JP2682926B2 - Backhoe hydraulic controller - Google Patents

Backhoe hydraulic controller

Info

Publication number
JP2682926B2
JP2682926B2 JP713092A JP713092A JP2682926B2 JP 2682926 B2 JP2682926 B2 JP 2682926B2 JP 713092 A JP713092 A JP 713092A JP 713092 A JP713092 A JP 713092A JP 2682926 B2 JP2682926 B2 JP 2682926B2
Authority
JP
Japan
Prior art keywords
lever
boom
backhoe
flow rate
hydraulic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP713092A
Other languages
Japanese (ja)
Other versions
JPH05195558A (en
Inventor
敬典 三浦
敏雄 向田
聡 飯田
勇太郎 森下
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kubota Corp
Original Assignee
Kubota Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kubota Corp filed Critical Kubota Corp
Priority to JP713092A priority Critical patent/JP2682926B2/en
Publication of JPH05195558A publication Critical patent/JPH05195558A/en
Application granted granted Critical
Publication of JP2682926B2 publication Critical patent/JP2682926B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Fluid-Pressure Circuits (AREA)
  • Operation Control Of Excavators (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、バックホー装置を複数
の油圧アクチュエータにより駆動するよう構成するとと
もに、前記バックホー装置におけるブームを上下動駆動
する油圧アクチュエータの電磁式比例流量制御弁の開度
を、操作レバーの操作量に応じた電流を供給して比例制
御する流量制御手段を備えてあるバックホーの油圧制御
装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention is constructed so that a backhoe device is driven by a plurality of hydraulic actuators, and the opening degree of an electromagnetic proportional flow control valve of a hydraulic actuator for vertically moving a boom in the backhoe device is The present invention relates to a backhoe hydraulic control device provided with a flow rate control unit that supplies a current according to an operation amount of an operation lever to perform proportional control.

【0002】[0002]

【従来の技術】上記バックホーの油圧制御装置におい
て、従来では、前記ブーム駆動用油圧シリンダ〔油圧ア
クチュエータの一例〕の主制御弁とは別に他の油圧ポン
プからの圧油をブーム上昇作動用圧油供給路に合流供給
する副制御弁を設け、バックホー装置を上昇駆動させる
際に、バックホー装置の重量に抗して大きな油圧力で持
ち上げ駆動するよう構成してあった〔例えば、油圧回路
構成の例として特開平2−289726号公報参照〕。
2. Description of the Related Art In the hydraulic control device for a backhoe described above, conventionally, pressure oil from another hydraulic pump is used in addition to the main control valve of the boom driving hydraulic cylinder [an example of hydraulic actuator] for boom raising operation. A sub-control valve that joins the supply path is provided, and when the backhoe device is driven to rise, the backhoe device is configured to lift and drive with a large hydraulic pressure against the weight of the backhoe device (for example, an example of a hydraulic circuit configuration. See Japanese Patent Application Laid-Open No. 2-289726].

【0003】[0003]

【発明が解決しようとする課題】上記構造は、通常の掘
削作業においては、バックホー装置により土砂を掬い上
げる作業を行う場合、ブームの上昇駆動はバックホー装
置自身の重量と土砂の重量とが共に加わり大きな重量負
担となるので、この上昇作動の際に2つの油圧ポンプの
圧油を合流して駆動力を大きくするようにしたものであ
る。ところで、この種のバックホーにおいて、バックホ
ー装置の先端部のバケットにより、又は、バケットに代
えて鉄製の杭体を取付けてバックホー装置を勢いよく下
降させて、コンクリート割りやアスファルトの破砕作業
を行うことがあるが、このような場合、上記従来構造の
如くバックホー装置の上昇作動の際に圧油合流が行われ
ると、杭打ち込み用下降作動に対してバックホー装置の
上昇作動の速度が速く行われることになり、上下作動に
速度差が発生して作業が行い難いものになる欠点があっ
た。このような杭打ち作業ではバックホー装置を下降さ
せた後、素早く上昇させる作業となるので、特に、電磁
式比例流量制御弁の電流供給量をレバー操作に基づいて
制御する構成においては、前記上昇作動時に電磁式比例
流量制御弁の応答遅れが生じて、バックホー装置が所望
位置よりも高い位置まで戻り作動して、次回下降操作に
時間が掛かり作業操作性が低下してしまう弊害があっ
た。本発明は上記不具合点を解消することを目的として
いる。
In the above structure, in a normal excavation work, when the backhoe device is used to scoop the earth and sand, the boom is driven up by both the weight of the backhoe device itself and the weight of the earth and sand. Since a large weight load is applied, the pressure oils of the two hydraulic pumps are combined to increase the driving force during this ascending operation. By the way, in this type of backhoe, a bucket at the tip of the backhoe or, instead of the bucket, an iron pile is attached to lower the backhoe vigorously to perform concrete cracking and asphalt crushing work. However, in such a case, when pressure oil merging is performed during the ascending operation of the backhoe device as in the above-described conventional structure, the ascending operation speed of the backhoe device is faster than the descending operation for driving the pile. However, there is a drawback that a speed difference occurs in the vertical movement, which makes it difficult to perform the work. In such pile driving work, since the backhoe device is lowered and then quickly raised, in particular, in the configuration in which the current supply amount of the electromagnetic proportional flow control valve is controlled based on the lever operation, the raising operation is performed. At the same time, a response delay of the electromagnetic proportional flow control valve occurs, the backhoe device returns to a position higher than the desired position, and the lowering operation takes time, which deteriorates the workability. An object of the present invention is to eliminate the above disadvantages.

【0004】[0004]

【課題を解決するための手段】本第1発明の特徴構成
は、冒頭に記載したバックホーの油圧制御装置におい
て、前記操作レバーが下降側操作領域から中立位置に対
して所定速度以上で戻し操作されたことを検出するレバ
ー速度検出手段と、ブーム用油圧アクチュエータ以外の
他の油圧アクチュエータが中立状態にあることを検出す
る中立検出手段とを備え、かつ、前記レバー速度検出手
段及び前記中立検出手段が共に検出状態になると、前記
ブーム用油圧アクチュエータに対する上昇操作側の圧油
供給量を標準流量よりも少ない量に抑制する流量抑制手
段を備えてある点にある。本第2発明の特徴構成は、前
記ブームの下降操作において前記操作レバーの下降駆動
用操作、中立維持操作及び上昇駆動用戻し操作の夫々が
所定速度以上の高速で行われたことを検出するレバー操
作状態検出手段と、ブーム用油圧アクチュエータ以外の
他の油圧アクチュエータが中立状態にあることを検出す
る中立検出手段とを備え、かつ、前記レバー操作状態検
出手段及び前記中立検出手段が共に検出状態になると、
前記ブーム用油圧アクチュエータに対する上昇操作側の
圧油供給量を標準流量よりも少ない量に抑制する流量抑
制手段を備えてある点にある。本第3発明の特徴構成
は、前記レバー操作状態検出手段が、ブームの下降駆動
用操作後の下降操作維持時間が第1所定時間以上であっ
て、かつ、第2所定時間以下であるときのみ、検出作動
するものである点にある。
According to a first aspect of the present invention, in the hydraulic control device for a backhoe described at the beginning, the operation lever is returned from a descending side operation area to a neutral position at a predetermined speed or more. And a neutral speed detecting means for detecting that a hydraulic actuator other than the boom hydraulic actuator is in a neutral state, and the lever speed detecting means and the neutral detecting means are provided. When both are in the detection state, there is provided a flow rate suppressing means for suppressing the amount of pressure oil supplied to the boom hydraulic actuator on the raising operation side to an amount smaller than the standard flow rate. The characteristic configuration of the second aspect of the present invention is a lever for detecting that each of the descending drive operation of the operation lever, the neutral maintaining operation, and the ascending drive return operation in the boom descending operation is performed at a high speed equal to or higher than a predetermined speed. An operating state detecting means and a neutral detecting means for detecting that a hydraulic actuator other than the boom hydraulic actuator is in a neutral state are provided, and both the lever operating state detecting means and the neutral detecting means are in a detecting state. Then,
A point is that a flow rate suppressing means is provided for suppressing the amount of pressure oil supplied to the boom hydraulic actuator on the raising operation side to be smaller than the standard flow rate. The characteristic configuration of the third aspect of the present invention is only when the lever operation state detection means has the lowering operation maintaining time after the boom lowering operation is the first predetermined time or more and the second predetermined time or less. The point is that the detection is activated.

【0005】[0005]

【作用】杭打ち作業の場合には、杭体を素早く下降させ
て打ち込んだ後、短い時間で素早く上昇作動させるよう
レバー操作を行う必要があるので、このうち、操作レバ
ーが下降側操作領域から中立位置に対して所定速度以上
で戻し操作されたこと、あるいは、ブームの下降操作に
おいて前記操作レバーの下降駆動用操作、中立維持操作
及び上昇駆動用戻し操作の夫々が所定速度以上の高速で
行われたことのうちのいずれかの作動条件と、他の油圧
アクチュエータが作動していないこととを共に検出した
ときのみ、そのレバー操作が杭打ち作業であると判断し
て、上昇操作側の圧油供給量を自動的に少ないものに抑
制するので、上昇作動速度を下降速度とほぼ等しい作動
速度に合わせることができる。尚、前記レバー操作状態
検出手段が、ブームの下降駆動用操作後の下降操作維持
時間が第1所定時間以上であって、かつ、第2所定時間
以下であるときのみ、検出作動するものに構成しておく
と、例えば、操縦者が誤って操作レバーを手で弾いたよ
うな場合に杭打ち作業状態に設定されることがなく、安
全に作業できる。
[Operation] In the case of pile driving work, after the pile body is quickly lowered and driven, it is necessary to perform the lever operation so as to raise the pile body quickly in a short time. The return operation to the neutral position is performed at a predetermined speed or higher, or the lowering operation of the operating lever, the neutral maintenance operation, and the return operation for raising drive of the operating lever are performed at high speeds higher than the predetermined speed. Only when both of the above operating conditions and the fact that the other hydraulic actuator is not operating are detected, it is judged that the lever operation is piling work, and the pressure on the lifting operation side is judged. Since the oil supply amount is automatically suppressed to a small amount, the ascending operating speed can be adjusted to an operating speed substantially equal to the descending speed. In addition, the lever operation state detecting means is configured to detect and operate only when the descending operation maintaining time after the boom descending operation is a first predetermined time or more and a second predetermined time or less. Then, for example, when the operator accidentally flips the operating lever by hand, the operation is not set to the pile driving work state, and the work can be performed safely.

【0006】[0006]

【発明の効果】従って、杭打ち作業時特有のレバー操作
状態を判断して、ブームの上下作動をほぼ同一作動速度
でバランスよく作業を行うことができ、上昇作動時に制
御弁の応答遅れによるオーバー上昇を抑制できて、杭打
ち作業における作業性が向上するものとなった。又、ブ
ームシリンダ以外の油圧アクチュエータが作動していた
り、上昇用レバー操作がゆっくり行われるような作業あ
るいはブーム下降状態が長く続くような作業等、掘削作
業や杭打ち以外の他の作業である場合には、ブーム上昇
作動が2ポンプ合流状態で強い力で駆動できることにな
る。しかも、このような切り換えが自動で行われるの
で、操縦者は煩わしさがなく操作性が低下することもな
い。
Therefore, it is possible to perform a well-balanced work for the vertical movement of the boom at almost the same operating speed by judging the lever operation state peculiar to the pile driving work. It is possible to suppress the rise and improve workability in pile driving work. Also, when the hydraulic actuator other than the boom cylinder is operating, or when the lifting lever is operated slowly or when the boom descending state continues for a long time, other than excavation work or pile driving. Therefore, the boom raising operation can be driven with a strong force when the two pumps are joined. Moreover, since such switching is automatically performed, the operator does not have to bother and the operability does not deteriorate.

【0007】[0007]

【実施例】以下、実施例を図面に基いて説明する。図7
にバックホーを示している。このバックホーは、クロー
ラ走行装置1を備えた走行機台2に旋回用油圧モータM
の駆動により縦軸芯周りで全旋回自在に旋回台3を搭載
するとともに、旋回台3にバックホー装置4を連結し、
走行機台2にドーザ装置5を備えて構成してある。前記
バックホー装置4は、旋回台3に横軸芯周りで上下揺動
自在に枢支されるブーム6にアーム7、バケット8を枢
支連結するとともに、夫々をブームシリンダ15、アー
ムシリンダ16、バケットシリンダ17により駆動揺動
して掘削作業やあるいはコンクリート割り等の杭打ち作
業を行えるよう構成してある。又、ブーム6は、基端部
6a、中間部6b及び先端部6cに3分割され、夫々を
縦軸芯周りで枢支連結するとともに、基端部6aと先端
部6cとを中間部6bと平行なリンク9を介して枢支連
結し、オフセットシリンダ18により中間部6bを揺動
駆動することでバケット8が平行姿勢を維持しながら左
右方向に移動できるよう構成し、バケット8をブーム基
端部6aに対して横方向にオフセットして旋回台3上に
格納することで最大旋回径を小さくした状態で旋回作動
できるよう構成してある。
Embodiments will be described below with reference to the drawings. FIG.
Shows the backhoe. This backhoe is equipped with a hydraulic motor M for turning on a traveling machine base 2 equipped with a crawler traveling device 1.
The swivel base 3 is mounted on the swivel base 3 such that the swivel base 3 can be freely swiveled around the longitudinal axis by driving the
The travel base 2 is provided with a dozer device 5. The backhoe device 4 pivotally connects an arm 7 and a bucket 8 to a boom 6 that is pivotally supported on a swivel base 3 so as to be vertically swingable about a horizontal axis center. The cylinder 17 is driven and rocked so that excavation work or pile driving work such as concrete cutting can be performed. In addition, the boom 6 is divided into a base end portion 6a, an intermediate portion 6b and a tip portion 6c, which are pivotally connected to each other about a longitudinal axis, and the base end portion 6a and the tip portion 6c are connected to the intermediate portion 6b. The bucket 8 is pivotally connected via parallel links 9, and the offset cylinder 18 swingably drives the intermediate portion 6b so that the bucket 8 can move in the left-right direction while maintaining the parallel posture. It is configured to be laterally offset with respect to the portion 6a and stored on the swivel base 3 so that swivel operation can be performed in a state where the maximum swivel diameter is reduced.

【0008】油圧アクチュエータとしての前記ブームシ
リンダ15、アームシリンダ16、バケットシリンダ1
7及び旋回油圧モータMの夫々は、旋回台3上に設けら
れた操縦部10に配設した十字揺動操作自在な左右一対
の操作レバー11により制御操作されるよう構成してあ
る。詳述すると、図1に示すように、前記各シリンダ1
5,16,17及び旋回モータMは、夫々電磁式比例流
量制御弁Vにより油圧流量を制御するよう構成し、各操
作レバー11の夫々の操作方向における操作量を4個の
ポテンショメータPMにより検出して、この検出操作量
に基づいて制御装置12が各電磁式比例流量制御弁Vに
対する電流供給量を制御するよう構成してある。又、前
記オフセットシリンダ18は操作スイッチSWの操作に
より予め設定される流量を供給するよう構成されてい
る。ブームシリンダ15に対する圧油供給回路において
は、図3に示すように、複動型のブームシリンダ15に
対して第1油圧ポンプ13からの往復圧油を給排する主
制御弁V1と、ブーム6の上昇作動側の圧油供給路に対
してのみ第2油圧ポンプ14からの圧油を合流供給する
副制御弁V2とを設けてあり、ブームシリンダ15の上
昇側作動時には、第1、第2油圧ポンプ13,14の夫
々の圧油を合流供給するようにして、例えばバックホー
装置4を機体外方に張り出した姿勢で掘削土砂を持ち上
げる等の大重量が掛かる場合に、大きな油圧力が作用す
るよう構成してある。前記制御装置12は、操作レバー
11の操作量に応じた電流を供給して電磁式比例流量制
御弁Vの開度を制御する流量制御手段Aと、前記操作レ
バーが下降側操作領域から中立位置に対して所定速度以
上で戻し操作されたことを検出するレバー速度検出手段
Bと、ブーム用油圧シリンダ15以外の他の油圧アクチ
ュエータが中立状態にあることを検出する中立検出手段
Cと、前記レバー速度検出手段B及び前記中立検出手段
Cが共に検出状態にあるときのみ、前記ブーム用油圧シ
リンダ15に対する上昇操作側の圧油供給量を標準流量
よりも少ない量に抑制する流量抑制手段Dを制御プログ
ラム形式で備えてある。つまり、杭打ち作業の場合には
制御装置12は以下のように制御を実行する。図2に示
すように、前記各操作量検出用ポテンショメータPMの
出力を読み込み、ブーム操作用ポテンショメータPM以
外の他のポテンショメータPMの出力が変化していなけ
れば〔ステップ1,2〕、ブーム用ポテンショメータP
Mの出力が下降側最大速度操作位置に近い位置まで所定
位置aを越えて操作が行われ、中立操作領域を越えて上
昇側に操作されると、前記所定位置aから中立領域に到
るまでの操作に要した時間tが設定値tx以下の短い時
間であるときは〔ステップ3〜6〕、杭打ち作業である
と判断して、前記ブーム用副制御弁V2を中立位置に維
持するとともに、主制御弁V1に対してのみ次回上昇側
操作が行われるまでレバー操作量に対応する電流量を供
給する〔ステップ7〜9〕。そして、上記したような各
条件が整わない場合には、その他の作業であると判断し
て、前記各制御弁Vに各ポテンショメータPMの操作量
に対応する電流値を供給するとともに、ブーム6の上昇
操作時には前記主制御弁V1及び副制御弁V2夫々にも
同様に電流を供給して2ポンプ合流作動が行われる〔ス
テップ10〕。そして、リセットするまで上記したよう
な制御が繰り返し行われる〔ステップ11〕。前記ステ
ップ10により流量制御手段Aを構成し、ステップ4〜
6によりレバー速度検出手段Bを構成し、ステップ2に
より中立検出手段Cを構成し、ステップ7〜9により流
量抑制手段Dを構成する。
The boom cylinder 15, the arm cylinder 16 and the bucket cylinder 1 as hydraulic actuators.
Each of the turning hydraulic motor M and the turning hydraulic motor M is configured to be controlled and operated by a pair of left and right operation levers 11 which are provided in a control unit 10 provided on the turning base 3 and which are capable of cross movement. More specifically, as shown in FIG.
5, 16 and 17 and the swing motor M are each configured to control the hydraulic flow rate by the electromagnetic proportional flow rate control valve V, and the operation amount of each operation lever 11 in each operation direction is detected by the four potentiometers PM. Then, the control device 12 controls the current supply amount to each electromagnetic proportional flow rate control valve V based on the detected manipulated variable. The offset cylinder 18 is configured to supply a preset flow rate by operating the operation switch SW. In the pressure oil supply circuit for the boom cylinder 15, as shown in FIG. 3, the main control valve V1 for supplying and discharging the reciprocating pressure oil from the first hydraulic pump 13 to the double-acting boom cylinder 15 and the boom 6 are used. And a sub-control valve V2 that joins and supplies the pressure oil from the second hydraulic pump 14 only to the pressure oil supply path on the ascending side of the boom cylinder 15. When hydraulic oils of the hydraulic pumps 13 and 14 are jointly supplied, for example, when a large weight is applied such as lifting the excavated earth and sand in a posture in which the backhoe device 4 is projected to the outside of the machine, a large hydraulic pressure acts. It is configured as follows. The control device 12 supplies a current according to the operation amount of the operation lever 11 to control the opening of the electromagnetic proportional flow rate control valve V, and the operation lever moves from the descending side operation area to the neutral position. With respect to the lever speed detecting means B for detecting a return operation at a predetermined speed or more, a neutral detecting means C for detecting that a hydraulic actuator other than the boom hydraulic cylinder 15 is in a neutral state, and the lever. Only when both the speed detecting means B and the neutrality detecting means C are in the detection state, the flow rate suppressing means D for controlling the amount of pressure oil supplied to the boom hydraulic cylinder 15 on the raising operation side to an amount smaller than the standard flow rate is controlled. It is provided in program form. That is, in the case of the pile driving work, the control device 12 executes the control as follows. As shown in FIG. 2, the outputs of the respective operation amount detecting potentiometers PM are read, and if the outputs of the potentiometers PM other than the boom operating potentiometer PM are not changed [steps 1 and 2], the boom potentiometer P is used.
When the output of M is operated beyond the predetermined position a to a position close to the maximum speed operation position on the descending side and is operated to the ascending side beyond the neutral operation area, the operation reaches from the predetermined position a to the neutral area. When the time t required for the operation is shorter than the set value tx [Steps 3 to 6], it is determined that the work is pile driving, and the boom auxiliary control valve V2 is maintained at the neutral position. , The current amount corresponding to the lever operation amount is supplied until the next rising side operation is performed only on the main control valve V1 [steps 7 to 9]. When the above-mentioned conditions are not satisfied, it is determined that the work is other work, and a current value corresponding to the operation amount of each potentiometer PM is supplied to each control valve V, and the boom 6 At the time of the raising operation, the main control valve V1 and the sub control valve V2 are similarly supplied with electric currents to perform the two-pump merging operation [step 10]. Then, the above-described control is repeatedly performed until reset (step 11). The flow rate control means A is constituted by the step 10, and steps 4 to 4 are performed.
6 constitutes the lever speed detecting means B, step 2 constitutes the neutrality detecting means C, and steps 7 to 9 constitute the flow rate suppressing means D.

【0009】〔別実施例1〕上記したように杭打ち作業
を判断した場合、前記副制御弁V2の作動を中立位置に
維持するよう制御するものに代えて、主制御弁V1及び
副制御弁V2の夫々に対する電流供給量を少ないものに
抑制するものでもよい。 〔別実施例2〕前記制御装置12は、上記したようなレ
バー速度検出手段Bを備えるものに代えて、図4に示す
ように、前記ブーム6の下降操作において前記操作レバ
ー11の下降駆動用操作、中立維持操作及び上昇駆動用
戻し操作の夫々が所定速度以上の高速で行われたことを
検出するレバー操作状態検出手段Eを制御プログラムで
備えるものでもよい。即ち、制御装置12は次にように
制御を実行する。図5に示すように、前記各操作量検出
用ポテンショメータPMの出力を読み込み、ブーム操作
用ポテンショメータPM以外の他のポテンショメータP
Mの出力が変化していなければ〔ステップ1,2〕、ブ
ーム用ポテンショメータPMの出力が下降側最大速度操
作位置に近い位置まで所定位置aを越えて操作が行わ
れ、中立操作領域を越えて上昇側に操作されると、例え
ば図6に示すように、下降操作において中立操作域から
前記所定位置までの第1レバー操作時間t1、前記所定
位置aを越える下降側操作が行われた第2レバー操作時
間t2、及び、上昇操作において前記所定位置aから中
立操作域に到るまでの第3レバー操作時間t3の夫々を
計測し、前記第1レバー操作時間t1が所定値ta以下
であり、第2レバー操作時間t2が第1所定時間tb以
上であって、かつ、第2所定時間tc以下であり、更
に、第3レバー操作時間t3が所定時間td以下である
場合にのみ、杭打ち作業であると判断して〔ステップ3
〜8〕、前記ブーム用副制御弁V2を中立位置に維持す
るとともに、主制御弁V1に対してのみ次回上昇側操作
が行われるまでレバー操作量に対応する電流量を供給す
る〔ステップ9〜11〕。そして、上記したような各条
件が整わない場合には、その他の作業であると判断し
て、前記各制御弁Vに各ポテンショメータPMの操作量
に対応する電流値を供給するとともに、ブーム6の上昇
操作時には前記主制御弁V1及び副制御弁V2夫々にも
同様に電流を供給して2ポンプ合流作動が行われる〔ス
テップ12〕。そして、リセットするまで上記したよう
な制御が繰り返し行われる〔ステップ13〕。前記ステ
ップ4〜8によりレバー操作状態検出手段Eを構成す
る。
[Other Embodiment 1] When the pile driving work is judged as described above, the main control valve V1 and the sub control valve V1 are replaced with the sub control valve V2 which is controlled to maintain the operation at the neutral position. The amount of current supplied to each of V2 may be suppressed to be small. [Second Embodiment] The control device 12 replaces the one having the lever speed detecting means B as described above, and as shown in FIG. 4, for lowering drive of the operation lever 11 in lowering operation of the boom 6. The control program may be provided with a lever operation state detecting means E for detecting that each of the operation, the neutrality maintaining operation and the ascending drive returning operation is performed at a high speed of a predetermined speed or higher. That is, the control device 12 executes the control as follows. As shown in FIG. 5, the outputs of the respective operation amount detecting potentiometers PM are read, and the potentiometers P other than the boom operating potentiometer PM are read.
If the output of M has not changed [steps 1 and 2], the operation of the output of the boom potentiometer PM is performed beyond the predetermined position a to a position close to the maximum speed operation position on the descending side, and the operation is performed beyond the neutral operation area. When operated to the ascending side, for example, as shown in FIG. 6, in the descending operation, the first lever operation time t1 from the neutral operation area to the predetermined position, and the descending side operation exceeding the predetermined position a are performed. Each of the lever operation time t2 and the third lever operation time t3 from the predetermined position a to the neutral operation range in the upward operation is measured, and the first lever operation time t1 is equal to or less than a predetermined value ta, Only when the second lever operation time t2 is the first predetermined time tb or more and the second predetermined time tc or less and the third lever operation time t3 is the predetermined time td or less, the pile driving is performed. It is determined that the [Step 3
~ 8], while maintaining the boom auxiliary control valve V2 at the neutral position, only the main control valve V1 is supplied with a current amount corresponding to the lever operation amount until the next rising side operation is performed [step 9- 11]. When the above-mentioned conditions are not satisfied, it is determined that the work is other work, and a current value corresponding to the operation amount of each potentiometer PM is supplied to each control valve V, and the boom 6 At the time of the raising operation, the main control valve V1 and the sub control valve V2 are similarly supplied with electric currents to perform the two-pump merging operation [step 12]. Then, the above-mentioned control is repeatedly performed until reset (step 13). The steps 4 to 8 constitute the lever operation state detecting means E.

【0010】〔別実施例3〕上記実施例2において、前
記副制御弁V2の作動を中立位置に維持するよう制御す
るものに代えて、主制御弁V1及び副制御弁V2の夫々
に対する電流供給量を少ないものに抑制するものでもよ
い。
[Third Embodiment] In the second embodiment, instead of controlling the operation of the sub-control valve V2 to maintain the neutral position, current supply to each of the main control valve V1 and the sub-control valve V2 is performed. The amount may be suppressed to a small amount.

【0011】尚、特許請求の範囲の項に図面との対照を
容易にするために符号を記すが、該記入により本発明は
添付図面の構成に限定されるものではない。
[0011] In the claims, reference numerals are provided to facilitate comparison with the drawings, but the present invention is not limited to the configuration shown in the attached drawings.

【図面の簡単な説明】[Brief description of the drawings]

【図1】制御ブロック図FIG. 1 is a control block diagram.

【図2】制御フローチャートFIG. 2 is a control flowchart.

【図3】ブームシリンダの駆動用油圧回路図[Fig. 3] Hydraulic circuit diagram for driving the boom cylinder

【図4】別実施例の制御ブロック図FIG. 4 is a control block diagram of another embodiment.

【図5】別実施例の制御フローチャートFIG. 5 is a control flowchart of another embodiment.

【図6】別実施例の制御特性図FIG. 6 is a control characteristic diagram of another embodiment.

【図7】バックホーの側面図FIG. 7 is a side view of the backhoe.

【符号の説明】[Explanation of symbols]

4 バックホー装置 6 ブーム 11 操作レバー 15 油圧アクチュエータ A 流量制御手段 B レバー速度検出手段 C 中立検出手段 D 流量抑制手段 E レバー操作状態検出手段 V1,V2 電磁式比例流量制御弁 4 Backhoe device 6 Boom 11 Operation lever 15 Hydraulic actuator A Flow rate control means B Lever speed detection means C Neutral detection means D Flow rate suppression means E Lever operation state detection means V1, V2 Electromagnetic proportional flow control valve

───────────────────────────────────────────────────── フロントページの続き (72)発明者 森下 勇太郎 大阪府堺市石津北町64番地 株式会社ク ボタ 堺製造所内 (56)参考文献 特開 平5−1434(JP,A) 特開 平5−195551(JP,A) 特開 平3−157503(JP,A) ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Yutarou Morishita 64 Ishizukita-machi, Sakai City, Osaka Prefecture Kubota Corporation Sakai Plant (56) Reference JP-A-5434 (JP, A) JP-A-5- 195551 (JP, A) JP-A-3-157503 (JP, A)

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 バックホー装置(4)を複数の油圧アク
チュエータにより駆動するよう構成するとともに、前記
バックホー装置(4)におけるブーム(6)を上下動駆
動する油圧アクチュエータ(15)の電磁式比例流量制
御弁(V1),(V2)の開度を、操作レバー(11)
の操作量に応じた電流を供給して比例制御する流量制御
手段(A)を備えてあるバックホーの油圧制御装置であ
って、前記操作レバー(11)が下降側操作領域から中
立位置に対して所定速度以上で戻し操作されたことを検
出するレバー速度検出手段(B)と、ブーム用油圧アク
チュエータ(15)以外の他の油圧アクチュエータが中
立状態にあることを検出する中立検出手段(C)とを備
え、かつ、前記レバー速度検出手段(B)及び前記中立
検出手段(C)が共に検出状態になると、前記ブーム用
油圧アクチュエータ(15)に対する上昇操作側の圧油
供給量を標準流量よりも少ない量に抑制する流量抑制手
段(D)を備えてあるバックホーの油圧制御装置。
1. An electromagnetic proportional flow rate control of a hydraulic actuator (15) configured to drive a backhoe device (4) by a plurality of hydraulic actuators, and vertically driving a boom (6) of the backhoe device (4). Open the valves (V1) and (V2) with the operation lever (11).
A hydraulic controller for a backhoe equipped with a flow rate control means (A) for proportionally controlling by supplying a current according to an operation amount of the operating lever (11) from a descending side operating region to a neutral position. Lever speed detecting means (B) for detecting a return operation at a predetermined speed or more, and neutral detecting means (C) for detecting that a hydraulic actuator other than the boom hydraulic actuator (15) is in a neutral state. And the lever speed detecting means (B) and the neutral detecting means (C) are both in the detection state, the pressure oil supply amount on the raising operation side with respect to the boom hydraulic actuator (15) is higher than the standard flow rate. A hydraulic control device for a backhoe, comprising a flow rate suppressing means (D) for suppressing the amount to a small amount.
【請求項2】 バックホー装置(4)を複数の油圧アク
チュエータにより駆動するよう構成するとともに、前記
バックホー装置(4)におけるブーム(6)を上下動駆
動する前記油圧アクチュエータ(15)の電磁式比例流
量制御弁(V1),(V2)の開度を、操作レバー(1
1)の操作量に応じた電流を供給して比例制御する流量
制御手段(A)を備えてあるバックホーの油圧制御装置
であって、前記ブーム(6)の下降操作において前記操
作レバー(11)の下降駆動用操作、中立維持操作及び
上昇駆動用戻し操作の夫々が所定速度以上の高速で行わ
れたことを検出するレバー操作状態検出手段(E)と、
ブーム用油圧アクチュエータ(15)以外の他の油圧ア
クチュエータが中立状態にあることを検出する中立検出
手段(C)とを備え、かつ、前記レバー操作状態検出手
段(E)及び前記中立検出手段(C)が共に検出状態に
なると、前記ブーム用油圧アクチュエータ(15)に対
する上昇操作側の圧油供給量を標準流量よりも少ない量
に抑制する流量抑制手段(D)を備えてあるバックホー
の油圧制御装置。
2. An electromagnetic proportional flow rate of the hydraulic actuator (15) configured to drive the backhoe device (4) by a plurality of hydraulic actuators and driving the boom (6) of the backhoe device (4) up and down. Open the control valves (V1) and (V2) with the operation lever (1
A hydraulic control device for a backhoe, comprising a flow rate control means (A) for proportionally controlling by supplying a current according to the operation amount of 1), wherein the operating lever (11) is used for lowering operation of the boom (6). Lever operation state detecting means (E) for detecting that each of the descending drive operation, the neutrality maintaining operation, and the ascending drive returning operation at a high speed equal to or higher than a predetermined speed,
Neutralizing detection means (C) for detecting that a hydraulic actuator other than the boom hydraulic actuator (15) is in a neutral state, and the lever operation state detecting means (E) and the neutrality detecting means (C). ) Are both detected, the backhoe hydraulic control device is provided with flow rate suppressing means (D) for suppressing the amount of pressure oil supplied to the boom hydraulic actuator (15) on the raising operation side to an amount smaller than the standard flow rate. .
【請求項3】 前記レバー操作状態検出手段(E)が、
ブーム(6)の下降駆動用操作後の下降操作維持時間が
第1所定時間以上であって、かつ、第2所定時間以下で
あるときのみ、検出作動するものである請求項2に記載
のバックホーの油圧制御装置。
3. The lever operation state detection means (E),
The backhoe according to claim 2, wherein the detection operation is performed only when the descending operation maintaining time after the operation for descending the boom (6) is a first predetermined time or more and a second predetermined time or less. Hydraulic control device.
JP713092A 1992-01-20 1992-01-20 Backhoe hydraulic controller Expired - Fee Related JP2682926B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP713092A JP2682926B2 (en) 1992-01-20 1992-01-20 Backhoe hydraulic controller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP713092A JP2682926B2 (en) 1992-01-20 1992-01-20 Backhoe hydraulic controller

Publications (2)

Publication Number Publication Date
JPH05195558A JPH05195558A (en) 1993-08-03
JP2682926B2 true JP2682926B2 (en) 1997-11-26

Family

ID=11657500

Family Applications (1)

Application Number Title Priority Date Filing Date
JP713092A Expired - Fee Related JP2682926B2 (en) 1992-01-20 1992-01-20 Backhoe hydraulic controller

Country Status (1)

Country Link
JP (1) JP2682926B2 (en)

Also Published As

Publication number Publication date
JPH05195558A (en) 1993-08-03

Similar Documents

Publication Publication Date Title
WO2011061988A1 (en) Hydraulic drive for construction machine
JP2000282513A (en) Method and device for controlling devices of working machine
CN107532409B (en) Control device for construction machine
KR102107579B1 (en) Hydraulic drive device for construction machinery
JP6676827B2 (en) Work machine
JP6625575B2 (en) Construction machinery
JP4223893B2 (en) Control method and control device for hydraulic pump for work machine of work vehicle
US20240151004A1 (en) Hydraulic system for working machine
JP2682926B2 (en) Backhoe hydraulic controller
JPH0771057A (en) Back-hoe
JPWO2019064557A1 (en) Construction machinery
JP6882214B2 (en) Construction machinery
JP5320003B2 (en) Hydraulic control device for work machine
JPH06185093A (en) Front controller of wheel loader
JP7455285B2 (en) construction machinery
JP2019157544A (en) Work machine including contractive and expansive arm
JPH05195559A (en) Hydraulic controller for backhoe
JP4007593B2 (en) Control device for hydraulic pump for work machine of work vehicle
JP2539471Y2 (en) Hydraulic excavator front drive circuit
JP2675231B2 (en) Backhoe
JP3541116B2 (en) Hydraulic control device for work equipment
JP2651076B2 (en) Hydraulic actuator control device for earth moving machine
JP4017278B2 (en) Operating device for 2-piece boom type work machine
JP6161916B2 (en) Work machine
JP2500452Y2 (en) Hydraulic excavator front drive circuit

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees