JP3002215U - Avalanche prevention pile - Google Patents

Avalanche prevention pile

Info

Publication number
JP3002215U
JP3002215U JP1994004278U JP427894U JP3002215U JP 3002215 U JP3002215 U JP 3002215U JP 1994004278 U JP1994004278 U JP 1994004278U JP 427894 U JP427894 U JP 427894U JP 3002215 U JP3002215 U JP 3002215U
Authority
JP
Japan
Prior art keywords
main body
pile
avalanche prevention
foundation
prevention pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1994004278U
Other languages
Japanese (ja)
Inventor
英穂 村上
Original Assignee
英穂 村上
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 英穂 村上 filed Critical 英穂 村上
Priority to JP1994004278U priority Critical patent/JP3002215U/en
Application granted granted Critical
Publication of JP3002215U publication Critical patent/JP3002215U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

(57)【要約】 【目的】 景観的に異和感を与えず、施工のときに法
面を荒らさない強度的に優れた雪崩防止杭を提供する。 【構成】 鋼管よりなる本体幹材2から同様に鋼管よ
りなる本体枝材3を多段にわたって放射状に斜め上方に
張り出させて一体構造とし、雪崩防止杭本体1を構成す
る。基礎は本体側、控側共に基礎杭とする。雪崩防止杭
本体1の本体側基礎杭4への固定には連結パイプ5また
はスリーブ等で行う。雪崩防止杭本体1の山側上方の適
切な位置に同様に控側基礎杭6を打設し、控ワイヤーロ
ープ9を控側基礎杭6の上端に固定し、それを雪崩防止
杭の本体幹材2の上端から適切な位置に結び付け支持さ
せる。以上のように構成した雪崩防止杭。
(57) [Summary] [Purpose] To provide an avalanche prevention pile with excellent strength that does not give a sense of strangeness to the landscape and does not roughen the slope during construction. [Structure] An avalanche prevention pile main body 1 is constructed by projecting a main body branch member 2 made of a steel pipe in the same manner as a main body branch member 3 made of a steel pipe radially obliquely upward in multiple stages to form an integral structure. The foundation will be foundation piles on both the main body side and the back side. The avalanche prevention pile main body 1 is fixed to the main body side foundation pile 4 with a connecting pipe 5 or a sleeve. In the same way, a backing foundation pile 6 is laid at an appropriate position above the mountain side of the avalanche prevention pile main body 1, and the backing wire rope 9 is fixed to the upper end of the backing side foundation pile 6, which is a trunk material of the avalanche prevention pile. The upper end of 2 is tied and supported at an appropriate position. The avalanche prevention pile configured as described above.

Description

【考案の詳細な説明】[Detailed description of the device] 【産業上の利用分野】[Industrial applications]

本考案は雪崩防止のために斜面に設置される雪崩防止杭に関わるものである。 The present invention relates to an avalanche prevention pile installed on a slope to prevent an avalanche.

【従来の技術】[Prior art]

雪崩予防杭は樹木が茂った斜面では雪崩が起きないことから考案された、斜面 に直角に設置される杭状構造物であり、集合的に用いられる。斜面への配置法は 千鳥配置とし、35〜40度の斜面では杭間の水平距離は5m、列間斜距離は8 m程度が標準とされる。その構造は単独柱のものと杭本体を谷側に設けた控柱で 支持する2通りの方法が採用されている。基礎はコンクリート基礎または根かせ が採用されている。 The avalanche prevention pile is a pile-like structure installed at right angles to the slope, which was devised because an avalanche does not occur on a forested slope and is used collectively. The staggered layout method is staggered, and the standard horizontal distance between piles is 5 m and the diagonal distance between rows is approximately 8 m on a slope of 35-40 degrees. As for the structure, there are two types of methods: one with a single pillar and the other with the main body of the pile supported by a retaining pillar installed on the valley side. The foundation is concrete foundation or skein.

【考案が解決しようとする課題】[Problems to be solved by the device]

現状の雪崩防止杭には以下に述べるような問題がある。 法面に無機的な杭状構造物が林立するので、景観上好ましくない。 単一な杭状構造物である従来の雪崩防止杭は全層雪崩の防止が対象であり、表 層雪崩に関しては何らその効果が期待できない。 標準の設計法では1本の雪崩防止杭は水平距離分の雪圧を受けると考えて計算 を行うので、多雪地では基礎、部材が共に大きなものになる。そのとき、谷側に 控柱を設ける方法もあるが、法面上にさらに部材が多数見えるので景観上好まし くない。 現在、雪崩防止杭に用いられているコンクリート基礎、根かせは共に施工時に 法面の掘削を伴うので、法面を荒らし、崩落の危険が増大する。 本考案は以上のような従来の雪崩防止杭の欠点をなくし、景観的に異和感を与 えず、施工のときに法面を荒らさない強度的に優れた雪崩防止杭を提供するもの である。 The current avalanche prevention pile has the following problems. Inorganic pile-like structures are lined up on the slope, which is not desirable for the landscape. The conventional avalanche prevention pile, which is a single pile-like structure, is intended to prevent all-layer avalanche, and no effect can be expected for surface avalanche. In the standard design method, one avalanche prevention pile is calculated on the assumption that it receives the snow pressure for the horizontal distance, so the foundation and the members will be large in a snowy area. At that time, there is also a method of providing support pillars on the valley side, but it is not preferable for the landscape because more members can be seen on the slope. At present, both concrete foundations and skeins used for avalanche prevention piles involve excavation of slopes during construction, which damages the slopes and increases the risk of collapse. The present invention eliminates the above-mentioned drawbacks of conventional avalanche prevention piles, provides an avalanche prevention pile with excellent strength that does not give a strange feeling to the landscape and does not roughen the slope during construction. is there.

【課題を解決するための手段】[Means for Solving the Problems]

本体幹材から枝材を多段にわたって放射状に斜め上方に張り出させ、人工樹木 風な立体構造物とする。本体幹材の下部は穿孔打設した本体側基礎杭に連結させ る。法面上で雪崩防止杭本体の位置から山側上方に控側基礎杭を穿孔打設し、控 側基礎杭上部に固定した控ワイヤーロープで本体幹材の頂部から適宜距離を置い た位置で本体幹材を支持させる。 本体側、控側基礎に杭基礎を採用し、施工による斜面の荒れを最小にする。 The branch material is projected radially upward from the main trunk material in multiple stages to form an artificial tree-like three-dimensional structure. The lower part of the trunk of the main body is connected to the foundation piles on the main body side that are punched. On the slope, a backing foundation pile is pierced from the position of the avalanche prevention pile main body to the mountain side above, and the main body is placed at an appropriate distance from the top of the main trunk material with a holding wire rope fixed to the top of the backing foundation pile. Support trunk material. Pile foundations are used for the main body side and the back side foundation to minimize the roughness of the slope due to construction.

【作用】[Action]

本体幹材から張り出させた各枝部も雪の移動を防止する。また、基礎杭は穿孔 や打設によって施工するので斜面を荒らさない。本体側、控側共に基礎として杭 を用いているので、荷重によりある程度自由に変位することが出来る。本体幹材 の頂部から適宜離れた位置を控ワイヤーロープで支持するので、本体幹材に作用 する雪圧による曲げモーメントを大幅に低減させる。 The branches that extend from the main trunk also prevent the movement of snow. In addition, the foundation piles will be constructed by drilling and placing, so the slope will not be roughened. Since piles are used as foundations on both the main body side and the back side, they can be displaced to some extent by the load. Since the wire rope is supported at a position that is appropriately separated from the top of the main trunk material, the bending moment due to the snow pressure acting on the main trunk material is greatly reduced.

【実施例】【Example】

本考案の実施例を図面に基づいて説明する。図1は本考案の雪崩防止杭を法面 に設置したときの側面図である。雪崩防止杭本体1は鋼管で構成した本体幹材2 から同様に鋼管で構成した本体枝材3を多段にわたって放射状に斜め上方に張り 出させて一体構造としたものである。基礎は本体側、控側共に基礎杭とする。そ の際、雪崩防止柵のアンカーとして多用されている、杭自体に先端ビット7が付 いていて、それを旋回掘進させてそのまま杭とするものを使用すると施工が容易 になる。雪崩防止杭本体1の本体側基礎杭4への固定には連結パイプ5を介して ボルトナット8で行う。雪崩防止杭本体1の山側上方の適切な位置に同様に控側 基礎杭6を打設し、控ワイヤーロープ9を控側基礎杭6の上端に固定し、それを 雪崩防止杭の本体幹材2の上端から適切な位置に結び付け支持させる。 An embodiment of the present invention will be described with reference to the drawings. FIG. 1 is a side view when the avalanche prevention pile of the present invention is installed on the slope. The avalanche prevention pile main body 1 has a one-piece structure in which a main body trunk member 2 made of a steel pipe and a main body branch member 3 made of a steel pipe are radially and diagonally extended in multiple stages. The foundation will be foundation piles on both the main body side and the back side. At this time, the pile itself, which is often used as an anchor for an avalanche prevention fence, has a tip bit 7 attached to it, which can be swiveled to form a pile as it is. The avalanche prevention pile main body 1 is fixed to the main body side foundation pile 4 with the bolt nut 8 through the connecting pipe 5. In the same way, a backing foundation pile 6 is laid at an appropriate position above the mountain side of the avalanche prevention pile main body 1, and a backing wire rope 9 is fixed to the upper end of the backing foundation pile 6, which is used as a main trunk material of the avalanche prevention pile. The upper end of 2 is tied and supported at an appropriate position.

【考案の効果】[Effect of device]

本考案の雪崩防止杭は以上のような構成であり、以下に示すような効果がある 。 本体幹材に放射状に枝部が配置されているので、従来の単純な支柱状の雪崩防 止杭に較べて、斜面積雪の移動をより効果的に押さえることが出来、雪崩防止効 果が高い。また、人工樹木風の外観であるので景観上好ましい効果がある。その 際、FRPコーティングなどにより表面に擬木的な塗装処理を施せばより効果的 である。 本体幹材が本体側基礎杭と控側基礎杭に結び付けられたワイヤーロープの2点 で支持されているので、従来の単支柱的な雪崩防止杭で対応できないような積雪 深の場所でも適用することが出来る。また同じ積雪深ならより小さな断面の材料 で済む。なお控柱を付けた雪崩防止杭でも同様な効果が期待出来るが、ワイヤー ロープに較べてはるかに目に付く断面の大きい控柱が必要であり、しかも目立ち 易い本体の谷側に控柱が位置するので景親上、極めて都合が悪い。 法面の不整などで側圧が作用した場合でも基礎杭の場合は柔軟に変位し、雪崩 防止杭本体材料に無理が掛かりにくい。 また、コンクリート基礎や根かせを使用しないので法面を荒らさない、また特 にコンクリート基礎に較べて目立たないので景観上好ましい。 The avalanche prevention pile of the present invention is configured as described above and has the following effects. Since the branches are radially arranged on the trunk of the main body, the movement of snow on sloping areas can be suppressed more effectively compared to the conventional simple pillar-shaped avalanche prevention piles, and the avalanche prevention effect is high. . In addition, the appearance of an artificial tree has a favorable effect on the landscape. At that time, it is more effective if the surface is coated with a pseudo-wood like FRP coating. Since the trunk material of the main body is supported at two points of the wire rope connected to the main body side foundation pile and the holding side foundation pile, it can be applied even in deep snow areas where conventional avalanche avalanche prevention piles cannot handle. You can If the snow depth is the same, a material with a smaller cross section will suffice. A similar effect can be expected with an avalanche prevention pile with retaining columns, but a retaining column with a much larger cross section than a wire rope is required, and the retaining column is located on the valley side of the main body where it is easily noticeable. It is extremely inconvenient because of the fact that it does. Even if lateral pressure is applied due to irregular slopes, the foundation pile will be displaced flexibly, and it will be difficult for the material of the avalanche prevention pile body to be forced. In addition, since it does not use concrete foundations or skeins, it does not roughen the slope, and it is particularly unobtrusive compared to concrete foundations, which is preferable for the landscape.

【図面の簡単な説明】[Brief description of drawings]

【図1】本考案の雪崩防止杭が法面に設置された状態の
側面図である。
FIG. 1 is a side view showing a state where the avalanche prevention pile of the present invention is installed on a slope.

【図2】控ワイヤーロープの結合状態を示すA−A′矢
視図である。
FIG. 2 is a view taken along the line AA ′ of FIG.

【図3】本考案の雪崩防止杭の正面図である。FIG. 3 is a front view of the avalanche prevention pile of the present invention.

【図4】本考案の雪崩防止杭の平面図である。FIG. 4 is a plan view of an avalanche prevention pile of the present invention.

【符号の説明】[Explanation of symbols]

1 雪崩防止杭本体 2 本体幹材 3 本体枝材 4 本体側基礎杭 5 連結パイプ 6 控側基礎杭 7 先端ビット 8 ボルトナット 9 控ワイヤーロープ 10 ワイヤークリップ 11 法面 1 Avalanche prevention pile main body 2 Main body trunk material 3 Main body branch material 4 Main body side foundation pile 5 Connecting pipe 6 Preservation side foundation pile 7 Tip bit 8 Bolt nut 9 Preservation wire rope 10 Wire clip 11 Slope

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】鋼管よりなる本体幹材2から同様に鋼管よ
りなる本体枝材3を多段にわたって放射状に斜め上方に
張り出させて一体構造とし、雪崩防止杭本体1を構成す
る。基礎は本体側、控側共に基礎杭とする。雪崩防止杭
本体1の本体側基礎杭4への固定には連結パイプ5また
はスリーブ等で行う。雪崩防止杭本体1の山側上方の適
切な位置に同様に控側基礎杭6を打設し、控ワイヤーロ
ープ9を控側基礎杭6の上端に固定し、それを雪崩防止
杭の本体幹材2の上端から適切な位置に結び付け支持さ
せる。以上のように構成した雪崩防止杭。
1. An avalanche prevention pile main body 1 is constructed by integrally projecting a main body trunk member 2 made of a steel pipe and a main body branch member 3 made of a steel pipe in a radially upward manner in multiple stages. The foundation will be foundation piles on both the main body side and the back side. The avalanche prevention pile main body 1 is fixed to the main body side foundation pile 4 with a connecting pipe 5 or a sleeve. In the same way, a backing foundation pile 6 is laid at an appropriate position above the mountain side of the avalanche prevention pile main body 1, and the backing wire rope 9 is fixed to the upper end of the backing side foundation pile 6, which is a trunk material of the avalanche prevention pile. The upper end of 2 is tied and supported at an appropriate position. The avalanche prevention pile configured as described above.
JP1994004278U 1994-03-15 1994-03-15 Avalanche prevention pile Expired - Lifetime JP3002215U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1994004278U JP3002215U (en) 1994-03-15 1994-03-15 Avalanche prevention pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1994004278U JP3002215U (en) 1994-03-15 1994-03-15 Avalanche prevention pile

Publications (1)

Publication Number Publication Date
JP3002215U true JP3002215U (en) 1994-09-20

Family

ID=43138182

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1994004278U Expired - Lifetime JP3002215U (en) 1994-03-15 1994-03-15 Avalanche prevention pile

Country Status (1)

Country Link
JP (1) JP3002215U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114592480A (en) * 2022-03-11 2022-06-07 重庆三峡学院 Method and device for preventing and treating bank landslide

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114592480A (en) * 2022-03-11 2022-06-07 重庆三峡学院 Method and device for preventing and treating bank landslide

Similar Documents

Publication Publication Date Title
CN207244654U (en) Stake two layers of retaining wall structure of support
US20070181171A1 (en) Tie down stake, angle
CN204530723U (en) A kind of foundation pit supporting construction for hole, side
JP6847444B2 (en) Slope protection system
JP2017036592A (en) Pressure receiving plate
JP3002215U (en) Avalanche prevention pile
CN207260160U (en) The strong anchor supporting construction of thin stake that a kind of long-short pile combines
KR101364586B1 (en) Nail assembly, reinforcement installation for method of slope reinforcement
JP4514523B2 (en) Slope protection method
US20200199906A1 (en) Fencing System for Negotiating Topography of Surfaces
JP3659622B2 (en) Slope stabilization device
JP2006180796A (en) Wooden underground mine-timbering for transplanted wood and timbering method
JP2000178925A (en) Ring net type rockfall prevention device
JP4526302B2 (en) Slope protection method
KR101623342B1 (en) Earth retaining structure utilizing in-situ soil and earth retaining structure construction Method
CN208072451U (en) A kind of ground anchor structure formula cantilever barrier wall structure of railway sunk type station
JP5729670B1 (en) Temporary fence fixing method and anchor in soil
CN206127985U (en) Limiting connection piece , spacing coupling assembling , honeycomb restraining structure and bank protection
AU2015258335B2 (en) Ground Anchor
KR101558931B1 (en) File with enhanced tensile resistances
JP2015154760A (en) Anchorage tool, driving type stake, and stake to fix sheet-like material
JP3830065B2 (en) Natural slope stabilization method and bearing member used therefor
JP7130252B2 (en) Slope stabilization structure
CN211922675U (en) Traffic engineering construction slope protection device
JP2003336254A (en) Concrete pile and construction method of foundation structure by use thereof