JP2579120B2 - garage - Google Patents

garage

Info

Publication number
JP2579120B2
JP2579120B2 JP12782394A JP12782394A JP2579120B2 JP 2579120 B2 JP2579120 B2 JP 2579120B2 JP 12782394 A JP12782394 A JP 12782394A JP 12782394 A JP12782394 A JP 12782394A JP 2579120 B2 JP2579120 B2 JP 2579120B2
Authority
JP
Japan
Prior art keywords
wall
members
floor
wall member
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP12782394A
Other languages
Japanese (ja)
Other versions
JPH084343A (en
Inventor
良樹 石田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Asahi Concrete Works Co Ltd
Original Assignee
Asahi Concrete Works Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Asahi Concrete Works Co Ltd filed Critical Asahi Concrete Works Co Ltd
Priority to JP12782394A priority Critical patent/JP2579120B2/en
Publication of JPH084343A publication Critical patent/JPH084343A/en
Application granted granted Critical
Publication of JP2579120B2 publication Critical patent/JP2579120B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、大型で地中に埋設して
使用するのに好適なガレージに関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a garage which is large and suitable for being buried underground.

【0002】[0002]

【従来の技術】従来、地下等に構築される大型のガレー
ジは、その全体が現場打ちコンクリートによって構成さ
れるのが一般的である。
2. Description of the Related Art Conventionally, a large garage constructed underground or the like is generally constructed entirely of cast-in-place concrete.

【0003】[0003]

【発明が解決しようとする課題】ところが、現場打ちコ
ンクリートによる構築は、鉄筋工、型枠大工、あるいは
足場、支保工等の熟練工が必要になる上に、工期の短縮
が難しいという問題がある。特に、側壁は、面積が大き
く多量の型枠が必要になるため、現場工事が繁雑なもの
になり、多くの時間を費やすことになる。
However, the construction using cast-in-place concrete requires a skilled worker such as a reinforcing bar, a form carpenter, a scaffold, a supporter, and the like, and it is difficult to shorten the construction period. In particular, since the side wall has a large area and requires a large amount of formwork, site construction is complicated and a lot of time is spent.

【0004】なお、小型のガレージにおいては、プレキ
ャストボックスカルバートを用いて現場施工の簡略化を
図り得るようにしたものも開発されているが、箱形ボッ
クスカルバートを多数連結して大型のガレージを構築す
ると、その内部にも壁が存在することになる。そのた
め、駐車スペースが減少するとともに、必要以上の材料
を要し不経済さを免れない。また、内部に壁が存在する
と、障害物が多くなるとともに見通しが悪くなるため、
自動車の移動に危険が伴うという問題もある。
[0004] In the case of a small garage, there has been developed a garage in which pre-cast box culverts can be used to simplify the on-site construction. Then, there will be walls inside. For this reason, the parking space is reduced, and more materials are required than necessary, which is unavoidable. Also, if there are walls inside, the obstacles will increase and the visibility will be worse,
There is also a problem that moving a car is dangerous.

【0005】このような不具合を解消するための方策と
しては、例えば、底版のみを現場打ちコンクリートによ
り構成し、この底版上にプレキャストコンクリートブロ
ック製の側壁を立設して大型ガレージを構築し、その上
面を覆う床部材を柱や梁によって支持することが考えら
れる。ところが、現場打ちコンクリート製の底版上にプ
レキャストコンクリートブロック製の壁部材を載置して
側壁等を構成する場合、簡単な作業によってその底版と
側壁との間の接合強度やシール性を確保するのが難し
く、雨水や地下水等が内部に侵入するのを確実に防止す
るには格別なシール対策が必要となる。
As a measure for solving such a problem, for example, only the bottom slab is made of cast-in-place concrete, and a side wall made of a precast concrete block is erected on the bottom slab to construct a large garage. It is conceivable that the floor member covering the upper surface is supported by columns or beams. However, when a precast concrete block wall member is placed on a cast-in-place concrete bottom slab to form a side wall, etc., it is necessary to ensure the joint strength and sealing property between the bottom slab and the side wall by a simple operation. It is difficult to prevent rainwater, groundwater, and the like from entering the inside, so special sealing measures are required.

【0006】本発明は、このような不具合をことごとく
解消することができるガレージを提供することを目的と
している。
An object of the present invention is to provide a garage capable of solving all of such problems.

【0007】[0007]

【課題を解決するための手段】本発明は、かかる目的を
達成するために、次のような手段を講じたものである。
すなわち、本発明に係るガレージは、底版と、横方向に
隣接させて前記底版上に立設され所要箇所に自動車出入
口を有した側壁を形成する複数のプレキャストコンクリ
ートブロック製の壁部材と、前記側壁の上端開口部を閉
塞する床版とを具備してなるものであって、前記各壁部
材を該壁部材の横方向の遊動を許容する凹凸係合部を介
して底版上に載置し、前記各壁部材同士を連結部材によ
り相寄る方向に緊締連結するとともに、前記凹凸係合部
の遊動隙間に硬化材を充填して底版と各壁部材とを結合
していることを特徴とする。
In order to achieve the above object, the present invention takes the following measures.
That is, a garage according to the present invention is a bottom plate, a plurality of wall members made of precast concrete blocks that are formed on the bottom plate so as to be laterally adjacent to each other and that have a vehicle entrance at a required position and that stand on the bottom plate; A floor slab that closes the upper end opening of the wall member, and the wall members are placed on the bottom slab through a concave / convex engagement portion that allows the wall member to move in the horizontal direction. The wall members are tightly connected to each other by a connecting member, and a hardening material is filled in a floating gap of the concave-convex engagement portion to connect the bottom plate and each wall member.

【0008】現場での作業を特に簡素化するには、側壁
の内側に形成される駐車領域にプレキャストコンクリー
トブロック製の柱部材を所要の間隔で立設し、これら柱
部材上にプレキャストコンクリートブロック製の梁部材
を架設し、この梁部材によって床版を構成するプレキャ
ストコンクリートブロック製の床部材を支持するように
しておくのがよい。
In order to particularly simplify the work on site, column members made of precast concrete blocks are erected at required intervals in a parking area formed inside the side wall, and precast concrete blocks are formed on these column members. It is preferable that the beam member is erected and the beam member supports a floor member made of a precast concrete block constituting the floor slab.

【0009】その場合、側壁部分における梁部材の支持
構造を簡素なものにするには、側壁の一部に、前記柱部
材に対応する柱部を一体に備えた梁支持用の壁部材を用
いるのが望ましい。
In this case, in order to simplify the supporting structure of the beam member in the side wall portion, a beam supporting wall member integrally provided with a column corresponding to the column member is used in a part of the side wall. It is desirable.

【0010】側壁のコーナー部の構造を簡略化して強度
やシール性を無理なく向上させるには、側壁を、直壁部
分を形成する直壁用の壁部材と、隅角部分を形成する平
面視L字形をなすコーナー用の壁部材とを用いて構築す
るのがよい。
In order to simplify the structure of the corner portion of the side wall and to improve the strength and the sealing property without difficulty, the side wall is formed by a wall member for the straight wall forming the straight wall portion and a plan view forming the corner portion. It is preferable to use an L-shaped corner wall member.

【0011】凹凸係合部の好適な態様としては、底版か
ら突設した鉄筋と、壁部材の下端面に開設した鉄筋挿入
穴とからなり、前記鉄筋を前記鉄筋挿入穴に挿入した状
態で該鉄筋の外周と鉄筋挿入穴の内周との間に遊動隙間
が形成されるように構成したものを挙げることができ
る。
[0011] A preferred embodiment of the concave-convex engaging portion comprises a reinforcing bar protruding from the bottom plate and a reinforcing-bar insertion hole formed in the lower end surface of the wall member, and the reinforcing bar is inserted into the reinforcing-bar insertion hole. An example in which a floating gap is formed between the outer periphery of the reinforcing bar and the inner periphery of the reinforcing bar insertion hole can be given.

【0012】床版を無理なく薄肉化するには、緊張させ
た状態の引張部材によって、壁部材と床部材とを緊締接
合するのが望ましい。
In order to reduce the thickness of the floor slab without difficulty, it is desirable that the wall member and the floor member be tightly joined by a tensioned tension member.

【0013】[0013]

【作用】このガレージは、少なくとも側板がプレキャス
トコンクリートブロック製のものであるため、大掛かり
な型枠工事が不要となる。そのため、鉄筋工、型枠大
工、あるいは足場、支保工等の熟練工に依存する度合い
を大幅に低減させことができるとともに、工事の煩雑化
を防止して工期を短縮することが可能となる。
In this garage, at least the side plate is made of a precast concrete block, so that a large-scale formwork is not required. Therefore, it is possible to greatly reduce the degree of dependence on skilled workers such as reinforcing steelwork, formwork carpenters, scaffolds, and supporters, and to prevent complicated work, thereby shortening the construction period.

【0014】しかも、側壁と底版との結合を前述のよう
にすれば、高い機械的強度とシール性を共に確保するこ
とが可能となる。すなわち、壁部材を底版上に横方向の
遊動を許容する凹凸係合部を介して載置するようにして
いるため、側壁を構成する壁部材同士を連結部材により
相寄る方向に無理なく緊締することができ、壁部材同士
の接合部分のシール性を十分に確保することができる。
その上、凹凸係合部による遊動許容範囲内で壁部材が横
方向にずれ動くことが可能であるため、その壁部材の下
面と底版の上面との間で擦り合わせ作用を惹起させるこ
とができ、後述するように壁部材と底版との間の水密性
も良好なものとなる。そして、その状態で凹凸係合部の
遊動隙間に硬化材を充填して硬化させることによって、
その水密性を維持したままで、壁部材を底版に確実に固
定することができる。なお、凹凸係合部の遊動隙間に硬
化材を充填して硬化させた後に、壁部材同士を緊締連結
する場合であっても、底版上に壁部材を載置して遊動隙
間の範囲内で壁部材を移動させて壁部材間のシール材を
可能な範囲で圧密する際等に、前述した擦り合せ作用を
発揮させることは可能である。
Moreover, if the side wall and the bottom plate are connected as described above, it is possible to secure both high mechanical strength and sealing performance. That is, since the wall member is placed on the bottom plate via the concave / convex engaging portion that allows the play in the horizontal direction, the wall members constituting the side walls are easily tightened in the direction in which they are brought close by the connecting member. Therefore, it is possible to sufficiently secure the sealing property of the joint between the wall members.
In addition, since the wall member can be displaced in the lateral direction within the permissible range of movement due to the uneven engagement portion, a rubbing action can be caused between the lower surface of the wall member and the upper surface of the bottom plate. As described later, the watertightness between the wall member and the bottom plate is also improved. Then, in this state, by filling the hardening material into the floating gap of the concave-convex engagement portion and hardening,
The wall member can be reliably fixed to the bottom plate while maintaining the watertightness. In addition, even if the wall members are tightened and connected to each other after the hardening material is filled in the floating gap of the concave-convex engagement portion and hardened, the wall member is placed on the bottom plate and within the range of the floating gap. When the wall members are moved to consolidate the sealing material between the wall members as much as possible, it is possible to exert the above-described rubbing action.

【0015】また、このような構成によれば、内部に壁
を設ける必然性がなくなり、床部材を柱部材や梁部材を
用いて支持することが可能となるが、このようにすれば
内部の構成が単純化され、回転ブラシ等を有する洗浄装
置を用いてガレージ内部の洗浄を能率よく行うことが可
能となる。また、壁ではなく柱部材によれば、貯溜槽内
の見通しが良好なものになるため、移動中の自動車の安
全性を高めることが可能となる。
According to such a configuration, it is not necessary to provide a wall in the interior, and it is possible to support the floor member by using a column member or a beam member. Is simplified, and the inside of the garage can be efficiently cleaned using a cleaning device having a rotating brush or the like. In addition, according to the pillar member instead of the wall, the visibility in the storage tank is improved, so that the safety of the moving vehicle can be improved.

【0016】[0016]

【実施例】以下、本発明の一実施例を、図面を参照して
説明する。
An embodiment of the present invention will be described below with reference to the drawings.

【0017】このガレージは、図1〜図4に示すよう
に、底版1と、側壁2と、柱部材3と、梁部材4と、床
版5とを具備してなるもので、地中に埋設して使用され
る。
As shown in FIGS. 1 to 4, this garage includes a bottom slab 1, side walls 2, a column member 3, a beam member 4, and a floor slab 5, and is provided underground. It is used buried.

【0018】底版1は、掘削領域の底部にコンクリート
を打設して形成される現場打ちコンクリート製のもの
で、側壁2を載設すべき縁部、及び、柱部材3を立設す
べき部位に側壁用の嵩上部11及び柱用の嵩上部12を
有しており、それら嵩上部11、12の上面に異型鉄筋
13を位置決めした状態で突設してある。
The bottom slab 1 is made of cast-in-place concrete formed by casting concrete at the bottom of an excavation area. The bottom slab 1 has an edge on which the side wall 2 is to be placed and a portion on which the column member 3 is to be erected. In addition, a bulge 11 for a side wall and a bulge 12 for a column are provided, and a deformed reinforcing bar 13 is projected from the upper surfaces of the bulges 11 and 12 in a state of being positioned.

【0019】側壁2は、コーナー用の壁部材21と、直
壁用の壁部材22、23と、梁支持用の壁部材24とか
らなるもので、これらの壁部材21、22、23、24
を横方向に隣接させて連結部材たるPC鋼棒25により
緊締結合することにより構築される。
The side wall 2 is composed of a wall member 21 for corners, wall members 22 and 23 for straight walls, and a wall member 24 for supporting beams, and these wall members 21, 22, 23 and 24 are provided.
Are laterally adjacent to each other and tightened by a PC steel rod 25 as a connecting member.

【0020】コーナー用の壁部材21は、図5に示すよ
うに、プレキャストコンクリートブロック製のもので、
平面視L字形をなす屈曲板状をなしており、その下端部
に金属製のスリーブ26を埋設することによって下面に
開口する複数の鉄筋挿入穴27を形成してある。この壁
部材21の下端両側部には起立安定性を確保するための
肉厚部21aが設けてあり、上端近傍部内面側には水平
な突条21bを突設して床受面21cを形成している。
The corner wall member 21 is made of a precast concrete block as shown in FIG.
It has a bent plate shape having an L-shape in plan view, and has a plurality of rebar insertion holes 27 opened on the lower surface by embedding a metal sleeve 26 at the lower end thereof. Thick portions 21a are provided on both sides of the lower end of the wall member 21 to secure standing stability, and a horizontal ridge 21b is provided on the inner surface near the upper end to form a floor receiving surface 21c. doing.

【0021】直壁用の壁部材22、23は、図6に示す
ように、プレキャストコンクリートブロック製のもの
で、平板状をなしており、その下端部に金属製のスリー
ブ26を埋設することによって下面に開口する鉄筋挿入
穴27を形成してある。この壁部材22、23の下端部
には起立安定性を確保するための肉厚部22a、23a
が設けてあり、上端近傍部の内面側に水平な突条22
b、23bを突設して床受面22c、23cを形成して
いる。
As shown in FIG. 6, the wall members 22 and 23 for a straight wall are made of a precast concrete block and have a flat plate shape, and a metal sleeve 26 is embedded at the lower end thereof. A reinforcing bar insertion hole 27 is formed on the lower surface. The lower end portions of the wall members 22 and 23 have thick portions 22a and 23a for securing standing stability.
Are provided on the inner surface near the upper end side.
The floor receiving surfaces 22c and 23c are formed by protruding the b and 23b.

【0022】梁支持用の壁部材24は、図7に示すよう
に、プレキャストコンクリートブロック製のもので、平
板状をなしており、その下端部に金属製のスリーブ26
を埋設することによって下面に開口する鉄筋挿入穴27
を形成してある。この壁部材24の下端両側部には起立
安定性を確保するための肉厚部24aが設けてあり、上
端近傍部の内面側には水平な突条24bを突設して床受
面24cを形成している。また、この梁支持用の壁部材
24の内面中央部には、柱部材3と同じ高さ寸法をなす
柱部24dを一体に形成してあり、この柱部24dの上
面を梁受面24eとなしている。この壁部材24におけ
る梁部材4の小口42に対応する部位には切欠部24f
が設けてあり、この小口42から延出させてある図示し
ない鉄筋を受け入れることができるようにしてある。こ
の柱部24dに形成された梁受面24eと突条24bの
上面に形成された床受面24cとの高低差は、梁部材4
の上下方向寸法に対応させてある。また、各壁部材2
1、22、23、24の床受面21c、22c、23
c、24cと該壁部材21、22、23、24の上端面
との上下方向寸法は、床版5の厚み寸法に対応させてあ
る。
As shown in FIG. 7, the wall member 24 for supporting the beam is made of a precast concrete block, has a flat plate shape, and has a metal sleeve 26 at its lower end.
Bar insertion hole 27 that opens to the bottom surface by burying
Is formed. Thick portions 24a are provided on both sides of the lower end of the wall member 24 to ensure standing stability, and a horizontal ridge 24b is protruded on the inner surface near the upper end to form a floor receiving surface 24c. Has formed. Further, a column portion 24d having the same height as the column member 3 is integrally formed at the center of the inner surface of the beam supporting wall member 24, and the upper surface of the column portion 24d is connected to the beam receiving surface 24e. No. A cutout portion 24f is formed in a portion of the wall member 24 corresponding to the small opening 42 of the beam member 4.
Is provided so as to be able to receive a reinforcing bar (not shown) extending from the small opening 42. The height difference between the beam receiving surface 24e formed on the pillar portion 24d and the floor receiving surface 24c formed on the upper surface of the ridge 24b is determined by the beam member 4
In the vertical direction. In addition, each wall member 2
1, 22, 23, 24 floor receiving surfaces 21c, 22c, 23
The vertical dimension between c, 24c and the upper end surface of the wall members 21, 22, 23, 24 corresponds to the thickness dimension of the floor slab 5.

【0023】しかして、この側壁2は、前記各壁部材2
1、22、23、24を、該壁部材21、22、23、
24の横方向の遊動を許容する凹凸係合部6を介して底
版1上に載置し、前記各壁部材21、22、23、24
同士を前記PC鋼材25により相寄る方向に緊締連結す
るとともに、前記凹凸係合部6の遊動隙間7に硬化材た
るモルタルを充填して底版1と各壁部材21、22、2
3、24とを結合することによって構築されている。
Thus, the side wall 2 is formed by each of the wall members 2
1, 22, 23, 24, the wall members 21, 22, 23,
24 is placed on the bottom plate 1 via the concave / convex engaging portion 6 which allows the lateral movement of the wall member 24, and the wall members 21, 22, 23, 24
The PC plates 25 are tightened and connected to each other, and the floating gap 7 of the concavo-convex engaging portion 6 is filled with mortar as a hardening material so that the bottom slab 1 and each of the wall members 21, 22, 2,
3 and 24 are combined.

【0024】凹凸係合部6は、底版1から突設した前述
の異形鉄筋13と、壁部材21、22、23、24の下
面に開設した鉄筋挿入穴27とからなるもので、前記異
形鉄筋13を前記鉄筋挿入穴27に遊嵌させつつ壁部材
21、22、23、24を底版1上に載置し得るように
構成されている。なお、壁部材21、22、23、24
の下面と底版1の嵩上部11の上面との間には、所要厚
さだけモルタル14を敷くようにしている。
The concave / convex engaging portion 6 comprises the above-mentioned deformed reinforcing bar 13 protruding from the bottom plate 1 and a reinforcing bar insertion hole 27 formed on the lower surface of the wall members 21, 22, 23, 24. The wall members 21, 22, 23, 24 can be placed on the bottom slab 1 while the 13 is loosely fitted in the rebar insertion hole 27. The wall members 21, 22, 23, 24
The mortar 14 is laid between the lower surface of the bottom plate 1 and the upper surface of the raised portion 11 of the bottom plate 1 by a required thickness.

【0025】図8は、PC鋼材25による緊締部分を示
している。すなわち、各壁部材21、22、23、24
の端部近傍に箱抜により凹陥部28を形成するととも
に、これら凹陥部28同士を連通させるようにして壁部
材21、22、23、24内にPC鋼材挿通孔29を穿
設してある。そして、そのPC鋼材挿通孔29内に挿入
したPC鋼材25の両端ねじ部25aを各凹陥部28内
に位置させ、そのPC鋼材25に緊張力を付与しつつ前
記ねじ部25aにナット25bをそれぞれ定着すること
によって、隣接する壁部材21、22、23、24同士
を緊締結合するようにしてある。
FIG. 8 shows a tightening portion made of the PC steel material 25. That is, each of the wall members 21, 22, 23, 24
A recess 28 is formed in the vicinity of the end of the box by box extraction, and a PC steel material insertion hole 29 is drilled in the wall members 21, 22, 23, 24 so that the recesses 28 communicate with each other. Then, the screw portions 25a at both ends of the PC steel material 25 inserted into the PC steel material insertion holes 29 are positioned in the respective concave portions 28, and the nuts 25b are respectively attached to the screw portions 25a while applying tension to the PC steel material 25. By fixing, the adjacent wall members 21, 22, 23, 24 are tightly connected to each other.

【0026】図9は、コーナー用の壁部材21と直壁用
の壁部材22間の接合部分を示す平面図である。その接
合部分においては、一方の接合面21cにのみ上下方向
に連続した嵌入溝21dを設けている。そして、嵌入溝
21dに水膨脹ゴム8を嵌着するとともに、その両側に
クリアランスを確保するための硬質ゴム81を貼着して
おき、その水膨脹ゴム8と各硬質ゴム81との間に形成
される約5mmの接合面間クリアランスにグラウト82を
注入している。そして、前記目地溝83にポリウレタン
製のシーリング84を充填している。コーナー用の壁部
材21と直壁用の壁部材23との接合部、隣接する直壁
用の壁部材22と22、23と23の接合部、及び、直
壁用の壁部材23と梁支持用の壁部材24との接合部
も、同様な構成をなしている。
FIG. 9 is a plan view showing a joint between the wall member 21 for the corner and the wall member 22 for the straight wall. In the joint portion, a fitting groove 21d which is continuous in the vertical direction is provided only on one joint surface 21c. The water-expandable rubber 8 is fitted into the fitting groove 21d, and hard rubbers 81 for securing clearance are adhered to both sides of the water-expandable rubbers 8 so as to form between the water-expandable rubbers 8 and the respective hard rubbers 81. The grout 82 is injected into the clearance of about 5 mm between the joining surfaces. The joint groove 83 is filled with a sealing 84 made of polyurethane. The joint between the corner wall member 21 and the wall member 23 for the straight wall, the joint between the adjacent wall members 22 and 22, 23 and 23 for the straight wall, and the wall member 23 for the straight wall and the beam support The joint portion with the wall member 24 has the same configuration.

【0027】柱部材3は、図4に示すように、プレキャ
ストコンクリートブロック製のもので、角柱状をなして
おり、その下端部に金属製のスリーブ31を埋設するこ
とによって下面に開口する鉄筋挿入穴32を形成してあ
る。この柱部材3の下端部には起立安定性を確保するた
めの膨大部33が設けてあり、上端部には張出部を設け
て水平な梁受面34を形成している。そして、前記鉄筋
挿入穴32に底版1の柱用嵩上部12に突設した異形鉄
筋13を遊嵌させつつ該柱部材3を底版1上に立設し、
その鉄筋挿入穴32内にモルタルを注入して硬化させる
ことによって、この柱部材3を底版1上に固定するよう
にしてある。
As shown in FIG. 4, the column member 3 is made of a precast concrete block and has a prismatic shape. A metal sleeve 31 is buried at the lower end of the column member 3 to insert a reinforcing bar opening at the lower surface. A hole 32 is formed. At the lower end of the column member 3, an enlarged portion 33 for securing standing stability is provided, and at the upper end, a projecting portion is provided to form a horizontal beam receiving surface. Then, the column member 3 is erected on the bottom plate 1 while the deformed reinforcing bar 13 protruding from the column bulk part 12 of the bottom plate 1 is loosely fitted into the reinforcing bar insertion hole 32,
The column member 3 is fixed on the bottom slab 1 by injecting and hardening mortar into the reinforcing bar insertion hole 32.

【0028】梁部材4は、プレキャストコンクリートブ
ロック製のもので、角柱状をなしており、上端部両縁に
張出部を突設して水平な床受面41を形成している。こ
の梁部材4は、両端部を梁受面24e、34に支持させ
て梁支持用の壁部材24と柱部材3との間、及び、柱部
材3間に架設されている。
The beam member 4 is made of a precast concrete block, has a prismatic shape, and has a projecting portion projecting from both edges of the upper end to form a horizontal floor receiving surface 41. The beam member 4 has both ends supported by the beam receiving surfaces 24 e and 34, and is bridged between the beam supporting wall member 24 and the column member 3 and between the column members 3.

【0029】床版5は、プレキャストコンクリートブロ
ック製の長方形をなす床部材51を、複数枚隣接させて
敷設したもので、各床部材51は、壁部材21、22、
23、24の床受面21c、22c、23c、24c及
び梁部材4の床受面41のいずれかに支持されている。
The floor slab 5 is formed by laying a plurality of rectangular floor members 51 made of a precast concrete block so as to be adjacent to each other.
It is supported on any of the floor receiving surfaces 21 c, 22 c, 23 c, 24 c of 23 and 24 and the floor receiving surface 41 of the beam member 4.

【0030】床部材51同士の接合は、シェアコッター
52により行っている。すなわち、図13に示すよう
に、床部材51の突き合わすべき長辺側接合端に傾斜面
51aをそれぞれ形成し、その傾斜面51aにシェアコ
ッター52を添設している。シェアコッター52にはア
ンカ53が固設してあり、そのアンカ53を床部材51
のコンクリート組織内に埋設することによって、該シェ
アコッター52を床部材51に固定している。そして、
対応するシェアコッター52の端縁同士を溶接により結
合することによって、隣接する床部材51同士を連結し
ている。
The joining of the floor members 51 is performed by a shear cotter 52. That is, as shown in FIG. 13, an inclined surface 51 a is formed at each long side joining end of the floor member 51 to be abutted, and a shear cotter 52 is attached to the inclined surface 51 a. An anchor 53 is fixed to the shear cotter 52, and the anchor 53 is attached to the floor member 51.
The shear cotter 52 is fixed to the floor member 51 by being buried in a concrete structure. And
The adjacent floor members 51 are connected to each other by joining the edges of the corresponding shear cotters 52 by welding.

【0031】また、壁部材21、22、23、24に支
持された床部材51は、引張部材たるPC鋼材54によ
り壁部材21、22、23、24に緊締結合されてい
る。図14は、壁部材22の上部と床部材51との接合
構造を示す部分断面図である。床部材51は、長辺及び
短辺からそれぞれ一定距離だけ内方に離れた部位にそれ
ぞれ箱抜きによって形成された複数の凹陥部55を備え
ており、これら各凹陥部55内をPC鋼材挿通孔56を
介して対応する端面51bに連通させている。また、壁
部材21、22、23、24の前記PC鋼材挿通孔56
に合致し得る部位に、PC鋼材挿通孔57を貫設し、こ
のPC鋼材挿通孔57の外方端に座ぐり穴58を形成し
ている。そして、それらPC鋼材挿通孔56、57に挿
通させたPC鋼材54の両端ねじ部54aを前記座ぐり
穴58及び凹陥部55内に位置させ、そのPC鋼材54
に緊張力を付与した状態で前記各ねじ部54aにナット
54bを定着して、前記壁部材21、22、23、24
と床部材51とを緊締結合している。このように壁部材
21、22、23、24の上端部と各床部材51とを複
数本のPC鋼材54により緊締して剛構造にしておく
と、床部材51の厚さを無理なく薄くすることが可能で
ある。図15は、下向き荷重を受けたときの床部材51
の曲げモーメントMを縦軸にとり、床部材51の端面5
1bからの距離Lを横軸にとって、床部材51の曲げモ
ーメントとその位置との関係を示したグラフである。上
述のように接合を剛構造にすると、床部材51の端面5
1bの位置における曲げモーメントMo は上面を凸にす
るマイナス方向のある大きさになり、端面51bからあ
る距離だけ離れた位置で曲げモーメントMが0になり、
さらに端面51bから離れると曲げモーメントMは上面
を凹にするプラス方向になり、床部材51の中央に近付
くに連れてプラスの曲げモーメントMの絶対値が大きく
なる。剛構造の場合、従来の如きヒンジ構造に比較し
て、マイナスの曲げモーメントM0 が生じる分だけプラ
スの曲げモーメントの最大値が低下するため、強度を低
下させることなしに床部材51の厚さを薄くできること
になる。
The floor member 51 supported by the wall members 21, 22, 23, 24 is tightly connected to the wall members 21, 22, 23, 24 by a PC steel member 54 as a tension member. FIG. 14 is a partial cross-sectional view showing a joint structure between the upper part of the wall member 22 and the floor member 51. The floor member 51 is provided with a plurality of recesses 55 formed by box-removal at portions respectively spaced inward from the long side and the short side by a fixed distance, and a PC steel material insertion hole is formed in each of the recesses 55. It communicates with the corresponding end face 51b via 56. Further, the PC steel material insertion holes 56 of the wall members 21, 22, 23, 24 are provided.
A PC steel material insertion hole 57 is provided at a position that can match the shape of the PC steel material, and a counterbore hole 58 is formed at the outer end of the PC steel material insertion hole 57. Then, the screw portions 54a at both ends of the PC steel material 54 inserted into the PC steel material insertion holes 56 and 57 are positioned in the counterbore hole 58 and the concave portion 55, and the PC steel material 54
The nuts 54b are fixed to the screw portions 54a in a state where tension is applied to the wall members 21, 22, 23, and 24.
And the floor member 51 are tightly connected. When the upper end portions of the wall members 21, 22, 23, and 24 and the floor members 51 are tightened with a plurality of PC steel members 54 to have a rigid structure, the thickness of the floor members 51 is reduced without difficulty. It is possible. FIG. 15 shows the floor member 51 when receiving a downward load.
Of the floor member 51 of the floor member 51
5 is a graph showing the relationship between the bending moment of the floor member 51 and its position, with the distance L from 1b as the horizontal axis. When the connection is made rigid as described above, the end surface 5
The bending moment Mo at the position 1b has a certain magnitude in the negative direction making the upper surface convex, and the bending moment M becomes 0 at a position away from the end face 51b by a certain distance,
Further away from the end surface 51b, the bending moment M becomes a plus direction in which the upper surface is concaved, and the absolute value of the plus bending moment M increases as approaching the center of the floor member 51. In the case of the rigid structure, the maximum value of the positive bending moment is reduced by the amount corresponding to the generation of the negative bending moment M0 as compared with the conventional hinge structure, so that the thickness of the floor member 51 can be reduced without reducing the strength. It can be made thin.

【0032】このようにしてなるガレージの底版1上
に、車止め100を有する個別駐車区画101を複数設
定するとともに、それ以外のスペースを通路102と
し、側壁2の所要箇所に自動車出入口105を設けてい
る。図1における矢印Gは、自動車Cの進行方向を示し
ている。自動車出入口105の両側縁には格別な一対の
柱103を設け、その柱103の上端間に梁104を架
設している。底版1に対する柱103の結合は、前記柱
3に準じて行われている。梁104は、壁部材22の上
端部と連続し得る断面形状をなすもので、床部材51の
端縁部を支持し得るようになっている。自動車出入口1
05は、図示しない傾斜通路を介して地上に連通してい
る。
On the bottom plate 1 of the garage thus constructed, a plurality of individual parking sections 101 each having a car stop 100 are set, the other space is used as a passage 102, and an automobile entrance 105 is provided at a required portion of the side wall 2. I have. The arrow G in FIG. 1 indicates the traveling direction of the vehicle C. A special pair of pillars 103 are provided on both side edges of the vehicle entrance 105, and a beam 104 is provided between the upper ends of the pillars 103. The connection of the pillar 103 to the bottom plate 1 is performed according to the pillar 3. The beam 104 has a cross-sectional shape that can be continuous with the upper end of the wall member 22, and can support the edge of the floor member 51. Car doorway 1
Reference numeral 05 communicates with the ground via a not-shown inclined passage.

【0033】次いで、このガレージの施工方法を順を追
って説明する。
Next, the construction method of the garage will be described step by step.

【0034】(1)地面を掘削し所定深さまで掘り下げ
て、緊締作業を行うためのスペースを考慮した広さのガ
レージ用穴を確保する。
(1) The ground is excavated and dug down to a predetermined depth to secure a garage hole having a size in consideration of a space for performing a tightening operation.

【0035】(2)ガレージ用穴の底に図示しない砕石
基礎を設け、この砕石基礎上に底版用の配筋を行う。壁
部材21、22、23、24、及び、柱部材3を固定す
るための異形鉄筋13を立ち上げるときは、所定位置に
孔のあいた位置決め鉄板を使用する。
(2) A crushed stone foundation (not shown) is provided at the bottom of the garage hole, and reinforcement for the bottom plate is arranged on the crushed stone foundation. When raising the deformed reinforcing bar 13 for fixing the wall members 21, 22, 23, 24 and the column member 3, a positioning iron plate having a hole at a predetermined position is used.

【0036】(3)型枠を配設し、この型枠内に底版用
のコンクリートを打設する。
(3) A mold is provided, and concrete for the bottom slab is poured into the mold.

【0037】(4)底版1のコンクリートが硬化した
後、図3において一番奥のコーナー用の壁部材21を立
設する。すなわち、底版1の嵩上部11上にモルタル1
4を敷設し、その嵩上部11から突出する異形鉄筋13
を壁部材21の鉄筋挿入穴27に遊嵌させつつ該壁部材
21を底版1上に立ち上げる。
(4) After the concrete of the bottom slab 1 has hardened, the innermost corner wall member 21 in FIG. 3 is erected. That is, the mortar 1
4 and the deformed reinforcing bar 13 protruding from the bulk 11
The wall member 21 is raised on the bottom slab 1 while loosely fitting into the reinforcing bar insertion hole 27 of the wall member 21.

【0038】(5)次いで、このコーナー用の壁部材2
1に図中前後方向に隣接する直壁用の壁部材21や、図
中左右方向に隣接する直壁用の壁部材22、あるいは、
この壁部材22に隣接する梁支持用の壁部材23を順次
立ち上げて連結して行く。具体的には、例えば、図10
及び図11に示すように、既に立ち上げた壁部材21の
隣に、立ち上げようとする壁部材22を、その鉄筋挿通
穴27に底版1の異形鉄筋13を遊嵌させつつ載置す
る。しかる後に、図12に示すように、これら両壁部材
をPC鋼材25により相寄る方向に緊締して結合する。
この際、前記壁部材22は、水膨脹ゴム8を圧密しつつ
凹凸係合部6の遊嵌隙間7の範囲内で横方向にスライド
移動することになり、この移動により壁部材22の下面
と底版1との間で擦り合せが行われて該壁部材22と底
版1との間の水密性が向上する。具体的に説明すれば、
例えば、図10に極端な例を示すように、底版1上に敷
かれたモルタル14に途切れた部分14aが存在した
り、前記水膨脹ゴム8の下端8aが十分に底版1上面に
まで達しないような場合、壁部材22を単に底版1上に
載置しただけでは、図11に示すように微小な隙間14
b,14cが残る場合があり、外部の雨水や地下水等が
ガレージ内に侵入するおそれが生じる。しかるに、PC
鋼材25による緊締操作に伴って壁部材22が横方向に
移動すると、そのモルタル14層を介して壁部材22の
下面と底版1の上面とが擦り合わされ、その隙間14
b、14cにもモルタル14が行き亘って水密性が向上
するものである。この状態で凹凸係合部6の遊嵌隙間7
にモルタルを充填し硬化させると、壁部材22が底版1
に対して強く結合されることになり、底版1と壁部材2
2とが一体化される。
(5) Next, this corner wall member 2
1, a wall member 21 for a straight wall adjacent in the front-rear direction in the figure, a wall member 22 for a straight wall adjacent in the left-right direction in the figure, or
The beam supporting wall members 23 adjacent to the wall member 22 are sequentially raised and connected. Specifically, for example, FIG.
As shown in FIG. 11, the wall member 22 to be raised is placed next to the already raised wall member 21 while the deformed reinforcing bar 13 of the bottom slab 1 is loosely fitted in the reinforcing bar insertion hole 27. Thereafter, as shown in FIG. 12, these two wall members are tightened and joined in the mutually proximate direction by the PC steel material 25.
At this time, the wall member 22 slides in the lateral direction within the range of the loose fitting gap 7 of the concave-convex engagement portion 6 while consolidating the water-expandable rubber 8, and this movement causes the lower surface of the wall member 22 to move. Rubbing is performed between the bottom plate 1 and the watertightness between the wall member 22 and the bottom plate 1 is improved. Specifically,
For example, as shown in an extreme example in FIG. 10, a broken portion 14 a exists in the mortar 14 laid on the bottom plate 1, or the lower end 8 a of the water-expandable rubber 8 does not sufficiently reach the upper surface of the bottom plate 1. In such a case, if the wall member 22 is simply placed on the bottom plate 1, as shown in FIG.
In some cases, b and 14c may remain, which may cause external rainwater, groundwater, and the like to enter the garage. However, PC
When the wall member 22 moves in the horizontal direction in accordance with the tightening operation by the steel material 25, the lower surface of the wall member 22 and the upper surface of the bottom plate 1 are rubbed through the mortar 14 layer, and the gap 14
The mortar 14 also extends over the b and 14c to improve the watertightness. In this state, the loose fitting gap 7
When the mortar is filled and hardened, the wall member 22
And the bottom plate 1 and the wall member 2
2 are integrated.

【0039】(6)以上の操作を繰り返して壁部材2
1、22、23、24を連結しつつ立設する。
(6) By repeating the above operation, the wall member 2
1, 22, 23 and 24 are connected and erected.

【0040】(7)底版1の柱用嵩上部12上に柱部材
3を立設する。この場合も、底版1から突設した異形鉄
筋13を柱部材3の鉄筋挿通穴32に遊嵌させ、その鉄
筋挿通穴32内にモルタルを充填して硬化させることに
よって、柱部材3を底版1に固定する。
(7) The column member 3 is erected on the column bulky portion 12 of the bottom slab 1. Also in this case, the deformed reinforcing bar 13 protruding from the bottom plate 1 is loosely fitted in the reinforcing bar insertion hole 32 of the column member 3, and the reinforcing bar insertion hole 32 is filled with mortar and hardened, so that the column member 3 is connected to the bottom plate 1. Fixed to.

【0041】(8)梁部材4を、その両端を梁受面24
e,34に支持させつつ梁受用の壁部材24と柱部材3
との間、及び、柱部材3間に架設する。梁部材4の小口
42間には該小口から延出させた鉄筋(図示せず)同士
を繋ぐための空間43を確保しておく。一列の梁部材4
を架設し終わった段階で、梁部材4の小口42から延出
させてある鉄筋同士を結束により一体化する。そして、
鉄筋の配筋処理が終わった段階で、梁部材4の小口42
間に形成された空間43にコンクリートを打設する。
(8) The beam member 4 is connected to the beam receiving surface 24 at both ends.
e, 34 while supporting the beam 24 and the column 3
And between the column members 3. A space 43 for connecting rebars (not shown) extending from the fore-edge is secured between the fore-edges 42 of the beam member 4. One row of beam members 4
At the stage when the erection is completed, the reinforcing bars extending from the small opening 42 of the beam member 4 are integrated by binding. And
At the stage where the rebar arrangement processing is completed, the fore-edge 42 of the beam member 4 is
Concrete is poured into the space 43 formed therebetween.

【0042】(9)構築し終わった梁部材4上に奥の列
から順次床部材51を設置する。床部材51の長辺に固
設されているシェアコッター52同士を溶接することに
よって床部材51同士を連結するとともに、対応する壁
部材21、22、23、24と床部材51とをPC鋼材
54により緊締結合する。
(9) The floor members 51 are sequentially placed on the beam members 4 that have been constructed from the back row. The floor members 51 are connected to each other by welding the shear cotters 52 fixed to the long sides of the floor members 51, and the corresponding wall members 21, 22, 23, 24 and the floor member 51 are connected to the PC steel 54. For tight coupling.

【0043】(10)上記と同様にして、その次の列の
梁部材4と床部材51を設置する。
(10) The beam members 4 and the floor members 51 in the next row are installed in the same manner as described above.

【0044】(11)床部材51の小口51cから延出
させてある鉄筋51d(図3には一部のみ図示)同士
を、梁部材4上において溶接する。
(11) Reinforcing bars 51d (only some of which are shown in FIG. 3) extending from the small opening 51c of the floor member 51 are welded to each other on the beam member 4.

【0045】(12)最後の梁部材4間上への床部材5
1の配設が終わったら、手前側の左右方向に沿った各壁
部材23、24を奥側のそれらと同様にして配設する。
(12) Floor member 5 over the last space between beam members 4
After the arrangement of 1, the wall members 23 and 24 along the left-right direction on the near side are arranged in the same manner as those on the far side.

【0046】(13)各壁部材21、22、23、24
間の目地を施工する。
(13) Each wall member 21, 22, 23, 24
Build joints between them.

【0047】(14)梁部材4上に現場打ちコンクリー
トを打設する。
(14) Cast-in-place concrete is cast on the beam member 4.

【0048】(15)床部材51上に防水加工を施して
施工が完了する。
(15) Waterproofing is performed on the floor member 51 to complete the construction.

【0049】なお、本発明は、以上説明した実施例に限
定されるものではなく、その趣旨を逸脱しない範囲で、
種々変形が可能である。
The present invention is not limited to the embodiment described above, but may be modified without departing from the scope of the invention.
Various modifications are possible.

【0050】例えば、梁支持用の壁部材の柱部や、柱部
材は、四角断面に代えて円形断面や多角形断面にしても
よい。
For example, the pillar portion of the beam supporting wall member or the pillar member may have a circular cross section or a polygonal cross section instead of a square cross section.

【0051】また、壁部材同士を緊締連結するための構
成も、前記実施例のものに限定されるものではなく、例
えば、複数の壁部材に亘って挿通させた長尺なPC鋼材
によって、各壁部材を緊締結合するようにしてもよい。
PC鋼材に緊張力を付与する方法は、ナットの締め付け
のみによるものであってもよいし、あるいは、油圧ジャ
ッキ等を用いてPC鋼材に緊張力を与えておき、その緊
張状態でナットを定着し、しかる後に油圧ジャッキや、
この油圧ジャッキの牽引力を前記PC構材に伝達するた
めの緊張棒及びカップラ等を除去するような手法によっ
てもよい。
The structure for tightly connecting the wall members to each other is not limited to that of the above-described embodiment. For example, a long PC steel material inserted through a plurality of wall members may be used. The wall members may be fastened together.
The method of applying tension to the PC steel material may be only by tightening the nut, or a tension may be applied to the PC steel material using a hydraulic jack or the like, and the nut may be fixed in the tension state. And then a hydraulic jack,
A method of removing a tension rod, a coupler, and the like for transmitting the traction force of the hydraulic jack to the PC member may be employed.

【0052】さらに、前記実施例では、壁部材同士を緊
締結合した後に、凹凸係合部の遊動隙間に硬化材を充填
して硬化させる場合について説明したが、逆に、底版上
に壁部材を載置するとともに遊動隙間の範囲内で壁部材
を移動させて壁部材間のシール材を可能な範囲で圧密
し、その状態で前記遊動隙間に硬化材を充填して硬化さ
せ、しかる後に、壁部材同士を緊締連結してもよい。
Further, in the above-described embodiment, the case where the wall members are tightly connected to each other, and then the hardening material is filled in the floating gap of the concave / convex engaging portion and hardened, but conversely, the wall members are mounted on the bottom plate. Placed and moved the wall member within the range of the floating gap to consolidate the sealing material between the wall members as much as possible, and in that state, fill the floating gap with a hardening material and harden, and then, The members may be tightly connected to each other.

【0053】[0053]

【発明の効果】本発明は、以上説明した構成であるか
ら、現場工事の繁雑化を招くことなしに高い強度及びシ
ール性を確保することができ、地中に埋設して使用して
も雨水や地下水の侵入することのないガレージを提供で
きるものである。しかも、ボックスカルバートを用いる
場合のように内部に多くの壁が存在するというような不
具合を解消することが可能になるため、内部のスペース
を駐車のために有効利用することができ、また、出入り
する自動車の走行安全性を向上させることができるもの
である。
According to the present invention having the above-described structure, high strength and sealing performance can be secured without complicating on-site construction, and rainwater can be used even when buried underground. It can provide a garage without intrusion of groundwater. In addition, since it is possible to solve the problem that there are many walls inside as in the case of using a box culvert, it is possible to effectively use the internal space for parking, It is possible to improve the driving safety of the automobile.

【0054】請求項2記載の発明のように、側壁のみな
らず、柱部材、梁部材、及び、床版をもプレキャストコ
ンクリートブロック製のものにすれば、現場での型枠工
事等を最小限に止めることが可能となり、特に迅速な施
工が可能となる。
If not only the side walls but also the column members, the beam members and the floor slabs are made of precast concrete blocks as in the second aspect of the present invention, on-site formwork and the like can be minimized. , And particularly quick construction becomes possible.

【0055】また、請求項3記載の発明のように、側壁
の一部に、前記柱部材に対応する柱部を一体に備えた梁
支持用の壁部材を用いれば、単なる平板状の壁部材間に
別体の柱部材を介在させて接合する場合に比べて、複雑
な接合部分を大幅に減少させることが可能となる。
Further, if a beam supporting wall member integrally provided with a column corresponding to the column member is used in a part of the side wall as in the invention according to claim 3, a simple flat wall member is used. Compared to a case where a separate column member is interposed therebetween and joined, a complicated joint can be greatly reduced.

【0056】さらに、請求項4記載の発明のように、側
壁の隅角部分を、屈曲板状をなすコーナー用の壁部材に
より構成すれば、単なる平板状の壁部材のみを組み合わ
せて側壁を構築する場合のようにコーナー部分のシール
構造が複雑になるという不具合がなく、簡単な構成によ
り高い強度と水密性を確保することが可能となる。
Further, if the corner portion of the side wall is formed by a bent wall-shaped corner wall member as in the invention according to the fourth aspect, the side wall is constructed by combining only a simple flat wall member. In this case, there is no problem that the sealing structure at the corner portion is complicated as in the case of the above, and it is possible to secure high strength and water tightness with a simple configuration.

【0057】また、請求項5記載の発明では、凹凸係合
部を鉄筋と鉄筋挿入穴とからなるものにしているが、前
記鉄筋は、通常の配筋作業の一貫として底版から突設す
ることが可能であり、また、前記鉄筋挿入穴は壁部材を
成形する際にスリーブ等を埋設しておくことによって容
易に形成することができる。そのため、かかる態様を採
用すれば、製造の簡略化を図ることができる。
According to the fifth aspect of the present invention, the concave / convex engaging portion is formed of a reinforcing bar and a reinforcing bar insertion hole, but the reinforcing bar is protruded from the bottom plate as part of a normal reinforcing work. The rebar insertion hole can be easily formed by embedding a sleeve or the like when molding the wall member. Therefore, if such an aspect is adopted, the manufacturing can be simplified.

【0058】さらに、請求項6記載の発明のように、緊
張させた状態の引張部材によって、壁部材と床部材とを
緊締接合しておけば、前述した理由によって床版を無理
なく薄肉化することが可能となる。
Furthermore, if the wall member and the floor member are tightly joined to each other by the tension member in a tensioned state, the floor slab can be thinned without difficulty for the above-mentioned reason. It becomes possible.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施例を示す平断面図。FIG. 1 is a plan sectional view showing one embodiment of the present invention.

【図2】図1におけるA−A線断面図FIG. 2 is a sectional view taken along line AA in FIG.

【図3】同実施例を示す斜視図。FIG. 3 is a perspective view showing the same embodiment.

【図4】同実施例を示す分解斜視図。FIG. 4 is an exploded perspective view showing the same embodiment.

【図5】同実施例のコーナー用壁部材を示す斜視図。FIG. 5 is a perspective view showing a corner wall member of the embodiment.

【図6】同実施例の直壁用壁部材を示す斜視図。FIG. 6 is a perspective view showing a wall member for a straight wall of the embodiment.

【図7】同実施例の梁支持用壁部材を示す斜視図。FIG. 7 is a perspective view showing a beam supporting wall member of the embodiment.

【図8】同実施例の壁部材接合部分を示す側断面図。FIG. 8 is a side sectional view showing a joint portion of the wall member of the embodiment.

【図9】同実施例の壁部材接合部分を示す拡大平断面
図。
FIG. 9 is an enlarged plan sectional view showing a wall member joint portion of the embodiment.

【図10】同実施例における壁部材立設手順を模式的に
示す説明図。
FIG. 10 is an explanatory diagram schematically showing a wall member erecting procedure in the embodiment.

【図11】同実施例における壁部材立設手順を模式的に
示す説明図。
FIG. 11 is an explanatory view schematically showing a wall member erecting procedure in the embodiment.

【図12】同実施例における壁部材立設手順を模式的に
示す説明図。
FIG. 12 is an explanatory view schematically showing a wall member erecting procedure in the embodiment.

【図13】同実施例の床部材接合部分を示す断面図。FIG. 13 is a sectional view showing a floor member joint portion of the embodiment.

【図14】同実施例の壁部材と床部材との接合部分を示
す正断面図。
FIG. 14 is a front sectional view showing a joint portion between the wall member and the floor member of the embodiment.

【図15】同実施例の作用説明図。FIG. 15 is an operation explanatory view of the embodiment.

【符号の説明】[Explanation of symbols]

1…底版 2…側壁 3…柱部材 4…梁部材 5…床版 6…凹凸係合部 7…遊動隙間 8…水膨脹ゴム 11…側壁用の嵩上部 12…柱用の嵩上部 13…異形鉄筋 14…モルタル 21…コーナー用の壁部材 22…直壁用の壁部材 23…直壁用の壁部材 24…梁支持用の壁部材 25…連結部材(PC鋼材) 26…スリーブ 27…鉄筋挿通穴 28…凹陥部 29…PC鋼材挿通孔 31…スリーブ 32…鉄筋挿入孔 33…膨大部 34…梁受面 41…床受面 42…小口 51…床部材 52…シェアコッター 53…アンカー 54…引張部材(PC鋼材) 55…凹陥部 56…PC鋼材挿通孔 57…PC鋼材挿通孔 58…座ぐり穴 81…硬質ゴム 82…グラウト 83…目地溝 84…シーリング 100…車止め 101…個別駐車区域 102…通路 103…柱 104…梁 105…自動車出入口 C…自動車 G…進行方向 DESCRIPTION OF SYMBOLS 1 ... Bottom plate 2 ... Side wall 3 ... Column member 4 ... Beam member 5 ... Floor slab 6 ... Concavo-convex engagement part 7 ... Floating gap 8 ... Water expansion rubber 11 ... Bulk part for side wall 12 ... Bulk part for pillar 13 ... Irregular shape Reinforcing bar 14 ... Mortar 21 ... Corner wall member 22 ... Wall member for straight wall 23 ... Wall member for straight wall 24 ... Wall member for beam support 25 ... Connecting member (PC steel) 26 ... Sleeve 27 ... Rebar insertion Hole 28 ... concave portion 29 ... PC steel material insertion hole 31 ... sleeve 32 ... reinforcing bar insertion hole 33 ... enlarged part 34 ... beam receiving surface 41 ... floor receiving surface 42 ... small edge 51 ... floor member 52 ... shear cotter 53 ... anchor 54 ... tension Member (PC steel material) 55 ... concave portion 56 ... PC steel material insertion hole 57 ... PC steel material insertion hole 58 ... counterbore hole 81 ... hard rubber 82 ... grout 83 ... joint groove 84 ... sealing 100 ... car stop 101 ... individual parking area 102 ... Through 103 ... pillar 104 ... beam 105 ... car doorway C ... car G ... traveling direction

Claims (6)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】底版と、横方向に隣接させて前記底版上に
立設され所要箇所に自動車出入口を有した側壁を形成す
る複数のプレキャストコンクリートブロック製の壁部材
と、前記側壁の上端開口部を閉塞する床版とを具備して
なるガレージであって、前記各壁部材を該壁部材の横方
向の遊動を許容する凹凸係合部を介して底版上に載置
し、前記各壁部材同士を連結部材により相寄る方向に緊
締連結するとともに、前記凹凸係合部の遊動隙間に硬化
材を充填して底版と各壁部材とを結合していることを特
徴とするガレージ。
1. A bottom member, a plurality of wall members made of precast concrete blocks, which are formed on the bottom plate so as to be laterally adjacent to each other and have a vehicle entrance at a required position, and an upper end opening of the side wall. A slab comprising: a floor slab for closing each of the wall members, wherein each of the wall members is placed on the bottom slab via a concave / convex engaging portion that allows the wall members to move in the lateral direction, A garage, wherein the slabs are tightly connected to each other by a connecting member in a direction approaching each other, and a hardening material is filled in a floating gap of the concave-convex engaging portion to connect the bottom plate and each wall member.
【請求項2】側壁の内側に形成された駐車領域にプレキ
ャストコンクリートブロック製の柱部材を所要の間隔で
立設し、これら柱部材上にプレキャストコンクリートブ
ロック製の梁部材を架設し、この梁部材によって床版を
構成するプレキャストコンクリートブロック製の床部材
を支持していることを特徴とする請求項1記載のガレー
ジ。
2. Precast concrete block pillar members are erected at predetermined intervals in a parking area formed inside the side wall, and a beam member made of precast concrete block is erected on these pillar members. The garage according to claim 1, wherein a floor member made of a precast concrete block constituting a floor slab is supported by the slab.
【請求項3】側壁が、前記柱部材に対応する柱部を一体
に備えた梁支持用の壁部材を含むことを特徴とする請求
項2記載のガレージ。
3. The garage according to claim 2, wherein the side wall includes a beam supporting wall member integrally provided with a column portion corresponding to the column member.
【請求項4】側壁が、該側壁の直壁部分を形成する直壁
用の壁部材と、該側壁の隅角部分を形成する平面視L字
形をなすコーナー用の壁部材とを含むことを特徴とする
請求項1、2、又は、3記載のガレージ。
4. The side wall includes a wall member for a straight wall forming a straight wall portion of the side wall, and a wall member for a corner having an L-shape in plan view forming a corner portion of the side wall. A garage according to claim 1, 2, or 3.
【請求項5】凹凸係合部が、底版から突設した鉄筋と、
壁部材の下端面に開設した鉄筋挿入穴とからなり、前記
鉄筋を前記鉄筋挿入穴に挿入した状態で該鉄筋の外周と
鉄筋挿入穴の内周との間に遊動隙間が形成されるように
構成したものであることを特徴とする請求項1、2、
3、又は、4記載のガレージ。
5. A rebar in which the concave and convex engaging portion protrudes from the bottom plate.
A rebar insertion hole formed in the lower end surface of the wall member, and in a state where the rebar is inserted in the rebar insertion hole, a floating gap is formed between an outer periphery of the rebar and an inner circumference of the rebar insertion hole. Claim 1, 2, characterized in that it is configured
The garage according to 3, or 4.
【請求項6】緊張させた状態の引張部材によって、壁部
材と床部材とを緊締接合していることを特徴とする請求
項2、3、又は、4記載のガレージ。
6. The garage according to claim 2, wherein the wall member and the floor member are tightly joined by a tensioned tension member.
JP12782394A 1994-06-09 1994-06-09 garage Expired - Fee Related JP2579120B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP12782394A JP2579120B2 (en) 1994-06-09 1994-06-09 garage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP12782394A JP2579120B2 (en) 1994-06-09 1994-06-09 garage

Publications (2)

Publication Number Publication Date
JPH084343A JPH084343A (en) 1996-01-09
JP2579120B2 true JP2579120B2 (en) 1997-02-05

Family

ID=14969556

Family Applications (1)

Application Number Title Priority Date Filing Date
JP12782394A Expired - Fee Related JP2579120B2 (en) 1994-06-09 1994-06-09 garage

Country Status (1)

Country Link
JP (1) JP2579120B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SG109988A1 (en) * 2002-09-06 2005-04-28 Eng Shyan Toh Pre-cast panel and a method of constructing a wall structure using pre-cast panels
BG65319B1 (en) * 2004-04-06 2008-01-31 ПЕТКОВ Михаил Town multifunctional complex
US10584471B2 (en) 2017-06-15 2020-03-10 James Bradford Boulton Integrated retaining wall and fluid collection system
CN217175989U (en) * 2022-03-23 2022-08-12 刘星东 Garage and building for motor vehicle or non-motor vehicle

Also Published As

Publication number Publication date
JPH084343A (en) 1996-01-09

Similar Documents

Publication Publication Date Title
KR101331261B1 (en) Underground prefabricated precast concrete rainwater recycling facility using precast concrete continuous wall in strut structure or earth anchor and construction method of the same
JP2543667B2 (en) Rainwater storage tank
KR100938395B1 (en) The Construction Method of Underpass using Steel-Concrete Composite Wall Pile
JP4881555B2 (en) Construction method of underground structure
KR20100009802A (en) All precast concrete prefabricated water storage tank using precast concrete panel for retaining wall
KR101167511B1 (en) Underpass using precast concrete pile and method for constructing the same
JP2004232328A (en) Structure of half precast type arch culvert and its construction method
KR100650411B1 (en) Tunnel cover plate
JP2579120B2 (en) garage
JP7232714B2 (en) how to build a foundation
KR20020007521A (en) method for underground construction of building by using permanent structural member as strut for support retaining wall
JP2009185487A (en) Septic tank foundation structural body and its construction method
JP3760304B2 (en) Building foundation construction method
JP3671344B2 (en) Joint structure between foundation pile and column base and its construction method
JP2000212979A (en) Underground structure having arch roof and construction method therefor
JP5021526B2 (en) Construction method of underpass and connecting structure of superstructure girder and underground wall
JP2884495B2 (en) Rainwater storage tank
KR100456192B1 (en) Composition of precast concrete wall and precast concrete column for outdoor to sustain external force
JP2864906B2 (en) Precast wall joining method
JPH03199528A (en) Steel frame foundation of construction
JP2000345502A (en) Boundary jointing structure for road with enlarged width and method for jointing boundary
JP2003055961A (en) Steel-concrete integrated underground wall and construction method thereof
JP2001164559A (en) Construction method of continuous underground wall guide wall making use of l-type precast member
KR100646870B1 (en) Concrete Panel Assembly for Traffic Sign Board and Construction Method therefor
JP7438441B1 (en) How to update bridges

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees