JP2637829B2 JP2018294A JP1829490A JP2637829B2 JP 2637829 B2 JP2637829 B2 JP 2637829B2 JP 2018294 A JP2018294 A JP 2018294A JP 1829490 A JP1829490 A JP 1829490A JP 2637829 B2 JP2637829 B2 JP 2637829B2
Authority
JP
Japan
Prior art keywords
master
power
control
slave
power supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2018294A
Other languages
Japanese (ja)
Other versions
JPH03222555A (en
Inventor
卓也 河崎
義春 滝
博志 岩本
俊章 遠山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Hitachi Information Systems Ltd
Original Assignee
Hitachi Ltd
Hitachi Information Network Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd, Hitachi Information Network Ltd filed Critical Hitachi Ltd
Priority to JP2018294A priority Critical patent/JP2637829B2/en
Publication of JPH03222555A publication Critical patent/JPH03222555A/en
Application granted granted Critical
Publication of JP2637829B2 publication Critical patent/JP2637829B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Data Exchanges In Wide-Area Networks (AREA)
  • Small-Scale Networks (AREA)
  • Communication Control (AREA)

Description

【発明の詳細な説明】 [産業上の利用分野] 本発明は、通信システム等のように、隔離して装置を
配置するシステムにおける電源の投入、切断の制御を行
なう電源制御方式に関する。
Description: BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a power supply control method for controlling turning on and off of a power supply in a system in which devices are arranged in isolation, such as a communication system.

[従来の技術] 従来、通信機器における電源投入/切断の方式として
は、例えば、ホストコンピュータが端末の電源の投入/
切断を行なうような片方向の制御方式がある。
[Prior Art] Conventionally, as a method of turning on / off a power of a communication device, for example, a host computer turns on / off a terminal.
There is a one-way control method for performing cutting.

この種の技術として関連するものには、例えば、特開
昭60−215226号公報等に記載されるものがある。
Related technologies of this type include, for example, those described in Japanese Patent Application Laid-Open No. 60-215226.

例えば、同公報には、特定のシーケンスパターンを格
納する格納手段と、外部から供給されるシーケンスパタ
ーンと前記特定のシーケンスパターンとを比較して一致
したときに一致信号を発生する比較手段と、前記一致信
号の供給に応答して端末への電源供給を制御する制御手
段とを含んで構成される技術が開示される。
For example, the publication discloses a storage means for storing a specific sequence pattern, a comparing means for comparing a sequence pattern supplied from the outside with the specific sequence pattern and generating a match signal when they match, A technology is disclosed that includes control means for controlling power supply to a terminal in response to the supply of a match signal.

この技術によれば、特定パターンの受信データにより
制御することにより、ホストコンピュータと端末装置と
が、互いにパケット交換網を介して接続される場合にお
いても、端末装置について、ホストコンピュータから自
動的に電源を制御することができる。
According to this technique, by controlling the received data in a specific pattern, even when the host computer and the terminal device are connected to each other via a packet switching network, the terminal device is automatically powered by the host computer. Can be controlled.

[発明が解決しようとする課題] ところで、システムによっては、管理を行なう装置の
故障や保守・点検等による機能停止に対処するため、シ
ステムを管理する装置を2台備え、これらを交互に用い
る構成とすることがある。このような構成であれば、シ
ステムの運用の信頼性を高めることができる。
[Problems to be Solved by the Invention] By the way, some systems are provided with two devices for managing the system and used alternately in order to cope with a failure of the device for management or a function stop due to maintenance / inspection. It may be. With such a configuration, the reliability of the operation of the system can be improved.

このようなシステムにあっては、2台の装置につい
て、互いに他の装置に制御の起点を移すことができて、
かつ、他装置の電源の投入/切断の制御が行なえること
が好ましい。
In such a system, the starting point of the control can be shifted to the other devices with respect to the two devices,
In addition, it is preferable that the power on / off control of another device can be performed.

しかし、上述したように、従来の電源投入/切断の制
御は、ホストコンピュータが端末の電源を制御する場合
についてのみ適用されるものであって、いずれもが主装
置となり得る装置を2台含むシステムにおける電源の制
御については、全く配慮されていない。
However, as described above, the conventional power on / off control is applied only when the host computer controls the power of the terminal, and a system including two devices each of which can be a main device is used. No consideration is given to the control of the power supply.

そのため、例えば、第1図に示すような網管理装置
(ネットワークの監視・制御を行なう)が2台接続され
ているシステムにおいて、従来の技術を適用すると、網
管理装置3aが、通信回線4a、交換装置1a、通信回線2c、
交換装置1bおよび通信回線4bを経由して網管理装置3bの
電源の制御を行なう構成とすることができる。ところ
が、従来の技術は、制御の起点が網管理装置3aに固定さ
れているため、その逆方向の制御である網管理装置3bに
よる網管理装置3aの電流の制御ができないという問題が
生ずる。
Therefore, for example, in a system in which two network management apparatuses (monitoring and controlling the network) as shown in FIG. 1 are connected, if the conventional technique is applied, the network management apparatus 3a becomes the communication line 4a, Switching equipment 1a, communication line 2c,
The power supply of the network management device 3b can be controlled via the switching device 1b and the communication line 4b. However, in the conventional technique, since the starting point of the control is fixed to the network management device 3a, there is a problem that the current of the network management device 3a cannot be controlled by the network management device 3b which is the reverse control.

このように、上述した従来の技術では、一方の装置か
ら他方の装置に対してのみ、電源の制御ができるに過ぎ
ないため、2台の装置により、交互にシステムの管理等
を行なう場合に、電源について対等な制御が行なえな
い、という問題がある。
As described above, according to the above-described conventional technology, only the power supply can be controlled from one device to the other device. Therefore, when two devices perform system management and the like alternately, There is a problem that equal control of the power supply cannot be performed.

本発明の目的は、2台の装置がいずれの側からも他の
装置の電源の投入/切断の制御ができて、システムの監
視・制御を2台の装置の相互で一方から他方に切り替え
て実行できる電源制御方式を提供することにある。
An object of the present invention is to enable two devices to control the power on / off of the other device from either side, and to switch the monitoring and control of the system from one device to the other for the two devices. An object of the present invention is to provide an executable power control method.

[課題を解決するための手段] 上記目的を達成するため、本発明によれば、複数の装
置を通信回線で接続して構成されるシステムにおける電
源の投入、切断の制御を行なう電源制御方式であって、
システム管理する管理装置を少なくとも2台備え、上記
各管理装置は、自装置がマスタであるとき、外部からの
指示に応じて、他の装置に対して電源制御データを送信
する機能と、他装置から送信される電源制御データを受
信し、その指示に応じて、自装置の電源の制御を行なう
機能とを備えることを特徴とする電源制御方式が提供さ
れる。
[Means for Solving the Problems] To achieve the above object, according to the present invention, a power supply control method for controlling power on / off in a system configured by connecting a plurality of devices via a communication line. So,
A management device for managing the system, wherein each of the management devices, when the device itself is a master, transmits power control data to another device in response to an external instruction; And a function of receiving power supply control data transmitted from the device and controlling the power supply of the apparatus in response to the instruction.

また、本発明によれば、このようなシステムの管理に
好適な管理装置であって、自装置がマスタであるとき、
外部からの指示に応じて、他の装置に対して電源制御デ
ータを送信する機能と、他装置から送信される電源制御
データを受信し、その指示に応じて、自装置の電源の制
御を行なう機能とを備えるものが提供される。
Further, according to the present invention, a management device suitable for managing such a system, and when its own device is a master,
A function of transmitting power control data to another device in response to an external instruction, and receiving power control data transmitted from the other device, and controlling the power of the own device in response to the instruction What is provided with a function is provided.

上記管理装置は、自装置がマスタかスレーブかの状態
を示す信号を保持する状態保持手段と、外部からの指示
に応じて、自装置の状態保持手段に対してマスタ/スレ
ーブの切替を行なうと共に、他装置に対してマスタ/ス
レーブの切替を指示するデータを生成して送信する手段
と、他装置から送信されるマスタ/スレーブ切替指示デ
ータを受信して、自装置の状態保持手段に対して、マス
タ/スレーブの切替を行なう手段とを備えることが好ま
しい。
The management device performs a master / slave switch to the status holding unit of the own device in response to an external instruction, and a status holding unit that holds a signal indicating whether the own device is a master or a slave. Means for generating and transmitting data for instructing another device to switch master / slave, and receiving master / slave switching instruction data transmitted from the other device, And means for switching between master and slave.

さらに、本発明によれば、2台の装置がインターフェ
ースで接続されているシステムにおいて、一方の装置が
主装置と認識する手段と、自装置が主装置と認識するこ
とにより他装置の電源を投入/切断可能とする手段とを
設けることにより、主装置が他の装置の電源の投入/切
断を可能とする電源制御方式が提供される。
Furthermore, according to the present invention, in a system in which two devices are connected by an interface, a means for recognizing one device as a main device and turning on the power of another device by recognizing the own device as a main device. By providing means for enabling / disconnecting power, a power supply control method is provided which enables the main device to turn on / off the power of another device.

この場合、一方の装置の電源が切断されているときに
は、他の装置が主装置と認識する手段を有することが好
ましい。
In this case, when the power of one device is turned off, it is preferable that the other device has means for recognizing the main device.

本発明は、システムコンソールを用いて、外部からの
コマンド入力操作等により、従装置に主装置(マスタ)
として動作する権限を与える構成とすることができる。
According to the present invention, a master device (master) is connected to a slave device by an external command input operation or the like using a system console.
A configuration that gives the authority to operate as

[作用] 本発明は、通信システム等のシステムを管理する管理
装置を少なくとも2台備える。従って、いずれかの管理
装置をマスタとすることにより、当該マスタの管理装置
により、システムの管理が行なえる。
[Operation] The present invention includes at least two management devices that manage a system such as a communication system. Therefore, by using one of the management devices as a master, the system can be managed by the management device of the master.

また、各管理装置は、マスタ/スレーブの切り変えが
可能である。そして、マスタの管理装置は、他の管理装
置について、電源の投入、切断の制御を行なうことがで
きる。
Further, each management device can switch between master and slave. Then, the master management device can control turning on and off of the power of the other management devices.

すなわち、上記管理装置は、自装置がマスタであると
き、外部からの指示、例えば、コンソール等からオペレ
ータによって投入されるコマンドに応じて、他の装置に
対して電源制御データを生成し、このデータを送信す
る。一方、自装置がスレーブであるとき、他の管理装置
から送信される電源制御データを受信し、その指示に応
じて、自装置の電源の制御を行なう。すなわち、主電源
の投入または切断を行なう。
That is, when the management device is a master, the management device generates power control data for another device in response to an external instruction, for example, a command input by an operator from a console or the like, and Send On the other hand, when the own device is a slave, it receives power control data transmitted from another management device and controls the power of the own device according to the instruction. That is, the main power is turned on or off.

なお、システムに接続される、管理装置以外の装置
に、いずれかの管理装置から送信される電源制御データ
を受信し、その指示に応じて、自装置の電源の制御を行
なう機能を備えることにより、この装置に対して、管理
装置から通信回線を介して、遠隔操作で電源の制御を行
なうことが可能となる。
In addition, by providing a device connected to the system, other than the management device, with a function of receiving power control data transmitted from any of the management devices and controlling the power of the own device in accordance with the instruction. The power of this device can be controlled by a remote control from a management device via a communication line.

これは、複数台の交換装置と、2台の網管理装置とを
通信回線により接続して構成される通信システムにおい
て、特に有用である。本発明は、もちろん、通信システ
ムに限られないことはいうまでもない。
This is particularly useful in a communication system configured by connecting a plurality of switching devices and two network management devices via a communication line. It goes without saying that the present invention is not limited to communication systems.

また、本発明は、2台の装置がインターフェースで接
続されているシステムにおいて、一方の装置が、自装置
が主装置(マスタ)と認識することにより、他装置の電
源を投入/切断可能とすることができる。しかも、主装
置(マスタ)が電源OFFのため他装置の電源の制御がで
きない場合、従装置(スレーブ)が自動的に主装置(マ
スタ)に切り替わる。あるいは、主装置として動作する
権限を与えられることにより、通信網の監視・制御を可
能とする。
Further, according to the present invention, in a system in which two devices are connected by an interface, one device can turn on / off the power of another device by recognizing itself as a master device (master). be able to. Moreover, when the power of the main device (master) cannot be controlled because the power of the main device (master) is OFF, the slave device (slave) is automatically switched to the main device (master). Alternatively, it is possible to monitor and control a communication network by being given the authority to operate as a main device.

本発明によれば、複数の装置を通信回線で接続して構
成される、通信システム等のシステムに、少なくとも2
台の管理装置が接続され、しかも、2台の装置がいずれ
の側からも他の装置の電源の投入/切断の制御ができる
ので、システムの監視・制御を2台の管理装置の相互で
一方から他方に切り替えて実行できることになり、シス
テムの信頼性が向上する。
According to the present invention, a system such as a communication system configured by connecting a plurality of devices by a communication line has at least two components.
Two management devices are connected, and since two devices can control the power on / off of the other device from either side, system monitoring and control can be performed by one of the two management devices. Can be switched to the other, and the reliability of the system is improved.

[実施例] 以下、本発明の実施例について、図面を用いて具体的
に説明する。
[Examples] Examples of the present invention will be specifically described below with reference to the drawings.

第1図は、本発明の一実施例を示し、網管理装置を2
台接続したネットワークシステムの構成図である。
FIG. 1 shows an embodiment of the present invention, in which
FIG. 1 is a configuration diagram of a network system in which two units are connected.

1,1a,1bは、交換装置である。これらは、通信回線2a,
2b,2cによって互いに接続される。端末から受けたデー
タは、該通信回線2a,2b,2cを通して受け渡しされる。3
a,3bは、網管理装置であり、通信回線4a,4bによって交
換装置1a,1bに接続されている。5a,5bは、システムコン
ソールであり、網管理装置3a,3bに接続されている。9
は交換装置1,1a,1bに接続された端末である。
1, 1a and 1b are exchange devices. These are communication lines 2a,
They are connected to each other by 2b and 2c. Data received from the terminal is passed through the communication lines 2a, 2b, 2c. Three
Reference numerals a and 3b denote network management devices, which are connected to the switching devices 1a and 1b by communication lines 4a and 4b. 5a and 5b are system consoles, which are connected to the network management devices 3a and 3b. 9
Is a terminal connected to the switching devices 1, 1a, 1b.

上記網管理装置3aおよび3bは、例えば、第2A図に示す
ように構成される。第2A図は、網管理装置の構成の一実
施例を示すブロック図である。
The network management devices 3a and 3b are configured, for example, as shown in FIG. 2A. FIG. 2A is a block diagram showing one embodiment of the configuration of the network management device.

同図に示す網管理装置は、コンソール5と接続され
て、オペレータの指示に従って網管理を行なう網管理部
301と、通信回線4と接続されてデータの通信を行なう
通信制御部302と、主電源316と、該主電源316と接続さ
れて該主電源316のオンオフを制御する電源制御部303と
を備えて構成される。
The network management device shown in FIG. 1 is connected to the console 5 and performs network management in accordance with an instruction from an operator.
301, a communication control unit 302 connected to the communication line 4 to perform data communication, a main power supply 316, and a power control unit 303 connected to the main power supply 316 and controlling on / off of the main power supply 316. It is composed.

網管理部301はコンソール5から投入されるコマンド
を解析するコマンド解析回路306と、自装置がマスタ/
スレーブのいずれの状態であるかを示す情報を保持する
状態レジスタ308と、コマンド解析回路306からの指示を
受けて状態レジスタ308を制御するマスタ/スレーブ制
御回路309と、状態レジスタ308のマスタ/スレーブの状
態を読み出して、コンソール5に表示させる状態表示回
路307と、コマンド解析回路306からの指示に応じて、他
装置に対する電源制御を行なう信号の生成を通信制御部
302に対して指示する電源制御指示回路310とを備えて構
成される。
The network management unit 301 includes a command analysis circuit 306 for analyzing a command input from the console 5 and
A status register 308 for holding information indicating which state the slave is in, a master / slave control circuit 309 for controlling the status register 308 in response to an instruction from the command analysis circuit 306, and a master / slave for the status register 308 And a communication control unit for generating a signal for performing power control on another device in response to an instruction from the command display circuit 307 and a command analysis circuit 306 to read the status of the device 5 and display it on the console 5.
And a power control instruction circuit 310 for instructing the power supply control circuit 302.

コマンド解析回路306は、その内部または外部に設け
られるメモリに設定される、第2B図に示すようなコマン
ドテーブル304およびパラメータテーブル305を有してい
る。
The command analysis circuit 306 has a command table 304 and a parameter table 305 as shown in FIG. 2B which are set in a memory provided inside or outside the command analysis circuit 306.

システムコンソール(以下、単にコンソールと略称す
る場合もある)5は、CRT等の表示装置と、キーボード
等の入力装置と、それらの駆動装置とを備えて構成され
る。
The system console (hereinafter, may be simply referred to as a console) 5 includes a display device such as a CRT, an input device such as a keyboard, and a driving device thereof.

状態レジスタ308は、例えば、自装置がマスタであれ
ば“1"、スレーブであれば“0"が設定される。
For example, the status register 308 is set to “1” if the device itself is a master, and “0” if the device is a slave.

通信制御部302は、上記電源制御指示回路310からの指
示を受けて、他装置の電源を制御するデータや、マスタ
/スレーブ切替データ等を生成するデータ生成回路313
と、上記生成されたデータ等を他装置に送る送信回路31
5と、上記電源制御指示回路310からの指示を状態レジス
タ308からの電源制御許可信号325に応じてデータ生成回
路313に入力させるか否かを許可する許可回路311と、他
装置から通信回線4を介して送られてくるデータを受信
する受信回路314と、受信したデータを解析してマスタ
/スレーブ切替コマンドであることを認識して、状態レ
ジスタ308の状態を更新するデータ解析回路302とを備え
て構成される。
The communication control unit 302 receives a command from the power control command circuit 310 and generates a data for controlling power of another device, a data generation circuit 313 for generating master / slave switching data, and the like.
And a transmission circuit 31 for transmitting the generated data and the like to another device.
5, a permission circuit 311 for permitting whether or not to input an instruction from the power control instruction circuit 310 to the data generation circuit 313 in response to the power control permission signal 325 from the status register 308; And a data analysis circuit 302 that analyzes the received data to recognize that it is a master / slave switching command and updates the state of the state register 308. It is configured with.

電源制御部303は、通信回線4を介して送られてくる
データを受信する受信回路319と、受信データを解析し
て電源制御データであることを認識すると主電源316を
制御するデータ解析回路330と、クロック信号を発生す
るクロック発生回路317と、自装置のクロックを用いる
か他装置のクロックを用いるかを切り替えるクロック切
替回路318とを備えて構成される。
The power supply control unit 303 includes a reception circuit 319 that receives data transmitted via the communication line 4 and a data analysis circuit 330 that controls the main power supply 316 when the received data is analyzed and recognized as power control data. And a clock generation circuit 317 for generating a clock signal, and a clock switching circuit 318 for switching between using the clock of the own device or the clock of another device.

次に、本実施例の動作について、第1図、第2A図〜第
2F図を参照して説明する。
Next, the operation of this embodiment will be described with reference to FIGS.
This will be described with reference to FIG. 2F.

まず、網管理装置の動作について、コマンド解析回路
306の動作を中心として説明する。
First, regarding the operation of the network management device, the command analysis circuit
The operation of 306 will be mainly described.

第2C図のフローチャートに示すように、コマンド解析
回路306は、コンソール5からのコマンド入力の有無を
監視している(ステップ1)。ここで、コマンドの入力
があると、そのコマンドの種別を、第2B図のコマンドテ
ーブル304をサーチして決定する(ステップ2)。コマ
ンドの種別が決まると、SSD,NCG,POW等の各コマンドご
との処理を実行する。
As shown in the flowchart of FIG. 2C, the command analysis circuit 306 monitors the presence or absence of a command input from the console 5 (step 1). Here, when a command is input, the type of the command is determined by searching the command table 304 of FIG. 2B (step 2). When the command type is determined, processing for each command such as SSD, NCG, and POW is executed.

以下、これらのコマンドごとの処理について説明す
る。
Hereinafter, processing for each of these commands will be described.

まず、装置がマスタかスレーブかの状態をコンソール
5に表示させる場合について説明する。この処理は、シ
ステムコンソール5からコマンド“SSD"を投入すること
によって開始される。
First, a case will be described in which the state of whether the device is a master or a slave is displayed on the console 5. This processing is started by inputting a command “SSD” from the system console 5.

コマンド解析回路306は、コマンドテーブル304をサー
チし、“SSD"のキーを探す(ステップ2)。そして、
“SSD"のキーに対応した状態表示指示信号320を変化さ
せる。状態表示回路307は、装置のマスタ/スレーブの
状態を、状態レジスタ308からリードし、決められたフ
ォーマットでシステムコンソール5に出力する(ステッ
プ3,4)。
The command analysis circuit 306 searches the command table 304 for a key "SSD" (step 2). And
The status display instruction signal 320 corresponding to the “SSD” key is changed. The status display circuit 307 reads the status of the master / slave of the device from the status register 308 and outputs it to the system console 5 in a predetermined format (steps 3 and 4).

この手順は、コンソール5上では、例えば、第2D図に
示すように表われる。
This procedure appears on the console 5, for example, as shown in FIG. 2D.

すなわち、例えば、TYO局から見たNCS(網管理局)の
状態を表示するために、コマンドを入力すると、同図に
おいて符号501で示すような形式で表示される。この結
果、同図符号502で示すように、NCSのステータスは、OS
AがACTであることが表示され、TYO局では、OSA局をマス
タのNCSと見ていることが示される。そして、コマンド
終了メッセージが同図符号503に示すように表示され
る。
That is, for example, when a command is input to display the state of an NCS (network management station) viewed from the TYO station, the command is displayed in a format indicated by reference numeral 501 in FIG. As a result, as shown by the reference numeral 502 in FIG.
A indicates that A is ACT, and the TYO station indicates that it sees the OSA station as the master NCS. Then, a command end message is displayed as shown in FIG.

次に、網管理装置のマスタ/スレーブ切り替えを行な
う場合について説明する。この処理は、コマンド“NCG"
をコンソール5から投入することによって開始される。
Next, the case where the master / slave switching of the network management device is performed will be described. This processing is performed by the command “NCG”
Is started from the console 5.

コマンド解析回路306は、投入されたコマンドの種別
がNCGであると、ステップ5に移り、マスタ/スレーブ
切替指示信号322を変化させる。マスタ/スレーブ制御
回路309は、状態レジスタ308を更新し、データ生成回路
313にマスタ/スレーブ切替データの生成を指示する。
マスタ/スレーブ切替データは、送信回路315により回
線4を通して相手の網管理装置に送られる(ステップ
6)。
If the type of the input command is NCG, the command analysis circuit 306 proceeds to step 5 and changes the master / slave switching instruction signal 322. The master / slave control circuit 309 updates the status register 308 and
Instruct 313 to generate master / slave switching data.
The master / slave switching data is sent by the transmission circuit 315 to the partner network management device via the line 4 (step 6).

相手装置では、受信回路314により該データを受信
し、データ解析回路312によりマスタ/スレーブ切り替
えのコマンドであることを認識し、状態レジスタ308を
更新する。
In the partner device, the data is received by the receiving circuit 314, and the data analysis circuit 312 recognizes that the command is a master / slave switching command, and updates the status register 308.

この手順は、コンソール5上では、例えば、第2E図に
示すように表われる。
This procedure appears on the console 5, for example, as shown in FIG. 2E.

同図符号504に示すように、例えば、TYO局からコマン
ドNCGが投入されると、同図符号505に示すように、NCG
のコマンドの実行を開始してよいか否かについて、オペ
レータに認識を求めるメッセージがコンソール5に表示
される。オペレータが、これに対して、同図符号506に
示すように、キーボード等から“YES"の応答を行なう
と、上述したように、マスタ/スレーブ切替動作が実行
される。
For example, when a command NCG is input from the TYO station as shown by reference numeral 504 in FIG.
Is displayed on the console 5 asking the operator to recognize whether or not the execution of this command can be started. When the operator responds “YES” from the keyboard or the like, as indicated by reference numeral 506 in the figure, the master / slave switching operation is executed as described above.

この切替動作が終了すると、第2E図符号507に示すよ
うに、NCSのマスタが、OSA局からTYO局に切り替わった
ことが表示される。そして、コマンド終了メッセージが
同図符号508に示すように表示される。
When this switching operation is completed, it is displayed that the NCS master has been switched from the OSA station to the TYO station, as indicated by reference numeral 507 in FIG. 2E. Then, a command end message is displayed as shown in FIG.

次に、他装置の電源を切断する場合について説明す
る。この処理は、コンソール5から“POW:OFF"のコマン
ドを投入することによって行なう。
Next, a case in which the power of the other device is turned off will be described. This process is performed by inputting a “POW: OFF” command from the console 5.

コマンド解析回路306は、コマンドテーブル304から
“POW"を、パラメータテーブル305から“OFF"のキーを
探し、対応する電源OFF指示信号324を変化させる(ステ
ップ7)。電源制御指示回路310は、状態レジスタ308が
マスタ状態のとき、電源制御許可信号325により許可回
路311を通り、データ生成回路313に電源OFFデータの生
成を指示する。電源OFFデータは、マスタ/スレーブ切
り替えと同様に相手装置に送られる(ステップ9)。
The command analysis circuit 306 searches for the key "POW" from the command table 304 and the key "OFF" from the parameter table 305, and changes the corresponding power-off instruction signal 324 (step 7). When the status register 308 is in the master state, the power control instruction circuit 310 passes the power control permission signal 325 through the permission circuit 311 and instructs the data generation circuit 313 to generate power OFF data. The power-off data is sent to the partner device in the same manner as the master / slave switching (step 9).

これを受けて、相手装置は、受信回路319で該データ
を受け、データ解析回路330により電源OFFデータである
ことを認識し、主電源316をOFFする。
In response, the partner device receives the data at the receiving circuit 319, recognizes that the data is power OFF data by the data analysis circuit 330, and turns off the main power supply 316.

他装置の電源をONする場合には、“POW:ON"のコマン
ドを投入することによって行なう。
When turning on the power of the other device, it is performed by inputting a command of “POW: ON”.

ONの場合には、コマンドテーブル304から“POW"を、
パラメータテーブル305から“ON"のキーを探し、対応す
る電源ON指示信号323を変化させる(ステップ7)。こ
の後は、ステップ8に従って処理が実行される。この処
理は、ONとOFFの相違がある他は、上述した電源OFFの場
合と同様に実行される。
In the case of ON, “POW” from the command table 304,
The key "ON" is searched for in the parameter table 305, and the corresponding power-on instruction signal 323 is changed (step 7). Thereafter, the process is performed according to step 8. This processing is executed in the same manner as the above-described power-off except that there is a difference between ON and OFF.

上述した電源OFF処理は、コンソール5上では、例え
ば、第2F図に示すように表われる。
The power-off process described above appears on the console 5, for example, as shown in FIG. 2F.

同図符号509に示すように、例えば、OSA局の電源OFF
を指示するコマンドが投入されると、同図符号510に示
すように、POWコマンドの実行を開始してよいか否かに
ついて、オペレータに確認を求めるメッセージが、コン
ソール5上に表示される。これに対して、同図符号511
に示すように、オペレータが、キーボード等から“YES"
の応答を行なうと、電源OFFの処理が実行される。そし
て、第2F図符号512に示すように、コマンド終了メッセ
ージが表示される。
For example, as shown in FIG.
Is input, a message asking the operator to confirm whether or not the execution of the POW command can be started is displayed on the console 5 as shown by reference numeral 510 in FIG. On the other hand, FIG.
As shown in the figure, the operator inputs “YES” from the keyboard or the like.
Is performed, the power-off process is executed. Then, as shown in FIG. 2F, reference numeral 512, a command end message is displayed.

次に、第1図に示す2台の網管理装置で通信網の電源
の制御を行なう場合の動作について説明する。
Next, the operation in the case where the power of the communication network is controlled by the two network management devices shown in FIG. 1 will be described.

なお、本実施例のシステムにおいては、各交換装置1
には、上記した第2A図に示す電源管理部303と同等の装
置が含まれているものとする。これによって、交換装置
1について、網管理装置3aまたは3bから遠隔的に電源制
御を行なえることになる。もっとも、遠隔的に電源制御
する必要のない装置については、このような電源管理部
を必要としない。
In the system according to the present embodiment, each switching device 1
Includes a device equivalent to the power management unit 303 shown in FIG. 2A described above. As a result, the power of the switching device 1 can be remotely controlled from the network management device 3a or 3b. However, a device that does not need to remotely control the power supply does not require such a power management unit.

通常、網管理装置3aが起点となり、交換装置1,1a,1b,
網管理装置3bの電源の制御を行なう。このとき、網管理
装置3aはマスタ装置(マスタ/スレーブの状態を表わす
状態レジスタの値は“1")、網管理装置3bはスレーブ装
置(マスタ/スレーブの状態を表わす状態レジスタの値
は“0")である。
Usually, the network management device 3a is the starting point, and the switching devices 1, 1a, 1b,
The power supply of the network management device 3b is controlled. At this time, the network management device 3a is the master device (the value of the status register indicating the status of the master / slave is "1"), and the network management device 3b is the slave device (the value of the status register indicating the status of the master / slave is "0"). ").

例えば、交換装置1の電源を切断する場合、まず、シ
ステムコンソール5aから電源切断のコマンドを投入す
る。これを受けて、網管理装置3aの網管理部301は、電
源OFFの指示を通信制御部302に送る。通信制御部302
は、状態レジスタ308の状態に応じて、自装置がマスタ
であるか否かを認識し、マスタであれば、電源OFFのデ
ータを生成して、通信回線4に出力する。
For example, when the power of the exchange apparatus 1 is to be turned off, a power-off command is first input from the system console 5a. In response, the network management unit 301 of the network management device 3a sends a power-off instruction to the communication control unit 302. Communication control unit 302
Recognizes whether the device itself is a master according to the state of the status register 308, and if so, generates power-off data and outputs it to the communication line 4.

該データは、交換装置1a、通信回線2aを経由して交換
装置1に到達し、該交換装置1の電源が切断される。
The data reaches the switching device 1 via the switching device 1a and the communication line 2a, and the power of the switching device 1 is turned off.

次に、上記交換装置1の電源を再び投入する際に、網
管理装置3aに障害が発生し、制御不可能になった場合を
考える。この場合には、網管理装置3bが起点となる。
Next, it is assumed that when the power of the switching device 1 is turned on again, a failure occurs in the network management device 3a and control becomes impossible. In this case, the starting point is the network management device 3b.

この場合は、システムコンソール5bからマスタ/スレ
ーブ切り替えのコマンド“NCG"を発行する。これを受け
て、網管理装置3bの網管理部301は、上述したようにマ
スタ/スレーブの切り替え処理を実行する。通信制御部
302は、切替コマンドを網管理装置3aに送る。これによ
って、網管理装置3aがスレーブに、一方、網管理装置3b
がマスタに変わる。
In this case, a master / slave switching command “NCG” is issued from the system console 5b. In response to this, the network management unit 301 of the network management device 3b executes the master / slave switching process as described above. Communication control unit
302 sends a switching command to the network management device 3a. As a result, the network management device 3a becomes a slave, while the network management device 3b
Changes to master.

この状態から交換装置1の電源を投入するには、シス
テムコンソール5bから電源投入のコマンドを投入する。
To turn on the power of the exchange apparatus 1 from this state, a power-on command is inputted from the system console 5b.

これを受けて、網管理装置3bは、上述したように、電
源ON処理を実行し、電源ONデータを通信回線4に出力す
る。該データは交換装置1b、通信回線2bを経由して交換
装置1に到達し、電源が投入される。
In response to this, the network management device 3b executes the power ON process and outputs the power ON data to the communication line 4 as described above. The data reaches the switching device 1 via the switching device 1b and the communication line 2b, and the power is turned on.

同様に、網管理装置3bから網管理装置3aの電源の制御
を行なうことも可能である。
Similarly, the power of the network management device 3a can be controlled from the network management device 3b.

本実施例によれば、網管理装置3aと網管理装置3bのい
ずれもが、主装置(マスタ)となり得ると共に、マスタ
側からスレーブ側に対して、電源の制御を行なうことが
できる。そのため、システムの制御の起点を、一方から
他方に相互に交替できる。従って、一方の装置が機能停
止しても、他方の装置により通信網の監視・制御を行な
うことができる。
According to the present embodiment, both the network management device 3a and the network management device 3b can be the main device (master), and can control the power supply from the master side to the slave side. Therefore, the starting point of the control of the system can be switched from one to the other. Therefore, even if one device stops functioning, the other device can monitor and control the communication network.

上記実施例では、システムに2台の網管理装置を有す
るが、3台以上配置してもよい。
In the above embodiment, the system has two network management devices, but three or more network management devices may be arranged.

また、上記実施例では、管理装置として、網管理装置
を備えたネットワークシステムの例を示すが、本発明
は、このようなシステムに限らず、装置が通信回線によ
り接続されるようなシステム等に広く適用することがで
きる。
Further, in the above-described embodiment, an example of a network system including a network management device as a management device is described. However, the present invention is not limited to such a system, but may be applied to a system or the like in which devices are connected by a communication line. Can be widely applied.

次に、本発明の他の実施例について、第3図〜第5図
を参照して説明する。
Next, another embodiment of the present invention will be described with reference to FIGS.

第3図は、本発明の他の実施例を示し、通信ケーブル
で直接接続された2台の通信制御装置の構成の一例を示
すブロック図である。
FIG. 3 is a block diagram showing another embodiment of the present invention and showing an example of a configuration of two communication control devices directly connected by a communication cable.

同図において、7,8は通信制御装置であり、通信ケー
ブル50により接続されている。ここで、通信制御装置7,
8は、例えば、第1図に示す網管理装置3aおよび交換装
置1aが、モデム6を介さず、通信ケーブルで直接に接続
されているような場合における、網管理装置3aおよび交
換装置1aなどである。
In the figure, reference numerals 7 and 8 denote communication control devices, which are connected by a communication cable 50. Here, the communication control device 7,
Reference numeral 8 denotes, for example, the network management device 3a and the switching device 1a when the network management device 3a and the switching device 1a shown in FIG. 1 are directly connected by a communication cable without passing through the modem 6. is there.

該通信制御装置7,8は、互いに同一回路構成を有して
おり、以下の説明では装置の各要素を並べて引用する場
合、通信制御装置7の要素の引用符号の後に、通信制御
装置8の要素の引用符号を()を付して示すものとす
る。
The communication control devices 7 and 8 have the same circuit configuration with each other, and in the following description, when quoting each element of the device side by side, the reference numeral of the element of the communication control device 7 The quotes of the elements shall be indicated with parentheses.

第3図において、10(11)は通信制御回路であり、送
信クロック12(13)に同期して送信データ線14(15)に
データを送出し、受信クロック16(17)に同期して受信
データ線18(19)のデータを取り込む。
In FIG. 3, reference numeral 10 (11) denotes a communication control circuit which transmits data to a transmission data line 14 (15) in synchronization with a transmission clock 12 (13) and receives data in synchronization with a reception clock 16 (17). The data of the data line 18 (19) is taken.

20(21)はマスタ/スレーブ判定回路である。このマ
スタ/スレーブ判定回路20(21)は、制御信号22(2
3)、表示信号24(25)およびマスタ/スレーブ制御信
号26(27)の値により、自装置が主装置(マスタ)か、
従装置(スレーブ)かを判定し、マスタ/スレーブ信号
28(29)を出力する。
20 (21) is a master / slave determination circuit. The master / slave determination circuit 20 (21) outputs the control signal 22 (2
3) Depending on the value of the display signal 24 (25) and the master / slave control signal 26 (27), whether the own device is the main device (master)
Master / slave signal
Outputs 28 (29).

30(31)はクロック切替回路である。クロック切替回
路30(31)は、自装置がマスタ(マスタ/スレーブ信号
28(29)の値が1)のとき、送信クロック12(13)およ
びクロック出力32(33)としてクロック発生回路34(3
5)が出力する内部クロック36(37)を選択する。一
方、自装置がスレーブ(マスタ/スレーブ信号28(29)
の値が0)のとき、クロック入力38(39)を選択する。
30 (31) is a clock switching circuit. The clock switching circuit 30 (31) uses its own device as a master (master / slave signal).
When the value of 28 (29) is 1), the clock generation circuit 34 (3) is used as the transmission clock 12 (13) and the clock output 32 (33).
5) Select the internal clock 36 (37) output. On the other hand, if the own device is a slave (master / slave signal 28 (29)
Is 0), the clock input 38 (39) is selected.

40(41)は電源制御回路であり、受信データ18(19)
を受信クロック16(17)に同期して取り込み、該受信デ
ータが電源制御データのパターンと一致した場合に、電
源投入あるいは切断の指示を行なう。
40 (41) is a power supply control circuit, and receives data 18 (19)
Is synchronized with the reception clock 16 (17), and when the received data matches the power control data pattern, an instruction to turn on or off the power is issued.

42(43)は主電源であり、該電源は、通信制御回路10
(11)に給電する。44(45)は補助電源であり、該電源
は、マスタ/スレーブ判定回路20(21)、クロック切替
回路30(31)、クロック発生回路34(35)、電源制御回
路40(41)に給電する。
Reference numeral 42 (43) denotes a main power supply.
Power is supplied to (11). An auxiliary power supply 44 (45) supplies power to the master / slave determination circuit 20 (21), the clock switching circuit 30 (31), the clock generation circuit 34 (35), and the power supply control circuit 40 (41). .

第4図は、上記マスタ/スレーブ判定回路20(21)の
構成の一例を示す回路図である。
FIG. 4 is a circuit diagram showing an example of the configuration of the master / slave determination circuit 20 (21).

同図に示すマスタ/スレーブ判定回路20(21)は、イ
ンバータ201,202および203と、アンドゲート204および2
05と、オアゲート206とを備えて構成される。
The master / slave determination circuit 20 (21) shown in FIG.
05 and an OR gate 206.

このマスタ/スレーブ判定回路20(21)における入力
と出力の関係は、第5図に示すようになる。
The relationship between input and output in the master / slave determination circuit 20 (21) is as shown in FIG.

マスタ/スレーブ制御信号26(27)は、通信制御装置
7,8の電源がいずれもONのとき、どちらの装置が主装置
(マスタ)として動作するかを制御する信号であり、該
信号値は、両装置で排反である必要がある。制御信号22
(23)は、自装置が通信可能か否かを示す信号であり、
マスタ/スレーブ判定回路20(21)は、該信号の値が1
であるとき、自装置の電源がONであるとみなす。表示信
号24(25)は、相手装置が通信可能か否かを示す信号で
あり、マスタ/スレーブ判定回路20(21)は、該信号の
値が1であるとき、相手装置の電源がONであるとみな
す。
Master / slave control signal 26 (27)
When both of the power supplies 7 and 8 are ON, this signal is a signal for controlling which device operates as a main device (master), and the signal value needs to be the same for both devices. Control signal 22
(23) is a signal indicating whether the own device can communicate,
The master / slave determination circuit 20 (21) determines that the value of the signal is 1
, It is considered that the power of the own device is ON. The display signal 24 (25) is a signal indicating whether or not the other device can communicate. When the value of the signal is 1, the master / slave determination circuit 20 (21) turns on the power of the other device. Assume that there is.

同図の表から明らかなように、両装置7,8とも電源がO
Nのときに主装置(マスタ)である装置(マスタ/スレ
ーブ制御信号26(27)の値が“0"の装置)の電源がONの
ときは、該装置が主装置(マスタ)、OFFのときは他方
の装置が主装置(マスタ)として動作する。
As is clear from the table, the power of both devices 7 and 8 is O
When the power of the device (master device whose master / slave control signal 26 (27) value is “0”) which is the main device (master) is ON at N, the device becomes the main device (master), At that time, the other device operates as a main device (master).

次に、第3図を用いて電源の投入/切断およびマスタ
/スレーブの切替動作を説明する。
Next, turning on / off of power and switching operation of master / slave will be described with reference to FIG.

まず、通信制御装置73通信制御装置8ともに電源がON
の状態において、通信制御装置7が通信制御装置8の電
源を切断する場合の動作を説明する。
First, the power of both the communication control device 73 and the communication control device 8 is turned on.
The operation when the communication control device 7 turns off the power of the communication control device 8 in the state described above will be described.

この状態では、両装置の電源がONのため、制御信号2
2,23の値は“1"であり、制御信号22に接続されている表
示信号25、制御信号23に接続されている表示信号24の値
も“1"である。また、通信制御装置7側のマスタ/スレ
ーブ制御信号26は、通信ケーブル50を通してアースに接
続されているため値は“0"になり、これに対し、通信制
御装置8側のマスタ/スレーブ制御信号27はアースには
接続されずプルアップされているため値は“1"になる。
In this state, since both devices are powered on, the control signal 2
The values of 2, 23 are “1”, and the values of the display signal 25 connected to the control signal 22 and the display signal 24 connected to the control signal 23 are also “1”. The value of the master / slave control signal 26 of the communication control device 8 is "0" because the master / slave control signal 26 of the communication control device 7 is connected to the ground through the communication cable 50. Since 27 is not connected to ground and is pulled up, its value is "1".

これらの条件では、第5図から判るように、マスタ/
スレーブ信号28の値は“1"、マスタ/スレーブ信号29の
値は0となり、通信制御装置7の送信クロック12、クロ
ック出力32は、共に自装置側の内部クロック36が選択さ
れており、通信制御装置8の送信クロック13、クロック
出力33はともにクロック入力39が選択されている。クロ
ック入力39は、通信ケーブル50を通して通信制御装置7
のクロック出力32に接続されており、結局、両装置の同
期クロックは、全て主装置である通信制御装置7のクロ
ック発生回路34が供給していることがわかる。
Under these conditions, as can be seen from FIG.
The value of the slave signal 28 is "1", the value of the master / slave signal 29 is 0, and the transmission clock 12 and the clock output 32 of the communication control device 7 both select the internal clock 36 of the own device. The clock input 39 is selected for both the transmission clock 13 and the clock output 33 of the control device 8. The clock input 39 is connected to the communication control device 7 through the communication cable 50.
It can be seen that, after all, the synchronous clocks of both devices are all supplied by the clock generation circuit 34 of the communication control device 7 which is the main device.

通信制御回路10は、マスタ/スレーブ信号28の値が
“1"であることから、自装置が主装置(マスタ)である
ことを認識し、送信データ線14に電源切断のデータパタ
ーンを送る。通信制御装置8は、これを受信データとし
て受け、電源制御回路41は、電源切断のデータであるこ
とを認識し、主電源43を切断する。
Since the value of the master / slave signal 28 is “1”, the communication control circuit 10 recognizes that the device itself is the main device (master), and sends a power-off data pattern to the transmission data line 14. The communication control device 8 receives this as received data, and the power control circuit 41 recognizes that the data is power-off data, and turns off the main power supply 43.

次に、通信制御装置7の電源がON、通信制御装置8の
電源がOFFの状態において通信制御装置7が通信制御装
置8の電源を投入する場合の動作について説明する。
Next, an operation when the communication control device 7 turns on the power of the communication control device 8 while the power of the communication control device 7 is on and the power of the communication control device 8 is off will be described.

この状態では、通信制御装置7の電源がONのため、制
御信号22の値は“1"であり、制御信号22に接続されてい
る表示信号25の値も“1"である。また、通信制御装置8
の電源がOFFのため、制御信号23の値は“0"であり、制
御信号23に接続されている表示信号24の値も“0"であ
る。さらに、前述のとおりマスタ/スレーブ制御信号26
の値は“0"、マスタ/スレーブ制御信号27の値は“1"で
ある。
In this state, since the power of the communication control device 7 is ON, the value of the control signal 22 is “1”, and the value of the display signal 25 connected to the control signal 22 is also “1”. In addition, the communication control device 8
Is turned off, the value of the control signal 23 is “0”, and the value of the display signal 24 connected to the control signal 23 is also “0”. Further, as described above, the master / slave control signal 26
Is "0", and the value of the master / slave control signal 27 is "1".

第5図から判るように、これらの条件においても、マ
スタ/スレーブ信号28の値は“1"、マスタ/スレーブ信
号29の値は“0"であり、両装置の同期クロックは、全て
通信制御装置7のクロック発生回路34が供給している。
As can be seen from FIG. 5, even under these conditions, the value of the master / slave signal 28 is "1" and the value of the master / slave signal 29 is "0". It is supplied by the clock generation circuit 34 of the device 7.

通信制御回路10は、やはりマスタ/スレーブ信号28の
値が“1"であることから、自装置が主装置(マスタ)で
あることを認識し、送信データ線14に電源投入のデータ
パターンを送る。通信制御装置8は、これを受信データ
として受け、電源制御回路41は、電源投入のデータであ
ることを認識し、主電源43を投入する。
Since the value of the master / slave signal 28 is also “1”, the communication control circuit 10 recognizes that the own device is the main device (master), and sends a power-on data pattern to the transmission data line 14. . The communication control device 8 receives this as received data, and the power control circuit 41 recognizes that the data is power-on data, and turns on the main power supply 43.

次に、両装置ともに電源がONの状態から、通信制御装
置7の電源がOFFになり、主装置(マスタ)が通信制御
装置7から通信制御装置8に切り替わった状態におい
て、通信制御装置8が通信制御装置7の電源を投入する
場合の動作を説明する。
Next, in a state where the power of the communication control device 7 is turned off from a state where both devices are turned on and the main device (master) is switched from the communication control device 7 to the communication control device 8, the communication control device 8 The operation when the power of the communication control device 7 is turned on will be described.

まず、両装置ともに電源がONのときは、前述のとおり
通信制御装置7が主装置(マスタ)であり、同期クロッ
クを供給している。ここで、通信制御装置7の電源がOF
Fになると、制御信号22、表示信号25の値が“0"にな
り、第5図から判るように、マスタ/スレーブ信号28の
値が“0"、マスタ/スレーブ信号29の値が“1"になる。
First, when the power of both devices is ON, the communication control device 7 is the main device (master) and supplies a synchronous clock as described above. Here, the power of the communication control device 7 is turned off.
At F, the values of the control signal 22 and the display signal 25 become "0", and as can be seen from FIG. 5, the value of the master / slave signal 28 becomes "0" and the value of the master / slave signal 29 becomes "1". "become.

これは、主装置(マスタ)が通信制御装置8に切り替
わったことを意味し、同期クロックの供給源も主装置で
ある通信制御装置8に切り替わる。そして、この状態通
信制御回路11が、自装置が主装置であることを認識し、
送信データ線15に電源投入のデータパターンを送る。通
信制御装置7は、これを受信データとして受け、電源制
御回路40は、電源投入のデータであることを認識し、主
電源42を投入する。
This means that the main device (master) has been switched to the communication control device 8, and the supply source of the synchronous clock is also switched to the communication control device 8 which is the main device. Then, the state communication control circuit 11 recognizes that the own device is the main device,
A power-on data pattern is sent to the transmission data line 15. The communication control device 7 receives this as received data, and the power supply control circuit 40 recognizes that the data is power-on data, and turns on the main power supply 42.

[発明の効果] 本発明によれば、少なくとも2台の管理装置につい
て、いずれの装置も主装置(マスタ)となることができ
ると共に、マスタの装置から他の装置に対する電源制御
も行なえるので、制御の起点を複数の管理装置において
交互に交替でき、一方の装置が機能停止しても、他方の
装置より通信網の監視・制御を行なうことができる効果
がある。
[Effects of the Invention] According to the present invention, for at least two management devices, any device can be a main device (master) and power control from the master device to other devices can be performed. The starting point of the control can be alternately switched between a plurality of management devices, and even if one device stops functioning, the other device can monitor and control the communication network.

【図面の簡単な説明】[Brief description of the drawings]

第1図は網管理装置を2台接続した通信システムの構成
の一例を示すブロック図、第2A図は網管理装置の一実施
例の構成を示すブロック図、第2B図はコマンドテーブル
およびパラメータテーブルの一例を示す説明図、第2C図
はもう管理装置の動作の一例を示すフローチャート、第
2D図〜第2F図はコンソールにおける表示例を示す説明
図、第3図は本発明の他の実施例であって、通信ケーブ
ルで直接接続された2台の通信制御装置の構成の一例を
示すブロック図、第4図はマスタ/スレーブ判定回路の
構成の一例を示す回路図、第5図はマスタ/スレーブ判
定回路の入力と出力の関係の一例を表わした表である。 1,1a,1b……交換装置、2a,2b,2c,4,4a,4b……通信回
線、3,3a,3b……網管理装置、5,5a,5b……システムコン
ソール、6……モデム、7,8……通信制御装置、9……
端末、10,11……通信制御回路、12,13……送信クロッ
ク、14,15……送信データ線、16,17……受信クロック、
18,19……受信データ線、20,21……マスタ/スレーブ判
定回路、22,23……制御信号、24,25……表示信号、26,2
7……マスタ/スレーブ制御信号、28,29……マスタ/ス
レーブ信号、30,31……クロック切替回路、32,33……ク
ロック出力、34,35……クロック発生回路、36,37……内
部クロック、38,39……クロック入力、40,41……電源制
御回路、42,43……主電源、44,45……補助電源、50……
通信ケーブル、301……網管理部、302……通信制御部、
303……電源制御部、304……コマンドテーブル、305…
…パラメータテーブル、306……コマンド解析回路、307
……状態表示回路、308……状態レジスタ、309……マス
タ/スレーブ制御回路、310……電源制御指示回路、311
……許可回路、312,330……データ解析回路、313……デ
ータ生成回路、314,319……受信回路、315……送信回
路、316……主電源、317……クロック発生回路、318…
…クロック切替回路。
FIG. 1 is a block diagram showing an example of a configuration of a communication system in which two network management devices are connected, FIG. 2A is a block diagram showing a configuration of an embodiment of the network management device, and FIG. 2B is a command table and a parameter table. FIG. 2C is a flowchart showing an example of the operation of the management device, and FIG.
2D to 2F are explanatory diagrams showing display examples on a console, and FIG. 3 is another embodiment of the present invention, showing an example of the configuration of two communication control devices directly connected by a communication cable. FIG. 4 is a block diagram, FIG. 4 is a circuit diagram showing an example of the configuration of the master / slave determination circuit, and FIG. 5 is a table showing an example of the relationship between the input and output of the master / slave determination circuit. 1,1a, 1b ... switching device, 2a, 2b, 2c, 4,4a, 4b ... communication line, 3,3a, 3b ... network management device, 5,5a, 5b ... system console, 6 ... Modem, 7,8 …… Communication control device, 9 ……
Terminals, 10, 11: communication control circuit, 12, 13, transmission clock, 14, 15 transmission data line, 16, 17 reception clock,
18, 19: Receive data line, 20, 21: Master / slave determination circuit, 22, 23: Control signal, 24, 25 ... Display signal, 26, 2
7 Master / slave control signal, 28, 29 Master / slave signal, 30, 31 Clock switching circuit, 32, 33 Clock output, 34, 35 Clock generation circuit, 36, 37 Internal clock, 38, 39 Clock input, 40, 41 Power supply control circuit, 42, 43 Main power supply, 44, 45 Auxiliary power supply, 50
Communication cable, 301: Network management unit, 302: Communication control unit,
303: Power control unit, 304: Command table, 305:
... Parameter table, 306 ... Command analysis circuit, 307
... status display circuit, 308 status register, 309 master / slave control circuit, 310 power control instruction circuit, 311
... Permission circuit, 312,330... Data analysis circuit, 313... Data generation circuit, 314,319... Receiving circuit, 315... Transmission circuit, 316.
... Clock switching circuit.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 岩本 博志 神奈川県秦野市堀山下1番地 株式会社 日立製作所神奈川工場内 (72)発明者 遠山 俊章 神奈川県秦野市堀山下1番地 株式会社 日立製作所神奈川工場内 (56)参考文献 特開 平1−155736(JP,A) 特開 昭62−51331(JP,A) 特開 昭63−39235(JP,A) 特開 昭59−183553(JP,A) 特開 昭61−23446(JP,A) ──────────────────────────────────────────────────続 き Continued on the front page (72) Inventor Hiroshi Iwamoto 1 Horiyamashita, Hadano-shi, Kanagawa Prefecture Inside the Hitachi, Ltd.Kanagawa Plant (72) Inventor Toshiaki Toyama 1-Horiyamashita, Hadano-shi, Kanagawa Hitachi, Ltd. (56) References JP-A-1-155736 (JP, A) JP-A-62-151331 (JP, A) JP-A-63-39235 (JP, A) JP-A-59-183553 (JP, A) JP-A-61-23446 (JP, A)

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】2台の装置が信号を伝送するための手段を
介して接続されている場合に、互いに他の装置の主電源
をオン/オフ制御する電源制御方法において、 2台の装置の一方をマスタに、他方をスレーブに初期設
定しておき、 マスタに初期設定されている装置の主電源がオンの場合
には、その装置をその時点におけるマスタとし、マスタ
に初期設定されている装置の主電源がオフの場合には、
スレーブに初期設定されている装置をその時点でのマス
タとし、かつ、 2台の装置のうち、マスタとなっている装置からスレー
ブとなっている装置に対してのみ、主電源のオン/オフ
を制御することを許容して、 マスタ側の装置から、信号を伝送するための手段を介し
て、スレーブ側の装置の主電源をオン/オフ制御し、 上記2台の装置に関するマスタ/スレーブの初期設定
は、それぞれの装置において特定の信号線を接地する状
態、および、接地しない状態の2状態をマスタとスレー
ブとに対応させ、2台の装置の一方において信号線を接
地し、他方において信号線を接地しない状態とすること
により行なうこと を特徴とする電源制御方法。
A power control method for controlling the main power of another device to be turned on / off when two devices are connected via a means for transmitting a signal. One is set as the master and the other is set as the slave. If the main power of the device initialized as the master is turned on, the device is set as the master at that time and the device initialized as the master If the main power of the
The device initially set as the slave is set as the master at that time, and the main power is turned on / off only from the master device to the slave device out of the two devices. Controlling the main power of the slave device via means for transmitting a signal from the master device via a means for transmitting a signal from the master device, and controlling the master / slave initialization of the two devices The setting is such that a specific signal line is grounded in each device and a non-grounded state is associated with a master and a slave, a signal line is grounded on one of the two devices, and a signal line is on the other. A power supply control method, wherein the power supply control method is performed by setting the power supply to a non-ground state.
【請求項2】信号を伝送するための手段を介して接続さ
れている2台の装置を含むシステムにおいて、 上記2台の装置は、それぞれ、 主電源と、 主電源から給電されて、データの送受信を行なうための
通信手段と、 自装置がマスタかスレーブかを判定するマスタ/スレー
ブ判定手段と、 他装置から上記信号を伝送するための手段を介して送ら
れる主電源のオン/オフを指示するオン/オフデータに
基づいて、自装置の主電源をオン/オフする電源制御手
段と、 2台の装置が共に主電源がオンのとき、いずれをマスタ
とするかを予め設定する信号を上記マスタ/スレーブ判
定手段に与える手段と、 自装置の主電源のオン/オフの状態を示す信号を、上記
信号を伝送するための手段を介して他装置に送る手段と
を備え、 マスタ/スレーブ判定手段は、自装置が予めマスタに設
定されているとき、自装置の主電源がオンであれば、自
装置をその時点でのマスタと判定し、自装置が予めスレ
ーブに設定されているとき、他装置の主電源の状態を調
べて、他装置の主電源がオフのとき、自装置をその時点
でのマスタと判定し、 上記通信手段は、前記マスタ/スレーブ判定手段が自装
置をマスタと判定しているとき、上記信号を伝送するた
めの手段を介して送られる主電源のオン/オフを指示す
るオン/オフデータを他装置に送ること を特徴とする電源制御装置。
2. A system comprising two devices connected via means for transmitting a signal, wherein the two devices are respectively powered by a main power supply and powered by the main power supply to transmit data. Communication means for performing transmission / reception, master / slave determination means for determining whether the own device is a master or a slave, and instructing on / off of a main power transmitted from another device via means for transmitting the signal Power control means for turning on / off the main power of the own device based on the on / off data to be transmitted, and a signal for presetting which of the two devices is to be the master when both the main power is on. Means for giving to the master / slave determination means, and means for sending a signal indicating the on / off state of the main power supply of the own apparatus to another apparatus via means for transmitting the signal, and The means, when the own device is set in advance as a master, if the main power of the own device is on, determines the own device as a master at that time, and when the own device is set in advance as a slave, The state of the main power supply of the other device is examined, and when the main power supply of the other device is off, the own device is determined to be the master at that time. A power supply control device, characterized in that when the determination is made, on / off data for instructing on / off of the main power sent via the means for transmitting the signal is sent to another device.
【請求項3】複数の装置を通信回線で接続して構成され
るシステムに接続され、他装置の電源の投入/切断の制
御を行う電源制御装置であって、 自装置が、他装置の電源の投入/切断の制御を行なうこ
とについて許容されている状態にあるか否かを示す制御
可/否情報を保持する制御可/否情報保持手段と、 通信回線で接続される他の装置に対する電源の投入/切
断の指示の入力を受け付ける手段と、 制御可/否情報保持手段が制御可であることを示す情報
を保持しているとき、上記受け付けた電源の投入/切断
の指示に基づいて、他装置に対する電源制御データを作
成して、送信する手段と、 他装置から送信される電源制御データを受信し、その指
示に応じて、自装置の電源の制御を行なう手段と、 制御可/否情報保持手段に保持されている制御可/否の
情報を、現在の状態と反対の状態に書き替える指示を受
け付ける手段と、 受け付けた書替指示に基づいて、制御可/否情報保持手
段に保持されている、制御可/否の情報を、現在の状態
と反対の状態に書き替える手段と、 1または2以上の他の電源制御装置が上記通信回線に接
続されている場合に、前記受け付けた書替指示を、目的
の他の電源制御装置に送る手段と、 1または2以上の他の電源制御装置が上記通信回線に接
続されている場合に、他のいずれかの電源制御装置から
送られる書替指示に基づいて、制御可/否情報保持手段
に保持されている、制御可/否の情報を、現在の状態と
反対の状態に書き替える手段と を備えることを特徴とする電源制御装置。
3. A power supply control device which is connected to a system constituted by connecting a plurality of devices by a communication line and controls turning on / off of a power supply of another device. Control / non-control information holding means for storing control enable / disable information indicating whether or not the control of turning on / off of the power supply is permitted, and a power supply for other devices connected by a communication line Means for receiving an input of a power on / off instruction, and when the controllability / non-retention information holding means holds information indicating that control is possible, based on the received power on / off instruction, Means for generating and transmitting power control data for another device; means for receiving power control data transmitted from the other device and controlling the power of the own device in accordance with the instruction; Stored in the information storage means Means for receiving an instruction to rewrite the information on the controllability / non-controllability to a state opposite to the current state, and controllability / retention information stored in the controllability / rejection information holding means based on the received rewrite instruction. Means for rewriting the information of rejection to a state opposite to the current state; and when one or more other power supply control devices are connected to the communication line, the received rewriting instruction Means for sending to another power control device, and when one or more other power control devices are connected to the communication line, based on a rewriting instruction sent from any of the other power control devices, Means for rewriting control enable / disable information held in the control enable / disable information holding means to a state opposite to the current state.
JP2018294A 1990-01-29 1990-01-29 Power supply control method and device Expired - Fee Related JP2637829B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018294A JP2637829B2 (en) 1990-01-29 1990-01-29 Power supply control method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018294A JP2637829B2 (en) 1990-01-29 1990-01-29 Power supply control method and device

Publications (2)

Publication Number Publication Date
JPH03222555A JPH03222555A (en) 1991-10-01
JP2637829B2 true JP2637829B2 (en) 1997-08-06

Family

ID=11967589

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018294A Expired - Fee Related JP2637829B2 (en) 1990-01-29 1990-01-29 Power supply control method and device

Country Status (1)

Country Link
JP (1) JP2637829B2 (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59183553A (en) * 1983-04-04 1984-10-18 Anritsu Corp Loop transmission system
JPS6123446A (en) * 1984-07-11 1986-01-31 Mitsubishi Electric Corp Node equipment of loop transmission system
JPH0728303B2 (en) * 1985-08-30 1995-03-29 株式会社日立製作所 Stationary dual configuration control system
JPS6339235A (en) * 1986-08-04 1988-02-19 インターナシヨナル・ビジネス・マシーンズ・コーポレーシヨン Intelligent work-station network
JPH01155736A (en) * 1987-12-11 1989-06-19 Nec Corp System for switching modulator/demodulator

Also Published As

Publication number Publication date
JPH03222555A (en) 1991-10-01

Similar Documents

Publication Publication Date Title
JP2637829B2 (en) Power supply control method and device
JP2799104B2 (en) Redundant switching device for programmable controller
US20030051107A1 (en) System for controlling attributes of storage device
KR100329652B1 (en) Method for controlling remote board by using packet network
JPH11119903A (en) Method for control between pointing device and computer, and the pointing device and the computer
KR0177711B1 (en) Remote control method of branch processor
JP2019045957A (en) Transmission/reception system, control method of transmission/reception system, and relay device
JPH07160657A (en) Inter-cluster communication controller
JP2727847B2 (en) Debug device
JPH06309057A (en) Starting system for remote system device
JP2645456B2 (en) Power control device
JP2001320841A (en) Supervision and control system for power system and storage medium storing its program therein
JPH1011177A (en) Remote power supply control system
JP2000057017A (en) Remote control module and computer with remote control function using the module
JP2768768B2 (en) Cyclic data transmission method and apparatus
JPH04170618A (en) Automatic power supply control system corresponding to token ring lan
JP2812265B2 (en) Network management method for information processing system
JPH05236566A (en) Central monitor control system
CN118092974A (en) Control circuit, electronic equipment and firmware updating method
JP3079782B2 (en) Master slave network system
JP3186728B2 (en) Remote power control system and method
JP2000040065A (en) Parallel computer system
JPH1051980A (en) Monitoring control system
JPH05207548A (en) Remote supervisory control system
JPH05344139A (en) Loop type signal transmission system

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees
S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

R370 Written measure of declining of transfer procedure

Free format text: JAPANESE INTERMEDIATE CODE: R370