JP3056489U - Power control device - Google Patents

Power control device

Info

Publication number
JP3056489U
JP3056489U JP1998005948U JP594898U JP3056489U JP 3056489 U JP3056489 U JP 3056489U JP 1998005948 U JP1998005948 U JP 1998005948U JP 594898 U JP594898 U JP 594898U JP 3056489 U JP3056489 U JP 3056489U
Authority
JP
Japan
Prior art keywords
power
load
control device
loads
power supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1998005948U
Other languages
Japanese (ja)
Inventor
博 大川
Original Assignee
大川電設株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 大川電設株式会社 filed Critical 大川電設株式会社
Priority to JP1998005948U priority Critical patent/JP3056489U/en
Application granted granted Critical
Publication of JP3056489U publication Critical patent/JP3056489U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

(57)【要約】 【課題】 最大電力が消費される期間の電力使用量を低
減させることができ、且つ、商用電力と自家用発電機を
有効に利用することができる電力制御装置を提供する。 【解決手段】 複数の電力負荷15と、自家用発電機2
0と、電力負荷15の使用電力量を監視して電力負荷1
5への給電を制御する制御手段とを設ける。電力負荷1
5にて設定値以上の電力が消費された場合、制御手段は
一定条件下で電力負荷15の電源を商用電力若しくは自
家用発電機20の電力に切り換える。
(57) [Problem] To provide a power control device capable of reducing power consumption during a period in which maximum power is consumed, and effectively using commercial power and a private power generator. SOLUTION: A plurality of electric loads 15 and a private generator 2 are provided.
0 and the amount of power used by the power load 15
And control means for controlling power supply to the power supply 5. Power load 1
When the power equal to or larger than the set value is consumed in step 5, the control unit switches the power supply of the power load 15 to the commercial power or the power of the private generator 20 under a certain condition.

Description

【考案の詳細な説明】[Detailed description of the invention]

【0001】[0001]

【考案の属する技術分野】[Technical field to which the invention belongs]

本考案は、工場、店舗或いは家庭などに設けられ、商用電力が供給される冷暖 房機或いは照明などの複数の電力負荷の制御を行なう電力制御装置に関するもの である。 The present invention relates to a power control device that is provided in a factory, a store, a home, or the like, and controls a plurality of power loads such as a cooling / heating device or a lighting to which commercial power is supplied.

【0002】[0002]

【従来の技術】[Prior art]

従来工場、倉庫、店舗或いは家庭などと電力会社との契約基本料金は、高圧引 き込みの場合、使用電力の最高値(デマンド値)により基本電力料金が設定され ると共に、店舗或いは家庭用などの低圧引き込みの場合、電力負荷の台数や電力 負荷の電力使用量の大きさにより基本電力料金が設定されている。そして、電力 会社に支払う電力使用料金はそれぞれの電力負荷で消費される電力使用量に応じ て算出される。 Conventionally, basic contract rates between factories, warehouses, stores or homes and electric power companies are set based on the maximum value (demand value) of electric power used in the case of high-voltage service. In the case of low-voltage pull-in, the basic power tariff is set according to the number of power loads and the amount of power used by the power loads. The power usage fee paid to the power company is calculated according to the power usage consumed by each power load.

【0003】 一方、一般的に日中には多くの電力負荷が使用され、夜間には比較的少ない電 力負荷が使用されている。また、高圧引き込みタイプの電力(この場合6600 V)が供給される工場或いは店舗などでは、特に夏の最も暑い時期の日中13時 〜16時には冷房機などが最大限に運転され年間を通じて最大の電力が使用され ている。On the other hand, in general, a large amount of power load is used during the day, and a relatively small amount of power load is used at night. In a factory or a store to which high-voltage draw-type electric power (in this case, 6600 V) is supplied, especially at 13:00 to 16:00 during the hottest summer time, the air conditioner and the like are operated to the maximum, and Electricity is being used.

【0004】 そして、一定時間内(この場合約30分間とされている)に使用された電力量 が積算されて所定の記憶装置に記憶されると共に、当該記憶装置には年間を通じ て最大の電力使用量のみが記憶される。係る、記憶装置に記憶された最大の電力 使用量を元に以後の基本電力料金が算出される。この場合、最大使用電力量が大 きいと月々の基本電力料金は高額であり、最大使用電力量が小さいと月々の基本 電力料金は低額であった。[0004] Then, the amount of power used within a certain period of time (in this case, about 30 minutes) is integrated and stored in a predetermined storage device, and the storage device has a maximum power consumption throughout the year. Only usage is stored. The subsequent basic power rate is calculated based on the maximum power usage stored in the storage device. In this case, if the maximum power consumption was large, the monthly basic power rate was high, and if the maximum power consumption was low, the monthly basic power rate was low.

【0005】 しかし、電力会社では大量の電力が使用され供給電力が不足してしまうと、電 力使用者に多大の迷惑をかけてしまう。このため、年間を通じて最大の電力使用 量に対応した発電所を準備して、供給電力が不足しそうな場合に電力を補填して いた。係る、電力使用量が供給電力量を超えてしまうような場合、新たに膨大な 費用をかけて発電所を建設しなくてはならなかった。そこで、電力会社では発電 所建設などの費用の負担を軽減するため、最大電力が使用される日中の13時〜 16時の時間帯と、その前後数時間の時間帯と、それ以外の時間帯とに分け、最 大電力が使用される時間帯の電力使用料金を高額、最大電力が使用される前後と なる時間帯の電力使用料金を中額、それ以外の時間帯の電力使用料金を低額に設 定して発電所建設などの経費負担の増大を抑えていた。[0005] However, if a power company uses a large amount of power and the power supply is insufficient, it causes a great deal of inconvenience to power users. For this reason, a power station was prepared to handle the largest amount of power consumption throughout the year, and power was supplied in the event of a shortage of power supply. If the amount of power used would exceed the amount of power supplied, the power plant had to be built at a huge expense. Therefore, in order to reduce the burden of power plant construction and other costs, the electric power company should use the maximum power at 13:00 to 16:00 during the day, several hours before and after that, and other times during the day. Power usage fee during the time when the maximum power is used, medium-time power usage before and after the maximum power is used, and power usage during the other times. It was set at a low price to prevent an increase in expenses such as power plant construction.

【0006】 また、低圧引き込みタイプの電力(この場合100V/200V)が供給され る一般家庭等での代表的な契約基本料金としては負荷契約、回路契約等がある。 また、電力負荷の起動時には約3倍の電力が消費されるのは周知の通りであり、 多数の電力負荷が同時に起動されると、大きな電力が消費されることとなる。こ の場合、多数設置された負荷が同時に運転される可能性を考慮して主ブレーカー の遮断電力容量が設定されて取り付けられるが、電力会社との契約基本料金は、 取り付けられた負荷の電力消費量の大きさにより決められた計算式で契約基本料 金が設定されている。係る場合、主ブレーカーに接続された負荷の電力使用量が 大きいと契約基本料金は高額となり、負荷の電力使用量が小さいと契約基本料金 は低額であった。[0006] Typical contract basic charges in a general household or the like to which low-voltage pull-in type power (100 V / 200 V in this case) is supplied include a load contract and a circuit contract. It is well known that about three times as much power is consumed when the power load is started, and when a large number of power loads are started at the same time, a large amount of power is consumed. In this case, the cut-off power capacity of the main breaker is set and installed in consideration of the possibility that a large number of installed loads will be operated at the same time. The basic contract fee is set using a formula determined by the size of the amount. In such a case, the contract basic charge was high if the load connected to the main breaker had a large amount of power consumption, and the contract basic charge was low if the load had low power consumption.

【0007】[0007]

【考案が解決しようとする課題】[Problems to be solved by the invention]

しかしながら、高圧引き込みタイプの工場、倉庫或いは店舗などでは年間を通 じての最大電力使用量を元に電力会社に支払う基本電力料金が算出されていたが 、大きな電力が使用される期間は年間を通じて数日乃至1ヶ月間位であった。こ の場合、大きな電力が使用されない他の月でも高額の基本電力料金を支払わなけ ればならない問題があった。 However, in the case of high-voltage service-type factories, warehouses, or stores, the basic power rate to be paid to the power company based on the maximum power consumption throughout the year has been calculated. It was around a few days to a month. In this case, there was a problem that a large basic power fee had to be paid even in other months when large power was not used.

【0008】 そこで、年間を通じて大きな電力が使用される数日乃至1ヶ月間位の電力使用 量を小さく抑えることができれば大きな電力が使用されない他の月の基本電力料 金を低減させることが可能となる。このため、年間を通じて最も大きな電力が消 費される期間の電力使用量を低減させることができる電力制御装置の開発が望ま れていた。[0008] Therefore, if it is possible to reduce the power consumption for several days to one month when large power is used throughout the year, it is possible to reduce the basic power rate in other months when large power is not used. Become. For this reason, there has been a demand for the development of a power control device that can reduce the amount of power consumption during the period when the largest amount of power is consumed throughout the year.

【0009】 また、店舗或いは家庭用などの低圧引き込みタイプで何台も数多くの電力負荷 が一度に使用された場合でも、安全に使用できるように遮断電力容量に余裕のあ る主ブレーカーが取り付けられていた。そこで、負荷が同時に稼働しないように 制御を行なえば、取り付けられている遮断電力容量の大きな主ブレーカーを、小 さな遮断電力容量のものにすることができ、契約基本料金の低減を図ることが可 能となるが、遮断電力容量の大きな主ブレーカーが取り付けられるとどうしても 契約基本料金が高額になり、月々の基本電力料金が高額になってしまう問題があ った。In addition, even when a large number of power loads are used at a time in a low-voltage draw-in type such as a store or home, a main breaker having a sufficient cut-off power capacity is mounted so that it can be used safely. I was Therefore, if control is performed so that the loads do not operate at the same time, the installed main breaker with a large breaking power capacity can be replaced with a small breaking power capacity, and the basic contract fee can be reduced. Although possible, there was a problem that if a main breaker with a large interrupting power capacity was installed, the basic contract fee would be high and the monthly basic power fee would be high.

【0010】 本考案は、係る従来の技術的課題を解決するために成されたものであり、最大 電力が消費される期間の電力使用量を低減させることができ、且つ、商用電力と 自家用発電機を有効に利用することができる電力制御装置を提供することを目的 とする。[0010] The present invention has been made to solve the above-mentioned conventional technical problem, and can reduce the amount of power consumption during a period in which the maximum power is consumed. It is an object of the present invention to provide a power control device capable of effectively using a power supply.

【0011】[0011]

【課題を解決するための手段】[Means for Solving the Problems]

即ち、請求項1の考案の電力制御装置は、工場、店舗或いは家庭などに設けら れた冷暖房機或いは照明などの複数の電力負荷と、自家用発電機と、電力負荷の 使用電力量を監視して電力負荷への給電を制御する制御手段とを備え、電力負荷 にて設定値以上の電力が消費された場合、制御手段は一定条件下で電力負荷の電 源を商用電力又は自家用発電機の電力の何れかに切り換えるものである。 That is, the power control device according to the first aspect of the present invention monitors a plurality of power loads such as air conditioners or lights provided in factories, stores, or homes, a private generator, and the amount of power used by the power loads. Control means for controlling the power supply to the power load through the power load.If the power load consumes more than a set value, the control means turns off the power of the power load under a certain condition by using the commercial power or the private generator. It switches to any of the electric power.

【0012】 また、請求項2の考案の電力制御装置によれば、請求項1に加えて制御手段は 、夜間は商用電力のままとし、日中は自家用発電機の電力に切り換えるものであ る。[0012] According to the power control device of the invention of claim 2, in addition to claim 1, the control means keeps commercial power at night and switches to electric power of a private generator during the day. .

【0013】 また、請求項3の考案の電力制御装置によれば、工場、店舗或いは家庭などに 設けられた冷暖房機或いは照明などの複数の電力負荷と、自家用発電機と、電力 負荷の使用電力量を監視して電力負荷への給電を制御する制御手段とを備え、工 場、店舗或いは家庭などで使用される商用電力の使用電力量が設定値より大きく なった場合、制御手段は設定値で不足した分の電力を自家用発電機から補填する ものである。[0013] According to the power control device of the invention of claim 3, a plurality of power loads such as air conditioners and heaters provided in factories, stores, and homes, a private generator, and power used by the power loads are provided. Control means for monitoring the power consumption and controlling the power supply to the power load, and when the power consumption of commercial power used in factories, stores or homes becomes larger than the set value, the control means sets the set value. Insufficient power is supplied from private generators.

【0014】 更に、請求項4の考案の電力制御装置によれば、工場、店舗或いは家庭などに 設けられた冷暖房機或いは照明などの複数の電力負荷と、当該電力負荷の使用電 力量を監視して電力負荷への給電を制御する制御手段とを備え、電力負荷にて設 定値以上の電力が消費された場合、制御手段は電力負荷を予め設定された順位に 従って給電の制限若しくは遮断を行なうものである。Further, according to the power control device of the invention of claim 4, a plurality of power loads such as a cooling / heating machine or lighting provided in a factory, a store or a home and the amount of power used by the power load are monitored. And control means for controlling power supply to the power load, and when the power load consumes more than a set value, the control means limits or interrupts the power supply in accordance with a preset order. Things.

【0015】 更にまた、請求項5の考案の電力制御装置によれば、請求項4に加えて制御手 段は、工場、店舗或いは家庭などで使用される使用電力量が予め設定された設定 値以上になった場合、照明に供給している電力を制限するものである。Further, according to the power control device of the invention of claim 5, in addition to claim 4, the control means further comprises a control unit for setting a power consumption used in a factory, a store or a home to a predetermined value. In the case described above, the power supplied to the lighting is limited.

【0016】 また、請求項6の考案の電力制御装置によれば、複数の電力供給装置と、工場 、店舗或いは家庭などに設けられた冷暖房機或いは照明などの複数の電力負荷と 、当該電力負荷の使用電力量を監視して電力負荷への給電を制御する制御手段と を備え、制御手段は各電力供給装置の使用電力量を検出し、各電力供給装置から 電力使用料金が安いものに切り換えるものである。Further, according to the power control device of the invention of claim 6, a plurality of power supply devices, a plurality of power loads such as a heating / cooling machine or lighting provided in a factory, a store, or a home, and the power load Control means for monitoring the power consumption of the power supply and controlling the power supply to the power load.The control means detects the power consumption of each power supply device and switches from each power supply device to the one with a lower power usage fee. Things.

【0017】[0017]

【考案の実施の形態】[Embodiment of the invention]

次に、図面に基づき本発考案の実施形態を詳述する。図1は本発明の電力制御 装置10の電気回路図である。尚、各図において同一符号で示すものは同一のも のとする。電力制御装置10は例えば電力制御部11と図示しない工場或いは店 舗などに設けられた冷暖房機16、或いは、照明17などの複数の電力負荷15 ・・・とから構成されている。係る電力制御部11には計器用変成器13と、制 御手段としての制御装置12が設けられている。 Next, an embodiment of the present invention will be described in detail with reference to the drawings. FIG. 1 is an electric circuit diagram of a power control device 10 of the present invention. Note that the same reference numerals in each drawing denote the same components. The power control device 10 includes, for example, a power control unit 11 and a plurality of power loads 15 such as an air conditioner 16 or a lighting 17 provided in a factory or a store (not shown). The power control unit 11 is provided with an instrument transformer 13 and a control device 12 as control means.

【0018】 また、計器用変成器13と制御装置12との間にはデマンド積算計26、パル ス検出器27及びデマンド制御盤28がそれぞれ計器用変成器13側から順に配 線接続されている。該計器用変成器13は電力会社から給電される高圧引き込み タイプの6600Vでは直接使用電力量を測定することが困難であるため、電流 と電圧を変成して測定できるように構成されている。係る高圧引き込みタイプの 電流と電圧を計器用変成器13で変成する技術については、周知の技術であるた め説明を省略する。A demand integrator 26, a pulse detector 27, and a demand control panel 28 are connected between the instrument transformer 13 and the control device 12 in this order from the instrument transformer 13 side. . Since it is difficult to directly measure the amount of power used at 6600 V of a high-voltage pull-in type supplied from a power company, the instrument transformer 13 is configured to be able to transform current and voltage to measure. The technique of transforming the current and voltage of the high-voltage pull-in type by the instrument transformer 13 is a well-known technique and will not be described.

【0019】 ここで、デマンド積算計26は計器用変成器13で変成された電流と電圧を測 定すると共に、測定した電力使用量及びデマンド値(ピーク値)を測定し、それ らの信号データを送出するものである。また、パルス検出器27はデマンド積算 計26より受けた信号データをパルス信号データに変換してデマンド制御盤28 へ送出するものである。係るデマンド積算計26にて電力会社から供給される高 圧引き込みタイプの電流と電圧を測定して、電力使用量及び一定時間内の電力使 用量のデマンド値を測定する技術については、周知の技術であるため説明を省略 する。また、パルス検出器27で検出した信号データを送出する技術については 、周知の技術であるため説明を省略する。Here, the demand integrator 26 measures the current and voltage transformed by the instrument transformer 13, measures the measured power consumption and the demand value (peak value), and outputs the signal data. Is sent. The pulse detector 27 converts the signal data received from the demand integrator 26 into pulse signal data and sends it to the demand control panel 28. The technology for measuring the power consumption and the demand value of the power consumption within a certain period of time by measuring the current and voltage of the high-voltage pull-in type supplied from the power company by the demand integrator 26 is a known technology. Therefore, the description is omitted. Further, the technique for transmitting the signal data detected by the pulse detector 27 is a well-known technique, and a description thereof will be omitted.

【0020】 また、デマンド制御盤28はパルス検出器27より送出された信号データを受 けて、使用電力量及び電力使用量のピーク値を表示するように構成されると共に 、受けた信号データを制御装置12に送出するものである。係るデマンド制御盤 28で使用電力及び電力使用量のピーク値を表示する技術、及び、受けた信号デ ータを送出する技術については、周知の技術であるため説明を省略する。The demand control panel 28 is configured to receive the signal data transmitted from the pulse detector 27 and display the power consumption and the peak value of the power consumption. This is sent to the control device 12. The technology for displaying the peak value of the power consumption and the power consumption on the demand control panel 28 and the technology for transmitting the received signal data are well-known technologies and will not be described.

【0021】 一方、工場、倉庫或いは店舗などで消費する電力の電力供給源としては商用電 力と自家用発電機20とがあり、商用電力として業務用高圧電源21は6600 Vが用いられてる。業務用高圧電源21は計器用変成器13を介して二つに分岐 して変圧器14、14Aに接続されている。この場合、一方の変圧器14Aは業 務用高圧電源21を三相200Vに変換すると共に、他方の変圧器14は単相1 00V/200Vに変換するように構成されている。On the other hand, as a power supply source of power consumed in factories, warehouses, stores, and the like, there are a commercial power supply and a private power generator 20, and the commercial high-voltage power supply 21 uses 6600 V as commercial power. The commercial high-voltage power supply 21 is branched into two via the instrument transformer 13 and connected to the transformers 14 and 14A. In this case, one transformer 14A is configured to convert the commercial high-voltage power supply 21 to three-phase 200V, and the other transformer 14 is configured to convert it to single-phase 100V / 200V.

【0022】 そして、業務用高圧電源21は一方の変圧器14A、主ブレーカー32A(図 中主開閉器)を介して電力負荷15に接続されている。係る電力負荷15は、図 示しない店舗、会館或いは大広間などのホールに複数台設置された冷暖房機16 の室外機16B(この場合、室外機16Bは1台のみ図示)、室内機16A、1 6A、16Aなどの機器を云う。The commercial high-voltage power supply 21 is connected to the power load 15 via one transformer 14A and a main breaker 32A (main switch in the figure). The electric power load 15 includes an outdoor unit 16B of a plurality of air conditioners 16 installed in a hall (not shown) such as a store, a hall or a saloon (in this case, only one outdoor unit 16B is shown), indoor units 16A and 16A. , 16A and the like.

【0023】 また、業務用高圧電源21は他方の変圧器14、主ブレーカー32(図中主開 閉器)を介して調光器19に接続され、調光器19は電力負荷15としての照明 17に接続されている。係る調光器19は周知の通り照明17の明るさを調整す るものであり詳細な説明を省略する。また、変圧器14には遮断スイッチ25を 介して図示しない湯沸かし器、調理器、冷蔵庫などの電力負荷15が接続されて いる。また、変圧器14には切換スイッチ18を介して電気ストーブなどの電力 負荷15が接続されている。The commercial high-voltage power supply 21 is connected to the dimmer 19 via the other transformer 14 and the main breaker 32 (main switch in the figure), and the dimmer 19 is an illumination as the power load 15. 17. The dimmer 19 adjusts the brightness of the illumination 17 as is well known, and a detailed description thereof will be omitted. The transformer 14 is connected to an electric load 15 such as a water heater, a cooker, or a refrigerator (not shown) via a cutoff switch 25. An electric load 15 such as an electric stove is connected to the transformer 14 via a changeover switch 18.

【0024】 係る切換スイッチ18には自家用発電機(図中低圧発電機)20が接続されて おり、この自家用発電機20は他方の変圧器14で変換された単相100V/2 00Vと同等の単相100V/200Vを出力し、切換スイッチ18に接続され た電力負荷15を動作できるように構成されている。尚、33は主ブレーカー3 2、32Aより遮断電力容量の小さな分岐ブレーカーである。A private generator (low-voltage generator in the figure) 20 is connected to the changeover switch 18, and the private generator 20 is equivalent to a single-phase 100 V / 200 V converted by the other transformer 14. It is configured to output a single-phase 100 V / 200 V and operate the power load 15 connected to the changeover switch 18. Reference numeral 33 denotes a branch breaker having a smaller breaking power capacity than the main breakers 32 and 32A.

【0025】 ここで、電力供給源としては商用電力(業務用高圧電源21)と自家用発電機 20とが考えられる。係る、商用電力と自家用発電機20との電力使用料金は、 最大電力が消費される日中の一定時間帯では、自家用発電機20で発電した電力 使用料金より、電力会社から供給される商用電力の電力使用料金の方が大幅に高 額となっている。Here, as the power supply source, commercial power (commercial high-voltage power supply 21) and private power generator 20 are considered. The power usage fee between the commercial power and the private power generator 20 is calculated based on the commercial power supplied by the power company from the power usage fee generated by the private power generator 20 during a certain daytime period when the maximum power is consumed. Electricity usage fees are significantly higher.

【0026】 他方、制御装置12は冷暖房機16の室外機16B及び室内機16Aなどに接 続されると共に、他の電力負荷15及び遮断スイッチ25に接続されている。ま た、制御装置12は制御盤24を介して切換スイッチ18に接続されている。尚 、制御盤24は制御装置12より信号データを受けて、自家用発電機20の駆動 を行なうと共に、切換スイッチ18を切り換えて自家用発電機20の電力を電力 負荷15に給電するように構成されている。On the other hand, the control device 12 is connected to the outdoor unit 16 B and the indoor unit 16 A of the air conditioner 16, and is also connected to another power load 15 and a cutoff switch 25. The control device 12 is connected to a changeover switch 18 via a control panel 24. The control panel 24 receives the signal data from the control device 12, drives the private generator 20, and switches the changeover switch 18 to supply the electric power of the private generator 20 to the power load 15. I have.

【0027】 また、制御装置12は計器用変成器13で測定された一定時間内(この場合約 30分間)の電力使用量を信号データとしてデマンド積算計26、パルス検出器 27、デマンド制御盤24を介して受ける。そして、一定時間内に受けた信号デ ータを積算して記憶すると共に、一定時間内に使用される電力使用量の監視を行 なう。これにより、制御装置12は一定時間内に各電力負荷15で消費される電 力使用量がどの位の値になるかを予測できるように構成されている。The control device 12 uses the power consumption within a fixed time (about 30 minutes in this case) measured by the instrument transformer 13 as signal data as a demand integrator 26, a pulse detector 27, and a demand control board 24. Receive through. Then, it integrates and stores the signal data received within a certain period of time and monitors the amount of power used within a certain period of time. Thus, the control device 12 is configured to be able to predict the value of the power consumption consumed by each power load 15 within a certain time.

【0028】 即ち、制御装置12は各電力負荷15で消費される電力使用量を監視して、そ れら電力負荷15で消費される電力使用量が一定時間内に予め定められた設定値 以上になってしまうのを予測した場合、電力負荷15の制御、遮断スイッチ25 、制御盤24及び調光器19の制御を行なうように構成されている。また、電力 負荷15、遮断スイッチ25、制御盤24及び調光器19には優先順位が設定さ れており、制御装置12は優先順位の高い順に制御できるように構成されている 。That is, the control device 12 monitors the amount of power consumed by each power load 15, and determines that the amount of power consumed by each power load 15 is equal to or more than a predetermined set value within a certain period of time. When it is predicted that the load will be reduced, the control of the power load 15 and the control of the cutoff switch 25, the control panel 24 and the dimmer 19 are performed. Priorities are set for the power load 15, the cutoff switch 25, the control panel 24, and the dimmer 19, and the control device 12 is configured to be able to control in descending order of priority.

【0029】 以上の構成で次ぎに電力制御装置10の動作説明を行なう。尚、電力制御装置 10には電力会社から商用電力(業務用高圧電源21)が供給されているものと する。また、電力制御部11には分岐ブレーカー33を介して電力が供給され動 作状態にあるものとする。また、制御装置12には予め年間を通じて最も暑い時 期の日中の13時〜16時の最大電力使用量より例えば20%〜30%低い値が 予め設定されているものとする。また、制御装置12は電力負荷15、遮断スイ ッチ25、調光器19、制御盤24の順に制御を行なうものとする。Next, the operation of the power control apparatus 10 having the above configuration will be described. It is assumed that commercial power (commercial high-voltage power supply 21) is supplied to the power control device 10 from a power company. Also, it is assumed that power is supplied to the power control unit 11 via the branch breaker 33 and the power control unit 11 is operating. Further, it is assumed that a value lower than the maximum power consumption during the daytime of 13:00 to 16:00, for example, by 20% to 30%, is preset in the control device 12 in advance during the year. Further, the control device 12 controls the power load 15, the cutoff switch 25, the dimmer 19, and the control panel 24 in this order.

【0030】 夏などの暑い時期に冷暖房機16などの電力負荷15・・・が運転されると、 制御装置12は計器用変成器13で測定された一定時間内(この場合約30分間 )の電力使用量を積算して記憶すると共に、一定時間内の電力使用量の予測値の 設定を行なう。そして、制御装置12は電力負荷15の電力使用量を監視して最 も暑くなる日中13時〜16時の一定時間内に消費される電力使用量が予測した 設定値を越えそうな場合、優先順位の高い冷暖房機16を一台或いは複数台の運 転を一時停止させる。When the electric loads 15... Such as the air conditioner 16 are operated in a hot time such as summer, the control device 12 operates within a certain time (about 30 minutes in this case) measured by the instrument transformer 13. The power consumption is integrated and stored, and a predicted value of the power consumption within a certain time is set. Then, the control device 12 monitors the power usage of the power load 15 and, if the power usage within a certain period of time from 13:00 to 16:00 during the hottest day is likely to exceed the predicted set value, The operation of one or more air conditioners 16 having a higher priority is temporarily stopped.

【0031】 この場合、停止させる冷暖房機16は一時電力を遮断しても他に大きく影響す ることのない、店舗、会館或いは大広間などのホールに複数台設置された冷暖房 機16を停止させ、冷暖房機16に設けられた図示しない送風機のみの運転が行 なわれる。係る、制御装置12は電力使用量を積算している一定時間を経過した 場合、一時電力を遮断した冷暖房機16の運転を再開する。これにより、一定時 間内に消費される電力使用量が設定値を超えないようにすることができるように なる。In this case, the air conditioner 16 to be stopped stops the air conditioner 16 installed in a plurality of halls, such as a store, a hall or a hall, so that even if power is temporarily cut off, there is no significant effect on the other. The operation of only the fan (not shown) provided in the air conditioner 16 is performed. The control device 12 restarts the operation of the air conditioner 16 whose power has been temporarily cut off after a certain period of time in which the power consumption is integrated. As a result, it is possible to prevent the amount of power consumed within a certain time from exceeding the set value.

【0032】 また、優先順位の高い冷暖房機16を一台或いは複数台の運転を一時停止させ ても更に一定時間内に積算される電力使用量が設定値を越えそうな場合、遮断ス イッチ25を遮断して電力負荷15の遮断を行なう。それでも、一定時間内に積 算される電力使用量が設定値を越えそうな場合、調光器19を制御して、他に大 きく影響することのない照明17の照度を下げて暗くし電力使用量を低減させる 。係る、制御装置12は電力使用量を積算している一定時間を経過した場合、一 時電力を遮断した調光器19を制御して照明17を明るくする。これにより、一 定時間内に消費される電力使用量が予め設定された設定値を超えないようにする ことができるようになる。In addition, even if the operation of one or more of the cooling / heating units 16 having a high priority is temporarily stopped, if the power consumption integrated within a certain period of time is likely to exceed the set value, the cutoff switch 25 To shut off the power load 15. Still, if the power consumption accumulated within a certain period of time is likely to exceed the set value, the dimmer 19 is controlled to lower the illuminance of the lighting 17 which does not greatly affect the other, to make the power darker. Reduce usage. The control device 12 controls the dimmer 19, which temporarily shuts off the power, to brighten the illumination 17 when a certain period of time in which the power usage is integrated is elapsed. This makes it possible to prevent the amount of power consumed within a certain time from exceeding a preset value.

【0033】 そして、それでも尚一定時間内に消費される電力使用量が設定値を越えそうな 場合、制御盤24を制御して自家用発電機20を運転すると共に、切換スイッチ 18を切り換えて、自家用発電機20の電力を電力負荷15に給電する。係る、 制御装置12は電力使用量を積算している一定時間を経過した場合、切換スイッ チ18を元に戻してから自家用発電機20を運転停止する。これにより、前述同 様一定時間内に消費される電力使用量が設定値を超えないようにすることができ るようになる。従って、最も暑くなる日中の一定時間内の電力最大使用量を低減 できて基本電力料金を低く抑えることができるようになり、基本電力料金が高額 の場合に比して、電力使用料金を大幅に低減させることができ、総じて年間の電 力使用料金を大幅に低減させることができるようになる。If the amount of power consumed within a certain period of time still exceeds the set value, the control panel 24 is operated to operate the private generator 20 and the changeover switch 18 is switched to change the private switch. The power of the generator 20 is supplied to the power load 15. The control device 12 returns to the original state of the switching switch 18 and stops the operation of the private power generator 20 when a certain period of time during which the power consumption is integrated elapses. As a result, the amount of power consumed within a certain period of time can be prevented from exceeding the set value as described above. Therefore, it is possible to reduce the maximum power consumption during a certain period of time during the hottest day and to keep the basic power rate low, and to significantly increase the power usage rate compared to when the basic power rate is high. And annual electricity bills can be significantly reduced.

【0034】 次に、図2に他の電力制御装置10の回路図を示している。この場合、業務用 高圧電源21は計器用変成器13を介して切換スイッチ18の一方が接続されて おり、切換スイッチ18の他方には業務用高圧電源21と同じ高圧電源(660 0V)を発電する自家用発電機20Aが接続されている。また、切換スイッチ1 8には変圧器14、14Aが接続されており、一方の変圧器14A、主ブレーカ ー32Aを介して電力負荷15に接続されている。Next, FIG. 2 shows a circuit diagram of another power control device 10. In this case, one of the changeover switches 18 is connected to the commercial high-voltage power supply 21 via the instrument transformer 13, and the same high-voltage power supply (6600 V) as the commercial high-voltage power supply 21 is generated at the other of the changeover switches 18. Private power generator 20A is connected. Transformers 14 and 14A are connected to the changeover switch 18, and are connected to the power load 15 via one transformer 14A and the main breaker 32A.

【0035】 また、他方の変圧器14は主ブレーカー32(図中主開閉器)を介して調光器 19に接続され、調光器19は電力負荷15としての照明17に接続されている 。また、変圧器14には遮断スイッチ25を介して図示しない湯沸かし器、調理 器、冷蔵庫などの電力負荷15が接続されている。また、変圧器14には切換ス イッチ18を介して電気ストーブなどの電力負荷15が接続されている。この場 合、制御装置12は制御盤24を制御して業務用高圧電源21或いは自家用発電 機20Aをそれぞれの変圧器14、14Aに供給するように構成されている。The other transformer 14 is connected to a dimmer 19 via a main breaker 32 (main switch in the figure), and the dimmer 19 is connected to a lighting 17 as a power load 15. The transformer 14 is connected to an electric load 15 such as a water heater, a cooker and a refrigerator (not shown) via a cutoff switch 25. Further, a power load 15 such as an electric stove is connected to the transformer 14 via a switching switch 18. In this case, the controller 12 controls the control panel 24 to supply the commercial high-voltage power supply 21 or the private generator 20A to the respective transformers 14 and 14A.

【0036】 以上の構成で次ぎに電力制御装置10の動作説明を行なう。尚、電力制御装置 10には電力会社から商用電力(業務用高圧電源21)が供給されているものと する。また、電力制御部11には分岐ブレーカー33を介して電力が供給され動 作状態にあるものとする。また、制御装置12には予め年間を通じて最も暑い時 期の日中の13時〜16時の最大電力使用量より例えば20%〜30%低い値が 設定されているものとする。また、電力負荷15、遮断スイッチ25、制御盤2 4及び調光器19には制御する優先順位が設定されており、制御装置12は電力 負荷15、遮断スイッチ25、調光器19、制御盤24の順に制御を行なうもの とする。Next, the operation of the power control apparatus 10 having the above configuration will be described. It is assumed that commercial power (commercial high-voltage power supply 21) is supplied to the power control device 10 from a power company. Also, it is assumed that power is supplied to the power control unit 11 via the branch breaker 33 and the power control unit 11 is operating. Further, it is assumed that the control device 12 is set in advance to a value which is 20% to 30% lower than the maximum power consumption during 13:00 to 16:00 during the day, which is the hottest time throughout the year. The power load 15, the cutoff switch 25, the control panel 24, and the dimmer 19 are set in a priority order to control, and the control device 12 controls the power load 15, the cutoff switch 25, the dimmer 19, and the control panel. Control is performed in the order of 24.

【0037】 夏などの暑い時期に冷暖房機16などの電力負荷15・・・が運転されると、 制御装置12は計器用変成器13で測定された一定時間内(この場合約30分間 )の電力使用量を積算して記憶すると共に、一定時間内の電力使用量の予測を行 なう。そして、制御装置12は電力負荷15の電力使用量を監視して最も暑くな る日中13時〜16時の一定時間内に消費される電力使用量が予測した設定値を 越えそうな場合、優先順位の高い冷暖房機16を一台或いは複数台の運転を一時 停止させる。When the electric loads 15... Such as the air conditioner 16 are operated in a hot time such as summer, the controller 12 operates within a certain time (about 30 minutes in this case) measured by the instrument transformer 13. The power consumption is integrated and stored, and the power consumption within a certain period of time is predicted. Then, the control device 12 monitors the power usage of the power load 15 and, if the power usage consumed within a certain time from 13:00 to 16:00 during the hottest day is likely to exceed the predicted set value, The operation of one or more air conditioners 16 having a higher priority is temporarily stopped.

【0038】 この場合、停止させる冷暖房機16は一時電力を遮断しても他に大きく影響す ることのない、店舗、会館或いは大広間などのホールに複数台設置された冷暖房 機16を停止させ、冷暖房機16に設けられた図示しない送風機のみの運転が行 なわれる。係る、制御装置12は電力使用量を積算している一定時間を経過した 場合、一時電力を遮断した冷暖房機16の運転を再開する。これにより、前述同 様一定時間内に消費される電力使用量が設定値を超えないようにすることができ るようになる。In this case, the air conditioner 16 to be stopped stops the air conditioner 16 installed in a plurality of halls, such as a store, a hall or a hall, so that even if power is temporarily cut off, there is no significant effect on the other. The operation of only the fan (not shown) provided in the air conditioner 16 is performed. The control device 12 restarts the operation of the air conditioner 16 whose power has been temporarily cut off after a certain period of time in which the power consumption is integrated. As a result, the amount of power consumed within a certain period of time can be prevented from exceeding the set value as described above.

【0039】 また、優先順位の高い冷暖房機16を一台或いは複数台の運転を一時停止させ ても更に一定時間内に消費される電力使用量が設定値を越えそうな場合、遮断ス イッチ25を遮断して電力負荷15の遮断を行なう。それでも、一定時間内に消 費される電力使用量が設定値を越えそうな場合、調光器19を制御して、他に大 きく影響することのない照明17をある程度暗くして電力使用量を低減させる。 係る、制御装置12は電力使用量を積算している一定時間を経過した場合、一時 電力を遮断した調光器19を制御して照明17を明るくする。これにより、前述 同様一定時間内に消費される電力使用量が予め設定された設定値を超えないよう にすることができるようになる。In addition, even if the operation of one or a plurality of high-priority air conditioners / heaters 16 is temporarily stopped, if the amount of electric power consumed within a certain period of time is likely to exceed a set value, the cutoff switch 25 To shut off the power load 15. However, if the power consumption within a certain period of time is likely to exceed the set value, the dimmer 19 is controlled to darken the lighting 17 which does not greatly affect other powers to a certain extent. To reduce. The control device 12 controls the dimmer 19, which temporarily shuts off the power, to brighten the illumination 17 when a certain period of time in which the power consumption is integrated is elapsed. As a result, the amount of power consumed within a certain period of time can be prevented from exceeding a preset value as described above.

【0040】 そして、それでも尚一定時間内に消費される電力使用量が設定値を越えそうな 場合、制御盤24に制御信号を送る。制御盤24は自家用発電機20の運転を開 始すると共に、切換スイッチ18を切り換え、自家用発電機20の電力は各変圧 器14、14Aに供給されて各電力負荷15・・・は運転される。これにより、 商用電力と自家用発電機20Aを有効に利用することができるようになる。特に 、電力会社と時間帯別季節別料金で契約を行なう深夜電力(この場合、20時か ら翌日の8時)は日中電力より安く、深夜電力を電力会社、日中を自家用発電機 20Aの電力を使用することにより電力使用料金を大幅に低減させることが可能 となる。If the amount of power consumed within a certain period of time still exceeds the set value, a control signal is sent to the control panel 24. The control panel 24 starts the operation of the private generator 20 and switches the changeover switch 18 so that the electric power of the private generator 20 is supplied to the transformers 14 and 14A and the electric power loads 15 are operated. . As a result, the commercial power and the private power generator 20A can be used effectively. In particular, late-night power (in this case, from 20:00 to 8:00 the following day), which is contracted with a power company at a time-based seasonal rate, is cheaper than daytime power. By using this power, it is possible to significantly reduce the power usage fee.

【0041】 次に、図3にもう一つの他の電力制御装置10の回路図を示している。この場 合、業務用高圧電源21は計器用変成器13を介して各変圧器14、14Aに接 続されている。そして、一方の変圧器14Aは、主ブレーカー32Aを介して電 力負荷15に接続されている。Next, FIG. 3 shows a circuit diagram of another power control device 10. In this case, the commercial high-voltage power supply 21 is connected to the transformers 14 and 14A via the instrument transformer 13. The one transformer 14A is connected to the electric load 15 via the main breaker 32A.

【0042】 また、他方の変圧器14は主ブレーカー32(図中主開閉器)を介して調光器 19に接続され、調光器19は電力負荷15としての照明17に接続されている 。また、変圧器14には遮断スイッチ25を介して図示しない湯沸かし器、調理 器、冷蔵庫などの電力負荷15が接続されている。即ち、制御装置12は一方の 変圧器14Aに接続された電力負荷15、及び、他方の変圧器14に接続された 調光器19、遮断スイッチ25などの制御を行なうように構成されている。The other transformer 14 is connected to a dimmer 19 via a main breaker 32 (main switch in the figure), and the dimmer 19 is connected to a lighting 17 as a power load 15. The transformer 14 is connected to an electric load 15 such as a water heater, a cooker and a refrigerator (not shown) via a cutoff switch 25. That is, the control device 12 is configured to control the power load 15 connected to one transformer 14A, the dimmer 19 connected to the other transformer 14, the cutoff switch 25, and the like.

【0043】 以上の構成で次ぎに電力制御装置10の動作説明を行なう。尚、電力制御装置 10には電力会社から商用電力(業務用高圧電源21)が供給されているものと する。また、電力制御部11には分岐ブレーカー33を介して電力が供給され動 作状態にあるものとする。また、制御装置12には予め年間を通じて最も暑い時 期の日中の13時〜16時の最大電力使用量より例えば20%〜30%低い値が 設定されているものとする。また、電力負荷15、遮断スイッチ25、制御盤2 4及び調光器19には制御する優先順位が設定されており、制御装置12は電力 負荷15、遮断スイッチ25、調光器19の順に制御を行なうものとする。Next, the operation of the power control apparatus 10 having the above configuration will be described. It is assumed that commercial power (commercial high-voltage power supply 21) is supplied to the power control device 10 from a power company. Also, it is assumed that power is supplied to the power control unit 11 via the branch breaker 33 and the power control unit 11 is operating. Further, it is assumed that the control device 12 is set in advance to a value which is 20% to 30% lower than the maximum power consumption during 13:00 to 16:00 during the day, which is the hottest time throughout the year. The power load 15, the cutoff switch 25, the control panel 24, and the dimmer 19 are set to have control priorities. The control device 12 controls the power load 15, the cutoff switch 25, and the dimmer 19 in this order. Shall be performed.

【0044】 夏などの暑い時期に冷暖房機16などの電力負荷15・・・が運転されると、 制御装置12は計器用変成器13で測定された一定時間内(この場合約30分間 )の電力使用量を積算して記憶すると共に、一定時間内の電力使用量の予測を行 なう。そして、制御装置12は電力負荷15の電力使用量を監視して最も暑くな る日中13時〜16時の一定時間内に消費される電力使用量が予測した設定値を 越えそうな場合、優先順位の高い冷暖房機16を一台或いは複数台の運転を一時 停止させる。When the electric loads 15... Such as the air conditioner 16 are operated in a hot season such as summer, the control device 12 operates within a predetermined time (about 30 minutes in this case) measured by the instrument transformer 13. The power consumption is integrated and stored, and the power consumption within a certain period of time is predicted. Then, the control device 12 monitors the power usage of the power load 15 and, if the power usage consumed within a certain time from 13:00 to 16:00 during the hottest day is likely to exceed the predicted set value, The operation of one or more air conditioners 16 having a higher priority is temporarily stopped.

【0045】 この場合、停止させる冷暖房機16は一時電力を遮断しても他に大きく影響す ることのない、店舗、会館或いは大広間などのホールに複数台設置された冷暖房 機16を停止させ、冷暖房機16に設けられた図示しない送風機のみ運転が行な われる。係る、制御装置12は電力使用量を積算している一定時間を経過した場 合、一時電力を遮断した冷暖房機16の運転を再開する。これにより、前述同様 一定時間内に消費される電力使用量が設定値を超えないようにすることができる ようになる。In this case, the air conditioner 16 to be stopped stops the air conditioner 16 installed in a plurality of halls, such as a store, a hall or a hall, so that even if power is temporarily cut off, there is no significant effect on the other. Only the fan (not shown) provided in the air conditioner 16 is operated. The control device 12 restarts the operation of the air conditioner 16 whose power has been temporarily cut off when a certain period of time of accumulating the power consumption has elapsed. This makes it possible to prevent the power consumption within a certain time from exceeding the set value as described above.

【0046】 また、優先順位の高い冷暖房機16を一台或いは複数台の運転を一時停止させ ても更に一定時間内に消費される電力使用量が設定値を越えそうな場合、遮断ス イッチ25を動作して電力負荷15の遮断を行なう。それでも、一定時間内に消 費される電力使用量が設定値を越えそうな場合、調光器19を制御して、他に大 きく影響することのない照明17の照度を下げて暗くして電力使用量を低減させ る。In addition, even if the operation of one or more air conditioners 16 with high priority is temporarily stopped, if the amount of power consumed within a certain period of time is likely to exceed the set value, the cutoff switch 25 Is operated to cut off the power load 15. If the power consumption within a certain period of time is likely to exceed the set value, the dimmer 19 is controlled to reduce the illuminance of the illumination 17 which does not greatly affect other components to make the illumination 17 darker. Reduce power consumption.

【0047】 係る、制御装置12は電力使用量を積算している一定時間を経過した場合、一 時電力を遮断した調光器19を制御して照明17を明るくする。これにより、前 述同様一定時間内に消費される電力使用量が予め設定された設定値を超えないよ うにすることができるようになる。従って、最も暑くなる日中の一定時間内の電 力最大使用量を低減できて基本電力料金を低く抑えることができるようになり、 基本電力料金が高額の場合に比して、電力使用料金を大幅に低減させることがで き、総じて年間の電力使用料金を大幅に低減させることができるようになる。The control device 12 controls the dimmer 19 that has temporarily cut off the power and brightens the lighting 17 when a certain period of time during which the power consumption is integrated elapses. This makes it possible to prevent the amount of power consumed within a certain time from exceeding a preset value, as described above. Therefore, it is possible to reduce the maximum power consumption during a certain period of time during the hottest day and to keep the basic power rate low, and to reduce the power usage rate compared to when the basic power rate is high. It can be greatly reduced, and the annual electricity usage fee can be greatly reduced as a whole.

【0048】 尚、実施例では制御装置12に予め年間を通じて最も暑い時期の日中の13時 〜16時の最大電力使用量より20%〜30%低い値を設定したが、設定値はこ れに限るものではない。In this embodiment, the controller 12 is set in advance to a value that is 20% to 30% lower than the maximum power consumption during the hottest season from 13:00 to 16:00 during the day. It is not limited to.

【0049】 次に、図4にもう一つの他の電力制御装置10の回路図を示している。この場 合、電力会社から低圧引き込みタイプの電灯低圧電源23(単相100V/20 0V電力)と、動力低圧電源22(三相200V電力)が供給されている。動力 低圧電源22は、主ブレーカー32A、分岐ブレーカー33・・・を介して電力 負荷15(この場合冷暖房機16)が接続されている。また、電灯低圧電源23 は調光器19に接続され、調光器19には電力負荷15としての照明17が接続 されている。Next, FIG. 4 shows a circuit diagram of another power control device 10. In this case, a low-voltage draw-in type lamp low-voltage power supply 23 (single-phase 100 V / 200 V power) and a power low-voltage power supply 22 (three-phase 200 V power) are supplied from a power company. Power The low-voltage power supply 22 is connected to the power load 15 (in this case, the air conditioner 16) via the main breaker 32A, the branch breakers 33, and so on. The electric lamp low-voltage power supply 23 is connected to a dimmer 19, and the dimmer 19 is connected to an illumination 17 as a power load 15.

【0050】 また、電灯低圧電源23は、主ブレーカー32、分岐ブレーカー33・・・、 遮断スイッチ25を介して図示しない湯沸かし器、調理器、冷蔵庫及び図示しな い冷暖房機などの電力負荷15が接続されている。係る、主ブレーカー32、3 2Aと分岐ブレーカー33・・・との間には電流及び電圧を測定するためのセン サー29、29がそれぞれ接続されており、各センサー29、29は制御装置1 2に接続されている。Further, the electric power load 15 such as a water heater, a cooker, a refrigerator (not shown) and a heating / cooling unit (not shown) is connected to the electric lamp low-voltage power supply 23 via a main breaker 32, a branch breaker 33,. Have been. Sensors 29 and 29 for measuring current and voltage are connected between the main breakers 32 and 32A and the branch breakers 33..., And the sensors 29 and 29 are connected to the control device 12. It is connected to the.

【0051】 制御装置12はこれらセンサー29、29で検出された信号データに基づいて 電力負荷15、遮断スイッチ25及び調光器19などの制御を行なうように構成 されている。即ち、制御装置12は電灯低圧電源23と、動力低圧電源22とを 別々に制御できるように構成されている。尚、30、31は電力使用量を積算す るための積算電力計である。The control device 12 is configured to control the power load 15, the cutoff switch 25, the dimmer 19 and the like based on the signal data detected by the sensors 29, 29. That is, the control device 12 is configured to be able to separately control the electric lamp low-voltage power supply 23 and the power low-voltage power supply 22. In addition, 30 and 31 are integrating wattmeters for integrating the amount of power consumption.

【0052】 また、制御装置12は一方のセンサー29で検出された信号データに基づいて 電力消費量を監視し、電力負荷15及び調光器19などの制御を行なえるように 構成されている。この場合、制御装置12はセンサー29で検出された信号デー タ(運転している電力負荷15の電力使用量)と予め設定された設定値とから、 他の電力負荷15の使用電力量を算出できるように構成されている。即ち、制御 装置12はセンサー29で検出された信号データと、これから運転する電力負荷 15の起動時及び運転時の使用電力量が予め設定された設定値以内の場合、その 電力負荷15の運転を行なえる(この場合、複数台の電力負荷15の運転も含む )ように構成されている。The control device 12 is configured to monitor the power consumption based on the signal data detected by the one sensor 29 and control the power load 15 and the dimmer 19. In this case, the control device 12 calculates the power consumption of the other power loads 15 from the signal data detected by the sensor 29 (the power consumption of the operating power load 15) and a preset value. It is configured to be able to. That is, the control device 12 controls the operation of the power load 15 when the signal data detected by the sensor 29 and the power consumption at the time of start-up and operation of the power load 15 to be operated from now are within a preset set value. (In this case, the operation of a plurality of power loads 15 is also included).

【0053】 また、制御装置12は予め設定された設定値とセンサー29で検出された信号 データとから、これから運転する電力負荷15の起動時及び運転時の電力使用量 が予め設定された設定値以上になる場合、優先順位の低い電力負荷15を制御を 行なう。これにより、これから運転する電力負荷15の起動時及び運転時の電力 使用量が予め設定された設定値以下になった場合、優先順位の高い電力負荷15 の運転を行なうように構成されている。Further, the control device 12 determines the amount of power consumption at the time of start-up and operation of the power load 15 to be operated from the predetermined set value and the signal data detected by the sensor 29. If the above is the case, the power load 15 having a lower priority is controlled. Accordingly, the power load 15 having a higher priority is operated when the power consumption at the time of start-up and operation of the power load 15 to be operated becomes equal to or less than a preset set value.

【0054】 また、制御装置12は他方のセンサー29で検出された信号データに基づいて 電力消費量を監視し、複数の電力負荷15(この場合冷暖房機16)の起動時電 力使用量の最大値が予め設定された設定値以上になる場合、電力負荷15を一台 ずつ起動するように構成されている。即ち、制御装置12は複数の電力負荷15 を起動する電力使用量のピーク値が予め設定された設定値を越えそうな場合、電 力負荷15を一台ずつ起動して、電力負荷15の起動時の電力使用量のピーク値 が予め設定された設定値を越えないように構成されている。The control device 12 monitors the power consumption based on the signal data detected by the other sensor 29, and determines the maximum power consumption of the plurality of power loads 15 (in this case, the air conditioner 16) at startup. When the value is equal to or greater than a preset value, the power loads 15 are activated one by one. That is, when the peak value of the power consumption for starting the plurality of power loads 15 is likely to exceed the preset value, the control device 12 starts the power loads 15 one by one and starts the power loads 15. It is configured so that the peak value of the power consumption at the time does not exceed the preset value.

【0055】 以上の構成で次ぎに電力制御装置10の動作説明を行なう。尚、電力制御装置 10には電力会社から商用電力(動力低圧電源22、電灯低圧電源23)が供給 され、各主ブレーカー32、32Aの遮断電力容量はそれぞれの主ブレーカー3 2、32Aに接続された全電力負荷15と同等、或いは、それより所定値小さな ものが取り付けられているものとする。また、電力負荷15、遮断スイッチ25 及び調光器19には優先順位が設定されており、制御装置12は優先順位の高い 順に制御を行なうものとする。Next, the operation of the power control device 10 having the above configuration will be described. The power control device 10 is supplied with commercial power (power low-voltage power supply 22 and light low-voltage power supply 23) from a power company, and the cutoff power capacities of the main breakers 32 and 32A are connected to the respective main breakers 32 and 32A. It is assumed that a load equal to or smaller than the total power load 15 by a predetermined value is attached. Priorities are set for the power load 15, the cutoff switch 25, and the dimmer 19, and the control device 12 performs control in descending order of priority.

【0056】 夏などの暑い時期に図示しない冷暖房機などの電力負荷15・・・が運転され ると、制御装置12は一方のセンサー29からの信号データを検出する。係る制 御装置12は主ブレーカー32に接続された電力負荷15・・・の電力消費量を 監視し、センサー29で検出された電力負荷15の電力使用量と予め設定された 設定値とから、他の電力負荷15の使用電力量を算出する。そして、分岐ブレー カー33に接続された図示しない電力負荷の運転を行なう場合、運転可能な電力 量であれば、その電力負荷15の運転が行なわれる。When the electric loads 15... Such as air conditioners and the like (not shown) are operated during a hot time such as summer, the control device 12 detects signal data from one sensor 29. The control device 12 monitors the power consumption of the power loads 15... Connected to the main breaker 32, and, based on the power consumption of the power load 15 detected by the sensor 29 and a preset setting value, The power consumption of another power load 15 is calculated. When the power load (not shown) connected to the branch breaker 33 is operated, the power load 15 is operated if the amount of power is operable.

【0057】 また、優先順位の高い電力負荷15(この場合、冷暖房機16)を運転する場 合、優先順位の低い電力負荷15(この場合照明17)の制御が行なわれる。即 ち、制御装置12は調光器19を制御して他に大きく影響することのない優先順 位の低い照明17の照度を下げて暗くし、照明17の電力使用量を低減させる。 また、他の優先順位の高い電力負荷(図示せず)が運転される場合、制御装置1 2は、これもまた電力を遮断しても他に大きく影響することのない、事務所など に複数台設置された冷暖房機16を停止し、図示しない冷暖房機16の送風機の み運転が行なわれる。When the power load 15 with a higher priority (in this case, the air conditioner 16) is operated, the power load 15 with a lower priority (in this case, the lighting 17) is controlled. In other words, the control device 12 controls the dimmer 19 to lower and darken the illuminance of the low-priority lighting 17 which does not greatly affect the other, thereby reducing the power consumption of the lighting 17. Further, when another high-priority power load (not shown) is operated, the control device 12 transmits a plurality of power to an office or the like, which does not greatly affect the power cutoff. The air conditioner 16 installed on the stand is stopped, and only the blower of the air conditioner 16 (not shown) is operated.

【0058】 これにより、消費される電力使用量を略平準化することが可能となると共に予 め制御装置12に設定した設定値を超えないようにすることができ、主ブレーカ ー32の遮断電力容量を小さくすることが可能となる。従って、電力会社との契 約基本料金を低減させることが可能となり、電力使用料金を低減させることがで きるようになる。尚、他の電力負荷の使用が終了し、センサー29で検出した信 号データと設定値とから遮断スイッチ25及び調光器19などを復帰可能な電力 量になった場合、制御装置12は遮断スイッチ25を接続して電力負荷15の運 転を行なうと共に、調光器19を制御して照明17を明るくする。As a result, the amount of consumed power can be substantially leveled, and the power consumption can be prevented from exceeding a preset value set in the control device 12. The capacity can be reduced. Therefore, it is possible to reduce the basic charge of the contract with the power company, and it is possible to reduce the power usage charge. When the use of the other power load is completed and the amount of power that can return the shutoff switch 25 and the dimmer 19 from the signal data detected by the sensor 29 and the set value is reached, the control device 12 shuts off. The switch 25 is connected to operate the power load 15, and the dimmer 19 is controlled to brighten the illumination 17.

【0059】 また、制御装置12は他方のセンサー29からの信号データから主ブレーカー 32Aに接続された複数の電力負荷15・・・の電力消費量の監視を行なう。係 る、複数の電力負荷15・・の起動を行なう場合、センサー29で検出された信 号データと予め設定した設定値とから、電力負荷15の起動が行なわれる。この 場合、センサー29で検出された信号データと予め設定された設定値から複数の 電力負荷15を運転可能な場合、複数の電力負荷15が同時に起動される。The control device 12 monitors the power consumption of the plurality of power loads 15... Connected to the main breaker 32 A from the signal data from the other sensor 29. When the plurality of power loads 15 are to be activated, the power load 15 is activated based on the signal data detected by the sensor 29 and a preset value. In this case, if a plurality of power loads 15 can be operated based on the signal data detected by the sensor 29 and a preset set value, the plurality of power loads 15 are started simultaneously.

【0060】 また、センサー29で検出された信号データと予め設定された設定値から電力 負荷15を複数運転不可能な場合、制御装置12は電力負荷15を一台起動し、 所定時間経過後次の電力負荷15の起動を行なう。即ち、制御装置12は複数の 電力負荷15を起動する電力使用量のピーク値が予め設定された設定値を越えそ うな場合、電力負荷15を所定の時間間隔で一台ずつ起動して、電力負荷15の 起動時の電力使用量が定値を越えないようにしている。If a plurality of power loads 15 cannot be operated based on the signal data detected by the sensor 29 and a preset value, the control device 12 activates one power load 15 and after a predetermined time elapses, Of the power load 15 is started. In other words, when the peak value of the power consumption for activating the plurality of power loads 15 is likely to exceed the preset value, the control device 12 activates the power loads 15 one by one at predetermined time intervals, and The power consumption at the time of starting the load 15 does not exceed a predetermined value.

【0061】 これにより、前述同様消費される電力使用量を略平準化することが可能となる と共に予め制御装置12に設定した設定値を超えないようにすることができ、主 ブレーカー32Aの遮断電力容量を小さくすることが可能となる。従って、電力 会社との契約基本料金を低減させることができるようになると共に、電力使用料 金を低減させることができ、総じて年間を通じて電力使用料金を大幅に低減させ ることができるようになる。As described above, it is possible to substantially equalize the amount of power consumption consumed as described above, and not to exceed a set value previously set in the control device 12. The capacity can be reduced. Therefore, it is possible to reduce the basic charge of the contract with the electric power company, and at the same time, it is possible to reduce the electric power charge, and it is possible to drastically reduce the electric charge throughout the year.

【0062】 尚、実施例では高圧引き込みタイプの電力を業務用高圧電源21で説明したが これに限らず、工場、倉庫等に使用される高圧A、高圧Bの高圧電源でも差し支 えない。In the embodiment, the high-voltage draw-in type power is described using the commercial high-voltage power supply 21. However, the present invention is not limited to this, and high-voltage power supplies of high voltage A and high voltage B used in factories, warehouses, and the like may be used.

【0063】[0063]

【考案の効果】[Effect of the invention]

以上詳述した如く本考案によれば、工場、店舗或いは家庭などに設けられた冷 暖房機或いは照明などの複数の電力負荷と、自家用発電機と、電力負荷の使用電 力量を監視して電力負荷への給電を制御する制御手段とを備え、電力負荷にて設 定値以上の電力が消費された場合、制御手段は一定条件下で電力負荷の電源を商 用電力又は自家用発電機の電力の何れかに切り換えるようにしているので、例え ば一定時間内の電力使用量が制御手段に予め設定された設定値より越えそうな場 合、電力負荷の電源を商用電力又は自家用発電機の電力に切り換えて使用するこ とが可能となる。これにより、基本電力料金の安い方の電力を使用することが可 能となる。従って、日中の一定時間内の電力最大使用量を低減できて基本電力料 金を低く抑えられ、総じて年間を通じて電力使用料金を大幅に低減させることが できるようになるものである。 As described in detail above, according to the present invention, a plurality of electric loads, such as air conditioners or lights, installed in factories, stores, or homes, a private generator, and the amount of electric power used by the electric loads are monitored. Control means for controlling the power supply to the load, and when the power load consumes more than the set value, the control means switches the power of the power load to the commercial power or the power of the private generator under a certain condition. If the power consumption within a certain period of time is likely to exceed the preset value set in the control means, the power source of the power load is switched to commercial power or power of the private generator. It is possible to switch and use. This makes it possible to use the power with the lower basic power rate. Therefore, it is possible to reduce the maximum power consumption during a certain period of time during the day, keep the basic power rate low, and significantly reduce the power usage rate throughout the year.

【0064】 また、請求項2の考案によれば、請求項1に加えて制御手段は、夜間は商用電 力のままとし、日中は自家用発電機の電力に切り換えるようにしているので、例 えば夜間だけ商用電力を使用することが可能となる。これにより、昼間は商用電 力の代わりに比較的安い自家用発電機の電力を使用することが可能となる。従っ て、商用電力と自家用発電機を効率的に使用することができ、総じて年間を通じ て電力使用料金を大幅に低減させることができるようになるものである。According to the invention of claim 2, in addition to claim 1, the control means keeps the commercial power at night and switches to the power of the private generator during the day. For example, commercial power can be used only at night. This makes it possible to use relatively cheap private generator power instead of commercial power during the day. Therefore, the commercial power and the private generator can be used efficiently, and the electricity usage fee can be greatly reduced throughout the year.

【0065】 特に、例えば電力会社と時間帯別季節別料金で契約を行なうと深夜電力(この 場合、20時から翌日の8時)は日中電力より安く、電力会社の電力を深夜に使 用し、自家用発電機の電力を日中使用することにより電力使用料金を大幅に低減 させることが可能となるものである。In particular, for example, if a contract is made with a power company at a time-based seasonal rate, late-night power (in this case, from 20:00 to 8:00 the next day) is cheaper than daytime power, and the power company's power is used at midnight. However, by using the power of the private generator during the day, it is possible to significantly reduce the electricity usage fee.

【0066】 また、請求項3の考案によれば、工場、店舗或いは家庭などに設けられた冷暖 房機或いは照明などの複数の電力負荷と、自家用発電機と、電力負荷の使用電力 量を監視して電力負荷への給電を制御する制御手段とを備え、工場、店舗或いは 家庭などで使用される商用電力の使用電力量が設定値より大きくなった場合、制 御手段は不足した分の電力を自家用発電機から補填するようにしているので、不 足した商用電力を自家用発電機から補填することが可能となる。これにより、例 えば最も暑くなる日中の一定時間内の電力最大使用量を低減できて、基本電力料 金を低く抑えることができる。従って、年間の電力使用料金を大幅に低減させる ことができるようになるものである。According to the invention of claim 3, a plurality of power loads such as a heating / cooling device or lighting provided in a factory, a store, or a home, a private generator, and the power consumption of the power load are monitored. Control means for controlling the power supply to the power load, and if the amount of commercial power used in factories, stores, or homes exceeds the set value, the control means Power is supplied from the private generator, it becomes possible to supplement the lack of commercial power from the private generator. As a result, for example, it is possible to reduce the maximum power consumption within a certain period of time during the hottest day, and to keep the basic power rate low. Therefore, the annual electricity usage fee can be significantly reduced.

【0067】 更に、請求項4の考案によれば、工場、店舗或いは家庭などに設けられた冷暖 房機或いは照明などの複数の電力負荷と、当該電力負荷の使用電力量を監視して 電力負荷への給電を制御する制御手段とを備え、電力負荷にて設定値以上の電力 が消費された場合、制御手段は電力負荷を予め設定された順位に従って給電の制 限若しくは遮断を行なうようにしているので、例えば頻繁に使用することのない 電力負荷の優先順位を高くすることが可能となる。これにより、優先順位の高い 順に電力負荷を制御、若しくは、遮断することができるようになる。従って、例 えば日中の一定時間内の最大電力使用量が設定値を超えてしまうのを防止するこ とが可能となる。特に、電力負荷の制御、若しくは、遮断することにより消費さ れる電力使用量を略平準化することが可能となる。これにより、遮断電力容量の 小さな主ブレーカーを確実に使用することができるようになる。従って、一層効 果的に年間の電力使用料金を低減させることができるようになるものである。Further, according to the invention of claim 4, a plurality of power loads such as a cooling / heating machine or a lighting provided in a factory, a store or a home, and the amount of power used by the power loads are monitored to monitor the power loads. Control means for controlling power supply to the power supply, and when power equal to or greater than the set value is consumed by the power load, the control means limits or interrupts the power supply in accordance with a preset order. Therefore, for example, it is possible to increase the priority of power loads that are not frequently used. As a result, the power loads can be controlled or cut off in the order of priority. Therefore, for example, it is possible to prevent the maximum power consumption within a certain period of time during the day from exceeding a set value. In particular, it is possible to substantially equalize the amount of power consumed by controlling or interrupting the power load. As a result, it is possible to reliably use a main breaker having a small breaking power capacity. Therefore, the annual electricity usage fee can be reduced more effectively.

【0068】 更にまた、請求項5の考案によれば、請求項4に加えて制御手段は、工場、店 舗或いは家庭などで使用される使用電力量が予め設定された設定値以上になった 場合、照明に供給している電力を制限するようにしているので、例えば他に大き く影響しない照明の照度を下げて電力使用量を低減させることが可能となる。こ れにより、例えば日中の一定時間内の最大電力使用量を低減させることが可能と なる。従って、月々の基本電力料金を低く抑えることができ、総じて基本電力料 金を年間を通じて大幅に低減させることができるようになるものである。Further, according to the invention of claim 5, in addition to claim 4, the control means determines that the amount of electric power used in the factory, store, home, or the like is equal to or more than a preset value. In this case, since the power supplied to the lighting is limited, for example, it is possible to reduce the illuminance of the lighting which does not significantly affect the other, thereby reducing the power consumption. This makes it possible, for example, to reduce the maximum power consumption during a certain period of time during the day. Therefore, the monthly basic electricity rate can be kept low, and the overall basic electricity rate can be significantly reduced throughout the year.

【0069】 また、請求項6の考案によれば、複数の電力供給装置と、工場、店舗或いは家 庭などに設けられた冷暖房機或いは照明などの複数の電力負荷と、当該電力負荷 の使用電力量を監視して電力負荷への給電を制御する制御手段とを備え、制御手 段は各電力供給装置の使用電力量を検出し、各電力供給装置から電力使用料金が 安いものに切り換えるようにしているので、使用料金の易い電力を使用すること ができるようになる。これにより、使用する電力料金を大幅に低減させることが 可能になる。従って、年間を通じての電力使用料金を一層効果的に低減させるこ とができるようになるものである。According to the invention of claim 6, a plurality of power supply devices, a plurality of power loads such as a heating / cooling machine or lighting provided in a factory, a store, a home, or the like, and a power consumption of the power load. Control means for monitoring the power consumption and controlling the power supply to the power load, and the control means detects the power consumption of each power supply device and switches from the power supply device to the one with a lower power usage fee. As a result, it is possible to use electricity that is easy to use. As a result, it is possible to significantly reduce the electricity charges used. Therefore, it will be possible to reduce the electricity usage fee throughout the year more effectively.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の電力制御装置の電気回路図である。FIG. 1 is an electric circuit diagram of a power control device of the present invention.

【図2】もう一つの電力制御装置の電気回路図である。FIG. 2 is an electric circuit diagram of another power control device.

【図3】もう一つの電力制御装置の電気回路図である。FIG. 3 is an electric circuit diagram of another power control device.

【図4】もう一つの電力制御装置の電気回路図である。FIG. 4 is an electric circuit diagram of another power control device.

【符号の説明】[Explanation of symbols]

10 電力制御装置 11 電力制御部 12 制御装置 13 計器用変成器 14 変圧器 14A 変圧器 15 電力負荷 16 冷暖房機 17 照明 18 切換スイッチ 19 調光器 20 自家用発電機 20A 自家用発電機 21 業務用高圧電源 22 動力低圧電源 23 電灯低圧電源 25 遮断スイッチ 26 デマンド積算計 27 パルス検出器 28 デマンド制御盤 29 センサー 32 主ブレーカー 32A 主ブレーカー 33 分岐ブレーカー DESCRIPTION OF SYMBOLS 10 Power control device 11 Power control part 12 Control device 13 Instrument transformer 14 Transformer 14A Transformer 15 Electric load 16 Cooling / heating machine 17 Lighting 18 Changeover switch 19 Dimmer 20 Private generator 20A Private generator 21 Commercial high voltage power supply 22 Power low voltage power supply 23 Lighting low voltage power supply 25 Cutoff switch 26 Demand integrating meter 27 Pulse detector 28 Demand control panel 29 Sensor 32 Main breaker 32A Main breaker 33 Branch breaker

Claims (6)

【実用新案登録請求の範囲】[Utility model registration claims] 【請求項1】 工場、店舗或いは家庭などに設けられた
冷暖房機或いは照明などの複数の電力負荷と、自家用発
電機と、前記電力負荷の使用電力量を監視して電力負荷
への給電を制御する制御手段とを備え、 前記電力負荷にて設定値以上の電力が消費された場合、
前記制御手段は一定条件下で前記電力負荷の電源を商用
電力又は前記自家用発電機の電力の何れかに切り換える
ことを特徴とする電力制御装置。
1. A power supply to a power load by monitoring a plurality of power loads such as a heating / cooling device or lighting provided in a factory, a store, or a home, a private generator, and an amount of power used by the power load. Control means for performing, when power equal to or more than a set value is consumed in the power load,
The power control device according to claim 1, wherein the control unit switches a power supply of the power load to either commercial power or power of the private generator under a certain condition.
【請求項2】 制御手段は、夜間は商用電力のままと
し、日中は自家用発電機の電力に切り換えることを特徴
とする請求項1の電力制御装置。
2. The power control apparatus according to claim 1, wherein the control means keeps commercial power at night and switches to electric power of a private generator during the day.
【請求項3】 工場、店舗或いは家庭などに設けられた
冷暖房機或いは照明などの複数の電力負荷と、自家用発
電機と、前記電力負荷の使用電力量を監視して電力負荷
への給電を制御する制御手段とを備え、 前記工場、店舗或いは家庭などで使用される商用電力の
使用電力量が設定値より大きくなった場合、前記制御手
段は前記設定値で不足した分の電力を前記自家用発電機
から補填することを特徴とする電力制御装置。
3. A plurality of electric loads, such as a heating / cooling unit or lighting, provided in a factory, a store, or a home, a private generator, and the amount of electric power used by the electric load are monitored to control power supply to the electric load. When the amount of commercial power used in the factory, store, home, or the like becomes larger than a set value, the control unit generates the power shortage of the set value for the private power generation. A power control device, which is supplemented from a machine.
【請求項4】 工場、店舗或いは家庭などに設けられた
冷暖房機或いは照明などの複数の電力負荷と、当該電力
負荷の使用電力量を監視して電力負荷への給電を制御す
る制御手段とを備え、 前記電力負荷にて設定値以上の電力が消費された場合、
前記制御手段は前記電力負荷を予め設定された順位に従
って給電の制限若しくは遮断を行なうことを特徴とする
電力制御装置。
4. A plurality of electric loads, such as air conditioners or lights, provided in factories, stores, or homes, and control means for monitoring power consumption of the electric loads and controlling power supply to the electric loads. When power equal to or greater than a set value is consumed in the power load,
The power control device according to claim 1, wherein the control means limits or interrupts the power supply in accordance with a preset order.
【請求項5】 制御手段は、工場、店舗或いは家庭など
で使用される使用電力量が予め設定された設定値以上に
なった場合、照明に供給している電力を制限することを
特徴とする請求項4の電力制御装置。
5. The control means limits the power supplied to the lighting when the amount of power used in a factory, store, home, or the like becomes equal to or greater than a preset value. The power control device according to claim 4.
【請求項6】 複数の電力供給装置と、工場、店舗或い
は家庭などに設けられた冷暖房機或いは照明などの複数
の電力負荷と、当該電力負荷の使用電力量を監視して電
力負荷への給電を制御する制御手段とを備え、 前記制御手段は前記各電力供給装置の使用電力量を検出
し、前記各電力供給装置から電力使用料金が安いものに
切り換えることを特徴とする電力制御装置。
6. A plurality of power supply devices, a plurality of power loads such as air conditioners or lights provided in factories, stores or homes, and the amount of power used by the power loads is monitored to supply power to the power loads. Control means for controlling the power supply apparatus, wherein the control means detects the amount of power used by each of the power supply apparatuses, and switches from each of the power supply apparatuses to one having a lower power usage fee.
JP1998005948U 1998-08-06 1998-08-06 Power control device Expired - Lifetime JP3056489U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1998005948U JP3056489U (en) 1998-08-06 1998-08-06 Power control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1998005948U JP3056489U (en) 1998-08-06 1998-08-06 Power control device

Publications (1)

Publication Number Publication Date
JP3056489U true JP3056489U (en) 1999-02-16

Family

ID=43190458

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1998005948U Expired - Lifetime JP3056489U (en) 1998-08-06 1998-08-06 Power control device

Country Status (1)

Country Link
JP (1) JP3056489U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5500285B1 (en) * 2013-03-19 2014-05-21 日新電機株式会社 Power supply equipment for switchgear and on-site power generation method at switchgear
JP2015139317A (en) * 2014-01-23 2015-07-30 株式会社東光高岳 Simulation device, operation pattern determination support system, and operation pattern determination support method
US9762036B2 (en) 2014-02-25 2017-09-12 Wave Energy Inc. Electric power distribution system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5500285B1 (en) * 2013-03-19 2014-05-21 日新電機株式会社 Power supply equipment for switchgear and on-site power generation method at switchgear
JP2015139317A (en) * 2014-01-23 2015-07-30 株式会社東光高岳 Simulation device, operation pattern determination support system, and operation pattern determination support method
US9762036B2 (en) 2014-02-25 2017-09-12 Wave Energy Inc. Electric power distribution system

Similar Documents

Publication Publication Date Title
US6718213B1 (en) Variable base load energy management system and method
US6680547B1 (en) Power sharing system including rechargeable power source
JP5272545B2 (en) Store power supply equipment
KR100947038B1 (en) Hybrid ups system for controlling maximum demand power
EP2137800B1 (en) A load management controller
US20070145952A1 (en) Efficient power system
US9859750B2 (en) Power distribution control apparatus, electricity storage system, and power distribution control method
WO2011142330A1 (en) Electric power supply system
US4117537A (en) System and method for limiting energy consumption
JP2012186950A (en) Electric power supply system
CN103294021A (en) Relay system with branch circuit metering
JP2007166818A (en) Power supply system and control method thereof
JP2001258176A (en) Power consumption control system
NO336975B1 (en) Voltage regulation device
JP2001296904A (en) Energy control system
JP2011250673A (en) Energy controller and control method
JP2011083088A (en) Dc power distribution system
JP2000295784A (en) Power storage system
EP0647365B1 (en) Power controller device
JP2014158327A (en) Power supply apparatus
GB2457506A (en) Solar power system with storage element and mains electricity supply
JP3056489U (en) Power control device
KR101203148B1 (en) Maximum demand control system in conjunction with back-up power source and operating method therefor
EP0889571A2 (en) An auxiliary electric supply apparatus
GB2545079A (en) Power generation