JP3240964B2 - Construction method of pile foundation - Google Patents

Construction method of pile foundation

Info

Publication number
JP3240964B2
JP3240964B2 JP20120597A JP20120597A JP3240964B2 JP 3240964 B2 JP3240964 B2 JP 3240964B2 JP 20120597 A JP20120597 A JP 20120597A JP 20120597 A JP20120597 A JP 20120597A JP 3240964 B2 JP3240964 B2 JP 3240964B2
Authority
JP
Japan
Prior art keywords
formwork
folding
pile
steel plate
piles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP20120597A
Other languages
Japanese (ja)
Other versions
JPH1143952A (en
Inventor
俊雄 牧野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Sumitomo Metal Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Metal Industries Ltd filed Critical Sumitomo Metal Industries Ltd
Priority to JP20120597A priority Critical patent/JP3240964B2/en
Publication of JPH1143952A publication Critical patent/JPH1143952A/en
Application granted granted Critical
Publication of JP3240964B2 publication Critical patent/JP3240964B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本願発明は、地盤中に打設し
た複数本の杭とこれらの杭頭部をつなぐ鉄筋コンクリー
ト製のフーチングとを有する杭基礎の構築方法に関する
ものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a pile foundation having a plurality of piles cast in the ground and a reinforced concrete footing connecting these pile heads.

【0002】[0002]

【従来の技術】杭基礎の構築では、一般的に、杭を所定
位置に打設した後、杭頭部の土の掘削と締固めを行い、
その後、捨てコンクリートを打設し、捨てコンクリート
上に個々の鉄筋を配置し結束線で緊結することにより配
筋し、その回りに型枠として4枚の合板製または金属製
のせき板パネルを立てて長方形に配置し、これをセパレ
ータ等を使用して固定している。
2. Description of the Related Art In the construction of a pile foundation, generally, after a pile is driven into a predetermined position, excavation and compaction of soil at a pile head are performed.
After that, cast abandoned concrete, arrange the individual reinforcing bars on the abandoned concrete, tie them up with binding wires, arrange them, and set up four plywood or metal dam panels as formwork around them. Are arranged in a rectangular shape, and this is fixed using a separator or the like.

【0003】また、上部構造物の柱脚部を固定するため
のアンカーボルトは、型枠の上部にテンプレートをおい
て吊り下げたり、アングル等により構成したアンカーフ
レームを利用して所定の位置に配置している。
An anchor bolt for fixing a column base of an upper structure is suspended at a template on an upper part of a formwork, or is disposed at a predetermined position by using an anchor frame constituted by an angle or the like. are doing.

【0004】コンクリートの打設、硬化後は、型枠を解
体撤去し、掘削部の埋め戻しを行っている。
After placing and hardening concrete, the formwork is dismantled and removed, and the excavated portion is backfilled.

【0005】[0005]

【発明が解決しようとする課題】上述した従来の型枠工
法では、合板製や金属製のせき板を再使用することを前
提としており、型枠の解体に非常に手間がかかり、再使
用のための掃除と維持管理にもコストがかかる。
The above-described conventional formwork method is based on the premise that plywood or metal dams will be reused, and the dismantling of the formwork is extremely troublesome, and the reuse of the formwork is difficult. Cleaning and maintenance costs are also high.

【0006】これらの問題を解決するため、ラス型枠工
法などの捨て型枠工法が種々提案されているが、いずれ
も現場での組立てに手間を要し、作業が煩雑であるとと
もに、構成が複雑なため製作費も高くなっている。ま
た、型枠の組立には従来の型枠工法と同様にフォームタ
イと端太角を使用しているため、これらの材料は回収す
る必要が生じる。
[0006] In order to solve these problems, there have been proposed various disposal mold construction methods such as a lath form method, but all of them require time and labor for assembling on site, and the work is complicated, and the structure is complicated. Production costs are high due to the complexity. In addition, since a form tie and a wide angle corner are used for assembling the form as in the case of the conventional form method, it is necessary to collect these materials.

【0007】なお、本願出願人は、独立基礎について
は、先に、上下の2辺に上部折り曲げ部と下部折り曲げ
部を有する4枚の鋼板パネルを、平面形状が長方形にな
るように立てて配置し、鋼板パネルどうしの隣接する縁
を屈曲可能な接合部材を介して接合して折り畳み可能と
した折り畳み型枠と、この折り畳み型枠を用いた独立基
礎の構築方法を提案している(特開平8−93218号
公報参照)。
[0007] The applicant of the present invention firstly arranges four steel plate panels having an upper bent portion and a lower bent portion on two upper and lower sides so as to have a rectangular planar shape. In addition, there has been proposed a folding formwork in which adjacent edges of steel plate panels are joined via a bendable joining member so as to be able to be folded, and a method of constructing an independent foundation using the folding formwork (Japanese Patent Laid-Open No. HEI 9-260572). 8-93218).

【0008】また、従来の施工方法では鉄筋工、型枠工
といった専門職種が必要であり、工事量が多い時には職
人の確保が難しくなり工程的にも問題が生じる。
Further, in the conventional construction method, a specialty such as a reinforcing bar and a formwork is required, and when the amount of construction is large, it is difficult to secure craftsmen, which causes a problem in the process.

【0009】本願発明は上述のような課題の解決を図っ
たものであり、複数の杭とこれらの杭頭部をつなぐフー
チングとを有する杭基礎について、現場での組立てが簡
単で専門職種を必要としない、施工性の良い、経済的な
構築方法を提供することを目的としている。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems. A pile foundation having a plurality of piles and a footing for connecting these pile heads is easy to assemble on site and requires a specialty. It is intended to provide an economical construction method with good workability.

【0010】[0010]

【課題を解決するための手段】本願の請求項1に係る杭
基礎の構築方法は、地盤中に打設した複数本の杭と前記
複数本の杭の杭頭部をつなぐフーチングとを有する杭基
礎の構築方法であって、上下の2辺に上部折り曲げ部と
下部折り曲げ部を有する4枚の鋼板パネルを、平面形状
が長方形になるように立てて配置し、前記鋼板パネルど
うしの隣接する縁を屈曲可能な接合部材を介して接合し
て折り畳み可能とした折り畳み型枠を、前記複数本の杭
の杭頭部を取り囲むように長方形に広げて高さ方向に複
数段積み上げて設置し、上側の折り畳み型枠を構成する
鋼板パネルの下部折り曲げ部と下側の折り畳み型枠を構
成する鋼板パネルの上部どうしを結合し、内部に柱脚固
定用のアンカーボルトを支持するアンカーポストとコン
クリート補強用の先組鉄筋とを設置した状態で、前記折
り畳み型枠内にコンクリートを打設することを特徴とす
るものである。
According to a first aspect of the present invention, there is provided a pile foundation construction method comprising: a pile having a plurality of piles cast in the ground; and a footing connecting the pile heads of the plurality of piles. A method of constructing a foundation, comprising: placing four steel panels having upper bent portions and lower bent portions on two upper and lower sides so as to have a rectangular planar shape; The folding formwork which can be folded by being joined through a bendable joining member is spread in a rectangular shape so as to surround the pile heads of the plurality of piles, and
Stack several stages to form the upper folding formwork
Combine the lower bent part of the steel panel and the lower folding formwork.
The upper part of the steel plate panel to be formed is joined together, and concrete is poured into the folding formwork with an anchor post for supporting an anchor bolt for fixing a column pedestal and a pre-assembled rebar for concrete reinforcement installed inside. It is characterized by doing.

【0011】本願発明は、特殊な技量を必要とすること
なく施工できることを前提に考えており、その手段とし
て、鉄筋工を不要とする先組鉄筋の使用、アンカーボル
トの位置決めを容易にするアンカーポストの使用、型枠
工を不要とする折り畳み型枠の使用を含めている。
The present invention is based on the premise that construction can be performed without the need for special skills, and as means for this, use of pre-assembled rebar which does not require rebar work, and anchors which facilitate the positioning of anchor bolts Includes the use of posts and the use of folding formwork that eliminates the need for formwork.

【0012】折り畳み型枠は、上述した本願出願人によ
る独立基礎用の型枠(特開平8−93218号公報)と
基本的には同一の構成を有しているが、杭の飲み込み長
さ(杭頭部におけるフーチングの厚さ)やパンチングシ
ヤーなどの関係から型枠の高さは独立基礎用のものと比
べ、高くする必要がある。
The folding formwork has basically the same configuration as the above-described independent foundation formwork (JP-A-8-93218), but the swallowing length of the pile ( Due to factors such as the thickness of the footing at the pile head) and punching shear, the height of the formwork must be higher than that for the independent foundation.

【0013】折り畳み型枠の設置に関しては、例えば杭
頭部の掘削底部に打設した捨てコンクリート上に、折り
畳み型枠を構成する鋼板パネルの下部折り曲げ部を載
せ、これをコンクリート釘あるいはホールインアンカー
等を利用して固定するといったことが行われる。
[0013] Regarding the installation of the folding formwork, for example, a lower bent portion of a steel plate panel constituting the folding formwork is placed on discarded concrete cast at the excavation bottom of the pile head, and this is put on a concrete nail or a hole-in anchor. And the like are fixed.

【0014】このような構成において、本願発明は、特
に、折り畳み型枠を高さ方向に複数段積み上げ、上側の
折り畳み型枠を構成する鋼板パネルの下部折り曲げ部と
下側の折り畳み型枠を構成する鋼板パネルの上部どうし
を結合するようにしたものである。
In such a configuration, the present invention provides
A plurality of folding forms are stacked in the height direction, and the lower bent portion of the steel sheet panel forming the upper folding form and the upper part of the steel sheet panel forming the lower folding form are joined together. It is.

【0015】型枠の高さが高い場合、内部に打設するコ
ンクリートからの側圧が大きくなり、型枠のはらみが顕
著に発生する。この対処方法として、型枠の板厚を厚く
する方法があるが、その場合、型枠重量が増加し、現場
での施工において重機等の補助機を使用する必要が生じ
る。
When the height of the formwork is high, the lateral pressure from the concrete to be cast therein becomes large, and the formwork is notably stuck. As a countermeasure for this, there is a method of increasing the thickness of the formwork. However, in this case, the weight of the formwork increases, and it becomes necessary to use an auxiliary machine such as a heavy machine for construction on site.

【0016】これに対処するため、本願発明では、折り
畳み型枠を高さ方向に複数段積み上げて結合することと
し、単一の折り畳み型枠の重量は人力で運搬可能な範囲
に押さえることが可能となっている。
[0016] To cope with this, in the present application onset bright, and be coupled by stacking a plurality of stages of folding frame in the height direction, of a single foldable frame weight be suppressed to the extent possible transported by human power It is possible.

【0017】また、各段の折り畳み型枠を構成する鋼板
パネルが、それぞれ上下の2辺に上部折り曲げ部と下部
折り曲げ部を有しており、これらが補強リブとして機能
することによっても型枠のはらみ出しを抑えることがで
きる。
Further, the steel sheet panels constituting the folding formwork of each step have upper and lower bent parts on the upper and lower two sides, respectively, and these also function as reinforcing ribs, so that the formwork of the formwork is also formed. Extrusion can be suppressed.

【0018】さらに、型枠が大型化し、高さが高い場合
には、上記の折り曲げ部のみでは型枠のはらみ出しを防
止できないことが想定され、その場合は、折り曲げ部に
形成した孔を利用して、相対する折り曲げ部をタイバー
で連結するなどしてはらみを防止することができる。
Further, when the form is large and the height is high, it is supposed that it is impossible to prevent the form from protruding only by the above-mentioned bent portion. In this case, the hole formed in the bent portion is used. In this way, it is possible to prevent the bent portions from being connected to each other with a tie bar or the like so as to prevent the bent portions.

【0019】[0019]

【発明の実施の形態】図1は、本願発明の杭基礎の構築
方法と対比される方法として、折り畳み型枠を高さ方向
に複数段積み上げない場合におけるコンクリート打設前
の杭頭部の概要を示したものである。
Figure 1 DETAILED DESCRIPTION OF THE INVENTION As a method to be compared with how to build a pile foundation of the present invention, the height direction folding formwork
Fig. 1 shows an outline of a pile head before concrete is poured when multiple piles are not stacked .

【0020】この例では、地盤中に打設した並列する2
本の杭13の杭頭部を掘削し、締固め後、捨てコンクリ
ート11を打設し、その上に後述する4枚の鋼板パネル
1を長方形に組んだ折り畳み型枠を固定し、その内側に
アンカーボルト15を支持するアンカーポスト14およ
びあらかじめ鉄筋を格子状に組んだ先組鉄筋12を配置
している。
In this example, two parallel
After excavating the pile head of the pile 13 and compacting it, casting a discarded concrete 11 thereon, fixing a folding formwork in which four steel plate panels 1 described later are assembled in a rectangular shape, and inside thereof, An anchor post 14 for supporting an anchor bolt 15 and a pre-assembled reinforcing bar 12 in which reinforcing bars are previously assembled in a lattice shape are arranged.

【0021】この状態でコンクリートを打設することに
より、折り畳み型枠を捨て型枠として、杭頭部に杭基礎
を構成する鉄筋コンクリート製のフーチングが形成され
る。
By pouring concrete in this state, a footing made of reinforced concrete constituting a pile foundation is formed at the pile head, using the folding form as a discard form.

【0022】図2(a),(b) は、本願発明で用いる折り畳
み型枠の一例を示したもので、互いに隣り合う縁が接合
部材としての連結シート5で連結された4枚の鋼板パネ
ル1とタイバー4からなっている。
FIGS. 2 (a) and 2 (b) show an example of a folding formwork used in the present invention, in which four adjacent steel sheets are connected by a connecting sheet 5 as a joining member. It consists of 1 and 4 tie bars.

【0023】鋼板パネル1の上下の縁は曲げ加工され、
下部折り曲げ部2には捨てコンクリートに固定するため
のホールインアンカーまたはコンクリート釘7用の孔9
が開いている。また、上部折り曲げ部3にはタイバー4
を接合するための孔10が開いている。
The upper and lower edges of the steel plate 1 are bent.
A hole 9 for a hole 9 for a concrete nail or a hole-in anchor for fixing to the discarded concrete is provided in the lower bent portion 2.
Is open. In addition, a tie bar 4 is provided in the upper bent portion 3.
The hole 10 for joining is opened.

【0024】輸送および保管時には、鋼板パネル1どう
しを連結シート5部分で図2(b) に示すような形に折り
畳むことができるので、余分な場所を必要としない。
At the time of transportation and storage, the steel sheet panels 1 can be folded at the connecting sheet 5 in the shape shown in FIG. 2B, so that no extra space is required.

【0025】連結シート5は引張り強度が高く曲げ追随
性の良い合成樹脂シート(例えば、コンベアベルトに用
いられているようなものが利用できる)に取付け孔を開
けたものであり、鋼板パネル1の縁に開けられた孔にボ
ルト6等で接合することにより、パネルどうしを折り畳
み可能な状態で連結することができる。なお、連結シー
ト5はボルト接合の代わりに強力な接着剤によって取り
付けてもよい。また、連結シート5の代わりに蝶番等他
の屈曲可能な接合部材を使用してもよい。
The connecting sheet 5 is a sheet made of a synthetic resin sheet having a high tensile strength and good bending followability (for example, a sheet used for a conveyor belt can be used). The panels can be connected to each other in a foldable state by joining the holes formed in the edges with bolts 6 or the like. Note that the connection sheet 5 may be attached with a strong adhesive instead of the bolt connection. Further, instead of the connection sheet 5, another bendable joining member such as a hinge may be used.

【0026】なお、基礎の形状が大きい場合等は、相対
する鋼板パネル1の上部折り曲げ部3どうしをタイバー
4で連結することで、コンクリートからの側圧により変
形するのを抑えることができる。この例で、タイバー4
は鋼製の帯板の両端に孔を開けたものであり、図3(a)
に示すように上部折り曲げ部3とボルト8によって接合
される。
When the foundation has a large shape or the like, the upper bent portions 3 of the steel plate panels 1 are connected to each other by the tie bars 4, so that deformation due to lateral pressure from concrete can be suppressed. In this example, tie bar 4
Fig. 3 (a) shows a steel strip with holes at both ends.
As shown in the figure, the upper bent portion 3 and the bolt 8 are joined.

【0027】上下辺の折り曲げ形状は、製作上は図3
(a) に示す1回曲げが簡単であるが、より強度を上げる
ために図3(b) に示すようなリップ溝形断面、あるいは
図3(c) に示すように折り返して上下の折り曲げ部2,
3の厚みが増すような形状としてもよい。さらには、型
枠中央部分のはらみ出しを小さく抑えるために、高さ方
向に波板加工を施してもよい。
The bent shape of the upper and lower sides is shown in FIG.
The single bending shown in (a) is easy, but in order to increase the strength, a lip groove-shaped cross section as shown in FIG. 3 (b) or a folded part as shown in FIG. 2,
3 may be shaped to increase the thickness. Further, in order to suppress the protrusion of the central portion of the form to be small, corrugated plate processing may be performed in the height direction.

【0028】図4は、本願発明の一実施形態として、
り畳み型枠の重量増加を抑え、かつ変形を防止するた
め、高さ方向に2段積み上げた様子を示したものであ
る。他の構成については対比例としての図1の場合と同
様であり、図1における1段の折り畳み型枠を上下に結
合された2段の折り畳み型枠に置き換えて考えることが
できる。
FIG. 4 shows, as an embodiment of the present invention, a state in which the folding molds are stacked in two levels in the height direction in order to suppress an increase in weight and prevent deformation. Other configurations are the same as in FIG. 1 as a comparative example.
The one-stage folding formwork in FIG.
It can be replaced with a two-stage folded formwork
it can.

【0029】これは、実質的に型枠を高さ方向に分割し
たことに相当し、1つの型枠の重量を人間で持ち運び可
能な重量に設定することが可能となる。さらに、下側の
折り畳み型枠の上部折り曲げ部3と上側の折り畳み型枠
の下部折り曲げ部2を、現場でボルト等で結合し一体化
することで、これらの折り曲げ部2,3が水平方向のリ
ブとして機能するため、変形を防止することができる。
This is substantially equivalent to dividing the formwork in the height direction, and it is possible to set the weight of one formwork to a weight that can be carried by a human. Furthermore, the upper bent part 3 of the lower folding formwork and the lower bent part 2 of the upper folding formwork are combined and integrated at the site with bolts or the like, so that these bent parts 2 and 3 are aligned in the horizontal direction. Since it functions as a rib, deformation can be prevented.

【0030】図5は、図4の形態に対し、さらに変形を
抑制するできるようにしたものである。すなわち、下側
の折り畳み型枠の上部折り曲げ部3と上側の折り畳み型
枠の下部折り曲げ部2との間にタイバー4を挟んでボル
トで結合し、さらに上側の折り畳み型枠の上部折り曲げ
部3にもタイバー4を配置することで、水平方向のリブ
の機能と相まって、さらに変形を抑制することができ
る。
FIG. 5 shows a further modification of the embodiment shown in FIG. That is, the upper folding part 3 of the lower folding form and the lower folding part 2 of the upper folding form are connected by bolts with the tie bar 4 interposed therebetween. Also, by disposing the tie bar 4, the deformation can be further suppressed in combination with the function of the rib in the horizontal direction.

【0031】図6(a) ,(b) は、柱引き抜き力により杭
基礎フーチング上部にも配筋が必要な場合の上部配筋の
配置方法を示したものである。
FIGS. 6 (a) and 6 (b) show a method of arranging the upper reinforcing bar in a case where a reinforcing bar is also required at the upper portion of the pile foundation footing due to the column pull-out force.

【0032】図6(a) では、最上部の折り畳み型枠の上
部折り曲げ部3に取り付けた鉄筋支持材16に、先組鉄
筋12を載せることで、上部鉄筋の位置決めおよび支持
を行っている。また、図6(b) では、最上部の折り畳み
型枠の上部折り曲げ部3に載せた鋼管17等の横材か
ら、吊り材18により先組鉄筋12を吊り下げることで
上部鉄筋の配筋を行っている。
In FIG. 6 (a), positioning and support of the upper reinforcing bar are performed by placing the pre-assembled reinforcing bar 12 on the reinforcing bar support member 16 attached to the upper bent portion 3 of the uppermost folding formwork. In FIG. 6B, the reinforcement of the upper reinforcing bar 12 is suspended by suspending the pre-assembled reinforcing bar 12 from the horizontal member such as the steel pipe 17 placed on the upper bent portion 3 of the uppermost folding formwork. Is going.

【0033】[0033]

【発明の効果】本願発明の杭基礎構造の構築方法によれ
ば、型枠、アンカーボルトの設置、配筋等に専門の職種
を必要とすることなく杭基礎が構築できるとともに、施
工後の型枠の解体・掃除が省略できるため、工期を短縮
することができる。折り畳み型枠を高さ方向に複数段積
み上げて結合するため、型枠高さが高くなる場合でも、
単一の折り畳み型枠の重量は人力で運搬可能な範囲に押
さえることができる。 また、各段の折り畳み型枠を構成
する鋼板パネルが、それぞれ上下の2辺に上部折り曲げ
部と下部折り曲げ部を有しており、これらが補強リブと
して機能することによっても型枠のはらみ出しを抑える
ことができる。
According to the method for constructing a pile foundation structure of the present invention, a pile foundation can be constructed without requiring a specialized job for formwork, installation of anchor bolts, reinforcing bars, etc. Since dismantling and cleaning of the frame can be omitted, the construction period can be shortened. Stacking the folding formwork in multiple heights
Because it is raised and joined, even if the formwork height is high,
The weight of a single folding form must be kept within the range that can be transported manually.
Can be sustained. In addition, the folding formwork of each stage is configured
Steel panels to be bent upward on the upper and lower sides respectively
Part and a lower bent part, these are reinforcing ribs and
Function to keep the formwork from sticking out
be able to.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本願発明に対する対比例におけるコンクリー
ト打設前の杭頭部の概要を示したもので、(a) 平面図、
(b) は正面図(一部断面図)である。
FIG. 1 shows an outline of a pile head before concrete casting in comparison with the present invention, and (a) a plan view,
(b) is a front view (partial sectional view).

【図2】 本願発明で用いる折り畳み型枠の一例を示し
たもので、(a) は広げた状態の斜視図、(b) は折り畳ん
だ状態の斜視図である。
FIGS. 2A and 2B show an example of a folding formwork used in the present invention, wherein FIG. 2A is a perspective view in an expanded state, and FIG. 2B is a perspective view in a folded state.

【図3】 (a) は図2の型枠の要部拡大断面図、(b) お
よび(c) は鋼板パネル折り曲げ部の変形例を示す断面図
である。
3 (a) is an enlarged cross-sectional view of a main part of the formwork of FIG. 2, and (b) and (c) are cross-sectional views showing modified examples of a bent portion of a steel plate panel.

【図4】 本願発明の一実施形態として、折り畳み型枠
を高さ方向に2段に積み上げた場合を示す斜視図であ
る。
One embodiment of FIG. 4 the present invention, is a perspective view showing a case in which stacked two-stage folding-type frame in the height direction.

【図5】 本願発明の他の実施形態として、折り畳み型
枠を高さ方向に2段に積み上げ、さらにタイバーを取り
付けた場合を示す斜視図である。
Another embodiment of Figure 5 the present invention, stacked in two stages foldable frame in the height direction, is a perspective view showing a case fitted with a further tie bars.

【図6】 (a) および(b) はそれぞれ上部配筋の配置方
法の一例を示す断面図である。
FIGS. 6A and 6B are cross-sectional views each showing an example of a method of arranging upper reinforcing bars.

【符号の説明】[Explanation of symbols]

1…鋼板パネル、2…下部折り曲げ部、3…上部折り曲
げ部、4…タイバー、5…連結シート、6…パネル連結
ボルト、7…ホールイナンカーまたはコンクリート釘、
8…ボルト、9…ホールインアンカーまたはコンクリー
ト釘用の孔、10…タイバー用の孔、11…捨てコンク
リート、12…先組鉄筋、13…杭、14…アンカーポ
スト、15…アンカーボルト、16…鉄筋支持材、17
…鋼管、18…吊り材
DESCRIPTION OF SYMBOLS 1 ... Steel plate panel, 2 ... Lower bent part, 3 ... Upper bent part, 4 ... Tie bar, 5 ... Connection sheet, 6 ... Panel connection bolt, 7 ... Hole anchor or concrete nail,
8 bolt, 9 hole for hole-in anchor or concrete nail, 10 hole for tie bar, 11 discarded concrete, 12 steel bar, 13 pile, 14 anchor post, 15 anchor bolt, 16 Reinforcing bars, 17
... steel pipe, 18 ... hanging material

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) E02D 27/12 E04G 9/08 ──────────────────────────────────────────────────続 き Continued on the front page (58) Field surveyed (Int.Cl. 7 , DB name) E02D 27/12 E04G 9/08

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 地盤中に打設した複数本の杭と前記複数
本の杭の杭頭部をつなぐフーチングとを有する杭基礎の
構築方法であって、上下の2辺に上部折り曲げ部と下部
折り曲げ部を有する4枚の鋼板パネルを、平面形状が長
方形になるように立てて配置し、前記鋼板パネルどうし
の隣接する縁を屈曲可能な接合部材を介して接合して折
り畳み可能とした折り畳み型枠を、前記複数本の杭の杭
頭部を取り囲むように長方形に広げて高さ方向に複数段
積み上げて設置し、上側の折り畳み型枠を構成する鋼板
パネルの下部折り曲げ部と下側の折り畳み型枠を構成す
る鋼板パネルの上部どうしを結合し、内部に柱脚固定用
のアンカーボルトを支持するアンカーポストとコンクリ
ート補強用の先組鉄筋とを設置した状態で、前記折り畳
み型枠内にコンクリートを打設することを特徴とする杭
基礎の構築方法。
1. A method for constructing a pile foundation having a plurality of piles driven into the ground and a footing connecting the pile heads of the plurality of piles, wherein an upper bent portion and a lower portion are provided on two upper and lower sides. A folding type in which four steel plate panels each having a bent portion are arranged upright so that the planar shape becomes rectangular, and adjacent edges of the steel plate panels are joined via a bendable joining member so as to be foldable. The frame is extended in a rectangular shape so as to surround the pile heads of the plurality of piles, and a plurality of
Steel plates that are stacked and installed to form the upper folding formwork
Configure the lower folding part of the panel and the lower folding formwork
Concrete parts are poured into the folding formwork in a state where the upper portions of the steel plate panels are connected to each other, and an anchor post for supporting an anchor bolt for fixing a column pedestal and a pre-assembled reinforcing bar are installed inside. A method of constructing a pile foundation, characterized in that:
JP20120597A 1997-07-28 1997-07-28 Construction method of pile foundation Expired - Lifetime JP3240964B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20120597A JP3240964B2 (en) 1997-07-28 1997-07-28 Construction method of pile foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20120597A JP3240964B2 (en) 1997-07-28 1997-07-28 Construction method of pile foundation

Publications (2)

Publication Number Publication Date
JPH1143952A JPH1143952A (en) 1999-02-16
JP3240964B2 true JP3240964B2 (en) 2001-12-25

Family

ID=16437100

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20120597A Expired - Lifetime JP3240964B2 (en) 1997-07-28 1997-07-28 Construction method of pile foundation

Country Status (1)

Country Link
JP (1) JP3240964B2 (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FI20075384L (en) * 2007-05-29 2008-11-30 Rautaruukki Oyj Column attachment positioning method and device
ES2361867B1 (en) * 2009-12-11 2012-03-23 Grupo De Ingenier�?A Oce�?Nica, S.L. METHOD OF MANUFACTURE, INFLATION AND INJECTION OF UNDERWATER PILOTS TICOS.
JP5563409B2 (en) * 2010-09-03 2014-07-30 株式会社住金システム建築 Anchor bolt installation jig and pile foundation construction method using the installation jig
JP2020002711A (en) * 2018-06-29 2020-01-09 旭化成ホームズ株式会社 Structure and construction method thereof
JP7175669B2 (en) * 2018-08-03 2022-11-21 Jfeシビル株式会社 Formwork, foundations and methods of construction of foundations
JP7408364B2 (en) * 2019-03-11 2024-01-05 株式会社フジタ Structure
JP7424824B2 (en) * 2019-07-10 2024-01-30 庄次 松澤 Formwork for building column bases and method of assembling formwork for building column bases
CN116290059B (en) * 2023-01-04 2023-09-08 江苏海洋大学 Prefabricated ultra-high performance concrete spiral pile cap and construction process

Also Published As

Publication number Publication date
JPH1143952A (en) 1999-02-16

Similar Documents

Publication Publication Date Title
JP3240964B2 (en) Construction method of pile foundation
KR101044441B1 (en) Slab top-down method of underground construction
JP2742994B2 (en) Bridge pier reinforcement method
JP4347846B2 (en) Bridge pier reinforcement method
JP3200813B2 (en) Beam formwork structure and its forming method
JP4421124B2 (en) Civil engineering structures such as sabo dams, etc. using long materials such as steel sheet piles and thinned wood, and construction methods
JP2004131988A (en) Precast block for bridge pier/abutment, bridge pier/abutment using precast block, and work execution method for bridge pier/abutment
JP3137448B2 (en) Construction method of concrete main tower
JP3945668B2 (en) Construction method of concrete pier
JP2000328586A (en) Retaining wall
JPH0122405B2 (en)
JP3835716B2 (en) Reinforced concrete pier construction method
JPH0893218A (en) Construction of individual footing and folding form for individual footing
JP2002242210A (en) Earth retaining wall and construction method therefor
JPH06264453A (en) Precast concrete-made permanent form for foundation, and foundation practice using its form
JP2003034997A (en) Earthquake-resistant steel plate wall and its construction method
JP2891931B2 (en) Formwork for building concrete structures
JPH11117333A (en) Construction method of concrete structure and form therefor
JPH10102423A (en) Pca form and construction method of pier using the same pca form
JP2886376B2 (en) Anchor structure of pile head
KR102482691B1 (en) Foundation structures using strut-tie reinforcement and its construction method
JP7471678B1 (en) Formwork panels and method for pouring a concrete slab
JP3589329B2 (en) Construction method
JPH06299718A (en) Construction of wall, floor in atomic power plant and wall slab thereof
JPS6115085Y2 (en)

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20010918

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081019

Year of fee payment: 7

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313113

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081019

Year of fee payment: 7

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091019

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101019

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111019

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121019

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131019

Year of fee payment: 12

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term