に追従するため、スウェイ方式あるいはロッキング方
式により、PC板の下部あるいは上部の取付け部材をど
ちらかを固定し固定していないほうをスライドさせたり
(スウェイ方式)、PC板の上端または下端を上方向自
由の鉛直支持としてもう一方の端部を上下連動させてP
C板を回動させること(ロッキング方式)により、PC
板に加わる応力を逃している。
In such a PC board, in order to follow the interlayer displacement due to an earthquake or the like, either the lower or upper mounting member of the PC board is fixed and the unfixed one is slid by a sway method or a locking method. (Sway method), the upper or lower end of the PC board is vertically supported freely upward, and the other end is linked vertically.
By rotating C plate (locking method), PC
The stress applied to the plate has been released.

【0004】一方、鉄筋コンクリート構造(RC構造ま
たはSRC構造)の建物においてもPC板によるカーテ
ンウォール構造が用いられる。この場合、各PC板の取
付け構造は、S構造に対するものと同様であり、躯体側
コンクリートに予め支持金物を埋設し、この躯体付け支
持金物にPC板を取付け、その後PC板と躯体側コンク
リート間に生じた隙間に塞ぎ材を充填するものである。
On the other hand, a curtain wall structure using a PC board is also used in a building having a reinforced concrete structure (RC structure or SRC structure). In this case, the mounting structure of each PC board is the same as that for the S structure. A support metal is buried in the skeleton-side concrete in advance, and the PC board is mounted on the skeleton-supporting metal support. The filling material is filled in the gaps generated in the step (c).

【0005】図17は、従来の鉄筋コンクリート構造の
躯体に対するPC板取付け構造の要部縦断面図であり、
図18はそのA−A方向から見た立面図である。建物各
階の梁またはスラブを構成する鉄筋コンクリート構造の
躯体コンクリート1a(鉄筋は図示省略)の端部に、躯
体側から外面を露出させてアングル鋼材からなる第1の
躯体付け支持金物2が埋設される。この第1の躯体付け
支持金物2は、これに溶接された埋め込み筋3を介して
躯体コンクリート1aに固着されて一体化される。第1
の躯体付け支持金物2には位置決め用ボルト4が固着さ
れる。このボルト4に対し、PC板5aの上端部に設け
たアングル鋼材からなる取付け片7に設けたルーズ孔7
bを挿通させ出入り方向の位置決めをしてナット9で固
定する。この取付け片7は上下方向に長い長孔7aを通
してアンカーボルト6を介してPC板5aに対しナット
8により固定される。
FIG. 17 is a longitudinal sectional view of a main part of a conventional PC board mounting structure for a reinforced concrete structure body.
FIG. 18 is an elevation view as viewed from the AA direction. At the end of a skeleton concrete 1a (rebar is not shown) of a reinforced concrete structure constituting a beam or a slab of each floor of the building, a first skeleton-supporting metal fitting 2 made of an angle steel material with its outer surface exposed from the skeleton side is buried. . The first skeleton-attached support metal 2 is fixed to and integrated with the skeleton concrete 1a via the embedding bar 3 welded thereto. First
A positioning bolt 4 is fixed to the supporting member 2 with a frame. A loose hole 7 provided in a mounting piece 7 made of an angle steel material provided at an upper end portion of the PC plate 5a is formed in the bolt 4.
b is inserted and positioned in the in-out direction and fixed with the nut 9. The mounting piece 7 is fixed to the PC board 5a by an nut 8 via an anchor bolt 6 through a vertically long slot 7a.

【0006】躯体コンクリート1aには、前述のPC板
5aの上端部を保持する第1の躯体付け支持金物2に隣
接して別体の第2の躯体付け支持金物10が同様に埋設
される。この第2の躯体付け支持金物10は、上階のP
C板5bの重量を支持するものである。この第2の躯体
付け支持金物10上に台座金物12および突棒11が固
着される。突棒11に嵌め込まれる孔を有する各種厚さ
の積層板13を重ねて高さの調整が行われる。この積層
板13上に、PC板側に埋設された支持金物102が搭
載され、この支持金物102を介して上階のPC板5b
の重量が支持される。この支持金物102は、支持アン
グル15と、これに溶接され一体化された埋め込み材1
4により構成される。埋め込み材14の部分がPC板5
bの下端部に埋め込まれる。上階のPC板5bの上端部
には下階のPC板5aと同様にPC板保持用の取付け片
7が固定され、前述と同様に上階の第1の躯体付け支持
金物2を介して上階の躯体コンクリート1bに取付けら
れる。
In the skeleton concrete 1a, a separate second skeleton supporting metal member 10 is similarly buried adjacent to the first skeleton supporting metal member 2 holding the upper end of the PC board 5a. The second frame-attached support hardware 10 is provided on the upper floor P
It supports the weight of the C plate 5b. The pedestal fitting 12 and the protruding bar 11 are fixed on the second framed support fitting 10. Height adjustment is performed by stacking laminated plates 13 of various thicknesses having holes to be fitted into the protruding rods 11. A support metal 102 buried on the PC board side is mounted on the laminated board 13, and the PC board 5 b on the upper floor is mounted via the support metal 102.
Weight is supported. The metal support 102 is made up of a support angle 15 and an embedded material 1 welded to and integrated with the support angle 15.
4. The part of the embedding material 14 is the PC board 5
embedded in the lower end of b. A mounting piece 7 for holding the PC board is fixed to the upper end of the PC board 5b on the upper floor in the same manner as the PC board 5a on the lower floor. It is attached to the skeleton concrete 1b on the upper floor.

【0007】各階の躯体コンクリート1a,1bとPC
板5a,5bの間に形成された隙間には、上下階間での
漏水や漏音の防止および防災のために耐火材からなる塞
ぎ材16が充填される。
[0007] Frame concrete 1a, 1b and PC on each floor
A gap formed between the plates 5a and 5b is filled with a blocking material 16 made of a refractory material for preventing water leakage and sound leakage between upper and lower floors and for disaster prevention.

【0008】このような構造のPC板カーテンウォール
を施工する場合、従来は、各階の躯体コンクリートを打
設して躯体付け支持金物等の躯体側の固定金具を埋設し
て硬化した後、この躯体コンクリートにPC板を取付け
ていた。すなわち、従来のPC板の取付け方法では、躯
体のコンクリート打ち作業を先行させて各階の梁やスラ
ブを下階から順番に形成し、これに遅れてコンクリート
が硬化した後に3層またはそれ以上下階の外壁にPC板
を順番に取付けていた。
In the case of constructing a PC board curtain wall having such a structure, conventionally, a slab concrete of each floor is cast, a fixing fixture on the skeletal side such as a skeletal support metal is buried and hardened. A PC board was attached to concrete. That is, in the conventional method of mounting a PC board, beams and slabs of each floor are formed in order from the lower floor in advance of the concrete pouring work of the skeleton, and after the concrete hardens later, three or more lower layers are formed. PC boards were sequentially mounted on the outer wall of the PC.

【0009】[0009]

【発明が解決しようとする課題】しかしながら、従来の
躯体コンクリート打設工事を先行させて梁やスラブを形
成し、その後からPC板を取付ける施工方法では、PC
板取付け作業に先行してPC板取付け階の上階部分まで
コンクリート打ち作業のための足場を組み立てる必要が
あり、PC板取付け作業時にはこの足場と躯体コンクリ
ート間の狭い隙間を通してPC板を取付けなければなら
ず作業性が悪かった。
However, in the construction method in which beams and slabs are formed in advance of the conventional framing concrete casting work, and then a PC board is attached,
Prior to the board mounting work, it is necessary to assemble a scaffold for concrete casting up to the upper floor of the PC board mounting floor. At the time of PC board mounting work, the PC board must be mounted through a narrow gap between this scaffold and the concrete of the frame. The workability was bad.

【0010】また、PC板取付け後に塞ぎ材を装着する
際、PC板と躯体コンクリートとの間の隙間幅が型枠自
体やその設置精度等のばらつきにより一定とならないた
め、塞ぎ材により隙間を完全に密封することが難しく、
上下階の間で音が大きく伝わったり漏水の面で問題とな
ることがあった。
In addition, when the plugging material is attached after the PC board is mounted, the gap width between the PC plate and the skeleton concrete is not constant due to variations in the formwork itself and its installation accuracy. Difficult to seal in
There was a case where the sound was transmitted loudly between the upper and lower floors and there was a problem in terms of water leakage.

【0011】また、コンクリートが完全に硬化してから
下階のPC板を取付けなければならないため、工期が長
期化していた。
In addition, since the PC board on the lower floor must be attached after the concrete has completely hardened, the construction period has been prolonged.

【0012】本発明は上記従来技術を考慮したものであ
って、施工性を向上させ工期の短縮を図るとともに、P
C板と躯体側との間に塞ぎ材を完全に充填可能とするP
C板取付け方法およびこのようなPC板取付け方法によ
るPC板取付け構造の提供を目的とする。
The present invention has been made in consideration of the above-mentioned prior art, and aims to improve workability and shorten the construction period,
P that allows filling material to be completely filled between the C plate and the frame side
It is an object of the present invention to provide a C board mounting method and a PC board mounting structure using such a PC board mounting method.

【0013】[0013]

【課題を解決するための手段】前記目的を達成するた
め、本発明では、PC板に予めPCファスナーを埋設
し、このPCファスナーを受けてPC板を躯体側に固定
する固定金具を躯体コンクリートに埋設し、PC板と躯
体との間に塞ぎ材を装着した鉄筋コンクリート構造物へ
のPC板取付け方法において、前記固定金具を躯体側に
埋設する前にこの固定金具を前記PCファスナーに仮固
定し、このPC板を前記塞ぎ材とともに躯体側に仮保持
し、この仮保持状態でコンクリートを打設して前記固定
金具をコンクリートに埋設することを特徴とするPC板
取付け方法を提供する。
In order to achieve the above object, according to the present invention, a PC fastener is embedded in a PC board in advance, and a fixture for receiving the PC fastener and fixing the PC board to the body side is formed on the body concrete. In the method of attaching a PC board to a reinforced concrete structure which is buried and a sealing material is mounted between the PC board and the skeleton, the fixing metal is temporarily fixed to the PC fastener before the fixing metal is buried in the skeleton, A method of mounting a PC board, comprising temporarily holding the PC board together with the closing material on the skeleton side, casting concrete in the temporarily held state, and embedding the fixing fitting in the concrete.

【0014】この構成によれば、PC板側に固定したP
Cファスナーに躯体付け用の固定金具を仮止めした状態
でコンクリート打設とPC板取付けを同時に行うため、
コンクリート打設用の足場を利用してPC板取付け作業
を下階側から同時に進行させることができ、PC板の取
付け作業が効率よく行われ現場での作業性が向上する。
また、固定金具をコンクリートに埋設する前にPCファ
スナーに取付けるため、従来のようにコンクリートに固
定された固定金具に対するPCファスナーの位置合せが
不要になり、PC板の位置調整作業が簡素化する。
According to this structure, the P fixed to the PC board side
In order to perform concrete placement and PC board mounting simultaneously with the fixing fasteners for attaching the frame to the C fastener temporarily,
The PC board mounting work can be simultaneously advanced from the lower floor side using the concrete scaffolding scaffold, so that the PC board mounting work is performed efficiently and workability at the site is improved.
In addition, since the fixing bracket is attached to the PC fastener before being embedded in the concrete, the positioning of the PC fastener with respect to the fixing bracket fixed to concrete as in the related art becomes unnecessary, and the work of adjusting the position of the PC board is simplified.

【0015】また、塞ぎ材をPC板と躯体の間に装着し
た状態でコンクリートを流し込むため、硬化後の躯体コ
ンクリートとPC板間は塞ぎ材により完全に密封され
る。したがって、従来の場合のようにコンクリート硬化
後にPC板を取付け、このPC板との間の隙間に塞ぎ材
を詰込む方法と異なり、塞ぎ不良による音漏れや漏水等
の問題を生じることがなくなる。
Further, since concrete is poured in a state in which the plugging material is mounted between the PC board and the skeleton, the space between the hardened concrete concrete and the PC plate is completely sealed by the plugging material. Therefore, unlike the conventional method in which the PC board is attached after the concrete is hardened and the blocking material is filled in the gap between the PC board and the PC board, problems such as sound leakage and water leakage due to poor blocking will not occur.

【0016】また、従来のように上階のコンクリートの
硬化を待つことなく各階ごとにPC板の取付け作業とコ
ンクリート打ちとを同時に進行させることができるた
め、工期の短縮が図られる。
In addition, since the work of mounting the PC board and the concrete driving can be simultaneously performed for each floor without waiting for the hardening of the concrete on the upper floor unlike the related art, the construction period can be shortened.

【0017】好ましい構成例では、前記PCファスナー
はPC板の上端部に埋設され、PC板の下端部に仮設支
持部材を設け、この仮設支持部材を介してこのPC板の
自重を床側の躯体コンクリートに支持し、この状態で天
井側の躯体にコンクリートを打設してPC板上端部を躯
体側に固定し、その後、前記仮設支持部材を取外してP
C板の自重をその上端部のPCファスナーを介して躯体
側に支持させることを特徴としている。
In a preferred configuration example, the PC fastener is embedded in an upper end of the PC board, and a temporary support member is provided at a lower end of the PC board, and the weight of the PC board is reduced by the temporary support member via the floor side frame. In this state, concrete is poured into the skeleton on the ceiling side to fix the upper end portion of the PC board to the skeleton side.
It is characterized in that the weight of the C plate is supported on the skeleton side via a PC fastener at the upper end thereof.

【0018】この構成によれば、PC板の上端部側の躯
体コンクリートが硬化するまでの仮設時に、既に硬化し
ているPC板の下端部側の躯体コンクリートに仮設支持
部材を介してPC板の自重を支持し、上端部側の躯体コ
ンクリートが硬化した後、下端部側の仮設支持部材が取
外されPC板の自重がPCファスナーおよび固定部材を
介して上端部側の躯体コンクリートに支持される。これ
により、下階側から順次PC板取付けと躯体コンクリー
ト打ちとを同時に進行させながら建物を構築できる。
According to this configuration, at the time of temporary setting until the concrete at the upper end side of the PC board is hardened, the concrete at the lower end side of the already hardened PC board is connected to the concrete of the PC board via the temporary support member. After supporting the own weight and hardening the concrete at the upper end, the temporary support member at the lower end is removed and the own weight of the PC board is supported by the concrete at the upper end via the PC fastener and the fixing member. . As a result, the building can be constructed while the PC board mounting and the slab concrete driving are simultaneously advanced sequentially from the lower floor side.

【0019】さらに好ましい構成例では、前記仮設支持
部材は、レベル調整ボルトを有し、このレベル調整ボル
トによりPC板の高さ調整を行うことを特徴としてい
る。
In a further preferred configuration, the temporary support member has a level adjusting bolt, and the height of the PC board is adjusted by the level adjusting bolt.

【0020】この構成によれば、仮設時に従来のように
積層板の積み重ねによることなく、ボルトの調整により
容易にPC板の高さ調整を行うことができる。
According to this configuration, the height of the PC board can be easily adjusted by adjusting the bolts without temporarily stacking the laminated boards at the time of temporary installation.

【0021】さらに好ましい構成例では、PC板の前記
仮保持状態において、前記塞ぎ材によりコンクリートの
型枠の一部を構成することを特徴としている。
In a further preferred configuration example, in the temporary holding state of the PC board, a part of a concrete formwork is constituted by the closing material.

【0022】この構成によれば、塞ぎ材をコンクリート
の型枠の一部としてPC板と躯体の間に装着した状態で
コンクリートを流し込むため、硬化後の躯体コンクリー
トとPC板間は塞ぎ材により完全に密封される。
According to this structure, since the concrete is poured in a state where the plugging material is attached between the PC board and the skeleton as a part of the concrete formwork, the space between the hardened concrete concrete and the PC plate is completely formed by the plugging material. Sealed.

【0023】さらに好ましい構成例では、前記PCファ
スナーの上部に、上階側のPC板の下端部に係合して上
階側のPC板の出入り方向の位置決めを行うための出入
り調整手段を設けたことを特徴としている。
In a further preferred configuration example, an access control means for engaging the lower end of the PC board on the upper floor and positioning the PC board on the upper floor in the entry / exit direction is provided on the upper portion of the PC fastener. It is characterized by that.

【0024】この構成によれば、下階側から順次躯体コ
ンクリート打ちと同時進行でPC板を取付ける場合に、
既に硬化した下階側の躯体コンクリートに固定された下
階側のPC板上端部のPCファスナーを介して、その上
側に仮保持したPC板の出入り方向の位置調整が容易に
効率的に行われる。
According to this configuration, when the PC board is to be mounted sequentially from the lower floor and simultaneously with the slab concrete driving,
Via the PC fastener at the upper end of the lower floor PC board fixed to the already hardened lower floor frame concrete, the position adjustment of the PC board temporarily held on the upper side of the lower floor PC board can be easily and efficiently performed. .

【0025】さらに好ましい構成例では、前記出入り調
整手段として、前記PCファスナーに上端が開口した凹
部を形成し、この凹部に、上階側のPC板下端部に埋設
したアンカーに螺合する引きボルトを挿入し、前記PC
ファスナーに、上階側のPC板下端部表面に当接する押
しボルトを装着したことを特徴としている。
In a further preferred configuration example, as the access control means, a recess having an open upper end is formed in the PC fastener, and a pull bolt which is screwed into an anchor embedded in the lower end of the PC board on the upper floor side is formed in the recess. Insert the PC
The fastener is provided with a push bolt which is in contact with the lower surface of the PC board on the upper floor side.

【0026】この構成によれば、PCファスナー上端部
の凹部に引きボルトが挿入され、この引きボルトの調整
により上階側PC板下端部のアンカーを介して上階側P
C板の躯体側に引張って位置を調整し、さらにPCファ
スナーに設けた押しボルトの調整により上階側PC板下
端部表面を押圧して躯体側から押出して位置を調整する
ことにより、出入り方向の位置決めができる。この場
合、上階PC板のアンカーに結合される引きボルトはP
Cファスナーの凹部にその上端開口部から挿入され上下
方向に移動可能であり、押しボルトはPC板表面に当接
して上下に移動可能である。したがって、PC板の自重
をその上端部のPCファスナーで支持した場合、下端部
側は上下に自由にロッキング動作が可能になる。
According to this configuration, the pull bolt is inserted into the recess at the upper end of the PC fastener, and the adjustment of the pull bolt causes the upper floor P to be inserted through the anchor at the lower end of the upper PC board.
Pull the C board to the skeleton side to adjust the position, and adjust the position by pushing the lower end surface of the PC board on the upper floor side by adjusting the push bolt provided on the PC fastener and adjusting the position by pushing out from the skeleton side. Can be positioned. In this case, the pull bolt connected to the anchor of the upper floor PC board is P
It is inserted into the concave portion of the C fastener from its upper end opening and is movable up and down, and the push bolt abuts on the PC board surface and is movable up and down. Therefore, when the own weight of the PC board is supported by the PC fastener at the upper end thereof, the lower end side can freely rock vertically.

【0027】さらに好ましい構成例では、前記固定金具
は、その上面にPCファスナーを係止するための係止突
起を有し、前記PCファスナーは、前記係止突起に嵌合
する孔を有し、前記係止突起はその上端部にネジ部を有
し、この係止突起にPCファスナーの孔を嵌合させて前
記係止突起上端部のネジ部に仮設ナットを螺合させるこ
とにより前記固定金具を前記PCファスナーに仮固定す
ることを特徴としている。
In a further preferred configuration, the fixing bracket has a locking projection for locking a PC fastener on an upper surface thereof, and the PC fastener has a hole that fits into the locking projection. The fixing projection has a screw portion at an upper end thereof, and a hole of a PC fastener is fitted into the locking projection, and a temporary nut is screwed into a screw portion of the upper end of the locking projection to thereby fix the fixing bracket. Is temporarily fixed to the PC fastener.

【0028】この構成によれば、固定金具上面に突出す
る係止突起にPCファスナー側の孔を嵌合させてPCフ
ァスナーと固定金具とを連結し、係止突起上端部のネジ
部に仮設ナットを装着して固定金具をPCファスナーに
仮固定する。この仮固定状態で固定金具をコンクリート
に埋設する。したがって、従来行っていたコンクリート
に固定金具を埋設してからこの固定金具にPCファスナ
ーを装着する方法と異なり、PCファスナーと固定金具
との位置合せ作業が不要になり、PCファスナー側の孔
はルーズ孔とする必要はなく、係止突起に嵌合する径の
孔として位置決めできる。コンクリート硬化後は仮設ナ
ットを取外してPCファスナーを固定金具の係止突起に
沿って上下方向にロッキング動作可能とする。この場
合、係止突起に沿って摺動するPCファスナーの摺動抵
抗を小さくするために、係止突起のネジ部は仮設ナット
の螺合に必要な先端部のみに形成しておくことが望まし
い。本発明ではさらにPC板取付け構造として、PC板
にPCファスナーが埋設され、このPCファスナーを受
けてこのPC板を躯体側に固定する固定金具が躯体コン
クリートに埋設され、前記PC板と躯体コンクリートの
間に塞ぎ材が装着された鉄筋コンクリート構造物へのP
C板取付け構造において、前記PCファスナーをPC板
の上端部に設け、前記固定金具の上面にPCファスナー
を係止するための係止突起を設け、前記PCファスナー
は、前記係止突起に嵌合する孔を有し、このPC板の自
重をその上端部のPCファスナーおよび固定金具を介し
て躯体コンクリート側に支持し、PC板の下端部は、下
階側のPC板のPCファスナーに対し出入り方向に位置
決めされるとともに上下方向に移動可能に保持され、前
記固定金具はこれに係止するPCファスナーおよび塞ぎ
材に対し位置決めされた状態でコンクリートに埋設され
たものであることを特徴とするPC板取付け構造を提供
する。
According to this structure, the hole on the PC fastener side is fitted to the locking projection projecting from the upper surface of the fixing bracket to connect the PC fastener and the fixing bracket. And temporarily fix the fixing bracket to the PC fastener. In this temporarily fixed state, the fixture is buried in concrete. Therefore, unlike the conventional method in which the fixing metal is buried in the concrete and then the PC fastener is attached to the fixing metal, the work of aligning the PC fastener and the fixing metal becomes unnecessary, and the hole on the PC fastener side is loose. It is not necessary to form a hole, and it can be positioned as a hole having a diameter that fits into the locking projection. After the concrete is hardened, the temporary nut is removed, and the PC fastener can be vertically rocked along the locking projection of the fixture. In this case, in order to reduce the sliding resistance of the PC fastener that slides along the locking projection, it is desirable that the threaded portion of the locking projection be formed only at the tip required for screwing the temporary nut. . In the present invention, as a PC board mounting structure, a PC fastener is buried in the PC board, and a fixture for receiving the PC fastener and fixing the PC board to the skeleton side is buried in the skeleton concrete. P for reinforced concrete structures with intervening seals
In the C-plate mounting structure, the PC fastener is provided on an upper end portion of the PC plate, and a locking projection for locking the PC fastener is provided on an upper surface of the fixing bracket, and the PC fastener is fitted to the locking projection. The PC board has its own weight supported by the PC concrete at the upper end of the PC board through the PC fastener and the fixing metal at the upper end, and the lower end of the PC board enters and exits the PC fastener of the PC board on the lower floor side. The fixing bracket is buried in concrete in a state where the fixing bracket is positioned with respect to a PC fastener and a closing material which are locked to the fixing member. Provides board mounting structure.

【0029】この構成によれば、PC板のPCファスナ
ーの孔に固定金具の係止突起を嵌合させた状態で仮結合
し、固定金具をPCファスナーおよび塞ぎ材に対し位置
決めした状態でコンクリート打ちが行われるため、前述
の本発明に係るPC板取付け方法が好適に実施され、ま
た前述の本発明に係るPC板取付け方法を実施すると上
記構造が得られる。したがって、このPC板取付け構造
によれば、前述の本発明方法を実施した場合のように、
PC板側に固定したPCファスナーに躯体付け用の固定
金具を仮止めした状態でコンクリート打設とPC板取付
けを同時に行うため、コンクリート打設用の足場を利用
してPC板取付け作業を下階側から同時に進行させるこ
とができ、PC板の取付け作業が効率よく行われ現場で
の作業性が向上する。また、固定金具をコンクリートに
埋設する前にPCファスナーに取付けるため、従来のよ
うにコンクリートに固定された固定金具に対するPCフ
ァスナーの位置合せが不要になり、PC板の位置調整作
業が簡素化する。
According to this structure, the fixing fastener is temporarily connected to the hole of the PC fastener of the PC board in a state where the locking projection is fitted to the hole, and the concrete fastener is positioned with the fixing metal positioned with respect to the PC fastener and the closing member. Therefore, the above-described PC board attaching method according to the present invention is suitably implemented, and the above-described structure is obtained by implementing the above-described PC board attaching method according to the present invention. Therefore, according to the PC board mounting structure, as in the case where the above-described method of the present invention is performed,
Concrete mounting and PC board mounting are performed simultaneously with the mounting fasteners temporarily fixed to the PC fasteners fixed to the PC board side. Therefore, the PC board mounting work is performed using the concrete mounting scaffold on the lower floor. It is possible to proceed simultaneously from the side, the work of mounting the PC board is performed efficiently, and the workability on site is improved. In addition, since the fixing bracket is attached to the PC fastener before being embedded in the concrete, the positioning of the PC fastener with respect to the fixing bracket fixed to concrete as in the related art becomes unnecessary, and the work of adjusting the position of the PC board is simplified.

【0030】また、同じく前述の本発明方法の場合と同
様に、塞ぎ材をPC板と躯体の間に装着した状態でコン
クリートを流し込むため、硬化後の躯体コンクリートと
PC板間は塞ぎ材により完全に密封される。したがっ
て、従来の場合のようにコンクリート硬化後にPC板を
取付け、このPC板との間の隙間に塞ぎ材を詰込む方法
と異なり、塞ぎ不良による音漏れや漏水等の問題を生じ
ることがなくなる。
Further, similarly to the case of the above-described method of the present invention, concrete is poured in a state in which the plugging material is mounted between the PC board and the skeleton, so that the hardened concrete between the skeleton concrete and the PC plate is completely filled with the plugging material. Sealed. Therefore, unlike the conventional method in which the PC board is attached after the concrete is hardened and the blocking material is filled in the gap between the PC board and the PC board, problems such as sound leakage and water leakage due to poor blocking will not occur.

【0031】また、従来のように上階のコンクリートの
硬化を待つことなく各階ごとにPC板の取付け作業とコ
ンクリート打ちとを同時に進行させることができるた
め、工期の短縮が図られる。
Further, since the work of mounting the PC board and the concrete driving can be simultaneously performed for each floor without waiting for the hardening of the concrete on the upper floor as in the related art, the construction period can be shortened.

【0032】好ましい構成例では、前記固定金具の上面
に、PC板に近接させて棒材を配設し、この棒材を介し
て前記PCファスナーを前記固定金具上に支持したこと
を特徴としている。
In a preferred configuration example, a bar is provided on the upper surface of the fixing bracket in close proximity to the PC plate, and the PC fastener is supported on the fixing bracket via the bar. .

【0033】この構成によれば、固定金具上でのPCフ
ァスナーの支持位置がPC板に近接しているため、PC
板やPCファスナーに作用する曲げモーメントを極力小
さくすることができ、構造上の強度を高めて地震や風そ
の他躯体側からの偏倚荷重等による力を受けた場合に、
PC板に作用する力を軽減することができる。また、こ
れによりPCファスナーの強度が実質上高められるた
め、部材の薄型化や小型軽量化を図ることができる。
According to this structure, since the support position of the PC fastener on the fixing bracket is close to the PC plate,
The bending moment acting on the plate and the PC fastener can be minimized, and the structural strength is increased, and when a force such as an earthquake, wind or other bias load from the skeleton side is applied,
The force acting on the PC board can be reduced. Further, since the strength of the PC fastener is substantially increased, the thickness and the size and weight of the member can be reduced.

【0034】さらに好ましい構成例では、前記固定金具
上面の係止突起は、その上端部に仮設ナット装着用のネ
ジが形成され、この仮設ナット締め付け時にこの固定金
具がPCファスナーに対し回転することを防止するため
の回転防止部材をこの固定金具上面に設けたことを特徴
としている。
In a further preferred configuration example, a screw for mounting a temporary nut is formed on the upper end of the locking projection on the upper surface of the fixing bracket, and when the temporary nut is tightened, the fixing bracket rotates with respect to the PC fastener. It is characterized in that an anti-rotation member for prevention is provided on the upper surface of the fixture.

【0035】この構成によれば、コンクリート打ち前の
仮設時に、PCファスナーの孔に固定金具の係止突起を
挿通させて仮設ナットで締め付けるときに、ナットの締
め付けによる固定金具の回転が防止され取付け作業が円
滑に行われる。
According to this structure, when the concrete fitting is temporarily installed, the fixing fitting is prevented from rotating due to the tightening of the nut when the locking projection of the fixing fitting is inserted into the hole of the PC fastener and tightened with the temporary nut. Work is carried out smoothly.

【0036】さらに好ましい構成例では、前記固定金具
の上面は躯体側コンクリートの上面より低くなるように
段差が形成され、前記係止突起の高さはこの段差の高さ
以下であることを特徴としている。
In a further preferred configuration example, a step is formed so that an upper surface of the fixing bracket is lower than an upper surface of the concrete on the skeleton side, and the height of the locking projection is equal to or less than the height of the step. I have.

【0037】この構成によれば、固定金具の上面に突出
する係止突起が、躯体側コンクリート上面までの段差以
下の高さであるため、躯体側コンクリート上面を床仕上
げした場合、その床仕上げ面を広く有効にとることがで
きる。
According to this structure, since the locking projection projecting from the upper surface of the fixing bracket has a height equal to or less than the step to the upper surface of the concrete on the skeleton side, when the upper surface of the concrete on the skeleton side is floor-finished, the floor finish surface is formed. Can be widely and effectively taken.

【0038】別の好ましい構成例では、前記固定金具の
上面は躯体側コンクリートの上面より低くなるように段
差が形成され、この固定金具の上面に該段差に対応した
高さの箱枠を設けたことを特徴としている。
In another preferred configuration example, a step is formed so that the upper surface of the fixing bracket is lower than the upper surface of the concrete on the skeleton side, and a box frame having a height corresponding to the step is provided on the upper surface of the fixing bracket. It is characterized by:

【0039】この構成によれば、固定金具と躯体コンク
リートとの間の段差部分に箱枠が設けられるため、段差
部の上面が塞がれ使用性が高まるとともに強度が高めら
れる。
According to this configuration, since the box frame is provided at the step between the fixing bracket and the skeleton concrete, the upper surface of the step is closed to enhance the usability and the strength.

【0040】本発明ではさらに、鉄筋コンクリート構造
物へのPC板取付け構造において、PC板の上端部およ
び下端部に、内部に水平方向のピンを有するPCファス
ナーを埋設し、躯体側から突出して前記ピンに係止する
上端が開口した凹部を有する固定金具を躯体コンクリー
トに埋設し、前記固定金具は、PC板の上端部および下
端部のうち一方のPCファスナーのピンに対し、この固
定金具の前記凹部の底部が密着してこのPC板の自重を
支持し、他方のPCファスナーのピンに対しては前記凹
部の底部から浮かせた状態で係止し、前記固定金具はこ
れに係止するPCファスナーおよび塞ぎ材に対し位置決
めされた状態でコンクリートに埋設されたものであるこ
とを特徴とするPC板取付け構造を提供する。
Further, in the present invention, in a structure for mounting a PC board to a reinforced concrete structure, a PC fastener having a horizontal pin therein is embedded at an upper end and a lower end of the PC board, and the PC fastener projects from the skeleton side. A fixture having a recess with an open upper end that is locked to the main body is buried in the skeleton concrete, and the fixture is attached to the pin of one of the PC fasteners of the upper end and the lower end of the PC board. The bottom of the PC board is tightly attached to support the weight of the PC board, and the other PC fastener is locked in a state of being lifted from the bottom of the concave portion, and the fixing bracket is fixed to the PC fastener and the PC fastener. A PC board mounting structure characterized in that it is buried in concrete while being positioned with respect to a closing material.

【0041】この構成によれば、固定金具が躯体コンク
リートから外側に突出して埋設され、この突出部に設け
た凹部がPCファスナーのピンに係合してPC板を保持
する。この場合、PCファスナーはPC板の上端部およ
び下端部に埋設され、固定金具は、上端部または下端部
の一方のPCファスナーのピンを介してPC板の重量を
支持し、他方のPCファスナーのピンを係止してPC板
を保持する。
According to this configuration, the fixture is embedded so as to protrude outward from the skeleton concrete, and the recess provided in the projection engages the pin of the PC fastener to hold the PC board. In this case, the PC fastener is embedded at the upper end and the lower end of the PC board, and the fixing bracket supports the weight of the PC board via the pin of one of the PC fasteners at the upper end or the lower end, and supports the other PC fastener. Lock the pin and hold the PC board.

【0042】PC板取付け時には、固定金具をPCファ
スナーに仮固定し、PC板を躯体側に仮支持し、塞ぎ材
を装着した状態で、コンクリート打ちを行って固定金具
をコンクリートに埋設する。この構造は、特に柱等の上
下に連続した躯体コンクリートにPC板を支持する場合
に適している。この場合、固定金具は、柱等の上下に連
続した躯体コンクリート内に埋設する構造に限らず、梁
や床スラブの高さ方向の中間部に埋設する構造として用
いてもよい。
At the time of mounting the PC board, the fixing metal is temporarily fixed to the PC fastener, the PC board is temporarily supported on the skeleton side, and the fixing metal is buried in concrete with the plugging material attached. This structure is particularly suitable for supporting a PC board on a slab concrete vertically continuous such as a pillar. In this case, the fixing fitting is not limited to the structure embedded in the skeleton concrete continuous up and down such as a pillar, but may be used as a structure embedded in a middle portion of a beam or a floor slab in the height direction.

【0043】[0043]

【発明の実施の形態】以下本発明の実施の形態について
図面を参照して説明する。図1から図4に本発明の第1
の実施の形態を示す。図1は本発明の実施の形態に係る
PC板取付け構造の要部縦断面図、図2はそのA−A方
向から見た平面図、図3はB−B方向から見た立面図、
図4は図3のC−C方向から見た立面図である。
Embodiments of the present invention will be described below with reference to the drawings. 1 to 4 show the first embodiment of the present invention.
An embodiment will be described. FIG. 1 is a longitudinal sectional view of a main part of a PC board mounting structure according to an embodiment of the present invention, FIG. 2 is a plan view of the PC board mounting structure viewed from the AA direction, FIG.
FIG. 4 is an elevation view as seen from the direction of arrows CC in FIG.

【0044】建物の梁またはスラブを構成するRC構造
の躯体コンクリート(鉄筋は図示省略)21の外壁側に
下階側のPC板20aおよび上階側のPC板20bが取
付けられる。各PC板の上端部(下階側のPC板20a
の上端部のみ図示)にはPCファスナー98が埋設され
る。躯体コンクリート21には、このPCファスナー9
8を受けてPC板を躯体側に取付け固定するための固定
金具99が埋設される。PC板側のPCファスナー98
は、後述の取付け板28、アンカープレート29、アン
カー筋30およびPC板保持片34等を溶接等により一
体に結合して構成される。躯体側の固定金具99は、後
述の躯体付け支持金物22、プレート23、補助筋2
4、台プレート25およびボルト26等を溶接等により
一体に結合して構成される。
A PC board 20a on the lower floor side and a PC board 20b on the upper floor side are attached to the outer wall side of an RC structure skeleton concrete (rebar is not shown) constituting a beam or slab of the building. Upper end of each PC board (PC board 20a on the lower floor side)
The PC fastener 98 is embedded in only the upper end portion of the PC). The PC fastener 9 is attached to the concrete body 21.
8, a fixture 99 for mounting and fixing the PC board to the skeleton side is embedded. PC fastener 98 on PC board side
Is formed by integrally connecting a mounting plate 28, an anchor plate 29, an anchor bar 30, a PC board holding piece 34, and the like, which will be described later, by welding or the like. The fixing bracket 99 on the skeleton side includes a skeleton-attached support metal 22, a plate 23, and an auxiliary muscle 2 described later.
4. The base plate 25 and the bolts 26 are integrally connected by welding or the like.

【0045】躯体21には、上記固定金具99を構成す
るアングル鋼材からなる躯体付け支持金物22が埋設さ
れる。この躯体付け支持金物22は、これに溶接された
プレート23および補助筋24を介して躯体コンクリー
ト21の縁部を構成するように埋設され躯体と一体化さ
れる。躯体付け支持金物22には台プレート25が溶接
され、この台プレート25上にPC板係止用のボルト2
6が溶接により固着され、躯体付け支持金物22の上面
22aから突出する。この躯体付け支持金物22の上面
側には上面が開口したコンクリート塞ぎ枠27が設けら
れる。躯体21のコンクリート上面21aと躯体付け支
持金物22の上面22aとの間には段差が形成され、躯
体付け支持金物22から突出するボルト26の突出量は
この段差の高さ以内に収まるようにボルト26の長さが
決められる。
In the frame 21, a frame-supporting metal fitting 22 made of an angle steel material constituting the fixing bracket 99 is embedded. The frame-attached support metal 22 is embedded and integrated with the frame via the plate 23 and the auxiliary reinforcement 24 welded thereto so as to form an edge of the frame concrete 21. A base plate 25 is welded to the support member 22 with a frame, and bolts 2 for locking the PC board are provided on the base plate 25.
6 is fixed by welding, and protrudes from the upper surface 22a of the support member 22 with a frame. A concrete closing frame 27 having an open upper surface is provided on the upper surface side of the frame-attached support hardware 22. A step is formed between the concrete upper surface 21a of the skeleton 21 and the upper surface 22a of the skeleton supporting metal member 22, and the amount of the bolt 26 projecting from the skeleton supporting metal member 22 is adjusted so as to be within the height of the step. 26 lengths are determined.

【0046】このボルト26のネジ部26aは、後述の
仮設ナットを装着するためにボルト26の先端部にのみ
形成される。ボルト26の先端のネジ部26aより下側
のPCファスナー98のPC板保持片34が挿通して係
合する部分には、地震時等にPCファスナー98と固定
金具99との相互の摺動抵抗を小さくして円滑に摺動さ
せるためにネジは形成されていない。
The screw portion 26a of the bolt 26 is formed only at the tip end of the bolt 26 for mounting a temporary nut described later. The portion of the PC fastener 98 below the screw portion 26a at the tip of the bolt 26 where the PC plate holding piece 34 is inserted and engaged with the PC fastener 98 has a mutual sliding resistance between the PC fastener 98 and the fixture 99 during an earthquake or the like. No screw is formed in order to reduce the size and to slide smoothly.

【0047】上階側のPC板20bと下階側のPC板2
0aとの間は、変成シリコーン等からなるシーリング材
31、発泡クロロプレンゴム等からなるバックアップ材
32および耐火耐水性の弾性材からなるガスケット材3
3により密封される。
The upper floor PC board 20b and the lower floor PC board 2
0a, a sealing material 31 made of modified silicone or the like, a backup material 32 made of foamed chloroprene rubber or the like, and a gasket material 3 made of a fire-resistant and water-resistant elastic material.
3 sealed.

【0048】PC板20aの上端部には、前述のPCフ
ァスナー98を構成する取付け板28が固着される。こ
の取付け板28にアンカープレート29が溶接され、こ
のアンカープレート29にアンカー筋30が溶接され
る。これらのアンカープレート29およびアンカー筋3
0がPC板20aのコンクリート内に埋設されることに
より、取付け板28がPC板20aに一体的に固着され
る。取付け板28の下部のPC板20aの内面側には、
アングル鋼材からなるPC板保持片34が溶接される。
このPC板保持片34は、前述の躯体付け支持金物22
から突出するボルト26が嵌合する孔を有し、この孔に
ボルト26を挿通させて躯体付け支持金物22とPC板
20aとを連結する。この場合、ボルト26を挿通させ
るPC板保持片34側の孔はルーズ孔ではなく、ボルト
26が実質上隙間なく嵌合する径の孔である。これは、
本実施形態では、ボルト26をPC板保持片34の孔に
挿通した状態で、かつ塞ぎ材54をPC板20aの内側
に装着した状態でコンクリート打ちを行うため、従来の
ようにコンクリート硬化後にPC板の位置合せを行う必
要がないためである。
The mounting plate 28 constituting the PC fastener 98 is fixed to the upper end of the PC board 20a. An anchor plate 29 is welded to the mounting plate 28, and an anchor bar 30 is welded to the anchor plate 29. These anchor plate 29 and anchor bar 3
The mounting plate 28 is integrally fixed to the PC board 20a by embedding 0 in the concrete of the PC board 20a. On the inner surface side of the PC board 20a below the mounting plate 28,
The PC board holding piece 34 made of an angle steel material is welded.
The PC board holding piece 34 is provided with the above-mentioned framed support metal 22.
There is a hole in which a bolt 26 protruding from the hole is fitted, and the bolt 26 is inserted through this hole to connect the frame-mounted supporting hardware 22 and the PC board 20a. In this case, the hole on the side of the PC plate holding piece 34 through which the bolt 26 is inserted is not a loose hole, but a hole having a diameter into which the bolt 26 can fit with substantially no gap. this is,
In the present embodiment, concrete is set with the bolt 26 inserted through the hole of the PC board holding piece 34 and the plug 54 attached to the inside of the PC board 20a. This is because there is no need to align the plates.

【0049】PCファスナー98を構成するPC板保持
片34は、ボルト26に対し上下方向には拘束されずに
係止するため、PC板20aはこのボルト26に沿って
上下に移動可能となりボルト26の突出長さに応じたロ
ッキング動作が可能になる。なお、前述のように、この
PC板保持片34とボルト26とが相互に係合して摺動
する部分には円滑な摺動動作をさせるためにネジは形成
されていない。
The PC plate holding piece 34 constituting the PC fastener 98 is locked without being restrained in the vertical direction with respect to the bolt 26, so that the PC plate 20a can move up and down along the bolt 26, Locking operation according to the protruding length of. As described above, no screw is formed at a portion where the PC board holding piece 34 and the bolt 26 are engaged with each other and slide to perform a smooth sliding operation.

【0050】PC板保持片34は、丸鋼材35を介して
躯体付け支持金物22上に支持される。この丸鋼材35
は、躯体付け支持金物22の上面22a上でなるべくP
C板20aに近い位置に設けられる。これにより、PC
板20aの重量を躯体付け支持金物22に支持させた場
合に、PC板保持片34に対する曲げモーメントが小さ
くなる。したがって、PC板の自重や地震、風その他躯
体側からの変位荷重等による応力を受けた場合、PC板
の取付け板やそのアンカー部材および保持片等に作用す
る曲げモーメントの応力を小さくすることができ、構造
上の強度を高めることができる。
The PC board holding piece 34 is supported on the framed support metal 22 via the round steel 35. This round steel material 35
Is preferably P on the upper surface 22a of the framed support hardware 22.
It is provided at a position near the C plate 20a. With this, PC
When the weight of the plate 20a is supported by the frame-supporting metal fitting 22, the bending moment with respect to the PC plate holding piece 34 is reduced. Therefore, when the PC board is subjected to stress due to its own weight, earthquake, wind or other displacement load from the skeleton side, it is necessary to reduce the stress of the bending moment acting on the PC board mounting plate, its anchor member, holding piece, and the like. And structural strength can be increased.

【0051】下側のPC板20aの上端部に固着された
PCファスナー98を構成する取付け板28の上部は、
上側のPC板20bの下端部に係合してこれを以下のよ
うにして保持する。すなわち、取付け板28の上部に
は、上端が開口した凹部37(図3)が形成され、この
凹部37に出入り調整用の引きボルト41が装着され
る。この引きボルト41の頭部と取付け板28の間に
は、戻り止め用のスプリングワッシャ38、プレートワ
ッシャ39およびステンレス鋼材等の金属材あるいは樹
脂材からなる滑り材40が装着される。引きボルト41
は、プレート43を介してPC板20bに埋設されたイ
ンサート42に螺合して、PC板20bを躯体側に引い
て位置調整することができる。プレート43は、埋め込
み筋44を介してPC板20bに固着される。
The upper portion of the mounting plate 28 constituting the PC fastener 98 fixed to the upper end of the lower PC board 20a is
It engages with the lower end of the upper PC board 20b and holds it as follows. That is, a concave portion 37 (FIG. 3) having an open upper end is formed in the upper portion of the mounting plate 28, and a pull bolt 41 for adjusting the access is mounted in the concave portion 37. A detent spring washer 38, a plate washer 39, and a sliding member 40 made of a metal material such as a stainless steel material or a resin material are mounted between the head of the pull bolt 41 and the mounting plate 28. Pull bolt 41
Can be screwed into the insert 42 embedded in the PC board 20b via the plate 43, and the PC board 20b can be adjusted in position by pulling it toward the frame. The plate 43 is fixed to the PC board 20b via the embedding line 44.

【0052】引きボルト41の下側の取付け板28には
出入り調整用押しボルト45が螺着する。押しボルト4
5は、プレート43の表面に当接してPC板20bを外
側に押して位置調整することができる。
A push bolt 45 for adjusting the access is screwed onto the lower mounting plate 28 of the pull bolt 41. Push bolt 4
5, the position can be adjusted by contacting the surface of the plate 43 and pushing the PC board 20b outward.

【0053】引きボルト41は凹部37内で上下方向に
移動可能であり、押しボルト45はプレート43表面に
当接した状態で上下方向に移動可能である。したがっ
て、これらの出入り調整用のボルト41,45はPC板
20bの上下方向の位置調整やロッキング動作を妨げな
い。
The pulling bolt 41 can move up and down in the concave portion 37, and the push bolt 45 can move up and down while being in contact with the surface of the plate 43. Therefore, the bolts 41 and 45 for adjusting the access do not hinder the vertical position adjustment and the locking operation of the PC board 20b.

【0054】施工時には、各PC板の下端部に取付け板
28に隣接して仮設用レベル調整金物46が取付けられ
る。このレベル調整金物46は、仮設金物53と、この
仮設金物53の下端に接合された台座プレート47と、
この台座プレート47を挿通するボルト48と、このボ
ルト48に螺合するナット49と、ボルト48の下端が
当接する基台50とからなる。ナット49は台座プレー
ト47の下面に溶接される。ボルト48をナット49に
対し回転調整することにより、ナット49が台座プレー
ト47に固着されているため、ボルト48が台座プレー
ト47に対し上下動してPC板の上下位置の調整が行わ
れる。このような仮設金物53は、2本のボルト51を
PC板内に埋設されたインサート52に螺着することに
よりPC板に固定される。このレベル調整金物46は、
PC板の取付け後に取り外される。レベル調整金物46
を取り外した後は、PC板の重量は、その上端部に設け
た取付け板28のPC板保持片34等からなるPCファ
スナー98および躯体付け支持金物22等からなる固定
金具99を介して上階側の躯体に支持される。
At the time of construction, a temporary level adjusting hardware 46 is attached to the lower end of each PC board adjacent to the mounting plate 28. The level adjusting hardware 46 includes a temporary hardware 53, a pedestal plate 47 joined to a lower end of the temporary hardware 53,
A bolt 48 is inserted through the pedestal plate 47, a nut 49 is screwed to the bolt 48, and a base 50 is contacted with a lower end of the bolt 48. The nut 49 is welded to the lower surface of the base plate 47. Since the nut 49 is fixed to the pedestal plate 47 by rotating and adjusting the bolt 48 with respect to the nut 49, the bolt 48 moves up and down with respect to the pedestal plate 47, and the vertical position of the PC board is adjusted. Such a temporary metal fitting 53 is fixed to the PC board by screwing two bolts 51 into an insert 52 embedded in the PC board. This level adjustment hardware 46 is
It is removed after attaching the PC board. Level adjustment hardware 46
After the PC board is removed, the weight of the PC board is increased via a PC fastener 98 formed of the PC board holding piece 34 of the mounting plate 28 provided at the upper end thereof and a fixing fitting 99 formed of the frame mounting support 22 and the like. It is supported by the side frame.

【0055】図5および図6は、この第1実施形態の施
工方法を説明するための全体の分解斜視図および要部分
解斜視図である。図5に示すように、PC板に固着され
た取付け板28の下部内側に溶接されるPC板保持片
(アングル鋼材)34の孔34aに躯体付け支持金物2
2の上面に突出するボルト26を挿通させる。ボルト2
6の先端部にネジ26aが形成されている。このネジ2
6aに螺合する仮設ナット56を仮設パイプ55を介し
てボルト26に装着して締め付ける。躯体付け支持金物
22の上面には回転防止部材36が突出して設けられて
いる。仮設ナット56の締め付け時に、この回転防止部
材36がPC板保持片34の側面に当接するため、躯体
付け支持金物22等からなる固定金具99の回転が防止
され円滑な装着作業ができる。
FIGS. 5 and 6 are an overall exploded perspective view and a main part exploded perspective view for explaining the construction method of the first embodiment. As shown in FIG. 5, the frame-supporting metal fitting 2 is inserted into a hole 34 a of a PC plate holding piece (angle steel material) 34 welded to the lower inside of the mounting plate 28 fixed to the PC plate.
The bolt 26 protruding from the upper surface of the second 2 is inserted. Bolt 2
6, a screw 26a is formed at the tip. This screw 2
A temporary nut 56 screwed to 6a is mounted on the bolt 26 via the temporary pipe 55 and tightened. An anti-rotation member 36 protrudes from the upper surface of the frame-attached support hardware 22. When the temporary nut 56 is tightened, the anti-rotation member 36 comes into contact with the side surface of the PC board holding piece 34, so that the fixing bracket 99 including the frame-supporting metal fitting 22 and the like is prevented from rotating, and a smooth mounting operation can be performed.

【0056】このようにPCファスナー98のPC板保
持片34と固定金具99の躯体付け支持金物22とを相
互に固定した状態で躯体コンクリートの型枠を形成し、
塞ぎ材54をPC板の内面側に装着してこれを型枠の一
部として用いる。この型枠内に躯体付け支持金物22を
配設してコンクリート打ちを行う。PC板の出入り調整
は、図6に示すように、取付け板28の上部に設けた凹
部37を通して引きボルト41を取付け、その下側にね
じ孔57を通して押しボルト45を装着して両ボルト4
1,45の調整により行う。なお、図6ではスプリング
ワッシャ38(図1)は図示省略してある。
In this manner, the concrete frame of the frame is formed in a state where the PC plate holding piece 34 of the PC fastener 98 and the frame 22 are fixed to each other.
The closing material 54 is mounted on the inner surface side of the PC board and is used as a part of the mold. The supporting body 22 is provided in the formwork and concrete is cast. As shown in FIG. 6, a pull bolt 41 is attached through a concave portion 37 provided on an upper portion of a mounting plate 28, and a push bolt 45 is attached to a lower side of the PC board through a screw hole 57 as shown in FIG.
The adjustment is performed by the adjustment of 1,45. In FIG. 6, the spring washer 38 (FIG. 1) is not shown.

【0057】PC板の高さ調整は、前述のように、レベ
ル調整金物46(図3、図4)のボルト48を回して、
台座プレート47に固着されたナット49に対する捩じ
込み位置の調整により行う。
As described above, the height of the PC board is adjusted by turning the bolt 48 of the level adjusting metal member 46 (FIGS. 3 and 4).
The adjustment is performed by adjusting the screwing position of the nut 49 fixed to the base plate 47.

【0058】図7は、出入り調整の別の方法を示す。P
C板20aの下端部に仮設用のアングル鋼材からなる出
入り調整金物62を固定する。この出入り調整金物62
は、ボルト63をPC板20aのインサート66に螺着
させることによりPC板20aに固定される。この出入
り調整金物62の水平部側の端部には長孔64が形成さ
れ、この長孔64を挿通して躯体コンクリート21に埋
設したインサート66にボルト65を螺着する。これに
より、長孔64の範囲内でPC板20aの出入り調整が
できる。
FIG. 7 shows another method of adjusting the access. P
An access metal fitting 62 made of a temporary angle steel material is fixed to the lower end of the C plate 20a. This entry / exit adjustment hardware 62
Is fixed to the PC board 20a by screwing the bolt 63 to the insert 66 of the PC board 20a. A long hole 64 is formed at the horizontal portion of the end adjustment metal fitting 62, and a bolt 65 is screwed into an insert 66 embedded in the skeleton concrete 21 through the long hole 64. Thus, the PC board 20a can be adjusted in and out within the range of the long hole 64.

【0059】図8は、施工時のPC板の支持状態を示
す。床スラブ60および梁59からなる躯体21Aの外
壁を構成するPC板20bは、振れ止めサポート58に
より施工中躯体21Aに保持される。図中、61は梁5
9の鉄筋を示す。
FIG. 8 shows a support state of the PC board at the time of construction. The PC board 20b constituting the outer wall of the frame 21A including the floor slab 60 and the beam 59 is held by the steady frame 21A by the steady rest support 58. In the figure, 61 is the beam 5
9 shows reinforcing bars.

【0060】施工手順は、まず躯体21Aのコンクリー
トを打設する。このとき、前述の図1〜図7で説明した
ように、下階側のPC板20aの上端部に設けたPCフ
ァスナー(図8では図示省略)が、躯体21Aのコンク
リート内に埋設される固定金具(図8では図示省略)に
結合され、かつこの階の躯体21Aに対する塞ぎ材54
Aが装着された状態でコンクリート打ちが行われる。
In the construction procedure, first, concrete of the skeleton 21A is cast. At this time, as described with reference to FIGS. 1 to 7, the PC fastener (not shown in FIG. 8) provided at the upper end of the PC board 20a on the lower floor is fixed to be embedded in the concrete of the frame 21A. A sealing member 54 connected to a metal fitting (not shown in FIG. 8) and for the frame 21A of this floor.
Concrete driving is performed with A attached.

【0061】次に、コンクリートが硬化した後、この躯
体21Aの階の外壁を構成するPC板20bを取付け
る。このとき、前述の図1〜図7で説明したように、P
C板20bの下端部に係合する下階側のPC板20aの
PCファスナーの取付け板を介して出入り調整が行わ
れ、レベル調整金物46により高さ調整が行われるとと
もに重量が支持される。さらにこのとき、PC板20b
の上端部に塞ぎ材54Bが装着される。また、このとき
振れ止めサポート58が取付けられ、PC板20bを保
持する。続いて、この状態から、前述の躯体21Aのコ
ンクリート打ちと同様に、上階の躯体21Bのコンクリ
ート打ちが行われる。躯体21Bのコンクリートが硬化
したら振れ止めサポート58を外すとともにレベル調整
金物46を外してPC板20bの自重をその上端部のP
Cファスナーを介して上階側の躯体21Bに支持する。
このようにして順次下階側から、躯体のコンクリート打
ちとPC板の取付けを同時に進行しながら建物を構築す
る。
Next, after the concrete has hardened, the PC board 20b constituting the outer wall of the floor of the frame 21A is mounted. At this time, as described with reference to FIGS.
Ingress / egress adjustment is performed via a PC fastener mounting plate of the lower PC board 20a which is engaged with the lower end of the C board 20b. The height adjustment is performed by the level adjustment hardware 46, and the weight is supported. At this time, the PC board 20b
The closing member 54B is attached to the upper end of the cover. At this time, the steady rest support 58 is attached to hold the PC board 20b. Subsequently, from this state, the concrete of the frame 21B on the upper floor is cast in the same manner as the concrete of the frame 21A. When the concrete of the frame 21B is hardened, the steady rest support 58 is removed, and the level adjustment hardware 46 is removed, and the weight of the PC board 20b is reduced by P at the upper end thereof.
It is supported on the upper frame body 21B via a C fastener.
In this way, the building is constructed sequentially from the lower floor side while simultaneously proceeding with the concrete driving of the skeleton and the mounting of the PC board.

【0062】図9は、本発明の第2の実施の形態の要部
縦断面図、図10(A)(B)(C)はそれぞれ図9の
A−A部、B−B部およびC−C部の要部構成説明図で
あり、図11(A)は図9のD−D部の平面図であり、
同図(B)はその変形例である。また、図12はこの実
施形態の要部構成部材の分解斜視図である。
FIG. 9 is a longitudinal sectional view of a main part of a second embodiment of the present invention, and FIGS. 10A, 10B and 10C are AA, BB and C of FIG. 9, respectively. FIG. 11 (A) is a plan view of a DD section of FIG. 9, and FIG.
FIG. 7B is a modification of the embodiment. FIG. 12 is an exploded perspective view of the main components of this embodiment.

【0063】この実施形態は、特に柱にPC板を取付け
る場合に適した構造である。柱を構成する躯体70の外
面にPC板72が取付けられる。各PC板72と躯体7
0との間には前述の実施形態と同様に塞ぎ材88が装着
される。各PC板72の上端部および下端部にはそれぞ
れ箱状の取付け枠73が、これに溶接された異形鋼棒等
からなるアンカー74を介して埋設される(図ではPC
板の上端部側が下に示され、下端部側が上に示されてい
る)。取付け枠73の内部には水平方向のピン75が設
けられる。このような取付け枠73、アンカー74およ
びピン75等によりPCファスナー100を構成する。
This embodiment has a structure particularly suitable for mounting a PC board on a pillar. The PC board 72 is attached to the outer surface of the body 70 constituting the pillar. Each PC board 72 and frame 7
In the same manner as in the above-described embodiment, a blocking member 88 is attached between 0 and 0. At the upper end and the lower end of each PC board 72, a box-shaped mounting frame 73 is buried via an anchor 74 made of a deformed steel bar or the like welded to the box-shaped mounting frame 73 (PC in the figure).
The upper end side of the plate is shown below and the lower end side is shown above). A horizontal pin 75 is provided inside the mounting frame 73. The PC fastener 100 is configured by the mounting frame 73, the anchor 74, the pins 75, and the like.

【0064】ピン75には、躯体付け金物71に形成し
た上端が開口した上下方向に長い凹部83が係合する。
躯体付け金物71は、凹部83を柱の外側に突出させた
状態で、異形鋼棒等からなるアンカー84を介して柱の
躯体70内に埋設される。このような躯体付け金物71
およびアンカー84により、PCファスナー100を受
けて固定保持する固定金具101を構成する。
The pin 75 is engaged with a vertically long concave portion 83 formed at the upper end of the frame attaching metal member 71 and having an open upper end.
The frame attachment metal 71 is embedded in the column body 70 via an anchor 84 made of a deformed steel bar or the like with the concave portion 83 protruding outside the column. Such a frame-attached hardware 71
The anchor 84 constitutes a fixture 101 for receiving and fixing the PC fastener 100.

【0065】取付け枠73の内側(柱側)には入口プレ
ート76が設けられる。入口プレート76には、躯体付
け金物71を挿通させてセットするための開口86が形
成される。躯体付け金物71は、躯体コンクリート打設
前にこの入口プレート76の開口86を通してピン75
に係合してセットされる。この場合、躯体付け金物71
を開口86の下部から挿入し、凹部83がピン75の下
側にきたら上に持上げて凹部83をピン75に嵌め合わ
せる。このとき、躯体付け金物71の挿入操作を容易に
し且つピンに係合したときの位置ずれを抑えるために、
入口プレート76の開口86は、下側の幅が広くピンと
の係合位置では幅が狭くなるように形成することが望ま
しい。
An entrance plate 76 is provided inside the mounting frame 73 (on the column side). An opening 86 is formed in the inlet plate 76 for inserting and setting the metal fitting 71. The skeleton attachment metal 71 is inserted into the opening 86 of the entrance plate 76 before the skeleton concrete is cast.
Is set in engagement with. In this case, the skeleton fitting 71
Is inserted from the lower part of the opening 86, and when the concave portion 83 comes under the pin 75, it is lifted up and the concave portion 83 is fitted to the pin 75. At this time, in order to facilitate the insertion operation of the frame attaching hardware 71 and to suppress the displacement when engaging with the pin,
The opening 86 of the inlet plate 76 is desirably formed such that the width on the lower side is large and the width is small at the engagement position with the pin.

【0066】躯体付け金物71は、ピン75に係合させ
た後、仮設アングル80上に台座85を介してボルト8
1およびナット82により支持される。仮設アングル8
0は、滑り材77を介して入口プレート76の内側(躯
体側)に、ボルト79を入口プレート76に設けた孔8
7(図10(B)、図12)を通してインサート78に
螺着させることにより固定される。
After the frame attaching hardware 71 is engaged with the pin 75, the bolt 8 is mounted on the temporary angle 80 via the pedestal 85.
1 and a nut 82. Temporary angle 8
Reference numeral 0 denotes a hole 8 in which a bolt 79 is provided in the entrance plate 76 on the inside (body side) of the entrance plate 76 via a sliding material 77.
7 (FIG. 10 (B), FIG. 12) and fixed by screwing to the insert 78.

【0067】躯体付け金物71の凹部83は、PC板7
2の上端部側のピン75に対してはその底部にピン75
が当接するようにセットされ、下端部側のピン75に対
しては底部から浮いて凹部の中間位置に配置されるよう
にセットされる。したがって、PC板72の重量はその
上端部のピン75を介して躯体付け金物71に支持され
る。下端部側のピン75に係合する躯体付け金物71に
は垂直方向の荷重は作用せず、PC板72を出入り方向
の位置を固定して保持するとともに、凹部83の長さに
応じた量の上下方向のロッキング動作を可能とする。
The concave portion 83 of the frame attaching hardware 71 is
For the pin 75 on the upper end side of the pin 2, a pin 75
Are set so as to come into contact with each other, and are set so as to be floated from the bottom and arranged at the middle position of the concave portion with respect to the pin 75 on the lower end side. Therefore, the weight of the PC board 72 is supported by the frame fitting 71 via the pin 75 at the upper end. A vertical load is not applied to the frame attaching hardware 71 which engages the lower end side pin 75, and the PC board 72 is fixedly held in the entering and exiting direction, and the amount corresponding to the length of the concave portion 83. In the vertical direction.

【0068】このようにPC板72に躯体付け金物71
をセットした状態で且つ前述の第1の実施形態と同様に
塞ぎ材88を装着した状態で、躯体側の型枠を形成して
コンクリートを打ち込む。このとき、PC板の自重は、
その下端部で例えば柱の両側のスラブ(図示しない)上
に前述の仮設用のレベル調整金物46(図3、図4、図
8参照)を用いて支持する。柱のコンクリート硬化後
は、このレベル調整金物を外して、PC板の自重をその
上端部側のPCファスナー100および固定金物101
を介して躯体70で支持する。
As described above, the PC board 72 is provided with the frame attaching hardware 71.
In a state where is set and the closing member 88 is attached in the same manner as in the first embodiment, a formwork on the skeleton side is formed and concrete is driven in. At this time, the weight of the PC board is
At its lower end, for example, it is supported on slabs (not shown) on both sides of the pillar using the above-described temporary level adjustment hardware 46 (see FIGS. 3, 4, and 8). After the concrete in the column is hardened, the level adjusting metal is removed, and the weight of the PC board is reduced by the PC fastener 100 and the fixing metal 101 on the upper end side.
And is supported by the frame 70.

【0069】この実施形態の固定金具101を構成する
躯体付け金物71の別の例を図11(B)および(C)
に示す。(B)の例は、躯体付け金物71の躯体側の端
部71aを1ヵ所または2ヵ所で一方向または両方向に
曲げてアンカー機能を持たせたものである(図は両方向
に折曲げた形状を示す)。(C)は躯体付け金物71の
躯体側の端部71aの幅を上下方向に広げてアンカー機
能を持たせたものである。これらの例において、鉄筋か
らなるアンカー84は省略してもよいし、補助的に付加
してアンカー機能をさらに高めてもよい。また(B)お
よび(C)の形状を組合せてもよい。さらに、このよう
に端部を折曲げた形状や幅を広げた形状に代えて、また
はこれらとともに、端部の厚さを増すことによりアンカ
ー機能を高めてもよい。
FIGS. 11 (B) and 11 (C) show another example of the frame attaching metal member 71 constituting the fixing member 101 of this embodiment.
Shown in In the example of (B), the end 71a on the skeleton side of the skeleton attachment metal 71 is bent at one or two places in one direction or both directions to have an anchor function (the figure shows a shape bent in both directions). Is shown). (C) shows a structure in which the width of the end 71a on the skeleton side of the skeleton mounting hardware 71 is increased in the vertical direction to provide an anchor function. In these examples, the anchor 84 made of a reinforcing bar may be omitted, or may be additionally provided to further enhance the anchor function. Further, the shapes of (B) and (C) may be combined. Further, the anchor function may be enhanced by increasing the thickness of the end portion instead of or in addition to the bent shape or the widened shape of the end portion.

【0070】図13は、本発明の第3の実施の形態に係
るPC板取付け構造の要部縦断面図、図14は、そのA
−A方向から見た平面図、図15は、B−B方向から見
た立面図、図16は、この第3実施形態の要部分解斜視
図である。
FIG. 13 is a longitudinal sectional view of a main part of a PC board mounting structure according to a third embodiment of the present invention, and FIG.
FIG. 15 is an elevation view as viewed from the BB direction, and FIG. 16 is an exploded perspective view of a main part of the third embodiment.

【0071】この実施形態は、前記第1実施形態と同様
に躯体付け支持金物22の上面が躯体側コンクリートの
上面より低くなるように段差が形成された埋設部構造に
おいて、この躯体付け支持金物22の上面に該段差に対
応した高さの箱枠89を設けたものである。箱枠89の
上面は塞がり、施工時にこの箱枠89上に仮設アングル
90が取付けられる。仮設アングル90は、ボルト91
によりPC板保持片34を介して取付け板28に固定さ
れる。ボルト91は、プレート95を介して仮設アング
ル90の長孔96(図16)および取付け板28の孔9
7(図16)を通してインサート92(図13)に螺着
される。この場合、仮設アングル90は長孔96の範囲
内で上下方向の取付け位置が調整される。この仮設アン
グル90の上面にボルト26が突出し、このボルト26
にワッシャ94を介して仮設ナット93を螺着して締め
付けることにより、仮設時に箱枠89とともに躯体付け
金物22等からなる固定金具99が取付け板28等から
なるPCファスナー98側に固定される。
This embodiment is similar to the first embodiment, except that in the buried portion structure in which a step is formed so that the upper surface of the skeleton-supporting metal fitting 22 is lower than the upper surface of the skeleton-side concrete, the skeleton-supporting metal fitting 22 is provided. Are provided with a box frame 89 having a height corresponding to the step. The upper surface of the box frame 89 is closed, and a temporary angle 90 is mounted on the box frame 89 during construction. The temporary angle 90 is a bolt 91
Thus, it is fixed to the mounting plate 28 via the PC board holding piece 34. The bolts 91 are inserted through the plate 95 into the slots 96 (FIG. 16) of the temporary angle 90 and the holes 9 of the mounting plate 28.
7 (FIG. 16) and screwed into the insert 92 (FIG. 13). In this case, the vertical mounting position of the temporary angle 90 is adjusted within the range of the elongated hole 96. The bolt 26 projects from the upper surface of the temporary angle 90, and the bolt 26
By screwing a temporary nut 93 through a washer 94 and tightening, a fixing fitting 99 made of the frame attaching hardware 22 and the like together with the box frame 89 is fixed to the PC fastener 98 made of the mounting plate 28 and the like at the time of temporary installation.

【0072】このように箱枠89および躯体付け支持金
物22を装着した状態で、前述の第1実施形態と同様に
塞ぎ材54を装着してコンクリートの打設とPC板の取
付けを同時に進行させる。コンクリート硬化後に仮設ア
ングル90は取り外される。このような箱枠89を設け
ることにより、躯体付け支持金物22の埋設部分の段差
部上面の強度が高まり使用性が高められる。このような
箱枠89以外の構成、すなわち施工時に用いる仮設用レ
ベル調整金物46等その他の構成や施工方法およびその
効果は前記第1実施形態と同様である。
With the box frame 89 and the frame-supporting metal fittings 22 thus mounted, the covering member 54 is mounted in the same manner as in the above-described first embodiment, and the concrete placing and the PC board mounting proceed simultaneously. . After the concrete is hardened, the temporary angle 90 is removed. By providing such a box frame 89, the strength of the upper surface of the step portion of the buried portion of the frame-attached support hardware 22 is increased, and the usability is enhanced. The configuration other than the box frame 89, that is, the other configuration, the construction method, and the effect of the temporary level adjustment hardware 46 used during construction are the same as those of the first embodiment.

【0073】[0073]

【発明の効果】以上説明したように、本発明では、PC
板側に固定したPCファスナーに躯体付け用の固定金具
を仮止めした状態でコンクリート打設とPC板取付けを
同時に行うため、コンクリート打設用の足場を利用して
PC板取付け作業を下階側から同時に進行させることが
でき、PC板の取付け作業が効率よく行われ現場での作
業性が向上する。また、固定金具をコンクリートに埋設
する前にPCファスナーに取付けるため、従来のように
コンクリートに固定された固定金具に対するPCファス
ナーの位置合せが不要になり、PC板の位置調整作業が
簡素化する。
As described above, according to the present invention, the PC
Concrete mounting and PC board mounting are performed simultaneously with the mounting fasteners temporarily attached to the PC fastener fixed to the board side, so the PC board mounting work is performed on the lower floor using the concrete mounting scaffold. From the same time, the work of mounting the PC board is performed efficiently, and the workability at the site is improved. In addition, since the fixing bracket is attached to the PC fastener before being embedded in the concrete, the positioning of the PC fastener with respect to the fixing bracket fixed to concrete as in the related art becomes unnecessary, and the work of adjusting the position of the PC board is simplified.

【0074】また、塞ぎ材をPC板と躯体の間に装着し
た状態でコンクリートを流し込むため、硬化後の躯体コ
ンクリートとPC板間は塞ぎ材により完全に密封され
る。したがって、従来の場合のようにコンクリート硬化
後にPC板を取付け、このPC板との間の隙間に塞ぎ材
を詰込む方法と異なり、塞ぎ不良による音漏れや漏水等
の問題を生じることがなくなる。
Further, since concrete is poured in a state in which the closing material is mounted between the PC board and the skeleton, the hardened concrete between the skeleton concrete and the PC board is completely sealed by the closing material. Therefore, unlike the conventional method in which the PC board is attached after the concrete is hardened and the blocking material is filled in the gap between the PC board and the PC board, problems such as sound leakage and water leakage due to poor blocking will not occur.

【0075】また、従来のように上階のコンクリートの
硬化を待つことなく各階ごとにPC板の取付け作業とコ
ンクリート打ちとを同時に進行させることができるた
め、工期の短縮が図られる。
In addition, since the work of mounting the PC board and the concrete driving can be simultaneously performed for each floor without waiting for the concrete on the upper floor to be hardened as in the prior art, the construction period can be shortened.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本発明の第1実施形態の要部縦断面図。FIG. 1 is a longitudinal sectional view of a main part of a first embodiment of the present invention.

【図2】 図1のA−A方向から見た平面図。FIG. 2 is a plan view seen from the AA direction in FIG. 1;

【図3】 図1のB−B方向から見た立面図。FIG. 3 is an elevation view as seen from the BB direction in FIG. 1;

【図4】 図3のC−C方向から見た立面図。FIG. 4 is an elevation view as seen from the direction of arrows CC in FIG. 3;

【図5】 第1実施形態の要部構成部材の分解斜視図。FIG. 5 is an exploded perspective view of main components of the first embodiment.

【図6】 第1実施形態の一部構成部材の分解斜視図。FIG. 6 is an exploded perspective view of some components of the first embodiment.

【図7】 出入り調整手段の別の例の構成説明図。FIG. 7 is a configuration explanatory view of another example of the access control means.

【図8】 本発明の施工手順を説明するための建物の要
部縦断面図。
FIG. 8 is a vertical sectional view of a main part of a building for explaining the construction procedure of the present invention.

【図9】 本発明の第2実施形態の要部縦断面図。FIG. 9 is a vertical sectional view of a main part of a second embodiment of the present invention.

【図10】 (A)(B)(C)はそれぞれ図9のA−
A方向、B−B方向およびC−C方向からみた要部構成
説明図。
FIGS. 10A, 10B, and 10C respectively show A-
FIG. 4 is an explanatory diagram of a main part configuration viewed from a direction A, a direction BB, and a direction CC.

【図11】 (A)は図9のD−D方向から見た平面
図、(B)(C)は躯体付け金物の別の例の形状を示す
図。
11 (A) is a plan view as seen from the DD direction in FIG. 9, and FIGS. 11 (B) and 11 (C) are diagrams showing the shape of another example of the skeleton fitting.

【図12】 第2実施形態の要部分解斜視図。FIG. 12 is an exploded perspective view of a main part of the second embodiment.

【図13】 本発明の第3実施形態の要部縦断面図。FIG. 13 is a longitudinal sectional view of a main part of a third embodiment of the present invention.

【図14】 図13のA−A方向から見た平面図。FIG. 14 is a plan view seen from the AA direction in FIG. 13;

【図15】 図13のB−B方向から見た立面図。FIG. 15 is an elevation view as seen from the BB direction in FIG. 13;

【図16】 第3実施形態の要部分解斜視図。FIG. 16 is an exploded perspective view of a main part of the third embodiment.

【図17】 従来のPC板取付け構造の要部縦断面図。FIG. 17 is a longitudinal sectional view of a main part of a conventional PC board mounting structure.

【図18】 図17のA−A方向から見た立面図。FIG. 18 is an elevation view as seen from the direction of arrows AA in FIG. 17;

【符号の説明】[Explanation of symbols]

1a,1b:躯体、2:第1の躯体付け支持金物、3:
埋め込み筋、4:ボルト、5a,5b:PC板、6:ア
ンカーボルト、7:取付け片、7a:長孔、7b:ルー
ズ孔、8,9:ナット、10:第2の躯体付け支持金
物、11:突棒、12:台座金物、13:積層板、1
4:埋め込み材、15:支持アングル、16:塞ぎ材、
20a,20b:PC板、21:躯体コンクリート、2
1a:躯体コンクリートの上面、22:躯体付け支持金
物、23:プレート、24:補助筋、25:台プレー
ト、26:PC板係止用のボルト、27:コンクリート
塞ぎ枠、28:取付け板、29:アンカープレート、3
0:アンカー筋、31:シーリング材、32:バックア
ップ材、33:ガスケット材、34:PC板保持片、3
4a:孔、35:丸鋼材、36:回転防止部材、37:
凹部、38:スプリングワッシャ、39:プレートワッ
シャ、40:滑り材、41:引きボルト、42:インサ
ート、43:プレート、44:埋め込み筋、45:押し
ボルト、46:仮設用レベル調整金物、47:台座プレ
ート、48:ボルト、49:ナット、50:基台、5
1:ボルト、52:インサート、53:仮設金物、5
4:塞ぎ材、55:仮設パイプ、56:ナット、57:
ねじ孔、58:振れ止めサポート、59:梁、60:床
スラブ、61:鉄筋、62:出入り調整金物、63,6
5:ボルト、64:長孔、66:インサート、70:躯
体、71:躯体付け金物、72:PC板、73:取付け
枠、74:アンカー、75:ピン、76:入口プレー
ト、77:滑り材、78:インサート、79:ボルト、
80:仮設アングル、81:ボルト、82:ナット、8
3:凹部、84:アンカー、85:台座、86:開口、
87:孔、88:塞ぎ材、89:箱枠、90:仮設アン
グル、91:ボルト、92:インサート、93:ナッ
ト、94:ワッシャ、95:プレート、96:長孔、9
7:孔、98,100:PCファスナー、99,10
1:固定金具、102:支持金物。
1a, 1b: frame, 2: first frame-mounted support, 3:
Embedding streak, 4: bolt, 5a, 5b: PC board, 6: anchor bolt, 7: mounting piece, 7a: long hole, 7b: loose hole, 8, 9: nut, 10: second frame-mounted supporting hardware, 11: protruding rod, 12: pedestal hardware, 13: laminated board, 1
4: embedding material, 15: supporting angle, 16: closing material,
20a, 20b: PC board, 21: Structural concrete, 2
1a: Upper surface of framed concrete, 22: framed support hardware, 23: plate, 24: auxiliary bar, 25: base plate, 26: bolt for locking PC board, 27: concrete closing frame, 28: mounting plate, 29 : Anchor plate, 3
0: anchor bar, 31: sealing material, 32: backup material, 33: gasket material, 34: PC board holding piece, 3
4a: hole, 35: round steel, 36: anti-rotation member, 37:
Recess, 38: spring washer, 39: plate washer, 40: sliding material, 41: pull bolt, 42: insert, 43: plate, 44: embedding bar, 45: push bolt, 46: temporary level adjustment metal, 47: Pedestal plate, 48: bolt, 49: nut, 50: base, 5
1: bolt, 52: insert, 53: temporary hardware, 5
4: closing material, 55: temporary pipe, 56: nut, 57:
Screw hole, 58: Anti-sway support, 59: Beam, 60: Floor slab, 61: Reinforcing bar, 62: In / out adjustment hardware, 63, 6
5: bolt, 64: long hole, 66: insert, 70: skeleton, 71: skeleton fitting, 72: PC board, 73: mounting frame, 74: anchor, 75: pin, 76: entrance plate, 77: sliding material , 78: insert, 79: bolt,
80: temporary angle, 81: bolt, 82: nut, 8
3: recess, 84: anchor, 85: pedestal, 86: opening,
87: hole, 88: closing material, 89: box frame, 90: temporary angle, 91: bolt, 92: insert, 93: nut, 94: washer, 95: plate, 96: slot, 9
7: hole, 98, 100: PC fastener, 99, 10
1: fixing bracket, 102: supporting hardware.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 増川 博 東京都港区元赤坂一丁目2番7号 鹿島 建設株式会社内 (72)発明者 小林 美亀雄 東京都調布市飛田給二丁目19番1号 鹿 島建設株式会社技術研究所内 (72)発明者 相場 新之輔 東京都港区元赤坂一丁目2番7号 鹿島 建設株式会社内 (72)発明者 池田 秀機 東京都港区元赤坂一丁目3番8号 鹿島 建設株式会社東京支店内 (72)発明者 鈴木 博行 東京都港区元赤坂一丁目3番8号 鹿島 建設株式会社東京支店内 (72)発明者 矢口 卓郎 東京都港区元赤坂一丁目2番7号 鹿島 建設株式会社内 (72)発明者 河野 賢一 東京都港区元赤坂一丁目2番7号 鹿島 建設株式会社内 (72)発明者 鹿児島 計一 東京都港区元赤坂一丁目3番8号 鹿島 建設株式会社東京支店内 (72)発明者 井田 敏男 東京都港区元赤坂一丁目3番8号 鹿島 建設株式会社東京支店内 (72)発明者 武村 保 東京都港区元赤坂一丁目3番8号 鹿島 建設株式会社東京支店内 (72)発明者 岡本 晴義 東京都葛飾区立石6−13−2 共栄技建 株式会社内 (56)参考文献 特開 平6−101296(JP,A) 特開2000−273994(JP,A) 実開 平5−92306(JP,U) 実開 平6−67628(JP,U) 実公 昭54−5533(JP,Y2) (58)調査した分野(Int.Cl.7,DB名) E04B 2/88 - 2/96 ──────────────────────────────────────────────────続 き Continued on the front page (72) Inventor Hiroshi Masukawa 1-2-7 Moto-Akasaka, Minato-ku, Tokyo Kashima Construction Co., Ltd. (72) Inventor Mikao Kobayashi 2-9-1-1, Tobita-Shiba, Chofu-shi, Tokyo Kashima Construction Co., Ltd.Technical Research Institute (72) Innovator Shinnosuke Aiba 1-2-7 Moto-Akasaka, Minato-ku, Tokyo Kashima Construction Co., Ltd. (72) Hideki Ikeda 1-3-3 Moto-Akasaka, Minato-ku, Tokyo No. 8 Kashima Construction Co., Ltd. Tokyo Branch (72) Inventor Hiroyuki Suzuki 1-8-3 Moto-Akasaka, Minato-ku, Tokyo Kashima Construction Co., Ltd. Tokyo Branch (72) Inventor Takuro Yaguchi 1-Chome Moto-Akasaka, Minato-ku, Tokyo No. 2 Kashima Construction Co., Ltd. (72) Inventor Kenichi Kono 2-7 Motomoto Akasaka, Minato-ku, Tokyo 2-7 Inside Kashima Construction Co., Ltd. (72) Inventor Kazushima Kazuichi Tokyo Metropolitan Government 1-3-8 Moto-Akasaka Kashima Construction Co., Ltd., Tokyo Branch (72) Inventor Toshio Ida 1-3-8 Moto-Akasaka, Minato-ku, Tokyo Kashima Construction Co., Ltd., Tokyo Branch (72) Inventor Tamotsu Takemura Tokyo 1-3-8 Moto-Akasaka, Minato-ku Kashima Construction Co., Ltd. Tokyo Branch (72) Inventor Haruyoshi Okamoto 6-13-2 Tateishi, Katsushika-ku, Tokyo Kyoei Giken Co., Ltd. (56) References JP-A-2000-273994 (JP, A) JP-A-5-92306 (JP, U) JP-A-6-67628 (JP, U) JP-A-54-5553 (JP, Y2) 58) Fields surveyed (Int.Cl. 7 , DB name) E04B 2/88-2/96

Claims (13)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】PC板に予めPCファスナーを埋設し、 このPCファスナーを受けてPC板を躯体側に固定する
固定金具を躯体コンクリートに埋設し、 PC板と躯体との間に塞ぎ材を装着した鉄筋コンクリー
ト構造物へのPC板取付け方法において、 前記固定金具を躯体側に埋設する前にこの固定金具を前
記PCファスナーに対し位置決めされた状態で仮固定
し、 このPC板を前記塞ぎ材とともに躯体側に仮保持し、 この仮保持状態でコンクリートを打設して前記固定金具
をコンクリートに埋設することを特徴とするPC板取付
け方法。
1. A PC fastener is buried in a PC board in advance, and a fixture for receiving the PC fastener and fixing the PC board to a skeleton is buried in skeleton concrete, and a closing member is attached between the PC board and the skeleton. in the PC board mounting process of the reinforced concrete structures, the fixing bracket temporarily fixed in a state where the fixing member is positioned against the PC fastener prior to embedding the skeleton side, precursor together closes the the PC board material A method of mounting a PC board, comprising temporarily holding concrete on the side thereof, placing concrete in the temporarily held state, and embedding the fixing bracket in concrete.
【請求項2】前記PCファスナーはPC板の上端部に埋
設され、 PC板の下端部に仮設支持部材を設け、この仮設支持部
材を介してこのPC板の自重を床側の躯体コンクリート
に支持し、 この状態で天井側の躯体にコンクリートを打設してPC
板上端部を躯体側に固定し、 その後、前記仮設支持部材を取外してPC板の自重をそ
の上端部のPCファスナーを介して躯体側に支持させる
ことを特徴とする請求項1に記載のPC板取付け方法。
2. The PC fastener is embedded in an upper end of a PC board, a temporary support member is provided at a lower end of the PC board, and the weight of the PC board is supported by the concrete on the floor side via the temporary support member. In this state, concrete is poured into the building on the ceiling side and PC
2. The PC according to claim 1, wherein an upper end portion of the PC plate is fixed to the skeleton side, and thereafter, the temporary support member is removed to support a weight of the PC board to the skeleton side via a PC fastener at the upper end portion. Board mounting method.
【請求項3】前記仮設支持部材は、レベル調整ボルトを
有し、このレベル調整ボルトによりPC板の高さ調整を
行うことを特徴とする請求項1または2に記載のPC板
取付け方法。
3. The PC board mounting method according to claim 1, wherein the temporary support member has a level adjustment bolt, and the height of the PC board is adjusted by the level adjustment bolt.
【請求項4】PC板の前記仮保持状態において、前記塞
ぎ材によりコンクリートの型枠の一部を構成することを
特徴とする請求項1から3のいずれかに記載のPC板取
付け方法。
4. The PC board mounting method according to claim 1, wherein a part of a concrete formwork is formed by the closing material in the temporary holding state of the PC board.
【請求項5】前記PCファスナーの上部に、上階側のP
C板の下端部に係合して上階側のPC板の出入り方向の
位置決めを行うための出入り調整手段を設けたことを特
徴とする請求項1から4のいずれかに記載のPC板取付
け方法。
5. An upper floor side P above the PC fastener.
The PC board mounting according to any one of claims 1 to 4, further comprising an access control means for engaging with a lower end portion of the C board to position the PC board on the upper floor in the access direction. Method.
【請求項6】前記出入り調整手段として、 前記PCファスナーに上端が開口した凹部を形成し、 この凹部に、上階側のPC板下端部に埋設したアンカー
に螺合する引きボルトを挿入し、 前記PCファスナーに、上階側のPC板下端部表面に当
接する押しボルトを装着したことを特徴とする請求項5
に記載のPC板取付け方法。
6. As the access control means, a recess having an open upper end is formed in the PC fastener, and a pull bolt which is screwed into an anchor embedded in a lower end of the PC board on the upper floor side is inserted into the recess. 6. The PC fastener according to claim 5, further comprising a push bolt abutting on a lower end surface of the PC board on the upper floor.
PC board mounting method described in the above.
【請求項7】前記固定金具は、その上面にPCファスナ
ーを係止するための係止突起を有し、 前記PCファスナーは、前記係止突起に嵌合する孔を有
し、 前記係止突起はその上端部にネジ部を有し、 この係止突起にPCファスナーの孔を嵌合させて前記係
止突起上端部のネジ部に仮設ナットを螺合させることに
より前記固定金具を前記PCファスナーに仮固定するこ
とを特徴とする請求項1から6のいずれかに記載のPC
板取付け方法。
7. The fixing bracket has a locking projection on an upper surface thereof for locking a PC fastener, the PC fastener has a hole to be fitted in the locking projection, and the locking projection. Has a threaded portion at the upper end thereof, and a hole of a PC fastener is fitted into the locking projection, and a temporary nut is screwed into the threaded portion at the upper end of the locking projection, thereby fixing the fixing bracket to the PC fastener. The PC according to any one of claims 1 to 6, wherein the PC is temporarily fixed to the PC.
Board mounting method.
【請求項8】PC板にPCファスナーが埋設され、 このPCファスナーを受けてこのPC板を躯体側に固定
する固定金具が躯体コンクリートに埋設され、 前記PC板と躯体コンクリートの間に塞ぎ材が装着され
た鉄筋コンクリート構造物へのPC板取付け構造におい
て、 前記PCファスナーをPC板の上端部に設け、 前記固定金具の上面にPCファスナーを係止するための
係止突起を設け、 前記PCファスナーは、前記係止突起に嵌合する孔を有
し、 このPC板の自重をその上端部のPCファスナーおよび
固定金具を介して躯体コンクリート側に支持し、 PC板の下端部は、下階側のPC板のPCファスナーに
対し出入り方向に位置決めされるとともに上下方向に移
動可能に保持され、 前記固定金具はこれに結合されるPCファスナーおよび
塞ぎ材に対し位置決めされた状態でコンクリートに埋設
されたものであることを特徴とするPC板取付け構造。
8. A PC fastener is embedded in the PC board, and a fixing fitting for receiving the PC fastener and fixing the PC board to the skeleton is buried in the skeleton concrete, and a sealing material is interposed between the PC board and the skeleton concrete. In the structure for mounting a PC board to a mounted reinforced concrete structure, the PC fastener is provided on an upper end portion of the PC board, and a locking projection for locking the PC fastener is provided on an upper surface of the fixing bracket. , Having a hole to be fitted to the locking projection, supporting the own weight of the PC board on the skeleton concrete side via a PC fastener and a fixing bracket at an upper end thereof, and a lower end of the PC board at a lower floor side. is held movably in the vertical direction while being positioned in and out direction with respect to PC fastener PC board, PC fasteners the fixing bracket to be coupled thereto PC board mounting structure, characterized in that in a state of being positioned with respect to pre-closing material is one which is embedded in the concrete.
【請求項9】前記固定金具の上面に、PC板に近接させ
て棒材を配設し、この棒材を介して前記PCファスナー
を前記固定金具上に支持したことを特徴とする請求項8
に記載のPC板取付け構造。
9. The PC fastener according to claim 8, wherein a bar is provided on an upper surface of said fixture in close proximity to a PC plate, and said PC fastener is supported on said fixture via said bar.
PC board mounting structure described in 1.
【請求項10】前記固定金具上面の係止突起は、その上
端部に仮設ナット装着用のネジが形成され、この仮設ナ
ット締め付け時にこの固定金具がPCファスナーに対し
回転することを防止するための回転防止部材をこの固定
金具上面に設けたことを特徴とする請求項8または9に
記載のPC板取付け構造。
10. A locking nut on the upper surface of the fixing bracket is formed with a screw for mounting a temporary nut at an upper end thereof, and is used to prevent the fixing bracket from rotating with respect to the PC fastener when the temporary nut is tightened. 10. The PC board mounting structure according to claim 8, wherein an anti-rotation member is provided on an upper surface of the fixture.
【請求項11】前記固定金具の上面は躯体側コンクリー
トの上面より低くなるように段差が形成され、前記係止
突起の高さはこの段差の高さ以下であることを特徴とす
る請求項8から10のいずれかに記載のPC板取付け構
造。
11. A step is formed so that an upper surface of the fixing bracket is lower than an upper surface of the concrete on the skeleton side, and the height of the locking projection is equal to or less than the height of the step. 11. The PC board mounting structure according to any one of items 1 to 10.
【請求項12】前記固定金具の上面は躯体側コンクリー
トの上面より低くなるように段差が形成され、この固定
金具の上面に該段差に対応した高さの箱枠を設けたこと
を特徴とする請求項8から10のいずれかに記載のPC
板取付け構造。
12. A step is formed so that an upper surface of the fixing bracket is lower than an upper surface of the concrete on the skeleton side, and a box frame having a height corresponding to the step is provided on the upper surface of the fixing bracket. The PC according to any one of claims 8 to 10.
Board mounting structure.
【請求項13】鉄筋コンクリート構造物へのPC板取付
け構造において、 PC板の上端部および下端部に、内部に水平方向のピン
を有するPCファスナーを埋設し、 躯体側から突出して前記ピンに係止する上端が開口した
凹部を有する固定金具を躯体コンクリートに埋設し、 前記固定金具は、PC板の上端部および下端部のうち一
方のPCファスナーのピンに対し、この固定金具の前記
凹部の底部が密着してこのPC板の自重を支持し、 他方のPCファスナーのピンに対しては前記凹部の底部
から浮かせた状態で係止し、 前記固定金具はこれに係止するPCファスナーおよび塞
ぎ材に対し位置決めされた状態でコンクリートに埋設さ
れたものであることを特徴とするPC板取付け構造。
13. A mounting structure of a PC board to a reinforced concrete structure, wherein a PC fastener having a horizontal pin therein is embedded in an upper end and a lower end of the PC board, and the PC fastener is projected from a skeleton side and locked to the pin. A fixing bracket having a recess with an open upper end is embedded in skeleton concrete, and the fixing bracket has a bottom portion of the recess of the fixing bracket with respect to a pin of one PC fastener of an upper end portion and a lower end portion of a PC board. The weight of the PC board is tightly supported, and it is locked to the other PC fastener pin while floating from the bottom of the recess, and the fixing bracket is used for the PC fastener and the closing material which are locked to the pin. A PC board mounting structure characterized by being buried in concrete while being positioned with respect to the PC board.
JP13824899A 1999-05-19 1999-05-19 PC board mounting method and mounting structure Expired - Fee Related JP3251262B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13824899A JP3251262B2 (en) 1999-05-19 1999-05-19 PC board mounting method and mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13824899A JP3251262B2 (en) 1999-05-19 1999-05-19 PC board mounting method and mounting structure

Publications (2)

Publication Number Publication Date
JP2000328701A JP2000328701A (en) 2000-11-28
JP3251262B2 true JP3251262B2 (en) 2002-01-28

Family

ID=15217538

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13824899A Expired - Fee Related JP3251262B2 (en) 1999-05-19 1999-05-19 PC board mounting method and mounting structure

Country Status (1)

Country Link
JP (1) JP3251262B2 (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3902451B2 (en) * 2001-11-15 2007-04-04 大成建設株式会社 Structure of fastener and its buried setting part
CA2499824C (en) * 2002-09-30 2009-12-08 Canon Kabushiki Kaisha Liquid supply system, fluid communicating structure, ink supply system, and inkjet recording head utilizing the fluid communicating structure
JP2004176340A (en) * 2002-11-26 2004-06-24 Naoyuki Nishimura Aseismatic concrete wall body panel, and its installation method
JP2006104735A (en) * 2004-10-04 2006-04-20 Shimizu Corp Wall panel mounting structure and fastener
JP6785564B2 (en) * 2016-02-19 2020-11-18 大成建設株式会社 Connecting structure and wall material
JP6905800B2 (en) * 2016-06-24 2021-07-21 大成建設株式会社 Structure related to the mating part of the outer surface arrangement PCa plate and the floor slab
JP7160634B2 (en) * 2018-10-31 2022-10-25 旭化成ホームズ株式会社 Joint structure of outer wall slab and building
CN109372128A (en) * 2018-11-02 2019-02-22 山东海龙建筑科技有限公司 Exterior wall limit connector, assembling type outer wall and processing method and construction installation method
JP7248510B2 (en) * 2018-12-27 2023-03-29 大和ハウス工業株式会社 Column-beam connection structure

Also Published As

Publication number Publication date
JP2000328701A (en) 2000-11-28

Similar Documents

Publication Publication Date Title
US20070039258A1 (en) Adjustable attachment system
JP3251262B2 (en) PC board mounting method and mounting structure
US4045933A (en) Prefabricated panel structure
JPH10176378A (en) Installation structure of earthquakeproofing wall
JP2002194746A (en) Anchor bolt burying method
JP3333757B2 (en) Construction member of exterior wall of reinforced concrete building and exterior wall construction method using the same
JPH0115774Y2 (en)
JPS61176731A (en) Mounting of weight member to concrete structure wall body
EP4180610B1 (en) Fixing anchor and a set containing at least one this fixing anchor
JPS5854489Y2 (en) Fastener base mounting device in buildings
KR102582701B1 (en) Seismic retrofit device against overturning of partition wall
JP4502542B2 (en) Corner panel mounting structure
JPS6229544Y2 (en)
JPH11293919A (en) Retaining structure of form and method thereof
JPH102047A (en) Mounting structure of wall panel
JP2001295497A (en) Structure of installing viscous seismic control wall onto concrete beam
JPH0229826B2 (en) KEIRYOKIHOKONKURIITOBAN
JPH04153465A (en) Constructing method with partition bearing-wall panel for extension
JP2000274147A (en) Mounting structure and mounting metal fitting of sash frame and mounting method of sash frame
JP2537341Y2 (en) Building ceiling joist fastening structure and joist receiving bracket
JPH05156734A (en) Wall structure of architecture having finish panel of long size external wall
JPH0137046Y2 (en)
JP2003278281A (en) Setting structure of column of building
JP2001027001A (en) Fitting structure of upper part of wall panel
JP2004238976A (en) Cutoff structure for concrete construction

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees