Prior art keywords
equipment
smoke
test
smoke exhaust
exhaust port
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2019063092A
Other languages
Japanese (ja)
Inventor
雅章 神▲崎▼
Masaaki Kanzaki
雅章 神▲崎▼
加藤 晃一
Koichi Kato
晃一 加藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hochiki Corp
Original Assignee
Hochiki Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hochiki Corp filed Critical Hochiki Corp
Priority to JP2019063092A priority Critical patent/JP2020157014A/en
Publication of JP2020157014A publication Critical patent/JP2020157014A/en
Priority to JP2023176465A priority patent/JP2023178355A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)
  • Fire Alarms (AREA)

Abstract

To provide a disaster prevention system and a controller, capable of grasping a state of a smoke prevention exhaustion facility.SOLUTION: A disaster prevention system 100 comprises: a smoke exhaustion port facility 3 and a smoke exhaustion apparatus 5; and a smoke exhaustion facility control board 2 for controlling the smoke exhaustion port facility 3 and the smoke exhaustion apparatus 5. The smoke exhaustion facility control board 2 comprises: a testing unit 241 for performing a test on the smoke exhaustion port facility 3 and the smoke exhaustion apparatus 5; and an output unit 242 for outputting a test related signal, a signal indicating information on the test by the testing unit 241, to a receiver 1. The testing unit 241 of the smoke exhaustion facility control board 2 performs a test on electric conduction between a side of the receiver 1 and a side of the smoke exhaustion port facility 3 and the smoke exhaustion apparatus 5. The testing unit 241 of the smoke exhaustion facility control board 2 further performs a test on operation of the smoke exhaustion port facility 3 and the smoke exhaustion apparatus 5.SELECTED DRAWING: Figure 1

Description

本発明は、防災システム、及び制御装置に関する。 The present invention relates to a disaster prevention system and a control device.

従来、防災のために防火戸等の防排煙設備を連動して動作させる技術が知られていた(例えば、特許文献1参照)。 Conventionally, a technique for operating smoke prevention equipment such as a fire door in conjunction with each other has been known for disaster prevention (see, for example, Patent Document 1).

特開2017−107421号公報JP-A-2017-107421

しかしながら、特許文献1の防排煙設備については、例えば、通常時は動作していないものの、火災等の異常発生時に確実に動作させる必要があり、防排煙設備を正常な状態に維持する必要があるので、防排煙設備の状態を把握することが要望されていた。 However, regarding the smoke prevention equipment of Patent Document 1, for example, although it does not operate normally, it is necessary to operate it reliably in the event of an abnormality such as a fire, and it is necessary to maintain the smoke prevention equipment in a normal state. Therefore, it was requested to grasp the state of the smoke prevention equipment.

本発明は上記問題に鑑みてなされたもので、防排煙設備の状態を把握することが可能な防災システム、及び制御装置を提供することを目的とする。 The present invention has been made in view of the above problems, and an object of the present invention is to provide a disaster prevention system and a control device capable of grasping the state of smoke prevention equipment.

上述した課題を解決し、目的を達成するために、請求項1に記載の防災システムは、防排煙設備と、前記防排煙設備を制御するための制御装置とを備える防災システムであって、前記制御装置は、前記防排煙設備に関する試験を行う試験手段と、前記試験手段による試験に関する情報を示す信号である試験関連信号を、外部装置に対して出力する出力手段と、を備える。 The disaster prevention system according to claim 1 is a disaster prevention system including a smoke prevention equipment and a control device for controlling the smoke prevention equipment in order to solve the above-mentioned problems and achieve the object. The control device includes a test means for performing a test related to the smoke prevention equipment, and an output means for outputting a test-related signal, which is a signal indicating information about the test by the test means, to an external device.

また、請求項2に記載の防災システムは、請求項1に記載の防災システムにおいて、前記制御装置の前記試験手段は、前記防排煙設備側と前記制御装置側との間の通電に関する試験を行う。 Further, the disaster prevention system according to claim 2 is the disaster prevention system according to claim 1, wherein the test means of the control device performs a test on energization between the smoke prevention equipment side and the control device side. Do.

また、請求項3に記載の防災システムは、請求項1又は2に記載の防災システムにおいて、前記制御装置の前記試験手段は、前記防排煙設備の動作に関する試験を行う。 Further, the disaster prevention system according to claim 3 is the disaster prevention system according to claim 1 or 2, and the test means of the control device performs a test regarding the operation of the smoke prevention equipment.

また、請求項4に記載の防災システムは、請求項1から3の何れか一項に記載の防災システムにおいて、前記防排煙設備は、複数設けられており、複数の前記防排煙設備の少なくとも一部の防排煙設備には当該少なくとも一部の防排煙設備を識別するための識別情報が設定されており、前記制御装置の前記試験手段は、前記識別情報に基づいて前記少なくとも一部の防排煙設備を識別し、識別結果に基づいて、前記少なくとも一部の防排煙設備に関する試験を行う。 Further, the disaster prevention system according to claim 4 is the disaster prevention system according to any one of claims 1 to 3, wherein a plurality of the smoke prevention / exhaust equipments are provided, and a plurality of the smoke prevention / exhaust equipments are provided. Identification information for identifying at least a part of the smoke prevention equipment is set in at least a part of the smoke prevention equipment, and the test means of the control device is based on the identification information. The smoke prevention equipment of the unit is identified, and based on the identification result, a test on at least a part of the smoke prevention equipment is performed.

また、請求項5に記載の防災システムは、請求項1から4の何れか一項に記載の防災システムにおいて、前記防排煙設備は、少なくとも、排煙口設備、排煙機、給気口設備、給気機、防火シャッター設備、防火防煙ダンパー設備、又は防火戸設備のうちの1つ以上を含む。 Further, the disaster prevention system according to claim 5 is the disaster prevention system according to any one of claims 1 to 4, wherein the smoke prevention / exhaust equipment is at least a smoke exhaust port equipment, a smoke exhaust device, and an air supply port. Includes one or more of equipment, air supply, fire shutter equipment, fire and smoke damper equipment, or fire door equipment.

また、請求項6に記載の制御装置は、防排煙設備と、前記防排煙設備を制御するための制御装置とを備える防災システムの前記制御装置であって、前記防排煙設備に関する試験を行う試験手段と、前記試験手段による試験に関する情報を示す信号である試験関連信号を、外部装置に対して出力する出力手段と、を備える。 The control device according to claim 6 is the control device of the disaster prevention system including the smoke prevention equipment and the control device for controlling the smoke prevention equipment, and is a test relating to the smoke prevention equipment. And an output means for outputting a test-related signal, which is a signal indicating information about the test by the test means, to an external device.

請求項1に記載の防災システム、及び請求項6に記載の制御装置によれば、防排煙設備に関する試験を行い、試験に関する情報を示す信号である試験関連信号を外部装置に対して出力することにより、例えば、試験を行って防排煙設備の状態を把握することが可能となる。また、例えば、外部装置(一例としては、防災受信機)の他に防排煙設備を制御する制御装置を設けることにより、防排煙設備及び制御装置を施工する工程(例えば、空調設備工事工程)と、外部装置を施工する工程(例えば、電気設備工事工程)に分けることができるので、電気設備工事工程での工数を減少させることが可能となる。 According to the disaster prevention system according to claim 1 and the control device according to claim 6, a test relating to smoke prevention equipment is performed, and a test-related signal, which is a signal indicating information regarding the test, is output to an external device. As a result, for example, it is possible to perform a test and grasp the state of the smoke prevention equipment. Further, for example, a process of constructing a smoke prevention equipment and a control device (for example, an air conditioning equipment construction process) by providing a control device for controlling the smoke prevention equipment in addition to an external device (for example, a disaster prevention receiver). ) And the process of constructing the external device (for example, the electrical equipment construction process), so that the number of steps in the electrical equipment construction process can be reduced.

請求項2に記載の防災システムによれば、防排煙設備側と制御装置側との間の通電に関する試験を行うことにより、例えば、防排煙設備側と制御装置側との間の通電に関する状態を把握することが可能となる。 According to the disaster prevention system according to claim 2, by conducting a test regarding energization between the smoke prevention equipment side and the control device side, for example, regarding energization between the smoke prevention equipment side and the control device side. It becomes possible to grasp the state.

請求項3に記載の防災システムによれば、防排煙設備の動作に関する試験を行うことにより、例えば、防排煙設備の動作に関する状態を把握することが可能となる。 According to the disaster prevention system according to claim 3, by conducting a test on the operation of the smoke prevention / exhaust equipment, for example, it is possible to grasp the state of the operation of the smoke prevention / exhaust equipment.

請求項4に記載の防災システムによれば、識別情報に基づいて少なくとも一部の防排煙設備を識別し、識別結果に基づいて、少なくとも一部の防排煙設備に関する試験を行うことにより、例えば、各防排煙設備の状態を個別に把握することが可能となる。 According to the disaster prevention system according to claim 4, at least a part of the smoke prevention equipment is identified based on the identification information, and at least a part of the smoke prevention equipment is tested based on the identification result. For example, it is possible to individually grasp the state of each smoke prevention / exhaust facility.

請求項5に記載の防災システムによれば、防排煙設備は、少なくとも、排煙口設備、排煙機、給気口設備、給気機、防火シャッター設備、防火防煙ダンパー設備、又は防火戸設備のうちの1つ以上を含むことにより、例えば、排煙口設備、排煙機、給気口設備、給気機、防火シャッター設備、防煙防火ダンパー設備、又は防火戸設備のうちの1つ以上の状態を把握することが可能となる。 According to the disaster prevention system according to claim 5, the smoke prevention equipment is at least a smoke exhaust port equipment, a smoke exhaust device, an air supply port equipment, an air supply machine, a fire shutter equipment, a fire prevention smoke prevention damper equipment, or a fire prevention. By including one or more of the door equipment, for example, among smoke exhaust port equipment, smoke exhaust machine, air supply port equipment, air supply machine, fire shutter equipment, smoke prevention fire damper equipment, or fire door equipment. It is possible to grasp one or more states.

実施の形態に係る防災システムの接続図である。It is a connection diagram of the disaster prevention system which concerns on embodiment. 排煙設備制御盤のブロック図である。It is a block diagram of a smoke exhaust equipment control panel. 装置情報を例示した図である。It is a figure which illustrated the device information. 防排煙処理のフローチャートである。It is a flowchart of smoke prevention processing. 試験処理のフローチャートである。It is a flowchart of a test process.

以下に、本発明に係る防災システム、及び制御装置の実施の形態を図面に基づいて詳細に説明する。なお、この実施の形態によりこの発明が限定されるものではない。 Hereinafter, embodiments of the disaster prevention system and the control device according to the present invention will be described in detail with reference to the drawings. The present invention is not limited to this embodiment.

〔実施の形態の基本的概念〕
まずは、実施の形態の基本的概念について説明する。実施の形態は、概略的に、防災システム、及び制御装置に関するものである。
[Basic concept of the embodiment]
First, the basic concept of the embodiment will be described. Embodiments generally relate to disaster prevention systems and control devices.

「防災システム」とは、対象領域での防災を行うシステムであり、例えば、火災についての防災を行うシステムを含む概念であり、一例としては、防排煙設備、火災報知設備、及び制御装置を備える。「対象領域」とは、防災システムによる防災の対象となる領域であり、例えば、一定の広がりを持った領域であり、一例としては、建築物の内部の領域等を含む概念である。 "Disaster prevention system" is a system that performs disaster prevention in the target area, for example, a concept that includes a system that performs disaster prevention for fire, and as an example, smoke prevention equipment, fire alarm equipment, and control equipment. Be prepared. The "target area" is an area targeted for disaster prevention by a disaster prevention system, for example, an area having a certain extent, and one example is a concept including an area inside a building.

「防排煙設備」とは、防災を行う設備であり、例えば、1個のみ設けられている設備、及び複数設けられている設備等を含む概念であり、また、各防排煙設備を一意に識別するための識別情報が設定される設備、あるいは、当該識別情報が設定されない設備等を含む概念であり、一例としては、排煙口設備、排煙機、給気口設備、給気機、防火シャッター設備、防煙防火ダンパー設備、及び防火戸設備等を含む概念である。 "Smoke prevention equipment" is equipment for disaster prevention, and is a concept including, for example, equipment provided with only one, equipment provided with a plurality of equipment, etc., and each smoke prevention equipment is unique. It is a concept that includes equipment for which identification information is set for identification, or equipment for which the identification information is not set, and as an example, smoke exhaust port equipment, smoke exhaust machine, air supply port equipment, air supply machine, etc. , Fire prevention shutter equipment, smoke prevention fire prevention damper equipment, fire door equipment, etc.

「排煙口設備」とは、火災時に発生する煙を屋外に排出するための設備であり、例えば、煙を通すための風道、風道に続く開口部、当該開口部を開閉する開閉蓋、及び開閉蓋の開閉を制御する開閉蓋用制御装置等を備える。「排煙機」とは、火災時に発生する煙を屋外に排出するための設備であり、例えば、風道を介して煙を排出するためのファン、及び当該ファンを制御するファン制御装置等を備える。 "Smoke exhaust port equipment" is equipment for discharging smoke generated in the event of a fire to the outside. For example, a wind path for passing smoke, an opening leading to the wind path, and an opening / closing lid for opening and closing the opening. , And a control device for an opening / closing lid that controls the opening / closing of the opening / closing lid. A "smoke evacuator" is a facility for discharging smoke generated in the event of a fire to the outside. For example, a fan for discharging smoke through an air passage, a fan control device for controlling the fan, and the like are used. Be prepared.

「給気口設備」とは、屋外の空気を屋内に供給するための設備であり、例えば、空気を通すための風道等を備える。「給気機」とは、屋外の空気を屋内に供給するための設備であり、例えば、風道を介して空気を供給するためのファン等を備える。 The "air supply port facility" is a facility for supplying outdoor air indoors, and is provided with, for example, an air passage for passing air. The "air supply machine" is a facility for supplying outdoor air indoors, and includes, for example, a fan for supplying air through an air passage.

「防火シャッター設備」とは、防火性能又は防煙性能を有するシャッター設備であり、例えば、シャッターカーテン、及びシャッターカーテンの開閉を制御するシャッターカーテン用制御装置等を備える。「防火戸設備」とは、防火性能又は防煙性能を有する扉設備であり、例えば、防火戸等を備える。 The "fire shutter equipment" is a shutter equipment having fire prevention performance or smoke prevention performance, and includes, for example, a shutter curtain, a shutter curtain control device for controlling the opening and closing of the shutter curtain, and the like. The "fire door equipment" is a door equipment having fire prevention performance or smoke prevention performance, and includes, for example, a fire door or the like.

「制御装置」とは、防排煙設備を制御するための装置であり、例えば、試験手段、及び出力手段を備える。 The "control device" is a device for controlling smoke prevention equipment, and includes, for example, test means and output means.

「試験手段」とは、防排煙設備に関する試験を行う手段であり、例えば、防排煙設備側と前記制御装置側との間の通電に関する試験を行う手段等を含む概念であり、また、防排煙設備の動作に関する試験を行う手段等を含む概念であり、また、識別情報に基づいて少なくとも一部の防排煙設備を識別し、識別結果に基づいて、少なくとも一部の防排煙設備に関する試験を行う手段等を含む概念である。 The "test means" is a means for conducting a test relating to smoke prevention equipment, and is a concept including, for example, a means for performing a test regarding energization between the smoke prevention equipment side and the control device side, and also. It is a concept that includes means for testing the operation of smoke prevention equipment, and at least a part of smoke prevention equipment is identified based on the identification information, and at least a part of smoke prevention equipment is identified based on the identification result. It is a concept that includes means for conducting tests related to equipment.

「試験」とは、能力や性能をためすこと、調べること、又は測定することであり、例えば、前述の通電に関する試験、及び動作に関する試験等を含む概念である。「通電に関する試験」とは、防排煙設備に関する通電が行われるか否かを調べること等を含む概念であり、例えば、任意の配線が断線しているか否かを調べること等を含む概念である。「動作に関する試験」とは、防排煙設備が規定通りに動作するか否かを調べること等を含む概念であり、例えば、防排煙設備の能力に基づく物理量(例えば、排煙口設備における開口部での風量等)を測定すること等を含む概念である。 "Test" is to test, examine, or measure ability or performance, and is a concept including, for example, the above-mentioned test related to energization, test related to operation, and the like. The "test for energization" is a concept including checking whether or not energization is performed for smoke prevention equipment, and for example, a concept including checking whether or not any wiring is broken. is there. The "operation test" is a concept including checking whether or not the smoke prevention equipment operates as specified. For example, a physical quantity based on the capacity of the smoke prevention equipment (for example, in a smoke exhaust port equipment). It is a concept that includes measuring the air volume at the opening, etc.).

「出力手段」とは、試験手段による試験に関する情報を示す信号である試験関連信号を、外部装置に対して出力する手段であり、例えば、有線通信又は無線通信にて試験関連信号を出力する手段等を含む概念である。 The "output means" is a means for outputting a test-related signal, which is a signal indicating information related to the test by the test means, to an external device, for example, a means for outputting the test-related signal by wired communication or wireless communication. It is a concept including.

「外部装置」とは、制御装置との間で通信を行う装置であり、具体的には、試験関連信号を受信する装置等を含む概念であり、例えば、防災受信機、あるいは、端末装置等を含む概念である。「防災受信機」とは、対象領域を管理する機器であり、具体的には、火災、又はガス漏れ等の防災を行うものであり、例えば、R型受信機又はP型受信機等含む概念である。「端末装置」とは、管理者又はユーザが利用可能な装置であり、例えば、据え置き型のコンピュータ、携行可能なスマートフォン又はタブレット端末等を含む概念である。 The "external device" is a device that communicates with a control device, and specifically, is a concept including a device that receives test-related signals, for example, a disaster prevention receiver, a terminal device, or the like. It is a concept including. A "disaster prevention receiver" is a device that manages a target area, and specifically, a device that performs disaster prevention such as a fire or a gas leak, and is a concept including, for example, an R-type receiver or a P-type receiver. Is. The "terminal device" is a device that can be used by an administrator or a user, and is a concept including, for example, a stationary computer, a portable smartphone or a tablet terminal, and the like.

そして、以下の実施形態では、「防排煙設備」が排煙口設備及び排煙機であり、また、「外部装置」が防災受信機である場合について説明する。 Then, in the following embodiment, the case where the "smoke prevention equipment" is the smoke exhaust port equipment and the smoke exhaust device and the "external device" is the disaster prevention receiver will be described.

[実施の形態の具体的内容]
次に、実施の形態の具体的内容について説明する。
[Specific contents of the embodiment]
Next, the specific contents of the embodiment will be described.

(構成)
まず、本実施の形態に係る防災システムの構成について説明する。図1は、本実施の形態に係る防災システムの接続図であり、図2は、排煙設備制御盤のブロック図である。
(Constitution)
First, the configuration of the disaster prevention system according to the present embodiment will be described. FIG. 1 is a connection diagram of a disaster prevention system according to the present embodiment, and FIG. 2 is a block diagram of a smoke exhaust equipment control panel.

防災システム100は、例えば、建物に設けられているシステムであり、一例としては、受信機1、排煙設備制御盤2、排煙口設備3、排煙口スイッチ4、及び排煙機5を備える。なお、排煙口設備3は、排煙口設備31〜33の総称であり、これらを相互に区別する必要がない場合は、この総称を用いて説明する。また、排煙口スイッチ4も排煙口スイッチ41〜43の総称であり、また、排煙機5も排煙機51、52の総称であり、これらも同様にして説明する。 The disaster prevention system 100 is, for example, a system installed in a building, and as an example, a receiver 1, a smoke exhaust facility control panel 2, a smoke exhaust port facility 3, a smoke exhaust port switch 4, and a smoke exhaust device 5 are used. Be prepared. The smoke exhaust port facility 3 is a general term for the smoke exhaust port facilities 31 to 33, and when it is not necessary to distinguish them from each other, this generic term will be used for description. Further, the smoke exhaust port switch 4 is also a general term for the smoke exhaust port switches 41 to 43, and the smoke exhaust device 5 is also a general term for the smoke exhaust devices 51 and 52, which will be described in the same manner.

(構成−受信機)
図1の受信機1は、外部装置であって、前述の防災受信機である。この受信機1の具体的な種類や構成は任意であるが、例えば、伝送線を介して排煙設備制御盤2との間で通信することが可能となるようにR型受信機として構成することができる。「伝送線」とは、任意の通信方式で通信を行うための配線であり、例えば、LANケーブル等を用いて構成することができる。
(Configuration-Receiver)
The receiver 1 in FIG. 1 is an external device and is the above-mentioned disaster prevention receiver. The specific type and configuration of the receiver 1 is arbitrary, but for example, it is configured as an R-type receiver so that it can communicate with the smoke exhaust equipment control panel 2 via a transmission line. be able to. The "transmission line" is a wiring for performing communication by an arbitrary communication method, and can be configured by using, for example, a LAN cable or the like.

(構成−排煙設備制御盤)
図1の排煙設備制御盤2は、制御装置であり、具体的には、排煙口設備3及び排煙機5を制御したり試験したりする装置である。この排煙設備制御盤2の具体的な種類や構成は任意であるが、伝送線を介して受信機1と接続されているものであり、また、配線を介して排煙口設備3、排煙口スイッチ4、及び排煙機5と接続されているものである。排煙設備制御盤2は、例えば、図2の通信部21、接続部22、記録部23、及び制御部24を備える。
(Configuration-Smoke exhaust equipment control panel)
The smoke exhaust equipment control panel 2 of FIG. 1 is a control device, specifically, a device that controls and tests the smoke exhaust port equipment 3 and the smoke exhaust device 5. The specific type and configuration of the smoke exhaust equipment control panel 2 is arbitrary, but it is connected to the receiver 1 via a transmission line, and the smoke exhaust port equipment 3 and exhaust are exhausted via wiring. It is connected to the smoke port switch 4 and the smoke evacuator 5. The smoke exhaust equipment control panel 2 includes, for example, a communication unit 21, a connection unit 22, a recording unit 23, and a control unit 24 in FIG.

(構成−排煙設備制御盤−通信部)
通信部21は、外部装置との間で通信を行う通信手段である。この通信部21の具体的な種類や構成は任意であるが、例えば、伝送線を介して受信機1との間で通信を行うための通信回路等を備えて構成することができる。
(Configuration-Smoke exhaust equipment control panel-Communication unit)
The communication unit 21 is a communication means for communicating with an external device. The specific type and configuration of the communication unit 21 is arbitrary, but for example, it can be configured to include a communication circuit or the like for communicating with the receiver 1 via a transmission line.

(構成−排煙設備制御盤−接続部)
接続部22は、電気的に接続される接続手段である。この接続部22の具体的な種類や構成は任意であるが、例えば、配線を介して排煙口設備3、排煙口スイッチ4、及び排煙機5に接続される接点群等を備えて構成することができる。
(Configuration-Smoke exhaust equipment control panel-Connection)
The connecting portion 22 is a connecting means that is electrically connected. The specific type and configuration of the connection portion 22 is arbitrary, but for example, a smoke exhaust port facility 3, a smoke exhaust port switch 4, a contact group connected to the smoke exhaust device 5 via wiring, and the like are provided. Can be configured.

(構成−排煙設備制御盤−記録部)
記録部23は、排煙設備制御盤2の動作に必要なプログラム及び各種のデータを記録する記録手段であり、例えば、外部記録装置としてのハードディスク(図示省略)を用いて構成されている。ただし、ハードディスクに代えてあるいはハードディスクと共に、磁気ディスクの如き磁気的記録媒体、又はDVDやブルーレイディスクの如き光学的記録媒体を含む、その他の任意の記録媒体を用いることができる。この記録部23は、装置情報を格納している。
(Configuration-Smoke exhaust equipment control panel-Recording unit)
The recording unit 23 is a recording means for recording a program and various data necessary for the operation of the smoke exhaust equipment control panel 2, and is configured by using, for example, a hard disk (not shown) as an external recording device. However, instead of or in combination with the hard disk, any other recording medium including a magnetic recording medium such as a magnetic disk or an optical recording medium such as a DVD or a Blu-ray disc can be used. The recording unit 23 stores device information.

(構成−排煙設備制御盤−記録部−装置情報)
「装置情報」とは、防排煙設備を特定するための情報であり、具体的には、排煙口設備3と排煙機5との相互間の対応付けを特定する情報である。図3は、装置情報を例示した図である。装置情報は、この図3に示すように、例えば、項目「排煙口アドレス情報」、項目「排煙口設備情報」、項目「排煙機アドレス情報」、及び項目「排煙機情報」と、これらの各項目に対応する情報とが関連付けられている情報である。項目「排煙口アドレス情報」に対応する情報は、前述の識別情報であり、具体的には、排煙口設備31〜33を一意に識別するためのアドレスを特定する排煙口アドレス情報である(図3では、図1の排煙口設備31を識別する「AD31」、排煙口設備32を識別する「AD32」、及び排煙口設備33を識別する「AD33」である)。項目「排煙口設備情報」に対応する情報は、排煙口設備31〜33を特定する排煙口設備情報である(図3では、名称であり、図1の排煙口設備31を特定する「排煙口1号機」、排煙口設備32を特定する「排煙口2号機」、及び排煙口設備33を特定する「排煙口3号機」)。項目「排煙機アドレス情報」に対応する情報は、前述の識別情報であり、具体的には、排煙機51、52を一意に識別するためのアドレスを特定する排煙機アドレス情報である(図3では、図1の排煙機51を識別する「AD51」、及び排煙機52を識別する「AD52」である)。項目「排煙機情報」に対応する情報は、排煙機51、52を特定する排煙機情報である(図3では、名称であり、図1の排煙機51を特定する「排煙機1号機」、及び排煙機52を特定する「排煙機2号機」)。そして、このような装置情報の具体的な格納手法は任意であるが、例えば、管理者又は作業員が、排煙口設備3及び排煙機5の施工時に、相互間の対応付け(例えば、排煙機51のファンを動作させることにより、排煙口設備31の風道での空気の流れが当該ファンによって生成されて、当該排口設備31の開口部及び排煙機51を介して屋内の煙が排煙される等の対応付け)を考慮して装置情報を生成して任意の手法(例えば、メモリスティック等の記録媒体を介して入力する手法、あるいは、不図示の操作部を介する操作により入力する手法等)で排煙設備制御盤2に入力することにより格納される。
(構成−制御部)
図2に戻って、制御部24は、排煙設備制御盤2を制御する制御手段である。具体的には、CPU、当該CPU上で解釈実行される各種のプログラム(OSなどの基本制御プログラムや、OS上で起動され特定機能を実現するアプリケーションプログラムを含む)、及びプログラムや各種のデータを格納するためのRAMの如き内部メモリを備えて構成されるコンピュータである。
(Configuration-Smoke exhaust equipment control panel-Recording unit-Device information)
The "device information" is information for specifying the smoke prevention / exhaust equipment, and specifically, is information for specifying the mutual correspondence between the smoke exhaust port equipment 3 and the smoke exhaust device 5. FIG. 3 is a diagram illustrating device information. As shown in FIG. 3, the device information includes, for example, the item "smoke exhaust port address information", the item "smoke exhaust port equipment information", the item "smoke exhaust device address information", and the item "smoke exhaust device information". , Information associated with the information corresponding to each of these items. The information corresponding to the item "smoke exhaust port address information" is the above-mentioned identification information, and specifically, is the smoke exhaust port address information that specifies an address for uniquely identifying the smoke exhaust port facilities 31 to 33. (In FIG. 3, "AD31" for identifying the smoke exhaust port equipment 31 of FIG. 1, "AD32" for identifying the smoke exhaust port equipment 32, and "AD33" for identifying the smoke exhaust port equipment 33). The information corresponding to the item "Smoke exhaust port equipment information" is the smoke exhaust port equipment information that specifies the smoke exhaust port equipment 31 to 33 (in FIG. 3, it is a name, and the smoke exhaust port equipment 31 in FIG. 1 is specified. "Smoke exhaust port No. 1", "Smoke exhaust port No. 2" for specifying the smoke exhaust port equipment 32, and "Smoke exhaust port No. 3" for specifying the smoke exhaust port equipment 33). The information corresponding to the item "smoke evacuator address information" is the above-mentioned identification information, and specifically, the smoke evacuator address information for specifying the address for uniquely identifying the smoke evacuators 51 and 52. (In FIG. 3, "AD51" for identifying the smoke evacuator 51 of FIG. 1 and "AD52" for identifying the smoke evacuator 52). The information corresponding to the item "Smoke evacuator information" is the smoke evacuator information that identifies the smoke evacuators 51 and 52 (in FIG. 3, it is a name, and the information that specifies the smoke evacuator 51 in FIG. "Unit 1" and "Smoke evacuator No. 2" that identifies the smoke evacuator 52). The specific storage method of such device information is arbitrary, but for example, when the manager or the worker constructs the smoke exhaust port equipment 3 and the smoke exhaust device 5, they associate each other (for example, By operating the fan of the smoke exhaust device 51, an air flow in the air passage of the smoke exhaust port facility 31 is generated by the fan, and indoors through the opening of the smoke exhaust device 31 and the smoke exhaust device 51. A method of generating device information in consideration of (correspondence such as smoke being discharged) and inputting it via a recording medium such as a memory stick, or via an operation unit (not shown). It is stored by inputting it to the smoke exhaust equipment control panel 2 by an operation method or the like.
(Configuration-Control unit)
Returning to FIG. 2, the control unit 24 is a control means for controlling the smoke exhaust equipment control panel 2. Specifically, the CPU, various programs that are interpreted and executed on the CPU (including basic control programs such as the OS and application programs that are started on the OS and realize specific functions), programs, and various data. It is a computer configured to have an internal memory such as a RAM for storing.

制御部24は、機能概念的に、例えば、試験部241、及び出力部242を備える。試験部241は、排煙口設備3及び排煙機5に関する試験を行う試験手段である。出力部242は、試験部241による試験に関する情報を示す信号である試験関連信号を、受信機1に対して出力する出力手段である。なお、この制御部24の各部によって行われる処理については、後述する。 The control unit 24 includes, for example, a test unit 241 and an output unit 242 in terms of functional concept. The test unit 241 is a test means for performing a test on the smoke exhaust port equipment 3 and the smoke exhaust device 5. The output unit 242 is an output means for outputting a test-related signal, which is a signal indicating information related to the test by the test unit 241 to the receiver 1. The processing performed by each unit of the control unit 24 will be described later.

(構成−排煙口設備)
図1の排煙口設備3は、防排煙設備であり、例えば、建物の相互に異なる位置に設けられている排煙口設備31〜33を備える。この排煙口設備3の具体的な種類や構成は任意であるが、例えば、配線を介して排煙設備制御盤2に接続されており、当該排煙設備制御盤2から電力が供給されるものであり、また、前述したように、煙を通すための風道、風道に続く開口部、当該開口部を開閉する開閉蓋、及び開閉蓋の開閉を制御する開閉蓋用制御装置を備えて構成することができる。また、排煙口設備31〜33の開閉蓋用制御装置には、アドレスとして「AD31」、「AD32」、及び「AD33」が設定されていることとする。また、排煙口設備3の開閉蓋が開いているか閉じているかについては、任意の手法(例えば、配線を介して行われる通信等)を用いて、排煙設備制御盤2側で把握可能となっていることとする。
(Configuration-Smoke outlet equipment)
The smoke exhaust port facility 3 of FIG. 1 is a smoke exhaust gas exhaust device, and includes, for example, smoke exhaust port facilities 31 to 33 provided at different positions in the building. The specific type and configuration of the smoke exhaust port equipment 3 is arbitrary, but for example, it is connected to the smoke exhaust equipment control panel 2 via wiring, and power is supplied from the smoke exhaust equipment control panel 2. Also, as described above, it is provided with an air passage for passing smoke, an opening following the air passage, an opening / closing lid for opening / closing the opening, and an opening / closing lid control device for controlling the opening / closing of the opening / closing lid. Can be configured. Further, it is assumed that "AD31", "AD32", and "AD33" are set as addresses in the control device for the opening / closing lid of the smoke exhaust port facilities 31 to 33. Further, whether the opening / closing lid of the smoke exhaust port equipment 3 is open or closed can be grasped on the smoke exhaust equipment control panel 2 side by using an arbitrary method (for example, communication performed via wiring). It is assumed that it is.

(構成−排煙口スイッチ)
図1の排煙口スイッチ4は、排煙口設備3の動作を開始させるためのスイッチである。この排煙口スイッチ4の具体的な種類や構成は任意であるが、例えば、配線を介して排煙口設備3、及び排煙設備制御盤2に接続されており、当該排煙設備制御盤2から電力が供給されるものであり、また、排煙口設備3の動作を開始させるために押下する押下ボタンを備えて構成することができる。また、排煙口スイッチ4の押下ボタンが押下された否かについては、任意の手法を用いて、排煙設備制御盤2側で把握可能となっていることとする。
(Configuration-Smoke outlet switch)
The smoke exhaust port switch 4 of FIG. 1 is a switch for starting the operation of the smoke exhaust port equipment 3. The specific type and configuration of the smoke exhaust port switch 4 is arbitrary, but for example, it is connected to the smoke exhaust port equipment 3 and the smoke exhaust equipment control panel 2 via wiring, and the smoke exhaust equipment control panel The electric power is supplied from 2, and it can be configured to include a pressing button to be pressed to start the operation of the smoke exhaust port facility 3. Further, it is assumed that whether or not the pressing button of the smoke exhaust port switch 4 is pressed can be grasped on the smoke exhaust equipment control panel 2 side by using an arbitrary method.

(構成−排煙機)
図1の排煙機5は、防排煙設備であり、例えば、建物の屋上に設けられている排煙機51、52を備える。この排煙機5の具体的な種類や構成は任意であるが、例えば、配線を介して排煙設備制御盤2に接続されており、当該排煙設備制御盤2から電力が供給されるものであり、また、前述したように、風道を介して煙を排出するためのファン、及び当該ファンを制御するファン制御装置を備えて構成することができる。また、排煙機51、52のファン制御装置には、アドレスとして「AD51」、及び「AD52」が設定されていることとする。また、排煙機5のファンが動作しているか否かについては、任意の手法(例えば、配線を介して行われる通信等)を用いて、排煙設備制御盤2側で把握可能となっていることとする。
(Composition-Smoke evacuator)
The smoke evacuator 5 of FIG. 1 is a smoke evacuator, and includes, for example, smoke evacuators 51 and 52 provided on the roof of a building. The specific type and configuration of the smoke exhaust device 5 is arbitrary, but for example, the smoke exhaust device 5 is connected to the smoke exhaust facility control panel 2 via wiring, and power is supplied from the smoke exhaust facility control panel 2. Further, as described above, it can be configured to include a fan for discharging smoke through the air passage and a fan control device for controlling the fan. Further, it is assumed that "AD51" and "AD52" are set as addresses in the fan control devices of the smoke evacuators 51 and 52. Further, whether or not the fan of the smoke evacuator 5 is operating can be grasped on the smoke evacuating equipment control panel 2 side by using an arbitrary method (for example, communication performed via wiring). It is assumed that there is.

(施工)
次に、このように構成される防災システム100の施工について説明する。防災システム100の施工手法は任意であるが、例えば、排煙口設備3、排煙口スイッチ4、及び排煙機5が排煙設備制御盤2から電力が供給されて制御されるように構成されていることに着目して、排煙設備制御盤2、排煙口設備3、排煙口スイッチ4、及び排煙機5をいわゆる空調設備工事工程にて施工し、受信機1を電気設備工事工程にて施工することとする。このような施工手法を採用することにより、電気設備工事工程において排煙口設備3の施工が不要となるので、当該工程での工数を減少させることが可能となる。
(Construction)
Next, the construction of the disaster prevention system 100 configured in this way will be described. The construction method of the disaster prevention system 100 is arbitrary, but for example, the smoke exhaust port equipment 3, the smoke exhaust port switch 4, and the smoke exhaust device 5 are configured to be controlled by being supplied with electricity from the smoke exhaust equipment control panel 2. Focusing on the fact that the smoke exhaust facility control panel 2, the smoke exhaust port facility 3, the smoke exhaust port switch 4, and the smoke exhaust device 5 are installed in the so-called air conditioning equipment construction process, and the receiver 1 is an electrical equipment. It will be constructed in the construction process. By adopting such a construction method, it is not necessary to construct the smoke exhaust port equipment 3 in the electrical equipment construction process, so that the man-hours in the process can be reduced.

(処理)
次に、このように構成される防災システム100によって実行される防排煙処理、及び試験処理について説明する。
(processing)
Next, the smoke prevention treatment and the test treatment executed by the disaster prevention system 100 configured in this way will be described.

(処理−防排煙処理)
図4は、防排煙処理のフローチャートである(以下の各処理の説明ではステップを「S」と略記する)。「防排煙処理」とは、防災を行うための処理であり、具体的には、火災発生時等に排煙口設備3及び排煙機5を動作させる処理である。この防排煙処理を実行するタイミングは任意であるが、例えば、排煙設備制御盤2の不図示の操作部を介して、排煙設備制御盤2の動作モードを防災モードに切り替えた後に実行を開始し、繰り返し実行するものとし、実行が開始されたところから説明する。
(Treatment-Smoke prevention treatment)
FIG. 4 is a flowchart of smoke prevention / exhaust processing (steps are abbreviated as “S” in the following description of each processing). The "smoke prevention treatment" is a treatment for performing disaster prevention, and specifically, is a treatment for operating the smoke exhaust port equipment 3 and the smoke exhaust machine 5 in the event of a fire or the like. The timing of executing this smoke prevention / exhaust treatment is arbitrary, but for example, it is executed after switching the operation mode of the smoke exhaust equipment control panel 2 to the disaster prevention mode via an operation unit (not shown) of the smoke exhaust equipment control panel 2. Is started and executed repeatedly, and the description will be given from the point where the execution is started.

「動作モード」とは、排煙設備制御盤2を動作させるためのモードであり、例えば、排煙設備制御盤2の不図示の操作部を操作することにより相互に切り替え可能な防災モード又は試験モードを含む。「防災モード」とは、排煙設備制御盤2の試験を行う場合以外の通常時に設定されるモード(つまり、通常監視用のモード)であり、また、「試験モード」とは、排煙設備制御盤2を試験する場合に設定されるモード(つまり、試験用のモード)である。 The "operation mode" is a mode for operating the smoke exhaust equipment control panel 2, and is, for example, a disaster prevention mode or a test that can be switched between each other by operating an operation unit (not shown) of the smoke exhaust equipment control panel 2. Including mode. The "disaster prevention mode" is a mode set at normal times (that is, a mode for normal monitoring) other than when testing the smoke exhaust equipment control panel 2, and the "test mode" is a smoke exhaust equipment. This is a mode (that is, a test mode) set when the control panel 2 is tested.

図4のSA1において排煙設備制御盤2の制御部24は、排煙口設備3及び排煙機5を起動するか否かを判定する。具体的には任意であるが、例えば、排煙口スイッチ4の押下ボタンが押下されたか否かに基づいて判定する。そして、排煙口スイッチ4の押下ボタンが押下されていない場合、排煙口設備3及び排煙機5を起動しないものと判定し(SA1のNO)、排煙口設備3及び排煙機5を起動するものと判定するまで、繰り返しSA1を実行する。また、排煙口スイッチ4の押下ボタンが押下された場合、排煙口設備3及び排煙機5を起動するものと判定し(SA1のYES)、SA2に移行する。 In SA1 of FIG. 4, the control unit 24 of the smoke exhaust equipment control panel 2 determines whether or not to activate the smoke exhaust port equipment 3 and the smoke exhaust device 5. Specifically, it is arbitrary, but for example, the determination is made based on whether or not the pressing button of the smoke exhaust port switch 4 is pressed. Then, when the pressing button of the smoke exhaust port switch 4 is not pressed, it is determined that the smoke exhaust port equipment 3 and the smoke exhaust device 5 are not started (NO of SA1), and the smoke exhaust port equipment 3 and the smoke exhaust device 5 are not activated. SA1 is repeatedly executed until it is determined that the system is to be activated. Further, when the pressing button of the smoke exhaust port switch 4 is pressed, it is determined that the smoke exhaust port equipment 3 and the smoke exhaust device 5 are to be activated (YES in SA1), and the process proceeds to SA2.

ここでは、例えば、火災発生時にユーザが図1の排煙口スイッチ41の押下ボタンを押下した場合、当該押下した排煙口スイッチ41に接続されている排煙口設備31の開閉蓋用制御装置が開閉蓋を開き、この場合、排煙口設備3及び排煙機5を起動するものと判定する。また、この場合、排煙設備制御盤2の制御部24は、排煙口設備31の状態を示す信号(例えば、排煙口設備31の開閉蓋から開いたことを示す信号)を受信機1に送信し、当該受信機1の表示装置(ディスプレイ)に開閉蓋の状態を表示する。 Here, for example, when the user presses the press button of the smoke exhaust port switch 41 of FIG. 1 when a fire breaks out, the control device for the opening / closing lid of the smoke exhaust port equipment 31 connected to the pressed smoke exhaust port switch 41. Opens the open / close lid, and in this case, it is determined that the smoke exhaust port equipment 3 and the smoke exhaust device 5 are activated. Further, in this case, the control unit 24 of the smoke exhaust facility control panel 2 receives a signal indicating the state of the smoke exhaust port equipment 31 (for example, a signal indicating that the smoke exhaust port equipment 31 has been opened from the open / close lid) of the receiver 1. And displays the status of the open / close lid on the display device (display) of the receiver 1.

図4のSA2において排煙設備制御盤2の制御部24は、排煙口設備3及び排煙機5を起動する。具体的には任意であるが、例えば、SA1で押下ボタンを押下された排煙口スイッチ4に接続されている排煙口設備3が、自己に設定されているアドレスを含めて自己に対応する排煙口スイッチ4の押下ボタンを押下されたことを示す押下信号を排煙設備制御盤2に送信することとする。そして、排煙設備制御盤2の制御部24は、当該送信された押下信号を受信し、図3の装置情報を参照して、当該押下信号に含まれているアドレスに対応する排煙機アドレス情報を特定し、特定した排煙機アドレス情報に対応する排煙機5を起動することにより、排煙口設備3及び排煙機5を起動する。 In SA2 of FIG. 4, the control unit 24 of the smoke exhaust equipment control panel 2 activates the smoke exhaust port equipment 3 and the smoke exhaust device 5. Specifically, although it is arbitrary, for example, the smoke exhaust port equipment 3 connected to the smoke exhaust port switch 4 whose press button is pressed in SA1 corresponds to itself including the address set in itself. A pressing signal indicating that the pressing button of the smoke exhaust port switch 4 has been pressed is transmitted to the smoke exhaust equipment control panel 2. Then, the control unit 24 of the smoke exhaust equipment control panel 2 receives the transmitted pressing signal, refers to the device information of FIG. 3, and refers to the smoke exhauster address corresponding to the address included in the pressing signal. By specifying the information and activating the smoke evacuator 5 corresponding to the specified smoke evacuator address information, the smoke exhaust port equipment 3 and the smoke evacuator 5 are activated.

ここでは、例えば、SA1で押下ボタンを押下された排煙口スイッチ41に接続されている排煙口設備31が、自己に設定されているアドレスである「AD31」を含めて押下ボタンを押下されたことを示す押下信号を排煙設備制御盤2に送信することとする。そして、排煙設備制御盤2の制御部24は、当該送信された押下信号を受信し、図3の装置情報を参照して、当該押下信号に含まれているアドレスである「AD31」に対応する排煙機アドレス情報である「AD51」を特定し、特定した排煙機アドレス情報である「AD51」に対応する排煙機51を起動する。また、排煙設備制御盤2の制御部24は、排煙機51の状態を示す信号(例えば、排煙機51が起動したことを示す信号)を受信機1に送信し、当該受信機1の表示装置に排煙機5の状態を表示する。そして、この場合、排煙機51のファン制御装置は、ファンの動作を開始することになり、SA1で開閉蓋が開かれた排煙口設備31の開口部、及び風道を介して、屋内の煙が屋外に排出されることになる。 Here, for example, the smoke exhaust port equipment 31 connected to the smoke exhaust port switch 41 whose press button was pressed in SA1 is pressed with the press button including the address "AD31" set to itself. A pressing signal indicating that is transmitted to the smoke exhaust equipment control panel 2. Then, the control unit 24 of the smoke exhaust equipment control panel 2 receives the transmitted pressing signal, refers to the device information of FIG. 3, and corresponds to the address "AD31" included in the pressing signal. The smoke evacuator address information "AD51" is specified, and the smoke evacuator 51 corresponding to the specified smoke evacuator address information "AD51" is activated. Further, the control unit 24 of the smoke exhaust equipment control panel 2 transmits a signal indicating the state of the smoke exhaust device 51 (for example, a signal indicating that the smoke exhaust device 51 has been activated) to the receiver 1, and the receiver 1 The status of the smoke evacuator 5 is displayed on the display device of. Then, in this case, the fan control device of the smoke evacuator 51 starts the operation of the fan, and is indoors through the opening of the smoke evacuator facility 31 whose opening / closing lid is opened by SA1 and the air passage. Smoke will be discharged outdoors.

なお、この後の処理は任意であるが、例えば、排煙設備制御盤2の不図示の操作部を介する所定操作等を行うことにより、排煙口設備3及び排煙機5の動作が終了する。そして、この場合、排煙設備制御盤2の制御部24は、排煙口設備3及び排煙機5の状態を示す信号(例えば、排煙口設備3及び排煙機5の動作が終了したことを示す信号)を受信機1に送信し、当該受信機1の表示装置に排煙口設備3及び排煙機5の状態を表示する。これにて、防排煙処理を終了する。 Although the subsequent processing is arbitrary, for example, the operation of the smoke exhaust port equipment 3 and the smoke exhaust device 5 is completed by performing a predetermined operation or the like via an operation unit (not shown) of the smoke exhaust equipment control panel 2. To do. Then, in this case, the control unit 24 of the smoke exhaust facility control panel 2 has completed the operation of the signal indicating the state of the smoke exhaust port facility 3 and the smoke exhaust device 5 (for example, the operation of the smoke exhaust port facility 3 and the smoke exhaust device 5). A signal indicating that) is transmitted to the receiver 1, and the status of the smoke exhaust port equipment 3 and the smoke exhaust device 5 is displayed on the display device of the receiver 1. This completes the smoke prevention treatment.

(処理−試験処理)
図5は、試験処理のフローチャートである。「試験処理」とは、試験を行うための処理であり、具体的には、排煙口設備3及び排煙機5を試験する処理である。この試験処理を実行するタイミングは任意であるが、例えば、排煙設備制御盤2の不図示の操作部を介して、排煙設備制御盤2の動作モードを試験モードに切り替えた後に実行を開始し、繰り返し実行するものとし、実行が開始されたところから説明する。
(Processing-Test processing)
FIG. 5 is a flowchart of the test process. The "test process" is a process for performing a test, and specifically, is a process for testing the smoke exhaust port equipment 3 and the smoke exhaust device 5. The timing of executing this test process is arbitrary, but for example, the execution is started after switching the operation mode of the smoke exhaust equipment control panel 2 to the test mode via an operation unit (not shown) of the smoke exhaust equipment control panel 2. However, it shall be executed repeatedly, and the explanation will be given from the point where the execution is started.

図5のSB1において排煙設備制御盤2の試験部241は、排煙口設備3及び排煙機5を試験する。具体的には任意であるが、例えば、排煙口設備3及び排煙機5にアドレスが設定されており各装置を特定可能であることに着目して、動作試験を行う。「動作試験」とは、動作に関する試験であり、例えば、前述の防排煙処理で説明した各処理が行われるか否かを調べる試験である。動作試験について具体的には、作業員が排煙口スイッチ4の押下ボタンを押下することとし、この場合に、排煙口設備3の開閉蓋が開くか否か、及び排煙機5が動作を開始するか否かを試験する。又は、排煙設備制御盤2、排煙口設備3及び排煙機5に自動試験機能を持たせ、当該自動試験機能(つまり、自己の動作が正常であるか異常であるかを自動的に試験する機能)を用いて試験する。 In SB1 of FIG. 5, the test unit 241 of the smoke exhaust equipment control panel 2 tests the smoke exhaust port equipment 3 and the smoke exhauster 5. Specifically, although it is optional, the operation test is performed by paying attention to the fact that the smoke exhaust port equipment 3 and the smoke exhaust device 5 have addresses set and each device can be specified. The "operation test" is a test related to operation, and is, for example, a test for examining whether or not each of the treatments described in the above-mentioned smoke prevention treatment is performed. Regarding the operation test, specifically, the worker presses the press button of the smoke exhaust port switch 4, and in this case, whether or not the opening / closing lid of the smoke exhaust port equipment 3 opens, and the smoke exhaust device 5 operates. Test whether to start. Alternatively, the smoke exhaust facility control panel 2, the smoke exhaust port facility 3, and the smoke exhaust device 5 are provided with an automatic test function, and the automatic test function (that is, whether or not the self-operation is normal or abnormal is automatically determined. Test using the test function).

排煙口設備3の開閉蓋が開くか否かについては、試験部241は、例えば、作業員に押下された押下ボタンを備える排煙口スイッチ4に対応する排煙口設備3を特定し、特定した排煙口設備3の開閉蓋が押下ボタンの押下から所定時間(例えば、30秒〜1分以内等)以内に開いた場合、試験結果として正常であることを特定し、また、特定した排煙口設備3の開閉蓋が押下ボタンの押下から所定時間(例えば、30秒〜1分以内等)以内に開かない場合、試験結果として異常であることを特定する。なお、「正常」とは、想定通りであることであり、例えば、現状のまま利用続けられることを示す概念である。「異常」とは、想定通りではないことであり、例えば、メンテナンス等を要することを示す概念である。また、ここでの「作業員に押下された押下ボタンを備える排煙口スイッチ4に対応する排煙口設備3を特定」する具体的な手法は任意であり、公知の手法を用いてもよく、例えば、図1に示すように、対応する各排煙口設備3及び排煙口スイッチ4が共通の配線を介して排煙設備制御盤2に接続されていることに着目して、排煙口スイッチ41〜43に対する排煙口設備31〜33を特定する手法を用いてもよい。 Regarding whether or not the opening / closing lid of the smoke exhaust port equipment 3 is opened, the test unit 241 identifies, for example, the smoke exhaust port equipment 3 corresponding to the smoke exhaust port switch 4 provided with the press button pressed by the worker. When the opening / closing lid of the specified smoke exhaust port equipment 3 is opened within a predetermined time (for example, within 30 seconds to 1 minute) from the pressing of the pressing button, it is specified and specified that the test result is normal. If the opening / closing lid of the smoke exhaust port equipment 3 does not open within a predetermined time (for example, within 30 seconds to 1 minute) from the pressing of the pressing button, it is identified as an abnormality as a test result. Note that "normal" is as expected, and is, for example, a concept indicating that the product can be used as it is. "Abnormality" is not as expected, and is a concept indicating that maintenance or the like is required, for example. Further, the specific method of "identifying the smoke exhaust port equipment 3 corresponding to the smoke exhaust port switch 4 provided with the press button pressed by the worker" here is arbitrary, and a known method may be used. For example, as shown in FIG. 1, the smoke exhaust port equipment 3 and the smoke exhaust port switch 4 are connected to the smoke exhaust facility control panel 2 via a common wiring, and smoke is exhausted. A method for specifying smoke exhaust port facilities 31 to 33 for the mouth switches 41 to 43 may be used.

ここでは、例えば、作業員が排煙口スイッチ41の押下ボタンを押下してから3〜5秒後に、排煙口設備31の開閉蓋が開いたこととし、この場合、試験結果として「正常」を特定する。 Here, for example, it is assumed that the opening / closing lid of the smoke exhaust port equipment 31 is opened 3 to 5 seconds after the worker presses the press button of the smoke exhaust port switch 41. In this case, the test result is "normal". To identify.

排煙機5が動作を開始するか否かについては、試験部241は、例えば、図4のSA2で説明した処理と同様な処理を行うこととし、前述のようにして、作業員に押下された押下ボタンを備える排煙口スイッチ4に対応する排煙口設備3を特定し、特定した排煙口設備3に対応する排煙機5を特定し、特定した排煙機5が押下ボタンの押下から所定時間(例えば、10秒〜30秒以内等)以内に動作を開始した場合、試験結果として正常であることを特定し、また、特定した排煙機5が押下ボタンの押下から所定時間以内に動作を開始しない場合、試験結果として異常であることを特定する。なお、ここでの「排煙口設備3に対応する排煙機5を特定」する具体的な手法は任意であるが、例えば、図4のSA2で説明したように、アドレスに着目して特定する手法を用いてもよい。 Regarding whether or not the smoke evacuator 5 starts operation, the test unit 241 decides to perform the same process as the process described in SA2 of FIG. 4, and is pressed by the worker as described above. The smoke exhaust port equipment 3 corresponding to the smoke exhaust port switch 4 provided with the press button is specified, the smoke exhaust device 5 corresponding to the specified smoke exhaust port equipment 3 is specified, and the specified smoke exhaust device 5 is the press button. If the operation is started within a predetermined time (for example, within 10 to 30 seconds) from the pressing, it is specified that the test result is normal, and the specified smoke evacuator 5 is specified for a predetermined time from the pressing of the pressing button. If the operation does not start within the time, the test result identifies it as abnormal. The specific method of "identifying the smoke exhaust device 5 corresponding to the smoke exhaust port facility 3" here is arbitrary, but for example, as described in SA2 of FIG. 4, it is specified by focusing on the address. You may use the method of

ここでは、例えば、作業員が排煙口スイッチ41の押下ボタンを押下してから3〜5秒後に、排煙機51が起動したこととし、この場合、「正常」を特定する。 Here, for example, it is assumed that the smoke evacuator 51 is activated 3 to 5 seconds after the worker presses the press button of the smoke evacuator switch 41, and in this case, "normal" is specified.

自動試験機能を用いる試験については、任意のタイミング(例えば、試験処理起動直後のタイミング、あるいは、排煙設備制御盤2の不図示の操作部を介して所定操作を行ったタイミング等)に、排煙設備制御盤2の試験部241が、動作試験信号(自動試験を開始させるための信号)を排煙口設備3及び排煙機5に送出する。そして、この場合、排煙口設備3及び排煙機5は機器内部にて動作試験(自己の動作が正常であるか異常であるかを判定する試験)を行い、排煙設備制御盤2に対して試験結果良否として、自己の動作が正常であるか異常であるかを特定する信号を送出する。なお、この際、排煙口設備3及び排煙機5は実際には動作せず、機器内部の自動試験機能にて良否(正常であるか異常であるか)を判定して判定結果を特定する信号を送出することとする。そして、試験部241は、排煙口設備3及び排煙機5から送出された判定結果を特定する信号を受信して、受信した信号に基づいて、「正常」又は「異常」を特定する。 For tests using the automatic test function, the smoke is discharged at an arbitrary timing (for example, the timing immediately after the start of the test process, or the timing when a predetermined operation is performed via an operation unit (not shown) of the smoke exhaust equipment control panel 2). The test unit 241 of the smoke equipment control panel 2 sends an operation test signal (a signal for starting an automatic test) to the smoke exhaust port equipment 3 and the smoke exhaust machine 5. Then, in this case, the smoke exhaust port equipment 3 and the smoke exhaust device 5 perform an operation test (a test for determining whether or not their own operation is normal or abnormal) inside the equipment, and the smoke exhaust equipment control panel 2 is used. On the other hand, as a test result good or bad, a signal for identifying whether the self-operation is normal or abnormal is sent. At this time, the smoke exhaust port equipment 3 and the smoke exhaust device 5 do not actually operate, and the automatic test function inside the device determines the quality (normal or abnormal) and specifies the determination result. Smoke will be sent. Then, the test unit 241 receives a signal for specifying the determination result sent from the smoke exhaust port facility 3 and the smoke exhaust device 5, and identifies "normal" or "abnormal" based on the received signal.

図5のSB2において排煙設備制御盤2の出力部242は、試験関連信号を出力する。「試験関連信号」とは、試験に関連する信号であり、具体的には、試験に関連する情報を含む信号であり、例えば、行われた試験を特定する情報、及び当該試験の結果を示す情報等を含む信号である。具体的には任意であるが、例えば、SB2で行った試験及び当該試験の結果を取得し、取得した試験及び当該試験を示す情報を含む試験関連信号を生成し、生成した試験関連信号を通信部21及び図1の伝送線を介して受信機1に送信(出力)する。そして、受信機1は、当該送信された試験関連信号を受信し、受信した試験関連信号に含まれている情報を自己の表示装置に表示等する。この場合、試験に関連する情報を、受信機1側で確認することが可能となる。 In SB2 of FIG. 5, the output unit 242 of the smoke exhaust equipment control panel 2 outputs a test-related signal. The "test-related signal" is a signal related to the test, specifically, a signal including information related to the test, and indicates, for example, information identifying the test performed and the result of the test. It is a signal including information and the like. Specifically, although it is optional, for example, the test performed by SB2 and the result of the test are acquired, the acquired test and the test-related signal including the information indicating the test are generated, and the generated test-related signal is communicated. It is transmitted (output) to the receiver 1 via the unit 21 and the transmission line of FIG. Then, the receiver 1 receives the transmitted test-related signal, and displays the information contained in the received test-related signal on its own display device. In this case, the information related to the test can be confirmed on the receiver 1 side.

ここでは、例えば、SB2で行った排煙口設備3の開閉蓋が開くか否かについての試験及び当該試験の結果である「正常」と、SB2で行った排煙機5が動作を開始するか否かについての試験及び当該試験の結果である「正常」と、自動試験及び当該試験の結果である例えば「正常」とを取得し、取得したこれらの情報を含む試験関連信号を生成し、生成した試験関連信号を受信機1に送信する。これにて、試験処理を終了する。 Here, for example, a test on whether or not the opening / closing lid of the smoke exhaust port equipment 3 performed in SB2 is opened, and "normal" which is the result of the test, and the smoke exhauster 5 performed in SB2 start operation. The test as to whether or not the test and the result of the test, "normal", and the automatic test and the result of the test, for example, "normal" are acquired, and a test-related signal including the acquired information is generated. The generated test-related signal is transmitted to the receiver 1. This completes the test process.

(実施の形態の効果)
このように本実施の形態によれば、排煙口設備3及び排煙機5に関する試験を行い、試験に関する情報を示す信号である試験関連信号を受信機1に対して出力することにより、例えば、試験を行って排煙口設備3及び排煙機5の状態を把握することが可能となる。また、例えば、受信機1の他に排煙口設備3及び排煙機5を制御する排煙設備制御盤2を設けることにより、排煙口設備3及び排煙機5及び排煙設備制御盤2を施工する工程(例えば、空調設備工事工程)と、受信機1を施工する工程(例えば、電気設備工事工程)に分けることができるので、電気設備工事工程での工数を減少させることが可能となる。
(Effect of embodiment)
As described above, according to the present embodiment, the smoke exhaust port equipment 3 and the smoke exhaust device 5 are tested, and a test-related signal, which is a signal indicating information on the test, is output to the receiver 1, for example. , It becomes possible to grasp the state of the smoke exhaust port equipment 3 and the smoke exhaust device 5 by conducting a test. Further, for example, by providing the smoke exhaust port equipment 3 and the smoke exhaust equipment control panel 2 for controlling the smoke exhaust device 5 in addition to the receiver 1, the smoke exhaust port equipment 3 and the smoke exhaust device 5 and the smoke exhaust equipment control panel are provided. Since it can be divided into a process of constructing 2 (for example, an air conditioning equipment construction process) and a process of constructing the receiver 1 (for example, an electrical equipment construction process), it is possible to reduce the number of steps in the electrical equipment construction process. It becomes.

また、排煙口設備3及び排煙機5の動作に関する試験を行うことにより、例えば排煙口設備3及び排煙機5の動作に関する状態を把握することが可能となる。 Further, by conducting a test on the operation of the smoke exhaust port facility 3 and the smoke exhaust device 5, it is possible to grasp the state of the operation of the smoke exhaust port facility 3 and the smoke exhaust device 5, for example.

また、アドレスに基づいて少なくとも一部の排煙口設備3及び排煙機5を識別し、識別結果に基づいて、少なくとも一部の排煙口設備3及び排煙機5に関する試験を行うことにより、例えば、各排煙口設備3及び排煙機5の状態を個別に把握することが可能となる。 In addition, by identifying at least a part of the smoke exhaust port equipment 3 and the smoke exhaust device 5 based on the address, and performing a test on at least a part of the smoke exhaust port equipment 3 and the smoke exhaust device 5 based on the identification result. For example, it is possible to individually grasp the state of each smoke exhaust port facility 3 and the smoke exhaust device 5.

〔実施の形態に対する変形例〕
以上、本発明に係る実施の形態について説明したが、本発明の具体的な構成及び手段は、特許請求の範囲に記載した各発明の技術的思想の範囲内において、任意に改変及び改良することができる。以下、このような変形例について説明する。
[Modified example with respect to the embodiment]
Although the embodiments according to the present invention have been described above, the specific configuration and means of the present invention may be arbitrarily modified and improved within the scope of the technical idea of each invention described in the claims. Can be done. Hereinafter, such a modification will be described.

(解決しようとする課題や発明の効果について)
まず、発明が解決しようとする課題や発明の効果は、上述の内容に限定されるものではなく、発明の実施環境や構成の詳細に応じて異なる可能性があり、上述した課題の一部のみを解決したり、上述した効果の一部のみを奏したりすることがある。
(About the problem to be solved and the effect of the invention)
First, the problem to be solved by the invention and the effect of the invention are not limited to the above-mentioned contents, and may differ depending on the implementation environment and the details of the configuration of the invention, and only a part of the above-mentioned problems. May be solved or only some of the above effects may be achieved.

(分散や統合について)
また、上述した構成は機能概念的なものであり、必ずしも物理的に図示の如く構成されていることを要しない。すなわち、各部の分散や統合の具体的形態は図示のものに限られず、その全部または一部を、任意の単位で機能的または物理的に分散又は統合して構成できる。また、本出願における「装置」とは、単一の装置によって構成されたものに限定されず、複数の装置によって構成されたものを含む。
(About distribution and integration)
Further, the above-described configuration is a functional concept, and does not necessarily have to be physically configured as shown in the figure. That is, the specific form of dispersion or integration of each part is not limited to the one shown in the figure, and all or a part thereof can be functionally or physically dispersed or integrated in any unit. Further, the "device" in the present application is not limited to a device composed of a single device, but includes a device composed of a plurality of devices.

(試験について)
また、上記実施の形態では、図5のSB1において「動作試験」を行う場合について説明したが、これに限らない。例えば、試験部241が、「動作試験」と共に又は代わりに「断線検知試験」、又は「風量測定試験」を行うように構成してもよい。「断線検知試験」とは、配線が断線しているか否かを調べる試験であり、例えば、図1の排煙設備制御盤2と、排煙口設備3及び排煙機5との間の配線が断線しているか否かを調べる試験である。「風量測定試験」とは、動作に関する試験であり、例えば、排煙機5のファンを動作させた場合の排煙口設備3の開口部での風量を測定する試験である。
(About the test)
Further, in the above-described embodiment, the case where the "operation test" is performed in SB1 of FIG. 5 has been described, but the present invention is not limited to this. For example, the test unit 241 may be configured to perform a "disconnection detection test" or an "air volume measurement test" together with or instead of the "operation test". The "wire disconnection detection test" is a test for checking whether or not the wiring is broken. For example, the wiring between the smoke exhaust equipment control panel 2 of FIG. 1 and the smoke exhaust port equipment 3 and the smoke exhaust device 5. This is a test to check whether or not the wire is broken. The "air volume measurement test" is a test related to operation, and is, for example, a test for measuring the air volume at the opening of the smoke exhaust port facility 3 when the fan of the smoke exhaust device 5 is operated.

断線検知試験について具体的には、試験部241は、例えば、任意の手法(例えば、配線に電圧を供給して当該電圧の電圧降下又は配線での電流値に着目して行う手法等)で排煙設備制御盤2と、排煙口設備3及び排煙機5との間の配線が断線しているか否か判定し、断線していないものと判定した場合に、試験結果として「正常」を特定し、また、断線しているものと判定した場合に、試験結果として「異常」を特定する。なお、ここでは、排煙口設備3及び排煙機5にアドレスが設定されており個別に特定可能であるので、機器毎に試験を行ってもよい。このように構成した場合、排煙口設備3及び排煙機5側と排煙設備制御盤2側との間の通電に関する試験を行うことにより、例えば、排煙口設備3及び排煙機5側と排煙設備制御盤2側との間の通電に関する状態を把握することが可能となる。 Regarding the disconnection detection test, specifically, the test unit 241 discharges by an arbitrary method (for example, a method of supplying a voltage to the wiring and paying attention to the voltage drop of the voltage or the current value in the wiring). It is determined whether or not the wiring between the smoke equipment control panel 2 and the smoke exhaust port equipment 3 and the smoke exhaust device 5 is broken, and when it is determined that the wiring is not broken, "normal" is set as the test result. If it is identified and it is determined that the wire is broken, "abnormality" is identified as the test result. Here, since the addresses are set for the smoke exhaust port equipment 3 and the smoke exhaust device 5 and can be individually specified, a test may be performed for each device. In this configuration, by conducting a test on energization between the smoke exhaust port equipment 3 and the smoke exhaust device 5 side and the smoke exhaust equipment control panel 2 side, for example, the smoke exhaust port equipment 3 and the smoke exhaust device 5 It is possible to grasp the state of energization between the side and the smoke exhaust equipment control panel 2 side.

また、風量測定試験について具体的には、排煙口設備3の開口部に風量測定センサを設置した上で、試験部241は、排煙機5のファンの動作を開始し、当該排煙機5に対応する排煙口設備3の開口部に設置されている風量測定センサが検知する風量を取得し、取得した風量と上限閾値及び下限閾値とを比較し、取得した風量が上限閾値及び下限閾値の間である場合、試験結果として「正常」を特定し、また、取得した風量が上限閾値を上回っている場合、又は、取得した風量が下限閾値を下回っている場合、試験結果として「異常」を特定する。また、この場合、試験部241は、取得した風量自体を試験結果として特定してもよい。 Further, specifically, regarding the air volume measurement test, after installing the air volume measurement sensor at the opening of the smoke exhaust port facility 3, the test unit 241 starts the operation of the fan of the smoke exhaust device 5 and the smoke exhaust device. The air volume detected by the air volume measurement sensor installed in the opening of the smoke exhaust port facility 3 corresponding to 5 is acquired, the acquired air volume is compared with the upper limit threshold value and the lower limit threshold value, and the acquired air volume is the upper limit threshold value and the lower limit limit. If it is between the thresholds, "normal" is specified as the test result, and if the acquired air volume is above the upper limit threshold value, or if the acquired air volume is below the lower limit threshold value, the test result is "abnormal". To identify. Further, in this case, the test unit 241 may specify the acquired air volume itself as the test result.

(履歴について)
また、上記実施の形態の図5のSA1で行われた試験に関する情報を、試験を行った時間と共に、記録部23に記録するように構成することにより、試験の履歴を蓄積してもよい。
(About history)
Further, the test history may be accumulated by configuring the recording unit 23 to record the information regarding the test performed in SA1 of FIG. 5 of the above embodiment together with the time when the test is performed.

(試験中であることを報知について)
また、上記実施の形態の図5の試験処理が起動された場合に、出力部242が、試験中であることを示す情報を含む試験報知信号を受信機1に送信(出力)するように構成してもよい。このように構成することにより、受信機1側で試験中であることを把握することが可能となる。
(Notification that the test is in progress)
Further, when the test process of FIG. 5 of the above embodiment is activated, the output unit 242 is configured to transmit (output) a test notification signal including information indicating that the test is in progress to the receiver 1. You may. With such a configuration, it becomes possible to grasp that the test is being performed on the receiver 1 side.

(排煙口設備の開閉蓋について)
また、上記実施の形態の図1の排煙口設備3の開閉蓋については、排煙口スイッチ41の押下したことを把握した場合に、排煙設備制御盤2の制御部24が制御する(開く)ように構成してもよい。
(About the opening / closing lid of the smoke exhaust port equipment)
Further, the opening / closing lid of the smoke exhaust port equipment 3 of FIG. 1 of the above embodiment is controlled by the control unit 24 of the smoke exhaust equipment control panel 2 when it is grasped that the smoke exhaust port switch 41 is pressed ( It may be configured to open).

(防排煙処理について(その1))
また、上記実施の形態では、図4のSA1において、排煙口スイッチ4の押下ボタンが押下された場合に、排煙口設備3及び排煙機5を起動するものと判定する場合について説明したが、任意に変更してもよい。例えば、いわゆる感知器からの発報信号を受信した場合に、起動するものと判定するように構成してもよい。
(About smoke prevention treatment (1))
Further, in the above embodiment, in SA1 of FIG. 4, a case where it is determined that the smoke exhaust port equipment 3 and the smoke exhaust device 5 are activated when the press button of the smoke exhaust port switch 4 is pressed has been described. However, it may be changed arbitrarily. For example, it may be configured to be determined to be activated when a notification signal from a so-called sensor is received.

(防排煙処理について(その2))
また、上記実施の形態の防排煙処理について、以下の処理を行うように構成してもよい。具体的には、受信機1がある場所の火災感知器から火災信号(発報信号)を受信したときに、排煙設備制御盤2に火災位置情報(つまり、火災の位置を特定する情報)を転送する。排煙設備制御盤2は、移報受信した火災情報(つまり、受信機1から転送された火災位置情報に対応する情報)を不図示の盤面に表示したり、不図示のスピーカを介して音声警報したりし、また、火災の位置に対応した予め決められた連動対象の防排煙設備を特定し、特定した防排煙設備を作動させる。なお、ここでの、火災の位置に対応した予め決められた連動対象の防排煙設備を特定する手法は任意でるが、例えば、各火災感知器と各防排煙設備との相互間の連動である対応付けを特定する連動テーブルが、排煙設備制御盤2の記録部23に記録されていることとし、当該連動テーブルを参照して、前述の火災信号を出力した火災感知器に対応する防排煙設備を特定する手法を用いてもよい。この場合、排煙設備制御盤2は作動させた防排煙設備を不図示の盤面に表示する。また、排煙設備制御盤2が、作動させた防排煙設備を受信機1に返信して、受信機1でも連動状態(つまり、火災信号を出力した火災感知器に対応する防排煙設備が作動したことを示す情報等)を表示する。なお、前述の排煙設備制御盤2の連動テーブルについては、受信機1側でも表示可能としたり、あるいは、受信機1側でも確認や変更を行ったりすることができるように構成してもよい。
(About smoke prevention treatment (2))
In addition, the smoke prevention treatment of the above embodiment may be configured to perform the following treatment. Specifically, when a fire signal (alarm signal) is received from a fire detector at a location where the receiver 1 is located, fire position information (that is, information for identifying the position of the fire) is displayed on the smoke exhaust equipment control panel 2. To transfer. The smoke exhaust equipment control panel 2 displays the fire information received by the transfer (that is, the information corresponding to the fire position information transferred from the receiver 1) on a panel surface (not shown), or voices through a speaker (not shown). It also gives an alarm, identifies a predetermined smoke prevention equipment to be linked according to the position of the fire, and operates the specified smoke prevention equipment. The method of specifying the smoke prevention / exhaust equipment to be interlocked in advance corresponding to the position of the fire is arbitrary, but for example, the interlocking between each fire detector and each smoke prevention / exhaust equipment is optional. It is assumed that the interlocking table for specifying the correspondence is recorded in the recording unit 23 of the smoke exhaust equipment control panel 2, and the interlocking table is referred to to correspond to the fire detector that outputs the above-mentioned fire signal. A method for identifying smoke control equipment may be used. In this case, the smoke exhaust equipment control panel 2 displays the operated smoke prevention equipment on a panel surface (not shown). Further, the smoke exhaust equipment control panel 2 returns the activated smoke prevention equipment to the receiver 1, and the receiver 1 is also in an interlocking state (that is, the smoke prevention equipment corresponding to the fire detector that outputs the fire signal). Information indicating that has been activated, etc.) is displayed. The interlocking table of the smoke exhaust equipment control panel 2 described above may be configured so that it can be displayed on the receiver 1 side, or can be confirmed or changed on the receiver 1 side as well. ..

(試験処理について(その1))
また、上記実施の形態の試験処理について、受信機1から排煙設備制御盤2へ試験実行指示等を送信するように構成し、当該試験実行指示等を排煙設備制御盤2が受信した場合に実行してもよい。具体的には任意であるが、例えば、受信機1は、自分が管轄している火災検知関係の端末機器(感知器、中継器等)を、定期的(例えば1週間に1回あるいは毎日)且つ自動的に試験して、端末機器の状態を監視しているが、この自動試験タイミング(つまり、端末機器を自動的に試験するタイミング)に、排煙設備制御盤2に自動試験の試験実行指示や結果要求を行うように構成してもよい。この場合、排煙設備制御盤2が試験処理における試験(一例としては、排煙設備制御盤2の試験部241が、動作試験信号(自動試験を開始させるための信号)を排煙口設備3及び排煙機5に送出して行う処理等)を行い、受信機1が、当該試験結果を排煙設備制御盤2から受信して管理する(一例としては、試験結果を記録したり、あるいは、表示出力又は音声出力したりする)ように構成してもよい。
(About test processing (1))
Further, regarding the test process of the above embodiment, when the receiver 1 is configured to transmit a test execution instruction or the like to the smoke exhaust equipment control panel 2, and the smoke exhaust equipment control panel 2 receives the test execution instruction or the like. May be executed. Specifically, although it is optional, for example, the receiver 1 regularly (for example, once a week or every day) the terminal equipment (sensor, repeater, etc.) related to fire detection under its jurisdiction. Moreover, the test is automatically performed and the state of the terminal device is monitored. At this automatic test timing (that is, the timing at which the terminal device is automatically tested), the smoke exhaust equipment control panel 2 is subjected to the automatic test test. It may be configured to give instructions and result requests. In this case, the smoke exhaust equipment control panel 2 performs a test in the test process (for example, the test unit 241 of the smoke exhaust equipment control panel 2 sends an operation test signal (a signal for starting an automatic test) to the smoke exhaust port equipment 3 And the process of sending to the smoke evacuator 5), and the receiver 1 receives the test result from the smoke evacuator control panel 2 and manages it (for example, the test result is recorded or performed. , Display output or audio output).

(試験処理について(その2))
また、上述の「(試験処理について(その1))」のように構成する場合、受信機1は、管轄の端末機器の自動試験結果と、排煙設備制御盤2側が管轄する機器(つまり、排煙口設備3及び排煙機5等の防排煙設備)の自動試験結果を纏めて管理することで、受信機1の表示部で設備全体の状態を閲覧でき、異常になった機器(火災検知用機器(一例としては、前述の端末機器)及び防排煙設備)を受信機1にて防災要員が把握することができる。また、受信機1及び/又は排煙設備制御盤2が、試験結果を、ネットワークを介して外部機関(設備管理会社、メンテナンス会社)に転送し、建物外部からパーソナルコンピュータや携帯端末で確認することができるように構成してもよい。
(About test processing (2))
Further, in the case of the above-mentioned "(test processing (No. 1))", the receiver 1 is the device under the jurisdiction of the smoke exhaust equipment control panel 2 side and the automatic test result of the terminal device under the jurisdiction (that is, the device under the jurisdiction). By collectively managing the automatic test results of the smoke exhaust port equipment 3 and smoke prevention equipment such as the smoke exhaust device 5, the status of the entire equipment can be viewed on the display unit of the receiver 1, and the equipment that has become abnormal (smoke exhaust equipment) The fire detection equipment (for example, the terminal equipment described above) and the smoke prevention equipment) can be grasped by the disaster prevention personnel with the receiver 1. In addition, the receiver 1 and / or the smoke exhaust equipment control panel 2 transfers the test results to an external organization (equipment management company, maintenance company) via the network, and confirms them from outside the building with a personal computer or mobile terminal. It may be configured so that

(施工効率化の効果について)
また、上記実施の形態の防災システム100のように構成した場合、施工時に、例えば防排煙設備が完全に設置されていなくても、受信機1側は独立して管轄機器(つまり、前述の感知器、中継器等の端末機器)の試験を行うことが可能となる。逆に、受信機1の工事が完了していなくても、排煙設備制御盤2にて防排煙設備だけの試験を実行することが可能となる。
(About the effect of improving construction efficiency)
Further, in the case of the disaster prevention system 100 of the above-described embodiment, even if the smoke-proof / exhaust equipment is not completely installed at the time of construction, the receiver 1 side is independently controlled (that is, the above-mentioned device). It is possible to test terminal devices such as detectors and repeaters). On the contrary, even if the construction of the receiver 1 is not completed, it is possible to execute the test of only the smoke prevention equipment on the smoke exhaust equipment control panel 2.

(試験の順次実行について)
また、上記実施の形態の図5のSB1における自動試験機能を用いる試験については、防排煙設備が複数存在する場合、複数ある防排煙設備を順次試験実行して、結果を格納するように構成してもよい。
(About sequential execution of tests)
Further, in the test using the automatic test function in SB1 of FIG. 5 of the above embodiment, when there are a plurality of smoke prevention equipments, the plurality of smoke prevention equipments are sequentially executed and the results are stored. It may be configured.

(自動試験機能について)
また、上記実施の形態では、自動試験機能を用いる試験については、防排煙設備を実際には動作させないで試験を行う場合について説明したが、これに限らず、防排煙設備を実際に動作させて、動作させた時のセンサ出力値(例えば、防排煙設備に既に設けられている各種センサの出力値、あるいは、当該自動試験を行うために設けられた各種センサの出力値等)から機器が正常か異常かを試験するように構成してもよい。
(About automatic test function)
Further, in the above embodiment, as for the test using the automatic test function, the case where the test is performed without actually operating the smoke prevention and exhaust equipment has been described, but the present invention is not limited to this, and the smoke prevention and exhaust equipment is actually operated. From the sensor output value when it is operated (for example, the output value of various sensors already installed in the smoke prevention equipment, or the output value of various sensors provided for performing the automatic test, etc.) It may be configured to test whether the device is normal or abnormal.

(特徴について)
また、実施の形態の特徴及び変形例の特徴を任意に組み合わせてもよい。
(About features)
Further, the features of the embodiment and the features of the modified example may be arbitrarily combined.

(付記)
付記1の防災システムは、防排煙設備と、前記防排煙設備を制御するための制御装置とを備える防災システムであって、前記制御装置は、前記防排煙設備に関する試験を行う試験手段と、前記試験手段による試験に関する情報を示す信号である試験関連信号を、外部装置に対して出力する出力手段と、を備える。
(Additional note)
The disaster prevention system of Appendix 1 is a disaster prevention system including a smoke prevention equipment and a control device for controlling the smoke prevention equipment, and the control device is a test means for performing a test on the smoke prevention equipment. And an output means for outputting a test-related signal, which is a signal indicating information about the test by the test means, to an external device.

付記2の防災システムは、付記1に記載の防災システムにおいて、前記制御装置の前記試験手段は、前記防排煙設備側と前記制御装置側との間の通電に関する試験を行う。 As for the disaster prevention system of Appendix 2, in the disaster prevention system of Appendix 1, the test means of the control device performs a test regarding energization between the smoke prevention equipment side and the control device side.

付記3の防災システムは、付記1又は2に記載の防災システムにおいて、前記制御装置の前記試験手段は、前記防排煙設備の動作に関する試験を行う。 The disaster prevention system of Appendix 3 is the disaster prevention system according to Appendix 1 or 2, wherein the test means of the control device tests the operation of the smoke prevention equipment.

付記4の防災システムは、付記1から3の何れか一項に記載の防災システムにおいて、前記防排煙設備は、複数設けられており、複数の前記防排煙設備の少なくとも一部の防排煙設備には当該少なくとも一部の防排煙設備を識別するための識別情報が設定されており、前記制御装置の前記試験手段は、前記識別情報に基づいて前記少なくとも一部の防排煙設備を識別し、識別結果に基づいて、前記少なくとも一部の防排煙設備に関する試験を行う。 The disaster prevention system of Appendix 4 is the disaster prevention system according to any one of Appendix 1 to 3, wherein a plurality of the smoke prevention / exhaust equipments are provided, and at least a part of the smoke prevention / exhaust equipments is exhausted. Identification information for identifying at least a part of the smoke prevention equipment is set in the smoke equipment, and the test means of the control device uses the identification information to identify at least a part of the smoke prevention equipment. Is identified, and based on the identification result, at least a part of the smoke prevention equipment is tested.

付記5の防災システムは、付記1から4の何れか一項に記載の防災システムにおいて、前記防排煙設備は、少なくとも、排煙口設備、排煙機、給気口設備、給気機、防火シャッター設備、防火防煙ダンパー設備、又は防火戸設備のうちの1つ以上を含む。 The disaster prevention system of Appendix 5 is the disaster prevention system according to any one of Appendix 1 to 4, wherein the smoke prevention / exhaust equipment is at least a smoke exhaust port equipment, a smoke exhaust device, an air supply port equipment, an air supply device, and the like. Includes one or more of fire shutter equipment, fire and smoke damper equipment, or fire door equipment.

付記6の制御装置は、防排煙設備と、前記防排煙設備を制御するための制御装置とを備える防災システムの前記制御装置であって、前記防排煙設備に関する試験を行う試験手段と、前記試験手段による試験に関する情報を示す信号である試験関連信号を、外部装置に対して出力する出力手段と、を備える。 The control device of Appendix 6 is the control device of the disaster prevention system including the smoke prevention equipment and the control device for controlling the smoke prevention equipment, and is a test means for performing a test on the smoke prevention equipment. , An output means for outputting a test-related signal, which is a signal indicating information related to the test by the test means, to an external device.

(付記の効果)
付記1に記載の防災システム、及び付記6に記載の制御装置によれば、防排煙設備に関する試験を行い、試験に関する情報を示す信号である試験関連信号を外部装置に対して出力することにより、例えば、試験を行って防排煙設備の状態を把握することが可能となる。また、例えば、外部装置(一例としては、防災受信機)の他に防排煙設備を制御する制御装置を設けることにより、防排煙設備及び制御装置を施工する工程(例えば、空調設備工事工程)と、外部装置を施工する工程(例えば、電気設備工事工程)に分けることができるので、電気設備工事工程での工数を減少させることが可能となる。
(Effect of appendix)
According to the disaster prevention system described in Appendix 1 and the control device described in Appendix 6, a test related to smoke prevention equipment is performed, and a test-related signal, which is a signal indicating information related to the test, is output to an external device. For example, it is possible to perform a test to grasp the state of the smoke prevention equipment. Further, for example, a process of constructing a smoke prevention equipment and a control device (for example, an air conditioning equipment construction process) by providing a control device for controlling the smoke prevention equipment in addition to an external device (for example, a disaster prevention receiver). ) And the process of constructing the external device (for example, the electrical equipment construction process), so that the number of steps in the electrical equipment construction process can be reduced.

付記2に記載の防災システムによれば、防排煙設備側と制御装置側との間の通電に関する試験を行うことにより、例えば、防排煙設備側と制御装置側との間の通電に関する状態を把握することが可能となる。 According to the disaster prevention system described in Appendix 2, by conducting a test regarding energization between the smoke prevention equipment side and the control device side, for example, a state regarding energization between the smoke prevention equipment side and the control device side. It becomes possible to grasp.

付記3に記載の防災システムによれば、防排煙設備の動作に関する試験を行うことにより、例えば、防排煙設備の動作に関する状態を把握することが可能となる。 According to the disaster prevention system described in Appendix 3, for example, by conducting a test on the operation of the smoke prevention equipment, it is possible to grasp the state of the operation of the smoke prevention equipment.

付記4に記載の防災システムによれば、識別情報に基づいて少なくとも一部の防排煙設備を識別し、識別結果に基づいて、少なくとも一部の防排煙設備に関する試験を行うことにより、例えば、各防排煙設備の状態を個別に把握することが可能となる。 According to the disaster prevention system described in Appendix 4, at least a part of the smoke prevention equipment is identified based on the identification information, and at least a part of the smoke prevention equipment is tested based on the identification result, for example. , It is possible to grasp the state of each smoke prevention and exhaust equipment individually.

付記5に記載の防災システムによれば、防排煙設備は、少なくとも、排煙口設備、排煙機、給気口設備、給気機、防火シャッター設備、防火防煙ダンパー設備、又は防火戸設備のうちの1つ以上を含むことにより、例えば、排煙口設備、排煙機、給気口設備、給気機、防火シャッター設備、防火防煙ダンパー設備、又は防火戸設備のうちの1つ以上の状態を把握することが可能となる。 According to the disaster prevention system described in Appendix 5, the smoke prevention equipment is at least smoke exhaust port equipment, smoke exhaust device, air supply port equipment, air supply machine, fire shutter equipment, fire prevention smoke prevention damper equipment, or fire door. By including one or more of the equipment, for example, one of a smoke exhaust port equipment, a smoke exhaust machine, an air supply port equipment, an air supply machine, a fire shutter equipment, a fire and smoke prevention damper equipment, or a fire door equipment. It is possible to grasp one or more states.

1 受信機
2 排煙設備制御盤
3 排煙口設備
4 排煙口スイッチ
5 排煙機
21 通信部
22 接続部
23 記録部
24 制御部
31 排煙口設備
32 排煙口設備
33 排煙口設備
41 排煙口スイッチ
42 排煙口スイッチ
43 排煙口スイッチ
51 排煙機
52 排煙機
100 防災システム
241 試験部
242 出力部
1 Receiver 2 Smoke exhaust facility control panel 3 Smoke exhaust port equipment 4 Smoke exhaust port switch 5 Smoke exhaust device 21 Communication unit 22 Connection unit 23 Recording unit 24 Control unit 31 Smoke exhaust port equipment 32 Smoke exhaust port equipment 33 Smoke exhaust port equipment 41 Smoke exhaust port switch 42 Smoke exhaust port switch 43 Smoke exhaust port switch 51 Smoke exhauster 52 Smoke exhauster 100 Disaster prevention system 241 Test unit 242 Output unit

Claims (6)

防排煙設備と、前記防排煙設備を制御するための制御装置とを備える防災システムであって、
前記制御装置は、
前記防排煙設備に関する試験を行う試験手段と、
前記試験手段による試験に関する情報を示す信号である試験関連信号を、外部装置に対して出力する出力手段と、を備える、
防災システム。
It is a disaster prevention system including a smoke prevention equipment and a control device for controlling the smoke prevention equipment.
The control device is
Test means for conducting tests on the smoke prevention equipment and
It includes an output means for outputting a test-related signal, which is a signal indicating information related to the test by the test means, to an external device.
Disaster prevention system.
前記制御装置の前記試験手段は、前記防排煙設備側と前記制御装置側との間の通電に関する試験を行う、
請求項1に記載の防災システム。
The test means of the control device performs a test regarding energization between the smoke prevention equipment side and the control device side.
The disaster prevention system according to claim 1.
前記制御装置の前記試験手段は、前記防排煙設備の動作に関する試験を行う、
請求項1又は2に記載の防災システム。
The test means of the control device performs a test regarding the operation of the smoke prevention equipment.
The disaster prevention system according to claim 1 or 2.
前記防排煙設備は、複数設けられており、
複数の前記防排煙設備の少なくとも一部の防排煙設備には当該少なくとも一部の防排煙設備を識別するための識別情報が設定されており、
前記制御装置の前記試験手段は、前記識別情報に基づいて前記少なくとも一部の防排煙設備を識別し、識別結果に基づいて、前記少なくとも一部の防排煙設備に関する試験を行う、
請求項1から3の何れか一項に記載の防災システム。
A plurality of the smoke prevention equipments are provided.
Identification information for identifying at least a part of the smoke prevention equipment is set in at least a part of the smoke prevention equipment.
The test means of the control device identifies at least a part of the smoke prevention equipment based on the identification information, and tests the at least a part of the smoke prevention equipment based on the identification result.
The disaster prevention system according to any one of claims 1 to 3.
前記防排煙設備は、少なくとも、排煙口設備、排煙機、給気口設備、給気機、防火シャッター設備、防火防煙ダンパー設備、又は防火戸設備のうちの1つ以上を含む、
請求項1から4の何れか一項に記載の防災システム。
The smoke prevention equipment includes at least one or more of smoke exhaust port equipment, smoke exhaust device, air supply port equipment, air supply machine, fire shutter equipment, fire and smoke prevention damper equipment, or fire door equipment.
The disaster prevention system according to any one of claims 1 to 4.
防排煙設備と、前記防排煙設備を制御するための制御装置とを備える防災システムの前記制御装置であって、
前記防排煙設備に関する試験を行う試験手段と、
前記試験手段による試験に関する情報を示す信号である試験関連信号を、外部装置に対して出力する出力手段と、を備える、
制御装置。
The control device of a disaster prevention system including a smoke prevention equipment and a control device for controlling the smoke prevention equipment.
Test means for conducting tests on the smoke prevention equipment and
It includes an output means for outputting a test-related signal, which is a signal indicating information related to the test by the test means, to an external device.
Control device.
JP2019063092A 2019-03-28 2019-03-28 Disaster prevention system and controller Pending JP2020157014A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2019063092A JP2020157014A (en) 2019-03-28 2019-03-28 Disaster prevention system and controller
JP2023176465A JP2023178355A (en) 2019-03-28 2023-10-12 disaster prevention system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019063092A JP2020157014A (en) 2019-03-28 2019-03-28 Disaster prevention system and controller

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2023176465A Division JP2023178355A (en) 2019-03-28 2023-10-12 disaster prevention system

Publications (1)

Publication Number Publication Date
JP2020157014A true JP2020157014A (en) 2020-10-01

Family

ID=72640677

Family Applications (2)

Application Number Title Priority Date Filing Date
JP2019063092A Pending JP2020157014A (en) 2019-03-28 2019-03-28 Disaster prevention system and controller
JP2023176465A Pending JP2023178355A (en) 2019-03-28 2023-10-12 disaster prevention system

Family Applications After (1)

Application Number Title Priority Date Filing Date
JP2023176465A Pending JP2023178355A (en) 2019-03-28 2023-10-12 disaster prevention system

Country Status (1)

Country Link
JP (2) JP2020157014A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07284544A (en) * 1994-04-18 1995-10-31 Nohmi Bosai Ltd Sprinkler firefighting equipment
JP2001175978A (en) * 1999-12-20 2001-06-29 Hochiki Corp Check system
JP2005122490A (en) * 2003-10-16 2005-05-12 Nohmi Bosai Ltd Fire alarm equipment
JP2011104335A (en) * 2009-10-23 2011-06-02 Shimizu Corp Smoke extraction system and multistory building having the same
JP2014071660A (en) * 2012-09-28 2014-04-21 Nohmi Bosai Ltd Inspection support system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07284544A (en) * 1994-04-18 1995-10-31 Nohmi Bosai Ltd Sprinkler firefighting equipment
JP2001175978A (en) * 1999-12-20 2001-06-29 Hochiki Corp Check system
JP2005122490A (en) * 2003-10-16 2005-05-12 Nohmi Bosai Ltd Fire alarm equipment
JP2011104335A (en) * 2009-10-23 2011-06-02 Shimizu Corp Smoke extraction system and multistory building having the same
JP2014071660A (en) * 2012-09-28 2014-04-21 Nohmi Bosai Ltd Inspection support system

Also Published As

Publication number Publication date
JP2023178355A (en) 2023-12-14

Similar Documents

Publication Publication Date Title
USRE50005E1 (en) Systems and methods for detecting events based on wireless signal degredation
US11985214B2 (en) Universal protocol translator
US11235187B2 (en) Systems and methods for detecting building conditions based on wireless signal degradation
US8676390B2 (en) Universal remote machinery controller and monitor
US8077026B2 (en) Technician communications for automated building protection systems
CA2968502C (en) Systems and methods for addressably programming a notification safety device
US20170025892A1 (en) Smart Power Node
CN103400481B (en) A kind of detection method for fire control alarm leakage system and system thereof and device
CN104101053A (en) Air conditioner monitoring method, device and system
JP2021532511A (en) Electrical safety devices and systems
EP2973481A1 (en) Methods for inspecting and testing notification appliances in alarm systems
US8063763B2 (en) System for testing NAC operability using reduced operating voltage
US11137159B2 (en) Fire notification device with integrated environmental node sensor
US20140266676A1 (en) Method for self-testing notification appliances in alarm systems
KR101932136B1 (en) System for total monitoring of fire protection system
US9361785B2 (en) System and method for testing battery backup capacities in alarm systems
AU2018354716A1 (en) Fire detection system, automatic data capture, remote testing, analysis, apparatus and methods
JP2015231185A (en) Emergency broadcast facility
JP2020157014A (en) Disaster prevention system and controller
JP2018112951A (en) Fire alarm system
KR101241582B1 (en) Remote control system of local surveillance cctv equipments
CN114253800A (en) Edge diagnosis method, device, equipment and storage medium
CN103576008A (en) Electronic device capable of indicating hardware fault through sound, and method
KR20180085287A (en) Refrigerator and method for controlling the same
JP6548012B2 (en) Receiving machine

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20220217

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20221031

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20221101

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20221213

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230322

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230420

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20230801

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20231012

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20231019

A912 Re-examination (zenchi) completed and case transferred to appeal board

Free format text: JAPANESE INTERMEDIATE CODE: A912

Effective date: 20231117