JP2018076722A JP2016219870A JP2016219870A JP2018076722A JP 2018076722 A JP2018076722 A JP 2018076722A JP 2016219870 A JP2016219870 A JP 2016219870A JP 2016219870 A JP2016219870 A JP 2016219870A JP 2018076722 A JP2018076722 A JP 2018076722A
Authority
JP
Japan
Prior art keywords
shield
tunnel
shield tunnel
shield machine
spiral
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2016219870A
Other languages
Japanese (ja)
Inventor
善幸 山下
Yoshiyuki Yamashita
善幸 山下
福田 昌弘
Masahiro Fukuda
昌弘 福田
琢郎 小坂
Takuro Kosaka
琢郎 小坂
実 米沢
Minoru Yonezawa
実 米沢
串田 慎二
Shinji Kushida
慎二 串田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2016219870A priority Critical patent/JP2018076722A/en
Publication of JP2018076722A publication Critical patent/JP2018076722A/en
Pending legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a starting method for a shield machine, for efficiently constructing a large cross section tunnel.SOLUTION: A starting method for a shield machine includes: a first process of excavating the natural ground using a spiral shield machine 30 so as to circulate around an axial line P to form a spiral shield tunnel 100 extending so as to circulate around the axial line P; a second process of carrying a roof shield machine 40 for forming roof shield tunnels 101-126 extending in parallel with the axial line P into the spiral shield tunnel 100; and a third process of starting the roof shield machine 40 from the spiral shield tunnel 100.SELECTED DRAWING: Figure 1

Description

本発明は、地山を掘進してシールドトンネルを形成するシールド掘進機の発進方法に関する。   The present invention relates to a starting method for a shield machine that excavates natural ground to form a shield tunnel.

特許文献1及び2はシールドトンネルの分岐合流部(例えば、本線シールドトンネルと支線シールドトンネルとの合流領域)に大断面トンネルを施工する方法を開示している。   Patent Documents 1 and 2 disclose a method for constructing a large-section tunnel in a branching junction of the shield tunnel (for example, a junction region between a main shield tunnel and a branch shield tunnel).

特許文献1に開示の大断面トンネルの施工方法では、ルーフシールドトンネルと呼ばれる小径のシールドトンネルを、前記分岐合流部を取り囲むようにそのトンネル軸線方向に沿って複数本配置し、それらを周方向に相互連結することで外殻躯体を形成して、外殻躯体の内側領域を掘削する。   In the construction method of the large-section tunnel disclosed in Patent Document 1, a plurality of small-diameter shield tunnels called roof shield tunnels are arranged along the tunnel axial direction so as to surround the branch and merge portions, and they are arranged in the circumferential direction. The outer shell is formed by interconnecting, and the inner region of the outer shell is excavated.

特許文献2に開示の大断面トンネルの施工方法では、小径のシールドトンネルを、前記分岐合流部を取り囲むようにそのトンネル軸線周りに螺旋状に形成し、当該小径シールドトンネルのうち前記トンネル軸線に沿って互いに対向する外周面の間に連結用鋼材を配置することで外殻躯体を形成して、外殻躯体の内側領域を掘削する。   In the construction method of the large-section tunnel disclosed in Patent Document 2, a small-diameter shield tunnel is formed in a spiral shape around the tunnel axis so as to surround the branch and merge portion, and along the tunnel axis of the small-diameter shield tunnel. Thus, an outer shell housing is formed by disposing the connecting steel material between the outer peripheral surfaces facing each other, and an inner region of the outer shell housing is excavated.

特開2007−217911号公報JP 2007-217911 A 特開2015−206217号公報JP-A-2015-206217

しかしながら、特許文献1に開示の技術では、特許文献1の図2に示すように、小径シールドトンネルを形成するためのシールド掘進機が、支線シールドトンネルのうち前記分岐合流部から離れた箇所から発進することになる。それゆえ、大断面トンネルの施工領域がトンネル軸線方向にて広範囲になり、これが工期あるいはコストの面で大きな負担になっていた。   However, in the technique disclosed in Patent Document 1, as shown in FIG. 2 of Patent Document 1, a shield machine for forming a small-diameter shield tunnel is started from a location in the branch shield tunnel away from the branch junction. Will do. Therefore, the construction area of the large section tunnel has become wide in the direction of the tunnel axis, which has been a heavy burden in terms of construction period or cost.

一方、特許文献2に開示の技術では、前記分岐合流部の全域を取り囲むように1本の螺旋状の小径のシールドトンネルを形成するので、この小径のシールドトンネルの形成に時間がかかる。これが工期あるいはコストの面で大きな負担になっていた。   On the other hand, in the technique disclosed in Patent Document 2, since one spiral small-diameter shield tunnel is formed so as to surround the entire region of the branch and merge part, it takes time to form the small-diameter shield tunnel. This was a big burden in terms of construction period or cost.

本発明は、このような実状に鑑み、大断面トンネルを効率良く施工するためのシールド掘進機の発進方法を提供することを目的とする。   In view of such a situation, an object of the present invention is to provide a starting method for a shield machine for efficiently constructing a large-section tunnel.

そのため本発明に係るシールド掘進機の発進方法は、第1のシールド掘進機によって第1の軸線周りを周回するように地山を掘進して、第1の軸線周りを周回して延びる第1のシールドトンネルを形成する第1の工程と、第1の軸線に並行して延びる第2のシールドトンネルを形成するための第2のシールド掘進機を第1のシールドトンネル内に搬入する第2の工程と、第2のシールド掘進機を第1のシールドトンネルから発進させる第3の工程と、を含む。   Therefore, the starting method of the shield machine according to the present invention is the first shield machine that excavates the natural ground so as to go around the first axis and extends around the first axis. A first step of forming a shield tunnel, and a second step of carrying a second shield machine for forming a second shield tunnel extending in parallel with the first axis into the first shield tunnel And a third step of starting the second shield machine from the first shield tunnel.

尚、本発明における「螺旋」とは、3次元曲線の1種として知られているものであり、「つる巻線」又は「へリックス(helix)」と称させるものである。   The “spiral” in the present invention is known as a kind of three-dimensional curve, and is referred to as a “vine winding” or “helix”.

本発明によれば、第2のシールド掘進機を第1のシールドトンネルから発進させる。これにより、例えば、第1のシールドトンネルを前記分岐合流部の近傍に形成する場合には、前記分岐合流部の近傍にて第2のシールド掘進機を発進させることができるので、第2のシールド掘進機の発進のために大断面トンネルの施工領域がトンネル軸線方向に拡大することを抑制することができる。また、前述のように前記分岐合流部の全域を取り囲むように1本の螺旋状の小径のシールドトンネルを形成する場合に比べて、短時間で大断面トンネルの施工を行うことができる。従って、大断面トンネルを効率良く施工することができる。   According to the present invention, the second shield machine is started from the first shield tunnel. Thereby, for example, when the first shield tunnel is formed in the vicinity of the branch / merging portion, the second shield machine can be started in the vicinity of the branch / merging portion. Due to the start of the excavator, it is possible to suppress the construction area of the large section tunnel from expanding in the tunnel axis direction. Moreover, compared with the case where one spiral small-diameter shield tunnel is formed so as to surround the entire region of the branching / merging portion as described above, the construction of the large-section tunnel can be performed in a short time. Therefore, a large section tunnel can be constructed efficiently.

本発明の一実施形態における螺旋シールドトンネルの斜視図The perspective view of the spiral shield tunnel in one Embodiment of this invention 同上実施形態における螺旋シールドトンネルの正面図Front view of spiral shield tunnel in the same embodiment 同上実施形態における螺旋シールドトンネルの背面図Rear view of spiral shield tunnel in the same embodiment 同上実施形態における螺旋シールドトンネルの左側面図Left side view of spiral shield tunnel in the same embodiment 図2のA−A断面図AA sectional view of FIG. 同上実施形態における螺旋シールド掘進機の発進準備方法を示す図The figure which shows the start preparation method of the spiral shield machine in embodiment same as the above 同上実施形態における螺旋シールド掘進機の発進準備方法を示す図The figure which shows the start preparation method of the spiral shield machine in embodiment same as the above 同上実施形態における螺旋シールド掘進機の発進準備方法を示す図The figure which shows the start preparation method of the spiral shield machine in embodiment same as the above 同上実施形態におけるルーフシールドトンネルの形成順序の一例を示す図The figure which shows an example of the formation order of the roof shield tunnel in embodiment same as the above 同上実施形態におけるルーフシールドトンネルの形成順序の一例を示す図The figure which shows an example of the formation order of the roof shield tunnel in embodiment same as the above 同上実施形態におけるルーフシールド掘進機が内部に配置された筒状部材を示す図The figure which shows the cylindrical member by which the roof shield machine in embodiment same as the above has been arrange | positioned 同上実施形態におけるルーフシールド掘進機の発進準備方法を示す図The figure which shows the start preparation method of the roof shield excavator in embodiment same as the above 同上実施形態におけるルーフシールド掘進機の発進準備方法を示す図The figure which shows the start preparation method of the roof shield excavator in embodiment same as the above 同上実施形態におけるルーフシールド掘進機の発進準備方法を示す図The figure which shows the start preparation method of the roof shield excavator in embodiment same as the above 同上実施形態におけるルーフシールドトンネルの形成方法を示す図The figure which shows the formation method of the roof shield tunnel in embodiment same as the above 同上実施形態におけるルーフシールドトンネルの形成方法を示す図The figure which shows the formation method of the roof shield tunnel in embodiment same as the above 同上実施形態におけるルーフシールドトンネルの形成方法を示す図The figure which shows the formation method of the roof shield tunnel in embodiment same as the above

以下に本発明の実施の形態を図面に基づいて説明する。
図1は、本発明の一実施形態における螺旋シールドトンネル100の斜視図である。図2〜図4は、螺旋シールドトンネル100の正面図、背面図、及び、左側面図である。図5は図2のA−A断面図である。ここで、図1、図4、及び、図5では、図示簡略化のため、発進坑口形成予定部201〜226の図示を省略している。また、図4及び図5では、図示簡略化のため、本線シールドトンネル1の図示を省略している。また、図4では、図示簡略化のため、螺旋シールド掘進機30の図示を省略している。
Embodiments of the present invention will be described below with reference to the drawings.
FIG. 1 is a perspective view of a spiral shield tunnel 100 according to an embodiment of the present invention. 2 to 4 are a front view, a rear view, and a left side view of the spiral shield tunnel 100. 5 is a cross-sectional view taken along the line AA in FIG. Here, in FIG.1, FIG4 and FIG.5, illustration of the start well opening formation scheduled parts 201-226 is abbreviate | omitted for illustration simplification. In FIGS. 4 and 5, the main shield tunnel 1 is not shown for the sake of simplicity. Moreover, in FIG. 4, illustration of the spiral shield machine 30 is omitted for simplification of illustration.

尚、図1にはルーフシールド掘進機40及び形成途中のルーフシールドトンネル101,102,124〜126が図示されているが、この図示はルーフシールドトンネル101〜126(後述する図10参照)の施工順序を特定するものではない。本実施形態におけるルーフシールドトンネル101〜126の施工順序については図9及び図10を用いて後述する。また、説明の便宜上、図1に示すように上下・前後・左右を規定している。   1 shows the roof shield machine 40 and the roof shield tunnels 101, 102, and 124 to 126 being formed. This illustration shows the construction of the roof shield tunnels 101 to 126 (see FIG. 10 described later). It does not specify the order. The construction sequence of the roof shield tunnels 101 to 126 in this embodiment will be described later with reference to FIGS. 9 and 10. Further, for convenience of explanation, as shown in FIG.

本実施形態では、本発明に係るシールド掘進機の発進方法の一例として、大断面トンネルの施工におけるルーフシールド掘進機40の発進方法を挙げて以下説明するが、本発明に係るシールド掘進機の発進方法はこれに限らない。ここで、本実施形態において、前述の大断面トンネルは、本線シールドトンネル1と支線シールドトンネル2との合流領域(分岐合流部)に形成されるものであり、螺旋シールドトンネル100と複数(本実施形態では26本)のルーフシールドトンネル101〜126とを含んで構成される。この大断面トンネルの外殻躯体を構成するルーフシールドトンネル101〜126は、本線シールドトンネル1と支線シールドトンネル2との双方を取り囲むように形成される(後述する図10参照)。   In the present embodiment, as an example of a method for starting the shield machine according to the present invention, a method for starting the roof shield machine 40 in the construction of a large section tunnel will be described below, but the shield machine according to the present invention is started. The method is not limited to this. Here, in the present embodiment, the large cross-section tunnel described above is formed in a merge region (branch merge portion) between the main shield tunnel 1 and the branch shield tunnel 2, and includes a plurality of spiral shield tunnels 100 (this embodiment). 26) roof shield tunnels 101 to 126 in the form. The roof shield tunnels 101 to 126 constituting the outer shell of the large section tunnel are formed so as to surround both the main shield tunnel 1 and the branch shield tunnel 2 (see FIG. 10 described later).

前述の大断面トンネルの施工は、以下の工程〔1〕〜〔4〕を含む。
〔1〕螺旋シールド掘進機30の発進準備を行い、螺旋シールド掘進機30を支線シールドトンネル2の拡幅部3内から下向きに拡幅部3外に発進させて、螺旋シールドトンネル100を形成する(螺旋シールドトンネル形成工程)。
〔2〕螺旋シールドトンネル100の内部と支線シールドトンネル2の内部とを連通する連絡通路71,72を形成する(連絡通路形成工程)。
〔3〕螺旋シールドトンネル100におけるルーフシールド掘進機40用の複数(本実施形態では26箇所)の発進坑口形成予定部201〜226の各々に対応するように、螺旋シールドトンネル100に複数(本実施形態では26本)の連通路300を形成する(連通路形成工程)。
〔4〕ルーフシールド掘進機40の発進準備を行い、ルーフシールド掘進機40を螺旋シールドトンネル100内から螺旋シールドトンネル100外に発進させることで、ルーフシールドトンネル101〜126を形成する(ルーフシールドトンネル形成工程)。ここで、ルーフシールドトンネル101〜126は、本線シールドトンネル1、支線シールドトンネル2、及び、螺旋シールドトンネル100の各々よりも小径である。
The construction of the aforementioned large-section tunnel includes the following steps [1] to [4].
[1] Preparation for starting the spiral shield machine 30 is performed, and the spiral shield machine 30 is started downward from the widened portion 3 of the branch shield tunnel 2 to the outside of the widened portion 3 to form the spiral shield tunnel 100 (spiral) Shield tunnel formation process).
[2] Forming communication passages 71 and 72 that connect the inside of the spiral shield tunnel 100 and the inside of the branch shield tunnel 2 (connection passage forming step).
[3] In the spiral shield tunnel 100, a plurality of (in this embodiment) a plurality (26 in this embodiment) of the start wellhead formation scheduled portions 201 to 226 for the roof shield excavator 40 are provided in the spiral shield tunnel 100 (this embodiment). In this embodiment, 26 communication paths 300 are formed (communication path forming step).
[4] The roof shield machine 40 is prepared for launch, and the roof shield machine 40 is started from the inside of the spiral shield tunnel 100 to the outside of the spiral shield tunnel 100, thereby forming the roof shield tunnels 101 to 126 (the roof shield tunnel). Forming step). Here, the roof shield tunnels 101 to 126 have a smaller diameter than each of the main line shield tunnel 1, the branch line shield tunnel 2, and the spiral shield tunnel 100.

ここにおいて、螺旋シールド掘進機30が本発明の「第1のシールド掘進機」に対応する。螺旋シールドトンネル100が本発明の「第1のシールドトンネル」に対応する。ルーフシールド掘進機40が本発明の「第2のシールド掘進機」に対応する。ルーフシールドトンネル101〜126の各々が本発明の「第2のシールドトンネル」に対応する。支線シールドトンネル2が本発明の「第3のシールドトンネル」に対応する。図2及び図3に示すように、螺旋シールドトンネル100を前方又は後方から見た円形状の中心となる軸線Pが、本発明の「第1の軸線」に対応する。軸線Pは前後方向に延びており、本線シールドトンネル1と支線シールドトンネル2とは、各々が、軸線Pに並行して延びる。ルーフシールドトンネル101〜126は、軸線Pに並行して延びる。ルーフシールドトンネル101〜126は、軸線P周りに並列に並ぶように形成される。ルーフシールドトンネル101〜126は、本線シールドトンネル1及び支線シールドトンネル2の周りに並列に並ぶように形成される。   Here, the spiral shield machine 30 corresponds to the “first shield machine” of the present invention. The spiral shield tunnel 100 corresponds to the “first shield tunnel” of the present invention. The roof shield machine 40 corresponds to the “second shield machine” of the present invention. Each of the roof shield tunnels 101 to 126 corresponds to a “second shield tunnel” of the present invention. The branch shield tunnel 2 corresponds to the “third shield tunnel” of the present invention. As shown in FIGS. 2 and 3, the axis P that is the center of the circular shape when the spiral shield tunnel 100 is viewed from the front or the rear corresponds to the “first axis” of the present invention. The axis P extends in the front-rear direction, and each of the main shield tunnel 1 and the branch shield tunnel 2 extends in parallel to the axis P. Roof shield tunnels 101 to 126 extend in parallel to axis P. Roof shield tunnels 101 to 126 are formed so as to be arranged in parallel around axis P. The roof shield tunnels 101 to 126 are formed so as to be arranged in parallel around the main line shield tunnel 1 and the branch line shield tunnel 2.

前記工程〔1〕(螺旋シールドトンネル形成工程)の説明に先立って、本線シールドトンネル1及び支線シールドトンネル2について説明する。
本実施形態において、前述の分岐合流部では、本線シールドトンネル1の左側方に支線シールドトンネル2が並設されている。
Prior to the description of the step [1] (spiral shield tunnel forming step), the main shield tunnel 1 and the branch shield tunnel 2 will be described.
In the present embodiment, the branch shield tunnel 2 is juxtaposed on the left side of the main shield tunnel 1 at the branch junction.

本線シールドトンネル1及び支線シールドトンネル2は各々がシールド工法により形成される。シールド工法では、例えば、地山に発進立坑と到達立坑とを形成し、発進立坑から到達立坑へ向けてシールド掘進機で地山を掘削しながら、シールド掘進機の後部で次々にセグメントをトンネル周方向に組み立ててセグメントリングを形成すると共に、隣接するセグメントリング同士をトンネル軸線方向で連結することで円筒状の覆工体を形成する。この工法では、シールド掘進機は、その後方の既設セグメントリングを推進ジャッキで後方へ押圧し、その反力として発生する推力によって、地山を掘削しながら前進する。   The main shield tunnel 1 and the branch shield tunnel 2 are each formed by a shield method. In the shield method, for example, a start shaft and a reaching shaft are formed in the ground, and the segments are tunneled around the tunnel one after another while excavating the ground with the shield machine from the start shaft to the reaching shaft. While assembling in the direction to form segment rings, adjacent segment rings are connected in the tunnel axis direction to form a cylindrical covering body. In this construction method, the shield machine pushes the existing segment ring behind it with a propulsion jack and moves forward while excavating natural ground by the thrust generated as a reaction force.

支線シールドトンネル2は拡幅部3を有している。拡幅部3は、支線シールドトンネル2において螺旋シールド掘進機30の発進に必要なスペースを確保するために形成されたものである。拡幅部3では支線シールドトンネル2が左側方に拡幅されている。   The branch shield tunnel 2 has a widened portion 3. The widening portion 3 is formed in order to secure a space necessary for the start of the spiral shield machine 30 in the branch shield tunnel 2. In the widened portion 3, the branch shield tunnel 2 is widened to the left.

拡幅部3の外殻をなして断面形状が角丸長方形である筒状の覆工体3aの下部には切削可能セグメント3bが配置されている(図5、及び、後述する図6〜図8参照)。切削可能セグメント3bは、螺旋シールド掘進機30によって切削され得るものである。換言すれば、切削可能セグメント3bは、螺旋シールド掘進機30のカッタヘッド31で直接切削可能である。切削可能セグメント3bは例えば樹脂製や低強度コンクリート製である。切削可能セグメント3bとしては、例えば、特許第4851133号公報に開示の切削可能セグメント、及び、特許4934416号に開示の切削可能セグメントを挙げることができる。   A cutable segment 3b is disposed at the lower part of a cylindrical covering body 3a that forms an outer shell of the widened portion 3 and has a rounded rectangular cross section (FIG. 5 and FIGS. 6 to 8 described later). reference). The cutable segment 3 b can be cut by the spiral shield machine 30. In other words, the cutable segment 3 b can be cut directly by the cutter head 31 of the spiral shield machine 30. The cutable segment 3b is made of, for example, resin or low-strength concrete. Examples of the cutable segment 3b include the cuttable segment disclosed in Japanese Patent No. 485133 and the cuttable segment disclosed in Japanese Patent No. 4934416.

ここで、支線シールドトンネル2の一部(本実施形態では拡幅部3)は、螺旋シールド掘進機30によって切削される切削可能セグメント3bを含んで構成されている。切削可能セグメント3bは、支線シールドトンネル2の一部の下部(本実施形態では拡幅部3の下部)に配置されている。   Here, a part of the branch shield tunnel 2 (the widened portion 3 in the present embodiment) is configured to include a cutable segment 3 b that is cut by the spiral shield machine 30. The cutable segment 3b is arranged at a part of the lower part of the branch shield tunnel 2 (in the present embodiment, the lower part of the widened part 3).

前記工程〔1〕(螺旋シールドトンネル形成工程)では、まず、支線シールドトンネル2内(本実施形態では拡幅部3内)に螺旋シールド掘進機30を搬入して、螺旋シールド掘進機30の発進準備を行う。この螺旋シールド掘進機30の発進準備について、図6〜図8を用いて説明する。
図6〜図8は、螺旋シールド掘進機30の発進準備方法を示す図であり、図4のB−B断面及び図5のC−C断面に対応している。
In the step [1] (spiral shield tunnel forming step), first, the spiral shield machine 30 is carried into the branch shield tunnel 2 (in the widened portion 3 in the present embodiment), and preparation for starting the spiral shield machine 30 is started. I do. Preparation for starting the spiral shield machine 30 will be described with reference to FIGS.
6-8 is a figure which shows the start preparation method of the spiral shield machine 30, and respond | corresponds to the BB cross section of FIG. 4, and CC cross section of FIG.

螺旋シールド掘進機30の発進準備では、まず図6(a)に示すように、鋼製の筒状部材4を拡幅部3の下部に連結する。筒状部材4は、その下側の開口端部が、拡幅部3の下部の内周面(本実施形態では切削可能セグメント3bの上面)に液密に連結される。このため、本実施形態では、筒状部材4の周囲を囲むように、拡幅部3の下部に坑口コンクリート5が形成される。尚、本実施形態では、坑口コンクリート5を介して、筒状部材4の下側の開口端部を拡幅部3の下部の内周面に液密に連結しているが、この他、拡幅部3の下部を構成する鋼製のセグメントが筒状部材4の下側の開口端部に近接している場合には、当該鋼製のセグメントと筒状部材4の下側の開口端部とを溶接固定することで、筒状部材4の下側の開口端部を拡幅部3の下部の内周面に液密に連結してもよい。この場合には、坑口コンクリート5を形成しなくてもよい。また、筒状部材4の下側の開口端部と、拡幅部3の下部の内周面との間の間隙を塞ぐための鉄板が適宜配置され得る。   In the start preparation of the spiral shield machine 30, first, as shown in FIG. 6A, the steel tubular member 4 is connected to the lower portion of the widened portion 3. The cylindrical member 4 is liquid-tightly connected at its lower opening end to the inner peripheral surface of the lower portion of the widened portion 3 (in the present embodiment, the upper surface of the cutable segment 3b). For this reason, in this embodiment, the wellhead concrete 5 is formed in the lower part of the widening part 3 so that the circumference | surroundings of the cylindrical member 4 may be enclosed. In this embodiment, the opening end on the lower side of the tubular member 4 is liquid-tightly connected to the inner peripheral surface of the lower portion of the widened portion 3 through the wellhead concrete 5. When the steel segment constituting the lower part of 3 is close to the lower opening end of the tubular member 4, the steel segment and the lower opening end of the tubular member 4 are By fixing by welding, the lower opening end portion of the tubular member 4 may be liquid-tightly connected to the inner peripheral surface of the lower portion of the widened portion 3. In this case, the wellhead concrete 5 may not be formed. Further, an iron plate for closing a gap between the opening end on the lower side of the tubular member 4 and the inner peripheral surface of the lower portion of the widened portion 3 can be appropriately disposed.

次に、図6(b)に示すように、螺旋シールド掘進機30のうち、カッタヘッド31を有する前胴32を、カッタヘッド31を下向きにした状態で、筒状部材4内に挿入する。   Next, as shown in FIG. 6B, the front cylinder 32 having the cutter head 31 in the spiral shield machine 30 is inserted into the tubular member 4 with the cutter head 31 facing downward.

次に、図7(a)に示すように、螺旋シールド掘進機30の後胴33を、中折れジャッキ(図示せず)を介して、前胴32に連結する。ここで、螺旋シールド掘進機30は、カッタヘッド31を有する前胴32と、図示しない推進ジャッキを有する後胴33と、前述の中折れジャッキとを含む。螺旋シールド掘進機30の掘進方向の変更・調整時(例えば、螺旋シールドトンネル100の形成途中における曲率変更・調整時)には前述の中折れジャッキの伸長量が変更・調整される。   Next, as shown in FIG. 7A, the rear cylinder 33 of the spiral shield machine 30 is connected to the front cylinder 32 via a bent jack (not shown). Here, the spiral shield machine 30 includes a front cylinder 32 having a cutter head 31, a rear cylinder 33 having a propulsion jack (not shown), and the above-described bent jack. At the time of changing / adjusting the direction of excavation of the spiral shield machine 30 (for example, at the time of changing / adjusting the curvature during the formation of the spiral shield tunnel 100), the extension amount of the above-described bent jack is changed / adjusted.

次に、図7(b)に示すように、螺旋シールド掘進機30のうち、筒状部材4によって取り囲まれていない部分(つまり露出している部分)を取り囲むように、鋼製の筒状部材6を設置する。筒状部材6の下端部は筒状部材4の上端部に液密に連結される。ここで、発進用筒部7は筒状部材4,6を含む。発進用筒部7内には、螺旋シールド掘進機30が下向きに挿入されている。発進用筒部7は、螺旋シールド掘進機30の発進時の曲率に応じて湾曲している。   Next, as shown in FIG. 7 (b), a steel tubular member is formed so as to surround a portion of the spiral shield machine 30 that is not surrounded by the tubular member 4 (ie, an exposed portion). 6 is installed. The lower end portion of the tubular member 6 is liquid-tightly connected to the upper end portion of the tubular member 4. Here, the starting cylinder portion 7 includes cylindrical members 4 and 6. A spiral shield machine 30 is inserted downward into the starting cylinder 7. The starting cylinder portion 7 is curved according to the curvature of the spiral shield machine 30 when starting.

次に、図7(b)に示すように、螺旋シールド掘進機30の推進ジャッキによって押圧され得る仮セグメントリング8を筒状部材6の上側の開口端部内に配置し、筒状部材6の上側の開口端部の内周面と仮セグメントリング8の外周面との間を塞ぐように筒状部材6に仮セグメントリング8を固定する。ここで、仮セグメントリング8については、鋼製の仮セグメントをリング状に組み立てることで形成され得る。また、筒状部材6の上側の開口端部の内周面と仮セグメントリング8の外周面との間を塞ぐように筒状部材6に仮セグメントリング8を溶接固定することで両者が液密に固定され得る。   Next, as shown in FIG. 7 (b), the temporary segment ring 8 that can be pressed by the propulsion jack of the spiral shield machine 30 is disposed in the opening end on the upper side of the cylindrical member 6, and the upper side of the cylindrical member 6. The temporary segment ring 8 is fixed to the tubular member 6 so as to close the space between the inner peripheral surface of the opening end of the first and the outer peripheral surface of the temporary segment ring 8. Here, the temporary segment ring 8 can be formed by assembling a temporary segment made of steel into a ring shape. In addition, the temporary segment ring 8 is welded and fixed to the cylindrical member 6 so as to close the space between the inner peripheral surface of the upper open end of the cylindrical member 6 and the outer peripheral surface of the temporary segment ring 8. Can be fixed to.

次に、図8に示すように、仮セグメントリング8の上方に反力受け9を設置する。
このようにして、螺旋シールド掘進機30の発進準備が行われる。
Next, as shown in FIG. 8, a reaction force receiver 9 is installed above the temporary segment ring 8.
In this way, preparation for starting the spiral shield machine 30 is performed.

この後、螺旋シールドトンネル100を形成する際には、まず、螺旋シールド掘進機30が、仮セグメントリング8及び反力受け9を介して、拡幅部3から反力を取って、下向きに発進する。この発進の初期には、螺旋シールド掘進機30のカッタヘッド31が切削可能セグメント3bを切削する。これにより、拡幅部3の覆工体3aの下部には坑口3c(図5参照)が形成される。   Thereafter, when the spiral shield tunnel 100 is formed, first, the spiral shield machine 30 takes a reaction force from the widened portion 3 via the temporary segment ring 8 and the reaction force receiver 9 and starts downward. . At the beginning of this start, the cutter head 31 of the spiral shield machine 30 cuts the cutable segment 3b. Thereby, the wellhead 3c (refer FIG. 5) is formed in the lower part of the covering body 3a of the widening part 3. FIG.

坑口3cから拡幅部3外に進んで地山の掘進を開始した螺旋シールド掘進機30は、地山を掘進しながら、次々にセグメントをリング状に組み立ててセグメントリングを形成すると共に、隣接するセグメントリング同士を連結することで、螺旋状の覆工体100aを形成する。この螺旋状の覆工体100aが螺旋シールドトンネル100に対応する(図1〜図5参照)。   The spiral shield machine 30 that has advanced from the wellhead 3c to the outside of the widening portion 3 and started excavating the natural ground, assembles the segments one after another while excavating the natural ground to form a segment ring, and adjacent segments A spiral lining body 100a is formed by connecting the rings together. This spiral covering body 100a corresponds to the spiral shield tunnel 100 (see FIGS. 1 to 5).

本実施形態では、筒状部材4の下側の開口端部が拡幅部3の下部の内周面に液密に連結されている。また、筒状部材4の上側の開口端部が筒状部材6の下側の開口端部に液密に連結されている。また、筒状部材6の上側の開口端部の内周面と仮セグメントリング8の外周面との間を塞ぐように筒状部材6に仮セグメントリング8を溶接固定することで両者が液密に固定されている。また、螺旋シールド掘進機30の後胴33に設けられたテールシールが、後胴33の内周面と、仮セグメントリング8及び覆工体100aの外周面との間の間隙をシールする。それゆえ、螺旋シールド掘進機30によって地山の掘進が行われているときに、地山からの地下水が螺旋シールド掘進機30の内部、螺旋シールドトンネル100の内部、及び、拡幅部3の内部に流入することを防止することができる。従って、本実施形態では、坑口3cにエントランスパッキンなどの止水装置を設ける必要がない。   In the present embodiment, the lower opening end of the tubular member 4 is liquid-tightly connected to the inner peripheral surface of the lower portion of the widened portion 3. Further, the upper opening end of the tubular member 4 is liquid-tightly connected to the lower opening end of the tubular member 6. In addition, the temporary segment ring 8 is welded and fixed to the cylindrical member 6 so as to close the space between the inner peripheral surface of the upper open end of the cylindrical member 6 and the outer peripheral surface of the temporary segment ring 8. It is fixed to. Further, a tail seal provided on the rear cylinder 33 of the spiral shield machine 30 seals the gap between the inner peripheral surface of the rear cylinder 33 and the outer peripheral surfaces of the temporary segment ring 8 and the covering body 100a. Therefore, when the natural shield is excavated by the spiral shield machine 30, groundwater from the natural mountain enters the spiral shield machine 30, the spiral shield tunnel 100, and the widened portion 3. Inflow can be prevented. Therefore, in this embodiment, it is not necessary to provide a water stop device such as an entrance packing at the wellhead 3c.

本実施形態では、螺旋シールド掘進機30が坑口3cから下向きに発進して、軸線P、本線シールドトンネル1及び支線シールドトンネル2の周りを周回するように地山を掘進して、軸線P、本線シールドトンネル1及び支線シールドトンネル2の周りを周回して延びる螺旋シールドトンネル100を形成する。周回する螺旋シールドトンネル100は本線シールドトンネル1及び支線シールドトンネル2と離隔している。   In this embodiment, the spiral shield machine 30 starts downward from the wellhead 3c, excavates the natural ground so as to go around the axis P, the main line shield tunnel 1 and the branch line shield tunnel 2, and the axis P, main line A spiral shield tunnel 100 extending around the shield tunnel 1 and the branch shield tunnel 2 is formed. The circulating spiral shield tunnel 100 is separated from the main shield tunnel 1 and the branch shield tunnel 2.

また、本実施形態では、螺旋シールド掘進機30が坑口3cから下向きに発進して、地山を軸線P周りに、かつ、本線シールドトンネル1及び支線シールドトンネル2の周りを約2巻半(約2周半)螺旋状に掘進して、軸線P周りに螺旋状に延び、かつ、本線シールドトンネル1及び支線シールドトンネル2の周りを螺旋状に延びる螺旋シールドトンネル100を形成する。ゆえに螺旋シールドトンネル100は軸線Pの延在方向に重層されている。   Moreover, in this embodiment, the spiral shield machine 30 starts downward from the wellhead 3c, and the natural ground is around the axis P and the main shield tunnel 1 and the branch shield tunnel 2 are about two and a half turns (about (Half-and-a-half) A spiral shield tunnel 100 is formed by digging spirally, extending spirally around the axis P, and extending spirally around the main shield tunnel 1 and the branch shield tunnel 2. Therefore, the spiral shield tunnel 100 is layered in the extending direction of the axis P.

尚、本実施形態では、螺旋シールド掘進機30の発進用の坑口3cを支線シールドトンネル2の下部に配置して螺旋シールド掘進機30を下向きに発進させているが、この他、坑口3cを支線シールドトンネル2の上部に配置して螺旋シールド掘進機30を上向きに発進させてもよい。   In addition, in this embodiment, the wellhead 3c for starting the spiral shield machine 30 is arranged below the branch shield tunnel 2 and the spiral shield machine 30 is started downward. The spiral shield machine 30 may be started upward by being arranged on the shield tunnel 2.

螺旋シールド掘進機30は、ルーフシールド掘進機40による地山の掘進に干渉しない位置(存置位置)に達するまで地山の掘進を行い、その位置に存置される。すなわち、前述の工程〔4〕(ルーフシールドトンネル形成工程)に先立って、螺旋シールド掘進機30は、ルーフシールド掘進機40による地山の掘進に干渉しない位置(存置位置)まで移動される。この存置位置は、ルーフシールドトンネル101〜126を含む前述の大断面トンネルの外殻躯体より径方向外方の位置である(後述する図10参照)。   The spiral shield machine 30 excavates the ground until it reaches a position (placement position) that does not interfere with the excavation of the ground by the roof shield machine 40, and is placed at that position. That is, prior to the above-described step [4] (roof shield tunnel forming step), the spiral shield machine 30 is moved to a position (placement position) that does not interfere with the excavation of natural ground by the roof shield machine 40. This location is a position radially outward from the outer shell of the large-section tunnel including the roof shield tunnels 101 to 126 (see FIG. 10 described later).

螺旋シールド掘進機30が前述の存置位置に達すると、螺旋シールド掘進機30の推進ジャッキ、エレクタ装置、カッタヘッド31駆動用の電動モータなどが取り外されて回収され得る。また、螺旋シールドトンネル100における螺旋シールド掘進機30の近傍にて、螺旋シールドトンネル100内に地下水が流入することを防止するための密閉処置が施される。   When the spiral shield machine 30 reaches the aforementioned position, the propulsion jack, the erector device, the electric motor for driving the cutter head 31 and the like of the spiral shield machine 30 can be removed and collected. In addition, in the vicinity of the spiral shield machine 30 in the spiral shield tunnel 100, a sealing treatment is performed to prevent groundwater from flowing into the spiral shield tunnel 100.

螺旋シールドトンネル100(覆工体100a)における発進坑口形成予定部201〜226は、螺旋シールドトンネル100の前側部分に位置している。発進坑口形成予定部201〜226には、それぞれ、切削可能セグメント250が配置されている。すなわち、螺旋シールドトンネル100の前側部分は切削可能セグメント250を含んで構成されている。この切削可能セグメント250は、ルーフシールド掘進機40によって切削され得るものである。換言すれば、切削可能セグメント250は、ルーフシールド掘進機40のカッタヘッド41で直接切削可能である。切削可能セグメント250は例えば樹脂製や低強度コンクリート製である。切削可能セグメント250としては、例えば、特許第4851133号公報に開示の切削可能セグメント、及び、特許4934416号に開示の切削可能セグメントを挙げることができる。   The start well formation portions 201 to 226 in the spiral shield tunnel 100 (the lining body 100 a) are located at the front side portion of the spiral shield tunnel 100. The startable wellhead formation scheduled portions 201 to 226 are each provided with a cuttable segment 250. That is, the front portion of the spiral shield tunnel 100 is configured to include the cutable segment 250. This cutable segment 250 can be cut by the roof shield machine 40. In other words, the cutable segment 250 can be cut directly by the cutter head 41 of the roof shield machine 40. The cutable segment 250 is made of, for example, resin or low-strength concrete. Examples of the cutable segment 250 include the cuttable segment disclosed in Japanese Patent No. 485133 and the cuttable segment disclosed in Japanese Patent No. 4934416.

ここで、発進坑口形成予定部204〜226については、螺旋シールドトンネル100における前側から1巻き目の前側部分に設定されている。一方、発進坑口形成予定部201〜203については、螺旋シールドトンネル100における前側から2巻目の前側部分に設定されている。それゆえ、発進坑口形成予定部201〜203については、その前方に螺旋シールドトンネル100の螺旋シールド掘進機30側部分が位置しており、この部分にも切削可能セグメント250が配置されている。   Here, the start pit formation scheduled portions 204 to 226 are set to the front portion of the first winding from the front side in the spiral shield tunnel 100. On the other hand, the starting well formation portions 201 to 203 are set to the front portion of the second volume from the front side in the spiral shield tunnel 100. Therefore, about the start well opening formation scheduled parts 201-203, the spiral shield machine 30 side part of the spiral shield tunnel 100 is located in front thereof, and the cutable segment 250 is also arranged in this part.

前記工程〔2〕(連絡通路形成工程)では、支線シールドトンネル2の左側部と、螺旋シールドトンネル100のうち、支線シールドトンネル2の左側部に隣接する部分との間に、例えば矩形筒状の連絡通路71,72を形成する。連絡通路71,72は、各々が、支線シールドトンネル2の内部と螺旋シールドトンネル100の内部とを左右方向(支線シールドトンネル2の幅方向)に連通する。前側の連絡通路71は、支線シールドトンネル2と螺旋シールドトンネル100における前側から1巻き目の部分とを直接的に連結する。後側の連絡通路72は、支線シールドトンネル2と螺旋シールドトンネル100における前側から2巻き目の部分とを直接的に連結する。   In the step [2] (connection passage forming step), for example, a rectangular cylindrical shape is formed between the left side portion of the branch shield tunnel 2 and a portion of the spiral shield tunnel 100 adjacent to the left side portion of the branch shield tunnel 2. Communication passages 71 and 72 are formed. Each of the communication passages 71 and 72 communicates the inside of the branch shield tunnel 2 and the inside of the spiral shield tunnel 100 in the left-right direction (the width direction of the branch shield tunnel 2). The front side communication passage 71 directly connects the branch shield tunnel 2 and the portion of the first shield from the front side in the spiral shield tunnel 100. The rear connecting passage 72 directly connects the branch shield tunnel 2 and the second winding portion from the front side in the spiral shield tunnel 100.

本実施形態において、連絡通路71は主としてルーフシールド掘進機40の搬送に用いられる。連絡通路72は主としてルーフシールドトンネル101〜126の形成に必要な資材の搬送に用いられる。しかしながら、連絡通路71,72の用途はこれらに限らない。   In the present embodiment, the communication passage 71 is mainly used for transporting the roof shield machine 40. The communication passage 72 is mainly used for conveying materials necessary for forming the roof shield tunnels 101 to 126. However, the use of the communication passages 71 and 72 is not limited to these.

前記工程〔3〕(連通路形成工程)では、螺旋シールドトンネル100の発進坑口形成予定部201〜226の各々に対応するように、螺旋シールドトンネル100に連通路300を形成する。連通路300は、螺旋シールドトンネル100の重層部分に設けられており、前後方向に延びている。   In the step [3] (communication passage forming step), the communication passage 300 is formed in the spiral shield tunnel 100 so as to correspond to each of the start well opening formation scheduled portions 201 to 226 of the spiral shield tunnel 100. The communication path 300 is provided in the layered portion of the spiral shield tunnel 100 and extends in the front-rear direction.

次に、前記工程〔4〕(ルーフシールドトンネル形成工程)について、図9〜図17を用いて説明する。
図9及び図10は、ルーフシールドトンネル101〜126の形成順序の一例を示す図である。図11は、ルーフシールド掘進機40が内部に配置された筒状部材50を示す図である。図12〜図14は、ルーフシールド掘進機40の発進準備方法を示す図である。図15〜図17はルーフシールドトンネルの形成方法を示す図である。ここで、図13〜図17は、ルーフシールドトンネル101〜126の形成の一例としてルーフシールドトンネル107の形成について図示している。
Next, the process [4] (roof shield tunnel forming process) will be described with reference to FIGS.
9 and 10 are diagrams illustrating an example of the order in which the roof shield tunnels 101 to 126 are formed. FIG. 11 is a view showing a cylindrical member 50 in which the roof shield machine 40 is disposed. 12-14 is a figure which shows the start preparation method of the roof shield machine 40. As shown in FIG. 15 to 17 are views showing a method for forming a roof shield tunnel. Here, FIGS. 13 to 17 illustrate the formation of the roof shield tunnel 107 as an example of the formation of the roof shield tunnels 101 to 126.

本実施形態では、図9に示すように、まず、ルーフシールドトンネル101,103,105,107,109,111,113,115,117,119,121,123,125の計13本のルーフシールドトンネルを形成し、この後に、図10に示すように、ルーフシールドトンネル102,104,106,108,110,112,114,116,118,120,122,124,126の計13本のルーフシールドトンネルを形成する。尚、ルーフシールドトンネル101〜126の形成順序はこれに限らない。   In the present embodiment, as shown in FIG. 9, first, a total of 13 roof shield tunnels of roof shield tunnels 101, 103, 105, 107, 109, 111, 113, 115, 117, 119, 121, 123, 125 are provided. Thereafter, as shown in FIG. 10, a total of 13 roof shield tunnels of roof shield tunnels 102, 104, 106, 108, 110, 112, 114, 116, 118, 120, 122, 124, 126 are formed. Form. The order of forming the roof shield tunnels 101 to 126 is not limited to this.

前記工程〔4〕(ルーフシールドトンネル形成工程)では、まず、螺旋シールドトンネル100から離れた場所(例えば支線シールドトンネル2の発進立坑又は到達立坑)にて、鋼製の筒状部材50内にルーフシールド掘進機40を配置する(図11参照)。ここで、図11(a)は、ルーフシールド掘進機40が内部に配置された筒状部材50の縦断面図である。図11(b)は、図11(a)のE−E断面におけるスペーサー55の設置位置を示す図である。   In the step [4] (roof shield tunnel forming step), first, a roof is formed in the steel tubular member 50 at a location away from the spiral shield tunnel 100 (for example, a start shaft or a reaching shaft of the branch shield tunnel 2). A shield machine 40 is arranged (see FIG. 11). Here, Fig.11 (a) is a longitudinal cross-sectional view of the cylindrical member 50 by which the roof shield machine 40 is arrange | positioned inside. FIG.11 (b) is a figure which shows the installation position of the spacer 55 in the EE cross section of Fig.11 (a).

図11に示すように、筒状部材50は、第1筒体51と第2筒体52とにより構成されている。第1筒体51の後端には外フランジ51aが設けられており、この外フランジ51aには、図示しない複数のボルト挿通孔が形成されている。第2筒体52の前端には外フランジ52aが設けられており、この外フランジ52aには、図示しない複数のボルト挿通孔が形成されている。外フランジ51aのボルト挿通孔と外フランジ52aのボルト挿通孔とが相対するように外フランジ51a,52a同士を重ね合わせて当該ボルト挿通孔にボルトを挿入し、ナットで締め付けることで、第1筒体51の後端と第2筒体52の前端とが連結される。つまり、第1筒体51は第2筒体52に着脱可能に固定されている。   As shown in FIG. 11, the tubular member 50 includes a first tubular body 51 and a second tubular body 52. An outer flange 51a is provided at the rear end of the first cylinder 51, and a plurality of bolt insertion holes (not shown) are formed in the outer flange 51a. An outer flange 52a is provided at the front end of the second cylinder 52, and a plurality of bolt insertion holes (not shown) are formed in the outer flange 52a. The first cylinder is formed by inserting the bolts into the bolt insertion holes by overlapping the outer flanges 51a and 52a so that the bolt insertion holes of the outer flange 51a and the bolt insertion holes of the outer flange 52a face each other, and tightening with the nuts. The rear end of the body 51 and the front end of the second cylinder 52 are connected. That is, the 1st cylinder 51 is being fixed to the 2nd cylinder 52 so that attachment or detachment is possible.

筒状部材50内に配置されるルーフシールド掘進機40は、第1筒体51の内周面に溶接固定されるストッパー部材53と、第2筒体52の内周面に溶接固定されるストッパー部材54とによって、筒状部材50に対する前後方向の移動が制限される。すなわち、ルーフシールド掘進機40は、ストッパー部材53,54によって、筒状部材50に対してその軸方向に移動できないように固定される。尚、ルーフシールド掘進機40を筒状部材50に固定する手法はこれに限らない。例えば、第1筒体51と第2筒体52との少なくとも一方にルーフシールド掘進機40を連結することにより(例えば溶接で連結することにより)、ルーフシールド掘進機40を筒状部材50に固定してもよい。   The roof shield machine 40 disposed in the tubular member 50 includes a stopper member 53 that is welded and fixed to the inner peripheral surface of the first cylindrical body 51, and a stopper that is welded and fixed to the inner peripheral surface of the second cylindrical body 52. The movement in the front-rear direction with respect to the tubular member 50 is restricted by the member 54. That is, the roof shield machine 40 is fixed by the stopper members 53 and 54 so as not to move in the axial direction with respect to the tubular member 50. The method for fixing the roof shield machine 40 to the cylindrical member 50 is not limited to this. For example, the roof shield machine 40 is fixed to the cylindrical member 50 by connecting the roof shield machine 40 to at least one of the first cylinder 51 and the second cylinder 52 (for example, by connecting by welding). May be.

筒状部材50の内周面とルーフシールド掘進機40の外周面との間には複数のスペーサー55が介装されている。これらスペーサー55は、筒状部材50及びルーフシールド掘進機40の周方向に互いに間隔を空けて配置されている。   A plurality of spacers 55 are interposed between the inner peripheral surface of the tubular member 50 and the outer peripheral surface of the roof shield machine 40. These spacers 55 are arranged at intervals in the circumferential direction of the tubular member 50 and the roof shield machine 40.

筒状部材50の後側の開口端部(第2筒体52の後側の開口端部)50a内には、鋼製の仮セグメントを組み立てて形成された仮セグメントリング58が配置されている。仮セグメントリング58は、ルーフシールド掘進機40の推進ジャッキ42によって押圧され得る。筒状部材50の後側の開口端部50aには全周にわたって内フランジ50bが設けられており、この内フランジ50bと仮セグメントリング58とが全周にわたって溶接固定されている。ゆえに、筒状部材50の後側の開口端部50aの内周面と仮セグメントリング58の外周面との間を塞ぐように、仮セグメントリング58が内フランジ50bを介して筒状部材50に液密に固定されている。   A temporary segment ring 58 formed by assembling a temporary segment made of steel is disposed in the rear opening end portion (the rear opening end portion of the second cylindrical body 52) 50a of the tubular member 50. . The temporary segment ring 58 can be pressed by the propulsion jack 42 of the roof shield machine 40. An inner flange 50b is provided over the entire circumference of the opening end 50a on the rear side of the tubular member 50, and the inner flange 50b and the temporary segment ring 58 are fixed by welding over the entire circumference. Therefore, the temporary segment ring 58 is connected to the cylindrical member 50 via the inner flange 50b so as to close the space between the inner peripheral surface of the opening end 50a on the rear side of the cylindrical member 50 and the outer peripheral surface of the temporary segment ring 58. It is fixed liquid-tight.

以上のように、螺旋シールドトンネル100から離れた場所にて、ルーフシールド掘進機40が筒状部材50内に配置されて、ストッパー部材53,54によって筒状部材50に固定される。また、仮セグメントリング58が筒状部材50に固定される。すなわち、ルーフシールド掘進機40、筒状部材50、及び、仮セグメントリング58からなるルーフシールド発進ユニット60が形成される。本実施形態では計13個のルーフシールド発進ユニット60が形成される。   As described above, the roof shield machine 40 is disposed in the tubular member 50 at a location away from the spiral shield tunnel 100 and is fixed to the tubular member 50 by the stopper members 53 and 54. Further, the temporary segment ring 58 is fixed to the cylindrical member 50. That is, the roof shield starter unit 60 including the roof shield machine 40, the tubular member 50, and the temporary segment ring 58 is formed. In the present embodiment, a total of 13 roof shield starter units 60 are formed.

また、螺旋シールドトンネル100から離れた場所(例えば支線シールドトンネル2の発進立坑又は到達立坑)にて、各ルーフシールド発進ユニット60は、それぞれ、搬送台車64に搭載される(図12及び図13参照)。搬送台車64は、螺旋シールドトンネル100の内周面に敷設されたレール65,66に沿って走行可能に構成されている。ここで、レール65,66は、螺旋シールドトンネル100の螺旋形状に沿って、発進坑口形成予定部201から連絡通路71を経て発進坑口形成予定部226まで延びている。   In addition, each roof shield start unit 60 is mounted on the transport carriage 64 at a place away from the spiral shield tunnel 100 (for example, the start shaft or the reach shaft of the branch shield tunnel 2) (see FIGS. 12 and 13). ). The transport carriage 64 is configured to be able to travel along rails 65 and 66 laid on the inner peripheral surface of the spiral shield tunnel 100. Here, the rails 65 and 66 extend from the start well formation forming portion 201 to the start well formation forming portion 226 via the communication passage 71 along the spiral shape of the spiral shield tunnel 100.

次に、図12及び図13に示すように、ルーフシールド発進ユニット60を搭載した搬送台車64を、支線シールドトンネル2内から連絡通路71を経て螺旋シールドトンネル100内に搬入し、レール65,66に沿って発進坑口形成予定部まで移動させる。この搬送台車64の螺旋シールドトンネル100内への搬入と発進坑口形成予定部までの移動とは、発進坑口形成予定部201,203,205,207,209,211,213,215,217,219,221,223,225の各々について行われる。この搬送台車64の搬入・移動時において、ルーフシールド掘進機40は筒状部材50の内部に配置されて筒状部材50に固定されているので、この搬入・移動中にルーフシールド掘進機40が筒状部材50の内部で筒状部材50に対して移動したりずれたりしてルーフシールド掘進機40が破損することを防止できる。   Next, as shown in FIGS. 12 and 13, the transport carriage 64 on which the roof shield starting unit 60 is mounted is carried into the spiral shield tunnel 100 from the branch shield tunnel 2 through the connecting passage 71, and rails 65, 66. And move to the start wellhead formation planned part. The carrying of the transport carriage 64 into the spiral shield tunnel 100 and the movement to the starting well formation forming portion are the starting well formation forming portions 201, 203, 205, 207, 209, 211, 213, 215, 217, 219, This is performed for each of 221, 223, and 225. Since the roof shield machine 40 is disposed inside the tubular member 50 and fixed to the tubular member 50 when the transport carriage 64 is carried in / moved, the roof shield machine 40 is fixed during the carrying / moving. It is possible to prevent the roof shield machine 40 from being damaged due to movement or displacement with respect to the tubular member 50 inside the tubular member 50.

ここで、図12(a)及び(b)は、図5のD−D断面に対応する。図12(a)は、搬送台車64が支線シールドトンネル2内に位置する状態を示す。図12(b)は、搬送台車64が連絡通路71から螺旋シールドトンネル100内に搬入された状態を示す。図12(a)に示すように、搬送台車64の車輪ユニット64aについては、搬送台車64が螺旋シールドトンネル100内に搬入されるに先立って、レール66に仮固定しておき、搬送台車64が螺旋シールドトンネル100内に搬入された後に、搬送台車64の本体64bに取り付けて、前記仮固定を解除してもよい。また、図12(a)及び(b)に示すように、レール65のうち、搬送台車64が螺旋シールドトンネル100内に搬入されるときに邪魔になる部分65aについては、着脱可能な構成としておき、当該部分65aを、搬送台車64が螺旋シールドトンネル100内に搬入されるに先立って、搬送台車64の車輪ユニット64cに仮固定しておいてもよい。   Here, FIGS. 12A and 12B correspond to the DD cross section of FIG. FIG. 12A shows a state in which the transport carriage 64 is located in the branch shield tunnel 2. FIG. 12B shows a state where the transport carriage 64 is carried into the spiral shield tunnel 100 from the communication passage 71. As shown in FIG. 12A, the wheel unit 64a of the transport carriage 64 is temporarily fixed to the rail 66 before the transport carriage 64 is carried into the spiral shield tunnel 100. After being carried into the spiral shield tunnel 100, the temporary fixing may be released by attaching to the main body 64b of the transport carriage 64. Also, as shown in FIGS. 12A and 12B, a portion 65a of the rail 65 that becomes an obstacle when the transport carriage 64 is carried into the spiral shield tunnel 100 is configured to be removable. The part 65 a may be temporarily fixed to the wheel unit 64 c of the transport carriage 64 before the transport carriage 64 is carried into the spiral shield tunnel 100.

発進坑口形成予定部201,203,205,207,209,211,213,215,217,219,221,223,225の各々に、ルーフシールド発進ユニット60を搭載した搬送台車64が移動されて配置されると(図13参照)、次に、図14に示すように、ルーフシールド発進ユニット60を前方に移動して、発進坑口形成予定部201,203,205,207,209,211,213,215,217,219,221,223,225の各々に連結する。筒状部材50の前側の開口端部(第1筒体51の前側の開口端部)は、発進坑口形成予定部201,203,205,207,209,211,213,215,217,219,221,223,225の各々の背面(螺旋シールドトンネル100の内周面)に液密に連結される。このため、本実施形態では、第1筒体51の周囲を囲むように、螺旋シールドトンネル100内に坑口コンクリート68が形成される。尚、本実施形態では、坑口コンクリート68を介して、筒状部材50の前側の開口端部を螺旋シールドトンネル100の内周面に液密に連結しているが、この他、螺旋シールドトンネル100を構成する鋼製のセグメントが筒状部材50の前側の開口端部に近接している場合には、当該鋼製のセグメントと筒状部材50の前側の開口端部とを溶接固定することで、筒状部材50の前側の開口端部を螺旋シールドトンネル100の内周面に液密に連結してもよい。この場合には、坑口コンクリート68を形成しなくてもよい。また、筒状部材50の前側の開口端部と、螺旋シールドトンネル100の内周面との間の間隙を塞ぐための鉄板が適宜配置され得る。   A transport carriage 64 on which the roof shield start unit 60 is mounted is moved and arranged in each of the start wellhead formation scheduled portions 201, 203, 205, 207, 209, 211, 213, 215, 217, 219, 221, 223, and 225. Then (see FIG. 13), next, as shown in FIG. 14, the roof shield start unit 60 is moved forward to start start wellhead formation scheduled portions 201, 203, 205, 207, 209, 211, 213, 215, 217, 219, 221, 223, and 225. The opening end on the front side of the cylindrical member 50 (the opening end on the front side of the first cylindrical body 51) is a start well opening formation scheduled portion 201, 203, 205, 207, 209, 211, 213, 215, 217, 219, It is liquid-tightly connected to the rear surfaces (inner circumferential surfaces of the spiral shield tunnel 100) of each of 221, 223, and 225. For this reason, in this embodiment, the wellhead concrete 68 is formed in the spiral shield tunnel 100 so that the circumference | surroundings of the 1st cylinder 51 may be enclosed. In the present embodiment, the opening end on the front side of the tubular member 50 is liquid-tightly connected to the inner peripheral surface of the spiral shield tunnel 100 through the wellhead concrete 68. In addition, the spiral shield tunnel 100 When the steel segment that constitutes is close to the opening end on the front side of the tubular member 50, the steel segment and the opening end on the front side of the tubular member 50 are fixed by welding. The opening end on the front side of the cylindrical member 50 may be liquid-tightly connected to the inner peripheral surface of the spiral shield tunnel 100. In this case, the wellhead concrete 68 may not be formed. Further, an iron plate for closing a gap between the opening end on the front side of the cylindrical member 50 and the inner peripheral surface of the spiral shield tunnel 100 may be appropriately disposed.

次に、図14に示すように、ルーフシールド発進ユニット60の仮セグメントリング58の後方に反力受け69を設置する。
次に、ストッパー部材53,54のうち少なくともストッパー部材53(ルーフシールド掘進機40の前側の固定に用いられているもの)を撤去する。これにより、ルーフシールド掘進機40の筒状部材50への固定が解除される。尚、前述のように第1筒体51と第2筒体52との少なくとも一方にルーフシールド掘進機40が連結されている場合には、当該連結を解くことで、ルーフシールド掘進機40の筒状部材50への固定が解除され得る。
Next, as shown in FIG. 14, a reaction force receiver 69 is installed behind the temporary segment ring 58 of the roof shield starting unit 60.
Next, at least the stopper member 53 (used for fixing the front side of the roof shield machine 40) of the stopper members 53 and 54 is removed. Thereby, fixation to the cylindrical member 50 of the roof shield machine 40 is cancelled | released. In addition, when the roof shield machine 40 is connected to at least one of the first cylinder 51 and the second cylinder 52 as described above, the cylinder of the roof shield machine 40 is released by releasing the connection. The fixing to the member 50 can be released.

このようにして、発進坑口形成予定部201,203,205,207,209,211,213,215,217,219,221,223,225の各々について、ルーフシールド掘進機40の発進準備が行われる。   In this way, the start preparation of the roof shield excavator 40 is performed for each of the start wellhead formation scheduled portions 201, 203, 205, 207, 209, 211, 213, 215, 217, 219, 221, 223, and 225. .

この後、図9に示したようにルーフシールドトンネル101,103,105,107,109,111,113,115,117,119,121,123,125を形成する際には、発進坑口形成予定部201,203,205,207,209,211,213,215,217,219,221,223,225の各々において、まず、ルーフシールド掘進機40が、仮セグメントリング58及び反力受け69を介して、螺旋シールドトンネル100から反力を取って、前方に向かって発進する(図15参照)。この発進の初期には、ルーフシールド掘進機40のカッタヘッド41が、発進坑口形成予定部201,203,205,207,209,211,213,215,217,219,221,223,225の各々の切削可能セグメント250を切削する。これにより、発進坑口形成予定部201,203,205,207,209,211,213,215,217,219,221,223,225の各々には坑口(例えば、図15に示す坑口107c)が形成される。   Thereafter, when the roof shield tunnels 101, 103, 105, 107, 109, 111, 113, 115, 117, 119, 121, 123, 125 are formed as shown in FIG. In each of 201, 203, 205, 207, 209, 211, 213, 215, 217, 219, 221, 223, and 225, first, the roof shield machine 40 passes through the temporary segment ring 58 and the reaction force receiver 69. Then, the reaction force is taken from the spiral shield tunnel 100 and the vehicle starts moving forward (see FIG. 15). At the beginning of this start, the cutter head 41 of the roof shield excavator 40 is used for each of the start well opening formation scheduled portions 201, 203, 205, 207, 209, 211, 213, 215, 217, 219, 221, 223, 225. The cuttable segment 250 is cut. Thereby, a wellhead (for example, wellhead 107c shown in FIG. 15) is formed in each of the starting wellhead formation scheduled portions 201, 203, 205, 207, 209, 211, 213, 215, 217, 219, 221, 223, and 225. Is done.

これら坑口から螺旋シールドトンネル100外に進んで地山の掘進を開始したルーフシールド掘進機40は、地山を掘進しながら、次々にセグメントをリング状に組み立ててセグメントリングを形成すると共に、隣接するセグメントリング同士を連結する。これにより、ルーフシールドトンネル101,103,105,107,109,111,113,115,117,119,121,123,125が形成され得る。   The roof shield excavator 40 that has started to excavate the natural ground by proceeding to the outside of the spiral shield tunnel 100 from these wellheads, while excavating the natural ground, successively assembles segments into a ring shape to form a segment ring, and is adjacent to it. Connect the segment rings together. Thereby, the roof shield tunnel 101,103,105,107,109,111,113,115,117,119,121,123,125 can be formed.

本実施形態では、筒状部材50の前側の開口端部が螺旋シールドトンネル100の内周面に液密に連結されている。また、筒状部材50の後側の開口端部50aの内周面と仮セグメントリング58の外周面との間を塞ぐように、仮セグメントリング58が内フランジ50bを介して筒状部材50に液密に固定されている。また、ルーフシールド掘進機40の胴部の後部に設けられたテールシールが、胴部の内周面と、仮セグメントリング58及びルーフシールドトンネル101,103,105,107,109,111,113,115,117,119,121,123,125の外周面との間の間隙をシールする。それゆえ、ルーフシールド掘進機40によって地山の掘進が行われているときに、地山からの地下水がルーフシールド掘進機40の内部、ルーフシールドトンネル101,103,105,107,109,111,113,115,117,119,121,123,125の内部、及び、螺旋シールドトンネル100に流入することを防止することができる。従って、本実施形態では、ルーフシールド掘進機40の発進坑口(例えば、図15に示す坑口107c)にエントランスパッキンなどの止水装置を設ける必要がない。   In the present embodiment, the opening end on the front side of the cylindrical member 50 is liquid-tightly connected to the inner peripheral surface of the spiral shield tunnel 100. Further, the temporary segment ring 58 is attached to the cylindrical member 50 via the inner flange 50b so as to block between the inner peripheral surface of the opening end 50a on the rear side of the cylindrical member 50 and the outer peripheral surface of the temporary segment ring 58. It is fixed liquid-tight. Further, a tail seal provided at the rear part of the trunk part of the roof shield machine 40 includes an inner peripheral surface of the trunk part, the temporary segment ring 58 and the roof shield tunnels 101, 103, 105, 107, 109, 111, 113, The gap between the outer peripheral surfaces 115, 117, 119, 121, 123, and 125 is sealed. Therefore, when a natural ground is excavated by the roof shield excavator 40, groundwater from the natural ground is transferred to the inside of the roof shield excavator 40, the roof shield tunnels 101, 103, 105, 107, 109, 111, 113, 115, 117, 119, 121, 123, 125 can be prevented from flowing into the spiral shield tunnel 100. Therefore, in this embodiment, it is not necessary to provide a water stop device such as an entrance packing at the start well (for example, the well 107c shown in FIG. 15) of the roof shield machine 40.

ルーフシールド掘進機40による地山の掘進に並行して、地山とルーフシールドトンネル101,103,105,107,109,111,113,115,117,119,121,123,125の外周面との間の間隙には裏込材80が注入される(図16参照)。   In parallel with the excavation of the natural ground by the roof shield excavator 40, the natural ground and the outer peripheral surfaces of the roof shield tunnels 101, 103, 105, 107, 109, 111, 113, 115, 117, 119, 121, 123, 125 Backing material 80 is injected into the gap between them (see FIG. 16).

ルーフシールドトンネル101,103,105,107,109,111,113,115,117,119,121,123,125に関して、ルーフシールド掘進機40による地山の掘進が完了すると、図16に示すように、搬送台車64、第2筒体52、仮セグメントリング58、及び反力受け69を撤去して、第1筒体51の外フランジ51aと、ルーフシールドトンネル101,103,105,107,109,111,113,115,117,119,121,123,125の各々の後端部とに跨るように止水鉄板81を設置する。撤去された搬送台車64、第2筒体52、仮セグメントリング58、及び反力受け69については、ルーフシールドトンネル102,104,106,108,110,112,114,116,118,120,122,124,126の形成時に再利用可能である。   When the excavation of the natural ground by the roof shield excavator 40 is completed with respect to the roof shield tunnels 101, 103, 105, 107, 109, 111, 113, 115, 117, 119, 121, 123, 125, as shown in FIG. The transport carriage 64, the second cylinder 52, the temporary segment ring 58, and the reaction force receiver 69 are removed, and the outer flange 51a of the first cylinder 51 and the roof shield tunnels 101, 103, 105, 107, 109, The water-stopping iron plate 81 is installed so as to straddle the rear end portions of 111, 113, 115, 117, 119, 121, 123, and 125. The removed transport carriage 64, the second cylindrical body 52, the temporary segment ring 58, and the reaction force receiver 69 are the roof shield tunnels 102, 104, 106, 108, 110, 112, 114, 116, 118, 120, 122. , 124, 126 can be reused.

次に、ルーフシールドトンネル101,103,105,107,109,111,113,115,117,119,121,123,125の形成と同様に、ルーフシールドトンネル102,104,106,108,110,112,114,116,118,120,122,124,126を形成する。ここで、図17は、形成されたルーフシールドトンネル107の後方を、ルーフシールド発進ユニット60を搭載した搬送台車64が通過する様子を示している。
このようにして、ルーフシールドトンネル101〜126が形成される。
Next, similarly to the formation of the roof shield tunnels 101, 103, 105, 107, 109, 111, 113, 115, 117, 119, 121, 123, 125, the roof shield tunnels 102, 104, 106, 108, 110, 112, 114, 116, 118, 120, 122, 124, 126 are formed. Here, FIG. 17 shows a state where the transport carriage 64 on which the roof shield starting unit 60 is mounted passes behind the formed roof shield tunnel 107.
In this way, the roof shield tunnels 101 to 126 are formed.

本実施形態によれば、シールド掘進機の発進方法は、螺旋シールド掘進機30(第1のシールド掘進機)によって軸線P(第1の軸線)周りを周回するように地山を掘進して、軸線P周りを周回して延びる螺旋シールドトンネル100(第1のシールドトンネル)を形成する第1の工程(図2〜図4参照)と、軸線Pに並行して延びるルーフシールドトンネル101〜126(第2のシールドトンネル)を形成するためのルーフシールド掘進機40(第2のシールド掘進機)を螺旋シールドトンネル100内に搬入する第2の工程(図12参照)と、ルーフシールド掘進機40を螺旋シールドトンネル100から発進させる第3の工程(図14及び図15参照)と、を含む。前記第1の工程では、螺旋シールド掘進機30(第1のシールド掘進機)によって地山を軸線P(第1の軸線)周りに螺旋状に掘進して、軸線P周りに螺旋状に延びる螺旋シールドトンネル100(第1のシールドトンネル)を形成する。ゆえに、例えば、螺旋シールドトンネル100を前記分岐合流部の近傍に形成する場合には、前記分岐合流部の近傍にてルーフシールド掘進機40を発進させることができるので、ルーフシールド掘進機40の発進のために大断面トンネルの施工領域がトンネル軸線方向に拡大することを抑制することができる。また、螺旋シールドトンネル100をルーフシールド掘進機40の発進基地として用いることができる。   According to this embodiment, the starting method of the shield machine is to excavate the natural ground so as to go around the axis P (first axis) by the spiral shield machine 30 (first shield machine), A first step (see FIGS. 2 to 4) for forming a spiral shield tunnel 100 (first shield tunnel) extending around the axis P, and roof shield tunnels 101 to 126 extending in parallel to the axis P (see FIGS. A second step (see FIG. 12) of carrying the roof shield machine 40 (second shield machine) for forming the second shield tunnel) into the spiral shield tunnel 100, and the roof shield machine 40 And a third step of starting from the spiral shield tunnel 100 (see FIGS. 14 and 15). In the first step, the spiral shield machine 30 (first shield machine) digs a natural ground around the axis P (first axis) in a spiral shape, and the spiral extends spirally around the axis P. A shield tunnel 100 (first shield tunnel) is formed. Therefore, for example, when the spiral shield tunnel 100 is formed in the vicinity of the branching / merging portion, the roof shield machine 40 can be started in the vicinity of the branching / merging portion. Therefore, it is possible to prevent the construction area of the large-section tunnel from expanding in the tunnel axis direction. Further, the spiral shield tunnel 100 can be used as a starting base for the roof shield machine 40.

また本実施形態によれば、螺旋シールドトンネル100(第1のシールドトンネル)の一部である前側部分(発進坑口形成予定部201〜226)は、ルーフシールド掘進機40(第2のシールド掘進機)によって切削される切削可能セグメント250を含んで構成される(図2参照)。前記第3の工程(図14及び図15参照)は、螺旋シールドトンネル100の前側部分(発進坑口形成予定部201〜226)をルーフシールド掘進機40によって切削することを含む。それゆえ、ルーフシールド掘進機40の発進時に坑口を容易に形成することができる。   Moreover, according to this embodiment, the front side part (starting well opening formation scheduled parts 201-226) which is a part of the spiral shield tunnel 100 (first shield tunnel) is the roof shield machine 40 (second shield machine). ) To be cut (see FIG. 2). The third step (see FIG. 14 and FIG. 15) includes cutting the front portion (starting well opening forming scheduled portions 201 to 226) of the spiral shield tunnel 100 by the roof shield excavator 40. Therefore, the wellhead can be easily formed when the roof shield machine 40 starts.

また本実施形態によれば、シールド掘進機の発進方法は、前記第1の工程にて螺旋シールドトンネル100(第1のシールドトンネル)を形成するに先立って、支線シールドトンネル2(第3のシールドトンネル)内に螺旋シールド掘進機30(第1のシールド掘進機)を搬入する第4の工程(図6〜図8参照)と、支線シールドトンネル2の一部(拡幅部3)を螺旋シールド掘進機30によって切削して、螺旋シールド掘進機30を支線シールドトンネル2から発進させる第5の工程(図1〜図8参照)と、を更に含む。支線シールドトンネル2は軸線P(第1の軸線)に並行して延びる(図2及び図3参照)。前記第1の工程にて形成される螺旋シールドトンネル100は、支線シールドトンネル2の周りを周回して(螺旋状に)延びる(図2及び図3参照)。従って、螺旋シールド掘進機30の発進基地として支線シールドトンネル2の一部(拡幅部3)を用いることができる。   According to the present embodiment, the start method of the shield machine is the branch shield tunnel 2 (third shield) prior to forming the spiral shield tunnel 100 (first shield tunnel) in the first step. 4th process (refer FIG. 6-8) which carries in the spiral shield machine 30 (1st shield machine) in a tunnel), and a part (widening part 3) of the branch shield tunnel 2 is spiral-shielded. And a fifth step (see FIGS. 1 to 8) of cutting by the machine 30 to start the spiral shield machine 30 from the branch shield tunnel 2. The branch shield tunnel 2 extends in parallel with the axis P (first axis) (see FIGS. 2 and 3). The spiral shield tunnel 100 formed in the first step extends around the branch shield tunnel 2 (spirally) (see FIGS. 2 and 3). Accordingly, a part of the branch shield tunnel 2 (the widened portion 3) can be used as a starting base of the spiral shield machine 30.

また本実施形態によれば、支線シールドトンネル2(第3のシールドトンネル)の一部(拡幅部3)は、螺旋シールド掘進機30(第1のシールド掘進機)によって切削される切削可能セグメント3bを含んで構成される(図5〜図8参照)。これにより、螺旋シールド掘進機30の発進時に坑口3cを容易に形成することができる。   Further, according to the present embodiment, a part of the branch shield tunnel 2 (third shield tunnel) (the widened portion 3) is cut by the spiral shield machine 30 (first shield machine). (Refer to FIGS. 5 to 8). Thereby, the wellhead 3c can be easily formed when the spiral shield machine 30 starts.

また本実施形態によれば、前記第5の工程では、螺旋シールド掘進機30(第1のシールド掘進機)を支線シールドトンネル2(第3のシールドトンネル)から下向きに発進させる(図1〜図8参照)。これにより、螺旋シールド掘進機30を支線シールドトンネル2から上向きに発進させる場合に比べて、反力受け9にかかる負荷が軽減されるので、反力受け9の構造を簡素化することができる。   According to the present embodiment, in the fifth step, the spiral shield machine 30 (first shield machine) is started downward from the branch shield tunnel 2 (third shield tunnel) (FIGS. 1 to 1). 8). Thereby, compared with the case where the spiral shield machine 30 is started upward from the branch shield tunnel 2, the load applied to the reaction force receiver 9 is reduced, so that the structure of the reaction force receiver 9 can be simplified.

また本実施形態によれば、シールド掘進機の発進方法は、前記第2の工程にてルーフシールド掘進機40(第2のシールド掘進機)を螺旋シールドトンネル100(第1のシールドトンネル)内に搬入するに先立って、支線シールドトンネル2(第3のシールドトンネル)の側部と、螺旋シールドトンネル100のうち前記側部に隣接する部分との間に連絡通路71,72を設ける第6の工程(図1〜図5参照)を更に含む。連絡通路71,72は、支線シールドトンネル2の内部と螺旋シールドトンネル100の内部とを連通する(図5参照)。これにより、連絡通路71,72を用いて、ルーフシールド掘進機40の搬送やルーフシールドトンネル101〜126の形成に必要な資材の搬送を効率良く行うことができる。   In addition, according to the present embodiment, the method of starting the shield machine is the roof shield machine 40 (second shield machine) in the spiral shield tunnel 100 (first shield tunnel) in the second step. Prior to carrying in, a sixth step of providing communication passages 71 and 72 between the side portion of the branch shield tunnel 2 (third shield tunnel) and the portion of the spiral shield tunnel 100 adjacent to the side portion. (See FIGS. 1 to 5). The communication passages 71 and 72 communicate the inside of the branch shield tunnel 2 with the inside of the spiral shield tunnel 100 (see FIG. 5). Thereby, conveyance of the material required for conveyance of the roof shield machine 40 and formation of the roof shield tunnels 101 to 126 can be efficiently performed using the communication passages 71 and 72.

また本実施形態によれば、前記第2の工程では、ルーフシールド掘進機40(第2のシールド掘進機)を支線シールドトンネル2(第3のシールドトンネル)内から連絡通路71内を経て螺旋シールドトンネル100(第1のシールドトンネル)内に搬入する(図12参照)。これにより、ルーフシールド掘進機40を、拡幅部3の坑口3cから螺旋シールドトンネル100内に搬入するのに比べて、ルーフシールド掘進機40を効率良く発進坑口形成予定部201〜226まで搬送することができる。   Further, according to the present embodiment, in the second step, the roof shield machine 40 (second shield machine) is moved from the branch shield tunnel 2 (third shield tunnel) through the connection passage 71 to the spiral shield. It is carried into the tunnel 100 (first shield tunnel) (see FIG. 12). Thereby, the roof shield machine 40 is efficiently transported to the start well formation part 201 to 226 compared with the case where the roof shield machine 40 is carried into the spiral shield tunnel 100 from the well 3c of the widening part 3. Can do.

また本実施形態によれば、複数のルーフシールドトンネル101〜126(第2のシールドトンネル)が、支線シールドトンネル2(第3のシールドトンネル)の周りに並列に形成される(図10参照)。これにより、ルーフシールドトンネル101〜126は、支線シールドトンネル2を内包する大断面トンネルの外殻躯体を構成することができる。   According to the present embodiment, a plurality of roof shield tunnels 101 to 126 (second shield tunnels) are formed in parallel around the branch shield tunnel 2 (third shield tunnel) (see FIG. 10). Thus, the roof shield tunnels 101 to 126 can constitute an outer shell housing of a large-section tunnel that encloses the branch shield tunnel 2.

また本実施形態によれば、複数のルーフシールドトンネル101〜126(第2のシールドトンネル)が、軸線P(第1の軸線)周りに並列に形成される(図10参照)。ルーフシールドトンネル101〜126は、大断面トンネルの外殻躯体を構成することができる。   Moreover, according to this embodiment, the several roof shield tunnel 101-126 (2nd shield tunnel) is formed in parallel around the axis line P (1st axis line) (refer FIG. 10). The roof shield tunnels 101 to 126 can constitute an outer shell of a large section tunnel.

また本実施形態によれば、前記第3の工程にてルーフシールド掘進機40(第2のシールド掘進機)を螺旋シールドトンネル100(第1のシールドトンネル)から発進させるに先立って、螺旋シールド掘進機30(第1のシールド掘進機)を、ルーフシールド掘進機40による地山の掘進に干渉しない位置まで移動する(図2、図9及び図10参照)。これにより、螺旋シールド掘進機30のカッタヘッド31などを撤去することなく、ルーフシールドトンネル101〜126の形成を行うことができる。   Further, according to the present embodiment, prior to starting the roof shield machine 40 (second shield machine) from the spiral shield tunnel 100 (first shield tunnel) in the third step, the spiral shield machine is started. The machine 30 (first shield machine) is moved to a position where it does not interfere with the excavation of natural ground by the roof shield machine 40 (see FIGS. 2, 9, and 10). Thereby, the roof shield tunnels 101 to 126 can be formed without removing the cutter head 31 and the like of the spiral shield machine 30.

尚、本実施形態では、筒状部材50と仮セグメントリング58との溶接固定が螺旋シールドトンネル100から離れた場所(例えば支線シールドトンネル2の発進立坑又は到達立坑)にて行われているが、この溶接固定が行われる場所は前述の場所に限らない。ルーフシールドトンネル101〜126の各々の形成において、ルーフシールド掘進機40が螺旋シールドトンネル100から発進する前の任意の時期に、筒状部材50と仮セグメントリング58との溶接固定が行われ得ることは言うまでもない。また、仮セグメントリング58として、ルーフシールドトンネル101〜126の覆工体を構成し得るセグメントからなる筒状の部材を用いてもよいし、又は、仮セグメントリング専用の筒状の部材を用いてもよい。仮セグメントリング58は、ルーフシールド掘進機40の推進ジャッキ反力を受けることが可能なものであればよい。ここにおいて、仮セグメントリング58を構成する仮セグメントが鋼製であれば、仮セグメントリング58は、内フランジ50bを介して、筒状部材50に溶接により容易にかつ液密に固定され得る。   In the present embodiment, the welding and fixing of the tubular member 50 and the temporary segment ring 58 are performed at a location away from the spiral shield tunnel 100 (for example, the start shaft or the reach shaft of the branch shield tunnel 2). The place where the welding is fixed is not limited to the above-described place. In the formation of each of the roof shield tunnels 101 to 126, the tubular member 50 and the temporary segment ring 58 can be welded and fixed at an arbitrary time before the roof shield machine 40 starts from the spiral shield tunnel 100. Needless to say. Moreover, as the temporary segment ring 58, a cylindrical member made of a segment that can constitute the covering body of the roof shield tunnels 101 to 126 may be used, or a cylindrical member dedicated to the temporary segment ring may be used. Also good. The temporary segment ring 58 only needs to be able to receive the propulsion jack reaction force of the roof shield machine 40. Here, if the temporary segment which comprises the temporary segment ring 58 is steel, the temporary segment ring 58 can be easily and liquid-tightly fixed to the cylindrical member 50 by welding via the inner flange 50b.

また、本実施形態では、ルーフシールドトンネルが26本であるが、ルーフシールドトンネルの本数は26本に限らず任意である。それゆえ、螺旋シールドトンネル100におけるルーフシールド掘進機40用の発進坑口形成予定部も26箇所に限らず、ルーフシールドトンネルの本数と同数になるようにルーフシールドトンネルの本数に応じて適宜設定され得る。これに加えて、連通路300の本数も26本に限らず、ルーフシールドトンネルの本数と同数になるようにルーフシールドトンネルの本数に応じて適宜設定され得る。   In this embodiment, there are 26 roof shield tunnels, but the number of roof shield tunnels is not limited to 26 and is arbitrary. Therefore, the number of start well openings for the roof shield tunneling machine 40 in the spiral shield tunnel 100 is not limited to 26, and can be set as appropriate according to the number of roof shield tunnels so as to be the same as the number of roof shield tunnels. . In addition to this, the number of communication passages 300 is not limited to 26, and can be appropriately set according to the number of roof shield tunnels so as to be the same as the number of roof shield tunnels.

また、本実施形態では、本線シールドトンネル1及び支線シールドトンネル2の断面形状が円形状であるが、断面形状はこれに限らず、例えば、楕円形状、又は、矩形形状であってもよい。   Moreover, in this embodiment, although the cross-sectional shape of the main line shield tunnel 1 and the branch line shield tunnel 2 is circular shape, a cross-sectional shape is not restricted to this, For example, elliptical shape or a rectangular shape may be sufficient.

また、本実施形態では、螺旋シールドトンネル100の断面形状が円形状であるが、断面形状はこれに限らず、例えば、楕円形状、又は、矩形形状であってもよい。   Moreover, in this embodiment, although the cross-sectional shape of the spiral shield tunnel 100 is circular, a cross-sectional shape is not restricted to this, For example, an elliptical shape or a rectangular shape may be sufficient.

また、本実施形態では、ルーフシールドトンネル101〜126の断面形状が円形状であるが、断面形状はこれに限らず、例えば、楕円形状、又は、矩形形状であってもよい。   Moreover, in this embodiment, although the cross-sectional shape of the roof shield tunnel 101-126 is circular, a cross-sectional shape is not restricted to this, For example, elliptical shape or a rectangular shape may be sufficient.

また、本実施形態では、支線シールドトンネル2に拡幅部3を形成し、螺旋シールド掘進機30を、支線シールドトンネル2の拡幅部3内から支線シールドトンネル2の拡幅部3外に発進させているが、拡幅部3を形成せずとも支線シールドトンネル2内に螺旋シールド掘進機30の発進に必要なスペースを確保できるのであれば、拡幅部3を形成しなくてもよい。この場合においても、螺旋シールド掘進機30が、支線シールドトンネル2の下部から下向きに発進することが好ましい。   Moreover, in this embodiment, the wide part 3 is formed in the branch shield tunnel 2, and the spiral shield machine 30 is started from the wide part 3 of the branch shield tunnel 2 to the outside of the wide part 3 of the branch shield tunnel 2. However, if the space necessary for starting the spiral shield machine 30 can be secured in the branch shield tunnel 2 without forming the widened portion 3, the widened portion 3 may not be formed. Even in this case, it is preferable that the spiral shield machine 30 starts downward from the lower part of the branch shield tunnel 2.

また、本実施形態では、本発明の「第3のシールドトンネル」の一例として支線シールドトンネル2を挙げて説明したが、この他、本発明の「第3のシールドトンネル」が、本線シールドトンネル1であってもよいことは言うまでもない。この場合には、螺旋シールド掘進機30が、本線シールドトンネル1内から本線シールドトンネル1外に発進し得る。この発進においても、螺旋シールド掘進機30が、本線シールドトンネル1の下部から下向きに発進することが好ましい。   In the present embodiment, the branch shield tunnel 2 has been described as an example of the “third shield tunnel” of the present invention. In addition, the “third shield tunnel” of the present invention is the main shield tunnel 1. Needless to say, it may be. In this case, the spiral shield machine 30 can start from the main shield tunnel 1 to the outside of the main shield tunnel 1. Also in this start, it is preferable that the spiral shield machine 30 starts downward from the lower part of the main shield tunnel 1.

また、図示の実施形態はあくまで本発明を例示するものであり、本発明は、説明した実施形態により直接的に示されるものに加え、特許請求の範囲内で当業者によりなされる各種の改良・変更を包含するものであることは言うまでもない。   The illustrated embodiments are merely examples of the present invention, and the present invention is not limited to those directly described by the described embodiments, and various improvements and modifications made by those skilled in the art within the scope of the claims. Needless to say, it encompasses changes.

1 本線シールドトンネル
2 支線シールドトンネル
3 拡幅部
3a 覆工体
3b 切削可能セグメント
3c 坑口
4 筒状部材
5 坑口コンクリート
6 筒状部材
7 発進用筒部
8 仮セグメントリング
9 反力受け
30 螺旋シールド掘進機
31 カッタヘッド
32 前胴
33 後胴
40 ルーフシールド掘進機
41 カッタヘッド
42 推進ジャッキ
50 筒状部材
50a 後側の開口端部
50b 内フランジ
51 第1筒体
51a 外フランジ
52 第2筒体
52a 外フランジ
53,54 ストッパー部材
55 スペーサー
58 仮セグメントリング
60 ルーフシールド発進ユニット
64 搬送台車
64a 車輪ユニット
64b 本体
64c 車輪ユニット
65,66 レール
65a 部分
68 坑口コンクリート
69 反力受け
71,72 連絡通路
80 裏込材
81 止水鉄板
100 螺旋シールドトンネル
100a 覆工体
101〜126 ルーフシールドトンネル
107c 坑口
201〜226 発進坑口形成予定部
250 切削可能セグメント
300 連通路
P 軸線
DESCRIPTION OF SYMBOLS 1 Main line shield tunnel 2 Branch line shield tunnel 3 Widening part 3a Covering body 3b Cutable segment 3c Wellhead 4 Tubular member 5 Wellhead concrete 6 Tubular member 7 Starting cylinder 8 Temporary segment ring 9 Reaction force receiving 30 Spiral shield machine 31 Cutter head 32 Front cylinder 33 Rear cylinder 40 Roof shield machine 41 Cutter head 42 Propulsion jack 50 Cylindrical member 50a Rear opening end 50b Inner flange 51 First cylinder 51a Outer flange 52 Second cylinder 52a Outer flange 53, 54 Stopper member 55 Spacer 58 Temporary segment ring 60 Roof shield start unit 64 Carriage carriage 64a Wheel unit 64b Main body 64c Wheel unit 65, 66 Rail 65a Part 68 Wellhead concrete 69 Reaction force receiver 71, 72 Connecting passage 80 Backing material 81 Still water iron plate DESCRIPTION OF SYMBOLS 100 Spiral shield tunnel 100a Cover body 101-126 Roof shield tunnel 107c Wellhead 201-226 Start wellhead formation scheduled part 250 Cutable segment 300 Communication path P Axis

Claims (10)

第1のシールド掘進機によって第1の軸線周りを周回するように地山を掘進して、前記第1の軸線周りを周回して延びる第1のシールドトンネルを形成する第1の工程と、
前記第1の軸線に並行して延びる第2のシールドトンネルを形成するための第2のシールド掘進機を前記第1のシールドトンネル内に搬入する第2の工程と、
前記第2のシールド掘進機を前記第1のシールドトンネルから発進させる第3の工程と、
を含む、シールド掘進機の発進方法。
A first step of forming a first shield tunnel extending around the first axis by excavating a natural ground so as to circulate around the first axis by a first shield machine;
A second step of carrying a second shield machine for forming a second shield tunnel extending in parallel with the first axis into the first shield tunnel;
A third step of starting the second shield machine from the first shield tunnel;
A method for starting a shield machine.
前記第1の工程では、前記第1のシールド掘進機によって地山を前記第1の軸線周りに螺旋状に掘進して、前記第1の軸線周りに螺旋状に延びる前記第1のシールドトンネルを形成する、請求項1に記載のシールド掘進機の発進方法。   In the first step, the first shield tunnel is formed by spirally excavating a natural ground around the first axis by the first shield machine, and extending spirally around the first axis. The method for starting a shield machine according to claim 1, wherein the shield machine is formed. 前記第1のシールドトンネルの前側部分は、前記第2のシールド掘進機によって切削される切削可能セグメントを含んで構成され、
前記第3の工程は、前記第1のシールドトンネルの前側部分を前記第2のシールド掘進機によって切削することを含む、請求項1又は請求項2に記載のシールド掘進機の発進方法。
A front portion of the first shield tunnel is configured to include a cutable segment cut by the second shield machine;
3. The method of starting a shield machine according to claim 1, wherein the third step includes cutting a front side portion of the first shield tunnel by the second shield machine.
前記第1の工程にて前記第1のシールドトンネルを形成するに先立って、第3のシールドトンネル内に前記第1のシールド掘進機を搬入する第4の工程と、
前記第3のシールドトンネルの一部を前記第1のシールド掘進機によって切削して、前記第1のシールド掘進機を前記第3のシールドトンネルから発進させる第5の工程と、
を更に含み、
前記第3のシールドトンネルは前記第1の軸線に並行して延び、
前記第1の工程にて形成される前記第1のシールドトンネルは、前記第3のシールドトンネルの周りを周回して延びる、請求項1〜請求項3のいずれか1つに記載のシールド掘進機の発進方法。
A fourth step of carrying the first shield machine into a third shield tunnel prior to forming the first shield tunnel in the first step;
A fifth step of cutting a portion of the third shield tunnel with the first shield machine and starting the first shield machine from the third shield tunnel;
Further including
The third shield tunnel extends parallel to the first axis;
4. The shield machine according to claim 1, wherein the first shield tunnel formed in the first step extends around the third shield tunnel. 5. How to start.
前記第5の工程では、前記第1のシールド掘進機を前記第3のシールドトンネルから下向きに発進させる、請求項4に記載のシールド掘進機の発進方法。   The start method of the shield machine according to claim 4, wherein in the fifth step, the first shield machine is started downward from the third shield tunnel. 前記第2の工程にて前記第2のシールド掘進機を前記第1のシールドトンネル内に搬入するに先立って、前記第3のシールドトンネルの側部と、前記第1のシールドトンネルのうち前記側部に隣接する部分との間に連絡通路を設ける第6の工程を更に含み、
前記連絡通路は、前記第3のシールドトンネルの内部と前記第1のシールドトンネルの内部とを連通する、請求項4又は請求項5に記載のシールド掘進機の発進方法。
Prior to carrying the second shield machine into the first shield tunnel in the second step, the side of the third shield tunnel and the side of the first shield tunnel A sixth step of providing a communication passage between the portion adjacent to the portion;
6. The method of starting a shield machine according to claim 4, wherein the communication path communicates the inside of the third shield tunnel with the inside of the first shield tunnel. 7.
前記第2の工程では、前記第2のシールド掘進機を前記第3のシールドトンネル内から前記連絡通路内を経て前記第1のシールドトンネル内に搬入する、請求項6に記載のシールド掘進機の発進方法。   7. The shield machine according to claim 6, wherein in the second step, the second shield machine is carried into the first shield tunnel from the third shield tunnel through the communication path. 8. How to start. 複数の前記第2のシールドトンネルが、前記第3のシールドトンネルの周りに並列に形成される、請求項4〜請求項7のいずれか1つに記載のシールド掘進機の発進方法。   The start method of the shield machine according to any one of claims 4 to 7, wherein a plurality of the second shield tunnels are formed in parallel around the third shield tunnel. 複数の前記第2のシールドトンネルが、前記第1の軸線周りに並列に形成される、請求項1〜請求項8のいずれか1つに記載のシールド掘進機の発進方法。   The start method of the shield machine according to any one of claims 1 to 8, wherein the plurality of second shield tunnels are formed in parallel around the first axis. 前記第3の工程にて前記第2のシールド掘進機を前記第1のシールドトンネルから発進させるに先立って、前記第1のシールド掘進機を、前記第2のシールド掘進機による地山の掘進に干渉しない位置まで移動する、請求項1〜請求項9のいずれか1つに記載のシールド掘進機の発進方法。   Prior to starting the second shield machine from the first shield tunnel in the third step, the first shield machine is used for excavation of natural ground by the second shield machine. The method for starting a shield machine according to any one of claims 1 to 9, wherein the shield machine moves to a position where the interference does not occur.
JP2016219870A 2016-11-10 2016-11-10 Starting method for shield machine Pending JP2018076722A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016219870A JP2018076722A (en) 2016-11-10 2016-11-10 Starting method for shield machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016219870A JP2018076722A (en) 2016-11-10 2016-11-10 Starting method for shield machine

Publications (1)

Publication Number Publication Date
JP2018076722A true JP2018076722A (en) 2018-05-17

Family

ID=62150001

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016219870A Pending JP2018076722A (en) 2016-11-10 2016-11-10 Starting method for shield machine

Country Status (1)

Country Link
JP (1) JP2018076722A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020079491A (en) * 2018-11-12 2020-05-28 清水建設株式会社 Double circle circumferential shield excavator, shield starting base, and outer shell shielding method using a circumferential tunnel
CN111927476A (en) * 2020-07-14 2020-11-13 中铁第四勘察设计院集团有限公司 Method for constructing large-section tunnel by enlarging and digging shield tunnel by mining method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006097329A (en) * 2004-09-29 2006-04-13 Ishikawajima Harima Heavy Ind Co Ltd Starting method for branch shield
JP2006225928A (en) * 2005-02-16 2006-08-31 Sekisui Chem Co Ltd Segment for partition wall of underground structure
JP2007224532A (en) * 2006-02-22 2007-09-06 Taisei Corp Construction method for underground structure
JP2008025303A (en) * 2006-07-25 2008-02-07 Shimizu Corp Construction method for support structure at branched confluence
JP2008057148A (en) * 2006-08-30 2008-03-13 Taisei Corp Segment, and construction method for diverging/merging tunnel
JP2009264047A (en) * 2008-04-28 2009-11-12 Mitsubishi Heavy Industries Tunneling Machinery & Geotechnology Co Ltd Tunnel excavating method
JP2015129411A (en) * 2014-01-08 2015-07-16 清水建設株式会社 Material feeder for use in shield tunnel, and tunnel construction method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006097329A (en) * 2004-09-29 2006-04-13 Ishikawajima Harima Heavy Ind Co Ltd Starting method for branch shield
JP2006225928A (en) * 2005-02-16 2006-08-31 Sekisui Chem Co Ltd Segment for partition wall of underground structure
JP2007224532A (en) * 2006-02-22 2007-09-06 Taisei Corp Construction method for underground structure
JP2008025303A (en) * 2006-07-25 2008-02-07 Shimizu Corp Construction method for support structure at branched confluence
JP2008057148A (en) * 2006-08-30 2008-03-13 Taisei Corp Segment, and construction method for diverging/merging tunnel
JP2009264047A (en) * 2008-04-28 2009-11-12 Mitsubishi Heavy Industries Tunneling Machinery & Geotechnology Co Ltd Tunnel excavating method
JP2015129411A (en) * 2014-01-08 2015-07-16 清水建設株式会社 Material feeder for use in shield tunnel, and tunnel construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020079491A (en) * 2018-11-12 2020-05-28 清水建設株式会社 Double circle circumferential shield excavator, shield starting base, and outer shell shielding method using a circumferential tunnel
JP7162501B2 (en) 2018-11-12 2022-10-28 清水建設株式会社 Outer shell shield construction method using shield starting base and circumferential tunnel
CN111927476A (en) * 2020-07-14 2020-11-13 中铁第四勘察设计院集团有限公司 Method for constructing large-section tunnel by enlarging and digging shield tunnel by mining method

Similar Documents

Publication Publication Date Title
JP6733862B2 (en) Construction method of the underground widening part
JP6147818B2 (en) Large section tunnel construction method and large section lining body
JP6922280B2 (en) How to build a tunnel skeleton
JP2007077677A (en) Construction method for underground structure
JP2018076722A (en) Starting method for shield machine
JP3966334B2 (en) Method for forming communication part of parallel shield tunnel and its communication part structure
JP5393947B2 (en) Multiple tunnel construction method and connection structure, and tunnel and pipe roof connection structure constituting the multiple tunnel
JP2017043983A (en) Underground structure, and construction method of underground structure
JP2017043982A (en) Underground structure, and construction method of underground structure
JP2751636B2 (en) Tunnel construction method and underground space construction method
JP6726602B2 (en) Starting method of shield machine
JP5806576B2 (en) Pipe roof and pipe roof construction method
JP4100231B2 (en) Tunnel branching method using parent-child shield machine
JP2008169550A (en) Widening structure of shield tunnel, shield tunnel segment, and widening method for shield tunnel
JP2016008426A (en) Construction method for large-cross-section tunnel
JP7004580B2 (en) Connection structure between the pipe roof and the starting tunnel
JP4810333B2 (en) How to build a concatenated tunnel
JP6874375B2 (en) How to build a tunnel skeleton
JP6619710B2 (en) Tunnel widening method and tunnel reinforcement device
JP2007277904A (en) Tunnel excavation method, construction method of tunnel branch/confluent width expanding part using this method and tunnel branch/confluent width expending part constructed thereby
JP6720765B2 (en) Construction method of large section tunnel
JP7130105B2 (en) Connection structure and connection method of pipe roof and departure side tunnel
JP7002950B2 (en) Connection structure and connection method between straight pipe roof and reaching tunnel
JP6707351B2 (en) Construction method of underground starting base structure and construction method of underground cavity
JP2007303195A (en) Construction method for shield tunnel

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190522

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20200205

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20200218

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20200908