JP2018165921A - Power control system - Google Patents

Power control system Download PDF

Info

Publication number
JP2018165921A
JP2018165921A JP2017063193A JP2017063193A JP2018165921A JP 2018165921 A JP2018165921 A JP 2018165921A JP 2017063193 A JP2017063193 A JP 2017063193A JP 2017063193 A JP2017063193 A JP 2017063193A JP 2018165921 A JP2018165921 A JP 2018165921A
Authority
JP
Japan
Prior art keywords
power
solar cell
duty ratio
control
subsystems
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2017063193A
Other languages
Japanese (ja)
Other versions
JP6887667B2 (en
Inventor
稔 岩佐
Minoru Iwasa
稔 岩佐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Japan Aerospace Exploration Agency JAXA
Original Assignee
Japan Aerospace Exploration Agency JAXA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Japan Aerospace Exploration Agency JAXA filed Critical Japan Aerospace Exploration Agency JAXA
Priority to JP2017063193A priority Critical patent/JP6887667B2/en
Publication of JP2018165921A publication Critical patent/JP2018165921A/en
Priority to JP2021027764A priority patent/JP7051157B2/en
Priority to JP2021027763A priority patent/JP7051156B2/en
Application granted granted Critical
Publication of JP6887667B2 publication Critical patent/JP6887667B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/10Photovoltaic [PV]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E70/00Other energy conversion or management systems reducing GHG emissions
    • Y02E70/30Systems combining energy storage with energy generation of non-fossil origin

Landscapes

  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Control Of Electrical Variables (AREA)
  • Dc-Dc Converters (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a power control system suppressing control interference between subsystems without reducing a control frequency of the subsystems.SOLUTION: There are provided: a solar battery 10 and a plurality of subsystems 20 to 40, in which the first subsystem included in the plurality of subsystems is controlled in an MPPT (maximum power tracking) mode and is directly connected in parallel to the solar battery and each of the plurality of subsystems includes a power converter and a battery or a load. The power converter includes a control part, and converts an output voltage of the solar battery and outputs the converted output voltage towards the subsystem. The control part of the power converter of the first subsystem determines an increase or a decrease in the output power of the solar battery upon variation in a duty ratio of the power converter of the first subsystem, and determines whether an operation point of the solar battery after the duty ratio variation is located on a low voltage side or a high voltage side with respect to a maximum power point in a power voltage curve of the solar battery.SELECTED DRAWING: Figure 1

Description

本発明は、電力制御システムに関するものであり、より詳細には、電源、負荷、コンバータ等を備えるサブシステムを複数備える電力制御システムに関する。   The present invention relates to a power control system, and more particularly to a power control system including a plurality of subsystems including a power source, a load, a converter, and the like.

スマートハウスやスマートシティなど太陽光発電等の分散電源を統合的に制御するシステムとして、HEMS (Home Energy Management System)やBEMS (Building Energy Management System)等が知られている(下記特許文献1、2等参照)。これらのシステムでは、分散電源に対して1対の電力変換装置(コンバー夕、インバータ等)を接続し、それらを統合制御することで、効率的な電力の運用を提供する。   HEMS (Home Energy Management System), BEMS (Building Energy Management System), and the like are known as systems for integrated control of distributed power sources such as photovoltaic power generation such as smart houses and smart cities (Patent Documents 1 and 2 below). Etc.). In these systems, a pair of power conversion devices (converter, inverter, etc.) are connected to the distributed power supply, and they are integratedly controlled to provide efficient power operation.

これらのシステムにおいては、上述のように、分散電源に対して1対の電力変換装置を接続することが前提で構成されているので、電力源(太陽電池パネル等)の規模に応じて、パワーコンディショナーと呼ばれる電力変換装置の規模が大きくなる。例えば、従来から集中電源を採用している人工衛星等の宇宙機にこのようなシステムの分散電源を適用すると、電力変換装置の規模は2倍程度になり、実用的ではない。   Since these systems are configured on the premise that a pair of power conversion devices are connected to the distributed power supply as described above, the power is determined according to the scale of the power source (solar cell panel or the like). The scale of a power converter called a conditioner increases. For example, when a distributed power source of such a system is applied to a spacecraft such as an artificial satellite that has conventionally adopted a centralized power source, the scale of the power conversion device is about twice, which is not practical.

そこで、電力源の電力制御を、負荷側に接続されるサブシステムの電力変換装置で行うことで、電力源に接続される電力変換装置を不要とするシステムを本発明者らは提案した(非特許文献1)。   Therefore, the present inventors have proposed a system that eliminates the need for the power conversion device connected to the power source by performing power control of the power source with the power conversion device of the subsystem connected to the load side (non- Patent Document 1).

本発明者らが提案したシステムにおいては、電力源に接続される電力変換装置が不要になることで、システムの大幅な簡略化と、それに伴うコスト低減が可能となった。また、システム構築後の電力源及び負荷機器の電力規模をフレキシブルに変更することが可能となった。   In the system proposed by the present inventors, the power conversion device connected to the power source is not required, and thus the system can be greatly simplified and the associated costs can be reduced. In addition, it is possible to flexibly change the power scale of the power source and the load device after the system construction.

このシステムにおいては、MPPT(最大電力追尾)制御に従来から広く利用されている山登り法を適用すると、サブシステム間で制御の干渉が生じ、MPPT制御が正確に行えなかった。そのため、サブシステム間での制御の干渉を低減するために、MPPT制御を行っているサブシステムの制御周波数と、CC(定電流)制御を行っているサブシステムの制御周波数を異なる制御周波数とすることを本発明者らは提案した(非特許文献1)。具体的には、MPPT制御の制御周波数を100Hzとしたまま、CC制御の制御周波数を10Hzとすることによって、サブシステム間での制御の干渉を回避することができた。   In this system, when the hill-climbing method that has been widely used for MPPT (maximum power tracking) control is applied, control interference occurs between subsystems, and MPPT control cannot be performed accurately. Therefore, in order to reduce control interference between subsystems, the control frequency of the subsystem performing MPPT control and the control frequency of the subsystem performing CC (constant current) control are set to different control frequencies. The present inventors have proposed this (Non-Patent Document 1). Specifically, control interference between subsystems could be avoided by setting the control frequency for CC control to 10 Hz while keeping the control frequency for MPPT control at 100 Hz.

特開2013−20488号公報JP 2013-20488 A 特開2013−41723号公報JP 2013-41723 A

岩佐稔、内藤均、艸分宏昌,“分散協調制御を適用した宇宙機電源システムの研究”,電子情報通信学会技術研究報告 EE 電子通信エネルギー技術,一般社団法人電子情報通信学会,2016年1月21日,第115巻,第429号,pp.115-120Satoshi Iwasa, Hitoshi Naito, Hiromasa Minato, “Research on spacecraft power supply system using distributed cooperative control”, IEICE Technical Report EE Electronic Communication Energy Technology, IEICE, January 2016 21st, 115, 429, pp.115-120

しかしながら、サブシステムの制御周波数を小さくすることは、過渡応答特性を悪化させる要因となる。   However, reducing the control frequency of the subsystem causes deterioration of the transient response characteristics.

そこで、本発明は、サブシステムの制御周波数を小さくすることなく、サブシステム間での制御の干渉を抑制する電力制御システムを提供することを目的の1つとする。   Accordingly, an object of the present invention is to provide a power control system that suppresses control interference between subsystems without reducing the control frequency of the subsystems.

本発明の1つの態様は、太陽電池と複数のサブシステムとを備え、前記複数のサブシステムのうちの第1のサブシステムがMPPT(最大電力追尾)モードで制御され、前記複数のサブシステムは、前記太陽電池に並列に直接接続され、前記複数のサブシステムの各々は、電力変換装置とバッテリ又は負荷を含み、前記電力変換装置は、制御部を備え、前記太陽電池の出力電圧を変換して前記サブシステム側へ出力し、前記第1のサブシステムの前記電力変換装置の前記制御部は、前記第1のサブシステムの前記電力変換装置のデューティー比を変化させた際の前記太陽電池の出力電力の増減を判定し、前記デューティー比を変化させた後の前記太陽電池の動作点が、前記太陽電池の電力電圧曲線において最大電力点に対して低電圧側又は高電圧側のいずれの側に位置するのかを判定し、前記太陽電池の動作点の位置が、前記デューティー比を変化させた前後で、前記低電圧側から前記高電圧側に、又は前記高電圧側から前記低電圧側に変わった場合、前回補正制御を行ったか否かに対応する補正制御情報、及び、前記太陽電池の出力電力の増減の判定において、複数回連続で前記太陽電池の出力電力が減少したと判定されたか否かに対応する太陽電池出力電力連続減少情報を否定とし、前記補正制御情報又は前記太陽電池出力電力連続減少情報が肯定であり、且つ前記デューティー比を変化させた後の前記太陽電池の動作点が、前記太陽電池の電力電圧曲線において最大電力点に対して低電圧側に位置すると判定された場合、デューティー比を減少させ、前記補正制御情報又は前記太陽電池出力電力連続減少情報が肯定であり、且つ前記デューティー比を変化させた後の前記太陽電池の動作点が、前記太陽電池の電力電圧曲線において最大電力点に対して高電圧側に位置すると判定された場合、デューティー比を増加させ、前記太陽電池の出力電力の増減の判定において、前記太陽電池の出力電力が増加したと判定された場合、デューティー比を前回と同じ方向に変化させ、前記補正制御情報又は前記太陽電池出力電力連続減少情報が肯定でない場合、デューティー比を前回と反対の方向に変化させる、制御を繰り返し行う電力制御システムを提供するものである。   One aspect of the present invention includes a solar cell and a plurality of subsystems, wherein a first subsystem of the plurality of subsystems is controlled in an MPPT (maximum power tracking) mode, and the plurality of subsystems are Each of the plurality of subsystems includes a power conversion device and a battery or a load, and the power conversion device includes a control unit and converts an output voltage of the solar cell. Output to the subsystem side, and the control unit of the power converter of the first subsystem changes the duty ratio of the power converter of the first subsystem. The operating point of the solar cell after determining the increase / decrease in output power and changing the duty ratio is lower or higher than the maximum power point in the power voltage curve of the solar cell. It is determined which side of the pressure side is located, and the position of the operating point of the solar cell is changed from the low voltage side to the high voltage side or from the high voltage side before and after the duty ratio is changed. In the case of changing to the low voltage side, the correction control information corresponding to whether or not the previous correction control was performed, and the determination of increase or decrease of the output power of the solar cell, the output power of the solar cell decreases continuously several times The solar cell output power continuous decrease information corresponding to whether or not it has been determined to be negative, the correction control information or the solar cell output power continuous decrease information is affirmative, and the duty ratio is changed When it is determined that the operating point of the solar cell is located on the low voltage side with respect to the maximum power point in the power voltage curve of the solar cell, the duty ratio is decreased, and the correction control information or the previous When the solar cell output power continuous decrease information is affirmative and the operating point of the solar cell after changing the duty ratio is located on the high voltage side with respect to the maximum power point in the power voltage curve of the solar cell. If determined, the duty ratio is increased, and in the determination of the increase or decrease of the output power of the solar cell, when it is determined that the output power of the solar cell has increased, the duty ratio is changed in the same direction as the previous time, When the correction control information or the solar battery output power continuous decrease information is not affirmative, a power control system that repeatedly performs control is provided to change the duty ratio in the direction opposite to the previous time.

前記電力制御システムは、前記複数のサブシステムに対して制御モードを指示する統合制御装置を更に含み、前記第1のサブシステムの前記制御部は、前記統合制御装置からMPPTモードの指示を受信すると、前記制御を繰り返し行うものとすることができる。   The power control system further includes an integrated control device that instructs a control mode to the plurality of subsystems, and the control unit of the first subsystem receives an MPPT mode instruction from the integrated control device. The control can be repeatedly performed.

前記複数のサブシステムのうちの第2のサブシステムがCV(定電圧)モードで制御され、前記第2のサブシステムの前記電力変換装置の前記制御部は、前記第2のサブシステムの前記電力変換装置のデューティー比を変化させた際の前記太陽電池の出力電力の増減を判定し、前記デューティー比を変化させた後の前記太陽電池の動作点が、前記太陽電池の電力電圧曲線において最大電力点に対して低電圧側又は高電圧側のいずれの側に位置するのかを判定し、前記電力変換装置の出力側電圧が、定電圧制御目標値よりも大きい場合、デューティー比を減少させ、前記電力変換装置の出力側電圧が、定電圧制御目標値よりも小さく、且つ前記デューティー比を変化させた後の前記太陽電池の動作点が、前記太陽電池の電力電圧曲線において最大電力点に対して低電圧側に位置すると判定された場合、デューティー比を減少させ、前記電力変換装置の出力側電圧が、定電圧制御目標値よりも小さく、且つ前記デューティー比を変化させた後の前記太陽電池の動作点が、前記太陽電池の電力電圧曲線において最大電力点に対して高電圧側に位置すると判定された場合、デューティー比を増加させる、制御を繰り返し行うものとすることができる。   A second subsystem of the plurality of subsystems is controlled in a CV (constant voltage) mode, and the control unit of the power conversion device of the second subsystem is configured to control the power of the second subsystem. The increase / decrease in the output power of the solar cell when the duty ratio of the converter is changed, and the operating point of the solar cell after changing the duty ratio is the maximum power in the power voltage curve of the solar cell. It is determined whether it is located on the low voltage side or the high voltage side with respect to the point, and when the output side voltage of the power converter is larger than the constant voltage control target value, the duty ratio is decreased, The operating point of the solar cell after the output side voltage of the power converter is smaller than the constant voltage control target value and the duty ratio is changed is the maximum in the power voltage curve of the solar cell. When it is determined that the power point is located on the low voltage side, the duty ratio is decreased, the output side voltage of the power converter is smaller than the constant voltage control target value, and the duty ratio is changed. When it is determined that the operating point of the solar cell is located on the high voltage side with respect to the maximum power point in the power voltage curve of the solar cell, the duty ratio is increased and the control is repeatedly performed. .

前記複数のサブシステムのうちの第3のサブシステムがCC(定電流)モードで制御され、前記第3のサブシステムの前記電力変換装置の前記制御部は、前記第3のサブシステムの前記電力変換装置のデューティー比を変化させるか、又は変化させない処理を行った際の前記太陽電池の出力電力の増減を判定し、前記太陽電池の出力電力の増減の判定結果と、前記電力変換装置の出力側電流の定電流制御目標値に対する大小に基づいて、デューティー比を変化させるか、又は変化させない、制御を繰り返し行うものとすることができる。   A third subsystem of the plurality of subsystems is controlled in a CC (constant current) mode, and the control unit of the power converter of the third subsystem is configured to control the power of the third subsystem. Determine the increase / decrease in the output power of the solar cell when performing the process of changing or not changing the duty ratio of the conversion device, the determination result of the increase / decrease in the output power of the solar cell, and the output of the power conversion device Based on the magnitude of the side current with respect to the constant current control target value, the duty ratio can be changed or the control can be repeatedly performed.

少なくとも1つの前記電力変換装置は、双方向DC/DCコンバータであるものとすることができる。   At least one of the power conversion devices may be a bidirectional DC / DC converter.

本発明の1つの態様は、太陽電池と複数のサブシステムとを備え、前記複数のサブシステムのうちの1つがCV(定電圧)モードで制御され、前記複数のサブシステムは、前記太陽電池に並列に直接接続され、前記複数のサブシステムの各々は、電力変換装置とバッテリ又は負荷を含み、前記電力変換装置は、制御部を備え、前記太陽電池の出力電圧を変換して前記サブシステム側へ出力し、CVモードの前記サブシステムの前記電力変換装置の前記前記制御部は、CVモードの前記サブシステムの前記電力変換装置のデューティー比を変化させた際の前記太陽電池の出力電力の増減を判定し、前記デューティー比を変化させた後の前記太陽電池の動作点が、前記太陽電池の電力電圧曲線において最大電力点に対して低電圧側又は高電圧側のいずれの側に位置するのかを判定し、前記電力変換装置の出力側電圧が、定電圧制御目標値よりも大きい場合、デューティー比を減少させ、前記電力変換装置の出力側電圧が、定電圧制御目標値よりも小さく、且つ前記デューティー比を変化させた後の前記太陽電池の動作点が、前記太陽電池の電力電圧曲線において最大電力点に対して低電圧側に位置すると判定された場合、デューティー比を減少させ、前記電力変換装置の出力側電圧が、定電圧制御目標値よりも小さく、且つ前記デューティー比を変化させた後の前記太陽電池の動作点が、前記太陽電池の電力電圧曲線において最大電力点に対して高電圧側に位置すると判定された場合、デューティー比を増加させる、制御を繰り返し行う電力制御システムを提供するものである。   One aspect of the present invention includes a solar cell and a plurality of subsystems, wherein one of the plurality of subsystems is controlled in a CV (constant voltage) mode, and the plurality of subsystems are connected to the solar cell. Directly connected in parallel, each of the plurality of subsystems includes a power conversion device and a battery or a load, and the power conversion device includes a control unit and converts the output voltage of the solar cell to the subsystem side The control unit of the power conversion device of the subsystem in the CV mode outputs or decreases the output power of the solar cell when the duty ratio of the power conversion device of the subsystem in the CV mode is changed The operating point of the solar cell after changing the duty ratio is lower or higher than the maximum power point in the power voltage curve of the solar cell. It is determined whether the output side voltage of the power converter is larger than a constant voltage control target value, the duty ratio is decreased, and the output side voltage of the power converter is controlled by a constant voltage control. When it is determined that the operating point of the solar cell after changing the duty ratio is smaller than a target value and located on the low voltage side with respect to the maximum power point in the power voltage curve of the solar cell, the duty The operating point of the solar cell after the ratio is decreased, the output side voltage of the power converter is smaller than the constant voltage control target value, and the duty ratio is changed is the power voltage curve of the solar cell. It is intended to provide a power control system that repeatedly performs control to increase the duty ratio when it is determined that the power point is located on the high voltage side with respect to the maximum power point.

前記電力制御システムは、前記複数のサブシステムに対して制御モードを指示する統合制御装置を更に含み、前記複数のサブシステムのうちの1つの前記制御部は、前記統合制御装置からCVモードの指示を受信すると、前記制御を繰り返し行うものとすることができる。   The power control system further includes an integrated control device that instructs a control mode to the plurality of subsystems, and the control unit of one of the plurality of subsystems instructs the CV mode from the integrated control device. Can be repeatedly performed.

少なくとも1つの前記電力変換装置は、双方向DC/DCコンバータであるものとすることができる。   At least one of the power conversion devices may be a bidirectional DC / DC converter.

本発明の1つの態様は、太陽電池と複数のサブシステムとを備え、前記複数のサブシステムのうちの1つがCC(定電流)モードで制御され、前記複数のサブシステムは、前記太陽電池に並列に直接接続され、前記複数のサブシステムの各々は、電力変換装置とバッテリ又は負荷を含み、前記電力変換装置は、制御部を備え、前記太陽電池の出力電圧を変換して前記サブシステム側へ出力し、CCモードの前記サブシステムの前記電力変換装置の前記制御部は、CCモードの前記サブシステムの前記電力変換装置のデューティー比を変化させるか、又は変化させない処理を行った際の前記太陽電池の出力電力の増減を判定し、前記太陽電池の出力電力の増減の判定結果と、前記電力変換装置の出力側電流の定電流制御目標値に対する大小に基づいて、デューティー比を変化させるか、又は変化させない、制御を繰り返し行うものとすることができる。   One aspect of the present invention includes a solar cell and a plurality of subsystems, wherein one of the plurality of subsystems is controlled in a CC (constant current) mode, and the plurality of subsystems are connected to the solar cell. Directly connected in parallel, each of the plurality of subsystems includes a power conversion device and a battery or a load, and the power conversion device includes a control unit and converts the output voltage of the solar cell to the subsystem side The control unit of the power converter of the subsystem in CC mode changes the duty ratio of the power converter of the subsystem in CC mode or performs a process that does not change The increase / decrease in the output power of the solar cell is determined, based on the determination result of the increase / decrease in the output power of the solar cell, and the magnitude of the output-side current of the power converter with respect to the constant current control target value. There are, alters the duty ratio, or not changed, it can be made to repeat the control.

前記電力制御システムは、前記複数のサブシステムに対して制御モードを指示する統合制御装置を更に含み、前記複数のサブシステムのうちの1つの前記制御部は、前記統合制御装置からCCモードの指示を受信すると、前記制御を繰り返し行うものとすることができる。   The power control system further includes an integrated control device that instructs a control mode to the plurality of subsystems, and the control unit of one of the plurality of subsystems instructs the CC mode from the integrated control device. Can be repeatedly performed.

前記電力変換装置は、双方向DC/DCコンバータであるものとすることができる。   The power conversion device may be a bidirectional DC / DC converter.

本発明の1つの態様は、太陽電池と複数のサブシステムとを備え、前記複数のサブシステムのうちの第1のサブシステムがMPPT(最大電力追尾)モードで制御され、前記複数のサブシステムは、前記太陽電池に並列に直接接続され、前記複数のサブシステムの各々は、電力変換装置とバッテリ又は負荷を含み、前記電力変換装置は、制御部を備え、前記太陽電池の出力電圧を変換して前記サブシステム側へ出力する電力制御システムにおける電力制御方法であって、前記第1のサブシステムの前記電力変換装置のデューティー比を変化させた際の前記太陽電池の出力電力の増減を判定するステップと、前記デューティー比を変化させた後の前記太陽電池の動作点が、前記太陽電池の電力電圧曲線において最大電力点に対して低電圧側又は高電圧側のいずれの側に位置するのかを判定するステップと、前記太陽電池の動作点の位置が、前記デューティー比を変化させた前後で、前記低電圧側から前記高電圧側に、又は前記高電圧側から前記低電圧側に変わった場合、前回補正制御を行ったか否かに対応する補正制御情報、及び、前記太陽電池の出力電力の増減の判定において、複数回連続で前記太陽電池の出力電力が減少したと判定されたか否かに対応する太陽電池出力電力連続減少情報を否定とするステップと、前記補正制御情報又は前記太陽電池出力電力連続減少情報が肯定であり、且つ前記デューティー比を変化させた後の前記太陽電池の動作点が、前記太陽電池の電力電圧曲線において最大電力点に対して低電圧側に位置すると判定された場合、デューティー比を減少させるステップと、前記補正制御情報又は前記太陽電池出力電力連続減少情報が肯定であり、且つ前記デューティー比を変化させた後の前記太陽電池の動作点が、前記太陽電池の電力電圧曲線において最大電力点に対して高電圧側に位置すると判定された場合、デューティー比を増加させるステップと、前記太陽電池の出力電力の増減の判定において、前記太陽電池の出力電力が増加したと判定された場合、デューティー比を前回と同じ方向に変化させるステップと、前記補正制御情報又は前記太陽電池出力電力連続減少情報が肯定でない場合、デューティー比を前回と反対の方向に変化させるステップと、を繰り返し行う電力制御方法を提供するものである。   One aspect of the present invention includes a solar cell and a plurality of subsystems, wherein a first subsystem of the plurality of subsystems is controlled in an MPPT (maximum power tracking) mode, and the plurality of subsystems are Each of the plurality of subsystems includes a power conversion device and a battery or a load, and the power conversion device includes a control unit and converts an output voltage of the solar cell. A power control method in a power control system that outputs to the subsystem side, wherein increase / decrease in output power of the solar cell when the duty ratio of the power converter of the first subsystem is changed is determined And the operating point of the solar cell after changing the duty ratio is lower than the maximum power point in the power voltage curve of the solar cell, or Determining which side of the voltage side is located, and the position of the operating point of the solar cell before and after changing the duty ratio, from the low voltage side to the high voltage side or the high voltage side. When changing from the voltage side to the low voltage side, the correction control information corresponding to whether or not the previous correction control was performed, and the output of the solar cell in a plurality of times in the determination of the increase or decrease of the output power of the solar cell The step of negating the solar cell output power continuous decrease information corresponding to whether or not it is determined that the power has decreased, the correction control information or the solar cell output power continuous decrease information is affirmative, and the duty ratio is When it is determined that the operating point of the solar cell after the change is located on the low voltage side with respect to the maximum power point in the power voltage curve of the solar cell, the duty ratio is decreased. And the correction control information or the solar cell output power continuous decrease information is affirmative, and the operating point of the solar cell after changing the duty ratio is the maximum power in the power voltage curve of the solar cell. In the case where it is determined that the output power of the solar cell is increased in the step of increasing the duty ratio and the determination of increase / decrease of the output power of the solar cell, when determined to be located on the high voltage side with respect to the point, Power control for repeatedly changing the duty ratio in the same direction as the previous time, and changing the duty ratio in the direction opposite to the previous time when the correction control information or the solar cell output power continuous decrease information is not positive A method is provided.

前記電力制御システムは、前記複数のサブシステムに対して制御モードを指示する統合制御装置を更に含み、前記第1のサブシステムの前記制御部が、前記統合制御装置からMPPTモードの指示を受信すると、すべての前記ステップを繰り返し行うものとすることができる。   The power control system further includes an integrated control device that instructs a control mode to the plurality of subsystems, and the control unit of the first subsystem receives an MPPT mode instruction from the integrated control device. , All the steps may be repeated.

前記複数のサブシステムのうちの第2のサブシステムがCV(定電圧)モードで制御され、前記第2のサブシステムの前記電力変換装置のデューティー比を変化させた際の前記太陽電池の出力電力の増減を判定するステップと、前記デューティー比を変化させた後の前記太陽電池の動作点が、前記太陽電池の電力電圧曲線において最大電力点に対して低電圧側又は高電圧側のいずれの側に位置するのかを判定するステップと、前記電力変換装置の出力側電圧が、定電圧制御目標値よりも大きい場合、デューティー比を減少させるステップと、前記電力変換装置の出力側電圧が、定電圧制御目標値よりも小さく、且つ前記デューティー比を変化させた後の前記太陽電池の動作点が、前記太陽電池の電力電圧曲線において最大電力点に対して低電圧側に位置すると判定された場合、デューティー比を減少させるステップと、前記電力変換装置の出力側電圧が、定電圧制御目標値よりも小さく、且つ前記デューティー比を変化させた後の前記太陽電池の動作点が、前記太陽電池の電力電圧曲線において最大電力点に対して高電圧側に位置すると判定された場合、デューティー比を増加させるステップと、を繰り返し行うものとすることができる。   The output power of the solar cell when the second subsystem of the plurality of subsystems is controlled in a CV (constant voltage) mode and the duty ratio of the power converter of the second subsystem is changed. The step of determining the increase / decrease of the solar cell, and the operating point of the solar cell after changing the duty ratio is the low voltage side or the high voltage side with respect to the maximum power point in the power voltage curve of the solar cell And when the output voltage of the power converter is larger than a constant voltage control target value, the step of decreasing the duty ratio, and the output voltage of the power converter is a constant voltage. The operating point of the solar cell after the duty ratio is smaller than the control target value is lower than the maximum power point in the power voltage curve of the solar cell. The output side voltage of the power converter is smaller than a constant voltage control target value and the duty ratio of the solar cell after changing the duty ratio is determined. When it is determined that the operating point is located on the high voltage side with respect to the maximum power point in the power voltage curve of the solar cell, the step of increasing the duty ratio can be repeatedly performed.

前記複数のサブシステムのうちの第3のサブシステムがCC(定電流)モードで制御され、前記第3のサブシステムの前記電力変換装置のデューティー比を変化させるか、又は変化させない処理を行った際の前記太陽電池の出力電力の増減を判定するステップと、前記太陽電池の出力電力の増減の判定結果と、前記電力変換装置の出力側電流の定電流制御目標値に対する大小に基づいて、デューティー比を変化させるか、又は変化させないステップと、を繰り返し行うものとすることができる。   A third subsystem of the plurality of subsystems is controlled in a CC (constant current) mode, and a process of changing or not changing a duty ratio of the power converter of the third subsystem is performed. The step of determining the increase or decrease of the output power of the solar cell, the determination result of the increase or decrease of the output power of the solar cell, and the duty based on the magnitude of the output side current of the power converter with respect to the constant current control target value The step of changing or not changing the ratio may be repeated.

少なくとも1つの前記電力変換装置は、双方向DC/DCコンバータであるものとすることができる。   At least one of the power conversion devices may be a bidirectional DC / DC converter.

本発明の1つの態様は、太陽電池と複数のサブシステムとを備え、前記複数のサブシステムのうちの1つがCV(定電圧)モードで制御され、前記複数のサブシステムは、前記太陽電池に並列に直接接続され、前記複数のサブシステムの各々は、電力変換装置とバッテリ又は負荷を含み、前記電力変換装置は、制御部を備え、前記太陽電池の出力電圧を変換して前記サブシステム側へ出力する電力制御システムにおける電力制御方法であって、CVモードの前記サブシステムの前記電力変換装置のデューティー比を変化させた際の前記太陽電池の出力電力の増減を判定するステップと、前記デューティー比を変化させた後の前記太陽電池の動作点が、前記太陽電池の電力電圧曲線において最大電力点に対して低電圧側又は高電圧側のいずれの側に位置するのかを判定するステップと、前記電力変換装置の出力側電圧が、定電圧制御目標値よりも大きい場合、デューティー比を減少させるステップと、前記電力変換装置の出力側電圧が、定電圧制御目標値よりも小さく、且つ前記デューティー比を変化させた後の前記太陽電池の動作点が、前記太陽電池の電力電圧曲線において最大電力点に対して低電圧側に位置すると判定された場合、デューティー比を減少させるステップと、前記電力変換装置の出力側電圧が、定電圧制御目標値よりも小さく、且つ前記デューティー比を変化させた後の前記太陽電池の動作点が、前記太陽電池の電力電圧曲線において最大電力点に対して高電圧側に位置すると判定された場合、デューティー比を増加させるステップと、を繰り返し行う電力制御方法を提供するものである。   One aspect of the present invention includes a solar cell and a plurality of subsystems, wherein one of the plurality of subsystems is controlled in a CV (constant voltage) mode, and the plurality of subsystems are connected to the solar cell. Directly connected in parallel, each of the plurality of subsystems includes a power conversion device and a battery or a load, and the power conversion device includes a control unit and converts the output voltage of the solar cell to the subsystem side A power control method in a power control system for outputting to the power control system, the step of determining an increase or decrease in the output power of the solar cell when the duty ratio of the power converter of the subsystem in CV mode is changed, and the duty The operating point of the solar cell after changing the ratio is either the low voltage side or the high voltage side with respect to the maximum power point in the power voltage curve of the solar cell. And when the output voltage of the power converter is larger than a constant voltage control target value, the step of decreasing the duty ratio, and the output voltage of the power converter is a constant voltage. When it is determined that the operating point of the solar cell after being smaller than the control target value and changing the duty ratio is located on the low voltage side with respect to the maximum power point in the power voltage curve of the solar cell, A step of decreasing a duty ratio, and an output side voltage of the power converter is smaller than a constant voltage control target value, and an operating point of the solar cell after changing the duty ratio is an electric power of the solar cell. When it is determined that the voltage curve is located on the high voltage side with respect to the maximum power point, a step of increasing the duty ratio is repeated. It is intended to provide.

前記複数のサブシステムに対して制御モードを指示する統合制御装置を更に含み、前記複数のサブシステムのうちの1つの前記制御部が、前記統合制御装置からCVモードの指示を受信すると、すべての前記ステップを繰り返し行うものとすることができる。   And further including an integrated control device that instructs a control mode to the plurality of subsystems, and when the control unit of one of the plurality of subsystems receives an instruction of the CV mode from the integrated control device, The steps can be repeated.

本発明の1つの態様は、太陽電池と複数のサブシステムとを備え、前記複数のサブシステムのうちの1つがCC(定電流)モードで制御され、前記複数のサブシステムは、前記太陽電池に並列に直接接続され、前記複数のサブシステムの各々は、電力変換装置とバッテリ又は負荷を含み、前記電力変換装置は、制御部を備え、前記太陽電池の出力電圧を変換して前記サブシステム側へ出力する電力制御システムにおける電力制御方法であって、CCモードの前記サブシステムの前記電力変換装置のデューティー比を変化させるか、又は変化させない処理を行った際の前記太陽電池の出力電力の増減を判定するステップと、前記太陽電池の出力電力の増減の判定結果と、前記電力変換装置の出力側電流の定電流制御目標値に対する大小に基づいて、デューティー比を変化させるか、又は変化させないステップと、を繰り返し行う電力制御方法を提供するものである。   One aspect of the present invention includes a solar cell and a plurality of subsystems, wherein one of the plurality of subsystems is controlled in a CC (constant current) mode, and the plurality of subsystems are connected to the solar cell. Directly connected in parallel, each of the plurality of subsystems includes a power conversion device and a battery or a load, and the power conversion device includes a control unit and converts the output voltage of the solar cell to the subsystem side A power control method in a power control system that outputs to a power control system, wherein a change in duty ratio of the power conversion device of the subsystem in the CC mode is changed, or an increase or decrease in output power of the solar cell when a process that does not change is performed , The determination result of increase / decrease in the output power of the solar cell, and the magnitude of the output side current of the power converter with respect to the constant current control target value , There is provided a step of either changing the duty ratio, or not changed, the repeated power control method.

前記複数のサブシステムに対して制御モードを指示する統合制御装置を更に含み、前記複数のサブシステムの1つの前記制御部が、前記統合制御装置からCCモードの指示を受信すると、すべての前記ステップを繰り返し行うものとすることができる。   The system further includes an integrated control device that instructs a control mode to the plurality of subsystems, and when the control unit of one of the plurality of subsystems receives an instruction of the CC mode from the integrated control device, all the steps Can be repeated.

上記構成を有する本発明によれば、サブシステムの制御周波数を小さくすることなく、サブシステム間での制御の干渉を抑制する電力制御システムを提供することができる。   According to the present invention having the above-described configuration, it is possible to provide a power control system that suppresses control interference between subsystems without reducing the control frequency of the subsystems.

本発明の1つの実施形態に係る電力制御システム1の全体構成を示す図である。It is a figure showing the whole power control system 1 composition concerning one embodiment of the present invention. 本実施形態に係る電力制御システム1の統合制御装置50のハードウエア構成の例を示す図である。It is a figure which shows the example of the hardware constitutions of the integrated control apparatus 50 of the power control system 1 which concerns on this embodiment. モード指示処理のフローチャートである。It is a flowchart of a mode instruction | indication process. MPPTモード処理のフローチャートである。It is a flowchart of a MPPT mode process. MPPTモード処理のフローチャートである。It is a flowchart of a MPPT mode process. 太陽電池の電力電圧曲線を示す図である。It is a figure which shows the power voltage curve of a solar cell. CVモード処理のフローチャートである。It is a flowchart of a CV mode process. デューティー比設定マトリクスを示す図である。It is a figure which shows a duty ratio setting matrix. CCモード処理のフローチャートである。It is a flowchart of CC mode processing. 本実施形態に係る電力制御方法の適用前のシミュレーション結果を示す図である。It is a figure which shows the simulation result before application of the power control method which concerns on this embodiment. 本実施形態に係る電力制御方法の適用後のシミュレーション結果を示す図である。It is a figure which shows the simulation result after application of the electric power control method which concerns on this embodiment.

以下、本発明の実施形態について図面を参照して説明する。   Embodiments of the present invention will be described below with reference to the drawings.

図1は、本発明の1つの実施形態に係る電力制御システム1の全体構成を示す図である。電力制御システム1は、太陽電池10、第1のサブシステム20、第2のサブシステム30、第3のサブシステム40、統合制御装置50を備える。   FIG. 1 is a diagram showing an overall configuration of a power control system 1 according to one embodiment of the present invention. The power control system 1 includes a solar cell 10, a first subsystem 20, a second subsystem 30, a third subsystem 40, and an integrated control device 50.

第1のサブシステム20、第2のサブシステム30、第3のサブシステム40は、太陽電池10に並列に直接接続されている。   The first subsystem 20, the second subsystem 30, and the third subsystem 40 are directly connected to the solar cell 10 in parallel.

第1のサブシステム20は、第1の電力変換装置である第1の双方向DC/DCコンバータ210、第1のバッテリ230、第1の負荷250を備える。同様に、第2のサブシステム30は、第2の双方向DC/DCコンバータ310、第2のバッテリ330、第2の負荷350を備え、第3のサブシステム40は、第3の双方向DC/DCコンバータ410、第3のバッテリ430、第3の負荷450を備える。   The first subsystem 20 includes a first bidirectional DC / DC converter 210 that is a first power conversion device, a first battery 230, and a first load 250. Similarly, the second subsystem 30 includes a second bidirectional DC / DC converter 310, a second battery 330, and a second load 350, and the third subsystem 40 includes a third bidirectional DC. / DC converter 410, third battery 430, and third load 450 are provided.

第1の双方向DC/DCコンバータ210は、第1の制御部211、第1の記憶部213を備える。同様に、第2の双方向DC/DCコンバータ310は、第2の制御部311、第2の記憶部313を備え、第3の双方向DC/DCコンバータ410は、第3の制御部411、第3の記憶部413を備える。第1の双方向DC/DCコンバータ210、第2の双方向DC/DCコンバータ310、第3の双方向DC/DCコンバータ410は、それぞれPWM(パルス幅変調)によって太陽電池10の出力電圧を変換して負荷側へ出力する。第1の制御部211、第2の制御部311、第3の制御部411は、それぞれの双方向DC/DCコンバータのPWMのデューティー比を制御する。   The first bidirectional DC / DC converter 210 includes a first control unit 211 and a first storage unit 213. Similarly, the second bidirectional DC / DC converter 310 includes a second control unit 311 and a second storage unit 313, and the third bidirectional DC / DC converter 410 includes a third control unit 411, A third storage unit 413 is provided. The first bidirectional DC / DC converter 210, the second bidirectional DC / DC converter 310, and the third bidirectional DC / DC converter 410 each convert the output voltage of the solar cell 10 by PWM (pulse width modulation). And output to the load side. The 1st control part 211, the 2nd control part 311, and the 3rd control part 411 control the duty ratio of PWM of each bidirectional DC / DC converter.

統合制御装置50は、太陽電池10、各サブシステムの双方向DC/DCコンバータ、バッテリ、負荷の電圧や電流、バッテリの容量等のシステム全体の状態を監視し、各双方向DC/DCコンバータに対して制御モードを指示する。本実施形態においては、制御モードは、MPPT(最大電力追尾)モード、CC(定電流)モード、CV(定電圧)モードの3つである。MPPTモードは太陽電池出力を最大化する制御を行う。CCモードは定電流制御を行い、負荷機器への電流供給を一定に保つ。CVモードは定電圧制御を行い、負荷機器の電圧を一定に保つ。   The integrated control device 50 monitors the state of the entire system such as the solar cell 10, the bidirectional DC / DC converter of each subsystem, the battery, the voltage and current of the load, the capacity of the battery, and the like. Instruct the control mode. In this embodiment, there are three control modes: MPPT (maximum power tracking) mode, CC (constant current) mode, and CV (constant voltage) mode. The MPPT mode performs control to maximize the solar cell output. The CC mode performs constant current control and keeps current supply to the load equipment constant. CV mode performs constant voltage control and keeps the voltage of the load equipment constant.

ここで、各双方向DC/DCコンバータにおけるPWMのデューティー比の制御は、各双方向DC/DCコンバータの制御部が、統合制御装置50から送信された制御モード信号に基づいて行う。   Here, the control of the PWM duty ratio in each bidirectional DC / DC converter is performed based on the control mode signal transmitted from the integrated control device 50 by the control unit of each bidirectional DC / DC converter.

図2は、本実施形態に係る電力制御システム1の統合制御装置50のハードウエア構成の例を示す図である。統合制御装置50は、CPU50a、RAM50b、ROM50c、外部メモリ50d、入力部50e、出力部50f、通信部50gを含む。RAM50b、ROM50c、外部メモリ50d、入力部50e、出力部50f、通信部50gは、システムバス50hを介して、CPU50aに接続されている。各双方向DC/DCコンバータの制御部のハードウエア構成も同様である。図1に示される統合制御装置50の制御部の各部は、ROM50cや外部メモリ50dに記憶された各種プログラムが、CPU50a、RAM50b、ROM50c、外部メモリ50d、入力部50e、出力部50f、通信部50g等を資源として使用することで実現される。各双方向DC/DCコンバータの制御部についても同様である。   FIG. 2 is a diagram illustrating an example of a hardware configuration of the integrated control device 50 of the power control system 1 according to the present embodiment. The integrated control device 50 includes a CPU 50a, a RAM 50b, a ROM 50c, an external memory 50d, an input unit 50e, an output unit 50f, and a communication unit 50g. The RAM 50b, ROM 50c, external memory 50d, input unit 50e, output unit 50f, and communication unit 50g are connected to the CPU 50a via a system bus 50h. The hardware configuration of the control unit of each bidirectional DC / DC converter is the same. Each unit of the control unit of the integrated control apparatus 50 shown in FIG. 1 includes a CPU 50a, a RAM 50b, a ROM 50c, an external memory 50d, an input unit 50e, an output unit 50f, and a communication unit 50g. Etc. are used as resources. The same applies to the control unit of each bidirectional DC / DC converter.

以上のシステム構成を前提に、本発明の1つの実施形態に係る電力制御システムの電力制御処理の例を以下に説明する。図3〜8は、本実施形態に係る電力制御システムの電力制御処理のフローチャートである。   Based on the above system configuration, an example of power control processing of the power control system according to one embodiment of the present invention will be described below. 3 to 8 are flowcharts of the power control process of the power control system according to the present embodiment.

<モード指示>
図3は、モード指示処理のフローチャートである。統合制御装置50は、太陽電池10、各サブシステムの双方向DC/DCコンバータ、バッテリ、負荷の電圧や電流、バッテリの容量等のシステム全体の状態の監視結果に基づいて、どの双方向DC/DCコンバータに対してどの制御モードを指示するかを判定し(S301)、各双方向DC/DCコンバータに対して、判定された制御モードを指示する(S303)。本実施形態においては、一例として、第1のサブシステム20にMPPTモードを指示し、第2のサブシステム30にCVモードを指示し、及び第3のサブシステム40にCCモードを指示する。フローチャートから明らかなとおり、ステップS301から進んだ処理がステップS303へと至り、その後ステップS301へと戻るループ処理が行われる。
<Mode indication>
FIG. 3 is a flowchart of the mode instruction process. The integrated control device 50 determines which bidirectional DC / DC based on the monitoring results of the state of the entire system, such as the solar cell 10, the bidirectional DC / DC converter of each subsystem, the battery, the voltage and current of the load, and the capacity of the battery. It is determined which control mode is instructed to the DC converter (S301), and the determined control mode is instructed to each bidirectional DC / DC converter (S303). In this embodiment, as an example, the MPT mode is instructed to the first subsystem 20, the CV mode is instructed to the second subsystem 30, and the CC mode is instructed to the third subsystem 40. As is apparent from the flowchart, a loop process is performed in which the process that has proceeded from step S301 reaches step S303 and then returns to step S301.

<MPPTモード>
図4A、図4Bは、MPPTモード処理のフローチャートである。まず、第1のサブシステム20が、統合制御装置50からのMPPTモード指示を受信する(S401)。フローチャートから明らかなとおり、ステップS401ら進んだ処理がステップS441、S443、又はステップS449へと至り、その後ステップS403へと戻るループ処理が行われる。
<MPPT mode>
4A and 4B are flowcharts of MPPT mode processing. First, the first subsystem 20 receives an MPPT mode instruction from the integrated control device 50 (S401). As is apparent from the flowchart, the processing that has advanced from step S401 to step S441, S443, or step S449 is performed, and then loop processing that returns to step S403 is performed.

ステップS403においては、第1の双方向DC/DCコンバータ210が或るデューティー比duty(ステップS403が初めて実施される場合には初期値)で動作している状態で、図示しない各電圧計、電流計により、太陽電池10の動作電圧、出力電流、第1の双方向DC/DCコンバータ210の入力側電圧値、出力側電圧値、入力側電流値、出力側電流値等が測定されて、第1の制御部211に入力される。第1の制御部211は、入力された太陽電池10の動作電圧値と出力電流値の乗算により、太陽電池10の出力電力値SAS_Pを計算し、第1の記憶部213に記憶させる。   In step S403, the first bidirectional DC / DC converter 210 is operating at a duty ratio duty (initial value when step S403 is performed for the first time). The operation voltage, output current, input side voltage value, output side voltage value, input side current value, output side current value, etc. of the first bidirectional DC / DC converter 210 are measured by the meter. 1 to the control unit 211. The first control unit 211 calculates the output power value SAS_P of the solar cell 10 by multiplying the input operating voltage value of the solar cell 10 and the output current value, and stores the calculated output power value SAS_P in the first storage unit 213.

ステップS403の処理が2回目以降に行われる場合は、第1の制御部211は、前回計算された太陽電池10の出力電力値SAS_P_oldと今回計算された現在の太陽電池10の出力電力値SAS_Pの差を計算し、第1の記憶部213に記憶させると共に、太陽電池10の出力電力の増減を判定する(S403)。判定の結果、現在の太陽電池10の出力電力SAS_Pが、前回の太陽電池10の出力電力SAS_P_old以上であった場合、太陽電池出力電力増加フラグSAS_P_Fを1とし(S405)、前回の太陽電池10の出力電力SAS_P_old未満であった場合、太陽電池出力電力増加フラグSAS_P_Fを0とし(S407)、第1の記憶部213に記憶させる。   When the process of step S403 is performed after the second time, the first controller 211 calculates the output power value SAS_P_old of the solar cell 10 calculated last time and the current output power value SAS_P of the current solar cell 10 calculated this time. The difference is calculated and stored in the first storage unit 213, and the increase / decrease in the output power of the solar cell 10 is determined (S403). As a result of the determination, if the current output power SAS_P of the solar cell 10 is greater than or equal to the previous output power SAS_P_old of the solar cell 10, the solar cell output power increase flag SAS_P_F is set to 1 (S405), If it is less than the output power SAS_P_old, the solar cell output power increase flag SAS_P_F is set to 0 (S407) and stored in the first storage unit 213.

更に、第1の制御部211は、前回測定された太陽電池10の動作電圧値SAS_V_oldと今回測定された現在の太陽電池10の動作電圧値SAS_Vの差を計算し、太陽電池10の動作電圧値の増減を判定する(S409)。判定の結果、現在の太陽電池10の動作電圧値SAS_Vが、前回の太陽電池10の動作電圧値SAS_V_old以上であった場合、太陽電池動作電圧増加フラグSAS_V_Fを1とし(S411)、前回の太陽電池10の出力電力SAS_V_old未満であった場合、太陽電池動作電圧増加フラグSAS_V_Fを0とし(S413)、第1の記憶部213に記憶させる。   Further, the first control unit 211 calculates the difference between the operating voltage value SAS_V_old of the solar cell 10 measured last time and the current operating voltage value SAS_V of the current solar cell 10 measured this time, and the operating voltage value of the solar cell 10 is calculated. Increase / decrease is determined (S409). As a result of the determination, if the current operating voltage value SAS_V of the solar cell 10 is equal to or higher than the previous operating voltage value SAS_V_old of the solar cell 10, the solar cell operating voltage increase flag SAS_V_F is set to 1 (S411), When the output power is less than 10 SAS_V_old, the solar cell operating voltage increase flag SAS_V_F is set to 0 (S413) and stored in the first storage unit 213.

続いて、第1の制御部211は、太陽電池出力電力増加フラグSAS_P_Fの値と太陽電池動作電圧増加フラグSAS_V_Fの値を加算し、得られた値を、太陽電池10の動作点が電力電圧曲線において最大電力点Pmaxに対して低電圧側又は高電圧側のいずれの側に位置するかを判定するための位置判定準備フラグSAS_Fの値とする(S415)。   Subsequently, the first control unit 211 adds the value of the solar cell output power increase flag SAS_P_F and the value of the solar cell operating voltage increase flag SAS_V_F, and the operating point of the solar cell 10 is the power voltage curve. Is set to the value of the position determination preparation flag SAS_F for determining which side is located on the low voltage side or the high voltage side with respect to the maximum power point Pmax (S415).

位置判定準備フラグSAS_Fの値が0又は2の場合、第1の制御部211は、太陽電池10の動作点が電力電圧曲線において最大電力点Pmaxに対して低電圧側にあると判定し、太陽電池10の動作点が電力電圧曲線において最大電力点Pmaxに対して低電圧側又は高電圧側のいずれの側に位置するかを示す位置フラグMountain_Ridgeの値を0とする(S419、S423)。一方、位置判定準備フラグSAS_Fの値が1の場合、第1の制御部211は、太陽電池10の動作点が電力電圧曲線において最大電力点Pmaxに対して高電圧側にあると判定し、太陽電池10の動作点が電力電圧曲線において最大電力点Pmaxに対して低電圧側又は高電圧側のいずれの側に位置するかを示す位置フラグMountain_Ridgeの値を1とする(S421)。   When the value of the position determination preparation flag SAS_F is 0 or 2, the first control unit 211 determines that the operating point of the solar cell 10 is on the low voltage side with respect to the maximum power point Pmax in the power voltage curve, and A value of a position flag Mountain_Ridge indicating whether the operating point of the battery 10 is located on the low voltage side or the high voltage side with respect to the maximum power point Pmax in the power voltage curve is set to 0 (S419, S423). On the other hand, when the value of the position determination preparation flag SAS_F is 1, the first control unit 211 determines that the operating point of the solar cell 10 is on the high voltage side with respect to the maximum power point Pmax in the power voltage curve. The value of the position flag Mountain_Ridge indicating whether the operating point of the battery 10 is located on the low voltage side or the high voltage side with respect to the maximum power point Pmax in the power voltage curve is set to 1 (S421).

この判定方法の原理は以下のとおりである。図5は、太陽電池10の電力電圧曲線を示した図である。太陽電池10の動作点が、電力電圧曲線において最大電力点Pmaxに対して低電圧側に位置する場合、太陽電池10の出力電力が増加すると太陽電池10の動作電圧も増加し、太陽電池10の出力電力が減少すると太陽電池10の動作電圧も減少するが、これは、太陽電池出力電力増加フラグSAS_P_Fが1且つ太陽電池動作電圧増加フラグSAS_V_Fが1の場合と、太陽電池出力電力増加フラグSAS_P_Fが0且つ太陽電池動作電圧増加フラグSAS_V_Fが0の場合に相当する。一方、電力電圧曲線において最大電力点Pmaxに対して高電圧側に位置する場合、太陽電池10の出力電力が増加すると太陽電池10の動作電圧は減少し、太陽電池10の出力電力が減少すると太陽電池10の動作電圧は増加するが、これは、太陽電池出力電力増加フラグSAS_P_Fが1且つ太陽電池動作電圧増加フラグSAS_V_Fが0の場合と、太陽電池出力電力増加フラグSAS_P_Fが0且つ太陽電池動作電圧増加フラグSAS_V_Fが1の場合に相当する。したがって、上記のような判定方法により、太陽電池10の動作点が電力電圧曲線において、最大電力点Pmaxに対して低電圧側又は高電圧側のいずれの側に位置するかを判定することができる。   The principle of this determination method is as follows. FIG. 5 is a diagram showing a power voltage curve of the solar cell 10. When the operating point of the solar cell 10 is located on the low voltage side with respect to the maximum power point Pmax in the power voltage curve, when the output power of the solar cell 10 increases, the operating voltage of the solar cell 10 also increases. When the output power decreases, the operating voltage of the solar cell 10 also decreases. This is because the solar cell output power increase flag SAS_P_F is 1 and the solar cell operating voltage increase flag SAS_V_F is 1, and the solar cell output power increase flag SAS_P_F is 1 This corresponds to 0 and the solar cell operating voltage increase flag SAS_V_F is 0. On the other hand, when the power voltage curve is located on the high voltage side with respect to the maximum power point Pmax, the operating voltage of the solar cell 10 decreases when the output power of the solar cell 10 increases, and the solar cell 10 decreases when the output power of the solar cell 10 decreases. The operating voltage of the battery 10 increases. This is because the solar cell output power increase flag SAS_P_F is 1 and the solar cell operating voltage increase flag SAS_V_F is 0, and the solar cell output power increase flag SAS_P_F is 0 and the solar cell operating voltage. This corresponds to the case where the increase flag SAS_V_F is 1. Therefore, it can be determined by the determination method as described above whether the operating point of the solar cell 10 is located on the low voltage side or the high voltage side with respect to the maximum power point Pmax in the power voltage curve. .

上記実施形態においては、太陽電池出力電力増加フラグSAS_P_Fの値と太陽電池動作電圧増加フラグSAS_V_Fの値を加算した値に基づいて、太陽電池10の動作点が電力電圧曲線において最大電力点Pmaxに対して低電圧側又は高電圧側のいずれの側に位置するかを判定したが、太陽電池10の動作点が電力電圧曲線において最大電力点Pmaxに対して低電圧側又は高電圧側のいずれの側に位置するかを判定手法はこれに限定されるものではなく、例えば、太陽電池出力電力増加フラグSAS_P_Fの値と太陽電池動作電圧増加フラグSAS_V_Fの値の排他的論理和に基づいて判定する等他の適切な任意の手法を用いることができる。   In the above embodiment, based on the value obtained by adding the value of the solar cell output power increase flag SAS_P_F and the value of the solar cell operating voltage increase flag SAS_V_F, the operating point of the solar cell 10 is relative to the maximum power point Pmax in the power voltage curve. It is determined which side is located on the low voltage side or the high voltage side. The operating point of the solar cell 10 is on the low voltage side or the high voltage side with respect to the maximum power point Pmax in the power voltage curve. The determination method is not limited to this, for example, determination based on the exclusive OR of the value of the solar cell output power increase flag SAS_P_F and the value of the solar cell operating voltage increase flag SAS_V_F, etc. Any suitable technique can be used.

次に、第1の制御部211は、今回判定された現在の位置フラグMountain_Ridgeの値と、前回判定された位置フラグMountain_Ridge_oldの値を比較する(S425)。比較の結果、現在の位置フラグMountain_Ridgeの値と、前回判定された位置フラグMountain_Ridge_oldの値が異なる場合、前回補正制御を行ったか否かに対応する補正制御情報である補正制御フラグPPT_HELPの値を0とし、太陽電池10の出力電力が減少した回数PDを0とする(S427)。一方、比較の結果、現在の位置フラグMountain_Ridgeの値と、前回判定された位置フラグMountain_Ridge_oldの値が同じ場合、S429に進む。   Next, the first control unit 211 compares the value of the current position flag Mountain_Ridge determined this time with the value of the position flag Mountain_Ridge_old determined last time (S425). If the current position flag Mountain_Ridge is different from the previously determined position flag Mountain_Ridge_old as a result of the comparison, the value of the correction control flag PPT_HELP, which is correction control information corresponding to whether or not the previous correction control was performed, is set to 0. The number PD of times when the output power of the solar cell 10 is reduced is set to 0 (S427). On the other hand, as a result of the comparison, if the value of the current position flag Mountain_Ridge is the same as the value of the position flag Mountain_Ridge_old determined last time, the process proceeds to S429.

第1の制御部211は、ステップS403で計算され、第1の記憶部213に記憶された太陽電池出力電力増加フラグSAS_P_Fの値を判定し(S429)、その値が0の場合、太陽電池10の出力電力が減少した回数PDに1を加算する(S431)。一方、太陽電池出力電力増加フラグSAS_P_Fの値が0ではない場合(1の場合)、太陽電池10の出力電力が減少した回数PDを0とする(S433)。したがって、太陽電池10の出力電力が減少した回数PDが2以上であることは、複数回連続で太陽電池10の出力電力が減少したと判定されたことを示し、太陽電池10の出力電力が減少した回数PDが0又は1であることは、複数回連続で太陽電池10の出力電力が減少したと判定されていないことを示すので、太陽電池10の出力電力が減少した回数PDは、複数回連続で太陽電池10の出力電力が減少したと判定されたか否かに対応する太陽電池出力電力連続減少情報である。   The first control unit 211 determines the value of the solar cell output power increase flag SAS_P_F calculated in step S403 and stored in the first storage unit 213 (S429). If the value is 0, the solar cell 10 1 is added to the number of times PD output power has decreased (S431). On the other hand, when the value of the solar cell output power increase flag SAS_P_F is not 0 (in the case of 1), the number PD of times when the output power of the solar cell 10 decreases is set to 0 (S433). Therefore, the number PD of the number of times the output power of the solar cell 10 has decreased is 2 or more indicates that it has been determined that the output power of the solar cell 10 has decreased continuously several times, and the output power of the solar cell 10 has decreased. Since the number of times PD is 0 or 1 indicates that it is not determined that the output power of the solar cell 10 has decreased continuously for a plurality of times, the number of times PD that the output power of the solar cell 10 has decreased is a plurality of times. This is solar cell output power continuous decrease information corresponding to whether or not it is determined that the output power of the solar cell 10 has been continuously decreased.

本実施形態においては、複数回連続で太陽電池10の出力電力が減少したと判定された場合、つまり太陽電池出力電力連続減少情報が肯定の場合、サブシステム間で制御の干渉が生じていると判断し、補正制御を行う。ここで、上記ステップS425〜S433の処理から理解されるように、太陽電池10の動作点の位置が、デューティー比を変化させた前後で、最大電力点Pmaxに対して低電圧側から高電圧側に、又は高電圧側から低電圧側に変わった場合、太陽電池出力電力連続減少情報を否定とする。   In this embodiment, when it is determined that the output power of the solar cell 10 has decreased continuously several times, that is, when the solar cell output power continuous decrease information is affirmative, there is control interference between subsystems. Determine and perform correction control. Here, as understood from the processing in steps S425 to S433, the position of the operating point of the solar cell 10 is changed from the low voltage side to the high voltage side with respect to the maximum power point Pmax before and after the duty ratio is changed. Or when the high voltage side is changed to the low voltage side, the solar cell output power continuous decrease information is negated.

第1の制御部211は、S431又はS433で得られたPDの値を判定し(S435)、S431又はS433で得られたPの値が2以上であるか、又は補正制御フラグPPT_HELPの値が1である場合、補正制御フラグPPT_HELPの値を1とし(S437)、以下のステップS439〜S443の補正制御を行う。   The first control unit 211 determines the value of PD obtained in S431 or S433 (S435), and the value of P obtained in S431 or S433 is 2 or more, or the value of the correction control flag PPT_HELP is If it is 1, the value of the correction control flag PPT_HELP is set to 1 (S437), and correction control in the following steps S439 to S443 is performed.

すなわち、まず、第1の制御部211は、現在の位置フラグMountain_Ridgeの値を判定し(S439)、現在の位置フラグMountain_Ridgeの値が0の場合、デューティー比を補正制御量HELP_Stepだけ減少させ(S441)、現在の位置フラグMountain_Ridgeの値が0ではない場合(1の場合)、デューティー比を補正制御量HELP_Stepだけ増加させる(S443)。   That is, first, the first control unit 211 determines the value of the current position flag Mountain_Ridge (S439). If the value of the current position flag Mountain_Ridge is 0, the duty ratio is decreased by the correction control amount HELP_Step (S441). ) If the value of the current position flag Mountain_Ridge is not 0 (in the case of 1), the duty ratio is increased by the correction control amount HELP_Step (S443).

一方、第1の制御部211は、S431又はS433で得られたPの値が2以上、又は補正制御フラグPPT_HELPの値が1以外の場合、以下のステップS445〜S449の制御を行う。   On the other hand, when the value of P obtained in S431 or S433 is 2 or more, or the value of the correction control flag PPT_HELP is other than 1, the first control unit 211 performs the following control in steps S445 to S449.

すなわち、ステップS403で計算され、第1の記憶部213に記憶された太陽電池出力電力増加フラグSAS_P_Fの値を判定し(S445)、その値が1の場合、デューティー比を、前回のデューティー比の制御量PPT_F(正負の符号付き)だけ増加させ、デューティー比を前回と同じ方向に変化させる(S449)。一方、太陽電池出力電力増加フラグSAS_P_Fの値が1ではない場合(0の場合)、前回のデューティー比の制御量PPT_Fの符号を反転させ(S447)、デューティー比を、符号を反転させたデューティー比の制御量PPT_Fだけ増加させ、デューティー比を前回と反対の方向に変化させる(S449)。   That is, the value of the solar cell output power increase flag SAS_P_F calculated in step S403 and stored in the first storage unit 213 is determined (S445). If the value is 1, the duty ratio is set to the previous duty ratio. The control amount is increased by PPT_F (with positive and negative signs), and the duty ratio is changed in the same direction as the previous time (S449). On the other hand, when the value of the solar cell output power increase flag SAS_P_F is not 1 (in the case of 0), the sign of the control amount PPT_F of the previous duty ratio is inverted (S447), and the duty ratio is the duty ratio obtained by inverting the sign. And the duty ratio is changed in the opposite direction to the previous time (S449).

上記実施形態においては、太陽電池出力電力連続減少情報として、上記のようなアルゴリズムにより得られる太陽電池10の出力電力が減少した回数PDを用いたが、これに限定されるものではなく、他の適切な任意のアルゴリズムにより得られる情報を用いることができる。   In the above embodiment, the number PD of times the output power of the solar cell 10 obtained by the algorithm as described above is used as the solar cell output power continuous decrease information, but the present invention is not limited to this. Information obtained by any suitable algorithm can be used.

本実施形態のMPPTモード制御によれば、太陽電池の電力電圧曲線において、現在の動作点が最大電力点の低電圧側又は高電圧側のいずれの側に位置するのかを判定し、その判定結果に応じて、デューティー比を適切に設定することによって、サブシステム間の制御の干渉を抑制することができる。   According to the MPPT mode control of the present embodiment, in the power voltage curve of the solar cell, it is determined whether the current operating point is located on the low voltage side or the high voltage side of the maximum power point, and the determination result Accordingly, by appropriately setting the duty ratio, it is possible to suppress control interference between subsystems.

<CVモード>
図6は、CVモード処理のフローチャートである。まず、第2のサブシステム30が、統合制御装置50からのCVモード指示を受信する(S601)。フローチャートから明らかなとおり、ステップS601から進んだ処理がステップS619又はステップS621へと至り、その後ステップS603へと戻るループ処理が行われる。
<CV mode>
FIG. 6 is a flowchart of the CV mode process. First, the second subsystem 30 receives a CV mode instruction from the integrated control device 50 (S601). As is apparent from the flowchart, a loop process is performed in which the process that has proceeded from step S601 reaches step S619 or step S621, and then returns to step S603.

ステップS603においては、第2の双方向DC/DCコンバータ310が或るデューティー比duty(ステップS603が初めて実施される場合には初期値)で動作している状態で、図示しない各電圧計、電流計により、太陽電池10の動作電圧、出力電流、第2の双方向DC/DCコンバータ310の入力側電圧値、出力側電圧値、入力側電流値、出力側電流値等が測定されて、第2の制御部311に入力される。第2の制御部311は、入力された太陽電池10の動作電圧値と出力電流値の乗算により、太陽電池10の出力電力値を計算し、第2の記憶部313に記憶させる。   In step S603, in the state where the second bidirectional DC / DC converter 310 is operating at a certain duty ratio duty (initial value when step S603 is performed for the first time), each voltmeter and current (not shown) are operated. The meter measures the operating voltage, output current of the solar cell 10, the input side voltage value, the output side voltage value, the input side current value, the output side current value, etc. of the second bidirectional DC / DC converter 310, 2 to the control unit 311. The second control unit 311 calculates the output power value of the solar cell 10 by multiplying the input operating voltage value of the solar cell 10 and the output current value, and stores them in the second storage unit 313.

ステップS603の処理が2回目以降に行われる場合は、第2の制御部311は、現在のデューティー比dutyと前回のデューティー比duty_oldを比較し(S603)、現在のデューティー比dutyが前回のデューティー比duty_oldよりも大きい場合、以下のステップS605〜S609の制御を行う。   When the process of step S603 is performed after the second time, the second control unit 311 compares the current duty ratio duty with the previous duty ratio duty_old (S603), and the current duty ratio duty is the previous duty ratio. When larger than duty_old, control of the following steps S605-S609 is performed.

すなわち、第2の制御部311は、今回計算された現在の太陽電池10の出力電力値SAS_Pと前回計算された太陽電池10の出力電力値SAS_P_oldを比較する(S605)。比較の結果、前回計算された太陽電池10の出力電力SAS_P_oldが、今回計算された現在の太陽電池10の出力電力SAS_P以上であった場合、太陽電池10の動作点が電力電圧曲線において最大電力点Pmaxに対して低電圧側又は高電圧側のいずれの側に位置するかを示す位置フラグCV_Fを、低電圧側に位置することを示す「−1」とし(S607)、今回計算された現在の太陽電池10の出力電力SAS_P_old未満であった場合、位置フラグCV_Fを、高電圧側に位置することを示す「1」とし(S609)、第2の記憶部313に記憶させる。   That is, the second control unit 311 compares the current output power value SAS_P of the solar cell 10 calculated this time with the output power value SAS_P_old of the solar cell 10 calculated last time (S605). As a result of the comparison, when the output power SAS_P_old of the solar cell 10 calculated last time is equal to or greater than the current output power SAS_P of the solar cell 10 calculated this time, the operating point of the solar cell 10 is the maximum power point in the power voltage curve. The position flag CV_F indicating which side is located on the low voltage side or the high voltage side with respect to Pmax is set to “−1” indicating that it is located on the low voltage side (S607). If the output power of the solar cell 10 is less than SAS_P_old, the position flag CV_F is set to “1” indicating that it is located on the high voltage side (S609), and is stored in the second storage unit 313.

一方、現在のデューティー比dutyが前回のデューティー比duty_old以下の場合、以下のステップS611〜S615の制御を行う。   On the other hand, when the current duty ratio duty is less than or equal to the previous duty ratio duty_old, the following control in steps S611 to S615 is performed.

すなわち、第2の制御部311は、今回計算された現在の太陽電池10の出力電力値SAS_Pと前回計算された太陽電池10の出力電力値SAS_P_oldを比較する(S611)。比較の結果、前回計算された太陽電池10の出力電力SAS_P_oldが、今回計算された現在の太陽電池10の出力電力SAS_P以上であった場合、位置フラグCV_Fを「1」とし(S613)、今回計算された現在の太陽電池10の出力電力SAS_P_old未満であった場合、位置フラグCV_Fを「−1」とし(S615)、第2の記憶部313に記憶させる。   That is, the second control unit 311 compares the current output power value SAS_P of the solar cell 10 calculated this time with the output power value SAS_P_old of the solar cell 10 calculated last time (S611). As a result of the comparison, when the output power SAS_P_old of the solar cell 10 calculated last time is equal to or greater than the current output power SAS_P of the solar cell 10 calculated this time, the position flag CV_F is set to “1” (S613) and calculated this time. If the output power of the current solar cell 10 is less than SAS_P_old, the position flag CV_F is set to “−1” (S615) and stored in the second storage unit 313.

このように、MTTPモードと同様の原理で、太陽電池10の動作点が、最大電力点Pmaxに対して低電圧側又は高電圧側のいずれの側に位置するのかを判定する。   In this way, based on the same principle as in the MTTP mode, it is determined whether the operating point of the solar cell 10 is located on the low voltage side or the high voltage side with respect to the maximum power point Pmax.

次に、第2の制御部311は、出力側電圧BUS_Vと定電圧制御目標値CV_Vを比較し(S617)、出力側電圧BUS_Vが定電圧制御目標値CV_V以上であった場合、デューティー比を制御量Stepだけ減少させる(S619)。一方、出力側電圧BUS_Vが定電圧制御目標値CV_V未満であった場合、ステップS607、S609、S613又はS615において第2の記憶部313に記憶された位置フラグCV_Fの値に基づいて、デューティー比を制御量Step×CV_Fだけ増加させる(S621)。これにより、太陽電池10の動作点が最大電力点Pmaxの低電圧側に位置することを検出した場合は、補正制御が行われる。   Next, the second control unit 311 compares the output side voltage BUS_V with the constant voltage control target value CV_V (S617), and controls the duty ratio when the output side voltage BUS_V is equal to or higher than the constant voltage control target value CV_V. Decrease by the amount Step (S619). On the other hand, when the output side voltage BUS_V is less than the constant voltage control target value CV_V, the duty ratio is set based on the value of the position flag CV_F stored in the second storage unit 313 in step S607, S609, S613 or S615. The control amount is increased by Step × CV_F (S621). Thereby, when it is detected that the operating point of the solar cell 10 is located on the low voltage side of the maximum power point Pmax, correction control is performed.

従来のCV制御モードでは、太陽電池の電力電圧曲線において最大電力点Pmaxに対して低電圧側に位置する場合には、目標値CV_Vに対して出力側電圧BUS_Vが小さく、ディーティー比を増加させる制御を行うと、最大電力点Pに対して、さらに低電圧側に移動することになるので、適切な制御ができない。本実施形態のCVモード制御によれば、太陽電池の電力電圧曲線において、現在の動作点が最大電力点の低電圧側又は高電圧側のいずれの側に位置するのかを判定し、低電圧側に位置することを検出した場合は、補正制御を行うことにより、サブシステム間の制御の干渉を抑制することができる。   In the conventional CV control mode, when the solar cell power voltage curve is positioned on the low voltage side with respect to the maximum power point Pmax, the output side voltage BUS_V is smaller than the target value CV_V, and the duty ratio is increased. When the control is performed, the maximum power point P is further moved to the low voltage side, so that appropriate control cannot be performed. According to the CV mode control of the present embodiment, in the power voltage curve of the solar cell, it is determined whether the current operating point is located on the low voltage side or the high voltage side of the maximum power point, and the low voltage side When it is detected that the position is located in the position, it is possible to suppress control interference between subsystems by performing correction control.

<CCモード>
定電流制御を行う場合、(サブ)システムが単一の場合は、現在の電力変換装置の出力側電流値が、定電流制御目標値よりも大きい場合にデューティー比を減少させ、定電流制御目標値よりも小さい場合にデューティー比を増加させればよい。しかしながら、サブシステムが複数の場合は、サブシステム間で制御の干渉の問題が生じる。そこで、本実施形態のCCモードでは、太陽電池10の出力電力の増減も考慮して制御を行う。
<CC mode>
When performing constant current control, if the (sub) system is single, the duty ratio is decreased when the current value of the output side of the current power converter is larger than the constant current control target value, and the constant current control target If the value is smaller than the value, the duty ratio may be increased. However, when there are a plurality of subsystems, a problem of control interference occurs between the subsystems. Therefore, in the CC mode of the present embodiment, control is performed in consideration of increase / decrease in the output power of the solar cell 10.

具体的には、図7に示すような、太陽電池出力の増減と、定電流制御目標値に対する現在の出力側電流値の大小をマトリクスに状態判定し、その9通りの状態におけるデューティー比制御を、それぞれデューティー比の増加、減少、変更なしのいずれかに設定することで、制御干渉を抑制する。   Specifically, as shown in FIG. 7, the state of the output of the solar cell and the current output side current value relative to the constant current control target value are determined in a matrix, and duty ratio control in the nine states is performed. The control interference is suppressed by setting the duty ratio to increase, decrease, or no change.

9通りの状態においてどのようなデューティー比制御設定が適切であるかは、システム構成によって異なるが、本実施形態においては、一例として、出力側電流値が定電流制御目標値よりも低く、太陽電池の出力電力が減少する状態のデューティー比設定を、従来の定電流制御においては「増加」となるのに対して、「変更なし」とする実施形態について説明する。出力側電流値が定電流制御目標値よりも低く、太陽電池の出力電力が減少する状態のデューティー比設定を「変更なし」としたのは、太陽電池の出力電力が減少する状態において、デューティー比を増加させると更に太陽電池の出力電力が減少する可能性があるためである。したがって、デューティー比設定を「減少」とすることも考えられる。しかしながら、上述のように、どのようなデューティー比制御設定が適切であるかは、システム構成によって異なるので、デューティー比設定を「増加」とすることが適切な場合もあることに留意が必要である。   Although what duty ratio control setting is appropriate in nine states differs depending on the system configuration, in this embodiment, as an example, the output-side current value is lower than the constant current control target value, and the solar cell A description will be given of an embodiment in which the duty ratio setting in a state in which the output power decreases is “increase” in the conventional constant current control, whereas “no change”. The duty ratio setting when the output side current value is lower than the constant current control target value and the output power of the solar battery decreases is set to “No change” because the duty ratio is set when the output power of the solar battery decreases. This is because there is a possibility that the output power of the solar cell is further reduced when the value is increased. Therefore, it is conceivable to set the duty ratio setting to “decrease”. However, as described above, what duty ratio control setting is appropriate depends on the system configuration, so it should be noted that it may be appropriate to set the duty ratio setting to “increase”. .

以下、図7に示されるデューティー比設定におけるCCモードにおける処理について説明する。図8は、CCモード処理のフローチャートである。まず、第2のサブシステム30が、統合制御装置50からのCVモード指示を受信する(S801)。フローチャートから明らかなとおり、ステップS801ら進んだ処理がステップS805又はステップS811へと至り、その後ステップS803へと戻るループ処理が行われる。   Hereinafter, the process in the CC mode in the duty ratio setting shown in FIG. 7 will be described. FIG. 8 is a flowchart of CC mode processing. First, the second subsystem 30 receives a CV mode instruction from the integrated control device 50 (S801). As is apparent from the flowchart, a loop process is performed in which the process proceeds from step S801 to step S805 or S811, and then returns to step S803.

ステップS803においては、第3の双方向DC/DCコンバータ410が或るデューティー比duty(ステップS803が初めて実施される場合には初期値)で動作している状態で、図示しない各電圧計、電流計により、太陽電池10の動作電圧、出力電流、第3の双方向DC/DCコンバータ410の入力側電圧値、出力側電圧値、入力側電流値、出力側電流値等が測定されて、第3の制御部411に入力される。第3の制御部411は、入力された太陽電池10の動作電圧値と出力電流値の乗算により、太陽電池10の出力電力値を計算し、第3の記憶部413に記憶させる。   In step S803, the third bidirectional DC / DC converter 410 is operating at a certain duty ratio duty (initial value when step S803 is implemented for the first time). The meter measures the operating voltage, output current, the input voltage value, the output voltage value, the input current value, the output current value, etc. of the third bidirectional DC / DC converter 410, 3 to the control unit 411. The third control unit 411 calculates the output power value of the solar cell 10 by multiplying the input operating voltage value of the solar cell 10 and the output current value, and stores the calculated output power value in the third storage unit 413.

ステップS803の処理が2回目以降に行われる場合は、第3の制御部411は、出力側電流BUS_Iと定電流制御目標値CC_Iを比較し(S803)、出力側電流BUS_Iが定電圧制御目標値CC_Iを上回った場合、デューティー比を制御量Stepだけ減少させる(S805)。   When the process of step S803 is performed after the second time, the third control unit 411 compares the output side current BUS_I with the constant current control target value CC_I (S803), and the output side current BUS_I is determined as the constant voltage control target value. If it exceeds CC_I, the duty ratio is decreased by the control amount Step (S805).

一方、出力側電流BUS_Iが定電圧制御目標値CC_I以下であった場合、出力側電流BUS_Iと定電流制御目標値CC_Iを比較し(S807)、出力側電流BUS_Iが定電圧制御目標値CC_I未満であった場合、前回計算された太陽電池10の出力電力値SAS_P_oldと今回計算された現在の太陽電池10の出力電力値SAS_Pを比較する(S809)。比較の結果、現在の太陽電池10の出力電力SAS_Pが、前回計算された太陽電池10の出力電力SAS_P_old以上であった場合、デューティー比を制御量Stepだけ増加させ(S811)、前回計算された太陽電池10の出力電力SAS_P_old未満であった場合、デューティー比は変更しない。また、出力側電流BUS_Iが定電圧制御目標値CC_Iと等しかった場合もデューティー比を変更しない。   On the other hand, when the output side current BUS_I is equal to or less than the constant voltage control target value CC_I, the output side current BUS_I is compared with the constant current control target value CC_I (S807), and the output side current BUS_I is less than the constant voltage control target value CC_I. If there is, the output power value SAS_P_old of the solar cell 10 calculated last time is compared with the current output power value SAS_P of the solar cell 10 calculated this time (S809). If the current output power SAS_P of the solar cell 10 is equal to or greater than the previously calculated output power SAS_P_old of the solar cell 10 as a result of the comparison, the duty ratio is increased by the control amount Step (S811). When the output power of the battery 10 is less than SAS_P_old, the duty ratio is not changed. Also, the duty ratio is not changed when the output-side current BUS_I is equal to the constant voltage control target value CC_I.

<シミュレーション例>
上記実施形態の電力制御システムにおいて、本実施形態の電力制御方法の適用前と適用後の1つのシミュレーション例について説明する。
<Example of simulation>
In the power control system of the above embodiment, one simulation example before and after application of the power control method of the present embodiment will be described.

第1のサブシステム20がMPPTモード、第2のサブシステム30及び第3のサブシステム40がCCモードで制御され、0.5秒後に、第1のサブシステム20をCCモードに変更すると共に、第2のサブシステム30をMPPTモードに変更した。第3のサブシステム40はCCモードのままであった。   The first subsystem 20 is controlled in the MPPT mode, the second subsystem 30 and the third subsystem 40 are controlled in the CC mode, and after 0.5 seconds, the first subsystem 20 is changed to the CC mode, The second subsystem 30 was changed to the MPPT mode. The third subsystem 40 remained in CC mode.

太陽電池10の諸元は、Vocが27.4V、Iocが2.3A、Vmpが25.0V、Impが2.0Aで、バッテリの初期電圧を全て10Vとした。   The specifications of the solar cell 10 are as follows: Voc is 27.4V, Ioc is 2.3A, Vmp is 25.0V, Imp is 2.0A, and the initial voltage of the battery is 10V.

太陽電池10の動作電圧や出力電流、各双方向DC/DCコンバータの入出力電圧・電流及びデューティー比の計測は、1制御周期(100Hz)毎に行った。   The measurement of the operating voltage and output current of the solar cell 10, the input / output voltage / current of each bidirectional DC / DC converter, and the duty ratio were performed every control cycle (100 Hz).

結果を、図9、図10に示す。ここで、図9、図10において、0.5秒付近以前において、第3のサブシステムの特性を示す線が見えない領域では、第3のサブシステムの特性と第2のサブシステムの特性が重なっており、0.5秒付近以降において、第1のサブシステムの特性を示す線が見えない領域では、第1のサブシステムの特性と第3のサブシステムの特性が重なっている。図9から分かるように、本実施形態の電力制御方法の適用前は、各サブシステム間での制御の干渉が生じるために、太陽電池10は、設定最大電力である50Wを出力できず、出力電力は30W程度で推移していた。これに対して、図10から分かるように、本実施形態の電力制御方法の適用後は、各サブシステム間での制御の干渉が抑制され、太陽電池10は、設定最大電力である50Wを出力し続けることができた。また、第1のサブシステム20と第2のサブシステム30とのモード切り替え時において、太陽電池10の出力電力が変動することなく、スムーズなモード切り替えができた。   The results are shown in FIGS. Here, in FIG. 9 and FIG. 10, in the region where the line indicating the characteristic of the third subsystem is not visible before about 0.5 seconds, the characteristics of the third subsystem and the characteristics of the second subsystem are In the region where the line indicating the characteristics of the first subsystem is not visible after about 0.5 seconds, the characteristics of the first subsystem and the characteristics of the third subsystem overlap. As can be seen from FIG. 9, before application of the power control method of the present embodiment, control interference occurs between the subsystems, so the solar cell 10 cannot output the set maximum power of 50 W, and the output Electricity was changing at around 30W. On the other hand, as can be seen from FIG. 10, after application of the power control method of the present embodiment, control interference between the subsystems is suppressed, and the solar cell 10 outputs 50 W, which is the set maximum power. I was able to continue. In addition, when the mode was switched between the first subsystem 20 and the second subsystem 30, the output power of the solar cell 10 did not fluctuate and the mode could be switched smoothly.

上記実施形態においては、すべてのサブシステムの電力変換装置を、双方向DC/DCコンバータとしたが、これに限定されるものではなく、例えばDC/DCコンバータ、DC/ACインバータ等の他の適切な任意の電力変換装置を用いることができる。   In the above embodiment, the power converters of all the subsystems are bidirectional DC / DC converters, but the present invention is not limited to this. For example, other appropriate converters such as a DC / DC converter, a DC / AC inverter, etc. Any power converter can be used.

上記実施形態においては、すべてのサブシステムが、電力変換装置、バッテリ、負荷を備えるものであったが、各サブシステムは、少なくとも電力変換装置とバッテリ又は負荷を備えていればよい。   In the above-described embodiment, all the subsystems include the power conversion device, the battery, and the load. However, each subsystem only needs to include at least the power conversion device and the battery or the load.

以上、本発明について、例示のためにいくつかの実施形態に関して説明してきたが、本発明はこれに限定されるものでなく、本発明の範囲から逸脱することなく、形態及び詳細について、様々な変形及び修正を行うことができることは、当業者に明らかであろう。   Although the present invention has been described above with reference to several embodiments for purposes of illustration, the present invention is not limited thereto and various forms and details may be used without departing from the scope of the present invention. It will be apparent to those skilled in the art that variations and modifications can be made.

1 電力制御システム
10 太陽電池
20 第1のサブシステム
30 第2のサブシステム
40 第3のサブシステム
50 統合制御装置
210 第1の双方向DC/DCコンバータ
310 第2の双方向DC/DCコンバータ
410 第3の双方向DC/DCコンバータ
211 第1の制御部
311 第2の制御部
411 第3の制御部
213 第1の記憶部
313 第2の記憶部
413 第3の記憶部
230 第1のバッテリ
330 第2のバッテリ
430 第3のバッテリ
250 第1の負荷
350 第2の負荷
450 第3の負荷
DESCRIPTION OF SYMBOLS 1 Power control system 10 Solar cell 20 1st subsystem 30 2nd subsystem 40 3rd subsystem 50 Integrated control apparatus 210 1st bidirectional DC / DC converter 310 2nd bidirectional DC / DC converter 410 3rd bidirectional DC / DC converter 211 1st control part 311 2nd control part 411 3rd control part 213 1st memory | storage part 313 2nd memory | storage part 413 3rd memory | storage part 230 1st battery 330 Second battery 430 Third battery 250 First load 350 Second load 450 Third load

Claims (20)

太陽電池と、
複数のサブシステムと、
を備え、
前記複数のサブシステムのうちの第1のサブシステムがMPPT(最大電力追尾)モードで制御され、
前記複数のサブシステムは、前記太陽電池に並列に直接接続され、
前記複数のサブシステムの各々は、電力変換装置とバッテリ又は負荷を含み、
前記電力変換装置は、制御部を備え、前記太陽電池の出力電圧を変換して前記サブシステム側へ出力し、
前記第1のサブシステムの前記電力変換装置の前記制御部は、
前記第1のサブシステムの前記電力変換装置のデューティー比を変化させた際の前記太陽電池の出力電力の増減を判定し、
前記デューティー比を変化させた後の前記太陽電池の動作点が、前記太陽電池の電力電圧曲線において最大電力点に対して低電圧側又は高電圧側のいずれの側に位置するのかを判定し、
前記太陽電池の動作点の位置が、前記デューティー比を変化させた前後で、前記低電圧側から前記高電圧側に、又は前記高電圧側から前記低電圧側に変わった場合、前回補正制御を行ったか否かに対応する補正制御情報、及び、前記太陽電池の出力電力の増減の判定において、複数回連続で前記太陽電池の出力電力が減少したと判定されたか否かに対応する太陽電池出力電力連続減少情報を否定とし、
前記補正制御情報又は前記太陽電池出力電力連続減少情報が肯定であり、且つ前記デューティー比を変化させた後の前記太陽電池の動作点が、前記太陽電池の電力電圧曲線において最大電力点に対して低電圧側に位置すると判定された場合、デューティー比を減少させ、
前記補正制御情報又は前記太陽電池出力電力連続減少情報が肯定であり、且つ前記デューティー比を変化させた後の前記太陽電池の動作点が、前記太陽電池の電力電圧曲線において最大電力点に対して高電圧側に位置すると判定された場合、デューティー比を増加させ、
前記太陽電池の出力電力の増減の判定において、前記太陽電池の出力電力が増加したと判定された場合、デューティー比を前回と同じ方向に変化させ、
前記補正制御情報又は前記太陽電池出力電力連続減少情報が肯定でない場合、デューティー比を前回と反対の方向に変化させる、
制御を繰り返し行う電力制御システム。
Solar cells,
Multiple subsystems;
With
A first subsystem of the plurality of subsystems is controlled in MPPT (maximum power tracking) mode;
The plurality of subsystems are directly connected in parallel to the solar cell;
Each of the plurality of subsystems includes a power converter and a battery or a load,
The power conversion device includes a control unit, converts the output voltage of the solar cell and outputs the converted voltage to the subsystem side,
The control unit of the power converter of the first subsystem is
Determining an increase or decrease in the output power of the solar cell when the duty ratio of the power converter of the first subsystem is changed;
It is determined whether the operating point of the solar cell after changing the duty ratio is located on the low voltage side or the high voltage side with respect to the maximum power point in the power voltage curve of the solar cell,
When the position of the operating point of the solar cell is changed from the low voltage side to the high voltage side or from the high voltage side to the low voltage side before and after changing the duty ratio, the previous correction control is performed. The correction control information corresponding to whether or not it has been performed, and the solar cell output corresponding to whether or not it has been determined that the output power of the solar cell has decreased continuously several times in the determination of increase or decrease of the output power of the solar cell Denying continuous power reduction information,
The correction control information or the solar cell output power continuous decrease information is affirmative, and the operating point of the solar cell after changing the duty ratio is the maximum power point in the power voltage curve of the solar cell. If it is determined that it is located on the low voltage side, decrease the duty ratio,
The correction control information or the solar cell output power continuous decrease information is affirmative, and the operating point of the solar cell after changing the duty ratio is the maximum power point in the power voltage curve of the solar cell. If it is determined that it is located on the high voltage side, increase the duty ratio,
In the determination of the increase or decrease of the output power of the solar cell, when it is determined that the output power of the solar cell has increased, the duty ratio is changed in the same direction as the previous time,
If the correction control information or the solar cell output power continuous decrease information is not affirmative, the duty ratio is changed in the direction opposite to the previous time.
A power control system that repeats control.
前記複数のサブシステムに対して制御モードを指示する統合制御装置を更に含み、
前記第1のサブシステムの前記制御部は、前記統合制御装置からMPPTモードの指示を受信すると、前記制御を繰り返し行う請求項1に記載の電力制御システム。
An integrated control device for instructing a control mode to the plurality of subsystems;
The power control system according to claim 1, wherein the control unit of the first subsystem repeatedly performs the control when receiving an instruction of an MPPT mode from the integrated control device.
前記複数のサブシステムのうちの第2のサブシステムがCV(定電圧)モードで制御され、
前記第2のサブシステムの前記電力変換装置の前記制御部は、
前記第2のサブシステムの前記電力変換装置のデューティー比を変化させた際の前記太陽電池の出力電力の増減を判定し、
前記デューティー比を変化させた後の前記太陽電池の動作点が、前記太陽電池の電力電圧曲線において最大電力点に対して低電圧側又は高電圧側のいずれの側に位置するのかを判定し、
前記電力変換装置の出力側電圧が、定電圧制御目標値よりも大きい場合、デューティー比を減少させ、
前記電力変換装置の出力側電圧が、定電圧制御目標値よりも小さく、且つ前記デューティー比を変化させた後の前記太陽電池の動作点が、前記太陽電池の電力電圧曲線において最大電力点に対して低電圧側に位置すると判定された場合、デューティー比を減少させ、
前記電力変換装置の出力側電圧が、定電圧制御目標値よりも小さく、且つ前記デューティー比を変化させた後の前記太陽電池の動作点が、前記太陽電池の電力電圧曲線において最大電力点に対して高電圧側に位置すると判定された場合、デューティー比を増加させる、
制御を繰り返し行う請求項1又は2に記載の電力制御システム。
A second subsystem of the plurality of subsystems is controlled in a CV (constant voltage) mode;
The control unit of the power converter of the second subsystem is
Determining an increase or decrease in the output power of the solar cell when the duty ratio of the power converter of the second subsystem is changed;
It is determined whether the operating point of the solar cell after changing the duty ratio is located on the low voltage side or the high voltage side with respect to the maximum power point in the power voltage curve of the solar cell,
If the output voltage of the power converter is larger than the constant voltage control target value, reduce the duty ratio,
The output voltage of the power converter is smaller than a constant voltage control target value, and the operating point of the solar cell after changing the duty ratio is the maximum power point in the power voltage curve of the solar cell. If it is determined that it is located on the low voltage side, the duty ratio is decreased.
The output voltage of the power converter is smaller than a constant voltage control target value, and the operating point of the solar cell after changing the duty ratio is the maximum power point in the power voltage curve of the solar cell. Increase the duty ratio.
The power control system according to claim 1 or 2, wherein the control is repeatedly performed.
前記複数のサブシステムのうちの第3のサブシステムがCC(定電流)モードで制御され、
前記第3のサブシステムの前記電力変換装置の前記制御部は、
前記第3のサブシステムの前記電力変換装置のデューティー比を変化させるか、又は変化させない処理を行った際の前記太陽電池の出力電力の増減を判定し、
前記太陽電池の出力電力の増減の判定結果と、前記電力変換装置の出力側電流の定電流制御目標値に対する大小に基づいて、デューティー比を変化させるか、又は変化させない、
制御を繰り返し行う請求項1〜3のいずれか1項に記載の電力制御システム。
A third subsystem of the plurality of subsystems is controlled in a CC (constant current) mode;
The control unit of the power conversion device of the third subsystem is
Change the duty ratio of the power converter of the third subsystem, or determine the increase or decrease in the output power of the solar cell when performing a process that does not change,
Based on the determination result of increase / decrease in the output power of the solar cell and the magnitude of the output-side current of the power converter with respect to the constant current control target value, the duty ratio is changed or not changed,
The power control system according to claim 1, wherein the control is repeatedly performed.
少なくとも1つの前記電力変換装置は、双方向DC/DCコンバータであることを特徴とする請求項1〜4のいずれか1項に記載の電力制御システム。   The power control system according to claim 1, wherein the at least one power conversion device is a bidirectional DC / DC converter. 太陽電池と、
複数のサブシステムと、
を備え、
前記複数のサブシステムのうちの1つがCV(定電圧)モードで制御され、
前記複数のサブシステムは、前記太陽電池に並列に直接接続され、
前記複数のサブシステムの各々は、電力変換装置とバッテリ又は負荷を含み、
前記電力変換装置は、制御部を備え、前記太陽電池の出力電圧を変換して前記サブシステム側へ出力し、
CVモードの前記サブシステムの前記電力変換装置の前記制御部は、
CVモードの前記サブシステムの前記電力変換装置のデューティー比を変化させた際の前記太陽電池の出力電力の増減を判定し、
前記デューティー比を変化させた後の前記太陽電池の動作点が、前記太陽電池の電力電圧曲線において最大電力点に対して低電圧側又は高電圧側のいずれの側に位置するのかを判定し、
前記電力変換装置の出力側電圧が、定電圧制御目標値よりも大きい場合、デューティー比を減少させ、
前記電力変換装置の出力側電圧が、定電圧制御目標値よりも小さく、且つ前記デューティー比を変化させた後の前記太陽電池の動作点が、前記太陽電池の電力電圧曲線において最大電力点に対して低電圧側に位置すると判定された場合、デューティー比を減少させ、
前記電力変換装置の出力側電圧が、定電圧制御目標値よりも小さく、且つ前記デューティー比を変化させた後の前記太陽電池の動作点が、前記太陽電池の電力電圧曲線において最大電力点に対して高電圧側に位置すると判定された場合、デューティー比を増加させる、
制御を繰り返し行う電力制御システム。
Solar cells,
Multiple subsystems;
With
One of the plurality of subsystems is controlled in a CV (constant voltage) mode;
The plurality of subsystems are directly connected in parallel to the solar cell;
Each of the plurality of subsystems includes a power converter and a battery or a load,
The power conversion device includes a control unit, converts the output voltage of the solar cell and outputs the converted voltage to the subsystem side,
The control unit of the power converter of the subsystem in CV mode is:
Determine the increase or decrease in the output power of the solar cell when changing the duty ratio of the power converter of the subsystem in CV mode,
It is determined whether the operating point of the solar cell after changing the duty ratio is located on the low voltage side or the high voltage side with respect to the maximum power point in the power voltage curve of the solar cell,
If the output voltage of the power converter is larger than the constant voltage control target value, reduce the duty ratio,
The output voltage of the power converter is smaller than a constant voltage control target value, and the operating point of the solar cell after changing the duty ratio is the maximum power point in the power voltage curve of the solar cell. If it is determined that it is located on the low voltage side, the duty ratio is decreased.
The output voltage of the power converter is smaller than a constant voltage control target value, and the operating point of the solar cell after changing the duty ratio is the maximum power point in the power voltage curve of the solar cell. Increase the duty ratio.
A power control system that repeats control.
前記複数のサブシステムに対して制御モードを指示する統合制御装置を更に含み、
前記複数のサブシステムのうちの1つの前記制御部は、前記統合制御装置からCVモードの指示を受信すると、前記制御を繰り返し行う請求項6に記載の電力制御システム。
An integrated control device for instructing a control mode to the plurality of subsystems;
The power control system according to claim 6, wherein one of the plurality of subsystems repeatedly performs the control when receiving an instruction of a CV mode from the integrated control device.
少なくとも1つの前記電力変換装置は、双方向DC/DCコンバータであることを特徴とする請求項5又は6に記載の電力制御システム。   The power control system according to claim 5 or 6, wherein at least one of the power conversion devices is a bidirectional DC / DC converter. 太陽電池と、
複数のサブシステムと、
を備え、
前記複数のサブシステムのうちの1つがCC(定電流)モードで制御され、
前記複数のサブシステムは、前記太陽電池に並列に直接接続され、
前記複数のサブシステムの各々は、電力変換装置とバッテリ又は負荷を含み、
前記電力変換装置は、制御部を備え、前記太陽電池の出力電圧を変換して前記サブシステム側へ出力し、
CCモードの前記サブシステムの前記電力変換装置の前記制御部は、
CCモードの前記サブシステムの前記電力変換装置のデューティー比を変化させるか、又は変化させない処理を行った際の前記太陽電池の出力電力の増減を判定し、
前記太陽電池の出力電力の増減の判定結果と、前記電力変換装置の出力側電流の定電流制御目標値に対する大小に基づいて、デューティー比を変化させるか、又は変化させない、
制御を繰り返し行う電力制御システム。
Solar cells,
Multiple subsystems;
With
One of the plurality of subsystems is controlled in CC (constant current) mode;
The plurality of subsystems are directly connected in parallel to the solar cell;
Each of the plurality of subsystems includes a power converter and a battery or a load,
The power conversion device includes a control unit, converts the output voltage of the solar cell and outputs the converted voltage to the subsystem side,
The control unit of the power conversion device of the subsystem in CC mode,
Change the duty ratio of the power converter of the subsystem in the CC mode, or determine the increase or decrease in the output power of the solar cell when performing a process that does not change,
Based on the determination result of increase / decrease in the output power of the solar cell and the magnitude of the output-side current of the power converter with respect to the constant current control target value, the duty ratio is changed or not changed,
A power control system that repeats control.
前記複数のサブシステムに対して制御モードを指示する統合制御装置を更に含み、
前記複数のサブシステムのうちの1つの前記制御部は、前記統合制御装置からCCモードの指示を受信すると、前記制御を繰り返し行う請求項9に記載の電力制御システム。
An integrated control device for instructing a control mode to the plurality of subsystems;
The power control system according to claim 9, wherein one of the plurality of subsystems repeatedly performs the control when receiving an instruction of a CC mode from the integrated control device.
前記電力変換装置は、双方向DC/DCコンバータであることを特徴とする請求項9又は10に記載の電力制御システム。   The power control system according to claim 9 or 10, wherein the power converter is a bidirectional DC / DC converter. 太陽電池と、
複数のサブシステムと、
を備え、
前記複数のサブシステムのうちの第1のサブシステムがMPPT(最大電力追尾)モードで制御され、
前記複数のサブシステムは、前記太陽電池に並列に直接接続され、
前記複数のサブシステムの各々は、電力変換装置とバッテリ又は負荷を含み、
前記電力変換装置は、制御部を備え、前記太陽電池の出力電圧を変換して前記サブシステム側へ出力する、
電力制御システムにおける電力制御方法であって、
前記第1のサブシステムの前記電力変換装置のデューティー比を変化させた際の前記太陽電池の出力電力の増減を判定するステップと、
前記デューティー比を変化させた後の前記太陽電池の動作点が、前記太陽電池の電力電圧曲線において最大電力点に対して低電圧側又は高電圧側のいずれの側に位置するのかを判定するステップと、
前記太陽電池の動作点の位置が、前記デューティー比を変化させた前後で、前記低電圧側から前記高電圧側に、又は前記高電圧側から前記低電圧側に変わった場合、前回補正制御を行ったか否かに対応する補正制御情報、及び、前記太陽電池の出力電力の増減の判定において、複数回連続で前記太陽電池の出力電力が減少したと判定されたか否かに対応する太陽電池出力電力連続減少情報を否定とするステップと、
前記補正制御情報又は前記太陽電池出力電力連続減少情報が肯定であり、且つ前記デューティー比を変化させた後の前記太陽電池の動作点が、前記太陽電池の電力電圧曲線において最大電力点に対して低電圧側に位置すると判定された場合、デューティー比を減少させるステップと、
前記補正制御情報又は前記太陽電池出力電力連続減少情報が肯定であり、且つ前記デューティー比を変化させた後の前記太陽電池の動作点が、前記太陽電池の電力電圧曲線において最大電力点に対して高電圧側に位置すると判定された場合、デューティー比を増加させるステップと、
前記太陽電池の出力電力の増減の判定において、前記太陽電池の出力電力が増加したと判定された場合、デューティー比を前回と同じ方向に変化させるステップと、
前記補正制御情報又は前記太陽電池出力電力連続減少情報が肯定でない場合、デューティー比を前回と反対の方向に変化させるステップと、
を繰り返し行う電力制御方法。
Solar cells,
Multiple subsystems;
With
A first subsystem of the plurality of subsystems is controlled in MPPT (maximum power tracking) mode;
The plurality of subsystems are directly connected in parallel to the solar cell;
Each of the plurality of subsystems includes a power converter and a battery or a load,
The power conversion device includes a control unit, converts an output voltage of the solar cell, and outputs the converted voltage to the subsystem side.
A power control method for a power control system, comprising:
Determining an increase / decrease in output power of the solar cell when the duty ratio of the power converter of the first subsystem is changed;
Step of determining whether the operating point of the solar cell after changing the duty ratio is located on the low voltage side or the high voltage side with respect to the maximum power point in the power voltage curve of the solar cell When,
When the position of the operating point of the solar cell is changed from the low voltage side to the high voltage side or from the high voltage side to the low voltage side before and after changing the duty ratio, the previous correction control is performed. The correction control information corresponding to whether or not it has been performed, and the solar cell output corresponding to whether or not it has been determined that the output power of the solar cell has decreased continuously several times in the determination of increase or decrease of the output power of the solar cell A step of negating continuous power reduction information;
The correction control information or the solar cell output power continuous decrease information is affirmative, and the operating point of the solar cell after changing the duty ratio is the maximum power point in the power voltage curve of the solar cell. A step of reducing the duty ratio if determined to be located on the low voltage side;
The correction control information or the solar cell output power continuous decrease information is affirmative, and the operating point of the solar cell after changing the duty ratio is the maximum power point in the power voltage curve of the solar cell. If it is determined to be located on the high voltage side, increasing the duty ratio;
In the determination of the increase or decrease of the output power of the solar cell, when it is determined that the output power of the solar cell has increased, the step of changing the duty ratio in the same direction as the previous time;
If the correction control information or the solar cell output power continuous decrease information is not affirmative, changing the duty ratio in the direction opposite to the previous time;
Power control method that repeats the process.
前記電力制御システムは、前記複数のサブシステムに対して制御モードを指示する統合制御装置を更に含み、
前記第1のサブシステムの前記制御部が、前記統合制御装置からMPPTモードの指示を受信すると、すべての前記ステップを繰り返し行う請求項12に記載の電力制御方法。
The power control system further includes an integrated control device that instructs a control mode to the plurality of subsystems,
The power control method according to claim 12, wherein when the control unit of the first subsystem receives an MPPT mode instruction from the integrated control device, all the steps are repeated.
前記複数のサブシステムのうちの第2のサブシステムがCV(定電圧)モードで制御され、
前記第2のサブシステムの前記電力変換装置のデューティー比を変化させた際の前記太陽電池の出力電力の増減を判定するステップと、
前記デューティー比を変化させた後の前記太陽電池の動作点が、前記太陽電池の電力電圧曲線において最大電力点に対して低電圧側又は高電圧側のいずれの側に位置するのかを判定するステップと、
前記電力変換装置の出力側電圧が、定電圧制御目標値よりも大きい場合、デューティー比を減少させるステップと、
前記電力変換装置の出力側電圧が、定電圧制御目標値よりも小さく、且つ前記デューティー比を変化させた後の前記太陽電池の動作点が、前記太陽電池の電力電圧曲線において最大電力点に対して低電圧側に位置すると判定された場合、デューティー比を減少させるステップと、
前記電力変換装置の出力側電圧が、定電圧制御目標値よりも小さく、且つ前記デューティー比を変化させた後の前記太陽電池の動作点が、前記太陽電池の電力電圧曲線において最大電力点に対して高電圧側に位置すると判定された場合、デューティー比を増加させるステップと、
を繰り返し行う請求項12又は13に記載の電力制御方法。
A second subsystem of the plurality of subsystems is controlled in a CV (constant voltage) mode;
Determining an increase / decrease in the output power of the solar cell when the duty ratio of the power converter of the second subsystem is changed;
Step of determining whether the operating point of the solar cell after changing the duty ratio is located on the low voltage side or the high voltage side with respect to the maximum power point in the power voltage curve of the solar cell When,
When the output voltage of the power converter is larger than a constant voltage control target value, reducing the duty ratio;
The output voltage of the power converter is smaller than a constant voltage control target value, and the operating point of the solar cell after changing the duty ratio is the maximum power point in the power voltage curve of the solar cell. Reducing the duty ratio when it is determined that the low voltage side is located,
The output voltage of the power converter is smaller than a constant voltage control target value, and the operating point of the solar cell after changing the duty ratio is the maximum power point in the power voltage curve of the solar cell. And increasing the duty ratio if it is determined to be located on the high voltage side,
The power control method according to claim 12 or 13, wherein the step is repeatedly performed.
前記複数のサブシステムのうちの第3のサブシステムがCC(定電流)モードで制御され、
前記第3のサブシステムの前記電力変換装置のデューティー比を変化させるか、又は変化させない処理を行った際の前記太陽電池の出力電力の増減を判定するステップと、
前記太陽電池の出力電力の増減の判定結果と、前記電力変換装置の出力側電流の定電流制御目標値に対する大小に基づいて、デューティー比を変化させるか、又は変化させないステップと、
を繰り返し行う請求項12〜14のいずれか1項に記載の電力制御方法。
A third subsystem of the plurality of subsystems is controlled in a CC (constant current) mode;
Determining the increase or decrease in the output power of the solar cell when performing a process that changes or does not change the duty ratio of the power converter of the third subsystem;
Based on the determination result of increase / decrease in the output power of the solar cell and the magnitude of the output-side current of the power conversion device with respect to the constant current control target value, changing the duty ratio or not changing,
The power control method according to any one of claims 12 to 14, which is repeatedly performed.
少なくとも1つの前記電力変換装置は、双方向DC/DCコンバータであることを特徴とする請求項12〜15のいずれか1項に記載の電力制御システム。   The power control system according to claim 12, wherein the at least one power conversion device is a bidirectional DC / DC converter. 太陽電池と、
複数のサブシステムと、
を備え、
前記複数のサブシステムのうちの1つがCV(定電圧)モードで制御され、
前記複数のサブシステムは、前記太陽電池に並列に直接接続され、
前記複数のサブシステムの各々は、電力変換装置とバッテリ又は負荷を含み、
前記電力変換装置は、制御部を備え、前記太陽電池の出力電圧を変換して前記サブシステム側へ出力する、
電力制御システムにおける電力制御方法であって、
CVモードの前記サブシステムの前記電力変換装置のデューティー比を変化させた際の前記太陽電池の出力電力の増減を判定するステップと、
前記デューティー比を変化させた後の前記太陽電池の動作点が、前記太陽電池の電力電圧曲線において最大電力点に対して低電圧側又は高電圧側のいずれの側に位置するのかを判定するステップと、
前記電力変換装置の出力側電圧が、定電圧制御目標値よりも大きい場合、デューティー比を減少させるステップと、
前記電力変換装置の出力側電圧が、定電圧制御目標値よりも小さく、且つ前記デューティー比を変化させた後の前記太陽電池の動作点が、前記太陽電池の電力電圧曲線において最大電力点に対して低電圧側に位置すると判定された場合、デューティー比を減少させるステップと、
前記電力変換装置の出力側電圧が、定電圧制御目標値よりも小さく、且つ前記デューティー比を変化させた後の前記太陽電池の動作点が、前記太陽電池の電力電圧曲線において最大電力点に対して高電圧側に位置すると判定された場合、デューティー比を増加させるステップと、
を繰り返し行う電力制御方法。
Solar cells,
Multiple subsystems;
With
One of the plurality of subsystems is controlled in a CV (constant voltage) mode;
The plurality of subsystems are directly connected in parallel to the solar cell;
Each of the plurality of subsystems includes a power converter and a battery or a load,
The power conversion device includes a control unit, converts an output voltage of the solar cell, and outputs the converted voltage to the subsystem side.
A power control method for a power control system, comprising:
Determining an increase or decrease in the output power of the solar cell when the duty ratio of the power converter of the subsystem in CV mode is changed;
Step of determining whether the operating point of the solar cell after changing the duty ratio is located on the low voltage side or the high voltage side with respect to the maximum power point in the power voltage curve of the solar cell When,
When the output voltage of the power converter is larger than a constant voltage control target value, reducing the duty ratio;
The output voltage of the power converter is smaller than a constant voltage control target value, and the operating point of the solar cell after changing the duty ratio is the maximum power point in the power voltage curve of the solar cell. Reducing the duty ratio when it is determined that the low voltage side is located,
The output voltage of the power converter is smaller than a constant voltage control target value, and the operating point of the solar cell after changing the duty ratio is the maximum power point in the power voltage curve of the solar cell. And increasing the duty ratio if it is determined to be located on the high voltage side,
Power control method that repeats the process.
前記複数のサブシステムに対して制御モードを指示する統合制御装置を更に含み、
前記複数のサブシステムのうちの1つの前記制御部が、前記統合制御装置からCVモードの指示を受信すると、すべての前記ステップを繰り返し行う請求項17に記載の電力制御方法。
An integrated control device for instructing a control mode to the plurality of subsystems;
18. The power control method according to claim 17, wherein one of the plurality of subsystems repeatedly performs all the steps when receiving an instruction of a CV mode from the integrated control apparatus.
太陽電池と、
複数のサブシステムと、
を備え、
前記複数のサブシステムのうちの1つがCC(定電流)モードで制御され、
前記複数のサブシステムは、前記太陽電池に並列に直接接続され、
前記複数のサブシステムの各々は、電力変換装置とバッテリ又は負荷を含み、
前記電力変換装置は、制御部を備え、前記太陽電池の出力電圧を変換して前記サブシステム側へ出力する、
電力制御システムにおける電力制御方法であって、
CCモードの前記サブシステムの前記電力変換装置のデューティー比を変化させるか、又は変化させない処理を行った際の前記太陽電池の出力電力の増減を判定するステップと、
前記太陽電池の出力電力の増減の判定結果と、前記電力変換装置の出力側電流の定電流制御目標値に対する大小に基づいて、デューティー比を変化させるか、又は変化させないステップと、
を繰り返し行う電力制御方法。
Solar cells,
Multiple subsystems;
With
One of the plurality of subsystems is controlled in CC (constant current) mode;
The plurality of subsystems are directly connected in parallel to the solar cell;
Each of the plurality of subsystems includes a power converter and a battery or a load,
The power conversion device includes a control unit, converts an output voltage of the solar cell, and outputs the converted voltage to the subsystem side.
A power control method for a power control system, comprising:
A step of changing the duty ratio of the power converter of the subsystem in the CC mode, or determining an increase or decrease in the output power of the solar cell when performing a process that does not change;
Based on the determination result of increase / decrease in the output power of the solar cell and the magnitude of the output-side current of the power conversion device with respect to the constant current control target value, changing the duty ratio or not changing,
Power control method that repeats the process.
前記複数のサブシステムに対して制御モードを指示する統合制御装置を更に含み、
前記複数のサブシステムの1つの前記制御部が、前記統合制御装置からCCモードの指示を受信すると、すべての前記ステップを繰り返し行う請求項19に記載の電力制御方法。
An integrated control device for instructing a control mode to the plurality of subsystems;
The power control method according to claim 19, wherein when the control unit of one of the plurality of subsystems receives a CC mode instruction from the integrated control apparatus, all the steps are repeated.
JP2017063193A 2017-03-28 2017-03-28 Power control system Active JP6887667B2 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
JP2017063193A JP6887667B2 (en) 2017-03-28 2017-03-28 Power control system
JP2021027764A JP7051157B2 (en) 2017-03-28 2021-02-24 Power control system
JP2021027763A JP7051156B2 (en) 2017-03-28 2021-02-24 Power control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017063193A JP6887667B2 (en) 2017-03-28 2017-03-28 Power control system

Related Child Applications (2)

Application Number Title Priority Date Filing Date
JP2021027763A Division JP7051156B2 (en) 2017-03-28 2021-02-24 Power control system
JP2021027764A Division JP7051157B2 (en) 2017-03-28 2021-02-24 Power control system

Publications (2)

Publication Number Publication Date
JP2018165921A true JP2018165921A (en) 2018-10-25
JP6887667B2 JP6887667B2 (en) 2021-06-16

Family

ID=63922794

Family Applications (3)

Application Number Title Priority Date Filing Date
JP2017063193A Active JP6887667B2 (en) 2017-03-28 2017-03-28 Power control system
JP2021027763A Active JP7051156B2 (en) 2017-03-28 2021-02-24 Power control system
JP2021027764A Active JP7051157B2 (en) 2017-03-28 2021-02-24 Power control system

Family Applications After (2)

Application Number Title Priority Date Filing Date
JP2021027763A Active JP7051156B2 (en) 2017-03-28 2021-02-24 Power control system
JP2021027764A Active JP7051157B2 (en) 2017-03-28 2021-02-24 Power control system

Country Status (1)

Country Link
JP (3) JP6887667B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020124973A1 (en) * 2018-12-18 2020-06-25 珠海格力电器股份有限公司 Power optimization method and apparatus therefor, and photovoltaic device and photovoltaic system

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0844446A (en) * 1994-07-29 1996-02-16 Sanyo Electric Co Ltd Method and device for tracking and controlling maximum power point of solar battery
JPH0844445A (en) * 1994-07-29 1996-02-16 Sanyo Electric Co Ltd Method and device for tracking and controlling maximum power point of solar battery
JP2011141794A (en) * 2010-01-08 2011-07-21 Tabuchi Electric Co Ltd Power conversion device
JP2012174070A (en) * 2011-02-23 2012-09-10 Hitachi Engineering & Services Co Ltd Solar cell characteristic acquisition circuit and solar cell control device
JP2013090460A (en) * 2011-10-19 2013-05-13 Next Energy & Resources Co Ltd Power generation control unit of photovoltaic power generation system
JP2013517581A (en) * 2010-01-18 2013-05-16 エルエス産電株式会社 Maximum power point tracking method
JP2014023305A (en) * 2012-07-19 2014-02-03 Denso Corp Charger
WO2016129464A1 (en) * 2015-02-10 2016-08-18 株式会社 東芝 Control device for power conversion apparatus, control program, and power conversion apparatus

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3404620B2 (en) * 1996-10-31 2003-05-12 シャープ株式会社 Inverter control method and inverter device
JPH1031525A (en) * 1996-07-15 1998-02-03 Fuji Electric Co Ltd Photovoltaic power generation system
JP3945658B1 (en) * 2006-02-20 2007-07-18 株式会社パワーシステム Charging device for capacitor storage power supply
JP5799210B2 (en) * 2011-09-09 2015-10-21 パナソニックIpマネジメント株式会社 Power storage system, charge / discharge circuit, and grid interconnection device
KR20140076353A (en) * 2012-12-12 2014-06-20 삼성전자주식회사 Power converting apparatus including multi DC-DC converters and method for controlling multi DC-DC converters

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0844446A (en) * 1994-07-29 1996-02-16 Sanyo Electric Co Ltd Method and device for tracking and controlling maximum power point of solar battery
JPH0844445A (en) * 1994-07-29 1996-02-16 Sanyo Electric Co Ltd Method and device for tracking and controlling maximum power point of solar battery
JP2011141794A (en) * 2010-01-08 2011-07-21 Tabuchi Electric Co Ltd Power conversion device
JP2013517581A (en) * 2010-01-18 2013-05-16 エルエス産電株式会社 Maximum power point tracking method
JP2012174070A (en) * 2011-02-23 2012-09-10 Hitachi Engineering & Services Co Ltd Solar cell characteristic acquisition circuit and solar cell control device
JP2013090460A (en) * 2011-10-19 2013-05-13 Next Energy & Resources Co Ltd Power generation control unit of photovoltaic power generation system
JP2014023305A (en) * 2012-07-19 2014-02-03 Denso Corp Charger
WO2016129464A1 (en) * 2015-02-10 2016-08-18 株式会社 東芝 Control device for power conversion apparatus, control program, and power conversion apparatus

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020124973A1 (en) * 2018-12-18 2020-06-25 珠海格力电器股份有限公司 Power optimization method and apparatus therefor, and photovoltaic device and photovoltaic system
US11710969B2 (en) 2018-12-18 2023-07-25 Gree Electric Appliances, Inc. Of Zhuhai Power optimization method and apparatus therefor, and photovoltaic device and photovoltaic system

Also Published As

Publication number Publication date
JP2021093192A (en) 2021-06-17
JP7051157B2 (en) 2022-04-11
JP7051156B2 (en) 2022-04-11
JP2021093193A (en) 2021-06-17
JP6887667B2 (en) 2021-06-16

Similar Documents

Publication Publication Date Title
KR102567310B1 (en) Method and apparatus for regulation of generators in droop controlled microgrids using hysteresis
AU2016317031B2 (en) Method and apparatus for controlling energy flow between dissimilar energy storage devices
CN102170249B (en) solar power system and operational approach thereof
EP3907882B1 (en) Optimizer, photovoltaic power generation system, and i-v curve scanning method for photovoltaic assembly
US20150288189A1 (en) Power control apparatus, power control method, program, and energy management system
JP6430775B2 (en) Storage battery device
KR20170095578A (en) Energy Storage System and management method thereof
CN102904245A (en) System and method for power curtailment in a power network
JP2017051083A (en) Power generation system, power generation method and program
JP7181691B2 (en) RENEWABLE ENERGY HYBRID GENERATION SYSTEM AND CONTROL METHOD THEREOF
EP2947740A1 (en) Control apparatus, method, and program, and natural energy generation apparatus provided with control apparatus, method, and program
EP4131700A2 (en) Inverter parallel system and zero feed-in control method therefor
JP2024009124A (en) Power control device, storage battery system, storage battery charge power control method and program
JP7051156B2 (en) Power control system
JP2000341959A (en) Power generating system
KR20150085227A (en) The control device and method for Energy Storage System
JP2017200307A (en) Power storage control device
KR20200129555A (en) System and method for controlling charging rate
WO2022107583A1 (en) Power system and method for controlling power system
JP4624717B2 (en) Power system
CN110896230B (en) SOFC power generation system and control method thereof
EP3675307A1 (en) Direct current voltage coordination control method
JP2019193317A (en) Power storage system, charge/discharge control device, control method thereof, and program
JP2011167014A (en) Device for control of converter
JP2015186390A (en) Control device and control method for multi-source pcs group

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200302

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20201225

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210114

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210224

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210412

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20210512

R150 Certificate of patent or registration of utility model

Ref document number: 6887667

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250