JP2811550B2 - Swing type fixing device - Google Patents

Swing type fixing device

Info

Publication number
JP2811550B2
JP2811550B2 JP25668495A JP25668495A JP2811550B2 JP 2811550 B2 JP2811550 B2 JP 2811550B2 JP 25668495 A JP25668495 A JP 25668495A JP 25668495 A JP25668495 A JP 25668495A JP 2811550 B2 JP2811550 B2 JP 2811550B2
Authority
JP
Japan
Prior art keywords
notch
cut
gas pipe
point
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP25668495A
Other languages
Japanese (ja)
Other versions
JPH0959986A (en
Inventor
謙一 福森
Original Assignee
日本スピードショア株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日本スピードショア株式会社 filed Critical 日本スピードショア株式会社
Priority to JP25668495A priority Critical patent/JP2811550B2/en
Publication of JPH0959986A publication Critical patent/JPH0959986A/en
Application granted granted Critical
Publication of JP2811550B2 publication Critical patent/JP2811550B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、スイング式切りばりの
固定装置に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a swing-type fixing device.

【0002】[0002]

【従来の技術】特に、ガス管等の管埋設工事において
は、掘削溝に土止め支保工がなされており、通常4mの
一対の腹起し間に、2本の切りばりが横設されている。
2. Description of the Related Art In burying pipes such as gas pipes, in particular, earth retaining supports are provided in excavation trenches, and two cuts are usually laid horizontally between a pair of uprights of 4 m in length. I have.

【0003】一方、埋設する鋼管製のガス管は、通常1
0〜12mの長さがあり、しかも地上で2〜3本溶接し
たものを、地上から掘削敷に搬入している。
On the other hand, a steel pipe gas pipe to be buried is usually
What has a length of 0 to 12 m and is welded by two or three welds on the ground is carried into the excavation floor from the ground.

【0004】従来、最大約36mの長さとなるガス管
を、クレーンまたはチェーンブロック等で水平に吊り上
げ、この水平状態で掘削敷に降下させる為に、既設の切
りばりが、ガス管に当らないように切りばりを一時撤去
するか、又は切りばりの一端部を腹起しと結合させ、他
端部を旋回させるスイング式切りばりを用いる方法があ
るが、このスイング式切りばりの工法では、ガス管が切
りばりが横設されている水平位置を上方から下方へ通過
してしまう迄、旋回させた切りばりをロープで縛ったり
又は、図のような固定金具を使用して、切りばりが自
由に戻らない様に、固定する必要があった。
Conventionally, a gas pipe having a length of about 36 m at the maximum is lifted horizontally by a crane or a chain block or the like, and is lowered on an excavation bed in this horizontal state. There is a method that uses a swing-type cutting method that temporarily removes the cut-out or connects one end of the cut-out with the prong, and turns the other end. the horizontal position the tube is cut beams are horizontal set from above until get through downwardly, or tied off Beams pivoted in rope or by using the fixing bracket as shown in FIG. 3, the cutting beams It had to be fixed so that it would not return freely.

【0005】図の方法では、ガス管がクレーン又はチ
ェーンブロック等で吊り上げた水平状態で容易に掘削敷
に降下する空間を設ける為旋回してきた切りばりを掘削
溝と平行になる状態で腹起し等と固定する作業を要する
が、これは固定と解除の両方の作業を要する手間のかか
る作業であり、固定金具が掘削面に突出しているので、
作業の妨げになることもある。
In the method shown in FIG. 3 , a gas pipe is lifted by a crane or a chain block or the like in a horizontal state to provide a space for easily descending on an excavation floor. Although it requires work to fix it with a work, etc., this is a laborious work that requires both work of fixing and release, and since the fixing bracket protrudes from the excavation surface,
It can hinder your work.

【0006】また他の方法として、作業員が直接、手等
を使ったり、又は、ロープ等で引っ張ったりして、固定
する方法がある。
[0006] As another method, there is a method in which an operator directly fixes by hand or the like or by pulling with a rope or the like.

【0007】この方法では、ガス管が切りばりが横設さ
れている水平位置を上方から下方へ通過してしまう迄、
多数の人手を要し、しかも、これらの作業員は、掘削溝
の縁の崩壊や、クレーンやチェーンブロック等で空中に
吊り上げられたガス管の落下等、通常十分な安全対策を
講じているとはいえ、絶対に事故が起こらないとは保証
できないこのような危険な状態にさらされた現場付近で
の作業を強いられることになる。
[0007] In this method, until the gas pipe passes from above to below the horizontal position where the notch is provided horizontally,
It requires a lot of manpower, and these workers usually take sufficient safety measures, such as collapsing the edges of the digging trench and dropping gas pipes suspended in the air by cranes or chain blocks. Nevertheless, they must be forced to work close to the site where they are exposed to such dangerous situations, which cannot be guaranteed that no accidents will occur.

【0008】[0008]

【発明が解決しようとする課題】本発明は、上記の欠点
を除いて、作業の効率と安全を高めようとするものであ
る。
SUMMARY OF THE INVENTION The present invention seeks to eliminate the above-mentioned drawbacks and improve the efficiency and safety of work.

【0009】[0009]

【課題を解決するための手段】本発明のスイング式切り
ばりの固定装置は、一対の腹起しと切りばりで構成する
土止め支保工で、切りばりの一端部が直接又は間接に腹
起しと結合され他端部が上下或は左右に旋回するスイン
グ式切りばりにおいて、切りばりが解放並びに設定位置
で固定する為に、次のような手段を講じている。即ち切
りばりの一端部側で、且つ切りばりの軸芯線に対し、旋
回する側にオフセットされている回転軸と、切りばりの
他端部側の任意の位置に設けられた作用点と、回転軸に
対し、切りばりが旋回する方向と逆方向の任意の位置
で、且つ回転軸に対し、切りばりの他端部側とは逆方向
で、作用点からみて、回転軸の中心より遠い任意の位置
に設けられた固定点と、前記作用点と固定点とをスプリ
ングにより引っ張り合わされていることを特徴とする。
SUMMARY OF THE INVENTION A swing-type fixing device according to the present invention is a soil retaining support comprising a pair of prongs and a cut-out, and one end of the cut-out is directly or indirectly protruded. The following means are taken in order to release and fix the cut-off plate at the set position in the swing-type cut plate which is connected to the hand and the other end pivots up and down or left and right. That is, at one end of the notch, and with respect to the axis of the notch, a rotating shaft that is offset to the revolving side, an action point provided at an arbitrary position on the other end of the notch, and rotation. Any position in the direction opposite to the direction in which the notch turns with respect to the axis, and in the direction opposite to the other end of the notch with respect to the rotation axis, any position farther from the center of the rotation axis as viewed from the point of action. , And the action point and the fixed point are pulled together by a spring.

【0010】[0010]

【作用】本発明のスイング式切りばりの固定装置は、ガ
ス管等を掘削敷に降下する際に、切りばりを少し縮めて
から、その他端部を腹起しから解放し、切りばりが腹起
しと平行に当接する方向に、引っ掛け工具等で旋回して
くれば、前記の固定点と回転軸を直線で結ぶ延長線上に
作用点が並ぶ位置で、スプリングの力が均衡し、この位
置で、力を加えず放置すれば、切りばりは静止すること
になる。そして、この均衡位置をわずかでも通過して、
さらに切りばりに力を加えれば、均衡点を通過した時点
でスプリングの力が働き、もはや、人力等の力を加えな
くても、切りばりは旋回を続け、腹起しと当接して固定
する。また反対に、この均衡位置より、切りばりが腹起
しと直角になる方向に通過させれば、均衡位置を通過し
た時にスプリングの力が働き、もはや、人力等の力を加
えなくても、切りばりは旋回を続け、腹起しと直角に当
接して固定する。
According to the present invention, when the gas pipe or the like is lowered on the excavation bed, the swing-type cutting fixture is slightly contracted, and then the other end is released from the belly. If it is turned by a hooking tool or the like in the direction in which it comes into contact in parallel with the rising, the force of the spring is balanced at the position where the points of action are arranged on an extension line connecting the fixed point and the rotation axis with a straight line. If left without applying force, the cutting edge will come to rest. And even slightly pass through this equilibrium position,
If a force is further applied to the cutting edge, the force of the spring acts upon passing the equilibrium point, and the cutting edge continues turning and abuts against the belly and is fixed even when no force such as human power is applied anymore. . Conversely, from this equilibrium position, if the cut is passed in a direction perpendicular to the bulging, the force of the spring will work when passing the equilibrium position, no longer applying force such as human power, The cutting edge keeps turning and abuts at right angles to the belly to fix.

【実施例】【Example】

【0011】本発明のスイング式切りばりの固定装置を
図面1及び図面2に基づいて説明すれば以下の通りであ
るが、もちろん本発明は、本実施例の具体的な構成に限
定されるものではない。
The apparatus for fixing a swing-type notch according to the present invention will be described below with reference to FIGS. 1 and 2, but the present invention is, of course, limited to the specific structure of the present embodiment. is not.

【0012】図面1の設置平面図に示すように本発明の
一実施例に係るスイング式切りばりの固定装置は、一対
の腹起し5と水圧シリンダー構造の切りばり4で構成す
る土止め支保工において、切りばり4に一端部は連結用
ガイドを介して、腹起し5と結合され他端部が左側に
旋回するスイング式切りばりで、連結用ガイド6の左側
にピン孔を有するブラケット7が設けられており、この
ブラケット7のピン孔と、シリンダーパット8のピン孔
9とを、重ね合わせた位置に、回転軸1を設け、切りば
り4の中心線上の他端側に、アイボルト2により作用点
17を設け、さらに連結用ガイドの中心位置に、アイ
ボルト2により固定点18を設ける。そして、前記作用
点17と固定点18を構成するそれぞれのアイボルト2
を引っ張り合わせるスプリング3を備える。
As shown in the installation plan view of FIG. 1, a swing type fixing device according to one embodiment of the present invention is a soil retaining support comprising a pair of belly protuberances 5 and a hydraulic cylinder structure of a cutting device 4. In the construction, one end of the cutout 4 is connected to the belly 5 via the connecting guide 6 and the other end is a swing-type cutout that turns leftward, and has a pin hole on the left side of the connecting guide 6. A bracket 7 is provided. The rotating shaft 1 is provided at a position where the pin hole of the bracket 7 and the pin hole 9 of the cylinder pad 8 are overlapped, and at the other end side on the center line of the notch 4, An action point 17 is provided by the eyebolt 2, and a fixing point 18 is provided by the eyebolt 2 at the center position of the connection guide 6 . Each of the eyebolts 2 forming the action point 17 and the fixed point 18
Is provided.

【0013】本作業に先だって、まず、公知の方法で土
止め支保工を行う。
Prior to this work, first, a shoring support is carried out by a known method.

【0014】本発明を実施するガス管等の埋設工事にお
いては、掘削溝が深く、土壁に大きな土圧がかかる為、
通常2段の土止め支保工を施している。
In burying gas pipes and the like according to the present invention, the excavation trench is deep and a large earth pressure is applied to the earth wall.
Usually, two steps of earth support are applied.

【0015】従って、図面2で示す通り、まずガス管1
2をAの位置からBの位置に降下させる為、上段の水圧
式シリンダー構造の切りばり4の水を抜いて、切りばり
4を縮小させることにより、他端部を解放し、切りばり
4が腹起し5と平行に、当接する方向に、作業棒11を
用いて、作用点17を構成するアイボルト2に引っ掛
け、左側に旋回していけば、前記説明の通り回転軸1と
固定点18とを直線で結ぶ延長線上を作用点17が、通
過した時、スプリング3の力が作用し、もはや、人力等
による力を加えなくても、切りばり4は自発的に旋回を
続け腹起し5に当接して固定する。
Therefore, as shown in FIG.
In order to lower 2 from the position of A to the position of B, drain the water of the cut-out 4 of the upper hydraulic cylinder structure, reduce the cut-out 4, release the other end, and the cut-out 4 The work bar 11 is used to hook the eyebolt 2 constituting the action point 17 in the contact direction in parallel with the abdomen 5 and turn to the left. When the action point 17 passes on an extension line connecting the straight line and the force, the force of the spring 3 acts, and the cutting edge 4 continues to turn spontaneously even if no force is applied by human power anymore. 5 and fixed.

【0016】通常切りばり4は4m間に2本設置されて
いるが、ガス管12は通常12mの長さがあり、これを
2、3本地上で溶接したものを、地上から垂直にクレー
ン又はチェーンブロック13等で吊り上げ、水平に掘削
敷に降下させるので最大18本の切りばり4に、前記作
業を繰り返す。
Normally, two notches 4 are provided between 4 m, but the gas pipe 12 is usually 12 m in length, and two or three of these gas pipes are welded on the ground, and are vertically crane-mounted from the ground. The above work is repeated with a maximum of 18 cuts 4 because the hoist is lifted by the chain block 13 or the like and lowered horizontally on the excavation floor.

【0017】前記の作業により、上段の切りばり4は、
全て臨時的に取り払われた状態となっているのでガス管
12が水平状態のまま、降下するのに十分なスペースが
確保できている。
By the above operation, the upper cut 4 is
Since all are temporarily removed, a sufficient space for descending can be secured while the gas pipe 12 is kept horizontal.

【0018】従って、ガス管12はクレーン又はチェー
ンブロック13等で吊り上げ、容易に図面2のBの位置
迄降下される。
Accordingly, the gas pipe 12 is lifted by the crane or the chain block 13 or the like, and is easily lowered to the position B in FIG.

【0019】ガス管12がBの位置に搬入されれば、先
ほど腹起し5に当接させた切りばり4を元の腹起し5と
直角に当接した状態に戻す為に、作業棒11により上段
の切りばり4を腹起し5と直角になる方向に旋回させて
いくと、回転軸1と固定点18を直線で結ぶ延長線上を
作用点17が通過した時、スプリング3の力が作用し、
もはや人力等の力を加えなくても、上段の切りばり4
は、自発的に旋回を続け、水圧式シリンダー構造の切り
ばり4のシリンダーパット底面10が腹起し5に嵌合し
ている連結用ガイド6の側面に当接することにより、腹
起し5と直角となる位置で固定する。そして、再び水圧
式シリンダー構造の切りばり4に水圧ポンプにより圧力
水を注入し腹起し5を加圧させる。
When the gas pipe 12 is carried into the position B, the working rod is used to return the cut-out 4 which has just contacted the upset 5 to the original abutment 5 at a right angle. When the upper cutting edge 4 is protruded by 11 and turned in a direction perpendicular to 5, the force of the spring 3 is applied when the action point 17 passes on an extension line connecting the rotation axis 1 and the fixed point 18 in a straight line. Acts,
Even if no more human power is applied, the upper tier 4
Is continuously rotated, and the bottom surface 10 of the cylinder pad of the cutting surface 4 of the hydraulic cylinder structure comes into contact with the side surface of the connecting guide 6 fitted to the protruding portion 5, thereby forming the protruding portion 5. Fix at a right angle. Then, pressurized water is again injected into the cut-out 4 having a hydraulic cylinder structure by a hydraulic pump to bulge and pressurize 5.

【0020】次に同様の方法で、図面2で示す通り、ガ
ス管12をBの位置からCの位置に降下させる為、下段
の水圧式シリンダー構造の切りばり4の水を抜いて、切
りばり4を縮小させることにより、他端部を解放し、切
りばり4が腹起し5と平行に、当接する方向に、作業棒
11を用いて、作用点17を構成するアイボルト2に引
っ掛け、左側に旋回していけば、前記説明の通り回転軸
1と固定点18とを直線で結ぶ延長線上を作用点17
が、通過した時スプリング3の力が作用し、もはや、人
力等による力を加えなくても、切りばり4は自発的に旋
回を続け、腹起し5に当接して固定する。
Next, in a similar manner, as shown in FIG. 2, in order to lower the gas pipe 12 from the position B to the position C, the water is drained from the cut-out 4 of the lower hydraulic cylinder structure, and the cut-off is performed. 4 is released, the other end is released, and the notch 4 is hooked on the eyebolt 2 constituting the action point 17 using the working rod 11 in a direction parallel to and protruding from the abdomen 5, and As described above, the action point 17 is on the extension line connecting the rotary shaft 1 and the fixed point 18 with a straight line as described above.
However, when passing, the force of the spring 3 acts, and the cutting edge 4 continues to turn spontaneously and abuts on the belly 5 to be fixed, even when no more force is applied by human power or the like.

【0021】通常切りばり4は4m間に2本設置されて
いるが、ガス管12は通常12mの長さがあり、これを
2、3本地上で溶接したものを、地上から垂直にクレー
ン又はチェーンブロック13等で吊り上げ、水平に掘削
敷に降下させるので最大18本の切りばり4に、前記の
作業を繰り返す。
Normally, two notches 4 are installed between 4 m, but the gas pipe 12 is usually 12 m long, and two or three gas pipes are welded on the ground, and are vertically crane-mounted from the ground. The above operation is repeated with a maximum of 18 cuts 4 because the chain is lifted by the chain block 13 or the like and lowered horizontally on the excavation floor.

【0022】前記の作業により、下段の切りばり5は、
全て臨時的に取り払われた状態となっているので、ガス
管12が水平状態のまま、降下するのに十分なスペース
が確保できている。
By the above operation, the lower cutting edge 5 is
Since all are temporarily removed, a sufficient space for descending can be secured while the gas pipe 12 is kept horizontal.

【0023】従って、ガス管12はクレーン又はチェー
ンブロック13等で吊り上げ、容易に図面2のCの位置
に降下される。
Therefore, the gas pipe 12 is lifted by the crane or the chain block 13 or the like, and is easily lowered to the position C in FIG.

【0024】ガス管12がCの位置に搬入されれば、先
ほど腹起し5に当接させた切りばり4を元の腹起し5と
直角に当接した状態に戻す為に、作業棒11により下段
の切りばり4を腹起し5と直角になる方向に旋回させて
いくと、回転軸1と固定点18を直線で結ぶ延長線上を
作用点17が通過した時、スプリング3の力が作用し、
もはや人力等の力を加えなくても、下段の切りばり4
は、自発的に旋回を続け、水圧式シリンダー構造の切り
ばり4のシリンダーパット底面10が腹起し5に嵌合し
ている連結用ガイド6の側面に当接することにより、腹
起し5と直角となる位置で固定する。そして、再び水圧
式シリンダー構造の切りばり4に水圧ポンプにより圧力
水を注入し腹起し5を加圧させる。
When the gas pipe 12 is carried into the position C, the working rod is used to return the cut 4 that has just contacted the upset 5 to the original abutment 5 at a right angle. When the lower cutting edge 4 is turned upside down by 11 and turned in a direction perpendicular to 5, the force of the spring 3 is applied when the action point 17 passes on an extension line connecting the rotation axis 1 and the fixed point 18 in a straight line. Acts,
Even if no more human power is applied, the lower cut 4
Is continuously rotated, and the bottom surface 10 of the cylinder pad of the cutting surface 4 of the hydraulic cylinder structure comes into contact with the side surface of the connecting guide 6 fitted to the protruding portion 5, thereby forming the protruding portion 5. Fix at a right angle. Then, pressurized water is again injected into the cut-out 4 having a hydraulic cylinder structure by a hydraulic pump to bulge and pressurize 5.

【0025】前記説明した作業により、Cの位置にガス
管12の搬入が完了した後は、公知の方法で、ガス管1
2の接合及び溝内を埋戻し、転圧しながら土止め支保工
の撤去を行う。
After the transfer of the gas pipe 12 to the position C is completed by the above-described operation, the gas pipe 1 is moved in a known manner.
2) Backfill the inside of the groove and the inside of the groove, and remove the earth retaining support while rolling.

【0026】[0026]

【発明の効果】本発明においては、一対の腹起しと切り
ばりで構成する土止め支保工で、切りばりの一端部が直
接又は間接に腹起しと結合され、他端部が上下或は左右
に旋回するスイング式切りばりにおいて、切りばりの他
端部を解放し、切りばりが腹起しと平行に当接する方向
に、人力等で旋回していけば、前記実施例で説明の通
り、それぞれアイボルトで設けられた作用点と固定点を
繋ぐスプリングの力が作用し、何ら複雑な手順を踏むこ
となくワンタッチで、切りばりは腹起しと当接して固定
する。
According to the present invention, one end of the cut is directly or indirectly connected to the bulge, and the other end is vertically or indirectly formed by a pair of bulges and cuts. In a swing type swinging plate that turns left and right, the other end of the cutting plate is released, and if the cutting plate is turned by human power or the like in a direction in which the cutting plate contacts in parallel with the abdomen, the same as described in the above embodiment. As described above, the force of the spring connecting the action point and the fixing point provided by the eye bolts respectively acts, and the cut-out portion abuts on the belly and is fixed by one-touch without any complicated procedure.

【0027】従来のスイング式切りばり工法では、切り
ばりの他端部を解放すれば、その切りばりの他端部は、
全く無制御であり、切りばりの旋回する範囲内で掘削溝
上の空間を自由に動くものであった。従って、ガス管等
の管埋設工事においてガス管を地上から掘削敷に降下す
る際、ガス管が、切りばりが横設されている水平位置を
上方から下方へ通過してしまう迄、その降下の妨げにな
らない様、旋回してきた切りばりを固定金具等を使用し
て、自由に戻らない様に固定する必要があった。
In the conventional swing-type cutting method, if the other end of the cutting is released, the other end of the cutting becomes
It was completely uncontrolled and could freely move in the space above the digging trench within the turning range of the cutting edge. Therefore, when lowering the gas pipe from the ground to the excavation bed in the laying work of the gas pipe etc., the lowering of the gas pipe until the gas pipe passes from above to below the horizontal position where the notch is laid horizontally. In order not to hinder, it was necessary to fix the turning fin using a fixing bracket or the like so as not to return freely.

【0028】この方法では、ガス管がクレーン又はチェ
ーンブロック等で吊り上げた水平状態で容易に掘削敷に
降下する空間を設ける為、旋回してきた切りばりを腹起
しと当接した状態で腹起しと固定する作業を要するが、
これは固定と解除の両方の作業を要する手間のかかる作
業であり、又、固定金具が掘削面に突出しているので、
作業の妨げになることもある。
In this method, the gas pipe is hung up by a crane or a chain block or the like to provide a space for easily descending on the excavation bed in a horizontal state. It requires a work to fix it,
This is a time-consuming operation that requires both fixing and releasing work, and since the fixing bracket protrudes from the digging surface,
It can hinder your work.

【0029】従って、本発明により、安価な費用で、作
業効率の向上と省力化並びに、作業員の安全が実現する
ことになる。
Therefore, according to the present invention, it is possible to improve work efficiency, save labor, and realize worker safety at low cost.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の設置平面図FIG. 1 is an installation plan view of the present invention.

【図2】ガス管の降下状態を示す正面図FIG. 2 is a front view showing a lowered state of a gas pipe.

【図3】従来工法の平面図、従来工法の断面図(A〜
A’間)
FIG. 3 is a plan view of the conventional method and a cross-sectional view of the conventional method (A to FIG. 3).
A ')

【符号の説明】[Explanation of symbols]

1…回転軸 2…アイボルト 3…スプリング 4…切りばり 5…腹起し 6…連結用ガイド 7…ブラケット 8…シリンダーパット 9…ピン孔 10…シリンダーパット底面 11…作業棒 12…ガス管 13…チェーンブロック 14…固定金具 15…伸縮用ネジ 16…矢板 17…作用点 18…固定点 DESCRIPTION OF SYMBOLS 1 ... Rotating shaft 2 ... Eyebolt 3 ... Spring 4 ... Cutting 5 ... Protrusion 6 ... Connection guide 7 ... Bracket 8 ... Cylinder pad 9 ... Pin hole 10 ... Cylinder pad bottom surface 11 ... Working rod 12 ... Gas pipe 13 ... Chain block 14 ... Fixing bracket 15 ... Expansion screw 16 ... Pile 17

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】一対の腹起しと切りばりで構成する土止め
支保工で、切りばりの一端部が直接又は間接に腹起しと
結合され、他端部が上下或は左右に旋回するスイング式
切りばりにおいて、切りばりの一端部側で、且つ切りば
りの軸芯線に対し、旋回する側にオフセットされている
回転軸と、切りばりの他端部側の任意の位置に設けられ
た作用点と、回転軸に対し、切りばりが旋回する方向と
逆方向の任意の位置で、且つ回転軸に対し、切りばりの
他端部側とは逆方向で、作用点からみて、回転軸の中心
より遠い任意の位置に設けられた固定点と、前記作用点
と固定点とをスプリングにより引っ張り合わされている
ことを特徴とするスイング式切りばりの固定装置。
1. An earth retaining support comprising a pair of prongs and a cut-out, wherein one end of the cut-out is directly or indirectly connected to the protuberance, and the other end pivots up and down or left and right. In a swing-type notch, a rotating shaft that is offset to a turning side at one end of the notch and with respect to an axis of the notch, and provided at an arbitrary position on the other end of the notch. The point of action and any position in the direction opposite to the direction in which the notch rotates with respect to the rotation axis, and the direction of rotation of the rotation axis in the direction opposite to the other end of the notch with respect to the rotation axis. A fixing point provided at an arbitrary position distant from the center of the above, and the action point and the fixing point are pulled together by a spring.
JP25668495A 1995-08-28 1995-08-28 Swing type fixing device Expired - Fee Related JP2811550B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP25668495A JP2811550B2 (en) 1995-08-28 1995-08-28 Swing type fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP25668495A JP2811550B2 (en) 1995-08-28 1995-08-28 Swing type fixing device

Publications (2)

Publication Number Publication Date
JPH0959986A JPH0959986A (en) 1997-03-04
JP2811550B2 true JP2811550B2 (en) 1998-10-15

Family

ID=17296040

Family Applications (1)

Application Number Title Priority Date Filing Date
JP25668495A Expired - Fee Related JP2811550B2 (en) 1995-08-28 1995-08-28 Swing type fixing device

Country Status (1)

Country Link
JP (1) JP2811550B2 (en)

Also Published As

Publication number Publication date
JPH0959986A (en) 1997-03-04

Similar Documents

Publication Publication Date Title
KR950005004B1 (en) Tool controlling mechanisms for excavator with telescopic arm
US7559161B2 (en) Soil working method and apparatus
CN104532842A (en) Sleeve rotating friction type breaking pile-extracting construction method
JP2811550B2 (en) Swing type fixing device
JP6068774B1 (en) Earth retaining prior construction method using adjustable erection
JPS6024753Y2 (en) Support for preventing gutter collapse
JP3218183B2 (en) Pile driver top sheave device
JPS6272815A (en) Lower restrainer for steel sheet pile penetrator
JP3018921B2 (en) Earth retaining method and earth retaining device
JPH09111763A (en) Device for pulling-out casing
JP5961441B2 (en) Steel sheet pile burial excavator and steel sheet pile burial method
JPH0989159A (en) Pipe line laying method, timbering method, and timbering assembling body
JP3011093U (en) Sheet pile connecting device
KR100619273B1 (en) Apparatus laying under the ground of water supply and drainage pipe
JPS63171902A (en) Coated plate
JP4994153B2 (en) Block construction method
JP2023064070A (en) Drain pipe driving construction method, and drain pipe
JP3003233U (en) Soil retaining device
JPH05156640A (en) Digging hole forming for constructing thin film wall
JP3314299B2 (en) Earth retaining device
JPH0310198Y2 (en)
JPH0346612B2 (en)
JPS6027157Y2 (en) Equipment for pulling out earth retaining structures, etc. in excavated trenches
JPS6219705Y2 (en)
JPS6363820A (en) Penetrator for shape steel by biaxial auger

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 10

Free format text: PAYMENT UNTIL: 20080807

LAPS Cancellation because of no payment of annual fees