JP2019165566A - Management apparatus, method, program and management system - Google Patents

Management apparatus, method, program and management system Download PDF

Info

Publication number
JP2019165566A
JP2019165566A JP2018052255A JP2018052255A JP2019165566A JP 2019165566 A JP2019165566 A JP 2019165566A JP 2018052255 A JP2018052255 A JP 2018052255A JP 2018052255 A JP2018052255 A JP 2018052255A JP 2019165566 A JP2019165566 A JP 2019165566A
Authority
JP
Japan
Prior art keywords
power
building
demand
supply
demander
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2018052255A
Other languages
Japanese (ja)
Inventor
加奈子 池田
Kanako Ikeda
加奈子 池田
滝沢 大二郎
Daijiro Takizawa
大二郎 滝沢
秀和 斉藤
Hidekazu Saito
秀和 斉藤
賢 華山
Ken Hanayama
賢 華山
修司 仲山
Shuji Nakayama
修司 仲山
恵一 井口
Keiichi Iguchi
恵一 井口
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Honda Motor Co Ltd
Original Assignee
Honda Motor Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Honda Motor Co Ltd filed Critical Honda Motor Co Ltd
Priority to JP2018052255A priority Critical patent/JP2019165566A/en
Publication of JP2019165566A publication Critical patent/JP2019165566A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

To provide a management apparatus, method, program and management system for operating power equipment while paying consideration to the surroundings.SOLUTION: A management apparatus according to the present invention is provided with: acquisition means for acquiring activity information of a building of a second power supplier/consumer in the proximity of a building of a first power supplier/consumer; and setting means for setting an operation mode of power equipment provided in the building of the first power supplier/consumer on the basis of the activity information. The activity information is information showing whether the user of the building of the second power supplier/consumer is present or absent in the building of the second power supplier/consumer.SELECTED DRAWING: Figure 5

Description

本発明は、電力需給者の電力機器の管理技術に関する。   The present invention relates to a technology for managing power equipment of a power supplier and demander.

電力市場における電力需要量の要求を満たすよう、地域に分散する複数の需給者の電力源(リソース)を取りまとめるリソースアグリゲータが知られている。リソースアグリゲータによる電力量を制御する仕組みは、例えばデマンドレスポンス(DR)として知られており、需給者は、そのような仕組みに参加することでアグリゲータから報酬を得ることができる(非特許文献1)。   There is known a resource aggregator that collects power sources (resources) of a plurality of suppliers and demands distributed in a region so as to satisfy the demand for power demand in the power market. A mechanism for controlling the amount of power by the resource aggregator is known as demand response (DR), for example, and a demander can obtain a reward from the aggregator by participating in such a mechanism (Non-patent Document 1). .

“エネルギー・リソース・アグリゲーション・ビジネスについて”、インターネット(URL:http://www.meti.go.jp/committee/kenkyukai/energy_environment/energy_resource/pdf/001_04_00.pdf)“About Energy Resource Aggregation Business”, Internet (URL: http://www.meti.go.jp/committee/kenkyukai/energy_environment/energy_resource/pdf/001_04_00.pdf)

エンジン発電機などの電力機器はその稼働により騒音や振動等、周辺環境に影響を与える場合がある。デマンドレスポンスに対応するために無条件に需給者が電力機器を稼働させた場合には、周辺住民に対する配慮に欠ける場合がある。   Power equipment such as engine generators may affect the surrounding environment, such as noise and vibration, depending on the operation. When a demander unconditionally operates a power device in order to respond to a demand response, consideration for surrounding residents may be lacking.

本発明は、周囲に配慮しつつ電力機器を稼働することにある。   It is an object of the present invention to operate a power device while considering the surroundings.

本発明によれば、例えば、
第一の電力需給者の建物に近接する第二の電力需給者の建物の活動情報を取得する取得手段と、
前記活動情報に基づいて前記第一の電力需給者の建物に備えられた電力機器の稼働態様を設定する設定手段と、を備える、
ことを特徴とする管理装置が提供される。
According to the present invention, for example,
An acquisition means for acquiring activity information of the building of the second electricity supplier / demander adjacent to the building of the first electricity supplier / demander;
Setting means for setting the operation mode of the power equipment provided in the building of the first power supplier and demand based on the activity information,
The management apparatus characterized by this is provided.

本発明によれば、周囲に配慮しつつ電力機器を稼働することができる。   According to the present invention, it is possible to operate a power device while considering the surroundings.

本発明の一実施形態に係る管理システムを適用したVPPの例を示す概要図。The schematic diagram showing the example of VPP to which the management system concerning one embodiment of the present invention is applied. 需給者設備及び管理装置のブロック図。The block diagram of a supplier-demand facility and a management apparatus. 管理データの例を示す図。The figure which shows the example of management data. 制御例を示すフローチャート。The flowchart which shows the example of control. 制御例を示すフローチャート。The flowchart which shows the example of control. 別の制御例を示すフローチャート。The flowchart which shows another control example. 別の管理データの例を示す図。The figure which shows the example of another management data. 別の制御例を示すフローチャート。The flowchart which shows another control example. 別の需給者設備のブロック図。The block diagram of another supplier-demand facility. 別の制御例を示すフローチャート。The flowchart which shows another control example.

<第一実施形態>
<概要>
図1は本発明の一実施形態に係る管理システム1を含むVPP(バーチャルパワープラント)の例を示す概要図である。VPPは、通信網100、電気事業者101及び電力網102を含む。電気事業者101とは、例えば大規模発電所を有する系統電力事業者であり、需給者への売電や、余剰電力の買電を行い得る。図示の電気事業者101は、電力網102と共に電力系統を構成する配電設備、送電設備、変電設備等の設備を指す概念としても用いられている。図示の電気事業者101はまた、データ通信のための通信網100(例えばインターネット)に接続され、売買電等を管理するサーバを含む概念としても用いられている。
<First embodiment>
<Overview>
FIG. 1 is a schematic diagram showing an example of a VPP (virtual power plant) including a management system 1 according to an embodiment of the present invention. The VPP includes a communication network 100, an electric power company 101, and a power network 102. The electric power company 101 is, for example, a grid power power company having a large-scale power plant, and can sell power to supply and demand or purchase surplus power. The illustrated electric utility company 101 is also used as a concept indicating facilities such as power distribution equipment, power transmission equipment, and substation equipment that constitute an electric power system together with the power network 102. The illustrated electric utility company 101 is also used as a concept including a server that is connected to a communication network 100 (for example, the Internet) for data communication and manages power purchase and sale.

管理システム1は、需給設備3A〜3E(区別しない場合は需給設備3と呼ぶ。)が備えるエネルギリソースの電力をVPP上で運用するアグリゲータである。管理システム1は、管理装置2と、複数の需給設備3と、を含む。管理装置2は、需給設備3が備えるエネルギリソースを運用する管理サーバとして機能するサーバコンピュータである。管理装置2と需給設備3とは通信網100により通信可能に接続されている。   The management system 1 is an aggregator that operates the power of energy resources included in the supply and demand facilities 3A to 3E (referred to as the supply and demand facility 3 if not distinguished) on the VPP. The management system 1 includes a management device 2 and a plurality of supply and demand facilities 3. The management device 2 is a server computer that functions as a management server that operates energy resources included in the supply and demand facility 3. The management device 2 and the supply and demand facility 3 are connected to each other via a communication network 100 so that they can communicate with each other.

需給設備3とは、電力網102から供給される電力を消費する機能と、電力網102へ電力を供給する機能の少なくともいずれかの機能を有する設備を意味し、需給者とは電力網102から供給される電力を消費するか、電力網102へ電力を供給するかの少なくともいずれかを行う人物を意味する。   The supply and demand facility 3 means a facility having at least one of a function of consuming power supplied from the power network 102 and a function of supplying power to the power network 102, and a demand and supply facility is supplied from the power network 102. It means a person who consumes power or supplies power to the power network 102.

図示の例では需給設備3A〜3Eの5つの需給設備が示されているが、多数の需給設備が管理システム1を構成し得る。需給設備3の所有者は需給者である。図1では需給設備3A〜3Eに設けられた建物の地理的な位置関係を模式的に示している。図示の例では、需給設備3が設けられている建物として住宅を想定しており、建物の使用者としてその居住者を想定している。需給者は居住者であり、需給者の家族も居住者となり得る。   In the example shown in the figure, five supply and demand facilities, that is, the supply and demand facilities 3 </ b> A to 3 </ b> E are shown, but a large number of supply and demand facilities can constitute the management system 1. The owner of the supply and demand equipment 3 is a supply and demand person. In FIG. 1, the geographical positional relationship of the buildings provided in the supply and demand facilities 3A to 3E is schematically shown. In the illustrated example, a house is assumed as a building where the supply and demand equipment 3 is provided, and a resident is assumed as a user of the building. The supply and demand person is a resident, and the family of the supply and demand person can also be a resident.

本実施形態は、需給設備3における電気機器の稼働に際して発生する騒音、臭い、振動といった環境負荷が近隣の需給者に与える影響を抑制する仕組みを提供するものである。この仕組みは、これに同意する需給者の間で実現される。したがって、管理システム1を構成する需給設備3の需給者はこの仕組みに同意していることを前提としている。   The present embodiment provides a mechanism that suppresses the influence of environmental loads such as noise, odor, and vibration generated upon operation of electrical equipment in the supply and demand facility 3 on nearby supply and demand. This mechanism is realized among the supply and demand who agree. Therefore, it is assumed that the supply and demand person of the supply and demand equipment 3 constituting the management system 1 agrees with this mechanism.

環境負荷の影響を抑制する適用対象となる、近接する建物の範囲は、環境負荷が及び得る範囲、例えば、数十メートル以内の範囲である。図示の例では、需給設備3Aの建物と需給設備3Bの建物とは近接した建物に該当し、また、需給設備3Bの建物と需給設備3Cの建物とは近接した建物に該当することが想定されている。需給設備3Aの建物と需給設備3Dの建物とは近接した建物に該当しないことが想定されている。また、例えば、需給設備3Dの建物や、需給設備3Eの建物は、他のいずれの需給設備3の建物とも近接していないことが想定されている。   The range of adjacent buildings to be applied to suppress the influence of the environmental load is a range that the environmental load can reach, for example, a range of several tens of meters or less. In the example shown in the figure, it is assumed that the building of the supply and demand equipment 3A and the building of the supply and demand equipment 3B correspond to the adjacent buildings, and the building of the supply and demand equipment 3B and the buildings of the supply and demand equipment 3C correspond to the adjacent buildings. ing. It is assumed that the building of the supply and demand equipment 3A and the building of the supply and demand equipment 3D do not correspond to the adjacent buildings. Further, for example, it is assumed that the building of the supply and demand facility 3D and the building of the supply and demand facility 3E are not close to any other building of the supply and demand facility 3.

<管理システムの構成>
図2を参照して管理システム1の構成について説明する。同図は、管理装置2及び需給設備3の各ブロック図である。
<Configuration of management system>
The configuration of the management system 1 will be described with reference to FIG. FIG. 3 is a block diagram of the management device 2 and the supply and demand equipment 3.

管理装置2は、処理部21、記憶部22、I/F部23を含む。処理部21はCPUに代表されるプロセッサであり、記憶部22に記憶されたプログラムを実行する。記憶部22は、RAM、ROM、ハードディスクなどの記憶デバイスであり、処理部21が実行するプログラムや、各種のデータを記憶する。I/F部33は、外部デバイスと処理部21との信号の送受信を中継するインタフェースである。I/F部23には、通信網100を介した通信用の通信インタフェースが含まれる。管理装置2は、通信網100を介して各需給設備3を遠隔制御可能である。   The management device 2 includes a processing unit 21, a storage unit 22, and an I / F unit 23. The processing unit 21 is a processor typified by a CPU, and executes a program stored in the storage unit 22. The storage unit 22 is a storage device such as a RAM, a ROM, and a hard disk, and stores programs executed by the processing unit 21 and various data. The I / F unit 33 is an interface that relays signal transmission / reception between the external device and the processing unit 21. The I / F unit 23 includes a communication interface for communication via the communication network 100. The management device 2 can remotely control each supply and demand facility 3 via the communication network 100.

需給設備3は、制御装置30と、電力機器33と、蓄電池34と、活動検知センサ35とを含む。   The supply and demand facility 3 includes a control device 30, a power device 33, a storage battery 34, and an activity detection sensor 35.

電力機器33は、管理装置2の指示により稼働させる対象となる機器であり、電力を消費する機器、電力を供給する機器(発電又は放電する機器)、もしくは、電力の消費と供給との双方が可能な機器である。具体的には、例えば、電動車両、空調機器、照明機器、家電機器、太陽光パネル、エンジン発電機、大容量バッテリ、燃料電池等である。電動車両は、電動自動車、ハイブリッド自動車、電動二輪車等である。こうした移動可能な電力機器や可搬式の電力機器は需要設備3に対して着脱自在に接続され得る。図示の例では電力機器33は一つであるが複数設けられてもよい。   The power device 33 is a device to be operated in accordance with an instruction from the management device 2, and includes a device that consumes power, a device that supplies power (a device that generates or discharges power), or both consumption and supply of power. It is a possible device. Specifically, for example, there are an electric vehicle, an air conditioner, a lighting device, a home appliance, a solar panel, an engine generator, a large capacity battery, a fuel cell, and the like. The electric vehicle is an electric vehicle, a hybrid vehicle, an electric motorcycle, or the like. Such movable power equipment and portable power equipment can be detachably connected to the demand facility 3. In the illustrated example, there is one power device 33, but a plurality of power devices 33 may be provided.

蓄電池34は、例えばリチウムイオンバッテリ等の二次電池であり、本実施形態の場合、余剰電力を蓄電するために用いられることを想定している。電力機器33が蓄電池34に代わる二次電池を内蔵している場合、蓄電池34を設けない構成も採用可能である。   The storage battery 34 is a secondary battery such as a lithium ion battery, for example. In the case of this embodiment, it is assumed that the storage battery 34 is used to store surplus power. When the electric power device 33 has a built-in secondary battery that replaces the storage battery 34, a configuration in which the storage battery 34 is not provided may be employed.

活動検知センサ35は、需給設備3が設けられた建物の使用者の活動状態を検知するセンサであり、本実施形態の場合、需給設備3が設けられた住宅に居住者が不在か在宅かを検知するセンサである。具体的には、住宅内の騒音を検知する騒音計、住宅内の振動を検知する振動計、住宅内の消費電力を検知する電力計等、居住者の不在、在宅を検知結果に基づいて推定できるセンサであればよい。   The activity detection sensor 35 is a sensor that detects the activity state of the user of the building where the supply and demand equipment 3 is provided. In the case of this embodiment, whether the resident is absent or at home in the house where the supply and demand equipment 3 is provided. It is a sensor to detect. Specifically, the presence of a resident is estimated based on the detection results, such as a sound level meter that detects house noise, a vibration meter that detects house vibration, and a power meter that detects power consumption in the house. Any sensor can be used.

例えば、騒音計であれば生活音の程度を検知して居住者の不在、在宅を推定できる。また、振動計であれば住宅内の居住者の移動により生じる振動の程度を検知して居住者の不在、在宅を推定できる。また、電力計であれば消費電力の程度を検知して居住者の不在、在宅を推定できる。   For example, a sound level meter can detect the level of daily life sounds and estimate the absence of a resident and staying at home. Moreover, if it is a vibrometer, the absence of a resident and being at home can be estimated by detecting the degree of vibration caused by the movement of the resident in the house. Moreover, if it is a power meter, the absence of a resident and staying at home can be estimated by detecting the level of power consumption.

制御装置30は、需給設備3が設けられた建物内における電力制御を行う装置であり、制御ユニット31と電力回路32とを含む。制御ユニット31は、処理部31a、記憶部31b、I/F(インタフェース)部31cを含む。処理部31aはCPUに代表されるプロセッサであり、記憶部31bに記憶されたプログラムを実行する。記憶部31bは、RAM、ROM、ハードディスクなどの記憶デバイスであり、処理部31aが実行するプログラムや、各種のデータを記憶する。I/F部31cは、外部デバイスと処理部31aとの信号の送受信を中継するインタフェースである。I/F部31cには、入出力インタフェース、通信インタフェースが含まれる。通信インタフェースには、通信網100を介した通信用のインタフェースが含まれる。   The control device 30 is a device that performs power control in the building where the supply and demand equipment 3 is provided, and includes a control unit 31 and a power circuit 32. The control unit 31 includes a processing unit 31a, a storage unit 31b, and an I / F (interface) unit 31c. The processing unit 31a is a processor typified by a CPU, and executes a program stored in the storage unit 31b. The storage unit 31b is a storage device such as a RAM, a ROM, and a hard disk, and stores programs executed by the processing unit 31a and various data. The I / F unit 31c is an interface that relays signal transmission / reception between the external device and the processing unit 31a. The I / F unit 31c includes an input / output interface and a communication interface. The communication interface includes an interface for communication via the communication network 100.

電力回路32は、電力網102から供給される電力を電力機器33に利用可能に、又は、蓄電池34に充電可能な電力に変換し、また、電力機器33又は蓄電池34から電力網102へ電力を変換して送電する送受電回路である。電力回路32には、例えば、双方向DC/DCコンバータや双方向インバータが含まれる。双方向DC/DCコンバータは、直流電力の電圧変換を行い、双方向インバータは交流電力と直流電力との変換を行う。制御ユニット31は電力回路32を制御して、電力網102上の交流電力を直流電力に変換して蓄電池34に給電(充電)したり、電力網102上の交流電力を、電力機器33の仕様に応じて交流電力で、或いは、直流電力に変換して給電する。また、制御ユニット31は電力回路32を制御して、蓄電池34の放電電力や電力機器33が供給する電力を、電力網102の交流電力に整合させて電力網102に送電(放電)する。   The power circuit 32 converts the power supplied from the power network 102 into power that can be used by the power device 33 or can be charged to the storage battery 34, and converts the power from the power device 33 or the storage battery 34 to the power network 102. Power transmission / reception circuit for transmitting power. The power circuit 32 includes, for example, a bidirectional DC / DC converter and a bidirectional inverter. The bidirectional DC / DC converter performs voltage conversion of DC power, and the bidirectional inverter converts AC power and DC power. The control unit 31 controls the power circuit 32 to convert the AC power on the power network 102 to DC power and supply (charge) the storage battery 34, or to change the AC power on the power network 102 according to the specifications of the power device 33. Then, power is supplied with AC power or converted to DC power. The control unit 31 also controls the power circuit 32 to transmit (discharge) the discharge power of the storage battery 34 and the power supplied by the power device 33 to the power network 102 so as to match the AC power of the power network 102.

<データベース>
図3は管理装置2の記憶部22に蓄積されるデータベースの例を示している。同図の例は、需給者や需給設備3を管理する管理情報である。「需給者ID」は需給者を特定する識別子であり、需給設備3を特定する識別子でもある。「所在地」は需給設備3が設けられた建物の地理的な位置の情報である。
<Database>
FIG. 3 shows an example of a database stored in the storage unit 22 of the management apparatus 2. The example of the figure is management information for managing the supply / demand and the supply / demand equipment 3. “Supplier / Supplier ID” is an identifier that identifies the demand / supplyer, and is also an identifier that identifies the supply / demand facility 3. “Location” is information on the geographical position of the building where the supply and demand equipment 3 is provided.

「近接需給者」は、「需給者ID」で特定される需給者の建物に、建物が近接している別の需給者を特定する情報であり、別の需給者は「需給者ID」で特定されている。例えば、図示の例では「需給者ID」がF0001の需給者の建物には、「需給者ID」がA8056の需給者の建物に近接していることが示されている。また、図示の例では「需給者ID」がF0002の需給者の建物には、「需給者ID」がV0022の需給者の建物とK1602の需給者の建物の二つの建物に近接していることが示されている。「近接需給者」の情報は、「所在地」の情報から管理装置2が、建物が近接している別の需給者を自動的に検索して生成されてもよいし、管理情報の登録時や更新時に需給者の申告により特定されてもよい。近接需給者の建物のことを近接建物と呼ぶ場合がある。また、稼働態様の設定対象となる電力機器33を備える需給者の建物を対象建物と呼ぶ場合がある。   “Proximity supply / demand” is information for specifying another supply / demand that is close to the building of the supply / demand specified by “supply / demand ID”, and another supply / demand is “supply / demand ID”. Have been identified. For example, in the example shown in the figure, it is shown that a “supply-and-demand ID” “F0001” building is close to a “demand-and-supply ID” A8056 supply-and-demand building. Further, in the example shown in the figure, the building of the supply-demand group having the “supply-and-demand ID” F0002 is close to the two buildings of the supply-demand building having the “supply-and-demand ID” V0022 and the supply-and-demand building of the K1602. It is shown. The “proximity supply / demand” information may be generated by the management apparatus 2 automatically searching for another supply / demand supply that is close to the building from the “location” information. It may be specified by a demander's report at the time of renewal. A building of a nearby supply and demand person may be called a nearby building. In addition, a building of a supply and demander that includes the power device 33 that is an operation mode setting target may be referred to as a target building.

「活動状態」は、「需給者ID」で特定される需給者の建物における使用者の活動状態を示す情報であり、活動検知センサ35の検知結果に基づいて略リアルタイムで(例えば30分〜数時間周期で)更新される。本実施形態の場合、「活動状態」の内容は在宅か不在の二種類である。「電力機器情報」は「需給者ID」で特定される需給者の電力機器33に関する情報であり、図示の例の場合「種別」と「環境負荷」と「運用許否」とを含む。   The “activity state” is information indicating the activity state of the user in the building of the supplier / demander specified by the “supplier / supplier ID”, and is based on the detection result of the activity detection sensor 35 in substantially real time (for example, 30 minutes to several Updated in time period). In the case of the present embodiment, there are two types of contents of “activity state”: home or absent. “Power device information” is information related to the power device 33 of the supply / demand specified by the “supply / demand ID”, and includes “type”, “environmental load”, and “operation permission / inhibition” in the illustrated example.

「種別」は電力機器33が、電気負荷のように電力を消費する機器か、発電機などのように電力を供給する機器か、双方が可能な機器か、の情報であり、電力機器33をVPPにおけるエネルギリソースとして運用する際に参照される情報である。「環境負荷」は、その電力機器33を稼働することにより生じる環境負荷の情報である。図示の例では例えば、「需給者ID」がF0001の需給者の電力機器33は、その稼働により騒音を発生することが示されている。また、「需給者ID」がF0002の需給者の電力機器33は、その稼働により騒音や臭いを発生することが示されている。こうした電力機器33は、その稼働に際して、近接建物の居住者に対する配慮が必要である。一方、「需給者ID」がX0305の需給者の電力機器33は、その稼働により特段の環境負荷を生じないことが示されている。こうした電力機器33は、その稼働に際して、近接建物の居住者に対する配慮は基本的に不要となる。   “Type” is information on whether the power device 33 is a device that consumes power, such as an electrical load, a device that supplies power, such as a generator, or a device capable of both. This is information that is referred to when operating as an energy resource in VPP. The “environmental load” is information on the environmental load generated by operating the power device 33. In the example shown in the figure, for example, it is shown that the power supply device 33 of the supply and demand person whose “supply and demand ID” is F0001 generates noise due to its operation. Further, it is shown that the power supply device 33 of the supply and demand person whose “supply and demand ID” is F0002 generates noise and odor due to its operation. Such power devices 33 require consideration for residents of neighboring buildings when operating. On the other hand, it is shown that the power supply device 33 of the supply and demand person whose “supply and demand ID” is X0305 does not cause any particular environmental load due to its operation. In consideration of the operation of such a power device 33, consideration for residents in neighboring buildings is basically unnecessary.

「運用許否」は電力機器33をエネルギリソースとして運用可能か否かを示す情報である。例えば、需給者が予め運用可能な時間帯を指定し、その指定に応じてこの情報が設定される。電動車両のような移動体の場合、移動体が需給設備3に接続されているか否かによりこの情報が設定されてもよい。   “Operation permission / denial” is information indicating whether the power device 33 can be operated as an energy resource. For example, a time zone in which the supply and demander can operate is designated in advance, and this information is set according to the designation. In the case of a mobile body such as an electric vehicle, this information may be set depending on whether or not the mobile body is connected to the supply and demand equipment 3.

<処理例>
管理システム1の処理例について説明する。本実施形態では、図3に示した「活動状態」を略リアルタイムで更新しておき、対象建物の電力機器33をエネルギリソースとして活用する段階において、近接需給者の活動状態を参照し、その稼働態様を設定する。稼働態様の設定に際して、近接建物の居住者が在宅であれば対象建物の電力機器33の稼働を相対的に低め、不在であれば対象建物の電力機器33の稼働を相対的に高める。これにより、近接建物の居住者に対して対象建物の電力機器33の稼働により生じる環境負荷が及ぶことを抑制でき、周囲に配慮しつつ電力機器33を稼働することができる。
<Processing example>
A processing example of the management system 1 will be described. In the present embodiment, the “activity state” shown in FIG. 3 is updated substantially in real time, and in the stage where the power equipment 33 of the target building is utilized as an energy resource, the activity state of the proximity demander is referred to and the operation is performed. Set the aspect. When setting the operation mode, if the resident of a nearby building is at home, the operation of the power device 33 in the target building is relatively lowered, and if not, the operation of the power device 33 in the target building is relatively increased. Thereby, it can suppress that the environmental load which arises by operation | movement of the electric power apparatus 33 of an object building with respect to the resident of an adjacent building can be suppressed, and the electric power apparatus 33 can be operated considering the circumference | surroundings.

図4は図3に示した「活動状態」を更新する処理例を示している。管理装置2の処理は処理部21が実行し、需給設備3の処理は処理部31aが実行する。なお、図4の処理は全ての需給設備3と管理装置2との間で順次行われる。   FIG. 4 shows an example of processing for updating the “activity state” shown in FIG. The processing of the management device 2 is executed by the processing unit 21, and the processing of the supply and demand equipment 3 is executed by the processing unit 31a. Note that the processing of FIG. 4 is sequentially performed between all the supply and demand equipment 3 and the management device 2.

管理装置2は、S1で更新タイミングか否かを判定する。更新タイミングは上記の通り、例えば、30分〜数時間である。更新タイミングであればS2へ進み、更新タイミングでなければ一回の処理を終了する。S2では需給設備3に対して活動状態の送信を要求する。   The management device 2 determines whether or not it is an update timing in S1. As described above, the update timing is, for example, 30 minutes to several hours. If it is the update timing, the process proceeds to S2, and if it is not the update timing, one process is terminated. In S <b> 2, the power supply / demand facility 3 is requested to transmit an activity state.

需給設備3は活動状態の送信要求を受信すると、S11で活動検知センサ35の検知結果を取得する。S12ではS11で取得した活動検知センサ35の検知結果に基づいて活動状態を判定する。ここでは需給設備3が設けられた建物(住居)の使用者(居住者)が不在か在宅かを推定により判定する。S13ではS12の判定結果を活動情報として需給者IDと共に管理装置2へ送信する。   When the supply and demand equipment 3 receives the transmission request for the activity state, the detection result of the activity detection sensor 35 is acquired in S11. In S12, an activity state is determined based on the detection result of the activity detection sensor 35 acquired in S11. Here, it is determined by estimation whether the user (resident) of the building (residential) where the supply and demand equipment 3 is provided is absent or at home. In S13, the determination result of S12 is transmitted to the management apparatus 2 together with the demander ID as activity information.

管理装置2はS3で活動情報を受信し、対応する需給者IDについて図3に例示した管理情報の「活動状態」を更新する。こうして本実施形態の場合は活動情報を通信により需給設備3から取得してデータベースを更新している。なお、本実施形態ではS12の活動状態の判定を需給設備3側で行ったが、管理装置2の側で行ってもよい。この場合、活動情報としては、S11の検知結果が含まれればよい。   The management device 2 receives the activity information in S3, and updates the “activity state” of the management information illustrated in FIG. 3 for the corresponding supply-demand ID. In this way, in the case of this embodiment, the activity information is acquired from the supply and demand equipment 3 by communication, and the database is updated. In the present embodiment, the determination of the activity state in S12 is performed on the supply and demand equipment 3 side, but it may be performed on the management device 2 side. In this case, the activity information only needs to include the detection result of S11.

なお、本実施形態では管理装置2が需給設備3に対して活動情報を要求する処理としたが、需給設備3が所定のタイミングで管理装置2へ活動情報を送信する処理としてもよい。所定のタイミングとは、活動状態が変更したと判断したタイミングや、時間を単位とした周期的なタイミングを挙げることができる。   In the present embodiment, the management device 2 requests the activity information from the supply and demand facility 3, but the supply and demand facility 3 may transmit the activity information to the management device 2 at a predetermined timing. Examples of the predetermined timing include timing when it is determined that the activity state has changed, and periodic timing in units of time.

図5は各需給者の電力機器33を運用する場合の処理例を示している。管理装置2の処理は処理部21が実行し、需給設備3の処理は処理部31aが実行する。   FIG. 5 shows a processing example when operating the power equipment 33 of each supply and demander. The processing of the management device 2 is executed by the processing unit 21, and the processing of the supply and demand equipment 3 is executed by the processing unit 31a.

管理装置2は、S21で運用タイミングか否かを判定する。運用タイミングの周期は例えば30分〜数時間、或いは、半日〜1日である。運用タイミングである場合はS22へ進み、運用タイミングでない場合は一回の処理を終了する。S22では電力機器33をエネルギリソースとして活用する運用計画を立案する。ここでは、今回の運用期間における電力の需給予測や電気事業者101の要請等に基づいて、給電する電力機器33又は送電させる電力機器33の需給者を複数選定する。選定の際には図3の「電力機器情報」の「種別」や「運用許否」が参照される。   The management device 2 determines whether or not it is an operation timing in S21. The cycle of operation timing is, for example, 30 minutes to several hours, or half day to 1 day. If it is the operation timing, the process proceeds to S22, and if it is not the operation timing, one process is terminated. In S22, an operation plan for utilizing the power device 33 as an energy resource is drawn up. Here, based on the supply and demand prediction of electric power during the current operation period, the request of the electric power company 101, and the like, a plurality of supply and demand suppliers of the power equipment 33 to be fed or the power equipment 33 to be transmitted is selected. In the selection, “type” and “operation permission / inhibition” of “power device information” in FIG. 3 are referred to.

S23ではS22で複数選定した需給者のうちの一つ(対象建物の需給者。処理対象需給者と呼ぶ。)について、図3の「近接需給者」に登録されている「需給者ID」のレコードを参照し、その「活動状態」を確認する。S24ではS23での確認の結果、近接建物の居住者が不在であれば処理対象需給者の電力機器33を稼働すべくS26へ進み、在宅であればS25へ進む。S25では処理対象需給者の電力機器33について、「電力機器情報」を参照し、電力機器33の稼働による「環境負荷」があるか否かを判定する。騒音等の環境負荷がある場合は処理対象需給者の電力機器33を稼働しないものとしてS27へ進み、ない場合は処理対象需給者の電力機器33を稼働すべくS26へ進む。   In S23, one of the plurality of supply / demand suppliers selected in S22 (the supply / demand of the target building, referred to as the processing target supply / demand) is the “supply / demand ID” registered in the “proximity supply / demand” in FIG. Refer to the record and confirm its “active state”. In S24, as a result of the confirmation in S23, if there is no resident in the adjacent building, the process proceeds to S26 to operate the power supply device 33 of the processing target demander, and if it is at home, the process proceeds to S25. In S25, with respect to the power equipment 33 of the processing target supply and demander, it is determined whether or not there is “environmental load” due to the operation of the power equipment 33 with reference to “power equipment information”. If there is an environmental load such as noise, the process proceeds to S27 on the assumption that the power supply device 33 of the processing target supply and demander is not operated. If not, the process proceeds to S26 to operate the power supply device 33 of the process target supply and demand.

S26では処理対象需給者の電力機器33の稼働態様の設定とその指示の送信を行う。稼働態様の設定においては、稼働時間や稼働時の出力の度合等を設定する。そして、設定した稼働態様での稼働指示を、処理対象需給者の需給設備3へ送信する。需給設備3は、S31で稼働指示を受信し、指示された設定内容にて電力機器33を稼働させる。   In S26, the operation mode setting of the power equipment 33 of the processing target demander and the transmission of the instruction are performed. In setting the operation mode, the operation time, the degree of output during operation, and the like are set. And the operation instruction | indication in the set operation mode is transmitted to the supply / demand equipment 3 of a process target demander. The supply and demand equipment 3 receives the operation instruction in S31 and operates the power device 33 with the instructed setting content.

管理装置2は、S27でS22で立案した運用計画が遂行されたか否かを判定し、遂行されたと判定した場合は一回の処理を終了する。遂行されたとは、S22で立案した運用計画を満足させる複数の電力機器33の稼働を行えた場合である。遂行されていないと判定した場合はS28では、S22で複数選定した需給者の中から、処理対象需給者として未処理の他の需給者を選択し、S23へ戻る。以下、同様の処理を繰り返す。   In S27, the management device 2 determines whether or not the operation plan drafted in S22 has been executed. If it is determined that the operation plan has been executed, the process ends. “Performed” refers to a case where a plurality of power devices 33 that satisfy the operation plan prepared in S22 can be operated. If it is determined that it has not been performed, in S28, an unprocessed other supply / demand is selected as the processing target supply / demand from the plurality of supply / demand selected in S22, and the process returns to S23. Thereafter, the same processing is repeated.

以上の通り、本実施形態によれば、エネルギリソースとして対象建物の電力機器33を稼働させる際、近接需給者の不在/在宅により対象建物の電力機器33の稼働態様を切り替えるので、近接建物の居住者に対して対象建物の電力機器33の稼働により生じる環境負荷が及ぶことを抑制でき、周囲に配慮しつつ対象建物の電力機器33を稼働することができる。   As described above, according to the present embodiment, when operating the power equipment 33 of the target building as an energy resource, the operation mode of the power equipment 33 of the target building is switched depending on the absence / at-home of the proximity demander. It is possible to suppress the environmental load caused by the operation of the power device 33 of the target building on the person, and the power device 33 of the target building can be operated while considering the surroundings.

<第二実施形態>
第一実施形態では、近接建物の居住者の不在/在宅により対象建物の電力機器33の稼働態様を相対的に高める/低める、の例として、稼働する/稼働しない、と切り替える例を説明したが、高出力で稼働する/低出力で稼働する、と切り替えてよい。図6はその処理例を示すフローチャートであり、図5の処理例の代替例である。以下、図5の例と異なる処理について説明する。
<Second embodiment>
In the first embodiment, the example of switching between operating / not operating has been described as an example of relatively increasing / decreasing the operating mode of the power device 33 of the target building due to the absence / at-home of a resident in a nearby building. You can switch between running at high power and running at low power. FIG. 6 is a flowchart showing the processing example, which is an alternative example of the processing example of FIG. Hereinafter, processing different from the example of FIG. 5 will be described.

図6の処理例において、管理装置2は、S24で近接建物の居住者が不在と判定した場合はS261へ進み、在宅と判定した場合はS25へ進む。S25では処理対象需給者の電力機器33について、「電力機器情報」を参照し、電力機器33の稼働による「環境負荷」があるか否かを判定する。騒音等の環境負荷がある場合はS262へ進み、ない場合はS261へ進む。   In the processing example of FIG. 6, the management device 2 proceeds to S261 if it is determined in S24 that a resident of an adjacent building is absent, and proceeds to S25 if it is determined that the resident is at home. In S25, with respect to the power equipment 33 of the processing target supply and demander, it is determined whether or not there is “environmental load” due to the operation of the power equipment 33 with reference to “power equipment information”. If there is an environmental load such as noise, the process proceeds to S262, and if not, the process proceeds to S261.

S261では電力機器33の稼働態様として相対的に高出力の稼働態様を設定し、S262では電力機器33の稼働態様として相対的に低出力の稼働態様を設定する。前者の場合、例えば、100%の出力で電力機器33を稼働させ、後者の場合、例えば、30%の出力で電力機器33を稼働させる。S263では稼働指示を、処理対象需給者の需給設備3へ送信する。需給設備3は、S31で稼働指示を受信し、指示された設定内容にて電力機器33を稼働させることになる。   In S261, a relatively high output operation mode is set as the operation mode of the power device 33, and in S262, a relatively low output operation mode is set as the operation mode of the power device 33. In the former case, for example, the power device 33 is operated at 100% output, and in the latter case, for example, the power device 33 is operated at 30% output. In S263, the operation instruction is transmitted to the supply / demand equipment 3 of the processing target supply / demand. The supply and demand equipment 3 receives the operation instruction in S31 and operates the power device 33 with the instructed setting content.

本実施形態の場合、近接建物の居住者が在宅の場合も対象建物の電力機器33を稼働させるため、環境負荷が近接建物の居住者に及ぶ場合がある。しかし、低出力での稼働態様で電力機器33を稼働させるため、近接建物の居住者に与える影響を小さくすることができる。したがって、近接需給者に対して対象建物の電力機器33の稼働により生じる環境負荷が及ぶことを抑制でき、周囲に配慮しつつ電力機器33を稼働することができる。   In the case of this embodiment, since the power equipment 33 of the target building is operated even when the resident of the adjacent building is at home, the environmental load may reach the resident of the adjacent building. However, since the electric power device 33 is operated in an operation mode with low output, it is possible to reduce the influence on the residents of neighboring buildings. Therefore, it can suppress that the environmental load which arises by operation | movement of the electric power equipment 33 of a target building with respect to a proximity | contact demander can be suppressed, and the electric power equipment 33 can be operated considering the circumference | surroundings.

<第三実施形態>
第一実施形態及び第二実施形態では、活動状態として、不在と在宅の二種類の状態を例示したが、近接建物の居住者が在宅中であっても、近接建物の居住者が音楽を鑑賞したり、楽器を演奏している場合等においては、騒音が左程気にならない。そこで、活動情報(活動状態)の種類をより細分化し、近接建物の使用者の活動に伴って生じる建物内の環境に関する情報として、電力機器33の稼働態様を設定することも可能である。近接建物の使用者の活動に伴って生じる建物内の環境としては、楽器の演奏のように使用者の行為継続により発生している環境の他、オーディオ機器が音楽を発生する場合や、エンジン発電機が振動を発生する場合のように、機器に対する使用者の行為(例えば始動指示)を契機として発生し、その機器の自律的動作により継続的に発生している環境も含まれる。
<Third embodiment>
In the first embodiment and the second embodiment, two types of states, such as absence and at-home, are exemplified as the activity state, but the resident of the adjacent building appreciates music even if the resident of the adjacent building is at home. Or when playing a musical instrument, etc. Therefore, the type of activity information (activity state) can be further subdivided, and the operation mode of the electric power device 33 can be set as information related to the environment in the building that occurs in accordance with the activity of the user of the adjacent building. In addition to the environment generated by the continuation of the user's actions, such as playing a musical instrument, the environment in the building that arises as a result of the user's activities in a nearby building, the audio equipment generates music, and the engine power generation As in the case where the machine generates vibration, an environment that is generated by the user's action (for example, a start instruction) on the device and is continuously generated by the autonomous operation of the device is also included.

図7は本実施形態における管理情報を例示しており、図3の管理情報の代替例である。図3の例と異なる点について説明すると、「活動状態」の在宅の種類が細分化されている。例えば、「需給者ID」がF0001の需給者の「活動状態」は、在宅(静か)とされており、在宅であるが、生活音が小さいことを示している。このような場合、この建物に近接する需給設備3における電力機器33の稼働は控えめに行うべきである。「需給者ID」がX0305の需給者の「活動状態」は、在宅(騒音)とされており、在宅であるが、生活音が大きいことを示している。このような場合、この建物に近接する需給設備3における電力機器33の稼働は比較的高い出力で行っても、与える影響は少ないと考えられる。   FIG. 7 illustrates the management information in this embodiment, which is an alternative example of the management information in FIG. The difference from the example of FIG. 3 will be described. The types of homes in “active state” are subdivided. For example, the “activity state” of the demander / supplier whose “demander ID” is F0001 is home (quiet), and is home but indicates that the living sound is low. In such a case, the operation of the power device 33 in the supply and demand facility 3 adjacent to the building should be performed sparingly. The “activity state” of the demand / supply with the “supply / demand ID” of X0305 is assumed to be at home (noise) and is at home, but indicates that the living sound is loud. In such a case, even if the operation of the power equipment 33 in the supply and demand facility 3 adjacent to the building is performed at a relatively high output, it is considered that the influence is small.

その他、在宅中であっても振動の発生が検知される場合においては、この建物に近接する需給設備3における電力機器33の稼働により振動が発生したとしても、与える影響は少ないと考えられる。同様に、在宅中であっても臭いの発生が検知される場合においては、この建物に近接する需給設備3における電力機器33の稼働により臭いが発生したとしても、与える影響は少ないと考えられる。このように、近接建物の居住者の活動により生じた環境と、対象建物の電力機器33の「環境負荷」の種類とを対比することで、対象建物の電力機器33の稼働態様を、より的確に設定することが可能となる。   In addition, in the case where occurrence of vibration is detected even when at home, even if vibration occurs due to the operation of the power equipment 33 in the supply and demand facility 3 close to the building, it is considered that the influence is small. Similarly, when the generation of odor is detected even at home, even if the odor is generated due to the operation of the power device 33 in the supply and demand facility 3 close to the building, it is considered that the influence is small. In this way, by comparing the environment generated by the activities of the residents in the neighboring building and the type of “environmental load” of the power equipment 33 in the target building, the operation mode of the power equipment 33 in the target building can be more accurately determined. It becomes possible to set to.

図8は本実施形態における処理例を示すフローチャートであり、図5の処理例の代替例である。以下、図5の例と異なる処理について説明する。管理装置2は、S264で、S23で確認した近接建物の居住者の活動状態と、対象建物の電力機器33の「環境負荷」の種類とを対比して、電力機器33の稼働態様を設定する。例えば、近接建物の居住者が不在であれば、相対的に高出力の稼働態様を設定する。近接建物の居住者が在宅であっても、活動状態と対象建物の電力機器33の「環境負荷」の種類とが整合する場合(例えば、活動状態が騒音ありで環境負荷が騒音の場合)、相対的に高出力の稼働態様を設定する。近接建物の居住者が在宅で、活動状態と対象建物の電力機器33の「環境負荷」の種類とが不整合な場合(例えば、活動状態が騒音ありで環境負荷が臭いの場合)、相対的に低出力の稼働態様を設定するか、稼働なしを設定して破線で示すようにS27へ進む。   FIG. 8 is a flowchart showing a processing example in this embodiment, which is an alternative example of the processing example of FIG. Hereinafter, processing different from the example of FIG. 5 will be described. In S264, the management device 2 compares the activity state of the resident of the neighboring building confirmed in S23 with the type of “environmental load” of the power device 33 of the target building, and sets the operation mode of the power device 33. . For example, if there is no resident in a nearby building, a relatively high output operation mode is set. Even if a resident of a nearby building is at home, the activity state matches the type of “environmental load” of the power equipment 33 of the target building (for example, when the activity state is noisy and the environmental load is noise), A relatively high output operation mode is set. If the resident of a nearby building is at home and the activity state and the type of “environmental load” of the power device 33 of the target building are inconsistent (for example, the activity state is noisy and the environmental load is smelly), the relative Set a low output operation mode or set no operation, and proceed to S27 as indicated by a broken line.

S265では稼働指示を、処理対象需給者の需給設備3へ送信する。需給設備3は、S31で稼働指示を受信し、指示された設定内容にて電力機器33を稼働させることになる。   In S265, the operation instruction is transmitted to the supply / demand equipment 3 of the processing target supply / demand. The supply and demand equipment 3 receives the operation instruction in S31 and operates the power device 33 with the instructed setting content.

<第四実施形態>
第一〜第三実施形態では、近接建物の居住者の「活動状態」の情報を図4の処理により略リアルタイムで管理装置2が取得する構成とした。しかし、需給者が建物の使用者の活動スケジュールを事前に登録しておき、管理装置2は登録された活動スケジュールに基づいて、電力機器33の稼働態様を設定してもよい。
<Fourth embodiment>
In 1st-3rd embodiment, it was set as the structure which the management apparatus 2 acquires substantially real-time information of the "activity state" of the resident of a nearby building by the process of FIG. However, the supply and demand may register the activity schedule of the user of the building in advance, and the management apparatus 2 may set the operation mode of the power device 33 based on the registered activity schedule.

図9は本実施形態における管理装置2及び需給設備3の各ブロック図であり、図3の例とは需給設備3の構成が異なっている。以下、異なる構成について説明する。   FIG. 9 is a block diagram of the management device 2 and the supply and demand equipment 3 in the present embodiment, and the configuration of the supply and demand equipment 3 is different from the example of FIG. Hereinafter, different configurations will be described.

本実施形態の需給設備3は、活動検知センサ35に代えて活動予定入力部36が設けられている。活動予定入力部36は需給者が建物の使用者の活動スケジュールを入力するための装置であり、例えば、タッチパネルや、携帯型端末と近距離無線通信により情報の入力を受け付ける通信端末である。活動スケジュールは、例えば、使用者の不在、在宅や、在宅時における騒音、臭い、振動等の発生予定を時間単位で示すデータとすることができる。或いは、例えば、建物の使用者の通勤、通学、買い物、自宅作業、旅行といった通常のスケジュール管理アプリケーションにおいて登録されているスケジュールデータであってもよく、この場合、スケジュールの内容から在宅、不在、騒音、臭い、振動等の発生を推測してもよい。或いは、例えば、端的に、近接する需給設備3の稼働の許否を時間単位で示すデータであってもよい。   The supply and demand equipment 3 of the present embodiment is provided with an activity schedule input unit 36 instead of the activity detection sensor 35. The activity schedule input unit 36 is a device for the supply and demand to input the activity schedule of the user of the building. For example, the activity schedule input unit 36 is a communication terminal that receives input of information through short-range wireless communication with a touch panel or a portable terminal. The activity schedule can be, for example, data indicating the occurrence schedule of the absence of the user, staying at home, and noise, odor, vibration, etc. at the time of stay in units of time. Or, for example, it may be schedule data registered in a normal schedule management application such as commuting, attending school, shopping, working at home, and traveling of a building user. The occurrence of odor, vibration, etc. may be estimated. Alternatively, for example, it may be data indicating, in a time unit, whether or not the adjacent supply and demand equipment 3 is permitted to operate.

図10は活動スケジュールの登録に関わる処理例を示すフローチャートである。本実施形態の場合、図4の処理に代えて図10の処理が実行される。   FIG. 10 is a flowchart showing an example of processing related to registration of an activity schedule. In the present embodiment, the process of FIG. 10 is executed instead of the process of FIG.

需給設備3は、S41において活動予定入力36に対する活動スケジュールの入力を受け付ける。S42ではS41で受け付けた活動スケジュールを活動情報として需給者IDを特定して管理装置2へ送信する。管理装置2は、S51で受信した活動情報によりデータベースを更新する。図3や図7の管理情報の例で言えば、「活動状態」の情報をS51の通信で取得した活動情報に基づいて更新することになり、「活動状態」の情報は時刻単位での活動状態を示す情報とすることができる。そして、運用計画の実行において、S23で活動状態を確認する際には、実行時刻に対応した活動状態を参照すればよい。   The supply and demand equipment 3 receives an activity schedule input for the activity schedule input 36 in S41. In S42, the supply / demand ID is identified and transmitted to the management apparatus 2 using the activity schedule received in S41 as activity information. The management device 2 updates the database with the activity information received in S51. In the example of the management information in FIG. 3 and FIG. 7, the “activity state” information is updated based on the activity information acquired by the communication of S51, and the “activity state” information is the activity in time units. It can be information indicating a state. In the execution of the operation plan, when the activity state is confirmed in S23, the activity state corresponding to the execution time may be referred to.

このように活動スケジュールに基づいて、対象建物の電力機器33の稼働態様を設定する処理の場合、より長期間に渡る運用計画を立案し易くなる。   In this way, in the case of the process of setting the operation mode of the power equipment 33 in the target building based on the activity schedule, it becomes easier to make an operation plan for a longer period.

<第五実施形態>
上記各実施形態では、管理システム1を、管理サーバ2と複数の需給設備3とを通信網100で通信可能なサーバ−クライアント方式のシステムとしたが、各需給設備3が独自に運用計画を立案してその電力機器33の稼働態様を設定して管理装置として機能する構成であってもよい。この場合、各需給設備(各管理装置)は通信網100を介して近接建物の管理装置と通信を行い、活動情報を個別に取得すればよい。
<Fifth embodiment>
In each of the above embodiments, the management system 1 is a server-client system capable of communicating the management server 2 and a plurality of supply and demand equipment 3 via the communication network 100. However, each supply and demand equipment 3 independently formulates an operation plan. And the structure which sets the operation | movement aspect of the electric power apparatus 33, and functions as a management apparatus may be sufficient. In this case, each supply and demand facility (each management device) may communicate with a nearby building management device via the communication network 100 to individually acquire activity information.

<他の実施形態>
また、上記各実施形態は、互いに組合せが可能であり、また、各実施形態の一部として説明した内容を他の実施形態に組み合わせることも可能である。
<Other embodiments>
In addition, the above embodiments can be combined with each other, and the contents described as a part of each embodiment can be combined with other embodiments.

<実施形態のまとめ>
1.上記実施形態の管理装置は、
第一の電力需給者の建物に近接する第二の電力需給者の建物の活動情報を取得する取得手段(例えばS11又は35,36)と、
前記活動情報に基づいて前記第一の電力需給者の建物に備えられた電力機器の稼働態様を設定する設定手段(例えばS26,S261,S262,S264)と、を備える。
<Summary of Embodiment>
1. The management device of the above embodiment is
An acquisition means (e.g., S11 or 35, 36) for acquiring activity information of the building of the second power supplier and demander adjacent to the building of the first power supplier and demander;
Setting means (for example, S26, S261, S262, S264) for setting an operation mode of the power equipment provided in the building of the first power supplier and demand based on the activity information.

この実施形態によれば、周囲に配慮しつつ電力機器を稼働することができる。   According to this embodiment, it is possible to operate the power device while considering the surroundings.

2.上記実施形態では、
前記活動情報とは、前記第二の電力需給者の建物の使用者が前記第二の電力需給者の建物に存在するか不在かを示す情報である。
2. In the above embodiment,
The activity information is information indicating whether a user of the second power supply / demand building is present or absent in the second power supply / demand building.

この実施形態によれば、使用者の在、不在により電力機器の稼働態様を切り替えることができ、周囲に配慮しつつ電力機器を稼働することができる。   According to this embodiment, the operation mode of the power device can be switched depending on the presence or absence of the user, and the power device can be operated while considering the surroundings.

3.上記実施形態では、
前記設定手段は、前記活動情報が前記使用者の不在を示す場合、前記使用者の存在を示す場合に比べて、前記電力機器の稼働が高まるように前記稼働態様を設定する(例えばS26,S261,S262,S264)。
3. In the above embodiment,
The setting means sets the operation mode so that the operation of the power device is higher when the activity information indicates the absence of the user than when the activity information indicates the presence of the user (for example, S26, S261). , S262, S264).

この実施形態によれば、使用者の不在の場合に電力機器の稼働が高まるので、その環境負荷が使用者に及ぶことを抑制でき、周囲に配慮しつつ電力機器を稼働することができる。   According to this embodiment, since the operation of the power device is increased in the absence of the user, the environmental load can be suppressed from reaching the user, and the power device can be operated while considering the surroundings.

4.上記実施形態では、
前記活動情報とは、前記第二の電力需給者の建物の使用者の活動に伴って生じる建物内の環境に関する情報である(例えば図7)。
4). In the above embodiment,
The activity information is information relating to the environment in the building that is generated in accordance with the activity of the user of the building of the second power supplier and demander (for example, FIG. 7).

この実施形態によれば、活動状態の種類をより細分化して、電力機器の稼働態様をより的確に設定することができる。   According to this embodiment, the type of activity state can be further subdivided, and the operation mode of the power device can be set more accurately.

5.上記実施形態では、
前記設定手段は、前記活動情報が示す前記環境と、前記電力機器の稼働による環境負荷とが整合する場合、整合しない場合に比べて、前記電力機器の稼働が高まるように前記稼働態様を設定する。
5. In the above embodiment,
The setting means sets the operation mode so that the operation of the electric power device is higher when the environment indicated by the activity information matches the environmental load due to the operation of the electric power device than when the environment does not match. .

この実施形態によれば、使用者の環境と電力機器の稼働による環境負荷とが整合する場合には電力機器の稼働が高まるので、その環境負荷が使用者に与える影響が小さくため、周囲に配慮しつつ電力機器を稼働することができる。   According to this embodiment, when the user's environment and the environmental load due to the operation of the power device are matched, the operation of the power device is increased. However, the power device can be operated.

6.上記実施形態では、
前記環境は、音、匂い、振動の少なくともいずれか一つを含む。
6). In the above embodiment,
The environment includes at least one of sound, smell, and vibration.

この実施形態によれば、電力機器の代表的な環境負荷と、使用者の環境とを比較することにより、周囲に配慮しつつ電力機器を稼働することができる。   According to this embodiment, the power equipment can be operated while considering the surroundings by comparing the representative environmental load of the power equipment with the environment of the user.

7.上記実施形態では、
前記電力機器とは、電力を消費する機器又は供給する機器である。
7). In the above embodiment,
The power device is a device that consumes or supplies power.

この実施形態によれば、受電、送電のいずれの電気機器も稼働制御の対象とすることができる。   According to this embodiment, both electric power reception and power transmission electric devices can be targeted for operation control.

8.上記実施形態では、
前記管理装置は、前記第一の電力需給者の建物に設けられ、前記電力機器を制御する制御装置である(例えば第五実施形態)。
8). In the above embodiment,
The management device is a control device that is provided in the building of the first power supplier and demander and controls the power equipment (for example, the fifth embodiment).

この実施形態によれば、需給者が周囲に配慮しつつ自身の電力機器を稼働することができる。   According to this embodiment, a demander can operate his / her own electric power equipment while considering the surroundings.

9.上記実施形態では、
前記活動情報は、前記第二の電力需給者の建物の使用者のスケジュールの情報を含み(例えば第四実施形態)、
前記設定手段は、前記スケジュールの情報に基づいて、前記稼働態様を設定する。
9. In the above embodiment,
The activity information includes information on a schedule of a user of the building of the second power supplier and demander (for example, the fourth embodiment),
The setting unit sets the operation mode based on the schedule information.

この実施形態によれば、周囲に配慮しつつ電力機器を稼働することができると共に、より長期間に渡る運用計画を立案し易くなる。   According to this embodiment, it is possible to operate the power equipment while considering the surroundings, and it is easy to make an operation plan for a longer period.

10.上記実施形態の方法は、
コンピュータ(例えば21又は31a)により実行される方法であって、
第一の電力需給者の建物に近接する第二の電力需給者の建物の活動情報を取得する取得工程と、
前記活動情報に基づいて前記第一の電力需給者の建物に備えられた電力機器の稼働態様を設定する設定工程と、を備える。
10. The method of the above embodiment
A method performed by a computer (e.g. 21 or 31a),
An acquisition step of acquiring activity information of the building of the second electricity supplier / demander adjacent to the building of the first electricity supplier / demander;
A setting step of setting an operation mode of the power equipment provided in the building of the first power supplier and demand based on the activity information.

この実施形態によれば、周囲に配慮しつつ電力機器を稼働することができる。   According to this embodiment, it is possible to operate the power device while considering the surroundings.

11.上記実施形態のプログラムは、
コンピュータ(例えば21又は31a)を、
第一の電力需給者の建物に近接する第二の電力需給者の建物の活動情報を取得する取得手段、
前記活動情報に基づいて前記第一の電力需給者の建物に備えられた電力機器の稼働態様を設定する設定手段、として機能させる、
この実施形態によれば、周囲に配慮しつつ電力機器を稼働することができる。
11. The program of the above embodiment is
A computer (e.g. 21 or 31a)
An acquisition means for acquiring activity information of the building of the second electricity supplier / demander adjacent to the building of the first electricity supplier / demander;
Based on the activity information, function as setting means for setting the operating mode of the power equipment provided in the building of the first power supplier and demander,
According to this embodiment, it is possible to operate the power device while considering the surroundings.

12.上記実施形態の管理システム(例えば1)は、
第一の電力需給者の建物に設けられた電力機器(例えば33)と、
前記第一の電力需給者の建物に設けられ、前記電力機器を制御する制御手段(例えば30)と、
通信回線を介して前記制御手段と通信可能なサーバ(例えば2)と、を備え、
前記サーバは、
前記第一の電力需給者の建物に近接する第二の電力需給者の建物の活動情報を取得し(例えばS3)、取得した前記活動情報に基づいて前記制御手段に前記電力機器の稼働態様を指示する(例えばS26,S263,S265)。
12 The management system (for example, 1) of the above embodiment is
Power equipment (e.g. 33) installed in the building of the first electricity supplier and demander,
Control means (e.g., 30) for controlling the power equipment, provided in the building of the first power supplier and demander,
A server capable of communicating with the control means via a communication line (for example, 2),
The server
Acquire activity information of the building of the second electric power supplier / proximity close to the building of the first electric power supplier / demander (for example, S3), based on the acquired activity information, the operation mode of the electric power equipment to the control means Instruct (eg, S26, S263, S265).

この実施形態によれば、周囲に配慮しつつ電力機器を稼働することができる。   According to this embodiment, it is possible to operate the power device while considering the surroundings.

1 管理システム、2 管理装置、33 電力機器、30 制御装置 DESCRIPTION OF SYMBOLS 1 Management system, 2 Management apparatus, 33 Electric power equipment, 30 Control apparatus

Claims (12)

第一の電力需給者の建物に近接する第二の電力需給者の建物の活動情報を取得する取得手段と、
前記活動情報に基づいて前記第一の電力需給者の建物に備えられた電力機器の稼働態様を設定する設定手段と、を備える、
ことを特徴とする管理装置。
An acquisition means for acquiring activity information of the building of the second electricity supplier / demander adjacent to the building of the first electricity supplier / demander;
Setting means for setting the operation mode of the power equipment provided in the building of the first power supplier and demand based on the activity information,
A management device characterized by that.
請求項1に記載の管理装置であって、
前記活動情報とは、前記第二の電力需給者の建物の使用者が前記第二の電力需給者の建物に存在するか不在かを示す情報である、
ことを特徴とする管理装置。
The management device according to claim 1,
The activity information is information indicating whether a user of the second power supply / demand building is present or absent in the second power supply / demand building,
A management device characterized by that.
請求項2に記載の管理装置であって、
前記設定手段は、前記活動情報が前記使用者の不在を示す場合、前記使用者の存在を示す場合に比べて、前記電力機器の稼働が高まるように前記稼働態様を設定する、
ことを特徴とする管理装置。
The management device according to claim 2,
When the activity information indicates the absence of the user, the setting means sets the operation mode so that the operation of the power device is increased as compared to the case where the activity information indicates the presence of the user.
A management device characterized by that.
請求項1に記載の管理装置であって、
前記活動情報とは、前記第二の電力需給者の建物の使用者の活動に伴って生じる建物内の環境に関する情報である、
ことを特徴とする管理装置。
The management device according to claim 1,
The activity information is information relating to the environment in the building that occurs in accordance with the activity of the user of the building of the second power supplier and demander.
A management device characterized by that.
請求項4に記載の管理装置であって、
前記設定手段は、前記活動情報が示す前記環境と、前記電力機器の稼働による環境負荷とが整合する場合、整合しない場合に比べて、前記電力機器の稼働が高まるように前記稼働態様を設定する、
ことを特徴とする管理装置。
The management device according to claim 4,
The setting means sets the operation mode so that the operation of the electric power device is higher when the environment indicated by the activity information matches the environmental load due to the operation of the electric power device than when the environment does not match. ,
A management device characterized by that.
請求項4又は請求項5に記載の管理装置であって、
前記環境は、音、臭い、振動の少なくともいずれか一つを含む、
ことを特徴とする管理装置。
The management device according to claim 4 or 5, wherein
The environment includes at least one of sound, smell, and vibration.
A management device characterized by that.
請求項1乃至請求項6のいずれか1項に記載の管理装置であって、
前記電力機器とは、電力を消費する機器又は供給する機器である、
ことを特徴とする管理装置。
The management apparatus according to any one of claims 1 to 6,
The power device is a device that consumes or supplies power,
A management device characterized by that.
請求項1乃至請求項7のいずれか1項に記載の管理装置であって、
前記管理装置は、前記第一の電力需給者の建物に設けられ、前記電力機器を制御する制御装置である、
ことを特徴とする管理装置。
The management apparatus according to any one of claims 1 to 7,
The management device is a control device that is provided in the building of the first power supplier and demander and controls the power equipment.
A management device characterized by that.
請求項1乃至請求項8のいずれか1項に記載の管理装置であって、
前記活動情報は、前記第二の電力需給者の建物の使用者のスケジュールの情報を含み、
前記設定手段は、前記スケジュールの情報に基づいて、前記稼働態様を設定する、
ことを特徴とする管理装置。
The management apparatus according to any one of claims 1 to 8,
The activity information includes information on a schedule of a user of the building of the second power supplier and demander,
The setting means sets the operation mode based on the schedule information.
A management device characterized by that.
コンピュータにより実行される方法であって、
第一の電力需給者の建物に近接する第二の電力需給者の建物の活動情報を取得する取得工程と、
前記活動情報に基づいて前記第一の電力需給者の建物に備えられた電力機器の稼働態様を設定する設定工程と、を備える、
ことを特徴とする方法。
A method performed by a computer,
An acquisition step of acquiring activity information of the building of the second electricity supplier / demander adjacent to the building of the first electricity supplier / demander;
A setting step for setting an operation mode of the power equipment provided in the building of the first power supplier and demand based on the activity information,
A method characterized by that.
コンピュータを、
第一の電力需給者の建物に近接する第二の電力需給者の建物の活動情報を取得する取得手段、
前記活動情報に基づいて前記第一の電力需給者の建物に備えられた電力機器の稼働態様を設定する設定手段、として機能させる、
ことを特徴とするプログラム。
Computer
An acquisition means for acquiring activity information of the building of the second electricity supplier / demander adjacent to the building of the first electricity supplier / demander;
Based on the activity information, function as setting means for setting the operating mode of the power equipment provided in the building of the first power supplier and demander,
A program characterized by that.
第一の電力需給者の建物に設けられた電力機器と、
前記第一の電力需給者の建物に設けられ、前記電力機器を制御する制御手段と、
通信回線を介して前記制御手段と通信可能なサーバと、を備え、
前記サーバは、
前記第一の電力需給者の建物に近接する第二の電力需給者の建物の活動情報を取得し、取得した前記活動情報に基づいて前記制御手段に前記電力機器の稼働態様を指示する、
ことを特徴とする管理システム。
Power equipment installed in the building of the first electricity supplier and demand;
Control means provided in the building of the first power supplier and demander to control the power equipment;
A server capable of communicating with the control means via a communication line,
The server
Obtaining activity information of the building of the second power supplier and demander adjacent to the building of the first power supplier and demand, and instructing the operating mode of the power device to the control unit based on the acquired activity information;
Management system characterized by that.
JP2018052255A 2018-03-20 2018-03-20 Management apparatus, method, program and management system Pending JP2019165566A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018052255A JP2019165566A (en) 2018-03-20 2018-03-20 Management apparatus, method, program and management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018052255A JP2019165566A (en) 2018-03-20 2018-03-20 Management apparatus, method, program and management system

Publications (1)

Publication Number Publication Date
JP2019165566A true JP2019165566A (en) 2019-09-26

Family

ID=68064956

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018052255A Pending JP2019165566A (en) 2018-03-20 2018-03-20 Management apparatus, method, program and management system

Country Status (1)

Country Link
JP (1) JP2019165566A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110826210A (en) * 2019-10-31 2020-02-21 华东电力试验研究院有限公司 Power interconnection-based multi-zone building virtual power plant modeling and optimization coordination method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110826210A (en) * 2019-10-31 2020-02-21 华东电力试验研究院有限公司 Power interconnection-based multi-zone building virtual power plant modeling and optimization coordination method
CN110826210B (en) * 2019-10-31 2023-06-23 华东电力试验研究院有限公司 Multi-region building virtual power plant modeling and optimization coordination method based on power interconnection

Similar Documents

Publication Publication Date Title
WO2024104143A1 (en) Control method for energy storage device, and device
Gruber et al. Advanced building energy management based on a two-stage receding horizon optimization
US20130207466A1 (en) Home energy management apparatus and method for interworking with new renewable energy
CN102868217A (en) Systems, methods, and apparatus for maintaining stable conditions within a power grid
WO2012154451A2 (en) Electricity demand prediction
JP2017017779A (en) Power supply system and power supply method
JP2012005210A (en) Distribution system power flow simulation device, distribution system power flow simulation method, and program thereof
JP2016015858A (en) Electric power control system and method, and electric power controller
JP2011248618A (en) Information processing device, information processing method, program and power storage device management system
US10152075B2 (en) Information equipment, control system and control method
KR20130103793A (en) Wireless power supply device, electronic device capable of receiving wireless power, and method for controlling transmission of wireless power
JP2016123105A (en) Management system, management method and apparatus
US10416700B2 (en) Control apparatus and control method
JP6142057B2 (en) Power management system, control device and storage battery device
WO2016092737A1 (en) Information communicating method and information communicating device
JP7102182B2 (en) Power systems, controls, power management methods, programs, and power management servers
JP2021108525A (en) Electric power operation system
Ghai et al. DC picogrids: A case for local energy storage for uninterrupted power to DC appliances
JP2019165566A (en) Management apparatus, method, program and management system
JP2014072931A (en) Management system, management method and controller
CN102457104A (en) Communication device, power distribution control device, and power distribution control system
JP2019164638A (en) Information providing device, information providing system, and information providing method
CN104932304A (en) Micro-grid multi-agent control system and method
US20200343732A1 (en) System and method for district energy management
JP6978274B2 (en) Object recommendation system and object recommendation method