Construction method of steel framed house

Info

Publication number
JP2672058B2
JP2672058B2 JP19988192A JP19988192A JP2672058B2 JP 2672058 B2 JP2672058 B2 JP 2672058B2 JP 19988192 A JP19988192 A JP 19988192A JP 19988192 A JP19988192 A JP 19988192A JP 2672058 B2 JP2672058 B2 JP 2672058B2
Authority
JP
Japan
Prior art keywords
pole
beam assembly
jig
jack
climbing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP19988192A
Other languages
Japanese (ja)
Other versions
JPH0642186A (en
Inventor
進 田中
忠男 石川
海二 柳原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kubota Corp
KYB Corp
Original Assignee
Kubota Corp
KYB Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kubota Corp, KYB Corp filed Critical Kubota Corp
Priority to JP19988192A priority Critical patent/JP2672058B2/en
Publication of JPH0642186A publication Critical patent/JPH0642186A/en
Application granted granted Critical
Publication of JP2672058B2 publication Critical patent/JP2672058B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Residential Or Office Buildings (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、鉄骨系2階建住宅の建
方工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a steel-framed two-story house.

【0002】[0002]

【従来の技術】鉄骨系2階建住宅の建方工法として、地
上近くで小屋組を有する上階梁組みと下階梁組みを仮柱
治具によって上下に組付けるとともに、水平方向に間隔
を有して複数本のクライミングポールを垂直方向に立設
し、該クライミングポールに沿って尺取運動で昇降する
油圧ジャッキで上階梁組みを所定位置まで上昇させた後
に前記仮柱治具に代替して本柱を上下階梁組み間に連結
し、その後、上下階梁組みを、前記油圧ジャッキで上昇
させて施工して行く技術は、特開平3-176568号公報で提
案されている。
2. Description of the Related Art As a method of constructing a steel-framed two-story house, an upper floor beam assembly and a lower floor beam assembly, which have a rooftop structure near the ground, are assembled vertically with a temporary pillar jig, and a horizontal space is provided. Having a plurality of climbing poles standing upright in the vertical direction, and using a hydraulic jack that moves up and down along the climbing poles to raise the upper beam assembly to a predetermined position and then replaces the temporary pillar jig Japanese Patent Laid-Open No. 3-176568 proposes a technique in which the main columns are connected between the upper and lower floor beam assemblies and then the upper and lower floor beam assemblies are raised by the hydraulic jack to be installed.

【0003】[0003]

【発明が解決しようとする課題】前述公報で開示の技術
は、地上近くで上・下階梁組みを組付け、一方、クライ
ミングポールは、上階梁組みを上昇させるに必要な長さ
を有することから、上階梁組みにおける小屋組みを貫通
していた。従って、クライミングポールが貫通する部分
の小屋組みにおける屋根葺は、部分的にしろ後処理とな
り、これは高所作業であることから危険性を伴ってい
た。
In the technique disclosed in the above publication, the upper and lower floor beams are assembled near the ground, while the climbing pole has a length required to raise the upper beams. Therefore, it passed through the shed structure in the upper floor beam structure. Therefore, the roofing in the roof frame at the portion where the climbing pole penetrates is partially post-processed, which is dangerous because it is work at a high place.

【0004】そこで本発明は、クライミングポールを用
いてプッシュアップジャッキシステムによる建方工法で
あるにも拘らず、小屋組の全面屋根葺した状態での施工
ができるようにしたことを目的とする。
Therefore, an object of the present invention is to make it possible to carry out construction with the roofing of the entire shed, despite the construction method using a push-up jack system using a climbing pole.

【0005】[0005]

【課題を解決するための手段】本発明は、地上近くで小
屋組11を有する上階梁組み12と下階梁組み10を仮柱治具
4 によって上下に組付けるとともに、水平方向に間隔を
有して複数本のクライミングポール15を垂直方向に立設
し、該クライミングポール15に沿って尺取運動で昇降す
る油圧ジャッキ16で上階梁組み12を所定位置まで上昇さ
せた後に前記仮柱治具4 に代替して本柱37を上下階梁組
み10,12 間に連結し、その後、上下階梁組み10,12 を、
前記油圧ジャッキ16で上昇させて施工して行く鉄骨系住
宅の建方工法において、前述の目的を達成するために、
次の技術的手段を講じている。
SUMMARY OF THE INVENTION According to the present invention, an upper floor beam assembly 12 and a lower floor beam assembly 10 having a roof frame assembly 11 and a lower floor beam assembly 10 near the ground are used as temporary pillar jigs.
The upper and lower beams are assembled with the hydraulic jacks 16 that are vertically assembled by vertically mounting a plurality of climbing poles 15 with a space in the horizontal direction in the vertical direction and move up and down along the climbing poles 15 by a staking motion. After raising the set 12 to a predetermined position, the main column 37 is connected between the upper and lower girder beams 10 and 12 in place of the temporary column jig 4, and then the upper and lower girder beams 10 and 12 are
In the method of constructing a steel-framed house to be raised and constructed by the hydraulic jack 16, in order to achieve the above-mentioned object,
The following technical measures are taken.

【0006】すなわち、本発明は、前記油圧ジャッキ16
で上階梁組み12を上昇させるとき、上階梁組み12と油圧
ジャッキ16との間でクライミングポール15に摺動自在に
套嵌したストローク調整治具17を介して上昇するととも
に所定の上昇時に、前記クライミングポール15に継ポー
ル19を接続して行くことを特徴とするものである。
That is, according to the present invention, the hydraulic jack 16 is provided.
When ascending the upper beam assembly 12 with, the upper beam assembly 12 is lifted via the stroke adjusting jig 17 slidably fitted on the climbing pole 15 between the upper beam assembly 12 and the hydraulic jack 16 The connecting pole 19 is connected to the climbing pole 15.

【0007】[0007]

【作用】本発明によれば、油圧ジャッキ16で上階梁組み
12を上昇させるとき、上階梁組み12と油圧ジャッキ16と
の間でクライミングポール15に摺動自在に套嵌したスト
ローク調整治具17を介して上昇するとともに所定の上昇
時に、前記クライミングポール15に継ポール19を接続し
て行くことにより、地上近くで小屋組11を有する上階梁
組み12と下階梁組み10を仮柱治具4 によって上下に組付
けるとき、クライミングポール15は小屋組み11を貫通す
る必要はなく、従って、地上近くで小屋組み11の全面屋
根葺ができる。
According to the present invention, the hydraulic jack 16 is used to assemble the upper floor beam.
When raising 12, the climbing pole 15 is raised through a stroke adjusting jig 17 slidably fitted on the climbing pole 15 between the upper floor beam assembly 12 and the hydraulic jack 16, and the climbing pole 15 By connecting the connecting pole 19 to the upper and lower beam assembly 12 and the lower beam assembly 10 having the roof structure 11 near the ground, the climbing pole 15 is connected to the roof structure 11 by the temporary pillar jig 4. It is not necessary to penetrate the roof, so that the entire roof of the shed 11 can be made near the ground.

【0008】[0008]

【実施例】以下、図面を参照して本発明の実施例を説明
する。図6において、1 は住宅の基礎であり、この天端
には鋼製土台2 を介して柱締結孔3Aを有する鋼製の柱脚
ピース3 が本柱の立設位置に対応して取付けてある。4
は仮柱治具であり、住宅本来の柱(本柱)よりも相当短
い、具体的には80cm程度の鋼製角柱材よりなり、柱脚ピ
ース3 に嵌合されて必要に応じて締結孔4Aに挿通するボ
ルト等で仮止め可能である。
Embodiments of the present invention will be described below with reference to the drawings. In FIG. 6, 1 is a foundation of a house, and a steel column base piece 3 having a column fastening hole 3A is attached to this top end through a steel base 2 in correspondence with the standing position of the main column. is there. Four
Is a temporary pillar jig, which is made of steel square pillar material that is considerably shorter than the original pillar (main pillar) of the house, specifically about 80 cm, and is fitted to the pillar base piece 3 and a fastening hole if necessary. It can be temporarily fixed with a bolt or the like inserted through 4A.

【0009】この仮柱治具4 の上部には、切欠部4Bを有
し、この切欠部4Bを介して柱頭ピース5 が嵌合可能とさ
れている。柱頭ピース5 は、鋼製角柱材よりなり、水平
面上のフランジ6 、垂直面上のフランジ7 等が形成して
あり、締結孔8 を介して本柱および梁9 が締結可能であ
るとともに、上端面には柱脚ピース3 を固定自在として
いる。
A notch 4B is provided on the upper portion of the provisional pillar jig 4, and a stigma piece 5 can be fitted through the notch 4B. The stigma piece 5 is made of steel prismatic material and has a flange 6 on the horizontal surface, a flange 7 on the vertical surface, etc., and the main pillar and the beam 9 can be fastened through the fastening holes 8 and The column base piece 3 can be fixed to the end face.

【0010】従って、図1に示す如く地上近くにおい
て、下階梁組み10と、小屋組み11を有する上階梁組み12
を以下説明する如く構築するとともに、持上げ装置13を
構築するのである。すなわち、住宅基礎1 の柱対応位置
に第1柱脚ピース3 を取付け、この第1柱脚ピース3 に
第1仮柱治具4 を挿脱自在に嵌合するとともに、第1仮
柱治具4 上部の水平方向で相対する柱頭ピース5 間を互
いに梁9 で連結することで下階梁組み10を構築し、次い
で該下階梁組み10を作業足場として小屋組11を有する上
階梁組み12を前述同様に仮柱治具4 等を利用して構築す
る。
Therefore, as shown in FIG. 1, near the ground, a lower floor beam assembly 10 and an upper floor beam assembly 12 having a shed assembly 11 are provided.
Is constructed as described below, and the lifting device 13 is constructed. That is, the first pillar base piece 3 is attached to the pillar-corresponding position of the housing foundation 1, the first temporary pillar jig 4 is removably fitted to the first pillar base piece 3, and the first temporary pillar jig 3 is attached. 4 A lower story beam assembly 10 is constructed by connecting beams 6 that are horizontally opposed to each other at the upper part with beams 9, and then an upper story beam assembly having a shed member 11 with the lower story beam assembly 10 as a working scaffold. 12 is constructed using the temporary pillar jig 4 and the like as described above.

【0011】一方、前述の上・下階梁組みの構築ととも
に、持上げ装置13の複数を水平方向に間隔をおいて構築
する。この持上げ装置13の配置、個数は、住宅の規模、
形状等によって決定され、梁組みを捩ることなく垂直方
向にプッシャジャッキアップできるものであればよい。
持上げ装置13は、土台14を介して垂直方向に立設された
クライミングポール15と、このクライミングポール15に
沿って尺取虫運動で昇降するジャッキ16と、クライミン
グポール15に摺動自在として套嵌されているストローク
調整治具17と、梁受け治具18と、クライミングポール15
に継ぎたされる継ぎポール19等よりなる。
On the other hand, together with the construction of the upper and lower story beams, a plurality of lifting devices 13 are constructed at intervals in the horizontal direction. The arrangement and number of the lifting devices 13 depend on the size of the house,
Any shape can be used as long as it is determined by the shape and the like and can push up the pusher in the vertical direction without twisting the beam assembly.
The lifting device 13 is vertically slidably fitted on the climbing pole 15, which is vertically erected through the base 14, a jack 16 which moves up and down along the climbing pole 15 by a scale insect movement, and the climbing pole 15. Stroke adjusting jig 17, beam receiving jig 18, and climbing pole 15
It consists of a splicing pole 19 etc.

【0012】クライミングポール15は鋼製の角筒体であ
り、その下部が土台14に嵌挿されて図外のボルトによっ
て締上げることによって垂直方向に立設されるととも
に、その長手方向に所定間隔を有してジャッキ爪の係合
孔20が相対して一対宛形成してあり、該ポール15の長さ
は図1に示す如く持上げ前の小屋組み11を貫通しない長
さとされていて、ここに、小屋組み11上に地上近くにお
いて全面屋根葺を可能としている。
The climbing pole 15 is a steel rectangular tubular body, the lower part of which is fitted into the base 14 and vertically erected by tightening it with bolts (not shown), and at a predetermined interval in the longitudinal direction. And the engaging holes 20 of the jack claws are formed opposite to each other, and the length of the pole 15 is such that it does not penetrate the shed 11 before lifting as shown in FIG. 1. , It is possible to roof all over the roof 11 near the ground.

【0013】ジャッキ16は、図5で示す如く上下で相対
する取付金具21,22 間に左右一対の油圧による複動形伸
縮シリンダ23を設けて、両取付金具21,22 を連結してい
る。上下の取付金具21,22 にはポール15に套嵌される角
筒部24,25 を有し、この角筒部24,25 にバネ26,27 で係
合方向に付勢された一対のジャッキ爪28,29 をポール15
に対して進退自在に備えてなり、これによって、ジャッ
キ爪28,29 は係合孔20に対して係脱自在とされている。
As shown in FIG. 5, the jack 16 is provided with a pair of left and right hydraulic double-acting telescopic cylinders 23 between mounting metal fittings 21, 22 which are opposed to each other, to connect the two mounting metal fittings 21, 22. The upper and lower fittings 21, 22 have square tube portions 24, 25 fitted to the pole 15, and a pair of jacks biased in the engaging direction by springs 26, 27 on the square tube portions 24, 25. Claws 28,29 to pole 15
The jack claws 28 and 29 can be engaged with and disengaged from the engagement hole 20.

【0014】ジャッキ爪28,29 の係合部上面にはテーパ
ー面28A,29A が形成されているとともに、操作ハンドル
30,31 を有し、該操作ハンドル30,31 は鈎状係合部32A,
33Aを有する位置決め保持体32,33 に挿通されて、ジャ
ッキ爪28,29 を離脱姿勢と係合姿勢とに保持可能とされ
ていて、その姿勢は、操作ハンドル30,31 を介してオン
・オフするリミットスイッチLS1,LS2がジャッキ
爪28,29 を案内するボス部に固定されている。
Taper surfaces 28A and 29A are formed on the upper surfaces of the engaging portions of the jack claws 28 and 29, and the operation handle is provided.
30 and 31, and the operation handles 30 and 31 are hook-shaped engaging portions 32A,
The jack claws 28, 29 can be held in the disengaged posture and the engaged posture by being inserted into the positioning holding bodies 32, 33 having 33A, and the postures can be turned on / off via the operation handles 30, 31. Limit switches LS1 and LS2 are fixed to the boss portion that guides the jack claws 28 and 29.

【0015】なお、リミットスイッチLS1,LS2が
オンになると、その信号を図外の遠隔操作手段における
コントローラにフィードバックし、電磁弁を介して伸縮
シリンダ23を伸縮するようになっており、コントローラ
には、ジャッキ爪28,29 が係合してないことを報知する
パイロットランプ、ブザー等の警報手段を備え、ここ
に、リミットスイッチ、警報手段等はジャッキ16の安全
手段を構成している。
When the limit switches LS1 and LS2 are turned on, the signal is fed back to the controller in the remote control means (not shown) to extend and retract the telescopic cylinder 23 via the solenoid valve. An alarm means such as a pilot lamp and a buzzer for notifying that the jack claws 28 and 29 are not engaged is provided, and the limit switch, the alarm means and the like constitute a safety means for the jack 16.

【0016】ジャッキ16は、図1に示す如くクライミン
グポール15に套嵌されて土台14上に装着してあり、この
ジャッキ16と梁受け治具18との間においてクライミング
ポール15に摺動自在としてストローク調整治具17が套嵌
されている。図4に示す如く、ストローク調整治具17は
鋼製の角筒体であり、その下部には、ジャッキ16への嵌
合部17A を有し、上部には、梁受け治具18の支承部17B
を有している。一方、梁受け治具18は、鋼製材料よりな
り、その中央角筒部34の両側に、受梁36の嵌合部35を有
し、受梁36は梁9 間の下面に架設されて嵌合部35に形成
した締結孔35A に図外のボルトで取付けられているとと
もに、中央角筒部34には切欠部34A が形成してある。従
って、ストローク調整治具17の支承部17B を中央角筒部
34に挿嵌するとともに、受梁36間のスキマ36A を介して
横方向から継ぎポール19を切欠部34A を通してポール15
に継ぎたし可能とされている。なお、継ぎポール19にも
係合孔20が形成されていて、クライミングポール15との
継ぎ目は、互いにインロー嵌合するとともに、該嵌合部
に係止爪等を有して持上げ時に、離脱しないようにされ
ている。
As shown in FIG. 1, the jack 16 is fitted over the climbing pole 15 and mounted on the base 14, and is slidable on the climbing pole 15 between the jack 16 and the beam receiving jig 18. The stroke adjusting jig 17 is fitted. As shown in FIG. 4, the stroke adjusting jig 17 is a steel rectangular tube, and has a fitting portion 17A for the jack 16 in the lower portion and a support portion for the beam receiving jig 18 in the upper portion. 17B
have. On the other hand, the beam receiving jig 18 is made of a steel material, and has the fitting portions 35 of the receiving beams 36 on both sides of the central rectangular tube portion 34, and the receiving beams 36 are erected on the lower surface between the beams 9. The bolt is attached to a fastening hole 35A formed in the fitting portion 35, and a cutout portion 34A is formed in the central square tube portion 34. Therefore, the support 17B of the stroke adjusting jig 17 should be
It is inserted in the pole 34 and the joint pole 19 is laterally inserted through the gap 36A between the receiving beams 36 and the pole 15 through the cutout 34A.
It is possible to connect to. An engagement hole 20 is also formed in the joint pole 19, and the joint with the climbing pole 15 has a spigot fitting with each other, and has a locking claw or the like in the fitting portion so that the joint does not come off during lifting. Is being done.

【0017】従って、2階建住宅の構築にあたっては、
図1(A)の状態でジャッキ16における伸縮シリンダ23
に、伸長方向の油圧を送ることにより、図5(B)に示
す上位のジャッキ爪28がテーパー面28A を介してバネ26
に抗して係合孔20から離脱されつつ上昇し、一段上の係
合孔20に再係合する。この間、下位のジャッキ爪29は係
合孔20に対して係合姿勢を維持している。
Therefore, when constructing a two-story house,
Telescopic cylinder 23 in jack 16 in the state of FIG.
By sending the hydraulic pressure in the extension direction, the upper jack claw 28 shown in FIG. 5 (B) causes the spring 26 through the tapered surface 28A.
Against this, it rises while being disengaged from the engagement hole 20, and re-engages with the engagement hole 20 one step higher. During this time, the lower jack claws 29 maintain the engagement posture with the engagement holes 20.

【0018】また、上述のクライミングポール15に沿う
上昇において、ストローク調整治具17も同行して梁受け
治具18を介して上階梁組み12を小屋組み11とともに垂直
方向に持上げることになる。上位のジャッキ爪28が一段
上の係合孔20に再係合した後に、伸縮シリンダ23に縮小
方向の油圧を供給することによって、下位のジャッキ爪
29はそのテーパー面29A を介してバネ27に抗して係合孔
20から離脱しつつ上昇し、一段上の係合孔20に再係合
し、このように、伸縮シリンダ23の伸縮動作によってジ
ャッキ16はクライミングポール15に沿って所謂尺取虫運
動によって上階梁組み11を徐々に垂直方向に持上げる。
When the climbing pole 15 is lifted, the stroke adjusting jig 17 is also accompanied and the upper floor beam assembly 12 is vertically lifted together with the shed assembly 11 via the beam receiving jig 18. After the upper jack claw 28 is re-engaged with the engagement hole 20 on the upper step, by supplying hydraulic pressure in the contracting direction to the telescopic cylinder 23, the lower jack claw 28
29 is an engaging hole against the spring 27 through its tapered surface 29A.
Ascending while separating from 20 and re-engaging with the engaging hole 20 one step higher, in this way, the expansion / contraction motion of the expansion / contraction cylinder 23 causes the jack 16 to move along the climbing pole 15 by the so-called scale insect movement. Gradually lift vertically.

【0019】所定の持上げにより、ストローク調整治具
17も同行し、一方、クライミングポール15の長さは短い
ことから、受梁36のスキマ36A および切欠部35A を通し
て継ぎポール19をストローク調整治具17に挿通し、その
下端をクライミングポール15に差込み、クライミングポ
ール15の不足部を継ぎポール19によって補い、上階梁組
み11を2階の天井部相当位置まで持上げた後、上階梁組
み11と下階梁組み10とを図1(B) で示す如く本柱37で
連結する。
By a predetermined lifting, a stroke adjusting jig
On the other hand, since the climbing pole 15 is short in length, the joint pole 19 is inserted into the stroke adjusting jig 17 through the gap 36A of the receiving beam 36 and the notch 35A, and the lower end thereof is inserted into the climbing pole 15. , The missing portion of the climbing pole 15 is supplemented by the connecting pole 19, and the upper floor beam assembly 11 is lifted to the position corresponding to the ceiling portion of the second floor, and then the upper floor beam assembly 11 and the lower floor beam assembly 10 are shown in FIG. 1 (B). The main pillars 37 are connected as shown in FIG.

【0020】その後、梁受け治具18は下階梁組み10の下
面に装着するとともに、ジャッキ16はクライミングポー
ル15に沿って降下させ、図2に示す如く土台14上に再セ
ットし、2階部分(2F)は、外受材38等の付帯作業を
行う。この付帯作業は、下階梁組み10を作業足場として
実施できる。そして、スロトーク調整治具17は最早必要
でないことから、これを取外した状態で、2階部分(2
F)と下階梁組み10をともに、ジャッキ16による前述し
た尺取虫運動によってクライミングポール15に沿って垂
直方向に持上げ、所定の持上げ位置になると、1階部分
(1F)の本柱37を立設して、図3に示す如く、外装工
事、内装工事等を除く躯体の構築が略完了する。
After that, the beam receiving jig 18 is attached to the lower surface of the lower floor beam assembly 10, and the jack 16 is lowered along the climbing pole 15 and set again on the base 14 as shown in FIG. The part (2F) carries out incidental work such as the outer receiving material 38. This ancillary work can be performed using the lower-story beam structure 10 as a work scaffold. Since the Slotalk adjusting jig 17 is no longer required, with the Slotalk adjusting jig 17 removed, the second floor portion (2
F) and the lower floor beam assembly 10 are both vertically lifted along the climbing pole 15 by the above-mentioned shakutake insect movement by the jack 16, and when the predetermined lifting position is reached, the main pillar 37 of the first floor portion (1F) is erected. Then, as shown in FIG. 3, the construction of the skeleton excluding exterior work, interior work, etc. is almost completed.

【0021】その後、持上げ措置13は撤去される。After that, the lifting means 13 is removed.

【0022】[0022]

【発明の効果】本発明は以上の通りであり、クライミン
グポールとこれに沿って尺取虫運動するジャッキによる
2階建鉄骨住宅の構築にあたって、垂直方向のガイドで
あるクライミングポールに、ストローク調整治具を摺動
自在に套嵌することにより、クライミングポールは、小
屋組みを貫挿する必要がなく、従って、地上近くで全面
屋根葺した状態での構築ができる。
The present invention is as described above, and in constructing a two-story steel-framed house with a climbing pole and a jack that moves along the same scale, a stroke adjusting jig is attached to the climbing pole which is a vertical guide. By slidably fitting, the climbing pole does not need to be inserted through the hut structure, and therefore can be constructed with the entire roof close to the ground.

【図面の簡単な説明】[Brief description of the drawings]

【図1】(A)は地上近くでの梁組み状態を示す正面図
である。(B)は2階部分のジャッキアップ状態を示す
正面図である。
FIG. 1A is a front view showing a beam assembled state near the ground. (B) is a front view showing the jack-up state of the second floor.

【図2】2階部分と1階部分のジャッキアップ前を示す
正面図である。
FIG. 2 is a front view showing the second floor portion and the first floor portion before jacking up.

【図3】2階部分と1階部分のジャッキアップ後の正面
図である。
FIG. 3 is a front view of the second floor portion and the first floor portion after jacking up.

【図4】梁受け治具、ストローク調整治具、継ぎポール
およびクライミングポールの関係を示す斜視図である。
FIG. 4 is a perspective view showing a relationship between a beam receiving jig, a stroke adjusting jig, a joint pole, and a climbing pole.

【図5】ジャッキの詳細を示し、(A)は正面図、
(B)は一部切欠の側面図、(C)は平面図である。
FIG. 5 shows details of the jack, (A) is a front view,
(B) is a side view of a part cutaway, (C) is a plan view.

【図6】地上近くでの梁組みの分解斜視図である。FIG. 6 is an exploded perspective view of a beam assembly near the ground.

【符号の説明】[Explanation of symbols]

4 仮柱治具 9 梁 10 下階梁組み 11 小屋組み 12 上階梁組み 16 ジャッキ 17 ストローク調整治具 19 継ぎポール 4 Temporary pillar jig 9 Beam 10 Lower floor beam assembly 11 Shed construction 12 Upper floor beam assembly 16 Jack 17 Stroke adjustment jig 19 Joint pole

───────────────────────────────────────────────────── フロントページの続き (72)発明者 田中 進 大阪府大阪市中央区南船場3丁目12番12 号 クボタハウス株式会社内 (72)発明者 石川 忠男 東京都港区浜松町二丁目4番1号 世界 貿易センタービル カヤバ工業株式会社 内 (72)発明者 柳原 海二 東京都港区芝大門2丁目11−1号 富士 ビル 日本鉱機株式会社内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Susumu Tanaka 3-12-12 Minamisenba, Chuo-ku, Osaka City, Osaka Prefecture Kubota House Co., Ltd. (72) Tadao Ishikawa 2-4-1, Hamamatsucho, Minato-ku, Tokyo No. World Trade Center Building Kayaba Industry Co., Ltd. (72) Inventor Kaiji Yanagihara 2-11-1, Shibadaimon, Minato-ku, Tokyo Fuji Building Nippon Mining Machinery Co., Ltd.

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 地上近くで小屋組(11)を有する上階梁組
み(12)と下階梁組み(10)を仮柱治具(4) によって上下に
組付けるとともに、水平方向に間隔を有して複数本のク
ライミングポール(15)を垂直方向に立設し、該クライミ
ングポール(15)に沿って尺取運動で昇降する油圧ジャッ
キ(16)で上階梁組み(12)を所定位置まで上昇させた後に
前記仮柱治具(4) に代替して本柱(37)を上下階梁組み(1
0)(12)間に連結し、その後、上下階梁組み(10)(12)を、
前記油圧ジャッキ(16)で上昇させて施工して行く鉄骨系
住宅の建方工法において、 前記油圧ジャッキ(16)で上階梁組み(12)を上昇させると
き、上階梁組み(12)と油圧ジャッキ(16)との間でクライ
ミングポール(15)に摺動自在に套嵌したストローク調整
治具(17)を介して上昇するとともに所定の上昇時に、前
記クライミングポール(15)に継ポール(19)を接続して行
くことを特徴とする鉄骨系住宅の建方工法。
1. The upper beam assembly (12) and the lower beam assembly (10) having a shed assembly (11) near the ground are vertically assembled by a temporary pillar jig (4), and a space is provided in the horizontal direction. A plurality of climbing poles (15) are vertically installed, and a hydraulic jack (16) that moves up and down along the climbing poles (15) moves the upper floor beam assembly (12) at a predetermined position. After ascending to (1), replace the temporary pillar jig (4) with the main pillar (37)
Connect between 0) and (12), then connect the upper and lower beams (10) and (12),
In the method of constructing a steel-framed house to be raised by the hydraulic jack (16) for construction, when the upper floor beam assembly (12) is raised by the hydraulic jack (16), Ascending through a stroke adjusting jig (17) slidably fitted to the climbing pole (15) between the hydraulic jack (16) and at the time of a predetermined rise, the connecting pole (15) to the climbing pole (15). 19) A method of constructing a steel-framed house, characterized by connecting the two.
JP19988192A 1992-07-27 1992-07-27 Construction method of steel framed house Expired - Fee Related JP2672058B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP19988192A JP2672058B2 (en) 1992-07-27 1992-07-27 Construction method of steel framed house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP19988192A JP2672058B2 (en) 1992-07-27 1992-07-27 Construction method of steel framed house

Publications (2)

Publication Number Publication Date
JPH0642186A JPH0642186A (en) 1994-02-15
JP2672058B2 true JP2672058B2 (en) 1997-11-05

Family

ID=16415169

Family Applications (1)

Application Number Title Priority Date Filing Date
JP19988192A Expired - Fee Related JP2672058B2 (en) 1992-07-27 1992-07-27 Construction method of steel framed house

Country Status (1)

Country Link
JP (1) JP2672058B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2765790B2 (en) * 1992-12-16 1998-06-18 積水ハウス株式会社 Construction method
JP2682778B2 (en) * 1992-12-16 1997-11-26 積水ハウス株式会社 Construction method
JP2682780B2 (en) * 1992-12-16 1997-11-26 積水ハウス株式会社 Construction method
JP2682779B2 (en) * 1992-12-16 1997-11-26 積水ハウス株式会社 Construction method
US5839239A (en) * 1996-04-04 1998-11-24 Jang; Byung K. Apparatus and method for building construction

Also Published As

Publication number Publication date
JPH0642186A (en) 1994-02-15

Similar Documents

Publication Publication Date Title
CA1329633C (en) Construction apparatus and construction method
EP0480683A1 (en) Erection workbench and construction process
JP2672058B2 (en) Construction method of steel framed house
JP2723431B2 (en) Construction method of steel framed house
US4782634A (en) Building construction
US3974617A (en) Double shell tank construction method
JPH05248089A (en) Jack for construction work
JP2792806B2 (en) Construction method and capital piece of steel frame house
JP3066460B2 (en) How to build a tower
CN218175602U (en) Plate girder jacking supporting structure for bridge
KR102628253B1 (en) Stacker system and load dispersion type indoor lifting apparatus of prefabricated steel structure including the same
JP3177726B2 (en) Dismantling method of temporary shed for building structures
KR102623001B1 (en) Dual frame structure for lifting prefabricated steel structure and load dispersion type indoor lifting apparatus of prefabricated steel structure including the same
KR102584877B1 (en) Load dispersion type indoor lifting apparatus of prefabricated steel structure and method of installing prefabricated steel structure using the same
JP2793053B2 (en) Building construction method
CN113338439A (en) Assembled steel construction list slope roofing house
JP2793052B2 (en) Building construction method
JPH07286368A (en) Method and equipment for lifting up uppermost floor frame for constructing structure
JP2653630B2 (en) How to raise the temporary roof
JPH0530949B2 (en)
JPH0340786B2 (en)
JP2622313B2 (en) How to build a building
CN118007971A (en) Welding ball net frame jacking construction installation device
JP2884961B2 (en) Building construction platform
JPH0525940A (en) Erection method for steel skeleton construction

Legal Events

Date Code Title Description
FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 11

Free format text: PAYMENT UNTIL: 20080711

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080711

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 12

Free format text: PAYMENT UNTIL: 20090711

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090711

Year of fee payment: 12

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090711

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 13

Free format text: PAYMENT UNTIL: 20100711

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 14

Free format text: PAYMENT UNTIL: 20110711

LAPS Cancellation because of no payment of annual fees