JP2853016B2 - Construction method of anti-vibration sleeper track - Google Patents

Construction method of anti-vibration sleeper track

Info

Publication number
JP2853016B2
JP2853016B2 JP7144147A JP14414795A JP2853016B2 JP 2853016 B2 JP2853016 B2 JP 2853016B2 JP 7144147 A JP7144147 A JP 7144147A JP 14414795 A JP14414795 A JP 14414795A JP 2853016 B2 JP2853016 B2 JP 2853016B2
Authority
JP
Japan
Prior art keywords
sleeper
support box
concrete
sleeper support
steel girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP7144147A
Other languages
Japanese (ja)
Other versions
JPH08311802A (en
Inventor
惣一郎 清水
喬 山本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TOKYO FUABURITSUKU KOGYO KK
Original Assignee
TOKYO FUABURITSUKU KOGYO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TOKYO FUABURITSUKU KOGYO KK filed Critical TOKYO FUABURITSUKU KOGYO KK
Priority to JP7144147A priority Critical patent/JP2853016B2/en
Publication of JPH08311802A publication Critical patent/JPH08311802A/en
Application granted granted Critical
Publication of JP2853016B2 publication Critical patent/JP2853016B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)
  • Bridges Or Land Bridges (AREA)
  • Railway Tracks (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】この発明は、防振まくらぎ軌道の
施工方法に係り、特に道床厚さが確保できない場合の防
振まくらぎ軌道の施工方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing an anti-vibration sleeper track, and more particularly to a method of constructing an anti-vibration sleeper track when the thickness of a track bed cannot be ensured.

【0002】[0002]

【従来の技術】鉄道軌条用まくらぎは、バラスト道床や
コンクリート道床または鋼桁等で支持される。まくらぎ
がバラスト道床で支持されるときは、バラスト道床自体
に弾性支承の作用があるから特別な弾性支承手段は必要
ないが、まくらぎがコンクリート道床や鋼桁で支持され
るときは、このコンクリート道床や鋼桁には弾性支承作
用がないところから、まくらぎは弾性支承手段を介して
前記のコンクリート道床や鋼桁に支持される。従来、コ
ンクリート道床における鉄道軌条用まくらぎの弾性支持
方法としては特公昭57−36363号公報に開示のも
のが提案されている。
2. Description of the Related Art Railroad sleepers are supported by ballast ballasts, concrete ballasts, steel girders, or the like. When the sleepers are supported by a ballast ballast, special elastic bearings are not necessary because the ballast bed itself has an elastic bearing function.However, when the sleepers are supported by a concrete ballast or steel girder, this concrete Since there is no elastic bearing action on the roadbed or the steel girder, the sleeper is supported on the concrete floor or the steel girder through the elastic bearing means. Conventionally, a method disclosed in Japanese Patent Publication No. 57-36363 has been proposed as a method of elastically supporting a railroad railroad sleeper on a concrete track floor.

【0003】前記、従来技術の場合は、弾性を有する板
状の側面パッド及び底面パッドが合成樹脂製のまくらぎ
支持箱内に収容されていて、このまくらぎ支持箱内にお
いて、前記側面パッドと底面パッドによりコンクリート
まくらぎの底面と両側面を弾性的に支持しているので、
側面パッドと底面パッドの所定配置の位置決めを簡単に
行なうことができ、かつ、まくらぎ支持箱の各側板によ
りコンクリート道床を各パッドに接しないようにして打
設でき、よって、高精度な軌条のレベル調整を迅速に行
ない、かつ、弾性的なコンクリートまくらぎの支持が容
易に行なえるという利点を有している。
[0003] In the case of the prior art described above, plate-shaped side pads and bottom pads having elasticity are accommodated in a sleeper support box made of synthetic resin. Because the bottom and both sides of the concrete sleeper are elastically supported by the bottom pad,
The positioning of the predetermined arrangement of the side pad and the bottom pad can be easily performed, and the concrete track bed can be driven into contact with each pad by each side plate of the sleeper support box. There is an advantage that the level can be adjusted quickly and the elastic concrete sleeper can be easily supported.

【0004】[0004]

【発明が解決しようとする課題】ところで、前記まくら
ぎ支持箱が設置されるのは前述のとおりコンクリート道
床であって、これ以外の例えば鋼桁にまくらぎ支持箱を
容易,確実に固定する手段は従来存在しないのが実状で
ある。すなわち、従来、まくらぎ支持箱の下部をコンク
リート道床に固定する場合は、当該まくらぎ支持箱をコ
ンクリート道床の打設時に一体的に埋設固定しているの
で、特に問題がない。しかし、まくらぎ支持箱を鋼桁に
埋設固定することは当然不可能であり、結果として、前
述のとおり、まくらぎ支持箱を鋼桁に固定する手段がな
いのが実状である。
The sleeper support box is installed on the concrete roadbed as described above, and other means for easily and securely fixing the sleeper support box to, for example, a steel girder. It is the fact that has not existed before. That is, conventionally, when fixing the lower portion of the sleeper support box to the concrete roadbed, there is no particular problem because the sleeper support box is integrally buried and fixed when the concrete roadbed is cast. However, it is naturally impossible to embed and fix the sleeper support box to the steel girder, and as a result, as described above, in reality, there is no means for fixing the sleeper support box to the steel girder.

【0005】本発明は、前記の課題を解決した防振まく
らぎ軌道の施工方法を提供することを目的とする。
[0005] An object of the present invention is to provide a method of constructing an anti-vibration sleeper track which has solved the above-mentioned problems.

【0006】[0006]

【課題を解決するための手段】前記の目的を達成するた
め本発明に係る防振まくらぎ軌道の施工方法は、まくら
ぎ嵌入側と上面が開口しており、底板1と両側板2と外
端板3を有し、前記底板1にボルト挿入孔4を有するま
くらぎ支持箱5を設け、前記まくらぎ支持箱5を鋼桁6
の上フランジ7に載置し、前記ボルト挿入孔4に挿入し
たフックボルト8の先端を前記上フランジ7に係合した
うえ、まくらぎ支持箱5の内側から前記フックボルト8
のねじ部9にナット10を螺合して、前記まくらぎ支持
箱5を前記鋼桁6に固定し、前記まくらぎ支持箱5に収
納したまくらぎ支持パッド11と、側面用パッド12と
によりコンクリートまくらぎ13を支承することを特徴
とする。前記ボルト挿入孔4は、その長軸が前記コンク
リートまくらぎ13の長手方向と平行になるように形成
された長円孔であってもよい。
According to the present invention, there is provided a method of constructing an anti-vibration sleeper track according to the present invention, wherein a sleeper insertion side and an upper surface are open, and a bottom plate 1, both side plates 2 and an outer surface are provided. A sleeper support box 5 having an end plate 3 and a bolt insertion hole 4 is provided in the bottom plate 1, and the sleeper support box 5 is
The hook bolt 8 inserted into the bolt insertion hole 4 is placed on the upper flange 7, the tip of the hook bolt 8 is engaged with the upper flange 7, and the hook bolt 8 is inserted from inside the sleeper support box 5.
A nut 10 is screwed into the screw portion 9 of the above, the sleeper support box 5 is fixed to the steel girder 6, and the sleeper support pad 11 housed in the sleeper support box 5 and the side pad 12 are used. It is characterized by supporting a concrete sleeper 13. The bolt insertion hole 4 may be an oblong hole formed such that its major axis is parallel to the longitudinal direction of the concrete sleeper 13.

【0007】[0007]

【作用】本発明によると、まくらぎ支持箱5を鋼桁6の
上フランジ7の上面に載置したうえ、ボルト挿入孔4に
挿入したフックボルト8の先端部を鋼桁6の上フランジ
7に係合させ、フックボルト8のねじ部9にナット10
を螺合して締付けることで、前記まくらぎ支持箱5を鋼
桁6に堅固に固定できる。
According to the present invention, the sleeper support box 5 is placed on the upper surface of the upper flange 7 of the steel girder 6 and the tip of the hook bolt 8 inserted into the bolt insertion hole 4 is connected to the upper flange 7 of the steel girder 6. Into the threaded portion 9 of the hook bolt 8 and the nut 10
By screwing and tightening, the sleeper support box 5 can be firmly fixed to the steel girder 6.

【0008】[0008]

【実施例】以下本発明の実施例を図1〜図6を参照して
説明する。まず、図1において、河川,溝等に設けられ
る橋台14の間に弾性支承28を介して鋼桁6が架設さ
れている。鋼桁6はH形鋼を用いて構成されており、上
下フランジ7,17の間がウエブ15で連結されてい
て、上フランジ7の上面に、まくらぎ支持箱5(詳細は
後述する)を介して複数のコンクリートまくらぎ13が
一定間隔で支承されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to FIGS. First, in FIG. 1, a steel girder 6 is installed via an elastic bearing 28 between abutments 14 provided in a river, a ditch, or the like. The steel girder 6 is made of H-shaped steel, and the upper and lower flanges 7 and 17 are connected by a web 15. On the upper surface of the upper flange 7, a sleeper support box 5 (details will be described later) is provided. A plurality of concrete sleepers 13 are supported at regular intervals.

【0009】また、橋台14の外側にはバラストを敷詰
めてなるバラスト道床16が設けられ、このバラスト道
床16の上に複数のコンクリートまくらぎ13が一定間
隔で支承されており、前記鋼桁6とバラスト道床16と
で支持されたコンクリートまくらぎ13によってレール
18が支持されている。
On the outside of the abutment 14, there is provided a ballast ballast 16 laid with ballasts. A plurality of concrete sleepers 13 are supported on the ballast ballast 16 at regular intervals. The rail 18 is supported by the concrete sleeper 13 supported by the ballast and the ballast roadbed 16.

【0010】前記鋼桁6の上フランジ7の上面に一定の
間隔をおいて複数のまくらぎ支持箱5が載置され、この
まくらぎ支持箱5はフックボルト8を介して前記上フラ
ンジ7に固定されている。
A plurality of sleeper support boxes 5 are mounted on the upper surface of the upper flange 7 of the steel girder 6 at regular intervals, and this sleeper support box 5 is attached to the upper flange 7 via hook bolts 8. Fixed.

【0011】まくらぎ支持箱5は、図2〜図4に示され
るように構成されている。各図において、まくらぎ支持
箱5は、底板1と、底板1の両側縁から起立する両側板
2と、底板1の外端縁から起立し、前記両側板2に連続
する外端板3とから構成され、さらにコンクリートまく
らぎ13を嵌入するまくらぎ嵌入開口部19と、上面開
口部20とを有し、さらに前記底板1において、その長
手方向中心線上の位置には、所定の間隔をあけて2つの
ボルト挿入孔4が開設されている。このボルト挿入孔4
は、図のようにその長軸がまくらぎ支持箱5で支持され
るコンクリートまくらぎ13の軸線と平行となるように
開削された長円孔とするのがよい。
The sleeper support box 5 is configured as shown in FIGS. In each of the figures, the sleeper support box 5 includes a bottom plate 1, two side plates 2 rising from both side edges of the bottom plate 1, and an outer end plate 3 rising from the outer edge of the bottom plate 1 and continuing from the both side plates 2. And a sleeper fitting opening 19 into which the concrete sleeper 13 is fitted, and an upper surface opening 20. In the bottom plate 1, a predetermined interval is provided at a position on the center line in the longitudinal direction. Two bolt insertion holes 4 are provided. This bolt insertion hole 4
Is preferably an oblong hole cut so that its long axis is parallel to the axis of the concrete sleeper 13 supported by the sleeper support box 5 as shown in the figure.

【0012】前記まくらぎ支持箱5の底には、前記ボル
ト挿入孔4とその周辺の部位を除いてまくらぎ支持パッ
ド11が仕切壁21を介してずれ動かないように敷詰め
られる。また、図2,図3のように2つのまくらぎ支持
箱5は所定の間隔離して、かつまくらぎ嵌入開口部19
が向い合うよう対向配置される。そして、各まくらぎ支
持箱5にまくらぎ嵌入開口部19と上面開口部20を介
して上方からコンクリートまくらぎ13が嵌入され、こ
のコンクリートまくらぎ13の両端部下面が、前記まく
らぎ支持パッド11により支持される。
At the bottom of the sleeper support box 5, a sleeper support pad 11 is laid so as not to be displaced via a partition wall 21 except for the bolt insertion hole 4 and a portion therearound. Also, as shown in FIGS. 2 and 3, the two sleeper support boxes 5 are separated from each other by a predetermined distance, and the sleeper fitting opening 19 is provided.
Are arranged to face each other. A concrete sleeper 13 is fitted into each sleeper support box 5 from above through a sleeper fitting opening 19 and an upper surface opening 20, and the lower surfaces of both ends of the concrete sleeper 13 are connected to the sleeper support pad 11. Supported by

【0013】前記まくらぎ支持パッド11によるコンク
リートまくらぎ13の支持面を嵩上げ調整する場合は、
図2,図4に示されるように、まくらぎ支持箱5内にお
いて、まくらぎ支持パッド11の下面に所定の厚みを有
する1枚又は複数枚の高低調整パッキング22を挿入す
ることにより調整できる。また、まくらぎ支持箱5内に
おいて、23はスポンジ、25は前記側面用パッド12
を介してコンクリートまくらぎ13の端面の位置規制を
するレールの通り修正用側面調整パッキング、26は空
間である。
When raising and adjusting the support surface of the concrete sleeper 13 by the sleeper support pad 11,
As shown in FIGS. 2 and 4, the adjustment can be performed by inserting one or more height adjustment packings 22 having a predetermined thickness into the lower surface of the sleeper support pad 11 in the sleeper support box 5. Further, in the sleeper support box 5, 23 is a sponge, and 25 is the side pad 12
The side adjustment packing for correction, 26 is a space according to the rail that regulates the position of the end face of the concrete sleeper 13 through the space.

【0014】前記まくらぎ支持箱5は図2〜図4の状態
で使用される。すなわち、まくらぎ支持箱5をコンクリ
ートまくらぎ13の配置間隔に合わせた間隔で鋼桁6の
上フランジ7上に設置する。次に、まくらぎ支持箱5の
底板1のボルト挿入孔4にフックボルト8の軸部を挿入
し、かつ、フックボルト8の先端を鋼桁6の上フランジ
7に係合させたうえ、まくらぎ支持箱5の内側におい
て、前記フックボルト8のねじ部9にナット10を螺合
することにより、まくらぎ支持箱5を鋼桁6にしっかり
と固定することができる。
The sleeper support box 5 is used in the state shown in FIGS. That is, the sleeper support box 5 is installed on the upper flange 7 of the steel girder 6 at intervals corresponding to the arrangement interval of the concrete sleepers 13. Next, the shaft of the hook bolt 8 is inserted into the bolt insertion hole 4 of the bottom plate 1 of the sleeper support box 5, and the tip of the hook bolt 8 is engaged with the upper flange 7 of the steel girder 6. By screwing a nut 10 into the threaded portion 9 of the hook bolt 8 inside the nail support box 5, the sleeper support box 5 can be firmly fixed to the steel beam 6.

【0015】このとき、ボルト挿入孔4が図のように長
孔であると、この長孔を介してまくらぎ支持箱5を、レ
ールの通り修正方向に調整しながら鋼桁6に固定でき
る。
At this time, if the bolt insertion hole 4 is a long hole as shown in the figure, the sleeper support box 5 can be fixed to the steel girder 6 through this long hole while adjusting in the correction direction along the rail.

【0016】その後、まくらぎ支持パッド11,高低調
整パッキング22,側面用パッド12,側面調整パッキ
ング25を介して、まくらぎ支持箱5内にコンクリート
まくらぎ13を設置する。レール18はコンクリートま
くらぎ13に所定間隔で配置されるレール締結装置27
により固定されている。
Thereafter, the concrete sleeper 13 is set in the sleeper support box 5 via the sleeper support pad 11, the height adjustment packing 22, the side pad 12, and the side adjustment packing 25. The rail 18 is a rail fastening device 27 arranged at a predetermined interval on the concrete sleeper 13.
It is fixed by.

【0017】また、まくらぎ支持箱5を鋼桁6の上フラ
ンジ7に固定した後、まくらぎ支持箱5内においてレー
ルの通りを修正する場合は、コンクリートまくらぎ13
の端面を位置規制する側面調整パッキング25の厚みを
適正なものに取替えて、前記コンクリートまくらぎ13
の位置を修正することにより、レール18の通りも自ら
修正される。
After the sleeper support box 5 is fixed to the upper flange 7 of the steel girder 6 and the rails are corrected in the sleeper support box 5, the concrete sleeper 13 is used.
The thickness of the side adjustment packing 25 that regulates the position of the end face of the concrete sleeper 13 is replaced with an appropriate one.
Is corrected, the street of the rail 18 is also corrected by itself.

【0018】[0018]

【発明の効果】以上説明したように、本発明によると、
防振まくらぎ軌道の施工に際し、コンクリートまくらぎ
13を弾性的に支承する防振用まくらぎ支持箱5の底板
1にボルト挿入孔4を設け、このボルト挿入孔4に軸部
を挿入したフックボルト8の先端を鋼桁6の上フランジ
7に係合すると共に、ねし部9にナット10を螺合する
ことで、前記まくらぎ支持箱5を前記鋼桁6に確実に、
かつ堅固に固定することができ、よって従来実用化がで
きなかったまくらぎ支持箱5の鋼桁6への設置が可能と
なり、鋼桁配置区間における前記防振まくらぎ軌道の施
工を円滑に行なうことができる。
As described above, according to the present invention,
When installing the anti-vibration sleeper track, a bolt insertion hole 4 is provided in the bottom plate 1 of the anti-vibration sleeper support box 5 for elastically supporting the concrete sleeper 13, and a hook is inserted into the bolt insertion hole 4. By engaging the tip of the bolt 8 with the upper flange 7 of the steel girder 6 and screwing the nut 10 into the threaded part 9, the sleeper support box 5 is securely connected to the steel girder 6.
And can be firmly fixed, so that the sleeper support box 5, which has not been practically used in the past, can be installed on the steel girder 6, and the construction of the anti-vibration sleeper track in the steel girder arrangement section can be performed smoothly. be able to.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の防振まくらぎ軌道の施工方法の実施例
を示す断面説明図である。
FIG. 1 is an explanatory sectional view showing an embodiment of a method for constructing a vibration isolating sleeper track according to the present invention.

【図2】図1におけるまくらぎ支持箱の鋼桁への固定構
造を示す断面図である。
FIG. 2 is a sectional view showing a structure for fixing the sleeper support box to a steel girder in FIG.

【図3】図2の一部省略平面図である。FIG. 3 is a partially omitted plan view of FIG. 2;

【図4】図2の一部拡大図である。FIG. 4 is a partially enlarged view of FIG. 2;

【図5】図2のA部の拡大断面図である。FIG. 5 is an enlarged sectional view of a portion A in FIG. 2;

【図6】図5の平面図である。FIG. 6 is a plan view of FIG. 5;

【符号の説明】[Explanation of symbols]

1 底板 2 両側板 3 外端板 4 ボルト挿入孔 5 まくらぎ支持箱 6 鋼桁 7 上フランジ 8 フックボルト 9 ねじ部 10 ナット 11 まくらぎ支持パッド 12 側面用パッド 13 コンクリートまくらぎ 14 橋台 15 ウエブ 16 バラスト道床 17 下フランジ 18 レール 19 まくらぎ嵌入開口部 20 上面開口部 21 仕切壁 22 高低調整パッキング 23 スポンジ 25 側面調整パッキング 26 空間 27 レール締結装置 28 弾性支承 DESCRIPTION OF SYMBOLS 1 Bottom plate 2 Side plates 3 Outer end plate 4 Bolt insertion hole 5 Sleeper support box 6 Steel girder 7 Upper flange 8 Hook bolt 9 Screw part 10 Nut 11 Sleeper support pad 12 Side pad 13 Concrete sleeper 14 Abutment 15 Web 16 Ballast ballast 17 Lower flange 18 Rail 19 Sleeper fitting opening 20 Top opening 21 Partition wall 22 Height adjustment packing 23 Sponge 25 Side adjustment packing 26 Space 27 Rail fastening device 28 Elastic bearing

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.6,DB名) E01B 1/00 E01B 3/00 E01B 3/46 E01B 19/00 E01B 29/06 E01B 37/00 E01D 19/12──────────────────────────────────────────────────続 き Continued on the front page (58) Fields investigated (Int.Cl. 6 , DB name) E01B 1/00 E01B 3/00 E01B 3/46 E01B 19/00 E01B 29/06 E01B 37/00 E01D 19 / 12

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 まくらぎ嵌入側と上面が開口しており、
底板1と両側板2と外端板3を有し、前記底板1にボル
ト挿入孔4を有するまくらぎ支持箱5を設け、前記まく
らぎ支持箱5を鋼桁6の上フランジ7に載置し、前記ボ
ルト挿入孔4に挿入したフックボルト8の先端を前記上
フランジ7に係合したうえ、まくらぎ支持箱5の内側か
ら前記フックボルト8のねじ部9にナット10を螺合し
て前記まくらぎ支持箱5を前記鋼桁6に固定し、前記ま
くらぎ支持箱5に収納したまくらぎ支持パッド11と、
側面用パッド12とによりコンクリートまくらぎ13を
支承することを特徴とする防振まくらぎ軌道の施工方
法。
1. A sleeper fitting side and an upper surface are open,
A sleeper support box 5 having a bottom plate 1, both side plates 2 and an outer end plate 3, and a bolt insertion hole 4 is provided in the bottom plate 1, and the sleeper support box 5 is mounted on an upper flange 7 of a steel girder 6. Then, the tip of the hook bolt 8 inserted into the bolt insertion hole 4 is engaged with the upper flange 7, and a nut 10 is screwed into the thread portion 9 of the hook bolt 8 from inside the sleeper support box 5. A sleeper support pad 11 for fixing the sleeper support box 5 to the steel girder 6 and housed in the sleeper support box 5;
A method for constructing an anti-vibration sleeper track, wherein a concrete sleeper (13) is supported by a side pad (12).
【請求項2】 前記ボルト挿入孔4は、その長軸が前記
コンクリートまくらぎ13の長手方向と平行になるよう
に形成された長円孔である請求項1に記載の防振まくら
ぎ軌道の施工方法。
2. The anti-vibration sleeper track according to claim 1, wherein the bolt insertion hole 4 is an oblong hole formed such that a major axis thereof is parallel to a longitudinal direction of the concrete sleeper 13. Construction method.
JP7144147A 1995-05-19 1995-05-19 Construction method of anti-vibration sleeper track Expired - Fee Related JP2853016B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7144147A JP2853016B2 (en) 1995-05-19 1995-05-19 Construction method of anti-vibration sleeper track

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7144147A JP2853016B2 (en) 1995-05-19 1995-05-19 Construction method of anti-vibration sleeper track

Publications (2)

Publication Number Publication Date
JPH08311802A JPH08311802A (en) 1996-11-26
JP2853016B2 true JP2853016B2 (en) 1999-02-03

Family

ID=15355315

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7144147A Expired - Fee Related JP2853016B2 (en) 1995-05-19 1995-05-19 Construction method of anti-vibration sleeper track

Country Status (1)

Country Link
JP (1) JP2853016B2 (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010076146A (en) * 2000-01-21 2001-08-11 최종민 Vibration and sound absorption system of railroad track
KR20040037430A (en) * 2002-10-28 2004-05-07 현대자동차주식회사 Rail structure of moving cart
CN102011354B (en) * 2010-11-19 2012-01-11 中铁十七局集团有限公司铺架分公司 Arrival-departure line track sleeper assembling platform for broad-sleeper
CN102425105B (en) * 2011-12-09 2013-09-25 清华大学 Construction method of longitudinal non-shearing resistance screw-type pullout-resistance connecting piece
CN103643600B (en) * 2013-12-31 2015-08-12 洛阳双瑞橡塑科技有限公司 A kind of adjustable pretightning force double-layer vibration damping fastener system
KR101982567B1 (en) * 2018-12-04 2019-05-27 충남대학교산학협력단 Non-ballast track structure for allowing longitudinal direction slip of steel railway bridge
KR102138365B1 (en) * 2019-04-04 2020-07-29 충남대학교산학협력단 Non-ballast track structure for allowing longitudinal direction slip of steel railway bridge
JP2022086815A (en) * 2020-11-30 2022-06-09 公益財団法人鉄道総合技術研究所 Ballast track structure and method for manufacturing ballast track structure

Also Published As

Publication number Publication date
JPH08311802A (en) 1996-11-26

Similar Documents

Publication Publication Date Title
KR100416133B1 (en) Rail Fastening Assembly
JP2853016B2 (en) Construction method of anti-vibration sleeper track
US5538182A (en) Railroad crossing system
JP2004124617A (en) Bearing replacement method for existing bearing device, and bearing device
JP2990221B2 (en) Floating slab with precast version
EP1809810A1 (en) Railway track construction shim and method of constructing railway track
JP2858226B2 (en) Construction method of anti-vibration sleeper track
US4325510A (en) Adjustable spring clip
JP5129022B2 (en) Fixing device for track deck
JP2928745B2 (en) Installation structure of directly connected pillows and installation method of directly connected pillows
JP2767562B2 (en) Height adjustment support method of rail anti-vibration sleepers
JP3837686B2 (en) Floating floor structure to horizontal two-dimensional base isolation floor
JP3636624B2 (en) Ladder-type sleeper anti-vibration rubber mounting structure and construction method
JP2887720B2 (en) Level crossing pavement
JP3349912B2 (en) Rail buckling prevention device
JP3602851B6 (en) Rail fixing assembly
KR950025198A (en) How to install track of maglev train
JP3453216B2 (en) Rail buckling prevention device
JPS6241042Y2 (en)
KR102672171B1 (en) Temporary rail fixing apparatus for mountain railway and mountain railway construction method using the same
US20060054714A1 (en) Method of installing a railway sleeper
JP2969404B2 (en) Sound absorbing material installation structure in slab track
KR19980081939A (en) Floating track structure and its construction method for vibration prevention
KR200168731Y1 (en) Antibuckling apparatus on the rail
SU1203172A1 (en) Track superstructure

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20071120

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081120

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081120

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091120

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101120

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101120

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111120

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111120

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121120

Year of fee payment: 14

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131120

Year of fee payment: 15

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees