JP2737047B2 - Deep foundation pile foundation construction device and construction method of deep foundation pile foundation - Google Patents

Deep foundation pile foundation construction device and construction method of deep foundation pile foundation

Info

Publication number
JP2737047B2
JP2737047B2 JP9297094A JP9297094A JP2737047B2 JP 2737047 B2 JP2737047 B2 JP 2737047B2 JP 9297094 A JP9297094 A JP 9297094A JP 9297094 A JP9297094 A JP 9297094A JP 2737047 B2 JP2737047 B2 JP 2737047B2
Authority
JP
Japan
Prior art keywords
gondola
foundation pile
pile foundation
crane
shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP9297094A
Other languages
Japanese (ja)
Other versions
JPH07279169A (en
Inventor
雅孝 魚住
栄 中井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsui Construction Co Ltd
Original Assignee
Mitsui Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsui Construction Co Ltd filed Critical Mitsui Construction Co Ltd
Priority to JP9297094A priority Critical patent/JP2737047B2/en
Publication of JPH07279169A publication Critical patent/JPH07279169A/en
Application granted granted Critical
Publication of JP2737047B2 publication Critical patent/JP2737047B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、急な勾配や起伏がある
山岳地等の地盤において深礎杭基礎を構築するのに好適
な深礎杭基礎施工装置及び、深礎杭基礎の構築方法に関
する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a deep foundation pile foundation construction apparatus suitable for constructing a deep foundation pile foundation in a mountainous land having a steep slope or undulation, and a method of constructing a deep foundation pile foundation. About.

【0002】[0002]

【従来の技術】従来、山岳地等では送電線鉄塔を構築す
るための基礎として深礎杭基礎が構築されている。
2. Description of the Related Art Conventionally, in mountainous areas and the like, a deep foundation pile foundation has been constructed as a foundation for constructing a power transmission tower.

【0003】[0003]

【発明が解決しようとする課題】しかし、山岳地等での
深礎杭基礎の構築作業においては、地盤に急な勾配や起
伏があるので掘削機等の施工機械の設置が困難であっ
た。従って、従来、山岳地等では深礎杭基礎の構築作業
の多くを人力作業に依存していたので、構築作業に手間
と時間がかかり、しかも困難であった。また従来、山岳
地等では、自然環境を良好に保持する必要上、整地作業
を極力行わないことが要望されている。そこで本発明は
上記事情に鑑み、手間と時間をかけず容易に、しかも自
然環境を良好に保持し得る形で深礎杭基礎の構築を行い
得る深礎杭基礎施工装置及び、深礎杭基礎の構築方法を
提供するものである。
However, in the construction work of a deep foundation pile in a mountainous area or the like, it is difficult to install a construction machine such as an excavator due to a steep slope or undulation in the ground. Therefore, conventionally, in mountainous areas and the like, much of the construction work of the deep foundation pile foundation has been dependent on manual labor, so that the construction work has been troublesome, time-consuming, and difficult. Conventionally, in mountainous areas and the like, it has been demanded that the natural terrain work should be performed as little as possible in order to maintain a good natural environment. In view of the above circumstances, the present invention provides a deep foundation pile foundation construction apparatus and a deep foundation pile foundation that can easily construct a deep foundation pile in a form that can maintain a natural environment satisfactorily without taking time and effort. Is provided.

【0004】[0004]

【課題を解決するための手段】即ち本発明のうち第一の
発明は、複数の脚部(13)をもつステージ(15)を
有し、前記ステージ(15)にガイド手段(17)を、
掘削位置(K1)と待機位置(K2)との間に亙って水
平方向に形成し、前記ステージ(15)にクレーン架台
(21)を、該クレーン架台(21)が前記ガイド手段
(17)に沿って移動し得る形で設け、前記クレーン架
台(21)に、ウインチ手段(25)により繰出・巻取
自在に設けられた吊支手段(25a)を介して作業ゴン
ドラ(26)を着脱自在に吊支し、前記ステージ(1
5)の掘削位置(K1)に、該ステージ(15)を上下
方向に貫通した形のゴンドラ通行穴(16)を設けて構
成される。また本発明のうち第二の発明は、第一の発明
において、前記脚部(13)の支持部(13a)を、前
記ステージ(15)に対して下方に突出後退位置決めし
得る形で設けて構成される。また本発明のうち第三の発
明は、第一の発明において、前記クレーン架台(21)
に水平駆動手段(22)を、前記吊支手段(25a)を
該クレーン架台(21)の移動方向に交差する方向に移
動駆動自在に設けて構成される。また本発明のうち第四
の発明は、地盤(2)に立坑(5)を掘削し、掘削した
立坑(5)内にコンクリートを打設してコンクリート杭
躯体(10)を形成することにより深礎杭基礎(3)を
構築する深礎杭基礎の構築方法において、前記立坑
(5)を掘削する際に、第一の発明の深礎杭基礎施工装
置(12)を、複数の脚部(13)を介して前記地盤
(2)上に設置した後、前記クレーン架台(21)の移
動により前記作業ゴンドラ(26)を前記掘削位置(K
1)に移動させ、前記吊支手段(25a)の繰出しによ
り該作業ゴンドラ(26)を前記ゴンドラ通行穴(1
6)を介して立坑(5)内に降下挿入させ、該作業ゴン
ドラ(26)を介して立坑(5)を延長掘削し、前記吊
支手段(25a)の巻取りにより該作業ゴンドラ(2
6)を地上に上昇させ、前記クレーン架台(21)の移
動により該作業ゴンドラ(26)を前記待機位置(K
2)に移動させ、該ゴンドラ通行穴(16)を介して立
坑(5)内のズリを外部に排出して、前記立坑(5)の
掘削を行うようにして構成される。なお、( )内の番
号等は、図面における対応する要素を示す、便宜的なも
のであり、従って、本記述は図面上の記載に限定拘束さ
れるものではない。以下の作用の欄についても同様であ
る。
That is, a first aspect of the present invention has a stage (15) having a plurality of legs (13), and a guide means (17) is provided on the stage (15).
It is formed horizontally between the excavation position (K1) and the standby position (K2), and the stage (15) is provided with a crane mount (21), and the crane mount (21) is provided with the guide means (17). The work gondola (26) is attached to and detached from the crane gantry (21) via suspension means (25a) provided so as to be able to be fed and wound up by the winch means (25). Suspended freely, the stage (1
A gondola passage hole (16) is formed at the excavation position (K1) of (5) so as to penetrate the stage (15) in the vertical direction. According to a second aspect of the present invention, in the first aspect, the support portion (13a) of the leg portion (13) is provided so as to project downward and retreat relative to the stage (15). Be composed. A third invention of the present invention is the first invention, wherein the crane mount (21)
And a horizontal drive means (22) provided so that the suspension support means (25a) can be driven to move in a direction intersecting the moving direction of the crane gantry (21). In the fourth invention of the present invention, a shaft (5) is excavated in the ground (2), and concrete is poured into the excavated shaft (5) to form a concrete pile frame (10). In the method of constructing a deep foundation pile foundation for constructing a foundation pile foundation (3), when excavating the shaft (5), the deep foundation pile foundation construction device (12) of the first invention is provided with a plurality of legs ( 13), the work gondola (26) is moved to the excavation position (K) by moving the crane stand (21).
1), and the working gondola (26) is moved out of the gondola passage hole (1) by the extension of the hanging support means (25a).
6) into the shaft (5) via the work gondola (26), excavate the shaft (5) through the work gondola (26), and wind up the suspension support means (25a).
6) is raised to the ground, and the working gondola (26) is moved to the standby position (K) by moving the crane stand (21).
2), the gap in the shaft (5) is discharged to the outside through the gondola passage hole (16), and the shaft (5) is excavated. The numbers and the like in parentheses are for convenience showing the corresponding elements in the drawings, and therefore, the description is not limited to the description on the drawings. The same applies to the following operation columns.

【0005】[0005]

【作用】上記した構成により、本発明のうち第一の発明
では、地盤(2)に勾配や起伏がある場合にも、脚部
(13)に対応した地盤(2)だけを整地することによ
りステージ(15)が水平に設置され、該ステージ(1
5)において、クレーン架台(21)は、水平方向に形
成されたガイド手段(17)に沿って水平に移動され
る。また本発明のうち第二の発明では、地盤(2)の勾
配や起伏の状態に対応して、各脚部(13)の上下長の
設定、即ち支持部(13a)側のレベルの設定が行われ
る。また本発明のうち第三の発明では、作業ゴンドラ
(26)は、クレーン架台(21)及び水平駆動手段
(22)によって水平方向四方に自在に移動される。ま
た本発明のうち第四の発明では、深礎杭基礎施工装置
(12)は脚部(13)を介して設置される。
According to the above construction, according to the first aspect of the present invention, even when the ground (2) has a gradient or undulation, only the ground (2) corresponding to the leg (13) is leveled. The stage (15) is installed horizontally, and the stage (1)
In 5), the crane gantry (21) is moved horizontally along the guide means (17) formed in the horizontal direction. According to the second aspect of the present invention, the setting of the vertical length of each leg (13), that is, the setting of the level on the support portion (13a) side, is performed in accordance with the inclination and the undulation of the ground (2). Done. In the third invention of the present invention, the work gondola (26) is freely moved in four directions in the horizontal direction by the crane gantry (21) and the horizontal drive means (22). Further, in the fourth invention of the present invention, the deep foundation pile foundation construction apparatus (12) is installed via the legs (13).

【0006】[0006]

【実施例】図1は、本発明による深礎杭基礎施工装置の
一例が設置された深礎杭基礎の構築現場を示した模式
図、図2は、図1の矢印I方向から見た深礎杭基礎施工
装置の拡大矢視図、図3は、図2の矢印II方向から見た
矢視図、図4は、図2の深礎杭基礎施工装置を示した平
面図である。
FIG. 1 is a schematic diagram showing a construction site of a deep foundation pile foundation on which an example of a deep foundation pile foundation construction apparatus according to the present invention is installed, and FIG. 2 is a depth view seen from the direction of arrow I in FIG. FIG. 3 is an enlarged view of the foundation pile foundation construction apparatus, FIG. 3 is a view seen from the direction of arrow II in FIG. 2, and FIG. 4 is a plan view showing the deep foundation pile construction apparatus of FIG.

【0007】電力鉄塔等を構築するための構築現場1
が、図1に示すように山岳地に設けられており、構築現
場1における地盤2の表面は急峻な勾配をもち、かつ起
伏をもった地面2aとなっている。構築現場1の地盤2
には、電力鉄塔等の基礎構造物となる深礎杭基礎3を構
築すべき、複数の構築箇所PT(図1では、2つの構築
箇所PTを図示)が設定されており、各構築箇所PTに
は、鉛直下方に伸延した形の深礎杭基礎構築立坑5が掘
削形成されている(但し、図1の紙面左側に位置した構
築箇所PTでは掘削形成途中である。)。なお、深礎杭
基礎構築立坑5には、地面2a付近、即ち開口部5a付
近の坑壁6に沿って、所定のライナプレート7が土留め
として敷設されており、ライナプレート7より下方の坑
壁6に沿っては、吹き付けコンクリートによって形成さ
れたコンクリート覆工9が敷設されている。複数の構築
箇所PTのうち図1の紙面右側に位置した構築箇所PT
では、掘削形成が完了された深礎杭基礎構築立坑5に、
該深礎杭基礎構築立坑5の内部(即ち、ライナプレート
7及びコンクリート覆工9等の内部)を充填する形で鉄
筋コンクリートからなる深礎杭躯体10が打設構築され
ており、深礎杭基礎3はこれら深礎杭躯体10、ライナ
プレート7、コンクリート覆工9から構成されている。
[0007] Construction site 1 for constructing power towers, etc.
However, as shown in FIG. 1, it is provided in a mountainous area, and the surface of the ground 2 at the construction site 1 has a steep slope and an uneven ground 2a. Ground 2 of construction site 1
A plurality of construction locations PT (two construction locations PT are shown in FIG. 1) in which a deep foundation pile foundation 3 to be a basic structure such as an electric power tower is to be constructed are set in each of the construction locations PT. , A deep foundation pile foundation construction shaft 5 extending vertically downward is formed by excavation (however, excavation is being performed at a construction site PT located on the left side of the paper of FIG. 1). In addition, a predetermined liner plate 7 is laid as a ground retaining along the pit wall 6 near the ground 2a, that is, near the opening 5a in the deep foundation pile foundation construction shaft 5, and the pit below the liner plate 7 is laid. Along the wall 6, a concrete lining 9 made of sprayed concrete is laid. The construction point PT located on the right side of the paper of FIG. 1 among the plurality of construction points PT
In the deep foundation pile foundation construction shaft 5 where excavation formation is completed,
A deep foundation pile body 10 made of reinforced concrete is cast and constructed so as to fill the inside of the deep foundation pile foundation construction shaft 5 (that is, the inside of the liner plate 7 and the concrete lining 9 etc.). Reference numeral 3 denotes a deep foundation pile body 10, a liner plate 7, and a concrete lining 9.

【0008】複数の構築箇所PTのうち、深礎杭基礎構
築立坑5が掘削形成途中である構築箇所PT(図1の紙
面左側に位置した構築箇所PT)では、図1乃至図4に
示すように、本発明による深礎杭基礎施工装置12が設
置されている。深礎杭基礎施工装置12は、鉛直上下方
向に伸延した複数の設置脚13を介して地面2aに設置
された形の、水平なステージフレーム15を有してい
る。設置脚13には所定の油圧ジャッキ機構(図示せ
ず)が設けられており、該油圧ジャッキ機構の駆動によ
り、設置脚13の支持部13a(即ち、地面2a側の部
分)が、該設置脚13のステージ固定部13b(即ち、
ステージフレーム15側の部分)に対して下方に突出後
退駆動及び位置決めし得るようになっている。なお、ス
テージフレーム15の設置箇所では、地面2aのうち設
置脚13の支持部13aの下端が載置される箇所が水平
に整地されており、整地によってステージフレーム15
の設置が水平かつ安定になされている。また、地盤2の
整地は設置脚13の支持部13aの下端が載置される箇
所だけで行われている。ところで、各設置脚13では、
支持部13aがステージ固定部13bに対して下方に突
出後退駆動し得るようになっており、従って各設置脚1
3ではその上下長が設定自在になっているが、該上下長
の設定範囲は限られているので、地面2aの起伏或いは
勾配状態によっては、地面2aの整地だけでなく、設置
脚13の支持部13aと地面2aとの間にコンクリート
製の補助台13cを設置することも可能である。
[0010] Of the plurality of construction points PT, as shown in FIGS. 1 to 4, at the construction point PT where the deep foundation pile foundation construction shaft 5 is in the middle of excavation formation (the construction point PT located on the left side of the paper of FIG. 1). Further, a deep foundation pile foundation construction apparatus 12 according to the present invention is installed. The deep foundation pile foundation construction apparatus 12 has a horizontal stage frame 15 that is installed on the ground 2a via a plurality of installation legs 13 extending vertically. The installation leg 13 is provided with a predetermined hydraulic jack mechanism (not shown). When the hydraulic jack mechanism is driven, the support portion 13a of the installation leg 13 (that is, the portion on the ground 2a side) is moved. 13 stage fixing portions 13b (ie,
With respect to the stage frame 15 side portion), it can be driven backward and protruded downward and positioned. In the place where the stage frame 15 is installed, a place where the lower end of the support portion 13a of the installation leg 13 is placed on the ground 2a is leveled horizontally.
Is installed horizontally and stably. The ground leveling of the ground 2 is performed only at the place where the lower end of the support portion 13a of the installation leg 13 is placed. By the way, in each installation leg 13,
The support portion 13a is configured to be able to protrude downward with respect to the stage fixing portion 13b and to be driven backward.
In FIG. 3, the vertical length can be set freely, but since the setting range of the vertical length is limited, depending on the undulation or gradient of the ground 2a, not only the ground 2a but also the support of the installation leg 13 can be supported. It is also possible to install an auxiliary table 13c made of concrete between the portion 13a and the ground 2a.

【0009】一方、ステージフレーム15は、図1、図
3、図4に示すように、水平方向である図の矢印A、B
方向に伸延した形で形成されており、該ステージフレー
ム15のうち矢印A側端部付近が掘削位置K1、矢印B
側端部付近が待機位置K2となっている。ステージフレ
ーム15のうち前記掘削位置K1には、図4に示すよう
に、該ステージフレーム15を上下方向に貫通した形の
作業穴16が設けられており、上述したステージフレー
ム15の設置は、該作業穴16と深礎杭基礎構築立坑5
の開口部5aが上下方向に互いに対応整合する形で行わ
れている。ステージフレーム15には、2本の平行なガ
イドレール17、17が図の矢印A、B方向に平行に、
しかも前記掘削位置K1と前記待機位置K2に亙って形
成されており、これらガイドレール17、17は、これ
らガイドレール17、17間に、前記作業穴16が配置
される形で形成されている。更に、ステージフレーム1
5には、各ガイドレール17に沿った形で、ネジジャッ
キ19がそれぞれ配設されており、これらネジジャッキ
19、19はステージフレーム15に設けられた所定の
駆動手段(図示せず)により軸回転駆動自在になってい
る。ステージフレーム15には門型クレーンユニット2
0が設けられており、門型クレーンユニット20は、上
下方向に伸延した一対の脚部21a、21aとこれら脚
部21a、21aの上端側に水平に架設された桁部21
bからなるクレーンフレーム21を有している。なお、
クレーンフレーム21の脚部21a、21aの下端側
は、該クレーンフレーム21が前記ガイドレール17、
17に沿って矢印A、B方向に移動し得る形で、これら
ガイドレール17、17及び、前記ネジジャッキ19、
19にそれぞれ係合されており、脚部21a、21aと
ネジジャッキ19、19との係合は螺合係合となってい
る。つまり、ステージフレーム15に設けられた所定の
駆動手段(図示せず)を介してネジジャッキ19、19
が軸回転駆されることにより、これらネジジャッキ1
9、19に螺合係合したクレーンフレーム21が、ガイ
ドレール17、17に沿って矢印A、B方向に移動駆動
し得るようになっている(なお、脚部21a、21aの
下端部に、ガイドレール17、17等のガイドレールの
上を矢印A、B方向に走行移動駆動し得る図示しない車
輪駆動ユニットを設けることにより、クレーンフレーム
21を矢印A、B方向に移動駆動し得るようにしてもよ
い。)。
On the other hand, as shown in FIGS. 1, 3 and 4, the stage frame 15 has horizontal arrows A and B as shown in FIG.
The stage frame 15 has an excavation position K1 and an arrow B near the end on the arrow A side.
The vicinity of the side end is a standby position K2. As shown in FIG. 4, the excavation position K1 of the stage frame 15 is provided with a working hole 16 that penetrates the stage frame 15 in the up-down direction. Working hole 16 and shaft 5 for deep foundation pile foundation
Are formed in such a manner that the openings 5a are aligned with each other in the vertical direction. On the stage frame 15, two parallel guide rails 17, 17 are arranged in parallel to the directions of arrows A and B in the drawing.
Moreover, the guide rails 17, 17 are formed over the excavation position K1 and the standby position K2, and the work holes 16 are formed between the guide rails 17, 17. . Furthermore, stage frame 1
5, screw jacks 19 are provided along the respective guide rails 17, and these screw jacks 19 are pivoted by predetermined driving means (not shown) provided on the stage frame 15. It can be driven to rotate. The stage frame 15 has a portal crane unit 2
0, the portal crane unit 20 comprises a pair of legs 21a, 21a extending in the vertical direction, and a girder 21 laid horizontally on the upper end side of the legs 21a, 21a.
b. In addition,
At the lower ends of the legs 21a, 21a of the crane frame 21, the crane frame 21
The guide rails 17, 17 and the screw jack 19,
19, and the legs 21a, 21a and the screw jacks 19, 19 are screwed engagements. That is, the screw jacks 19, 19 are provided via predetermined driving means (not shown) provided on the stage frame 15.
The screw jack 1
The crane frame 21 which is screwed and engaged with 9, 9 can be moved and driven in the directions of arrows A, B along the guide rails 17, 17 (note that the lower ends of the legs 21a, 21a are By providing a wheel drive unit (not shown) that can move and drive in the directions of arrows A and B on guide rails such as the guide rails 17 and 17, the crane frame 21 can be moved and driven in the directions of arrows A and B. May be.).

【0010】一方、クレーンフレーム21の桁部21b
には、シープスライド装置22が設けられており、シー
プスライド装置22は、桁部21bに対して固定的に設
けられた固定枠体23を有している。固定枠体23に
は、矢印A、B方向と直交交差する水平な方向、即ち図
2及び図4の矢印C、D方向に平行なガイドレール23
a、23aが形成されており、該固定枠体23には、こ
れらガイドレール23a、23aに係合し、これらガイ
ドレール23a、23aに沿って矢印C、D方向に移動
自在なスライド体24が設けられている。固定枠体23
とスライド体24との間には所定の油圧ジャッキ機構2
4aが設けられており、該油圧ジャッキ機構24aの駆
動によって、スライド体24は固定枠体23に対して、
ガイドレール23a、23aに沿って矢印C、D方向に
移動駆動され得るようになっている。クレーンフレーム
21には、ワイヤ25aを繰出・巻取駆動自在なる所定
のウインチユニット25が、該クレーンフレーム21に
対して固定的に設けられており、ウインチユニット25
から繰出されたワイヤ25aは前記シープスライド装置
22のスライド体24に設けられたプーリ24bを介し
てスライド体24の下方に繰出されるようになってい
る。つまり、スライド体24が、上述したように矢印
C、D方向に移動駆動自在になっているので、スライド
体24に設けられたプーリ24bから下方に繰出された
ワイヤ25aが矢印C、D方向に移動駆動され得るよう
になっている。なお、深礎杭基礎施工装置12のうち、
以上説明したステージフレーム15、門型クレーンユニ
ット20、シープスライド装置22等を架台装置14と
し、該架台装置14と、深礎杭基礎施工装置12のうち
以下説明する作業ゴンドラユニット26とを区別する。
On the other hand, the beam portion 21b of the crane frame 21
Is provided with a sheave slide device 22, and the sheave slide device 22 has a fixed frame 23 fixedly provided to the beam portion 21b. Guide rails 23 parallel to the horizontal direction orthogonal to the directions of arrows A and B, that is, the directions of arrows C and D in FIGS.
a, 23a are formed on the fixed frame body 23. A slide body 24 that engages with the guide rails 23a, 23a and is movable along the guide rails 23a, 23a in the directions of arrows C and D is formed on the fixed frame body 23. Is provided. Fixed frame 23
A predetermined hydraulic jack mechanism 2 is provided between the
4a, the slide body 24 is moved relative to the fixed frame body 23 by driving the hydraulic jack mechanism 24a.
It can be driven to move in the directions of arrows C and D along the guide rails 23a. The crane frame 21 is provided with a predetermined winch unit 25 which is capable of driving the wire 25a to be fed and wound up in a fixed manner with respect to the crane frame 21.
The wire 25a fed out of the shed slide device 22 is fed out below the slide body 24 via a pulley 24b provided on the slide body 24 of the sheep slide device 22. That is, since the slide body 24 is freely movable in the directions indicated by the arrows C and D as described above, the wire 25a extended downward from the pulley 24b provided on the slide body 24 is moved in the directions indicated by the arrows C and D. It can be driven to move. In addition, among the deep foundation pile foundation construction equipment 12,
The stage frame 15, the portal crane unit 20, the sheep slide device 22, and the like described above are used as the gantry device 14, and the gantry device 14 and the work gondola unit 26 of the deep foundation pile foundation construction device 12 described below are distinguished. .

【0011】スライド体24の下方に繰出されたワイヤ
25aの先端側(即ち、下端側)には、図2及び図3に
示すように、所定のフック等を介して作業ゴンドラユニ
ット26が着脱自在に接続されて吊支されている。作業
ゴンドラユニット26は前記深礎杭基礎構築立坑5内に
挿入され得る形のゴンドラ本体27を有しており、ゴン
ドラ本体27には、該ゴンドラ本体27の周囲側方に、
所定の油圧ジャッキ等により複数のラム29aを突出後
退させ得るグリッパ29が設けられている。即ち、深礎
杭基礎構築立坑5内に挿入されたゴンドラ本体27は、
該グリッパ29の複数のラム29aを該ゴンドラ本体2
7の周囲側方である坑壁6に突出押圧させて突っ張るこ
とにより、地盤2に対してゴンドラ本体27を固定安定
させることができる。また、ゴンドラ本体27の下には
ゴンドラ下部体30が設けられており、ゴンドラ下部体
30は、所定の駆動手段(図示せず)を介してゴンドラ
本体27に対して、鉛直方向の所定の軸心Qを中心とし
た方向、即ち図2乃至図4に示す矢印E、F方向に軸回
転駆動自在になっている。ゴンドラ下部体30には伸縮
及び屈曲駆動自在なる所定のアーム31aを介してツイ
ンヘッダ等の岩盤掘削が可能な掘削機31が設けられて
いる。従って、深礎杭基礎構築立坑5内に挿入され、ゴ
ンドラ本体27がグリッパ29を介して地盤2に固定安
定された状態の作業ゴンドラユニット26では、そのゴ
ンドラ本体27に対してゴンドラ下部体30を矢印E、
F方向に適宜回転駆動させ、ゴンドラ下部体30に対し
て前記アーム31aを適宜伸縮或いは屈曲駆動させるこ
とにより、前記掘削機31を介して、作業ゴンドラユニ
ット26下方の地盤2及び、作業ゴンドラユニット26
の側方の地盤2を自在に掘削し得るようになっている。
更に、ゴンドラ下部体30にはコンクリートの吹付ノズ
ル32が、ゴンドラ下部体30の側方にコンクリートを
吹き付けし得る形で設けられており、該吹付ノズル32
は、地上、即ち深礎杭基礎構築立坑5外部に設けられた
所定のコンクリートポンプ(図示せず)から連絡された
コンクリート圧送管(図示せず)に接続されている。従
って、これらコンクリートポンプ、コンクリート圧送管
を介して吹付ノズル32に供給されたコンクリートは、
該吹付ノズル32を介してゴンドラ下部体30の側方に
吹き付けされ得るようになっている。また、深礎杭基礎
構築立坑5内に挿入され、ゴンドラ本体27がグリッパ
29を介して地盤2に固定安定された状態の作業ゴンド
ラユニット26では、そのゴンドラ本体27に対してゴ
ンドラ下部体30を矢印E、F方向に適宜回転駆動さ
せ、吹付ノズル32を介してゴンドラ下部体30の側方
である坑壁6にコンクリートを適宜吹き付けることによ
り、該坑壁6に沿ってコンクリート覆工9を敷設し得る
ようになっている。なお、構築現場1には地盤2上に仮
設設置された所定のジブクレーン11が設けられてい
る。
As shown in FIGS. 2 and 3, a working gondola unit 26 is detachably attached to the distal end side (ie, the lower end side) of the wire 25a extended below the slide body 24 via a predetermined hook or the like. It is connected and suspended. The work gondola unit 26 has a gondola main body 27 that can be inserted into the deep foundation pile foundation construction shaft 5, and the gondola main body 27 has, on the side around the gondola main body 27,
A gripper 29 capable of projecting and retracting a plurality of rams 29a by a predetermined hydraulic jack or the like is provided. That is, the gondola body 27 inserted into the deep foundation pile foundation construction shaft 5
A plurality of rams 29a of the gripper 29 are
The gondola main body 27 can be fixed and stabilized with respect to the ground 2 by protruding and pressing against the pit wall 6 which is the peripheral side of the pit 7. Further, a gondola lower body 30 is provided below the gondola main body 27, and the gondola lower body 30 is attached to a predetermined vertical axis with respect to the gondola main body 27 via predetermined driving means (not shown). The shaft can be driven to rotate in a direction about the center Q, that is, in directions indicated by arrows E and F shown in FIGS. The gondola lower body 30 is provided with an excavator 31 capable of excavating a rock such as a twin header via a predetermined arm 31a that can freely expand and contract and bend. Therefore, in the working gondola unit 26 in a state where the gondola body 27 is inserted into the deep foundation pile foundation construction shaft 5 and the gondola body 27 is fixed to the ground 2 via the gripper 29, the gondola lower body 30 is attached to the gondola body 27. Arrow E,
The ground 2 below the working gondola unit 26 and the working gondola unit 26 via the excavator 31 by appropriately rotating and driving the arm 31a with respect to the gondola lower body 30 by appropriately rotating and driving in the F direction.
Can be excavated freely on the side of the ground 2.
Further, a concrete spray nozzle 32 is provided on the gondola lower body 30 so that concrete can be sprayed on the side of the gondola lower body 30.
Is connected to a concrete pumping pipe (not shown) connected from a predetermined concrete pump (not shown) provided on the ground, that is, outside of the deep foundation pile foundation construction shaft 5. Accordingly, the concrete supplied to the spray nozzle 32 through the concrete pump and the concrete pumping pipe is:
It can be sprayed to the side of the gondola lower body 30 via the spray nozzle 32. Further, in the working gondola unit 26 in which the gondola body 27 is inserted into the deep foundation pile foundation construction shaft 5 and is fixed and fixed to the ground 2 via the gripper 29, the gondola lower body 30 is attached to the gondola body 27. The concrete lining 9 is laid along the pit wall 6 by appropriately rotating and driving in the directions of the arrows E and F and spraying concrete onto the pit wall 6 on the side of the gondola lower body 30 via the spray nozzle 32 as appropriate. It is possible to do. The construction site 1 is provided with a predetermined jib crane 11 temporarily installed on the ground 2.

【0012】構築現場1及び、本発明による深礎杭基礎
施工装置12は以上のように構成されているので、該構
築現場1の複数の構築箇所PTで、深礎杭基礎施工装置
12を介して深礎杭基礎3をそれぞれ構築するには以下
のように行う。まず、構築現場1に設定されている複数
の構築箇所PTのうちの1つの構築箇所PTにおいて深
礎杭基礎3を構築する場合を説明する。即ち、構築箇所
PTの地面2aに、地盤2に仮設設置された前記ジブク
レーン11を介して、本発明による深礎杭基礎施工装置
12を設置する。なお、深礎杭基礎施工装置12及び、
その他の機材(ジブクレーン11等を含む)や資材は、
図示しないヘリコプター等を介して予め構築現場1に運
搬されたものとする。深礎杭基礎施工装置12の設置で
はまず、作業ゴンドラユニット26が取り外された状態
の深礎杭基礎施工装置12、即ち深礎杭基礎施工装置1
2の架台装置14を、前記ジブクレーン11を介して構
築箇所PTに設置する。設置は、ステージフレーム15
の複数の設置脚13の上下長を、地面2aの起伏や勾配
に対応して適宜設定することにより、ステージフレーム
15を水平に支持する形で行われる。なお、この設置箇
所では、地面2aのうち設置脚13の支持部13aが載
置される箇所のみが予め水平に整地される(或いは、地
面2aと設置脚13の支持部13aとの間にコンクリー
ト製の補助台13cが設置される。)。従って、設置箇
所での大がかりな整地が必要ないため、深礎杭基礎3の
構築において手間と時間がかからないと共に、構築現場
1の自然環境が極力良好に保持される。また、構築箇所
PTでは、予め人力等により深礎杭基礎構築立坑5が途
中まで(例えば3メートルぐらいの深さまで)掘削され
ており、架台装置14の設置は、ステージフレーム15
の作業穴16と途中まで掘削されている該深礎杭基礎構
築立坑5の開口部5aが上下方向に互いに対応整合され
る形で行われる。なお、深礎杭基礎構築立坑5のうち人
力等により掘削された部位では、その掘削直後に土留め
のため、坑壁6にライナプレート7が敷設されている。
次いで、作業ゴンドラユニット26を、前記ジブクレー
ン11を介して設置された前記架台装置14に設置す
る。即ち、この設置は、スライド体24のプーリ24b
の下方に繰出されたワイヤ25aの下端側に、所定のフ
ック等を介して作業ゴンドラユニット26を接続吊支す
る形で行われる(なお、作業ゴンドラユニット26の接
続吊支時には、ワイヤ25aはウインチユニット25に
より十分に巻取られた状態になっており、接続吊支直後
の作業ゴンドラユニット26の吊支位置はステージフレ
ーム15の上方になっている。)。作業ゴンドラユニッ
ト26の設置完了により、構築箇所PTでの深礎杭基礎
施工装置12の設置が完了する。
The construction site 1 and the deep foundation pile foundation construction apparatus 12 according to the present invention are configured as described above. In order to construct the deep foundation pile foundation 3 respectively, the following is performed. First, a case where the deep foundation pile foundation 3 is constructed at one construction site PT among a plurality of construction sites PT set at the construction site 1 will be described. That is, the deep foundation pile foundation construction apparatus 12 according to the present invention is installed on the ground 2a at the construction site PT via the jib crane 11 temporarily installed on the ground 2. In addition, the deep foundation pile foundation construction device 12 and
Other equipment (including jib crane 11 etc.) and materials
It is assumed that it has been transported to the construction site 1 in advance via a helicopter (not shown) or the like. In the installation of the deep foundation pile foundation construction apparatus 12, first, the deep foundation pile foundation construction apparatus 12 with the work gondola unit 26 removed, that is, the deep foundation pile foundation construction apparatus 1
The second gantry device 14 is installed at the construction site PT via the jib crane 11. The installation is stage frame 15
The stage frame 15 is horizontally supported by appropriately setting the vertical length of the plurality of installation legs 13 according to the ups and downs of the ground 2a. In this installation location, only a portion of the ground 2a where the support portion 13a of the installation leg 13 is placed is previously leveled horizontally (or concrete is placed between the ground 2a and the support portion 13a of the installation leg 13). An auxiliary table 13c is provided.). Therefore, since large-scale leveling is not required at the installation location, the construction of the deep foundation pile foundation 3 does not take time and effort, and the natural environment of the construction site 1 is maintained as good as possible. In addition, at the construction point PT, the deep foundation pile foundation construction shaft 5 is excavated halfway (for example, to a depth of about 3 meters) by human power or the like, and the gantry device 14 is installed in the stage frame 15.
The work hole 16 and the opening 5a of the deep foundation pile foundation construction shaft 5 excavated partway are aligned with each other vertically. A liner plate 7 is laid on a pit wall 6 in a portion excavated by manpower or the like in the deep foundation pile foundation construction shaft 5 immediately after the excavation.
Next, the work gondola unit 26 is installed on the gantry device 14 installed via the jib crane 11. That is, this installation is performed by the pulley 24b of the slide body 24.
The work gondola unit 26 is connected and suspended via a predetermined hook or the like at the lower end side of the wire 25a drawn out below (the wire 25a is connected to the winch when the work gondola unit 26 is connected and suspended). It is in a state of being sufficiently wound by the unit 25, and the suspension position of the work gondola unit 26 immediately after the connection suspension is above the stage frame 15.) When the installation of the work gondola unit 26 is completed, the installation of the deep foundation pile foundation construction device 12 at the construction location PT is completed.

【0013】次いで、ステージフレーム15に設けられ
た所定の駆動手段(図示せず)を介してネジジャッキ1
9、19を軸回転駆させることにより、これらネジジャ
ッキ19、19に螺合係合したクレーンフレーム21
を、ガイドレール17、17に沿って矢印B方向に移動
駆動させ、従って、クレーンフレーム21に吊支されて
いる作業ゴンドラユニット26を矢印B方向に移動駆動
させ、作業穴16上方の位置である掘削位置K1からク
レーンフレーム21及び、作業ゴンドラユニット26を
待機位置K2に移動退避させる(或いは、既に待機位置
K2に位置しているクレーンフレーム21及び、作業ゴ
ンドラユニット26をそのまま待機位置K2に保持す
る。)。なお、ステージフレーム15は設置脚13を介
して、地盤2上に安定して設置されており、クレーンフ
レーム21はガイドレール17、17に沿って、該ステ
ージフレーム15上で滑らかに移動するので、クレーン
フレーム21の移動駆動時にも、吊支された作業ゴンド
ラユニット26の揺動が殆どおこらず安全である。次い
で、掘削途中の深礎杭基礎構築立坑5の底端である切羽
5cにおいて発破掘削を行った後、前記ジブクレーン1
1のワイヤ11bの先端に吊支した所定のクラムセルバ
ケット11aを介して、深礎杭基礎構築立坑5内の残さ
い等を外部に排出する。排出の後、クレーンフレーム2
1を、ガイドレール17、17に沿って矢印A方向に移
動駆動させ、掘削位置K1に作業ゴンドラユニット26
を位置決めする。次いで、ウインチユニット25を介し
てワイヤ25aを繰出し、作業ゴンドラユニット26を
作業穴16を介して深礎杭基礎構築立坑5内に挿入降下
させる。続けて降下させ、作業ゴンドラユニット26が
切羽5c付近に位置するように降下を停止する。その
後、グリッパ29を介してゴンドラ本体27を地盤2に
対して固定安定させる。次いで、ゴンドラ本体27に対
してゴンドラ下部体30を矢印E、F方向に適宜回転駆
動させ、ゴンドラ下部体30に対して前記アーム31a
を適宜伸縮或いは屈曲駆動させることにより、掘削機3
1を介して、作業ゴンドラユニット26下方の地盤2及
び、作業ゴンドラユニット26の側方の地盤2を適宜掘
削する形で仕上げ掘削を行う。次いで、ウインチユニッ
ト25を介して、作業ゴンドラユニット26をステージ
フレーム15上方に上昇させ、ネジジャッキ19、19
を介してクレーンフレーム21を矢印B方向に移動駆動
させて、クレーンフレーム21及び作業ゴンドラユニッ
ト26を待機位置K2に退避させる。次いで、ジブクレ
ーン11のクラムセルバケット11aを介して、深礎杭
基礎構築立坑5内のズリ等を外部に排出した後、再びク
レーンフレーム21を矢印A方向に移動駆動させ、掘削
位置K1に作業ゴンドラユニット26を位置決めする。
次いで、作業ゴンドラユニット26を降下させて、該作
業ゴンドラユニット26を切羽5c付近に停止させた
後、グリッパ29を介してゴンドラ本体27を地盤2に
対して固定安定させる。次いで、ゴンドラ本体27に対
してゴンドラ下部体30を矢印E、F方向に適宜回転駆
動させ、吹付ノズル32を介してゴンドラ下部体30の
側方である坑壁6にコンクリートを適宜吹き付け、該坑
壁6に沿ってコンクリート覆工9を敷設する。次いで、
作業ゴンドラユニット26をステージフレーム15上方
に上昇させ、クレーンフレーム21を矢印B方向に移動
駆動させて、クレーンフレーム21及び、作業ゴンドラ
ユニット26を待機位置K2に退避させる。
Next, the screw jack 1 is driven via a predetermined driving means (not shown) provided on the stage frame 15.
The crane frame 21 which is screwed and engaged with these screw jacks 19, 19 by rotating the shafts 9 and 19 on the shafts.
Is moved along the guide rails 17 and 17 in the direction of arrow B, and therefore, the work gondola unit 26 suspended and supported by the crane frame 21 is moved and driven in the direction of arrow B, and is located above the work hole 16. The crane frame 21 and the work gondola unit 26 are moved and retracted from the excavation position K1 to the standby position K2 (or the crane frame 21 and the work gondola unit 26 already located at the standby position K2 are held at the standby position K2 as they are. .). Since the stage frame 15 is stably installed on the ground 2 via the installation legs 13, and the crane frame 21 moves smoothly on the stage frame 15 along the guide rails 17, 17, Even when the crane frame 21 is driven to move, the suspended work gondola unit 26 hardly swings and is safe. Next, after performing blasting excavation at the face 5c, which is the bottom end of the deep foundation pile foundation construction shaft 5 during excavation, the jib crane 1 is used.
The residue in the deep foundation pile foundation construction shaft 5 is discharged to the outside through a predetermined clam cell bucket 11a suspended from the tip of one wire 11b. After discharging, crane frame 2
1 is moved along the guide rails 17, 17 in the direction of arrow A to move the work gondola unit 26 to the excavation position K1.
Position. Next, the wire 25a is fed out through the winch unit 25, and the working gondola unit 26 is inserted into the deep foundation pile foundation construction shaft 5 through the working hole 16 and lowered. Then, the descent is stopped so that the work gondola unit 26 is located near the face 5c. Thereafter, the gondola body 27 is fixed and stabilized to the ground 2 via the gripper 29. Next, the gondola lower body 30 is appropriately rotated and driven in the directions of arrows E and F with respect to the gondola main body 27, and the arm 31a is moved with respect to the gondola lower body 30.
The excavator 3 is driven by expanding and contracting or bending as appropriate.
1, finish excavation is performed in such a manner that the ground 2 below the work gondola unit 26 and the ground 2 beside the work gondola unit 26 are appropriately excavated. Next, the work gondola unit 26 is raised above the stage frame 15 via the winch unit 25, and the screw jacks 19, 19
The crane frame 21 and the work gondola unit 26 are retracted to the standby position K2 by moving the crane frame 21 in the direction of the arrow B via. Next, after the shears and the like in the deep foundation pile foundation construction shaft 5 are discharged to the outside via the clam cell bucket 11a of the jib crane 11, the crane frame 21 is moved and driven again in the direction of arrow A, and the work gondola is moved to the excavation position K1. The unit 26 is positioned.
Next, after lowering the work gondola unit 26 to stop the work gondola unit 26 near the face 5c, the gondola body 27 is fixed and stabilized to the ground 2 via the gripper 29. Next, the gondola lower body 30 is appropriately rotated and driven in the directions of arrows E and F with respect to the gondola main body 27, and concrete is sprayed as appropriate on the pit wall 6 on the side of the gondola lower body 30 through the spray nozzle 32. A concrete lining 9 is laid along the wall 6. Then
The work gondola unit 26 is raised above the stage frame 15, and the crane frame 21 is moved and driven in the direction of arrow B to retract the crane frame 21 and the work gondola unit 26 to the standby position K2.

【0014】以降、上述した作業、即ち、深礎杭基礎構
築立坑5の切羽5cにおいて発破掘削を行い、クラムセ
ルバケット11aを介して深礎杭基礎構築立坑5内の残
さい等を外部に排出し、作業ゴンドラユニット26を切
羽5c付近に挿入降下させ、掘削機31を介して仕上げ
掘削を行い、作業ゴンドラユニット26を上昇させて待
機位置2に移動退避させ、クラムセルバケット11aを
介して深礎杭基礎構築立坑5内のズリ等を外部に排出
し、作業ゴンドラユニット26を掘削位置K1に位置決
めして切羽5c付近に挿入降下させ、吹付ノズル32を
介してコンクリート覆工9を敷設し、作業ゴンドラユニ
ット26を上昇させて待機位置2に移動退避させる、こ
れら一連の作業を繰り返して、深礎杭基礎構築立坑5を
完成させる。なお、深礎杭基礎構築立坑5は、その内径
が一定ではなく、図1に示すように、途中で拡大する異
型断面の形で掘削形成される。従って、深礎杭基礎構築
立坑5のうち、その内径が拡大する部位に対する掘削或
いは、コンクリート覆工9の敷設は、深礎杭基礎構築立
坑5内に挿入された作業ゴンドラユニット26を、クレ
ーンフレーム21及びシープスライド装置22の移動駆
動により、内径が拡大する方向寄りに適宜移動位置決め
させた後、グリッパ29を介してゴンドラ本体27を地
盤2に対して固定安定させて行われる。なお、作業ゴン
ドラユニット26の水平方向四方への移動位置決め動作
は、上述したように、ネジジャッキ19、19を介して
クレーンフレーム21を矢印A、B方向に適宜移動駆動
させると共に、シープスライド装置22においてスライ
ド体24を矢印C、D方向に適宜移動駆動させることに
より、プーリ24bから下方に繰出されたワイヤ25a
が水平方向のうちの任意の方向に移動駆動され得ること
により可能となる。つまり、シープスライド装置22に
より、深礎杭基礎構築立坑5内で作業ゴンドラユニット
26を、水平方向のうち所望の方向、即ち深礎杭基礎構
築立坑5の内径が拡大する方向に移動位置決めさせ得る
ようになるので、該深礎杭基礎構築立坑5の拡幅掘削等
が容易になり、深礎杭基礎3の構築が更に容易になる。
Thereafter, blasting excavation is performed at the face 5c of the deep foundation pile foundation construction shaft 5, and the residue in the deep foundation pile foundation construction shaft 5 is discharged to the outside via the clam cell bucket 11a. Then, the work gondola unit 26 is inserted and lowered near the face 5c, finish excavation is performed through the excavator 31, the work gondola unit 26 is raised and moved to the standby position 2 and retracted, and is deeply moved through the clam cell bucket 11a. Debris and the like in the foundation pile foundation construction shaft 5 are discharged to the outside, the work gondola unit 26 is positioned at the excavation position K1, inserted and lowered near the face 5c, and the concrete lining 9 is laid via the spray nozzle 32, The series of operations for raising the work gondola unit 26 and moving it to the standby position 2 and retreating it is repeated to complete the deep foundation pile foundation construction shaft 5. In addition, the inside diameter of the deep foundation pile foundation construction shaft 5 is not constant, and is excavated and formed in the form of an irregular cross section that expands in the middle as shown in FIG. Therefore, in the excavation or the laying of the concrete lining 9 in the part of the deep foundation pile foundation construction shaft 5 whose inner diameter is enlarged, the work gondola unit 26 inserted into the deep foundation pile foundation construction shaft 5 is replaced with the crane frame. After the movable drive 21 and the sheep slide device 22 are appropriately moved and positioned near the direction in which the inner diameter increases, the gondola body 27 is fixed and stabilized to the ground 2 via the gripper 29. As described above, the work gondola unit 26 is moved and positioned in four directions in the horizontal direction by appropriately moving and driving the crane frame 21 in the directions of arrows A and B via the screw jacks 19 and 19, and the sheep slide device 22. , The slide 25 is appropriately moved and driven in the directions of the arrows C and D, so that the wire 25a extended downward from the pulley 24b
Can be driven in any of the horizontal directions. That is, the sheep slide device 22 can move and position the work gondola unit 26 in the desired direction among the horizontal directions, that is, the direction in which the inner diameter of the deep foundation pile foundation building shaft 5 is enlarged, in the deep foundation pile foundation construction shaft 5. Therefore, widening excavation and the like of the deep foundation pile foundation vertical shaft 5 are facilitated, and construction of the deep foundation pile foundation 3 is further facilitated.

【0015】深礎杭基礎構築立坑5の完成後、作業ゴン
ドラユニット26を前記架台装置14から取り外すと共
に、前記ジブクレーン11を介して架台装置14から撤
去し、続いて、該架台装置14をジブクレーン11を介
して、深礎杭基礎構築立坑5が未だ完成されていない構
築箇所PTに設置する。その後、架台装置14から撤去
されていた作業ゴンドラユニット26を新しく設置され
た架台装置14に、ジブクレーン11を介して設置す
る。即ち、深礎杭基礎施工装置12が他の構築箇所PT
に設置された。設置の後、深礎杭基礎構築立坑5の切羽
5cにおいて発破掘削を行い、クラムセルバケット11
aを介して深礎杭基礎構築立坑5内の残さい等を外部に
排出し、掘削機31を介して仕上げ掘削を行い、クラム
セルバケット11aを介して深礎杭基礎構築立坑5内の
ズリ等を外部に排出し、吹付ノズル32を介してコンク
リート覆工9を敷設する形の、上述した一連の作業を繰
り返して、深礎杭基礎構築立坑5を完成させる。以降、
未だ深礎杭基礎構築立坑5が完成されていない構築箇所
PTに、ジブクレーン11を介して深礎杭基礎施工装置
12を設置し、該深礎杭基礎施工装置12を介して深礎
杭基礎構築立坑5を完成させる形の作業を繰り返して、
全ての構築箇所PTで深礎杭基礎構築立坑5を完成させ
る。
After the shaft 5 for constructing the deep foundation pile is completed, the work gondola unit 26 is removed from the gantry 14 and is removed from the gantry 14 via the jib crane 11. Subsequently, the gantry 14 is moved to the jib crane 11. The deep foundation pile foundation construction shaft 5 is installed at a construction site PT that has not been completed yet. Thereafter, the work gondola unit 26 removed from the gantry device 14 is installed on the newly installed gantry device 14 via the jib crane 11. That is, the deep foundation pile foundation construction device 12 is
Was installed in After the installation, blasting excavation is performed at the face 5c of the shaft 5 for building the deep foundation pile foundation,
The residue in the deep foundation pile foundation construction shaft 5 is discharged to the outside via a, the final excavation is performed via the excavator 31, and the slip in the deep foundation pile foundation construction shaft 5 via the clam cell bucket 11a. And the like are discharged to the outside, and the above-described series of operations of laying the concrete lining 9 through the spray nozzle 32 is repeated to complete the deep foundation pile foundation construction shaft 5. Or later,
A deep foundation pile foundation construction device 12 is installed via a jib crane 11 at a construction site PT where the deep foundation pile foundation construction shaft 5 is not yet completed, and a deep foundation pile foundation construction is carried out via the deep foundation pile foundation construction device 12. Repeat the work of completing the shaft 5,
At all construction points PT, the deep foundation pile foundation construction shaft 5 is completed.

【0016】深礎杭基礎構築立坑5が完成された各構築
箇所PTでは、該深礎杭基礎構築立坑5内部に適宜配筋
した後(図示せず)、該深礎杭基礎構築立坑5内部をコ
ンクリートで打設充填する。打設充填されたコンクリー
トを固結させることにより深礎杭躯体10が構築完了
し、各構築箇所PTで深礎杭基礎3が完成する。なお、
各深礎杭基礎3が完成した後、これら深礎杭基礎3の上
端部には、図示しない電力鉄塔等の本体が、これら深礎
杭基礎3を基礎とする形で構築されることになる。
At each construction site PT where the deep foundation pile foundation building shaft 5 is completed, after appropriately arranging the reinforcing pile inside the deep foundation pile foundation construction shaft 5 (not shown), the inside of the deep foundation pile foundation construction shaft 5 is set. Is cast and filled with concrete. The deep foundation pile skeleton 10 is completed by solidifying the poured and filled concrete, and the deep foundation pile foundation 3 is completed at each construction location PT. In addition,
After each of the deep foundation pile foundations 3 is completed, a main body such as a power tower (not shown) is constructed at the upper end of these deep foundation pile foundations 3 based on these deep foundation pile foundations 3. .

【0017】[0017]

【発明の効果】以上説明したように本発明のうち第一の
発明は、複数の設置脚13等の脚部をもつステージフレ
ーム15等のステージを有し、前記ステージにガイドレ
ール17等のガイド手段を、掘削位置K1等の掘削位置
と待機位置K2等の待機位置との間に亙って水平方向に
形成し、前記ステージにクレーンフレーム21等のクレ
ーン架台を、該クレーン架台が前記ガイド手段に沿って
移動し得る形で設け、前記クレーン架台に、ウインチユ
ニット25等のウインチ手段により繰出・巻取自在に設
けられたワイヤ25a等の吊支手段を介して作業ゴンド
ラユニット26等の作業ゴンドラを着脱自在に吊支し、
前記ステージの掘削位置に、該ステージを上下方向に貫
通した形の作業穴16等のゴンドラ通行穴を設けて構成
されるので、地盤に勾配や起伏がある構築現場におい
て、脚部に対応した地盤だけを整地する作業、即ち簡単
な整地作業等により、ステージを水平に設置できる。つ
まり、本発明による深礎杭基礎施工装置は、地盤に勾配
や起伏がある構築現場、即ち山岳地等においても設置し
得るので、深礎杭基礎の構築作業における機械化が実現
され、よって深礎杭基礎の構築作業は手間と時間がかか
らず、容易になる。また、深礎杭基礎施工装置を設置す
る地盤では、脚部に対応した箇所だけを整地すればよい
ので、地盤上の植物等を極力破壊せず、自然環境の良好
なる保持が実現する。更に、水平に設置されたステージ
において、クレーン架台は、水平方向に形成されたガイ
ド手段に沿って水平に移動し得るため、移動中のクレー
ン架台及び該クレーン架台に吊支された作業ゴンドラに
は、振動、揺動が殆ど生じず、従って作業員等に対する
危険防止、深礎杭基礎施工装置の破損防止が容易にな
る。
As described above, the first invention of the present invention has a stage such as a stage frame 15 having a plurality of legs such as a plurality of installation legs 13 and the like, and a guide such as a guide rail 17 is provided on the stage. Means is formed in a horizontal direction between an excavation position such as an excavation position K1 and a standby position such as a standby position K2, and a crane mount such as a crane frame 21 is provided on the stage, and the crane mount is provided with the guide means. The work gondola unit 26 and the like are provided on the crane gantry via suspending means such as a wire 25a provided so as to be able to be fed and wound by the winch means such as the winch unit 25. Hanging the gondola detachably,
At the excavation position of the stage, a gondola passage hole such as a work hole 16 penetrating the stage in the up-down direction is provided, so that in a construction site where the ground has a slope or undulation, The stage can be set horizontally by the work of leveling only the ground, that is, the simple leveling work. That is, the deep foundation pile foundation construction apparatus according to the present invention can be installed even at a construction site where the ground has slopes or undulations, that is, at a mountainous area, so that mechanization in the construction work of the deep foundation pile foundation is realized, and The construction work of the pile foundation does not take much time and effort and becomes easy. Further, in the ground where the deep foundation pile foundation construction device is installed, only the portions corresponding to the legs need to be leveled, so that plants and the like on the ground are not destroyed as much as possible, and a good maintenance of the natural environment is realized. Further, in the stage installed horizontally, the crane cradle can move horizontally along the guide means formed in the horizontal direction, so that the moving crane cradle and the work gondola suspended from the crane cradle are movable. Almost no vibration and swinging occur, which makes it easier to prevent danger to workers and the like and prevent damage to the deep pile foundation construction device.

【0018】また本発明のうち第二の発明は、第一の発
明において、前記脚部の支持部13a等の支持部を、前
記ステージに対して下方に突出後退位置決めし得る形で
設けて構成されるので、第一の発明の効果に加えて、地
盤の勾配や起伏の状態に対応しての、各脚部の上下長の
設定、即ち支持部側のレベルの設定が可能となり、地盤
側における表面レベルの調整、即ち整地作業が極力省か
れる。つまり、深礎杭基礎の構築において手間と時間が
更に一層省かれる。
According to a second aspect of the present invention, in the first aspect, a support portion such as the support portion 13a of the leg portion is provided so as to project downward and retreat relative to the stage. Therefore, in addition to the effects of the first invention, it is possible to set the vertical length of each leg, that is, to set the level on the support portion side, corresponding to the state of the slope or undulation of the ground. The adjustment of the surface level in the above, that is, the leveling work is minimized. That is, labor and time are further reduced in the construction of the deep foundation pile foundation.

【0019】また本発明のうち第三の発明は、第一の発
明において、前記クレーン架台にシープスライド装置2
2等の水平駆動手段を、前記吊支手段を該クレーン架台
の移動方向(矢印A、B方向など)に交差する方向(矢
印C、D方向など)に移動駆動自在に設けて構成される
ので、第一の発明の効果に加えて、クレーン架台に吊支
された作業ゴンドラは、該クレーン架台及び水平駆動手
段の移動により水平方向四方に自在に移動され得る。つ
まり、深礎杭基礎構築立坑5等の立坑内で作業ゴンドラ
を、水平方向のうち所望の方向に移動位置決めさせ得る
ことにより、該立坑の拡幅掘削が容易になるので、深礎
杭基礎の構築が更に容易となる。
In a third aspect of the present invention, in the first aspect, the sheep slide device 2 is mounted on the crane base.
Since two horizontal driving means such as 2 are provided so as to be able to move and drive the hanging support means in directions (arrows C and D directions) intersecting with the moving direction (arrows A and B directions) of the crane gantry. In addition to the effects of the first invention, the working gondola suspended from the crane mount can be freely moved in four directions in the horizontal direction by the movement of the crane mount and the horizontal driving means. That is, since the work gondola can be moved and positioned in a desired direction among the horizontal directions in the shaft such as the shaft 5 for building the deep foundation pile, the widening excavation of the shaft becomes easy. Becomes easier.

【0020】また本発明のうち第四の発明は、地盤2等
の地盤に深礎杭基礎構築立坑5等の立坑を掘削し、掘削
した立坑内にコンクリートを打設して深礎杭躯体10等
のコンクリート杭躯体を形成することにより深礎杭基礎
3等の深礎杭基礎を構築する深礎杭基礎の構築方法にお
いて、前記立坑を掘削する際に、第一の発明の深礎杭基
礎施工装置を、複数の脚部を介して前記地盤上に設置し
た後、前記クレーン架台の移動により前記作業ゴンドラ
を前記掘削位置に移動させ、前記吊支手段の繰出しによ
り該作業ゴンドラを前記ゴンドラ通行穴を介して立坑内
に降下挿入させ、該作業ゴンドラを介して立坑を延長掘
削し、前記吊支手段の巻取りにより該作業ゴンドラを地
上に上昇させ、前記クレーン架台の移動により該作業ゴ
ンドラを前記待機位置に移動させ、該ゴンドラ通行穴を
介して立坑内のズリを外部に排出して、前記立坑の掘削
を行うようにして構成されるので、深礎杭基礎の構築作
業における機械化が実現され、よって深礎杭基礎の構築
作業は手間と時間がかからず、容易になる。また、深礎
杭基礎施工装置を設置する地盤では、脚部に対応した箇
所だけを整地すればよいので、自然環境の良好なる保持
が実現する。
A fourth aspect of the present invention is that a shaft such as a deep foundation pile foundation construction shaft 5 is excavated on the ground such as the ground 2 and concrete is poured into the excavated shaft to form a deep foundation pile frame 10. In the method of constructing a deep-foundation pile foundation such as a deep-foundation pile foundation such as a deep-foundation pile foundation 3 by forming a concrete pile body such as After installing the construction device on the ground via a plurality of legs, the work gondola is moved to the excavation position by moving the crane gantry, and the work gondola is passed through the gondola by extending the suspension support means. The work gondola is lowered and inserted into the shaft through the hole, the shaft is extended and excavated through the work gondola, the work gondola is raised to the ground by winding the suspension support means, and the work gondola is moved by moving the crane stand. The waiting The vertical shaft is excavated through the gondola passage hole, and the vertical shaft is excavated, so that the mechanization in the construction work of the deep foundation pile foundation is realized, Therefore, the construction work of the deep foundation pile foundation does not take time and effort, and becomes easy. In addition, in the ground where the deep foundation pile foundation construction device is installed, only the portion corresponding to the leg portion needs to be leveled, so that good maintenance of the natural environment is realized.

【図面の簡単な説明】[Brief description of the drawings]

【図1】図1は、本発明による深礎杭基礎施工装置の一
例が設置された深礎杭基礎の構築現場を示した模式図で
ある。
FIG. 1 is a schematic diagram showing a construction site of a deep foundation pile foundation on which an example of a deep foundation pile foundation construction apparatus according to the present invention is installed.

【図2】図2は、図1の矢印I方向から見た深礎杭基礎
施工装置の拡大矢視図である。
FIG. 2 is an enlarged view of the deep foundation pile foundation construction apparatus as viewed from the direction of arrow I in FIG. 1;

【図3】図3は、図2の矢印II方向から見た矢視図であ
る。
FIG. 3 is a view as viewed in the direction of arrow II in FIG. 2;

【図4】図4は、図2の深礎杭基礎施工装置を示した平
面図である。
FIG. 4 is a plan view showing the deep foundation pile foundation construction apparatus of FIG. 2;

【符号の説明】[Explanation of symbols]

2……地盤 3……深礎杭基礎 5……立坑(深礎杭基礎構築立坑) 10……コンクリート杭躯体(深礎杭躯体) 12……深礎杭基礎施工装置 13……脚部(設置脚) 13a……支持部 15……ステージ(ステージフレーム) 16……ゴンドラ通行穴(作業穴) 17……ガイド手段(ガイドレール) 21……クレーン架台(クレーンフレーム) 22……水平駆動手段(シープスライド装置) 25……ウインチ手段(ウインチユニット) 25a……吊支手段(ワイヤ) 26……作業ゴンドラ(作業ゴンドラユニット) K1……掘削位置 K2……待機位置 2 ... ground 3 ... deep foundation pile foundation 5 ... vertical shaft (deep foundation pile construction vertical shaft) 10 ... concrete pile framework (deep foundation pile framework) 12 ... deep foundation pile foundation construction equipment 13 ... leg ( Installation leg) 13a Support 15 Stage (stage frame) 16 Gondola passage hole (work hole) 17 Guide means (guide rail) 21 Crane mount (crane frame) 22 Horizontal drive means (Sheep slide device) 25 ... winch means (winch unit) 25a ... hanging support means (wire) 26 ... working gondola (working gondola unit) K1 ... excavation position K2 ... standby position

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】複数の脚部をもつステージを有し、 前記ステージにガイド手段を、掘削位置と待機位置との
間に亙って水平方向に形成し、 前記ステージにクレーン架台を、該クレーン架台が前記
ガイド手段に沿って移動し得る形で設け、 前記クレーン架台に、ウインチ手段により繰出・巻取自
在に設けられた吊支手段を介して作業ゴンドラを着脱自
在に吊支し、 前記ステージの掘削位置に、該ステージを上下方向に貫
通した形のゴンドラ通行穴を設けて構成した深礎杭基礎
施工装置。
1. A stage having a plurality of legs, wherein a guide means is formed on the stage in a horizontal direction between an excavation position and a standby position, and a crane mount is mounted on the stage, and the crane is mounted on the stage. A gantry is provided so as to be movable along the guide means, and a work gondola is detachably suspended on the crane pedestal via suspension means provided so as to be able to be fed and wound up by winch means, A deep foundation pile foundation construction device in which a gondola passage hole is formed at the excavation position of a stage so as to penetrate the stage vertically.
【請求項2】前記脚部の支持部を、前記ステージに対し
て下方に突出後退位置決めし得る形で設けて構成した請
求項1記載の深礎杭基礎施工装置。
2. The deep foundation pile foundation construction apparatus according to claim 1, wherein the support portion of the leg portion is provided so as to project downward and retreat with respect to the stage.
【請求項3】前記クレーン架台に水平駆動手段を、前記
吊支手段を該クレーン架台の移動方向に交差する方向に
移動駆動自在に設けて構成した請求項1記載の深礎杭基
礎施工装置。
3. The deep foundation pile foundation construction apparatus according to claim 1, wherein said crane mount is provided with horizontal drive means, and said suspension support means is provided so as to be movable and movable in a direction intersecting with the moving direction of said crane mount.
【請求項4】地盤に立坑を掘削し、掘削した立坑内にコ
ンクリートを打設してコンクリート杭躯体を形成するこ
とにより深礎杭基礎を構築する深礎杭基礎の構築方法に
おいて、前記立坑を掘削する際に、 請求項1記載の深礎杭基礎施工装置を、複数の脚部を介
して前記地盤上に設置した後、 前記クレーン架台の移動により前記作業ゴンドラを前記
掘削位置に移動させ、前記吊支手段の繰出しにより該作
業ゴンドラを前記ゴンドラ通行穴を介して立坑内に降下
挿入させ、該作業ゴンドラを介して立坑を延長掘削し、
前記吊支手段の巻取りにより該作業ゴンドラを地上に上
昇させ、前記クレーン架台の移動により該作業ゴンドラ
を前記待機位置に移動させ、該ゴンドラ通行穴を介して
立坑内のズリを外部に排出して、前記立坑の掘削を行う
ようにして構成した深礎杭基礎の構築方法。
4. A method for constructing a deep-foundation pile foundation by excavating a shaft in the ground and placing concrete in the excavated shaft to form a concrete pile frame, the method comprising: When excavating, after the deep foundation pile foundation construction device according to claim 1 is installed on the ground via a plurality of legs, the work gondola is moved to the excavation position by moving the crane gantry, The work gondola is lowered and inserted into the shaft through the gondola passage hole by extending the hanging support means, and the shaft is extended and excavated through the work gondola,
The work gondola is raised to the ground by winding the suspension support means, the work gondola is moved to the standby position by the movement of the crane stand, and the slip in the shaft is discharged to the outside through the gondola passage hole. And a method of constructing a deep foundation pile foundation configured to excavate the shaft.
JP9297094A 1994-04-06 1994-04-06 Deep foundation pile foundation construction device and construction method of deep foundation pile foundation Expired - Lifetime JP2737047B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9297094A JP2737047B2 (en) 1994-04-06 1994-04-06 Deep foundation pile foundation construction device and construction method of deep foundation pile foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9297094A JP2737047B2 (en) 1994-04-06 1994-04-06 Deep foundation pile foundation construction device and construction method of deep foundation pile foundation

Publications (2)

Publication Number Publication Date
JPH07279169A JPH07279169A (en) 1995-10-24
JP2737047B2 true JP2737047B2 (en) 1998-04-08

Family

ID=14069273

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9297094A Expired - Lifetime JP2737047B2 (en) 1994-04-06 1994-04-06 Deep foundation pile foundation construction device and construction method of deep foundation pile foundation

Country Status (1)

Country Link
JP (1) JP2737047B2 (en)

Also Published As

Publication number Publication date
JPH07279169A (en) 1995-10-24

Similar Documents

Publication Publication Date Title
CN207332754U (en) Electric pole is digged pit upright bar integrated apparatus
CN112942398A (en) Assembled open caisson construction system and process
CN109706918B (en) Reinforcing cage orifice forming device for hoisting limited space and construction method thereof
JP2737047B2 (en) Deep foundation pile foundation construction device and construction method of deep foundation pile foundation
CN115897600A (en) Construction method for newly-built foundation pit close to existing subway station deep foundation pit proximity area
CN113266019B (en) Construction method of foundation pit steel pipe support system
CN113152978A (en) Hydraulic self-lifting construction method based on inverted cone shell water tank
JP2780571B2 (en) Reinforcing cage construction equipment
JP2967508B2 (en) Scaffolding equipment for wall work
JP3578850B2 (en) Drilling rigs for building shafts or foundations for structures
CN217734010U (en) Bearing diagonal construction equipment for foundation ditch
CN214832698U (en) Precast pile sinking equipment
CN114687356B (en) Construction method for deep foundation pit excavation of building
CN219930984U (en) Modular detachable elevator foundation pit supporting device
JPH0534475B2 (en)
JP2019173365A (en) Method of constructing linear structure
JPH028106B2 (en)
JP2012233344A (en) Method for connecting mast, and device for use in the same
CN214423355U (en) Formwork device for pile foundation construction and construction system using same
JP3046249B2 (en) Vertical hole drilling method
SU977176A1 (en) Apparatus for installing underground reinforced concrete vessels
JP3158227B2 (en) Underground building construction method
JP2024092112A (en) EARTH HOLE DUCTILIZER AND EARTH HOLE CONSTRUCTION METHOD
JP2009203750A (en) Excavating machine and excavation method
CN116464075A (en) High slope support construction method