JP2721950B2 - Ground improvement method for tunnel excavation and surrounding area - Google Patents

Ground improvement method for tunnel excavation and surrounding area

Info

Publication number
JP2721950B2
JP2721950B2 JP5221820A JP22182093A JP2721950B2 JP 2721950 B2 JP2721950 B2 JP 2721950B2 JP 5221820 A JP5221820 A JP 5221820A JP 22182093 A JP22182093 A JP 22182093A JP 2721950 B2 JP2721950 B2 JP 2721950B2
Authority
JP
Japan
Prior art keywords
tunnel
fixing
injection
outer tube
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP5221820A
Other languages
Japanese (ja)
Other versions
JPH0776819A (en
Inventor
功 岩田
明 神出
巌 鷺森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
OOSAKA BOSUI KENSETSUSHA KK
Original Assignee
OOSAKA BOSUI KENSETSUSHA KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by OOSAKA BOSUI KENSETSUSHA KK filed Critical OOSAKA BOSUI KENSETSUSHA KK
Priority to JP5221820A priority Critical patent/JP2721950B2/en
Publication of JPH0776819A publication Critical patent/JPH0776819A/en
Application granted granted Critical
Publication of JP2721950B2 publication Critical patent/JP2721950B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明はトンネル掘削部及びその
周辺部の地盤改良工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a soil improvement method for a tunnel excavation part and its surroundings.

【0002】[0002]

【従来技術とその問題点】従来、自立性の低い、例えば
未固結の軟弱地盤においてトンネルを構築するに際して
は、通常、トンネル掘削に先行してトンネル断面並びに
その周辺部の地盤を薬液注入により固結し、トンネル掘
削時に本坑や切羽部が崩壊せぬように強化している。ま
た、トンネル掘進中は、トンネルの掘削と同時並行して
掘削により新たに生じた坑壁を支保し、空洞空間を確保
している。
2. Description of the Related Art Conventionally, when constructing a tunnel in a low independence, for example, unconsolidated soft ground, usually, prior to the excavation of the tunnel, the cross section of the tunnel and the ground around the tunnel are injected with a chemical solution. It is reinforced and strengthened to prevent the main shaft and face from collapsing during tunnel excavation. In addition, during tunnel excavation, a newly formed tunnel wall is supported in parallel with the tunnel excavation to secure a hollow space.

【0003】従来、このような薬液注入工及び支保工は
個別作業によって行われているが、之等の作業には多大
の人手と時間を要し、工期延長、工費高騰の原因になっ
ていた。
Conventionally, such chemical solution injection work and support work have been performed individually, but such work requires a great deal of manpower and time, resulting in an increase in the construction period and a rise in construction costs. .

【0004】さらに、トンネル掘進により新たに生じた
坑壁の周辺時の地盤は薬液注入により固結強化されてい
るとはいえ、薬液注入による地盤改良の効果には限界が
あるので、坑壁の支保作業時に懸念される坑壁崩壊防止
対策としては万全なものでなく、より一層の改善が望ま
れていた。
Further, although the ground around the pit wall newly formed by tunnel excavation is reinforced by the injection of the chemical solution, the effect of the ground improvement by the injection of the chemical solution is limited. As a countermeasure to prevent collapse of the pit wall, which is a concern at the time of the support work, it was not thorough and further improvement was desired.

【0005】本発明は、このような従来の問題点を一掃
することを目的としてなされたものである。
The present invention has been made for the purpose of eliminating such a conventional problem.

【0006】本発明は、掘削すべきトンネルと略々平行
に予め掘削形成した導坑内よりトンネル掘削部及びその
周辺部の地盤改良を行う工法であって、上記導坑内から
掘削すべきトンネルの断面を超えてその周辺部の地盤内
の所定深度に到達するようにケーシングチューブの適用
のもとに削孔を形成する工程及び該削孔内に建て込まれ
た注入用外管と該外管内に入されたダブルパッカー付
き注入用内管とを用いて外管の外周部の周りの周隙をシ
ールグラウトの充填によりによりシールした状態で薬液
注入する工程とを含み、薬液注入後、内管は外管を建て
込み位置に残したままで引き抜き回収され、残置された
外管のうち、トンネル断面を超えてその周辺部の地盤内
に挿入設置される部分は、高強度部材から構成されてい
ると共に、先端側寄りの部分に注入孔付き定着用部を具
備し、該定着用部は、薬液注入の前又は後に、当該定着
用部内からその注入孔を通じ定着部外周部周りの周隙内
注入充填される定着材により建て込み位置に定着固定
されることを特徴とするトンネル掘削部及びその周辺部
の地盤改良工法に係る。
The present invention relates to a method of improving the ground of a tunnel excavation part and its surroundings from a tunnel previously formed substantially in parallel with a tunnel to be excavated, and a cross section of the tunnel to be excavated from the tunnel. Of the casing tube to reach a certain depth in the ground around it
By using the process and該削 injection outer tubes Tatekoma in the hole and the outer tube in a with a double packer implanted is inserted tube to form a drilling under the outer peripheral portion of the outer tube Clear the surrounding space
And a step of liquid injection while sealed by the filling of Rugurauto, after reagent injection, the inner tube is built outer tube
Pulled out and collected while remaining in the insertion position and left behind
Of the outer tube, the portion that is inserted and installed in the ground at the periphery beyond the tunnel cross section is made of a high-strength member, and has a fixing portion with an injection hole in a portion near the tip end, The fixing section is provided before or after the injection of the chemical solution.
From the inside of the fixing part through the injection hole
The present invention relates to a soil improvement method for a tunnel excavation part and its peripheral part, which is fixedly fixed at a built-in position by a fixing material injected and filled into a tunnel.

【0007】[0007]

【実施例】以下に本発明工法の1実施例を添付図面に基
づき説明すると、次の通りである。
DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the method of the present invention will be described below with reference to the accompanying drawings.

【0008】本発明工法の実施に際しては、図1に示す
ように先ず最初に自立性の低い例えば未固結の軟弱地盤
1内に、構築しようとする仮想トンネル2の下方近傍、
好ましくはその下辺中点の下方に、トンネルと平行に長
さ方向に延出する導坑3が掘削形成される。
When the method of the present invention is carried out, first, as shown in FIG. 1, a part near a virtual tunnel 2 to be constructed is first placed in an unconsolidated soft ground 1 having a low independence.
A pit 3 is preferably formed below the lower midpoint, extending in the length direction parallel to the tunnel.

【0009】導坑3はトンネル掘削部の地盤改良を行う
に際し作業坑として利用され、通常2〜5m程度の口径
を有している。図2に導坑3の掘削形成状況が示され、
例えばシールド式掘削機4の掘進につれセグメント5を
順次継足して行くことにより、立坑6.6間に導坑3を
掘削形成出来る。
The shaft 3 is used as a working pit for improving the ground at the tunnel excavation part, and usually has a diameter of about 2 to 5 m. FIG. 2 shows the state of excavation of the shaft 3.
For example, by sequentially adding the segments 5 as the shield type excavator 4 excavates, the shaft 3 can be excavated between the shafts 6.6.

【0010】図3は導坑3を作業坑として利用し、本発
明工法に従い、地盤改良を行った後の状況を示してい
る。参照符号aは本発明工法を適用して形成した1つの
地盤改良部を示し、地盤改良部aはトンネル断面方向と
トンネル長さ方向の全域を地盤改良するために、両方向
に適宜のピッチで繰り返し形成される。
FIG. 3 shows the situation after ground improvement has been carried out using the shaft 3 as a working shaft according to the method of the present invention. Reference numeral a denotes one ground improvement part formed by applying the method of the present invention, and the ground improvement part a is repeated at an appropriate pitch in both directions in order to improve the ground in the entire area in the tunnel sectional direction and the tunnel length direction. It is formed.

【0011】地盤改良部aの形成状況を、図面4〜9を
参照しつつ工程順に説明すると、次の通りである。
The state of formation of the ground improvement part a will be described in the order of steps with reference to FIGS.

【0012】図4は削孔形成時の状況を示し、削孔形成
はケーシングチューブ7を用いて行われる。ケーシング
チューブ7は、導孔3内から口元止水ボックス8を通
じ、地盤1中に該チューブ7の先端から噴出される削孔
水の削孔案内のもとに挿入され削孔により生ずる泥水は
上記ケーシング7の外側を通り、口元止水ボックス8に
備えた開閉バルブ9を経て導坑3内の適所に排出され
る。削孔形成のためのケーシングチューブ7の挿入は導
坑3内で継続しながら行われ、例えば図3に示すように
仮想トンネル2の断面を超えてその周辺部の地盤1a内
の所定深度に達した時点で終了する。
FIG. 4 shows a situation at the time of drilling. The drilling is performed using the casing tube 7. The casing tube 7 is inserted from the inside of the guide hole 3 through the water stop box 8 near the mouth under the drilling guide of drilling water jetted from the tip of the tube 7 into the ground 1, and the muddy water generated by the drilling is as described above. After passing through the outside of the casing 7, the water is discharged to an appropriate place in the shaft 3 via an opening / closing valve 9 provided in a water stop box 8 at the mouth. Insertion of the casing tube 7 for forming a hole is performed while continuing in the shaft 3, and, for example, as shown in FIG. 3, exceeds a cross section of the virtual tunnel 2 and reaches a predetermined depth in the ground 1 a around the virtual tunnel 2. It ends when it does.

【0013】削孔10の形成を終えた後は図5に示すよ
うに削孔10内への注入用外管11の建込みが行われ
る。
After the formation of the hole 10 is completed, the outer tube 11 for injection is built into the hole 10 as shown in FIG.

【0014】注入用外管11は下記に述べるダブルパッ
カー付注入用内管と協同して薬液注入による地盤改良を
行うためのものであり、管長さの方向に適宜の間隔を存
して多段的に多数の逆止弁環12付注入口13(図9参
照)を備えている。本発明工法において用いられる注入
用外管11は、図9に示すように先端が閉塞されいて、
閉塞部の先端に、復元バネ(図示せず)に抗し拡縮可能
な例えば翼型のアンカー部材14が備えられている。ま
た上記外管11のうち、図3において、トンネル断面を
超える周辺部の地盤1a内に挿入設置される部分11A
は、これにロックボルト工法におけるロックボルトと同
じ機能を保持させるために、高強度例えば鋼製又は強化
プラスチック製の管部材の継足しにより構成されてい
る。
The outer pipe for injection 11 is for improving the ground by injecting a chemical solution in cooperation with the inner pipe for injection with a double packer described below. Are provided with a number of inlets 13 with check valve rings 12 (see FIG. 9). The outer tube 11 for injection used in the method of the present invention has its tip closed as shown in FIG.
At the tip of the closing portion, for example, a wing-shaped anchor member 14 that can expand and contract against a restoring spring (not shown) is provided. In addition, in FIG. 3, a portion 11A of the outer pipe 11 inserted into the ground 1a at a peripheral portion exceeding the tunnel cross section.
In order to keep the same function as the lock bolt in the lock bolt method, the pipe is formed by adding a pipe member of high strength, for example, steel or reinforced plastic.

【0015】外管11の高強度部分11Aは図3及び図
9に示すように先端側の定着用部11aと、基端側の注
入用として機能する一般部11bとに分けられ、定着用
部11aと一般部11bとの境界部の外周面側にセパレ
ートパッカー15が備えられ、該パッカー15内に1つ
の逆止弁環12a付注入口13aが開口している。
As shown in FIGS. 3 and 9, the high-strength portion 11A of the outer tube 11 is divided into a fixing portion 11a on the distal end side and a general portion 11b functioning as a base for injection. A separate packer 15 is provided on the outer peripheral surface side of the boundary between the 11a and the general part 11b, and one inlet 13a with a check valve ring 12a is opened in the packer 15.

【0016】定着用部11aと一般部11bとの間に
は、内空部を隔離するように仕切り16が設けられ、該
仕切り16には管軸方向に貫通する注入通路17が形成
されている。注入通路17には逆止弁18を備えること
ができる。
A partition 16 is provided between the fixing section 11a and the general section 11b so as to isolate the inner space. The partition 16 has an injection passage 17 penetrating in the pipe axis direction. . The injection passage 17 can be provided with a check valve 18.

【0017】定着用部11aは必ずしも注入用外管11
の一部分を利用する必要はなく、例えば図10に示すよ
うに中空で側部に注入口27を有するロックボルト28
を用いて構成するようにしてもよい。
The fixing portion 11a is not necessarily the outer tube 11 for injection.
It is not necessary to use a part of the lock bolt 28, for example, as shown in FIG.
May be used.

【0018】上記構成の外管11は、導坑3(図3参
照)内で先端側のものから順に継ぎ足されながらケーシ
ングチューブ7内に基端側から先端に向け挿入されて行
き、ケーシング内の通過中は、アンカー部材14はチュ
ーブ内壁に拘束されて復元バネに抗し縮少状態を保持
し、図5に示すようにケーシングチューブ7の先端を通
過すると、チューブ内壁の拘束から開放されて復元バネ
の働きで拡張状態に自動復元し、削孔10の孔壁10a
に保止し、外管11を建込み位置に拘束する。尚、外管
11の建込み操作中は、セパレート用パッカー15は縮
小状態を保持している。外管11の建込みを終えた後
は、図6に示すように、ケーシングチューブ7が削孔1
0の口元部近くまで抜き出され、次いでダブルパッカー
19、19を備えた注入用内管20が注入用外管11内
に導坑3内で継ぎ足されながら挿入される。ダブルパッ
カー19、19は最初に、セパレート用パッカー15の
位置に置かれ、該パッカー19、19間に開口する射出
口(図示せず)より逆止弁環12a付注入口13aを通
じ液剤がパッカー15内に注入充填される。よってパッ
カー15は図6に示すように膨脹し、外管11の外側で
削孔10を、パッカー15より先端側の第1充填部10
Aと、同基端側の第2充填部10Bとに区別する。
The outer tube 11 having the above-described configuration is inserted from the base end toward the front end into the casing tube 7 while being added sequentially from the tip end side in the shaft 3 (see FIG. 3), and is inserted into the casing tube. During the passage, the anchor member 14 is restrained by the inner wall of the tube and holds the contracted state against the restoring spring. When the anchor member 14 passes through the distal end of the casing tube 7 as shown in FIG. It is automatically restored to the expanded state by the action of the spring, and the hole wall 10a of the drill hole 10 is formed.
And the outer tube 11 is restrained at the erected position. During the operation of setting the outer tube 11, the separate packer 15 is kept in a reduced state. After the outer tube 11 has been installed, as shown in FIG.
The inner tube 20 for injection with the double packers 19, 19 is inserted into the outer tube 11 for injection while being added to the inside of the shaft 3 in the shaft 3. The double packers 19, 19 are first placed at the position of the separate packer 15, and a liquid agent is supplied from an injection port (not shown) opened between the packers 19, 19 through an inlet 13 a with a check valve ring 12 a. It is injected and filled in. Accordingly, the packer 15 expands as shown in FIG.
A and the second filling portion 10B on the base end side.

【0019】パッカー部15膨脹による削孔10の区画
を終えた後は、ケーシングチューブ7と外管11との間
の間隔をプラグ21により閉じた状態で、開閉バルブ9
を通じ第2充填部10B内に矢符22で示すようにシー
ルグラウトが注入充填される。このシールグラウトの注
入充填は注入用内管20を用いて行っても良い。
After the division of the drilling hole 10 due to the expansion of the packer portion 15 is completed, the opening and closing valve 9 is closed while the space between the casing tube 7 and the outer tube 11 is closed by the plug 21.
As shown by an arrow 22, the seal grout is injected and filled into the second filling portion 10B. The injection filling of the seal grout may be performed using the inner tube 20 for injection.

【0020】図7に示すように、第2充填部10Bに注
入充填されたシールグラウト23が固化した後は、注入
用内管20を図7に示す挿入位置から導坑3に向けステ
ップダウンしダブルパッカー19、19と注入用外管1
1の各段の逆止弁環12付注入口13とを位置合わせし
つつ常法に従い薬液注入が行われ、これによりその周囲
の地盤が固結される。
As shown in FIG. 7, after the seal grout 23 injected and filled in the second filling portion 10B is solidified, the inner pipe 20 for injection is stepped down from the insertion position shown in FIG. Double packers 19, 19 and outer tube for injection 1
The chemical solution is injected according to a conventional method while aligning the injection port 13 with the check valve ring 12 of each stage 1 to thereby solidify the surrounding ground.

【0021】薬液注入を終えた後は、図8、9に示すよ
うに注入用内管20に代え注入管24が外管11内に挿
入され、その先端は図9に示すように仕切り16の注入
通路17に接続される。この状態で注入管24から注入
通路17、定着用部11aの内部及びその周辺部の逆止
弁環12b付注入口13bを順次経て第1充填部10A
内にセメントミルクなどのような高強度定着材25が注
入充填される。
After the injection of the chemical solution, an injection tube 24 is inserted into the outer tube 11 instead of the inner tube 20 for injection as shown in FIGS. It is connected to the injection passage 17. In this state, the first filling unit 10A is sequentially passed from the injection pipe 24 through the injection passage 17, the injection port 13b with the check valve ring 12b inside and around the fixing unit 11a.
A high-strength fixing material 25 such as cement milk is injected and filled therein.

【0022】第1充填部A内への高強度定着材25の注
入充填を終えた後は、注入管24が導孔3内に引き抜き
回収され、又は回収することなしに、注入管24がその
周辺の間隔26(図9参照)内に注入充填される定着材
(図示せず)を介し、外管11内に定着固定される。後
者の場合、注入管24としては図9に示すように中空の
ロックボルトを用いることが、外管11の強度の強化を
計る上で有利である。この場合、将来の掘削工事を考慮
し、注入管24及び外管11はプラスチック(強化プラ
スチックを含む)製であることが好ましい。
After the filling and filling of the high-strength fixing material 25 into the first filling portion A, the filling tube 24 is pulled out into the conducting hole 3 and collected, or the filling tube 24 is removed without being collected. It is fixed and fixed in the outer tube 11 via a fixing material (not shown) which is injected and filled into a peripheral space 26 (see FIG. 9). In the latter case, it is advantageous to use a hollow lock bolt as the injection tube 24 as shown in FIG. 9 in order to increase the strength of the outer tube 11. In this case, the injection pipe 24 and the outer pipe 11 are preferably made of plastic (including reinforced plastic) in consideration of future excavation work.

【0023】図4〜8の工程を順次経ることにより、地
盤改良工程の1サイクルが終了し、図3に示すように1
つの地盤改良部aが得られる。
By going through the steps of FIGS. 4 to 8 sequentially, one cycle of the ground improvement step is completed, and as shown in FIG.
One ground improvement part a is obtained.

【0024】而して、このような地盤改良工程の1サイ
クルをトンネル断面方向とトンネル長さ方向とに適宜の
ピッチで繰り返し行い両方向に連続させることにより、
トンネル断面方向とトンネル長さ方向の全域を地盤改良
することが出来る。
Thus, one cycle of the ground improvement process is repeated at an appropriate pitch in the tunnel cross-sectional direction and the tunnel length direction, and is continued in both directions.
The ground can be improved in the whole area in the tunnel section direction and the tunnel length direction.

【0025】本発明工法において得られた地盤改良部a
は、図3に示すように薬液注入により補強された固結地
盤部a1 と、該固結地盤部a1 の中心に貫入する外管1
1とを含んでいる。
The ground improvement part a obtained by the method of the present invention a
It includes a consolidated ground portion a 1 reinforced with liquid injector shown in FIG. 3, the outer tube 1 to penetrate the center of the solid forming the ground part a 1
1 is included.

【0026】外管11のうち、高強度部分11A(図3
参照)は、トンネル掘削後においてその周辺部の地盤1
a内に残る部分である。
The high-strength portion 11A of the outer tube 11 (FIG. 3)
Is the ground 1 around the tunnel after excavation.
This is the part remaining in a.

【0027】外管11の高強度部分11Aは、周辺部の
地盤1aへの薬液注入に必要な一般部11bと定着用部
11aとに分かれ、定着用部11aはその周囲に充填さ
れた高強度定着材25により、建込み位置にしっかりと
定着固定されている。
The high-strength portion 11A of the outer tube 11 is divided into a general portion 11b and a fixing portion 11a required for injecting a chemical solution into the surrounding ground 1a. The fixing material 25 firmly fixes and fixes the building position.

【0028】トンネル掘削後、その周辺部の地盤1a内
に残る外管11の高強度部分11Aは、その高強度と、
定着用部11aにおける堅固な定着固定とにより支保工
の一つとしてよく知られているロックボルト工法におけ
るロックボルトと同じ働きをすることが可能になる。
After the tunnel excavation, the high-strength portion 11A of the outer pipe 11 remaining in the ground 1a around the tunnel has its high strength,
The firm fixing of the fixing portion 11a enables the same function as the lock bolt in the lock bolt method, which is well known as one of the supports.

【0029】よって本発明工法においては、薬液注入工
とロックボルト工法における支保工とを同時に施工する
ことができる。
Therefore, in the method of the present invention, the chemical injection and the support in the rock bolt method can be performed simultaneously.

【0030】本発明工法に従いトンネル掘削部の地盤改
良を終えた後は、図3に示す仮想トンネル2の部分が常
法に従い掘削される。
After the ground improvement of the tunnel excavation section is completed according to the method of the present invention, the portion of the virtual tunnel 2 shown in FIG. 3 is excavated according to a conventional method.

【0031】トンネル掘削時の掘削性を考慮し、外管1
1のうち(注入管24を残置せしめる場合は注入管24
を含めて)仮想トンネル2の領域を貫通する部分は、プ
ラスチックなどの掘削し易い材質のものを用いることが
好ましい。
In consideration of the excavation property during tunnel excavation, the outer pipe 1
1 (If the injection tube 24 is left, the injection tube 24
It is preferable that a portion penetrating through the area of the virtual tunnel 2 be made of a material such as plastic that is easily excavated.

【0032】従来一般にトンネルの掘進中は、トンネル
の掘進と同時並行して、掘削により新に生じた坑壁の崩
壊を防止するために支保工が実施されるが、本発明工法
では、ロックボルト工による支保工を既に終えているの
で、新たな支保工は省略できるか又は少なくとも簡略化
することが可能になる。また、支保工がトンネル掘進よ
りも先行しているので、トンネル掘削後に初めて支保工
を実施する場合に比べ、作業の安全性を向上し得る。
Conventionally, while a tunnel is being excavated, a shoring is generally performed in parallel with the excavation of the tunnel in order to prevent collapse of a newly formed pit wall. Since the shoring has already been completed, a new shoring can be omitted or at least simplified. Moreover, since the shoring works ahead of the tunnel digging, the work safety can be improved as compared with the case where the shoring is performed for the first time after the tunnel digging.

【0033】図11に本発明工法の他の実施例が示され
ている。本実施例に於ては、注入用内管29に備えられ
るダブルパッカー30、30は第1及び第2ライン3
1、32から個別に給、排される加圧流体により膨脹、
収縮自在であり、また上段側のパッカー30の上端に高
強度定着材の供給ライン33の上端が注入口として開口
している。
FIG. 11 shows another embodiment of the method of the present invention. In this embodiment, the double packers 30, 30 provided in the inner tube 29 for injection are the first and second lines 3 and 3.
Inflated by pressurized fluid supplied and discharged individually from 1, 32,
It is contractible, and the upper end of the high-strength fixing material supply line 33 is opened at the upper end of the upper packer 30 as an inlet.

【0034】上端側パッカー30は図9に示す実施例に
おける仕切り16を兼用することができ、従って本実施
例では仕切り16は設けられていない。
The upper end side packer 30 can also serve as the partition 16 in the embodiment shown in FIG. 9, and therefore, in this embodiment, the partition 16 is not provided.

【0035】図11は先の実施例における図9に対応
し、外管11を建込むまでの工程は、先の実施例と実質
的に異なる所がない。
FIG. 11 corresponds to FIG. 9 in the previous embodiment, and there is no substantial difference between the steps up to the installation of the outer tube 11 and the previous embodiment.

【0036】本実施例において、外管11の建込みを終
えた後は、該外管11内に内管29がダブルパッカー3
0、30を収縮させた状態で挿入され、セパレートパッ
カー15との位置合わせ後、ダブルパッカー30、30
が膨脹されシールが形成される。次いで内管29を通じ
セパレートパッカー15内に流体が加圧充填され、その
結果該パッカー15は膨脹して、第1充填部10Aと第
2充填部10Bとを隔離する。
In this embodiment, after the outer tube 11 has been set up, the inner tube 29 is placed in the outer tube 11 by the double packer 3.
0, 30 are inserted in a contracted state, and after alignment with the separate packer 15, the double packers 30, 30 are inserted.
Expand to form a seal. Then, the fluid is pressurized and filled into the separate packer 15 through the inner pipe 29, and as a result, the packer 15 expands and separates the first filling portion 10A from the second filling portion 10B.

【0037】次いで高強度定着材34が供給ライン33
を通じ定着用部11a内から逆止弁環12B付注入口1
3bを経て第1充填部10A内に注入充填される。この
場合、定着材34としては、反応硬化タイプの比較的ゲ
ルタイムの短い急硬セメント系のものを用いることがで
きる。この第1充填部10Aへの定着材34の注入充填
操作の前に第2充填部10Bへのシールグラウト23の
注入充填及び養生固化を終えておくことができる。
Next, the high-strength fixing material 34 is supplied to the supply line 33.
Through the fixing part 11a and through the inlet 1 with the check valve ring 12B
Through 3b, the first filling portion 10A is injected and filled. In this case, as the fixing material 34, a reaction hardening type hardened cement type material having a relatively short gel time can be used. Before the operation of injecting and filling the fixing material 34 into the first filling part 10A, the filling and curing and curing of the seal grout 23 into the second filling part 10B can be completed.

【0038】第1充填部10Aへの定着材34の注入充
填及び養生固化を終えた後は、ダブルパッカー30、3
0を収縮し、ワンステップダウンした位置で再び膨脹さ
せ、常法通り薬液注入を行う。以下、ダブルパッカー3
0、30の収縮、膨脹とステップダウンを繰り返しなが
ら薬液注入を行うことにより、先の実施例と同様に外管
11を核として含む地盤改良部aを得ることができる。
After the filling and curing and curing of the fixing material 34 into the first filling section 10A are completed, the double packers 30, 3
0 is contracted and expanded again at the position one step down, and a chemical solution is injected as usual. Below, Double Packer 3
By injecting the chemical solution while repeating the contraction, expansion and step-down of 0 and 30, the ground improvement part a including the outer tube 11 as a core can be obtained as in the previous embodiment.

【0039】本実施例では第1充填部10Aへの高強度
定着材34を注入充填した後に薬液注入が行われる以外
は、先の実施例と実質的に異なる所がない。
In this embodiment, there is substantially no difference from the previous embodiment except that a chemical solution is injected after the high-strength fixing material 34 is injected and filled into the first filling section 10A.

【0040】本発明工法に於て、導坑3の形成位置は、
図3に示す仮想トンネル2の下方近傍に加え、図12〜
14に示すように、仮想トンネル2内であってもよい。
In the method of the present invention, the formation position of the shaft 3 is
In addition to the vicinity below the virtual tunnel 2 shown in FIG.
As shown in FIG. 14, it may be inside the virtual tunnel 2.

【0041】[0041]

【発明の効果】本発明工法によれば、トンネルの掘削に
先行して、薬液注入工とロックボルト工法に基づく支保
工とを同時に施工できるので、之等を個別に行う場合に
比べ、人手と時間を削減することができ、工期の短縮と
工費の節減を同時に計ることができる。
According to the method of the present invention, the chemical injection and the support based on the rock bolt method can be simultaneously performed prior to the tunnel excavation. The time can be reduced, and the construction period can be shortened and the construction cost can be reduced at the same time.

【0042】さらにトンネルの掘削に先行して、支保工
が施工されるので、トンネル掘削後に初めて支保工を実
施する場合に比べ作業の安定性を向上できる。
Further, since the shoring is performed prior to the excavation of the tunnel, the work stability can be improved as compared with the case where the shoring is performed for the first time after the excavation of the tunnel.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明工法における導坑の形成位置を概略的に
示す説明図である。
FIG. 1 is an explanatory view schematically showing a formation position of a shaft in the method of the present invention.

【図2】同導坑の形成状況を概略的に示す説明図であ
る。
FIG. 2 is an explanatory view schematically showing a formation state of the shaft.

【図3】本発明工法における地盤改良状況を概略的に示
す全体図である。
FIG. 3 is an overall view schematically showing a state of ground improvement in the method of the present invention.

【図4】本発明工法における削孔状況を概略的に示す説
明図である。
FIG. 4 is an explanatory view schematically showing a drilling state in the method of the present invention.

【図5】同外管の建込み途中の状況を概略的に示す説明
図である。
FIG. 5 is an explanatory view schematically showing a state in which the outer tube is being built.

【図6】同外管建込み後、セパレートパッカーを膨脹し
た状況を概略的に示す説明図である。
FIG. 6 is an explanatory view schematically showing a state where the separate packer is expanded after the outer tube is built.

【図7】同シールグラウト充填後、薬液注入を行ってい
る状況を概略的に示す説明図である。
FIG. 7 is an explanatory view schematically showing a state in which a chemical solution is being injected after filling the seal grout.

【図8】同高強度定着材の充填時の状況を概略的に示す
説明図である。
FIG. 8 is an explanatory view schematically showing a state when the high-strength fixing material is filled.

【図9】同拡大詳細図である。FIG. 9 is an enlarged detail view of the same.

【図10】定着用部の変形例を示す図9に対応する図で
ある。
FIG. 10 is a view corresponding to FIG. 9 and showing a modification of the fixing unit.

【図11】本発明工法の他の実施の1例を示す図9に対
応する図である。
FIG. 11 is a view corresponding to FIG. 9 showing another example of the working method of the present invention.

【図12】本発明工法における導坑形成位置の変更例を
示す。
FIG. 12 shows an example of changing the shaft formation position in the method of the present invention.

【図13】更に他の変更例を示す図である。FIG. 13 is a diagram showing still another modification.

【図14】更に他の変更例を示す図である。FIG. 14 is a diagram showing still another modification.

【符号の説明】[Explanation of symbols]

1 軟弱地盤 2 仮想トンネル 3 導坑 4 シールド式掘削機 5 セグメント 6 立坑 7 ケーシングチューブ 8 口元止水ボックス 9 開閉バルブ 10 削孔 11 注入用外管 12 逆止弁環 13 注入口 14 アンカー部 15 セパレートパッカー 16 仕切り 17 注入通路 18 逆止弁 19 ダブルパッカー 20 注入用内管 21 プラグ 22 矢符 23 シールグラウト 24 注入管 25 高強度定着材 DESCRIPTION OF SYMBOLS 1 Soft ground 2 Virtual tunnel 3 Shaft 4 Shield type excavator 5 Segment 6 Vertical shaft 7 Casing tube 8 Water stop box at mouth 9 Opening-and-closing valve 10 Drilling 11 Outer pipe for injection 12 Check valve ring 13 Injection 14 Anchor 15 Separate Packer 16 Partition 17 Injection passage 18 Check valve 19 Double packer 20 Inner tube for injection 21 Plug 22 Arrow 23 Seal grout 24 Injection tube 25 High strength fixing material

───────────────────────────────────────────────────── フロントページの続き (51)Int.Cl.6 識別記号 庁内整理番号 FI 技術表示箇所 E21D 20/00 E21D 20/00 M N ──────────────────────────────────────────────────続 き Continued on the front page (51) Int.Cl. 6 Identification number Agency reference number FI Technical display location E21D 20/00 E21D 20/00 M N

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 掘削すべきトンネルと略々平行に予め掘
削形成した導坑内よりトンネル掘削部及びその周辺部の
地盤改良を行う工法であって、上記導坑内から掘削すべ
きトンネルの断面を超えてその周辺部の地盤内の所定深
度に到達するようにケーシングチューブの適用のもとに
削孔を形成する工程及び該削孔内に建て込まれた注入用
外管と該外管内に入されたダブルパッカー付き注入用
内管とを用いて外管の外周部の周りの周隙をシールグラ
ウトの充填によりによりシールした状態で薬液注入する
工程とを含み、薬液注入後、内管は外管を建て込み位置
に残したままで引き抜き回収され、残置された外管のう
ち、トンネル断面を超えてその周辺部の地盤内に挿入設
置される部分は、高強度部材から構成されていると共
に、先端側寄りの部分に注入孔付き定着用部を具備し、
該定着用部は、薬液注入の前又は後に、当該定着用部内
からその注入孔を通じ定着部外周部周りの周隙内に注入
充填される定着材により建て込み位置に定着固定される
ことを特徴とするトンネル掘削部及びその周辺部の地盤
改良工法。
1. A method for improving the ground of a tunnel excavation part and its surrounding part from inside a tunnel previously excavated substantially in parallel with a tunnel to be excavated, wherein the tunnel excavation is performed over a cross section of the tunnel to be excavated from inside the tunnel. The casing tube so that it reaches a certain depth in the ground around the
Circumferential gap around the outer periphery of the outer tube using a step and該削 injection outer tubes Tatekoma in the hole and the outer tube in a with a double packer implanted is inserted tube to form a drilling The seal gras
The step of injecting a chemical solution in a state of being sealed by filling with an out , and after injecting the chemical solution, the inner pipe is installed at the outer pipe
Drawn out and collected, leaving the outer tube
That is, the portion that is inserted and installed in the ground around the tunnel cross section is made of a high-strength member, and includes a fixing portion with an injection hole in a portion near the tip end,
Before or after the injection of the chemical solution, the fixing section is provided inside the fixing section.
And a ground improvement method for a tunnel excavation part and its peripheral part, which is fixedly fixed at a built-in position by a fixing material injected and filled in a gap around an outer peripheral part of the fixing part through the injection hole .
【請求項2】 定着用部外周部周りの周隙内への定着材
の注入充填と外管外周部周りの周隙内へのシールグラウ
トの注入充填を、定着用部と外管との境界部の外周面側
に備えたセパレートパッカーの拡張により、定着部側と
外管側とに隔離した状態で行うことを特徴とする請求項
1記載の地盤改良工法。
2. A fixing material in a gap around an outer peripheral portion of a fixing portion.
Filling and sealing grout into the space around the outer circumference of the outer tube
Inject and fill the outer peripheral surface at the boundary between the fixing section and the outer tube.
By expanding the separate packer in preparation for
The method is performed in a state of being isolated from the outer tube side.
The ground improvement method according to 1.
【請求項3】外管の外周部周りの周隙内へのシーグラ
ウトの注入充填後薬液注入を行った後に、定着部の外周
部周りの周隙内に定着材を注入充填することを特徴とす
る請求項2記載の地盤改良工法。
After 3. A was injected after filling the liquid injector of the seal Gras <br/> out into the inner periphery of the gap around the outer periphery of the outer tube, a fixing member to the inner periphery of the gap around the outer periphery of the fixing portion 3. The method for improving the ground according to claim 2, wherein the material is injected and filled.
【請求項4】 定着部の外周部周りの周隙内に定着材を
注入充填した後に、外管の外周部内へのシールグラウト
の注入充填を行い、その後に薬液注入が行われることを
特徴とする請求項2記載の地盤改良工法。
4. A fixing material is provided in a gap around an outer peripheral portion of the fixing section.
After filling, seal grout into the outer circumference of the outer tube
Injection and filling, and then
The ground improvement method according to claim 2, characterized in that:
JP5221820A 1993-09-07 1993-09-07 Ground improvement method for tunnel excavation and surrounding area Expired - Fee Related JP2721950B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5221820A JP2721950B2 (en) 1993-09-07 1993-09-07 Ground improvement method for tunnel excavation and surrounding area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5221820A JP2721950B2 (en) 1993-09-07 1993-09-07 Ground improvement method for tunnel excavation and surrounding area

Publications (2)

Publication Number Publication Date
JPH0776819A JPH0776819A (en) 1995-03-20
JP2721950B2 true JP2721950B2 (en) 1998-03-04

Family

ID=16772704

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5221820A Expired - Fee Related JP2721950B2 (en) 1993-09-07 1993-09-07 Ground improvement method for tunnel excavation and surrounding area

Country Status (1)

Country Link
JP (1) JP2721950B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4794041B2 (en) * 2000-12-28 2011-10-12 清水建設株式会社 How to build a tunnel
WO2006057545A1 (en) * 2004-11-29 2006-06-01 Dong-Hyun Seo Tunnelling method using pre-support concept and an adjustable apparatus thereof
JP6742755B2 (en) * 2016-02-26 2020-08-19 公益財団法人鉄道総合技術研究所 Rock improvement rock bolt reinforcement method
JP6549501B2 (en) * 2016-02-26 2019-07-24 公益財団法人鉄道総合技術研究所 Hollow self-piercing lock bolt reinforcement method using steel inflatable packer

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4825316A (en) * 1971-08-10 1973-04-02
JPH0246373Y2 (en) * 1985-07-12 1990-12-06
JPS6241899A (en) * 1986-08-20 1987-02-23 鉄建建設株式会社 Method of fixing construction of tubular lock bolt
JPH01131715A (en) * 1987-11-16 1989-05-24 Osaka Bosui Constr Co Ltd Ground improving work by horizontal injection of chemical grout
JP2593356B2 (en) * 1990-03-16 1997-03-26 清水建設株式会社 Tunnel construction method
JP3011900U (en) * 1994-11-09 1995-06-06 好三 山野辺 Skipping rope
JP3021500U (en) * 1995-08-09 1996-02-20 株式会社桂 Door lock forget prevention device
JP3036024U (en) * 1995-09-12 1997-04-08 セキコン カング Shaft cell for golf bag

Also Published As

Publication number Publication date
JPH0776819A (en) 1995-03-20

Similar Documents

Publication Publication Date Title
CN108678772A (en) A kind of multilevel hierarchy suspension device and its construction method for rich water sandy gravel stratum tunnel
JP2721950B2 (en) Ground improvement method for tunnel excavation and surrounding area
KR100576053B1 (en) Soil nailing by extended packer grouting and construction method
CN208502786U (en) Multilevel hierarchy suspension device for rich water sandy gravel stratum tunnel
KR100823980B1 (en) Drain combination paker type pressurization grouting equipment and the upward method using the same
Bruce et al. The MPSP system: a new method of grouting difficult rock formations
JP4480907B2 (en) Tunnel excavation method
JP3125171B2 (en) How to build underground structures
JP2003055985A (en) Connecting method of column to pile
JP3015858B2 (en) Construction structure of landslide prevention pile and its construction method.
CN105041341A (en) Hole opening sealing device used for static pressure permeating rotary grouting of drill hole and using method thereof
US4431341A (en) Construction of a concrete lined chamber
JPH01131715A (en) Ground improving work by horizontal injection of chemical grout
JPH0821183A (en) Method for starting tunnel excavation
JP2566521B2 (en) Tunnel excavation and surrounding ground improvement method
JP3177908B2 (en) Starting method of shield excavator
JP4180347B2 (en) Construction method of underground continuous wall and underground continuous wall
KR20030091836A (en) A Continuous and Cut Off wall And Foundation Method By Overlap Casing
JPS61113924A (en) Method of forming pileform body
JPH0480495A (en) Execution of foundation pile
JPS61134496A (en) Departure of shield excavator
KR20220128814A (en) Construction method of retaining wall using cip wall
JP2777267B2 (en) Underground tunnel joining method and shaft shaft used for the method
JP2789370B2 (en) Piling method
Ganeshan et al. Grouting and its application in Tunneling

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees