JP2887031B2 - Elevator balance device - Google Patents

Elevator balance device

Info

Publication number
JP2887031B2
JP2887031B2 JP23234792A JP23234792A JP2887031B2 JP 2887031 B2 JP2887031 B2 JP 2887031B2 JP 23234792 A JP23234792 A JP 23234792A JP 23234792 A JP23234792 A JP 23234792A JP 2887031 B2 JP2887031 B2 JP 2887031B2
Authority
JP
Japan
Prior art keywords
weight
cage
pulley
chain
suspension cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP23234792A
Other languages
Japanese (ja)
Other versions
JPH0680345A (en
Inventor
光男 伊藤
伸 佐久本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ISHIKAWAJIMA UNPAN KIKAI KK
IHI Corp
Original Assignee
ISHIKAWAJIMA UNPAN KIKAI KK
IHI Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ISHIKAWAJIMA UNPAN KIKAI KK, IHI Corp filed Critical ISHIKAWAJIMA UNPAN KIKAI KK
Priority to JP23234792A priority Critical patent/JP2887031B2/en
Publication of JPH0680345A publication Critical patent/JPH0680345A/en
Application granted granted Critical
Publication of JP2887031B2 publication Critical patent/JP2887031B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明はケージとカウンタウエイ
トとを吊り索で互いに反対方向に昇降させるエレベータ
に係り、特にケージ側の吊り索の重量とカウンタウエイ
ト側の吊り索の重量とのアンバランスを是正するための
エレベータのバランス装置に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an elevator for raising and lowering a cage and a counterweight in mutually opposite directions by means of suspension cables, and more particularly to an imbalance between the weight of the suspension cable on the cage side and the weight of the suspension cable on the counterweight side. The present invention relates to an elevator balance device for correcting the above problem.

【0002】[0002]

【従来の技術】車両を多段に格納する駐車装置には車両
を入出庫するためにエレベータを採用した例が知られて
おり、このエレベータは例えば図6に示す如き構成が採
用されている。
2. Description of the Related Art There is known an example of a parking device that stores vehicles in multiple levels, in which an elevator is used to enter and leave the vehicle, and the elevator has, for example, a configuration as shown in FIG.

【0003】図示するように、このエレベータ1には車
両をパレット2に載置してパレット2ごと垂直搬送する
ケージ3が昇降路に沿って昇降自在に設けられると共に
このケージ3の重量にバランスするカウンタウエイト4
が設けられ、これらケージ3とカウンタウエイト4とは
チェーン5で互いに反対方向に昇降自在に吊り上げられ
ている。チェーン5は一端部がケージ3に連結され他端
部が固定滑車6、駆動滑車7、固定滑車8,9およびカ
ウンタウエイト4に連結される動滑車11を経由して上
方に折り返されて固定系12に連結されている。
[0003] As shown in the figure, a cage 3 for mounting a vehicle on a pallet 2 and vertically transporting the pallet 2 vertically is provided on the elevator 1 along a hoistway so as to be able to move up and down along with the weight of the cage 3. Counter weight 4
The cage 3 and the counterweight 4 are lifted up and down by a chain 5 in directions opposite to each other. The chain 5 has one end connected to the cage 3 and the other end folded upward via a moving pulley 11 connected to a fixed pulley 6, a driving pulley 7, fixed pulleys 8, 9 and a counterweight 4, so as to be fixed. 12.

【0004】したがって、駆動滑車7が一方向に回転駆
動されると、ケージ3とカウンタウエイト4とは互いに
反対方向に昇降することになる。
Accordingly, when the drive pulley 7 is driven to rotate in one direction, the cage 3 and the counterweight 4 move up and down in opposite directions.

【0005】[0005]

【発明が解決しようとする課題】ところで、ケージ3を
降下させると、ケージ3とその上方の定滑車6とを結ぶ
チェーン長S1 が増大するのに対し定滑車9と動滑車1
1とを結ぶチェーン長S2 は短くなるため、駆動滑車7
に作用するケージ3側のチェーン重量が増大する。逆
に、ケージ3が上昇した場合にはケージ3側のチェーン
長S1 は短くなり、カウンタウエイト4側のチェーン長
2 は長くなる。
By the way, when the cage 3 is lowered, the chain length S 1 connecting the cage 3 and the fixed pulley 6 above the cage 3 increases, whereas the fixed pulley 9 and the moving pulley 1 are increased.
For shorter chain length S 2 is connecting the 1 and the drive pulley 7
The chain weight on the side of the cage 3 acting on the shaft increases. Conversely, the chain length S 1 of the car 3 side when the car 3 rises is shortened, chain length S 2 of the counterweight 4 side becomes longer.

【0006】このように、ケージ3の昇降によりケージ
3側のチェーン長S1 とカウンタウエイト4側のチェー
ン長S2 とが互いに変化するため、駆動滑車7を回転駆
動するエレベータの駆動装置にはケージ3側のチェーン
重量とカウンタウエイト4側のチェーン重量とがアンバ
ランスに作用し、エレベータの駆動装置の負担が大きく
なる問題があった。特に、駐車装置にあっては車両の格
納台数を確保するためには高層化する傾向にあり、ケー
ジ3の揚程量が増大するに伴ってケージ3側のチェーン
長S1 とカウンタウエイト4側のチェーン長S2 とのア
ンバランスは増大し、エレベータの駆動装置に作用する
負担も大きくなる問題があった。
As described above, since the chain length S 1 on the cage 3 side and the chain length S 2 on the counter weight 4 side change with each other as the cage 3 moves up and down, the elevator drive device that drives the drive pulley 7 to rotate is used in the elevator drive device. There is a problem in that the weight of the chain on the side of the cage 3 and the weight of the chain on the side of the counterweight 4 act unbalanced, thereby increasing the load on the drive device of the elevator. In particular, in the case of a parking device, there is a tendency to increase the height of the vehicle in order to secure the number of stored vehicles, and as the lift of the cage 3 increases, the chain length S 1 of the cage 3 and the counter weight 4 of the counter weight 4 increase. imbalance between the chain length S 2 is increased, there is a burden increases problems which acts on the drive device for an elevator.

【0007】本発明は上記問題点を有効に解決すべく創
案されたものである。
The present invention has been made to effectively solve the above problems.

【0008】本発明はケージ側の吊り索の重量とカウン
タウエイト側の吊り索の重量とのアンバランスを是正
し、エレベータの駆動装置の負担を軽減することのでき
るエレベータのバランス装置を提供することを目的とす
る。
An object of the present invention is to provide an elevator balancing device capable of correcting the imbalance between the weight of the suspension cable on the cage side and the weight of the suspension cable on the counterweight side and reducing the load on the elevator driving device. With the goal.

【0009】[0009]

【課題を解決するための手段】本発明はケージとそのケ
ージの重量にバランスするカウンタウエイトとを滑車に
係合する吊り索で結んで互いに反対方向に昇降自在に吊
り上げるエレベータにおいて、上記滑車軸上にその滑車
と一体的に回転するバランス調整用滑車を取り付けると
共に、そのバランス調整用滑車に上記ケージを吊り上げ
るケージ側吊り索の重量とカウンタウエイトを吊り上げ
るウエイト側吊り索の重量とのアンバランスを是正すべ
く互いに単位長さ当りの重量の異なる重いバランス部材
と軽いバランス部材とを有する無端のバランサを係合さ
せたものである。
SUMMARY OF THE INVENTION The present invention relates to an elevator in which a cage and a counterweight which balances the weight of the cage are connected by a hanging cable which is engaged with a pulley, and are lifted up and down in mutually opposite directions. Attach a balance adjustment pulley that rotates integrally with the pulley, and adjust the weight of the cage-side suspension cable that lifts the cage to the balance adjustment pulley and the weight of the weight-side suspension cable that lifts the counterweight. In order to correct this, an endless balancer having a heavy balance member and a light balance member having different weights per unit length is engaged.

【0010】また、バランス調整用滑車は上記バランサ
を係合させて垂下させると共に、上記ケージ側の吊り索
の重量とウエイト側の吊り索の重量とのアンバランスを
是正するために上記吊り索に係合する滑車との間に所定
の径比を有するものである。
In addition, the balance pulley engages with the balancer and causes it to hang down. In addition, the pulley is attached to the suspension cable in order to correct the imbalance between the weight of the suspension cable on the cage side and the weight of the suspension cable on the weight side. It has a predetermined diameter ratio with the pulley to be engaged.

【0011】[0011]

【作用】ケージ側の吊り索の重量とカウンタウエイト側
の吊り索の重量とのアンバランスはバランサの重いバラ
ンス部材で調整されることになる。すなわち、ケージ側
の吊り索側の重量が重くなるとこれを打ち消すようにバ
ランサによる反力が発生し、カウンタウエイト側の吊り
索の重量が重くなるとこれを打ち消すようにバランサの
反力が発生する。
The unbalance between the weight of the suspension cable on the cage side and the weight of the suspension cable on the counterweight side is adjusted by a heavy balance member of the balancer. That is, when the weight of the suspension cable on the cage side is increased, a counterforce is generated by the balancer to cancel the weight, and when the weight of the suspension cable on the counterweight side is heavy, the reaction force of the balancer is generated to cancel the weight.

【0012】また、バランサにより発生する反力はバラ
ンス調整用滑車と吊り索に係合する滑車との径比により
微少調整され、ケージ側とカウンタウエイト側とのアン
バランス荷重を一定かつゼロに近づけることができる。
Further, the reaction force generated by the balancer is finely adjusted by the diameter ratio between the balance adjustment pulley and the pulley engaged with the suspension cable, so that the unbalance load between the cage side and the counterweight side becomes constant and close to zero. be able to.

【0013】[0013]

【実施例】以下、本発明の一実施例を添付図面に基づい
て詳述する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below in detail with reference to the accompanying drawings.

【0014】図4は本発明に係るエレベータを採用した
駐車装置を示すものである。図示するように、この駐車
装置21には車両22をパレット23に載せてパレット
23ごと多段に格納する格納棚24が上下方向に等間隔
を隔てて形成されると共に、これら格納棚24に車両2
2を入出庫するためのエレベータ25が設けられてい
る。このエレベータ25には車両22を垂直搬送するた
めに昇降路26に沿って昇降自在に案内されるケージ2
7が設けられると共にそのケージ27の重量にバランス
するカウンタウエイト28が互いに反対方向に昇降自在
に吊り上げられている。これらケージ27およびカウン
タウエイト28は一対の巻上げ装置31,32で昇降さ
れるようになっている。
FIG. 4 shows a parking device employing the elevator according to the present invention. As shown in the drawing, storage shelves 24 on which the vehicles 22 are placed on a pallet 23 and stored in multiple stages with the pallets 23 are formed at equal intervals in the up-down direction in the parking device 21.
An elevator 25 for loading and unloading 2 is provided. The elevator 25 has a cage 2 which is vertically guided along a hoistway 26 for vertically transporting the vehicle 22.
7 are provided and counterweights 28 that balance the weight of the cage 27 are lifted up and down in opposite directions. The cage 27 and the counterweight 28 are raised and lowered by a pair of hoisting devices 31 and 32.

【0015】一方の巻上げ装置31について説明する
と、図5に示すように、この巻上げ装置31には吊り索
となるチェーン33が設けられ、このチェーン33は一
端部がケージ27の長手方向一端部に連結されて他端部
が固定系34に係止される第1チェーン35を有すると
共に、一端部がケージ27の長手方向他端部に連結され
て他端部が固定系34に係止される第2吊りチェーン3
6とから構成されている。第1吊りチェーン35の途中
にはこれを上下に折り返して案内すべく固定系34側か
ら動滑車37、定滑車38、中間滑車39、駆動滑車4
1、定滑車42が順次係合されている。第2チェーン3
6には固定系34側から動滑車43、定滑車44、駆動
滑車45,定滑車46が順次係合されている。他方の巻
上げ装置32も同様に構成されており、同一部材には同
一符号を付す。
One hoisting device 31 will be described. As shown in FIG. 5, the hoisting device 31 is provided with a chain 33 serving as a hanging cable, and one end of the chain 33 is connected to one end of the cage 27 in the longitudinal direction. It has a first chain 35 connected and the other end locked to the fixing system 34, and one end connected to the other longitudinal end of the cage 27 and the other end locked to the fixing system 34. Second suspension chain 3
6 is comprised. In the middle of the first suspension chain 35, the movable pulley 37, the fixed pulley 38, the intermediate pulley 39, and the drive pulley 4 are turned from the fixed system 34 side to guide the folded back up and down.
1. The constant pulley 42 is sequentially engaged. Second chain 3
A moving pulley 43, a constant pulley 44, a driving pulley 45, and a constant pulley 46 are sequentially engaged with 6 from the fixed system 34 side. The other winding device 32 has the same configuration, and the same members are denoted by the same reference numerals.

【0016】各駆動滑車41,41,45,45は同軸
に配置されて駆動装置47で一体的に駆動されるように
なっている。この駆動装置47は減速機および駆動モー
タを有する。したがって、駆動装置47にはこれらケー
ジ27およびカウンタウエイト28による重量が同時に
反対方向に作用することになる。
Each of the drive pulleys 41, 41, 45, and 45 is coaxially arranged and integrally driven by a drive unit 47. This drive device 47 has a speed reducer and a drive motor. Therefore, the weight of the cage 27 and the counterweight 28 acts on the driving device 47 simultaneously in the opposite direction.

【0017】特に、定滑車38および定滑車44は互い
に同一の滑車軸51で一体的に連結されており、この滑
車軸51の一端部は軸方向に延長され、図1に示すよう
に、その延長される先端部にはこれと一体的に回転する
スプロケットからなるバランス調整用滑車52が取付け
られる。このバランス調整用滑車52にはケージ27を
吊り上げるケージ側吊りチェーン35aの重量とカウン
タウエイト28を吊り上げるウエイト側吊りチェーン3
5bの重量とのアンバランスを是正するためのバランサ
53が係合される。このバランサ53は互いに単位長さ
当りの重量の異なる重いバランス部材54と軽いバラン
ス部材55とを有する無端のチェーンからなる。これら
バランス部材54,55は両端部を継手56,57を介
して閉ループのチェーンを形成する。本実施例において
は例えば重いバランス部材54にJIS#120のチェ
ーンが採用され、軽いバランス部材55にはJIS#6
0のチェーンが採用される。このように形成されたバラ
ンサ53はバランス調整用滑車52とその下方の振止め
用滑車58とに上下方向に掛け渡されて定滑車38の回
転と同期して同方向に回転し、重いバランス部材54を
右上りにあるいは左上りに移動させるようになってい
る。
In particular, the fixed pulley 38 and the fixed pulley 44 are integrally connected by the same pulley shaft 51, and one end of the pulley shaft 51 is extended in the axial direction, and as shown in FIG. A balance adjusting pulley 52 made of a sprocket that rotates integrally with the extended end is attached to the extended end. The weight of the cage-side suspension chain 35a for lifting the cage 27 and the weight-side suspension chain 3 for lifting the counterweight 28 are attached to the balance adjustment pulley 52.
A balancer 53 for correcting imbalance with the weight of 5b is engaged. The balancer 53 comprises an endless chain having a heavy balance member 54 and a light balance member 55 having different weights per unit length. The balance members 54, 55 form a closed loop chain at both ends via joints 56, 57. In this embodiment, for example, a JIS # 120 chain is used for the heavy balance member 54, and JIS # 6 is used for the light balance member 55.
A zero chain is employed. The balancer 53 thus formed is vertically suspended between the balance adjusting pulley 52 and the anti-vibration pulley 58 thereunder, and rotates in the same direction in synchronization with the rotation of the constant pulley 38, so that a heavy balance member is provided. 54 is moved to the upper right or to the upper left.

【0018】また、バランス調整用滑車52はケージ2
7を吊り上げるケージ側吊りチェーン35aの重量とカ
ウンタウエイト28を吊り上げるウエイト側吊りチェー
ン35bの重量とのアンバランスを是正するために第1
チェーン35に係合する定滑車38との間に所定の径比
を有する。
The pulley 52 for adjusting the balance is connected to the cage 2.
In order to correct the imbalance between the weight of the cage-side suspension chain 35a that lifts the weight 7 and the weight of the weight-side suspension chain 35b that lifts the counterweight 28,
It has a predetermined diameter ratio with the constant pulley 38 engaged with the chain 35.

【0019】次に上記実施例の作用について説明する。Next, the operation of the above embodiment will be described.

【0020】図1および図2に示すように、ケージ27
が総ストローク中の最下部にあるとき、駆動滑車41に
はケージ側吊りチェーン35aが最大ストロークで下方
に引き出されることによるアンバランス荷重が加わわる
と共に、このアンバランス荷重を打ち消す反力としてバ
ランサ53の重いバランス部材54が左側に上昇位置し
て重いバランス部材54による荷重が加わることなる。
他方、ケージ27が総ストローク中の最上部にあるとき
は図1および図3に示すように重いバランス部材54が
図中右側に引き上げられ、ウエイト側吊りチェーン35
bが下方に引き出されることによるアンバランス荷重を
是正する反力が発生することになる。
As shown in FIG. 1 and FIG.
Is at the bottom of the total stroke, the drive pulley 41 is subjected to an unbalanced load due to the cage-side suspension chain 35a being pulled downward at the maximum stroke, and the balancer 53 is used as a reaction force to cancel the unbalanced load. The heavy balance member 54 rises to the left and the heavy balance member 54 applies a load.
On the other hand, when the cage 27 is at the uppermost position in the total stroke, as shown in FIGS. 1 and 3, the heavy balance member 54 is pulled up to the right side in the drawing, and the weight side suspension chain 35
A reaction force for correcting the unbalance load due to the b being pulled downward is generated.

【0021】具体的には図1において力のつり合い式は
次のようになる。
Specifically, in FIG. 1, the force balance equation is as follows.

【0022】先ず、ケージ27が最下段の場合には T2 =W2 /2+(Bw−bw)×RB/Ri+WL2 …(1) T1 =W1 +WL1 …(2) (1),(2) 式中、Riは定滑車38のスプロケット径、R
Bはバランス調整用滑車52のスプロケット径、Bwは
重いバランス部材54の重量、bwは軽いバランス部材
55の重量である。
[0022] First of all, T 2 = W 2/2 + (Bw-bw) × RB / Ri + WL 2 ... (1) If the cage 27 of the lowermost T 1 = W 1 + WL 1 ... (2) (1), (2) where Ri is the sprocket diameter of the fixed pulley 38, R
B is the diameter of the sprocket of the balance pulley 52, Bw is the weight of the heavy balance member 54, and bw is the weight of the light balance member 55.

【0023】ここからl1 だけ上昇した場合(ケージが
最上段)には t2 =W2 /2−(Bw−bw)×RB/Ri+(WL2 +Wl1 /2) …(3) t1 =W1 +(WL1 −Wl1 ) …(4) 次に巻上げに必要な力を求める。
[0023] When it is raised by l 1 from here to (the cage is the top) t 2 = W 2 / 2- (Bw-bw) × RB / Ri + (WL 2 + Wl 1/2) ... (3) t 1 = W 1 + (WL 1 −Wl 1 ) (4) Next, a force required for winding is obtained.

【0024】ケージが最下段の場合には F=T1 −T2 =W1 −W2 /2−(Bw−bw)×RB/Ri+(WL1 −WL2 ) …(5) ケージが最上段の場合には f=t1 −t2 =W1 −W2 /2+(Bw−bw)×RB/Ri +(WL1 −WL2 )−3Wl1 /2 …(6) したがって、吊りチェーン35のアンバランス荷重はバ
ランサ53による調整と径比(RB/Ri)の調整とに
より是正されることになる。すなわち、所定の径比(R
B/Ri)を設定し、その径比(RB/Ri)でケージ
側吊りチェーン35aの重量WL1 とウエイト側吊りチ
ェーン35bの重量WL2 とのアンバランスをバランサ
53の重量差(Bw−bw)で調整した後、さらに径比
(RB/Ri)を再度調整し、最後にウエイト側吊りチ
ェーン35bの吊り長を調整することにより、エレベー
タ25の各段の吊りチェーン35のアンバランス荷重を
一定にかつゼロに近づけることができる。
When the cage is at the bottom, F = T 1 −T 2 = W 1 −W 2 / 2− (Bw−bw) × RB / Ri + (WL 1 −WL 2 ) (5) when the upper is f = t 1 -t 2 = W 1 -W 2/2 + (bw-bw) × RB / Ri + (WL 1 -WL 2) -3Wl 1/2 ... (6) Therefore, hanging chain The imbalance load 35 is corrected by adjustment by the balancer 53 and adjustment of the diameter ratio (RB / Ri). That is, a predetermined diameter ratio (R
B / Ri) is set and the diameter ratio (RB / Ri) difference in weight unbalance the balancer 53 of the weight WL 2 weight WL 1 and the weight-side hanging chain 35b of the cage-side hanging chain 35a by (Bw-bw ), The diameter ratio (RB / Ri) is further adjusted again, and finally the suspension length of the weight-side suspension chain 35b is adjusted, so that the unbalance load of the suspension chains 35 at each stage of the elevator 25 is kept constant. To zero.

【0025】このように本発明にあってはケージ側のチ
ェーン重量とカウンタウエイト側のチェーン重量とのア
ンバランスを互いに単位長さ当り重量が異なるバランス
部材54,55を有する無端のバランサ53で調整する
ため、エレベータ25の駆動装置47の負荷を低減でき
る。また、バランス調整用滑車52と吊りチェーン35
の滑車38との間に所定の径比を設定することにより、
吊りチェーン35によるアンバランスをゼロに近づける
ことができる。
As described above, in the present invention, the unbalance between the weight of the chain on the cage side and the weight of the chain on the counterweight side is adjusted by the endless balancer 53 having the balance members 54 and 55 having different weights per unit length. Therefore, the load on the driving device 47 of the elevator 25 can be reduced. In addition, the pulley 52 for balance adjustment and the suspension chain 35
By setting a predetermined diameter ratio between the pulley 38 and
The unbalance due to the suspension chain 35 can be brought close to zero.

【0026】なお、上記実施例においては吊り索35お
よびバランサ53にチェーンを採用したが、これらチェ
ーンをそれぞれワイヤーロープで構成してもよい。この
場合、重いバランス部材54を太いワイヤロープで構成
し、軽いバランス部材55を細いワイヤロープで構成さ
れるバランサを採用することも可能である。
In the above embodiment, chains are used for the suspension cable 35 and the balancer 53. However, each of these chains may be constituted by a wire rope. In this case, it is also possible to employ a balancer in which the heavy balance member 54 is formed of a thick wire rope and the light balance member 55 is formed of a thin wire rope.

【0027】[0027]

【発明の効果】以上要するに本発明によれば、次の如き
優れた効果を発揮する。
In summary, according to the present invention, the following excellent effects are exhibited.

【0028】(1) 請求項1においてはケージ側の吊り索
の重量とカウンタウエイト側の吊り索の重量とのアンバ
ランスを互いに単位長さ当りの異なる無端のバランサで
調整するため、エレベータの駆動装置の負荷を低減でき
る。
(1) In order to adjust the imbalance between the weight of the suspension cable on the cage side and the weight of the suspension cable on the counterweight side according to the first aspect of the present invention, an endless balancer having different lengths per unit length drives the elevator. The load on the device can be reduced.

【0029】(2) 請求項2においてはバランス調整用滑
車と吊り索に係合する滑車との間に所定の径比を設定す
ることにより、ケージ側とカウンタウエイト側との吊り
索のアンバランス荷重を一定かつゼロに近づけることが
できる。
(2) In the second aspect, by setting a predetermined diameter ratio between the pulley for balance adjustment and the pulley engaged with the suspension cable, imbalance of the suspension cable between the cage side and the counterweight side is achieved. The load can be kept constant and close to zero.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明のバランス装置を示す正面図である。FIG. 1 is a front view showing a balance device of the present invention.

【図2】ケージが最下段のときの状態を示す図である。FIG. 2 is a diagram showing a state when a cage is at a lowermost stage.

【図3】ケージが最上段のときの状態を示す図である。FIG. 3 is a diagram showing a state when the cage is at the top.

【図4】駐車装置を示す断面図である。FIG. 4 is a sectional view showing a parking device.

【図5】エレベータを示す斜視図である。FIG. 5 is a perspective view showing an elevator.

【図6】従来のエレベータを示す図である。FIG. 6 is a diagram showing a conventional elevator.

【符号の説明】[Explanation of symbols]

27 ケージ 28 カウンタウエイト 35 吊り索としての吊りチェーン 35a ケージ側吊り索としての吊りチェーン 35b ウエイト側吊り索としての吊りチェーン 38 定滑車 51 滑車軸 52 バランス調整用滑車 53 バランサ 54 重いバランス部材 55 軽いバランス部材 27 Cage 28 Counterweight 35 Suspension chain as suspension line 35a Suspension chain as cage side suspension line 35b Suspension chain as weight side suspension line 38 Constant pulley 51 Pulley shaft 52 Balance adjustment pulley 53 Balancer 54 Heavy balance member 55 Light balance Element

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 平2−233489(JP,A) 実開 平5−26972(JP,U) (58)調査した分野(Int.Cl.6,DB名) B66B 7/06 B66F 7/02 B66F 19/00 E04H 6/18 601 ──────────────────────────────────────────────────続 き Continuation of the front page (56) References JP-A-2-233489 (JP, A) JP-A-5-26972 (JP, U) (58) Fields investigated (Int.Cl. 6 , DB name) B66B 7/06 B66F 7/02 B66F 19/00 E04H 6/18 601

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 ケージと該ケージの重量にバランスする
カウンタウエイトとを滑車に係合する吊り索で結んで互
いに反対方向に昇降自在に吊り上げるエレベータにおい
て、上記滑車軸上に該滑車と一体的に回転するバランス
調整用滑車を取り付けると共に、該バランス調整用滑車
に上記ケージを吊り上げるケージ側吊り索の重量とカウ
ンタウエイトを吊り上げるウエイト側吊り索の重量との
アンバランスを是正すべく互いに単位長さ当りの重量の
異なる重いバランス部材と軽いバランス部材とを有する
無端のバランサを係合させたことを特徴とするエレベー
タのバランス装置。
1. An elevator in which a cage and a counterweight that balances the weight of the cage are connected by a suspension cable that engages with a pulley, and are lifted up and down in opposite directions so that they can be lifted and lowered integrally with the pulley shaft. A rotating balance adjustment pulley is attached, and the weight of the cage-side suspension cable that lifts the cage and the weight of the weight-side suspension cable that lifts the counterweight are fixed to the balance adjustment pulley. An endless balancer having a heavy balance member and a light balance member having different weights is engaged with each other.
【請求項2】 上記バランス調整用滑車が、上記バラン
サを係合させて垂下させると共に上記ケージ側吊り索の
重量とウエイト側吊り索の重量とのアンバランスを是正
すべく上記吊り索に係合する滑車との間に所定の径比を
有する請求項1記載のエレベータのバランス装置。
2. The pulley for balance adjustment engages with the balancer to cause the balancer to hang down, and engages with the suspension cable to correct the imbalance between the weight of the cage-side suspension cable and the weight of the weight-side suspension cable. The elevator balancing device according to claim 1, wherein the elevator has a predetermined diameter ratio with respect to the pulley.
JP23234792A 1992-08-31 1992-08-31 Elevator balance device Expired - Fee Related JP2887031B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23234792A JP2887031B2 (en) 1992-08-31 1992-08-31 Elevator balance device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP23234792A JP2887031B2 (en) 1992-08-31 1992-08-31 Elevator balance device

Publications (2)

Publication Number Publication Date
JPH0680345A JPH0680345A (en) 1994-03-22
JP2887031B2 true JP2887031B2 (en) 1999-04-26

Family

ID=16937788

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23234792A Expired - Fee Related JP2887031B2 (en) 1992-08-31 1992-08-31 Elevator balance device

Country Status (1)

Country Link
JP (1) JP2887031B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3326769B2 (en) 2000-01-12 2002-09-24 株式会社アドバンテスト Constant voltage power supply circuit and constant voltage power supply circuit board
FI118335B (en) 2004-07-30 2007-10-15 Kone Corp Elevator
JP2018118855A (en) * 2017-01-23 2018-08-02 Biデザイン合同会社 Hoist and storage device with hoist
CN110921563B (en) * 2019-12-10 2021-06-01 福州聚英智能科技有限公司 AGV is with dual self preservation protection lifting devices

Also Published As

Publication number Publication date
JPH0680345A (en) 1994-03-22

Similar Documents

Publication Publication Date Title
US6193016B1 (en) Dual sheave rope climber using flat flexible ropes
JP2536816B2 (en) lift device
JP5095401B2 (en) Elevator installation method and elevator
JPH0343196B2 (en)
US6305499B1 (en) Drum drive elevator using flat belt
CN110040602B (en) Elevator car suspension assembly for double-deck elevator
JP2006504598A (en) Traction drive elevator with auto balance rope hook and drive mechanism
JP2887031B2 (en) Elevator balance device
KR101016822B1 (en) Elevator device
JP2639556B2 (en) Carriage elevating device of multi-story parking device
JP6727040B2 (en) Elevator type parking device and its cage attitude control method
JP3074951B2 (en) Elevator equipment
WO1999043599A1 (en) Drum drive elevator using flat belt
JPH0617586A (en) Balancer for lifting curtain type article carrying-in-and-out door
JP2017210829A (en) Elevator type parking device
US20160311655A1 (en) Elevator system
JP4558336B2 (en) Elevator drive device
JP3435711B2 (en) elevator
JP4641738B2 (en) Elevator equipment
JP2541796Y2 (en) Elevator type parking system
JPH09150915A (en) Elevating device for elevating stand in stacker crane
JPH08291637A (en) Pit type parking device
JPH0526972U (en) Elevator balancer
JP2502323Y2 (en) Construction elevator
JP2003147987A (en) Lift in three-dimensional parking lot

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19990112

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

R371 Transfer withdrawn

Free format text: JAPANESE INTERMEDIATE CODE: R371

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R371 Transfer withdrawn

Free format text: JAPANESE INTERMEDIATE CODE: R371

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080212

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090212

Year of fee payment: 10

LAPS Cancellation because of no payment of annual fees