JP2019157615A - Auxiliary tool for fixing foundation pile and method for fixing foundation pile - Google Patents

Auxiliary tool for fixing foundation pile and method for fixing foundation pile Download PDF

Info

Publication number
JP2019157615A
JP2019157615A JP2019040352A JP2019040352A JP2019157615A JP 2019157615 A JP2019157615 A JP 2019157615A JP 2019040352 A JP2019040352 A JP 2019040352A JP 2019040352 A JP2019040352 A JP 2019040352A JP 2019157615 A JP2019157615 A JP 2019157615A
Authority
JP
Japan
Prior art keywords
foundation pile
fixing
pile
position adjusting
auxiliary tool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2019040352A
Other languages
Japanese (ja)
Other versions
JP6541207B1 (en
Inventor
章弘 石原
Akihiro Ishihara
章弘 石原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maruto Co Ltd
Original Assignee
Maruto Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maruto Co Ltd filed Critical Maruto Co Ltd
Application granted granted Critical
Publication of JP6541207B1 publication Critical patent/JP6541207B1/en
Publication of JP2019157615A publication Critical patent/JP2019157615A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

To provide an auxiliary tool for fixing foundation piles and a method for fixing foundation piles that can align foundation piles easily and quickly to fix them in accurate positions, and that can shorten a construction period.SOLUTION: An auxiliary tool 1 for fixing foundation piles that fixes a foundation pile 10 for a solar panel base, includes a pair of horizontal retaining frames 3, 3 that are supported by support legs 2 at predetermined height positions and have long holes 31 along a substantially horizontal direction, and that are provided in positions where they face each other; guide shafts 4 for adjusting lateral position, both ends of which are movable in a substantially horizontal direction along each of the long holes 31, and that can adjust a lateral position with respect to the foundation pile 10; and fixing rings 5 for adjusting front-rear position that are provided movably along the guide shafts 4 for adjusting lateral position and can adjust a front-rear position with respect to the foundation pile 10, and that clamp and fix the foundation pile 10.SELECTED DRAWING: Figure 1

Description

本発明は、基礎杭を固定するための基礎杭固定用補助具および基礎杭固定工法に関するものである。   The present invention relates to a foundation pile fixing auxiliary tool for fixing a foundation pile and a foundation pile fixing method.

従来、太陽光パネルを設置するための太陽光パネル架台の基礎を施工する場合に、地面に複数本の基礎杭が埋設される。従来の基礎杭の施工方法としては、地面に20〜30cm深く余堀りした後に土を埋め戻して床付けした掘削孔を形成し、この掘削孔に基礎杭を建て込み、基礎杭と掘削孔との隙間に砕石などを埋めて簡易的に固定する。その後、筒状の基礎杭の上部に設けられた注入孔からモルタル等の充填剤を注入することにより基礎杭と掘削孔との間に前記充填剤を充填する方法が一般的である。   Conventionally, when constructing a foundation of a solar panel mount for installing a solar panel, a plurality of foundation piles are buried in the ground. As a conventional foundation pile construction method, after excavating 20-30 cm deep into the ground, soil is backfilled and floored to form an excavation hole, and the foundation pile is built into the excavation hole. Simply bury crushed stone in the gap between and fix it. Thereafter, a method of filling the filler between the foundation pile and the excavation hole by injecting a filler such as mortar from an injection hole provided in the upper part of the cylindrical foundation pile is common.

例えば、特開2016−89609号公報には、太陽光パネル等の構造物を支持する基礎杭としての鋼管杭の施工方法として、地盤の所定の位置に重機等で鋼管杭の直径よりも大きい穴を掘削し、鋼管杭を掘削した穴に挿入して重機等で打設した後に、鋼管杭の上端の開口部からモルタル等を流し込む施工方法が開示されている(特許文献1)。   For example, in Japanese Patent Application Laid-Open No. 2006-89609, as a method of constructing a steel pipe pile as a foundation pile that supports a structure such as a solar panel, a hole larger than the diameter of the steel pipe pile by a heavy machine or the like at a predetermined position on the ground. A construction method is disclosed in which mortar or the like is poured from the opening at the upper end of the steel pipe pile after the steel pipe pile is inserted into the excavated hole and placed with a heavy machine or the like (Patent Document 1).

特開2016−89609号公報Japanese Patent Laid-Open No. 2006-89609

しかしながら、特許文献1の発明を含め従来の基礎杭の施工方法では、掘削孔が基礎杭の外径より大きく形成されているため、基礎杭が建て込まれた位置でそのまま鉛直にして固定された場合、正規の位置からずれた位置に設置されてしまうという問題がある。また、基礎杭の建て込み後であって充填剤が硬化する前に、掘削孔の内側壁の崩落や風雨等の影響により、次第に杭位置がずれてしまうという不安定さがある。一般に一つの太陽光パネル架台は6本の基礎杭により支持されるところ、従来の施工方法により施工された基礎杭を用いた場合、歪みや曲がりが発生して太陽光パネルをうまく設置できないという問題に至る。   However, in the conventional foundation pile construction methods including the invention of Patent Document 1, since the excavation hole is formed larger than the outer diameter of the foundation pile, the foundation pile was fixed in the vertical position at the position where the foundation pile was built. In such a case, there is a problem that it is installed at a position shifted from the normal position. In addition, there is an instability that the pile position gradually shifts due to the collapse of the inner wall of the excavation hole, wind and rain, etc. after the foundation pile is built and before the filler is hardened. In general, one solar panel base is supported by six foundation piles. When foundation piles constructed by conventional construction methods are used, distortion and bending occur and solar panels cannot be installed successfully. To.

また、近年、メガソーラーのように太陽光パネルを広大な用地に設置する大規模な建設工事が増加しており、膨大な本数の基礎杭を短期間に施工することが求められている。しかしながら、基礎杭に設けられた注入孔からモルタル等の充填剤を注入する作業には、多大な時間を要しているため、当該作業を短縮できれば工期短縮に繋がる。また、上述のとおり、太陽光パネルがうまく設置できない場合には、パネル設置後の手直しが必要となったり、基礎杭の施工のやり直しが余儀なくされるケースもある。このようなことから工期が延びてしまうという問題もある。   In recent years, there has been an increase in large-scale construction work in which solar panels are installed on a vast site, such as mega solar, and a huge number of foundation piles are required to be constructed in a short period of time. However, since the operation | work which inject | pours fillers, such as mortar, from the injection hole provided in the foundation pile requires much time, if the said operation | work can be shortened, it will lead to a work period shortening. In addition, as described above, when the solar panel cannot be installed successfully, there are cases in which it is necessary to rework the panel after installation or the foundation pile is re-worked. There is also a problem that the construction period is extended due to this.

本発明は、このような問題点を解決するためになされたものであって、基礎杭を簡単かつ迅速に位置合わせして正確な位置に固定することができるとともに、工期を短縮することができる基礎杭固定用補助具および基礎杭固定工法を提供することを目的としている。   The present invention has been made to solve such problems, and can easily and quickly align the foundation pile and fix it at an accurate position, and can shorten the construction period. The purpose is to provide an auxiliary tool for foundation pile fixing and a foundation pile fixing method.

本発明に係る基礎杭固定用補助具は、基礎杭を簡単かつ迅速に位置合わせして正確な位置に固定することができるとともに、工期を短縮するという課題を解決するために、太陽光パネル架台の基礎杭を固定するための基礎杭固定用補助具であって、支持脚によって所定の高さ位置に支持されるとともに、略水平方向に沿う長孔を有し、互いに向かい合う位置に設けられる一対の水平保持フレームと、前記長孔のそれぞれに略水平方向へ移動可能に両端を支持され、前記基礎杭に対する左右方向の位置を調整可能な左右位置調整用ガイド軸と、前記左右位置調整用ガイド軸に沿って移動可能に設けられ、前記基礎杭に対する前後方向の位置を調整可能であるとともに、前記基礎杭を挟持して固定する前後位置調整用固定リングと、を有する。   The auxiliary tool for fixing the foundation pile according to the present invention can fix the foundation pile easily and quickly and fix it at an accurate position, and solves the problem of shortening the construction period. A pair of foundation pile fixing aids for fixing the foundation piles, which are supported at a predetermined height by support legs, have long holes along a substantially horizontal direction, and are provided at positions facing each other. A horizontal holding frame, a left and right position adjusting guide shaft which is supported at both ends so as to be movable in a substantially horizontal direction in each of the elongated holes, and capable of adjusting a horizontal position relative to the foundation pile, and the left and right position adjusting guide A front-rear position adjusting fixing ring that is provided so as to be movable along an axis, is capable of adjusting a position in the front-rear direction with respect to the foundation pile, and clamps and fixes the foundation pile.

また、本発明に係る基礎杭固定用補助具は、上端が基礎杭固定用補助具より低い基礎杭であっても簡単かつ迅速に位置合わせして正確な位置に固定することができるとともに、工期を短縮するという課題を解決するために、太陽光パネル架台の基礎杭を固定するための基礎杭固定用補助具であって、支持脚によって所定の高さ位置に支持されるとともに、略垂直方向に沿う長孔を有し、互いに向かい合う位置に設けられる一対の垂直保持フレームと、前記長孔のそれぞれに略垂直方向へ移動可能に両端を支持され、前記基礎杭に対する上下方向の位置を調整可能な上下位置調整用ガイド軸と、前記上下位置調整用ガイド軸に沿って移動可能に設けられ、前記基礎杭に対する前後方向の位置を調整可能であるとともに、前記基礎杭を挟持して固定する前後位置調整用固定リングと、を有する。   Moreover, the auxiliary tool for fixing the foundation pile according to the present invention can be easily and quickly aligned and fixed at an accurate position even if the upper end of the auxiliary pile is lower than the auxiliary tool for fixing the pile. In order to solve the problem of shortening the foundation pile, it is a foundation pile fixing auxiliary tool for fixing the foundation pile of the solar panel mount, and is supported at a predetermined height position by the support legs, and is substantially in the vertical direction. A pair of vertical holding frames provided at positions facing each other, and both ends supported by each of the long holes so as to be movable in a substantially vertical direction, and the vertical position relative to the foundation pile can be adjusted. The vertical vertical position adjustment guide shaft and the vertical position adjustment guide shaft are provided so as to be movable, and the position in the front-rear direction with respect to the foundation pile can be adjusted. Having a fixing ring for positioning before and after.

また、本発明の一態様として、簡易な構造によって基礎杭の固定位置を精度良く合わせるという課題を解決するために、前記左右位置調整用ガイド軸は、寸切りボルトと、前記寸切りボルトの両端に螺合され前記水平保持フレームに締結される固定ナットとを有しており、前記前後位置調整用固定リングは、前記基礎杭を挟持する一対の挟持バンドと、前記挟持バンドを左右位置調整用ガイド軸に連結する連結プレートと、前記寸切りボルトに螺合され前記連結プレートの両側に締結される固定ナットとを有していてもよい。また、前記上下位置調整用ガイド軸は、寸切りボルトと、前記寸切りボルトの両端に螺合され前記垂直保持フレームに締結される固定ナットとを有しており、前記前後位置調整用固定リングは、前記基礎杭を挟持する一対の挟持バンドと、前記挟持バンドを上下位置調整用ガイド軸に連結する連結プレートと、前記寸切りボルトに螺合され前記連結プレートの両側に締結される固定ナットとを有していてもよい。   Further, as one aspect of the present invention, in order to solve the problem of accurately aligning the fixed position of the foundation pile with a simple structure, the left and right position adjustment guide shaft includes a dimensioning bolt and both ends of the dimensioning bolt. A fixing nut that is screwed to the horizontal holding frame, and the front-rear position adjusting fixing ring includes a pair of holding bands for holding the foundation pile, and the holding band for adjusting the left-right position. You may have a connection plate connected with a guide axis | shaft, and the fixing nut screwed together by the said dimension bolt and fastened on the both sides of the said connection plate. The vertical position adjusting guide shaft includes a dimensioning bolt, and a fixing nut screwed to both ends of the dimensioning bolt and fastened to the vertical holding frame, and the longitudinal position adjusting fixing ring. Is a pair of clamping bands for clamping the foundation pile, a connection plate for connecting the clamping band to the vertical position adjusting guide shaft, and a fixing nut screwed to the dimensioning bolt and fastened to both sides of the connection plate You may have.

さらに、本発明の一態様として、長尺の基礎杭であっても安定的に鉛直に保持するという課題を解決するために、前記一対の水平保持フレームが、前記支持脚に対して異なる高さ位置に複数設けられており、前記一対の水平保持フレームのそれぞれには、前記左右位置調整用ガイド軸と、前記前後位置調整用固定リングとが設けられていてもよい。   Furthermore, as one aspect of the present invention, in order to solve the problem of stably holding vertically even a long foundation pile, the pair of horizontal holding frames have different heights with respect to the support legs. A plurality of positions may be provided, and each of the pair of horizontal holding frames may be provided with the left / right position adjusting guide shaft and the front / rear position adjusting fixing ring.

本発明に係る基礎杭固定工法は、基礎杭を固定する際に簡単かつ迅速に位置合わせするとともに、工期を短縮するという課題を解決するために、上述のいずれかに記載の基礎杭固定用補助具を用いて、前記基礎杭を固定するための基礎杭固定工法であって、前記基礎杭を建て込むための掘削孔を地面に形成する掘削孔形成工程と、前記掘削孔に充填剤を充填する充填剤充填工程と、前記掘削孔が前記一対の水平保持フレームの間に位置するように、前記基礎杭固定用補助具を設置する補助具設置工程と、前記前後位置調整用固定リングを杭芯の前後位置に略一致させるように前後方向にスライドさせて固定する前後位置調整工程と、前記左右位置調整用ガイド軸を杭芯の左右位置に略一致させるように左右方向にスライドさせて固定する左右位置調整工程と、前記前後位置調整用固定リングに前記基礎杭を挟持して固定する杭固定工程と、前記充填剤充填工程の後または前記補助具設置工程の後もしくは前記左右位置調整工程の後に行われ、前記掘削孔に前記基礎杭を挿入する杭挿入工程とを有する。   The foundation pile fixing method according to the present invention is an auxiliary for fixing a foundation pile according to any one of the above, in order to solve the problem of easily and quickly aligning the foundation pile and shortening the construction period. A foundation pile fixing method for fixing the foundation pile using a tool, a drilling hole forming step for forming a drilling hole for laying the foundation pile in the ground, and filling the drilling hole with a filler A filler filling step, an auxiliary tool installation step of installing the foundation pile fixing auxiliary tool such that the excavation hole is positioned between the pair of horizontal holding frames, and a pile of the front and rear position adjusting fixing ring. A front / rear position adjustment process in which the front / rear position is slid in the front / rear direction so as to substantially match the front / rear position of the core, and the left / right position adjustment guide shaft is slid in the left / right direction to substantially match the left / right position of the pile core. Left and right A position adjustment step, a pile fixing step for clamping and fixing the foundation pile to the front-rear position adjustment fixing ring, after the filler filling step, after the auxiliary device installation step, or after the left-right position adjustment step And a pile insertion step of inserting the foundation pile into the excavation hole.

本発明に係る基礎杭固定工法は、上端が基礎杭固定用補助具より低い基礎杭を固定する際に簡単かつ迅速に位置合わせするとともに、工期を短縮するという課題を解決するために、上述のいずれかに記載の基礎杭固定用補助具を用いて、前記基礎杭を固定するための基礎杭固定工法であって、前記基礎杭を建て込むための掘削孔を地面に形成する掘削孔形成工程と、前記掘削孔に充填剤を充填する充填剤充填工程と、前記前後位置調整用固定リングが杭芯の左右位置に略一致するように、前記基礎杭固定用補助具を設置する補助具設置工程と、前記上下位置調整用ガイド軸を基礎杭の上端よりも低くなるように上下方向にスライドさせて固定する上下位置調整工程と、前記前後位置調整用固定リングを杭芯の前後位置に略一致させるように前後方向にスライドさせて固定する前後位置調整工程と、前記前後位置調整用固定リングに前記基礎杭を挟持して固定する杭固定工程と、前記充填剤充填工程の後または前記補助具設置工程の後もしくは前記前後位置調整工程の後に行われ、前記掘削孔に前記基礎杭を挿入する杭挿入工程とを有する。   In order to solve the problem that the foundation pile fixing method according to the present invention aligns easily and quickly when fixing the foundation pile whose upper end is lower than the auxiliary tool for fixing the foundation pile, A foundation pile fixing method for fixing the foundation pile using the auxiliary tool for fixing the foundation pile according to any one of the above, wherein a drilling hole forming step for forming an excavation hole for building the foundation pile in the ground And a filler filling step for filling the excavation hole with a filler, and an auxiliary tool installation for installing the foundation pile fixing auxiliary tool so that the front-rear position adjusting fixing ring substantially coincides with the left and right positions of the pile core. A vertical position adjusting step for sliding and fixing the guide shaft for adjusting the vertical position so as to be lower than the upper end of the foundation pile, and the fixing ring for adjusting the longitudinal position substantially at the longitudinal position of the pile core. Before to match A front-rear position adjustment process that slides and fixes in the direction, a pile fixing process that clamps and fixes the foundation pile to the front-rear position adjustment fixing ring, after the filler filling process, or after the auxiliary equipment installation process Or it is performed after the said front-back position adjustment process, and has the pile insertion process of inserting the said foundation pile into the said excavation hole.

本発明によれば、基礎杭を簡単かつ迅速に位置合わせして正確な位置に固定することができるとともに、工期を短縮することができる。   According to the present invention, the foundation pile can be easily and quickly aligned and fixed at an accurate position, and the work period can be shortened.

本発明に係る基礎杭固定用補助具の第1実施形態を示す斜視図である。It is a perspective view showing a 1st embodiment of an auxiliary tool for foundation pile fixation concerning the present invention. 本第1実施形態における左右位置調整用ガイド軸および前後位置調整用固定リングを示す平面図である。It is a top view which shows the guide shaft for left-right position adjustment in this 1st Embodiment, and the fixing ring for front-back position adjustment. 本発明に係る基礎杭固定工法の第1実施形態を示すフローチャートである。It is a flowchart which shows 1st Embodiment of the foundation pile fixing construction method which concerns on this invention. 本発明に係る基礎杭固定工法の第1実施形態における、(a)前後位置調整工程、および(b)左右位置調整工程を説明する図である。It is a figure explaining the (a) front-back position adjustment process and (b) left-right position adjustment process in 1st Embodiment of the foundation pile fixing construction method which concerns on this invention. 本発明に係る基礎杭固定用補助具の第2実施形態を示す斜視図である。It is a perspective view which shows 2nd Embodiment of the auxiliary tool for foundation pile fixing which concerns on this invention. 本発明に係る基礎杭固定工法の第2実施形態を示すフローチャートである。It is a flowchart which shows 2nd Embodiment of the foundation pile fixing construction method which concerns on this invention.

以下、本発明に係る基礎杭固定用補助具およびこれを用いた基礎杭固定方法の第1実施形態について、図面を用いて説明する。   Hereinafter, a first embodiment of an auxiliary tool for fixing a foundation pile according to the present invention and a foundation pile fixing method using the same will be described with reference to the drawings.

基礎杭固定用補助具1Aは、太陽光パネル架台の基礎杭10を所定の位置に固定するために用いられるものである。本第1実施形態において、基礎杭10は、円筒状の鋼管杭によって構成されており、基礎杭10内にモルタル等の充填剤を注入するための注入孔11がその上端部に設けられている。そして、前記基礎杭10は地面に形成された掘削孔に挿入された後に基礎杭固定用補助具1Aを用いて固定されて、その基礎杭10内に充填剤が充填されることにより設置されるようになっている。   The auxiliary tool 1A for fixing the foundation pile is used for fixing the foundation pile 10 of the solar panel mount in a predetermined position. In this 1st Embodiment, the foundation pile 10 is comprised by the cylindrical steel pipe pile, and the injection hole 11 for inject | pouring fillers, such as mortar, in the foundation pile 10 is provided in the upper end part. . And the said foundation pile 10 is installed using the auxiliary tool 1A for foundation pile fixation after being inserted in the excavation hole formed in the ground, and the foundation pile 10 is installed by being filled with the filler. It is like that.

本第1実施形態において、基礎杭固定用補助具1Aは、図1に示すように、主として、下端部が地面に接地する複数の支持脚2と、これらの支持脚2によって支持される一対の水平保持フレーム3,3と、各水平保持フレーム3に両端を支持される左右位置調整用ガイド軸4と、この左右位置調整用ガイド軸4に設けられる前後位置調整用固定リング5とによって構成されている。以下、各構成部材について詳細に説明する。なお、本第1実施形態における左右方向とは、図1に示すように水平保持フレーム3の長手方向に沿った左右を意味し、前後方向とは、この長手方向と水平に直交する方向に沿った前後を意味するものである。   In the first embodiment, as shown in FIG. 1, the foundation pile fixing auxiliary tool 1 </ b> A mainly includes a plurality of support legs 2 whose lower ends are grounded to the ground, and a pair of support legs 2 supported by these support legs 2. The horizontal holding frames 3 and 3, the left and right position adjusting guide shaft 4 supported at both ends by each horizontal holding frame 3, and the front and rear position adjusting fixing ring 5 provided on the left and right position adjusting guide shaft 4 are configured. ing. Hereinafter, each component will be described in detail. Note that the left-right direction in the first embodiment means the left-right along the longitudinal direction of the horizontal holding frame 3 as shown in FIG. 1, and the front-rear direction is along the direction orthogonal to the longitudinal direction. It means before and after.

支持脚2は、一対の水平保持フレーム3,3を所定の高さ位置に支持するためのものである。本第1実施形態において、支持脚2は、下方に向けて拡開するように設けられた四本の棒状部材によって構成されており、図1に示すように、上端部と中央部近傍にそれぞれ一対の水平保持フレーム3,3が固定されている。   The support legs 2 are for supporting the pair of horizontal holding frames 3 and 3 at a predetermined height position. In the first embodiment, the support leg 2 is constituted by four rod-shaped members provided so as to expand downward, and as shown in FIG. A pair of horizontal holding frames 3 and 3 are fixed.

一対の水平保持フレーム3,3は、左右位置調整用ガイド軸4の両端を支持するためのものである。本第1実施形態において、各水平保持フレーム3は、L型アングル材等の縦断面略L形に形成された長尺部材によって構成されており、互いに向かい合う位置に設けられて、支持脚2の所定の高さ位置に略水平方向に固定されている。また、これら水平保持フレーム3は、L型アングル材等の連結材32によって連結され、略コの字形状に形成されている。なお、各水平保持フレーム3の接合方法は、ボルト等で固定してもよく、溶接等で接合してもよく、水平保持フレーム3と連結材32とを一体的に形成してもよい。   The pair of horizontal holding frames 3 and 3 are for supporting both ends of the left and right position adjusting guide shaft 4. In the first embodiment, each horizontal holding frame 3 is constituted by a long member formed in a substantially L-shaped longitudinal section such as an L-shaped angle member, and is provided at a position facing each other, and It is fixed in a substantially horizontal direction at a predetermined height position. These horizontal holding frames 3 are connected by a connecting member 32 such as an L-shaped angle member, and are formed in a substantially U-shape. In addition, the joining method of each horizontal holding frame 3 may be fixed with a volt | bolt etc., may be joined by welding etc., and the horizontal holding frame 3 and the connection material 32 may be formed integrally.

本第1実施形態において、各水平保持フレーム3の垂直面には、図1に示すように、略水平方向に沿って長孔31が設けられている。そして、長孔31のそれぞれが左右位置調整用ガイド軸4の両端を略水平方向へ移動可能に支持している。なお、本発明において、略水平方向とは、水平方向のみならず、本発明の作用効果を奏する範囲で水平に近い方向を含む概念である。   In the first embodiment, a long hole 31 is provided in the vertical surface of each horizontal holding frame 3 along the substantially horizontal direction as shown in FIG. Each of the long holes 31 supports both ends of the left and right position adjusting guide shaft 4 so as to be movable in a substantially horizontal direction. In the present invention, the substantially horizontal direction is a concept including not only the horizontal direction but also a direction close to the horizontal within the range in which the effects of the present invention are exhibited.

左右位置調整用ガイド軸4は、基礎杭10に対する左右方向の位置を調整するためのものである。本第1実施形態において、左右位置調整用ガイド軸4は、図2に示すように、寸切りボルト41と、寸切りボルト41の両端から螺合されて水平保持フレーム3に締結される一対の固定ナット42,42とを有している。そして、寸切りボルト41の両端を長孔31に沿ってスライドさせて基礎杭10に対する左右位置を調整し、各水平保持フレーム3の両側から固定ナット42で締結させることにより、左右位置調整用ガイド軸4の左右方向の位置が決定されるようになっている。   The left and right position adjusting guide shaft 4 is for adjusting the position in the left and right direction with respect to the foundation pile 10. In the first embodiment, as shown in FIG. 2, the left / right position adjusting guide shaft 4 is screwed from both ends of the dimensioning bolt 41 and the pair of dimensioning bolts 41 and fastened to the horizontal holding frame 3. And fixing nuts 42, 42. And the both ends of the dimension bolt 41 are slid along the long hole 31, the left-right position with respect to the foundation pile 10 is adjusted, and it is made to fasten with the fixing nut 42 from the both sides of each horizontal holding frame 3, and thereby the guide for left-right position adjustment The position of the shaft 4 in the left-right direction is determined.

前後位置調整用固定リング5は、左右位置調整用ガイド軸4に沿って移動可能に設けられ、基礎杭10に対する前後位置を調整するためのものである。本第1実施形態において、前後位置調整用固定リング5は、図2に示すように、基礎杭10を挟持する一対の挟持バンド51,51と、この挟持バンド51を左右位置調整用ガイド軸4に連結する連結プレート52と、寸切りボルト41に螺合され連結プレート52の両側に締結される一対の固定ナット53,53とを有している。   The front-rear position adjusting fixing ring 5 is provided so as to be movable along the left-right position adjusting guide shaft 4 and is used to adjust the front-rear position with respect to the foundation pile 10. In the first embodiment, as shown in FIG. 2, the front-rear position adjusting fixing ring 5 includes a pair of sandwiching bands 51, 51 that sandwich the foundation pile 10, and the sandwiching band 51 for the left-right position adjusting guide shaft 4. And a pair of fixing nuts 53, 53 that are screwed to the dimensioning bolt 41 and fastened to both sides of the connection plate 52.

なお、本発明において、前後位置調整用固定リング5は、円筒状の基礎杭10の断面形状に合わせて略円形状を成しているが、この形状に限定されるものではない。すなわち、基礎杭10を挟持して固定可能な形状であれば、略四角形状や多角形状等でもよく、適宜変更して構成されるものである。   In addition, in this invention, although the fixing ring 5 for front-back position adjustment has comprised the substantially circular shape according to the cross-sectional shape of the cylindrical foundation pile 10, it is not limited to this shape. In other words, as long as the foundation pile 10 can be sandwiched and fixed, it may be a substantially rectangular shape, a polygonal shape, or the like, and is appropriately modified.

一対の挟持バンド51,51は、基礎杭10を挟持して着脱可能に固定するためのものである。本第1実施形態において、各挟持バンド51は、長尺状の板状部材の中央付近を基礎杭10の外径に合わせて略半円形状に湾曲形成されており、これらの両端部のそれぞれには、締め付け用の固定ボルト54が設けられている。そして、掘削孔に挿入された基礎杭10を所定の高さ位置まで持ち上げた状態で、各挟持バンド51によって左右方向から挟持して、固定ボルト54をナット55で締結させることにより、基礎杭10が所定の高さ位置で固定されるようになっている。   A pair of clamping bands 51 and 51 are for pinching the foundation pile 10 and detachably fixing it. In the first embodiment, each clamping band 51 is formed in a substantially semicircular shape in the vicinity of the center of the long plate-like member in accordance with the outer diameter of the foundation pile 10, and each of these both end portions. Is provided with a fastening bolt 54 for fastening. Then, the foundation pile 10 inserted into the excavation hole is clamped from the left and right directions by the clamping bands 51 in a state where the foundation pile 10 is lifted up to a predetermined height position, and the fixing bolt 54 is fastened by the nut 55, whereby the foundation pile 10 Is fixed at a predetermined height position.

前記一対の挟持バンド51,51の一方には、湾曲された略中央位置に板状の連結プレート52が固定されている。この連結プレート52の自由端部には、前述した左右位置調整用ガイド軸4の寸切りボルト41が貫通されており、挟持バンド51を軸方向へ移動可能に連結させている。そして、この連結プレート52を寸切りボルト41に沿ってスライドさせて基礎杭10に対する前後位置を調整し、各挟持バンド51が略水平になるようにして連結プレート52の両側を固定ナット53で締結させることにより、前後位置調整用固定リング5の前後方向の位置が決定されるようになっている。   A plate-like connection plate 52 is fixed to one of the pair of sandwiching bands 51, 51 at a substantially centered position. In the free end portion of the connecting plate 52, the above-described dimension cutting bolt 41 of the left and right position adjusting guide shaft 4 is penetrated to connect the holding band 51 so as to be movable in the axial direction. Then, the connecting plate 52 is slid along the cutting bolt 41 to adjust the front-rear position with respect to the foundation pile 10, and both sides of the connecting plate 52 are fastened with the fixing nuts 53 so that the holding bands 51 are substantially horizontal. By doing so, the position of the front-rear position adjusting fixing ring 5 in the front-rear direction is determined.

つぎに、本第1実施形態の基礎杭固定用補助具1Aの作用、およびこれを用いた基礎杭固定方法について、図3のフローチャートを参照しつつ説明する。   Next, the operation of the foundation pile fixing auxiliary tool 1A of the first embodiment and the foundation pile fixing method using the same will be described with reference to the flowchart of FIG.

基礎杭10を固定する場合には、まず、基礎杭10の中心点の位置出し測量を行った後、基礎杭10の仕上がり高さを確認して、丁張り杭とこの丁張り杭に張られた水糸を設置する。そして、所定の大型クローラードリル等を基礎杭10の中心点に合わせてセットして、基礎杭10を建て込むための掘削孔を地面に形成する(ステップS1:掘削孔形成工程)。この掘削孔は、基礎杭10の外径より僅かに大きく、底部に接地した基礎杭10が仕上がり高さになるよりやや深く形成されている。   When fixing the foundation pile 10, first, after positioning and surveying the center point of the foundation pile 10, the finished height of the foundation pile 10 is confirmed, and the tension pile and the tension pile are stretched. Install a water thread. And a predetermined large crawler drill etc. are set according to the center point of the foundation pile 10, and the excavation hole for building the foundation pile 10 is formed in the ground (step S1: excavation hole formation process). The excavation hole is slightly larger than the outer diameter of the foundation pile 10 and is formed slightly deeper than the foundation pile 10 grounded at the bottom reaches the finished height.

つぎに、掘削孔にモルタル等の充填剤を地表面まで充填する(ステップS2:第1充填剤充填工程)。本発明では、後に基礎杭固定用補助具1Aによって基礎杭10の位置調整が行われるため、従来のように基礎杭10と掘削孔との隙間に砕石などを埋めて基礎杭10を固定する工程が必要ない。そのため、砕石等の邪魔がないことから基礎杭10を挿入する前に掘削孔に直接充填剤を充填することが可能となる。   Next, the excavation hole is filled with a filler such as mortar up to the ground surface (step S2: first filler filling step). In the present invention, since the position adjustment of the foundation pile 10 is performed later by the foundation pile fixing auxiliary tool 1A, the step of fixing the foundation pile 10 by filling crushed stone or the like in the gap between the foundation pile 10 and the excavation hole as in the prior art. Is not necessary. Therefore, since there is no hindrance such as crushed stone, it is possible to fill the excavation hole with the filler directly before inserting the foundation pile 10.

第1充填剤充填工程の後、掘削孔に基礎杭10を挿入する(ステップS3:杭挿入工程)。これにより、基礎杭10の開口された底部から杭下部に充填剤が一気に充填されるため、充填作業にかかる時間が大幅に短縮される。また、補助具設置工程前に基礎杭10を挿入することにより、地盤の傾斜が大きい場所に設置する場合であっても基礎杭固定用補助具1Aの位置を気にすることなく、基礎杭10を掘削孔内へ速やかに挿入することが可能となる。   After the first filler filling step, the foundation pile 10 is inserted into the excavation hole (step S3: pile insertion step). Thereby, since the filler is filled at a stretch from the opened bottom portion of the foundation pile 10 to the lower portion of the pile, the time required for the filling operation is significantly shortened. Moreover, even if it is a case where it installs in the place where the inclination of a ground is large by inserting the foundation pile 10 before an auxiliary tool installation process, the foundation pile 10 does not care about the position of the auxiliary tool 1A for foundation pile fixation. Can be quickly inserted into the borehole.

つづいて、掘削孔が一対の水平保持フレーム3,3の間に位置するように、基礎杭固定用補助具1Aを設置する(ステップS4:補助具設置工程)。これにより、基礎杭10を設置する平面的な位置を一対の水平保持フレーム3によって囲まれる範囲内で調整することが可能になる。このように、本発明の基礎杭固定用補助具1Aは、一対の水平保持フレーム3,3間距離に応じて位置調整可能な範囲が広く確保できるため、基礎杭固定用補助具1Aの設置位置に特に気を配る必要はない。また、一対の水平保持フレーム3,3における開放部分から横方向にずらすだけで、基礎杭固定用補助具1Aを容易に設置することが可能である。   Subsequently, the foundation pile fixing auxiliary tool 1A is installed so that the excavation hole is located between the pair of horizontal holding frames 3 and 3 (step S4: auxiliary tool installation step). Thereby, the planar position where the foundation pile 10 is installed can be adjusted within a range surrounded by the pair of horizontal holding frames 3. Thus, since the auxiliary | assistant tool 1A for foundation pile fixing of this invention can ensure the range which can adjust a position widely according to the distance between a pair of horizontal holding frames 3 and 3, the installation position of auxiliary | assistant tool 1A for foundation pile fixing There is no need to pay special attention. Moreover, the auxiliary | assistant tool 1A for foundation pile fixing can be easily installed only by shifting to the horizontal direction from the open part in a pair of horizontal holding frames 3 and 3. FIG.

つぎに、前後位置調整用固定リング5を杭芯の前後位置に略一致させるように、前後方向にスライドさせて固定する(ステップS5:前後位置調整工程)。具体的には、図4(a)に示すように、連結プレート52の長手方向を杭芯の前後位置に合わせて張られた水糸の通りに略一致させるように目視で確認しながら、連結プレート52を寸切りボルト41に沿ってスライドさせて固定する。これにより、基礎杭10に対する前後方向の位置を簡単かつ迅速に調整することが可能となる。   Next, the front / rear position adjusting fixing ring 5 is fixed by sliding in the front / rear direction so as to substantially match the front / rear position of the pile core (step S5: front / rear position adjusting step). Specifically, as shown in FIG. 4A, the connection plate 52 is connected while visually confirming that the longitudinal direction of the connection plate 52 is substantially matched with the stretched water string aligned with the front and rear positions of the pile core. The plate 52 is slid along the cutting bolt 41 and fixed. Thereby, the position of the front-back direction with respect to the foundation pile 10 can be adjusted easily and rapidly.

つづいて、左右位置調整用ガイド軸4を杭芯の左右位置に略一致させるように、左右方向にスライドさせて固定する(ステップS6:左右位置調整工程)。具体的には、図4(b)に示すように、左右位置調整用ガイド軸4に固定された前後位置調整用固定リング5の中心位置を、上記の水糸における距離(杭間距離)に略一致させるように目視で確認しながら、左右位置調整用ガイド軸4を長孔31に沿ってスライドさせて固定する。これにより、基礎杭10に対する左右方向の位置を簡単かつ迅速に調整することが可能となる。   Subsequently, the left / right position adjusting guide shaft 4 is fixed by sliding in the left / right direction so as to substantially match the left / right position of the pile core (step S6: left / right position adjusting step). Specifically, as shown in FIG. 4 (b), the center position of the front / rear position adjusting fixing ring 5 fixed to the left / right position adjusting guide shaft 4 is set to a distance (distance between piles) in the above-described water yarn. The left and right position adjusting guide shaft 4 is slid along the long hole 31 and fixed while visually confirming that they are substantially matched. Thereby, it becomes possible to adjust the position of the left-right direction with respect to the foundation pile 10 easily and rapidly.

そして、前後位置調整用固定リング5に基礎杭10を挟持して固定する(ステップS7:杭固定工程)。具体的には、水糸から基礎杭10の上端部までの高さを測定し、基礎杭10を所定の高さ位置まで持ち上げて一対の挟持バンド51,51で挟持して固定する。これにより、基礎杭10を正確な平面位置に固定することが可能になる。さらに、基礎杭10を正確な高さ位置に固定することも可能になる。また、掘削孔の底部から浮かせた状態で固定されるため、掘削孔の床付け作業が不要となる。   And the foundation pile 10 is clamped and fixed to the fixing ring 5 for front-back position adjustment (step S7: pile fixing process). Specifically, the height from the water thread to the upper end of the foundation pile 10 is measured, the foundation pile 10 is lifted to a predetermined height position, and is clamped and fixed by a pair of clamping bands 51 and 51. Thereby, it becomes possible to fix the foundation pile 10 to an exact plane position. Further, it becomes possible to fix the foundation pile 10 at an accurate height position. Moreover, since it is fixed in a state of being floated from the bottom of the excavation hole, the flooring operation of the excavation hole is not required.

なお、本第1実施形態では、一対の水平保持フレーム3,3が、支持脚2に対する上端部と中央部近傍にそれぞれ設けられているため、ステップS5〜ステップS7における工程が、一対の水平保持フレーム3のそれぞれに設けられた左右位置調整用ガイド軸4と前後位置調整用固定リング5に対して行われる。このように、一対の水平保持フレーム3,3が支持脚2に対して異なる高さ位置に複数設けられることにより、基礎杭10をより確実に鉛直に保持することが可能になる。   In the first embodiment, since the pair of horizontal holding frames 3 and 3 are provided in the vicinity of the upper end portion and the center portion with respect to the support leg 2, the steps S5 to S7 are performed as a pair of horizontal holding frames. This is performed on the left and right position adjusting guide shafts 4 and the front and rear position adjusting fixing rings 5 provided on the respective frames 3. Thus, by providing a plurality of the pair of horizontal holding frames 3 and 3 at different height positions with respect to the support leg 2, the foundation pile 10 can be more securely held vertically.

最後に、この基礎杭10の注入孔11から基礎杭10の内部に充填剤を充填する(ステップS8:第2充填剤充填工程)。1回目の充填工程において杭下部に充填されているため、本工程では基礎杭10の上部にのみに充填すればよい。このため、充填作業にかかる時間が大幅に短縮される。   Finally, a filler is filled into the foundation pile 10 from the injection hole 11 of the foundation pile 10 (step S8: second filler filling step). Since the lower part of the pile is filled in the first filling process, only the upper part of the foundation pile 10 needs to be filled in this process. For this reason, the time taken for the filling operation is greatly reduced.

そして、第2充填剤充填工程の後に充填剤の硬化を確認して、基礎杭固定用補助具1Aを取り外すことにより、基礎杭10の設置作業が完了する。具体的には、一対の挟持バンド51,51を緩め、一対の水平保持フレーム3,3における開口部分から横方向にずらして取り外す。このように、基礎杭10が設置された状態であっても、基礎杭固定用補助具1Aを容易に取り外すことが可能である。また、取り外した基礎杭固定用補助具1Aを別の基礎杭10に対して再利用することも可能である。   And the installation work of the foundation pile 10 is completed by confirming hardening of a filler after a 2nd filler filling process, and removing 1 A of auxiliary tools for foundation pile fixation. Specifically, the pair of sandwiching bands 51, 51 are loosened and removed from the opening portions of the pair of horizontal holding frames 3, 3 in the lateral direction. Thus, even if the foundation pile 10 is in the installed state, it is possible to easily remove the foundation pile fixing auxiliary tool 1A. Moreover, it is also possible to reuse the removed foundation pile fixing auxiliary tool 1 </ b> A for another foundation pile 10.

以上のような本第1実施形態の基礎杭固定用補助具1Aおよび基礎杭固定方法によれば、以下の効果を奏する。
1.基礎杭10を簡単かつ迅速に位置合わせし、正確な位置に固定することができる。
2.充填剤の注入に要する時間が大幅に短縮されるため、工期を短縮することができる。
3.基礎杭10の左右方向および前後方向からなる平面的な位置、および高さ方向の位置を精度良く調整することができる。
4.基礎杭10を正確な位置に固定することで、施工のやり直しを防止し、施工コストや施工工期を抑制することができる。
5.太陽光パネル架台の品質を向上することができる。
According to the foundation pile fixing auxiliary tool 1A and the foundation pile fixing method of the first embodiment as described above, the following effects are produced.
1. The foundation pile 10 can be easily and quickly aligned and fixed at an accurate position.
2. Since the time required for injecting the filler is greatly shortened, the construction period can be shortened.
3. The planar position which consists of the left-right direction and the front-back direction of the foundation pile 10, and the position of a height direction can be adjusted with sufficient precision.
4). By fixing the foundation pile 10 at an accurate position, it is possible to prevent re-execution of construction and to suppress construction cost and construction period.
5). The quality of the solar panel mount can be improved.

つぎに、本発明に係る基礎杭固定用補助具および基礎杭固定方法の第2実施形態について説明する。なお、第2実施形態の構成のうち、上述した第1実施形態と同一もしくは相当する構成については同一の符号を付し、再度の説明を省略する。   Below, 2nd Embodiment of the auxiliary | assistant tool for foundation pile fixing and the foundation pile fixing method which concern on this invention is described. Note that, in the configuration of the second embodiment, the same or corresponding components as those in the first embodiment described above are denoted by the same reference numerals, and description thereof is omitted.

本第2実施形態の基礎杭固定用補助具1Bおよび基礎杭固定方法の特徴は、上端が基礎杭固定用補助具1Bより低い基礎杭10であっても簡単かつ迅速に位置合わせして正確な位置に固定することができるとともに、工期を短縮する点にある。   The feature of the foundation pile fixing auxiliary tool 1B and the foundation pile fixing method of the second embodiment is that the upper end of the foundation pile fixing auxiliary tool 1B is lower and lower than the foundation pile fixing auxiliary tool 1B. In addition to being able to fix the position, the construction period is shortened.

本第2実施形態において、基礎杭固定用補助具1Bは、図5に示すように、主として、下端部が地面に接地する複数の支持脚2と、これらの支持脚2によって上下二段に支持される上段フレーム6および下段フレーム7と、これら上段フレーム6と下段フレーム7との間に支持される一対の垂直保持フレーム8,8と、各垂直保持フレーム8に両端を支持される上下位置調整用ガイド軸9と、この上下位置調整用ガイド軸9に設けられる前後位置調整用固定リング5とによって構成されている。以下、各構成部材について詳細に説明する。なお、本第2実施形態における上下方向とは、図5に示すように垂直保持フレーム8の長手方向に沿った上下を意味するものである。   In the second embodiment, as shown in FIG. 5, the foundation pile fixing auxiliary tool 1 </ b> B is mainly supported by a plurality of support legs 2 whose lower end portions are in contact with the ground, and these support legs 2 in two upper and lower stages. Upper frame 6 and lower frame 7, a pair of vertical holding frames 8, 8 supported between the upper frame 6 and the lower frame 7, and vertical position adjustment in which both ends are supported by each vertical holding frame 8. And a front-rear position adjusting fixing ring 5 provided on the vertical position adjusting guide shaft 9. Hereinafter, each component will be described in detail. Note that the vertical direction in the second embodiment means the vertical direction along the longitudinal direction of the vertical holding frame 8 as shown in FIG.

支持脚2は、一対の垂直保持フレーム8,8を所定の高さ位置に支持するためのものである。本第2実施形態において、支持脚2は、下方に向けて拡開するように設けられた四本の棒状部材によって構成されており、図5に示すように、平面視で略コの字形状に形成された上段フレーム6と下段フレーム7が、それぞれ上段側と下段側に固定されている。   The support leg 2 is for supporting the pair of vertical holding frames 8 and 8 at a predetermined height position. In the second embodiment, the support leg 2 is composed of four rod-shaped members provided so as to expand downward, and as shown in FIG. 5, is substantially U-shaped in plan view. The upper frame 6 and the lower frame 7 formed in the above are fixed to the upper and lower stages, respectively.

一対の垂直保持フレーム8,8は、上下位置調整用ガイド軸9の両端を支持するためのものである。本第2実施形態において、各垂直保持フレーム8は、図5に示すように、互いに向かい合う位置に設けられ、上段フレーム6と下段フレーム7との間に略垂直状態で固定されている。   The pair of vertical holding frames 8, 8 are for supporting both ends of the vertical position adjusting guide shaft 9. In the second embodiment, as shown in FIG. 5, the vertical holding frames 8 are provided at positions facing each other, and are fixed between the upper frame 6 and the lower frame 7 in a substantially vertical state.

また、本第2実施形態において、各垂直保持フレーム8には、図5に示すように、略垂直方向に沿って長孔81が設けられている。そして、長孔81のそれぞれが上下位置調整用ガイド軸9の両端を略垂直方向へ移動可能に支持している。なお、本発明において、略垂直方向とは、垂直方向のみならず、本発明の作用効果を奏する範囲で垂直に近い方向を含む概念である。   In the second embodiment, each vertical holding frame 8 is provided with a long hole 81 along a substantially vertical direction as shown in FIG. Each of the long holes 81 supports both ends of the vertical position adjusting guide shaft 9 so as to be movable in a substantially vertical direction. In the present invention, the substantially vertical direction is a concept including not only the vertical direction but also a direction close to vertical within the range where the effects of the present invention are exhibited.

上下位置調整用ガイド軸9は、基礎杭10に対する上下方向の位置を調整するためのものである。本第2実施形態において、上下位置調整用ガイド軸9は、図5に示すように、寸切りボルト91と、寸切りボルト91の両端から螺合されて垂直保持フレーム8に締結される一対の固定ナット92とを有している。そして、寸切りボルト91の両端を長孔81に沿ってスライドさせて基礎杭10に対する上下位置を調整し、各垂直保持フレーム8の両側から固定ナット92で締結させることにより、上下位置調整用ガイド軸9の上下方向の位置が決定されるようになっている。   The vertical position adjusting guide shaft 9 is for adjusting the vertical position of the foundation pile 10. In the second embodiment, as shown in FIG. 5, the guide shaft 9 for adjusting the vertical position is a pair of a dimensioning bolt 91 and a pair of screws that are screwed from both ends of the dimensioning bolt 91 and fastened to the vertical holding frame 8. And a fixing nut 92. And the both ends of the slicing bolt 91 are slid along the long hole 81 to adjust the vertical position with respect to the foundation pile 10, and are fastened with the fixing nuts 92 from both sides of each vertical holding frame 8. The position of the shaft 9 in the vertical direction is determined.

前後位置調整用固定リング5は、上下位置調整用ガイド軸9に沿って移動可能に設けられ、基礎杭10に対する前後位置を調整するためのものである。本第2実施形態において、前後位置調整用固定リング5は、図5に示すように、第1実施形態と同様の構成を有している。   The front-rear position adjustment fixing ring 5 is provided so as to be movable along the vertical position adjustment guide shaft 9 and is used to adjust the front-rear position with respect to the foundation pile 10. In the second embodiment, the front-rear position adjusting fixing ring 5 has the same configuration as that of the first embodiment, as shown in FIG.

つぎに、本第2実施形態の基礎杭固定用補助具1Bの作用、およびこれを用いた基礎杭固定方法について、図6のフローチャートを参照しつつ説明する。   Next, the action of the foundation pile fixing auxiliary tool 1B of the second embodiment and the foundation pile fixing method using the same will be described with reference to the flowchart of FIG.

まず、ステップS11からステップS13までは、第1実施形態と同様の工程を行う。つぎに、前後位置調整用固定リング5が杭芯の左右位置に略一致するように基礎杭固定用補助具1Bを設置する(ステップS14:補助具設置工程)。具体的には、上下位置調整用ガイド軸9に固定された前後位置調整用固定リング5の中心位置が、上記の水糸における距離(杭間距離)に略一致するように基礎杭固定用補助具1Bを設置する。これにより、基礎杭10に対する左右方向の位置が簡単かつ迅速に調整される。   First, from step S11 to step S13, the same processes as in the first embodiment are performed. Next, the foundation pile fixing auxiliary tool 1B is installed so that the front-rear position adjusting fixing ring 5 substantially coincides with the left and right positions of the pile core (step S14: auxiliary tool installation step). Specifically, the foundation pile fixing auxiliary is set so that the center position of the front / rear position adjusting fixing ring 5 fixed to the vertical position adjusting guide shaft 9 substantially coincides with the distance (distance between piles) in the water string. The tool 1B is installed. Thereby, the position of the left-right direction with respect to the foundation pile 10 is adjusted easily and rapidly.

つづいて、上下位置調整用ガイド軸9を基礎杭10の上端よりも低くなるように、上下方向にスライドさせて固定する(ステップS15:上下位置調整工程)。これにより、上端が基礎杭固定用補助具1Bより低い基礎杭10であっても簡単かつ迅速に位置合わせして正確な位置に固定することが可能となる。   Subsequently, the vertical position adjusting guide shaft 9 is fixed by sliding in the vertical direction so as to be lower than the upper end of the foundation pile 10 (step S15: vertical position adjusting step). Thereby, even if it is the foundation pile 10 whose upper end is lower than the auxiliary | assistant tool 1B for foundation pile fixing, it becomes possible to align easily and rapidly and to fix to an exact position.

その後、第1実施形態のステップS5と同様、前後位置調整用固定リング5の前後位置を調整した後(ステップS16)、第1実施形態のステップS7、ステップS8と同様の工程を実施することにより(ステップS17,ステップS18)、基礎杭10の設置作業が完了する。   Thereafter, similarly to step S5 of the first embodiment, after adjusting the front-rear position of the front-rear position adjusting fixing ring 5 (step S16), the same processes as steps S7 and S8 of the first embodiment are performed. (Step S17, Step S18), the installation work of the foundation pile 10 is completed.

以上の本第2実施形態によれば、上端が基礎杭固定用補助具1Bより低い基礎杭であっても簡単かつ迅速に位置合わせして正確な位置に固定することができるとともに、工期を短縮することができるという作用効果を奏する。   According to the above second embodiment, even if the upper end of the foundation pile is lower than the foundation pile fixing auxiliary tool 1B, it can be easily and quickly aligned and fixed at an accurate position, and the construction period is shortened. There is an effect that it can be performed.

なお、本発明に係る基礎杭固定用補助具および基礎杭固定方法は、上述した各実施形態に限定されるものではなく、適宜変更することができる。   In addition, the auxiliary | assistant tool for foundation pile fixing and the foundation pile fixing method which concern on this invention are not limited to each embodiment mentioned above, It can change suitably.

例えば、上述の第1実施形態において、一対の水平保持フレーム3,3が支持脚2の上端部と中央部近傍にそれぞれ設けられており、一対の水平保持フレーム3,3のそれぞれには、左右位置調整用ガイド軸4と前後位置調整用固定リング5とが設けられているが、この構成に限定されるものではなく、一対の水平保持フレーム3が支持脚2の上端部における1箇所のみに設けられていてもよく、支持脚2における異なる高さ位置の3箇所以上に設けられていててもよい。なお、一対の水平保持フレーム3,3の支持脚2に対する高さ位置や設けられる個数は、基礎杭10のサイズに応じて適宜変更されうるものである。   For example, in the first embodiment described above, a pair of horizontal holding frames 3 and 3 are provided in the vicinity of the upper end portion and the center portion of the support leg 2, respectively. Although the position adjustment guide shaft 4 and the front and rear position adjustment fixing ring 5 are provided, the present invention is not limited to this configuration, and the pair of horizontal holding frames 3 are provided only at one position on the upper end of the support leg 2. It may be provided, and may be provided in three or more places at different height positions in the support leg 2. In addition, the height position with respect to the support leg 2 of a pair of horizontal holding frames 3 and 3 and the number provided are appropriately changed according to the size of the foundation pile 10.

また、本第1実施形態の基礎杭固定方法において、杭挿入工程(ステップS3)は、第1充填剤充填工程(ステップS2)の直後に行われているが、この順序に限られず、左右位置調整工程(ステップS6)の後である基礎杭固定用補助具1Aの配置決定後に行われるようにしてもよい。これにより、杭が挿入されていない状態で前後および左右位置調整工程が行われるようになり、前後および左右の位置調整工程におけるそれぞれの位置調整作業が行いやすい。   Moreover, in the foundation pile fixing method of this 1st Embodiment, although a pile insertion process (step S3) is performed immediately after a 1st filler filling process (step S2), it is not restricted to this order, Left-right position You may make it perform after arrangement | positioning determination of the auxiliary tool 1A for foundation pile fixation after an adjustment process (step S6). Accordingly, the front and rear and left and right position adjustment steps are performed in a state where no pile is inserted, and the respective position adjustment operations in the front and rear and left and right position adjustment steps are easily performed.

また、杭挿入工程(ステップS3)と補助具設置工程(ステップS4)とは、順序を入れ替えて行われてもよい。さらに、前後位置調整工程(ステップS5)と左右位置調整工程(ステップS6)とは、順序を入れ替えて行われてもよい。   Moreover, a pile insertion process (step S3) and an auxiliary tool installation process (step S4) may be performed by changing order. Furthermore, the front / rear position adjustment step (step S5) and the left / right position adjustment step (step S6) may be performed in a reversed order.

また、第2実施形態の基礎杭固定方法において、杭挿入工程(ステップS13)は、第1充填剤充填工程(ステップS12)の直後に行われているが、この順序に限られず、基礎杭固定用補助具1Bを設置した後(ステップS14の後)や、前後位置調整用固定リング5の前後位置を調整した後(ステップS16の後)に行ってもよい。   Moreover, in the foundation pile fixing method of 2nd Embodiment, although the pile insertion process (step S13) is performed immediately after the 1st filler filling process (step S12), it is not restricted to this order, foundation pile fixation It may be performed after the auxiliary tool 1B is installed (after step S14) or after the front / rear position of the front / rear position adjusting fixing ring 5 is adjusted (after step S16).

1A,1B 基礎杭固定用補助具
2 支持脚
3 水平保持フレーム
4 左右位置調整用ガイド軸
5 前後位置調整用固定リング
6 上段フレーム
7 下段フレーム
8 垂直保持フレーム
9 上下位置調整用ガイド軸
10 基礎杭
11 注入孔
31 長孔
32 連結材
41 寸切りボルト
42 固定ナット
51 挟持バンド
52 連結プレート
53 固定ナット
54 固定ボルト
55 ナット
81 長孔
91 寸切りボルト
92 固定ナット
1A, 1B Auxiliary tools for fixing foundation piles 2 Support legs 3 Horizontal holding frame 4 Guide shaft for horizontal position adjustment 5 Fixing ring for longitudinal position adjustment 6 Upper frame 7 Lower frame 8 Vertical holding frame 9 Vertical adjustment guide shaft 10 Foundation pile DESCRIPTION OF SYMBOLS 11 Injection hole 31 Long hole 32 Connecting material 41 Cutting bolt 42 Fixing nut 51 Holding band 52 Connecting plate 53 Fixing nut 54 Fixing bolt 55 Nut 81 Slotted hole 91 Marking bolt 92 Fixing nut

Claims (7)

太陽光パネル架台の基礎杭を固定するための基礎杭固定用補助具であって、
支持脚によって所定の高さ位置に支持されるとともに、略水平方向に沿う長孔を有し、互いに向かい合う位置に設けられる一対の水平保持フレームと、
前記長孔のそれぞれに略水平方向へ移動可能に両端を支持され、前記基礎杭に対する左右方向の位置を調整可能な左右位置調整用ガイド軸と、
前記左右位置調整用ガイド軸に沿って移動可能に設けられ、前記基礎杭に対する前後方向の位置を調整可能であるとともに、前記基礎杭を挟持して固定する前後位置調整用固定リングと、
を有する、基礎杭固定用補助具。
A foundation pile fixing auxiliary tool for fixing the foundation pile of the solar panel mount,
A pair of horizontal holding frames that are supported at predetermined height positions by the support legs, have a long hole substantially in the horizontal direction, and are provided at positions facing each other;
Left and right position adjustment guide shafts that are supported at both ends so as to be movable in a substantially horizontal direction in each of the elongated holes, and that can adjust the position in the left and right direction relative to the foundation pile,
A front and rear position adjusting fixing ring that is provided movably along the left and right position adjusting guide shaft, is capable of adjusting a position in the front-rear direction with respect to the foundation pile, and sandwiches and fixes the foundation pile;
An auxiliary tool for fixing the foundation pile.
太陽光パネル架台の基礎杭を固定するための基礎杭固定用補助具であって、
支持脚によって所定の高さ位置に支持されるとともに、略垂直方向に沿う長孔を有し、互いに向かい合う位置に設けられる一対の垂直保持フレームと、
前記長孔のそれぞれに略垂直方向へ移動可能に両端を支持され、前記基礎杭に対する上下方向の位置を調整可能な上下位置調整用ガイド軸と、
前記上下位置調整用ガイド軸に沿って移動可能に設けられ、前記基礎杭に対する前後方向の位置を調整可能であるとともに、前記基礎杭を挟持して固定する前後位置調整用固定リングと、
を有する、基礎杭固定用補助具。
A foundation pile fixing auxiliary tool for fixing the foundation pile of the solar panel mount,
A pair of vertical holding frames that are supported by the supporting legs at a predetermined height, have long holes along a substantially vertical direction, and are provided at positions facing each other;
Up and down position adjustment guide shafts that are supported at both ends so as to be movable in a substantially vertical direction in each of the long holes, and that can adjust the vertical position with respect to the foundation pile,
A front and rear position adjustment fixing ring that is provided so as to be movable along the vertical position adjustment guide shaft, is capable of adjusting a position in the front-rear direction with respect to the foundation pile, and sandwiches and fixes the foundation pile;
An auxiliary tool for fixing the foundation pile.
前記左右位置調整用ガイド軸は、寸切りボルトと、前記寸切りボルトの両端に螺合され前記水平保持フレームに締結される固定ナットとを有しており、
前記前後位置調整用固定リングは、前記基礎杭を挟持する一対の挟持バンドと、前記挟持バンドを左右位置調整用ガイド軸に連結する連結プレートと、前記寸切りボルトに螺合され前記連結プレートの両側に締結される固定ナットとを有している、
請求項1に記載の基礎杭固定用補助具。
The left and right position adjusting guide shaft includes a dimensioning bolt and a fixing nut that is screwed to both ends of the dimensioning bolt and fastened to the horizontal holding frame.
The front / rear position adjusting fixing ring includes a pair of holding bands for holding the foundation pile, a connecting plate for connecting the holding band to a guide shaft for adjusting the left / right position, and a threaded bolt to the dimensioning bolt. Having fixing nuts fastened on both sides,
The auxiliary tool for fixing a foundation pile according to claim 1.
前記上下位置調整用ガイド軸は、寸切りボルトと、前記寸切りボルトの両端に螺合され前記垂直保持フレームに締結される固定ナットとを有しており、
前記前後位置調整用固定リングは、前記基礎杭を挟持する一対の挟持バンドと、前記挟持バンドを上下位置調整用ガイド軸に連結する連結プレートと、前記寸切りボルトに螺合され前記連結プレートの両側に締結される固定ナットとを有している、
請求項2に記載の基礎杭固定用補助具。
The vertical position adjusting guide shaft includes a dimensioning bolt and a fixing nut that is screwed to both ends of the dimensioning bolt and fastened to the vertical holding frame.
The front / rear position adjusting fixing ring includes a pair of holding bands for holding the foundation pile, a connecting plate for connecting the holding band to a guide shaft for adjusting the vertical position, and a screw that is screwed to the dimensioning bolt. Having fixing nuts fastened on both sides,
The auxiliary tool for fixing a foundation pile according to claim 2.
前記一対の水平保持フレームが、前記支持脚に対して異なる高さ位置に複数設けられており、前記一対の水平保持フレームのそれぞれには、前記左右位置調整用ガイド軸と、前記前後位置調整用固定リングとが設けられている、請求項1または請求項3に記載の基礎杭固定用補助具。   A plurality of the pair of horizontal holding frames are provided at different height positions with respect to the support legs. Each of the pair of horizontal holding frames includes the left and right position adjusting guide shaft and the front and rear position adjusting The auxiliary tool for fixing a foundation pile according to claim 1 or 3, wherein a fixing ring is provided. 請求項1、請求項3または請求項5のいずれかに記載の基礎杭固定用補助具を用いて、前記基礎杭を固定するための基礎杭固定工法であって、
前記基礎杭を建て込むための掘削孔を地面に形成する掘削孔形成工程と、
前記掘削孔に充填剤を充填する充填剤充填工程と、
前記掘削孔が前記一対の水平保持フレームの間に位置するように、前記基礎杭固定用補助具を設置する補助具設置工程と、
前記前後位置調整用固定リングを杭芯の前後位置に略一致させるように前後方向にスライドさせて固定する前後位置調整工程と、
前記左右位置調整用ガイド軸を杭芯の左右位置に略一致させるように左右方向にスライドさせて固定する左右位置調整工程と、
前記前後位置調整用固定リングに前記基礎杭を挟持して固定する杭固定工程と、
前記充填剤充填工程の後または前記補助具設置工程の後もしくは前記左右位置調整工程の後に行われ、前記掘削孔に前記基礎杭を挿入する杭挿入工程と、
を有する、基礎杭固定工法。
A foundation pile fixing method for fixing the foundation pile using the foundation pile fixing auxiliary tool according to any one of claims 1, 3, or 5,
An excavation hole forming step for forming an excavation hole in the ground for building the foundation pile;
A filler filling step of filling the borehole with a filler;
An auxiliary tool installation step of installing the foundation pile fixing auxiliary tool so that the excavation hole is located between the pair of horizontal holding frames;
A front / rear position adjusting step for fixing the front / rear position adjusting fixing ring by sliding in the front / rear direction so as to substantially match the front / rear position of the pile core;
A left-right position adjusting step for fixing the left-right position adjusting guide shaft by sliding in the left-right direction so as to substantially match the left-right position of the pile core;
A pile fixing step of clamping and fixing the foundation pile to the front and rear position adjusting fixing ring;
A pile insertion step that is performed after the filler filling step or after the auxiliary equipment installation step or after the left-right position adjustment step, and inserting the foundation pile into the excavation hole;
A foundation pile fixing method.
請求項2または請求項4に記載の基礎杭固定用補助具を用いて、前記基礎杭を固定するための基礎杭固定工法であって、
前記基礎杭を建て込むための掘削孔を地面に形成する掘削孔形成工程と、
前記掘削孔に充填剤を充填する充填剤充填工程と、
前記前後位置調整用固定リングが杭芯の左右位置に略一致するように、前記基礎杭固定用補助具を設置する補助具設置工程と、
前記上下位置調整用ガイド軸を基礎杭の上端よりも低くなるように上下方向にスライドさせて固定する上下位置調整工程と、
前記前後位置調整用固定リングを杭芯の前後位置に略一致させるように前後方向にスライドさせて固定する前後位置調整工程と、
前記前後位置調整用固定リングに前記基礎杭を挟持して固定する杭固定工程と、
前記充填剤充填工程の後または前記補助具設置工程の後もしくは前記前後位置調整工程の後に行われ、前記掘削孔に前記基礎杭を挿入する杭挿入工程と、
を有する、基礎杭固定工法。
A foundation pile fixing method for fixing the foundation pile using the foundation pile fixing auxiliary tool according to claim 2 or 4,
An excavation hole forming step for forming an excavation hole in the ground for building the foundation pile;
A filler filling step of filling the borehole with a filler;
An auxiliary equipment installation step of installing the foundation pile fixing auxiliary equipment so that the front-rear position adjusting fixing ring substantially coincides with the left and right positions of the pile core;
A vertical position adjusting step for fixing the vertical position adjusting guide shaft by sliding in the vertical direction so as to be lower than the upper end of the foundation pile;
A front / rear position adjusting step for fixing the front / rear position adjusting fixing ring by sliding in the front / rear direction so as to substantially match the front / rear position of the pile core;
A pile fixing step of clamping and fixing the foundation pile to the front and rear position adjusting fixing ring;
A pile insertion step that is performed after the filler filling step or after the auxiliary equipment setting step or after the front-rear position adjustment step, and inserting the foundation pile into the excavation hole;
A foundation pile fixing method.
JP2019040352A 2018-03-09 2019-03-06 Auxiliary equipment for foundation pile fixation and foundation pile fixation method Active JP6541207B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2018043229 2018-03-09
JP2018043229 2018-03-09

Publications (2)

Publication Number Publication Date
JP6541207B1 JP6541207B1 (en) 2019-07-10
JP2019157615A true JP2019157615A (en) 2019-09-19

Family

ID=67212186

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019040352A Active JP6541207B1 (en) 2018-03-09 2019-03-06 Auxiliary equipment for foundation pile fixation and foundation pile fixation method

Country Status (1)

Country Link
JP (1) JP6541207B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021055347A (en) * 2019-09-30 2021-04-08 大和ハウス工業株式会社 Foundation structure and construction method therefor
KR20220046856A (en) * 2020-10-08 2022-04-15 유한회사 쏠레어테크 dual hull structure of small vessel

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5265909A (en) * 1975-11-26 1977-05-31 Toyo Construction Pile supporting apparatus for pile driver
JPH0925630A (en) * 1995-07-12 1997-01-28 Atsushi Yoshino Pile guide apparatus
JP2009156010A (en) * 2007-12-27 2009-07-16 Chowa Kogyo Kk Pile punching machine alignment method and device
JP2017222982A (en) * 2016-06-13 2017-12-21 鹿島建設株式会社 Pile guide and pile installation method
CN206916745U (en) * 2017-07-14 2018-01-23 浙江之江工程项目管理有限公司 A kind of positioning saddle of the intensive barrier layer cast-in-situ bored pile in underground

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5265909A (en) * 1975-11-26 1977-05-31 Toyo Construction Pile supporting apparatus for pile driver
JPH0925630A (en) * 1995-07-12 1997-01-28 Atsushi Yoshino Pile guide apparatus
JP2009156010A (en) * 2007-12-27 2009-07-16 Chowa Kogyo Kk Pile punching machine alignment method and device
JP2017222982A (en) * 2016-06-13 2017-12-21 鹿島建設株式会社 Pile guide and pile installation method
CN206916745U (en) * 2017-07-14 2018-01-23 浙江之江工程项目管理有限公司 A kind of positioning saddle of the intensive barrier layer cast-in-situ bored pile in underground

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021055347A (en) * 2019-09-30 2021-04-08 大和ハウス工業株式会社 Foundation structure and construction method therefor
KR20220046856A (en) * 2020-10-08 2022-04-15 유한회사 쏠레어테크 dual hull structure of small vessel
KR102404347B1 (en) * 2020-10-08 2022-06-02 유한회사 쏠레어테크 dual hull structure of small vessel

Also Published As

Publication number Publication date
JP6541207B1 (en) 2019-07-10

Similar Documents

Publication Publication Date Title
CN104695557A (en) Steel structure building construction method for one-step pre-burying of foundation bolts
US20080222976A1 (en) Foundation construction for superstructures
US20140259989A1 (en) Pivoting bracket for foundation support system
JP2019157615A (en) Auxiliary tool for fixing foundation pile and method for fixing foundation pile
JP2019112811A (en) Main leg installation method and anchor frame installation jig
KR101285156B1 (en) Centering apparatus of column pile installed in cast-in-place pile construction mold
JP2015212507A (en) Substructure of long object and construction method for substructure of long object
JP6635767B2 (en) How to install the main landing gear on the deep foundation
JP4884117B2 (en) Column and steel pipe pile positioning device and positioning method
JP2015161125A (en) Plumbing adjustment method and building
KR101436119B1 (en) Holding apparatus for CFT column and the construction method of the CFT column using it
KR100532024B1 (en) Column supporter installed at the top of casing
JP7011254B2 (en) Structure Shinbashira building method and structure Shinbashira building device
JPH09291545A (en) Joining method of column and pile
JP2017193857A (en) Attachment structure of transverse member and guard fence
CN113195836B (en) Method and kit for manufacturing the foundation of a column using a sheet material embedded by vibration or tapping
JP2003113960A (en) Buried pipe supporting apparatus
JP5407597B2 (en) Method for constructing joint structure between steel frame and cast-in-place pile
JP5923400B2 (en) How to assemble true pillar
CN211736514U (en) Interior landing stage board construction system that supports
JP5766828B2 (en) Method for installing solar cell module installation stand and solar cell module installation stand
JP3890666B2 (en) Joining method and structure of the structural column and main body steel in the reverse driving method
JP2017008486A (en) Support post installation method
KR102144108B1 (en) Retaining wall construction structure using prestressed concrete and method thereof
JP7181069B2 (en) Reversed strut positioning jig

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190415

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20190418

A975 Report on accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A971005

Effective date: 20190515

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190522

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190606

R150 Certificate of patent or registration of utility model

Ref document number: 6541207

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250