JP2773768B2 - Ring network method - Google Patents

Ring network method

Info

Publication number
JP2773768B2
JP2773768B2 JP7285595A JP28559595A JP2773768B2 JP 2773768 B2 JP2773768 B2 JP 2773768B2 JP 7285595 A JP7285595 A JP 7285595A JP 28559595 A JP28559595 A JP 28559595A JP 2773768 B2 JP2773768 B2 JP 2773768B2
Authority
JP
Japan
Prior art keywords
signal
construction
transmission line
transmission
node
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP7285595A
Other languages
Japanese (ja)
Other versions
JPH09130417A (en
Inventor
英二 飯塚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEC Corp
Original Assignee
NEC Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NEC Corp filed Critical NEC Corp
Priority to JP7285595A priority Critical patent/JP2773768B2/en
Publication of JPH09130417A publication Critical patent/JPH09130417A/en
Application granted granted Critical
Publication of JP2773768B2 publication Critical patent/JP2773768B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Small-Scale Networks (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、伝送路に冗長を持
たせてリング状に複数のノード装置を接続し、伝送路お
よびノード装置のいずれかが障害の場合、AIS(Alar
m indication signal )信号の発生により障害箇所を自
動的に避けて通信を復旧させるリングネットワーク方式
に関し、特に、伝送路工事の際、伝送路の閉塞処理を簡
素化し、工事中の伝送路警報の発出を禁止できるリング
ネットワーク方式に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of connecting a plurality of node devices in a ring shape with redundancy in a transmission line, and when one of the transmission line and the node device fails, an AIS (Alar
m indication signal) Regarding a ring network system that automatically avoids a failure point and restores communication by the generation of a signal, particularly, when constructing a transmission line, simplifies the process of closing the transmission line and issues a transmission line alarm during construction. The present invention relates to a ring network system that can prohibit the communication.

【0002】[0002]

【従来の技術】従来、この種のリングネットワーク方式
では、図5に示されるように、リング状に接続されたノ
ード装置(以後ノード)91〜94それぞれが監視制御
装置90に接続され監視制御されている。リング状の伝
送路は、ノード91、92、〜94の方向にW(West)
系、また、ノード94、93、〜91の方向にE(Eas
t)系の両方向の経路を有し、伝送路またはノードの障
害時に、障害箇所を自動的に避けて通信ができる。
2. Description of the Related Art Conventionally, in this type of ring network system, as shown in FIG. 5, each of node devices (hereinafter referred to as nodes) 91 to 94 connected in a ring shape is connected to a monitoring control device 90 to be monitored and controlled. ing. The ring-shaped transmission path is W (West) in the direction of nodes 91, 92, to 94.
System, and E (Eas
t) It has a path in both directions of the system, so that when a transmission line or a node fails, communication can be performed automatically by avoiding the failure location.

【0003】図5に示される例では、ノード91がW系
およびE系両者の伝送路にノード94宛てのデータ信号
を送出しており、ノード93は、W系の障害を検出した
ので、W系で後位のノード94にAIS信号を送出して
いる。ノード94は、W系の上位ノード93からAIS
信号を受けた際にW系を介してデータ信号を受けていた
場合、障害箇所を含むW系を避け、E系の伝送路を自動
的に選択して切り替え接続し、E系を介してデータ信号
を正常に受けることができる。
In the example shown in FIG. 5, a node 91 sends a data signal addressed to a node 94 to both the W-system and E-system transmission lines, and the node 93 detects a W-system failure. The system sends an AIS signal to the subsequent node 94. The node 94 receives the AIS from the upper node 93 of the W system.
If a data signal is received via the W system when the signal is received, the W system including the fault location is avoided, the E system transmission line is automatically selected and switched, and the data is transmitted via the E system. The signal can be received normally.

【0004】他方、例えば、W系の伝送路工事の際に
は、監視制御装置90から各ノード91〜94に対して
E系の伝送路の選択を指示する制御を行なっている。
On the other hand, for example, during the construction of a W-system transmission line, control is performed by the monitoring and control device 90 to instruct each of the nodes 91 to 94 to select an E-system transmission line.

【0005】[0005]

【発明が解決しようとする課題】上述した従来のリング
ネットワーク方式は、ノード装置および伝送路のいずれ
か一方に工事がある場合、監視制御装置による遠隔によ
り、使用する伝送路の選択を指示しているが、先行保守
区間の障害に対して下位保守区間での警報送出を防止し
かつ、障害発生区間の識別を容易にするAIS信号の制
御はしていない。この結果、選択の指示に誤りが発生す
る機会が多いと共に、工事箇所に直接接するノード装置
での工事障害の発生による警報の発出を阻止することが
完全にはできないという問題点がある。
In the conventional ring network system described above, when construction is performed on one of the node device and the transmission line, the supervisory control device remotely instructs the selection of the transmission line to be used. However, it does not control the AIS signal to prevent the alarm from being transmitted in the lower maintenance section for the failure in the preceding maintenance section and to facilitate the identification of the failure section. As a result, there is a problem that there are many chances that an error occurs in the selection instruction, and it is not possible to completely prevent the issuance of an alarm due to the occurrence of a construction failure in the node device directly in contact with the construction location.

【0006】本発明の課題は、伝送路工事の際、伝送路
の閉塞処理を簡素化して誤指示を減少させ、更に、工事
中の伝送路警報の発出を禁止できるリングネットワーク
方式を提供することである。
SUMMARY OF THE INVENTION It is an object of the present invention to provide a ring network system capable of simplifying a process of closing a transmission line at the time of construction of the transmission line, reducing erroneous instructions, and prohibiting transmission line alarms during the construction. It is.

【0007】[0007]

【課題を解決するための手段】本発明によるリングネッ
トワーク方式は、伝送路に冗長を持たせてリング状に複
数のノード装置を接続し、伝送路およびノード装置のい
ずれかが障害の場合、AIS信号の発生により障害箇所
を自動的に避けて通信を復旧させるリングネットワーク
方式において、伝送路信号のオーバヘッドに挿入される
信号として、伝送路の使用可能を示す正常信号と伝送路
が工事のため使用不能であることを示す工事信号とを設
け、前記ノード装置は、伝送路工事、少なくとも伝送路
を撤去する工事の際にはこの工事のため使用不能になる
伝送路を介して対向するノード装置に前記工事信号を送
出する一方、正常な伝送路から前記工事信号を受けた際
にはこの伝送路から前記正常信号を受けるまでこの工事
信号をこの伝送路に対して保持して該当伝送路を予め閉
塞し、他方、使用可能になった伝送路には前記正常信号
を送出する一方、前記工事信号を保持して閉塞中の伝送
路から前記正常信号を受けた際にはこの工事信号を消去
してこの伝送路を正常とする手段を備えている。このよ
うに工事伝送路に工事信号を用いることにより、伝送路
工事の際に、監視制御装置のような外部装置から各ノー
ド装置に対して別の伝送路の選択を遠隔指示する制御を
行なう必要がなく、かつ工事伝送路に対して予め閉塞す
る処理および閉塞を解除する処理をこの工事伝送路に限
定して行うことができるので、これらの処理は簡素化さ
れかつ確実に実行される。
According to the ring network system of the present invention, a plurality of node devices are connected in a ring shape with redundancy in a transmission line. In a ring network system that automatically avoids faults and restores communication when a signal is generated, a normal signal indicating the availability of the transmission line and the transmission line are used for construction as signals inserted into the overhead of the transmission line signal. And a construction signal indicating that the transmission is impossible, the node device is connected to a node device that is opposed via a transmission line that is unusable due to this construction at the time of transmission line construction, at least construction for removing the transmission line. While the construction signal is transmitted, when the construction signal is received from a normal transmission path, the construction signal is transmitted to the transmission path until the normal signal is received from the transmission path. The transmission line is held and the corresponding transmission line is closed beforehand. On the other hand, the normal signal is transmitted to the transmission line that has become available, while the construction signal is held and the normal signal is received from the blocked transmission line. In this case, there is provided a means for erasing the construction signal and making the transmission path normal. In this way, by using the construction signal for the construction transmission line, it is necessary to perform control for remotely instructing each node device to select another transmission path from an external device such as a monitoring control device at the time of the transmission line construction. In addition, since the process for closing the construction transmission line and the process for releasing the blockage can be performed only for this construction transmission line, these processes are simplified and surely executed.

【0008】更に、前記ノード装置は、工事信号を受け
て受けた伝送路にこの工事信号を保持する際には該当す
る下流の伝送路へAIS信号を送出する一方、正常信号
を受けて受けた伝送路に保持中の工事信号を消去させる
際には前記AIS信号の送出を停止する手段を備え、ま
た、工事信号を受け、受けた伝送路にこの工事信号を保
持する際にはこの伝送路に対する伝送路警報の発出禁止
を行なう一方、正常信号を受け、受けた伝送路に保持中
の工事信号を消去させる際には伝送路警報の発出禁止を
解除する手段を備えている。この構成により、工事信号
を受けたノード装置が行う伝送路の切替えまたは伝送路
警報の発出禁止を、外部の監視制御装置からの指示では
なく、工事信号を受けたノード装置が工事信号を受けた
伝送路に対応して、AIS信号により自動的に伝送路の
切替えを行い、または伝送路対応の伝送路警報の発出禁
止を行うので、誤指示または工事中伝送路の警報発出を
回避できる。
Further, when the node device holds the construction signal on the transmission line which has received the construction signal, it transmits the AIS signal to the corresponding downstream transmission line while receiving the normal signal and receiving the normal signal. Means for stopping the transmission of the AIS signal when the construction signal held in the transmission path is deleted, and for receiving the construction signal and retaining the construction signal in the received transmission path, Means for canceling the transmission line alarm issuance when receiving a normal signal and deleting the construction signal held in the received transmission line. With this configuration, the switching of the transmission path or the prohibition of the transmission path alarm performed by the node device that has received the construction signal is not an instruction from an external monitoring and control device, but the node device that has received the construction signal has received the construction signal. In accordance with the transmission path, the transmission path is automatically switched by the AIS signal, or the transmission path warning corresponding to the transmission path is prohibited, so that an erroneous instruction or a warning of the transmission path during construction can be avoided.

【0009】[0009]

【発明の実施の形態】次に、本発明の実施の形態につい
て図面を参照して説明する。
Next, embodiments of the present invention will be described with reference to the drawings.

【0010】図1は本発明の実施の一形態およびオーバ
ヘッドにおける信号転送を示すノード装置0の主要機能
ブロック図であり、図2は図1に示されたノード装置
(以後ノード)0の4つ、ノード01〜04、をリング
状に接続した実例を示すリングネットワーク構成図であ
る。図2に示されたリングネットワーク方式では、リン
グ状の伝送路は、ノード01、02、〜04の方向にW
(West)系、また、ノード04、03、〜01の方向に
E(East)系の両方向の経路を有しているものとする。
FIG. 1 is a main functional block diagram of a node device 0 showing signal transfer in an embodiment of the present invention and overhead, and FIG. 2 is a diagram showing four node devices (hereinafter referred to as nodes) 0 shown in FIG. FIG. 1 is a ring network configuration diagram illustrating an example in which nodes 01 to 04 are connected in a ring. In the ring network system shown in FIG. 2, the ring-shaped transmission path is W in the direction of nodes 01, 02, to 04.
It is assumed that a path in both directions of the (West) system and the E (East) system is provided in the direction of the nodes 04, 03, and 01.

【0011】本発明が従来と相違する点は、伝送路信号
のオーバーヘッドに挿入される正常(NOR)信号と工
事(INS)信号とのビット符号を設けていることであ
る。正常信号は、接続されている伝送路に伝送路信号の
オーバヘッドの所定時期および定期的に送出されるもの
とし、他方、工事信号は、工事等により伝送路の使用を
禁止する際、該当伝送路へ工事者または保守者のスイッ
チ等により送出され、工事信号送出中、正常信号の送出
は停止されるものとする。
The present invention differs from the prior art in that bit codes of a normal (NOR) signal and a construction (INS) signal inserted into the overhead of a transmission line signal are provided. The normal signal shall be transmitted to the connected transmission line at a predetermined time of transmission line signal overhead and periodically, and the construction signal shall be transmitted when the use of the transmission line is prohibited due to construction or the like. The transmission of the normal signal is stopped during the transmission of the construction signal.

【0012】まず、図1に示されるように、ノード装置
0は、受信部1、送信部2、障害検出部3、工事設定部
4、および制御部5を備えているものとする。受信部1
は、信号を入力する伝送路を接続し、伝送信号中のオー
バーヘッドから、AIS信号の入力を検出するAIS信
号受信部11、工事信号の入力を検出する工事信号受信
部12、および正常信号の入力を検出する正常信号受信
部13を有している。AIS信号受信部11および工事
信号受信部12は、信号を検出した際、この信号が入力
した伝送路の障害検出をせず、伝送路警報の発出を禁止
する。更に、工事信号受信部12は、検出した工事信号
を、正常信号受信部13が正常信号を検出するまで保持
し続ける。
First, as shown in FIG. 1, it is assumed that the node device 0 includes a receiving unit 1, a transmitting unit 2, a failure detecting unit 3, a construction setting unit 4, and a control unit 5. Receiver 1
Is connected to a transmission line for inputting a signal, an AIS signal receiving section 11 for detecting an input of an AIS signal, an installation signal receiving section 12 for detecting an input of an installation signal, and an input of a normal signal from an overhead in the transmission signal. Is provided. When the AIS signal receiving unit 11 and the construction signal receiving unit 12 detect the signal, the AIS signal receiving unit 11 and the construction signal receiving unit 12 do not detect the failure of the transmission line to which the signal is input, and prohibit the transmission of the transmission line alarm. Further, the construction signal receiving unit 12 continues to hold the detected construction signal until the normal signal receiving unit 13 detects the normal signal.

【0013】また、送信部2は、信号を出力する伝送路
を接続し、AIS信号を送出するAIS信号送信部2
1、工事(INS)信号を送出する工事信号送信部2
2、および正常(NOR)信号を送出する正常信号送信
部23を有しているものとする。AIS信号送信部21
は、障害検出部3で検出した障害(ALM)情報、AI
S信号受信部11で検出したAIS信号、および工事信
号受信部12で検出した工事(INS)信号に基づいて
AIS信号を伝送路に送出する。工事信号送信部22お
よび正常信号送信部23は工事設定部4の制御を受け、
通常、正常信号送信部23からNOR信号が送出され、
工事の際、工事設定部4により設定された工事情報に基
づいて該当する伝送路で、NOR信号の送出が停止され
る一方、工事信号送信部22からINS信号が送出され
る。
The transmitting unit 2 is connected to a transmission line for outputting a signal, and transmits an AIS signal.
1. Construction signal transmission unit 2 for transmitting construction (INS) signal
2, and a normal signal transmitting unit 23 for transmitting a normal (NOR) signal. AIS signal transmission unit 21
Is the fault (ALM) information detected by the fault detection unit 3, AI
The AIS signal is transmitted to the transmission path based on the AIS signal detected by the S signal receiving unit 11 and the construction (INS) signal detected by the construction signal receiving unit 12. The construction signal transmission unit 22 and the normal signal transmission unit 23 are controlled by the construction setting unit 4,
Normally, a NOR signal is transmitted from the normal signal transmission unit 23,
At the time of the construction, transmission of the NOR signal is stopped on the corresponding transmission path based on the construction information set by the construction setting unit 4, and an INS signal is transmitted from the construction signal transmission unit 22.

【0014】障害検出部3は、主として受信部1の入力
信号の受信状態を監視し、障害検出の際には障害(AL
M)情報をAIS信号送信部21に送出する。工事設定
部4は、工事者により工事中を指定された伝送路を送信
部2に通知するものとし、該当伝送路に工事信号送信部
22から工事(INS)信号を送出させる一方、正常信
号送信部23の正常(NOR)信号送出を停止させてい
る。制御部5はノード装置0の機能動作全般を制御す
る。
The failure detecting section 3 mainly monitors the reception state of the input signal of the receiving section 1 and detects a failure (AL
M) Information is sent to the AIS signal transmission unit 21. The construction setting unit 4 notifies the transmission unit 2 of the transmission path designated to be under construction by the construction worker, and causes the construction signal transmission unit 22 to transmit a construction (INS) signal to the transmission path, while transmitting a normal signal. The normal (NOR) signal transmission of the unit 23 is stopped. The control unit 5 controls the entire functional operation of the node device 0.

【0015】また、各ノードでは、信号の送出はW系お
よびE系の両者である一方、信号の受入れはW系および
E系のいずれか一方を選択して使用し、他方を予備とし
ている。ノード01、04間の通信における図2に示さ
れる例では、、ノード01およびノード04は、W系お
よびE系の両者に信号を送出する一方、信号入力ではノ
ード01でE系が選択され、ノード04でW系が選択さ
れている。また、ノード02は、ノード01からの伝送
路をノード03への伝送路にW系として接続する一方、
ノード03からの伝送路をノード01への伝送路にE系
として接続している。ノード03も同様に伝送路を接続
することにより、ノード01からノード04への通信は
ノード02、03を介したW系を使用する一方、ノード
04からノード01への通信は直接接続されるE系を使
用している。
In each node, signals are transmitted by both the W system and the E system, while signals are received by selecting and using one of the W system and the E system, and the other is reserved. In the example shown in FIG. 2 in the communication between the nodes 01 and 04, the node 01 and the node 04 send signals to both the W system and the E system, while the signal input selects the E system at the node 01. The W system is selected at the node 04. The node 02 connects the transmission path from the node 01 to the transmission path to the node 03 as a W system.
The transmission path from the node 03 is connected to the transmission path to the node 01 as an E system. Similarly, the node 03 connects the transmission path so that the communication from the node 01 to the node 04 uses the W system via the nodes 02 and 03, while the communication from the node 04 to the node 01 is directly connected to the node E. Using the system.

【0016】また、通信中で信号入力しているノード0
1およびノード04は、選択中の系において、障害検出
部3でALM情報発生、または、AIS信号受信部11
もしくは工事信号受信部12の信号受信の際、伝送路を
予備系に切替え選択する。
The node 0 to which a signal is input during communication
1 and the node 04, in the system being selected, the ALM information generation by the fault detection unit 3 or the AIS signal reception unit 11
Alternatively, when the construction signal receiving unit 12 receives a signal, the transmission path is switched to the standby system and selected.

【0017】次に、図1、2に図3を併せ参照して、図
2におけるノード02、03間のW系の伝送路を撤去す
る伝送路工事の際の手順について説明する。図3は伝送
路工事の際の信号伝送状態と伝送路切替え状態とを図2
からの変化で示したノード接続状態図である。ここで、
伝送路工事の際には、工事者が工事する伝送路を工事設
定部4で指定して“工事中”を設定するものとする。
Next, with reference to FIGS. 1 and 2 and FIG. 3, a description will be given of a procedure at the time of transmission line construction for removing the W-system transmission line between the nodes 02 and 03 in FIG. FIG. 3 shows a signal transmission state and a transmission line switching state during transmission line construction.
FIG. 10 is a node connection state diagram shown by a change from FIG. here,
At the time of the construction of the transmission path, the construction setting section 4 designates the transmission path to be constructed by the worker and sets “under construction”.

【0018】ノード02、03間のW系の伝送路を撤去
する伝送路工事の際には、図3(A)に示されるよう
に、伝送路の送信側におけるノード02において、工事
者によりW系伝送路を指定して“工事中”が設定された
際、該当するW系伝送路の伝送路信号中のオーバヘッド
にINS信号が送出される。このINS信号を受けたノ
ード03は、INS信号を保持するすると共に入力した
伝送路の障害検出をせず、伝送路警報の発出を禁止する
一方、後位のノード04に対してAIS信号を送出す
る。通信中のノード04は、通信中のW系伝送路からA
IS信号を受けた際、予備としていたE系に切替えて伝
送路を選択する。この結果、W系の伝送路は解放され使
用されない。
At the time of transmission line construction for removing the W-system transmission line between the nodes 02 and 03, as shown in FIG. When “under construction” is set by designating the system transmission line, the INS signal is transmitted to the overhead in the transmission line signal of the corresponding W system transmission line. The node 03 receiving the INS signal holds the INS signal, does not detect a failure in the input transmission line, prohibits the transmission of a transmission line alarm, and sends an AIS signal to the subsequent node 04. I do. The communicating node 04 receives A from the communicating W transmission line.
Upon receiving the IS signal, the system switches to the E-system which has been set as a spare and selects a transmission path. As a result, the W-system transmission path is released and not used.

【0019】次いで、図3(B)に示されるように、工
事者は、ノード02におけるW系伝送路を、ノード01
側およびノード03側で撤去する。この場合、ノード0
1の送信部2ではNOR信号が送出されたままでよい。
Next, as shown in FIG. 3 (B), the construction worker connects the W-system transmission line in node 02 to node 01.
Side and the node 03 side. In this case, node 0
The transmitting unit 2 of 1 may keep the NOR signal transmitted.

【0020】次いで、図3(C)に示されるように、W
系伝送路がノード02を経由せずノード01からノード
03に直接接続された場合、ノード01のNOR信号を
ノード03が受けるので、ノード03はINS信号の保
持を解放して消去すると共に伝送路警報発出禁止を解除
する一方、AIS信号の送出を停止する。
Next, as shown in FIG.
If the system transmission path is directly connected from node 01 to node 03 without passing through node 02, node 03 receives the NOR signal of node 01, so that node 03 releases the holding of the INS signal to erase it, and While the prohibition of alarm issuance is released, transmission of the AIS signal is stopped.

【0021】次に、図1に図4を併せ参照してこれら信
号に基づくノード装置の動作手順について説明する。
Next, an operation procedure of the node device based on these signals will be described with reference to FIG. 1 and FIG.

【0022】まず、ノード装置0では、受信部1の障害
検出部3で伝送路に関する障害検出がなく(手順S1の
“NO”)、かつ、伝送路信号中のオーバヘッドから、
AIS信号受信部11によるAIS信号の検出がなく
(手順S2の“NO”)、更に正常信号受信部13によ
る正常信号の検出がない(手順S3の“NO”)状態
で、正常信号の代りに工事信号が入力して工事信号受信
部12により検出された(手順S4の“YES”)場
合、工事信号受信部12は、工事信号を保持する(手順
S5)と共に、伝送路警報の発出を禁止し(手順S
6)、送信部2のAIS信号送信部21に通知してAI
S信号を送出させる(手順S7)。
First, in the node device 0, the failure detection unit 3 of the reception unit 1 does not detect a failure in the transmission line ("NO" in step S1), and the overhead in the transmission line signal indicates
When the AIS signal is not detected by the AIS signal receiving unit 11 ("NO" in step S2), and the normal signal is not detected by the normal signal receiving unit 13 ("NO" in step S3), instead of the normal signal. When the construction signal is input and detected by the construction signal receiving unit 12 ("YES" in step S4), the construction signal receiving unit 12 holds the construction signal (procedure S5) and prohibits the transmission path alarm from being issued. (Step S
6) Notify the AIS signal transmitting unit 21 of the transmitting unit 2
An S signal is transmitted (step S7).

【0023】手順S1が“YES”で、障害検出部3が
障害を検出した際、AIS信号を送出させる手順S7に
進む。また、手順S2が“YES”で、AIS信号受信
部11がAIS信号を検出した際、伝送路警報の発出を
禁止する手順S6に進む。
When the procedure S1 is "YES" and the fault detecting section 3 detects a fault, the procedure proceeds to a procedure S7 for transmitting an AIS signal. When the procedure S2 is "YES" and the AIS signal receiving section 11 detects the AIS signal, the procedure goes to the procedure S6 for prohibiting the issuance of the transmission path alarm.

【0024】また、手順S3が“YES”で、正常信号
受信部13が正常信号を検出した際、工事信号受信部1
2により工事信号が保持されている場合(手順S11の
“YES”)、保持された工事信号は保持を解除されて
消去される(手順S12)と共に伝送路警報発出の禁止
を解除し(手順S13)、他方、送信部2のAIS信号
送信部21に指示してAIS信号の送出を停止する(手
順S14)。
When the normal signal receiving unit 13 detects a normal signal when the procedure S3 is "YES", the construction signal receiving unit 1
If the construction signal is held by step 2 ("YES" in step S11), the held construction signal is released and deleted (step S12) and the prohibition of transmission line alarm issuance is released (step S13). ) On the other hand, the AIS signal transmission unit 21 of the transmission unit 2 is instructed to stop transmitting the AIS signal (step S14).

【0025】障害および上記の信号が検出されない場合
には、正常信号の伝送があるので、手順S3が“YE
S”の正常信号の検出から手順S11に進み、手順は繰
返される。
If the fault and the above-mentioned signal are not detected, the normal signal is transmitted, so that the procedure S3 is carried out by "YE
The process proceeds from the detection of the normal signal of S ″ to the step S11, and the procedure is repeated.

【0026】上記説明では、工事信号受信部で工事信号
の保持および伝送路警報の発出禁止をするとしたが、別
の機能ブロックに分離または併合してもよく、また、ノ
ード装置の工事設定部で工事中を設定するとしたが、遠
隔地の監視制御装置から遠隔制御による設定でもよい。
動作手順も、手順の前後入れ替え、平行動作等、上記機
能を満たすものであればよく、上記説明が本発明を限定
するものではない。
In the above description, the construction signal receiving unit inhibits the holding of the construction signal and the issuance of the transmission path alarm. However, the construction signal receiving unit may be separated or merged into another functional block. Although the setting is made during construction, it may be set by remote control from a monitoring and control device at a remote location.
The operation procedure may be any procedure that satisfies the above functions, such as switching the order of the procedures, parallel operation, etc., and the above description does not limit the present invention.

【0027】[0027]

【発明の効果】以上説明したように本発明によれば、伝
送路信号のオーバヘッドに挿入される信号として、伝送
路の使用可能を示す正常信号および工事中を示す工事信
号を設け、前記ノード装置は、前記工事信号を受けた際
には該工事信号を保持する一方、前記正常信号を受けた
際には前記工事信号を消去する手段を備えているリング
ネットワーク方式が得られる。この構成によって、対象
となる伝送路に限定して工事信号を送出する“工事中”
を設定すれば、解除が自動的にできるので、伝送路工事
の際、伝送路の閉塞処理を簡素化して誤指示を減少させ
ることができる。
As described above, according to the present invention, as the signal inserted into the overhead of the transmission line signal, a normal signal indicating that the transmission line can be used and a construction signal indicating that construction is underway are provided. The ring network system includes means for holding the construction signal when receiving the construction signal and for deleting the construction signal when receiving the normal signal. With this configuration, “under construction” that sends a construction signal only to the target transmission line
Is set, the release can be automatically performed. Therefore, in the construction of the transmission line, the process of closing the transmission line can be simplified and the number of erroneous instructions can be reduced.

【0028】また、前記ノード装置は、工事信号を受け
て該工事信号を保持する際、該当する伝送路へAIS信
号を送出する一方、正常信号を受けて、該工事信号を消
滅させると共にAIS信号の送出を停止する手段を備え
ているので、従来の機能を損なうことがない。
When the node device receives the construction signal and holds the construction signal, the node device transmits the AIS signal to the corresponding transmission line, receives the normal signal, deletes the construction signal, and transmits the AIS signal. Since the means for stopping the transmission is provided, the conventional function is not impaired.

【0029】更に、前記ノード装置は、工事信号を受け
て該工事信号を保持する際、伝送路警報の発出禁止を行
なう一方、正常信号を受けて、該工事信号を消滅させる
と共に、伝送路警報の発出禁止を解除する手段を備えて
いるので、工事中の伝送路警報の発出を禁止して、必要
以上の作業を回避することができる。
Further, when the node device receives the construction signal and holds the construction signal, the node device prohibits the issuance of a transmission path alarm, receives the normal signal, and extinguishes the construction signal, and Since the means for canceling the transmission prohibition is provided, it is possible to prohibit the transmission path alarm from being issued during construction and to avoid unnecessary work.

【0030】また、各ノード装置が、少なくとも伝送路
を撤去する工事の際、該伝送路を介して対向するノード
装置に前記工事信号を送出して、該当伝送路を予め閉塞
する工事の設定方法を採ることによって、上記構成が有
する、工事設定の簡素化、小人数化等の効果を有効に発
揮することができる。
Further, at the time of the construction at which each node device removes at least the transmission line, the construction signal for transmitting the construction signal to the opposing node device via the transmission line to previously block the transmission line is set. By adopting the above configuration, the effects of the above configuration, such as simplification of construction setting and reduction in the number of people, can be effectively exhibited.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施の一形態を示すオーバヘッドにお
ける信号転送およびノード装置の主要機能説明図であ
る。
FIG. 1 is an explanatory diagram of signal transfer in overhead and main functions of a node device according to an embodiment of the present invention.

【図2】図1に示されたノード装置をリング状に接続し
た一形態を示すネットワーク構成図である。
FIG. 2 is a network configuration diagram showing an embodiment in which the node devices shown in FIG. 1 are connected in a ring.

【図3】図2に対応した伝送路工事の際の信号伝送状態
と伝送路切替え状態との変化の一形態を示したノード接
続状態図である。
FIG. 3 is a node connection state diagram showing one mode of a change between a signal transmission state and a transmission line switching state at the time of transmission line construction corresponding to FIG. 2;

【図4】図1に示された信号に基づくノード装置の主要
動作手順の一形態を示す流れ図である。
FIG. 4 is a flowchart showing one mode of a main operation procedure of the node device based on the signal shown in FIG. 1;

【図5】従来の一例を示すネットワーク構成図である。FIG. 5 is a network configuration diagram showing an example of the related art.

【符号の説明】[Explanation of symbols]

0、01〜04 ノード装置(ノード) 1 受信部 2 送信部 3 障害検出部 4 工事設定部 5 制御部 11 AIS信号受信部 12 工事信号受信部 13 正常信号受信部 21 AIS信号送信部 22 工事信号送信部 23 正常信号送信部 0, 01 to 04 Node device (node) 1 receiving unit 2 transmitting unit 3 failure detecting unit 4 construction setting unit 5 control unit 11 AIS signal receiving unit 12 construction signal receiving unit 13 normal signal receiving unit 21 AIS signal transmitting unit 22 construction signal Transmitter 23 Normal signal transmitter

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.6,DB名) H04L 12/42 - 12/437 JICSTファイル(JOIS) WPI(DIALOG)──────────────────────────────────────────────────続 き Continued on the front page (58) Fields surveyed (Int. Cl. 6 , DB name) H04L 12/42-12/437 JICST file (JOIS) WPI (DIALOG)

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 伝送路に冗長を持たせてリング状に複数
のノード装置を接続し、伝送路およびノード装置のいず
れかが障害の場合、AIS(Alarm indication signal
)信号の発生により障害箇所を自動的に避けて通信を
復旧させるリングネットワーク方式において、伝送路信
号のオーバヘッドに挿入される信号として、伝送路の使
用可能を示す正常信号と伝送路が工事のため使用不能で
あることを示す工事信号とを設け、前記ノード装置は、
伝送路工事、少なくとも伝送路を撤去する工事の際には
この工事のため使用不能になる伝送路を介して対向する
ノード装置に前記工事信号を送出する一方、正常な伝送
路から前記工事信号を受けた際にはこの伝送路から前記
正常信号を受けるまでこの工事信号をこの伝送路に対し
て保持して該当伝送路を予め閉塞し、他方、使用可能に
なった伝送路には前記正常信号を送出する一方、前記工
事信号を保持して閉塞中の伝送路から前記正常信号を受
けた際にはこの工事信号を消去してこの伝送路を正常と
する手段を備えることを特徴とするリングネットワーク
方式。
1. A method in which a plurality of node devices are connected in a ring shape with redundancy in a transmission line, and when either the transmission line or the node device fails, an alarm indication signal (AIS) is provided.
) In the ring network system where communication is restored by automatically avoiding a failure point due to the occurrence of a signal, a normal signal indicating that the transmission path is usable and a transmission path are required for construction as signals inserted into the overhead of the transmission path signal. Providing a construction signal indicating that it is unusable, wherein the node device comprises:
Transmission path construction, at least at the time of construction to remove the transmission path, while sending the construction signal to the opposite node device via the transmission path becomes unusable due to this construction, while transmitting the construction signal from the normal transmission path When receiving the normal signal from this transmission line, the construction signal is held in this transmission line until the normal signal is received, and the transmission line is closed beforehand. And a means for holding the construction signal and receiving the normal signal from the closed transmission line to erase the construction signal and normalize the transmission line. Network method.
【請求項2】 請求項1において、前記ノード装置は、
工事信号を受け、受けた伝送路にこの工事信号を保持す
る際には該当する下流の伝送路へAIS信号を送出する
一方、正常信号を受け、受けた伝送路に保持中の工事信
号を消去させる際には前記AIS信号の送出を停止する
手段を備えることを特徴とするリングネットワーク方
式。
2. The device according to claim 1, wherein the node device comprises:
When the construction signal is received and the construction signal is held in the received transmission line, the AIS signal is sent to the corresponding downstream transmission line, while the normal signal is received and the construction signal held in the received transmission line is deleted. A ring network system comprising means for stopping the transmission of the AIS signal when the ringing is performed.
【請求項3】 請求項1において、前記ノード装置は、
工事信号を受け、受けた伝送路にこの工事信号を保持す
る際にはこの伝送路に対する伝送路警報の発出禁止を行
なう一方、正常信号を受け、受けた伝送路に保持中の工
事信号を消去させる際には伝送路警報の発出禁止を解除
する手段を備えることを特徴とするリングネットワーク
方式。
3. The node device according to claim 1, wherein:
When receiving a construction signal and holding this construction signal on the received transmission line, prohibition of transmission line alarm for this transmission line is performed, while receiving a normal signal and deleting the construction signal held on the received transmission line A ring network system comprising means for canceling the transmission path alarm prohibition when the transmission is performed.
JP7285595A 1995-11-02 1995-11-02 Ring network method Expired - Lifetime JP2773768B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7285595A JP2773768B2 (en) 1995-11-02 1995-11-02 Ring network method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7285595A JP2773768B2 (en) 1995-11-02 1995-11-02 Ring network method

Publications (2)

Publication Number Publication Date
JPH09130417A JPH09130417A (en) 1997-05-16
JP2773768B2 true JP2773768B2 (en) 1998-07-09

Family

ID=17693590

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7285595A Expired - Lifetime JP2773768B2 (en) 1995-11-02 1995-11-02 Ring network method

Country Status (1)

Country Link
JP (1) JP2773768B2 (en)

Also Published As

Publication number Publication date
JPH09130417A (en) 1997-05-16

Similar Documents

Publication Publication Date Title
JP2773768B2 (en) Ring network method
US5459772A (en) External apparatus for monitoring a communication system
JP3862107B2 (en) Disaster prevention monitoring system
JP4193756B2 (en) Alarm transfer system, apparatus and method in duplex transmission line
JP2938495B2 (en) Network monitoring equipment
JPH0228798A (en) Disaster prevention monitoring device
JP2606130B2 (en) Loop network
JPS58156249A (en) Loop-back releasing system
JP3244247B2 (en) Clock signal working spare switching method
JPH0775352B2 (en) Loop-shaped transmission line reassembly method
JPS6199441A (en) Trouble locating control system of ring communication
JP3061691B2 (en) Communication device
JP3185710B2 (en) Automatic switching of order wire for MS shared protection ring system
JP2802772B2 (en) Loopback method
JPH0823304A (en) Switching/switch-back device
JP3593956B2 (en) Subscriber line terminal equipment
JP2689955B2 (en) Line switching device
JP2635835B2 (en) Multiple call processing monitoring
JPS58156248A (en) Loop-back controlling system
JPS6030235A (en) Automatic loopback system
JPH02173898A (en) Remote supervisory equipment
JPH06112965A (en) Transmission line control system
JPS60128730A (en) Diagnostic system of optical cable connection
JPH0993209A (en) Alarm processing unit
JPS6046140A (en) Line switching system

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19980325