JP2783773B2 - Recycling method of surplus soil - Google Patents

Recycling method of surplus soil

Info

Publication number
JP2783773B2
JP2783773B2 JP7248519A JP24851995A JP2783773B2 JP 2783773 B2 JP2783773 B2 JP 2783773B2 JP 7248519 A JP7248519 A JP 7248519A JP 24851995 A JP24851995 A JP 24851995A JP 2783773 B2 JP2783773 B2 JP 2783773B2
Authority
JP
Japan
Prior art keywords
concrete
soil
waste
concrete waste
earth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP7248519A
Other languages
Japanese (ja)
Other versions
JPH0966244A (en
Inventor
洋一 長谷川
節子 長谷川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP7248519A priority Critical patent/JP2783773B2/en
Publication of JPH0966244A publication Critical patent/JPH0966244A/en
Application granted granted Critical
Publication of JP2783773B2 publication Critical patent/JP2783773B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Processing Of Solid Wastes (AREA)
  • Disintegrating Or Milling (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、土木工事現場から
掘り出されたコンクリートガラや石を含む残土の全てを
再生できる残土のリサイクル方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for recycling remaining soil including concrete waste and stone excavated from a civil engineering work site.

【0002】[0002]

【従来の技術】一般に、市街地の土木工事現場では、図
7に示すように、パワーショベル1で基礎穴2を掘る
と、コンクリートガラや石を含む多量の残土5が掘り出
される。この掘り出された残土5の約半分は、掘った基
礎穴2に埋め戻されるが、残りは、トラック3で搬送し
て海や山の埋め立て地(最終処分地)に捨てられること
になる。
2. Description of the Related Art Generally, as shown in FIG. 7, when excavating a foundation hole 2 with a power shovel 1 at a civil engineering work site in an urban area, a large amount of residual soil 5 including concrete waste and stones is excavated. Approximately half of the excavated residual soil 5 is backfilled in the excavated foundation hole 2, but the rest is transported by the truck 3 and discarded in landfill sites (final disposal sites) in the sea or mountains.

【0003】上記残土には、土砂及び7立方cm以下の
コンクリートガラ等の他、7立方cm以上、例えば、1
5立方cm、30立方cm、50立方cm等のコンクリ
ートガラ等も含まれている。上記残土を埋め戻し土や宅
地・道路の盛り土として使用するときは、土砂のみでは
地盤の締まりが悪いことから、土砂に対して7立方cm
以下のコンクリートガラ等が20〜30%程度の割合で
混合されているのが好ましい。
[0003] The above-mentioned remaining soil includes earth and sand, concrete waste of 7 cubic centimeters or less, and 7 cubic centimeters or more, for example, 1 cubic centimeter or more.
Concrete cubes such as 5 cubic cm, 30 cubic cm, and 50 cubic cm are also included. When using the remaining soil as backfill soil or embankment of residential land and roads, since the soil is not tight enough with soil alone, it is 7 cubic centimeters to the soil.
It is preferable that the following concrete waste and the like are mixed at a ratio of about 20 to 30%.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、掘り出
されたままの残土には、土砂に7立方cm以下のコンク
リートガラ等がどの程度の割合で混合されているのかが
不明であるうえ、7立方cm以上のコンクリートガラ等
も含まれているから、そのままでは埋め戻し土や盛り土
として使用することができないので、土木工事現場にお
いて、パワーショベル等により、熟練者が残土を広げな
がら7立方cm以上のコンクリートガラ等を取り除いた
り、7立方cm以下のコンクリートガラ等の混合割合を
目視で確認するという作業が必要であった。
However, it is not known how much concrete garbage or the like of 7 cubic centimeters or less is mixed with earth and sand in the excavated residual soil. cm or more, it cannot be used as backfill soil or embankment as it is. It was necessary to remove concrete waste and the like and to visually check the mixing ratio of concrete waste and the like having a size of 7 cubic cm or less.

【0005】また、残土を埋め立て地に捨てるときは、
「廃棄物の処理及び清掃に関する法律」や所轄行政官庁
の条例等により、現状では15立方cm以上のコンクリ
ートガラ等を含む残土は「産業廃棄物」扱いとなるの
で、例えば大阪府では、府内には既に最終処分地が全く
無いことから、香川県や岡山県のような他県の最終処分
地に捨てるように義務づけられており、その費用はトラ
ック1台分(10トン)で約2万円も必要である。しか
も、他県の最終処分地も数年以内に無くなることは必定
である。
[0005] When the remaining soil is dumped in a landfill,
Under the current law, such as the Waste Disposal and Public Cleansing Law and the ordinances of the competent administrative agency, the remaining soil containing concrete garbage of 15 cubic centimeters or more is treated as "industrial waste." Because there is no final disposal site at all, it is obliged to dispose of it at final disposal sites in other prefectures such as Kagawa and Okayama prefectures, and the cost is about 20,000 yen for one truck (10 tons). Is also necessary. Moreover, it is indispensable that the final disposal site in other prefectures will disappear within a few years.

【0006】本発明は、上記問題を解決するためになさ
れたもので、コンクリートガラや石を含む残土の全てを
「産業廃棄物」扱いとならないように再生できる残土の
リサイクル方法を提供することを課題とするものであ
る。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems, and an object of the present invention is to provide a method of recycling the remaining soil, which can regenerate all the remaining soil including concrete waste and stone so as not to be treated as "industrial waste." It is an issue.

【0007】[0007]

【課題を解決するための手段】上記課題を解決するため
に、本発明は、土木工事現場から離れた仮置き場におい
て、掘り出されたコンクリートガラや石を含む残土を、
土砂及び7立方cm程度の塊寸法以下の再生用コンクリ
ートガラ等と、7立方cm程度の塊寸法以上の廃棄用コ
ンクリートガラ等とにふるい分けると共に、ふるい分け
た廃棄用コンクリートガラ等を粉砕して再びふるい分け
ながら、土砂に20〜30%程度の比率で再生用コンク
リートガラ等を混合して、掘り出された全ての残土を埋
め戻し土や盛り土に再生することを特徴とする残土のリ
サイクル方法を提供するものである。
Means for Solving the Problems To solve the above problems, the present invention provides a method for removing excavated concrete soil and stones in a temporary storage site away from a civil engineering work site.
While sieving into sediment and recycling concrete waste having a lump size of about 7 cubic centimeters or less and concrete waste for disposal having a lump size of about 7 cubic centimeters or more, the sieved waste concrete galley etc. is crushed and re-crushed. Providing a method of recycling residual soil, characterized by mixing reclaimed concrete gala etc. with earth and sand at a ratio of about 20 to 30% while sieving and reclaiming all excavated residual soil into backfill and embankment Is what you do.

【0008】本発明によれば、まず、土木工事現場から
離れた仮置き場までトラック等で搬送した残土を、土砂
及び例えば7立方cm程度の塊寸法以下の再生用コンク
リートガラ等と、7立方cm程度の塊寸法以上の廃棄用
コンクリートガラ等とにふるい分ける。これにより、残
土から廃棄用コンクリートガラ等がふるい分けにより自
然に取り除かれる。
According to the present invention, first, the remaining soil conveyed by a truck or the like to a temporary storage site distant from the civil engineering work site is mixed with soil and reclaimed concrete gala having a lump size of, for example, about 7 cubic cm or less, and 7 cubic cm. It is sieved with concrete waste for disposal with a lump size not less than about. As a result, the waste concrete waste and the like are naturally removed from the surplus soil by sieving.

【0009】ついで、ふるい分けた廃棄用コンクリート
ガラ等を、例えば7立方cm以下の塊寸法に粉砕して、
再びふるい分ける。以下、廃棄用コンクリートガラ等
は、完全にふるい分けされなくなるまで、つまり、全て
が再生用コンクリートガラ等になるまで粉砕とふるい分
けを繰り返す。上記ふるい分けを目視しながら、土砂に
所定の比率(例えば20〜30%)で再生用コンクリー
トガラ等が混合されたかどうかを確認する。
Then, the sieved waste concrete waste or the like is crushed to a lump size of, for example, 7 cubic centimeters or less,
Sift again. Hereinafter, the crushing and sieving are repeated until the waste concrete garbage and the like are not completely sieved, that is, until all of the waste concrete garbage and the like are recycled. While visually observing the sieving, it is confirmed whether or not the recycled concrete waste or the like is mixed in the earth and sand at a predetermined ratio (for example, 20 to 30%).

【0010】このようにして、掘り出された全ての残土
は、地盤の締まりが良い埋め戻し土や盛り土として再生
され、有効にリサイクルできるようになる。また、再生
された残土は、「産業廃棄物」扱いとはならないから、
特定の最終処分地に捨てる必要がなくなり、近郊の海、
池、沼や山等の埋め立て地に捨てることができる。さら
に、再生された残土は、「産業廃棄物」扱いでは無く、
埋め戻し土や盛り土として「商品」扱いになるから(関
係行政官庁に確認済み)、日本国内での余剰分は、コン
クリートガラ等が含まれない残土が掘り出される郊外等
での建設ラッシュが続いている近隣諸国に販売すること
も可能となり、日本国内で処分することのみを目的とし
た海や山等の無益な埋め立てによる自然破壊も防止でき
るようになる。
[0010] In this way, all the excavated soil is reclaimed as backfill soil or embankment with good ground compaction, and can be effectively recycled. Also, the reclaimed soil is not treated as "industrial waste".
There is no longer a need to dump at specific landfill sites,
Can be dumped in landfills such as ponds, swamps and mountains. Furthermore, the reclaimed soil is not treated as "industrial waste,"
Since it will be treated as "commodity" as backfill soil and embankment (confirmed by the relevant government agency), the surplus in Japan will continue to be rushed in suburban areas where excavated soil excluding concrete waste is excavated It can also be sold to neighboring countries, which will prevent the destruction of nature due to useless landfills such as the sea and mountains intended only for disposal in Japan.

【0011】[0011]

【0012】[0012]

【0013】[0013]

【0014】[0014]

【発明の実施の形態】以下、本発明の実施の形態を図面
を参照して詳細に説明する。図1は、第1実施形態の設
備であり、土木工事現場から掘り出されたコンクリート
ガラや石を含む残土5をトラック3で搬送し、土木工事
現場から離れた郊外の仮置き場6に搬入して、この仮置
き場6においてリサイクルする小規模な設備である。
Embodiments of the present invention will be described below in detail with reference to the drawings. FIG. 1 shows a facility according to the first embodiment, in which a soil 3 including concrete waste and stones excavated from a civil engineering work site is transported by a truck 3 and transported to a temporary storage site 6 in a suburb remote from the civil engineering work site. This is a small-scale facility to be recycled in the temporary storage 6.

【0015】トラック3で搬入した残土5は、ステップ
S1で、仮置き場6の第1置き位置6Aに仮置きする。
この仮置き場6には、バケットを、市販の網(格子)バ
ケット7Aにアタッチメントしたパワーショベル8と、
市販のクラッシャー(蟹状の爪…小割機又は小割圧砕機
とも呼ばれる。)9をアタッチメントしたパワーショベ
ル10とが備えられている。
The remaining soil 5 carried in by the truck 3 is temporarily stored in a first storage position 6A of a temporary storage 6 in step S1.
In this temporary storage space 6, a power shovel 8 having a bucket attached to a commercially available net (lattice) bucket 7A,
A power shovel 10 to which a commercially available crusher (crab-shaped claw: also referred to as a small splitter or a small crusher) 9 is provided.

【0016】上記網バケット7Aは、図4(A)に詳細
に示すように、バケット本体7aの底面に格子状のふる
い穴(例えば、7×10cm角)7b,…,7bを縦横
にあけたもので、この網バケット7Aをふるい分け機と
して利用する。上記クラッシャー9は、図4(B)に詳
細に示すように、一対の蟹状の爪9a,9bを油圧力で
開閉するもので、その破砕力は50〜250トンも有
り、このクラッシャー9を粉砕機として利用する。
As shown in detail in FIG. 4A, the mesh bucket 7A has lattice-shaped sieve holes (for example, 7 × 10 cm square) 7b,. This net bucket 7A is used as a sieving machine. As shown in detail in FIG. 4B, the crusher 9 opens and closes a pair of crab-shaped claws 9a and 9b by hydraulic pressure, and has a crushing force of 50 to 250 tons. Used as a crusher.

【0017】ステップS2(図6のフローチャートも参
照)で、仮置きされた残土5をパワーショベル8の網バ
ケット7Aですくい上げ、必要に応じて振動させると、
土砂及び所定の塊寸法(例えば0〜7立方cm)以下の
再生用コンクリートガラや石11がふるい穴7bを通過
し、第2置き位置6Bに落下して仮置きされると共に、
所定の塊寸法(例えば7立方cm)以上の廃棄用コンク
リートガラ等12が網バケット7A内に残って、残土5
が土砂及び再生用コンクリートガラ等11と、廃棄用コ
ンクリートガラ等12とに自然にふるい分けられる。
In step S2 (see also the flowchart in FIG. 6), the temporarily placed residual soil 5 is picked up by the net bucket 7A of the power shovel 8, and is vibrated if necessary.
Recycling concrete waste and stone 11 having a size of earth and sand and a predetermined lump size (for example, 0 to 7 cubic cm) or less pass through the sieve hole 7b, drop to the second placing position 6B and are temporarily placed,
Concrete waste 12 or the like having a predetermined lump size (for example, 7 cubic cm) or more remains in the net bucket 7A, and the remaining soil 5
Is naturally sieved into concrete and waste concrete and the like 11 and waste concrete and the like 12.

【0018】ステップS3で、パワーショベル8の網バ
ケット7A内に残った廃棄用コンクリートガラ等12を
第3置き位置6Cに仮置きし、仮置きされた廃棄用コン
クリートガラ等12をパワーショベル10のクラッシャ
ー9により、再生用コンクリートガラ等11の塊寸法と
なるように粉砕する。
In step S3, the concrete waste 12 and the like remaining in the net bucket 7A of the power shovel 8 are temporarily placed at the third placing position 6C, and the temporarily placed concrete waste 12 and the like are placed on the power shovel 10. The crusher 9 crushes the recycled concrete waste and the like 11 into a lump size.

【0019】そして、ステップS4で、粉砕された廃棄
用コンクリートガラ等12をパワーショベル8の網バケ
ット7Aですくい上げると、すくい上げた廃棄用コンク
リートガラ等12の内、再生用コンクリートガラ等11
の塊寸法に粉砕されたものがふるい穴7bを通過し、第
2置き位置6Bで、先に仮置きされた土砂及び再生用コ
ンクリートガラ等11の上に落下して仮置きされるよう
になる。
Then, in step S4, the crushed waste concrete garbage 12 and the like are scooped up by the net bucket 7A of the power shovel 8, and among the scraped up concrete garbage 12 and the like, the recycled concrete garbage 11 and the like are obtained.
The material crushed to the lump size passes through the sieve hole 7b, and falls on the temporarily placed earth and sand and the recycled concrete waste 11 at the second placing position 6B to be temporarily placed. .

【0020】以下、ステップS3とステップS4とを繰
り返して、廃棄用コンクリートガラ等12が網バケット
7Aで完全にふるい分けされなくなるまで、つまり、全
ての廃棄用コンクリートガラ等12が再生用コンクリー
トガラ等11になるまで、粉砕とふるい分けを繰り返
す。上記ふるい分けを目視しながら、ステップS5で、
土砂に所定の比率(例えば20〜30%)で再生用コン
クリートガラ等11が混合されたかどうかを確認する。
なお、パワーショベル8の網バケット7A内に残った廃
棄用コンクリートガラ等12は、少量であれば、網バケ
ット7A内にクラッシャー9を突っ込んで粉砕するよう
にしても良い。
Thereafter, steps S3 and S4 are repeated until the concrete waste 12 and the like are not completely sieved by the net bucket 7A, that is, all the concrete waste 12 and the like are recycled. Repeat crushing and sieving until While visually checking the sieving, in step S5,
It is confirmed whether or not the recycled concrete waste 11 or the like 11 is mixed with the earth and sand at a predetermined ratio (for example, 20 to 30%).
If the amount of the waste concrete waste 12 remaining in the net bucket 7A of the power shovel 8 is small, the crusher 9 may be inserted into the net bucket 7A to be pulverized.

【0021】ステップS6で、第2置き位置6Bの土砂
及び再生用コンクリートガラ等11は、残土5を搬入し
てきたトラック3、あるいは別のトラック3で搬送して
土木工事現場に搬入し、埋め戻し土や盛り土として使用
する。
In step S6, the earth and sand and the reclaimed concrete waste 11 at the second placing position 6B are transported by the truck 3 carrying the remaining soil 5 or another truck 3 to be transported to the civil engineering work site and backfilled. Used as soil and fill.

【0022】上記にようにして、全ての残土5は、地盤
の締まりが良い埋め戻し土や盛り土として再生されて、
有効にリサイクルできるようになる。第1実施形態の設
備では、既存の網バケット7Aのパワーショベル8やク
ラッシャー9のパワーショベル10等をそのまま使用で
きるから、設備コストがほとんどかからないので、コス
ト安であり、小規模な残土5のリサイクル設備として最
適である。
As described above, all of the remaining soil 5 is reclaimed as backfill soil or embankment with good ground compaction.
It can be recycled effectively. In the equipment of the first embodiment, the power shovel 8 of the existing net bucket 7A, the power shovel 10 of the crusher 9, and the like can be used as they are, so that the equipment cost is low, the cost is low, and the small-scale remaining soil 5 is recycled. Ideal as equipment.

【0023】図2(A)は、第2実施形態の設備であ
り、仮置き場6において、網バケット7Aのパワーショ
ベル8や第1,第3置き位置6A,6Cを不要にしたも
のである。
FIG. 2A shows the equipment of the second embodiment, in which the temporary yard 6 does not require the power shovel 8 of the net bucket 7A and the first and third storage positions 6A and 6C.

【0024】即ち、仮置き場6の第2置き位置6Bに深
溝6Dを掘設して、深溝6Dの途中にホッパー14を設
置し、このホッパー14の上部に、網バケット7Aの代
わりとなるふるい分け用網板7Bを置く。そして、トラ
ック3で搬入した残土5は、ステップS2で、ホッパー
14の上部に投入すると、土砂及び再生用コンクリート
ガラ等11がふるい分け用網板7Bのふるい穴7bを通
過し、ホッパー14の底部に落下して溜められる。
That is, a deep groove 6D is dug in the second storage position 6B of the temporary storage space 6, and a hopper 14 is installed in the middle of the deep groove 6D. The net plate 7B is placed. Then, when the remaining soil 5 carried in by the truck 3 is thrown into the upper part of the hopper 14 in step S2, the earth and sand and the concrete waste 11 for reproduction pass through the sieve hole 7b of the sieving mesh plate 7B, and reach the bottom of the hopper 14. It falls and is stored.

【0025】ステップS3で、ふるい分け用網板7Bの
上に残った廃棄用コンクリートガラ等12をパワーショ
ベル10のクラッシャー9により、再生用コンクリート
ガラ等11の塊寸法となるように粉砕する。この粉砕に
より、再生用コンクリートガラ等11の塊寸法に粉砕さ
れたものがふるい穴7bを通過し、ホッパー14内で、
先に溜められた土砂及び再生用コンクリートガラ等11
の上に落下して溜められるようになる。以下、クラッシ
ャー9により、全ての廃棄用コンクリートガラ等12が
再生用コンクリートガラ等11になるまで粉砕を続け
る。
In step S3, the waste concrete waste 12 remaining on the sieving mesh plate 7B is crushed by the crusher 9 of the power shovel 10 so as to have a lump size of the recycled concrete waste 11 or the like. Due to this pulverization, the material pulverized to the size of the reclaimed concrete glass 11 passes through the sieve hole 7b, and in the hopper 14,
Earth and sand accumulated earlier and concrete waste for recycling 11
It will fall on and be stored. Thereafter, the crusher 9 continues to pulverize the waste concrete waste 12 and the like 12 until the waste concrete waste 12 and the like become the recycled concrete waste 11 and the like.

【0026】上記ホッパー14に溜まった土砂及び再生
用コンクリートガラ等11は、ホッパー14の覗き窓等
から目視して、ステップS5で、所定の比率で混合され
たことを確認しながらホッパー14の切り出し口14a
から切り出して、ステップS6で、深溝6Dの底に停め
たトラック3に直接積み込むようにする。
The earth and sand accumulated in the hopper 14 and the concrete waste 11 for reproduction are visually observed through a viewing window of the hopper 14 and cut out of the hopper 14 while confirming that they are mixed at a predetermined ratio in step S5. Mouth 14a
And in step S6, are directly loaded on the truck 3 stopped at the bottom of the deep groove 6D.

【0027】第2実施形態の設備では、網バケット7A
のパワーショベル8が不要であり、残土5を網バケット
7Aですくい上げたり、廃棄用コンクリートガラ等12
を仮置きしたり、粉砕した廃棄用コンクリートガラ等1
2を再び網バケット7Aですくい上げる等の工程が不要
であると共に、第1,第3置き位置6A,6Cも不要で
あって、狭い仮置き場6に最適である。
In the equipment of the second embodiment, the net bucket 7A
The excavator 8 is unnecessary, and the residual soil 5 is scooped up by the net bucket 7A, and the concrete
Temporary or crushed concrete waste for disposal 1
This eliminates the need for steps such as scooping 2 again with the net bucket 7A, and also eliminates the need for the first and third storage positions 6A and 6C.

【0028】図2(B)は、第3実施形態の設備であ
り、第2実施形態の設備と比較して、深溝6Dの掘設を
不要にしたものである。即ち、仮置き場6の傾斜面(法
面)15を利用して、傾斜面15の途中にホッパー14
を設置し、このホッパー14の上部にふるい分け用網板
7Bを置く。そして、トラック3で搬入した残土5は、
ステップS2で、傾斜面15の上段15aから傾斜面1
5を利用してホッパー14の上部に投入すると、土砂及
び再生用コンクリートガラ等11がふるい分け用網板7
Bのふるい穴7bを通過し、ホッパー14の底部に落下
して溜められる。
FIG. 2B shows the equipment of the third embodiment, which does not require digging of the deep groove 6D as compared with the equipment of the second embodiment. That is, using the slope (slope) 15 of the temporary storage space 6, the hopper 14
And a screen 7B for sieving is placed on the upper part of the hopper 14. And the remaining soil 5 carried in by truck 3
In step S2, the upper surface 15a of the inclined surface 15
5 and put into the upper part of the hopper 14, the sediment and the recycled concrete waste 11 are sieved with the mesh screen 7.
After passing through the sieve hole 7b of B, it falls to the bottom of the hopper 14 and is stored.

【0029】ステップS3で、ふるい分け用網板7Bの
上に残った廃棄用コンクリートガラ等12を、傾斜面1
5の中段15bのパワーショベル10のクラッシャー9
により、再生用コンクリートガラ等11の塊寸法となる
ように粉砕する。この粉砕により、再生用コンクリート
ガラ等11の塊寸法に粉砕されたものがふるい穴7bを
通過し、ホッパー14内で、先に溜められた土砂及び再
生用コンクリートガラ等11の上に落下して溜められる
ようになる。以下、クラッシャー9により、全ての廃棄
用コンクリートガラ等12が再生用コンクリートガラ等
11になるまで粉砕を続ける。
In step S3, the discarded concrete waste 12 remaining on the sieving screen 7B is removed from the inclined surface 1
5 Crusher 9 of excavator 10 at middle stage 15b
Thus, the material is crushed so as to have a lump size of the concrete waste 11 for reproduction. As a result of this pulverization, the material pulverized to the size of the reclaimed concrete waste 11 or the like passes through the sieve hole 7b, and falls in the hopper 14 onto the previously accumulated soil and reclaimed concrete waste 11 or the like. You will be able to store it. Thereafter, the crusher 9 continues to pulverize the waste concrete waste 12 and the like 12 until the waste concrete waste 12 and the like become the recycled concrete waste 11 and the like.

【0030】上記ホッパー14に溜まった土砂及び再生
用コンクリートガラ等11は、ホッパー14の覗き窓等
から目視して、ステップS5で、所定の比率で混合され
たことを確認しながらホッパー14の切り出し口14a
から切り出して、ステップS6で、傾斜面15の下段1
5cに停めたトラック3に直接積み込むようにする。
The earth and sand accumulated in the hopper 14 and the concrete waste 11 for reproduction are visually observed through a viewing window or the like of the hopper 14 and cut out of the hopper 14 while confirming that they are mixed at a predetermined ratio in step S5. Mouth 14a
From the lower surface 1 of the inclined surface 15 in step S6.
The truck is directly loaded on the truck 3 stopped at 5c.

【0031】第3実施形態の設備では、傾斜面15を利
用することにより深溝6Dを掘設する作業が不要であ
り、設備コストがより安価になる。
In the facility according to the third embodiment, the use of the inclined surface 15 eliminates the need for digging the deep groove 6D, thereby reducing the facility cost.

【0032】図3は、第4実施形態の設備であり、第1
実施形態のように、残土5をトラック3で郊外等の仮置
き場6に搬出入する等しないで、パワーショベル1で基
礎穴2を掘った土木工事現場16においてリサイクルす
る小規模な設備である。
FIG. 3 shows the equipment according to the fourth embodiment.
As in the embodiment, a small-scale facility for recycling at a civil engineering work site 16 in which a foundation hole 2 has been dug by a power shovel 1 without carrying out the remaining soil 5 by a truck 3 to a temporary storage site 6 in a suburb or the like.

【0033】即ち、パワーショベル1で掘り出された残
土5は、第1実施形態と同様に、ステップS1で、土木
工事現場16の第1置き位置16Aに仮置きし、ステッ
プS2で、パワーショベル8の網バケット7Aで土砂及
び再生用コンクリートガラ等11と、廃棄用コンクリー
トガラ等12とにふるい分けて、土砂及び再生用コンク
リートガラ等12を第2置き位置16Bに仮置きし、ス
テップS3で、廃棄用コンクリートガラ等12を第3置
き位置16Cに仮置きし、パワーショベル10のクラッ
シャー9により再生用コンクリートガラ等11の塊寸法
となるように粉砕する。
That is, as in the first embodiment, the remaining soil 5 excavated by the power shovel 1 is temporarily placed in the first placing position 16A of the civil engineering work site 16 in step S1, and in step S2, the power shovel is 8, the sediment / recycling concrete waste 11 and the like 12 and the waste concrete waste 12 etc. are sieved in the net bucket 7A, and the earth and sand and the recycling concrete waste 12 are temporarily placed at the second placing position 16B. In step S3, The concrete waste 12 for disposal is temporarily placed at the third placing position 16C and crushed by the crusher 9 of the power shovel 10 so as to have a lump size of the concrete waste 11 for reproduction.

【0034】そして、ステップS4で、再びパワーショ
ベル8の網バケット7Aでふるい分けて、以下、ステッ
プS3とステップS4とを繰り返して、全ての廃棄用コ
ンクリートガラ等12が再生用コンクリートガラ等11
になるまで、粉砕とふるい分けを繰り返す。
Then, in step S4, sieving is again performed by the net bucket 7A of the power shovel 8, and thereafter, steps S3 and S4 are repeated, so that all the waste concrete garbage 12 and the like are recycled.
Repeat crushing and sieving until

【0035】ステップS6で、第2置き位置16Bの土
砂及び再生用コンクリートガラ等11の約半分は、埋め
戻し土としてパワーショベル1で基礎穴2に埋め戻す一
方、残りの土砂及び再生用コンクリートガラ等11は、
トラック3で搬送して別の土木工事現場に搬入し、埋め
戻し土や盛り土として使用する。あるいは、郊外等の仮
置き場に仮置きし、需要に応じて埋め戻し土や盛り土と
して使用する。
In step S6, about half of the earth and sand and the reclaimed concrete waste 11 at the second placing position 16B are buried in the foundation hole 2 by the power shovel 1 as backfill soil, while the remaining earth and sand and the reclaimed concrete waste are rebuilt. Etc. 11
It is transported by truck 3 and transported to another civil engineering work site, where it is used as backfill soil or embankment. Alternatively, they are temporarily placed in a temporary storage area such as a suburb and used as backfill soil or embankment according to demand.

【0036】図5は、第5実施形態の設備であり、土木
工事現場から掘り出された残土5をトラック3で搬送し
て、リサイクル専用の施設17に搬入し、この施設17
において大量にリサイクルする大規模な設備である。
FIG. 5 shows a facility according to a fifth embodiment. The remaining soil 5 excavated from a civil engineering work site is transported by a truck 3 and carried into a recycling facility 17.
This is a large-scale facility that recycles large quantities in

【0037】上記施設17には、傾斜式ふるい分け機1
8とロータリー式粉砕機19とが設置され、ふるい分け
機18は、ホッパー20と、このホッパー20の上部に
傾斜させて置かれたふるい分け用網板21とで構成され
ている。
The facility 17 has a tilting sieving machine 1
8 and a rotary crusher 19 are installed, and the sieving machine 18 is composed of a hopper 20 and a sieving mesh plate 21 which is placed on the hopper 20 at an angle.

【0038】トラック3で搬入された残土5は、ステッ
プS1で、第1コンベア22により搬送し、ステップS
2で、ホッパー20の上部に投入すると、土砂及び再生
用コンクリートガラ等11がふるい分け用網板21のふ
るい穴21bを通過し、ホッパー20の底部に落下して
溜められる。ふるい分け用網板21の上に残った廃棄用
コンクリートガラ等12は、ふるい分け用網板21の傾
斜で転動されて、粉砕機19に自然に投入される。
The residual soil 5 carried in by the truck 3 is conveyed by the first conveyor 22 in step S1, and
In step 2, when it is put into the upper part of the hopper 20, the earth and sand and the reclaimed concrete waste 11 pass through the sieve holes 21 b of the sieving mesh plate 21, and fall to the bottom of the hopper 20 to be accumulated. The discarded concrete waste 12 remaining on the sieving mesh plate 21 is rolled by the inclination of the sieving mesh plate 21 and naturally injected into the crusher 19.

【0039】ステップS3で、粉砕機19により廃棄用
コンクリートガラ等12が再生用コンクリートガラ等1
1の塊寸法となるように粉砕され、ステップS4で、粉
砕された廃棄用コンクリートガラ等12を第2コンベア
23によりホッパー20の上部に投入すると、再生用コ
ンクリートガラ等11の塊寸法に粉砕されたものがふる
い分け用網板21のふるい穴21bを通過し、ホッパー
20内で、先に溜められた土砂及び再生用コンクリート
ガラ等11の上に落下して溜められるようになる。以
下、ステップS3とステップS4とを繰り返して、粉砕
とふるい分けを繰り返す。
In step S3, the concrete waste 12 such as waste is recycled by the pulverizer 19 to the concrete waste 1 such as the recycled concrete waste.
When the crushed concrete waste 12 and the like are thrown into the upper part of the hopper 20 by the second conveyor 23 in Step S4, the crushed concrete waste 12 and the like are crushed to the lump size of the recycled concrete waste 11 and the like. The waste passes through the sieve holes 21b of the sieving mesh plate 21 and falls in the hopper 20 onto the previously accumulated earth and sand and the recycled concrete waste 11 to be accumulated. Hereinafter, steps S3 and S4 are repeated to repeat the pulverization and the sieving.

【0040】上記ホッパー20に溜まった土砂及び再生
用コンクリートガラ等11は、ホッパー20の覗き窓等
から目視して、ステップS5で、所定の比率で混合され
たことを確認しながらホッパー20の切り出し口20a
から切り出して、ステップS6で、第3コンベア24に
よりトラック3に直接積み込んだり、仮置き場に仮置き
する。
The earth and sand accumulated in the hopper 20 and the concrete waste 11 for recycling are cut out of the hopper 20 while visually confirming that they have been mixed at a predetermined ratio in step S5 through a viewing window or the like of the hopper 20. Mouth 20a
, And are directly loaded on the truck 3 by the third conveyor 24 or temporarily stored in a temporary storage space in step S6.

【0041】第5実施形態の設備では、多量の残土5の
リサイクル工程を全自動で効率的に行うことができる。
In the facility of the fifth embodiment, the recycling process of a large amount of the residual soil 5 can be performed fully automatically and efficiently.

【0042】[0042]

【発明の効果】以上の説明からも明らかなように、本発
明の残土のリサイクル方法は、土木工事現場から離れた
仮置き場までトラック等で搬送した残土中の廃棄用コン
クリートガラ等を所定の塊寸法以下に粉砕しながら、土
砂に所定の比率で再生用コンクリートガラ等を混合し
て、埋め戻し土や盛り土に再生するものであるから、掘
り出された全ての残土は、地盤の締まりが良い埋め戻し
土や盛り土として再生され、有効にリサイクルできるよ
うになる。
As is clear from the above description, the method for recycling surplus soil according to the present invention is a method for removing waste concrete waste and the like in the surplus soil transported by truck or the like to a temporary storage site distant from the civil engineering work site. While crushing to the dimensions or less, the concrete concrete for regeneration etc. is mixed with the earth and sand at a predetermined ratio and regenerated into backfill soil and embankment, so all excavated residual soil has good ground tightness It will be reclaimed as backfill or embankment, and can be recycled effectively.

【0043】[0043]

【0044】[0044]

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本発明の第1実施形態のリサイクル設備のシ
ステム図である。
FIG. 1 is a system diagram of a recycling facility according to a first embodiment of the present invention.

【図2】 (A)は第2実施形態のリサイクル設備のシ
ステム図、(B)は第3実施形態のリサイクル設備のシ
ステム図である。
FIG. 2A is a system diagram of a recycling facility according to a second embodiment, and FIG. 2B is a system diagram of a recycling facility according to a third embodiment.

【図3】 第4実施形態のリサイクル設備のシステム図
である。
FIG. 3 is a system diagram of a recycling facility according to a fourth embodiment.

【図4】 (A)は網バケットの斜視図、(B)はクラ
ッシャーの斜視図である。
4A is a perspective view of a net bucket, and FIG. 4B is a perspective view of a crusher.

【図5】 第5実施形態のリサイクル設備のシステム図
である。
FIG. 5 is a system diagram of a recycling facility according to a fifth embodiment.

【図6】 リサイクル工程のフローチャートである。FIG. 6 is a flowchart of a recycling process.

【図7】 土木工事現場で基礎穴を掘設するときの説明
図である。
FIG. 7 is an explanatory diagram when digging a foundation hole at a civil engineering work site.

【符号の説明】[Explanation of symbols]

5 残土 6 仮置き場 7A 網バケット 7B ふるい分け用網板 9 クラッシャー 11 再生用コンクリートガラ等 12 廃棄用コンクリートガラ等 18 傾斜式ふるい分け機 19 ロータリー式粉砕機 5 Remaining soil 6 Temporary storage area 7A Mesh bucket 7B Screening screen 9 Crusher 11 Recycled concrete waste 12 Concrete waste for disposal 18 Inclined sifter 19 Rotary crusher

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 土木工事現場から離れた仮置き場におい
て、掘り出されたコンクリートガラや石を含む残土を、
土砂及び7立方cm程度の塊寸法以下の再生用コンクリ
ートガラ等と、7立方cm程度の塊寸法以上の廃棄用コ
ンクリートガラ等とにふるい分けると共に、ふるい分け
た廃棄用コンクリートガラ等を粉砕して再びふるい分け
ながら、土砂に20〜30%程度の比率で再生用コンク
リートガラ等を混合して、掘り出された全ての残土を
め戻し土や盛り土に再生することを特徴とする残土のリ
サイクル方法
Claims: 1. In a temporary storage area away from the civil engineering work site
And excavated concrete soil and stones,
It is sieved into earth and sand and concrete garbage for reproduction with a lump size of about 7 cubic cm or less, and concrete garbage for disposal with a lump size of about 7 cubic cm or more. A reclaimed soil characterized by mixing reclaimed concrete gala or the like at a ratio of about 20 to 30% with earth and sand while sieving, and reclaiming all excavated reclaimed soil into reclaimed soil or embankment. Recycling method .
JP7248519A 1995-09-01 1995-09-01 Recycling method of surplus soil Expired - Fee Related JP2783773B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7248519A JP2783773B2 (en) 1995-09-01 1995-09-01 Recycling method of surplus soil

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7248519A JP2783773B2 (en) 1995-09-01 1995-09-01 Recycling method of surplus soil

Publications (2)

Publication Number Publication Date
JPH0966244A JPH0966244A (en) 1997-03-11
JP2783773B2 true JP2783773B2 (en) 1998-08-06

Family

ID=17179401

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7248519A Expired - Fee Related JP2783773B2 (en) 1995-09-01 1995-09-01 Recycling method of surplus soil

Country Status (1)

Country Link
JP (1) JP2783773B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU740949B2 (en) * 1998-03-18 2001-11-15 Hitachi Construction Machinery Co. Ltd. Automatically operated shovel and stone crushing system comprising the same
JP4247063B2 (en) * 2003-07-10 2009-04-02 積水ハウス株式会社 Housing land development method
JP2007014881A (en) * 2005-07-07 2007-01-25 Kajima Corp Recycling method of concrete mass
JP6589182B2 (en) * 2017-10-31 2019-10-16 タストン・エアポート株式会社 Waste disposal method
RU2703780C1 (en) * 2018-09-06 2019-10-22 Игорь Михайлович Рулев Method of recycling household and other biological wastes
CN111549846B (en) * 2020-04-30 2021-09-24 深圳市工勘岩土集团有限公司 Construction method for foundation pit earthwork transportation and crushing treatment

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60135360U (en) * 1984-02-16 1985-09-09 海野 治男 Waste soil processing vehicle

Also Published As

Publication number Publication date
JPH0966244A (en) 1997-03-11

Similar Documents

Publication Publication Date Title
JP2783773B2 (en) Recycling method of surplus soil
JP2003020625A (en) Method for reinforcing soil structure bank body
Breitenbach Rockfill placement and compaction guidelines
JP3610957B2 (en) Waste disposal site repair method
JPH09506547A (en) Landfill reuse
JP3045673B2 (en) Lightweight backfill, backfill method and lightweight embankment method
Lee et al. The Use of Scrap Rubber Tires for Building Embankment on Soft Soil Ground
JP3600934B2 (en) Renovation method for outdoor grounds
JP3419846B2 (en) Recycled clay method
JP2013031793A (en) Disposal method of sludge waste
Knuth et al. Rock Material Management at McMurdo Station, Antarctica
JPH10225700A (en) Recycle system of mixed and improved soil of dehydrated cake in construction sludge
JP3453706B2 (en) Managed waste disposal equipment and disposal law
JP2000039085A (en) Method for back-filling pipe
JPH01111759A (en) Treatment of broken concrete for reutilization
Shang et al. Study on comprehensive utilization and management of tunnel slag in Expressway
JP2008256078A (en) Manufacturing method for pipe protection material using excavated soil, production plant of pipe protection material for practicing the method and pipe protection material manufactured by the production plant
JP3769521B2 (en) Civil engineering groundwork, civil engineering methods using this civil engineering groundwork
JP4039509B2 (en) Excavation and restoration method for small shafts
CN117926653A (en) Method for half-filling and half-digging roadbed at poor geological interface of soft rock
Feng et al. The Impact of Temporary Projects on the Ecological Environment and Their Corresponding Protection Measures in the Construction of Highways in Northern Tibet
Townsend ESTIMATING THE ENVIRONMENTAL BENEFITS OF RECYCLING CONCRETE WASHOUT
Kuo et al. Environmental restoration by using waste tires: an example of the Nan-Liao landfill in Taiwan
Winter Report on a Technical Visit to the United States of America: May 2004
Dakes Compost Site Design for a Closed Sanitary Landfill

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080522

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090522

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090522

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100522

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110522

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130522

Year of fee payment: 15

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130522

Year of fee payment: 15

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140522

Year of fee payment: 16

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees