JP2021116619A - Steel guide wall - Google Patents

Steel guide wall Download PDF

Info

Publication number
JP2021116619A
JP2021116619A JP2020011325A JP2020011325A JP2021116619A JP 2021116619 A JP2021116619 A JP 2021116619A JP 2020011325 A JP2020011325 A JP 2020011325A JP 2020011325 A JP2020011325 A JP 2020011325A JP 2021116619 A JP2021116619 A JP 2021116619A
Authority
JP
Japan
Prior art keywords
shaped steel
steel
guide wall
connecting member
web
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2020011325A
Other languages
Japanese (ja)
Other versions
JP7284720B2 (en
Inventor
克成 小林
Katsunari Kobayashi
克成 小林
隆志 近藤
Takashi Kondo
隆志 近藤
史典 小原
Fuminori Obara
史典 小原
康介 八重尾
Kosuke Yaeo
康介 八重尾
暢亮 有江
Nobuaki Arie
暢亮 有江
隆 福島
Takashi Fukushima
隆 福島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Chemical Grouting Co Ltd
Original Assignee
Kajima Corp
Chemical Grouting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp, Chemical Grouting Co Ltd filed Critical Kajima Corp
Priority to JP2020011325A priority Critical patent/JP7284720B2/en
Publication of JP2021116619A publication Critical patent/JP2021116619A/en
Application granted granted Critical
Publication of JP7284720B2 publication Critical patent/JP7284720B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

To provide a steel guide wall that does not require the placement of reinforced concrete, is constructed without the use of special materials, and is easy to remove.SOLUTION: A steel guide wall (20) of the present invention comprises: a shaped steel (1: for example, H-shaped steel, C-shaped steel) in which webs are installed vertically along both sides of the planned excavation opening construction site for continuous wall construction; a first connecting member (bh) that connects adjacent shaped steels (1) to each other; a plate (5) that is connected to the web of the shaped steel (1) by a second connecting member (6) inserted through the web and closes the open cross section between the upper and lower flanges; a lower iron plate (3) on which the shaped steel (1) is placed; and a third connecting member (2) that connects the lower iron plate (3) and the shaped steel (1).SELECTED DRAWING: Figure 1

Description

本発明は、鋼製ガイドウォールの築造技術に関する。 The present invention relates to a technique for constructing a steel guide wall.

連壁築造工事その他において施工地盤に深い溝を掘削する場合には、表土部分を保護して掘削した溝の崩落を防止すると共に、掘削ドリル等の機器を案内するため、ガイドウォールを築造する場合がある。
図3を参照して、地盤が軟弱な場合における鉄筋コンクリートによるガイドウォールの築造について説明する。
軟弱な地盤にガイドウォール30を築造する際には、先ず、地中の所定領域に溝壁防護11を築造する。溝壁防護11は、例えば原位置土と固化材を(例えば多軸混練掘削機等で)混合・撹拌した、ソイルモルタル(土と固化材を混合)により造成されている。
溝壁防護11は、地盤の崩壊を防ぎながら掘削し、鉄筋かごを建込み、コンクリートを打設するまでの期間、掘削溝壁を安定に保つことを主目的としている。溝壁防護11の設置領域は、施工条件(地盤、地下水、掘削溝壁形状・深度、掘削機械等による上載荷重)などにより異なるが、掘削溝壁の側面に溝壁防護11を設けるのが一般的であり、その設置領域は、前記施工条件をもとに算出した安定計算により決定する。
When excavating a deep ditch in the construction ground in continuous wall construction work or other work, when constructing a guide wall to protect the topsoil part and prevent the excavated ditch from collapsing and to guide equipment such as excavation drills. There is.
With reference to FIG. 3, the construction of a guide wall using reinforced concrete when the ground is soft will be described.
When constructing the guide wall 30 on soft ground, first, the groove wall protection 11 is constructed in a predetermined area in the ground. The groove wall protection 11 is formed by, for example, soil mortar (mixing soil and solidifying material) in which in-situ soil and solidifying material are mixed and agitated (for example, with a multi-screw kneading excavator or the like).
The main purpose of the trench wall protection 11 is to keep the excavated trench wall stable during the period from excavation while preventing the ground from collapsing, building a reinforcing bar cage, and placing concrete. The installation area of the trench wall protection 11 varies depending on the construction conditions (ground, groundwater, excavation groove wall shape / depth, loading load by excavation machine, etc.), but it is common to provide the groove wall protection 11 on the side surface of the excavation groove wall. The installation area is determined by the stability calculation calculated based on the construction conditions.

次に、ガイドウォール30を設置するべき領域を掘削する。掘削された領域(空間)の底部には均しコンクリート(不図示)が打設され、均しコンクリート上で鉄筋14が組み立てられて、型枠15が設置される。
そして型枠15の外側(紙面における左右両側)にコンクリート13を打設する。既に鉄筋14が配置されているので、この工程でコンクリート13を打設することによって、鉄筋コンクリート構造物であるガイドウォール30が築造される。
Next, the area where the guide wall 30 should be installed is excavated. Leveling concrete (not shown) is placed at the bottom of the excavated area (space), reinforcing bars 14 are assembled on the leveling concrete, and formwork 15 is installed.
Then, concrete 13 is placed on the outside of the formwork 15 (on both the left and right sides on the paper surface). Since the reinforcing bar 14 has already been arranged, the guide wall 30 which is a reinforced concrete structure is constructed by placing the concrete 13 in this step.

一方、地盤が比較的強固な場合には、溝壁防護を築造する代わりに、施工領域の表層を改良することがある。表層改良は、例えば地表から2m程度の深度までの所定領域に対して行われる。浅層改良は、例えば、原位置土を掘削して固化材と混合した後、元位置に埋め戻すことにより行われる。
そして、ガイドウォールを設置するべき領域を必要な規模で掘削する。以降のガイドウォール30の築造の手順は、前述の溝壁防護11による手順と同様である。
On the other hand, when the ground is relatively strong, the surface layer of the construction area may be improved instead of constructing the groove wall protection. The surface layer improvement is performed on a predetermined area from the ground surface to a depth of about 2 m, for example. Shallow layer improvement is carried out, for example, by excavating in-situ soil, mixing it with a solidifying material, and then backfilling it in its original position.
Then, the area where the guide wall should be installed is excavated on the required scale. Subsequent construction procedure of the guide wall 30 is the same as the procedure by the groove wall protection 11 described above.

上述の従来技術において、ガイドウォール30として鉄筋コンクリート構造物を築造する理由は、ガイドウォールには、重量物である連壁築造用の掘削機械の無限軌道帯が載置されるためである。掘削機械を構成する連壁造成用のドリルを例に挙げても約30tの重量を有しており、掘削機械全体はさらに大重量である。それによりガイドウォールは多大な荷重を負荷することになるため、特に下方地盤が軟弱な場合は、ガイドウォールが堅固な構造でなければ掘削機械を確実に支持することが困難である。
また、掘削の際に、ガイドウォールの間の溝(掘削された領域)にベントナイト(泥水)が充填されるが、施工時に溝内に残留するスライムの吸引と、吸引により不足したベントナイトの補給により、ベントナイトの水位が上下するため、当該溝の両内側面が崩落し易くなる。このことも、強度に優れた鉄筋コンクリートでガイドウォール30を築造する理由だと言える。
In the above-mentioned conventional technique, the reason why the reinforced concrete structure is constructed as the guide wall 30 is that the endless track zone of the excavation machine for constructing the continuous wall, which is a heavy object, is placed on the guide wall. Taking an example of a drill for creating a continuous wall constituting an excavation machine, it has a weight of about 30 tons, and the entire excavation machine is even heavier. As a result, the guide wall is loaded with a large load, and it is difficult to reliably support the excavation machine unless the guide wall has a solid structure, especially when the lower ground is soft.
In addition, during excavation, the groove (excavated area) between the guide walls is filled with bentonite (muddy water), but due to the suction of slime remaining in the groove during construction and the replenishment of bentonite deficient due to suction. Since the water level of bentonite rises and falls, both inner surfaces of the groove are likely to collapse. This can also be said to be the reason for constructing the guide wall 30 with reinforced concrete having excellent strength.

しかし、上述のような鉄筋コンクリートのガイドウォール30では、コンクリート養生のための日数が必要であり、施工日数が増加し、施工コストも増加してしまう。
また、連壁施工後には、打設した鉄筋コンクリートのガイドウォール30を撤去する必要があるが、鉄筋コンクリートの撤去には多大な労力を必要とし、膨大なコストが掛かってしまう。さらに、撤去した鉄筋コンクリートは産業廃棄物として処理しなければならず、そのための労力・コストも必要になる。
However, in the reinforced concrete guide wall 30 as described above, the number of days for concrete curing is required, the number of construction days increases, and the construction cost also increases.
Further, after the construction of the continuous wall, it is necessary to remove the reinforced concrete guide wall 30 that has been cast, but the removal of the reinforced concrete requires a great deal of labor and enormous cost. Furthermore, the removed reinforced concrete must be treated as industrial waste, which requires labor and cost.

ここで、鉄筋コンクリート構造物ではなく、鋼でガイドウォールを築造する技術が存在する(特許文献1〜3参照)。
しかし、係る従来技術(特許文献1〜3)では構成部材の構成が複雑であり、組み立てや撤去に多大な労力が必要となり、且つ、製造コストが高い専用品を用いるため、ガイドウォールの築造、撤去にかかるコストが高騰化してしまうという問題が生じる。
Here, there is a technique for constructing a guide wall with steel instead of a reinforced concrete structure (see Patent Documents 1 to 3).
However, in the above-mentioned prior art (Patent Documents 1 to 3), the configuration of the constituent members is complicated, a great deal of labor is required for assembly and removal, and a special product having a high manufacturing cost is used. There is a problem that the cost of removal rises.

特開昭60−156825号公報Japanese Unexamined Patent Publication No. 60-156825 実開平4−4926号公報Jikkenhei No. 4-4926 特開平6−180011号公報Japanese Unexamined Patent Publication No. 6-180011

本発明は上述した従来技術の問題点に鑑みて提案されたものであり、鉄筋コンクリートの打設を必要とせず、特別な部材を使用することなく築造し、組み立てや撤去も容易で安価な鋼製ガイドウォールの提供を目的としている。 The present invention has been proposed in view of the above-mentioned problems of the prior art, and is made of inexpensive steel that does not require the placement of reinforced concrete, is constructed without using special members, is easy to assemble and remove, and is inexpensive. The purpose is to provide a guide wall.

本発明の鋼製ガイドウォール(20)は、掘削重機が稼働する地盤面高さより下方の領域に、連壁築造のための掘削開口施工予定箇所の両側に沿って配置される鋼製ガイドウォールであって、
連壁築造のための掘削開口施工予定箇所の両側に沿ってウエブが鉛直方向に設置される形鋼(1:例えばH形鋼、C形鋼)と、
隣接する形鋼(1)同士を接続する第1の接続部材(bh:例えばボルト・ナット)と、
形鋼(1)のウエブに対して、当該ウエブに挿通した第2の接続部材(6:例えばタイロッド)により接続され、上下フランジ間の開放断面を塞ぐプレート(5)と、
形鋼(1)を載置する下部鉄板(3)と、
当該下部鉄板(3)と形鋼(1)を接続する第3の接続部材(2:例えば挟締金具)と、で構成される。
The steel guide wall (20) of the present invention is a steel guide wall arranged along both sides of a planned excavation opening for construction of a continuous wall in a region below the ground level at which heavy excavation machinery operates. There,
Shaped steel (1: for example, H-shaped steel, C-shaped steel) in which the web is installed vertically along both sides of the planned excavation opening construction site for continuous wall construction.
A first connecting member (bh: for example, bolts and nuts) that connects adjacent shaped steels (1) to each other,
A plate (5) that is connected to the web of the shaped steel (1) by a second connecting member (6: for example, a tie rod) inserted through the web and closes the open cross section between the upper and lower flanges.
The lower iron plate (3) on which the shaped steel (1) is placed and
It is composed of a third connecting member (2: for example, a fastening metal fitting) that connects the lower iron plate (3) and the shaped steel (1).

本発明において、形鋼(1)の上下フランジ間に設置され、ウエブ(1A)の荷重を支持する補強部材(7:例えばジャッキ)を有していることが好ましい。 In the present invention, it is preferable to have a reinforcing member (7: for example, a jack) which is installed between the upper and lower flanges of the shaped steel (1) and supports the load of the web (1A).

上述の構成を具備する本発明によれば、鉄筋コンクリートの打設が不要である。そのため、コンクリート養生が不要であり、その分だけ施工期間を短縮することが出来て、施工コストも減少する。 According to the present invention having the above-described configuration, it is not necessary to place reinforced concrete. Therefore, concrete curing is not required, the construction period can be shortened by that amount, and the construction cost is also reduced.

また、(例えば連壁工法を)施工後、鋼製ガイドウォール(20)を撤去するに際して、鉄筋コンクリートをはつる必要が無いため鉄筋コンクリートの撤去に必要な労力、コストを節減することも出来る。さらに、鉄筋コンクリートを構成するコンクリートを産業廃棄物として処理する必要も無く、その分の労力及びコストも減少することが出来る。
それに加えて本発明によれば、特別な専用部材を用いる必要が無く、当該専用部材を製造する必要もない。また、ボルト・ナットやタイロッド、挟締金具による接続構造であるため組立・解体が容易であり、解体後の形鋼と接続部材の再利用も可能である。そのため、施工コストが低減される。
Further, when the steel guide wall (20) is removed after the construction (for example, the continuous wall construction method), it is not necessary to hang the reinforced concrete, so that the labor and cost required for removing the reinforced concrete can be reduced. Further, it is not necessary to treat the concrete constituting the reinforced concrete as industrial waste, and the labor and cost can be reduced accordingly.
In addition, according to the present invention, it is not necessary to use a special special member, and it is not necessary to manufacture the special member. In addition, since it has a connection structure using bolts / nuts, tie rods, and fastening metal fittings, it is easy to assemble and disassemble, and the shaped steel and connecting members after disassembly can be reused. Therefore, the construction cost is reduced.

さらに本発明において、形鋼(1)内に山留め材用ウエブの補強のため補強部材(7)を配置すれば、施工に必要な機器(例えば重量物である掘削機械)の荷重が鋼製ガイドウォール(20)に作用しても、形鋼(1)のウエブ(1A)が座屈或いは変形する等の不都合を防止することが出来る。 Further, in the present invention, if the reinforcing member (7) is arranged in the shaped steel (1) to reinforce the web for the retaining material, the load of the equipment required for construction (for example, a heavy excavation machine) is a steel guide. Even if it acts on the wall (20), it is possible to prevent inconveniences such as buckling or deformation of the web (1A) of the shaped steel (1).

本発明の第1実施形態に係る鋼製ガイドウォールの正面図である。It is a front view of the steel guide wall which concerns on 1st Embodiment of this invention. 第1実施形態に係る1段の形鋼の部分拡大図である。It is a partially enlarged view of the 1-stage shaped steel which concerns on 1st Embodiment. 従来技術に係る鉄筋コンクリートによるガイドウォールを示す説明図である。It is explanatory drawing which shows the guide wall by the reinforced concrete which concerns on the prior art.

以下、図1、図2を参照して、本発明の実施形態について説明する。
図1に示す実施形態は、鋼製ガイドウォール下方の地盤が軟弱である場合に適用される。
連続壁造成に用いられる掘削機械は、例えば掘削ドリル(不図示)と無限軌道帯52を備えている。掘削ドリルの重量は例えば約30tであり、当該掘削機械の一方の無限軌道帯には、多大な荷重が負荷されている。
そのため、実施形態に係る鋼製ガイドウォール20は、係る多大な荷重を支持できる強固な構造であることが要求される。
図示の実施形態では、形鋼1としてH形鋼が例示されている。
Hereinafter, embodiments of the present invention will be described with reference to FIGS. 1 and 2.
The embodiment shown in FIG. 1 is applied when the ground below the steel guide wall is soft.
The excavation machine used for continuous wall construction includes, for example, an excavation drill (not shown) and an endless track zone 52. The weight of the excavation drill is, for example, about 30 tons, and a large load is applied to one endless track zone of the excavation machine.
Therefore, the steel guide wall 20 according to the embodiment is required to have a strong structure capable of supporting such a large load.
In the illustrated embodiment, the H-shaped steel is exemplified as the shaped steel 1.

図1において、紙面に垂直な方向に連続して築造されている鋼製ガイドウォール20は、形鋼1、図1の上下方向に隣接する形鋼1同士を接続する第1の接続部材bh(例えばボルト・ナット)、形鋼1が載置されている下部鉄板3、下部鉄板3よりも上方の領域に充填されている充填材4(例えば良質土)、形鋼1の補強部材7(例えばジャッキ)、形鋼1の上方に配置される上部鉄板9、下部鉄板3の下方に築造された溝壁防護11を有している。 In FIG. 1, the steel guide wall 20 continuously constructed in the direction perpendicular to the paper surface is the first connecting member bh (1) connecting the shaped steel 1 and the shaped steel 1 adjacent to each other in the vertical direction of FIG. For example, bolts and nuts), a lower iron plate 3 on which the shaped steel 1 is placed, a filler 4 (for example, good quality soil) filled in a region above the lower iron plate 3, and a reinforcing member 7 of the shaped steel 1 (for example). It has a jack), an upper iron plate 9 arranged above the shaped steel 1, and a groove wall protection 11 built below the lower iron plate 3.

図1において、鋼製ガイドウォール20の開口部20−Aの左側には、2段2列の形鋼1が配置されている。一方、開口部20−Aの右側には、2段1列の形鋼1が配置されている。
上段に位置する形鋼1と下段に位置する形鋼1とは、第1の接続部材bhにより接続されている。なお、図面の簡略化のため、第1の接続部材bhは一点鎖線で表示している。
形鋼1のフランジ面に予め所定ピッチで孔が設けられた市況品を用いた場合、その孔を挿通孔として利用できるので、第1の接続部材bh(例えば、ボルト・ナット)で上下の形鋼1同士を止付けることができる。孔が設けられていない市況品に比べて、不要な孔切削を行うことなく利用できるので、滅損にならず再利用可能になる。
図1、図2において、鋼製ガイドウォール20は、奥行き方向(紙面に垂直な方向)に延在している。そして、図示はされていないが、奥行き方向においても、隣り合う形鋼1同士が接合されている。
In FIG. 1, two rows and two rows of shaped steel 1 are arranged on the left side of the opening 20-A of the steel guide wall 20. On the other hand, on the right side of the opening 20-A, the shaped steel 1 in two rows and one row is arranged.
The shaped steel 1 located in the upper stage and the shaped steel 1 located in the lower stage are connected by the first connecting member bh. For the sake of simplification of the drawings, the first connecting member bh is indicated by a alternate long and short dash line.
When a market product in which holes are provided in advance at a predetermined pitch on the flange surface of the shaped steel 1 is used, the holes can be used as insertion holes. Steel 1 can be fastened to each other. Compared to market products without holes, it can be used without unnecessary hole cutting, so it can be reused without being damaged.
In FIGS. 1 and 2, the steel guide wall 20 extends in the depth direction (direction perpendicular to the paper surface). Although not shown, adjacent shaped steels 1 are joined to each other even in the depth direction.

図1において、下部鉄板3は開口部20−Aの外側(図1では開口部20−Aの左右両側)にそれぞれ配置され、左右の下部鉄板3には開口部20−Aの左右の形鋼1がそれぞれ載置されている。
開口部20−Aの左側の領域において、下部鉄板3は、第3の接続部材2(例えば挟締金具)により、下方の形鋼1と接続されており、形鋼1が転倒することを防止されている。なお、第3の接続部材2として例示された挟締金具は、市販品を用いることが出来る。
開口部20−Aの左右に配置された下部鉄板3は、形鋼1を載置した位置から開口部20−Aから離隔する方向に延在して配置されており、下部鉄板3の当該延在した部分の上方には充填材4が充填されている。
図示の実施形態では充填材4として良質土が採用されている。充填材4としては、土に固化材を加えた改良土でも良いし、施工現場以外の箇所から持ち込まれた一軸圧縮強度が大きい土でも良い。なお、充填材4を載置している下部鉄板3は、掘削機械の無限軌道帯52からの多大な荷重を分散させる機能も有している。
In FIG. 1, the lower iron plate 3 is arranged outside the opening 20-A (on the left and right sides of the opening 20-A in FIG. 1), and the left and right lower iron plates 3 have the left and right shaped steels of the opening 20-A. 1 is placed respectively.
In the region on the left side of the opening 20-A, the lower iron plate 3 is connected to the lower shaped steel 1 by a third connecting member 2 (for example, a fastening metal fitting) to prevent the shaped steel 1 from tipping over. Has been done. As the fastening metal fittings exemplified as the third connecting member 2, a commercially available product can be used.
The lower iron plates 3 arranged on the left and right sides of the opening 20-A are arranged so as to extend in a direction away from the opening 20-A from the position where the shaped steel 1 is placed, and the extension of the lower iron plate 3 The filler 4 is filled above the existing portion.
In the illustrated embodiment, good quality soil is used as the filler 4. The filler 4 may be improved soil obtained by adding a solidifying material to the soil, or soil having a large uniaxial compressive strength brought in from a place other than the construction site. The lower iron plate 3 on which the filler 4 is placed also has a function of dispersing a large load from the endless track zone 52 of the excavating machine.

図1において、開口部20−Aの左側には、掘削機械の無限軌道帯52が破線で示されている。この状態では、鋼製ガイドウォール20の左側の2段2列の形鋼1における左側の列の形鋼1に最大の重量が負荷されている。
そのため、鋼製ガイドウォール20の左側の2段2列の形鋼1のうち、左側の列の形鋼1(上下2段の形鋼1)の内部空間(形鋼1の上下のフランジ間の空間)に、形鋼1のウエブ1A(上下方向に延在する部分)に負荷される荷重を支持するための補強部材7を設けている。
In FIG. 1, the endless track zone 52 of the excavator is indicated by a broken line on the left side of the opening 20-A. In this state, the maximum weight is loaded on the shaped steel 1 in the left row of the two-tiered two-row shaped steel 1 on the left side of the steel guide wall 20.
Therefore, of the two-tiered two-row shaped steel 1 on the left side of the steel guide wall 20, the internal space of the left-rowed shaped steel 1 (upper and lower two-tiered shaped steel 1) (between the upper and lower flanges of the shaped steel 1). A reinforcing member 7 for supporting a load applied to the web 1A (a portion extending in the vertical direction) of the shaped steel 1 is provided in the space).

図1において、開口部20−Aの左側の形鋼1の上方に、上部鉄板9が配置されている。換言すれば、上部鉄板9は形鋼1に被せられている。上部鉄板9は、掘削機械の無限軌道帯52の多大な荷重を分散させる機能と、無限軌道帯52による掘削機械の円滑な移動を実行し易くする機能を発揮する。そして上部鉄板9を配置する領域は、掘削機械の無限軌道帯52により多大な荷重を受ける領域に基づいて決定される。
図示の実施形態では鋼製ガイドウォール下方の地盤が軟弱であり、表層の改良のみでは重量物である掘削機械を支持できない恐れがあるため、当該下方の地盤には溝壁防護11が築造されている。
鋼製ガイドウォール20の築造後、開口部20−A下方の領域の掘削孔の崩落を防止するため、開口部20−A下方の領域の掘削孔には、例えばベントナイト(不図示)が充填される。
In FIG. 1, the upper iron plate 9 is arranged above the shaped steel 1 on the left side of the opening 20-A. In other words, the upper iron plate 9 is covered with the shaped steel 1. The upper iron plate 9 exhibits a function of distributing a large load of the endless track zone 52 of the excavation machine and a function of facilitating smooth movement of the excavation machine by the endless track zone 52. The region where the upper iron plate 9 is arranged is determined based on the region where a large load is received by the endless track zone 52 of the excavating machine.
In the illustrated embodiment, the ground below the steel guide wall is soft, and there is a risk that a heavy excavating machine cannot be supported only by improving the surface layer. Therefore, a groove wall protection 11 is constructed on the ground below. There is.
After the construction of the steel guide wall 20, in order to prevent the excavation hole in the area below the opening 20-A from collapsing, the excavation hole in the area below the opening 20-A is filled with, for example, bentonite (not shown). NS.

次に、図2を参照して、形鋼1周辺の構成についてさらに説明する。図示の簡略化のため、図1における開口部20−Aの左側の形鋼1のみが1段だけ示されており、且つ、下部鉄板3及び上部鉄板9の図示が省略されている。
図2において、左側の形鋼1の左側と、右側の形鋼1の右側にプレート5(板状部材)が配置されており、プレート5と形鋼1のウエブ1Aは第2の接続部材6(ボルト等によるタイロッド)により接続されている。第2の接続部材6の軸部に設けられているネジ部は図示されていない。
プレート5は、充填材4(図1参照)及びベントナイト(不図示)が形鋼1の内部空間に流入してしまうことを防止するために設けられている。
第2の接続部材6の頭部6A(ボルトヘッド)はプレート5に溶接固定され、ボルト部分は形鋼1のウエブに形成された貫通孔に挿通され、ナット6Bにより締結されている。これにより、プレート5が形鋼1に対して相対移動してしまうことを防止している。
なお、形鋼1のウエブ1Aに予め所定ピッチで孔が設けられた市況品を用いた場合、その孔を挿通孔として利用できるので、第2の接続部材6(例えば、タイロッド、ボルト)でプレート5を止付けることができる。孔が設けられていない市況品に比べて、不要な孔切削を行うことなく利用できるので、滅損にならず再利用可能になる。
Next, with reference to FIG. 2, the configuration around the shaped steel 1 will be further described. For the sake of simplification of the illustration, only the shaped steel 1 on the left side of the opening 20-A in FIG. 1 is shown in only one step, and the lower iron plate 3 and the upper iron plate 9 are not shown.
In FIG. 2, a plate 5 (plate-shaped member) is arranged on the left side of the shaped steel 1 on the left side and on the right side of the shaped steel 1 on the right side, and the web 1A of the plate 5 and the shaped steel 1 is a second connecting member 6. It is connected by (tie rods with bolts, etc.). The screw portion provided on the shaft portion of the second connecting member 6 is not shown.
The plate 5 is provided to prevent the filler 4 (see FIG. 1) and bentonite (not shown) from flowing into the internal space of the shaped steel 1.
The head portion 6A (bolt head) of the second connecting member 6 is welded and fixed to the plate 5, and the bolt portion is inserted into a through hole formed in the web of the shaped steel 1 and fastened by a nut 6B. This prevents the plate 5 from moving relative to the shaped steel 1.
When a market product in which holes are previously provided in the web 1A of the shaped steel 1 at a predetermined pitch is used, the holes can be used as insertion holes, so that the second connecting member 6 (for example, tie rods and bolts) is used to plate. 5 can be stopped. Compared to market products without holes, it can be used without unnecessary hole cutting, so it can be reused without being damaged.

図1を参照して上述した様に、補強部材7は、掘削機械の無限軌道帯52による多大な荷重が掛かる形鋼1のウエブ1Aの補強部材として、形鋼1の内部空間に配置されている。補強部材7は、図1、図2の紙面に垂直な方向に、例えば3mピッチで配置される。図示されていないが、補強部材7は公知の手段により、形鋼1の内部空間の所定位置に保持或いは固定されている。
図示の実施形態では、形鋼1に作用する荷重を支持する補強部材7(形鋼1のウエブ1Aの補強部材)の一例としてジャッキを示しているが、ジャッキ以外の他の機器、支保材も選択可能である。
なお、使用される掘削機械がブームを備えており、ブームから掘削ドリルを施工領域に下降させ、当該領域を掘削する様なタイプ(いわゆる「クローラクレーン」)であれば、その無限軌道帯は鋼製ガイドウォール20近傍には位置せず、鋼製ガイドウォール20は掘削機械(クローラクレーン)の荷重を支持する必要が無い。
その様に、鋼製ガイドウォール20が掘削機械の重量を負荷しない場合には、補強部材7を省略することが出来る。
As described above with reference to FIG. 1, the reinforcing member 7 is arranged in the internal space of the shaped steel 1 as a reinforcing member of the web 1A of the shaped steel 1 to which a large load is applied by the endless track zone 52 of the excavating machine. There is. The reinforcing members 7 are arranged in a direction perpendicular to the paper surface of FIGS. 1 and 2, for example, at a pitch of 3 m. Although not shown, the reinforcing member 7 is held or fixed at a predetermined position in the internal space of the shaped steel 1 by a known means.
In the illustrated embodiment, the jack is shown as an example of the reinforcing member 7 (reinforcing member of the web 1A of the shaped steel 1) that supports the load acting on the shaped steel 1, but other devices and supporting materials other than the jack are also used. It is selectable.
If the excavation machine used is equipped with a boom and the excavation drill is lowered from the boom to the construction area to excavate the area (so-called "crawler crane"), the endless track zone is steel. It is not located near the guide wall 20 made of steel, and the steel guide wall 20 does not need to support the load of the excavating machine (crawler crane).
As such, if the steel guide wall 20 does not bear the weight of the excavator, the reinforcing member 7 can be omitted.

図示されていないが、形鋼1の内部空間に詰め物、例えば発泡スチロールを充填することが可能である。プレート5を省略した場合に、発泡スチロール等の詰め物を充填することにより、形鋼1の内部空間に土砂等が侵入することを防止するためである。
なお、詰め物は発泡スチロールに限定される訳ではなく、形状可変且つ軽量な素材から選択することが出来る。
Although not shown, it is possible to fill the internal space of the shaped steel 1 with a padding, for example Styrofoam. This is to prevent earth and sand from entering the internal space of the shaped steel 1 by filling the plate 5 with a padding such as Styrofoam when the plate 5 is omitted.
The filling is not limited to Styrofoam, and can be selected from materials having a variable shape and being lightweight.

続いて、図1で示す鋼製ガイドウォール20の築造の手順を説明する。先ず、鋼製ガイドウォール20築造箇所の下方領域に溝壁防護11を築造し、溝壁防護11を築造した後、鋼製ガイドウォール20を設置するべき領域を掘削する。 Subsequently, the procedure for constructing the steel guide wall 20 shown in FIG. 1 will be described. First, the groove wall protection 11 is constructed in the lower region of the steel guide wall 20 construction location, and after the groove wall protection 11 is constructed, the region where the steel guide wall 20 should be installed is excavated.

そして鋼製ガイドウォール20の開口部20−Aの位置を決定して、下部鉄板3を開口部20−Aの左右両側に敷設し、形鋼1を下部鉄板3上に設置する。上述した様に、開口部20−Aの左側には形鋼1を2段2列に設置し、開口部20−Aの右側には形鋼1を2段1列に設置する。形鋼1の設置に際しては、形鋼1同士を第1の接続部材bhで接続する。
形鋼1の内部空間に補強部材7を配置する。そして開口部20−Aの左右の形鋼1(開口部20−Aの左側の領域については左側の形鋼1)において、開口部20−Aより離隔した側の開口端をプレート5で封鎖し、第2の接続部材6により形鋼1のウエブ1Aとプレート5を接続する。そして、開口部20−Aの左右の形鋼1(開口部20−Aの左側の領域については右側の形鋼1)において、開口部20−Aに接する側の開口端をプレート5で封鎖し、第2の接続部材6により形鋼1と接続する。
Then, the position of the opening 20-A of the steel guide wall 20 is determined, the lower iron plate 3 is laid on both the left and right sides of the opening 20-A, and the shaped steel 1 is installed on the lower iron plate 3. As described above, the shaped steel 1 is installed in two rows and two rows on the left side of the opening 20-A, and the shaped steel 1 is installed in two rows and two rows on the right side of the opening 20-A. When installing the shaped steels 1, the shaped steels 1 are connected to each other by a first connecting member bh.
The reinforcing member 7 is arranged in the internal space of the shaped steel 1. Then, in the left and right shaped steels 1 of the opening 20-A (the left shaped steel 1 for the region on the left side of the opening 20-A), the opening ends on the side separated from the opening 20-A are closed with a plate 5. , The web 1A of the shaped steel 1 and the plate 5 are connected by the second connecting member 6. Then, in the left and right shaped steels 1 of the opening 20-A (the right shaped steel 1 for the region on the left side of the opening 20-A), the opening ends on the side in contact with the opening 20-A are closed with the plate 5. , It is connected to the shaped steel 1 by the second connecting member 6.

次の工程では、形鋼1のプレート5で封鎖した側であって、下部鉄板3上方の領域を、充填材4で充填する。充填材4を充填した後、例えば転圧機等により締め固める。
充填材4を充填した後、形鋼1の上方から充填材4の表面に亘る領域に、上部鉄板9を配置する。
In the next step, the region above the lower iron plate 3 on the side sealed by the plate 5 of the shaped steel 1 is filled with the filler 4. After filling the filler 4, it is compacted by, for example, a compactor.
After filling the filler 4, the upper iron plate 9 is arranged in a region extending from above the shaped steel 1 to the surface of the filler 4.

図1で示す実施形態により鋼製ガイドウォール20を築造すれば、鉄筋コンクリートの打設が不要である。そのため、コンクリート養生が不要となり、その分だけ施工期間を短縮することが出来て、施工コストも減少する。
また、連壁を造成した後に鋼製ガイドウォール20を撤去する際に、鉄筋コンクリートを撤去する必要も無く、鉄筋コンクリート撤去の様なはつり作業が不要となり、労力、コストを節減することが出来る。さらに、コンクリートを産業廃棄物として処理する必要も無く、その労力及びコストも減少する。
If the steel guide wall 20 is constructed according to the embodiment shown in FIG. 1, it is not necessary to place reinforced concrete. Therefore, concrete curing becomes unnecessary, the construction period can be shortened by that amount, and the construction cost is also reduced.
Further, when the steel guide wall 20 is removed after the continuous wall is constructed, it is not necessary to remove the reinforced concrete, and the fishing work such as the removal of the reinforced concrete becomes unnecessary, and labor and cost can be saved. Furthermore, it is not necessary to treat concrete as industrial waste, and the labor and cost thereof are reduced.

加えて、形鋼1と、接続部材bh、6、2と、下部鉄板3と、プレート5の組合せにより鋼製ガイドウォール20が築造されるので、専用部材を製造、使用する必要が無く、専用部材の製造コストの分だけ施工コストが低減される。
また、ボルト・ナットやタイロッド、挟締金具による接続構造であるため組立・解体が容易であり、解体後の形鋼と接続部材の再利用も可能である。
In addition, since the steel guide wall 20 is constructed by the combination of the shaped steel 1, the connecting members bh, 6 and 2, the lower iron plate 3 and the plate 5, it is not necessary to manufacture and use a dedicated member, and it is dedicated. The construction cost is reduced by the manufacturing cost of the member.
In addition, since it has a connection structure using bolts / nuts, tie rods, and fastening metal fittings, it is easy to assemble and disassemble, and the shaped steel and connecting members after disassembly can be reused.

それに加えて、形鋼1における開口部20−Aから離隔した側の開口端をプレート5で封鎖し、第2の接続部材6で形鋼1のウエブ1Aとプレート5を接続したので、形鋼1内部の空間に土砂や充填材4が流入してしまうことを防止出来る。そして、形鋼1における開口部20−Aに接する側の開口端をプレート5で封鎖し、第2の接続部材6で形鋼1のウエブ1Aと接続したので、形鋼1内部の空間にベントナイトが流入してしまうことを防止出来る。
さらに形鋼1の内部空間に補強部材7を配置することで、掘削機械の無限軌道帯52が鋼製ガイドウォール20に載置したとしても、形鋼1のウエブ1Aの座屈或いは変形を防止出来る。
また、形鋼1上方に上部鉄板9を敷設したので、無限軌道帯52の荷重を分散させることが出来る。
さらに、施工現場の地盤が軟弱であっても、下部鉄板3の下方に溝壁防護11を築造することで、重量物である掘削機械の多大な荷重にも抵抗できる。
In addition to that, the opening end of the shaped steel 1 on the side separated from the opening 20-A was closed with the plate 5, and the web 1A of the shaped steel 1 and the plate 5 were connected by the second connecting member 6, so that the shaped steel It is possible to prevent earth and sand and the filler 4 from flowing into the space inside the 1. Then, the opening end of the shaped steel 1 on the side in contact with the opening 20-A was closed with the plate 5 and connected to the web 1A of the shaped steel 1 by the second connecting member 6, so that the space inside the shaped steel 1 was bentonite. Can be prevented from flowing in.
Further, by arranging the reinforcing member 7 in the internal space of the shaped steel 1, even if the endless track zone 52 of the excavating machine is placed on the steel guide wall 20, buckling or deformation of the web 1A of the shaped steel 1 is prevented. You can.
Further, since the upper iron plate 9 is laid above the shaped steel 1, the load of the endless track zone 52 can be dispersed.
Further, even if the ground at the construction site is soft, by constructing the groove wall protection 11 below the lower iron plate 3, it is possible to withstand a large load of a heavy excavation machine.

図1で示す実施形態では、鋼製ガイドウォール20を築造する施工現場の地盤が軟弱であり、鋼製ガイドウォール20下方に溝壁防護11を造成している。
それに対して、地盤が良好(比較的強固)な施工現場であれば、溝壁防護11の造成に換えて、下部鉄板3の下方の領域を浅層改良すれば、掘削機械の大重量を支持することが出来る。
In the embodiment shown in FIG. 1, the ground at the construction site where the steel guide wall 20 is constructed is soft, and the groove wall protection 11 is formed below the steel guide wall 20.
On the other hand, if the ground is good (relatively strong) at the construction site, instead of creating the trench wall protection 11, if the area below the lower iron plate 3 is improved in a shallow layer, the heavy weight of the excavation machine can be supported. Can be done.

そして、施工現場の地盤が良好(比較的強固)であり、且つ、掘削機械がブームから掘削ドリルを施工領域に下降させるタイプ(クローラクレーン)であれば、掘削機械の無限軌道帯は鋼製ガイドウォール20近傍には位置しない。そのため、溝壁防護11の造成に換えて下部鉄板3の下方の領域を浅層改良し、更に形鋼1の内部空間の補強部材7を省略することが出来る。 If the ground at the construction site is good (relatively strong) and the excavation machine is a type that lowers the excavation drill from the boom to the construction area (crawler crane), the endless track zone of the excavation machine is a steel guide. It is not located near the wall 20. Therefore, instead of creating the groove wall protection 11, the region below the lower iron plate 3 can be improved in a shallow layer, and the reinforcing member 7 in the internal space of the shaped steel 1 can be omitted.

図示の実施形態はあくまでも例示であり、本発明の技術的範囲を限定する趣旨の記述ではないことを付記する。
例えば、鋼製ガイドウォール20を構成する形鋼1は、2段2列、或いは2段1列に限定されず、例えば1段2列、1段1列、その他の段数、列数の組み合わせでも良く、施工現場の状況、掘削機械による負荷の状況等に応じて決定される。
It should be added that the illustrated embodiment is merely an example and is not a description intended to limit the technical scope of the present invention.
For example, the shaped steel 1 constituting the steel guide wall 20 is not limited to two stages and two rows or two stages and one row, and may be, for example, one stage and two rows, one stage and one row, or a combination of other stages and rows. It is often decided according to the situation of the construction site, the situation of the load by the excavation machine, etc.

1・・・形鋼(例えば、H形鋼、C形鋼)
1A・・・ウエブ
2・・・第3の接続部材(例えば、挟締金具)
3・・・下部鉄板
4・・・充填材(良質土)
5・・・プレート(板状部材)
6・・・第2の接続部材(例えば、タイロッド、ボルト)
7・・・補強部材(例えば、ジャッキ)
9・・・上部鉄板
11・・・溝壁防護
20・・・鋼製ガイドウォール
20−A・・・鋼製ガイドウォールの開口部
30・・・ガイドウォール
bh・・・第1の接続部材(例えばボルト・ナット)
1 ... Shaped steel (for example, H-shaped steel, C-shaped steel)
1A ... Web 2 ... Third connecting member (for example, fastening bracket)
3 ... Lower iron plate 4 ... Filler (good quality soil)
5 ... Plate (plate-shaped member)
6 ... Second connecting member (for example, tie rod, bolt)
7 ... Reinforcing member (for example, jack)
9 ... Upper iron plate 11 ... Groove wall protection 20 ... Steel guide wall 20-A ... Steel guide wall opening 30 ... Guide wall bh ... First connecting member ( For example, bolts and nuts)

Claims (2)

掘削重機が稼働する地盤面高さより下方の領域に、連壁築造のための掘削開口施工予定箇所の両側に沿って配置される鋼製ガイドウォールであって、
連壁築造のための掘削開口施工予定箇所の両側に沿ってウエブが鉛直方向に設置される形鋼と、
隣接する形鋼同士を接続する第1の接続部材と、
形鋼のウエブに対して、当該ウエブに挿通した第2の接続部材により接続され、上下フランジ間の開放断面を塞ぐプレートと、
形鋼を載置するための下部鉄板と、
当該下部鉄板と形鋼を接続する第3の接続部材と、で構成される、鋼製ガイドウォール。
A steel guide wall that is placed along both sides of the planned excavation opening for construction of a continuous wall in the area below the ground level where heavy excavation equipment operates.
Shaped steel with webs installed vertically along both sides of the planned excavation opening for continuous wall construction,
A first connecting member that connects adjacent shaped steels,
A plate that is connected to the shaped steel web by a second connecting member inserted through the web and closes the open cross section between the upper and lower flanges.
The lower iron plate for placing the shaped steel and
A steel guide wall composed of a third connecting member that connects the lower iron plate and the shaped steel.
形鋼の上下フランジ間に設置され、ウエブに作用する荷重を支持する補強部材を有する、請求項1に記載の鋼製ガイドウォール。 The steel guide wall according to claim 1, which is installed between the upper and lower flanges of the shaped steel and has a reinforcing member for supporting a load acting on the web.
JP2020011325A 2020-01-28 2020-01-28 steel guide wall Active JP7284720B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020011325A JP7284720B2 (en) 2020-01-28 2020-01-28 steel guide wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020011325A JP7284720B2 (en) 2020-01-28 2020-01-28 steel guide wall

Publications (2)

Publication Number Publication Date
JP2021116619A true JP2021116619A (en) 2021-08-10
JP7284720B2 JP7284720B2 (en) 2023-05-31

Family

ID=77175651

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020011325A Active JP7284720B2 (en) 2020-01-28 2020-01-28 steel guide wall

Country Status (1)

Country Link
JP (1) JP7284720B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023097947A1 (en) * 2021-11-30 2023-06-08 中交路桥建设有限公司 Recyclable steel guide wall

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4910314U (en) * 1972-04-25 1974-01-29
JPS4971704A (en) * 1972-11-15 1974-07-11
JPS537924U (en) * 1976-07-02 1978-01-24
JPS63112538U (en) * 1987-01-08 1988-07-20
JPH044926U (en) * 1990-04-10 1992-01-17
JP2001131976A (en) * 1999-11-04 2001-05-15 Nishimatsu Constr Co Ltd Junction method for steel for structure
JP2018087417A (en) * 2016-11-28 2018-06-07 株式会社フジモト Seismic reinforcement structure of h-shaped steel column

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4910314U (en) * 1972-04-25 1974-01-29
JPS4971704A (en) * 1972-11-15 1974-07-11
JPS537924U (en) * 1976-07-02 1978-01-24
JPS63112538U (en) * 1987-01-08 1988-07-20
JPH044926U (en) * 1990-04-10 1992-01-17
JP2001131976A (en) * 1999-11-04 2001-05-15 Nishimatsu Constr Co Ltd Junction method for steel for structure
JP2018087417A (en) * 2016-11-28 2018-06-07 株式会社フジモト Seismic reinforcement structure of h-shaped steel column

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023097947A1 (en) * 2021-11-30 2023-06-08 中交路桥建设有限公司 Recyclable steel guide wall

Also Published As

Publication number Publication date
JP7284720B2 (en) 2023-05-31

Similar Documents

Publication Publication Date Title
KR101302743B1 (en) Phc pile and its using the same soil cement wall construction methode
JP6166264B2 (en) How to build a retaining wall
KR100722665B1 (en) Steel guide wall for construction of underground diaphragm wall and construction method of underground diaphragm wall using the same
KR101173045B1 (en) Earth retaining-cum-retaining wall, and construction method thereof
JP2001241053A (en) Method for constructing underground structure
KR20180124795A (en) An Earth Retaining Wall with Underground Buttresses and A Method of Constructing the same
JP5634931B2 (en) Construction method of underground structure
JP2017186766A (en) Caisson type pile and earth retaining material used with the same
JP7284720B2 (en) steel guide wall
JP6422084B2 (en) Underground space construction method
JP5378066B2 (en) Mountain fastening method
JP7096469B1 (en) Small cross-section underground continuous wall
KR100327547B1 (en) Composite retaining wall construction method
JP2004132124A (en) Pneumatic caisson and pneumatic caisson constructing method
JP7204228B2 (en) Underground beam construction method
JP6130139B2 (en) Caisson structure having pressure-resistant plate and construction method thereof
KR102656370B1 (en) Underground structure capable of forming a supporting point of a molded beam and its construction method
JP2571426B2 (en) Construction method of retaining wall
KR101128955B1 (en) The Construction Method of Pressing Underground Structure
JP6718767B2 (en) Composite of soil structure and concrete structure and its construction method
KR101045663B1 (en) Wall-Foundation system
JPS6217295A (en) Concrete flow-down member of liner plate for shaft and usagethereof
WO2024042603A1 (en) Construction method for structure
JP6999483B2 (en) Guide wall and how to build a guide wall
JPS61126293A (en) Bottom part mount member of liner plate for vertical pit anduse thereof

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20220907

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230518

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230519

R150 Certificate of patent or registration of utility model

Ref document number: 7284720

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20230526