JP2652143B2 - Upright retaining wall construction unit - Google Patents

Upright retaining wall construction unit

Info

Publication number
JP2652143B2
JP2652143B2 JP6287305A JP28730594A JP2652143B2 JP 2652143 B2 JP2652143 B2 JP 2652143B2 JP 6287305 A JP6287305 A JP 6287305A JP 28730594 A JP28730594 A JP 28730594A JP 2652143 B2 JP2652143 B2 JP 2652143B2
Authority
JP
Japan
Prior art keywords
unit
retaining wall
concrete
rectangular parallelepiped
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP6287305A
Other languages
Japanese (ja)
Other versions
JPH08120691A (en
Inventor
順一 小野瀬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MYAGIKEN KONKURIITO BUROTSUKU KYOGYO KUMIAI
Original Assignee
MYAGIKEN KONKURIITO BUROTSUKU KYOGYO KUMIAI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MYAGIKEN KONKURIITO BUROTSUKU KYOGYO KUMIAI filed Critical MYAGIKEN KONKURIITO BUROTSUKU KYOGYO KUMIAI
Priority to JP6287305A priority Critical patent/JP2652143B2/en
Publication of JPH08120691A publication Critical patent/JPH08120691A/en
Application granted granted Critical
Publication of JP2652143B2 publication Critical patent/JP2652143B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Retaining Walls (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】 本発明は水平面に対して垂直に
起立した直立擁壁の構築に使用されるコンクリートブロ
ック製の擁壁構築用ユニットに関するものである。
The present invention relates to a vertical
The present invention relates to a concrete block retaining wall construction unit used for constructing an upright retaining wall .

【0002】[0002]

【従来の技術】 これまでも擁壁の設計基準は各学会や
諸行政機関によって整備されて来ているが、消費者が得
られる効果と比較して工費が高価であるため設置を省略
したり、大きく法勾配をつけるなどして有効な土地面積
が減少してしまうような工法がとられるなど、住宅本体
と比較して擁壁は手を抜かれ勝ちな部位である。
2. Description of the Related Art Retaining wall design standards have been developed by various academic societies and various administrative organizations. However, installation costs may be omitted because the construction cost is higher than the effect obtained by consumers. Retaining walls are more likely to be overwhelmed than the housing itself, as construction methods are used to reduce the effective land area by making a steep slope.

【0003】また、従来のブロック積み擁壁では、図9
に示したように縦鉄筋配置用の空洞部と横鉄筋配置用の
凹陥部がいずれもブロックの奥行き寸法の中間点上に中
心を置いて設けられており、主筋が擁壁の裏面から離れ
ているため、比較的小さな抵抗モーメントしか得ること
ができず、また、重いため施工性が悪い等といった問題
があった。
[0003] In the conventional block-retaining wall, FIG.
As shown in the figure, the cavity for vertical bar placement and the recess for horizontal bar placement are both provided at the center on the midpoint of the depth dimension of the block, and the main bar is separated from the backside of the retaining wall Therefore, only a relatively small resistance moment can be obtained, and there is a problem that the workability is poor due to the heavy weight.

【0004】[0004]

【発明が解決しようとする課題】 したがって本発明の
目的は、大きな抵抗モーメントが得られ、耐力強度が増
進した直立擁壁を的確に構築できる擁壁構築用ユニット
を提供することである。
SUMMARY OF THE INVENTION Accordingly, an object of the present invention is to provide a retaining wall construction unit capable of appropriately constructing an upright retaining wall having a large resistance moment and an increased proof strength.

【0005】[0005]

【課題を解決するための手段】 以下、添付図面中の参
照符号を用いて説明すると、本発明の直立擁壁構築用ユ
ニットは、コンクリート製直方体1で構成され、縦鉄筋
2が配置されてコンクリート3が充填される空洞部4
と、横鉄筋5が配置されてコンクリート3が充填される
凹陥部6を、直方体1の厚さの中間点よりも後面側に偏
心させて設けてあり、直方体1が水平面に対して垂直に
組み積みされ、縦鉄筋2と横鉄筋5が直方体1の厚さの
中間点よりも後面側に偏位して配置される
The upright retaining wall construction unit of the present invention will be described below with reference numerals in the accompanying drawings. The unit is constructed of a rectangular parallelepiped 1 made of concrete, and a vertical reinforcing bar 2 is disposed thereon. Cavity 4 filled with 3
And a concave portion 6 in which the horizontal reinforcing bar 5 is arranged and filled with the concrete 3 is provided eccentrically to the rear side from the middle point of the thickness of the rectangular parallelepiped 1, and the rectangular parallelepiped 1 is perpendicular to the horizontal plane.
The vertical reinforcing bar 2 and the horizontal reinforcing bar 5 are
It is arranged to be deviated to the rear side from the intermediate point .

【0006】図1から図3に示したユニットは、直方体
1の中央部に略楕円形状の大きな空洞部4を設け、直方
体1の左右側部に半円形状の空洞部4a,4bを設けた
基本形ユニットであり、直方体1の上面には深い凹陥部
6が設けられ、前記空洞部4,4a,4bと凹陥部6は
交差している。
The unit shown in FIGS. 1 to 3 has a substantially rectangular elliptical large cavity 4 at the center of the rectangular parallelepiped 1 and semicircular hollows 4a and 4b at the left and right sides of the rectangular parallelepiped 1. This is a basic unit, and a deep concave portion 6 is provided on the upper surface of the rectangular parallelepiped 1, and the hollow portions 4, 4a, 4b and the concave portion 6 intersect.

【0007】図4に示したユニットは、直方体1の中央
部から左端部にかけて略楕円形状の大きな空洞部4を設
け、直方体1の右側部に半円形状の空洞部4bを設けた
左コーナー型ユニットであり、直方体1の上面には深い
凹陥部6が設けられ、前記空洞部4,4bと凹陥部6は
交差している。
The unit shown in FIG. 4 is a left corner type in which a substantially hollow elliptical cavity 4 is provided from the center to the left end of the rectangular parallelepiped 1 and a semicircular hollow 4b is provided on the right side of the rectangular parallelepiped 1. A deep concave portion 6 is provided on the upper surface of the rectangular parallelepiped 1, and the hollow portions 4 and 4 b intersect with the concave portion 6.

【0008】図5に示したユニットは、直方体1の中央
部から右端部にかけて略楕円形状の大きな空洞部4を設
け、直方体1の左側部に半円形状の空洞部4aを設けた
右コーナー型ユニットであり、直方体1の上面には深い
凹陥部6が設けられ、前記空洞部4,4aと凹陥部6は
交差している。これらのユニットでは、左右の接合端面
には縦溝7と縦突条8を設けてあり、隣接のユニット同
士の間で該縦溝7と縦突条8を嵌合することによって、
横振れを抑止している。
The unit shown in FIG. 5 is a right-corner type in which a substantially hollow elliptical cavity 4 is provided from the center to the right end of the rectangular parallelepiped 1 and a semicircular hollow 4a is provided on the left side of the rectangular parallelepiped 1. As a unit, a deep concave portion 6 is provided on the upper surface of the rectangular parallelepiped 1, and the hollow portions 4 and 4 a intersect with the concave portion 6. In these units, a vertical groove 7 and a vertical ridge 8 are provided on the left and right joint end faces, and by fitting the vertical groove 7 and the vertical ridge 8 between adjacent units,
We restrain sideways.

【0009】[0009]

【作用】通常のタイプでは、ユニットの厚さは180m
mであり、高さは150mmであり、横幅は400mm
である。このユニットを用いて擁壁を構築するには、前
作業として、隣地境界線に合わせて縄張りを行い、図面
に合わせて70cm程度の深さまで設置地面を掘削し、
底盤をランマー等を用いて平らに突き固める。この上に
玉石または砕石を敷き積め、再びランマーで十分に転庄
して厚さ12cmを確保する。割栗工事が終了した後、
捨てコンクリートを平滑に施工する。遺形は10cm角
程度の角材を使用し下げ振りを用いて垂直に建て、レベ
ルを用いて基礎上端、ユニット割り付けの墨を出して置
く。
[Function] In normal type, unit thickness is 180m
m, height is 150 mm, width is 400 mm
It is. In order to construct a retaining wall using this unit, as a preliminary work, perform territory according to the adjacent land boundary line, excavate the installation ground to a depth of about 70 cm according to the drawing,
The bottom plate is pressed flat using a rammer or the like. Cobblestones or crushed stones are laid on this, and the rammers are sufficiently transferred again to secure a thickness of 12 cm. After the split chestnut work is completed,
The discarded concrete is applied smoothly. The remains will be built vertically using a lumber of about 10 cm square using a plumb bob, and the top of the foundation and the ink of the unit allocation will be put out using the level.

【0010】捨てコンクリートの上面に基礎位置、擁壁
の芯の墨出し行い、基礎の前面及び後面には型枠を用
い、コンクリート打込時にふくらまない用に繋ぎ材でと
める。配筋図にしたがって基礎の配筋を行う。基礎の主
筋はスペーサーブロック等により下部からの主筋位置1
3cmを確保する。縦鉄筋2の位置はユニットの空洞部
4の中心なので注意して配筋する。基礎コンクリート中
に鉄筋の継ぎ手を設ける場合は、重ね継ぎ手又はガス圧
接ないしアーク溶接とする。打込時に縦鉄筋が傾いた
り、間隔が乱れないように縦鉄筋の上部を互いに仮留め
しておく。
The foundation position and the core of the retaining wall are printed on the upper surface of the discarded concrete, and the formwork is used on the front and rear surfaces of the foundation. Perform the basic arrangement according to the arrangement plan. The main reinforcement of the foundation is the main reinforcement position 1 from the lower part by the spacer block etc.
Secure 3 cm. Since the position of the vertical reinforcing bar 2 is the center of the hollow portion 4 of the unit, the reinforcing bars are arranged with care. When joints of reinforcing steel are provided in the foundation concrete, lap joints or gas pressure welding or arc welding shall be used. The upper portions of the vertical reinforcing bars are temporarily fixed to each other so that the vertical reinforcing bars do not tilt or are not disturbed at the time of driving.

【0011】コンクリート(レデーミクストコンクリー
トまたは現場練りコンクリート)の打ち込みに当たって
は、コールドジョイントの生じないようによく突き締め
を行いながら連続して打ち込む。コンクリートの打ち込
み口間隔は2m置き以下とし、鉄筋を踏み荒らさないよ
うに足場板を用いる。打込後、表面の水引を待ってタン
ピングを行い、木ごてで平滑に仕上げる。気象に応じて
適切な養生を行う。基礎コンクリートの型枠は、コンク
リートが十分硬化した後、コンクリートに支障を生じな
いように、また、ユニットを組み積みする面を汚さない
ように丁寧に取り外す。
When pouring concrete (ready-mixed concrete or in-situ concrete), the concrete is continuously driven in while being thrust well so as not to cause a cold joint. The spacing between the concrete injection holes is set to 2 m or less, and a scaffold is used so as not to step on the reinforcing steel. After driving, wait for the surface to be drained, tamping, and finish with a wooden iron. Provide appropriate curing according to the weather. After the concrete has sufficiently hardened, the formwork of the base concrete is carefully removed so as not to hinder the concrete and not to stain the surface on which the unit is assembled.

【0012】遣形を用いて壁芯及び壁面の墨出しを行
い、縦鉄筋の位置を確認する。縦鉄筋はユニットの空洞
部内で前面より11cm,裏面より7cmの位置になる
ように設計されている。すなわち、図1において直方体
1(7)厚さ方向の中心線Lと空洞部4,4a,4b
の中心線L間の距離dは2cmに設定されている。根
付き調整モルタルの調合比は1:2とし、これには適当
な顔料や混和材料を用いても良い。基礎表面に出した墨
にしたがって第1段目のユニットを組み積みする。縦鉄
筋の位置は壁芯より約2cm内に入っていることを確認
する。組み積みは、基礎上のフェースシェル及びウェッ
ブ部分に三角ごて等を用いてモルタルを敷き、次いでユ
ニットのウェッブ面のある方を下にして載せ、ユニット
上面を水糸に合わせて水平に据えつける。
[0012] Ink marking is performed on the wall core and the wall surface by using the shape of the wall to confirm the position of the vertical reinforcing bar. The vertical rebar is designed to be 11 cm from the front and 7 cm from the back in the cavity of the unit. That is, a rectangular parallelepiped 1 (7) the thickness direction of the center line L 2 and the cavity 4,4a In FIG 1, 4b
The distance d between the center line L 1 of which is set to 2 cm. The mixing ratio of the root adjustment mortar is 1: 2, and an appropriate pigment or admixture may be used for this. The first-stage units are assembled according to the black ink on the base surface. Confirm that the position of the vertical rebar is within about 2 cm from the center of the wall. For assembling, lay mortar on the face shell and web part on the foundation using a triangular iron, etc., and place it with the unit's web side down, and place the unit top horizontally with the water thread .

【0013】次いで隣接するユニットは、縦目地モルタ
ルはつけずに密着させて組み積みする。敷きモルタル
は、同時にユニット2個分以上施してはならない。ユニ
ット中央の空洞部に縦鉄筋を通す場合には、縦鉄筋を折
り曲げたり湾曲させてはならない。第1段目のユニット
を積み終わった後には、全体の配置・水平等を確認し、
横鉄筋を配筋する。横鉄筋はユニット上面から約3cm
下がった位置でフルート側に配筋し結束する。第1段目
のユニットの上に直接、第2段目のユニットを組み積み
する。組み積みには、水糸にユニットの表面上部の隅角
部を合わせて通り良く行う。ユニットの水平及び通りを
調整する場合には、調整モルタルを薄付けして行う。4
段以降には水抜きパイプを設置する。これには水抜き用
に加工したユニットが使用される。
Next, the adjacent units are assembled in close contact with each other without attaching the vertical joint mortar. Laying mortar shall not be applied to more than one unit at a time. If a vertical bar is passed through the cavity in the center of the unit, the vertical bar must not be bent or bent. After stacking the first stage units, check the overall arrangement and level, etc.
Arrange horizontal rebar. The horizontal rebar is about 3cm from the top of the unit
At the lowered position, arrange the bars on the flute side and bind them together. The second-stage unit is assembled directly on the first-stage unit. The assembling is performed with the water thread aligned with the upper corner of the surface of the unit. When adjusting the horizontal and street of the unit, the adjustment mortar is thinned. 4
Drainage pipes will be installed after the steps. For this, a unit processed for drainage is used.

【0014】3〜4段目を組み積みし、横鉄筋を配筋し
たところで、コンクリートの充填を行うのを原則とす
る。充填は3〜4段目の横鉄筋が隠れる位置まで行う。
ユニットの組み積み段数が9段を越える場合の縦鉄筋は
重ね継ぎ手とし、3〜4段目までのコンクリートを充填
する前に、ユニットの上部から基礎スラブ面まで縦鉄筋
を落とし込む。落とし込んだ縦鉄筋は、前面より11c
mの位置を保つように5段目の位置で基礎スラブ9から
立ち上がってきた主筋10に固く結束する。全部の縦鉄
筋の位置及び結束の状況を確かめてから、3〜4段目の
横鉄筋が隠れる位置までコンクリートを充填する。充填
には棒状バイブレーターを用い、横鉄筋用凹陥部に十分
コンクリートが回り込むように施工する。
In principle, concrete is filled when the third and fourth stages are assembled and horizontal reinforcing bars are arranged. Filling is performed to the position where the third and fourth horizontal bars are hidden.
When the number of stacking units of the unit exceeds nine, the vertical reinforcing bar is used as a lap joint and before the concrete of the third to fourth stages is filled, the vertical reinforcing bar is dropped from the upper part of the unit to the foundation slab surface. The dropped vertical reinforcing bar is 11c from the front.
At the position of the fifth step, it is firmly bound to the main bar 10 rising from the foundation slab 9 so as to maintain the position of m. After confirming the position of all vertical reinforcing bars and the state of binding, concrete is filled to a position where the horizontal reinforcing bars in the third and fourth stages are hidden. A rod-shaped vibrator is used for filling, and the concrete is wrapped around the recess for the horizontal reinforcing bars.

【0015】4〜5段目以降のコンクリート充填は、ユ
ニット4段を組み積みする毎に実施する。擁壁頂部に笠
本用ユニットを使用する場合には、笠木用ユニットの中
央部を叩き、孔を貫通させたところに鉄筋を適宜の長さ
にして差し込み、モルタルを充填してずれ止めをする。
本ユニットの施工は、当日のうちに根付けから最上段ま
で組み積みし、コンクリート打ちを行って終了してよい
が、翌日以降に持ち越す場合には、組み積み段数を揃え
コンクリート打ちを行って終了するのを原則とする。こ
の場合のコンクリート打ち高さは、最上段の空洞部の高
さの50%程度に止めて置く。
The concrete filling of the fourth to fifth stages and thereafter is carried out every time four units of the unit are assembled. When using the Kasamoto unit on the top of the retaining wall, hit the center of the Kasamoto unit, insert a reinforcing bar of appropriate length where the hole has been penetrated, and fill with mortar to prevent slippage. .
The construction of this unit may be completed from the rooting to the top stage on the day and concreted and finished. In principle. In this case, the concrete pouring height is kept at about 50% of the height of the uppermost hollow portion.

【0016】コンクリートが十分に硬化するのを待って
埋め戻しを行う。最初にユニット2段目(下方の地盤
面)まで十分に突き固めながら埋め戻しを行う。埋め戻
しに用いる土は良質なものを用いる。擁壁に接する背後
の部分には、厚さ30cm以上の透水し易い礫質の層を
設ける。笠木用ユニットは土圧を負担しないので、これ
を用いた場合の埋め戻しは、笠本用ユニットの下端まで
とする。
After the concrete is sufficiently hardened, backfilling is performed. First, backfilling is performed while sufficiently squeezing to the second stage (lower ground surface) of the unit. Use good quality soil for backfilling. On the part in contact with the retaining wall, a permeable layer with a thickness of 30 cm or more is provided. Since the Kasagi unit does not bear the earth pressure, backfilling when using it is limited to the lower end of the Kasamoto unit.

【0017】[0017]

【実施例】 図9に示した空洞部が偏心していない従来
のブロックで作製した試験体と、本発明のユニットで作
製した試験体について、耐力の比較実験を行った。図6
に示したように直立擁壁の各試験体のGLからの高さは
1.95mとした。各試験体は同一断面、同一配筋であ
る。加力法は、常時における土圧作用を想定し、一方向
単調加力とした。加力位置としては、設計時に想定され
る土圧合力の作用点ではなく、重ね継手の開始点と擁壁
脚部における応力の比が設計応力分布における値と一致
する点を選定した。
EXAMPLE A comparative test was carried out on the proof stress of a test piece made of a conventional block in which the cavity shown in FIG . 9 was not eccentric and a test piece made of the unit of the present invention. FIG.
As shown in the figure, the height of the upright retaining wall from the GL of each specimen was 1.95 m. Each specimen has the same cross section and the same reinforcing arrangement. The force method assumes one-way monotonic force assuming the earth pressure action at all times. As the applied position, a point where the ratio of the stress at the start point of the lap joint to the retaining wall leg coincides with the value in the design stress distribution, instead of the point of application of the earth pressure resultant force assumed at the time of design.

【0018】この実験によれば、従来のブロックでば耐
力が平均1.81tmであるのに対して、本発明のユニ
ットでは平均2.18tmであり、また許容耐力が従来
のブロックでは0.94tmであるのに対して、本発明
のユニットでは1.11tmであり、許容耐力比は従来
のブロックを1とすると、本発明のユニットは1.17
6となり、空洞部位置を偏心させて鉄筋を直方体の厚さ
の中間点よりも後面側に偏位させることにより17.6
%耐力が上昇にすることが分かった。
According to this experiment, the proof stress of the conventional block is 1.81 tm on average, whereas the unit of the present invention has an average of 2.18 tm and the allowable proof strength of 0.94 tm in the conventional block. On the other hand, the unit of the present invention is 1.11 tm, and the allowable proof stress ratio is 1.17 assuming that the conventional block is 1.
6 and eccentric the cavity position to reinforce the cuboid thickness
17.6 by deviating to the rear side from the midpoint of
% Proof stress was found to increase.

【0019】[0019]

【発明の効果】 以上のように本発明では、直立擁壁構
築用ユニットをコンクリート製直方体1で構成し、縦鉄
筋2が配置されてコンクリート3が充填される空洞部4
と、横鉄筋5が配置されてコンクリート3が充填される
凹陥部6を、直方体1の厚さの中間点よりも後面側に偏
心させてあり、直方体1が水平面に対して垂直に組み積
みしたとき、縦鉄筋2と横鉄筋5が直方体1の厚さの中
間点よりも後面側に偏位して配置されるので、従来のブ
ロックより厚さを増すことなく主筋を擁壁の裏面に近く
配筋することができ、大きな抵抗モーメントを得ること
ができ、また、縦方向の空洞部と横方向の凹陥部はいず
れも大きな容積を有し、コンクリートのかぶり厚さを十
分に確保することができるので、耐力の増強された鉄筋
コンクリート構造擁壁を構築できる。
As described above, according to the present invention, the unit for constructing an upright retaining wall is constituted by the rectangular parallelepiped 1 made of concrete, and the cavity 4 in which the vertical reinforcing bars 2 are arranged and the concrete 3 is filled.
And the concave portion 6 in which the horizontal reinforcing bar 5 is disposed and filled with the concrete 3 is eccentric to the rear side from the middle point of the thickness of the rectangular parallelepiped 1, and the rectangular parallelepiped 1 is vertically assembled with the horizontal plane.
When viewed, the vertical reinforcing bar 2 and the horizontal reinforcing bar 5 are in the thickness of the rectangular parallelepiped 1.
Since it is arranged deviated to the rear side from the intermediate point, the main reinforcement can be arranged closer to the back of the retaining wall without increasing the thickness than the conventional block, and a large resistance moment can be obtained, In addition, both the vertical cavity and the horizontal recess have a large volume, and the cover thickness of the concrete can be sufficiently ensured, so that a reinforced concrete structure retaining wall with enhanced strength can be constructed.

【0020】また、空洞部や凹陥部を大きくとることに
よって、厚さの割りに軽量であり、組み積み施工が容易
になされる。土留め用擁壁の品質を高め、直方体1を
直に立ち上げることによって土地の有効利用を図ること
ができ、また基礎スラブの型枠以外は無型枠で施工で
き、施工コストが節減できる。
In addition, by making the cavity and the concave portion large, the weight is light for the thickness, and the assembling work can be easily performed. By improving the quality of the retaining wall for the retaining wall and raising the rectangular parallelepiped 1 vertically, it is possible to effectively use the land, and it is possible to construct with no form except for the form of the foundation slab. Cost can be reduced.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本発明の擁壁構築用ユニットの基本型ユニッ
トの一例を示す平面図である。
FIG. 1 is a plan view showing an example of a basic unit of a retaining wall construction unit of the present invention.

【図2】 該基本型ユニットの左側面図である。FIG. 2 is a left side view of the basic type unit.

【図3】 該基本型ユニットの底面図である。FIG. 3 is a bottom view of the basic unit.

【図4】 本発明の左コーナー型ユニットの一例を示す
平面図である。
FIG. 4 is a plan view showing an example of a left corner type unit of the present invention.

【図5】 本発明の右コーナー型ユニットの一例を示す
平面図である。
FIG. 5 is a plan view showing an example of a right corner type unit of the present invention.

【図6】 本発明のユニットを用いて構築した擁壁の一
例を示す右側面図である。
FIG. 6 is a right side view showing an example of a retaining wall constructed using the unit of the present invention.

【図7】 本発明のユニットで構築した擁壁の一例を示
す水平断面図である。
FIG. 7 is a horizontal sectional view showing an example of a retaining wall constructed by the unit of the present invention.

【図8】 本発明のユニットで構築した擁壁の別の一例
を示す水平断面図である。
FIG. 8 is a horizontal sectional view showing another example of the retaining wall constructed by the unit of the present invention.

【図9】 従来の擁壁構築用ブロックの平面図である。FIG. 9 is a plan view of a conventional retaining wall construction block.

【符号の説明】[Explanation of symbols]

1 ユニットを構成するコンクリート製直方体 2 縦鉄筋 3 充填コンクリート 4 空洞部 5 横鉄筋 6 凹陥部 7 縦溝 8 縦突条 DESCRIPTION OF SYMBOLS 1 Concrete rectangular parallelepiped which comprises a unit 2 Vertical reinforcement 3 Filling concrete 4 Hollow part 5 Horizontal reinforcement 6 Depression 7 Vertical groove 8 Vertical protrusion

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 コンクリート製直方体1で構成され、縦
鉄筋2が配置されてコンクリート3が充填される空洞部
4と、横鉄筋5が配置されてコンクリート3が充填され
る凹陥部6を、直方体1の厚さの中間点よりも後面側に
偏心させて設けてあり、直方体1が水平面に対して垂直
に組み積みされ、縦鉄筋2と横鉄筋5が直方体1の厚さ
の中間点よりも後面側に偏位して配置されることを特徴
とする直立擁壁構築用ユニット。
1. A rectangular parallelepiped 1 comprising a concrete rectangular parallelepiped 1 in which a vertical reinforcing bar 2 is arranged and filled with concrete 3 and a concave portion 6 in which a horizontal reinforcing bar 5 is arranged and filled with concrete 3 are formed. The cuboid 1 is provided eccentrically to the rear side from the midpoint of the thickness of
The vertical reinforcing bar 2 and the horizontal reinforcing bar 5 have the thickness of the rectangular parallelepiped 1
An upright retaining wall construction unit, wherein the unit is arranged so as to be deviated to the rear side from the intermediate point of the above .
JP6287305A 1994-10-27 1994-10-27 Upright retaining wall construction unit Expired - Lifetime JP2652143B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6287305A JP2652143B2 (en) 1994-10-27 1994-10-27 Upright retaining wall construction unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6287305A JP2652143B2 (en) 1994-10-27 1994-10-27 Upright retaining wall construction unit

Publications (2)

Publication Number Publication Date
JPH08120691A JPH08120691A (en) 1996-05-14
JP2652143B2 true JP2652143B2 (en) 1997-09-10

Family

ID=17715656

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6287305A Expired - Lifetime JP2652143B2 (en) 1994-10-27 1994-10-27 Upright retaining wall construction unit

Country Status (1)

Country Link
JP (1) JP2652143B2 (en)

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5343701U (en) * 1976-09-20 1978-04-14

Also Published As

Publication number Publication date
JPH08120691A (en) 1996-05-14

Similar Documents

Publication Publication Date Title
US7654776B2 (en) Retaining wall block
US5367845A (en) System for building a structure
KR102159832B1 (en) Construction method of basic construction of buildings
CN102966119A (en) Geogrid reinforced wall and construction method thereof
JP2004100157A (en) Retaining wall structure and its construction method
JP2652143B2 (en) Upright retaining wall construction unit
JPH05230845A (en) L-shaped block retaining wall structure and construction method thereof
KR101045019B1 (en) Installation structure of block type breast wall and its construction method
KR200263961Y1 (en) Sectional block for retaining wall building
JPH08177059A (en) Footing block, and integrated method for constructing continuous footing employing footing block
JP3057466B2 (en) How to build underground structures
JP3234820B2 (en) Retaining wall construction method and construction of retaining wall for building residential land
JP3059058U (en) Solid foundation structure with stabilizer
KR100380907B1 (en) Precast concrete segment for arch type culvert and construction method using this segment
CN217150381U (en) Earthquake-resistant building foundation
JPS6323475Y2 (en)
JPH11131505A (en) Retaining wall block and retaining wall
JPS602283Y2 (en) L-shaped concrete block for retaining wall
KR920008713B1 (en) Construction method and block for prefabricated retaining wall
JP3593752B2 (en) Retaining wall structure and built flat land structure or built road structure on steep slopes
JP2680241B2 (en) Underground Reservoir Structure
KR20240025838A (en) Retaining wall with three dimensional connecting block system
JPS60341Y2 (en) stacked block foundation frame
JPH09228395A (en) Retaining wall structure
JPH0452321A (en) Block for continuous footing construction