JP3072582B2 - Prestressed steel structures - Google Patents

Prestressed steel structures

Info

Publication number
JP3072582B2
JP3072582B2 JP4332784A JP33278492A JP3072582B2 JP 3072582 B2 JP3072582 B2 JP 3072582B2 JP 4332784 A JP4332784 A JP 4332784A JP 33278492 A JP33278492 A JP 33278492A JP 3072582 B2 JP3072582 B2 JP 3072582B2
Authority
JP
Japan
Prior art keywords
steel
steel structure
winding sheath
stiffener
sheath
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP4332784A
Other languages
Japanese (ja)
Other versions
JPH06180040A (en
Inventor
克也 岡田
晴彦 岡本
悠康 幾田
孝文 三苫
正 日元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Corp
Original Assignee
Takenaka Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Corp filed Critical Takenaka Corp
Priority to JP4332784A priority Critical patent/JP3072582B2/en
Publication of JPH06180040A publication Critical patent/JPH06180040A/en
Application granted granted Critical
Publication of JP3072582B2 publication Critical patent/JP3072582B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】この発明は、梁のような鋼構造物
が自重をはじめとする鉛直荷重によって撓むのを防止す
ることを目的として、鋼構造物の構築に適用されるプレ
ストレスト鋼構造物に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a prestressed steel structure applied to the construction of a steel structure for the purpose of preventing a steel structure such as a beam from being bent by a vertical load including its own weight. About things.

【0002】[0002]

【従来の技術】従来、鉄筋コンクリート造構造物の変形
及びひびわれを防止し強度を高めるために、PC鋼材な
どを用いてプレストレスを導入し、コンクリートに初期
圧縮力を加えた、所謂プレストレストコンクリート構造
物の構築は広く行われている。また、鋼構造物にPC鋼
材を用いてプレストレスを導入する方法も実施されてい
る。かかる場合も、PC鋼材は鋼管やワインディングシ
ース中に挿入することにより実施される。
2. Description of the Related Art Conventionally, in order to prevent deformation and cracking of a reinforced concrete structure and increase strength, a so-called prestressed concrete structure in which a prestress is introduced by using PC steel or the like and an initial compressive force is applied to the concrete. Has been widely implemented. Further, a method of introducing a prestress into a steel structure using a PC steel material has also been implemented. Also in such a case, the PC steel material is implemented by being inserted into a steel pipe or a winding sheath.

【0003】[0003]

【本発明が解決しようとする課題】プレストレスの導入
に用いられるPC鋼材は鋼構造物内において下向きの曲
線状に配置されることが多く、鋼管よりも可撓性の高い
ワインディングシースを用い、その中にPC鋼材を挿入
する実施例が一般的である。ところで、ワインディング
シースの外周面には、図2中符号2aで示したような突
起がある。この突起2aはワインディングシースをコン
クリート中に埋設した場合は何の支障もないが、鋼構造
物において受圧管の中に通して使用した場合は、プレス
トレスの導入時に当該突起と周辺の鋼板(図2中の受圧
管4参照)の内周面とが当接しこすれてしまう。その結
果、この突起がつぶれてプレストレス力の摩擦損失が生
じる問題点がある。例えば前記摩擦損失の分だけ大きい
能力のジャッキを使用せざるを得ないとか、より太径の
PC鋼材を使用せざるを得ない等々の問題点があり、こ
れらの点が解決すべき課題とされている。
The PC steel material used to introduce prestress is often arranged in a downward curved shape in a steel structure, and uses a winding sheath that is more flexible than a steel pipe. An embodiment in which a PC steel material is inserted therein is general. By the way, on the outer peripheral surface of the winding sheath, there is a projection as indicated by reference numeral 2a in FIG. This projection 2a has no problem when the winding sheath is buried in concrete, but when it is used in a steel structure by passing through a pressure receiving pipe, the projection and the surrounding steel plate (FIG. 2) (see the pressure receiving tube 4 in FIG. 2). As a result, there is a problem that the protrusions are crushed and a friction loss of the prestress force is generated. For example, there are problems such as the necessity of using a jack having a large capacity for the friction loss or the use of a PC steel having a larger diameter, and these problems are to be solved. ing.

【0004】したがって、本発明の目的は、ワインディ
ングシースに挿入したPC鋼材を使用して鋼構造物にプ
レストレスを導入する場合に、プレストレスの摩擦損失
の問題のない構造に改良したプレストレスト鋼構造物を
提供することにある。
Accordingly, an object of the present invention is to provide a prestressed steel structure improved to a structure free from frictional loss of prestress when a prestress is introduced into a steel structure using a PC steel material inserted into a winding sheath. To provide things.

【0005】[0005]

【課題を解決するための手段】上記従来技術の課題を解
決するための手段として、この発明に係るプレストレス
ト鋼構造物は、図面に実施例を示したとおり、両端を支
持される梁の如き鋼構造物Aにおいて、鋼構造物Aには
長手方向に所定のピッチで長手方向と略直角な配置のス
チフナー1を設け、前記スチフナー1を貫通する配置で
ワインディングシース付PC鋼材3を設置し、前記ワイ
ンディングシース2とスチフナー1との接点部分に受圧
管4を設置し、受圧管4とワインディングシース2とは
両者の間に充填したセメントグラウト等の充填材5で固
定し、PC鋼材3に所定大きさのプレストレスを導入し
たことを特徴とする。
As a means for solving the above-mentioned problems of the prior art, a prestressed steel structure according to the present invention is, as shown in the embodiment in the drawings, a steel such as a beam supported at both ends. In the structure A, the steel structure A is provided with a stiffener 1 arranged at a predetermined pitch in the longitudinal direction and substantially perpendicular to the longitudinal direction, and a PC steel material 3 with a winding sheath is arranged in an arrangement penetrating the stiffener 1; A pressure receiving tube 4 is installed at a contact portion between the winding sheath 2 and the stiffener 1, and the pressure receiving tube 4 and the winding sheath 2 are fixed with a filler 5 such as cement grout filled between the two, and a predetermined size is attached to the PC steel 3. It is characterized by the introduction of pre-stress.

【0006】[0006]

【作用】可撓性の高いワインディングシース2の中にP
C鋼材3が挿入され、鋼構造物Aの支点間で当該ワイン
ディングシース2は湾曲し、この湾曲形状に沿ってPC
鋼材3が適正に配置されている。即ち、ワインディング
シース2は当該ワインディングシース2とスチフナー1
との接点部分に設置された受圧管4内に挿通されて設置
されている(図1)。しかも、ワインディングシース2
と受圧管4とは、セメントグラウト等の充填材5でしっ
かり固定されるので、ワインディングシース2の外周の
突起2aはまるでコンクリート中に埋設されているのと
全く同様に受圧管4の中に固定されている。従って、プ
レストレスが導入されても、前記ワインディングシース
2の突起2aが潰れるようなことは決してなく、突起2
aが原因となることによるプレストレス力の摩擦損失が
生じることは一切ない。
The P winding inside the highly flexible winding sheath 2
C steel material 3 is inserted, the winding sheath 2 is curved between the fulcrums of the steel structure A, and PC is formed along the curved shape.
Steel materials 3 are properly arranged. That is, the winding sheath 2 is connected to the winding sheath 2 and the stiffener 1.
(See FIG. 1). And winding sheath 2
And the pressure receiving tube 4 are firmly fixed with a filler 5 such as cement grout, so that the projection 2a on the outer periphery of the winding sheath 2 is fixed in the pressure receiving tube 4 in exactly the same manner as being embedded in concrete. Have been. Therefore, even if the prestress is introduced, the projection 2a of the winding sheath 2 will never be crushed.
There is no friction loss of the prestressing force due to a.

【0007】[0007]

【実施例】次に、図示した本発明の実施例を説明する。
図中1はスチフナーであり、これが例えば両端を支柱に
より長スパンで支持された梁の如き鋼構造物Aの長手方
向に、約4mのピッチで、且つ長手方向と略直角な配置
でウェブ17の外側面に複数個設けられている(図1,
3参照)。この各スチフナー1…には、後述のワインデ
ィングシース2が貫通されている位置にシース貫通孔1
aが夫々形成されている。一例として300mぐらいの
長いスパンで両端が支持される鋼構造物Aに実施する場
合は、ワインディングシース付PC鋼材3を設置し易い
ように、当該鋼構造物Aは水平及び垂直方向に適宜分割
して形成したユニットA1,A2…に前記スチフナー1…
を設けて実施される(図3)。
BRIEF DESCRIPTION OF THE DRAWINGS FIG.
In the figure, reference numeral 1 denotes a stiffener, which is formed by arranging webs 17 at a pitch of about 4 m in the longitudinal direction of a steel structure A such as a beam supported at both ends by columns for a long span, at a pitch of about 4 m, and substantially perpendicular to the longitudinal direction. A plurality are provided on the outer side surface (FIG. 1,
3). Each of the stiffeners 1 has a sheath through hole 1 at a position where a later-described winding sheath 2 is penetrated.
a are formed respectively. For example, when the present invention is applied to a steel structure A whose both ends are supported by a long span of about 300 m, the steel structure A is appropriately divided horizontally and vertically so that the PC steel material 3 with a winding sheath can be easily installed. The stiffeners 1 are attached to the units A 1 , A 2 ,.
(FIG. 3).

【0008】図中3は可撓性の高いワインディングシー
ス2の中に通したPC鋼材である。このPC鋼材3はP
C鋼より線を複数本束ねたものを1ケーブルとして使用
されている。ワインディングシース2は、厚肉リジッド
ワインディングシースとされ、鋼構造物の支柱(支点)
間を結ぶ長さよりやや長く、外周面には突起2aが形成
されている。このワインディングシース2の中に前記P
C鋼材3が挿入されて両者が一体化されている。当該ワ
インディングシース付PC鋼材3は、前記スチフナー1
のシース貫通孔1aを貫通する配置で、しかも当該鋼構
造物の支点間の中央位置が最下端となる下向きの湾曲状
配置で設置されている。前記の如き湾曲状の配置にも追
従性があるワインディングシース2の使用により、PC
鋼材3は適正な湾曲状に設置されている。PC鋼材3の
端部は、図示を省略した定着部材で鋼構造物Aの端部に
定着されている。
In the figure, reference numeral 3 denotes a PC steel material passed through a highly flexible winding sheath 2. This PC steel material 3 is P
A bundle of a plurality of C steel strands is used as one cable. The winding sheath 2 is a thick rigid winding sheath, and supports (fulcrum) of a steel structure.
The length is slightly longer than the length connecting between them, and a projection 2a is formed on the outer peripheral surface. In the winding sheath 2, the P
The C steel material 3 is inserted to integrate them. The PC steel material 3 with the winding sheath is the stiffener 1.
The steel structure is disposed in a downwardly curved arrangement in which the center position between the fulcrums of the steel structure is the lowermost end. By using the winding sheath 2 which can follow the curved arrangement as described above, the PC
The steel material 3 is installed in an appropriate curved shape. The end of the PC steel material 3 is fixed to the end of the steel structure A by a fixing member (not shown).

【0009】図中4は受圧管であり、これは前記ワイン
ディングシース2の外径(約140mm)よりやや大きい
内径(約160mm)で長さ約400mmぐらいのパイプ状
に構成され、上部に充填材注入口6が取り付けられてい
る。当該受圧管4が、上記のように鋼構造物Aの支点間
で湾曲するワインディングシース2とスチフナー1との
接点部分において当該スチフナー1に各々溶接で固定し
て設置されている(図1)。受圧管4の両端部はテーピ
ングして密閉状態とされ、当該受圧管4の内部に充填材
注入口6からセメントグラウト等の充填材5が注入され
(図2)、受圧管4とワインディングシース2との間に
密実に充填されている。そして、PC鋼材3に鋼構造物
Aに応じた所定大きさのプレストレスが導入されてい
る。かくして、受圧管4とワインディングシース2との
間に充填した充填材5により、ワインディングシース2
の外周がまるでコンクリート中に埋設した形でしっかり
と一体化され固定されるので、所定大きさのプレストレ
スが導入されても、ワインディングシース2の外周の突
起2aが受圧管4の内壁に当接して当該突起2aがつぶ
れるようなことは決してなく、プレストレス力の摩擦損
失が生じない。
In the drawing, reference numeral 4 denotes a pressure receiving tube, which is formed in a pipe shape having an inner diameter (about 160 mm) slightly larger than the outer diameter (about 140 mm) of the winding sheath 2 and a length of about 400 mm, and a filler material at the top. An inlet 6 is attached. The pressure receiving tube 4 is fixed to the stiffener 1 by welding at a contact portion between the winding sheath 2 and the stiffener 1 which are curved between the fulcrums of the steel structure A as described above (FIG. 1). Both ends of the pressure receiving tube 4 are taped and sealed, and a filler 5 such as cement grout is injected into the pressure receiving tube 4 from a filler injection port 6 (FIG. 2). Is tightly packed between. Then, a prestress having a predetermined size corresponding to the steel structure A is introduced into the PC steel material 3. Thus, the winding sheath 2 is filled with the filler 5 filled between the pressure receiving tube 4 and the winding sheath 2.
The outer periphery of the winding sheath 2 is firmly integrated and fixed as if embedded in concrete, so that even when a predetermined amount of prestress is introduced, the outer projection 2a of the winding sheath 2 comes into contact with the inner wall of the pressure receiving tube 4. As a result, the projection 2a never collapses, and no friction loss occurs due to the prestressing force.

【0010】[0010]

【本発明が奏する効果】本発明に係るプレストレスト鋼
構造物によれば、PC鋼材に導入された初期張力が有効
に鋼構造物に伝わるので、当該鋼構造物の撓みが防止さ
れ、安全性、信頼性の高い、長スパンの梁の如き鋼構造
物の構築に寄与する。
According to the prestressed steel structure of the present invention, the initial tension introduced into the PC steel material is effectively transmitted to the steel structure, so that the bending of the steel structure is prevented, and It contributes to the construction of highly reliable steel structures such as long span beams.

【図面の簡単な説明】[Brief description of the drawings]

【図1】ワインディングシース付PC鋼材の設置状態を
示した断面図である。
FIG. 1 is a sectional view showing an installed state of a PC steel material with a winding sheath.

【図2】ワインディングシースとスチフナーの接点部分
を示した拡大図である。
FIG. 2 is an enlarged view showing a contact portion between a winding sheath and a stiffener.

【図3】スチフナーを示した斜視図である。FIG. 3 is a perspective view showing a stiffener.

【符号の説明】[Explanation of symbols]

1 スチフナー 3 PC鋼材 2 ワインディングシース 4 受圧管 5 充填材 Reference Signs List 1 stiffener 3 PC steel material 2 winding sheath 4 pressure receiving tube 5 filler

───────────────────────────────────────────────────── フロントページの続き (72)発明者 三苫 孝文 大阪市中央区本町四丁目1番13号 株式 会社竹中工務店大阪本店内 (72)発明者 日元 正 大阪市中央区本町四丁目1番13号 株式 会社竹中工務店大阪本店内 (56)参考文献 特開 平3−25142(JP,A) 特開 平4−128460(JP,A) 実開 平5−32534(JP,U) 特公 平7−47871(JP,B2) 特公 平6−74618(JP,B2) (58)調査した分野(Int.Cl.7,DB名) E04B 1/24 E04C 3/10 ──────────────────────────────────────────────────続 き Continuing on the front page (72) Takafumi Mitoma 4-1-1, Honcho, Chuo-ku, Osaka-shi Inside Takenaka Corporation Osaka Main Store (72) Inventor Tadashi Nimoto 4-1-1, Honcho, Chuo-ku, Osaka-shi No. 13 Takenaka Corporation Osaka Main Store (56) References JP-A-3-25142 (JP, A) JP-A-4-128460 (JP, A) JP-A-5-32534 (JP, U) Hei 7-47871 (JP, B2) JP-B Hei 6-74618 (JP, B2) (58) Fields investigated (Int. Cl. 7 , DB name) E04B 1/24 E04C 3/10

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 両端を支持される梁の如き鋼構造物にお
いて、鋼構造物には長手方向に所定のピッチで長手方向
と略直角な配置のスチフナーが設けられ、前記スチフナ
ーを貫通する配置でワインディングシース付PC鋼材が
設置され、前記ワインディングシースとスチフナーとの
接点部分に受圧管が設置され、受圧管とワインディング
シースとは両者の間に充填したセメントグラウト等の充
填材で固定され、PC鋼材に所定大きさのプレストレス
が導入されていることを特徴とするプレストレスト鋼構
造物。
In a steel structure such as a beam supported at both ends, the steel structure is provided with a stiffener arranged at a predetermined pitch in the longitudinal direction and substantially perpendicular to the longitudinal direction, and is arranged so as to penetrate the stiffener. A PC steel material with a winding sheath is installed, a pressure receiving tube is installed at a contact portion between the winding sheath and the stiffener, and the pressure receiving tube and the winding sheath are fixed with a filler such as cement grout filled between the two. A prestressed steel structure characterized in that a predetermined amount of prestress is introduced into the steel structure.
JP4332784A 1992-12-14 1992-12-14 Prestressed steel structures Expired - Fee Related JP3072582B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4332784A JP3072582B2 (en) 1992-12-14 1992-12-14 Prestressed steel structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4332784A JP3072582B2 (en) 1992-12-14 1992-12-14 Prestressed steel structures

Publications (2)

Publication Number Publication Date
JPH06180040A JPH06180040A (en) 1994-06-28
JP3072582B2 true JP3072582B2 (en) 2000-07-31

Family

ID=18258784

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4332784A Expired - Fee Related JP3072582B2 (en) 1992-12-14 1992-12-14 Prestressed steel structures

Country Status (1)

Country Link
JP (1) JP3072582B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101942883B (en) * 2009-07-09 2013-12-25 .贵州大学 Roof with rectangular plane, super-long span and prestressed space tube truss structure and manufacturing method
CN103255877B (en) * 2013-04-19 2015-11-25 北京工业大学 Prefabricated PC honeycombed ribbing web steel beam

Also Published As

Publication number Publication date
JPH06180040A (en) 1994-06-28

Similar Documents

Publication Publication Date Title
JPS5869908A (en) Free tension material, method and apparatus for producing and assembling obliquely tentioned cable of bridge
KR101672924B1 (en) Fire proof reinforced panel using high strength steel plate and construction method of the same
JP2007321486A (en) Armed pipe aseismatic structure and armed pipe aseismatic reinforcing method
US4630412A (en) Collapse preventing connection device for building structures
JPH09105173A (en) Connecting section structure of precast prestressed reinforced-concrete frame
JP3072582B2 (en) Prestressed steel structures
JP2011226071A (en) Reinforcement structure of structural member and reinforcement method thereof
JP2759217B2 (en) Introduction method of tensile force of carbon fiber reinforced plastic material
JP7050542B2 (en) Mixed structure of reinforced concrete columns and steel beams
JP2007191865A (en) Structure for jointing prestressed precast concrete member and member to be jointed, and prestressed precast concrete member
KR102143969B1 (en) Prestressed Cast in Place Concrete Pile Assembly for Retaining Wall And Method for Constructing the Same
JPS605945A (en) Beam and floor structures of construction
JP2716508B2 (en) Column and beam joint structure
JP2520304B2 (en) Prestressed steel beam
JPH09328813A (en) Brace earthquake resistance and fire resistance reinforcing construction
JP2001254317A (en) Structure for fixing hanging member to bridge girder material in hanging type bridge
JP3002740B2 (en) Seismic reinforcement structure of columnar structure
JP7482801B2 (en) Column and beam structure
JP4369077B2 (en) Reinforcement structure for joints between reinforced concrete columns and beam members
JP2903048B2 (en) Penetration fixed saddle
JPH0765381B2 (en) Beams with reinforced concrete ends and steel frames in the center
JP7510852B2 (en) Reinforcement of existing structures
JP3144077B2 (en) How to join columns and beams
JP2002021090A (en) Construction method for anchor and pressing member used therefor
JP2884279B2 (en) Filled steel pipe concrete column

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees