JP2021080687A - Attachment metal fitting for extrusion molding cement plate floor material and floor material attachment structure using the same - Google Patents

Attachment metal fitting for extrusion molding cement plate floor material and floor material attachment structure using the same Download PDF

Info

Publication number
JP2021080687A
JP2021080687A JP2019207692A JP2019207692A JP2021080687A JP 2021080687 A JP2021080687 A JP 2021080687A JP 2019207692 A JP2019207692 A JP 2019207692A JP 2019207692 A JP2019207692 A JP 2019207692A JP 2021080687 A JP2021080687 A JP 2021080687A
Authority
JP
Japan
Prior art keywords
floor material
mounting bracket
cement board
extruded cement
pressing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2019207692A
Other languages
Japanese (ja)
Other versions
JP7442081B2 (en
Inventor
光生 海野
Mitsuo Unno
光生 海野
健夫 小西
Takeo Konishi
健夫 小西
浩一 西野
Koichi Nishino
浩一 西野
一也 豊島
Kazuya Toyoshima
一也 豊島
更姓 道端
Kosei Michibata
更姓 道端
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui House Ltd
Nozawa Corp
Nankai Kogyo KK
Original Assignee
Sekisui House Ltd
Nozawa Corp
Nankai Kogyo KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui House Ltd, Nozawa Corp, Nankai Kogyo KK filed Critical Sekisui House Ltd
Priority to JP2019207692A priority Critical patent/JP7442081B2/en
Publication of JP2021080687A publication Critical patent/JP2021080687A/en
Priority to JP2023206183A priority patent/JP2024026288A/en
Priority to JP2023206184A priority patent/JP2024026289A/en
Application granted granted Critical
Publication of JP7442081B2 publication Critical patent/JP7442081B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)
  • Connection Of Plates (AREA)

Abstract

To provide attachment metal fitting allowing easy installation of extrusion molding cement plate floor material on a beam member and the extrusion molding cement plate floor material to be fastened on the beam member from an upper direction.SOLUTION: Attachment metal fitting for fastening extrusion molding cement plate floor material with a hollow part on a beam member is provided with: a floor material pressing metal fitting pressing the extrusion molding cement plate floor material toward the beam member; and a beam member attachment metal fitting to be attached on the beam member, wherein the beam member attachment metal fitting comprises: a body part placed above the beam member; a holding part arranged above the body part and holding the floor material pressing metal fitting; a clamp part connected to the body part and clamping a flange part of the beam member from one direction in a width direction; and a latching latched on the other end of the flange part in the width direction.SELECTED DRAWING: Figure 1

Description

本発明は、住宅の床などに用いられる押出成形セメント板床材の取付金具とそれを用いた床材取付構造に関する。 The present invention relates to a mounting bracket for an extruded cement board flooring material used for a floor of a house or the like, and a flooring material mounting structure using the same.

従来、鉄骨系の集合住宅の床材として押出成形セメント板の床材が用いられている。このような床材は、住宅の構造部材である梁材の上に載せられ、金具によって梁材に留め付けられている。押出成形セメント板床材を梁材に留め付ける方法として、梁材に載せた押出成形セメント板床材を階下から留め付け金具で留め付ける方法がある。しかし、この場合には押出成形セメント板床材の施工と金具の取り付けが階下のフロアからの作業となるため作業性が悪くなる。しかも、階下から作業を行う場合、作業員が上向きに見上げた作業となって作業負荷が大きく、脚立などを乗り降りする作業が必要となり、作業効率が悪い。 Conventionally, extruded cement board flooring materials have been used as flooring materials for steel-framed apartments. Such a floor material is placed on a beam material which is a structural member of a house, and is fastened to the beam material by metal fittings. As a method of fastening the extruded cement board floor material to the beam material, there is a method of fastening the extruded cement board floor material placed on the beam material from downstairs with a fastener. However, in this case, the workability is deteriorated because the construction of the extruded cement board floor material and the attachment of the metal fittings are performed from the floor downstairs. Moreover, when the work is performed from downstairs, the work is carried out by the worker looking up upward, and the work load is heavy, and the work of getting on and off the stepladder or the like is required, resulting in poor work efficiency.

そこで、押出成形セメント板床材を施工階において取り付けができるようにした先行技術がある。例えば、押出成形セメント板床材の裏面に可撓部材でZ型クリップ材を取り付け、このZ型クリップ材によって押出成形セメント板床材を梁材に挟持する取り付け金具がある(例えば、特許文献1参照)。この金具では、押出成形セメント板床材を梁材に載せた後、押出成形セメント板床材の上方から押出成形セメント板床材の裏面に取り付けられたZ型クリップ材の先端を押出成形セメント板床材の裏面の方向に回動させることで、押出成形セメント板床材とZ型クリップ材とによって梁材を挟持している。 Therefore, there is a prior art that enables the extruded cement board flooring material to be attached on the construction floor. For example, there is a mounting bracket in which a Z-shaped clip material is attached to the back surface of an extruded cement board floor material with a flexible member, and the extruded cement board floor material is sandwiched between beam materials by this Z-shaped clip material (see, for example, Patent Document 1). .. In this metal fitting, after the extruded cement board floor material is placed on the beam material, the tip of the Z-shaped clip material attached to the back surface of the extruded cement board floor material from above the extruded cement board floor material is the back surface of the extruded cement board floor material. The beam material is sandwiched between the extruded cement board floor material and the Z-shaped clip material by rotating in the direction of.

また、他の先行技術として、梁材の幅方向中央部分に金具を固定し、金具の左右位置に載せられた押出成形セメント板床材の中空部に留め付け金物を挿入し、押出成形セメント板床材を上方から留め付け金物で梁材に押圧して留め付けけるものもある(例えば、特許文献2参照)。 In addition, as another prior art, a metal fitting is fixed to the central portion in the width direction of the beam material, and a fastener is inserted into the hollow portion of the extruded cement board floor material placed at the left and right positions of the metal fitting, and the extruded cement board floor material is inserted. Can be fastened by pressing it against the beam material with a clasp from above (see, for example, Patent Document 2).

特開2005−264438号公報Japanese Unexamined Patent Publication No. 2005-264438 特開平8−53892号公報Japanese Unexamined Patent Publication No. 8-53892

しかし、上記特許文献1では、Z型クリップ材を押出成形セメント板床材の裏面に固定する必要があるため、Z型クリップ材を階下から上向きで正しい位置に取り付けるために多くの時間と労力を要する場合がある。 However, in Patent Document 1, since it is necessary to fix the Z-shaped clip material to the back surface of the extruded cement board floor material, it takes a lot of time and labor to attach the Z-shaped clip material upward from the downstairs to the correct position. In some cases.

また、上記特許文献2では、押出成形セメント板床材を梁材に載せるときに留め付け金物の位置を適切に保つことが難しい場合があり、押出成形セメント板床材を梁材に載せる作業に多くの時間と労力を要する場合がある。 Further, in Patent Document 2, it may be difficult to properly maintain the position of the fastener when the extruded cement board floor material is placed on the beam material, and many operations of placing the extruded cement board floor material on the beam material are carried out. It may take time and effort.

そこで、本発明は、押出成形セメント板床材を梁材に載せることが容易で、押出成形セメント板床材を上方から梁材へ留め付けることができる取付金具と、それを用いた床材取付構造を提供することを目的とする。 Therefore, the present invention provides a mounting bracket capable of easily mounting the extruded cement board floor material on the beam material and fastening the extruded cement board floor material to the beam material from above, and a floor material mounting structure using the same. The purpose is to provide.

上記目的を達成するために、本発明に係る取付金具は、中空部を有する押出成形セメント板床材を梁材に留め付けるための取付金具であって、前記押出成形セメント板床材を前記梁材に向けて押圧する床材押圧金具と、前記梁材に取り付けられる梁材取付金具と、を備え、前記梁材取付金具は、前記梁材の上方に配置される本体部と、前記本体部の上方に設けられ、前記床材押圧金具を保持する保持部と、前記本体部に接続され、前記梁材のフランジ部を幅方向の一方から挟み込む挟持部と、前記フランジ部の幅方向の他方端部に掛ける掛け止め部と、を有している。 In order to achieve the above object, the mounting bracket according to the present invention is a mounting bracket for fastening the extruded cement board flooring material having a hollow portion to the beam material, and the extruded cement board flooring material is used as the beam material. A floor material pressing metal fitting that presses toward the beam material and a beam material mounting metal fitting that is attached to the beam material are provided, and the beam material mounting metal fitting has a main body portion that is arranged above the beam material and an upper portion of the main body portion. A holding portion that is provided in the above and holds the floor material pressing metal fitting, a holding portion that is connected to the main body portion and sandwiches the flange portion of the beam material from one side in the width direction, and the other end portion in the width direction of the flange portion. It has a hooking part to hang on.

この構成により、梁材取付金具の挟持部で梁材のフランジ部を幅方向の一方から挟持し、フランジ部の幅方向の他方端部に掛け止め部を掛けることで、梁材のフランジ部を挟持部と掛け止め部とで水平方向に保持することができる。よって、梁材取付金具を梁材に保持する保持力をより強くすることができ、梁材取付金具の取り付け信頼性を向上することができる。これにより、梁材に取り付けた梁材取付金具に、押出成形セメント板床材を適切に載せることが容易にできる。そして、押出成形セメント板床材の梁材への留め付けは、床材押圧金具によって押出成形セメント板床材を梁材に向けて押し付けるだけでよいので、押出成形セメント板床材を留め付ける施工性の向上を図ることができる。また、押出成形セメント板床材を、施工階において上方から下向き作業で梁材に留め付けることができるので、施工性を向上させることができる。 With this configuration, the flange portion of the beam material is sandwiched from one side in the width direction by the sandwiching portion of the beam material mounting bracket, and the flange portion of the beam material is hooked by hooking the hooking portion on the other end portion in the width direction of the flange portion. It can be held in the horizontal direction by the holding portion and the hooking portion. Therefore, the holding force for holding the beam material mounting bracket on the beam material can be further strengthened, and the mounting reliability of the beam material mounting bracket can be improved. As a result, the extruded cement board floor material can be easily placed on the beam material mounting bracket attached to the beam material. Then, the extruded cement board floor material can be fastened to the beam material only by pressing the extruded cement board floor material toward the beam material by the floor material pressing metal fittings, so that the workability of fastening the extruded cement board floor material is improved. Can be planned. Further, since the extruded cement board floor material can be fastened to the beam material from above on the construction floor by downward work, the workability can be improved.

また、前記床材押圧金具は、前記押出成形セメント板床材の下面側基材を押圧する押圧部を有していてもよい。 Further, the floor material pressing metal fitting may have a pressing portion for pressing the lower surface side base material of the extruded cement board floor material.

このように構成すれば、床材押圧金具で押出成形セメント板床材の下面側基材を梁材に向けて押圧するので、簡単な構成で押出成形セメント板床材を梁材に強固に留め付けることができる。しかも、取付金具の部品数を少なくすることができる。また、押出成形セメント板床材を、施工階において上方から下向き作業で梁材に留め付けることができるので、施工性を向上させることができる。 With this configuration, the base material on the lower surface side of the extruded cement board floor material is pressed toward the beam material by the floor material pressing metal fittings, so that the extruded cement board floor material can be firmly fastened to the beam material with a simple structure. Can be done. Moreover, the number of parts of the mounting bracket can be reduced. Further, since the extruded cement board floor material can be fastened to the beam material from above on the construction floor by downward work, the workability can be improved.

また、前記床材押圧金具は、裏面側に前記下面側基材を押圧する突起状押圧部を有していてもよい。 Further, the floor material pressing metal fitting may have a protrusion-shaped pressing portion for pressing the lower surface side base material on the back surface side.

このように構成すれば、床材押圧金具の突起状押圧部で押出成形セメント板床材の下面側基材を梁材に向けて押圧するので、押出成形セメント板床材をより強固に留め付けることができる。しかも、取付金具の部品数を少なくすることができる。また、押出成形セメント板床材を、施工階において上方から下向き作業で梁材に留め付けることができるので、施工性を向上させることができる。 With this configuration, the protrusion-shaped pressing portion of the floor material pressing metal fitting presses the lower surface side base material of the extruded cement board floor material toward the beam material, so that the extruded cement board floor material can be fastened more firmly. it can. Moreover, the number of parts of the mounting bracket can be reduced. Further, since the extruded cement board floor material can be fastened to the beam material from above on the construction floor by downward work, the workability can be improved.

また、前記床材押圧金具は、前記押出成形セメント板床材の下面側基材に設けられた被係止部に係止させる係止部材と、前記係止部材から前記押出成形セメント板床材の端部まで延びる板状部と、を有していてもよい。 Further, the floor material pressing metal fitting includes a locking member for locking to a locked portion provided on the lower surface side base material of the extruded cement board floor material, and an end of the extruded cement board floor material from the locking member. It may have a plate-shaped portion extending to the portion.

このように構成すれば、床材押圧金具の係止部材が押出成形セメント板床材の被係止部に係止されるので、床材押圧金具を押出成形セメント板床材の適切な位置に保った状態で押出成形セメント板床材を梁材に留め付けることができる。また、押出成形セメント板床材を、施工階において上方から下向き作業で梁材に留め付けることができるので、施工性を向上させることができる。 With this configuration, the locking member of the floor material pressing metal fitting is locked to the locked portion of the extruded cement board floor material, so that the floor material pressing metal fitting is kept at an appropriate position of the extruded cement board floor material. The extruded cement board flooring material can be fastened to the beam material in the state. Further, since the extruded cement board floor material can be fastened to the beam material from above on the construction floor by downward work, the workability can be improved.

また、本発明に係る取付金具は、中空部を有する押出成形セメント板床材を梁材に留め付けるための取付金具であって、前記押出成形セメント板床材を前記梁材に向けて押圧する床材押圧金具と、前記梁材に取り付けられる梁材取付金具と、を備え、前記床材押圧金具は、前記押出成形セメント板床材の上面側の基材端部が切り取られた桟部を押圧する押圧部を有し、前記梁材取付金具は、前記梁材の上方に配置される本体部と、前記本体部の上方に設けられ、前記押圧部を保持する保持部と、前記本体部に接続され、前記梁材のフランジ部を幅方向の一方から挟み込む挟持部と、を有し、前記床材押圧金具の前記押圧部で前記保持部を挟んで隣り合う前記押出成形セメント板床材の前記桟部を前記梁材の方向に押圧して前記保持部で保持するように構成されている。 Further, the mounting bracket according to the present invention is a mounting bracket for fastening the extruded cement board flooring material having a hollow portion to the beam material, and is a flooring material that presses the extruded cement board flooring material toward the beam material. The floor material pressing metal fitting includes a pressing metal fitting and a beam material mounting metal fitting attached to the beam material, and the floor material pressing metal fitting presses a crosspiece from which an end portion of a base material on the upper surface side of the extruded cement board floor material has been cut off. The beam member mounting bracket has a portion, and is connected to a main body portion arranged above the beam material, a holding portion provided above the main body portion and holding the pressing portion, and the main body portion. , The crosspiece of the extruded cement board floor material having a holding portion for sandwiching the flange portion of the beam material from one side in the width direction, and adjacent to each other with the holding portion sandwiched between the pressing portions of the floor material pressing metal fitting. Is configured to be pressed in the direction of the beam member and held by the holding portion.

この構成により、取付金具の床材押圧金具によって、梁材取付金具の保持部を挟んで隣り合う押出成形セメント板床材の桟部を梁材に向けて押圧して保持するので、押出成形セメント板床材を強固に留め付けることができる。しかも、取付金具の部品数を少なくすることができる。その上、押出成形セメント板床材を施工階において上方から下向き作業で梁材に取り付けることができるので、施工性を向上させることができる。 With this configuration, the floor material pressing metal fittings of the mounting metal fittings press and hold the crosspieces of the adjacent extruded cement board flooring materials with the holding part of the beam material mounting metal fittings toward the beam material, so that the extruded cement board floor is held. The material can be firmly fastened. Moreover, the number of parts of the mounting bracket can be reduced. In addition, the extruded cement board floor material can be attached to the beam material from above on the construction floor by downward work, so that the workability can be improved.

また、前記床材押圧金具は、前記押出成形セメント板床材の前記上面側基材の切り取られた端部を保持する端部保持部を有していてもよい。 Further, the floor material pressing metal fitting may have an end holding portion for holding the cut end portion of the upper surface side base material of the extruded cement board floor material.

このように構成すれば、床材押圧金具の端部保持部によって、押出成形セメント板床材の上面側基材の端部も保持するので、留め付けをより強固に行うことができる。 With this configuration, the end holding portion of the floor material pressing metal fitting also holds the end portion of the upper surface side base material of the extruded cement board floor material, so that the fastening can be performed more firmly.

また、本発明に係る取付金具は、中空部を有する押出成形セメント板床材を梁材に留め付けるための取付金具であって、前記押出成形セメント板床材に取り付けられる床材取付金具と、前記梁材に取り付けられる梁材取付金具と、を備え、前記床材取付金具は、前記押出成形セメント板床材の裏面側に設けられた被係止部に係止させる係止部材と、前記係止部材から前記押出成形セメント板床材の端部まで延びる板状部と、前記押出成形セメント板床材の端部において立ち上がる立ち上がり部と、を有し、前記梁材取付金具は、前記梁材の上方に配置される本体部と、前記本体部に接続され、前記梁材のフランジ部を幅方向の一方から挟み込む挟持部と、前記本体部の上方に設けられる中空部保持部と、前記中空部保持部に設けられ、回転軸を中心に、前記押出成形セメント板床材の前記中空部に挿入されて前記床材取付金具の前記立ち上がり部を前記押出成形セメント板床材に押し付ける配置状態と、前記押出成形セメント板床材の前記中空部から出た退避状態と、に回転する押圧部材と、前記押圧部材が前記押出成形セメント板床材の端縁と平行となる状態に回転した前記退避状態で係止する回転防止部材と、を有している。 Further, the mounting bracket according to the present invention is a mounting bracket for fastening the extruded cement board floor material having a hollow portion to the beam material, and the floor material mounting bracket to be attached to the extruded cement board floor material and the beam. A beam material mounting bracket to be attached to the material is provided, and the floor material mounting bracket includes a locking member for locking to a locked portion provided on the back surface side of the extruded cement board floor material, and the locking member. It has a plate-shaped portion extending from the extruded cement board flooring material to the end portion and a rising portion rising at the end portion of the extruded cement board flooring material, and the beam material mounting bracket is arranged above the beam material. The main body portion to be formed, the holding portion connected to the main body portion and sandwiching the flange portion of the beam material from one side in the width direction, the hollow portion holding portion provided above the main body portion, and the hollow portion holding portion. An arrangement state in which the riser portion of the floor material mounting bracket is pressed against the extruded cement board floor material by being inserted into the hollow portion of the extruded cement board floor material and the extruded cement board floor is provided around a rotation axis. A pressing member that rotates in a retracted state from the hollow portion of the material, and an anti-rotation member that locks in the retracted state in which the pressing member rotates in a state parallel to the edge of the extruded cement board floor material. And have.

この構成により、梁材取付金具を梁材に挟持部で挟持して取り付け、押出成形セメント板床材に床材取付金具を取り付け、梁材に載せた押出成形セメント板床材を梁材取付金具と床材取付金具とによって梁材に留め付けることができる。しかも、中空部保持部の押圧部材を、押出成形セメント板床材の中空部から出た退避状態とすれば押出成形セメント板床材を梁材に載せるときに取付金具が邪魔にならず、押出成形セメント板床材の中空部に挿入した配置状態とすれば押出成形セメント板床材を梁材に向けて押し付けることができ、押出成形セメント板床材を留め付ける施工性を向上させることができる。また、押出成形セメント板床材を施工階において上方から下向き作業で梁材に留め付けることができるので、施工性を向上させることができる。さらに、床材取付金具の係止部材が押出成形セメント板床材の被係止部に係止されるので、強固に床材を保持することができる。 With this configuration, the beam material mounting bracket is attached to the beam material by sandwiching it with the holding part, the floor material mounting bracket is attached to the extruded cement board floor material, and the extruded cement board flooring material placed on the beam material is attached to the beam material mounting bracket and the floor. It can be fastened to the beam material with the material mounting bracket. Moreover, if the pressing member of the hollow portion holding portion is in a retracted state protruding from the hollow portion of the extruded cement board floor material, the mounting bracket does not get in the way when the extruded cement board floor material is placed on the beam material, and the extruded cement is extruded cement. If the arrangement is made by inserting the extruded cement board floor material into the hollow portion of the board floor material, the extruded cement board floor material can be pressed against the beam material, and the workability of fastening the extruded cement board floor material can be improved. Further, since the extruded cement board floor material can be fastened to the beam material from above on the construction floor by downward work, the workability can be improved. Further, since the locking member of the floor material mounting bracket is locked to the locked portion of the extruded cement board floor material, the floor material can be firmly held.

また、本発明に係る取付金具は、中空部を有する押出成形セメント板床材を梁材に留め付けるための取付金具であって、前記押出成形セメント板床材に取り付けられる床材取付金具と、前記梁材に取り付けられる梁材取付金具と、を備え、前記床材取付金具は、前記押出成形セメント板床材の裏面側に設けられた被係止部に係止させる係止部材と、前記係止部材から前記押出成形セメント板床材の端部まで延びる板状部と、前記梁材のフランジ部を幅方向の一方から挟み込む挟持部と、を有し、前記梁材取付金具は、前記梁材の上方に配置される本体部と、前記本体部に接続され、前記梁材の前記フランジ部を幅方向の一方から挟み込む挟持部と、前記本体部の上方に設けられる中空部保持部と、を有し、前記中空部保持部は、回転軸を中心に、前記押出成形セメント板床材の前記中空部に挿入させて該押出成形セメント板床材を前記梁材に押し付ける配置状態と、前記押出成形セメント板床材の前記中空部から出た退避状態と、に回転する押圧部材と、前記押圧部材が前記押出成形セメント板床材の端縁と平行となる状態に回転した前記退避状態で係止する回転防止部材と、を有している。 Further, the mounting bracket according to the present invention is a mounting bracket for fastening the extruded cement board flooring material having a hollow portion to the beam material, and is a flooring material mounting bracket to be attached to the extruded cement board flooring material and the beam. A beam material mounting bracket to be attached to the material is provided, and the floor material mounting bracket includes a locking member for locking to a locked portion provided on the back surface side of the extruded cement board floor material, and the locking member. It has a plate-shaped portion extending from the to the end of the extruded cement board floor material and a holding portion for sandwiching the flange portion of the beam material from one side in the width direction, and the beam material mounting bracket is above the beam material. It has a main body portion arranged in the main body portion, a holding portion connected to the main body portion and sandwiching the flange portion of the beam material from one side in the width direction, and a hollow portion holding portion provided above the main body portion. The hollow portion holding portion is inserted into the hollow portion of the extruded cement board floor material around the rotation axis to press the extruded cement board floor material against the beam material, and the extruded cement board floor material. A pressing member that rotates in the retracted state from the hollow portion of the above, and an anti-rotation member that locks in the retracted state in which the pressing member rotates in a state parallel to the edge of the extruded cement board floor material. ,have.

この構成により、梁材に挟持部で取り付けた床材取付金具の係止部材を押出成形セメント板床材の被係止部に係止させた状態で、梁材のフランジ部に挟持部で取り付けた梁材取付金具の押圧部材で押出成形セメント板床材を梁材に向けて押し付けて留め付けることができる。しかも、床材取付金具は、挟持部を梁材のフランジ部に挟み込み、係止部材を押出成形セメント板床材の裏面側に設けられた被係止部に係止させるだけなので、容易に取り付けができる。その上、梁材取付金具を予め梁材に取り付けた状態で、押出成形セメント板床材の被係止部を床材取付金具の係止部材に係止させることで押出成形セメント板床材の位置合わせができるので、施工性も向上する。 With this configuration, the locking member of the floor material mounting bracket attached to the beam material by the holding portion is locked to the locked portion of the extruded cement board floor material, and then attached to the flange portion of the beam material by the sandwiching portion. The extruded cement board floor material can be pressed against the beam material and fastened by the pressing member of the beam material mounting bracket. Moreover, the floor material mounting bracket can be easily mounted because the holding portion is sandwiched between the flange portions of the beam material and the locking member is locked to the locked portion provided on the back surface side of the extruded cement plate floor material. it can. In addition, the extruded cement board floor material is aligned by locking the locked portion of the extruded cement board floor material to the locking member of the floor material mounting bracket in a state where the beam material mounting bracket is attached to the beam material in advance. Therefore, workability is also improved.

また、前記回転防止部材は、前記押圧部材が前記押出成形セメント板床材の前記中空部の延びる方向に回転した前記配置状態でも係止するように構成されていてもよい。 Further, the rotation prevention member may be configured to be locked even in the arrangement state in which the pressing member is rotated in the extending direction of the hollow portion of the extruded cement board floor material.

このように構成すれば、回転防止部材によって、押圧部材を退避状態で係止するとともに、床材取付金具を押し付ける配置状態に回転させた状態でも係止することができる。よって、押出成形セメント板床材の取付作業を効率良く行うことができる。 With this configuration, the anti-rotation member can lock the pressing member in the retracted state, and can also lock the pressing member in the state of being rotated in the arrangement state in which the floor material mounting bracket is pressed. Therefore, the work of attaching the extruded cement board floor material can be efficiently performed.

また、前記本体部は、前記挟持部で挟み込んだ前記フランジ部の幅方向の他方端部に掛ける掛け止め部をさらに備えていてもよい。 Further, the main body portion may further include a hooking portion for hanging on the other end portion in the width direction of the flange portion sandwiched between the holding portions.

このように構成すれば、梁材のフランジ部の幅方向両端部を挟持部と掛け止め部とで水平方向に保持するので、梁材取付金具を梁材に保持する保持力をより強くすることができる。 With this configuration, both ends of the flange portion of the beam material in the width direction are held horizontally by the holding portion and the hooking portion, so that the holding force for holding the beam material mounting bracket to the beam material is further strengthened. Can be done.

また、前記本体部は、該本体部と前記梁材の上面との間に空隙部を形成する段部を備えていてもよい。 Further, the main body portion may be provided with a step portion that forms a gap portion between the main body portion and the upper surface of the beam member.

このように構成すれば、本体部の段部によって押出成形セメント板床材を保持する部分と梁材との間に空隙部が形成されるので、押出成形セメント板床材の振動が梁材取付金具から梁材に伝搬することを抑える緩衝特性を発揮することができる。よって、梁材に伝わる振動を抑えることができ、遮音性の向上を図ることができる。 With this configuration, a gap is formed between the portion that holds the extruded cement board floor material and the beam material by the stepped portion of the main body, so that the vibration of the extruded cement board floor material is generated from the beam material mounting bracket. It is possible to exhibit a cushioning property that suppresses propagation to the beam material. Therefore, the vibration transmitted to the beam material can be suppressed, and the sound insulation can be improved.

また、前記掛け止め部は、前記本体部から斜め下方に延びる傾斜部と、前記傾斜部に連続し前記フランジ部と水平に接触する水平部と、前記水平部に連続し前記フランジ部の端部を保持する端部保持部と、を有していてもよい。 Further, the hooking portion includes an inclined portion extending diagonally downward from the main body portion, a horizontal portion continuous with the inclined portion and in horizontal contact with the flange portion, and an end portion of the flange portion continuous with the horizontal portion. It may have an end holding part which holds.

このように構成すれば、掛け止め部の水平部に連続する端部保持部によりフランジ部の端部を保持できるとともに、傾斜部により梁材との間に空隙部ができるので、押出成形セメント板床材の振動が掛け止め部から梁材に伝搬することを抑える緩衝特性を発揮することができる。 With this configuration, the end portion of the flange portion can be held by the end holding portion continuous with the horizontal portion of the hooking portion, and the inclined portion creates a gap between the beam material and the extruded cement board floor. It is possible to exhibit a cushioning property that suppresses the vibration of the material from propagating from the hooking portion to the beam material.

また、前記掛け止め部は、端部保持部の中央部に、上方に折り返した折り返し部をさらに有していてもよい。 Further, the hooking portion may further have a folded-back portion that is folded upward at the central portion of the end holding portion.

このように構成すれば、掛け止め部に抜ける方向の力が掛かった場合、折り返し部が上向きに変形してフランジ部と床材の間で干渉することで、端部保持部がフランジ部から外れにくくなり、梁材取付金具が抜けにくくなる効果を発揮することができる。 With this configuration, when a force is applied to the hooking portion in the pulling direction, the folded-back portion deforms upward and interferes between the flange portion and the floor material, so that the end holding portion comes off from the flange portion. It becomes difficult, and the effect of making it difficult for the beam member mounting bracket to come off can be exhibited.

また、前記挟持部は、前記梁材に設けられた被係合部に係合する係合部をさらに有していてもよい。この明細書及び特許請求の範囲の書類中における「被係合部」は、凹部、凸部及び貫通孔などを含む。「係合部」は、被係合部に係合する凸部、凹凸部、貫通孔などを含む。 Further, the sandwiching portion may further have an engaging portion that engages with the engaged portion provided on the beam member. The "engaged portion" in this specification and the documents of the claims includes recesses, protrusions, through holes, and the like. The "engaging portion" includes a convex portion, an uneven portion, a through hole, and the like that engage with the engaged portion.

このように構成すれば、梁材に凹部、凸部及び貫通孔などの被係合部がある場合、挟持部に設けられた係合部を梁材の被係合部に係合させることにより、取付金具を梁材に保持する保持力をさらに強固にできる。 With this configuration, when the beam material has an engaged portion such as a concave portion, a convex portion, and a through hole, the engaging portion provided in the holding portion is engaged with the engaged portion of the beam material. , The holding force for holding the mounting bracket to the beam material can be further strengthened.

一方、本発明に係る押出成形セメント板床材の取付構造は、前記取付金具によって前記中空部を有する前記押出成形セメント板床材を前記梁材に留め付ける取付構造であって、前記梁材取付金具は、前記挟持部で前記梁材の前記フランジ部を幅方向の一方から挟み込み、前記掛け止め部を前記フランジ部の幅方向の他方端部に掛けて取り付けられ、前記床材押圧金具は、前記押出成形セメント板床材の前記下面側基材を前記梁材に向けて押圧して保持することにより前記押出成形セメント板床材を前記梁材に留め付けている。 On the other hand, the mounting structure of the extruded cement board floor material according to the present invention is a mounting structure in which the extruded cement board floor material having the hollow portion is fastened to the beam material by the mounting metal fitting, and the beam material mounting metal fitting is The flange portion of the beam material is sandwiched between the holding portions from one side in the width direction, and the hooking portion is hung on the other end portion in the width direction of the flange portion to be attached. The extruded cement board floor material is fastened to the beam material by pressing and holding the lower surface side base material of the molded cement board floor material toward the beam material.

この構成により、梁材取付金具の挟持部と掛け止め部とで梁材のフランジ部を水平方向に保持し、梁材取付金具と床材押圧金具で押出成形セメント板床材の下面側基材を梁材に向けて押圧して保持するので、押出成形セメント板床材を梁材に強固に留め付けることができる。しかも、取付金具の部品数を少なくすることができる。さらに、押出成形セメント板床材を、施工階において上方から下向き作業で梁材に留め付けることができるので、施工性を向上させることができる。 With this configuration, the flange portion of the beam material is held horizontally by the holding portion and the hooking portion of the beam material mounting bracket, and the lower surface side base material of the extruded cement board floor material is held by the beam material mounting bracket and the floor material pressing bracket. Since it is pressed and held toward the beam material, the extruded cement board floor material can be firmly fastened to the beam material. Moreover, the number of parts of the mounting bracket can be reduced. Further, since the extruded cement board floor material can be fastened to the beam material from above on the construction floor by downward work, the workability can be improved.

また、本発明に係る押出成形セメント板床材の取付構造は、前記取付金具によって前記中空部を有する前記押出成形セメント板床材を前記梁材に留め付ける取付構造であって、前記梁材取付金具は、前記挟持部で前記梁材の前記フランジ部を幅方向の一方から挟み込み、前記掛け止め部を前記フランジ部の幅方向の他方端部に掛けて取り付けられ、前記床材押圧金具は、前記押出成形セメント板床材の前記下面側基材に設けられた前記被係止部に前記係止部材を係止した状態で、前記押出成形セメント板床材の前記下面側基材を前記梁材に向けて押圧して保持することにより前記押出成形セメント板床材を前記梁材に留め付けている。 Further, the mounting structure of the extruded cement board floor material according to the present invention is a mounting structure in which the extruded cement board floor material having the hollow portion is fastened to the beam material by the mounting metal fitting, and the beam material mounting metal fitting is The flange portion of the beam material is sandwiched between the holding portions from one side in the width direction, and the hooking portion is hung on the other end portion in the width direction of the flange portion to be attached. With the locking member locked to the locked portion provided on the lower surface side base material of the molded cement board floor material, the lower surface side base material of the extruded cement board floor material is directed toward the beam material. The extruded cement board floor material is fastened to the beam material by pressing and holding.

この構成により、梁材取付金具の挟持部と掛け止め部とで梁材のフランジ部を水平方向に保持し、床材押圧金具の係止部材を押出成形セメント板床材の被係止部に係止した状態で下面側基材を梁材に向けて押圧して保持するので、押出成形セメント板床材を梁材に強固に留め付けることができる。しかも、取付金具の部品数を少なくすることができる。さらに、押出成形セメント板床材を、施工階において上方から下向き作業で梁材に留め付けることができるので、施工性を向上させることができる。 With this configuration, the flange portion of the beam material is held horizontally by the holding portion and the hooking portion of the beam material mounting bracket, and the locking member of the floor material pressing bracket is engaged with the locked portion of the extruded cement board floor material. Since the lower surface side base material is pressed and held toward the beam material in the stopped state, the extruded cement board floor material can be firmly fastened to the beam material. Moreover, the number of parts of the mounting bracket can be reduced. Further, since the extruded cement board floor material can be fastened to the beam material from above on the construction floor by downward work, the workability can be improved.

また、本発明に係る押出成形セメント板床材の取付構造は、前記取付金具によって前記中空部を有する前記押出成形セメント板床材を前記梁材に留め付ける取付構造であって、前記梁材取付金具は、前記挟持部で前記梁材の前記フランジ部を幅方向の一方から挟み込んで取り付けられ、前記床材押圧金具は、前記押出成形セメント板床材の前記桟部を前記梁材に向けて押圧して保持することにより前記押出成形セメント板床材を前記梁材に留め付けている。 Further, the mounting structure of the extruded cement board floor material according to the present invention is a mounting structure in which the extruded cement board floor material having the hollow portion is fastened to the beam material by the mounting metal fitting, and the beam material mounting metal fitting is , The flange portion of the beam material is sandwiched and attached from one side in the width direction by the sandwiching portion, and the floor material pressing metal fitting presses the crosspiece portion of the extruded cement board floor material toward the beam material. By holding, the extruded cement board floor material is fastened to the beam material.

この構成により、梁材取付金具は挟持部で梁材のフランジ部を挟み込んで取り付けられ、梁材取付金具と床材押圧金具で押出成形セメント板床材の桟部を梁材に向けて押圧して保持するので、押出成形セメント板床材を梁材に強固に留め付けることができる。しかも、押出成形セメント板床材を、施工階において上方から下向き作業で梁材に留め付けることができるので、施工性を向上させることができる。 With this configuration, the beam material mounting bracket is attached by sandwiching the flange part of the beam material with the holding part, and the crosspiece of the extruded cement board floor material is pressed toward the beam material by the beam material mounting bracket and the floor material pressing metal fitting. Since it is held, the extruded cement board floor material can be firmly fastened to the beam material. Moreover, since the extruded cement board floor material can be fastened to the beam material from above on the construction floor by downward work, the workability can be improved.

また、本発明に係る押出成形セメント板床材の取付構造は、前記取付金具によって前記中空部を有する前記押出成形セメント板床材を前記梁材に留め付ける取付構造であって、前記梁材取付金具を、前記押圧部材を前記退避状態にして前記梁材の前記フランジ部に前記挟持部で挟み込んで取り付け、前記床材取付金具を、前記押出成形セメント板床材の前記中空部に挿入して前記係止部材を前記被係止部に係止させた状態で前記立ち上がり部が前記押出成形セメント板床材の端部に位置するように取り付け、前記押圧部材を前記配置状態に回転させた状態で前記床材取付金具の前記立ち上がり部を押圧して前記押出成形セメント板床材を前記梁材に押し付けている。 Further, the mounting structure of the extruded cement board floor material according to the present invention is a mounting structure in which the extruded cement board flooring material having the hollow portion is fastened to the beam material by the mounting metal fitting, and the beam material mounting metal fitting is attached. The pressing member is placed in the retracted state and is sandwiched and attached to the flange portion of the beam material by the holding portion, and the floor material mounting bracket is inserted into the hollow portion of the extruded cement board floor material to lock the beam material. The floor material is attached so that the rising portion is located at the end of the extruded cement board floor material in a state where the member is locked to the locked portion, and the pressing member is rotated to the arrangement state. The rising portion of the mounting bracket is pressed to press the extruded cement board floor material against the beam material.

この構成により、押圧部材を、押出成形セメント板床材の中空部から出た退避状態とすれば押出成形セメント板床材を梁材に載せるときに取付金具が邪魔にならず、押出成形セメント板床材の中空部に挿入した配置状態とすれば、床材取付金具を中空部に向けて押圧することで、押出成形セメント板床材を梁材に向けて押し付けて留め付けることができ、押出成形セメント板床材を留め付ける施工性が向上する。さらに、床材取付金具により貫通孔で嵌合しているので、強固に床材を保持することができる。しかも、押出成形セメント板床材を施工する階における下向き作業で押出成形セメント板床材を梁材に留め付けることができるので、施工性が向上する。 With this configuration, if the pressing member is in a retracted state protruding from the hollow portion of the extruded cement board floor material, the mounting bracket does not get in the way when the extruded cement board floor material is placed on the beam material, and the extruded cement board floor material In the arrangement state where the floor material is inserted into the hollow part, the extruded cement board floor material can be pressed and fastened toward the beam material by pressing the floor material mounting bracket toward the hollow part, and the extruded cement board floor material can be fastened. Workability is improved. Further, since the floor material is fitted by the floor material mounting bracket through the through hole, the floor material can be firmly held. Moreover, since the extruded cement board floor material can be fastened to the beam material by the downward work on the floor where the extruded cement board floor material is constructed, the workability is improved.

また、本発明に係る押出成形セメント板床材の取付構造は、前記取付金具によって前記中空部を有する前記押出成形セメント板床材を前記梁材に留め付ける取付構造であって、前記床材取付金具を、前記挟持部で前記梁材の前記フランジ部を幅方向の一方から挟み込み、前記係止部材を前記押出成形セメント板床材の前記被係止部に係止させて取り付け、前記梁材取付金具を、前記挟持部で前記梁材の前記フランジ部を幅方向の一方から挟み込んで取り付け、前記押圧部材を回転させて該押圧部材を前記中空部に挿入させた前記配置状態として前記押出成形セメント板床材を前記梁材に押し付けている。 Further, the mounting structure of the extruded cement board flooring material according to the present invention is a mounting structure in which the extruded cement board flooring material having the hollow portion is fastened to the beam material by the mounting bracket, and the flooring material mounting bracket is attached. , The flange portion of the beam material is sandwiched by the sandwiching portion from one side in the width direction, and the locking member is locked and attached to the locked portion of the extruded cement board floor material, and the beam material mounting bracket is attached. The extruded cement board floor material is placed in the arrangement state in which the flange portion of the beam material is sandwiched and attached from one side in the width direction by the holding portion, and the pressing member is rotated to insert the pressing member into the hollow portion. Is pressed against the beam material.

この構成により、梁材に挟持部で取り付けた床材取付金具の係止部材を押出成形セメント板床材の被係止部に係止させた状態で、梁材のフランジ部に挟持部で取り付けた梁材取付金具の押圧部材で押出成形セメント板床材を梁材に向けて押し付けて留め付けることができる。しかも、梁材取付金具を予め梁材に取り付けた状態で、押出成形セメント板床材の被係合部を床材取付金具の係合部に係合させることで押出成形セメント板床材の位置合わせができるので、押出成形セメント板床材を載せる施工性も向上する。 With this configuration, the locking member of the floor material mounting bracket attached to the beam material by the holding portion is locked to the locked portion of the extruded cement board floor material, and then attached to the flange portion of the beam material by the sandwiching portion. The extruded cement board floor material can be pressed against the beam material and fastened by the pressing member of the beam material mounting bracket. Moreover, the extruded cement board floor material can be aligned by engaging the engaged portion of the extruded cement board floor material with the engaging part of the floor material mounting bracket in a state where the beam material mounting bracket is attached to the beam material in advance. Since it can be made, the workability of placing the extruded cement board flooring material is also improved.

本発明によれば、梁材に梁材取付金具を取り付けた状態を適切に保って押出成形セメント板床材を梁材に載せることが容易にできる。そして、取付金具で押出成形セメント板床材を梁材に留め付ける作業を上方から効率良く行うことができる。よって、押出成形セメント板床材の留め付け作業性を向上させることが可能となる。 According to the present invention, it is possible to easily place the extruded cement board floor material on the beam material while appropriately maintaining the state in which the beam material mounting bracket is attached to the beam material. Then, the work of fastening the extruded cement board floor material to the beam material with the mounting bracket can be efficiently performed from above. Therefore, it is possible to improve the fastening workability of the extruded cement board floor material.

さらに、押出成形セメント板床材の梁材への留め付けを、梁材取付金具と床材押圧金具とによって強固に行うことができるので、押出成形セメント板床材の留め付け信頼性を向上させることが可能となる。また、取付金具の構造によって遮音性能を向上させる構造とすることもできる。 Further, since the extruded cement board floor material can be firmly fastened to the beam material by the beam material mounting metal fitting and the floor material pressing metal fitting, the fastening reliability of the extruded cement board floor material can be improved. It will be possible. Further, the structure of the mounting bracket can be used to improve the sound insulation performance.

図1は、本発明の第1実施形態に係る第1取付金具を示す図面であり、(A)は分解斜視図、(B)は床材押圧金具の裏面側を示す斜視図である。1A and 1B are drawings showing a first mounting bracket according to the first embodiment of the present invention, FIG. 1A is an exploded perspective view, and FIG. 1B is a perspective view showing a back surface side of a floor material pressing bracket. 図2は、図1に示す第1取付金具を梁材に取り付けた使用状態の図面であり、(A)は平面図であり、(B)は側面視の断面図である。2A and 2B are drawings of a used state in which the first mounting bracket shown in FIG. 1 is attached to a beam member, FIG. 2A is a plan view, and FIG. 2B is a cross-sectional view in a side view. 図3は、図1に示す第1取付金具で押出成形セメント板床材を梁材に留め付けた取付構造を示す斜視図である。FIG. 3 is a perspective view showing a mounting structure in which the extruded cement board floor material is fastened to the beam material with the first mounting bracket shown in FIG. 図4は、図1に示す第1取付金具における梁材取付金具の変形例を示す斜視図である。FIG. 4 is a perspective view showing a modified example of the beam member mounting bracket in the first mounting bracket shown in FIG. 図5は、図4に示す梁材取付金具を梁材に取り付けた使用状態における側面視の断面図である。FIG. 5 is a cross-sectional view of the side view in a used state in which the beam material mounting bracket shown in FIG. 4 is attached to the beam material. 図6は、図1に示す第1取付金具における床材押圧金具の変形例を示す床材押圧金具の図面であり、(A)は表面側の斜視図、(B)は裏面側の斜視図である。6A and 6B are drawings of a floor material pressing metal fitting showing a modified example of the floor material pressing metal fitting in the first mounting metal fitting shown in FIG. 1, where FIG. 6A is a perspective view of the front surface side and FIG. 6B is a perspective view of the back surface side. Is. 図7は、図6に示す床材押圧金具を用いた第1取付金具を梁材に取り付けた使用状態における側面視の断面図である。FIG. 7 is a cross-sectional view of a side view in a used state in which the first mounting bracket using the floor material pressing bracket shown in FIG. 6 is attached to the beam material. 図8は、本発明の第2実施形態に係る第2取付金具の梁材取付金具を示す斜視図である。FIG. 8 is a perspective view showing a beam member mounting bracket of the second mounting bracket according to the second embodiment of the present invention. 図9は、図8に示す梁材取付金具を有する第2取付金具を梁材に取り付けた使用状態における側面視の断面図である。FIG. 9 is a cross-sectional view of a side view in a used state in which the second mounting bracket having the beam member mounting bracket shown in FIG. 8 is attached to the beam material. 図10は、図9に示す第2取付金具で押出成形セメント板床材を梁材に留め付けた取付構造を示す斜視図である。FIG. 10 is a perspective view showing a mounting structure in which the extruded cement board floor material is fastened to the beam material with the second mounting bracket shown in FIG. 図11は、本発明の第3実施形態に係る第3取付金具を示す図面であり、(A)は分解斜視図、(B)は床材押圧金具の裏面側を示す斜視図である。11A and 11B are drawings showing a third mounting bracket according to a third embodiment of the present invention, where FIG. 11A is an exploded perspective view and FIG. 11B is a perspective view showing the back surface side of the floor material pressing bracket. 図12は、図11に示す第3取付金具を梁材に取り付けた使用状態の図面であり、(A)は平面図であり、(B)は側面視の断面図である。12A and 12B are views of a used state in which the third mounting bracket shown in FIG. 11 is attached to the beam member, FIG. 12A is a plan view, and FIG. 12B is a cross-sectional view in a side view. 図13は、図11に示す第3取付金具で押出成形セメント板床材を梁材に留め付けた取付構造を示す斜視図である。FIG. 13 is a perspective view showing a mounting structure in which the extruded cement board floor material is fastened to the beam material with the third mounting bracket shown in FIG. 図14は、図11に示す第3取付金具における床材押圧金具の変形例を示す床材押圧金具の図面であり、(A)は表面側の斜視図、(B)は裏面側の斜視図である。14A and 14B are drawings of a floor material pressing metal fitting showing a modified example of the floor material pressing metal fitting in the third mounting metal fitting shown in FIG. 11, where FIG. 14A is a perspective view of the front surface side and FIG. 14B is a perspective view of the back surface side. Is. 図15は、図14に示す床材押圧金具を用いた第3取付金具を梁材に取り付けた使用状態の図面であり、(A)は平面図であり、(B)は側面視の断面図である。15A and 15B are drawings of a used state in which the third mounting bracket using the floor material pressing bracket shown in FIG. 14 is attached to the beam material, FIG. 15A is a plan view, and FIG. 15B is a cross-sectional view in a side view. Is. 図16は、本発明の第4実施形態に係る第4取付金具の床材押圧金具を示す斜視図である。FIG. 16 is a perspective view showing a floor material pressing metal fitting of the fourth mounting metal fitting according to the fourth embodiment of the present invention. 図17は、図16に示す床材押圧金具を用いた第4取付金具を梁材に取り付けた使用状態における側面視の断面図である。FIG. 17 is a cross-sectional view of a side view in a used state in which the fourth mounting bracket using the floor material pressing bracket shown in FIG. 16 is attached to the beam material. 図18は、本発明の第5実施形態に係る第5取付金具を示す分解斜視図である。FIG. 18 is an exploded perspective view showing a fifth mounting bracket according to a fifth embodiment of the present invention. 図19は、図18に示す第5取付金具を梁材に取り付けた使用状態の図面であり、(A)は平面図であり、(B)は側面視の断面図である。19A and 19B are views of a used state in which the fifth mounting bracket shown in FIG. 18 is attached to a beam member, FIG. 19A is a plan view, and FIG. 19B is a cross-sectional view taken from a side view. 図20は、図18に示す第5取付金具で押出成形セメント板床材を梁材に留め付けた取付構造を示す斜視図である。FIG. 20 is a perspective view showing a mounting structure in which the extruded cement board floor material is fastened to the beam material with the fifth mounting bracket shown in FIG. 図21は、本発明の第6実施形態に係る第6取付金具を示す図面であり、(A)は分解斜視図であり、(B)は(A)とは異なる梁材取付金具を示す斜視図である。21A and 21B are drawings showing a sixth mounting bracket according to a sixth embodiment of the present invention, (A) is an exploded perspective view, and (B) is a perspective view showing a beam material mounting bracket different from (A). It is a figure. 図22は、本発明の第7実施形態に係る第7取付金具を示す分解斜視図である。FIG. 22 is an exploded perspective view showing a seventh mounting bracket according to the seventh embodiment of the present invention. 図23は、図22に示す第7取付金具を梁材に取り付けた使用状態を示す図面であり、(A)は(B)に示すXXIII−XXIII矢視の断面図であり、(B)は側面視の断面図である。FIG. 23 is a drawing showing a usage state in which the seventh mounting bracket shown in FIG. 22 is attached to the beam material, (A) is a cross-sectional view taken along the line XXIII-XXIII shown in (B), and (B) is a cross-sectional view. It is sectional drawing of the side view. 図24は、本発明の第8実施形態に係る第8取付金具を示す分解斜視図である。FIG. 24 is an exploded perspective view showing an eighth mounting bracket according to an eighth embodiment of the present invention. 図25は、図24に示す第8取付金具を梁材に取り付けた取付構造を示す斜視図である。FIG. 25 is a perspective view showing a mounting structure in which the eighth mounting bracket shown in FIG. 24 is mounted on the beam material. 図26は、本発明の第9実施形態に係る第9取付金具を示す分解斜視図である。FIG. 26 is an exploded perspective view showing a ninth mounting bracket according to a ninth embodiment of the present invention. 図27は、図26に示す第9取付金具の梁材取付金具165と中空部保持部168とを組み立てた状態の平面図である。FIG. 27 is a plan view of the beam member mounting bracket 165 and the hollow portion holding portion 168 of the ninth mounting bracket shown in FIG. 26 in an assembled state. 図28は、図26に示す第9取付金具を梁材に取り付けた使用状態を示す図面であり、(A)は(B)に示すXXVIII−XXVIII矢視の断面図であり、(B)は側面視の断面図である。28 is a drawing showing a usage state in which the ninth mounting bracket shown in FIG. 26 is attached to the beam material, FIG. 28A is a cross-sectional view taken along the line XXVIII-XXVIII shown in FIG. It is sectional drawing of the side view. 図29は、図26に示す第9取付金具を梁材に取り付けた取付構造を示す斜視図である。FIG. 29 is a perspective view showing a mounting structure in which the ninth mounting bracket shown in FIG. 26 is mounted on the beam material.

以下、本発明の実施形態を図面に基づいて説明する。以下の実施形態では、施工階における一部の押出成形セメント板床材1を図示して説明する。この明細書及び特許請求の範囲の書類中では、図3に示すように、梁材5の延びる方向を前後方向、押出成形セメント板床材1の延びる方向を左右方向(幅方向)とする。また、押出成形セメント板床材1の上面を「表面」、下面を「裏面」ともいう。さらに、押出成形セメント板床材1の上面側基材1bと下面側基材1cとの間の中空部2を仕切る隔壁を「桟部1a」という。 Hereinafter, embodiments of the present invention will be described with reference to the drawings. In the following embodiment, a part of the extruded cement board floor material 1 on the construction floor will be illustrated and described. In this specification and documents within the scope of claims, as shown in FIG. 3, the extending direction of the beam member 5 is the front-rear direction, and the extending direction of the extruded cement board floor material 1 is the left-right direction (width direction). Further, the upper surface of the extruded cement board floor material 1 is also referred to as "front surface", and the lower surface is also referred to as "back surface". Further, the partition wall that partitions the hollow portion 2 between the upper surface side base material 1b and the lower surface side base material 1c of the extruded cement board floor material 1 is referred to as a “crosspiece 1a”.

(第1実施形態に係る第1取付金具)
図1は、第1実施形態に係る第1取付金具10を示す図面であり、(A)は分解斜視図、(B)は床材押圧金具11の裏面側を示す斜視図である。第1取付金具10は、押出成形セメント板床材1の下面側基材1c(図2)を梁材5(図2)に向けて押圧する床材押圧金具11と、梁材5に取り付けられる梁材取付金具15とを備えている。
(First mounting bracket according to the first embodiment)
1A and 1B are drawings showing the first mounting bracket 10 according to the first embodiment, FIG. 1A is an exploded perspective view, and FIG. 1B is a perspective view showing the back surface side of the floor material pressing bracket 11. The first mounting bracket 10 includes a floor material pressing bracket 11 that presses the lower surface side base material 1c (FIG. 2) of the extruded cement board flooring material 1 toward the beam material 5 (FIG. 2), and a beam attached to the beam material 5. It is provided with a material mounting bracket 15.

床材押圧金具11は、矩形状の板材で形成されており、中央部分には梁材取付金具15に設けられた保持部材たるボルト材18が挿通される貫通孔12が設けられている。また、床材押圧金具11の長手方向には、貫通孔12の両側方に上向きの突条13が設けられている。板状の床材押圧金具11に突条13を設けることで、曲げ強度を向上させている。この例の床材押圧金具11は、下面が押出成形セメント板床材1の下面側基材1c(図2)を押圧する押圧部となる。 The floor material pressing metal fitting 11 is formed of a rectangular plate material, and a through hole 12 through which a bolt material 18 as a holding member provided in the beam material mounting metal fitting 15 is inserted is provided in the central portion. Further, in the longitudinal direction of the floor material pressing metal fitting 11, upward ridges 13 are provided on both sides of the through hole 12. Bending strength is improved by providing the ridge 13 on the plate-shaped floor material pressing metal fitting 11. The lower surface of the floor material pressing metal fitting 11 of this example is a pressing portion that presses the lower surface side base material 1c (FIG. 2) of the extruded cement board floor material 1.

梁材取付金具15は、梁材5の上方に配置される平面状の本体部16と、本体部16との間で梁材5のフランジ部6(図2)を幅方向の一方から挟み込む挟持部17と、本体部16の上方に設けられた保持部たるボルト材18と、ボルト材18にねじ込むナット材19とを有している。挟持部17は、板材からなる本体部16の一方に延びる所定位置を下向きに屈曲させ、端部を本体部16の下方へ向けて延びるように所定位置まで曲げられて形成されている。挟持部17は、梁材5のフランジ部6(図2)を幅方向の一方から挟み込むように形成されている。 The beam member mounting bracket 15 sandwiches the flange portion 6 (FIG. 2) of the beam member 5 from one side in the width direction between the flat main body portion 16 arranged above the beam member 5 and the main body portion 16. It has a portion 17, a bolt material 18 as a holding portion provided above the main body portion 16, and a nut material 19 screwed into the bolt material 18. The sandwiching portion 17 is formed by bending a predetermined position extending downward to one side of the main body portion 16 made of a plate material and bending the end portion downward to a predetermined position so as to extend downward of the main body portion 16. The sandwiching portion 17 is formed so as to sandwich the flange portion 6 (FIG. 2) of the beam member 5 from one side in the width direction.

また、梁材取付金具15には、左右方向の一方に延びる上記挟持部17とは反対方向に延びる掛け止め部20が備えられている。掛け止め部20は、挟持部17でフランジ部6の幅方向を一方から挟持した状態で、フランジ部6の幅方向の他方端部に掛けることができるように形成されている。掛け止め部20は、本体部16の上面に接続された支持部20aと、支持部20aから斜め下方に延びる傾斜部20bと、傾斜部20bに連続してフランジ部6(図2)に水平に接触する水平部20cと、水平部20cに連続してフランジ部6の端部に掛けられる端部保持部20dと、を有している。端部保持部20dは、板材の端部を下向きに屈曲させて形成されている。端部保持部20dは、水平部20cに対し、30°〜90°の角度θの範囲で屈曲するように形成される。端部保持部20dを屈曲させる角度θは、90°より大きいとフランジ部6に掛け止める効果がなく、30°より小さいとフランジ部6の端部への掛かりが少なくなり、掛け止め効果が小さくなる。 Further, the beam member mounting bracket 15 is provided with a hooking portion 20 extending in a direction opposite to the holding portion 17 extending in one direction in the left-right direction. The hooking portion 20 is formed so that it can be hung on the other end portion of the flange portion 6 in the width direction while the holding portion 17 sandwiches the width direction of the flange portion 6 from one side. The hooking portion 20 has a support portion 20a connected to the upper surface of the main body portion 16, an inclined portion 20b extending diagonally downward from the supporting portion 20a, and a flange portion 6 (FIG. 2) horizontally continuous with the inclined portion 20b. It has a horizontal portion 20c that comes into contact with the horizontal portion 20c, and an end portion holding portion 20d that is continuously hung on the end portion of the flange portion 6 on the horizontal portion 20c. The end holding portion 20d is formed by bending the end portion of the plate material downward. The end holding portion 20d is formed so as to bend with respect to the horizontal portion 20c in a range of an angle θ of 30 ° to 90 °. If the angle θ at which the end holding portion 20d is bent is larger than 90 °, there is no effect of hooking on the flange portion 6, and if it is smaller than 30 °, the hooking on the end of the flange portion 6 is reduced and the hooking effect is small. Become.

また、この例では、端部保持部20dの中央部に、上方に折り返した折り返し部20eが設けられている。折り返し部20eを設けることにより、梁材取付金具15が抜ける方向に力が掛かった場合に折り返し部20eが上向きに変形し、フランジ部6と押出成形セメント板床材1の間で干渉することで、端部保持部20dをフランジ部から外れにくくし、梁材取付金具15を抜けにくくしている。掛け止め部20は、支持部20aが本体部16に溶接などで接続(固定)される。 Further, in this example, a folded portion 20e folded upward is provided at the central portion of the end holding portion 20d. By providing the folded-back portion 20e, when a force is applied in the direction in which the beam member mounting bracket 15 is pulled out, the folded-back portion 20e is deformed upward and interferes between the flange portion 6 and the extruded cement board floor material 1. The end holding portion 20d is hard to come off from the flange portion, and the beam member mounting bracket 15 is hard to come off. In the hooking portion 20, the support portion 20a is connected (fixed) to the main body portion 16 by welding or the like.

梁材取付金具15は、梁材5のフランジ部6の両端部を挟持部17と掛け止め部20とで水平方向に保持することができるので、梁材取付金具15を梁材5により強固に保持することができる。 Since both ends of the flange portion 6 of the beam member 5 can be held horizontally by the holding portion 17 and the hooking portion 20, the beam member mounting bracket 15 is made stronger by the beam member 5. Can be held.

さらに、第1取付金具10は、本体部16の中央部分が梁材5から上方へ離れるように段部16aが設けられている。段部16aは、本体部16を上方へ屈曲させることで形成されている。段部16aを設けることで、後述するように、本体部16と梁材5との間に空隙部V(図2(B))が形成される。空隙部Vを形成することで、押出成形セメント板床材1の振動が第1取付金具10から梁材5に伝搬することを抑える緩衝特性を発揮することができる。すなわち、段部16aによって振動伝搬に対して緩衝特性を持たせることができるため、第1取付金具10から梁材5に伝わる振動を抑えることができる。なお、段部16aの構成は限定されるものではなく、本体部16と梁材5との間に空隙部Vが形成できる構成であればよい。 Further, the first mounting bracket 10 is provided with a step portion 16a so that the central portion of the main body portion 16 is separated upward from the beam member 5. The step portion 16a is formed by bending the main body portion 16 upward. By providing the step portion 16a, a gap portion V (FIG. 2B) is formed between the main body portion 16 and the beam member 5 as described later. By forming the gap portion V, it is possible to exhibit a cushioning property that suppresses the vibration of the extruded cement board floor material 1 from propagating from the first mounting bracket 10 to the beam material 5. That is, since the step portion 16a can provide a cushioning characteristic against vibration propagation, it is possible to suppress the vibration transmitted from the first mounting bracket 10 to the beam member 5. The configuration of the step portion 16a is not limited as long as it can form a gap portion V between the main body portion 16 and the beam member 5.

(第1取付金具の使用例)
図2は、図1に示す第1取付金具10を梁材5に取り付けた使用状態の図面であり、(A)は平面図であり、(B)は側面視の断面図である。この実施形態の押出成形セメント板床材1は、第1取付金具10で梁材5に留め付けられる中空部2の位置の上面側基材1bの端部に切欠き部1dが設けられている。第1取付金具10の床材押圧金具11は、隣り合う押出成形セメント板床材1の目地の間から装着して取り付けてもよいが、この実施形態のように、予め押出成形セメント板床材1の上面側基材1bに最小限の切欠き部1dを設けることで、より容易に床材押圧金具11を取り付けることが可能となる。なお、押出成形セメント板床材1が隣り合う場合は、切欠き部1dを向い合う押出成形セメント板床材1の端部にそれぞれ設けてもよいし、いずれか一方にのみ設けてもよい。切欠き部1dは、床材押圧金具11が挿入できる大きさであればよい。
(Example of using the first mounting bracket)
2A and 2B are drawings in a used state in which the first mounting bracket 10 shown in FIG. 1 is attached to the beam member 5, FIG. 2A is a plan view, and FIG. 2B is a cross-sectional view in a side view. The extruded cement board floor material 1 of this embodiment is provided with a notch 1d at the end of the upper surface side base material 1b at the position of the hollow portion 2 to be fastened to the beam member 5 by the first mounting bracket 10. The floor material pressing metal fitting 11 of the first mounting metal fitting 10 may be mounted and mounted from between the joints of the adjacent extruded cement board floor material 1, but as in this embodiment, the extruded cement board floor material 1 may be mounted in advance. By providing the minimum cutout portion 1d on the upper surface side base material 1b, the floor material pressing metal fitting 11 can be attached more easily. When the extruded cement board flooring materials 1 are adjacent to each other, the notch portions 1d may be provided at the ends of the extruded cement board flooring materials 1 facing each other, or may be provided only on one of them. The notch portion 1d may have a size that allows the floor material pressing metal fitting 11 to be inserted.

第1取付金具10によって押出成形セメント板床材1を梁材5へ留め付ける場合、梁材取付金具15が挟持部17で梁材5のフランジ部6を幅方向の一方から挟み込むように挿入され、掛け止め部20の端部保持部20dがフランジ部6の幅方向の他方端部に掛けられて梁材5の所定位置に取り付けられる。この状態の梁材取付金具15は、挟持部17と端部保持部20dとによってフランジ部6を水平方向に保持しているので、強い保持力で保持されている。 When the extruded cement board floor material 1 is fastened to the beam material 5 by the first mounting bracket 10, the beam material mounting bracket 15 is inserted so as to sandwich the flange portion 6 of the beam material 5 with the sandwiching portion 17 from one side in the width direction. The end holding portion 20d of the hooking portion 20 is hung on the other end portion in the width direction of the flange portion 6 and attached to a predetermined position of the beam member 5. Since the flange portion 6 is held in the horizontal direction by the holding portion 17 and the end holding portion 20d, the beam member mounting bracket 15 in this state is held with a strong holding force.

その後、梁材取付金具15の本体部16に設けられたボルト材18を挟んで、押出成形セメント板床材1が梁材5に載せられる。梁材取付金具15が強い保持力で梁材5に取り付けられているので、押出成形セメント板床材1を容易に載せることができる。そして、ボルト材18に、床材押圧金具11が貫通孔12から挿入される。そして、ボルト材18にナット材19をねじ込んで締め付けることで、床材押圧金具11によって押出成形セメント板床材1の下面側基材1cが梁材5に向けて押圧されて保持される。これにより、隣り合う押出成形セメント板床材1を梁材5に留め付けることができる。 After that, the extruded cement board floor material 1 is placed on the beam material 5 with the bolt material 18 provided on the main body 16 of the beam material mounting bracket 15 sandwiched. Since the beam material mounting bracket 15 is attached to the beam material 5 with a strong holding force, the extruded cement board floor material 1 can be easily mounted. Then, the floor material pressing metal fitting 11 is inserted into the bolt material 18 through the through hole 12. Then, by screwing and tightening the nut material 19 into the bolt material 18, the lower surface side base material 1c of the extruded cement board floor material 1 is pressed and held toward the beam material 5 by the floor material pressing metal fitting 11. As a result, the adjacent extruded cement board floor material 1 can be fastened to the beam material 5.

また、第1取付金具10は、部品数を少なくすることができる。その上、押出成形セメント板床材1を施工階において上方から下向き作業で梁材5に留め付けることができるので、施工性を向上させることができる。しかも、空隙部Vにより、押出成形セメント板床材1から梁材5に向けて振動が伝搬することを抑える緩衝特性を発揮することができる。よって、梁材5に伝わる振動を抑えることができ、遮音性が向上する。 Further, the number of parts of the first mounting bracket 10 can be reduced. Further, since the extruded cement board floor material 1 can be fastened to the beam material 5 from above on the construction floor by downward work, the workability can be improved. Moreover, the gap portion V can exhibit a cushioning property that suppresses the propagation of vibration from the extruded cement board floor material 1 to the beam material 5. Therefore, the vibration transmitted to the beam member 5 can be suppressed, and the sound insulation property is improved.

さらに、第1取付金具10は、梁材5の左右位置に載せられる隣り合う押出成形セメント板床材1を1つの床材押圧金具11で同時に押圧して留め付けることができる。このため、隣り合う押出成形セメント板床材1の留め付け作業を1箇所で行うことができ、押出成形セメント板床材1の留め付け作業を効率良く行うことができる。 Further, the first mounting bracket 10 can simultaneously press and fasten the adjacent extruded cement board flooring materials 1 placed on the left and right positions of the beam member 5 with one flooring material pressing metal fitting 11. Therefore, the fastening work of the adjacent extruded cement board flooring materials 1 can be performed at one place, and the fastening work of the extruded cement board flooring material 1 can be efficiently performed.

(第1取付金具を用いた取付構造例)
図3は、図1に示す第1取付金具10で押出成形セメント板床材1を梁材5に留め付けた取付構造を示す斜視図である。第1取付金具10は、梁材取付金具15が挟持部17で梁材5のフランジ部6を幅方向の一方から挟み込むように取り付けられ、掛け止め部20の端部保持部20dがフランジ部6の幅方向の他方端部に掛けられる(図2)。梁材取付金具15の取り付け後、梁材取付金具15のボルト材18を挟んで隣り合うように押出成形セメント板床材1が梁材5に載せられる(図では一方の押出成形セメント板床材1のみを示す)。押出成形セメント板床材1は、上面側基材1bの端部が切り取られ切欠き部1dの部分(図2(A))がボルト材18の位置に載せられる。
(Example of mounting structure using the first mounting bracket)
FIG. 3 is a perspective view showing a mounting structure in which the extruded cement board floor material 1 is fastened to the beam material 5 with the first mounting bracket 10 shown in FIG. The first mounting bracket 10 is mounted so that the beam mounting bracket 15 sandwiches the flange portion 6 of the beam member 5 from one side in the width direction by the sandwiching portion 17, and the end holding portion 20d of the hooking portion 20 is the flange portion 6. It is hung on the other end in the width direction of (Fig. 2). After the beam material mounting bracket 15 is attached, the extruded cement board floor material 1 is placed on the beam material 5 so as to sandwich the bolt material 18 of the beam material mounting bracket 15 so as to be adjacent to each other (in the figure, only one extruded cement board floor material 1 is placed). Shows). In the extruded cement board floor material 1, the end portion of the upper surface side base material 1b is cut off, and the notched portion 1d (FIG. 2 (A)) is placed at the position of the bolt material 18.

そして、床材押圧金具11を、貫通孔12からボルト材18に挿通して、隣り合う押出成形セメント板床材1の下面側基材1cに掛かるように取り付けられる(図2)。その後、ボルト材18にナット材19をねじ込んで締め付けることにより、床材押圧金具11によって押出成形セメント板床材1を梁材5に向けて押圧して留め付けることができる。 Then, the floor material pressing metal fitting 11 is inserted through the through hole 12 into the bolt material 18 and attached so as to hang on the lower surface side base material 1c of the adjacent extruded cement board floor material 1 (FIG. 2). After that, by screwing and tightening the nut material 19 into the bolt material 18, the extruded cement board floor material 1 can be pressed and fastened toward the beam material 5 by the floor material pressing metal fitting 11.

(第1実施形態における梁材取付金具の変形例)
図4は、図1に示す第1取付金具10における梁材取付金具15の変形例を示す斜視図である。図5は、図4に示す梁材取付金具15を梁材5に取り付けた使用状態における側面視の断面図である。この例の梁材取付金具15は、図1に示す梁材取付金具15と掛け止め部21の構成が異なる例である。掛け止め部21以外の本体部16と、挟持部17と、保持部たるボルト材18と、ボルト材18にねじ込むナット材19は、図1に示す梁材取付金具15と同一である。同一の構成には同一の符号を付して、その説明は省略する。
(Modification example of beam member mounting bracket in the first embodiment)
FIG. 4 is a perspective view showing a modified example of the beam member mounting bracket 15 in the first mounting bracket 10 shown in FIG. FIG. 5 is a cross-sectional view of the side view in a used state in which the beam member mounting bracket 15 shown in FIG. 4 is attached to the beam member 5. The beam member mounting bracket 15 in this example is an example in which the configurations of the beam member mounting bracket 15 and the hooking portion 21 shown in FIG. 1 are different. The main body portion 16 other than the hooking portion 21, the holding portion 17, the bolt material 18 serving as the holding portion, and the nut material 19 screwed into the bolt material 18 are the same as the beam material mounting bracket 15 shown in FIG. The same components are designated by the same reference numerals, and the description thereof will be omitted.

図4に示すように、この例の掛け止め部21は、本体部16の上面に位置する支持部21aから斜め下方に傾斜部21bが延び、この傾斜部21bに連続してフランジ部6(図5)に水平に接触する水平部21cがフランジ部6の端部から突出するように設けられている。そして、水平部21cの中央部分の一部に、フランジ部6と係合するように下向きに屈曲させられた端部保持部21dが設けられている。 As shown in FIG. 4, in the hooking portion 21 of this example, the inclined portion 21b extends diagonally downward from the supporting portion 21a located on the upper surface of the main body portion 16, and the flange portion 6 is continuous with the inclined portion 21b (FIG. 4). A horizontal portion 21c that is in horizontal contact with 5) is provided so as to protrude from the end portion of the flange portion 6. An end holding portion 21d bent downward so as to engage with the flange portion 6 is provided in a part of the central portion of the horizontal portion 21c.

図5に示すように、このような掛け止め部21を備えた梁材取付金具15によれば、挟持部17で梁材5のフランジ部6を幅方向の一方から挟み込むように挿入され、掛け止め部21の端部保持部21dがフランジ部6の幅方向の他方端部に掛けられて梁材5の所定位置に取り付けられる。この例によっても、梁材取付金具15は、梁材5のフランジ部6の両端部を挟持部17と掛け止め部21とで水平方向に保持することができるので、梁材取付金具15を梁材5により強固に保持することができる。なお、他の構成は図2と同一であるため、同一の構成には同一符号を付し、詳細な説明は省略する。 As shown in FIG. 5, according to the beam member mounting bracket 15 provided with such a hooking portion 21, the flange portion 6 of the beam member 5 is inserted and hooked by the sandwiching portion 17 so as to be sandwiched from one side in the width direction. The end holding portion 21d of the stopping portion 21 is hung on the other end portion of the flange portion 6 in the width direction and attached to a predetermined position of the beam member 5. Also in this example, since the beam material mounting bracket 15 can hold both ends of the flange portion 6 of the beam material 5 in the horizontal direction by the holding portion 17 and the hooking portion 21, the beam material mounting bracket 15 can be held by the beam. It can be firmly held by the material 5. Since the other configurations are the same as those in FIG. 2, the same configurations are designated by the same reference numerals, and detailed description thereof will be omitted.

(第1実施形態における床材押圧金具の変形例)
図6は、図1示す第1取付金具10における床材押圧金具11の変形例を示す床材押圧金具25の図面であり、(A)は表面側の斜視図、(B)は裏面側の斜視図である。図7は、図6に示す床材押圧金具25を用いた第1取付金具10を梁材5に取り付けた使用状態における側面視の断面図である。なお、図1に示す梁材取付金具15と同一の構成には同一の符号を付して、その説明は省略する。
(Modification example of floor material pressing metal fitting in the first embodiment)
6A and 6B are drawings of the floor material pressing metal fitting 25 showing a modified example of the floor material pressing metal fitting 11 in the first mounting metal fitting 10 shown in FIG. 1, where FIG. 6A is a perspective view of the front surface side and FIG. It is a perspective view. FIG. 7 is a cross-sectional view of the first mounting bracket 10 using the floor material pressing bracket 25 shown in FIG. 6 in a side view in a used state in which the first mounting bracket 10 is attached to the beam member 5. The same components as those of the beam member mounting bracket 15 shown in FIG. 1 are designated by the same reference numerals, and the description thereof will be omitted.

図6(A)、(B)に示すように、床材押圧金具25は、矩形状の板材で形成されており、中央部分には梁材取付金具15に設けられたボルト材18が挿通される貫通孔26が設けられている。また、床材押圧金具25の長手方向には、貫通孔26の両側方に上向きの突条27が設けられている。板状の床材押圧金具25に突条27を設けることで、曲げ強度を向上させている。そして、矩形状の四隅には、裏面側に向けて突出する突起状押圧部28が設けられている。突起状押圧部28は、床材押圧金具25の隅部を裏面方向に屈曲させることで形成されている。 As shown in FIGS. 6A and 6B, the floor material pressing metal fitting 25 is formed of a rectangular plate material, and the bolt material 18 provided in the beam material mounting metal fitting 15 is inserted into the central portion thereof. A through hole 26 is provided. Further, in the longitudinal direction of the floor material pressing metal fitting 25, upward ridges 27 are provided on both sides of the through hole 26. Bending strength is improved by providing the ridge 27 on the plate-shaped floor material pressing metal fitting 25. At the four corners of the rectangle, protrusion-shaped pressing portions 28 projecting toward the back surface side are provided. The protruding pressing portion 28 is formed by bending the corner portion of the floor material pressing metal fitting 25 toward the back surface.

図7に示すように、この床材押圧金具25によれば、梁材5に取り付けられた梁材取付金具15のボルト材18を挟んで下面側基材1cが隣り合うように押出成形セメント板床材1が梁材5に載せられる。そして、ボルト材18に、床材押圧金具25が貫通孔26から挿入される。床材押圧金具25は、裏面側の突起状押圧部28が、隣り合う押出成形セメント板床材1の下面側基材1cに接した状態となる。その後、ボルト材18にナット材19をねじ込んで締め付けることで、突起状押圧部28が押出成形セメント板床材1の下面側基材1cに係合した状態で押圧される。これにより、床材押圧金具25の突起状押圧部28が下面側基材1cに係合し、隣り合う押出成形セメント板床材1を、梁材5により強固に留め付けることができる。 As shown in FIG. 7, according to the floor material pressing metal fitting 25, the extruded cement board floor is placed so that the lower surface side base material 1c is adjacent to each other with the bolt material 18 of the beam material mounting metal fitting 15 attached to the beam material 5 interposed therebetween. The material 1 is placed on the beam material 5. Then, the floor material pressing metal fitting 25 is inserted into the bolt material 18 through the through hole 26. The floor material pressing metal fitting 25 is in a state in which the protruding pressing portion 28 on the back surface side is in contact with the lower surface side base material 1c of the adjacent extruded cement board floor material 1. After that, by screwing and tightening the nut material 19 into the bolt material 18, the protruding pressing portion 28 is pressed in a state of being engaged with the lower surface side base material 1c of the extruded cement board floor material 1. As a result, the protruding pressing portion 28 of the floor material pressing metal fitting 25 engages with the lower surface side base material 1c, and the adjacent extruded cement plate floor material 1 can be firmly fastened by the beam material 5.

(第2実施形態に係る第2取付金具)
図8は、第2実施形態に係る第2取付金具30の梁材取付金具35を示す斜視図である。なお、第1取付金具10と同一の構成には「20」を付加した符号を付し、その説明は省略する。また、第2取付金具30における床材押圧金具は、上記第1取付金具10の床材押圧金具11又は床材押圧金具25、その他の床材押圧金具を用いることができるため、第2取付金具30については梁材取付金具35のみを説明する。
(Second mounting bracket according to the second embodiment)
FIG. 8 is a perspective view showing a beam member mounting bracket 35 of the second mounting bracket 30 according to the second embodiment. The same configuration as the first mounting bracket 10 is designated by a reference numeral with "20" added, and the description thereof will be omitted. Further, as the floor material pressing metal fitting in the second mounting metal fitting 30, the floor material pressing metal fitting 11 or the floor material pressing metal fitting 25 of the first mounting metal fitting 10 or other floor material pressing metal fittings can be used, so that the second mounting metal fitting is used. Regarding 30, only the beam member mounting bracket 35 will be described.

第2取付金具30は、梁材5のフランジ部6に貫通孔などの被係合部7(図10)が設けられている場合に使用される。被係合部7は、貫通穴の他、凹部、凸部などを含む。第2取付金具30の梁材取付金具35は、梁材5の上方に配置される平面状の本体部36と、本体部36との間で梁材5のフランジ部6(図9)の幅方向を一方から挟み込む挟持部37と、挟持部37で挟み込んだフランジ部6の幅方向の他方端部に掛ける掛け止め部40と、を有している。本体部36には、上方に延びる保持部たるボルト材38が設けられている。 The second mounting bracket 30 is used when the flange portion 6 of the beam member 5 is provided with an engaged portion 7 (FIG. 10) such as a through hole. The engaged portion 7 includes a concave portion, a convex portion, and the like in addition to the through hole. The beam member mounting bracket 35 of the second mounting bracket 30 has a width of the flange portion 6 (FIG. 9) of the beam member 5 between the flat main body portion 36 arranged above the beam member 5 and the main body portion 36. It has a holding portion 37 that sandwiches the direction from one side, and a hooking portion 40 that hangs on the other end portion in the width direction of the flange portion 6 sandwiched by the holding portion 37. The main body 36 is provided with a bolt member 38 which is a holding portion extending upward.

そして、本体部36には、挟持部37の部分に、梁材5のフランジ部6に設けられた被係合部7に係合させる係合部41が設けられている。係合部41は、被係合部7に係合させる凸部、凹凸部、貫通孔などを含む。 The main body 36 is provided with an engaging portion 41 that engages with the engaged portion 7 provided on the flange portion 6 of the beam member 5 at the portion of the holding portion 37. The engaging portion 41 includes a convex portion, a concave-convex portion, a through hole, and the like to be engaged with the engaged portion 7.

(第2取付金具の使用例)
図9は、図8に示す梁材取付金具35を有する第2取付金具30を梁材5に取り付けた使用状態における側面視の断面図である。梁材取付金具35は、第1実施形態に係る第1取付金具10の梁材取付金具15と同一の構成であるため、同一の構成には「20」を付加した符号を付して、その説明は省略する。
(Example of using the second mounting bracket)
FIG. 9 is a cross-sectional view of the second mounting bracket 30 having the beam member mounting bracket 35 shown in FIG. 8 in a side view in a used state in which the second mounting bracket 30 is attached to the beam member 5. Since the beam member mounting bracket 35 has the same configuration as the beam member mounting bracket 15 of the first mounting bracket 10 according to the first embodiment, the same configuration is designated by a reference numeral with "20" added. The description is omitted.

第2取付金具30の梁材取付金具35は、挟持部37で梁材5のフランジ部6を幅方向の一方から挟み込むように挿入され、掛け止め部40の端部保持部40dがフランジ部6の幅方向の他方端部に掛けられて梁材5の所定位置に取り付けられる。この梁材取付金具35によれば、挟持部37で梁材5のフランジ部6を挟み込むことで、係合部41がフランジ部6の被係合部7に係合される。 The beam member mounting bracket 35 of the second mounting bracket 30 is inserted so as to sandwich the flange portion 6 of the beam member 5 from one side in the width direction by the sandwiching portion 37, and the end holding portion 40d of the hooking portion 40 is the flange portion 6. It is hung on the other end in the width direction of the beam member 5 and attached to a predetermined position of the beam member 5. According to the beam member mounting bracket 35, the engaging portion 41 is engaged with the engaged portion 7 of the flange portion 6 by sandwiching the flange portion 6 of the beam member 5 with the holding portion 37.

その後、梁材取付金具35の本体部36に設けられたボルト材38を挟んで桟部1aが隣り合うように押出成形セメント板床材1が載せられる。押出成形セメント板床材1は、梁材5の上に置かれた緩衝材4の上に載せられる。 After that, the extruded cement board floor material 1 is placed so that the crosspieces 1a are adjacent to each other with the bolt material 38 provided on the main body 36 of the beam material mounting bracket 35 sandwiched between them. The extruded cement board floor material 1 is placed on the cushioning material 4 placed on the beam material 5.

そして、本体部36に設けられたボルト材38に床材押圧金具31が貫通孔32から挿入されて、隣り合う押出成形セメント板床材1の下面側基材1cに掛かるように取り付けられる。その後、ボルト材38にナット材39をねじ込んで締め付けることで、床材押圧金具31によって押出成形セメント板床材1の下面側基材1cを梁材5に向けて押圧する。これにより、隣り合う押出成形セメント板床材1を梁材5に留め付けることができる。 Then, the floor material pressing metal fitting 31 is inserted into the bolt material 38 provided in the main body 36 through the through hole 32, and is attached so as to hang on the lower surface side base material 1c of the adjacent extruded cement plate floor material 1. After that, by screwing and tightening the nut material 39 into the bolt material 38, the lower surface side base material 1c of the extruded cement board floor material 1 is pressed toward the beam material 5 by the floor material pressing metal fitting 31. As a result, the adjacent extruded cement board floor material 1 can be fastened to the beam material 5.

しかも、この梁材取付金具35によれば、挟持部37に設けられた係合部41が梁材5のフランジ部6に設けられた被係合部7に係合させられるので、第2取付金具30を梁材5に保持する保持力をさらに強固にできる。 Moreover, according to the beam member mounting bracket 35, the engaging portion 41 provided on the holding portion 37 is engaged with the engaged portion 7 provided on the flange portion 6 of the beam member 5, so that the second mounting is performed. The holding force for holding the metal fitting 30 on the beam member 5 can be further strengthened.

(第2取付金具を用いた取付構造例)
図10は、図9に示す第2取付金具30で押出成形セメント板床材1を梁材5に留め付けた取付構造を示す斜視図である。この例の梁材5には、フランジ部6の前後方向に所定間隔で被係合部7(この例は貫通穴)が設けられている。
(Example of mounting structure using the second mounting bracket)
FIG. 10 is a perspective view showing a mounting structure in which the extruded cement board floor material 1 is fastened to the beam material 5 with the second mounting bracket 30 shown in FIG. The beam member 5 of this example is provided with engaged portions 7 (through holes in this example) at predetermined intervals in the front-rear direction of the flange portion 6.

第2取付金具30の梁材取付金具35は、挟持部37で梁材5のフランジ部6を幅方向の一方から挟み込むように挿入することで係合部41が被係合部7に係合され、掛け止め部40の端部保持部40dがフランジ部6の幅方向の他方端部に掛けられて梁材5の所定位置に取り付けられる(図9)。梁材取付金具35の取り付け後は、梁材取付金具35のボルト材38を挟んで隣り合うように押出成形セメント板床材1が梁材5に載せられる(図では一方の押出成形セメント板床材1のみを示す)。押出成形セメント板床材1は、上面側基材1bの端部が切り取られた切欠き部1d(図9)の部分がボルト材38の位置となるように載せられる。 The beam member mounting bracket 35 of the second mounting bracket 30 is inserted so that the flange portion 6 of the beam member 5 is sandwiched by the sandwiching portion 37 from one side in the width direction, so that the engaging portion 41 engages with the engaged portion 7. Then, the end holding portion 40d of the hooking portion 40 is hung on the other end portion in the width direction of the flange portion 6 and attached to the predetermined position of the beam member 5 (FIG. 9). After the beam material mounting bracket 35 is attached, the extruded cement board floor material 1 is placed on the beam material 5 so as to sandwich the bolt material 38 of the beam material mounting bracket 35 so as to be adjacent to each other (in the figure, one of the extruded cement board flooring materials 1). Shows only). The extruded cement board floor material 1 is placed so that the portion of the notch portion 1d (FIG. 9) from which the end portion of the upper surface side base material 1b is cut off is the position of the bolt material 38.

そして、床材押圧金具31が、貫通孔32からボルト材38に挿通される。これにより、床材押圧金具31は、隣り合う押出成形セメント板床材1の下面側基材1cに接した状態となる。その後、ボルト材38にナット材39をねじ込んで締め付けることで、床材押圧金具31によって押出成形セメント板床材1を梁材5に向けて押圧して留め付けることができる。 Then, the floor material pressing metal fitting 31 is inserted into the bolt material 38 through the through hole 32. As a result, the floor material pressing metal fitting 31 is in contact with the lower surface side base material 1c of the adjacent extruded cement board floor material 1. After that, by screwing and tightening the nut material 39 into the bolt material 38, the extruded cement board floor material 1 can be pressed and fastened toward the beam material 5 by the floor material pressing metal fitting 31.

(第3実施形態に係る第3取付金具)
図11は、第3実施形態に係る第3取付金具50を示す図面であり、(A)は分解斜視図、(B)は床材押圧金具51の裏面側を示す斜視図である。第3取付金具50は、押出成形セメント板床材1の下面側基材1cに被係止部たる貫通孔8が設けられている場合に使用される(図12)。第3取付金具50は、施工階の端部において梁材5の片側に押出成形セメント板床材1を留め付ける場合に使用できる(図12)。
(Third mounting bracket according to the third embodiment)
11A and 11B are drawings showing a third mounting bracket 50 according to the third embodiment, FIG. 11A is an exploded perspective view, and FIG. 11B is a perspective view showing the back surface side of the floor material pressing bracket 51. The third mounting bracket 50 is used when the lower surface side base material 1c of the extruded cement board floor material 1 is provided with a through hole 8 as a locked portion (FIG. 12). The third mounting bracket 50 can be used when the extruded cement board floor material 1 is fastened to one side of the beam material 5 at the end of the construction floor (FIG. 12).

第3取付金具50は、押出成形セメント板床材1の下面側基材1c(図12)を梁材5(図12)に向けて押圧する床材押圧金具51と、梁材5に取り付けられる梁材取付金具55とを備えている。梁材取付金具55は、第1実施形態に係る第1取付金具10の梁材取付金具15と同一の構成であるため、同一の構成には「40」を付加した符号を付して、その説明は省略する。 The third mounting bracket 50 includes a floor material pressing bracket 51 that presses the lower surface side base material 1c (FIG. 12) of the extruded cement board flooring material 1 toward the beam material 5 (FIG. 12), and a beam attached to the beam material 5. It is provided with a material mounting bracket 55. Since the beam member mounting bracket 55 has the same configuration as the beam member mounting bracket 15 of the first mounting bracket 10 according to the first embodiment, the same configuration is designated by a reference numeral with "40" added. The description is omitted.

第3取付金具50の床材押圧金具51は、押出成形セメント板床材1の下面側基材1cに設けられた貫通孔8(図12)に係止させる係止部材たるピン52と、ピン52から押出成形セメント板床材1の端部方向に延びる板状部53と、この板状部53の端部において下向きに屈曲する支持部54とを有している。ピン52は、板状部53の所定位置(押出成形セメント板床材1に設けられた被係止部たる貫通孔8の位置)で下向きに突出するように設けられている。ピン52は、板状部53に溶接、ねじ止めなどの方法で固定される。ピン52の固定方法は限定されない。板状部53の支持部54に近接した位置には、梁材取付金具55に設けられたボルト材58を挿通する貫通孔53aが設けられている。支持部54の中央部分には、貫通孔53aの方向に凹み部54aが設けられている。また、板状部53の長手方向には、貫通孔53aの両側方に上向きの突条53bが設けられている。板状部53に突条53bを設けることで、床材押圧金具51の曲げ強度を向上させている。 The floor material pressing metal fitting 51 of the third mounting metal fitting 50 is a locking member pin 52 and a pin 52 for locking into a through hole 8 (FIG. 12) provided in the lower surface side base material 1c of the extruded cement board floor material 1. It has a plate-shaped portion 53 extending in the direction of the end of the extruded cement board floor material 1 and a support portion 54 that bends downward at the end of the plate-shaped portion 53. The pin 52 is provided so as to project downward at a predetermined position of the plate-shaped portion 53 (the position of the through hole 8 which is the locked portion provided in the extruded cement plate floor material 1). The pin 52 is fixed to the plate-shaped portion 53 by a method such as welding or screwing. The method of fixing the pin 52 is not limited. A through hole 53a through which the bolt member 58 provided in the beam member mounting bracket 55 is inserted is provided at a position close to the support portion 54 of the plate-shaped portion 53. A recess 54a is provided in the central portion of the support portion 54 in the direction of the through hole 53a. Further, in the longitudinal direction of the plate-shaped portion 53, upward ridges 53b are provided on both sides of the through hole 53a. By providing the ridge 53b on the plate-shaped portion 53, the bending strength of the floor material pressing metal fitting 51 is improved.

(第3取付金具の使用例)
図12は、図11に示す第3取付金具50を梁材5に取り付けた使用状態の図面であり、(A)は平面図であり、(B)は側面視の断面図である。この実施形態の押出成形セメント板床材1も、第3取付金具50で梁材5に留め付けられる部分の上面側基材1bの端部に切欠き部1dが設けられている。
(Example of using the third mounting bracket)
12A and 12B are drawings of a used state in which the third mounting bracket 50 shown in FIG. 11 is attached to the beam member 5, FIG. 12A is a plan view, and FIG. 12B is a cross-sectional view in a side view. The extruded cement board floor material 1 of this embodiment also has a notch 1d at the end of the upper surface side base material 1b of the portion to be fastened to the beam material 5 by the third mounting bracket 50.

第3取付金具50によって押出成形セメント板床材1を梁材5へ取り付ける場合、梁材取付金具55が挟持部57で梁材5のフランジ部6を幅方向の一方から挟み込むように挿入され、掛け止め部60の端部保持部60dがフランジ部6の幅方向の他方端部に掛けられて梁材5の所定位置に取り付けられる。その後、押出成形セメント板床材1が、梁材取付金具55の本体部56に設けられたボルト材58に近接するように梁材5に載せられる。そして、押出成形セメント板床材1の中空部2に床材押圧金具51が入れられて、ピン52が貫通孔8に挿入されて係止され、貫通孔53aがボルト材58に挿通される。その後、ボルト材58にナット材59をねじ込んで締め付けることで、支持部54がボルト材58に沿った状態で、床材押圧金具51によって押出成形セメント板床材1の下面側基材1cが梁材5に向けて押圧される。これにより、押出成形セメント板床材1を梁材5に留め付けることができる。 When the extruded cement board floor material 1 is attached to the beam material 5 by the third mounting bracket 50, the beam material mounting bracket 55 is inserted so as to sandwich the flange portion 6 of the beam material 5 from one side in the width direction by the holding portion 57, and is hooked. The end holding portion 60d of the stop portion 60 is hung on the other end portion of the flange portion 6 in the width direction and attached to a predetermined position of the beam member 5. After that, the extruded cement board floor material 1 is placed on the beam material 5 so as to be close to the bolt material 58 provided in the main body portion 56 of the beam material mounting bracket 55. Then, the floor material pressing metal fitting 51 is inserted into the hollow portion 2 of the extruded cement board floor material 1, the pin 52 is inserted into the through hole 8 and locked, and the through hole 53a is inserted into the bolt material 58. After that, the nut material 59 is screwed into the bolt material 58 and tightened, so that the lower surface side base material 1c of the extruded cement board floor material 1 is a beam material by the floor material pressing metal fitting 51 with the support portion 54 along the bolt material 58. It is pressed toward 5. Thereby, the extruded cement board floor material 1 can be fastened to the beam material 5.

このように、床材押圧金具51を、平板状の板状部53と端部が下向きに折れ曲がった支持部54とを有する形状とすることで、施工階の端部において梁材5の片側に押出成形セメント板床材1を配置する場合でも、凹み部54aがボルト材58に接して床材押圧金具51の水平状態を維持できる。よって、押出成形セメント板床材1を梁材5に向けて押圧して留め付けることができる。 In this way, the floor material pressing metal fitting 51 has a shape having a flat plate-shaped portion 53 and a support portion 54 whose end is bent downward, so that the floor material pressing metal fitting 51 can be placed on one side of the beam member 5 at the end of the construction floor. Even when the extruded cement board floor material 1 is arranged, the recessed portion 54a can be in contact with the bolt material 58 to maintain the horizontal state of the floor material pressing metal fitting 51. Therefore, the extruded cement board floor material 1 can be pressed and fastened toward the beam material 5.

また、第3取付金具50によれば、床材押圧金具51のピン52を下面側基材1cの貫通孔8に係止した状態で留め付けるので、床材押圧金具51の位置を保った状態で押出成形セメント板床材1の留め付けを強固に行うことができる。 Further, according to the third mounting bracket 50, the pin 52 of the floor material pressing bracket 51 is fastened in a state of being locked to the through hole 8 of the lower surface side base material 1c, so that the position of the floor material pressing bracket 51 is maintained. The extrusion-molded cement board floor material 1 can be firmly fastened.

さらに、第3取付金具50によっても、部品数を少なくすることができる。その上、押出成形セメント板床材1を施工階において上方から下向き作業で梁材5に留め付けることができるので、施工性を向上させることができる。しかも、空隙部Vにより、押出成形セメント板床材1から梁材5に向けて振動が伝搬することを抑える緩衝特性を発揮することができる。よって、梁材5に伝わる振動を抑えることができ、遮音性が向上する。 Further, the number of parts can be reduced by the third mounting bracket 50. Further, since the extruded cement board floor material 1 can be fastened to the beam material 5 from above on the construction floor by downward work, the workability can be improved. Moreover, the gap portion V can exhibit a cushioning property that suppresses the propagation of vibration from the extruded cement board floor material 1 to the beam material 5. Therefore, the vibration transmitted to the beam member 5 can be suppressed, and the sound insulation property is improved.

(第3取付金具を用いた取付構造例)
図13は、図11に示す第3取付金具50で押出成形セメント板床材1を梁材5に留め付けた取付構造を示す斜視図である。第3取付金具50は、梁材取付金具55が挟持部57で梁材5のフランジ部6を幅方向の一方から挟み込むように挿入され、掛け止め部60の端部保持部60dがフランジ部6の幅方向の他方端部に掛けられて梁材5の所定位置に取り付けられる(図12)。梁材取付金具55の取り付け後、梁材取付金具55のボルト材58に近接するように押出成形セメント板床材1が梁材5に載せられる。押出成形セメント板床材1は、上面側基材1bの端部が切り取られた切欠き部1dの部分(図12(A))がボルト材58の位置に載せられる。
(Example of mounting structure using the third mounting bracket)
FIG. 13 is a perspective view showing a mounting structure in which the extruded cement board floor material 1 is fastened to the beam material 5 with the third mounting bracket 50 shown in FIG. The third mounting bracket 50 is inserted so that the beam member mounting bracket 55 sandwiches the flange portion 6 of the beam member 5 from one side in the width direction with the holding portion 57, and the end holding portion 60d of the hooking portion 60 is the flange portion 6. It is hung on the other end in the width direction of the beam member 5 and attached to a predetermined position of the beam member 5 (FIG. 12). After the beam member mounting bracket 55 is attached, the extruded cement board flooring material 1 is placed on the beam member 5 so as to be close to the bolt member 58 of the beam member mounting bracket 55. In the extruded cement board floor material 1, a notched portion 1d (FIG. 12A) from which the end portion of the upper surface side base material 1b is cut off is placed at the position of the bolt material 58.

そして、床材押圧金具51を押出成形セメント板床材1の中空部2に入れてピン52を貫通孔8に挿入し、貫通孔53aがボルト材58に挿通される。その後、ボルト材58にナット材59をねじ込んで締め付けることで、床材押圧金具51によって押出成形セメント板床材1を梁材5に向けて押し付けて留め付けることができる。 Then, the floor material pressing metal fitting 51 is inserted into the hollow portion 2 of the extruded cement plate floor material 1, the pin 52 is inserted into the through hole 8, and the through hole 53a is inserted into the bolt material 58. After that, by screwing and tightening the nut material 59 into the bolt material 58, the extruded cement board floor material 1 can be pressed and fastened toward the beam material 5 by the floor material pressing metal fitting 51.

(第3実施形態における梁材取付金具の変形例)
図14は、図11に示す第3取付金具50における床材押圧金具51の変形例を示す床材押圧金具65の図面であり、(A)は表面側の斜視図、(B)は裏面側の斜視図である。図15は、図14に示す床材押圧金具65を用いた第3取付金具50を梁材5に取り付けた使用状態の図面であり、(A)は平面図であり、(B)は側面視の断面図である。なお、上記した第3取付金具50と梁材取付金具55は同一であるため、同一の構成には同一符号を付し、その説明は省略する。
(Modification example of beam member mounting bracket in the third embodiment)
14A and 14B are drawings of the floor material pressing metal fitting 65 showing a modified example of the floor material pressing metal fitting 51 in the third mounting metal fitting 50 shown in FIG. 11, where FIG. 14A is a perspective view of the front surface side and FIG. 14B is a back surface side. It is a perspective view of. 15A and 15B are drawings of a used state in which the third mounting bracket 50 using the floor material pressing bracket 65 shown in FIG. 14 is attached to the beam member 5, FIG. 15A is a plan view, and FIG. 15B is a side view. It is a cross-sectional view of. Since the third mounting bracket 50 and the beam mounting bracket 55 are the same, the same reference numerals are given to the same configurations, and the description thereof will be omitted.

図14(A)、(B)に示すように、この例の床材押圧金具65は、係止部材としてボルト66が用いられている。床材押圧金具65は、押出成形セメント板床材1の下面側基材1cに設けられた被係止部たる貫通孔8(図15)に係止させる係止部材たるボルト66と、ボルト66から押出成形セメント板床材1の端部方向に延びる板状部67と、この板状部67の端部において下向きに屈曲する支持部68とを有している。ボルト66は、板状部67の所定位置(押出成形セメント板床材1に設けられた被係止部たる貫通孔8の位置)で下向きに突出するように設けられている。なお、ボルト66の固定方法は限定されるものではなく、板状部67に溶接で固定する方法や、板状部67から上方に突出させてナットで固定する方法等を用いることができる。 As shown in FIGS. 14A and 14B, the floor material pressing metal fitting 65 in this example uses a bolt 66 as a locking member. The floor material pressing metal fitting 65 is formed from the bolt 66, which is a locking member, and the bolt 66, which are locked in the through hole 8 (FIG. 15), which is the locked portion provided in the lower surface side base material 1c of the extruded cement board floor material 1. It has a plate-shaped portion 67 extending in the end direction of the extruded cement board floor material 1 and a support portion 68 that bends downward at the end portion of the plate-shaped portion 67. The bolt 66 is provided so as to project downward at a predetermined position of the plate-shaped portion 67 (the position of the through hole 8 which is the locked portion provided in the extruded cement plate floor material 1). The method of fixing the bolt 66 is not limited, and a method of fixing to the plate-shaped portion 67 by welding, a method of projecting upward from the plate-shaped portion 67 and fixing with a nut, and the like can be used.

また、板状部67の支持部68に近接した位置には、梁材取付金具55に設けられたボルト材58を挿通する貫通孔67aが設けられている。支持部68の中央部分には、貫通孔67aの方向に凹み部68aが設けられている。板状部67の長手方向には、貫通孔67aの両側方に上向きの突条67bが設けられ、床材押圧金具65の曲げ強度を向上させている。 Further, a through hole 67a through which the bolt member 58 provided in the beam member mounting bracket 55 is inserted is provided at a position close to the support portion 68 of the plate-shaped portion 67. A recess 68a is provided in the central portion of the support portion 68 in the direction of the through hole 67a. In the longitudinal direction of the plate-shaped portion 67, upward ridges 67b are provided on both sides of the through hole 67a to improve the bending strength of the floor material pressing metal fitting 65.

図15(A)、(B)に示すように、上記床材押圧金具65を用いた第3取付金具50によれば、予め床材押圧金具65のボルト66を押出成形セメント板床材1の貫通孔8に挿入し、下面からナット66aで固定しておく。そして、梁材取付金具55を梁材5に取り付けた後、梁材取付金具55のボルト材58に近接するように押出成形セメント板床材1が載せられる。この時、床材押圧金具65の貫通孔67aにボルト材58が挿通されるように載せられる。その後、ボルト材58にナット材59をねじ込んで締め付けることで、床材押圧金具65によって押出成形セメント板床材1の下面側基材1cが梁材5に向けて押圧される。これにより、押出成形セメント板床材1を梁材5に留め付けることができる。 As shown in FIGS. 15 (A) and 15 (B), according to the third mounting bracket 50 using the floor material pressing bracket 65, the bolt 66 of the floor material pressing bracket 65 is previously penetrated through the extruded cement plate floor material 1. It is inserted into the hole 8 and fixed with a nut 66a from the lower surface. Then, after the beam member mounting bracket 55 is attached to the beam member 5, the extruded cement board floor material 1 is placed so as to be close to the bolt member 58 of the beam member mounting bracket 55. At this time, the bolt material 58 is placed so as to be inserted into the through hole 67a of the floor material pressing metal fitting 65. After that, by screwing and tightening the nut material 59 into the bolt material 58, the lower surface side base material 1c of the extruded cement board floor material 1 is pressed toward the beam material 5 by the floor material pressing metal fitting 65. Thereby, the extruded cement board floor material 1 can be fastened to the beam material 5.

(第4実施形態に係る第4取付金具)
図16は、第4実施形態に係る第4取付金具70(図17)の床材押圧金具71を示す斜視図である。第4取付金具70における梁材取付金具55は、上記第3取付金具50の梁材取付金具55と同一であるため、同一の構成には同一符号を付し、その説明は省略する。第4取付金具70は、押出成形セメント板床材1の下面側基材1cに被係止部たる貫通孔8が無い場合でも、押出成形セメント板床材1を梁材5に留め付けることができる。
(Fourth mounting bracket according to the fourth embodiment)
FIG. 16 is a perspective view showing a floor material pressing metal fitting 71 of the fourth mounting metal fitting 70 (FIG. 17) according to the fourth embodiment. Since the beam member mounting bracket 55 in the fourth mounting bracket 70 is the same as the beam member mounting bracket 55 of the third mounting bracket 50, the same reference numerals are given to the same configurations, and the description thereof will be omitted. The fourth mounting bracket 70 can fasten the extruded cement board floor material 1 to the beam material 5 even when the lower surface side base material 1c of the extruded cement board floor material 1 does not have a through hole 8 as a locked portion.

床材押圧金具71は、梁材取付金具55のボルト材58(図17)が挿通される貫通孔72aを有する固定部72と、固定部72から押出成形セメント板床材1の下面側基材1cに向けて、斜め下方に傾斜する傾斜部73と、傾斜部73から下面側基材1cの上面に沿う水平部74と、を有している。傾斜部73は、水平部74が押出成形セメント板床材1の下面側基材1cに接した状態で、固定部72が下面側基材1cから所定量上方に位置するように形成されている。また、固定部72の傾斜部73と反対方向には、下向きに屈曲する支持部75が設けられている。支持部75の下端の貫通孔72a側には、梁材取付金具55のボルト材58に接する当接材75aが設けられている。さらに、固定部72から傾斜部73及び水平部74にかけての上面には、補強材72bが設けられている。補強材72bは、例えば、板材を溶接等で固定したり、プレスで押圧してリブ形状に成形される。 The floor material pressing metal fitting 71 includes a fixing portion 72 having a through hole 72a through which the bolt material 58 (FIG. 17) of the beam material mounting metal fitting 55 is inserted, and a base material 1c on the lower surface side of the cement board floor material 1 extruded from the fixing portion 72. It has an inclined portion 73 that inclines diagonally downward toward the surface, and a horizontal portion 74 that extends from the inclined portion 73 along the upper surface of the lower surface side base material 1c. The inclined portion 73 is formed so that the fixed portion 72 is located above the lower surface side base material 1c by a predetermined amount while the horizontal portion 74 is in contact with the lower surface side base material 1c of the extruded cement board floor material 1. Further, a support portion 75 that bends downward is provided in the direction opposite to the inclined portion 73 of the fixed portion 72. An abutting member 75a in contact with the bolt member 58 of the beam member mounting bracket 55 is provided on the through hole 72a side of the lower end of the support portion 75. Further, a reinforcing member 72b is provided on the upper surface from the fixed portion 72 to the inclined portion 73 and the horizontal portion 74. The reinforcing material 72b is formed into a rib shape by fixing the plate material by welding or the like or pressing it with a press, for example.

(第4取付金具の使用例)
図17は、図16に示す床材押圧金具71を用いた第4取付金具70を梁材5に取り付けた使用状態における側面視の断面図である。床材押圧金具71を用いた第4取付金具70によれば、梁材5の所定位置に梁材取付金具55が取り付けられた状態で、押出成形セメント板床材1が本体部56に設けられたボルト材58に近接するように梁材5へ載せられる。そして、押出成形セメント板床材1の中空部2に床材押圧金具71が挿入されて貫通孔72aがボルト材58に挿通される。この状態で、床材押圧金具71は水平部74が下面側基材1cに接し、固定部72は傾斜部73によって下面側基材1cから所定量上方に位置した状態となる。その後、ボルト材58にナット材59をねじ込んで締め付けることで、床材押圧金具71によって押出成形セメント板床材1の下面側基材1cが梁材5に向けて押圧される。これにより、押出成形セメント板床材1を梁材5に留め付けることができる。
(Example of using the 4th mounting bracket)
FIG. 17 is a cross-sectional view of a side view in a used state in which the fourth mounting bracket 70 using the floor material pressing bracket 71 shown in FIG. 16 is attached to the beam member 5. According to the fourth mounting bracket 70 using the floor material pressing bracket 71, the extruded cement board flooring material 1 is provided on the main body 56 in a state where the beam mounting bracket 55 is mounted at a predetermined position of the beam material 5. It is placed on the beam member 5 so as to be close to the bolt member 58. Then, the floor material pressing metal fitting 71 is inserted into the hollow portion 2 of the extruded cement board floor material 1, and the through hole 72a is inserted into the bolt material 58. In this state, the horizontal portion 74 of the floor material pressing metal fitting 71 is in contact with the lower surface side base material 1c, and the fixing portion 72 is positioned above the lower surface side base material 1c by the inclined portion 73 by a predetermined amount. After that, by screwing and tightening the nut material 59 into the bolt material 58, the lower surface side base material 1c of the extruded cement board floor material 1 is pressed toward the beam material 5 by the floor material pressing metal fitting 71. Thereby, the extruded cement board floor material 1 can be fastened to the beam material 5.

床材押圧金具71によれば、施工階の端部において梁材5の片側に押出成形セメント板床材1を配置する場合でも、押出成形セメント板床材1を梁材5に向けて押圧して留め付けることができる。 According to the floor material pressing metal fitting 71, even when the extruded cement board floor material 1 is arranged on one side of the beam material 5 at the end of the construction floor, the extruded cement board floor material 1 is pressed toward the beam material 5 and fastened. Can be attached.

(第5実施形態に係る第5取付金具)
図18は、第5実施形態に係る第5取付金具80を示す分解斜視図である。第5取付金具80で梁材5に取り付けられる押出成形セメント板床材1は、上面側基材1bの端部が切り取られて桟部1aの上部が露出している(図19)。第5取付金具80は、押出成形セメント板床材1の上面側基材1bの端部が切り取られた部分の桟部1aを押圧するように取り付けられる床材押圧金具81と、梁材5(図19)に取り付けられる梁材取付金具85とを備えている。
(Fifth mounting bracket according to the fifth embodiment)
FIG. 18 is an exploded perspective view showing a fifth mounting bracket 80 according to the fifth embodiment. In the extruded cement board floor material 1 attached to the beam material 5 by the fifth mounting bracket 80, the end portion of the upper surface side base material 1b is cut off to expose the upper portion of the crosspiece 1a (FIG. 19). The fifth mounting bracket 80 includes a floor material pressing bracket 81 attached so as to press the crosspiece 1a of the portion where the end portion of the upper surface side base material 1b of the extruded cement board flooring material 1 is cut off, and the beam member 5 (FIG. It is provided with a beam member mounting bracket 85 to be mounted on 19).

床材押圧金具81は、押出成形セメント板床材1の桟部1aを跨ぐように断面が逆向きの略U字状に形成され、桟部1aと平行に延びる押圧部82と、押圧部82の両端部で押出成形セメント板床材1の上面側基材1bの端部を保持するように上向きに屈曲した端部保持部83と、を有している。押圧部82の中央部分には、梁材取付金具85に設けられたボルト材88が挿通される貫通孔82aが設けられている。 The floor material pressing metal fitting 81 is formed in a substantially U shape having an opposite cross section so as to straddle the cross section 1a of the extruded cement board floor material 1, and extends in parallel with the cross section 1a. It has end holding portions 83 that are bent upward so as to hold the ends of the upper surface side base material 1b of the extruded cement board floor material 1 at both ends. A through hole 82a through which the bolt member 88 provided in the beam member mounting bracket 85 is inserted is provided in the central portion of the pressing portion 82.

梁材取付金具85は、梁材5の上方に配置される平面状の本体部86と、本体部86との間で梁材5のフランジ部6(図19)を幅方向の一方から挟み込む挟持部87と、本体部86の上方に設けられた保持部たるボルト材88と、ボルト材88にねじ込まれるナット材89とを有している。挟持部87は、板材からなる本体部86の一方に延びる所定位置を下向きに屈曲させ、端部を本体部56の下方へ向けて延びるように所定位置まで曲げられて形成されている。挟持部87は、梁材5のフランジ部6(図19)を挟むように形成されている。 The beam member mounting bracket 85 sandwiches the flange portion 6 (FIG. 19) of the beam member 5 from one side in the width direction between the flat main body portion 86 arranged above the beam member 5 and the main body portion 86. It has a portion 87, a bolt member 88 as a holding portion provided above the main body portion 86, and a nut member 89 screwed into the bolt member 88. The sandwiching portion 87 is formed by bending a predetermined position extending downward to one side of the main body portion 86 made of a plate material and bending the end portion downward to a predetermined position so as to extend downward of the main body portion 56. The sandwiching portion 87 is formed so as to sandwich the flange portion 6 (FIG. 19) of the beam member 5.

また、第5取付金具80の本体部86にも、左右方向の一方に延びる挟持部87と反対方向に、挟持部87で挟み込んだフランジ部6の幅方向の他方端部に掛けられる掛け止め部90が備えられている。この実施形態の掛け止め部90は、本体部86の上面に位置する支持部90aと、支持部90aから斜め下方に延びる傾斜部90bと、傾斜部90bに連続しフランジ部6(図19)に水平に接触する水平部90cと、水平部90cに連続してフランジ部6の端部に掛けられる端部保持部90dと、を有している。この実施形態の端部保持部90dは、水平部90cに対してほぼ90°の角度θで下向きに屈曲させられている。第5取付金具80の梁材取付金具85は、梁材5のフランジ部6を挟持部87と掛け止め部90の端部保持部90dとによって両端部から水平方向に保持するので、梁材取付金具85を梁材5に強固に保持することができる。 Further, the main body 86 of the fifth mounting bracket 80 is also hooked on the other end in the width direction of the flange portion 6 sandwiched by the sandwiching portion 87 in the direction opposite to the sandwiching portion 87 extending in one direction in the left-right direction. 90 is provided. The hooking portion 90 of this embodiment has a support portion 90a located on the upper surface of the main body portion 86, an inclined portion 90b extending diagonally downward from the supporting portion 90a, and a flange portion 6 (FIG. 19) continuous with the inclined portion 90b. It has a horizontal portion 90c that comes into horizontal contact with the horizontal portion 90c, and an end portion holding portion 90d that is continuously hung on the end portion of the flange portion 6 with the horizontal portion 90c. The end holding portion 90d of this embodiment is bent downward at an angle θ of approximately 90 ° with respect to the horizontal portion 90c. The beam member mounting bracket 85 of the fifth mounting bracket 80 holds the flange portion 6 of the beam member 5 horizontally from both ends by the holding portion 87 and the end holding portion 90d of the hooking portion 90, so that the beam material mounting bracket portion 85 is used. The metal fitting 85 can be firmly held by the beam member 5.

さらに、第5取付金具80も、本体部86が挟持部87に対して上方に離れるように段部86aが設けられている。段部86aにより、本体部86と梁材5との間に空隙部V(図19(B))が形成され、押出成形セメント板床材1の振動が第5取付金具80から梁材5に伝搬することを抑える緩衝特性を発揮することができる。 Further, the fifth mounting bracket 80 is also provided with a step portion 86a so that the main body portion 86 is separated upward from the holding portion 87. A gap portion V (FIG. 19 (B)) is formed between the main body portion 86 and the beam member 5 by the step portion 86a, and the vibration of the extruded cement board floor material 1 propagates from the fifth mounting bracket 80 to the beam member 5. It is possible to exert a buffering property that suppresses the occurrence of the shock.

(第5取付金具の使用例)
図19は、図18に示す第5取付金具80を梁材5に取り付けた使用状態の図面であり、(A)は平面図であり、(B)は側面視の断面図である。第5取付金具80によって押出成形セメント板床材1を梁材5へ取り付ける場合、梁材取付金具85は、挟持部87で梁材5のフランジ部6を幅方向の一方から挟み込むように挿入され、掛け止め部90の端部保持部90dがフランジ部6の幅方向の他方端部に掛けられて梁材5の所定位置に取り付けられる。その後、押出成形セメント板床材1が、梁材取付金具85の本体部86に設けられたボルト材88を挟んで桟部1aが隣り合うように載せられる。押出成形セメント板床材1は、梁材5の上に置かれた緩衝材4の上に載せられる。
(Example of using the 5th mounting bracket)
19A and 19B are drawings of a used state in which the fifth mounting bracket 80 shown in FIG. 18 is attached to the beam member 5, FIG. 19A is a plan view, and FIG. 19B is a cross-sectional view in a side view. When the extruded cement board floor material 1 is attached to the beam material 5 by the fifth mounting bracket 80, the beam material mounting bracket 85 is inserted so as to sandwich the flange portion 6 of the beam material 5 from one side in the width direction by the holding portion 87. The end holding portion 90d of the hooking portion 90 is hung on the other end portion in the width direction of the flange portion 6 and attached to a predetermined position of the beam member 5. After that, the extruded cement board floor material 1 is placed so that the crosspieces 1a are adjacent to each other with the bolt material 88 provided on the main body 86 of the beam material mounting bracket 85 interposed therebetween. The extruded cement board floor material 1 is placed on the cushioning material 4 placed on the beam material 5.

そして、本体部86に設けられたボルト材88に、床材押圧金具81が貫通孔82aから挿通される。床材押圧金具81は、断面U字状の開口部分が下向きに挿通されて、隣り合う押出成形セメント板床材1の桟部1aを跨いだ状態で取り付けられる。その後、ボルト材88にナット材89をねじ込んで締め付けることで、押圧部82によって押出成形セメント板床材1の桟部1aが梁材5に向けて押圧される。これにより、隣り合う押出成形セメント板床材1を梁材5に留め付けることができる。 Then, the floor material pressing metal fitting 81 is inserted through the through hole 82a through the bolt material 88 provided in the main body portion 86. The floor material pressing metal fitting 81 is attached in a state where an opening portion having a U-shaped cross section is inserted downward and straddles the crosspiece 1a of the adjacent extruded cement plate floor material 1. After that, by screwing the nut material 89 into the bolt material 88 and tightening the nut material 89, the crosspiece 1a of the extruded cement board floor material 1 is pressed toward the beam material 5 by the pressing portion 82. As a result, the adjacent extruded cement board floor material 1 can be fastened to the beam material 5.

また、第5取付金具80によれば、床材押圧金具81で桟部1aを上部から保持するので、取り付けを強固に行うことができる。しかも、第5取付金具80によれば、床材押圧金具81の端部保持部83によって押出成形セメント板床材1の上面側基材1bの端部も保持するので、押出成形セメント板床材1の取り付けをより強固に行うことができる。さらに、第5取付金具80は、部品数も少なくすることができる。その上、押出成形セメント板床材1を施工階において上方から下向き作業で押出成形セメント板床材1を梁材5に取り付けることができるので、施工性を向上させることができる。 Further, according to the fifth mounting bracket 80, the floor material pressing bracket 81 holds the crosspiece 1a from above, so that the mounting can be performed firmly. Moreover, according to the fifth mounting bracket 80, the end portion of the extruded cement plate floor material 1 is also held by the end holding portion 83 of the floor material pressing bracket 81, so that the end portion of the upper surface side base material 1b of the extruded cement plate floor material 1 is also held. The mounting can be done more firmly. Further, the number of parts of the fifth mounting bracket 80 can be reduced. Further, since the extruded cement board floor material 1 can be attached to the beam material 5 by working downward from above on the construction floor, the workability can be improved.

さらに、第5取付金具80は、梁材5の左右位置に載せられる隣り合う押出成形セメント板床材1を1つの床材押圧金具81で同時に押圧することができる。このため、隣り合う押出成形セメント板床材1を保持する作業を1箇所で行うことができ、押出成形セメント板床材1の取付作業を効率良く行うことができる。 Further, the fifth mounting bracket 80 can simultaneously press the adjacent extruded cement board flooring materials 1 placed on the left and right positions of the beam member 5 with one flooring material pressing metal fitting 81. Therefore, the work of holding the adjacent extruded cement board floor material 1 can be performed at one place, and the work of attaching the extruded cement board floor material 1 can be efficiently performed.

その上、第5取付金具80によれば、取付状態で本体部86の段部86aによって梁材5との間に空隙部Vが形成される(図19(B))。この空隙部Vにより、第5取付金具80から梁材5に向けて振動が伝搬することを抑える緩衝特性を発揮することができる。よって、梁材5に伝わる振動を抑えることができ、遮音性が向上する。 Further, according to the fifth mounting bracket 80, a gap portion V is formed between the step portion 86a of the main body portion 86 and the beam member 5 in the mounted state (FIG. 19 (B)). Due to this gap portion V, it is possible to exhibit a cushioning property that suppresses the propagation of vibration from the fifth mounting bracket 80 toward the beam member 5. Therefore, the vibration transmitted to the beam member 5 can be suppressed, and the sound insulation property is improved.

(第5取付金具を用いた取付構造例)
図20は、図18に示す第5取付金具80で押出成形セメント板床材1を梁材5に留め付けた取付構造を示す斜視図である。第5取付金具80は、梁材取付金具85が挟持部87で梁材5のフランジ部6を幅方向の一方から挟み込むように挿入され、掛け止め部90の端部保持部90dがフランジ部6の幅方向の他方端部に掛けられて梁材5の所定位置に取り付けられる(図19)。梁材取付金具85の取り付け後、押出成形セメント板床材1が、梁材取付金具85のボルト材88を挟んで隣り合うように梁材5に載せられる(図では一方の押出成形セメント板床材1のみを示す)。押出成形セメント板床材1は、上面側基材1bの端部が切り取られた桟部1a(図19(A))がボルト材88の位置に載せられている。
(Example of mounting structure using the 5th mounting bracket)
FIG. 20 is a perspective view showing a mounting structure in which the extruded cement board floor material 1 is fastened to the beam material 5 with the fifth mounting bracket 80 shown in FIG. The fifth mounting bracket 80 is inserted so that the beam mounting bracket 85 sandwiches the flange portion 6 of the beam member 5 from one side in the width direction with the holding portion 87, and the end holding portion 90d of the hooking portion 90 is the flange portion 6. It is hung on the other end in the width direction of the beam member 5 and attached to a predetermined position of the beam member 5 (FIG. 19). After the beam material mounting bracket 85 is attached, the extruded cement board flooring material 1 is placed on the beam material 5 so as to sandwich the bolt material 88 of the beam material mounting bracket 85 (in the figure, one of the extruded cement board flooring materials 1). Shows only). In the extruded cement board floor material 1, a crosspiece 1a (FIG. 19A) from which the end portion of the upper surface side base material 1b is cut off is placed at the position of the bolt material 88.

そして、床材押圧金具81が、貫通孔82aからボルト材88に挿通されて隣り合う押出成形セメント板床材1の桟部1aを跨いだ状態で取り付けられる。その後、ボルト材88にナット材89をねじ込んで締め付けることで、床材押圧金具81によって押出成形セメント板床材1を梁材5に向けて押し付けて留め付けることができる。 Then, the floor material pressing metal fitting 81 is inserted through the through hole 82a into the bolt material 88 and attached so as to straddle the crosspiece 1a of the adjacent extruded cement plate floor material 1. After that, by screwing and tightening the nut material 89 into the bolt material 88, the extruded cement board floor material 1 can be pressed and fastened toward the beam material 5 by the floor material pressing metal fitting 81.

(第6実施形態に係る第6取付金具)
図21は、第6実施形態に係る第6取付金具100を示す図面であり、(A)は分解斜視図であり、(B)は(A)とは異なる梁材取付金具110を示す斜視図である。第6取付金具100は、床材押圧金具101が上記第5取付金具80とは異なっている。なお、上記した第5取付金具80と梁材取付金具85は同一であるため、同一の構成には同一符号を付し、その説明は省略する。
(6th mounting bracket according to the 6th embodiment)
21 is a drawing showing a sixth mounting bracket 100 according to a sixth embodiment, (A) is an exploded perspective view, and (B) is a perspective view showing a beam material mounting bracket 110 different from (A). Is. In the sixth mounting bracket 100, the floor material pressing bracket 101 is different from the fifth mounting bracket 80. Since the fifth mounting bracket 80 and the beam mounting bracket 85 described above are the same, the same reference numerals are given to the same configurations, and the description thereof will be omitted.

第6取付金具100の床材押圧金具101は、押出成形セメント板床材1の桟部1aを跨ぐように形成された断面U字状の部分が高く形成されており、桟部1aと平行に延びる押圧部102と、床材押圧金具101の両下端部で外向きに屈曲する屈曲部103と、を有している。床材押圧金具101の高さは、押出成形セメント板床材1の桟部1aの高さと同等の高さとなっている。押圧部102の中央部分には、梁材取付金具85に設けられたボルト材88が挿通される貫通孔102aが設けられている。 The floor material pressing metal fitting 101 of the sixth mounting metal fitting 100 has a high U-shaped cross-section formed so as to straddle the cross-section 1a of the extruded cement board floor material 1, and extends parallel to the cross-section 1a. It has a pressing portion 102 and a bent portion 103 that bends outward at both lower ends of the floor material pressing metal fitting 101. The height of the floor material pressing metal fitting 101 is the same as the height of the crosspiece 1a of the extruded cement board floor material 1. A through hole 102a through which the bolt member 88 provided in the beam member mounting bracket 85 is inserted is provided in the central portion of the pressing portion 102.

この第6取付金具100によっても、梁材5に取り付けられた梁材取付金具85の本体部86に設けられたボルト材88の位置に、上面側基材1bの端部が切り取られた桟部1aが隣り合うように押出成形セメント板床材1が載せられる(図19と同様)。そして、本体部86に設けられたボルト材88に、床材押圧金具101が貫通孔102aから挿入される。床材押圧金具101は、断面U字状の開口部分が下向きに挿入されて、隣り合う押出成形セメント板床材1の桟部1aを跨いだ状態となる(図19と同様)。その後、ボルト材88にナット材89をねじ込んで締め付けることで、押圧部102によって押出成形セメント板床材1を梁材5に向けて押圧して留め付けることができる。この第6取付金具100では、床材押圧金具101の押圧部102で桟部1aの上面を押し付け、屈曲部103で押出成形セメント板床材1の下面側基材1cを押し付けるので、取り付けを強固に行うことができる。 Also in the sixth mounting bracket 100, the end portion of the upper surface side base material 1b is cut off at the position of the bolt member 88 provided in the main body portion 86 of the beam member mounting bracket 85 attached to the beam member 5. The extruded cement board floor material 1 is placed so that 1a is adjacent to each other (similar to FIG. 19). Then, the floor material pressing metal fitting 101 is inserted into the bolt material 88 provided in the main body 86 through the through hole 102a. The floor material pressing metal fitting 101 is in a state in which an opening portion having a U-shaped cross section is inserted downward and straddles the crosspiece 1a of the adjacent extruded cement plate floor material 1 (similar to FIG. 19). After that, by screwing the nut material 89 into the bolt material 88 and tightening the nut material 89, the extruded cement board floor material 1 can be pressed and fastened toward the beam material 5 by the pressing portion 102. In the sixth mounting bracket 100, the upper surface of the crosspiece 1a is pressed by the pressing portion 102 of the floor material pressing bracket 101, and the lower surface side base material 1c of the extruded cement plate floor material 1 is pressed by the bent portion 103, so that the mounting is firm. It can be carried out.

図21(B)に示す例は、図21(A)に示す例とは梁材取付金具110の掛け止め部115が異なっている。掛け止め部115のみを説明し、図21(A)と同一の構成には、「25」を付加した符号を付して説明は省略する。この例の本体部111に設けられる掛け止め部115は、本体部111から延びた端部に、下方かつ狭持部側に折り曲げられた第一の折曲部115aと、第一の折曲部115aの下端から狭持部側とは逆に折り曲げられた第二の折曲部115b、さらに第二の折曲部115bの下端から上向きに折り曲げられた第三の折曲部115cとを有している。 In the example shown in FIG. 21 (B), the hooking portion 115 of the beam member mounting bracket 110 is different from the example shown in FIG. 21 (A). Only the hooking portion 115 will be described, and the same configuration as that shown in FIG. The hooking portion 115 provided on the main body portion 111 of this example includes a first bent portion 115a bent downward and toward the narrowing portion at an end extending from the main body portion 111, and a first bent portion. It has a second bent portion 115b that is bent from the lower end of the 115a in the opposite direction to the holding portion side, and a third bent portion 115c that is further bent upward from the lower end of the second bent portion 115b. ing.

本体部111は、挟持部112でフランジ部6の一方を挟持した状態で挿入され、掛け止め部115がフランジ部6の他方端部に掛けることができる位置に到達すると第二の折曲部115bで一旦係止され、掛け止め部115の上面をハンマーなどでたたくと第一の折曲部115aが嵌り込んで取り付けられる。第三の折曲部115cにより、ハンマーなどで折曲の角を叩くことで容易に取り外しができる。掛け止め部90,115の構成は、図21(A)、(B)のいずれでもできる。掛け止め部90(115)を設けることで、梁材5のフランジ部6の両端部を挟持部87(112)と掛け止め部90(115)とで水平方向に挟むので、梁材取付金具110を梁材5に保持する保持力を強くすることができる。 The main body portion 111 is inserted with one of the flange portions 6 sandwiched between the sandwiching portions 112, and when the hooking portion 115 reaches a position where it can be hooked on the other end portion of the flange portion 6, the second bent portion 115b When the upper surface of the hooking portion 115 is hit with a hammer or the like, the first bent portion 115a is fitted and attached. The third bent portion 115c can be easily removed by hitting the corner of the bent with a hammer or the like. The hooking portions 90 and 115 can be configured by any of FIGS. 21 (A) and 21 (B). By providing the hooking portion 90 (115), both ends of the flange portion 6 of the beam material 5 are sandwiched horizontally between the holding portion 87 (112) and the hooking portion 90 (115), so that the beam material mounting bracket 110 Can be strengthened in the holding force for holding the beam member 5.

(第7実施形態に係る第7取付金具)
図22は、第7実施形態に係る第7取付金具120を示す分解斜視図である。第7取付金具120は、押出成形セメント板床材1(図23)に取り付けられる床材取付金具121と、梁材5(図23)に取り付けられる梁材取付金具125とを備えている。
(7th mounting bracket according to the 7th embodiment)
FIG. 22 is an exploded perspective view showing the seventh mounting bracket 120 according to the seventh embodiment. The seventh mounting bracket 120 includes a floor material mounting bracket 121 attached to the extruded cement board floor material 1 (FIG. 23) and a beam material mounting bracket 125 attached to the beam material 5 (FIG. 23).

床材取付金具121は、押出成形セメント板床材1の裏面側に設けられた被係止部たる貫通孔3(図23)に係止させる係止部材たるピン122と、ピン122から押出成形セメント板床材1の端部まで延びる板状部123と、この板状部123の端部において上方に立ち上がる立ち上がり部124とを有している。立ち上がり部124には、斜め下方への折り返し部を設けてもよい。折り返し部を設ければ、後述する押圧部材131の押付部131cで立ち上がり部124を押圧するときに、折り返し部によるばね圧接効果で立ち上がり部124をより強く押圧することができる。 The floor material mounting bracket 121 includes a pin 122 which is a locking member for locking in a through hole 3 (FIG. 23) which is a locked portion provided on the back surface side of the extruded cement plate floor material 1, and extruded cement from the pin 122. It has a plate-shaped portion 123 extending to the end portion of the board floor material 1 and a rising portion 124 rising upward at the end portion of the plate-shaped portion 123. The rising portion 124 may be provided with a folded portion diagonally downward. If the folded-back portion is provided, when the rising portion 124 is pressed by the pressing portion 131c of the pressing member 131 described later, the rising portion 124 can be pressed more strongly by the spring pressure contact effect of the folded-back portion.

梁材取付金具125は、梁材5の上方に配置される平面状の本体部126と、梁材5のフランジ部6(図23)を幅方向の一方から挟み込む挟持部127と、本体部126の上方に設けられた中空部保持部128と、を有している。板材からなる本体部126は、一方に延びる所定位置を下向きに屈曲させ、端部を本体部126の下方へ向けて延びるように所定位置まで曲げられて挟持部127が形成されている。挟持部127は、梁材5のフランジ部6(図2)を挟むように形成されている。また、この例の本体部126は、挟持部127の部分に、梁材5のフランジ部6に設けられた被係合部7に係合させる係合部126bが設けられている。 The beam member mounting bracket 125 includes a flat main body 126 arranged above the beam 5, a holding portion 127 for sandwiching the flange 6 (FIG. 23) of the beam 5 from one side in the width direction, and a main body 126. It has a hollow portion holding portion 128 provided above the above. The main body 126 made of a plate material is bent downward at a predetermined position extending to one side and bent to a predetermined position so that the end portion extends downward of the main body 126 to form a holding portion 127. The sandwiching portion 127 is formed so as to sandwich the flange portion 6 (FIG. 2) of the beam member 5. Further, the main body portion 126 of this example is provided with an engaging portion 126b for engaging with the engaged portion 7 provided on the flange portion 6 of the beam member 5 at the portion of the holding portion 127.

中空部保持部128は、本体部126の上面に設けられた所定高さの台座129と、台座129の上部に設けられた回転防止部材130と、回転防止部材130の上方に設けられた押圧部材131とを有している。台座129は、本体部126から前後方向の一方(この例では前方(図25))に片寄って、所定高さで立ち上がるように設けられている。台座129の上面129aには、ボルト132をねじ込むボルト孔129bが設けられている。台座129の高さは、床材取付金具121の立ち上がり部124を押圧できる高さに設定されている(図23(B))。なお、台座129は、本体部126の前後方向の中央部分で立ち上がるようにしてもよい。回転防止部材130には、爪部130aが上向きに突設されており、台座129のボルト孔129bの部分に貫通孔130bが設けられている。回転防止部材130は、押圧部材131が押出成形セメント板床材1の端縁と平行となる状態に回転した退避状態で押圧部材131を係止する。 The hollow portion holding portion 128 includes a pedestal 129 having a predetermined height provided on the upper surface of the main body 126, an anti-rotation member 130 provided on the upper portion of the pedestal 129, and a pressing member provided above the anti-rotation member 130. It has 131 and. The pedestal 129 is provided so as to stand up at a predetermined height from the main body 126 in one of the front-rear directions (in this example, the front (FIG. 25)). The upper surface 129a of the pedestal 129 is provided with a bolt hole 129b into which the bolt 132 is screwed. The height of the pedestal 129 is set to a height at which the rising portion 124 of the floor material mounting bracket 121 can be pressed (FIG. 23 (B)). The pedestal 129 may stand up at the central portion of the main body 126 in the front-rear direction. The rotation prevention member 130 has a claw portion 130a projecting upward, and a through hole 130b is provided in a portion of the bolt hole 129b of the pedestal 129. The rotation prevention member 130 locks the pressing member 131 in a retracted state in which the pressing member 131 is rotated so as to be parallel to the edge of the extruded cement board floor material 1.

押圧部材131は、回転軸たるボルト132が所定位置に挿通されており、ボルト132を中心に回転可能となっている。ボルト132は、例えば六角穴付ボルトを用いることができる。押圧部材131は、ボルト132が挿通された支持部131bの両端部に、床材取付金具121の立ち上がり部124を押し付けるように下向きに屈曲された押付部131cが設けられている。押圧部材131の支持部131bには、回転防止部材130の爪部130aに当接する凹部131aが設けられている。押圧部材131は、回転軸たるボルト132を中心に、床材取付金具121の立ち上がり部124を押圧して押出成形セメント板床材1を梁材5に押し付ける配置状態と、押出成形セメント板床材1の中空部2から出た退避状態と、に回転する。 A bolt 132, which is a rotation shaft, is inserted into the pressing member 131 at a predetermined position, and the pressing member 131 can rotate around the bolt 132. As the bolt 132, for example, a hexagon socket head cap screw can be used. The pressing member 131 is provided with pressing portions 131c bent downward so as to press the rising portion 124 of the floor material mounting bracket 121 at both ends of the support portion 131b through which the bolt 132 is inserted. The support portion 131b of the pressing member 131 is provided with a recess 131a that abuts on the claw portion 130a of the rotation prevention member 130. The pressing member 131 is arranged so that the extruded cement plate floor material 1 is pressed against the beam material 5 by pressing the rising portion 124 of the floor material mounting bracket 121 around the bolt 132 which is the rotation shaft, and the extruded cement plate floor material 1. It rotates to the retracted state from the hollow portion 2.

ボルト132には、押圧部材131の下面に当接するバネ部材133が設けられている。ボルト132を台座129のボルト孔129bにねじ込むことで、押圧部材131はバネ部材133によってボルト132の頭部132aに向けて付勢される。押圧部材131は、バネ部材133により、ボルト132の下端部を台座129のボルト孔129bにねじ込んだ取付状態では、頭部132aに当接して押出成形セメント板床材1の中空部2に向けて回転させることができる高さで保持される。 The bolt 132 is provided with a spring member 133 that comes into contact with the lower surface of the pressing member 131. By screwing the bolt 132 into the bolt hole 129b of the pedestal 129, the pressing member 131 is urged by the spring member 133 toward the head 132a of the bolt 132. The pressing member 131 abuts on the head 132a and rotates toward the hollow portion 2 of the extruded cement board floor material 1 in the mounted state in which the lower end of the bolt 132 is screwed into the bolt hole 129b of the pedestal 129 by the spring member 133. It is held at a height that allows it to be made.

さらに、第7取付金具120は、本体部126が挟持部127に対して上方に離れるように段部126aが設けられている。段部126aは、本体部126と挟持部127との間を上方へ屈曲させることで形成されている。段部126aを設けることで、後述するように、本体部126と梁材5との間に空隙部V(図23(B))が形成される。空隙部Vを形成することで、押出成形セメント板床材1の振動が第7取付金具120から梁材5に伝搬することを抑える緩衝特性を発揮することができる。すなわち、段部126aによって振動伝搬に対して緩衝特性を持たせることができるため、第7取付金具120から梁材5に伝わる振動を抑えることができる。 Further, the seventh mounting bracket 120 is provided with a step portion 126a so that the main body portion 126 is separated upward from the holding portion 127. The step portion 126a is formed by bending upward between the main body portion 126 and the sandwiching portion 127. By providing the step portion 126a, a gap portion V (FIG. 23 (B)) is formed between the main body portion 126 and the beam member 5 as described later. By forming the gap portion V, it is possible to exhibit a cushioning property that suppresses the vibration of the extruded cement board floor material 1 from propagating from the seventh mounting bracket 120 to the beam material 5. That is, since the step portion 126a can provide a cushioning property against vibration propagation, the vibration transmitted from the seventh mounting bracket 120 to the beam member 5 can be suppressed.

床材取付金具121は、1つの梁材取付金具125に対して対向する位置に一対が設けられる。一対の床材取付金具121の立ち上がり部124を、梁材取付金具125の押圧部材131で同時に押圧して押出成形セメント板床材1を梁材5に留め付ける。 A pair of floor material mounting brackets 121 are provided at positions facing one beam mounting bracket 125. The rising portion 124 of the pair of floor material mounting brackets 121 is simultaneously pressed by the pressing member 131 of the beam material mounting bracket 125 to fasten the extruded cement board floor material 1 to the beam material 5.

押圧部材131は、ボルト132を締める方向に回転させることにより、回転防止部材130の爪部130aに係止されて止まる(図23(A))。この状態が、押圧部材131の配置状態であり、押圧部材131で床材取付金具121の立ち上がり部124を押圧することができる。また、押圧部材131は、ボルト132を緩める方向に回転させることにより、押出成形セメント板床材1の中空部2から出て回転防止部材130の爪部130aに係止されて止まる。この状態が、押圧部材131の退避状態である(後述する図27と同様)。 By rotating the pressing member 131 in the direction of tightening the bolt 132, the pressing member 131 is locked to the claw portion 130a of the rotation prevention member 130 and stops (FIG. 23 (A)). This state is the arrangement state of the pressing member 131, and the pressing member 131 can press the rising portion 124 of the floor material mounting bracket 121. Further, by rotating the pressing member 131 in the direction of loosening the bolt 132, the pressing member 131 comes out of the hollow portion 2 of the extruded cement board floor material 1 and is locked to the claw portion 130a of the rotation prevention member 130 to stop. This state is the retracted state of the pressing member 131 (similar to FIG. 27 described later).

この第7取付金具120によれば、押圧部材131は回転防止部材130によって、退避状態では押出成形セメント板床材1の端縁と平行の状態で係止され、配置状態では押出成形セメント板床材1の中空部2が延びる方向に向けられた状態で係止され、退避状態と配置状態の適切な位置で止まるようになっている。これにより、押出成形セメント板床材1の取付作業を効率良く行うことができる。 According to the seventh mounting bracket 120, the pressing member 131 is locked by the rotation prevention member 130 in a state parallel to the edge of the extruded cement board floor material 1 in the retracted state, and is locked in the extruded cement board floor material 1 in the arranged state. The hollow portion 2 of the above is locked in a state of being directed in the extending direction, and stops at appropriate positions in the retracted state and the arranged state. As a result, the mounting work of the extruded cement board floor material 1 can be efficiently performed.

そして、押圧部材131は、配置状態においてボルト132を締め付けることでバネ部材133が圧縮されて床材取付金具121の立ち上がり部124を梁材5に向けて押圧する。これにより、床材取付金具121で押出成形セメント板床材1を梁材5に押し付けて留め付けることができる。 Then, the pressing member 131 compresses the spring member 133 by tightening the bolt 132 in the arranged state, and presses the rising portion 124 of the floor material mounting bracket 121 toward the beam member 5. As a result, the extruded cement board floor material 1 can be pressed and fastened to the beam material 5 by the floor material mounting bracket 121.

(第7取付金具の使用例)
図23は、図22に示す第7取付金具120を梁材5に取り付けた使用状態を示す図面であり、(A)は(B)に示すXXIII−XXIII矢視の断面図であり、(B)は側面視の断面図である。
(Example of using the 7th mounting bracket)
FIG. 23 is a drawing showing a usage state in which the seventh mounting bracket 120 shown in FIG. 22 is attached to the beam member 5, and FIG. 23A is a cross-sectional view taken along the line XXIII-XXIII shown in FIG. 22B. ) Is a cross-sectional view of the side view.

第7取付金具120によれば、梁材5の上に緩衝材4が置かれ、その上に押出成形セメント板床材1が載せられる。そして、梁材取付金具125が挟持部127で梁材5のフランジ部6を幅方向の一方から挟み込むように取り付けられる。梁材取付金具125の梁材5への取り付けは、押出成形セメント板床材1を載せる前、一方の押出成形セメント板床材1を載せた後のいずれでもよい。押出成形セメント板床材1を載せた後でも、押出成形セメント板床材1の前後方向の中間部分には、緩衝材4の継目の部分に緩衝材4の厚み分の空間Sができる。このため、この空間Sを利用して、梁材取付金具125の本体部126を挿入して取り付けることができる。この場合、梁材取付金具125の取り付け後、押圧部材131を中空部2の延びる方向と直交する方向に向けておくとよい。また、押出成形セメント板床材1の中空部2に、床材取付金具121が挿入されてピン122が貫通孔3に係止される。 According to the seventh mounting bracket 120, the cushioning material 4 is placed on the beam material 5, and the extruded cement board floor material 1 is placed on the cushioning material 4. Then, the beam member mounting bracket 125 is attached so as to sandwich the flange portion 6 of the beam member 5 from one side in the width direction by the sandwiching portion 127. The beam material mounting bracket 125 may be attached to the beam material 5 either before the extruded cement board floor material 1 is placed or after one of the extruded cement board floor materials 1 is placed. Even after the extruded cement board floor material 1 is placed, a space S corresponding to the thickness of the cushioning material 4 is formed at the joint portion of the cushioning material 4 in the intermediate portion in the front-rear direction of the extruded cement board floor material 1. Therefore, the main body 126 of the beam member mounting bracket 125 can be inserted and mounted using this space S. In this case, after mounting the beam member mounting bracket 125, the pressing member 131 may be oriented in a direction orthogonal to the extending direction of the hollow portion 2. Further, the floor material mounting bracket 121 is inserted into the hollow portion 2 of the extruded cement board floor material 1, and the pin 122 is locked in the through hole 3.

この第7取付金具120によれば、梁材5に取り付けた梁材取付金具125の左右位置に押出成形セメント板床材1を載せた後、隣り合う押出成形セメント板床材1の目地部M(図28(B)に示す押出成形セメント板床材1の間)からボルト132を回転させる。ボルト132によって回転させた押圧部材131は、押出成形セメント板床材1の中空部2に進入して配置状態になると回転防止部材130の爪部130aに当接して止まる(図23(A))。その後、その状態でボルト132をさらにねじ込むことで、押圧部材131によって床材取付金具121の立ち上がり部124を押圧し、これにより押出成形セメント板床材1を梁材5に向けて押し付けて留め付けることができる。 According to the seventh mounting bracket 120, after the extruded cement board floor material 1 is placed at the left and right positions of the beam material mounting bracket 125 attached to the beam material 5, the joint portion M of the adjacent extruded cement board flooring materials 1 (FIG. The bolt 132 is rotated from (between the extruded cement board floor material 1) shown in 28 (B). When the pressing member 131 rotated by the bolt 132 enters the hollow portion 2 of the extruded cement board floor material 1 and is in the arranged state, it comes into contact with the claw portion 130a of the rotation prevention member 130 and stops (FIG. 23 (A)). After that, by further screwing the bolt 132 in that state, the rising portion 124 of the floor material mounting bracket 121 is pressed by the pressing member 131, whereby the extruded cement board floor material 1 is pressed and fastened toward the beam material 5. Can be done.

しかも、第7取付金具120は、梁材5の左右位置に載せられる隣り合う押出成形セメント板床材1に設けられている床材取付金具121の立ち上がり部124を押圧部材131で同時に押圧する。このため、隣り合う押出成形セメント板床材1を保持する作業を1箇所で行うことができ、押出成形セメント板床材1の取付作業を効率良く行うことができる。このことは、後述する第8取付金具140も同様である。 Moreover, the seventh mounting bracket 120 simultaneously presses the rising portion 124 of the flooring material mounting bracket 121 provided on the adjacent extruded cement plate flooring material 1 placed on the left and right positions of the beam member 5 with the pressing member 131. Therefore, the work of holding the adjacent extruded cement board floor material 1 can be performed at one place, and the work of attaching the extruded cement board floor material 1 can be efficiently performed. This also applies to the eighth mounting bracket 140, which will be described later.

その上、第7取付金具120によれば、挟持部127で梁材5のフランジ部6を挟持した取付状態で、本体部126の段部126aによって梁材5との間に空隙部Vが形成される(図23(B))。この空隙部Vにより、第7取付金具120から梁材5に向けて振動が伝搬することを抑える緩衝特性を発揮することができる。よって、梁材5に伝わる振動を抑えることができ、遮音性が向上する。このことは、後述する第8取付金具140も同様である。 Further, according to the seventh mounting bracket 120, a gap portion V is formed between the holding portion 127 and the beam member 5 by the stepped portion 126a of the main body portion 126 in the mounting state in which the flange portion 6 of the beam member 5 is sandwiched between the sandwiching portions 127. (Fig. 23 (B)). Due to this gap portion V, it is possible to exhibit a cushioning property that suppresses the propagation of vibration from the seventh mounting bracket 120 toward the beam member 5. Therefore, the vibration transmitted to the beam member 5 can be suppressed, and the sound insulation property is improved. This also applies to the eighth mounting bracket 140, which will be described later.

(第8実施形態に係る第8取付金具)
図24は、第8実施形態に係る第8取付金具140を示す分解斜視図である。第8取付金具140は、梁材取付金具145の一部と床材取付金具141及び押圧部材151が第7取付金具120とは異なる構成となっている。以下の説明では、第7取付金具120と異なる構成についてのみ説明し、同一の構成には「20」を加えた符号を付して、その説明は省略する。
(8th mounting bracket according to the 8th embodiment)
FIG. 24 is an exploded perspective view showing the eighth mounting bracket 140 according to the eighth embodiment. The eighth mounting bracket 140 has a structure in which a part of the beam mounting bracket 145, the floor material mounting bracket 141, and the pressing member 151 are different from the seventh mounting bracket 120. In the following description, only the configuration different from that of the seventh mounting bracket 120 will be described, and the same configuration will be designated by a reference numeral with “20” added, and the description thereof will be omitted.

第8取付金具140の床材取付金具141は、押出成形セメント板床材1の被係止部たる貫通孔3(図23)に係止させる係止部材がボルト142となっている。また、床材取付金具141の板状部143には、ボルト142を螺合させるねじ部143aが設けられている。床材取付金具141の押出成形セメント板床材1の端縁付近には、上向きに屈曲して立ち上がる立ち上がり部144が設けられている。 In the floor material mounting bracket 141 of the eighth mounting bracket 140, the locking member for locking in the through hole 3 (FIG. 23) which is the locked portion of the extruded cement board floor material 1 is a bolt 142. Further, the plate-shaped portion 143 of the floor material mounting bracket 141 is provided with a screw portion 143a for screwing the bolt 142. An extruded cement plate of the floor material mounting bracket 141 A rising portion 144 that bends upward and rises is provided near the edge of the floor material 1.

第8取付金具140は、係止部をボルト142とすることで、床材取付金具141と押出成形セメント板床材1との接合が強固になるので、押出成形セメント板床材1の取り付けもより強固に行うことができる。 In the eighth mounting bracket 140, since the locking portion is a bolt 142, the joint between the floor material mounting bracket 141 and the extruded cement board floor material 1 is strengthened, so that the extruded cement board floor material 1 is also more firmly mounted. Can be done.

また、第8取付金具140は、本体部146の上面部分に切り欠き部146cが設けられている。切り欠き部146cを設けることで、本体部146と梁材5とが接触したとしても、音の伝搬を軽減することができる。なお、切り欠き部146cはなくてもよい。他の構成は第7取付金具120と同一であるため、詳細な説明は省略する。 Further, the eighth mounting bracket 140 is provided with a notch portion 146c on the upper surface portion of the main body portion 146. By providing the cutout portion 146c, it is possible to reduce the propagation of sound even if the main body portion 146 and the beam member 5 come into contact with each other. The cutout portion 146c may not be provided. Since other configurations are the same as those of the seventh mounting bracket 120, detailed description thereof will be omitted.

このような第8取付金具140によっても、押圧部材151は回転防止部材150によって、退避状態では押出成形セメント板床材1の端縁と平行の状態で係止され、配置状態では押出成形セメント板床材1の中空部2が延びる方向に向けられた状態で係止され、退避状態と配置状態の適切な位置で止まるようになっている。これにより、押出成形セメント板床材1の取付作業を効率良く行うことができる。 Even with such an eighth mounting bracket 140, the pressing member 151 is locked by the rotation prevention member 150 in a state parallel to the edge of the extruded cement board floor material 1 in the retracted state, and is locked in the extruded cement board floor material 1 in the arranged state. The hollow portion 2 of 1 is locked in a state of being directed in the extending direction, and stops at appropriate positions in the retracted state and the arranged state. As a result, the mounting work of the extruded cement board floor material 1 can be efficiently performed.

そして、中空部保持部148の押圧部材151を配置状態として、ボルト152を締め付けることでバネ部材153が圧縮されて床材取付金具141の立ち上がり部144を梁材5に向けて押圧する。これにより、床材取付金具141で押出成形セメント板床材1を梁材5に押し付けて留め付けることができる。 Then, with the pressing member 151 of the hollow portion holding portion 148 in the arranged state, the spring member 153 is compressed by tightening the bolt 152, and the rising portion 144 of the floor material mounting bracket 141 is pressed toward the beam member 5. As a result, the extruded cement board floor material 1 can be pressed and fastened to the beam material 5 by the floor material mounting bracket 141.

(第8取付金具を用いた取付構造例)
図25は、図24に示す第8取付金具140を梁材5に取り付けた取付構造を示す斜視図である。第8取付金具140は、梁材取付金具145が挟持部147で梁材5のフランジ部6を幅方向の一方から挟み込むように取り付けられる。梁材取付金具145の取り付け後、押出成形セメント板床材1を載せる時の障害にならないように押圧部材151を中空部2の延びる方向と直交する方向に向けておくとよい。一方、床材取付金具141は、予め押出成形セメント板床材1の中空部2に挿入され、押出成形セメント板床材1の貫通孔3の部分にボルト152で固定される。
(Example of mounting structure using the 8th mounting bracket)
FIG. 25 is a perspective view showing a mounting structure in which the eighth mounting bracket 140 shown in FIG. 24 is mounted on the beam member 5. The eighth mounting bracket 140 is mounted so that the beam member mounting bracket 145 sandwiches the flange portion 6 of the beam member 5 from one side in the width direction with the holding portion 147. After the beam member mounting bracket 145 is attached, the pressing member 151 may be oriented in a direction orthogonal to the extending direction of the hollow portion 2 so as not to be an obstacle when the extruded cement board flooring material 1 is placed. On the other hand, the floor material mounting bracket 141 is inserted into the hollow portion 2 of the extruded cement board floor material 1 in advance, and is fixed to the through hole 3 of the extruded cement board floor material 1 with a bolt 152.

そして、第8取付金具140によれば、梁材5に取り付けた梁材取付金具145の左右位置に押出成形セメント板床材1を載せた後(図では一方の押出成形セメント板床材1のみを示す)、隣り合う押出成形セメント板床材1の目地部M(図23(B)に示す押出成形セメント板床材1の間)からボルト152を回転させる。これにより、押圧部材151が回転させられて、押出成形セメント板床材1の中空部2に進入して配置状態となると回転防止部材150の爪部150aに当接して止まる(図23(a)と同様)。その後、ボルト152をさらにねじ込むことで、押圧部材151によって床材取付金具141の立ち上がり部144が押出成形セメント板床材1に向けて押圧され、押出成形セメント板床材1を梁材5に向けて押し付けて留め付けることができる。 Then, according to the eighth mounting bracket 140, after the extruded cement board floor material 1 is placed at the left and right positions of the beam material mounting bracket 145 attached to the beam material 5 (in the figure, only one extruded cement board floor material 1 is shown. ), The bolt 152 is rotated from the joint portion M (between the extruded cement board floor material 1 shown in FIG. 23B) of the adjacent extruded cement board floor material 1. As a result, when the pressing member 151 is rotated and enters the hollow portion 2 of the extruded cement board floor material 1 and is in the arranged state, it comes into contact with the claw portion 150a of the rotation prevention member 150 and stops (FIG. 23 (a)). Similarly). After that, by further screwing the bolt 152, the rising portion 144 of the floor material mounting bracket 141 is pressed toward the extruded cement board floor material 1 by the pressing member 151, and the extruded cement board floor material 1 is pressed against the beam material 5. Can be fastened.

(第9実施形態に係る第9取付金具)
図26は、第9実施形態に係る第9取付金具160を示す分解斜視図である。図27は、図26に示す第9取付金具160の梁材取付金具165と中空部保持部168とを組み立てた状態の平面図である。第9取付金具160は、押出成形セメント板床材1(図28)に取り付けられる床材取付金具161と、梁材5(図28)に取り付けられる梁材取付金具165とを備えている。
(9th mounting bracket according to the 9th embodiment)
FIG. 26 is an exploded perspective view showing the ninth mounting bracket 160 according to the ninth embodiment. FIG. 27 is a plan view of the beam member mounting bracket 165 and the hollow portion holding portion 168 of the ninth mounting bracket 160 shown in FIG. 26 in an assembled state. The ninth mounting bracket 160 includes a floor material mounting bracket 161 attached to the extruded cement board floor material 1 (FIG. 28) and a beam material mounting bracket 165 attached to the beam material 5 (FIG. 28).

床材取付金具161は、板状部163の一端に設けられた梁材5のフランジ部6を挟み込む挟持部164と、押出成形セメント板床材1の裏面側に設けられた被係止部たる貫通孔3(図28)に係止させる係止部材たるピン162とを有している。 The floor material mounting bracket 161 is a penetrating portion 164 for sandwiching the flange portion 6 of the beam member 5 provided at one end of the plate-shaped portion 163 and a locked portion provided on the back surface side of the extruded cement plate floor material 1. It has a pin 162 which is a locking member for locking in the hole 3 (FIG. 28).

梁材取付金具165は、梁材5の上方に配置される本体部166と、梁材5のフランジ部6を幅方向の一方から挟み込む挟持部167と、本体部166の上方に設けられた中空部保持部168と、を有している。本体部166の挟持部167と反対側には、掛け止め部174が設けられている。本体部166の上面には、所定高さの台座169が設けられ、台座169の上部には回転防止部材170が設けられている。回転防止部材170の上方に、押圧部材171が設けられている。台座169は、本体部166から所定高さで(ボルト172による保持力を得るため押出成形セメント板床材1の中空部2の下側の厚み分よりも低く)立ち上がるように設けられ、上面の前後方向の端部に、ボルト172をねじ込むボルト孔169bが設けられている。台座169の高さは、ボルト172による保持力を得るために、押出成形セメント板床材1の中空部2の下方における床材厚み分よりも低くなっている(図28(B))。回転防止部材170には、爪部170aが上向きに突設されており、その前後方向の外側には、台座169のボルト孔169bの部分に貫通孔170bが設けられている。 The beam member mounting bracket 165 includes a main body portion 166 arranged above the beam member 5, a holding portion 167 that sandwiches the flange portion 6 of the beam member 5 from one side in the width direction, and a hollow provided above the main body portion 166. It has a portion holding portion 168 and a portion holding portion 168. A hooking portion 174 is provided on the opposite side of the main body portion 166 from the holding portion 167. A pedestal 169 having a predetermined height is provided on the upper surface of the main body 166, and a rotation prevention member 170 is provided on the upper portion of the pedestal 169. A pressing member 171 is provided above the rotation prevention member 170. The pedestal 169 is provided so as to stand up from the main body portion 166 at a predetermined height (lower than the thickness of the lower side of the hollow portion 2 of the extruded cement board floor material 1 in order to obtain the holding force by the bolt 172), and is provided in front of and behind the upper surface. A bolt hole 169b for screwing the bolt 172 is provided at the end in the direction. The height of the pedestal 169 is lower than the thickness of the floor material below the hollow portion 2 of the extruded cement board floor material 1 in order to obtain the holding force by the bolt 172 (FIG. 28 (B)). The rotation prevention member 170 is provided with a claw portion 170a projecting upward, and a through hole 170b is provided in a portion of the bolt hole 169b of the pedestal 169 on the outside in the front-rear direction thereof.

押圧部材171は、回転軸となるボルト172が所定位置に挿通されており、ボルト172を中心に回転可能となっている。ボルト172は、例えば六角穴付ボルトを用いることができる。押圧部材171は、押出成形セメント板床材1を押し付ける一端部が、反力を受けるように下向きに僅かに屈曲されている。押圧部材171の他端部には、回転防止部材170の爪部170aに当接する部分に凹部171aが設けられている。ボルト172には、押圧部材171の下面に当接するバネ部材173が設けられている。ボルト172を台座169のボルト孔169bにねじ込むことで、押圧部材171はバネ部材173によってボルト172の頭部172aに向けて付勢される。押圧部材171は、バネ部材173により、ボルト172の先端部を台座99のボルト孔99bにねじ込んだ取付状態では、頭部172aに当接して押出成形セメント板床材1の中空部2に向けて回転させることができる高さで保持される。 In the pressing member 171, a bolt 172 serving as a rotation axis is inserted at a predetermined position, and the pressing member 171 can rotate around the bolt 172. As the bolt 172, for example, a hexagon socket head cap screw can be used. One end of the pressing member 171 that presses the extruded cement board floor material 1 is slightly bent downward so as to receive a reaction force. At the other end of the pressing member 171, a recess 171a is provided at a portion of the rotation prevention member 170 that comes into contact with the claw portion 170a. The bolt 172 is provided with a spring member 173 that comes into contact with the lower surface of the pressing member 171. By screwing the bolt 172 into the bolt hole 169b of the pedestal 169, the pressing member 171 is urged by the spring member 173 toward the head 172a of the bolt 172. The pressing member 171 abuts on the head 172a and rotates toward the hollow portion 2 of the extruded cement board floor material 1 in the mounted state in which the tip of the bolt 172 is screwed into the bolt hole 99b of the pedestal 99 by the spring member 173. It is held at a height that allows it to be made.

図27に示すように、押圧部材171は、ボルト172を締める方向に回転させることにより、一端部が押出成形セメント板床材1の中空部2に進入させられて回転防止部材170の爪部170aに係止されて止まり配置状態Aとなる。また、押圧部材171は、ボルト172を緩める方向に回転させることにより、一端部が押出成形セメント板床材1の中空部2から出て凹部171aが回転防止部材170の爪部170aに係止されて止まり退避状態Bとなる。凹部171aは、押圧部材171を退避状態としたときに、適切に目地部M(図28(B)に示す押出成形セメント板床材1の間)内に収めるためのものである。 As shown in FIG. 27, by rotating the pressing member 171 in the direction of tightening the bolt 172, one end of the pressing member 171 is made to enter the hollow portion 2 of the extruded cement board floor material 1 and is inserted into the claw portion 170a of the rotation prevention member 170. It is locked and stops, and the arrangement state A is set. Further, by rotating the pressing member 171 in the direction of loosening the bolt 172, one end thereof comes out from the hollow portion 2 of the extruded cement board floor material 1, and the recess 171a is locked to the claw portion 170a of the rotation prevention member 170. It will stop and be in the retracted state B. The recess 171a is for appropriately fitting the pressing member 171 in the joint portion M (between the extruded cement board floor material 1 shown in FIG. 28B) when the pressing member 171 is in the retracted state.

このように、押圧部材171は、回転防止部材170により、退避状態では押出成形セメント板床材1の端縁と平行の状態で係止され、配置状態では押出成形セメント板床材1の中空部2に進入して中空部2の延びる方向に向けられた状態で係止され、ほぼ90度の退避状態と配置状態の適切な位置で止まるようになっている。これにより、以下のように押出成形セメント板床材1の取付作業を効率良く行うことができる。 In this way, the pressing member 171 is locked by the rotation prevention member 170 in a state parallel to the edge of the extruded cement board floor material 1 in the retracted state, and in the hollow portion 2 of the extruded cement board floor material 1 in the arranged state. It is locked in a state of entering and facing the extending direction of the hollow portion 2, and stops at an appropriate position in the retracted state and the arranged state of about 90 degrees. Thereby, the attachment work of the extruded cement board floor material 1 can be efficiently performed as follows.

(第9取付金具の使用例と取付構造例)
図28は、図26に示す第9取付金具160を梁材5に取り付けた使用状態を示す図面であり、(A)は(B)に示すXXVIII−XXVIII矢視の断面図であり、(B)は側面視の断面図である。図29は、図26に示す第9取付金具160を梁材5に取り付けた取付構造を示す斜視図である。
(Example of use of 9th mounting bracket and example of mounting structure)
FIG. 28 is a drawing showing a usage state in which the ninth mounting bracket 160 shown in FIG. 26 is attached to the beam member 5, and FIG. 28A is a cross-sectional view taken along the line XXVIII-XXVIII shown in FIG. ) Is a cross-sectional view of the side view. FIG. 29 is a perspective view showing a mounting structure in which the ninth mounting bracket 160 shown in FIG. 26 is mounted on the beam member 5.

第9取付金具160によれば、床材取付金具161が梁材5の所定位置に挟持部167でフランジ部6を幅方向の一方から挟み込んで取り付けられる。一方、梁材取付金具165は、挟持部167で梁材5のフランジ部6を幅方向の一方から挟み込んで取り付けられる。梁材取付金具165の取り付け後、押出成形セメント板床材1を載せる時の障害にならないように押圧部材171を中空部2の延びる方向と直交する方向に向けておくとよい。梁材取付金具165を左右に配置される一方の押出成形セメント板床材1を載せた後に取り付ける場合、梁材5と押出成形セメント板床材1との間にできる緩衝材4の厚み分の空間S(図23(B)と同様)を利用して取り付けることができる。 According to the ninth mounting bracket 160, the floor material mounting bracket 161 is mounted by sandwiching the flange portion 6 from one side in the width direction with the holding portion 167 at a predetermined position of the beam member 5. On the other hand, the beam member mounting bracket 165 is attached by sandwiching the flange portion 6 of the beam member 5 from one side in the width direction with the holding portion 167. After the beam member mounting bracket 165 is attached, the pressing member 171 may be oriented in a direction orthogonal to the extending direction of the hollow portion 2 so as not to be an obstacle when the extruded cement board flooring material 1 is placed. When the beam material mounting bracket 165 is mounted after the extruded cement board floor material 1 arranged on the left and right is placed, the space S corresponding to the thickness of the cushioning material 4 formed between the beam material 5 and the extruded cement board floor material 1. (Same as FIG. 23 (B)) can be used for mounting.

そして、梁材5に取り付けた梁材取付金具165の左右位置に押出成形セメント板床材1を載せ、床材取付金具161のピン162を押出成形セメント板床材1の貫通孔3に係止させる。床材取付金具161は、予め梁材5に取り付けた状態で押出成形セメント板床材1を載置して貫通孔3の位置を合わせるだけで取り付けができるので、床材取付金具161の正確な位置合わせが必要なく、施工性良く作業が行える。 Then, the extruded cement plate floor material 1 is placed at the left and right positions of the beam material mounting bracket 165 attached to the beam material 5, and the pins 162 of the floor material mounting bracket 161 are locked in the through holes 3 of the extruded cement plate floor material 1. Since the floor material mounting bracket 161 can be mounted by simply placing the extruded cement plate flooring material 1 in a state of being mounted on the beam material 5 in advance and aligning the positions of the through holes 3, the exact position of the floor material mounting bracket 161 Work can be done with good workability without the need for alignment.

その後、隣り合う押出成形セメント板床材1の目地部M(図28(B)に示す押出成形セメント板床材1の間)からボルト172を回転させる。ボルト172の回転によって回転させられる中空部保持部168の押圧部材171は、押出成形セメント板床材1の中空部2に進入して爪部170aに当接して配置状態となる(図27の状態)。その後、ボルト172をさらにねじ込むことで、押圧部材171によって押出成形セメント板床材1を梁材5に向けて押し付けて留め付けることができる。第9取付金具160によれは、隣り合う押出成形セメント板床材1を個別の押圧部材171で保持する作業を1箇所で行うことができ、押出成形セメント板床材1の取付作業を効率良く行うことができる。 After that, the bolt 172 is rotated from the joint portion M (between the extruded cement board floor material 1 shown in FIG. 28B) of the adjacent extruded cement board floor material 1. The pressing member 171 of the hollow portion holding portion 168, which is rotated by the rotation of the bolt 172, enters the hollow portion 2 of the extruded cement board floor material 1 and abuts on the claw portion 170a to be in an arranged state (state of FIG. 27). .. After that, by further screwing the bolt 172, the extruded cement board floor material 1 can be pressed and fastened toward the beam material 5 by the pressing member 171. According to the ninth mounting bracket 160, the work of holding the adjacent extruded cement board floor material 1 by the individual pressing members 171 can be performed at one place, and the work of mounting the extruded cement board floor material 1 can be efficiently performed. Can be done.

しかも、第9取付金具160によれば、床材取付金具161を予め梁材5に取り付けた状態で、押出成形セメント板床材1の貫通孔3を床材取付金具161のピン162に係合させることで押出成形セメント板床材1の位置合わせができるので、施工性も向上する。 Moreover, according to the ninth mounting bracket 160, the through hole 3 of the extruded cement board floor material 1 is engaged with the pin 162 of the floor material mounting bracket 161 in a state where the floor material mounting bracket 161 is attached to the beam material 5 in advance. As a result, the extruded cement board floor material 1 can be aligned, and the workability is also improved.

その上、第9取付金具160によっても、梁材取付金具165が挟持部167で梁材5のフランジ部6を挟持した取付状態で、本体部166が梁材5の上面から浮いた状態となって空隙部Vが形成される(図28(B))。この空隙部Vにより、押出成形セメント板床材1から梁材5に向けて振動が伝搬することを抑える緩衝特性を発揮することができる。よって、梁材5に伝わる振動を抑えることができ、遮音性が向上する。 Further, also by the ninth mounting bracket 160, the main body portion 166 is in a state of floating from the upper surface of the beam member 5 in the mounted state in which the beam member mounting bracket 165 sandwiches the flange portion 6 of the beam member 5 with the sandwiching portion 167. A gap V is formed (FIG. 28 (B)). Due to the gap portion V, it is possible to exhibit a cushioning property that suppresses the propagation of vibration from the extruded cement board floor material 1 to the beam material 5. Therefore, the vibration transmitted to the beam member 5 can be suppressed, and the sound insulation property is improved.

(その他の変形例)
梁材取付金具15,35,55,85,110,125,145,165の本体部16,36,56,86,111,126,146,166は、段部16a,36a,56a,86a,111a,126a,146a,166aを有しない構成であってもよく、上記実施形態に限定されるものではない。また、本体部16,36,56,86,111,126,146,166は、梁材5に貫通孔などの被係合部7が備えられている構成、又は被係合部7が備えられていない構成のいずれでも使用できる構成とすることができ、上記実施形態に限定されるものではない。
(Other variants)
The main body portions 16, 36, 56, 86, 111, 126, 146, 166 of the beam member mounting brackets 15, 35, 55, 85, 110, 125, 145, 165 have the step portions 16a, 36a, 56a, 86a, 111a. , 126a, 146a, 166a may not be provided, and the configuration is not limited to the above embodiment. Further, the main body portions 16, 36, 56, 86, 111, 126, 146, 166 are provided with a structure in which the beam member 5 is provided with an engaged portion 7 such as a through hole, or the engaged portion 7 is provided. Any of the configurations that are not provided can be used, and the configuration is not limited to the above embodiment.

さらに、上記した実施形態は一例を示しており、押出成形セメント板床材1の上面側基材1bに設けられた切欠き部1dは、ボルト材18,38,58,88に沿って梁材5に載せられる押出成形セメント板床材1の両方又は片方であってもよく、大きさ、数などは限定されない。 Further, the above embodiment shows an example, in which the notch 1d provided in the upper surface side base material 1b of the extruded cement board floor material 1 is formed along the bolt materials 18, 38, 58, 88 with the beam material 5. Both or one of the extruded cement board flooring materials 1 placed on the floor material 1 may be used, and the size, number and the like are not limited.

また、上記した実施形態は一例を示しており、本発明の要旨を損なわない範囲で種々の変更は可能であり、本発明は上記した実施形態に限定されるものではない。 Further, the above-described embodiment shows an example, and various modifications can be made without impairing the gist of the present invention, and the present invention is not limited to the above-described embodiment.

(総括)
以上のような取付金具10,30,50,70,80,100,120,140,160によれば、押出成形セメント板床材1を梁材5に留め付ける作業を、施工階において梁材取付金具15,35,55,85,110,125,145,165を梁材5に取り付けた状態で押出成形セメント板床材1を容易に載せることが可能となる。そして、押出成形セメント板床材1を上方から下向き作業で梁材5に留め付けることができるので、施工性を向上させることが可能となる。
(Summary)
According to the mounting brackets 10, 30, 50, 70, 80, 100, 120, 140, 160 as described above, the work of fastening the extruded cement board floor material 1 to the beam material 5 is performed on the construction floor. The extruded cement board floor material 1 can be easily placed in a state where 15, 35, 55, 85, 110, 125, 145, 165 are attached to the beam material 5. Then, since the extruded cement board floor material 1 can be fastened to the beam material 5 from above by downward work, it is possible to improve the workability.

また、押出成形セメント板床材1を梁材取付金具15,35,55,85,110と床材押圧金具11,31,51,65,71,81,101とによって梁材5へ留め付けるため、押出成形セメント板床材1を強固に保持することが可能となる。しかも、押出成形セメント板床材1の裏面あるいは表面に簡単な加工を施すことによっても、押出成形セメント板床材1を強固に取り付けることが可能となる。 Further, in order to fasten the extruded cement board floor material 1 to the beam material 5 by the beam material mounting metal fittings 15, 35, 55, 85, 110 and the floor material pressing metal fittings 11, 31, 51, 65, 71, 81, 101. The extruded cement board floor material 1 can be firmly held. Moreover, the extruded cement board floor material 1 can be firmly attached by simply processing the back surface or the front surface of the extruded cement board floor material 1.

さらに、押出成形セメント板床材1を梁材取付金具125,145,165と床材取付金具121,141,161及び押圧部材131,151,171とによって梁材5へ留め付けても、押出成形セメント板床材1を強固に保持することが可能となる。また、取付金具120,140,160は、梁材取付金具125,145,165を梁材5に取り付けた状態で押出成形セメント板床材1を下向きに押圧する押圧部材131,151,171が邪魔にならないので、押出成形セメント板床材1を梁材5に載せる作業を容易に行うことが可能となる。 Further, even if the extruded cement board floor material 1 is fastened to the beam material 5 by the beam material mounting brackets 125, 145, 165, the floor material mounting brackets 121, 141, 161 and the pressing members 131, 151, 171, the extruded cement is extruded cement. It becomes possible to firmly hold the board floor material 1. Further, the mounting brackets 120, 140, 160 are obstructed by the pressing members 131, 151, 171 that press the extruded cement board floor material 1 downward with the beam material mounting brackets 125, 145, 165 attached to the beam material 5. Therefore, the work of mounting the extruded cement board floor material 1 on the beam material 5 can be easily performed.

1 押出成形セメント板床材
1a 桟部
1b 上面側基材
1c 下面側基材
1d 切欠き部
2 中空部
3 貫通孔(被係止部)
5 梁材
6 フランジ部
7 被係合部
10 第1取付金具
11 床材取付金具
15 梁材取付金具
16 本体部
17 挟持部
18 ボルト材(保持部)
19 ナット材(保持部)
20 掛け止め部
20d 端部保持部
21 掛け止め部
21d 端部保持部
25 床材押圧金具
28 突起状押圧部
30 第2取付金具
35 梁材取付金具
36 本体部
37 挟持部
38 ボルト材(保持部)
39 ナット材(保持部)
40 掛け止め部
40d 端部保持部
41 係合部
50 第3取付金具
51 床材押圧金具
52 ピン(係止部材)
53 板状部
55 梁材取付金具
56 本体部
57 挟持部
58 ボルト材(保持部)
59 ナット材(保持部)
60 掛け止め部
60d 端部保持部
65 床材押圧金具
66 ボルト(係止部材)
67 板状部
70 第4取付金具
71 床材押圧金具
80 第5取付金具
81 床材押圧金具
82 押圧部
83 端部保持部
85 梁材取付金具
86 本体部
87 挟持部
88 ボルト材(保持部)
89 ナット材(保持部)
90 掛け止め部
90d 端部保持部
100 第6取付金具
101 床材押圧金具
102 押圧部
110 梁材取付金具
120 第7取付金具
121 床材取付金具
122 ピン(係止部材)
125 梁材取付金具
126 本体部
127 挟持部
128 中空部保持部
130 回転防止部材
131 押圧部材
140 第8取付金具
141 床材取付金具
142 ボルト(係止部材)
144 立ち上がり部
145 梁材取付金具
146 本体部
147 挟持部
148 中空部保持部
150 回転防止部材
151 押圧部材
160 第9取付金具
161 床材取付金具
162 ピン(係止部材)
164 挟持部
165 梁材取付金具
166 本体部
167 挟持部
168 中空部保持部
170 回転防止部材
171 押圧部材
174 掛け止め部
V 空隙部
θ 角度

1 Extruded cement board Floor material 1a Crosspiece 1b Top surface side base material 1c Bottom side base material 1d Notch
2 Hollow part
3 Through hole (locked part)
5 Beam material
6 Flange part
7 Engagement part 10 1st mounting bracket 11 Floor material mounting bracket 15 Beam mounting bracket 16 Main body 17 Holding part 18 Bolt material (holding part)
19 Nut material (holding part)
20 Hooking part 20d End holding part 21 Hooking part 21d End holding part 25 Floor material pressing metal fittings 28 Protruding pressing part 30 Second mounting metal fittings 35 Beam material mounting metal fittings 36 Main body part 37 Holding part 38 Bolt material (holding part) )
39 Nut material (holding part)
40 Hooking part 40d End holding part 41 Engaging part 50 Third mounting bracket 51 Floor material pressing bracket 52 Pin (locking member)
53 Plate-shaped part 55 Beam material mounting bracket 56 Main body part 57 Holding part 58 Bolt material (holding part)
59 Nut material (holding part)
60 Hooking part 60d End holding part 65 Floor material pressing bracket 66 Bolt (locking member)
67 Plate-shaped part 70 4th mounting bracket 71 Floor material pressing bracket 80 5th mounting bracket 81 Floor material pressing bracket 82 Pressing part 83 End holding part 85 Beam mounting bracket 86 Main body 87 Holding part 88 Bolt material (holding part)
89 Nut material (holding part)
90 Hooking part 90d End holding part 100 6th mounting bracket 101 Floor material pressing bracket 102 Pressing part 110 Beam mounting bracket 120 7th mounting bracket 121 Floor material mounting bracket 122 pin (locking member)
125 Beam mounting bracket 126 Main body 127 Holding part 128 Hollow part holding part 130 Rotation prevention member 131 Pressing member 140 8th mounting bracket 141 Floor material mounting bracket 142 Bolt (locking member)
144 Rising part 145 Beam material mounting bracket 146 Main body 147 Holding part 148 Hollow part holding part 150 Rotation prevention member 151 Pressing member 160 9th mounting bracket 161 Floor material mounting bracket 162 Pin (locking member)
164 Holding part 165 Beam material mounting bracket 166 Main body part 167 Holding part 168 Hollow part Holding part 170 Rotation prevention member 171 Pressing member 174 Hooking part
V void
θ angle

Claims (19)

中空部を有する押出成形セメント板床材を梁材に留め付けるための取付金具であって、
前記押出成形セメント板床材を前記梁材に向けて押圧する床材押圧金具と、
前記梁材に取り付けられる梁材取付金具と、を備え、
前記梁材取付金具は、前記梁材の上方に配置される本体部と、前記本体部の上方に設けられ、前記床材押圧金具を保持する保持部と、前記本体部に接続され、前記梁材のフランジ部を幅方向の一方から挟み込む挟持部と、前記フランジ部の幅方向の他方端部に掛ける掛け止め部と、を有している、
ことを特徴とする取付金具。
A mounting bracket for fastening an extruded cement board floor material having a hollow portion to a beam material.
A floor material pressing metal fitting that presses the extruded cement board floor material toward the beam material, and
A beam material mounting bracket that can be attached to the beam material is provided.
The beam member mounting bracket is connected to a main body portion arranged above the beam member, a holding portion provided above the main body portion and holding the floor material pressing bracket, and the main body portion, and the beam is connected. It has a holding portion that sandwiches the flange portion of the material from one side in the width direction, and a hooking portion that hangs on the other end portion in the width direction of the flange portion.
A mounting bracket that is characterized by this.
前記床材押圧金具は、前記押出成形セメント板床材の下面側基材を押圧する押圧部を有している、
請求項1に記載の取付金具。
The floor material pressing metal fitting has a pressing portion that presses the lower surface side base material of the extruded cement board floor material.
The mounting bracket according to claim 1.
前記床材押圧金具は、裏面側に前記下面側基材を押圧する突起状押圧部を有している、
請求項2に記載の取付金具。
The floor material pressing metal fitting has a protrusion-shaped pressing portion for pressing the lower surface side base material on the back surface side.
The mounting bracket according to claim 2.
前記床材押圧金具は、前記押出成形セメント板床材の下面側基材に設けられた被係止部に係止させる係止部材と、前記係止部材から前記押出成形セメント板床材の端部まで延びる板状部と、を有している、
請求項1に記載の取付金具。
The floor material pressing metal fitting includes a locking member for locking to a locked portion provided on the lower surface side base material of the extruded cement board floor material, and from the locking member to the end portion of the extruded cement board floor material. Has an extending plate-like part,
The mounting bracket according to claim 1.
中空部を有する押出成形セメント板床材を梁材に留め付けるための取付金具であって、
前記押出成形セメント板床材を前記梁材に向けて押圧する床材押圧金具と、
前記梁材に取り付けられる梁材取付金具と、を備え、
前記床材押圧金具は、前記押出成形セメント板床材の上面側基材の端部が切り取られた桟部を押圧する押圧部を有し、
前記梁材取付金具は、前記梁材の上方に配置される本体部と、前記本体部の上方に設けられ、前記押圧部を保持する保持部と、前記本体部に接続され、前記梁材のフランジ部を幅方向の一方から挟み込む挟持部と、を有し、
前記床材押圧金具の前記押圧部で前記保持部を挟んで隣り合う前記押出成形セメント板床材の前記桟部を前記梁材の方向に押圧して前記保持部で保持するように構成されている、
ことを特徴とする取付金具。
A mounting bracket for fastening an extruded cement board floor material having a hollow portion to a beam material.
A floor material pressing metal fitting that presses the extruded cement board floor material toward the beam material, and
A beam material mounting bracket that can be attached to the beam material is provided.
The floor material pressing metal fitting has a pressing portion that presses a crosspiece from which the end portion of the upper surface side base material of the extruded cement board floor material has been cut off.
The beam member mounting bracket is connected to a main body portion arranged above the beam member, a holding portion provided above the main body portion and holding the pressing portion, and the main body portion, and is connected to the main body portion. It has a holding part that sandwiches the flange part from one side in the width direction,
The cross section of the extruded cement board floor material adjacent to the holding portion with the holding portion sandwiched between the pressing portions of the floor material pressing metal fitting is pressed in the direction of the beam material and held by the holding portion. ,
A mounting bracket that is characterized by this.
前記床材押圧金具は、前記押出成形セメント板床材の前記上面側基材の切り取られた端部を保持する端部保持部を有している、
請求項5に記載の取付金具。
The floor material pressing metal fitting has an end holding portion for holding a cut end portion of the upper surface side base material of the extruded cement board floor material.
The mounting bracket according to claim 5.
中空部を有する押出成形セメント板床材を梁材に留め付けるための取付金具であって、
前記押出成形セメント板床材に取り付けられる床材取付金具と、
前記梁材に取り付けられる梁材取付金具と、を備え、
前記床材取付金具は、前記押出成形セメント板床材の裏面側に設けられた被係止部に係止させる係止部材と、前記係止部材から前記押出成形セメント板床材の端部まで延びる板状部と、前記押出成形セメント板床材の端部において立ち上がる立ち上がり部と、を有し、
前記梁材取付金具は、前記梁材の上方に配置される本体部と、前記本体部に接続され、前記梁材のフランジ部を幅方向の一方から挟み込む挟持部と、前記本体部の上方に設けられる中空部保持部と、前記中空部保持部に設けられ、回転軸を中心に、前記押出成形セメント板床材の前記中空部に挿入されて前記床材取付金具の前記立ち上がり部を前記押出成形セメント板床材に押し付ける配置状態と、前記押出成形セメント板床材の前記中空部から出た退避状態と、に回転する押圧部材と、前記押圧部材が前記押出成形セメント板床材の端縁と平行となる状態に回転した前記退避状態で係止する回転防止部材と、を有している、
ことを特徴とする取付金具。
A mounting bracket for fastening an extruded cement board floor material having a hollow portion to a beam material.
The floor material mounting bracket to be attached to the extruded cement board floor material,
A beam material mounting bracket that can be attached to the beam material is provided.
The floor material mounting bracket includes a locking member for locking to a locked portion provided on the back surface side of the extruded cement board floor material, and a plate extending from the locking member to the end of the extruded cement board floor material. It has a shape portion and a rising portion that rises at the end portion of the extruded cement board floor material.
The beam member mounting bracket is connected to a main body portion arranged above the beam material, a holding portion connected to the main body portion and sandwiching the flange portion of the beam material from one side in the width direction, and above the main body portion. The hollow portion holding portion provided and the rising portion of the floor material mounting bracket, which is provided in the hollow portion holding portion and is inserted into the hollow portion of the extruded cement board floor material around the rotation shaft, is extruded. The pressing member that rotates in the arrangement state of pressing against the cement board floor material and the retracted state of the extruded cement board floor material protruding from the hollow portion, and the pressing member are parallel to the edge of the extruded cement board floor material. It has a rotation prevention member that is rotated to a state and is locked in the retracted state.
A mounting bracket that is characterized by this.
中空部を有する押出成形セメント板床材を梁材に留め付けるための取付金具であって、
前記押出成形セメント板床材に取り付けられる床材取付金具と、
前記梁材に取り付けられる梁材取付金具と、を備え、
前記床材取付金具は、前記押出成形セメント板床材の裏面側に設けられた被係止部に係止させる係止部材と、前記係止部材から前記押出成形セメント板床材の端部まで延びる板状部と、前記梁材のフランジ部を幅方向の一方から挟み込む挟持部と、を有し、
前記梁材取付金具は、前記梁材の上方に配置される本体部と、前記本体部に接続され、前記梁材の前記フランジ部を幅方向の一方から挟み込む挟持部と、前記本体部の上方に設けられる中空部保持部と、を有し、
前記中空部保持部は、回転軸を中心に、前記押出成形セメント板床材の前記中空部に挿入させて該押出成形セメント板床材を前記梁材に押し付ける配置状態と、前記押出成形セメント板床材の前記中空部から出た退避状態と、に回転する押圧部材と、前記押圧部材が前記押出成形セメント板床材の端縁と平行となる状態に回転した前記退避状態で係止する回転防止部材と、を有している、
ことを特徴とする取付金具。
A mounting bracket for fastening an extruded cement board floor material having a hollow portion to a beam material.
The floor material mounting bracket to be attached to the extruded cement board floor material,
A beam material mounting bracket that can be attached to the beam material is provided.
The floor material mounting bracket includes a locking member for locking to a locked portion provided on the back surface side of the extruded cement board floor material, and a plate extending from the locking member to the end of the extruded cement board floor material. It has a shape portion and a holding portion that sandwiches the flange portion of the beam material from one side in the width direction.
The beam member mounting bracket has a main body portion arranged above the beam material, a holding portion connected to the main body portion and sandwiching the flange portion of the beam material from one side in the width direction, and an upper portion of the main body portion. Has a hollow portion holding portion provided in the
The hollow portion holding portion is in an arrangement state in which the extruded cement board floor material is inserted into the hollow portion of the extruded cement board floor material around the rotation axis and the extruded cement board floor material is pressed against the beam material, and the extruded cement board floor material. A pressing member that rotates in a retracted state protruding from the hollow portion, and an anti-rotation member that locks in the retracted state in which the pressing member rotates in a state parallel to the edge of the extruded cement board floor material. have,
A mounting bracket that is characterized by this.
前記回転防止部材は、前記押圧部材が前記押出成形セメント板床材の前記中空部の延びる方向に回転した前記配置状態でも係止するように構成されている、
請求項7又は8に記載の取付金具。
The anti-rotation member is configured to lock even in the arranged state in which the pressing member is rotated in the extending direction of the hollow portion of the extruded cement board floor material.
The mounting bracket according to claim 7 or 8.
前記本体部は、前記挟持部で挟み込んだ前記フランジ部の幅方向の他方端部に掛ける掛け止め部をさらに備えている、
請求項5〜9のいずれか1項に記載の取付金具。
The main body portion further includes a hooking portion for hanging on the other end portion in the width direction of the flange portion sandwiched between the holding portions.
The mounting bracket according to any one of claims 5 to 9.
前記本体部は、該本体部と前記梁材の上面との間に空隙部を形成する段部を備えている、
請求項1〜10のいずれか1項に記載の取付金具。
The main body portion includes a step portion that forms a gap portion between the main body portion and the upper surface of the beam member.
The mounting bracket according to any one of claims 1 to 10.
前記掛け止め部は、前記本体部から斜め下方に延びる傾斜部と、前記傾斜部に連続し前記フランジ部と水平に接触する水平部と、前記水平部に連続し前記フランジ部の端部を保持する端部保持部と、を有している、
請求項1〜4、10のいずれか1項に記載の取付金具。
The hooking portion holds an inclined portion extending diagonally downward from the main body portion, a horizontal portion continuous with the inclined portion and in horizontal contact with the flange portion, and an end portion of the flange portion continuous with the horizontal portion. Has an end holding part,
The mounting bracket according to any one of claims 1 to 4 and 10.
前記掛け止め部は、端部保持部の中央部に、上方に折り返した折り返し部をさらに有している、
請求項1〜4、10、12のいずれか1項に記載の取付金具。
The hooking portion further has a folded-back portion that is folded upward at the central portion of the end holding portion.
The mounting bracket according to any one of claims 1 to 4, 10 and 12.
前記挟持部は、前記梁材に設けられた被係合部に係合する係合部をさらに有している、
請求項1〜13のいずれか1項に記載の取付金具。
The sandwiching portion further has an engaging portion that engages with the engaged portion provided on the beam member.
The mounting bracket according to any one of claims 1 to 13.
請求項2又は3に記載の取付金具によって前記中空部を有する前記押出成形セメント板床材を前記梁材に留め付ける取付構造であって、
前記梁材取付金具は、前記挟持部で前記梁材の前記フランジ部を幅方向の一方から挟み込み、前記掛け止め部を前記フランジ部の幅方向の他方端部に掛けて取り付けられ、
前記床材押圧金具は、前記押出成形セメント板床材の前記下面側基材を前記梁材に向けて押圧して保持することにより前記押出成形セメント板床材を前記梁材に留め付けている、
ことを特徴とする押出成形セメント板床材の取付構造。
A mounting structure for fastening the extruded cement board floor material having the hollow portion to the beam material by the mounting bracket according to claim 2 or 3.
The beam member mounting bracket is attached by sandwiching the flange portion of the beam material from one side in the width direction with the holding portion and hanging the hooking portion on the other end portion in the width direction of the flange portion.
The floor material pressing metal fitting holds the extruded cement board floor material to the beam material by pressing and holding the lower surface side base material of the extruded cement board floor material toward the beam material.
The mounting structure of the extruded cement board flooring is characterized by this.
請求項4に記載の取付金具によって前記中空部を有する前記押出成形セメント板床材を前記梁材に留め付ける取付構造であって、
前記梁材取付金具は、前記挟持部で前記梁材の前記フランジ部を幅方向の一方から挟み込み、前記掛け止め部を前記フランジ部の幅方向の他方端部に掛けて取り付けられ、
前記床材押圧金具は、前記押出成形セメント板床材の前記下面側基材に設けられた前記被係止部に前記係止部材を係止した状態で、前記押出成形セメント板床材の前記下面側基材を前記梁材に向けて押圧して保持することにより前記押出成形セメント板床材を前記梁材に留め付けている、
ことを特徴とする押出成形セメント板床材の取付構造。
A mounting structure for fastening the extruded cement board floor material having the hollow portion to the beam material by the mounting bracket according to claim 4.
The beam member mounting bracket is attached by sandwiching the flange portion of the beam material from one side in the width direction with the holding portion and hanging the hooking portion on the other end portion in the width direction of the flange portion.
The floor material pressing metal fitting is the lower surface side of the extruded cement board floor material in a state where the locking member is locked to the locked portion provided on the lower surface side base material of the extruded cement board floor material. The extruded cement board floor material is fastened to the beam material by pressing and holding the base material toward the beam material.
The mounting structure of the extruded cement board flooring is characterized by this.
請求項5又は6に記載の取付金具によって前記中空部を有する前記押出成形セメント板床材を前記梁材に留め付ける取付構造であって、
前記梁材取付金具は、前記挟持部で前記梁材の前記フランジ部を幅方向の一方から挟み込んで取り付けられ、
前記床材押圧金具は、前記押出成形セメント板床材の前記桟部を前記梁材に向けて押圧して保持することにより前記押出成形セメント板床材を前記梁材に留め付けている、
ことを特徴とする押出成形セメント板床材の取付構造。
A mounting structure for fastening the extruded cement board floor material having the hollow portion to the beam material by the mounting bracket according to claim 5 or 6.
The beam member mounting bracket is attached by sandwiching the flange portion of the beam member from one side in the width direction with the holding portion.
The floor material pressing metal fittings fasten the extruded cement board floor material to the beam material by pressing and holding the crosspiece of the extruded cement board floor material toward the beam material.
The mounting structure of the extruded cement board flooring is characterized by this.
請求項7に記載の取付金具によって前記中空部を有する前記押出成形セメント板床材を前記梁材に留め付ける取付構造であって、
前記梁材取付金具を、前記押圧部材を前記退避状態にして前記梁材の前記フランジ部に前記挟持部で挟み込んで取り付け、
前記床材取付金具を、前記押出成形セメント板床材の前記中空部に挿入して前記係止部材を前記被係止部に係止させた状態で前記立ち上がり部が前記押出成形セメント板床材の端部に位置するように取り付け、
前記押圧部材を前記配置状態に回転させた状態で前記床材取付金具の前記立ち上がり部を押圧して前記押出成形セメント板床材を前記梁材に押し付けている、
ことを特徴とする押出成形セメント板床材の取付構造。
A mounting structure for fastening the extruded cement board floor material having the hollow portion to the beam material by the mounting bracket according to claim 7.
The beam member mounting bracket is attached by sandwiching the pressing member with the holding portion in the flange portion of the beam material in the retracted state.
The rising portion is the end of the extruded cement board floor material in a state where the floor material mounting bracket is inserted into the hollow portion of the extruded cement board floor material and the locking member is locked to the locked portion. Attach it so that it is located in the part,
The extruded cement board floor material is pressed against the beam material by pressing the rising portion of the floor material mounting bracket in a state where the pressing member is rotated to the arranged state.
The mounting structure of the extruded cement board flooring is characterized by this.
請求項8に記載の取付金具によって前記中空部を有する前記押出成形セメント板床材を前記梁材に留め付ける取付構造であって、
前記床材取付金具を、前記挟持部で前記梁材の前記フランジ部を幅方向の一方から挟み込み、前記係止部材を前記押出成形セメント板床材の前記被係止部に係止させて取り付け、
前記梁材取付金具を、前記挟持部で前記梁材の前記フランジ部を幅方向の一方から挟み込んで取り付け、前記押圧部材を回転させて該押圧部材を前記中空部に挿入させた前記配置状態として前記押出成形セメント板床材を前記梁材に押し付けている、
ことを特徴とする押出成形セメント板床材の取付構造。
A mounting structure for fastening the extruded cement board floor material having the hollow portion to the beam material by the mounting bracket according to claim 8.
The floor material mounting bracket is mounted by sandwiching the flange portion of the beam material from one side in the width direction with the holding portion, and locking the locking member to the locked portion of the extruded cement plate floor material.
The beam member mounting bracket is attached by sandwiching the flange portion of the beam member from one side in the width direction with the holding portion, and the pressing member is rotated to insert the pressing member into the hollow portion. The extruded cement board floor material is pressed against the beam material.
The mounting structure of the extruded cement board flooring is characterized by this.
JP2019207692A 2019-11-18 2019-11-18 Mounting bracket for extruded cement board flooring and flooring mounting structure using it Active JP7442081B2 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
JP2019207692A JP7442081B2 (en) 2019-11-18 2019-11-18 Mounting bracket for extruded cement board flooring and flooring mounting structure using it
JP2023206183A JP2024026288A (en) 2019-11-18 2023-12-06 Mounting hardware for extruded cement board flooring, and flooring mounting structure using the same
JP2023206184A JP2024026289A (en) 2019-11-18 2023-12-06 Mounting hardware for extruded cement board flooring, and flooring mounting structure using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019207692A JP7442081B2 (en) 2019-11-18 2019-11-18 Mounting bracket for extruded cement board flooring and flooring mounting structure using it

Related Child Applications (2)

Application Number Title Priority Date Filing Date
JP2023206184A Division JP2024026289A (en) 2019-11-18 2023-12-06 Mounting hardware for extruded cement board flooring, and flooring mounting structure using the same
JP2023206183A Division JP2024026288A (en) 2019-11-18 2023-12-06 Mounting hardware for extruded cement board flooring, and flooring mounting structure using the same

Publications (2)

Publication Number Publication Date
JP2021080687A true JP2021080687A (en) 2021-05-27
JP7442081B2 JP7442081B2 (en) 2024-03-04

Family

ID=75964377

Family Applications (3)

Application Number Title Priority Date Filing Date
JP2019207692A Active JP7442081B2 (en) 2019-11-18 2019-11-18 Mounting bracket for extruded cement board flooring and flooring mounting structure using it
JP2023206183A Pending JP2024026288A (en) 2019-11-18 2023-12-06 Mounting hardware for extruded cement board flooring, and flooring mounting structure using the same
JP2023206184A Pending JP2024026289A (en) 2019-11-18 2023-12-06 Mounting hardware for extruded cement board flooring, and flooring mounting structure using the same

Family Applications After (2)

Application Number Title Priority Date Filing Date
JP2023206183A Pending JP2024026288A (en) 2019-11-18 2023-12-06 Mounting hardware for extruded cement board flooring, and flooring mounting structure using the same
JP2023206184A Pending JP2024026289A (en) 2019-11-18 2023-12-06 Mounting hardware for extruded cement board flooring, and flooring mounting structure using the same

Country Status (1)

Country Link
JP (3) JP7442081B2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05295827A (en) * 1992-04-17 1993-11-09 Nippon Iton Kogyo Kk Panel fitting method on roof and floor and structure thereof
JPH0853892A (en) * 1994-08-12 1996-02-27 Nozawa Corp Structure for fastening cement floor slab formed by extrusion molding
JP2001020426A (en) * 1999-07-07 2001-01-23 Nihon Ytong Co Ltd Mounting structure of floor panel

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05295827A (en) * 1992-04-17 1993-11-09 Nippon Iton Kogyo Kk Panel fitting method on roof and floor and structure thereof
JPH0853892A (en) * 1994-08-12 1996-02-27 Nozawa Corp Structure for fastening cement floor slab formed by extrusion molding
JP2001020426A (en) * 1999-07-07 2001-01-23 Nihon Ytong Co Ltd Mounting structure of floor panel

Also Published As

Publication number Publication date
JP7442081B2 (en) 2024-03-04
JP2024026289A (en) 2024-02-28
JP2024026288A (en) 2024-02-28

Similar Documents

Publication Publication Date Title
JP5439003B2 (en) Securing clip
JP4087825B2 (en) Deck structure
RU2009120962A (en) COATING, COATING OR SIMILAR DESIGN OR DESIGN DETAILS
JP2014034872A (en) Clip
JP2021080687A (en) Attachment metal fitting for extrusion molding cement plate floor material and floor material attachment structure using the same
JP7522879B2 (en) Joint components and joint structures
JP5485829B2 (en) Architectural support
JP7318919B2 (en) wall mounting unit
JP7340253B2 (en) Roof snow protection device
JP4650316B2 (en) Banded bracing joint structure, load-bearing wall panel
JP3969353B2 (en) Wall panel connection structure
JP7201171B2 (en) Mounting bracket for extruded cement board flooring and flooring mounting structure using it
JP2003096915A (en) Z-clip rotation-preventive metal fitting and fixing structure of building material
JP3229948U (en) Connecting bracket
JP3474418B2 (en) Wiring and piping box
JP6287745B2 (en) Mounting bracket for installation on the roof
JP2019019649A (en) Connection fixture, connection locking device, connection locking method, wall substrate structure and construction method of wall substrate structure
JP2013011068A (en) On-roof fixture
JPH0649724Y2 (en) Fasteners for outer wall materials
JP2003056520A (en) Method for fitting panel to box and fitting device
JP2019152065A (en) Ceiling base material connector and ceiling base material connection structure
JP2016160701A (en) Building structure
JP2014034871A (en) Clip
JPH0545694Y2 (en)
JP2011231514A (en) Rain gutter and cover of the same

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20221020

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20230724

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230905

A601 Written request for extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A601

Effective date: 20231031

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20231206

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240206

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240208

R150 Certificate of patent or registration of utility model

Ref document number: 7442081

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150