JP2019157349A - Wall body and construction method of wall body - Google Patents

Wall body and construction method of wall body Download PDF

Info

Publication number
JP2019157349A
JP2019157349A JP2018040619A JP2018040619A JP2019157349A JP 2019157349 A JP2019157349 A JP 2019157349A JP 2018040619 A JP2018040619 A JP 2018040619A JP 2018040619 A JP2018040619 A JP 2018040619A JP 2019157349 A JP2019157349 A JP 2019157349A
Authority
JP
Japan
Prior art keywords
pipe
steel pipe
concrete
wall
outer tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2018040619A
Other languages
Japanese (ja)
Other versions
JP6944895B2 (en
Inventor
安永 正道
Masamichi Yasunaga
正道 安永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2018040619A priority Critical patent/JP6944895B2/en
Publication of JP2019157349A publication Critical patent/JP2019157349A/en
Application granted granted Critical
Publication of JP6944895B2 publication Critical patent/JP6944895B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

To provide an easily constructable wall body.SOLUTION: A wall body 1 comprises steel pipes 13 with lower parts buried underground and upper parts protruded from the ground, upper lids 15 and lower lids 17 closing upper ends and lower ends of the steel pipes 13, concrete 11 placed around the upper parts of the steel pipes 13, and multiple inner pipes 19, 21 installed to be extended inside the steel pipes 13 through piping ports 20, 22, respectively. During curing of the concrete 11, water is circulated into the steel pipes 13 using the inner pipes 19, 21.SELECTED DRAWING: Figure 1

Description

本発明は壁体およびその構築方法に関するものである。   The present invention relates to a wall body and a construction method thereof.

壁体の構築方法として、鋼管杭を地盤中に一列に設け、地上に突出したこれらの鋼管杭の上部を鉄筋コンクリートで巻き立てるものがある。   As a construction method of the wall body, there is a method in which steel pipe piles are provided in a row in the ground, and the upper portions of these steel pipe piles protruding above the ground are wound with reinforced concrete.

このような構造の壁体では、コンクリートの打設時の温度上昇と打設後の温度低下によって生じる温度応力により、鋼管杭の配列方向に沿った鉛直ひび割れがコンクリートに入りやすくなることが想定される。   In a wall with such a structure, it is assumed that vertical cracks along the arrangement direction of the steel pipe piles are likely to enter the concrete due to temperature stress caused by temperature rise during concrete placement and temperature drop after placement. The

例えばダム堤体などの大規模な壁体では、コンクリートの配合や打上がり速度を制御して、温度応力に起因したひび割れの発生を抑制する方法が提案されている(例えば特許文献1、2参照)。   For example, in a large-scale wall body such as a dam dam body, a method has been proposed in which the mixing of concrete and the launch speed are controlled to suppress the occurrence of cracks caused by temperature stress (see, for example, Patent Documents 1 and 2). ).

特許第4885101号公報Japanese Patent No. 4885101 特開2017−172300号公報Japanese Unexamined Patent Publication No. 2017-172300

コンクリートのひび割れ対策としては、上記の他、コンクリートの保温養生を行ったり、あるいはコンクリートに誘発目地材を設けてひび割れを集中して発生させた後、そのひび割れをエポキシ樹脂などで充填する方法があるが、いずれも手間がかかり、ある程度の工事費がかかる。   In addition to the above, concrete cracking countermeasures include thermal insulation curing of concrete, or by providing induced jointing material in the concrete to generate cracks in a concentrated manner, and then filling the cracks with epoxy resin etc. However, both are time-consuming and require some construction costs.

本発明は前述した問題点に鑑みてなされたものであり、容易に構築できる壁体等を提供することを目的とする。   The present invention has been made in view of the above-described problems, and an object thereof is to provide a wall body and the like that can be easily constructed.

前述した目的を達成するための第1の発明は、下部が地下に埋設され、上部が地上に突出する外管と、前記外管の下端を閉塞する閉塞部と、前記外管の上部の周囲に設けられたコンクリートと、複数の内管を前記外管内に通すための挿通部と、を有することを特徴とする壁体である。   According to a first aspect of the present invention for achieving the above object, an outer tube having a lower portion buried underground and an upper portion projecting to the ground, a closed portion closing the lower end of the outer tube, and a periphery of the upper portion of the outer tube A wall body characterized by having a concrete provided on the wall and an insertion portion for allowing a plurality of inner pipes to pass through the outer pipe.

前記外管の下端を閉塞する閉塞部は、前記外管に設けられた蓋体であることが望ましい。
複数の前記外管の下部が、地盤に形成された掘削部に並べて配置され、前記掘削部と前記外管の間が充填材で充填されることが望ましい。
The closing part that closes the lower end of the outer tube is preferably a lid provided on the outer tube.
It is desirable that the lower portions of the plurality of outer pipes are arranged side by side in an excavation part formed in the ground, and a space between the excavation part and the outer pipe is filled with a filler.

第2の発明は、下部が地下に埋設され、上部が地上に突出する外管を、前記外管の下端が閉塞部により閉塞されるように設ける工程(a)と、前記外管の上部の周囲にコンクリートを打設し、前記コンクリートを養生する工程(b)と、を有し、前記工程(b)における前記コンクリートの養生時に、挿通部を介して複数の内管を前記外管内に通し、複数の前記内管を用いて前記外管に冷媒を循環させることを特徴とする壁体の構築方法である。   According to a second aspect of the present invention, there is provided a step (a) in which an outer tube having a lower part buried in the underground and an upper part projecting to the ground is provided so that a lower end of the outer tube is closed by a closing part; A step (b) of placing concrete around and curing the concrete; and during curing of the concrete in the step (b), a plurality of inner pipes are passed through the outer pipes through insertion portions. The wall construction method is characterized in that a refrigerant is circulated through the outer pipe using a plurality of the inner pipes.

前記コンクリートの養生後に、前記内管を用いて前記冷媒を排出する工程(c)を有することが望ましい。
前記外管の下端を閉塞する閉塞部は、前記外管に設けられた蓋体であり、前記工程(a)において、前記外管の下部を、地盤を掘削して形成した掘削部内の液体中で下降させ、その際に前記外管に給水を行うことが望ましい。
また前記工程(a)において、複数の前記外管の下部を、地盤を掘削して形成した掘削部内に並べて配置し、前記掘削部と前記外管の間に充填材を充填することも望ましい。
また、連壁掘削機によって前記地盤を掘削することが望ましい。
It is desirable to have a step (c) of discharging the refrigerant using the inner pipe after curing of the concrete.
The closing part for closing the lower end of the outer pipe is a lid provided on the outer pipe, and in the step (a), the lower part of the outer pipe is formed in the liquid in the excavation part formed by excavating the ground. It is desirable that the water is supplied to the outer pipe at that time.
In the step (a), it is also preferable that the lower portions of the plurality of outer pipes are arranged side by side in an excavation part formed by excavating the ground, and a filler is filled between the excavation part and the outer pipe.
Moreover, it is desirable to excavate the ground with a continuous wall excavator.

本発明では、挿通部に通した複数の内管によって外管に冷媒を循環させながら、外管の上部の周囲のコンクリートを養生することが可能になり、これにより手間なく容易に壁体の構築を行うことができ工事費を抑えてコンクリートの温度ひび割れの発生を防止できる。コンクリートの養生後は、不要となった冷媒を内管を用いて排出することができる。   In the present invention, it becomes possible to cure the concrete around the upper part of the outer pipe while circulating the refrigerant through the outer pipe by the plurality of inner pipes passed through the insertion portion, thereby easily and easily constructing the wall body. It is possible to reduce the construction cost and prevent the occurrence of temperature cracks in the concrete. After curing the concrete, the unnecessary refrigerant can be discharged using the inner pipe.

また、外管の下端に蓋体を有することにより、外管の下部を掘削部内の安定液等の液体中に建て込む際に、外管の下部内に給水して浮力とのバランスをとりながら外管の下部を安定して建て込むことができる。また外管の下部を掘削部に並べて配置し、掘削部内に充填材を充填することで、地中での遮水性を確保した壁体を構築することができ、地盤の掘削に連壁掘削機を用いることで壁体の構築が容易になる。   In addition, by having a lid at the lower end of the outer pipe, when the lower part of the outer pipe is built in a liquid such as a stable liquid in the excavation part, water is supplied into the lower part of the outer pipe while balancing with buoyancy. The lower part of the outer pipe can be built stably. In addition, by placing the lower part of the outer pipe side by side in the excavation part and filling the excavation part with a filler, it is possible to construct a wall body that ensures water shielding in the ground. Using this makes it easy to construct the wall.

本発明によれば、容易に構築できる壁体等を提供することができる。   ADVANTAGE OF THE INVENTION According to this invention, the wall etc. which can be constructed | assembled easily can be provided.

壁体1を示す図。The figure which shows the wall body 1. FIG. 壁体1の構築方法を示す図。The figure which shows the construction method of the wall body 1. FIG. 壁体1の構築方法を示す図。The figure which shows the construction method of the wall body 1. FIG. 壁体1の構築方法を示す図。The figure which shows the construction method of the wall body 1. FIG. 壁体1’を示す図。The figure which shows wall 1 '. 壁体1aを示す図。The figure which shows the wall 1a. 水29の循環と排出について示す図。The figure shown about the circulation and discharge | emission of the water 29. FIG. 壁体1bを示す図。The figure which shows the wall 1b. 鋼管13の下部13aの配置について示す図。The figure shown about arrangement | positioning of the lower part 13a of the steel pipe 13. FIG. 壁体1cを示す図。The figure which shows the wall 1c. 壁体1cの構築方法を示す図。The figure which shows the construction method of the wall 1c. 壁体1cの構築方法を示す図。The figure which shows the construction method of the wall 1c. 壁体1c’を示す図。The figure which shows wall body 1c '.

以下、図面に基づいて、本発明の実施形態を詳細に説明する。   Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.

[第1の実施形態]
(1.壁体1)
図1は本発明の第1の実施形態に係る壁体1を示す図である。図1(a)は壁体1の延長方向に沿った鉛直断面を示す図であり、図1(b)は図1(a)の線A−Aによる水平断面を示す図である。
[First Embodiment]
(1. Wall 1)
FIG. 1 is a view showing a wall body 1 according to a first embodiment of the present invention. FIG. 1A is a diagram showing a vertical section along the extending direction of the wall body 1, and FIG. 1B is a diagram showing a horizontal section along the line AA in FIG.

この壁体1は堤体などとして用いられる壁状の構造体であり、モルタル7、コンクリート11、ソイルモルタル9、鋼管13等を有する。   The wall body 1 is a wall-like structure used as a bank body and includes a mortar 7, concrete 11, a soil mortar 9, a steel pipe 13, and the like.

鋼管13は、壁体1の延長方向(図1(a)、(b)の左右方向に対応する)に所定間隔で並べられる管体(外管)であり、下部13aが地下に埋設され、上部13bが地上に突出するように設けられる。   The steel pipe 13 is a pipe body (outer pipe) arranged at a predetermined interval in the extending direction of the wall body 1 (corresponding to the left-right direction in FIGS. 1A and 1B), and the lower portion 13a is buried underground, The upper part 13b is provided so as to protrude on the ground.

図1(b)に示すように、壁体1を構築する地盤3には、平面視で帯状の溝5(掘削部)が形成され、鋼管13の下部13aはこの溝5内に配置される。   As shown in FIG. 1B, a belt-like groove 5 (excavated portion) is formed in a plan view in the ground 3 that constructs the wall body 1, and a lower portion 13 a of the steel pipe 13 is disposed in the groove 5. .

鋼管13の下端には下蓋17(閉塞部)が設けられ、これにより鋼管13の下端が閉塞される。下蓋17は下方に凸となるドーム状の鋼製の蓋体である。   A lower lid 17 (blocking portion) is provided at the lower end of the steel pipe 13, thereby closing the lower end of the steel pipe 13. The lower lid 17 is a dome-shaped steel lid that protrudes downward.

溝5の底部の鋼管13の下端部に当たる位置では根固め用のモルタル7が打設され、その上方では固化体であるソイルモルタル9(充填材)が溝5と鋼管13の間に充填される。ソイルモルタル9等により、壁体1の地中での遮水性が確保される。   At a position corresponding to the lower end of the steel pipe 13 at the bottom of the groove 5, a mortar 7 for solidifying is placed, and above that, a solid mortar 9 (filler) is filled between the groove 5 and the steel pipe 13. . The soil mortar 9 or the like ensures the water shielding property of the wall 1 in the ground.

各鋼管13の上部13bの周囲にはコンクリート11が巻き立てられる。コンクリート11内には鉄筋(不図示)が埋設される。   Concrete 11 is wound around the upper portion 13b of each steel pipe 13. Reinforcing bars (not shown) are embedded in the concrete 11.

鋼管13の上端には上蓋15(閉塞部)が設けられ、これにより鋼管13の上端が閉塞される。上蓋15は上方に凸となるドーム状の鋼製の蓋体である。   An upper lid 15 (blocking portion) is provided at the upper end of the steel pipe 13, thereby closing the upper end of the steel pipe 13. The upper lid 15 is a dome-shaped steel lid that protrudes upward.

本実施形態では、複数の内管19、21が鋼管13の内部に通される。内管19、21は鋼管13の上蓋15に設けた配管口20、22(挿通部)にそれぞれ挿通される。内管19の下端は鋼管13内の上端部に位置し、内管21の下端は鋼管13内の下端部に位置する。配管口20と内管19、配管口22と内管21は、フランジ接合または溶接接合され、これにより鋼管13内が密閉される。本実施形態では、後述するように内管21については着脱式とし転用するためその外周に設けたフランジ(不図示)を用いてフランジ接合を行い、内管19は転用しないので上蓋15の配管口20と溶接接合することができる。   In the present embodiment, the plurality of inner pipes 19 and 21 are passed through the steel pipe 13. The inner pipes 19 and 21 are respectively inserted into pipe ports 20 and 22 (insertion portions) provided in the upper lid 15 of the steel pipe 13. The lower end of the inner pipe 19 is located at the upper end portion in the steel pipe 13, and the lower end of the inner pipe 21 is located at the lower end portion in the steel pipe 13. The piping port 20 and the inner tube 19 and the piping port 22 and the inner tube 21 are joined by flange or welding, whereby the inside of the steel tube 13 is sealed. In the present embodiment, as will be described later, the inner pipe 21 is detachable and diverted so that flange joining is performed using a flange (not shown) provided on the outer periphery thereof, and the inner pipe 19 is not diverted. 20 can be welded together.

壁体1は、所定本数(例えば4本)の鋼管13が設置される範囲を1ブロックとして構築され、隣り合うブロック間ではソイルモルタル9が連続する。ブロック間には止水板(不図示)等が設置されていてもよい。   The wall 1 is constructed with a range in which a predetermined number (for example, four) of steel pipes 13 are installed as one block, and the soil mortar 9 is continuous between adjacent blocks. A water stop plate (not shown) or the like may be installed between the blocks.

(2.壁体1の構築方法)
図2〜4は、壁体1の構築方法を示す図である。図2〜4の各図は、図1(b)の線B−Bに沿った鉛直断面に対応している。
(2. Construction method of wall 1)
2-4 is a figure which shows the construction method of the wall 1. Each of FIGS. 2 to 4 corresponds to a vertical section along line BB in FIG.

壁体1を構築するには、まず図2(a)に示すように、地盤3を掘削して溝5を形成する。本実施形態では連壁掘削機によって地盤3を掘削することで、壁体1の延長方向(図2(a)の紙面法線方向に対応する)に1ブロック分の長さで延びる帯状の溝5を形成する。溝5は例えば鋼管13の下端に当たる位置から約1m下の深さまで掘削するものとし、溝5の底部が岩盤などの支持層に達するようにする。溝5は安定液25(液体)で満たされた状態で掘削される。   In order to construct the wall 1, first, as shown in FIG. 2A, the ground 3 is excavated to form the grooves 5. In the present embodiment, by excavating the ground 3 with a continuous wall excavator, a belt-like groove extending by a length of one block in the extending direction of the wall body 1 (corresponding to the normal direction of the paper surface of FIG. 2A). 5 is formed. The groove 5 is excavated to a depth of about 1 m from a position corresponding to the lower end of the steel pipe 13 so that the bottom of the groove 5 reaches a support layer such as a rock mass. The groove 5 is excavated in a state filled with the stabilizing liquid 25 (liquid).

溝5の掘削後、安定液25中に鋼管13の下部13aを建て込む。鋼管13の下部13aは複数のピースからなり、まず図2(b)に示すように、下蓋17を有する最下段のピース131を、その上部を溝5の縁部に設けた鋼材等によるガイドウォール27で仮受けして溝5内に設置する。そして、当該ピース131の上に上段のピースを溶接等によって接合し、図2(c)に示すようにこれらのピース131を安定液25中で下降させ、上段のピース131の上部を再度ガイドウォール27で仮受けする。   After excavation of the groove 5, the lower part 13 a of the steel pipe 13 is built in the stabilizing liquid 25. The lower portion 13a of the steel pipe 13 is composed of a plurality of pieces. First, as shown in FIG. 2B, a lowermost piece 131 having a lower lid 17 is guided by a steel material or the like having an upper portion provided at the edge of the groove 5. Temporarily received by the wall 27 and installed in the groove 5. Then, the upper piece is joined onto the piece 131 by welding or the like, and as shown in FIG. 2C, the pieces 131 are lowered in the stabilizing liquid 25, and the upper portion of the upper piece 131 is again guided to the guide wall. 27.

以下同様に、ピース131を上方に継ぎ足しながら鋼管13の下部13aを安定液25中で下降させてゆく。鋼管13の下部13aの建て込みを終えた状態を図3(a)に示す。   Similarly, the lower part 13a of the steel pipe 13 is lowered in the stabilizing liquid 25 while adding the piece 131 upward. FIG. 3 (a) shows a state where the lower part 13a of the steel pipe 13 has been built.

上記の一連の工程中、鋼管13の下部13aには適宜バラスト水28の給水が行われ、安定液25(比重1.05〜1.15程度)により鋼管13の下部13aに加わる浮力と当該下部13aの重量をバランスさせる。より具体的には、鋼管13の下部13aの自重とバラスト水28の荷重の和が上記の浮力よりも若干大きくなるように調整される。   During the above series of steps, the ballast water 28 is appropriately supplied to the lower portion 13a of the steel pipe 13, and the buoyancy applied to the lower portion 13a of the steel pipe 13 by the stabilizing liquid 25 (specific gravity of about 1.05 to 1.15) and the weight of the lower portion 13a. Balance. More specifically, the sum of the weight of the lower portion 13a of the steel pipe 13 and the load of the ballast water 28 is adjusted to be slightly larger than the above buoyancy.

これにより、鋼管13の下部13aの建て込みを安定して行うことができる。また、建て込み時にはピース131を吊るためのクレーンが使用されるが、このクレーンも1ピース分の重量を吊れる能力が有れば十分である。さらに、仮受時にガイドウォール27に作用する反力はほぼ0となり、ガイドウォール27も簡易な構成のもので済む。   Thereby, the lower part 13a of the steel pipe 13 can be built stably. In addition, a crane for hanging the piece 131 is used at the time of erection, but it is sufficient that this crane is also capable of hanging the weight of one piece. Further, the reaction force acting on the guide wall 27 at the time of provisional reception is almost zero, and the guide wall 27 can be of a simple configuration.

こうして1ブロック分の各鋼管13の下部13aの建て込みを行った後、図3(b)に示すように溝5の底部に根固め用のモルタル7を打設し、その上方で溝5内にソイルモルタル9を充填する。   After the lower portions 13a of the steel pipes 13 for one block have been built in this way, as shown in FIG. 3 (b), a rooting mortar 7 is placed at the bottom of the groove 5, and the groove 5 Is filled with soil mortar 9.

モルタル7およびソイルモルタル9が固化して各鋼管13の下部13aが固定されれば、ガイドウォール27を撤去し、図3(c)に示すように、各鋼管13の下部13aの上端に鋼管13の上部13bを溶接等によって接合する。鋼管13の上部13bの上端には前記したように上蓋15が有り、この上蓋15には配管口20、22が設けられる。配管口22は、上端がコンクリート11(図1(a)参照)の天端より上方に位置するように筒状に設けられる。   When the mortar 7 and the soil mortar 9 are solidified and the lower part 13a of each steel pipe 13 is fixed, the guide wall 27 is removed, and the steel pipe 13 is formed at the upper end of the lower part 13a of each steel pipe 13 as shown in FIG. Are joined by welding or the like. As described above, the upper lid 15 is provided at the upper end of the upper portion 13 b of the steel pipe 13, and the upper lid 15 is provided with piping ports 20 and 22. The piping port 22 is provided in a cylindrical shape so that the upper end is located above the top end of the concrete 11 (see FIG. 1A).

次に、図3(d)に示すように上蓋15の配管口20、22に内管19、21を挿通し、内管19により鋼管13内に給水を行って鋼管13の頂部まで水29(冷媒)を充填する。   Next, as shown in FIG. 3 (d), the inner pipes 19, 21 are inserted into the piping ports 20, 22 of the upper lid 15, and water is supplied into the steel pipe 13 through the inner pipe 19, and water 29 ( Charge).

本実施形態では、バラスト水28を上記の水29の一部として再利用することが可能である。バラスト水28の温度は、地下水温度とほぼ同じ(15℃程度)となっているので、低温の水29を別途大量に準備する必要はない。ただし、バラスト水28を水29の一部として利用しない場合もあり、この場合には水29の給水を行う前に内管19からの給気を行いながら内管21からバラスト水28を排出しておく。   In the present embodiment, the ballast water 28 can be reused as part of the water 29. Since the temperature of the ballast water 28 is substantially the same as the groundwater temperature (about 15 ° C.), it is not necessary to prepare a large amount of the low-temperature water 29 separately. However, the ballast water 28 may not be used as a part of the water 29. In this case, the ballast water 28 is discharged from the inner pipe 21 while supplying air from the inner pipe 19 before supplying the water 29. Keep it.

こうして1ブロック分の複数の鋼管13に対して給水を行った後、これらの鋼管13の上部13bの周囲で配筋と型枠(不図示)の設置を行い、図4(a)に示すようにコンクリート11を打設してその養生を行う。なお、前記の内管21はコンクリート11の打設後に配管口22に挿通することも可能である。   After supplying water to the plurality of steel pipes 13 for one block in this way, reinforcing bars and formwork (not shown) are installed around the upper part 13b of these steel pipes 13, as shown in FIG. 4 (a). Concrete 11 is placed on the surface and cured. The inner pipe 21 can be inserted into the piping port 22 after the concrete 11 is placed.

コンクリート11の養生期間中、内管19からの給水と内管21からの排水を行うことにより、個々の鋼管13と外部のタンク、ポンプ等の循環設備(不図示)の間で水29を循環させる。鋼管13内では水29が内管19の下端から内管21の下端に向かって下降する。水29の循環経路の適切な位置には水29の温度を計測するための温度計(不図示)が設けられる。   During the curing period of the concrete 11, water 29 is circulated between the individual steel pipes 13 and external equipment such as an external tank and pump (not shown) by supplying water from the inner pipe 19 and draining from the inner pipe 21. Let In the steel pipe 13, the water 29 descends from the lower end of the inner pipe 19 toward the lower end of the inner pipe 21. A thermometer (not shown) for measuring the temperature of the water 29 is provided at an appropriate position in the circulation path of the water 29.

水29の循環は、コンクリート11の打設後例えば2週間程度継続し、鋼管13を介して水29とコンクリート11との間で熱交換を行うことでコンクリート11を冷却して養生する。壁体1に用いる鋼管13は太径であり表面積が大きいので、コンクリート11の冷却効率が良い。また循環設備のポンプも簡単なもので済み、高揚程ポンプ等は必要としない。   The circulation of the water 29 continues, for example, for about two weeks after the concrete 11 is placed, and the concrete 11 is cooled and cured by performing heat exchange between the water 29 and the concrete 11 through the steel pipe 13. Since the steel pipe 13 used for the wall 1 has a large diameter and a large surface area, the cooling efficiency of the concrete 11 is good. Moreover, the pump of the circulation equipment is simple, and a high head pump is not required.

コンクリート11の養生時には、前記の温度計により水温をモニタリングし、水29の温度が上昇し過ぎていることが確認された場合には、低温の水を新規に供給したり、水29を冷却設備(不図示)に循環させたりして、温度を下げることが望ましい。   During curing of the concrete 11, the water temperature is monitored by the thermometer, and when it is confirmed that the temperature of the water 29 has risen too much, new low-temperature water is supplied or the water 29 is cooled. It is desirable to reduce the temperature by circulating (not shown).

コンクリート11の養生が完了した後、図4(b)に示すように、内管19からの給気を行いながら内管21から排水を行うことで、図4(c)に示すように不要となった水29を排出して鋼管13内を空にする。排出した水29や不要となった循環設備等は他のブロックの施工時に転用できる。   After the curing of the concrete 11 is completed, as shown in FIG. 4 (b), draining from the inner pipe 21 while supplying air from the inner pipe 19 is unnecessary as shown in FIG. 4 (c). The formed water 29 is discharged to empty the steel pipe 13. The drained water 29 and unnecessary circulation equipment can be diverted when other blocks are constructed.

こうして図1で説明した壁体1が構築される。この後内管21を撤去するとともに内管19と配管口22を密閉することで鋼管13内への空気等の侵入を防止し腐食の進行を抑制することができる。撤去した内管21も他のブロックの施工時に転用可能である。   Thus, the wall body 1 described in FIG. 1 is constructed. Thereafter, by removing the inner pipe 21 and sealing the inner pipe 19 and the piping port 22, it is possible to prevent the intrusion of air or the like into the steel pipe 13 and suppress the progress of corrosion. The removed inner pipe 21 can also be diverted when other blocks are constructed.

このように、第1の実施形態では、配管口20、22に通した複数の内管19、21によって鋼管13に水29を循環させながらコンクリート11を養生することが可能になり、若干の配管とタンク、ポンプ等の循環設備を用意するだけでよく、手間なく容易に壁体1の構築を行うことができ工事費を抑えてコンクリート11の温度ひび割れの発生を防止できる。コンクリート11の養生後は、不要となった水29を内管21等を用いて排出することができる。   As described above, in the first embodiment, the concrete 11 can be cured while circulating the water 29 through the steel pipe 13 by the plurality of inner pipes 19, 21 passed through the pipe ports 20, 22. It is only necessary to prepare a circulation facility such as a tank and a pump, and the wall body 1 can be easily constructed without trouble, and the construction cost can be suppressed and the occurrence of temperature cracks in the concrete 11 can be prevented. After curing the concrete 11, the water 29 that is no longer needed can be discharged using the inner pipe 21 or the like.

また、鋼管13の下端に下蓋17を有することにより、鋼管13の下部13aを溝5内の安定液25中に建て込む際に、鋼管13の下部13a内にバラスト水28を給水して浮力とのバランスをとりながら鋼管13の下部13aを安定して建て込むことができる。   Further, by having the lower lid 17 at the lower end of the steel pipe 13, when the lower part 13 a of the steel pipe 13 is built in the stabilizing liquid 25 in the groove 5, the ballast water 28 is supplied into the lower part 13 a of the steel pipe 13 and the buoyancy is generated. Thus, the lower portion 13a of the steel pipe 13 can be stably built while maintaining the balance.

また本実施形態では連壁掘削機により帯状の溝5を形成して鋼管13の下部13aを溝5内に並べて配置し、溝5にソイルモルタル9等の充填材を充填することで、地中での遮水性を確保した壁体1を容易に構築することができる。   Moreover, in this embodiment, the strip | belt-shaped groove | channel 5 is formed with a continuous wall excavator, the lower part 13a of the steel pipe 13 is arrange | positioned in the groove | channel 5, and it fills the groove | channel 5 with fillers, such as soil mortar 9, It is possible to easily construct the wall body 1 that secures the water shielding property.

しかしながら、本発明はこれに限らない。例えば本実施形態ではコンクリート11の養生後に鋼管13内の水29を全て排水したが、一部の水29のみ排水を行い、例えば鋼管13の上部13bのみ空とすることも可能である。また水29に代えてその他の冷媒をコンクリート11の養生を行うため用いることも可能である。   However, the present invention is not limited to this. For example, in the present embodiment, all the water 29 in the steel pipe 13 is drained after curing the concrete 11, but only a part of the water 29 is drained, and for example, only the upper part 13 b of the steel pipe 13 can be emptied. It is also possible to use other refrigerants for curing the concrete 11 instead of the water 29.

また、本実施形態では水29の循環や排水を個々の鋼管13ごとに行っているが、図5の壁体1’に示すように1ブロック分の各鋼管13の内管19、21をそれぞれ1本の主管23、24に接続し、主管23、24を用いて水29の循環や排水を1ブロック分の複数の鋼管13ごとに行ってもよい。   Further, in this embodiment, the water 29 is circulated and drained for each steel pipe 13, but the inner pipes 19 and 21 of each steel pipe 13 for one block are respectively provided as shown in the wall 1 'of FIG. The main pipes 23 and 24 may be connected to each other, and the main pipes 23 and 24 may be used to circulate or drain the water 29 for each of the plurality of steel pipes 13 for one block.

また、コンクリート11の養生期間中にコンクリート11の温度を計測し、養生状況の判断に用いてもよい。一般的に、コンクリートの温度は打設後3、4日で最高温度に達し、その後ゆっくりと低下していく。従って、コンクリート11の温度を計測することで、計測結果により養生期間を2週間未満に短縮することも可能である。   Further, the temperature of the concrete 11 may be measured during the curing period of the concrete 11 and used for judging the curing condition. Generally, the concrete temperature reaches a maximum temperature in 3 and 4 days after placing, and then gradually decreases. Therefore, by measuring the temperature of the concrete 11, the curing period can be shortened to less than 2 weeks according to the measurement result.

また、上蓋15や下蓋17はドーム状に限らず、平板状であってもよい。また補強部材などを取付けることも可能である。   Further, the upper lid 15 and the lower lid 17 are not limited to a dome shape but may be a flat plate shape. It is also possible to attach a reinforcing member or the like.

以下、本発明の別の例について、第2〜第4の実施形態として説明する。各実施形態はそれまでに説明した実施形態と異なる点について説明し、同様の構成については図等で同じ符号を付すなどして説明を省略する。また、第1の実施形態も含め、各実施形態で説明する構成は必要に応じて組み合わせることができる。   Hereinafter, other examples of the present invention will be described as second to fourth embodiments. Each embodiment will be described with respect to differences from the embodiments described so far, and the same components will be denoted by the same reference numerals in the drawings and the description thereof will be omitted. In addition, the configurations described in each embodiment including the first embodiment can be combined as necessary.

[第2の実施形態]
図6は本発明の第2の実施形態に係る壁体1aを示す図であり、壁体1aの延長方向に沿った鉛直断面を示す図である。
[Second Embodiment]
FIG. 6 is a view showing a wall body 1a according to the second embodiment of the present invention, and is a view showing a vertical cross section along the extending direction of the wall body 1a.

この壁体1aは、第1の実施形態の壁体1とほぼ同様の構成であるが、内管19の下端が鋼管13内の下端部に位置し、内管21の下端が鋼管13内の上端部に位置する点で異なる。   The wall body 1a has substantially the same configuration as the wall body 1 of the first embodiment, but the lower end of the inner pipe 19 is located at the lower end portion in the steel pipe 13 and the lower end of the inner pipe 21 is in the steel pipe 13. It differs in that it is located at the upper end.

壁体1aの構築方法は第1の実施形態と同様であるが、コンクリート11の養生期間では、図7(a)に示すように内管19からの給水と内管21からの排水を行うことで水29を循環させ、この時鋼管13内の水29は内管19の下端から内管21の上端に向かって上昇する。コンクリート11の養生完了後は、図7(b)に示すように内管21からの給気を行いながら内管19から水29を排出する。   The construction method of the wall 1a is the same as that of the first embodiment, but in the curing period of the concrete 11, water supply from the inner pipe 19 and drainage from the inner pipe 21 are performed as shown in FIG. Then, the water 29 is circulated, and at this time, the water 29 in the steel pipe 13 rises from the lower end of the inner pipe 19 toward the upper end of the inner pipe 21. After curing of the concrete 11 is completed, water 29 is discharged from the inner pipe 19 while supplying air from the inner pipe 21 as shown in FIG.

第2の実施形態においても、第1の実施形態と同様、内管19、21によって鋼管13に水29を循環させながらコンクリート11を養生することが可能になり、これにより手間なく容易に壁体1aの構築を行うことができ工事費を抑えてコンクリート11の温度ひび割れの発生を防止できる。   Also in the second embodiment, as in the first embodiment, it becomes possible to cure the concrete 11 while circulating the water 29 through the steel pipe 13 by the inner pipes 19 and 21, and thereby the wall body easily and without trouble. Construction of 1a can be performed, construction costs can be suppressed, and the occurrence of temperature cracks in the concrete 11 can be prevented.

[第3の実施形態]
図8は本発明の第3の実施形態に係る壁体1bを示す図である。図8(a)は壁体1bの延長方向に沿った鉛直断面を示す図であり、図8(b)は図8(a)の線C−Cによる水平断面を示す図である。
[Third Embodiment]
FIG. 8 is a view showing a wall 1b according to the third embodiment of the present invention. FIG. 8A is a diagram showing a vertical section along the extending direction of the wall 1b, and FIG. 8B is a diagram showing a horizontal section taken along line CC in FIG. 8A.

この壁体1bは、第1の実施形態の壁体1とほぼ同様の構成であるが、地盤3を掘削して複数の孔45(掘削部)が形成され、鋼管13の下部13aが孔45内に配置される点で異なる。これらの孔45は、隣接する孔45同士がラップするように壁体1bの延長方向に連続する。本実施形態では鋼管13の下部13aが1つ置きの孔45内に配置される。   The wall body 1b has substantially the same configuration as the wall body 1 of the first embodiment, but a plurality of holes 45 (excavated portions) are formed by excavating the ground 3, and the lower portion 13a of the steel pipe 13 is formed in the hole 45. It is different in that it is placed inside. These holes 45 are continuous in the extending direction of the wall 1b so that the adjacent holes 45 wrap. In the present embodiment, the lower portion 13 a of the steel pipe 13 is disposed in every other hole 45.

図9(a)に示すように、孔45は、既知の全旋回オールケーシング工法によりケーシング47を回転させながら地盤3に押し込みつつ、ハンマグラブ等でケーシング47内を掘削することで形成する。孔45の内側は地下水46(液体)で満たされ、鋼管13の下部13aは図9(b)に示すようにこの地下水46中で建て込む。建て込み方法は第1の実施形態と略同様であり、鋼管13の下部13a内には前記と同様にバラスト水28も給水される。その後、ケーシング47を上方に引き抜きつつ、図9(c)に示すように孔45内にモルタル7(図8参照)の打設とソイルモルタル9の充填を行う。   As shown in FIG. 9A, the hole 45 is formed by excavating the inside of the casing 47 with a hammer magnet or the like while pushing the casing 47 into the ground 3 while rotating the casing 47 by a known all-turn all-casing method. The inside of the hole 45 is filled with ground water 46 (liquid), and the lower portion 13a of the steel pipe 13 is built in the ground water 46 as shown in FIG. 9B. The erection method is substantially the same as in the first embodiment, and the ballast water 28 is also supplied into the lower portion 13a of the steel pipe 13 in the same manner as described above. Thereafter, while the casing 47 is pulled upward, the mortar 7 (see FIG. 8) is placed in the hole 45 and the soil mortar 9 is filled as shown in FIG. 9C.

以下同様の工程を繰り返すことで、図9(d)に示すように1ブロック分の複数の鋼管13の下部13aの設置を行う。前記したように鋼管13の下部13aは1つ置きの孔45内に配置され、それ以外の孔45ではモルタル7の打設とソイルモルタル9の充填のみを行う。   Thereafter, the same steps are repeated to install the lower portions 13a of the plurality of steel pipes 13 for one block as shown in FIG. 9 (d). As described above, the lower portions 13a of the steel pipes 13 are disposed in every other hole 45, and the other holes 45 perform only the placement of the mortar 7 and the filling of the soil mortar 9.

以下の工程は前記の図3(c)以下で説明したものと略同様であり、コンクリート11の養生時には内管19、21を用いて前記と同様に水29の循環が行われる。   The following steps are substantially the same as those described with reference to FIG. 3C and thereafter, and when the concrete 11 is cured, the water 29 is circulated using the inner pipes 19 and 21 in the same manner as described above.

第3の実施形態においても、第1の実施形態と同様、内管19、21によって鋼管13に水29を循環させながらコンクリート11を養生することが可能になり、これにより手間なく容易に壁体1bの構築を行うことができ工事費を抑えてコンクリート11の温度ひび割れの発生を防止できる。   Also in the third embodiment, as in the first embodiment, it becomes possible to cure the concrete 11 while circulating the water 29 through the steel pipe 13 by the inner pipes 19, 21. 1b can be constructed, and the construction cost can be suppressed, and the occurrence of temperature cracks in the concrete 11 can be prevented.

なお、本実施形態では鋼管13の下部13aを1つ置きの孔45内に配置したが、これに限ることはない。例えば各孔45に鋼管13の下部13aを配置することも可能である。   In the present embodiment, the lower portions 13a of the steel pipes 13 are disposed in every other hole 45, but the present invention is not limited to this. For example, the lower portion 13a of the steel pipe 13 can be disposed in each hole 45.

[第4の実施形態]
図10は本発明の第4の実施形態に係る壁体1cを示す図であり、壁体1cの延長方向に沿った鉛直断面を示す図である。
[Fourth Embodiment]
FIG. 10 is a view showing a wall body 1c according to the fourth embodiment of the present invention, and is a view showing a vertical cross section along the extending direction of the wall body 1c.

この壁体1cは、第1の実施形態の壁体1とほぼ同様の構成であるが、鋼管13’の下端に下蓋17が設けられず、その代わりに鋼管13’の下端がモルタル7(閉塞部)で閉塞される点で異なる。モルタル7は鋼管13’の下端より若干上の高さまで打設される。   The wall body 1c has substantially the same configuration as the wall body 1 of the first embodiment, but the lower lid 17 is not provided at the lower end of the steel pipe 13 ', and instead the lower end of the steel pipe 13' is mortar 7 ( It is different in that it is closed at the closing part). The mortar 7 is driven to a height slightly above the lower end of the steel pipe 13 '.

壁体1cを構築するには、まず図11(a)に示すように地盤3に溝5を掘削し、鋼管13’の下部13aを溝5内に建て込み、その上部をガイドウォール27で支持する。溝5は前記と同様、安定液25で満たした状態で連壁掘削機により掘削され、鋼管13’の下部13aは安定液25中で下降させる。ただし、本実施形態では鋼管13’の下部13aに前記の下蓋17が無いので、第1の実施形態のようなバラスト水28の給水は行われない。   In order to construct the wall 1c, first, as shown in FIG. 11 (a), the groove 5 is excavated in the ground 3, the lower part 13a of the steel pipe 13 'is built in the groove 5, and the upper part is supported by the guide wall 27. To do. As described above, the groove 5 is excavated by the continuous wall excavator while being filled with the stabilizing liquid 25, and the lower portion 13 a of the steel pipe 13 ′ is lowered in the stabilizing liquid 25. However, in this embodiment, since the lower lid 17 is not provided in the lower portion 13a of the steel pipe 13 ', the ballast water 28 is not supplied as in the first embodiment.

こうして1ブロック分の各鋼管13’の下部13aの建て込みを行った後、図11(b)に示すように溝5の底部に根固め用のモルタル7を打設し、その上方で溝5内にソイルモルタル9を充填する。   After the lower portions 13a of the steel pipes 13 'for one block have been built in this way, a rooting mortar 7 is placed at the bottom of the groove 5 as shown in FIG. The soil mortar 9 is filled inside.

モルタル7およびソイルモルタル9が固化して各鋼管13’の下部13aが固定されれば、ガイドウォール27を撤去し、図11(c)に示すように各鋼管13’の下部13aの上端に鋼管13’の上部13bを溶接等によって接合する。   When the mortar 7 and the soil mortar 9 are solidified and the lower part 13a of each steel pipe 13 'is fixed, the guide wall 27 is removed, and a steel pipe is formed at the upper end of the lower part 13a of each steel pipe 13' as shown in FIG. The upper part 13b of 13 'is joined by welding or the like.

その後、図11(d)に示すように、鋼管13’の上蓋15に設けた配管口20、22に内管19、21を挿通し、内管19から給水を行って鋼管13’の頂部まで水29を充填する。なお給水前には鋼管13’の下部13aの内側に安定液25が存在する(図11(c)参照)ので、事前に内管19からの給気を行いながら内管21から安定液25の排出を行っておく。   Then, as shown in FIG.11 (d), the inner pipes 19 and 21 are inserted in the piping ports 20 and 22 provided in the upper cover 15 of the steel pipe 13 ', and water is supplied from the inner pipe 19 to the top of the steel pipe 13'. Fill with water 29. Since the stabilizing liquid 25 exists inside the lower portion 13a of the steel pipe 13 ′ before water supply (see FIG. 11C), the stabilizing liquid 25 is supplied from the inner pipe 21 while supplying air from the inner pipe 19 in advance. Discharge.

こうして1ブロック分の複数の鋼管13’に対して給水を行った後、これらの鋼管13’の上部13bの周囲で配筋と型枠(不図示)の設置を行い、図12(a)に示すようにコンクリート11を打設してその養生を行う。コンクリート11の養生期間中には、内管19からの給水と内管21からの排水を行うことにより前記と同様にして水29を循環させる。壁体1c内では水29が内管19の下端から内管21の下端に向かって下降し、鋼管13’を介して水29とコンクリート11の間で熱交換を行うことでコンクリート11を冷却して養生する。   After supplying water to a plurality of steel pipes 13 'for one block in this way, reinforcing bars and formwork (not shown) are installed around the upper part 13b of these steel pipes 13'. As shown, concrete 11 is cast and cured. During the curing period of the concrete 11, the water 29 is circulated in the same manner as described above by supplying water from the inner pipe 19 and draining from the inner pipe 21. In the wall 1c, the water 29 descends from the lower end of the inner pipe 19 toward the lower end of the inner pipe 21, and the concrete 11 is cooled by exchanging heat between the water 29 and the concrete 11 through the steel pipe 13 '. Take care.

コンクリート11の養生が完了した後、図12(b)に示すように、内管19からの給気を行いながら内管21から排水を行って不要な水29を排出し、図12(c)に示すように鋼管13’内を空にする。こうして図10で説明した壁体1cが構築される。   After the curing of the concrete 11 is completed, as shown in FIG. 12 (b), unnecessary water 29 is discharged by draining from the inner pipe 21 while supplying air from the inner pipe 19, and FIG. 12 (c). The steel pipe 13 'is emptied as shown in FIG. Thus, the wall 1c described with reference to FIG. 10 is constructed.

本実施形態では、この後さらに内管21を撤去して配管口22をキャップ等で密閉し、内管19から給気を行うことで鋼管13’内を加圧した後、内管19をキャップ等で密閉することができる。こうして鋼管13’内を加圧状態とすることで、鋼管13’内への地下水や空気等の侵入を確実に防止して鋼管13’の腐食の進行を抑制することができる。また、必要に応じて内管19のキャップ等を外して鋼管13’内を再加圧することも可能である。さらに、配管口22のキャップ等を外して内管21を再挿入し、内管21を用いて鋼管13’内に侵入した地下水の排出を行うことも可能である。   In this embodiment, after this, the inner pipe 21 is further removed, the piping port 22 is sealed with a cap or the like, the inside of the steel pipe 13 ′ is pressurized by supplying air from the inner pipe 19, and then the inner pipe 19 is capped. Etc. and can be sealed. By bringing the inside of the steel pipe 13 ′ into a pressurized state in this way, it is possible to reliably prevent the penetration of ground water, air, etc. into the steel pipe 13 ′ and to suppress the progress of corrosion of the steel pipe 13 ′. Moreover, it is also possible to re-pressurize the inside of the steel pipe 13 ′ by removing the cap of the inner pipe 19 as necessary. Furthermore, it is also possible to remove the cap of the piping port 22 and reinsert the inner pipe 21 and discharge the groundwater that has entered the steel pipe 13 ′ using the inner pipe 21.

第4の実施形態においても、第1の実施形態と同様、内管19、21によって鋼管13’に水29を循環させながらコンクリート11を養生することが可能になり、これにより手間なく容易に壁体1cの構築を行うことができ工事費を抑えてコンクリート11の温度ひび割れの発生を防止できる。   Also in the fourth embodiment, as in the first embodiment, the concrete 11 can be cured while circulating the water 29 through the steel pipe 13 ′ by the inner pipes 19, 21. The body 1c can be constructed, and the construction cost can be suppressed, and the occurrence of temperature cracks in the concrete 11 can be prevented.

なお、第4の実施形態では鋼管13’に下蓋17が無く、第1の実施形態のように鋼管13’の建て込み時にバラスト水28の給水を行えないので、鋼管13’の下部13aの全重量を吊り下げることのできるクレーンが必要になり、またガイドウォール27としても鋼管13’の下部13aの全重量を支持できるものが必要になる。この点では第1の実施形態のように鋼管13の下部13aに下蓋17を設けてバラスト水28を給水しつつ建て込みを行う方が有利である。   In the fourth embodiment, the steel pipe 13 'does not have the lower lid 17, and the ballast water 28 cannot be supplied when the steel pipe 13' is installed as in the first embodiment. Therefore, the lower portion 13a of the steel pipe 13 'is not provided. A crane that can suspend the entire weight is required, and a guide wall 27 that can support the entire weight of the lower portion 13a of the steel pipe 13 'is also required. In this respect, it is more advantageous to install the lower lid 17 on the lower portion 13a of the steel pipe 13 and build it while supplying the ballast water 28 as in the first embodiment.

また、本実施形態では前記の下蓋17を省略して鋼管13’の下端をモルタル7で閉塞したが、鋼管13’の上端についても上蓋15を省略し、コンクリート11によって閉塞することが可能である。ただし、この場合鋼管13’の直上のコンクリート11を打設する際に鋼管13’の上端に蓋状の底型枠が別途必要になり、この点では上蓋15を予め設けておいた方が好ましい。   In the present embodiment, the lower lid 17 is omitted and the lower end of the steel pipe 13 ′ is closed with the mortar 7. However, the upper lid 15 is also omitted from the upper end of the steel pipe 13 ′ and can be closed with the concrete 11. is there. However, in this case, when placing the concrete 11 immediately above the steel pipe 13 ', a lid-like bottom mold is separately required at the upper end of the steel pipe 13'. In this respect, it is preferable to provide the upper cover 15 in advance. .

また、鋼管13’の下部13aは中掘工法によって地下に埋設することも可能であり、図13は中掘工法によって鋼管13’の下部13aを地盤3内に設けた壁体1c’の例である。   Further, the lower portion 13a of the steel pipe 13 'can be buried underground by an intermediate digging method, and FIG. 13 shows an example of a wall 1c' in which the lower portion 13a of the steel pipe 13 'is provided in the ground 3 by the intermediate digging method. is there.

中掘工法では、鋼管13’の下部13aの地盤3内への沈設と、当該下部13aの内側の地盤3の掘削とを交互に繰り返すことで、鋼管13’の下部13aを所定深さに配置する。鋼管13’の下部13aの沈設はピース131を上方に継ぎ足しながら行い、鋼管13’の下部13aが所定深さに達した後、その内側から根固め用のモルタル7を地盤3内に打設する。なおこのとき鋼管13’の下部13aの内側には地下水が存在する。   In the intermediate excavation method, the lower portion 13a of the steel pipe 13 'is disposed at a predetermined depth by alternately repeating the sinking of the lower portion 13a of the steel pipe 13' into the ground 3 and the excavation of the ground 3 inside the lower portion 13a. To do. The lower part 13a of the steel pipe 13 'is set while the piece 131 is added upward. After the lower part 13a of the steel pipe 13' reaches a predetermined depth, the mortar 7 for solidifying is driven into the ground 3 from the inside. . At this time, groundwater exists inside the lower portion 13a of the steel pipe 13 '.

以下の工程は図11(c)以下で説明した前記の例と略同様であり、コンクリート11の養生時には内管19、21を用いて前記と同様に水29の循環が行われ、最終的に鋼管13’内を加圧状態とすることで鋼管13’内への地下水や空気等の侵入を防止して鋼管13’の腐食の進行を抑制することもできる。なお、前記の例では鋼管13’内に水29を給水する前に安定液25の排出を行っているが、ここでは安定液25の代わりに鋼管13’の下部13aの内側の地下水を排出する。   The following steps are substantially the same as the example described below in FIG. 11C, and when curing the concrete 11, the water 29 is circulated in the same manner as described above using the inner pipes 19 and 21, and finally By making the inside of the steel pipe 13 ′ into a pressurized state, it is possible to prevent the invasion of ground water or air into the steel pipe 13 ′ and to suppress the progress of corrosion of the steel pipe 13 ′. In the above example, the stabilizing liquid 25 is discharged before supplying the water 29 into the steel pipe 13 ′, but here, ground water inside the lower portion 13 a of the steel pipe 13 ′ is discharged instead of the stabilizing liquid 25. .

このように、鋼管13’は中掘工法によって設置を行うことも可能である。ただし、中掘工法では鋼管13’の下部13aの設置に時間と手間を要し、また太径の鋼管13’や長大な鋼管13’の場合は地盤3との間の摩擦が大きくなり設置が難しくなるという欠点はある。   In this way, the steel pipe 13 'can be installed by the digging method. However, in the middle digging method, it takes time and labor to install the lower portion 13a of the steel pipe 13 ', and in the case of a large diameter steel pipe 13' or a long steel pipe 13 ', the friction with the ground 3 becomes large and the installation is difficult. There is a drawback that it becomes difficult.

以上、添付図面を参照しながら、本発明に係る好適な実施形態について説明したが、本発明はかかる例に限定されない。当業者であれば、本願で開示した技術的思想の範疇内において、各種の変更例又は修正例に想到し得ることは明らかであり、それらについても当然に本発明の技術的範囲に属するものと了解される。   The preferred embodiments of the present invention have been described above with reference to the accompanying drawings, but the present invention is not limited to such examples. It will be apparent to those skilled in the art that various changes or modifications can be conceived within the scope of the technical idea disclosed in the present application, and these naturally belong to the technical scope of the present invention. Understood.

1、1’、1a、1b、1c、1c’:壁体
3:地盤
5:溝
7:モルタル
11:コンクリート
9:ソイルモルタル
13、13':鋼管
13a:下部
13b:上部
15:上蓋
17:下蓋
19、21:内管
25:安定液
28:バラスト水
29:水
45:孔
1, 1 ', 1a, 1b, 1c, 1c': Wall body 3: Ground 5: Groove 7: Mortar 11: Concrete 9: Soil mortar 13, 13 ': Steel pipe 13a: Lower part 13b: Upper part 15: Upper lid 17: Lower Lids 19, 21: Inner tube 25: Stabilizing liquid 28: Ballast water 29: Water 45: Hole

Claims (8)

下部が地下に埋設され、上部が地上に突出する外管と、
前記外管の下端を閉塞する閉塞部と、
前記外管の上部の周囲に設けられたコンクリートと、
複数の内管を前記外管内に通すための挿通部と、
を有することを特徴とする壁体。
An outer pipe whose lower part is buried underground and whose upper part protrudes above the ground,
A closing portion for closing the lower end of the outer tube;
Concrete provided around the upper part of the outer tube;
An insertion portion for passing a plurality of inner tubes through the outer tube;
A wall body characterized by comprising:
前記外管の下端を閉塞する閉塞部は、前記外管に設けられた蓋体であることを特徴とする請求項1に記載の壁体。   The wall according to claim 1, wherein the closing portion that closes the lower end of the outer tube is a lid provided on the outer tube. 複数の前記外管の下部が、地盤に形成された掘削部に並べて配置され、前記掘削部と前記外管の間が充填材で充填されたことを特徴とする請求項1または請求項2に記載の壁体。   The lower portions of the plurality of outer pipes are arranged side by side in an excavation part formed on the ground, and a space between the excavation part and the outer pipe is filled with a filler. The described wall. 下部が地下に埋設され、上部が地上に突出する外管を、前記外管の下端が閉塞部により閉塞されるように設ける工程(a)と、
前記外管の上部の周囲にコンクリートを打設し、前記コンクリートを養生する工程(b)と、
を有し、
前記工程(b)における前記コンクリートの養生時に、挿通部を介して複数の内管を前記外管内に通し、複数の前記内管を用いて前記外管に冷媒を循環させることを特徴とする壁体の構築方法。
A step (a) in which a lower portion is buried underground and an outer tube whose upper portion projects to the ground is provided such that a lower end of the outer tube is blocked by a blocking portion;
Placing concrete around the upper part of the outer pipe, and curing the concrete (b);
Have
When curing the concrete in the step (b), the wall is characterized in that a plurality of inner pipes are passed through the outer pipe through insertion parts, and a refrigerant is circulated through the outer pipe using the plurality of inner pipes. How to build the body.
前記コンクリートの養生後に、前記内管を用いて前記冷媒を排出する工程(c)を有することを特徴とする請求項4記載の壁体の構築方法。   The method for constructing a wall body according to claim 4, further comprising a step (c) of discharging the refrigerant using the inner pipe after curing of the concrete. 前記外管の下端を閉塞する閉塞部は、前記外管に設けられた蓋体であり、
前記工程(a)において、前記外管の下部を、地盤を掘削して形成した掘削部内の液体中で下降させ、その際に前記外管に給水を行うことを特徴とする請求項4または請求項5に記載の壁体の構築方法。
The closing part for closing the lower end of the outer tube is a lid provided on the outer tube,
The said process (a) WHEREIN: The lower part of the said outer tube | pipe is lowered | hung in the liquid in the excavation part formed by excavating the ground, and water is supplied to the said outer tube | pipe at that time Item 6. A method for constructing a wall according to Item 5.
前記工程(a)において、複数の前記外管の下部を、地盤を掘削して形成した掘削部内に並べて配置し、前記掘削部と前記外管の間に充填材を充填することを特徴とする請求項4から請求項6のいずれかに記載の壁体の構築方法。   In the step (a), the lower portions of the plurality of outer pipes are arranged side by side in a drilling section formed by excavating the ground, and a filler is filled between the drilling section and the outer pipe. The construction method of a wall body according to any one of claims 4 to 6. 連壁掘削機によって前記地盤を掘削することを特徴とする請求項6または請求項7記載の壁体の構築方法。
8. The wall construction method according to claim 6, wherein the ground is excavated by a continuous wall excavator.
JP2018040619A 2018-03-07 2018-03-07 Wall body, how to build a wall body Active JP6944895B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018040619A JP6944895B2 (en) 2018-03-07 2018-03-07 Wall body, how to build a wall body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018040619A JP6944895B2 (en) 2018-03-07 2018-03-07 Wall body, how to build a wall body

Publications (2)

Publication Number Publication Date
JP2019157349A true JP2019157349A (en) 2019-09-19
JP6944895B2 JP6944895B2 (en) 2021-10-06

Family

ID=67993234

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018040619A Active JP6944895B2 (en) 2018-03-07 2018-03-07 Wall body, how to build a wall body

Country Status (1)

Country Link
JP (1) JP6944895B2 (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0517429U (en) * 1991-05-09 1993-03-05 福井県 Heat exchange system using foundation piles
JPH05306516A (en) * 1991-02-04 1993-11-19 Yasuo Kakegai Composite structure of soil cement continuous wall and core part
JPH06306817A (en) * 1993-04-20 1994-11-01 Ohbayashi Corp Cooling method of concrete in bridge pier construction method
JP2004233031A (en) * 2002-12-05 2004-08-19 Nippon Steel Corp Underground heat exchanger by hollow tubular body embedded by rotating press-fitting method, and highly efficient energy system using the same
JP3113018U (en) * 2005-05-09 2005-09-02 郁男 鈴木 Earth retaining wall
JP2007051541A (en) * 2005-07-19 2007-03-01 Kanuka Design:Kk Retaining wall and construction method therefor
JP2007303159A (en) * 2006-05-11 2007-11-22 Hazama Corp Method of preventing cracks in concrete structure
JP2007308876A (en) * 2006-05-16 2007-11-29 Kanuka Design:Kk Retaining wall and its construction method
JP2009062792A (en) * 2007-09-10 2009-03-26 Shimizu Corp Ground vibration propagation restraining structure and its construction method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05306516A (en) * 1991-02-04 1993-11-19 Yasuo Kakegai Composite structure of soil cement continuous wall and core part
JPH0517429U (en) * 1991-05-09 1993-03-05 福井県 Heat exchange system using foundation piles
JPH06306817A (en) * 1993-04-20 1994-11-01 Ohbayashi Corp Cooling method of concrete in bridge pier construction method
JP2004233031A (en) * 2002-12-05 2004-08-19 Nippon Steel Corp Underground heat exchanger by hollow tubular body embedded by rotating press-fitting method, and highly efficient energy system using the same
JP3113018U (en) * 2005-05-09 2005-09-02 郁男 鈴木 Earth retaining wall
JP2007051541A (en) * 2005-07-19 2007-03-01 Kanuka Design:Kk Retaining wall and construction method therefor
JP2007303159A (en) * 2006-05-11 2007-11-22 Hazama Corp Method of preventing cracks in concrete structure
JP2007308876A (en) * 2006-05-16 2007-11-29 Kanuka Design:Kk Retaining wall and its construction method
JP2009062792A (en) * 2007-09-10 2009-03-26 Shimizu Corp Ground vibration propagation restraining structure and its construction method

Also Published As

Publication number Publication date
JP6944895B2 (en) 2021-10-06

Similar Documents

Publication Publication Date Title
KR101548666B1 (en) Reservoir in underground for the storage of highly pressured fluid and CAES system using the same
JP2009084919A (en) Ground excavating method
CN106609509A (en) Self-balancing foundation pit enclosure structure and construction method thereof
CN105569051A (en) Foundation pit support system of sandy pebble boulder geological stratification and construction method
JP5446774B2 (en) Temporary pile construction method
CN113174988A (en) Double-wall concrete open caisson structure and construction method
CN208965555U (en) The leakproof concrete device of solution cavity is met for cast-in-situ bored pile
CN113737780A (en) Underwater rock-socketed concrete pile and construction method thereof
CN109736329B (en) Automatic anti-bulge energy foundation pit support structure and construction method
JP2008208533A (en) Caisson and its construction method
JP5659766B2 (en) Method of installing pipe member related to underground heat exchanger in ground excavation hole
JP6944895B2 (en) Wall body, how to build a wall body
CN206591535U (en) Combined type cofferdam
CN114293564A (en) Construction method for foundation pit slope pile foundation of building engineering on site
JP2018040151A (en) Construction method of underground continuous wall and underground continuous wall
CN208870043U (en) On the anti-pit accident across existing tunnel ruggedized construction
JPH02128096A (en) Sinking burying caisson made of steel and installing method thereof
JP5375549B2 (en) How to construct a retaining wall
JP4475116B2 (en) Vertical shaft structure and its construction method
CN111206594A (en) Foundation pit supporting construction method
CN215926026U (en) Caisson type tunnel end cofferdam
CN106836247B (en) Combined cofferdam and construction method thereof
CN218033798U (en) Geothermal energy heat exchange structure
CN214738235U (en) Pier structure suitable for thick earthing district
CN114232601A (en) Construction method for wall of enclosing structure under pipeline

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200911

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210623

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210706

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210819

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210907

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20210913

R150 Certificate of patent or registration of utility model

Ref document number: 6944895

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150