JP2022517333A - Structure construction method - Google Patents

Structure construction method Download PDF

Info

Publication number
JP2022517333A
JP2022517333A JP2021539593A JP2021539593A JP2022517333A JP 2022517333 A JP2022517333 A JP 2022517333A JP 2021539593 A JP2021539593 A JP 2021539593A JP 2021539593 A JP2021539593 A JP 2021539593A JP 2022517333 A JP2022517333 A JP 2022517333A
Authority
JP
Japan
Prior art keywords
foundation plate
file
underground
construction method
subsidence
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2021539593A
Other languages
Japanese (ja)
Inventor
スン キム,ジュン
ミン ピョン,ス
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Korea Engineering & Construction Co Ltd
Original Assignee
Korea Engineering & Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Korea Engineering & Construction Co Ltd filed Critical Korea Engineering & Construction Co Ltd
Publication of JP2022517333A publication Critical patent/JP2022517333A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • E02D29/05Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench
    • E02D29/055Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench further excavation of the cross-section proceeding underneath an already installed part of the structure, e.g. the roof of a tunnel
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/1628Shapes rectangular

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

本発明は構造物を施工する方法において、地下構造物を地盤上部で施工し、地盤内部に沈下させて施工する構造物施工方法に関する。The present invention relates to a structure construction method in which an underground structure is constructed on the upper part of the ground and then subducted into the ground.

Description

本発明は構造物施工方法に関し、特に、構造物の中で地下に設置される地下構造物を地下で施工するのではなく地盤の上で施工して地盤の下に沈下させる方法による施工方法に関する。 The present invention relates to a structure construction method, and more particularly to a construction method by a method in which an underground structure installed underground in a structure is not constructed underground but is constructed on the ground and submerged under the ground. ..

地下水位が高かったり弱い地盤に地階を施工する場合には地下水の流出によって隣接するトンネル、ボックス構造物、地下鉄などの地下構造物だけでなく、地上構造物に深刻な損傷を誘発する虞がある。 When constructing a basement on a ground with high or weak groundwater level, the outflow of groundwater may cause serious damage not only to adjacent underground structures such as tunnels, box structures and subways, but also to above-ground structures. ..

所定の深さ以上を掘削する場合には、施工前に掘土審議などを通じて隣接構造物の安全性有無を一部確認している。しかしながら、実際施工の際には、土留め施設の崩壊による人命事故も頻繁に発生している。また、隣接構造物や道路などに割れ目や不等沈下、シンクホールなどが発生されている。 When excavating more than a predetermined depth, the safety of adjacent structures is partially confirmed through excavation deliberation before construction. However, during actual construction, life-threatening accidents frequently occur due to the collapse of the earth retaining facility. In addition, cracks, uneven subsidence, sinkholes, etc. have occurred in adjacent structures and roads.

さらに、最近には掘土審議対象ではない掘削深さが比較的深くない掘削現場でも土留め施設の崩壊または地下水の流出によって隣接建築物が崩壊されることが発生している。このように、都心地での地下構造物の施工のための掘削は非常に難しい作業である。従って、より安全で安定的な地下構造物施工のための掘削及び構造物の施工方法が要求される。 Furthermore, recently, even at excavation sites where the excavation depth is not relatively deep, which is not the subject of excavation deliberation, adjacent buildings have collapsed due to the collapse of earth retaining facilities or the outflow of groundwater. In this way, excavation for the construction of underground structures in the city center is a very difficult task. Therefore, excavation and structure construction methods for safer and more stable underground structure construction are required.

一般的に用いている地下掘削後に施工する地下構造物を図1に示す。図1に示すように、従来の施工方法は地下土砂を掘削した後に地下構造物を施工する方法である。即ち、敷地境界線に隣接して土留め壁500を設置し、掘削地域にセンターファイル700を設置する。その後、掘削とストラット600の設置を繰り返して地下掘削を完了する。そして、基礎、擁壁、地階などを施工しながらストラット600とセンターファイル700を除去して地下構造物を完成する。 Figure 1 shows a commonly used underground structure to be constructed after underground excavation. As shown in FIG. 1, the conventional construction method is a method of constructing an underground structure after excavating underground earth and sand. That is, the earth retaining wall 500 is installed adjacent to the site boundary line, and the center file 700 is installed in the excavation area. After that, excavation and installation of the strut 600 are repeated to complete the underground excavation. Then, the strut 600 and the center file 700 are removed while constructing the foundation, retaining wall, basement, etc. to complete the underground structure.

掘削する方法には多様な工法がある。地盤の条件によって土留め施工法も多様な方法が適用されており、地下水位の位置によって多様な遮水工法が適用されている。掘削が完了された後に地下構造物を施工する。または土留め仮設構造物を施工しながら構造物を上部から下部に施工するトップダウン方法を用いたりする。 There are various methods of excavation. Various methods are applied to the earth retaining method depending on the ground conditions, and various impermeable methods are applied depending on the position of the groundwater level. Underground structures will be constructed after excavation is completed. Alternatively, a top-down method is used in which the structure is constructed from the top to the bottom while the temporary earth retaining structure is constructed.

掘削した後に構造物を施工する従来の地下構造物施工方法は、安全性と経済性の面で次のような問題点があった。安全性の面で見ると、掘削による周辺施設物の被害と土留め構造物の崩壊による人命被害があった。経済性の面で土地を充分に利用することができなくて土留め工事による工事費用が無駄使いされていた。 The conventional underground structure construction method in which the structure is constructed after excavation has the following problems in terms of safety and economy. In terms of safety, there was damage to surrounding facilities due to excavation and human life damage due to the collapse of earth retaining structures. In terms of economy, the land could not be fully utilized and the construction cost for the earth retaining work was wasted.

即ち、土留め壁によって敷地境界線から所定距離離れた所に地下構造物を施工するしかなくて、相当量の地下面積を利用することができなくなって経済的損失が非常に大きいという問題があった。 That is, there is a problem that there is no choice but to construct an underground structure at a place separated from the boundary line of the site by a retaining wall, and a considerable amount of underground area cannot be used, resulting in a very large economic loss. rice field.

韓国公開特許第10-2013-0061368号公報は、建築物の地階や地下鉄などの地下構造物を構築したり地中管を埋設するための地下構造物施工方法に関するものであるが、つぼ掘りをして土留め構造を用いる構造であるため、上記のような問題点を解消することができなかった。 Korean Publication No. 10-2013-0061368 is related to the construction method of underground structures for constructing underground structures such as the basement of buildings and subways and burying underground pipes. Since the structure uses an earth retaining structure, the above-mentioned problems could not be solved.

従って、安全で、経済的で、迅速な構造物施工方法の開発が要求された。 Therefore, the development of a safe, economical and rapid structure construction method was required.

本発明は、上記のような従来技術の問題点を改善するために、工事現場周辺の安全を保障し、工事費用が節減され、工期が短縮されることができる効率的な構造物施工方法を提供することを目的とする。 The present invention provides an efficient structure construction method that can guarantee the safety around the construction site, reduce the construction cost, and shorten the construction period in order to improve the problems of the prior art as described above. The purpose is to provide.

本発明では、地下構造物を地盤上部で施工し、地盤内部に沈下させて施工する構造物施工方法において、前記構造物施工方法は、A)基礎板10及びファイル20を施工するステップと、B)ジャックダウン装置設置及び地階構造物施工ステップと、C)基礎板10下部掘削及び地下構造物沈下ステップと、D)ジャックダウン装置解体及びファイル20定着ステップと、を含み、前記ジャックダウン装置は前記基礎板10の上部に設置されて、前記ジャックダウン装置の力を調節することにより前記地下構造物の沈下量を制御することができ、前記基礎板10下部の掘削と地下構造物の沈下が並行して行われることができるようにすることを特徴とする、構造物施工方法を提供する。 In the present invention, in the structure construction method in which the underground structure is constructed at the upper part of the ground and subducted inside the ground, the structure construction method includes A) a step of constructing the foundation plate 10 and the file 20, and B. ) Jack-down device installation and basement structure construction step, C) foundation plate 10 lower excavation and underground structure subsidence step, D) jack-down device dismantling and file 20 fixing step, and the jack-down device is described above. Installed on the upper part of the foundation plate 10, the amount of subsidence of the underground structure can be controlled by adjusting the force of the jackdown device, and the excavation of the lower part of the base plate 10 and the subsidence of the underground structure are parallel. Provided is a method of constructing a structure, characterized in that it can be carried out.

また、本発明では、地下構造物を地盤上部で施工し、地盤内部に沈下させて施工する構造物施工方法において、前記構造物施工方法は、a)外郭基礎板50及びファイル20を施工するステップと、b)ジャックダウン装置を設置するステップと、c)外郭基礎板50下部掘削及び沈下ステップと、d)ジャックダウン装置解体及びファイル20定着ステップとを含み、前記ジャックダウン装置は前記外郭基礎板50の上部に設置されて、前記ジャックダウン装置の力を調節することにより前記地下構造物の沈下量を制御することができ、前記外郭基礎板50下部の掘削と地下構造物の沈下が並行して行われることができるようにすることを特徴とする、構造物施工方法を提供する。 Further, in the present invention, in the structure construction method in which the underground structure is constructed at the upper part of the ground and subducted inside the ground, the structure construction method is a) a step of constructing the outer foundation plate 50 and the file 20. And b) the step of installing the jack-down device, c) the step of excavating and sinking the lower part of the outer foundation plate 50, and d) the step of disassembling the jack-down device and fixing the file 20. Installed on the upper part of the 50, the amount of subsidence of the underground structure can be controlled by adjusting the force of the jackdown device, and the excavation of the lower part of the outer foundation plate 50 and the subsidence of the underground structure are parallel. Provided is a method of constructing a structure, characterized in that it can be carried out.

前記沈下は地下構造物の自重によって行われる。 The subsidence is carried out by the weight of the underground structure.

または、前記沈下は地下構造物の自重に加えて、追加外力によって行われる。 Alternatively, the subsidence is performed by an additional external force in addition to the own weight of the underground structure.

前記追加外力は、前記地下構造物に臨時荷重を載荷して荷重を増加させる方法と、地盤の中に設置したロックアンカー(rock anchor)またはアースアンカー(earth anchor)を用いる方法と、地盤の中に設置したファイルの周面摩擦力を利用する方法との中の何れか一つの方法によって発生する。 The additional external force can be applied by a method of loading a temporary load on the underground structure to increase the load, a method of using a rock anchor or an earth anchor installed in the ground, and a method of using the earth anchor in the ground. It is generated by one of the methods using the peripheral friction force of the file installed in.

前記掘削は、掘削装備を用いる方法と、ウォータージェット(water jet)を用いる方法と、地盤の土砂を吸入して排出する方法との中の何れか一つの方法によって行われる。 The excavation is carried out by one of a method using excavation equipment, a method using a water jet, and a method of sucking and discharging the earth and sand of the ground.

前記D)ステップ後に基礎板10及びファイル20の上部に追加基礎板を施工するステップをさらに含む。 The D) step further includes a step of constructing an additional foundation plate on top of the foundation plate 10 and the file 20.

前記d)ステップ後に外郭基礎板50及びファイル20の上部に追加基礎板を施工するステップをさらに含む。 The d) further includes a step of constructing an additional foundation plate on the outer foundation plate 50 and the upper part of the file 20 after the step.

本発明による構造物施工方法は次のような効果を奏する。 The structure construction method according to the present invention has the following effects.

第一、地下構造物の構造体となる掘削用壁体と外壁が構造体の機能をしながら、工事過程では土留め壁体として用いられることができるので、新築される隣近の土砂流出及び漏水が発生されなくなって周辺施設物の安全性が確保される。 First, the excavation wall and the outer wall, which are the structures of the underground structure, can be used as earth retaining walls in the construction process while functioning as the structure. Leakage will not occur and the safety of surrounding facilities will be ensured.

第二、従来の方法では、掘削する時に地下水が流入されると、これをポンピングして排出するため、周辺地下水位の低下によるシンクホール及び隣接構造物の安全性の問題が発生した。それに対して、本発明では、地下水を排出しないで、場合によってはウォータージェット(water jet)を利用しながら土砂を掘削するので、周辺地下水位の低下による問題が発生しない。 Second, in the conventional method, when groundwater flows in during excavation, it is pumped and discharged, which causes a problem of safety of sinkholes and adjacent structures due to a decrease in the surrounding groundwater level. On the other hand, in the present invention, since the earth and sand are excavated while using a water jet in some cases without discharging the groundwater, the problem due to the decrease in the surrounding groundwater level does not occur.

第三、本発明では、土留め仮施設を含む遮水工法が必要でなく、掘削による崩壊の危険がないので仮設構造物の不安定による問題点が全部解決される。 Third, in the present invention, the impermeable construction method including the temporary earth retaining facility is not required, and there is no danger of collapse due to excavation, so that all the problems due to the instability of the temporary structure are solved.

第四、土留め仮施設を設置しないので、土留め仮施設の設置と解体にかかる時間と費用を減少することができて、工期が短縮されて工事費用が節減される。 Fourth, since the temporary earth retaining facility is not installed, the time and cost required for the installation and dismantling of the temporary earth retaining facility can be reduced, the construction period can be shortened, and the construction cost can be reduced.

第五、地盤を掘削する前に掘削用壁体と外壁によって周辺地盤が堅固に支持されるので、周辺地盤の撹乱が発生しない。 Fifth, since the surrounding ground is firmly supported by the excavation wall and the outer wall before the ground is excavated, the surrounding ground is not disturbed.

第六、土留め壁を設置しなくて敷地境界線まで地下構造物を施工することができるので、土地の効用価値を高め、地下空間を最大限に利用することができる。 Sixth, since the underground structure can be constructed up to the boundary line of the site without installing the earth retaining wall, the utility value of the land can be increased and the underground space can be fully utilized.

第七、地下構造物の施工のためのファイルは工事中には地下構造物の沈下量を制御することができる支持台及びガイドの役割を果たし、工事が完了された後には永久構造物となって深基礎(deep foundation)の役割を果たすようになる。 Seventh, the file for the construction of the underground structure acts as a support and a guide that can control the amount of subsidence of the underground structure during the construction, and becomes a permanent structure after the construction is completed. It will play the role of deep foundation.

第八、油圧ジャッキを用いて地下構造物の沈下量を制御することができるので、精密施工が可能である。 Eighth, since the amount of subsidence of underground structures can be controlled using a hydraulic jack, precision construction is possible.

第九、土留め仮施設が必要でないので、土留め仮施設の崩壊による事故が防止される。 Ninth, since the temporary earth retaining facility is not required, accidents due to the collapse of the temporary earth retaining facility can be prevented.

従来技術である。It is a conventional technique. 本発明の第1実施例の過程を説明する図である。It is a figure explaining the process of 1st Embodiment of this invention. 本発明の第1実施例の過程を説明する図である。It is a figure explaining the process of 1st Embodiment of this invention. 本発明の第1実施例の過程を説明する図である。It is a figure explaining the process of 1st Embodiment of this invention. 本発明の第1実施例の過程を説明する図である。It is a figure explaining the process of 1st Embodiment of this invention. 本発明の第1実施例の過程を説明する図である。It is a figure explaining the process of 1st Embodiment of this invention. 本発明の第1実施例の過程を説明する図である。It is a figure explaining the process of 1st Embodiment of this invention. 本発明の第2実施例を説明する図である。It is a figure explaining the 2nd Embodiment of this invention. 本発明の第2実施例を説明する図である。It is a figure explaining the 2nd Embodiment of this invention. 本発明の第3実施例を説明する図である。It is a figure explaining the 3rd Embodiment of this invention. 本発明の第3実施例を説明する図である。It is a figure explaining the 3rd Embodiment of this invention. 基礎板、ファイル、油圧ジャッキの拡大図である。It is an enlarged view of a base plate, a file, and a hydraulic jack.

以下では添付図面を参照して本発明が属する技術分野において通常の知識を有する者が容易に実施することができるように本発明の実施例について詳しく説明する。しかしながら、本発明は様々な相異する形態に具現されることができ、ここで説明する実施例に限定されない。そして、図面で本発明を明確に説明するために説明と関係ない部分は省略し、明細書全体にかけて類似する部分に対しては類似する図面符号を付ける。明細書全体において、ある部分がある構成要素を「含む」とする時、これは特に反対される記載がない限り他の構成要素を除くのではなく、他の構成要素をさらに含むことができることを意味する。以下、添付図面を参照して本発明の好ましい実施例について詳しく説明する。 Hereinafter, examples of the present invention will be described in detail with reference to the accompanying drawings so that a person having ordinary knowledge in the technical field to which the present invention belongs can easily carry out the present invention. However, the invention can be embodied in a variety of different forms and is not limited to the examples described herein. Then, in order to clearly explain the present invention in the drawings, parts unrelated to the description are omitted, and similar drawing reference numerals are given to similar parts throughout the specification. When a component is referred to as "contains" in the entire specification, it may include other components, rather than excluding other components, unless otherwise stated. means. Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

従来には、地盤を掘削した後地下空間で地下構造物を施工する方法を用いた。それに対して、本発明は、地盤の上で地下構造物を施工した後、基礎板の下部を掘削しながら地下構造物を地盤内部に沈下させて構造物を施工する方法である。 Conventionally, a method of constructing an underground structure in an underground space after excavating the ground has been used. On the other hand, the present invention is a method of constructing an underground structure on the ground and then submerging the underground structure inside the ground while excavating the lower part of the foundation plate.

本発明の地下構造物100は、基礎板10、ファイル20、地階構造物を含む。前記地階構造物は1つ層であってもよく、2つ以上の複数の層であってもいい。第1、2実施例では前記地階構造物が地下2階構造物30と地下1階構造物40を含む場合を説明する。 The underground structure 100 of the present invention includes a foundation plate 10, a file 20, and a basement structure. The basement structure may be one layer or may be two or more layers. In the first and second embodiments, the case where the basement structure includes the basement second floor structure 30 and the basement first floor structure 40 will be described.

図2~図7には地下構造物100を施工する本発明の第1実施例が示されている。以下では、図2~図7を参照して地下2階を施工する場合について各施工ステップ別に詳しく説明する。 2 to 7 show a first embodiment of the present invention in which the underground structure 100 is constructed. In the following, the case of constructing the second basement floor will be described in detail for each construction step with reference to FIGS. 2 to 7.

(1)基礎板10の施工(図2参照)。 (1) Construction of the foundation plate 10 (see FIG. 2).

地盤の上に鉄筋コンクリートからなる基礎板10を施工する。図2に示すように、基礎板10の枠は敷地境界線400の真横や、敷地境界線400とほぼ一致するようにすることができる。 A foundation plate 10 made of reinforced concrete is constructed on the ground. As shown in FIG. 2, the frame of the foundation plate 10 can be set to be right next to the site boundary line 400 or substantially coincide with the site boundary line 400.

地下構造物の外壁が土留として活用される工法であるので、別途の土留壁が必要でなく、基礎板及び地下構造物の外壁は最大限に敷地境界線と接するように施工して地下空間を最大化することができるようにする。 Since the outer wall of the underground structure is used as an earth retaining wall, no separate earth retaining wall is required, and the foundation plate and the outer wall of the underground structure are constructed so as to be in contact with the site boundary line as much as possible to create an underground space. Allows you to maximize.

まず、基礎板10を施工した後にファイル20を施工するので、基礎板にはファイル20を施工することができる穴を形成する必要がある。従って、基礎板を施工する時にファイル20施工用穴を形成するためのスリーブを予め設置する。スリーブとしては鋼管を用いることができる。 First, since the file 20 is constructed after the foundation plate 10 is constructed, it is necessary to form a hole in the foundation plate on which the file 20 can be constructed. Therefore, when constructing the foundation plate, a sleeve for forming a hole for constructing the file 20 is installed in advance. A steel pipe can be used as the sleeve.

地下構造物の沈下が終わると、ファイル20の上部を基礎板に定着させるための空間を作るために、基礎板に所定の厚さだけ溝を形成してブロックアウト11(図12参照)を形成する。ファイルを定着させた後、前記ブロックアウト11にグラウティングして仕上げる。 When the subsidence of the underground structure is completed, a groove is formed in the foundation plate by a predetermined thickness to form a blockout 11 (see FIG. 12) in order to create a space for fixing the upper part of the file 20 to the foundation plate. do. After fixing the file, it is grounded to the blockout 11 to finish it.

基礎板10の下部枠には掘削用壁体12を備えることができる。前記掘削用壁体12は掘削作業時に土留め用壁体として活用されることができる。そして前記掘削用壁体12の下端には先端が傾斜した先端シュー13を備えて地下構造物が地盤内に容易に根入れされることができるようにする。 The lower frame of the foundation plate 10 can be provided with a wall body 12 for excavation. The excavation wall body 12 can be utilized as an earth retaining wall body during excavation work. A tip shoe 13 having an inclined tip is provided at the lower end of the excavation wall 12 so that the underground structure can be easily rooted in the ground.

前記先端シュー13は永久型形態の鉄板を用いてもよく、コンクリート断面を傾斜するように形成してもよい。 The tip shoe 13 may use a permanent iron plate, or may be formed so that the concrete cross section is inclined.

前記掘削用壁体12を先に施工した後、前記掘削用壁体12と基礎板10が一体になるように基礎板コンクリートを打設する。 After the excavation wall body 12 is constructed first, the foundation plate concrete is placed so that the excavation wall body 12 and the foundation plate 10 are integrated.

基礎板10を施工する時には、地下構造物の荷重を計算して必要な数量だけのジャックダウン用アンカー310を予め設置することができる(図12参照)。アンカー310の数量及び容量は地下構造物の重量及び沈下する時に発生する荷重によって適用することができる。 When constructing the foundation plate 10, the load of the underground structure can be calculated and a required number of jackdown anchors 310 can be installed in advance (see FIG. 12). The quantity and capacity of the anchors 310 can be applied by the weight of the underground structure and the load generated during subsidence.

アンカー310の下端末にはアンカーを基礎板に固定させるアンカー固定具311が備えられるが、前記アンカー固定具311は基礎板10内に埋められるように設置されるか、基礎板10の下部に固定されることができるようにする。 The lower terminal of the anchor 310 is provided with an anchor fixing tool 311 for fixing the anchor to the base plate, and the anchor fixing tool 311 is installed so as to be buried in the base plate 10 or fixed to the lower part of the base plate 10. To be able to be.

ジャックダウン用アンカー310を予め設置したことについて説明したが、場合によって、アンカーを予め設置しないで、基礎板を施工した後にケミカルアンカー(登録商標)を施工し、その後ジャックダウンすることも可能である。 Although it has been explained that the anchor 310 for jackdown is installed in advance, in some cases, it is possible to install the chemical anchor (registered trademark) after constructing the foundation plate without installing the anchor in advance, and then jack down. ..

基礎板の厚さはジャックダウンに必要な荷重と地下構造物の構造的安全性を考慮して決める。 The thickness of the foundation plate is determined in consideration of the load required for jackdown and the structural safety of the underground structure.

(2)ファイル20の施工(図2参照)。 (2) Construction of file 20 (see FIG. 2).

基礎板10が設置されると、スリーブによって形成されたファイル20施工用穴にファイル20を施工する。ファイル20は鋼管ファイル、既成鉄筋コンクリートファイル、PHCファイル、複合ファイル、現場打ちコンクリート杭などを用いることができる。ファイルの設置は杭打ち、掘削後の埋め込みなどの方法を用いることができる。ファイルは先端支持力を発揮することができる地下岩盤層まで設置する。 When the base plate 10 is installed, the file 20 is installed in the file 20 construction hole formed by the sleeve. As the file 20, a steel pipe file, a ready-made reinforced concrete file, a PHC file, a composite file, a cast-in-place concrete pile, or the like can be used. Files can be installed by using methods such as pile driving and embedding after excavation. The file is installed up to the underground bedrock layer that can exert the tip bearing capacity.

地下構造物が完工された後、前記ファイル20を深基礎(deep foundation)として用いない場合、即ち、ファイル基礎ではない直接基礎(spread foundation)の場合には地下構造物のジャックダウンに必要な最小限の仮設ファイルのみ施工することが好ましい。 After the underground structure is completed, if the file 20 is not used as a deep foundation, that is, if it is a direct foundation that is not a file foundation, the minimum required for jacking down the underground structure. It is preferable to construct only the limited temporary files.

ファイル基礎に設計される地下構造物の場合、全てのファイルにジャックダウン装置を設置しないで、地下構造物をジャックダウン(jack down)するのに必要な数だけのファイルのみに設置することができる。このときに適用される荷重はジャックダウンシ時に施工された地下構造物の自重と浮力による減少量を考慮して適用する。 Underground structures designed on a file basis can be installed in only as many files as necessary to jack down the underground structure, without installing a jackdown device in every file. .. The load applied at this time is applied in consideration of the weight of the underground structure constructed at the time of jackdown and the amount of decrease due to buoyancy.

直接基礎に設計される地下構造物の場合、ジャックダウンに必要な最小限のファイルを施工してジャックダウンに活用する。このときに適用される荷重はジャックダウンシ時に施工された地下構造物の自重と浮力による減少量を考慮して適用する。 In the case of an underground structure designed directly on the foundation, the minimum files required for jackdown are constructed and used for jackdown. The load applied at this time is applied in consideration of the weight of the underground structure constructed at the time of jackdown and the amount of decrease due to buoyancy.

(3)ジャックダウン装置設置及び地下2階構造物30の施工(図3参照) (3) Installation of jack-down device and construction of structure 30 on the second basement floor (see Fig. 3)

地下構造物の沈下量と沈下速度を制御することができるジャックダウン装置を設置し、地下2階構造物30を施工する。この時、作業を効率的に行って工期を短縮させるために、ジャックダウン装置設置作業と同時に地下2階構造物30の施工作業を並行することもできる。 A jack-down device capable of controlling the subsidence amount and subsidence speed of the underground structure will be installed, and the underground second floor structure 30 will be constructed. At this time, in order to efficiently perform the work and shorten the construction period, the construction work of the basement second floor structure 30 can be performed in parallel with the jackdown device installation work.

図12にはジャックダウン装置が示されているが、ファイル20の上部に加圧台330が固定されており、前記加圧台330の上に油圧ジャッキ300が設置されている。アンカー310の下端はアンカー固定具311によって基礎板10に固定されており、アンカー310の上端は加圧板320に締結されている。アンカー310の上端と加圧板320の締結はナットを用いることができる。前記油圧ジャッキ300が加圧板320を押す力を調節することにより基礎板の沈下量を精密に制御することができる。 Although the jack-down device is shown in FIG. 12, the pressurizing table 330 is fixed to the upper part of the file 20, and the hydraulic jack 300 is installed on the pressurizing table 330. The lower end of the anchor 310 is fixed to the base plate 10 by the anchor fixture 311 and the upper end of the anchor 310 is fastened to the pressure plate 320. A nut can be used to fasten the upper end of the anchor 310 and the pressure plate 320. By adjusting the force with which the hydraulic jack 300 pushes the pressure plate 320, the amount of subsidence of the base plate can be precisely controlled.

図12に示されたジャックダウン装置は一実施例を示したもので、油圧ジャッキ、アンカー、加圧板、加圧台は他の構造でも結合されることができることは勿論である。 The jack-down device shown in FIG. 12 shows an embodiment, and it goes without saying that the hydraulic jack, the anchor, the pressure plate, and the pressure table can be connected to other structures.

前記地下2階構造物30は底板31、外壁32、柱33を含むことができる。前記外壁32は地下構造物の外部壁体の機能と土留め壁体としての機能を同時にすることができる。前記柱33は底板31を支持する柱、壁体を含む。 The basement second floor structure 30 can include a bottom plate 31, an outer wall 32, and a pillar 33. The outer wall 32 can simultaneously function as an outer wall body of an underground structure and a retaining wall body. The pillar 33 includes a pillar and a wall body that support the bottom plate 31.

(4)基礎板10下部掘削及び地下構造物ジャックダウン(図3、4参照) (4) Excavation of the lower part of the foundation plate 10 and jackdown of underground structures (see FIGS. 3 and 4)

ジャックダウン装置の設置が完了された後、基礎板の下部を掘削すれば基礎板と地下2階構造物の自重によって自然に沈下するようになる。 After the installation of the jack-down device is completed, if the lower part of the foundation plate is excavated, it will naturally sink due to the weight of the foundation plate and the second basement floor structure.

基礎板下部を掘削する方法は下部の地盤条件によって多様な方法を用いることができる。 As a method of excavating the lower part of the foundation plate, various methods can be used depending on the ground conditions of the lower part.

軟弱地盤の場合、基礎板下部を吸入する方法で下部土砂を除去することができる。土砂が除去される時、構造物が不等沈下しないように沈下量を精密に計測しながらジャックダウン装置を制御する。一定量が掘削された後ジャックダウン装置を利用して構造物を沈下させるようになる。この工程を繰り返して施工しようとする位置に地下構造物を位置させる。粘土の粘性及び水分含量によって吸入に容易にウォータージェット(water jet)及び撹拌を実施する。吸入された泥水は脱水過程を経て土砂と水に分離される。この時、分離された土砂は土捨場に搬出され、分離された水は現場に再使用する方法を選択して環境汚染を防止することができる。 In the case of soft ground, the lower sediment can be removed by sucking the lower part of the foundation plate. When the earth and sand are removed, the jack-down device is controlled while precisely measuring the amount of subsidence so that the structure does not settle unevenly. After a certain amount has been excavated, a jackdown device will be used to subside the structure. The underground structure is positioned at the position where the construction is to be repeated by repeating this process. Water jets and agitation are easily carried out for inhalation due to the viscosity and water content of the clay. The inhaled muddy water is separated into earth and sand and water through a dehydration process. At this time, the separated earth and sand are carried out to the dumping site, and the separated water can be reused at the site to prevent environmental pollution.

基礎板下部地盤が比較的良好な場合には、必要によってウォータージェット(water jet)+吸入(Suction)または脱水(Dewater)工法を追加適用するか掘削を並行して構造物を沈下させる。 If the ground below the foundation plate is relatively good, additional water jet + suction or dewatering methods may be applied or excavation may be performed in parallel to submerge the structure.

基礎板下部が岩のように堅い場合には基礎板に装備出入口14を形成して、掘削装備などを利用して基礎板下部を掘削した後構造物をダウンさせる。 When the lower part of the foundation plate is hard like a rock, an equipment entrance / exit 14 is formed in the foundation plate, and after excavating the lower part of the foundation plate using excavation equipment or the like, the structure is brought down.

(5)地下1階構造物40の施工(図5参照) (5) Construction of structure 40 on the first basement floor (see Fig. 5)

基礎板の上に地下2階構造物30が載せられた後必要な深さだけ沈下が完了されると(図4)、前記地下2階構造物30の上に地下1階構造物40を地上で施工する(図5)。 When the subsidence is completed to the required depth after the second basement floor structure 30 is placed on the foundation plate (FIG. 4), the first basement floor structure 40 is placed above the ground on the second basement floor structure 30. (Fig. 5).

前記地下1階構造物40は底板41、外壁42、柱43を含むことができる。前記外壁42も地下構造物の外部壁体の機能と土留め壁体としての機能を同時に果たすようになる。前記柱43は底板41を支持する柱、壁体を含む。 The basement first floor structure 40 can include a bottom plate 41, an outer wall 42, and a pillar 43. The outer wall 42 also functions as an outer wall body of the underground structure and as a retaining wall body at the same time. The pillar 43 includes a pillar and a wall body that support the bottom plate 41.

(6)基礎板10下部掘削及び地下構造物ジャックダウン繰り返し(図5、6参照) (6) Excavation of the lower part of the foundation plate 10 and repeated jackdown of underground structures (see FIGS. 5 and 6)

前記地下1階構造物40を施工した後、基礎板下部を掘削しながらジャックダウン装置を制御して地下構造物を沈下させる。必要な深さまで沈下を行う(図6)。 After constructing the first basement floor structure 40, the jackdown device is controlled to sink the underground structure while excavating the lower part of the foundation plate. Settle to the required depth (Fig. 6).

(7)沈下完了、ジャックダウン装置解体及びファイル定着(図7参照) (7) Completion of subsidence, dismantling of jack-down device and file fixing (see Fig. 7)

必要な深さまで沈下が完了されるとジャックダウン装置を解体する。アンカー310を切断し、アンカー310とファイル20の上端を固定させた後、ブロックアウト11にグラウティングしてファイルを基礎板に定着させる。 Dismantle the jackdown device when subsidence is complete to the required depth. After cutting the anchor 310 and fixing the anchor 310 and the upper end of the file 20, the file is fixed to the base plate by grounding to the blockout 11.

前記(1)~(7)の過程を経た後、必要によって地下構造物の内部工事と地上構造物の工事をすれば構造物の施工が完了される。 After going through the steps (1) to (7) above, if necessary, the internal work of the underground structure and the work of the above-ground structure are performed to complete the construction of the structure.

図8、9には地下構造物100を施工する本発明の第2実施例が示されている。 8 and 9 show a second embodiment of the present invention in which the underground structure 100 is constructed.

第2実施例では、ファイル20を先に施工した後、基礎板10を施工する。即第2実施例では前記(2)を先に行った後、(1)を行う。そして、(3)~(7)と同じ過程を行う。 In the second embodiment, the file 20 is constructed first, and then the foundation plate 10 is constructed. Immediately in the second embodiment, (1) is performed after the above (2) is performed first. Then, the same process as (3) to (7) is performed.

第1、2実施例では、地下1階構造物と地下2階構造物を形成する過程について説明したが、本発明は地下1階構造物と地下2階構造物に限定されない。即ち、地下1階構造物のみ形成することもでき、上記説明した(4)、(5)過程を繰り返して地下2階以上の複数の地階を形成することもできる。 In the first and second embodiments, the process of forming the first basement floor structure and the second basement floor structure has been described, but the present invention is not limited to the first basement floor structure and the second basement floor structure. That is, it is possible to form only the structure of the first basement floor, or it is possible to form a plurality of basement floors of the second basement floor or more by repeating the processes (4) and (5) described above.

図10、11には地下構造物100を施工する本発明の第3実施例が示されている。 FIGS. 10 and 11 show a third embodiment of the present invention in which the underground structure 100 is constructed.

第3実施例は、地下構造物を施工する面積が広い場合に適用することができる実施例である。即ち地下構造物の平面面積が広い場合には基礎板全体を一つに形成して沈下させる作業が難しい場合があり、基礎板が破損される虞があって、むしろ非効率な場合がある。 The third embodiment is an embodiment that can be applied when the area where the underground structure is constructed is large. That is, when the plane area of the underground structure is large, it may be difficult to form the entire foundation plate into one and sink it, and the foundation plate may be damaged, which may be rather inefficient.

この場合には、敷地境界線400で所定幅に対して外郭基礎板50を施工し、前述したのと同じ方法で外郭基礎板50を沈下させる方法である。外郭基礎板50の上部には外郭地階構造物60を施工して沈下させることができる。この時、外郭基礎板50下部の土砂を掘削しながら外郭基礎板を沈下させる。外郭基礎板の沈下が完了されると、基礎板と地階構造物を施工する。 In this case, the outer foundation plate 50 is constructed at the site boundary line 400 with respect to a predetermined width, and the outer foundation plate 50 is subsided by the same method as described above. An outer basement structure 60 can be constructed and subsided on the upper part of the outer foundation plate 50. At this time, the outer foundation plate is subsided while excavating the earth and sand at the bottom of the outer foundation plate 50. When the subsidence of the outer foundation plate is completed, the foundation plate and the basement structure will be constructed.

この時、外郭基礎板50の内部にある内部土砂はそのまま置いた後地下構造物の沈下が完了された後内部土砂を掘削することができる。また、外郭基礎板50を一定量沈下させながら内部土砂も一緒に掘削することもできる。 At this time, the internal sediment inside the outer foundation plate 50 can be left as it is, and then the internal sediment can be excavated after the subsidence of the underground structure is completed. Further, it is also possible to excavate the internal earth and sand together while sinking the outer foundation plate 50 by a certain amount.

第3実施例で外郭基礎板50を施工した後、ファイル20を設置することもでき、ファイル20を先に設置した後、外郭基礎板50を施工することもできる。 The file 20 can be installed after the outer foundation plate 50 is installed in the third embodiment, and the outer foundation plate 50 can be installed after the file 20 is installed first.

前記実施例で、基礎板10または外郭基礎板50を一つの階に施工することで説明したが、場合によって沈下が完了された後、基礎板10または外郭基礎板50の上に追加基礎板をさらに形成することもできる。 In the above embodiment, the foundation plate 10 or the outer foundation plate 50 has been described by constructing it on one floor, but in some cases, after the subsidence is completed, an additional foundation plate is placed on the foundation plate 10 or the outer foundation plate 50. It can also be formed further.

即ち、コンクリートファイルまたは直径が大きいファイルをファイル基礎として用いる場合には、ファイルによって基礎板10の鉄筋配筋が難しい可能性があり、ファイルの上部が基礎板に堅固に定着されにくいので、沈下が完了された後に基礎板10の上に追加基礎板を施工することが好ましい。追加基礎板を施工する場合には、ジャックダウン用基礎板10は最大限に薄く施工する。地下構造物の沈下が終わり、ファイルと基礎板10を定着させた後、ファイルの上部と基礎板10の上部に鉄筋を配筋した後マット(追加基礎板)を打設して追加基礎板を施工する。 That is, when a concrete file or a file with a large diameter is used as the file foundation, it may be difficult to arrange the reinforcing bars of the foundation plate 10 depending on the file, and the upper part of the file is difficult to be firmly fixed to the foundation plate, so that subsidence occurs. It is preferable to install an additional foundation plate on the foundation plate 10 after completion. When constructing an additional foundation plate, the jackdown foundation plate 10 is constructed as thin as possible. After the subsidence of the underground structure is completed and the file and the foundation plate 10 are fixed, after arranging reinforcing bars on the upper part of the file and the upper part of the foundation plate 10, a mat (additional foundation plate) is placed to make an additional foundation plate. To construct.

基礎板10の上に追加基礎板を施工する場合には、基礎全体の配筋及び厚さを考慮して地下構造物の層高に反映する。追加基礎板を施工することにより直径が大きいファイルを施工してもマットの十分な剛性を得ることができる。そして追加基礎板を施工する場合には、追加基礎板と基礎板10の連結、追加基礎板と壁体及び柱の連結部を予め考慮して配筋される位置に鉄筋を予め施工しなければならない。 When constructing an additional foundation plate on the foundation plate 10, it is reflected in the layer height of the underground structure in consideration of the reinforcement arrangement and thickness of the entire foundation. By constructing an additional foundation plate, sufficient rigidity of the mat can be obtained even if a file with a large diameter is constructed. When constructing the additional foundation plate, the reinforcing bars must be constructed in advance at the positions where the reinforcements are arranged in consideration of the connection between the additional foundation plate and the foundation plate 10 and the connection portion between the additional foundation plate and the wall body and the column. It doesn't become.

一方、鋼管ファイルを用いる場合には、ファイルの直径が基礎板鉄筋配筋に干渉されるほどではないので、追加基礎板を必要とせず、基礎板10のみ用いることができる。 On the other hand, when the steel pipe file is used, the diameter of the file is not so much that it interferes with the reinforcing bar arrangement of the foundation plate, so that no additional foundation plate is required and only the foundation plate 10 can be used.

一方、地下構造物を沈下させる時に地下構造物の自重だけでは沈下が難しい場合がある。このような場合には次のような方法を用いて沈下させることができる。 On the other hand, when subsidence of an underground structure, it may be difficult to subside by the weight of the underground structure alone. In such a case, it can be subsided by using the following method.

第一、荷重を追加する方法を用いることができる。基礎板または地下構造物の上部に臨時荷重を載荷して荷重を増加させる方法を用いることができる。 First, a method of adding a load can be used. A method of increasing the load by loading a temporary load on the foundation plate or the upper part of the underground structure can be used.

第二、地盤の中にロックアンカー(rock anchor)またはアースアンカー(earth anchor)を設置し、ロックアンカーまたはアースアンカーを繰り上げて沈下させる方法である。 The second method is to install a rock anchor or an earth anchor in the ground and raise the lock anchor or the earth anchor to sink them.

第三、設置されたファイルの周面摩擦力を利用する方法である。油圧ジャッキを収縮すればファイルは周面摩擦力によって地盤の中に固定されているので、基礎板を下方へ引く力が発生する。 The third method is to utilize the frictional force on the peripheral surface of the installed file. When the hydraulic jack is contracted, the file is fixed in the ground by the frictional force on the peripheral surface, so a force that pulls the foundation plate downward is generated.

本発明は図面に示された実施例を参考にして説明されたが、これは例示的なものに過ぎず、本技術分野における通常の知識を有する者であればこれから多様な変形及び均等な他の実施例が可能であるという点を理解すべきである。従って、本発明の真の技術的保護範囲は特許請求範囲の技術的思想によって定められるべきである。 The present invention has been described with reference to the embodiments shown in the drawings, but this is merely exemplary, and any person with ordinary knowledge in the art will now be able to make various modifications and uniforms. It should be understood that the embodiment of is possible. Therefore, the true technical protection scope of the present invention should be determined by the technical idea of the claims.

100 地下構造物
10 基礎板
11 ブロックアウト
12 掘削用壁体
13 先端シュー
14 装備出入口
20 ファイル
30 地下2階構造物
31 底板
32 外壁
33 柱
34 地下2階
40 地下1階構造物
41 底板
42 外壁
43 柱
44 地下1階
50 外郭基礎板
60 外郭地階構造物
300 油圧ジャッキ
310 アンカー
311 アンカー固定具
320 加圧板
330 加圧台
400 敷地境界線
500 土留め壁
600 ストラット
700 センターファイル
100 Underground structure 10 Basement plate 11 Block out 12 Excavation wall 13 Tip shoe 14 Equipment entrance / exit 20 File 30 Underground 2nd floor structure 31 Bottom plate 32 Outer wall 33 Pillar 34 Underground 2nd floor 40 Underground 1st floor structure 41 Bottom plate 42 Outer wall 43 Pillar 44 Basement 1st floor 50 Outer basement plate 60 Outer basement structure 300 Hydraulic jack 310 Anchor 311 Anchor fixture 320 Pressurizing plate 330 Pressurizing stand 400 Site boundary line 500 Retaining wall 600 Strut 700 Center file

Claims (8)

地下構造物を地盤上部で施工し、地盤内部に沈下させて施工する構造物施工方法において、
前記構造物施工方法は、
A)基礎板(10)及びファイル(20)を施工するステップと、
B)ジャックダウン装置の設置及び地階構造物の施工ステップと
C)基礎板(10)下部掘削及び地下構造物沈下ステップと
D)ジャックダウン装置の解体及びファイル(20)の定着ステップとを含み、
前記ジャックダウン装置は前記基礎板(10)の上部に設置されて、前記ジャックダウン装置の力を調節することにより前記地下構造物の沈下量を制御することができ、
前記基礎板(10)下部の掘削と地下構造物の沈下が並行して行われることができるようにすることを特徴とする、構造物施工方法。
In the structure construction method in which an underground structure is constructed at the upper part of the ground and submerged inside the ground.
The structure construction method is
A) Steps to construct the foundation plate (10) and file (20),
B) Installation of jackdown equipment and construction steps of basement structure, C) Foundation plate (10) Lower excavation and subsidence of underground structure, and D) Dismantling of jackdown equipment and fixing step of file (20).
The jack-down device is installed on the upper part of the base plate (10), and the subsidence amount of the underground structure can be controlled by adjusting the force of the jack-down device.
A structure construction method, characterized in that excavation of the lower part of the foundation plate (10) and subsidence of an underground structure can be performed in parallel.
地下構造物を地盤上部で施工し、地盤内部に沈下させて施工する構造物施工方法において、
前記構造物施工方法は、
a)外郭基礎板(50)及びファイル(20)を施工するステップと、
b)ジャックダウン装置を設置するステップと、
c)外郭基礎板(50)下部掘削及び沈下ステップと、
d)ジャックダウン装置解体及びファイル(20)定着ステップと、を含み、
前記ジャックダウン装置は前記外郭基礎板(50)の上部に設置されて、前記ジャックダウン装置の力を調節することにより前記地下構造物の沈下量を制御することができ、
前記外郭基礎板(50)下部の掘削と地下構造物の沈下が並行して行われることができるようにすることを特徴とする構造物施工方法。
In the structure construction method in which an underground structure is constructed at the upper part of the ground and submerged inside the ground.
The structure construction method is
a) Steps to construct the outer foundation plate (50) and file (20),
b) Steps to install the jackdown device and
c) Outer foundation plate (50) Lower excavation and subsidence step,
d) Includes jackdown device dismantling and file (20) fixing steps.
The jack-down device is installed on the upper part of the outer foundation plate (50), and the subsidence amount of the underground structure can be controlled by adjusting the force of the jack-down device.
A structure construction method characterized in that excavation of the lower part of the outer foundation plate (50) and subsidence of an underground structure can be performed in parallel.
前記沈下は地下構造物の自重によって行われることを特徴とする請求項1または2に記載の構造物施工方法。 The structure construction method according to claim 1 or 2, wherein the subsidence is performed by the weight of the underground structure. 前記沈下は地下構造物の自重に加えて、追加外力によって行われることを特徴とする請求項1または2に記載の構造物施工方法。 The structure construction method according to claim 1 or 2, wherein the subsidence is performed by an additional external force in addition to the own weight of the underground structure. 前記追加外力は、前記地下構造物に臨時荷重を載荷して荷重を増加させる方法と
地盤の中に設置したロックアンカー(rock anchor)またはアースアンカー(earth anchor)を用いる方法と、
地盤の中に設置したファイルの周面摩擦力を利用する方法と、の中の何れか一つの方法によって発生することを特徴とする請求項4に記載の構造物施工方法。
The additional external force can be applied by a method of loading a temporary load on the underground structure to increase the load, a method of using a rock anchor or an earth anchor installed in the ground, and a method of using an earth anchor.
The structure construction method according to claim 4, wherein the method is generated by one of a method using the peripheral frictional force of a file installed in the ground and one of the methods.
前記掘削は、
掘削装備を用いる方法と、
ウォータージェット(water jet)を用いる方法と、
地盤の土砂を吸入して排出する方法と、の中の何れか一つの方法によって行われることを特徴とする請求項1または2に記載の構造物施工方法。
The excavation
How to use excavation equipment and
A method using a water jet and
The structure construction method according to claim 1 or 2, wherein the method is performed by inhaling and discharging the earth and sand of the ground, and by any one of the methods.
前記D)ステップ後に基礎板(10)及びファイル(20)の上部に追加基礎板を施工するステップをさらに含むことを特徴とする請求項1に記載の構造物施工方法。 D) The structure construction method according to claim 1, further comprising a step of constructing an additional foundation plate on the upper part of the foundation plate (10) and the file (20) after the step. 前記d)ステップ後に外郭基礎板(50)及びファイル(20)の上部に追加基礎板を施工するステップをさらに含むことを特徴とする請求項2に記載の構造物施工方法。 D) The structure construction method according to claim 2, further comprising a step of constructing an additional foundation plate on the upper part of the outer foundation plate (50) and the file (20) after the step.
JP2021539593A 2019-01-07 2019-10-04 Structure construction method Pending JP2022517333A (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
KR10-2019-0001641 2019-01-07
KR1020190001641A KR101960413B1 (en) 2019-01-07 2019-01-07 Structure construction method
PCT/KR2019/013075 WO2020145483A1 (en) 2019-01-07 2019-10-04 Method for constructing structure

Publications (1)

Publication Number Publication Date
JP2022517333A true JP2022517333A (en) 2022-03-08

Family

ID=66036173

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021539593A Pending JP2022517333A (en) 2019-01-07 2019-10-04 Structure construction method

Country Status (6)

Country Link
US (1) US20220098817A1 (en)
JP (1) JP2022517333A (en)
KR (1) KR101960413B1 (en)
CN (1) CN113614315A (en)
SG (1) SG11202107482SA (en)
WO (1) WO2020145483A1 (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101960413B1 (en) * 2019-01-07 2019-03-20 김준성 Structure construction method
KR102199641B1 (en) 2019-09-19 2021-01-07 김성수 Construction method of driven pile for newly built structure
KR102113117B1 (en) * 2019-10-22 2020-05-20 김준성 Structure construction method using guide wall
KR102215027B1 (en) 2020-08-31 2021-02-10 김상우 Construction method of structure using ground bearing capacity
CN112502464B (en) * 2020-11-23 2022-07-05 上海建工二建集团有限公司 Reverse construction method for extension basement under existing building
CN115467367B (en) * 2022-08-17 2023-06-16 湖北工业大学 Construction method for actively compensating deformation of underpass operation tunnel in upper engineering construction
KR102522619B1 (en) * 2023-01-26 2023-04-17 주식회사 선공 Upward basement structure demolition method
KR102595013B1 (en) * 2023-02-09 2023-10-26 노경범 Construction Method of Underground Road to Minimize Traffic Control
US11946217B1 (en) * 2023-09-18 2024-04-02 China Railway Tunnel Group Co., Ltd. Top plate jacking device and jacking construction method configured for V-shaped columns

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05247951A (en) * 1992-01-30 1993-09-24 Yuan Hoo Lee Construction method of basement of building and traction device used therefor
JP2688560B2 (en) * 1993-06-29 1997-12-10 戸田建設株式会社 Construction method of underground structure
JP3430376B2 (en) * 1993-12-22 2003-07-28 大成建設株式会社 How to build an underground skeleton
JPH09302683A (en) * 1996-05-11 1997-11-25 Fujikou:Kk Construction method for basement
KR100641960B1 (en) * 2005-02-16 2006-11-06 이성우 Form for Footing Structure using Fiber Reinforced Composites Panel of Tubular Profile And Method for Constructing Footing Structure using such Form
KR101034398B1 (en) * 2007-06-28 2011-05-16 (주)바로건설기술 Land-side protection wall that use ground structure
CN101418573B (en) * 2008-01-24 2012-09-05 丁慈鑫 Caisson structure and method for smoothly and accurately sinking caisson structure into earth surface
CN101851930B (en) * 2010-01-15 2012-10-03 丁慈鑫 Sinking device of open caisson and sinking method of open caisson with same
JP4942230B1 (en) * 2010-11-29 2012-05-30 賢治 町筋 Submersible method and equipment for submerged method
KR20130061368A (en) 2011-12-01 2013-06-11 정진덕 Structure of retaining wall and construction method for installing underground structures
CN107842046A (en) * 2017-11-27 2018-03-27 杨孝 A kind of strengthening of foundation error-correction structure and the method for strengthening of foundation correction
KR101960413B1 (en) * 2019-01-07 2019-03-20 김준성 Structure construction method

Also Published As

Publication number Publication date
KR101960413B1 (en) 2019-03-20
SG11202107482SA (en) 2021-08-30
US20220098817A1 (en) 2022-03-31
CN113614315A (en) 2021-11-05
WO2020145483A1 (en) 2020-07-16

Similar Documents

Publication Publication Date Title
JP2022517333A (en) Structure construction method
KR100964796B1 (en) Method for constructing the steel pipe-concrete composite pile structurized of burying and unifying into the bedrock, and a pile construction
KR101070426B1 (en) Improved Underpinning Method Using the micro pile
KR101545307B1 (en) Construction method of complex temporary facility with bottom grouting for weak ground
CN104264683B (en) Building concave shape ultra-deep foundation pit subregion supporting method is protected for three around literary composition
CN206428707U (en) A kind of integrated pile tube dado structure of pattern foundation pit supporting structure precipitation
KR20070024148A (en) Pass way construction method below the existing foundation
JP5038170B2 (en) How to rebuild a structure
JP2012112121A (en) Excavation method of ground under spread foundation and base-isolating method of existing building
KR102522619B1 (en) Upward basement structure demolition method
CN101161947A (en) Integration method of lagging pile and dewatering well for foundation ditch support
CN108179759A (en) The underwater drill core slotting of driftway is without bottom sealing method
CN111827705A (en) Method for expanding well barrel-shaped underground garage in existing underground garage
AU2020100004A4 (en) A Method Of Constructing A Column, A Subterranean Structure, And A Structure Made From The Method
KR100615149B1 (en) A method of construction top-down for the ground fabric construction
KR100663109B1 (en) Method for Constructing an Underground Structure Using Up-down Method
KR20050113450A (en) Downward reinforced-concrete underground structure using temporary assistant columns
JP6259271B2 (en) Caisson installation method and underground column body group
KR102113117B1 (en) Structure construction method using guide wall
KR101257905B1 (en) Method for constructing foundation work
JP2000110171A (en) Settling method for underground construction
CN205857212U (en) Corrugated steel cofferdam borehole hollow pile
KR20130015032A (en) The buoyancy protection device of a steel pipe piles and thereof construction method
JP7342343B2 (en) How to install piles
CN114934518B (en) Deep foundation pit reinforcement method combining reverse pile, decompression and grouting