JP2017193876A - Device and method for pile data estimation - Google Patents

Device and method for pile data estimation Download PDF

Info

Publication number
JP2017193876A
JP2017193876A JP2016084889A JP2016084889A JP2017193876A JP 2017193876 A JP2017193876 A JP 2017193876A JP 2016084889 A JP2016084889 A JP 2016084889A JP 2016084889 A JP2016084889 A JP 2016084889A JP 2017193876 A JP2017193876 A JP 2017193876A
Authority
JP
Japan
Prior art keywords
data
pile
excavation depth
sample
value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2016084889A
Other languages
Japanese (ja)
Other versions
JP6714265B2 (en
Inventor
泰博 後藤
Yasuhiro Goto
泰博 後藤
毅弘 田中
Takehiro Tanaka
毅弘 田中
煕建 伊藤
Hirotake Ito
煕建 伊藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyo University
Omtec Inc
Original Assignee
Toyo University
Omtec Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyo University, Omtec Inc filed Critical Toyo University
Priority to JP2016084889A priority Critical patent/JP6714265B2/en
Publication of JP2017193876A publication Critical patent/JP2017193876A/en
Application granted granted Critical
Publication of JP6714265B2 publication Critical patent/JP6714265B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a pile data estimation device that enhances reliability of an estimated value of an excavation depth of a data-missing pile, of which construction work pile data that represent actually constructed pile data is missing.SOLUTION: A pile data estimation device 1 includes: reference data extraction means 20 for extracting minimum value data, maximum value data and mean value data from sample data, referring to excavation depth data among the sample data extracted from actually constructed pile data for a pile P; quartile data determination means 30 for determining first quartile data of which the excavation depth is a mean value between the excavation depth of the minimum value data and the excavation depth of the mean value data, and third quartile data of which the excavation depth is a mean value between the excavation depth of the mean value data and the excavation depth of the maximum value data, from among the sample data; and estimation means 40 for estimating the excavation depth of a data-missing pile LP, between the excavation depth of the first quartile data and the excavation depth of the third quartile data.SELECTED DRAWING: Figure 1

Description

本発明は、杭データ推定装置に関し、詳しくは、実施工データが欠損したデータ欠損杭の掘削深度を推定する杭データ推定装置及びその方法に関する。   The present invention relates to a pile data estimation device, and more particularly, to a pile data estimation device and method for estimating the excavation depth of a data-deficient pile with missing construction data.

従来、杭の施工においては、杭打ち機から情報を収集し、杭の施工データとして、掘削深度等を記録する管理装置が用いられている。   Conventionally, in the construction of a pile, a management device that collects information from a pile driving machine and records the excavation depth or the like as the construction data of the pile is used.

このような管理装置として、杭打ち機の掘削ヘッド先端の深度を計測する掘削ヘッド深度計測手段、既製杭の先端深度を計測する既製杭深度計測手段及び/又は液状材噴射ノズルへの液状材注入量を計測する注入量計測手段等の実施工データ計測手段と、該実施工データ計測手段による計測データ及び施工段階毎の基本条件データを表示するデータ表示手段と、計測データを経時的に記録する記録手段と、を備える既製杭建込み施工管理装置が提案されている(特許文献1)。
この既製杭建込み施工管理装置によれば、実施工データ計測手段により計測された深度等の計測データを記憶手段に記憶できる。
As such a management device, the excavation head depth measurement means for measuring the depth of the excavation head tip of the pile driving machine, the ready-made pile depth measurement means for measuring the tip depth of the ready-made pile, and / or the liquid material injection into the liquid material injection nozzle Implementation data measurement means such as injection amount measurement means for measuring the amount, data display means for displaying the measurement data by the implementation data measurement means and basic condition data for each construction stage, and recording the measurement data over time A ready-made pile erection construction management device provided with a recording means has been proposed (Patent Document 1).
According to this ready-made pile construction management apparatus, measurement data such as the depth measured by the execution work data measurement means can be stored in the storage means.

特許第5071858号公報Japanese Patent No. 5071858

ところで、杭の施工現場は土埃や泥や水等が飛散し、また、杭打ち機における掘削により絶えず振動する環境であり、管理装置のような電子機器にとって過酷な環境である。このため、管理装置が故障し、深度等の計測データが記録されない場合も想定できる。   By the way, the construction site of the pile is an environment in which dust, mud, water, etc. are scattered, and constantly vibrates by excavation with a pile driving machine, which is a severe environment for an electronic device such as a management device. For this reason, it can also be assumed that the management device fails and measurement data such as depth is not recorded.

このような管理装置によって深度等の計測データが記録されなかった場合、既に杭が施工されてしまった状態において、この欠損した計測データを補完するために、掘削深度等を実際に計測することは不可能である。   When measurement data such as depth is not recorded by such a management device, in the state where the pile has already been constructed, in order to supplement this missing measurement data, actually measuring the excavation depth etc. Impossible.

このため、計測データが欠損した杭の掘削深度等は、計測データが記録されている他の杭の掘削深度等から推測することとなる。
ところが、掘削深度は、地盤の支持層によって異なるので、例えば、互いに隣接する杭であっても、その掘削深度が異なる場合がある。よって、計測データが欠損した杭の掘削深度を、この杭と隣接する杭の計測データの掘削深度と推定しても、信頼性が乏しい。
For this reason, the excavation depth and the like of the pile in which the measurement data is lost is estimated from the excavation depth and the like of the other pile in which the measurement data is recorded.
However, since the excavation depth varies depending on the support layer of the ground, the excavation depth may be different even for piles adjacent to each other. Therefore, even if the excavation depth of the pile in which the measurement data is missing is estimated as the excavation depth of the measurement data of the pile adjacent to this pile, the reliability is poor.

本発明は、施工した杭の杭データである実施工杭データが欠損したデータ欠損杭の掘削深度の推定値の信頼性を向上することが可能な杭データ推定装置を提供することを目的とする。   An object of the present invention is to provide a pile data estimation device capable of improving the reliability of the estimated value of the excavation depth of the data-deficient pile in which the construction pile data that is the pile data of the constructed pile is missing. .

(1) 少なくとも掘削深度を示す掘削深度データを含み、施工した杭の杭データである実施工杭データを、杭毎に記憶する記憶手段に接続され、前記実施工データが欠損したデータ欠損杭の掘削深度を推定する杭データ推定装置であって、
前記記憶手段に記憶された複数の杭の前記実施工杭データの中から、推定に用いるサンプルとなるサンプルデータを抽出するサンプル抽出手段と、
前記サンプルデータの前記掘削深度データを参照し、掘削深度が最小である最小値データと、掘削深度が最大である最大値データと、掘削深度が中央である中央値データと、を前記サンプルデータの中から抽出する基準データ抽出手段と、
前記サンプルデータの前記掘削深度データを参照し、掘削深度が、前記最小値データの掘削深度と前記中央値データの掘削深度との中央値である第1四分位点データと、前記中央値データの掘削深度と前記最大値データの掘削深度との中央値である第3四分位点データと、を前記サンプルデータの中から決定する四分位点データ決定手段と、
前記第1四分位点データの掘削深度と前記第3四分位点データの掘削深度の間で、前記データ欠損杭の掘削深度を推定する推定手段と、を備える杭データ推定装置。
(1) The data of the data-deficient pile including the excavation depth data indicating at least the excavation depth, connected to the storage means for storing the pile data of the piles constructed and stored for each pile, A pile data estimation device for estimating excavation depth,
Sample extraction means for extracting sample data to be used for estimation from the working pile data of the plurality of piles stored in the storage means,
With reference to the excavation depth data of the sample data, the minimum value data with the minimum excavation depth, the maximum value data with the maximum excavation depth, and the median value data with the excavation depth being the center are obtained. A reference data extraction means for extracting from inside,
With reference to the excavation depth data of the sample data, the first quartile data in which the excavation depth is the median between the excavation depth of the minimum value data and the excavation depth of the median data; and the median data Quartile data determining means for determining, from the sample data, third quartile data that is the median of the excavation depth of the maximum value data and the excavation depth of the maximum value data;
A pile data estimation device comprising: an estimation unit configured to estimate the excavation depth of the data-deficient pile between the excavation depth of the first quartile data and the excavation depth of the third quartile data.

(1)の発明によれば、杭データ推定装置は、サンプル抽出手段と、基準データ抽出手段と、四分位点データ決定手段と、推定手段と、を備え、少なくとも掘削深度を示す掘削深度データを含み、施工した杭の杭データである実施工杭データを、杭毎に記憶する記憶手段に接続され、実施工データが欠損したデータ欠損杭の掘削深度を推定する。
サンプル抽出手段は、記憶手段に記憶された複数の杭の実施工杭データの中から、推定に用いるサンプルとなるサンプルデータを抽出する。
基準データ抽出手段は、サンプルデータの掘削深度データを参照し、掘削深度が最小である最小値データと、掘削深度が最大である最大値データと、掘削深度が中央である中央値データと、をサンプルデータの中から抽出する。
四分位点データ決定手段は、サンプルデータの掘削深度データを参照し、掘削深度が、最小値データの掘削深度と中央値データの掘削深度との中央値である第1四分位点データと、中央値データの掘削深度と最大値データの掘削深度との中央値である第3四分位点データと、をサンプルデータの中から決定する。
推定手段は、第1四分位点データの掘削深度と第3四分位点データの掘削深度の間で、データ欠損杭の掘削深度を推定する。
According to the invention of (1), the pile data estimation device includes sample extraction means, reference data extraction means, quartile data determination means, and estimation means, and at least excavation depth data indicating the excavation depth. The construction pile data, which is the pile data of the constructed pile, is connected to the storage means for storing each pile, and the excavation depth of the data missing pile in which the construction work data is missing is estimated.
A sample extraction means extracts the sample data used as a sample for estimation from the execution pile data of the several pile memorize | stored in the memory | storage means.
The reference data extraction means refers to the excavation depth data of the sample data, and obtains the minimum value data with the minimum excavation depth, the maximum value data with the maximum excavation depth, and the median data with the excavation depth at the center. Extract from sample data.
The quartile data determining means refers to the first quartile data in which the excavation depth is a median between the excavation depth of the minimum value data and the excavation depth of the median data with reference to the excavation depth data of the sample data. The third quartile data, which is the median between the excavation depth of the median data and the excavation depth of the maximum value data, is determined from the sample data.
The estimation means estimates the excavation depth of the data missing pile between the excavation depth of the first quartile data and the excavation depth of the third quartile data.

これにより、実施工杭データの中から抽出されたサンプルデータの掘削深度を、最小値データ、中央値データ及び最大値データによって、小さい値群と大きい値群とに2分する。そして、小さい値群の中央値である第1四分位点データと、大きい値群の中央値である第3四分位点データとの間で、データ欠損杭の掘削深度を推定する。
よって、複数のサンプルデータを用いてデータ欠損杭の掘削深度を推定するので、単に隣接する杭の掘削深度と同じと推定した場合に比べ、推定した値の信頼性が向上する。
また、サンプルデータの掘削深度を、小さい値群と大きい値群とに2分し、更に、小さい値群の中央値と大きい値群の中央値との間で、データ欠損杭の掘削深度を推定するので、サンプルデータの掘削深度の平均値とした場合に比べ、サンプルデータの中において、極端に小さい値や大きい値が含まれていたとしても、これらの影響を抑えた値を推定できる。
したがって、施工した杭の杭データである実施工杭データが欠損したデータ欠損杭の掘削深度の推定値の信頼性を向上することが可能な杭データ推定装置を提供できる。
Thereby, the excavation depth of the sample data extracted from the working pile data is divided into two groups of a small value group and a large value group by the minimum value data, the median value data, and the maximum value data. And the excavation depth of a data defect | deletion pile is estimated between the 1st quartile data which is the median of a small value group, and the 3rd quartile data which is the median of a large value group.
Therefore, since the excavation depth of the data-deficient pile is estimated using a plurality of sample data, the reliability of the estimated value is improved as compared with the case where the excavation depth is simply the same as the excavation depth of the adjacent pile.
In addition, the excavation depth of the sample data is divided into two groups, a small value group and a large value group, and further, the excavation depth of the missing data pile is estimated between the median value of the small value group and the median value of the large value group. Therefore, compared to the case where the average value of the excavation depth of the sample data is used, even if an extremely small value or a large value is included in the sample data, a value that suppresses these influences can be estimated.
Therefore, it is possible to provide a pile data estimation device capable of improving the reliability of the estimated value of the excavation depth of the data-deficient pile in which the execution pile data that is the pile data of the constructed pile is missing.

(2) 前記サンプル抽出手段は、前記データ欠損杭から所定距離以内に施工された杭の前記実施工杭データの中から、前記サンプルデータを抽出する(1)に記載の杭データ推定装置。   (2) The pile data estimation device according to (1), wherein the sample extraction means extracts the sample data from the execution pile data of a pile constructed within a predetermined distance from the data missing pile.

これにより、データ欠損杭の周囲で施工された杭の実施工杭データの中から、サンプルデータを抽出し、このデータ欠損杭の掘削深度を推定できる。
したがって、施工した杭の杭データである実施工杭データが欠損したデータ欠損杭の掘削深度の推定値の信頼性をより向上することが可能な杭データ推定装置を提供できる。
Thereby, sample data can be extracted from the execution pile data of the pile constructed around the data defect pile, and the excavation depth of this data defect pile can be estimated.
Therefore, it is possible to provide a pile data estimation device that can further improve the reliability of the estimated value of the excavation depth of the data-deficient pile in which the execution pile data that is the pile data of the constructed pile is missing.

(3) 前記サンプルデータの前記掘削深度データを参照し、全ての前記サンプルデータの掘削深度の平均値を算出する平均値算出手段と、
前記平均値と、前記中央値データの掘削深度と、の差の絶対値が所定値以上か否かを判定するサンプル適正判定手段と、を更に備え、
前記サンプル抽出手段は、前記サンプル適正判定手段が前記所定値以上と判定した場合には、サンプル数を所定数増やして、再度、サンプルデータを抽出する(1)又は(2)に記載の杭データ推定装置。
(3) referring to the excavation depth data of the sample data, an average value calculating means for calculating an average value of the excavation depth of all the sample data;
A sample appropriateness determining means for determining whether or not an absolute value of a difference between the average value and the excavation depth of the median data is a predetermined value or more,
The sample extraction means increases the number of samples by a predetermined number and extracts the sample data again when the sample appropriateness determination means determines that the value is equal to or greater than the predetermined value. The pile data according to (1) or (2) Estimating device.

(3)の発明によれば、杭データ推定装置は、平均値算出手段と、サンプル適正判定手段と、を更に備える。
平均値算出手段は、サンプルデータの掘削深度データを参照し、全てのサンプルデータの掘削深度の平均値を算出する。
サンプル適正判定手段は、平均値と、中央値データの掘削深度と、の差の絶対値が所定値以上か否かを判定する。
そして、サンプル抽出手段は、サンプル適正判定手段が所定値以上と判定した場合には、サンプル数を所定数増やして、再度、サンプルデータを抽出する。
According to the invention of (3), the pile data estimation device further includes an average value calculation unit and a sample suitability determination unit.
The average value calculation means refers to the excavation depth data of the sample data and calculates an average value of the excavation depths of all the sample data.
The sample suitability determining means determines whether or not the absolute value of the difference between the average value and the excavation depth of the median data is greater than or equal to a predetermined value.
Then, when the sample appropriateness determining unit determines that the sample suitability determining unit is equal to or greater than the predetermined value, the sample extracting unit increases the number of samples by a predetermined number and extracts sample data again.

ここで、中央値データの掘削深度と平均値との差が大きい場合、全てのサンプルデータの値において偏りがあることが推測される。
(3)の発明によれば、このような場合に、サンプル数を所定数増やして、再度、サンプルデータを抽出するので、サンプルデータの値において偏りがあっても、推定した掘削深度の推定値の信頼性を向上できる。
したがって、施工した杭の杭データである実施工杭データが欠損したデータ欠損杭の掘削深度の推定値の信頼性をより向上することが可能な杭データ推定装置を提供できる。
Here, when the difference between the excavation depth and the average value of the median data is large, it is estimated that there is a bias in the values of all the sample data.
According to the invention of (3), in such a case, the number of samples is increased by a predetermined number and sample data is extracted again. Therefore, even if there is a deviation in the value of the sample data, the estimated value of the estimated excavation depth Can improve the reliability.
Therefore, it is possible to provide a pile data estimation device that can further improve the reliability of the estimated value of the excavation depth of the data-deficient pile in which the execution pile data that is the pile data of the constructed pile is missing.

(4) 少なくとも掘削深度を示す掘削深度データを含み、施工した杭の杭データである実施工杭データを、杭毎に記憶する記憶手段に接続され、前記実施工データが欠損したデータ欠損杭の掘削深度を推定する杭データ推定装置が実行する杭データ推定方法であって、
前記記憶手段に記憶された複数の杭の前記実施工杭データの中から、推定に用いるサンプルとなるサンプルデータを抽出するサンプル抽出ステップと、
前記サンプルデータの前記掘削深度データを参照し、掘削深度が最小である最小値データと、掘削深度が最大である最大値データと、掘削深度が中央である中央値データと、を前記サンプルデータの中から抽出する基準データ抽出ステップと、
前記サンプルデータの前記掘削深度データを参照し、掘削深度が、前記最小値データの掘削深度と前記中央値データの掘削深度との中央値である第1四分位点データと、前記中央値データの掘削深度と前記最大値データの掘削深度との中央値である第3四分位点データと、を前記サンプルデータの中から決定する四分位点データ決定ステップと、
前記第1四分位点データの掘削深度と前記第3四分位点データの掘削深度の間で、前記データ欠損杭の掘削深度を推定する推定ステップと、を含む杭データ推定方法。
(4) The data of the deficient pile including the excavation depth data indicating at least the excavation depth, connected to the storage means for storing the pile data of the pile that has been constructed and stored for each pile, A pile data estimation method executed by a pile data estimation device that estimates excavation depth,
Sample extraction step for extracting sample data to be a sample used for estimation from the execution work pile data of the plurality of piles stored in the storage means,
With reference to the excavation depth data of the sample data, the minimum value data with the minimum excavation depth, the maximum value data with the maximum excavation depth, and the median value data with the excavation depth being the center are obtained. A reference data extraction step for extracting from the inside;
With reference to the excavation depth data of the sample data, the first quartile data in which the excavation depth is the median between the excavation depth of the minimum value data and the excavation depth of the median data; and the median data Quartile data determining step for determining, from among the sample data, third quartile data that is a median of the excavation depth of and the maximum value of the excavation depth;
A pile data estimation method comprising: an estimation step of estimating the excavation depth of the data-deficient pile between the excavation depth of the first quartile data and the excavation depth of the third quartile data.

(4)の発明によれば、(1)の発明と同様の作用効果を奏する。   According to invention of (4), there exists an effect similar to invention of (1).

本発明によれば、施工した杭の杭データである実施工杭データが欠損したデータ欠損杭の掘削深度の推定値の信頼性を向上することが可能な杭データ推定装置を提供できる。   ADVANTAGE OF THE INVENTION According to this invention, the pile data estimation apparatus which can improve the reliability of the estimated value of the excavation depth of the data defect | deletion pile from which the construction pile data which is the pile data of the constructed pile was missing can be provided.

本発明の実施形態に係る杭データ推定装置における処理の概要を説明する図である。It is a figure explaining the outline | summary of the process in the pile data estimation apparatus which concerns on embodiment of this invention. 本発明の実施形態に係る杭データ推定装置の機能構成を示すブロック図である。It is a block diagram which shows the function structure of the pile data estimation apparatus which concerns on embodiment of this invention. 本発明の実施形態に係る杭データ推定装置が実行する杭データ推定処理フローを示す図である。It is a figure which shows the pile data estimation process flow which the pile data estimation apparatus which concerns on embodiment of this invention performs. 本発明の実施形態に係る杭データ推定装置が実行する杭データ推定処理における一例を説明する図である。It is a figure explaining an example in the pile data estimation process which the pile data estimation apparatus which concerns on embodiment of this invention performs. 図4に示す杭データ推定処理における一例の箱ひげ図である。It is a box-and-whisker diagram of an example in the pile data estimation process shown in FIG.

以下、本発明の実施形態を図面に基づいて説明する。以下の説明において、同一の構成には、同一の符号を付し、その説明を省略又は簡略化する。   Hereinafter, embodiments of the present invention will be described with reference to the drawings. In the following description, the same components are denoted by the same reference numerals, and the description thereof is omitted or simplified.

図1は、本発明の実施形態に係る杭データ推定装置における処理の概要を説明する図である。
杭データ推定装置は、少なくとも掘削深度を示す掘削深度データを含み、施工した杭Pの杭データである実施工杭データに基づき、実施工データが欠損したデータ欠損杭LPの掘削深度を推定する。なお、データ欠損杭LPは、施工はされているが、実施工データを記録する施工管理装置の故障等により、実施工データが欠損した杭である。
Drawing 1 is a figure explaining the outline of the processing in the pile data estimating device concerning the embodiment of the present invention.
The pile data estimation device includes excavation depth data indicating at least the excavation depth, and estimates the excavation depth of the data missing pile LP in which the execution work data is missing based on the execution work pile data that is the pile data of the constructed pile P. Note that the data missing pile LP is a pile that has been constructed but has lost construction data due to a failure of a construction management device that records the construction data.

具体的には、まず、杭データ推定装置は、複数の杭Pの実施工杭データの中から、推定に用いるサンプルとなるサンプルデータを抽出する。
次に、杭データ推定装置は、掘削深度が最小である最小値データと、掘削深度が最大である最大値データと、掘削深度が中央である中央値データと、をサンプルデータの中から抽出する。
次に、杭データ推定装置は、サンプルデータの掘削深度データを参照し、掘削深度が、最小値データの掘削深度と中央値データの掘削深度との中央値である第1四分位点データと、中央値データの掘削深度と最大値データの掘削深度との中央値である第3四分位点データと、をサンプルデータの中から決定する。
そして、杭データ推定装置は、第1四分位点データの掘削深度と第3四分位点データの掘削深度の間で、データ欠損杭LPの掘削深度を推定する。例えば、杭データ推定装置は、第1四分位点データの掘削深度と第3四分位点データの掘削深度との中央値や平均値を推定掘削深度に推定する。
Specifically, first, the pile data estimation device extracts sample data that is a sample used for estimation from the execution pile data of a plurality of piles P.
Next, the pile data estimation device extracts the minimum value data with the minimum excavation depth, the maximum value data with the maximum excavation depth, and the median value data with the central excavation depth from the sample data. .
Next, the pile data estimation device refers to the excavation depth data of the sample data, and the first quartile data in which the excavation depth is the median between the excavation depth of the minimum value data and the excavation depth of the median data; The third quartile data, which is the median between the excavation depth of the median data and the excavation depth of the maximum value data, is determined from the sample data.
Then, the pile data estimation device estimates the excavation depth of the data missing pile LP between the excavation depth of the first quartile data and the excavation depth of the third quartile data. For example, the pile data estimation device estimates the median value or average value of the excavation depth of the first quartile data and the excavation depth of the third quartile data to the estimated excavation depth.

このように、杭データ推定装置は、複数のサンプルデータを用いてデータ欠損杭LPの掘削深度を推定するので、単に隣接する杭Pの掘削深度と同じと推定した場合に比べ、推定した値の信頼性が向上する。
また、サンプルデータの掘削深度を、小さい値群と大きい値群とに2分し、更に、小さい値群の中央値と大きい値群の中央値との間で、データ欠損杭の掘削深度を推定するので、サンプルデータの掘削深度の平均値とした場合に比べ、サンプルデータの中において、極端に小さい値や大きい値が含まれていたとしても、これらの影響を抑えた値を推定できる。
したがって、施工した杭の杭データである実施工杭データが欠損したデータ欠損杭の掘削深度の推定値の信頼性を向上することが可能な杭データ推定装置を提供できる。
In this way, since the pile data estimation device estimates the excavation depth of the data-deficient pile LP using a plurality of sample data, the estimated value of the pile data estimation apparatus is compared with the case where the excavation depth is simply the same as the excavation depth of the adjacent pile P. Reliability is improved.
In addition, the excavation depth of the sample data is divided into two groups, a small value group and a large value group, and further, the excavation depth of the missing data pile is estimated between the median value of the small value group and the median value of the large value group. Therefore, compared to the case where the average value of the excavation depth of the sample data is used, even if an extremely small value or a large value is included in the sample data, a value that suppresses these influences can be estimated.
Therefore, it is possible to provide a pile data estimation device capable of improving the reliability of the estimated value of the excavation depth of the data-deficient pile in which the execution pile data that is the pile data of the constructed pile is missing.

図2は、本発明の実施形態に係る杭データ推定装置の機能構成を示すブロック図である。
杭データ推定装置1は、少なくとも掘削深度を示す掘削深度データを含み、施工した杭Pの杭データである実施工杭データを、杭毎に記憶する記憶手段100に接続され、サンプル抽出手段10と、基準データ抽出手段20と、四分位点データ決定手段30と、平均値算出手段40と、サンプル適正判定手段50と、推定手段60と、を備える。
FIG. 2 is a block diagram illustrating a functional configuration of the pile data estimation apparatus according to the embodiment of the present invention.
The pile data estimation device 1 includes at least excavation depth data indicating the excavation depth, and is connected to a storage unit 100 that stores, for each pile, execution pile data that is pile data of the constructed pile P. , Reference data extraction means 20, quartile data determination means 30, average value calculation means 40, sample suitability determination means 50, and estimation means 60.

記憶手段100に記憶された実施工杭データには、施工した杭Pの掘削深度を示す掘削深度データに加え、設計上の杭番号(No.)、経時的な掘削速度、経時的な掘削電流値、セメントミルクの積算注入量、経時的なセメントミルクの瞬時流量等が含まれている。また、実施工杭データには、各杭の位置情報を含めてもよい。
また、記憶手段100は、杭データ推定装置1が備えてもよいし、外部装置であってもよい。
In the execution pile data stored in the storage means 100, in addition to the excavation depth data indicating the excavation depth of the constructed pile P, the design pile number (No.), the excavation speed over time, the excavation current over time It includes the value, the cumulative amount of cement milk injected, and the instantaneous flow rate of cement milk over time. Moreover, you may include the positional information on each pile in execution work pile data.
The storage unit 100 may be included in the pile data estimation device 1 or may be an external device.

サンプル抽出手段10は、記憶手段100に記憶された複数の杭Pの実施工杭データの中から、推定に用いるサンプルとなるサンプルデータを、予め設定された初期設定数(例えば、29本(4の倍数+1)等)だけ抽出する。   The sample extraction means 10 selects a sample data to be used for estimation from among the execution pile data of the plurality of piles P stored in the storage means 100, and sets a preset initial set number (for example, 29 (4 Multiples of +1) etc.

このとき、サンプル抽出手段10は、データ欠損杭LPから所定距離以内(例えば、データ欠損杭LPを中心とした半径20mの円内)に施工された杭Pの実施工杭データの中から、サンプルデータを抽出する。
なお、サンプル抽出手段10は、記憶手段100に記憶された各杭の位置情報を参照して、データ欠損杭LPから所定距離以内の杭Pの実施工杭データをサンプルデータとして抽出してもよいし、データ欠損杭LPの杭番号の前後から初期設定数分の杭番号が付された杭Pの実施工杭データをサンプルデータとして抽出してもよいし、ユーザにより選択された杭番号が付された杭Pの実施工杭データをサンプルデータとして抽出してもよい。
At this time, the sample extraction means 10 selects a sample from the working pile data of the pile P constructed within a predetermined distance from the data missing pile LP (for example, within a circle having a radius of 20 m centering on the data missing pile LP). Extract data.
In addition, the sample extraction means 10 may extract the execution pile data of the pile P within a predetermined distance from the data missing pile LP as sample data with reference to the position information of each pile stored in the storage means 100. In addition, it is possible to extract the construction pile data of the pile P with the initial number of pile numbers assigned before and after the pile number of the data-missing pile LP as sample data, or to attach the pile number selected by the user. You may extract the execution work pile data of the made pile P as sample data.

また、サンプル抽出手段10は、サンプル適正判定手段50が、後述する平均値と、中央値データの掘削深度と、の差の絶対値が所定値以上と判定した場合には、サンプル数を所定数(例えば、8本(4の倍数)等)増やして、再度、サンプルデータを抽出する。なお、この場合、サンプル抽出手段10は、サンプルデータを抽出する範囲を広げてもよい。   Further, the sample extraction means 10 determines that the number of samples is a predetermined number when the sample appropriateness determination means 50 determines that the absolute value of the difference between the average value described later and the excavation depth of the median data is greater than or equal to a predetermined value. Increase the number (for example, 8 (multiple of 4), etc.) and extract the sample data again. In this case, the sample extraction means 10 may widen the range for extracting sample data.

基準データ抽出手段20は、サンプルデータの掘削深度データを参照し、掘削深度が最小である最小値データと、掘削深度が最大である最大値データと、掘削深度が中央である中央値データと、をサンプルデータの中から抽出する。   The reference data extraction means 20 refers to the excavation depth data of the sample data, the minimum value data with the minimum excavation depth, the maximum value data with the maximum excavation depth, the median data with the excavation depth at the center, Is extracted from the sample data.

四分位点データ決定手段30は、サンプルデータの掘削深度データを参照し、掘削深度が、最小値データの掘削深度と中央値データの掘削深度との中央値である第1四分位点データと、中央値データの掘削深度と最大値データの掘削深度との中央値である第3四分位点データと、をサンプルデータの中から決定する。
具体的には、四分位点データ決定手段30は、最小値データと中央値データとの間のサンプルデータ数が、奇数の場合には、1つの中央値を第1四分位点データに決定する。また、四分位点データ決定手段30は、中央値データと最大値データとの間のサンプルデータ数が、奇数の場合には、1つの中央値を第3四分位点データに決定する。
一方、四分位点データ決定手段30は、最小値データと中央値データとの間のサンプルデータ数が、偶数の場合には、2つの中央値の平均値を第1四分位点データに決定する。また、四分位点データ決定手段30は、中央値データと最大値データとの間のサンプルデータ数が、偶数の場合には、2つの中央値の平均値を第3四分位点データに決定する。
The quartile data determining means 30 refers to the excavation depth data of the sample data, and the first quartile data in which the excavation depth is the median between the excavation depth of the minimum value data and the excavation depth of the median data. And the third quartile data, which is the median of the excavation depth of the median data and the excavation depth of the maximum data, is determined from the sample data.
Specifically, when the number of sample data between the minimum value data and the median data is an odd number, the quartile data determination means 30 converts one median to the first quartile data. decide. Further, when the number of sample data between the median value data and the maximum value data is an odd number, the quartile data determining unit 30 determines one median as the third quartile data.
On the other hand, when the number of sample data between the minimum value data and the median data is an even number, the quartile data determination means 30 uses the average value of the two medians as the first quartile data. decide. Further, when the number of sample data between the median value data and the maximum value data is an even number, the quartile data determining means 30 uses the average value of the two median values as the third quartile data. decide.

平均値算出手段40は、サンプルデータの掘削深度データを参照し、全てのサンプルデータの掘削深度の平均値を算出する。   The average value calculating means 40 refers to the excavation depth data of the sample data and calculates the average value of the excavation depth of all the sample data.

サンプル適正判定手段50は、平均値算出手段40が算出した平均値と、基準データ抽出手段20が抽出した中央値データの掘削深度と、の差の絶対値が所定値(例えば、0.5(m))以上か否かを判定する。   The sample suitability determination means 50 is configured such that the absolute value of the difference between the average value calculated by the average value calculation means 40 and the excavation depth of the median data extracted by the reference data extraction means 20 is a predetermined value (for example, 0.5 ( m)) It is determined whether or not.

推定手段60は、四分位点データ決定手段30が決定した第1四分位点データの掘削深度と第3四分位点データの掘削深度の間で、データ欠損杭LPの掘削深度を推定する。
具体的には、推定手段60は、第1四分位点データと第3四分位点データとの平均値をデータ欠損杭LPの掘削深度と推定し、この推定した掘削深度をデータ欠損杭LPの掘削深度データとして記憶手段100に記憶する。
なお、推定手段60は、第1四分位点データと第3四分位点データとの間であれば、平均値に限らず、任意の方法でデータ欠損杭LPの掘削深度と推定してもよい。
The estimation means 60 estimates the excavation depth of the data missing pile LP between the excavation depth of the first quartile data determined by the quartile data determination means 30 and the excavation depth of the third quartile data. To do.
Specifically, the estimation means 60 estimates the average value of the first quartile data and the third quartile data as the excavation depth of the data missing pile LP, and the estimated excavation depth is used as the data missing pile. It memorize | stores in the memory | storage means 100 as LP excavation depth data.
In addition, if the estimation means 60 is between 1st quartile data and 3rd quartile data, it will estimate not only the average value but the excavation depth of the data defect pile LP by arbitrary methods. Also good.

なお、本実施形態の杭データ推定装置1は、複数のサンプルデータから成る1つのサンプルセットからデータ欠損杭LPの掘削深度を推定するが、これに限らず、複数のサンプルデータから成る複数のサンプルセットからデータ欠損杭LPの掘削深度を推定してもよい。
この場合、サンプル抽出手段10は、複数のサンプルデータから成る複数のサンプルセットを抽出する。
また、基準データ抽出手20は、サンプルセット毎に、最小値データ、最大値データ及び中央値データを抽出する。
また、四分位点データ決定手段30は、サンプルセット毎に、第1四分位点データ及び第3四分位点データを抽出する。
また、推定手段40は、サンプルセット毎に、第1四分位点データと第3四分位点データとの間で仮掘削深度を決定する。即ち、推定手段40は、複数の仮掘削深度を決定する。そして、推定手段40は、決定した複数の掘削深度の平均値をデータ欠損杭LPの掘削深度と推定する。
これにより、複数のサンプルセットに基づき、データ欠損杭LPの掘削深度を推定するので、サンプルデータ数を少なくしても、実施工杭データが欠損したデータ欠損杭LPの掘削深度の推定値の信頼性を向上できる。
In addition, although the pile data estimation apparatus 1 of this embodiment estimates the excavation depth of the data defect | deletion pile LP from one sample set which consists of several sample data, it is not restricted to this, The several sample which consists of several sample data The excavation depth of the data missing pile LP may be estimated from the set.
In this case, the sample extraction means 10 extracts a plurality of sample sets composed of a plurality of sample data.
The reference data extractor 20 extracts minimum value data, maximum value data, and median value data for each sample set.
The quartile data determining unit 30 extracts the first quartile data and the third quartile data for each sample set.
Moreover, the estimation means 40 determines a temporary excavation depth between the first quartile data and the third quartile data for each sample set. That is, the estimation means 40 determines a plurality of temporary excavation depths. And the estimation means 40 estimates the determined average value of several excavation depths as the excavation depth of the data defect pile LP.
As a result, the excavation depth of the data-deficient pile LP is estimated based on a plurality of sample sets. Therefore, even if the number of sample data is reduced, the reliability of the estimated excavation depth of the data-deficient pile LP in which the working pile data is missing Can be improved.

上記の杭データ推定装置1の機能構成は、あくまで一例であり、一つの機能ブロック(データベース及び機能処理部)を分割したり、複数の機能ブロックをまとめて一つの機能ブロックとして構成したりしてもよい。各機能処理手段は、装置に内蔵されたCPU(Central Processing Unit)が、ROM(Read Only Memory)、フラッシュメモリ、SSD(Solid State Drive)、ハードディスク等の記憶装置に格納されたコンピュータ・プログラム(例えば、基幹ソフト等)を読み出し、CPUにより実行されたコンピュータ・プログラムによって実現される。すなわち、各機能処理部は、このコンピュータ・プログラムが、記憶装置に格納されたデータベース(DB;Data Base)やメモリ上の記憶領域からテーブル等の必要なデータを読み書きし、場合によっては、関連するハードウェア(例えば、入出力装置、表示装置、通信インターフェース装置)を制御することによって実現される。   The above-described functional configuration of the pile data estimation apparatus 1 is merely an example, and one functional block (database and functional processing unit) is divided, or a plurality of functional blocks are configured as one functional block. Also good. Each function processing means includes a computer program (for example, a CPU (Central Processing Unit) built in the apparatus stored in a storage device such as a ROM (Read Only Memory), a flash memory, an SSD (Solid State Drive), or a hard disk. , Core software, etc.) is read and realized by a computer program executed by the CPU. That is, in each function processing unit, this computer program reads and writes necessary data such as a table from a database (DB; Data Base) stored in a storage device or a storage area on a memory, and may be related in some cases. This is realized by controlling hardware (for example, an input / output device, a display device, and a communication interface device).

次に、杭データ推定装置1が実行する杭データ推定処理について説明する。
図3は、本発明の実施形態に係る杭データ推定装置が実行する杭データ推定処理フローを示す図である。
図4は、本発明の実施形態に係る杭データ推定装置が実行する杭データ推定処理における一例を説明する図である。
図5は、図4に示す杭データ推定処理における一例の箱ひげ図である。
Next, a pile data estimation process executed by the pile data estimation apparatus 1 will be described.
FIG. 3 is a diagram illustrating a pile data estimation processing flow executed by the pile data estimation apparatus according to the embodiment of the present invention.
Drawing 4 is a figure explaining an example in the pile data estimation processing which the pile data estimation device concerning the embodiment of the present invention performs.
FIG. 5 is an example of a box whisker in the pile data estimation process shown in FIG.

ステップS1において、サンプル抽出手段10は、記憶手段100に記憶された複数の杭Pの実施工杭データの中から、推定に用いるサンプルとなるサンプルデータを、予め設定された設定数(図4に示す例では29本)だけ抽出する。   In step S1, the sample extraction means 10 selects a preset number of sample data (in FIG. 4) as sample data to be used for estimation from the execution pile data of the plurality of piles P stored in the storage means 100. In the example shown, only 29) are extracted.

ステップS2において、基準データ抽出手段20は、サンプルデータの掘削深度データを参照し、掘削深度が最小である最小値データ(図4,5に示す例では、杭No.1:29.6m)と、掘削深度が最大である最大値データ(図4,5に示す例では、杭No.29:31.2m)と、掘削深度が中央である中央値データ(図4,5に示す例では、杭No.15:30.6m)と、をサンプルデータの中から抽出する。   In step S2, the reference data extraction means 20 refers to the excavation depth data of the sample data, and the minimum value data (pile No. 1: 29.6 m in the example shown in FIGS. 4 and 5) with the minimum excavation depth. The maximum value data (pile No. 29: 31.2 m in the example shown in FIGS. 4 and 5) and the median value data (the example shown in FIGS. Pile No. 15: 30.6 m) is extracted from the sample data.

ステップS3において、四分位点データ決定手段30は、サンプルデータの掘削深度データを参照し、掘削深度が、最小値データの掘削深度と中央値データの掘削深度との中央値である第1四分位点データ(図4,5に示す例では、杭No.8:30.3m)と、中央値データの掘削深度と最大値データの掘削深度との中央値である第3四分位点データ(図4,5に示す例では、杭No.22:30.8m)と、をサンプルデータの中から決定する。   In step S3, the quartile data determining means 30 refers to the excavation depth data of the sample data, and the excavation depth is a median value of the excavation depth of the minimum value data and the excavation depth of the median data. The third quartile is the median of the quantile data (pile No. 8: 30.3 m in the example shown in FIGS. 4 and 5) and the excavation depth of the median data and the excavation depth of the maximum data Data (pile No. 22: 30.8 m in the example shown in FIGS. 4 and 5) is determined from the sample data.

ステップS4において、平均値算出手段40は、サンプルデータの掘削深度データを参照し、全てのサンプルデータの掘削深度の平均値(図4,5に示す例では、30.5m)を算出する。   In step S4, the average value calculation means 40 refers to the excavation depth data of the sample data, and calculates the average value (30.5 m in the examples shown in FIGS. 4 and 5) of the excavation depth of all the sample data.

ステップS5において、サンプル適正判定手段50は、平均値算出手段40が算出した平均値と、基準データ抽出手段20が抽出した中央値データの掘削深度と、の差の絶対値が所定値(例えば、0.5(m))以上か否かを判定し、所定値以上と判定した場合にはステップS6に処理を移し、所定値以上と判定しない場合にはステップS7に処理を移す。
図4,5に示す例では、ステップS2で基準データ抽出手段20が抽出した中央値データは30.6mであり、ステップS4で平均値算出手段40が算出した平均値は30.5mであり、これらの差の絶対値は0.1mであるので、サンプル適正判定手段50はステップS7に処理を移す。
In step S5, the sample suitability determining unit 50 determines that the absolute value of the difference between the average value calculated by the average value calculating unit 40 and the excavation depth of the median data extracted by the reference data extracting unit 20 is a predetermined value (for example, 0.5 (m)) or more. If it is determined that the value is equal to or greater than the predetermined value, the process proceeds to step S6. If it is not determined to be equal to or greater than the predetermined value, the process proceeds to step S7.
In the example shown in FIGS. 4 and 5, the median data extracted by the reference data extraction unit 20 in step S2 is 30.6 m, the average value calculated by the average value calculation unit 40 in step S4 is 30.5 m, Since the absolute value of these differences is 0.1 m, the sample suitability determining means 50 moves the process to step S7.

ステップS6において、サンプル抽出手段10は、サンプル数を所定数(例えば、8本(4の倍数)等)増やして、ステップS1に戻って、再度、サンプルデータを抽出する。   In step S6, the sample extraction means 10 increases the number of samples by a predetermined number (for example, 8 (multiple of 4) or the like), returns to step S1, and extracts sample data again.

ステップS7において、推定手段60は、ステップS3で四分位点データ決定手段30が決定した第1四分位点データ(図4,5に示す例では、杭No.8:30.3m)の掘削深度と第3四分位点データ(図4,5に示す例では、杭No.22:30.8m)の掘削深度の間で、データ欠損杭LPの掘削深度を推定する。
例えば、図4,5に示す例では、推定手段60は、30.3mと30.8mとの平均値である30.55mをデータ欠損杭LPの掘削深度と推定する。
In step S7, the estimating means 60 uses the first quartile data (pile No. 8: 30.3 m in the example shown in FIGS. 4 and 5) determined by the quartile data determining means 30 in step S3. The excavation depth of the data missing pile LP is estimated between the excavation depth and the excavation depth of the third quartile data (pile No. 22: 30.8 m in the example shown in FIGS. 4 and 5).
For example, in the example shown in FIGS. 4 and 5, the estimation means 60 estimates 30.55 m, which is an average value of 30.3 m and 30.8 m, as the excavation depth of the data-deleted pile LP.

このように、本実施形態の杭データ推定装置1によれば、以下の作用効果を奏する。
杭データ推定装置1によれば、実施工杭データの中から抽出されたサンプルデータの掘削深度を、最小値データ、中央値データ及び最大値データによって、小さい値群と大きい値群とに2分する。そして、小さい値群の中央値である第1四分位点データと、大きい値群の中央値である第3四分位点データとの間で、データ欠損杭LPの掘削深度を推定する。
よって、複数のサンプルデータを用いてデータ欠損杭LPの掘削深度を推定するので、単に隣接する杭Pの掘削深度と同じと推定した場合に比べ、推定した値の信頼性が向上する。
また、サンプルデータの掘削深度を、小さい値群と大きい値群とに2分し、更に、小さい値群の中央値と大きい値群の中央値との間で、データ欠損杭LPの掘削深度を推定するので、サンプルデータの掘削深度の平均値とした場合に比べ、サンプルデータの中において、極端に小さい値や大きい値が含まれていたとしても、これらの影響を抑えた値を推定できる。
したがって、施工した杭の杭データである実施工杭データが欠損したデータ欠損杭の掘削深度の推定値の信頼性を向上することが可能な杭データ推定装置を提供できる。
Thus, according to the pile data estimation device 1 of the present embodiment, the following operational effects are obtained.
According to the pile data estimation device 1, the excavation depth of the sample data extracted from the construction pile data is divided into two groups of a small value group and a large value group by the minimum value data, median value data, and maximum value data. To do. Then, the excavation depth of the data missing pile LP is estimated between the first quartile data that is the median of the small value group and the third quartile data that is the median of the large value group.
Therefore, since the excavation depth of the data-deficient pile LP is estimated using a plurality of sample data, the reliability of the estimated value is improved as compared with the case where the excavation depth is simply the same as the excavation depth of the adjacent pile P.
Moreover, the excavation depth of the sample data is divided into two groups, a small value group and a large value group, and further, the excavation depth of the data missing pile LP is set between the median value of the small value group and the median value of the large value group. Since estimation is performed, even if extremely small or large values are included in the sample data compared to the case where the average value of the excavation depth of the sample data is used, it is possible to estimate a value that suppresses these influences.
Therefore, it is possible to provide a pile data estimation device capable of improving the reliability of the estimated value of the excavation depth of the data-deficient pile in which the execution pile data that is the pile data of the constructed pile is missing.

また、杭データ推定装置1によれば、データ欠損杭LPの周囲で施工された杭Pの実施工杭データの中から、サンプルデータを抽出し、このデータ欠損杭LPの掘削深度を推定できる。
したがって、施工した杭の杭データである実施工杭データが欠損したデータ欠損杭の掘削深度の推定値の信頼性をより向上することが可能な杭データ推定装置を提供できる。
Moreover, according to the pile data estimation apparatus 1, sample data can be extracted from the execution pile data of the pile P constructed around the data defect pile LP, and the excavation depth of the data defect pile LP can be estimated.
Therefore, it is possible to provide a pile data estimation device that can further improve the reliability of the estimated value of the excavation depth of the data-deficient pile in which the execution pile data that is the pile data of the constructed pile is missing.

また、杭データ推定装置1によれば、サンプルデータの値において偏りがある場合に、サンプル数を所定数増やして、再度、サンプルデータを抽出するので、サンプルデータの値において偏りがあっても、推定した掘削深度の推定値の信頼性を向上できる。
したがって、施工した杭の杭データである実施工杭データが欠損したデータ欠損杭の掘削深度の推定値の信頼性をより向上することが可能な杭データ推定装置を提供できる。
Moreover, according to the pile data estimation apparatus 1, when there is a bias in the value of the sample data, the sample number is increased by a predetermined number and the sample data is extracted again, so even if there is a bias in the value of the sample data, The reliability of the estimated value of the estimated excavation depth can be improved.
Therefore, it is possible to provide a pile data estimation device that can further improve the reliability of the estimated value of the excavation depth of the data-deficient pile in which the execution pile data that is the pile data of the constructed pile is missing.

なお、本発明は前記実施形態に限定されるものではなく、本発明の目的を達成できる範囲での変形、改良等は本発明に含まれるものである。   It should be noted that the present invention is not limited to the above-described embodiment, and modifications, improvements, etc. within a scope that can achieve the object of the present invention are included in the present invention.

1 杭データ推定装置
10 サンプル抽出手段
20 基準データ抽出手段
30 四分位点データ決定手段
40 平均値算出手段
50 サンプル適正判定手段
60 推定手段
100 記憶手段


DESCRIPTION OF SYMBOLS 1 Pile data estimation apparatus 10 Sample extraction means 20 Reference data extraction means 30 Quartile data determination means 40 Average value calculation means 50 Sample appropriateness determination means 60 Estimation means 100 Storage means


Claims (4)

少なくとも掘削深度を示す掘削深度データを含み、施工した杭の杭データである実施工杭データを、杭毎に記憶する記憶手段に接続され、前記実施工データが欠損したデータ欠損杭の掘削深度を推定する杭データ推定装置であって、
前記記憶手段に記憶された複数の杭の前記実施工杭データの中から、推定に用いるサンプルとなるサンプルデータを抽出するサンプル抽出手段と、
前記サンプルデータの前記掘削深度データを参照し、掘削深度が最小である最小値データと、掘削深度が最大である最大値データと、掘削深度が中央である中央値データと、を前記サンプルデータの中から抽出する基準データ抽出手段と、
前記サンプルデータの前記掘削深度データを参照し、掘削深度が、前記最小値データの掘削深度と前記中央値データの掘削深度との中央値である第1四分位点データと、前記中央値データの掘削深度と前記最大値データの掘削深度との中央値である第3四分位点データと、を前記サンプルデータの中から決定する四分位点データ決定手段と、
前記第1四分位点データの掘削深度と前記第3四分位点データの掘削深度の間で、前記データ欠損杭の掘削深度を推定する推定手段と、を備える杭データ推定装置。
At least the excavation depth data indicating the excavation depth is included, and the execution pile data that is the pile data of the constructed pile is connected to storage means for each pile, and the excavation depth of the data-deficient pile in which the execution data is missing A pile data estimation device for estimation,
Sample extraction means for extracting sample data to be used for estimation from the working pile data of the plurality of piles stored in the storage means,
With reference to the excavation depth data of the sample data, the minimum value data with the minimum excavation depth, the maximum value data with the maximum excavation depth, and the median value data with the excavation depth being the center are obtained. A reference data extraction means for extracting from inside,
With reference to the excavation depth data of the sample data, the first quartile data in which the excavation depth is the median between the excavation depth of the minimum value data and the excavation depth of the median data; and the median data Quartile data determining means for determining, from among the sample data, third quartile data that is the median of the excavation depth of and the maximum value of the excavation depth;
A pile data estimation device comprising: an estimation unit configured to estimate the excavation depth of the data-deficient pile between the excavation depth of the first quartile data and the excavation depth of the third quartile data.
前記サンプル抽出手段は、前記データ欠損杭から所定距離以内に施工された杭の前記実施工杭データの中から、前記サンプルデータを抽出する請求項1に記載の杭データ推定装置。   The pile data estimation device according to claim 1, wherein the sample extraction means extracts the sample data from the execution pile data of a pile constructed within a predetermined distance from the data missing pile. 前記サンプルデータの前記掘削深度データを参照し、全ての前記サンプルデータの掘削深度の平均値を算出する平均値算出手段と、
前記平均値と、前記中央値データの掘削深度と、の差の絶対値が所定値以上か否かを判定するサンプル適正判定手段と、を更に備え、
前記サンプル抽出手段は、前記サンプル適正判定手段が前記所定値以上と判定した場合には、サンプル数を所定数増やして、再度、サンプルデータを抽出する請求項1又は2に記載の杭データ推定装置。
An average value calculating means for referring to the excavation depth data of the sample data and calculating an average value of the excavation depths of all the sample data;
A sample appropriateness determining means for determining whether or not an absolute value of a difference between the average value and the excavation depth of the median data is a predetermined value or more,
3. The pile data estimation device according to claim 1, wherein the sample extraction unit increases the number of samples by a predetermined number and extracts the sample data again when the sample suitability determination unit determines that the value is equal to or greater than the predetermined value. .
少なくとも掘削深度を示す掘削深度データを含み、施工した杭の杭データである実施工杭データを、杭毎に記憶する記憶手段に接続され、前記実施工データが欠損したデータ欠損杭の掘削深度を推定する杭データ推定装置が実行する杭データ推定方法であって、
前記記憶手段に記憶された複数の杭の前記実施工杭データの中から、推定に用いるサンプルとなるサンプルデータを抽出するサンプル抽出ステップと、
前記サンプルデータの前記掘削深度データを参照し、掘削深度が最小である最小値データと、掘削深度が最大である最大値データと、掘削深度が中央である中央値データと、を前記サンプルデータの中から抽出する基準データ抽出ステップと、
前記サンプルデータの前記掘削深度データを参照し、掘削深度が、前記最小値データの掘削深度と前記中央値データの掘削深度との中央値である第1四分位点データと、前記中央値データの掘削深度と前記最大値データの掘削深度との中央値である第3四分位点データと、を前記サンプルデータの中から決定する四分位点データ決定ステップと、
前記第1四分位点データの掘削深度と前記第3四分位点データの掘削深度の間で、前記データ欠損杭の掘削深度を推定する推定ステップと、を含む杭データ推定方法。

At least the excavation depth data indicating the excavation depth is included, and the execution pile data that is the pile data of the constructed pile is connected to storage means for each pile, and the excavation depth of the data-deficient pile in which the execution data is missing A pile data estimation method executed by an estimated pile data estimation device,
Sample extraction step for extracting sample data to be a sample used for estimation from the execution work pile data of the plurality of piles stored in the storage means,
With reference to the excavation depth data of the sample data, the minimum value data with the minimum excavation depth, the maximum value data with the maximum excavation depth, and the median value data with the excavation depth being the center are obtained. A reference data extraction step for extracting from the inside;
With reference to the excavation depth data of the sample data, the first quartile data in which the excavation depth is the median between the excavation depth of the minimum value data and the excavation depth of the median data; and the median data Quartile data determining step for determining, from among the sample data, third quartile data that is a median of the excavation depth of and the maximum value of the excavation depth;
A pile data estimation method comprising: an estimation step of estimating the excavation depth of the data-deficient pile between the excavation depth of the first quartile data and the excavation depth of the third quartile data.

JP2016084889A 2016-04-21 2016-04-21 Pile data estimation device and method Active JP6714265B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016084889A JP6714265B2 (en) 2016-04-21 2016-04-21 Pile data estimation device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016084889A JP6714265B2 (en) 2016-04-21 2016-04-21 Pile data estimation device and method

Publications (2)

Publication Number Publication Date
JP2017193876A true JP2017193876A (en) 2017-10-26
JP6714265B2 JP6714265B2 (en) 2020-06-24

Family

ID=60154732

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016084889A Active JP6714265B2 (en) 2016-04-21 2016-04-21 Pile data estimation device and method

Country Status (1)

Country Link
JP (1) JP6714265B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020159034A (en) * 2019-03-26 2020-10-01 株式会社オムテック Foundation pile support layer depth estimation device and method therefor

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0328410A (en) * 1989-06-24 1991-02-06 Nippon Concrete Ind Co Ltd Estimation of support layer for pile in pile embedding
JP2001020271A (en) * 1999-07-08 2001-01-23 Fudo Constr Co Ltd Depth detecting system
JP2005307607A (en) * 2004-04-22 2005-11-04 Sekisui House Ltd Construction management device of pile
JP2006299669A (en) * 2005-04-21 2006-11-02 Nitto Seiko Co Ltd Pile construction control device
JP2008038394A (en) * 2006-08-03 2008-02-21 Nippon Sharyo Seizo Kaisha Ltd Work control apparatus for pile driver and work execution method
JP2008250910A (en) * 2007-03-30 2008-10-16 Fujitsu Microelectronics Ltd Data mining method and process management method
JP2013072271A (en) * 2011-09-29 2013-04-22 Sanwa Kizai Co Ltd Support layer arrival estimation method used in pile burying method and support layer arrival estimation support device
JP2014225068A (en) * 2013-05-15 2014-12-04 株式会社日立製作所 Production index extraction apparatus and program
JP2015080812A (en) * 2013-10-24 2015-04-27 株式会社東芝 Joint method
US20160108598A1 (en) * 2014-10-21 2016-04-21 Terracon Pile design optimization

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0328410A (en) * 1989-06-24 1991-02-06 Nippon Concrete Ind Co Ltd Estimation of support layer for pile in pile embedding
JP2001020271A (en) * 1999-07-08 2001-01-23 Fudo Constr Co Ltd Depth detecting system
JP2005307607A (en) * 2004-04-22 2005-11-04 Sekisui House Ltd Construction management device of pile
JP2006299669A (en) * 2005-04-21 2006-11-02 Nitto Seiko Co Ltd Pile construction control device
JP2008038394A (en) * 2006-08-03 2008-02-21 Nippon Sharyo Seizo Kaisha Ltd Work control apparatus for pile driver and work execution method
JP2008250910A (en) * 2007-03-30 2008-10-16 Fujitsu Microelectronics Ltd Data mining method and process management method
JP2013072271A (en) * 2011-09-29 2013-04-22 Sanwa Kizai Co Ltd Support layer arrival estimation method used in pile burying method and support layer arrival estimation support device
JP2014225068A (en) * 2013-05-15 2014-12-04 株式会社日立製作所 Production index extraction apparatus and program
JP2015080812A (en) * 2013-10-24 2015-04-27 株式会社東芝 Joint method
US20160108598A1 (en) * 2014-10-21 2016-04-21 Terracon Pile design optimization

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020159034A (en) * 2019-03-26 2020-10-01 株式会社オムテック Foundation pile support layer depth estimation device and method therefor
JP7333932B2 (en) 2019-03-26 2023-08-28 株式会社オムテック Foundation pile bearing layer depth estimation device and method

Also Published As

Publication number Publication date
JP6714265B2 (en) 2020-06-24

Similar Documents

Publication Publication Date Title
CN109165152B (en) Method, system and storage medium for monitoring performance of WEB system
WO2018180442A1 (en) Inspection support device, inspection support method, and program
JP7061435B2 (en) Ground movement observation device and ground movement observation program
CN111810131B (en) Online measuring method and system for temperature stability of oil-gas well production layer and storage medium
CN103377303A (en) Curve surface measurement system and method
CN109508473B (en) Pumping well fault determination method based on case diagram, pumping well fault case diagram establishment method and related device
CN113566894A (en) Geological disaster monitoring method, system, terminal and medium based on Internet of things
JP2020107016A (en) Similarity determination device and abnormality detection device
JP2017193876A (en) Device and method for pile data estimation
CN114898057A (en) Geological profile three-dimensional space information extraction method and device and storage medium
CN109489660A (en) Robot localization method and apparatus
JP2018173275A (en) Notification device, notification processing program and notification processing method
JP2010238008A (en) Video feature extraction apparatus and program
CN105302691B (en) A kind of metadata method for monitoring performance and system
CN112287429A (en) Building target area determination method and device, computer equipment and storage medium
JP2014222384A (en) Function execution time measuring device, function execution time measuring method, and function execution time measuring program
JP2021127601A (en) Method and system for inspecting wear of tooth for bucket of working machine
KR102020595B1 (en) System for generating source code used for 3d modeling of permanent drain method and method thereof and record medium recorded with program thereof
JP5253684B1 (en) PLC system design equipment
CN104991722A (en) Cursor display method and apparatus
CN114519784B (en) Modeling method and device for three-dimensional fault
CN105786697A (en) Automatic power consumption test data processing method
CN107845122A (en) A kind of method and apparatus for the planar information for determining building
CN114814916B (en) Ground surface crack positioning method and device and electronic equipment
JP2020159034A (en) Foundation pile support layer depth estimation device and method therefor

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190409

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20200219

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20200225

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20200410

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20200430

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20200521

R150 Certificate of patent or registration of utility model

Ref document number: 6714265

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250