JP2852173B2 - Seawall construction using steel sheet piles - Google Patents

Seawall construction using steel sheet piles

Info

Publication number
JP2852173B2
JP2852173B2 JP9426493A JP9426493A JP2852173B2 JP 2852173 B2 JP2852173 B2 JP 2852173B2 JP 9426493 A JP9426493 A JP 9426493A JP 9426493 A JP9426493 A JP 9426493A JP 2852173 B2 JP2852173 B2 JP 2852173B2
Authority
JP
Japan
Prior art keywords
steel sheet
sheet pile
decorative panel
concrete
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP9426493A
Other languages
Japanese (ja)
Other versions
JPH06306832A (en
Inventor
定 河野
成人 田中
正 木邑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIOSUTAA KK
Nippon Steel Corp
Original Assignee
JIOSUTAA KK
Nippon Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIOSUTAA KK, Nippon Steel Corp filed Critical JIOSUTAA KK
Priority to JP9426493A priority Critical patent/JP2852173B2/en
Publication of JPH06306832A publication Critical patent/JPH06306832A/en
Application granted granted Critical
Publication of JP2852173B2 publication Critical patent/JP2852173B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】この発明は、海岸や河岸などの、
所謂、ウォーターフロントにおいて、岸辺の保護や景観
向上などを加味して造成する、鋼矢板を用いた護岸構造
に関するものである。
BACKGROUND OF THE INVENTION
The present invention relates to a seawall structure using steel sheet piles, which is constructed in a so-called waterfront in consideration of protection of a shore and improvement of a landscape.

【0002】[0002]

【従来の技術】従来、この種の護岸構造、即ち、護岸部
用躯体として配設された鋼矢板における水面側の前面
に、景観性や耐腐食性を加味してコンクリート被覆部を
形成する護岸構造としては、鋼矢板の前面に型枠を設置
し、この型枠内にコンクリート被覆部を形成する水中コ
ンクリートを打設してなるものが一般に知られている。
2. Description of the Related Art Conventionally, this type of revetment structure, that is, a revetment in which a concrete covering portion is formed on the front surface on the water surface side of a steel sheet pile provided as a revetment portion skeleton in consideration of landscape and corrosion resistance. As a structure, there is generally known a structure in which a formwork is installed in front of a steel sheet pile, and underwater concrete for forming a concrete covering portion is cast in the formwork.

【0003】この従来の護岸構造におけるコンクリート
被覆部の形成方法を述べておくと、先ず、コンクリート
被覆部用であるの現場打ち水中コンクリート用の型枠
(鋼製で非常に大型)を、作業船で吊り上げ、所定の鋼
矢板における前面位置に吊り降ろす。
[0003] A method of forming a concrete covering portion in the conventional seawall structure is as follows. First, a formwork (very large steel) for cast-in-place underwater concrete for the concrete covering portion is provided. And lift it down to the front position in a predetermined steel sheet pile.

【0004】そして、この吊り降ろされた型枠は、その
下端(河床側)を、潜水夫による水中での人力作業によ
って固定する。この型枠下端の固定作業は、水中溶接で
取付けた鋼材を、油圧ジャッキ等を用いて強力に押し付
ける形式である。
[0004] The lower end (the riverbed side) of the suspended formwork is fixed by a manual operation in water by a diver. The work of fixing the lower end of the formwork is a method of strongly pressing a steel material attached by underwater welding using a hydraulic jack or the like.

【0005】なお、この時に、コンクリート被覆部に鉄
筋を入れる場合は、型枠を設置して固定する前に、地上
または作業船上で組み立てた鉄筋籠を、潜水夫による水
中溶接で型枠内に固定する。
[0005] At this time, when a reinforcing bar is to be put into the concrete covering portion, before the formwork is installed and fixed, the reinforcing rod cage assembled on the ground or on a work boat is welded underwater by a diver into the formwork. Fix it.

【0006】そして、次の工程は、水中コンクリートの
型枠内への打設工事であり、打設量に応じて、相当数の
生コン車を道路等に待機させ、ポンプ車による打込みを
行う。その後、コンクリートの養生を行い強度確認を終
えた後、型枠を外して、護岸構造の完成となる。
[0006] The next step is the work of placing concrete in the form of underwater concrete. According to the amount of casting, a considerable number of ready-mixed concrete cars are made to stand by on a road or the like and driven by a pump car. After curing the concrete and checking the strength, the formwork is removed and the revetment structure is completed.

【0007】[0007]

【この発明が解決しようとする課題】しかし、前述した
従来の護岸構造では、水中溶接作業等の水中での危険な
人力作業が非常に多く、水中作業を行う専門の潜水夫が
必要となっている。ところが、このような危険な特殊作
業を行える職人は少ないものであり、しかも、近年では
ウォーターフロントの開発が盛んになっていることか
ら、人員の確保が大変なものとなっている。
However, in the above-mentioned conventional revetment structure, the number of dangerous manual work underwater such as underwater welding work is extremely large, and a specialized diver for underwater work is required. I have. However, there are few craftsmen who can perform such dangerous special tasks, and in recent years, the development of waterfronts has become active, and securing personnel has become difficult.

【0008】また、水中コンクリートの打設でコンクリ
ート被覆部を形成する型枠は、大型であると共に、波に
よって動くために、その据え付け作業が非常に危険なも
のとなっている。
Further, the formwork for forming the concrete covering portion by casting underwater concrete is large and moves by waves, so that the installation work is extremely dangerous.

【0009】一方、従来の護岸構造では、コンクリート
の打設量が多いことから、施工時における生コン車の動
員台数も多くなっている。そのため、周辺の交通障害を
招いたり、周辺住民からの騒音による苦情も多い等、周
辺環境を悪化させている。
On the other hand, in the conventional revetment structure, since the amount of concrete poured is large, the number of mobilized ready-mixed concrete vehicles at the time of construction is also large. For this reason, the surrounding environment is deteriorated, such as inviting traffic obstacles in the vicinity and complaints from noise from the residents in the vicinity.

【0010】しかも、コンクリートの打設は遠隔打設と
なるケースが多く、ポンプ車が必要で、配管設備も大が
かりとなる。また、コンクリートの強度発現まで養生期
間が必要であり、護岸施工の期間が長くなっている。
[0010] In addition, concrete is often cast remotely, requiring a pump truck, and requires large-scale piping facilities. In addition, a curing period is required until the strength of concrete is realized, and the period of revetment construction is long.

【0011】このように、従来の護岸構造は、その施工
に際して、工期が長大化すると共に、施工精度および品
質精度が悪くなり、しかも、非常に危険でコスト高なも
のとなっている。
[0011] As described above, the conventional revetment structure requires a long construction period, a poor construction accuracy and a low quality accuracy, and is extremely dangerous and expensive.

【0012】この発明は前述した事情に鑑みて創案され
たもので、その目的は現場での工事量を大幅に削減でき
ると共に、全工事を地上または作業船上から行えるよう
にして、作業環境の改善と工期の短縮とを図ることので
きる鋼矢板を用いた護岸構造を提供することにある。
The present invention has been made in view of the above-mentioned circumstances, and its object is to significantly reduce the amount of construction work on site and to improve the work environment by enabling all construction work to be performed from the ground or on a work boat. Another object of the present invention is to provide a revetment structure using steel sheet piles, which can shorten the construction period.

【0013】[0013]

【課題を解決するための手段】この発明の護岸構造によ
れば、護岸部に躯体として配設されており、上端に台座
プレートを有する鋼矢板と、この鋼矢板の水面側に配設
されており、上端部に前記台座プレートへの固定部が、
下端に水底面へ当接する漏洩防止材がそれぞれ設けられ
ている化粧パネルと、この化粧パネルを前記鋼矢板の水
面側へ配設する時に、化粧パネルを鋼矢板側に引き寄せ
て支持する引き寄せ機構と、前記化粧パネルと前記鋼矢
板の間に充填されている水中コンクリートとを備えてい
る。
According to the revetment structure of the present invention, a steel sheet pile having a pedestal plate at the upper end and a steel sheet pile having a pedestal plate at the upper end is provided on the seawall and a water sheet side of the steel sheet pile. There is a fixed part to the pedestal plate at the upper end,
A decorative panel provided with a leakage preventing material that abuts against a water bottom surface at a lower end, and a pulling mechanism that draws and supports the decorative panel toward the steel sheet pile side when the decorative panel is disposed on the water surface side of the steel sheet pile. , And underwater concrete filled between the decorative panel and the steel sheet pile.

【0014】そして、この発明の護岸構造は、景観性に
富んだ化粧パネルを、鋼矢板の台座プレート,化粧パネ
ルの固定部および漏洩防止材,引き寄せ機構の使用で、
護岸部の躯体として配設された鋼矢板の前面に配設する
ことにより、現場での工事量を大幅に削減すると共に、
作業環境改善と工期短縮を実現すべく、全工事を地上ま
たは作業船上から行うことができるようにして、水中作
業を不要にしたものである。
The revetment structure of the present invention uses a decorative panel rich in landscape by using a pedestal plate made of steel sheet pile, a fixing part of the decorative panel, a leak preventing material, and a drawing mechanism.
By arranging it in front of the steel sheet piles installed as the shore protection section, the amount of construction work on site can be significantly reduced,
In order to improve the working environment and shorten the construction period, the entire construction can be performed from the ground or on a work boat, thereby eliminating the need for underwater work.

【0015】[0015]

【実施例】以下、この発明の鋼矢板を用いた護岸構造
を、図示する実施例によって説明する。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a perspective view of a revetment structure using steel sheet piles according to the present invention.

【0016】海岸や河岸等の岸辺に鋼矢板2を配設して
造成され、岸辺の保護や景観向上などを行う護岸構造1
(図1参照)は、護岸部における躯体として配設され、
上端に台座プレート3が取付けられている鋼矢板2と、
この鋼矢板2の水面側に配設され、上端部に台座プレー
ト3への固定部4が、また下端に漏洩防止材5がそれぞ
れ取り付けられている化粧パネル6と、この化粧パネル
6および鋼矢板2の間に充填されている水中コンクリー
ト7と、鋼矢板2および化粧パネル6に設けられ、一体
的に作用する引き寄せ機構8とを備えてなっている。
A revetment structure 1 constructed by arranging steel sheet piles 2 on the shore, such as a shore or a river bank, for protecting the shore and improving the landscape.
(See Fig. 1) is installed as a skeleton at the seawall,
A steel sheet pile 2 having a pedestal plate 3 attached to its upper end;
A decorative panel 6 which is disposed on the water surface side of the steel sheet pile 2 and has a fixing portion 4 to the pedestal plate 3 at an upper end and a leakage prevention member 5 at a lower end, respectively; 2 and a drawing mechanism 8 provided on the steel sheet pile 2 and the decorative panel 6 and acting integrally.

【0017】また、化粧パネル6は、引き寄せ機構8に
よる、鋼矢板2側への引き寄せ状態での支持と、漏洩防
止材5の水底面への当接と、固定部4の鋼矢板2におけ
る台座プレート3への固定とで、鋼矢板2の水面側に配
設してなっている。
Further, the decorative panel 6 is supported by the pulling mechanism 8 in a state of being drawn toward the steel sheet pile 2, abuts on the water bottom surface of the leakage prevention member 5, and the pedestal of the fixing portion 4 in the steel sheet pile 2. By fixing to the plate 3, the steel sheet pile 2 is disposed on the water surface side.

【0018】そして、この実施例での鋼矢板2は、その
上端部の前後面、即ち、その上端部の地上側と水面側と
の面に、溝型鋼9(L型鋼でも良い。)を取付けられて
いると共に、この両溝型鋼9の上部に台座プレート3が
連続または一定の間隔をもって取付けられている。
The steel sheet pile 2 in this embodiment is provided with channel steel 9 (or L-shaped steel) on the front and rear surfaces of its upper end, that is, on the surface of the upper end between the ground side and the water surface side. The pedestal plate 3 is attached to the upper part of the two channel steels 9 continuously or at a constant interval.

【0019】なお、ここでの溝型鋼9は、取付け時にお
いて、鋼矢板2の打込み時に誤差があっても修正するこ
とができる。また、台座プレート3には、パネル接続用
ボルト10が容易にセットできるように予め加工されてい
る。
The grooved steel 9 can be corrected even when there is an error in driving the steel sheet pile 2 during mounting. Further, the pedestal plate 3 is processed in advance so that the panel connection bolt 10 can be easily set.

【0020】化粧パネル6は、プレキャストコンクリー
トで形成されており、台座プレート3にセットしたパネ
ル接続用ボルト10が螺合するナット部でなる固定部4が
上端部に、鋼矢板2と化粧パネル6との間に充填した水
中コンクリート7のパネル下部からの漏洩を防止する発
泡ウレタン等の漏洩防止材5が下端にそれぞれ取付けら
れている。
The decorative panel 6 is formed of precast concrete, and has a fixing portion 4 formed of a nut portion to which a panel connecting bolt 10 set on the pedestal plate 3 is screwed, and the steel sheet pile 2 and the decorative panel 6 are formed at the upper end. Leakage prevention members 5 such as urethane foam for preventing leakage of the underwater concrete 7 filled from below the panel are attached to the lower ends, respectively.

【0021】引き寄せ機構8は、図3および図4に示す
ように、鋼矢板2に取付けたリング金具11(アイボルト
でも良い。)と、このリング金具11の中に通したワイヤ
ー12と、図1に示すように、化粧パネル6に取付けられ
ており、ワイヤー12が接続されているリング金具13(フ
ックでも良い。)とからなっている。
As shown in FIGS. 3 and 4, the pulling mechanism 8 includes a ring fitting 11 (may be an eyebolt) attached to the steel sheet pile 2, a wire 12 passed through the ring fitting 11, and FIG. As shown in FIG. 5, the ring 12 is attached to the decorative panel 6 and is connected to the wire 12 (a hook may be used).

【0022】このような構成からなる護岸構造1を使用
して、護岸を施すには、次に述べるようにして行う。
The revetment is applied by using the revetment structure 1 having such a configuration as follows.

【0023】先ず、図2に示すように、溝型鋼9,台座
プレート3,リング金具11およびワイヤー12を取付ける
と共に、ワイヤー12を台座プレート3から上方の外部へ
出した状態の鋼矢板2を、護岸部の躯体として打ち込
む。
First, as shown in FIG. 2, the steel sheet pile 2 in a state where the channel steel 9, the pedestal plate 3, the ring fitting 11 and the wire 12 are attached, and the wire 12 is extended out of the pedestal plate 3 to the outside. Driving as a shore protection structure.

【0024】その後、図2に示すように、化粧パネル6
を、引き寄せ機構8であるリング金具13に接続したワイ
ヤー12によって、鋼矢板2へ引き寄せながら、図1に示
すような、下端の漏洩防止材5が水底面に当接する状態
となるまで吊り下ろす。
Thereafter, as shown in FIG.
Is pulled down to the steel sheet pile 2 by the wire 12 connected to the ring fitting 13 as the pulling mechanism 8, and is suspended until the leak prevention member 5 at the lower end comes into contact with the water bottom as shown in FIG.

【0025】このことで、護岸部の躯体として打込んだ
鋼矢板2の水面側前面に、化粧パネル6をセットする。
Thus, the decorative panel 6 is set on the front surface on the water surface side of the steel sheet pile 2 that has been driven in as a frame of the seawall.

【0026】次に、鋼矢板2の台座プレート3と化粧パ
ネル6の固定部4とを、図1に示すように、接続用ボル
ト10によって連結し、化粧パネル6の上端部を固定する
と共に、鋼矢板2と化粧パネル6とを接続するワイヤー
12を緊張することで、所定の箇所に化粧パネル6を設置
する。
Next, as shown in FIG. 1, the pedestal plate 3 of the steel sheet pile 2 and the fixing portion 4 of the decorative panel 6 are connected by connecting bolts 10 to fix the upper end of the decorative panel 6, and Wire connecting steel sheet pile 2 and decorative panel 6
The tension panel 12 places the decorative panel 6 at a predetermined location.

【0027】このワイヤー12の緊張に際しては、緊張し
すぎによる化粧パネル6における下端のねじれを誘発さ
せないように、鋼矢板2に当接するストッパーボルト14
を、化粧パネル6の所定位置に取付けておく。このスト
ッパーボルト14は、鋼矢板2との距離に合せて、その突
出長を調整できるようになっている。
When the wire 12 is tensioned, a stopper bolt 14 which comes into contact with the steel sheet pile 2 so as not to induce twisting of the lower end of the decorative panel 6 due to excessive tension.
At a predetermined position on the decorative panel 6. The protrusion length of the stopper bolt 14 can be adjusted according to the distance from the steel sheet pile 2.

【0028】また、このワイヤー12の緊張は、台座プレ
ート3の上に設置した緊張用桁15を介して、センターホ
ールジャッキ等(図示せず)で行う。そして、この緊張
用桁15には、ワイヤー12へ与えた緊張力が減少しないよ
うに、アンカーグリップ16が取付けられている。
The wire 12 is tensioned by a center hole jack or the like (not shown) via a tension girder 15 installed on the pedestal plate 3. An anchor grip 16 is attached to the tension girder 15 so that the tension applied to the wire 12 does not decrease.

【0029】なお、このようにして設置する時の、隣合
う両化粧パネル6の間の継手部は、図5に示すように、
オス・メス式の継ぎ手方式とする。この方式は、新たに
設置する化粧パネル6を、設置済みの化粧パネル6の継
手に沿わせるだけで、新たな化粧パネル6を、精度良
く、しかも容易に設置することができる。
The joint between the two adjacent decorative panels 6 at the time of installation in this manner is, as shown in FIG.
Male-female joint method is used. According to this method, a new decorative panel 6 can be accurately and easily installed simply by making the newly installed decorative panel 6 follow the joint of the installed decorative panel 6.

【0030】次に、化粧パネル6と鋼矢板2との間に、
化粧パネル6を捨て型枠として、水中コンクリート7を
打込む。なお、この時に、化粧パネル6の漏洩防止材5
によって、パネル下部からの水中コンクリート7の漏洩
を防止することができる。
Next, between the decorative panel 6 and the steel sheet pile 2,
Using the decorative panel 6 as a disposal form, the underwater concrete 7 is driven. At this time, at this time, the leakage preventing material 5
Thereby, leakage of the underwater concrete 7 from the lower part of the panel can be prevented.

【0031】また、隣合う両化粧パネル6におけるオス
・メス式の継手部は、この継手部からの水中コンクリー
ト7の漏洩経路を直線でなく複雑にすることができるの
で、漏洩防止効果を高くすることができる。さらに、図
5に示すように、オス継手の先端に、予め溝を設けてお
き、この溝に水膨張シール材17を貼付することで、より
一層の漏洩防止を図ることができる。
The male / female joint between the adjacent decorative panels 6 can make the leakage path of the underwater concrete 7 from this joint not a straight line but a complicated one, thereby increasing the effect of preventing leakage. be able to. Further, as shown in FIG. 5, a groove is provided at the tip of the male joint in advance, and the water expansion seal material 17 is attached to this groove, whereby leakage can be further prevented.

【0032】そして、これらのことで、この発明の護岸
構造の施工が完了することとなる。
Then, the construction of the revetment structure of the present invention is completed.

【0033】このように、この発明の護岸構造では、鋼
矢板2の打ち込み,化粧パネル6の吊り下ろし,鋼矢板
2の上端と化粧パネル6の上端との固定,化粧パネル6
のワイヤー12による鋼矢板2への引き寄せという、地上
または作業船上から行える工事のみで施工することがで
きる。
As described above, in the revetment structure of the present invention, the steel sheet pile 2 is driven, the decorative panel 6 is suspended, the upper end of the steel sheet pile 2 is fixed to the upper end of the decorative panel 6, and the decorative panel 6 is fixed.
It can be constructed only by work that can be performed from the ground or on a work boat, that is, drawing to the steel sheet pile 2 by the wire 12.

【0034】[0034]

【発明の効果】この発明の鋼矢板を用いた護岸構造によ
れば、作業が全て地上または作業船上から行え、水中作
業が不要となるので、潜水夫に代表される専門職が不要
とすることができる。また、作業が非常に安全で、作業
の効率化が図れると共に、工事費の低減および工期の短
縮を図ることができる。
According to the revetment structure using steel sheet piles of the present invention, all work can be performed from the ground or on a work boat, and no underwater work is required, so that a profession represented by a diver is not required. Can be. In addition, work is very safe, work efficiency can be improved, and construction costs can be reduced and the construction period can be shortened.

【0035】また、鋼矢板の前面に取付ける化粧パネル
によって、品質が安定し、断面厚の軽量化が図れると共
に、パネル表面に自由な景観性を容易に付加することが
でき、損傷または破壊した場合でも容易に取り換えるこ
とがでる。
In addition, the decorative panel attached to the front of the steel sheet pile can stabilize the quality, reduce the thickness of the cross section, and easily add a free view to the panel surface. But it can be easily replaced.

【0036】さらに、この化粧パネルは、1ピースの重
量が小さいため、使用機器,重機の小型化を図ることが
できると共に、水中コンクリート打設時の捨て型枠とし
ても用いられるために、型枠の組立てや取外しを行う従
来工法より、大幅な工期短縮となる。
Further, since this decorative panel has a small weight of one piece, it is possible to reduce the size of equipment and heavy equipment to be used, and it is also used as a discarding mold when casting concrete in water. The construction period is greatly shortened compared to the conventional method of assembling and removing components.

【0037】しかも、この化粧パネルは、鋼矢板に打ち
込み誤差があっても、直接、鋼矢板と接続するものでな
いために、十分調整することがでる。
Moreover, even if the decorative panel has a driving error in the steel sheet pile, it is not directly connected to the steel sheet pile, so that the decorative panel can be adjusted sufficiently.

【図面の簡単な説明】[Brief description of the drawings]

【図1】この発明の護岸構造を示す概略図である。FIG. 1 is a schematic view showing a revetment structure of the present invention.

【図2】この発明の護岸構造の施工状態を示す概略図で
ある。
FIG. 2 is a schematic view showing a construction state of the seawall structure of the present invention.

【図3】この発明の護岸構造で用いる鋼矢板を示す概略
平面図である。
FIG. 3 is a schematic plan view showing a steel sheet pile used in the revetment structure of the present invention.

【図4】図3のA−A線矢視図である。FIG. 4 is a view taken along the line AA of FIG. 3;

【図5】この発明の護岸構造で用いる化粧パネルの継手
部を示す概略断面図である。
FIG. 5 is a schematic sectional view showing a joint portion of a decorative panel used in the seawall structure of the present invention.

【符号の説明】[Explanation of symbols]

1…護岸構造、2…鋼矢板、3…台座プレート、4…固
定部、5…漏洩防止材、6…化粧パネル、7…水中コン
クリート、8…引き寄せ機構、9…溝型鋼、11…リング
金具、12…ワイヤー、13…リング金具、14…ストッパー
ボルト。
DESCRIPTION OF SYMBOLS 1 ... Revetment structure, 2 ... Steel sheet pile, 3 ... Pedestal plate, 4 ... Fixed part, 5 ... Leak prevention material, 6 ... Decorative panel, 7 ... Underwater concrete, 8 ... Pulling mechanism, 9 ... Channel steel, 11 ... Ring fitting , 12 ... wire, 13 ... ring bracket, 14 ... stopper bolt.

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 平6−167011(JP,A) 実開 昭58−1659(JP,U) 実開 平4−30127(JP,U) 実開 平4−33717(JP,U) (58)調査した分野(Int.Cl.6,DB名) E02B 3/04 - 3/10──────────────────────────────────────────────────続 き Continuation of the front page (56) References JP-A-6-167011 (JP, A) JP-A-58-1659 (JP, U) JP-A-4-30127 (JP, U) JP-A-4-167 33717 (JP, U) (58) Field surveyed (Int. Cl. 6 , DB name) E02B 3/04-3/10

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 海岸や河岸の護岸部に鋼矢板を配設する
ことで造成される護岸構造において、 前記護岸部に躯体として配設されており、上端に台座プ
レートを有する鋼矢板と、この鋼矢板の水面側に配設さ
れており、上端部に前記台座プレートへの固定部が、下
端に水底面へ当接する漏洩防止材がそれぞれ設けられて
いる化粧パネルと、この化粧パネルを前記鋼矢板の水面
側へ配設する時に、化粧パネルを鋼矢板側に引き寄せて
支持する引き寄せ機構と、前記化粧パネルと前記鋼矢板
の間に充填されている水中コンクリートとを備えてなる
ことを特徴とする鋼矢板を用いた護岸構造。
Claims: 1. A revetment structure formed by disposing steel sheet piles on a seawall or a riverbank, wherein the steel sheet pile is provided as a frame on the seawall and has a pedestal plate at an upper end; A decorative panel which is disposed on the water surface side of the steel sheet pile, has a fixing portion to the pedestal plate at an upper end portion, and a leakage preventing material which is in contact with a water bottom surface at a lower end portion; When disposed on the water surface side of the sheet pile, a drawing mechanism for drawing and supporting the decorative panel toward the steel sheet pile side, and comprising a submerged concrete filled between the decorative panel and the steel sheet pile. A revetment structure using steel sheet piles.
JP9426493A 1993-04-21 1993-04-21 Seawall construction using steel sheet piles Expired - Lifetime JP2852173B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9426493A JP2852173B2 (en) 1993-04-21 1993-04-21 Seawall construction using steel sheet piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9426493A JP2852173B2 (en) 1993-04-21 1993-04-21 Seawall construction using steel sheet piles

Publications (2)

Publication Number Publication Date
JPH06306832A JPH06306832A (en) 1994-11-01
JP2852173B2 true JP2852173B2 (en) 1999-01-27

Family

ID=14105430

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9426493A Expired - Lifetime JP2852173B2 (en) 1993-04-21 1993-04-21 Seawall construction using steel sheet piles

Country Status (1)

Country Link
JP (1) JP2852173B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017089144A (en) * 2015-11-05 2017-05-25 株式会社琉球技研 Revetment structure by steel sheet pile

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2802612B2 (en) * 1996-06-19 1998-09-24 西松建設株式会社 Underwater formwork method
JP5634814B2 (en) * 2010-10-06 2014-12-03 株式会社熊谷組 Seawall construction method
JP5680441B2 (en) * 2011-02-24 2015-03-04 Crs株式会社 Coated anticorrosion panel and revetment method using the anticorrosive panel
JP2017025585A (en) * 2015-07-22 2017-02-02 株式会社 南組 Repair construct of underwater wall surface of structure and repair method for the same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017089144A (en) * 2015-11-05 2017-05-25 株式会社琉球技研 Revetment structure by steel sheet pile

Also Published As

Publication number Publication date
JPH06306832A (en) 1994-11-01

Similar Documents

Publication Publication Date Title
CN113529763A (en) Method for constructing sea area shoal cushion cap by utilizing reinforced concrete combined steel cofferdam
JP2852173B2 (en) Seawall construction using steel sheet piles
CN108425374B (en) Integral construction method of steel suspension box cofferdam with tie beam dumbbell-shaped bearing platform under complex sea condition
JPH07216844A (en) Underwater framed structure and construction method thereof
JP2001107319A (en) Aseismic reinforcing method of pier and aseismic reinforced structure
JP3395944B2 (en) Underwater formwork method
JPH11303087A (en) Retaining wall using corrosion-resistant structure anchor
CN217559183U (en) Gas pipeline protection structure next to underground continuous wall
JPH1054037A (en) Coffering method and steel structural body therefor
CN110374214A (en) Finished product post-cast strip
JP2000017645A (en) Installation method of underwater structure
CN212153427U (en) Peripheral firm high accuracy zero interference weir mould body structure
JP2001288725A (en) Pile-type foundation structure and method for constructing the same
KR102038370B1 (en) Underwater structure cofferdam frame and installation method using cofferdam
CN212336244U (en) Ductile cast iron pipe water-carrying connection device
JP3117385B2 (en) Fixing method of steel pier and footing
CN111379265A (en) Peripherally-stabilized high-precision zero-interference weir-mold integrated structure and construction method thereof
JPH03275809A (en) Caisson structure
JPH09296427A (en) Structure in water area and construction method thereof
CN110616742A (en) Large-scale prefabricated part prestress construction drag reduction water tank and use method
JPS5844802B2 (en) Ganpekino hokiyoukohou
CN116608324B (en) Underground pipeline reinforcing structure below river-crossing bridge under tunnel construction
JP3849234B2 (en) Reinforced concrete underground outer wall construction method
JP3168197B2 (en) Caisson anchor structure and construction method
CN216475027U (en) Lattice column positioning and guiding device

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19981027

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081113

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081113

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091113

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091113

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101113

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121113

Year of fee payment: 14

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121113

Year of fee payment: 14

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131113

Year of fee payment: 15

EXPY Cancellation because of completion of term