JP2020133310A - Construction method of post-construction anchor - Google Patents

Construction method of post-construction anchor Download PDF

Info

Publication number
JP2020133310A
JP2020133310A JP2019030297A JP2019030297A JP2020133310A JP 2020133310 A JP2020133310 A JP 2020133310A JP 2019030297 A JP2019030297 A JP 2019030297A JP 2019030297 A JP2019030297 A JP 2019030297A JP 2020133310 A JP2020133310 A JP 2020133310A
Authority
JP
Japan
Prior art keywords
anchor
holding device
construction
hole
grout
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2019030297A
Other languages
Japanese (ja)
Inventor
駿 蛭田
Shun Hiruta
駿 蛭田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Mitsui Construction Co Ltd
Original Assignee
Sumitomo Mitsui Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Mitsui Construction Co Ltd filed Critical Sumitomo Mitsui Construction Co Ltd
Priority to JP2019030297A priority Critical patent/JP2020133310A/en
Publication of JP2020133310A publication Critical patent/JP2020133310A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)
  • Reinforcement Elements For Buildings (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

To provide a construction method of a post-construction anchor capable of filling grout deep into a hole and capable of installing an anchor bar at a predetermined position in a hole.SOLUTION: A holding device 10 attached to a tip portion of a rod-like anchor bar 20 slidably along the anchor bar 20 and holding the anchor bar 20 is pressed into a hole bottom 4 of an anchor hole 3 that is formed in advance on a construction face 2 together with the anchor bar 20 (S2). Grout g is injected between the hole bottom 4 and the holding device 10 from an injection hole 13 provided in the holding device 10 (S3). When, by injecting the grout g, the holding device 10 slides in the anchor hole 3 to reach the construction face 2, injection of the grout g is stopped (S5). After the grout g is hardened, the holding device 10 is removed from the construction face 2 (S6).SELECTED DRAWING: Figure 5

Description

本発明は、コンクリート構造体にアンカー筋を設置するあと施工アンカー施工方法に関する。 The present invention relates to a post-construction anchor construction method for installing anchor bars in a concrete structure.

従来よりコンクリート構造体に孔が空けられ、孔内にアンカー筋がグラウトにより固定される施工が行われている。例えば、特許文献1には、躯体側面に穿孔して、当該孔にグラウト材を充填し、排出口が形成された円環状の底部と、当該底部の周縁に沿って立設された壁部と、を備える型枠を、躯体側面上に穿孔を覆うように取り付け、アンカー筋を、型枠の底部を貫通して穿孔に所定の深さまで押し込んで、余分なグラウト材を排出口から排出させ、グラウト材が硬化した後に、型枠を撤去するあと施工アンカー施工方法が開示されている。 Conventionally, holes have been made in the concrete structure, and anchor bars have been fixed in the holes by grout. For example, Patent Document 1 describes an annular bottom portion in which a side surface of a skeleton is perforated and a grout material is filled in the holes to form a discharge port, and a wall portion erected along the peripheral edge of the bottom portion. A formwork with, is mounted on the side surface of the skeleton so as to cover the perforation, and an anchor bar is pushed through the bottom of the formwork into the perforation to a predetermined depth to expel excess grout material from the outlet. A post-construction anchor construction method for removing the formwork after the grout material has hardened is disclosed.

特開2016−130388号公報Japanese Unexamined Patent Publication No. 2016-13388

しかしながら、上記技術では、穿孔の奥までグラウトが充填されたか否か等の充填具合の管理が難しく、さらに、先に充填したグラウトの反発等によって、アンカー筋がうまく挿入できない等の問題があった。 However, with the above technique, it is difficult to control the filling condition such as whether or not the grout is filled to the depth of the perforation, and further, there is a problem that the anchor muscle cannot be inserted well due to the repulsion of the previously filled grout. ..

そこで、本発明は上記の問題点等に鑑みて為されたもので、その課題の一例は、孔の奥までグラウトを充填でき、かつ、アンカー筋を、孔内の所定位置に設置できるようにするあと施工アンカー施工方法を提供することを目的とする。 Therefore, the present invention has been made in view of the above problems and the like, and one example of the problem is that the grout can be filled deep into the hole and the anchor bar can be installed at a predetermined position in the hole. Post-construction The purpose is to provide an anchor construction method.

上記の課題を解決するために、請求項1に記載の発明は、棒状のアンカー筋に沿ってスライド可能に当該アンカー筋の先端部に取り付けられた、前記アンカー筋を保持する保持装置を、施工面に予め形成されたアンカー孔の孔底まで前記アンカー筋と共に押し込む押込ステップと、前記保持装置に設けられた注入孔から、前記孔底と前記保持装置との間にグラウトを注入する注入ステップと、前記グラウトの注入により前記保持装置が前記アンカー孔をスライドして前記施工面まで達したところで、前記グラウトの注入を止める注入中止ステップと、前記グラウトが硬化した後、前記施工面から前記保持装置を取り外す取外ステップと、を含むことを特徴とする。 In order to solve the above problems, the invention according to claim 1 constructs a holding device for holding the anchor bar, which is slidably attached to the tip of the anchor bar so as to be slidable along the rod-shaped anchor bar. A pushing step of pushing together with the anchor muscle to the bottom of an anchor hole formed in advance on the surface, and an injection step of injecting grout between the bottom of the hole and the holding device from an injection hole provided in the holding device. When the holding device slides the anchor hole to reach the construction surface by the injection of the grout, the injection stop step of stopping the injection of the grout and the holding device from the construction surface after the grout is cured. It is characterized by including a removal step for removing.

また、請求項2に記載の発明は、請求項1に記載のあと施工アンカー施工方法において、前記保持装置が、空気抜きの空気孔を更に有し、前記押込ステップにおいて、前記空気孔から空気を抜きながら、前記保持装置を押し込み、前記注入ステップにおいて、前記空気孔から前記グラウトが漏れ出た後に、前記空気孔を塞ぐことを特徴とする。 Further, in the invention according to claim 2, in the post-construction anchor construction method according to claim 1, the holding device further has an air vent for air venting, and air is vented from the air hole in the pushing step. However, the holding device is pushed in, and in the injection step, after the ground leaks from the air holes, the air holes are closed.

また、請求項3に記載の発明は、請求項2に記載のあと施工アンカー施工方法において、前記空気孔に空気管が取り付けられたことを特徴とする。 Further, the invention according to claim 3 is characterized in that an air pipe is attached to the air hole in the post-construction anchor construction method according to claim 2.

また、請求項4に記載の発明は、請求項1から3のいずれか1項に記載のあと施工アンカー施工方法において、硬化後の前記グラウトから前記保持装置を取り外すための剥離手段を前記保持装置の面に施したことを特徴とする。 Further, in the invention according to claim 4, in the post-construction anchor construction method according to any one of claims 1 to 3, the holding device is provided with a peeling means for removing the holding device from the cured grout. It is characterized by being applied to the surface of.

また、請求項5に記載の発明は、請求項1から4のいずれか1項に記載のあと施工アンカー施工方法において、前記保持装置の前記アンカー筋とのスライド面、および、前記保持装置の前記アンカー孔とのスライド面に、前記保持装置が、前記グラウトの漏れを止める止水手段を有することを特徴とする。 Further, the invention according to claim 5 is the slide surface of the holding device with the anchor bar and the holding device according to the post-construction anchor construction method according to any one of claims 1 to 4. The holding device has a water blocking means for stopping the leakage of the grout on the sliding surface with the anchor hole.

また、請求項6に記載の発明は、請求項1から5のいずれか1項に記載のあと施工アンカー施工方法において、前記保持装置が、前記アンカー孔とのスライド性能が変化するスライド可変手段を有することを特徴とする。 Further, the invention according to claim 6 is a slide variable means in which the holding device changes the sliding performance with the anchor hole in the post-construction anchor construction method according to any one of claims 1 to 5. It is characterized by having.

また、請求項7に記載の発明は、請求項1から5のいずれか1項に記載のあと施工アンカー施工方法において、前記アンカー筋を前記施工面側で保持する施工面用保持装置を取り付けることを特徴とする。 Further, the invention according to claim 7 is to attach a construction surface holding device for holding the anchor bar on the construction surface side in the post-construction anchor construction method according to any one of claims 1 to 5. It is characterized by.

本発明によれば、棒状のアンカー筋に沿ってスライド可能に当該アンカー筋の先端部に取り付けられた、アンカー筋を保持する保持装置を、施工面に予め形成されたアンカー孔の孔底までアンカー筋と共に押し込み、保持装置に設けられた注入孔から、孔底と保持装置との間にグラウトを注入し、グラウトの注入により保持装置がアンカー孔をスライドして施工面まで達したところで、グラウトの注入を止め、グラウトが硬化した後、施工面から保持装置を取り外すことにより、孔の奥までグラウトを充填でき、かつ、アンカー筋を、孔内の所定位置に設置できる。 According to the present invention, a holding device for holding an anchor muscle, which is slidably attached to the tip of the anchor muscle along a rod-shaped anchor muscle, is anchored to the bottom of an anchor hole formed in advance on the construction surface. Push in together with the streaks, inject grout between the bottom of the hole and the holding device from the injection hole provided in the holding device, and when the holding device slides the anchor hole to reach the construction surface by injecting the grout, the grout After the injection is stopped and the grout is hardened, the grout can be filled deep into the hole by removing the holding device from the construction surface, and the anchor bar can be installed at a predetermined position in the hole.

本実施形態に係る保持装置を模式的に示す斜視図である。It is a perspective view which shows typically the holding device which concerns on this embodiment. 図1における保持装置を模式的に示す平面図である。It is a top view which shows typically the holding device in FIG. 保持装置のアンカー筋への取り付けを示す説明図である。It is explanatory drawing which shows the attachment to the anchor muscle of a holding device. 保持装置のアンカー筋への取り付けを示す説明図である。It is explanatory drawing which shows the attachment to the anchor muscle of a holding device. 既存コンクリート構造体に形成されたアンカー孔を模式的に示す縦断側面図である。It is a vertical sectional side view which shows typically the anchor hole formed in the existing concrete structure. 実施形態に係るあと施工アンカーの施工手順のフローチャートである。It is a flowchart of the construction procedure of the post-construction anchor which concerns on embodiment. 実施形態に係るあと施工アンカーの施工手順の説明図である。It is explanatory drawing of the construction procedure of the post-construction anchor which concerns on embodiment. 実施形態に係るあと施工アンカーの施工手順の説明図である。It is explanatory drawing of the construction procedure of the post-construction anchor which concerns on embodiment. 実施形態に係るあと施工アンカーの施工手順の説明図である。It is explanatory drawing of the construction procedure of the post-construction anchor which concerns on embodiment. 実施形態に係るあと施工アンカーの施工手順の説明図である。It is explanatory drawing of the construction procedure of the post-construction anchor which concerns on embodiment. 実施形態に係るあと施工アンカーの施工手順の説明図である。It is explanatory drawing of the construction procedure of the post-construction anchor which concerns on embodiment. 実施形態に係るあと施工アンカーの施工手順の説明図である。It is explanatory drawing of the construction procedure of the post-construction anchor which concerns on embodiment. 実施形態に係るあと施工アンカーの施工手順の説明図である。It is explanatory drawing of the construction procedure of the post-construction anchor which concerns on embodiment. 保持装置の第1変形例を示す模式図である。It is a schematic diagram which shows the 1st modification of a holding device. 保持装置の第1変形例を示す模式図である。It is a schematic diagram which shows the 1st modification of a holding device. 保持装置の第2変形例を示す模式図である。It is a schematic diagram which shows the 2nd modification of a holding device. 保持装置の第3変形例を模式的に示す平面図である。It is a top view which shows typically the 3rd modification of the holding device.

以下、図面を参照して本発明の実施形態について説明する。なお、以下に説明する実施の形態は、保持装置に対して本発明を適用した場合の実施形態である。 Hereinafter, embodiments of the present invention will be described with reference to the drawings. The embodiment described below is an embodiment when the present invention is applied to the holding device.

[1.保持装置の構成および機能概要]
まず、本発明の一実施形態に係る保持装置の構成および概要機能について、図1から図4を用いて説明する。
[1. Outline of holding device configuration and functions]
First, the configuration and outline function of the holding device according to the embodiment of the present invention will be described with reference to FIGS. 1 to 4.

図1は、本実施形態に係る保持装置を模式的に示す斜視図である。図2は、図1における保持装置を模式的に示す平面図である。図3Aは、保持装置のアンカー筋への取り付けを示す説明図である。図3Bは、保持装置のアンカー筋への取り付けを示す説明図である。図4は、既存コンクリート構造体に形成されたアンカー孔を模式的に示す縦断側面図である。 FIG. 1 is a perspective view schematically showing a holding device according to the present embodiment. FIG. 2 is a plan view schematically showing the holding device in FIG. FIG. 3A is an explanatory view showing attachment of the holding device to the anchor bar. FIG. 3B is an explanatory view showing attachment of the holding device to the anchor bar. FIG. 4 is a longitudinal side view schematically showing an anchor hole formed in an existing concrete structure.

図1および図2に示すように、本実施形態に係る保持装置10は、アンカー筋20を保持するための保持孔11と、空気を抜くための空気孔12と、グラウトを注入するための注入孔13とを有する。 As shown in FIGS. 1 and 2, the holding device 10 according to the present embodiment has a holding hole 11 for holding the anchor muscle 20, an air hole 12 for removing air, and an injection for injecting grout. It has a hole 13.

図3Aおよび図3Bに示すように、保持装置10の保持孔11は、アンカー筋20の先端部を保持する。空気孔12には、空気を抜くためのエア抜き管p1(空気管の一例)が取り付けられる。注入孔13には、グラウトを注入する注入ガンを接続するための注入管p2が取り付けられる。エア抜き管p1および注入管p2は、例えば、可撓性のチューブやホース、または、硬質なパイプである。 As shown in FIGS. 3A and 3B, the holding hole 11 of the holding device 10 holds the tip of the anchor muscle 20. An air bleeding pipe p1 (an example of an air pipe) for bleeding air is attached to the air hole 12. An injection tube p2 for connecting an injection gun for injecting grout is attached to the injection hole 13. The air bleeding pipe p1 and the injection pipe p2 are, for example, a flexible tube or hose, or a hard pipe.

保持装置10は、アンカー孔に挿入可能な形状を有する。例えば、図4に示すように、既存コンクリート構造体1の施工面2に、コアドリル等により、円形に空けられたアンカー孔3の場合、保持装置10は、円柱形を有し、アンカー孔3の大きさ程度の外径である。保持装置10の外側である円柱面は、アンカー孔3と接するスライド面になる。 The holding device 10 has a shape that can be inserted into the anchor hole. For example, as shown in FIG. 4, in the case of an anchor hole 3 formed in a circle on the construction surface 2 of the existing concrete structure 1 by a core drill or the like, the holding device 10 has a cylindrical shape, and the anchor hole 3 has a cylindrical shape. The outer diameter is about the size. The cylindrical surface outside the holding device 10 becomes a sliding surface in contact with the anchor hole 3.

また、保持装置10は、中心部分にアンカー筋20の横断面形状の保持孔11を有するリング形状になる。例えば、アンカー筋20の横断面形状が円形の場合、保持孔11は、アンカー筋20の横断面形状の大きさ程度の円形の孔である。保持孔11は、アンカー筋20と接するスライド面になる。 Further, the holding device 10 has a ring shape having a holding hole 11 having a cross-sectional shape of the anchor bar 20 in the central portion. For example, when the cross-sectional shape of the anchor bar 20 is circular, the holding hole 11 is a circular hole about the size of the cross-sectional shape of the anchor bar 20. The holding hole 11 becomes a sliding surface in contact with the anchor muscle 20.

保持装置10は、アンカー孔3と接する保持装置10の外側のスライド面、および、アンカー筋20と接する保持装置10の内側のスライド面からグラウトが漏れなく、アンカー孔3内をスライドでき、棒状のアンカー筋20に沿ってスライドできる材質が好ましい。この材質は、グラウトの漏れを止める止水手段の一例で、例えば、ゴム、スポンジ等の軟質の材質が好ましい。また、アンカー筋20が、リブや節等の凹凸を備えた異形鉄筋の場合、アンカー筋20の表面の形状に合わせて、保持装置10の内側が変形して、アンカー筋20に沿ってスライドできる材質が好ましい。また、保持装置10の外側は、アンカー孔の内壁面の凹凸があっても、グラウトの漏れを防止し、アンカー孔の内壁をスライドできる材質が好ましい。 The holding device 10 can slide inside the anchor hole 3 without leaking grout from the outer sliding surface of the holding device 10 in contact with the anchor hole 3 and the inner sliding surface of the holding device 10 in contact with the anchor muscle 20, and has a rod shape. A material that can slide along the anchor bar 20 is preferable. This material is an example of a water stopping means for stopping the leakage of grout, and for example, a soft material such as rubber or sponge is preferable. Further, when the anchor bar 20 is a deformed reinforcing bar having irregularities such as ribs and knots, the inside of the holding device 10 is deformed according to the shape of the surface of the anchor bar 20 and can slide along the anchor bar 20. The material is preferred. Further, the outer surface of the holding device 10 is preferably made of a material that can prevent the grout from leaking and slide the inner wall of the anchor hole even if the inner wall surface of the anchor hole is uneven.

また、空気孔12に取り付けられたエア抜き管p1が抜かれると、空気孔12が塞がれて、グラウトが漏れ出なくなるような機能を、保持装置10は有してもよい。例えば、保持装置10に弾力性があり、エア抜き管p1が抜かれると空気孔12が塞がる構造である。 Further, the holding device 10 may have a function of closing the air hole 12 and preventing the grout from leaking when the air bleeding pipe p1 attached to the air hole 12 is pulled out. For example, the holding device 10 has elasticity, and the air hole 12 is closed when the air vent pipe p1 is pulled out.

グラウトは、例えば無収縮モルタル、合成樹脂等である。グラウトは、注入ガンにセットされ、注入管p2および注入孔13を介して注入される。 The grout is, for example, non-shrink mortar, synthetic resin, or the like. The grout is set in the injection gun and injected through the injection tube p2 and the injection hole 13.

[2.あと施工アンカーの施工手順]
次に、既存コンクリート構造体に、アンカー筋を施工する作業手順ついて、図を用いて説明する。
[2. Post-construction anchor construction procedure]
Next, the work procedure for constructing the anchor reinforcement on the existing concrete structure will be described with reference to the drawings.

図5は、実施形態に係るあと施工アンカーの施工手順のフローチャートである。図6Aから図6Gは、実施形態に係るあと施工アンカーの施工手順の説明図である。 FIG. 5 is a flowchart of a post-construction anchor construction procedure according to the embodiment. 6A to 6G are explanatory views of the construction procedure of the post-construction anchor according to the embodiment.

先ず、図4に示すように、既存コンクリート構造体1に、施工面2に対して、コアドリル、ハンマードリル等のドリルで、孔底4まで、所定の深さのアンカー孔3を空ける。施工面2に対してアンカー孔3が形成される。保持装置10が、スライドしやすいようにアンカー孔3内を清掃してもよい。 First, as shown in FIG. 4, an anchor hole 3 having a predetermined depth is drilled in the existing concrete structure 1 with a drill such as a core drill or a hammer drill on the construction surface 2 up to the hole bottom 4. Anchor holes 3 are formed with respect to the construction surface 2. The inside of the anchor hole 3 may be cleaned so that the holding device 10 can easily slide.

図5に示すように、保持装置10がアンカー筋20に取り付けられる(ステップS1)。例えば、図3Aおよび図3Bに示すように、アンカー筋20の先端部が、保持装置10の保持孔11に挿入される。 As shown in FIG. 5, the holding device 10 is attached to the anchor bar 20 (step S1). For example, as shown in FIGS. 3A and 3B, the tip of the anchor muscle 20 is inserted into the holding hole 11 of the holding device 10.

なお、グラウトgが触れる保持装置10の面に、グラウトgから剥がれやすいように、グリス等の剥離剤が塗られたり、剥離材が貼られたりしてもよい。 The surface of the holding device 10 to which the grout g touches may be coated with a release agent such as grease or a release material may be attached so that the surface of the holding device 10 can be easily peeled off from the grout g.

このように、硬化後のグラウトgから保持装置10を取り外すための剥離手段を保持装置10の面に施す作業が行われてもよい。 In this way, the work of applying the peeling means for removing the holding device 10 from the cured grout g to the surface of the holding device 10 may be performed.

次に、アンカー孔3の孔底4に保持装置10が当たるまで、アンカー筋20が取り付けられた保持装置10が押し込まれる(ステップS2)。例えば、図6Aに示すように、アンカー筋20の先端部と反対の端が作業者の手に持たれ、作業者が保持装置10とアンカー筋20とを、アンカー孔3に押し込む。図6Bに示すように、アンカー孔3の孔底4まで、保持装置10が押し込まれる。このとき、孔底4と保持装置10との間の空気が、空気孔12からエア抜き管p1を介して、排出される。空気が排出されることにより、保持装置10が孔底4まで押し込みやすくなり、孔底4と保持装置10とが密接しやすくなる。 Next, the holding device 10 to which the anchor bar 20 is attached is pushed in until the holding device 10 hits the hole bottom 4 of the anchor hole 3 (step S2). For example, as shown in FIG. 6A, the end opposite to the tip of the anchor bar 20 is held in the operator's hand, and the worker pushes the holding device 10 and the anchor bar 20 into the anchor hole 3. As shown in FIG. 6B, the holding device 10 is pushed to the bottom 4 of the anchor hole 3. At this time, the air between the hole bottom 4 and the holding device 10 is discharged from the air hole 12 through the air vent pipe p1. By discharging the air, the holding device 10 is easily pushed to the hole bottom 4, and the hole bottom 4 and the holding device 10 are easily brought into close contact with each other.

このように、棒状のアンカー筋20に沿ってスライド可能に当該アンカー筋20の先端部に取り付けられた、アンカー筋20を保持する保持装置10を、施工面2に予め形成されたアンカー孔3の孔底4までアンカー筋20と共に押し込む作業が行われる。また、空気孔12から空気を抜きながら、保持装置10を押し込む作業が行われてもよい。 In this way, the holding device 10 for holding the anchor bar 20 attached to the tip of the anchor bar 20 so as to be slidable along the rod-shaped anchor bar 20 is provided in the anchor hole 3 formed in advance on the construction surface 2. The work of pushing the hole bottom 4 together with the anchor bar 20 is performed. Further, the work of pushing the holding device 10 may be performed while removing air from the air holes 12.

次に、グラウトgが注入される(ステップS3)。例えば、図6Bに示すように、注入ガンにより、グラウトgが、注入管p2を介して、注入孔13から、孔底4と保持装置10との間に注入される。図6Cに示すように、グラウトgの注入圧力により、保持装置10が、アンカー筋20に沿って、アンカー孔3をスライドし始める。なお、グラウトgが、グラウトポンプで注入されてもよい。 Next, grout g is injected (step S3). For example, as shown in FIG. 6B, the grout g is injected from the injection hole 13 between the hole bottom 4 and the holding device 10 via the injection tube p2 by the injection gun. As shown in FIG. 6C, the injection pressure of the grout g causes the holding device 10 to start sliding the anchor hole 3 along the anchor muscle 20. The grout g may be injected by a grout pump.

このように、保持装置10に設けられた注入孔13から、孔底4と保持装置10との間にグラウトgを注入する作業が行われる。 In this way, the work of injecting grout g between the hole bottom 4 and the holding device 10 is performed from the injection hole 13 provided in the holding device 10.

次に、エア抜き管p1からのグラウトgの漏出確認後、空気孔12を塞ぐ(ステップS4)。図6Cに示すように、グラウトgの注入圧力により、孔底4と保持装置10との間を充満したグラウトgが、保持装置10の空気孔12からエア抜き管p1を介して、漏れ出てくる。エア抜き管p1からのグラウトgが漏れ出るのを確認したら、空気孔12を塞ぐ。例えば、エア抜き管p1を塞いだり、エア抜き管p1を抜くことで保持装置10の弾力で空気孔12を塞いだりする。 Next, after confirming the leakage of grout g from the air bleeding pipe p1, the air hole 12 is closed (step S4). As shown in FIG. 6C, the grout g that fills the space between the hole bottom 4 and the holding device 10 due to the injection pressure of the grout g leaks from the air hole 12 of the holding device 10 through the air bleeding pipe p1. come. After confirming that the grout g leaks from the air bleeding pipe p1, the air hole 12 is closed. For example, the air bleeding pipe p1 is closed, or the air hole 12 is closed by the elasticity of the holding device 10 by pulling out the air bleeding pipe p1.

このように、空気孔12からグラウトgが漏れ出た後に、空気孔12を塞ぐ作業が行われてもよい。 In this way, after the grout g leaks from the air hole 12, the work of closing the air hole 12 may be performed.

図6Dおよび図6Eに示すように、アンカー筋20がアンカー孔3に残ったまま、グラウトgの注入圧力により、保持装置10が、アンカー筋20に沿ってアンカー孔3内を施工面2の方に、グラウトgの注入に合わせてスライドしていく。 As shown in FIGS. 6D and 6E, the holding device 10 moves the inside of the anchor hole 3 along the anchor bar 20 toward the construction surface 2 by the injection pressure of the grout g while the anchor bar 20 remains in the anchor hole 3. Then, slide along with the injection of grout g.

次に、施工面2に保持装置10が達したところで注入を止める(ステップS5)。図6Fに示すように、保持装置10が施工面2に達したところで、グラウトgの注入を止める。注入管p2が外され、保持装置10が施工面2に残されたまま、グラウトgに対する型枠の機能を有する。 Next, the injection is stopped when the holding device 10 reaches the construction surface 2 (step S5). As shown in FIG. 6F, when the holding device 10 reaches the construction surface 2, the injection of grout g is stopped. The injection pipe p2 is removed, and the holding device 10 remains on the construction surface 2 and has the function of a formwork for the grout g.

このように、グラウトgの注入により保持装置10がアンカー孔3をスライドして施工面2まで達したところで、グラウトgの注入を止める作業が行われる。 In this way, when the holding device 10 slides the anchor hole 3 to reach the construction surface 2 due to the injection of the grout g, the work of stopping the injection of the grout g is performed.

次に、グラウトgの硬化後、保持装置10を外す(ステップS6)。図6Gに示すように、キャップの役割をしていた保持装置10が、施工面2から外される。 Next, after the grout g is cured, the holding device 10 is removed (step S6). As shown in FIG. 6G, the holding device 10 that has served as a cap is removed from the construction surface 2.

次に、施工面2に処理を行う(ステップS7)。保持装置10があったところには、金具を嵌めたり、シーリング処理をしたりする。 Next, the construction surface 2 is processed (step S7). A metal fitting is fitted or a sealing process is performed where the holding device 10 is located.

上記一連の作業を、機械が行ってもよい。また、注入作業において、使用するグラウトgの重量、粘性等のグラウトgの性質に応じて、グラウトポンプの圧力を調節してもよい。また、保持装置10とアンカー孔3面の摩擦、スライド具合に応じて、グラウトポンプの圧力を調節してもよい。 The machine may perform the above series of operations. Further, in the injection operation, the pressure of the grout pump may be adjusted according to the properties of the grout g such as the weight and viscosity of the grout g used. Further, the pressure of the grout pump may be adjusted according to the friction between the holding device 10 and the three anchor holes and the sliding condition.

以上説明したように、実施形態に係るあと施工アンカー施工方法によれば、棒状のアンカー筋20に沿ってスライド可能にアンカー筋20の先端部に取り付けられた、アンカー筋20を保持する保持装置10を、施工面2に予め形成されたアンカー孔3の孔底4までアンカー筋20と共に押し込み、保持装置10に設けられた注入孔13から、孔底4と保持装置10との間にグラウトgを注入し、グラウトgの注入により保持装置10がアンカー孔3をスライドして施工面2まで達したところで、グラウトgの注入を止め、グラウトgが硬化した後、施工面2から保持装置10を取り外すことにより、アンカー孔3の奥までグラウトgを充填でき、かつ、アンカー筋20を、アンカー孔3内の所定位置に設置できる。特に、アンカー孔3の中心部分にアンカー筋を設置できる。 As described above, according to the post-construction anchor construction method according to the embodiment, the holding device 10 for holding the anchor bar 20 is slidably attached to the tip of the anchor bar 20 along the rod-shaped anchor bar 20. Is pushed together with the anchor bar 20 to the hole bottom 4 of the anchor hole 3 formed in advance on the construction surface 2, and the grout g is inserted between the hole bottom 4 and the holding device 10 from the injection hole 13 provided in the holding device 10. When the holding device 10 slides the anchor hole 3 to reach the construction surface 2 by injecting the grout g, the injection of the grout g is stopped, and after the grout g is cured, the holding device 10 is removed from the construction surface 2. As a result, the grout g can be filled to the depth of the anchor hole 3, and the anchor muscle 20 can be installed at a predetermined position in the anchor hole 3. In particular, an anchor bar can be installed in the central portion of the anchor hole 3.

保持装置10が、施工面2付近に残り蓋として機能するので、アンカー孔が横向きでも、上向きでも施工可能である。 Since the holding device 10 functions as a remaining lid near the construction surface 2, the anchor hole can be constructed sideways or upward.

保持装置10が、空気抜きの空気孔12を更に有し、空気孔12から空気を抜きながら保持装置10を押し込み、空気孔12からグラウトgが漏れ出た後に、空気孔12を塞ぐ場合、アンカー孔3の奥までグラウトgを、より充填できる。 When the holding device 10 further has an air vent 12 for venting air, pushes the holding device 10 while bleeding air from the air hole 12, and closes the air hole 12 after the grout g leaks from the air hole 12, the anchor hole Grout g can be further filled to the depth of 3.

空気孔12にエア抜き管p1が取り付けられた場合、アンカー孔3の外からグラウトgの充填が確認しやすくなる。なお、エア抜き管p1の長さは、少なくともアンカー孔3の深さより長いことが好ましい。 When the air bleeding pipe p1 is attached to the air hole 12, it becomes easy to confirm the filling of the grout g from the outside of the anchor hole 3. The length of the air bleeding pipe p1 is preferably at least longer than the depth of the anchor hole 3.

硬化後のグラウトgから保持装置10を取り外すための剥離手段を保持装置10の面に施した場合、硬化したグラウトgから保持装置10を容易に取り外すことができる。 When the surface of the holding device 10 is provided with a peeling means for removing the holding device 10 from the cured grout g, the holding device 10 can be easily removed from the cured grout g.

[3.保持装置10の変形例]
次に、保持装置10の変形例について図を用いて説明する。
図7Aおよび図7Bは、保持装置10の第1変形例を示す模式図である。
[3. Modification example of holding device 10]
Next, a modified example of the holding device 10 will be described with reference to the drawings.
7A and 7B are schematic views showing a first modification of the holding device 10.

図7Aおよび図7Bに示すように、アンカー筋20を施工面2付近で保持する保持装置30を更に備えてもよい。保持装置30は、保持装置10とほぼ同じ構成を有するが、アンカー孔3内をスライドしなくてもよいので、アンカー孔3と接する保持装置30の外側は異なる構成でもよい。なお、図においてエア抜き管p1は、省略してある。 As shown in FIGS. 7A and 7B, a holding device 30 for holding the anchor bar 20 in the vicinity of the construction surface 2 may be further provided. The holding device 30 has substantially the same configuration as the holding device 10, but since it is not necessary to slide inside the anchor hole 3, the outside of the holding device 30 in contact with the anchor hole 3 may have a different configuration. In the figure, the air bleeding pipe p1 is omitted.

保持装置10がアンカー孔3の孔底4まで押し込まれ、グラウトgが注入管p2から注入されると、図7Aおよび図7Bに示すように、保持装置10は、アンカー筋20に沿ってアンカー孔3内をスライドするが、保持装置30は、グラウトgの圧力を受けないので施工面2付近で動かない。保持装置10がスライドしているとき、保持装置30の空気孔からは、保持装置10および保持装置30間の空気が排出される。 When the holding device 10 is pushed to the bottom 4 of the anchor hole 3 and the grout g is injected from the injection tube p2, the holding device 10 has the anchor hole along the anchor muscle 20 as shown in FIGS. 7A and 7B. Although it slides in 3, the holding device 30 does not move near the construction surface 2 because it does not receive the pressure of the grout g. When the holding device 10 is sliding, air between the holding device 10 and the holding device 30 is discharged from the air holes of the holding device 30.

保持装置10が施工面2に達するまでグラウトgが注入される。このとき、保持装置30が、保持装置10により押されてアンカー筋20をスライドして施工面2の外へ押し出されてもよい。 Grout g is injected until the holding device 10 reaches the construction surface 2. At this time, the holding device 30 may be pushed by the holding device 10 and slide the anchor bar 20 to be pushed out of the construction surface 2.

アンカー筋20を施工面2側で保持する施工面2用の保持装置30を取り付ける場合、保持装置10および保持装置30により、アンカー筋20を保持するので、アンカー筋20がよりアンカー孔3の中心軸付近に設置されやすくなる。 When the holding device 30 for the construction surface 2 that holds the anchor bar 20 on the construction surface 2 side is attached, the anchor bar 20 is held by the holding device 10 and the holding device 30, so that the anchor bar 20 is more centered on the anchor hole 3. It will be easier to install near the shaft.

次に、保持装置10の第2変形例について図を用いて説明する。
図8は、保持装置10の第2変形例を示す模式図である。
Next, a second modification of the holding device 10 will be described with reference to the drawings.
FIG. 8 is a schematic view showing a second modification of the holding device 10.

図8に示すように、保持装置10よりも、アンカー筋20の長軸方向に長い本体を備える保持装置10Aでもよい。施工面用保持装置の一例である保持装置10Aは、保持装置30のような機能も有する。保持装置10Aが、アンカー筋20が長いので、アンカー筋2がよりアンカー孔3の中心軸付近に設置されやすくなる。 As shown in FIG. 8, a holding device 10A having a main body longer than the holding device 10 in the long axis direction of the anchor bar 20 may be used. The holding device 10A, which is an example of the holding device for the construction surface, also has a function like the holding device 30. Since the anchor bar 20 is long in the holding device 10A, the anchor bar 2 is more easily installed near the central axis of the anchor hole 3.

次に、保持装置の第3変形例について図を用いて説明する。
図9は、保持装置の第3変形例を模式的に示す平面図である。
Next, a third modification of the holding device will be described with reference to the drawings.
FIG. 9 is a plan view schematically showing a third modification of the holding device.

図9に示すように、保持装置10Bの外側のスライド面または内側のスライド面に、保持装置10は、グラウトgを止水できる止水部b1、b2を備えてもよい。止水手段の一例である止水部b1、b2は、例えば、ブラシやスポンジ等である。止水性を高めるためブラシが複数段、アンカー筋20の長軸方向に並んでいてもよい。硬い保持装置10B本体に、可撓性の止水部b1、b2が設置されていてもよい。 As shown in FIG. 9, the holding device 10 may be provided with water stopping portions b1 and b2 capable of stopping the grout g on the outer sliding surface or the inner sliding surface of the holding device 10B. The water-stopping portions b1 and b2, which are examples of the water-stopping means, are, for example, brushes and sponges. In order to improve the water stopping property, the brushes may be arranged in a plurality of stages in the long axis direction of the anchor muscle 20. Flexible water-stopping portions b1 and b2 may be installed on the rigid holding device 10B main body.

保持装置10Bのアンカー筋20とのスライド面、および、保持装置10Bのアンカー孔3とのスライド面に、保持装置10Bが、グラウトgの漏れを止める止水部b1、b2を有する場合、グラウトgの漏れを、より防止することができる。特に、ブラシやスポンジのように止水部b1、b2が可撓性の場合、アンカー筋20の面に凹凸があったり、アンカー孔3の面に凹凸があっても、グラウトgの漏れを止めながら、保持装置10Bがスライドしやすくなる。 When the holding device 10B has water stopping portions b1 and b2 for stopping the leakage of the grout g on the sliding surface of the holding device 10B with the anchor bar 20 and the sliding surface of the holding device 10B with the anchor hole 3, the grout g Leakage can be further prevented. In particular, when the water blocking portions b1 and b2 are flexible like a brush or sponge, even if the surface of the anchor muscle 20 is uneven or the surface of the anchor hole 3 is uneven, the leakage of grout g is stopped. However, the holding device 10B becomes easy to slide.

なお、保持装置10の変形例として、空気等でより膨らむ材質でもよい。この場合、例えば、アンカー筋20の先端部に、リング形状の保持装置の中心部に挿入して、空気等により膨らませて取り付ける。十分膨らませていない保持装置10が孔底4まで押し込まれた後、グラウトgを止水でき、かつ、スライドできる程度まで保持装置10を膨らませる。膨らませることにより、保持装置のスライド性能が変化する。 As a modification of the holding device 10, a material that is more inflated by air or the like may be used. In this case, for example, it is inserted into the tip of the anchor bar 20 into the central portion of the ring-shaped holding device, and is inflated with air or the like to be attached. After the holding device 10 that has not been sufficiently inflated is pushed to the bottom 4 of the hole, the holding device 10 is inflated to the extent that the grout g can be stopped and slidable. By inflating, the sliding performance of the holding device changes.

保持装置が、アンカー孔3とのスライド性能が変化するスライド可変手段を有する場合、例えば、押し込む際に保持装置をアンカー孔に挿入され易くするために、スライド性能を高め、注入する際にはグラウトを止水できる程度にスライド性能を落とすことで、押し込みやすくなる。また、アンカー孔の内壁の状態によって、保持装置の大きさを調整できるので、施工しやすくなる。 When the holding device has a slide variable means for changing the sliding performance with the anchor hole 3, for example, in order to facilitate the holding device to be inserted into the anchor hole when pushing, the sliding performance is enhanced, and when injecting, the grout is performed. By lowering the slide performance to the extent that the water can be stopped, it becomes easier to push. In addition, the size of the holding device can be adjusted according to the condition of the inner wall of the anchor hole, which facilitates construction.

さらに、本発明は、上記各実施形態に限定されるものではない。上記各実施形態は、例示であり、本発明の特許請求の範囲に記載された技術的思想と実質的に同一な構成を有し、同様な作用効果を奏するものは、いかなるものであっても本発明の技術的範囲に包含される。 Furthermore, the present invention is not limited to each of the above embodiments. Each of the above embodiments is an example, and any one having substantially the same configuration as the technical idea described in the claims of the present invention and exhibiting the same action and effect may be used. It is included in the technical scope of the present invention.

2:施工面、3:アンカー孔、4:孔底、10:保持装置、20:アンカー筋、g:グラウト
2: Construction surface, 3: Anchor hole, 4: Hole bottom, 10: Holding device, 20: Anchor muscle, g: Grout

Claims (7)

棒状のアンカー筋に沿ってスライド可能に当該アンカー筋の先端部に取り付けられた、前記アンカー筋を保持する保持装置を、施工面に予め形成されたアンカー孔の孔底まで前記アンカー筋と共に押し込む押込ステップと、
前記保持装置に設けられた注入孔から、前記孔底と前記保持装置との間にグラウトを注入する注入ステップと、
前記グラウトの注入により前記保持装置が前記アンカー孔をスライドして前記施工面まで達したところで、前記グラウトの注入を止める注入中止ステップと、
前記グラウトが硬化した後、前記施工面から前記保持装置を取り外す取外ステップと、
を含むことを特徴とするあと施工アンカー施工方法。
Pushing the holding device for holding the anchor bar, which is slidably attached to the tip of the anchor bar along the rod-shaped anchor bar, together with the anchor bar to the bottom of the anchor hole formed in advance on the construction surface. Steps and
An injection step of injecting grout between the bottom of the hole and the holding device from an injection hole provided in the holding device.
When the holding device slides the anchor hole by the injection of the grout and reaches the construction surface, the injection stop step of stopping the injection of the grout and the injection stop step.
After the grout has hardened, the removal step of removing the holding device from the construction surface and
Post-construction anchor construction method characterized by including.
請求項1に記載のあと施工アンカー施工方法において、
前記保持装置が、空気抜きの空気孔を更に有し、
前記押込ステップにおいて、前記空気孔から空気を抜きながら、前記保持装置を押し込み、
前記注入ステップにおいて、前記空気孔から前記グラウトが漏れ出た後に、前記空気孔を塞ぐことを特徴とするあと施工アンカー施工方法。
In the post-construction anchor construction method according to claim 1,
The holding device further has an air vent for air vents.
In the pushing step, the holding device is pushed in while removing air from the air holes.
A post-construction anchor construction method characterized in that, in the injection step, after the grout leaks from the air holes, the air holes are closed.
請求項2に記載のあと施工アンカー施工方法において、
前記空気孔に空気管が取り付けられたことを特徴とするあと施工アンカー施工方法。
In the post-construction anchor construction method according to claim 2,
A post-construction anchor construction method characterized in that an air pipe is attached to the air hole.
請求項1から3のいずれか1項に記載のあと施工アンカー施工方法において、
硬化後の前記グラウトから前記保持装置を取り外すための剥離手段を前記保持装置の面に施したことを特徴とするあと施工アンカー施工方法。
In the post-construction anchor construction method according to any one of claims 1 to 3,
A post-construction anchor construction method, characterized in that the surface of the holding device is provided with a peeling means for removing the holding device from the cured grout.
請求項1から4のいずれか1項に記載のあと施工アンカー施工方法において、
前記保持装置の前記アンカー筋とのスライド面、および、前記保持装置の前記アンカー孔とのスライド面に、前記保持装置が、前記グラウトの漏れを止める止水手段を有することを特徴とするあと施工アンカー施工方法。
In the post-construction anchor construction method according to any one of claims 1 to 4,
Post-construction, characterized in that the holding device has a water stopping means for stopping the leakage of the grout on the sliding surface of the holding device with the anchor bar and the sliding surface of the holding device with the anchor hole. Anchor construction method.
請求項1から5のいずれか1項に記載のあと施工アンカー施工方法において、
前記保持装置が、前記アンカー孔とのスライド性能が変化するスライド可変手段を有することを特徴とするあと施工アンカー施工方法。
In the post-construction anchor construction method according to any one of claims 1 to 5,
A post-construction anchor construction method, wherein the holding device has a slide variable means for changing the slide performance with the anchor hole.
請求項1から5のいずれか1項に記載のあと施工アンカー施工方法において、
前記アンカー筋を前記施工面側で保持する施工面用保持装置を取り付けることを特徴とするあと施工アンカー施工方法。
In the post-construction anchor construction method according to any one of claims 1 to 5,
A post-construction anchor construction method, characterized in that a construction surface holding device for holding the anchor bar on the construction surface side is attached.
JP2019030297A 2019-02-22 2019-02-22 Construction method of post-construction anchor Pending JP2020133310A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019030297A JP2020133310A (en) 2019-02-22 2019-02-22 Construction method of post-construction anchor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019030297A JP2020133310A (en) 2019-02-22 2019-02-22 Construction method of post-construction anchor

Publications (1)

Publication Number Publication Date
JP2020133310A true JP2020133310A (en) 2020-08-31

Family

ID=72262530

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019030297A Pending JP2020133310A (en) 2019-02-22 2019-02-22 Construction method of post-construction anchor

Country Status (1)

Country Link
JP (1) JP2020133310A (en)

Similar Documents

Publication Publication Date Title
EP3128105B1 (en) Method for injecting injection filler into concrete structure and syringe therefor
JP2016089404A (en) Grout method for cast-in-place concrete pile
US10352016B2 (en) Method and apparatus for sealing and structurally renewing a wall of a manhole
JP2016145466A (en) Exhaust drainage/injection hose and tunnel crown construction method using the same
JP2020133310A (en) Construction method of post-construction anchor
JP2017082478A (en) Anchor pin, installation method thereof and anchor pin installation structure
JP6110156B2 (en) Construction method of high bearing capacity pile
JP4530378B2 (en) Seismic reinforcement method for masonry wall and masonry wall reinforcement used therefor
JP7081940B2 (en) Micro pile method using a gap blocker
JP5485810B2 (en) Injection method and equipment
KR101771670B1 (en) Grouting apparatus and method of the same
JP4336169B2 (en) How to install rock bolts
JP5973931B2 (en) Construction method of high bearing capacity pile
KR101122139B1 (en) A cylindrical removable packer with opened entrance and soil nailing method with the same
JP6068285B2 (en) Post-installation anchor fixing method
JP3032773U (en) Pipe for injection of ground improvement material
JP5026829B2 (en) Seismic reinforcement facilities and methods for seismic reinforcement of masonry walls
JP6634251B2 (en) Pile foundation structure, ready-made pile burying device, method of constructing pile foundation structure using said ready-made pile burying device
JP7216230B2 (en) Gap blocker used in the micropile construction method
JP3016452U (en) Waterstop injection tool
JP2017048645A (en) Pipe for injecting filler into reinforcement joint sleeve
JP2017048586A (en) Method for injecting chemical fluid in artesian groundwater
JP2004339883A (en) Injecting hose apparatus for concrete construction
JP5752822B2 (en) Filler leakage prevention device
JP2015021369A (en) Pile