JP2015048643A - Aseismic reinforcing method for existing building, and aseismic reinforcing structure - Google Patents

Aseismic reinforcing method for existing building, and aseismic reinforcing structure Download PDF

Info

Publication number
JP2015048643A
JP2015048643A JP2013181194A JP2013181194A JP2015048643A JP 2015048643 A JP2015048643 A JP 2015048643A JP 2013181194 A JP2013181194 A JP 2013181194A JP 2013181194 A JP2013181194 A JP 2013181194A JP 2015048643 A JP2015048643 A JP 2015048643A
Authority
JP
Japan
Prior art keywords
foundation
existing
new
anchor
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2013181194A
Other languages
Japanese (ja)
Other versions
JP5509380B1 (en
Inventor
亮平 黒沢
Ryohei Kurosawa
亮平 黒沢
亮太郎 黒沢
Ryotaro Kurosawa
亮太郎 黒沢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kurosawa Construction Co Ltd
Original Assignee
Kurosawa Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kurosawa Construction Co Ltd filed Critical Kurosawa Construction Co Ltd
Priority to JP2013181194A priority Critical patent/JP5509380B1/en
Application granted granted Critical
Publication of JP5509380B1 publication Critical patent/JP5509380B1/en
Publication of JP2015048643A publication Critical patent/JP2015048643A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide an aseismic reinforcing method for an existing building, which minimizes a deformation amount of an existing building by preventing an existing foundation from floating due to an earthquake, and prevents high axial force due to tensioning force applied to an anchor from causing an affection on the existing building.SOLUTION: New foundations 6 are provided at a required interval on at least one side face of an existing foundation 2 in an existing building 1. In the new foundation, joint bars 9 are provided in advance on a side facing the existing foundation 2 while being projected, and a ground anchor 7 extending into and anchored in a bearing ground is provided. After the ground anchor 7 is tension-anchored, the ground anchor 7 is provided in the existing foundation 2 and/or a column 5 within a required interval, and thereafter construction anchor bars 8 and the joint bars 9 of the new foundation 6 are connected together as reinforcing-bar lap joints. Concrete 10 is placed within the required interval and/or on the upper part of the existing foundation 2 to integrate the new foundation 6 with the existing foundation 2, and/or the column 5.

Description

本発明は、例えば、地震や強風などの対策のために、既存建物の耐震補強方法及び該補強方法によって得られた耐震補強構造に関するものである。   The present invention relates to a seismic reinforcement method for an existing building and a seismic reinforcement structure obtained by the reinforcement method, for example, for measures against earthquakes and strong winds.

この種の既存建物における既存基礎を補強する方法及び構造においては、例えば、複数の技術が公知になっている。その公知に係る第1の従来例は、既存建物の補強構造であって、前記既存建物の下方の地盤の少なくとも一部を地盤改良することにより構築された地盤改良部と、一端がアンカーの定着地盤に定着され、他端が緊張力が付与された状態で又は緊張力が付与されない状態で前記既存建物の構造体に定着されたアンカーとを備えることを特徴とする既存建物の補強構造である(特許文献1)。   In a method and a structure for reinforcing an existing foundation in this type of existing building, for example, a plurality of techniques are known. The first conventional example according to the public knowledge is a reinforcing structure of an existing building, and is a ground improvement portion constructed by improving the ground of at least a part of the ground below the existing building, and one end is anchored to an anchor. A reinforcing structure for an existing building, comprising an anchor fixed to the ground and having an anchor fixed to the structure of the existing building in a state in which tension is applied to the other end or in a state where tension is not applied (Patent Document 1).

そして、上記の補強構造においては、既存建物の下方の軟弱地盤を地盤改良することで、既存建物が軟弱地盤上に建てられた場合や既存建物の基礎杭が十分な耐力を備えていない場合でも、アンカーに緊張力を付与することができる。これにより、既存建物をアンカーによりアンカーの定着地盤に定着することができ、外部に新たな架構を設けることなく、周囲に建物が密集するような場合であっても、耐震補強を行うことができる、と云うものである。   And in the above reinforcing structure, even if the existing building is built on the soft ground by improving the soft ground below the existing building, or even if the foundation pile of the existing building does not have sufficient proof stress The tension can be applied to the anchor. As a result, the existing building can be anchored to the anchor anchorage ground by the anchor, and seismic reinforcement can be performed even in the case where the building is crowded around without providing a new frame outside. It is said.

また、第2の従来例は、前記第1の従来例と同一出願人によるものであって、アンカーを、地盤に構築された構造体と前記アンカーの定着地盤とに定着させることにより行う耐震補強方法であって、前記アンカーの緊張材に、当該緊張材が弛まない程度の大きさの緊張力で、且つ、地震発生時の設計上の緊張力よりも小さい緊張力を与えた状態で、前記アンカーを前記構造体と前記定着地盤とに定着させることを特徴とする耐震補強方法である(特許文献2)。   The second conventional example is the same applicant as the first conventional example, and the seismic reinforcement is performed by fixing the anchor to the structure constructed on the ground and the anchoring ground of the anchor. In the method, the tension material of the anchor is applied with a tension force that is large enough to prevent the tension material from loosening and a tension force that is smaller than the design tension force at the time of the occurrence of the earthquake. An earthquake-proof reinforcing method characterized in that anchors are fixed to the structure and the fixing ground (Patent Document 2).

この耐震補強方法によれば、施工コストを抑制し、工期を短縮できると共に、地盤に構築された構造物の耐震性能を向上させることができる、というものである。   According to this seismic reinforcement method, the construction cost can be reduced, the construction period can be shortened, and the seismic performance of the structure built on the ground can be improved.

特開2008−223430号公報JP 2008-223430 A 特開2012−127119号公報JP2012-127119A

前記第1の従来例においては、既存基礎に直接アンカーを定着させることとし、アンカーに緊張力を付与する場合と付与しない場合の2通りとしている。まず、緊張力を付与する場合、その緊張力が軸力等の応力として既存基礎に付加されて大きな影響を与え、既存基礎がその余分な応力に耐えられない問題が発生する。そのために、当該地盤の地盤改良を要しており、施工コストが増大し、工期が長期化していた。緊張力を付与しない場合、地震の揺れによる引抜力に対して、キャンセルできる緊張力がないため、アンカー自由長部におけるアンポンドPC鋼材の伸び量が大きく、耐震性能が低下するので、既存建物に生ずる変形量(層間変形角)が大きくなってしまうという問題点がある。   In the first conventional example, the anchor is directly fixed to the existing foundation, and there are two cases where the tension is applied to the anchor and when the tension is not applied. First, when a tension force is applied, the tension force is added to the existing foundation as a stress such as an axial force and has a great influence, and the existing foundation cannot withstand the extra stress. Therefore, the ground improvement of the said ground was required, construction cost increased, and the construction period was prolonged. When tension is not applied, there is no tension that can be canceled with respect to the pull-out force caused by the shaking of the earthquake, so the amount of extension of the unpound PC steel material at the anchor free length is large, and the seismic performance is reduced. There is a problem that the deformation amount (interlayer deformation angle) becomes large.

また、前記第2の従来技術においても、地盤に構築された構造体は、既存基礎に新設基礎を一体化したものであり、その一体化した後に新設基礎にアンカーを設置し、アンカーの緊張材に弛まない程度の大きさの緊張力を与えるため、前記第1の従来技術と同様に、地震の揺れによる引抜力によってPC鋼材の伸び量が大きく発生するから、既存建物の変形量が大きくなってしまうという問題点を有している。   Also in the second prior art, the structure constructed on the ground is a structure in which a new foundation is integrated with an existing foundation, and after the integration, an anchor is installed on the new foundation, In order to give the tension of a magnitude that does not sag, the amount of elongation of the PC steel material is greatly increased by the pulling force due to the shaking of the earthquake, as in the first conventional technique, so the deformation amount of the existing building increases. It has the problem that it ends up.

従って、既存建物の耐震補強に係る従来技術においては、既存基礎が地震による引抜力で浮き上がらないようにして既存建物の変形量を小さく押さえること、および、アンカーに与える緊張力による高軸力が既存基礎に影響を与えないようにすることに解決課題を有している。   Therefore, in the conventional technology related to the seismic reinforcement of existing buildings, the existing foundation has a high axial force due to the tension applied to the anchor, and the existing building is prevented from being lifted by the pulling force due to the earthquake, and the deformation amount of the existing building is kept small. It has a solution to avoid affecting the foundation.

前述の従来例の課題を解決する具体的手段として、本発明に係る第1の発明は、既存建物における既存基礎の少なくとも一側面に所要間隔を置いて新設基礎を設け、該新設基礎には既存基礎と対面する側に予め接合筋を突出させて設けておくと共に、支持地盤中に延びて定着させる地盤アンカーを設け、該地盤アンカーを緊張定着した後に、前記所要間隔内で前記既存基礎及び/又は柱に設けた後施工アンカー筋と前記新設基礎の接合筋とをつなぎ合わせ、前記所要間隔内及び/又は既存基礎の上部にコンクリートを打設して前記新設基礎と既存基礎及び/又は柱とを一体化することを特徴とする既存建物の耐震補強方法を提供するものである。   As a specific means for solving the problems of the above-described conventional example, the first invention according to the present invention provides a new foundation with a required interval on at least one side of the existing foundation in the existing building, and the new foundation A joint bar is provided in advance so as to protrude on the side facing the foundation, and a ground anchor is provided to extend and be fixed in the support ground. After the ground anchor is tension-fixed, the existing foundation and / or within the required interval are provided. Alternatively, the post-construction anchor bar provided on the column and the joint bar of the new foundation are joined together, and concrete is placed within the required interval and / or above the existing foundation, and the new foundation, the existing foundation and / or the column The present invention provides a seismic reinforcement method for an existing building, which is characterized by integrating the two.

本発明に係る第2の発明は、既存建物における既存基礎の両サイドに目地を設けて新設基礎を設け、該新設基礎に支持地盤中に延びて定着させる地盤アンカーを設け、該地盤アンカーを緊張定着した後に、前記目地に充填材を充填して硬化した後に、予め既存基礎に設けてある貫通孔と新設基礎に設けた貫通孔とにPC鋼材を挿通し両サイドの新設基礎に緊張定着して新設基礎と既存基礎とを一体化することを特徴とする既存建物の耐震補強方法を提供するものである。   According to a second aspect of the present invention, a new foundation is provided by providing joints on both sides of an existing foundation in an existing building, a ground anchor that extends into the supporting ground and is fixed to the new foundation, and the ground anchor is tensioned. After fixing, after filling the joint with the filler and hardening, PC steel material is inserted into the through hole provided in the existing foundation and the through hole provided in the new foundation beforehand, and the tension is fixed to the new foundation on both sides. It provides a seismic reinforcement method for existing buildings, which is characterized by integrating a new foundation and an existing foundation.

本発明に係る第3の発明は、既存建物における既存基礎の両サイドに所要間隔を設けて新設基礎を設け、該新設基礎には既存基礎と対面する側に予め接合筋を突出させて設けておくと共に、支持地盤中に延びて定着させる地盤アンカーを設け、該地盤アンカーを緊張定着した後に、前記所要間隔内で前記既存基礎に設けた後施工アンカー筋と前記新設基礎の接合筋とをつなぎ合わせてコンクリートを打設し、予め既存基礎に設けてある貫通孔と新設基礎に設けた貫通孔とにPC鋼材を挿通し両サイドの新設基礎に緊張定着して新設基礎と既存基礎とを一体化することを特徴とする既存建物の耐震補強方法を提供するものである。   According to a third aspect of the present invention, a new foundation is provided by providing a required interval on both sides of an existing foundation in an existing building, and a joint bar is provided in advance on the side facing the existing foundation. In addition, a ground anchor that extends into the supporting ground and is fixed is provided, and after fixing the ground anchor in tension, the post-construction anchor bar provided on the existing foundation and the joint bar of the new foundation are connected within the required interval. In addition, concrete is cast and PC steel is inserted into the through-hole already provided in the existing foundation and the through-hole provided in the new foundation, and the new foundation and the existing foundation are integrated with the new foundation on both sides. It is intended to provide a seismic reinforcement method for existing buildings.

本発明に係る第4の発明は、既存建物における既存基礎の少なくとも一側面の上部に切欠部を形成すると共に、目地部を設けて新設基礎を設け、該新設基礎に支持地盤中に延びて定着させる地盤アンカーを設けると共に、前記切欠部に突出する接合筋を設けておき、該地盤アンカーを緊張定着した後に、前記目地部に充填材を充填すると共に前記切欠部にコンクリートを打設してコッターを形成して新設基礎と既存基礎とを一体化する及び/又は予め既存基礎に設けてある貫通孔と新設基礎に設けた貫通孔とにPC鋼材を挿通し両サイドの新設基礎に緊張定着して新設基礎と既存基礎とを一体化することを特徴とする既存建物の耐震補強方法を提供するものである。   According to a fourth aspect of the present invention, a notch portion is formed at an upper portion of at least one side surface of an existing foundation in an existing building, a new foundation is provided by providing a joint portion, and the new foundation is fixed by extending into the supporting ground. A ground anchor to be provided is provided, and a joint bar projecting to the notch portion is provided, and after fixing the ground anchor in tension, a filler is filled in the joint portion and concrete is placed in the notch portion to cotter The new foundation and the existing foundation are integrated and / or PC steel is inserted into the through-hole already provided in the existing foundation and the through-hole provided in the new foundation, and the tension is fixed on the new foundation on both sides. It provides a seismic reinforcement method for existing buildings, which is characterized by integrating a new foundation and an existing foundation.

本発明に係る第5の発明は、既存建物における既存基礎の少なくとも一側面に目地部を設けて新設基礎を設け、該新設基礎には既存基礎の上部に突出させて予め接合筋を設けておくと共に、支持地盤中に延びて定着させる地盤アンカーを設け、該地盤アンカーを緊張定着した後に、前記目地部に充填材を充填して硬化した後に、両サイドに新設基礎を設けた場合は両サイドの接合筋の間に付加接合筋を配置して接合筋とをつなぎ合わせ、既存基礎の上部にコンクリートを打設してコッターを一体的に形成することを特徴とする既存建物の耐震補強方法を提供するものである。   According to a fifth aspect of the present invention, a joint base is provided on at least one side surface of an existing foundation in an existing building to provide a new foundation, and a joint bar is provided in advance on the new foundation so as to protrude above the existing foundation. In addition, when a ground anchor is provided that extends into the supporting ground and is fixed, and after fixing the ground anchor to tension, the joint is filled with a filler and cured, and then a new foundation is provided on both sides. A seismic reinforcement method for an existing building, characterized in that an additional joint bar is placed between the joint bars of the existing joint, the joint bars are joined together, and concrete is placed on the upper part of the existing foundation to integrally form a cotter. It is to provide.

本発明に係る第6の発明は、既存建物における既存基礎の二側面の上部に切欠部を形成すると共に、所要間隔を設けて新設基礎を設け、該新設基礎には既存基礎と対面する側にと切欠部に対応する側とに予め接合筋を突出させて設けておくと共に、支持地盤中に延びて定着させる地盤アンカーを設け、該地盤アンカーを緊張定着した後に、前記所要間隔内で前記既存基礎と切欠部とに設けた後施工アンカー筋と前記新設基礎の接合筋とをつなぎ合わせてコンクリートを打設して一体化する及び/又は予め既存基礎に設けてある貫通孔と新設基礎に設けた貫通孔とにPC鋼材を挿通し両サイドの新設基礎に緊張定着して新設基礎と既存基礎とを一体化することを特徴とする既存建物の耐震補強方法を提供するものである。   According to a sixth aspect of the present invention, a notched portion is formed at the upper part of two side surfaces of an existing foundation in an existing building, and a new foundation is provided at a necessary interval, and the new foundation is on the side facing the existing foundation. And a side corresponding to the notch is provided in advance so as to project a joining bar, and a ground anchor is provided to be extended and fixed in the supporting ground. Post-installed anchor bars provided in the foundation and notch and the joint bars of the new foundation are joined together to place the concrete and / or integrated into the existing foundation and through holes provided in the existing foundation. The present invention provides a method for seismic reinforcement of an existing building, in which a PC steel material is inserted into the through-hole and tension is fixed on the new foundation on both sides to integrate the new foundation and the existing foundation.

本発明に係る第7の発明は、既存建物における既存基礎の二側面に所要間隔を置いて新設基礎を設け、該新設基礎には既存基礎と柱とに対面する側に予め接合筋を突出させて設けておくと共に、支持地盤中に延びて定着させる地盤アンカーを設け、該地盤アンカーを緊張定着した後に、前記所要間隔内で前記既存基礎と柱とに設けた後施工アンカー筋と前記新設基礎の接合筋とをつなぎ合わせ、及び/又は両サイドに新設基礎を設けた場合は両サイドの接合筋の間に付加接合筋を配置して接合筋とをつなぎ合わせ、前記既存基礎の上部にコンクリートを打設してコッターを一体的に形成することを特徴とする既存建物の耐震補強方法を提供するものである。   According to a seventh aspect of the present invention, a new foundation is provided with a required interval on two sides of an existing foundation in an existing building, and a joint bar is projected in advance on the side facing the existing foundation and the column. And a ground anchor for extending and fixing in the supporting ground, and after fixing the ground anchor in tension, the post-installed anchor bar and the newly installed foundation provided on the existing foundation and the pillar within the required interval And / or if a new foundation is provided on both sides, an additional joint is placed between the joints on both sides, and the joint is joined to the upper part of the existing foundation. A seismic reinforcement method for an existing building is provided, in which a cotter is integrally formed by placing a cotter.

本発明に係る第8の発明は、既存建物における既存基礎の少なくとも一側面に目地部を設けて新設基礎を設け、該新設基礎には既存基礎の上部に突出させて予め接合筋を設けておくと共に、支持地盤中に延びて定着させる地盤アンカーを設け、該地盤アンカーを緊張定着した後に、前記目地部に充填材を充填して硬化した後に、柱に設けた後施工アンカー筋と前記新設基礎の接合筋とをつなぎ合わせ、前記既存基礎の上部にコンクリートを打設してコッターを一体的に形成することを特徴とする既存建物の耐震補強方法を提供するものである。   According to an eighth aspect of the present invention, a new foundation is provided by providing a joint on at least one side surface of an existing foundation in an existing building, and a joint bar is provided in advance on the new foundation so as to protrude above the existing foundation. And a ground anchor for extending and fixing in the supporting ground, and after fixing the ground anchor in tension, after filling and hardening the filler in the joint, the post-installed anchor bar and the new foundation A seismic reinforcement method for an existing building is provided, in which concrete joints are formed by connecting concrete joints to the upper part of the existing foundation and casting concrete on top of the existing foundation.

本発明に係る第9の発明は、前記請求項1乃至8のいずれかの耐震補強方法によって得られた既存建物の耐震補強構造を提供するものである。   According to a ninth aspect of the present invention, there is provided a seismic reinforcement structure for an existing building obtained by the seismic reinforcement method according to any one of the first to eighth aspects.

これら第1乃至第9の発明によれば、いずれも新設基礎を地盤アンカーによって支持地盤に緊張定着させてから、新設基礎と既存基礎またはコッターとを一体化したことによって、地盤アンカーの緊張による高軸力が既存基礎に影響を及ぼすことなく、しかも、新設基礎または新設基礎と一体化されたコッターが地震時に既存基礎の引抜力を押さえて既存基礎の全体耐力を補強し、地震時の引抜力による建物転倒を防止することができるという優れた効果を奏する。   According to the first to ninth inventions, the new foundation is tension-fixed to the supporting ground by the ground anchor, and then the new foundation and the existing foundation or the cotter are integrated, thereby increasing the height of the ground anchor. The axial force does not affect the existing foundation, and the new foundation or the cotter integrated with the new foundation suppresses the pulling force of the existing foundation in the event of an earthquake to reinforce the overall strength of the existing foundation, and the pulling force in the event of an earthquake. It has an excellent effect of preventing the building from falling over.

また、既存基礎に対して複数の耐震補強方法を提供し、これらいずれかの方法および方法の要部を自由に組み合わせをして様々な既存建物や既存基礎を補強できるようにしたのである。   In addition, a number of seismic reinforcement methods were provided for existing foundations, and various existing buildings and existing foundations could be reinforced by freely combining any of these methods and methods.

本発明の第1の実施の形態に係る既存建物の耐震補強構造を略示的に示すもので、(a)は隅部基礎の一例を示す平面図、(b)は同側面図である。BRIEF DESCRIPTION OF THE DRAWINGS The earthquake-proof reinforcement structure of the existing building which concerns on the 1st Embodiment of this invention is shown schematically, (a) is a top view which shows an example of a corner foundation, (b) is the same side view. 同じく第1の実施の形態を示すもので、(c)は隅部基礎の他の例を示す平面図、(d)は同側面図である。The 1st Embodiment is similarly shown, (c) is a top view which shows the other example of a corner base, (d) is the same side view. 同じく第1の実施の形態を示すもので、(e)は外周側面の基礎を示す平面図、(f)は同側面図である。The 1st Embodiment is similarly shown, (e) is a top view which shows the foundation of an outer peripheral side surface, (f) is the same side view. 本発明の第2の実施の形態に係る既存建物の耐震補強構造を略示的に示すもので、(a)は隅部基礎の一例を示す平面図、(b)は同側面図である。BRIEF DESCRIPTION OF THE DRAWINGS The earthquake-proof reinforcement structure of the existing building which concerns on the 2nd Embodiment of this invention is shown schematically, (a) is a top view which shows an example of a corner foundation, (b) is the same side view. 同じく第2の実施の形態を示すもので、(c)は隅部基礎の他の例を示す平面図、(d)は同側面図である。2nd Embodiment is shown similarly, (c) is a top view which shows the other example of a corner base, (d) is the same side view. 同じく第2の実施の形態を示すもので、(e)は外周側面の基礎を示す平面図、(f)は同側面図である。Similarly, the second embodiment is shown, in which (e) is a plan view showing the basis of the outer peripheral side surface, and (f) is a side view thereof. 本発明の第3の実施の形態に係る既存建物の耐震補強構造を略示的に示すもので、(a)は隅部基礎を示す平面図、(b)は同側面図、(c)は外周側面の基礎を示す平面図である。It shows schematically the earthquake-proof reinforcement structure of the existing building which concerns on the 3rd Embodiment of this invention, (a) is a top view which shows a corner foundation, (b) is the same side view, (c) is It is a top view which shows the foundation of an outer peripheral side surface. 本発明の第4の実施の形態に係る既存建物の耐震補強構造を略示的に示すもので、(a)は隅部基礎を示す平面図、(b)は同側面図、(c)は外周側面の基礎を示す平面図である。It shows schematically the earthquake-proof reinforcement structure of the existing building concerning the 4th embodiment of the present invention, (a) is a top view showing a corner foundation, (b) is the same side view, (c) is It is a top view which shows the foundation of an outer peripheral side surface. 本発明の第5の実施の形態に係る既存建物の耐震補強構造を略示的に示すもので、(a)は隅部基礎の一例を示す平面図、(b)は同側面図である。The earthquake-proof reinforcement structure of the existing building which concerns on the 5th Embodiment of this invention is shown schematically, (a) is a top view which shows an example of a corner | foundation foundation, (b) is the same side view. 同じく第5の実施の形態を示すもので、(c)は外周側面の基礎の一例を示す平面図、(d)は外周側面の基礎の他の例を示す平面図、(e)は同側面図である。FIG. 5C also shows the fifth embodiment, in which (c) is a plan view showing an example of the foundation of the outer peripheral side surface, (d) is a plan view showing another example of the foundation of the outer peripheral side surface, and (e) is the same side surface. FIG. 本発明の第6の実施の形態に係る既存建物の耐震補強構造を略示的に示すもので、(a)は隅部基礎の一例を示す平面図、(b)は同側面図である。The earthquake-proof reinforcement structure of the existing building which concerns on the 6th Embodiment of this invention is shown roughly, (a) is a top view which shows an example of a corner | foundation foundation, (b) is the same side view. 同じく第6の実施の形態を示すもので、(c)は外周側面の基礎の一例を示す平面図、(d)は外周側面の基礎の他の例を示す平面図、(e)は同側面図である。Similarly, FIG. 6 shows the sixth embodiment, (c) is a plan view showing an example of the foundation of the outer peripheral side surface, (d) is a plan view showing another example of the foundation of the outer peripheral side surface, and (e) is the same side surface. FIG. 本発明の第7の実施の形態に係る既存建物の耐震補強構造を略示的に示すもので、(a)は隅部基礎を示す平面図、(b)は同側面図、(c)は外周側面の基礎を示す平面図である。It shows schematically the earthquake-proof reinforcement structure of the existing building which concerns on the 7th Embodiment of this invention, (a) is a top view which shows a corner foundation, (b) is the same side view, (c) is It is a top view which shows the foundation of an outer peripheral side surface. 本発明の第8の実施の形態に係る既存建物の耐震補強構造を略示的に示すもので、(a)は隅部基礎を示す平面図、(b)は同側面図、(c)は外周側面の基礎を示す平面図である。It shows schematically the earthquake-proof reinforcement structure of the existing building which concerns on the 8th Embodiment of this invention, (a) is a top view which shows a corner foundation, (b) is the same side view, (c) is It is a top view which shows the foundation of an outer peripheral side surface. 本発明の第9の実施の形態に係る既存建物の耐震補強構造を略示的に示すもので、(a)は隅部基礎を示す平面図、(b)は同側面図である。The earthquake-proof reinforcement structure of the existing building which concerns on the 9th Embodiment of this invention is shown roughly, (a) is a top view which shows a corner | foundation foundation, (b) is the same side view. 同じく第9の実施の形態を示すもので、(c)は外周側面の基礎を示す平面図、(d)は同側面図である。Similarly, the ninth embodiment is shown, in which (c) is a plan view showing the basis of the outer peripheral side surface, and (d) is a side view thereof. 本発明の第10の実施の形態に係る既存建物の耐震補強構造を略示的に示すもので、(a)は隅部基礎を示す平面図、(b)は同側面図である。The earthquake-proof reinforcement structure of the existing building which concerns on the 10th Embodiment of this invention is shown roughly, (a) is a top view which shows a corner | foundation foundation, (b) is the same side view. 同じく第10の実施の形態を示すもので、(c)は外周側面の基礎を示す平面図、(d)は同側面図である。Similarly, the tenth embodiment is shown, in which (c) is a plan view showing the basis of the outer peripheral side surface, and (d) is a side view thereof. 本発明の第11の実施の形態に係る既存建物の耐震補強構造を略示的に示すもので、(a)は隅部基礎を示す平面図、(b)は同側面図、(c)は外周側面の基礎を示す平面図である。It shows schematically the earthquake-proof reinforcement structure of the existing building which concerns on the 11th Embodiment of this invention, (a) is a top view which shows a corner foundation, (b) is the same side view, (c) is It is a top view which shows the foundation of an outer peripheral side surface. 本発明の第12の実施の形態に係る既存建物の耐震補強構造を略示的に示すもので、(a)は隅部基礎を示す平面図、(b)は同側面図、(c)は外周側面の基礎を示す平面図である。It shows schematically the earthquake-proof reinforcement structure of the existing building concerning the 12th embodiment of the present invention, (a) is a top view showing a corner foundation, (b) is the same side view, (c) is It is a top view which shows the foundation of an outer peripheral side surface. 本発明の第13の実施の形態に係る既存建物の耐震補強構造を略示的に示すもので、(a)は隅部基礎を示す平面図、(b)は同側面図である。The earthquake-resistant reinforcement structure of the existing building which concerns on the 13th Embodiment of this invention is shown schematically, (a) is a top view which shows a corner | foundation foundation, (b) is the same side view.

本発明を図示の複数の実施の形態に基づいて詳しく説明する。図示していないが、低層または中高層の既存建物は、種々のコンクリート製の既存基礎の上に柱を建てると共に、壁部等を一体的に形成して建物が構築されている。このような建物において、地震による水平力が建物に作用すると、平面(断面)において曲げモーメントが生じ、その曲げモーメントによる引張力(引抜力)は、建物の中央部が小さく外周部が大きくなることは、この種技術分野において周知の事実であり、特に、外周に位置する外柱と隅部に位置する隅柱とに作用する引抜力は、異なるのであり、それらを支持する外周の既存基礎と隅部の既存基礎に作用する引抜力も、当然のこととして異なるのである。   The present invention will be described in detail based on a plurality of illustrated embodiments. Although not shown in the drawings, existing buildings of low-rise or middle-high rise are constructed by building pillars on various existing concrete foundations and integrally forming walls and the like. In such a building, when a horizontal force due to an earthquake acts on the building, a bending moment is generated in the plane (cross section), and the tensile force (withdrawal force) due to the bending moment is such that the central part of the building is small and the outer peripheral part is large. Is a well-known fact in this kind of technical field, and in particular, the pulling force acting on the outer column located on the outer circumference and the corner column located on the corner is different, and the existing foundation on the outer circumference supporting them is different. Naturally, the pulling force acting on the existing foundation at the corner is also different.

そこで、図1−1〜3(a)〜(f)に示した第1の実施の形態において、既存建物1は、例えば、既存基礎2(既存フーチングともいう)は、地盤中に打ち込んで構築された既存杭基礎3の上部に一体的に形成されると共に、地中梁4で隣接同士が連結された状態で形成され、該既存基礎2の上部は平坦で、該平坦の中央部に柱5が建てられて、低層または中高層の建物に構築されている。   Therefore, in the first embodiment shown in FIGS. 1-1 to 3 (a) to (f), the existing building 1 is constructed by, for example, driving the existing foundation 2 (also called existing footing) into the ground. It is formed integrally with the upper part of the existing pile foundation 3 and is formed in a state where the adjacent beams are connected by the underground beam 4. The upper part of the existing foundation 2 is flat, and a column is formed in the flat central part. 5 is built in a low-rise or middle-high building.

このような既存建物1において、まず、図1−1〜2(a)〜(d)に示した隅部の既存基礎2を耐震補強する場合について説明する。隅部の既存基礎2は、上面から見て2つの側面は建物1によって一部しか空いていないが、他の2つの側面は全面的に空いている。そこで、一例として(a)、(b)図に示したように、その全面的に空いている少なくとも1つの側面側に、所要間隔を置いて新設基礎6を設ける。この新設基礎6は、グラウンドレベルGLで覆われる位置、即ち、グラウンドレベGL以下の高さ(大きさ)に形成され、軟弱地盤の下にある支持地盤中に延びて定着させる地盤アンカー7により緊張定着させ、地震などによる引抜力に対抗して新設基礎6を安定化させるものである。   In such an existing building 1, the case where the existing foundation 2 at the corners shown in FIGS. As for the existing foundation 2 in the corner, the two side surfaces are partially vacant by the building 1 as viewed from above, but the other two side surfaces are completely vacant. Therefore, as an example, as shown in FIGS. (A) and (b), a new foundation 6 is provided at a required interval on at least one side surface that is completely open. The new foundation 6 is formed at a position covered with the ground level GL, that is, at a height (size) below the ground level GL, and is tensioned by a ground anchor 7 that extends and settles in a supporting ground under the soft ground. It fixes and stabilizes the new foundation 6 against the pulling force caused by an earthquake or the like.

新設基礎6を設けるのに先だって、既存基礎2の対向する面を目荒しすると共に、複数の後施工アンカー筋8を突出して設け、新設基礎6には、対向する面に複数の接合筋9を突出させて設けておき、新設基礎6を地盤アンカー7で緊張定着させた後に、新設基礎6と既存基礎2との間の所要間隔内において、接合筋9と後施工アンカー筋8とを重ね継手としてつなぎ合わせ、該所要間隔内に後打ちコンクリート10を打設して、新設基礎6と既存基礎2とを一体化するのである。このように一体化しても、新設基礎6は、一体化する前に地盤アンカー7で緊張定着させてあるので、地盤アンカー7による高軸力が既存基礎2に影響を与えないし、アンカー力によって地震などによる引抜力に対抗し、既存基礎の全体耐力を補強したのである。   Prior to providing the new foundation 6, the opposing surface of the existing foundation 2 is roughened, and a plurality of post-construction anchor bars 8 are provided so as to protrude. The new foundation 6 has a plurality of joint bars 9 on the opposing surface. After the new foundation 6 is tensioned and fixed by the ground anchor 7, the joint reinforcement 9 and the post-construction anchor reinforcement 8 are overlapped within the required interval between the new foundation 6 and the existing foundation 2. As a result, the newly-founded foundation 6 and the existing foundation 2 are integrated by placing the post-cast concrete 10 within the required interval. Even if it integrates in this way, since the new foundation 6 is tension-fixed by the ground anchor 7 before being integrated, the high axial force by the ground anchor 7 does not affect the existing foundation 2 and the anchor force causes an earthquake. In contrast, the overall strength of the existing foundation was reinforced against the pulling force.

また、他の例として図1−2(c)、(d)図に示したように、隅部の既存基礎2において、空いている2つの側面側に、それぞれ所要間隔を置いて新設基礎6を設けることができる。この場合の各新設基礎6の構成および構築の仕方については、前記と同様であるので、同一符号を付して詳細については、重複するので省略する。要するに、空いている2個所の側面に新設基礎6を設けることで、二方向からの地震による引抜力に対して補強することができるのである。   As another example, as shown in FIGS. 1-2 (c) and (d), in the existing foundation 2 at the corner, the newly installed foundation 6 is spaced apart from each of two vacant side surfaces by a required interval. Can be provided. Since the configuration and construction method of each new foundation 6 in this case are the same as described above, the same reference numerals are assigned and details are omitted because they are duplicated. In short, by providing the new foundation 6 on two vacant side surfaces, it is possible to reinforce the pulling force caused by the earthquake from two directions.

次に、外柱を支持する外周側面の既存基礎2を耐震補強する場合について説明する。外周側面の既存基礎2は、図1−3の(e)、(f)に示したように、上面から見て全面的に空いている側面は1つしかなく、2つの側面は建物1によって約半分しか空いていないのである。そこで、既存基礎2の少なくとも全面的に空いている側面に、1個の新設基礎6を設けるのである。この場合も、前記実施例と同様に、既存基礎2には後施工アンカー筋8を突出して設け、該既存基礎2から所要間隔を置いて新設基礎6を設け、該新設基礎6に地盤アンカー7で支持地盤に緊張定着させると共に、既存基礎2と対向する面に複数の接合筋9を突出させて設けておき、所要間隔内で接合筋9と後施工アンカー筋8とをつなぎ合わせ、該所要間隔内に後打ちコンクリート10を打設して、新設基礎6と既存基礎2とを一体化するのである。   Next, the case where the existing foundation 2 on the outer peripheral side surface supporting the outer pillar is seismically reinforced will be described. As shown in FIGS. 1-3 (e) and (f), the existing foundation 2 on the outer peripheral side has only one side that is completely open when viewed from the top, and the two sides depend on the building 1. Only about half are free. Therefore, one new foundation 6 is provided at least on the side of the existing foundation 2 that is completely open. Also in this case, as in the above-described embodiment, the post-construction anchor bar 8 protrudes from the existing foundation 2, the new foundation 6 is provided at a predetermined interval from the existing foundation 2, and the ground anchor 7 is provided on the new foundation 6. In addition to fixing the tension on the supporting ground, a plurality of joint bars 9 are provided to protrude on the surface facing the existing foundation 2, and the joint bars 9 and the post-construction anchor bars 8 are connected within a required interval. The post-cast concrete 10 is placed within the interval, and the new foundation 6 and the existing foundation 2 are integrated.

さらに、必要があれば、既存基礎2の約半分が空いている2つの側面に、それぞれ同様の新設基礎6を設けることもできる。これは、建物の中央部から離れた側面に設置された既存基礎2においては、地震による引抜力が強く作用すると認められるので、その中央部から離れた位置に設置された既存基礎2の耐引抜力を補強するために、空いている部分を利用して複数の新設基礎6を設け、既存基礎2の浮き上がりによる建物の転倒防止を行うのである。なお、新設基礎6と地中梁4との間には充填材11が充填される。なお、以降の実施の形態で新設基礎6との説明は、グラウンドレベルGL以下の高さのものである。   Furthermore, if necessary, a similar new foundation 6 can be provided on each of two side surfaces where about half of the existing foundation 2 is vacant. This is because the existing foundation 2 installed on the side away from the central part of the building is considered to have a strong pulling force due to the earthquake, so the existing foundation 2 installed at a position away from the central part is resistant to extraction. In order to reinforce the force, a plurality of new foundations 6 are provided using the vacant portions, and the building is prevented from falling due to the rising of the existing foundation 2. A filler 11 is filled between the new foundation 6 and the underground beam 4. In the following embodiments, the description with the new foundation 6 is a height below the ground level GL.

次に、図2−1〜3(a)〜(f)に示した第2の実施の形態に係る耐震補強について説明する。この実施の形態でも既存建物1およびその他の構成について、前記第1の実施の形態で説明したものと同一である部分は、同一符号を付して詳細な説明は省略する。まず、一例として図2−1(a)〜(b)に示した隅部の既存基礎2を耐震補強する場合は、全面的に空いている少なくとも1つの側面側に、所要間隔を置いて新設基礎16を設ける。この新設基礎16は、既存基礎2よりも高く形成し(既存基礎によっては、グラウンドレベルGLから上部に突出させて形成する場合もある)、軟弱地盤の下にある支持地盤中に延びて定着させる地盤アンカー7により緊張定着させるのである。   Next, the seismic reinforcement according to the second embodiment shown in FIGS. 2-1 to 3 (a) to (f) will be described. Also in this embodiment, with respect to the existing building 1 and other configurations, the same parts as those described in the first embodiment are denoted by the same reference numerals, and detailed description thereof is omitted. First, as an example, when the existing foundation 2 at the corner shown in FIGS. 2-1 (a) to (b) is seismically reinforced, it is newly installed at a required interval on at least one side surface that is completely open. A foundation 16 is provided. The new foundation 16 is formed higher than the existing foundation 2 (some existing foundations may be formed to protrude upward from the ground level GL) and extend into the supporting ground under the soft ground. The tension is fixed by the ground anchor 7.

新設基礎16が設けられる既存基礎2と柱5の対向面を目荒しすると共に、それぞれの面に複数の後施工アンカー筋8を突出して設け、新設基礎16には、対向する面に複数の接合筋9、19を突出させて設けておく。この場合に、上部の接合筋19は、柱5の位置と幅に合わせて、長く且つ幅を狭くして設けてある。そして、新設基礎16を地盤アンカー7で緊張定着させた後に、新設基礎6と既存基礎2および柱5との間の所要間隔内において、接合筋9、19と後施工アンカー筋8とをつなぎ合わせ、該所要間隔内に後打ちコンクリート20を打設することで、後打ちコンクリート20の一部が既存基礎2の上面に被さるコッター20aを形成し、該コッター20aにより、既存基礎2と柱5とを押さえ付ける機能をもって、新設基礎16と既存基礎2および柱5とを一体化するのである。このように一体化しても、新設基礎16は、一体化する前に地盤アンカー7で緊張定着させるので、地盤アンカー7による高軸力が既存基礎2に影響を与えないし、アンカー力によって地震などによる引抜力に対抗し、既存基礎の全体耐力を補強したのである。   The opposing surfaces of the existing foundation 2 and the column 5 on which the new foundation 16 is provided are roughened, and a plurality of post-installed anchor bars 8 are provided to protrude on each surface, and the new foundation 16 has a plurality of joints on the opposing surfaces. The lines 9 and 19 are provided so as to protrude. In this case, the upper joint bar 19 is provided long and narrow in accordance with the position and width of the column 5. Then, after fixing the new foundation 16 with the ground anchor 7, the joining bars 9, 19 and the post-construction anchor bars 8 are joined within the required interval between the new foundation 6, the existing foundation 2 and the column 5. By placing the post-cast concrete 20 within the required interval, a cotter 20a in which a part of the post-cast concrete 20 covers the upper surface of the existing foundation 2 is formed. By the cotter 20a, the existing foundation 2 and the column 5 are The new foundation 16, the existing foundation 2, and the pillar 5 are integrated with the function of pressing down. Even if it integrates in this way, since the new foundation 16 is tension-fixed by the ground anchor 7 before integration, the high axial force by the ground anchor 7 does not affect the existing foundation 2, and the anchor force causes an earthquake or the like. It was against the pulling force and reinforced the overall strength of the existing foundation.

また、他の例として図2−2(c)、(d)に示したように、隅部の既存基礎2において、空いている2つの側面側に、それぞれ所要間隔を置いて新設基礎16を設けることができる。この場合の各新設基礎16の構成および構築の仕方については、前記と同様であるので、同一符号を付して詳細については、重複するので省略する。但し、柱5の幅によって、形成されるコッター20aの幅も多少異なるのである。そして、空いている2個所の側面に新設基礎16を設けることで、二方向からの地震による引抜力に対して強度的に優れた耐震補強になるのである。   As another example, as shown in FIGS. 2-2 (c) and (d), in the existing foundation 2 at the corner, the new foundation 16 is placed on each of two vacant side surfaces with a required interval. Can be provided. Since the configuration and construction method of each new foundation 16 in this case are the same as described above, the same reference numerals are assigned and details are omitted because they are duplicated. However, the width of the cotter 20a to be formed is slightly different depending on the width of the pillar 5. Then, by providing the new foundation 16 on two vacant side surfaces, the seismic reinforcement is excellent in strength against the pulling force due to the earthquake from two directions.

次に、外柱を支持する外周側面の既存基礎2を耐震補強する場合について説明する。外周側面の既存基礎2は、図2−3の(e)、(f)に示したように、上面から見て全面的に空いている側面は1つしかなく、2つの側面は建物1によって約半分しか空いていないのである。そこで、既存基礎2の少なくとも全面的に空いている側面に、1個の新設基礎16を設けるのである。この場合も、前記実施例と同様に、既存基礎2と柱5とに後施工アンカー筋8を突出して設け、該既存基礎2から所要間隔を置いて新設基礎16を設け、該新設基礎16に地盤アンカー7で支持地盤に緊張定着させると共に、既存基礎2と対向する面に複数の接合筋9、19を突出させて設けておき、所要間隔内で接合筋9、19と後施工アンカー筋8とを重ね継手としてつなぎ合わせ、該所要間隔内に後打ちコンクリート20を打設することで、後打ちコンクリート20の一部が既存基礎2の上面に被さるコッター20aを形成し、該コッター20aにより、既存基礎2と柱5とを押さえ付ける機能をもって、新設基礎16と既存基礎2および柱5とを一体化するのである。この耐震補強構造は、既存基礎2が建物1における中間部に位置するものに限るのである。   Next, the case where the existing foundation 2 on the outer peripheral side surface supporting the outer pillar is seismically reinforced will be described. As shown in FIGS. 2-3 (e) and (f), the existing foundation 2 on the outer peripheral side has only one side that is completely open when viewed from the top, and the two sides depend on the building 1. Only about half are free. Therefore, one new foundation 16 is provided on the side surface of the existing foundation 2 that is at least entirely open. Also in this case, as in the above-described embodiment, the post-construction anchor bars 8 are provided so as to protrude from the existing foundation 2 and the column 5, and a new foundation 16 is provided at a necessary interval from the existing foundation 2. The ground anchor 7 fixes the tension to the supporting ground, and a plurality of joint muscles 9 and 19 are provided to protrude on the surface facing the existing foundation 2, and the joint muscles 9 and 19 and the post-construction anchor muscle 8 are within a required interval. Are joined together as a lap joint, and the post-cast concrete 20 is placed within the required interval to form a cotter 20a in which a part of the post-cast concrete 20 covers the upper surface of the existing foundation 2, and the cotter 20a The new foundation 16, the existing foundation 2 and the pillar 5 are integrated with a function of pressing the existing foundation 2 and the pillar 5. This seismic reinforcement structure is limited to the existing foundation 2 positioned in the middle part of the building 1.

さらに、建物1の中央部から遠ざかる既存基礎2においては、前記第1の実施の形態で説明した新設基礎6と新設基礎16と組み合わせて耐震補強構造を形成するのである。即ち、中央部から遠ざかる方向の半分空いている一方の側面に新設基礎6を構築する場合と、隅柱に近い位置の柱を支持する既存基礎2においては、半分空いている両側の側面とに新設基礎6を構築する場合とが考慮されるのであり、このようにすることにより耐震補強の強度が向上するのである。なお、建物1の構造によっては、最初から既存基礎2の全面的に空いている側面にコッター20a付きの新設基礎16を設け、両側の半分空いている側面に、それぞれコッターのない新設基礎6を構築するようにしてもよい。なお、以降の実施の形態で新設基礎16との説明は、グラウンドレベルGLの上部に突出させた高さのものも含む。   Furthermore, in the existing foundation 2 that is far from the center of the building 1, the seismic reinforcement structure is formed by combining the new foundation 6 and the new foundation 16 described in the first embodiment. That is, in the case of constructing the new foundation 6 on one side that is half vacant in the direction away from the center, and in the existing foundation 2 that supports the column located near the corner pillar, The case of constructing the new foundation 6 is considered, and the strength of the seismic reinforcement is improved by doing in this way. Depending on the structure of the building 1, a new foundation 16 with a cotter 20 a is provided on the side of the existing foundation 2 that is completely vacant from the beginning, and a new foundation 6 that has no cotter is provided on each side of the half vacant side. You may make it build. In addition, the description with the newly installed foundation 16 in the following embodiments includes the height projected above the ground level GL.

図3(a)〜(c)に示した第3の実施の形態に係る耐震補強構造について説明する。この実施の形態でも既存建物1およびその他の構成について、前記第1の実施の形態で説明したものと同一である部分は、同一符号を付して詳細な説明は省略する。既存建物1の隅部に位置する既存基礎2の空いている1つの側面、および外周側面の既存基礎2の空いている側面に沿って水平方向に、後述するPC鋼材用の複数の挿通孔12を削孔して予め設け、その挿通孔12が開口する両側面に隣接してそれぞれ新設基礎6を設けると共に、該新設基礎6を構築する際に、前記挿通孔12と連通する位置に、それぞれシース等を配設して挿通孔12aを設ける。   The seismic reinforcement structure according to the third embodiment shown in FIGS. 3 (a) to 3 (c) will be described. Also in this embodiment, with respect to the existing building 1 and other configurations, the same parts as those described in the first embodiment are denoted by the same reference numerals, and detailed description thereof is omitted. A plurality of insertion holes 12 for PC steel, which will be described later, in the horizontal direction along one vacant side surface of the existing foundation 2 located in the corner of the existing building 1 and the vacant side surface of the existing foundation 2 on the outer peripheral side surface. Are provided in advance and adjacent to both side surfaces where the insertion holes 12 are opened, respectively, and the new foundation 6 is provided, and when the new foundation 6 is constructed, An insertion hole 12a is provided by arranging a sheath or the like.

そして、新設基礎6と既存基礎2および地中梁4との間には目地を設けてそれぞれ充填材11を充填させる。新設基礎6を地盤アンカー7で支持地盤に緊張定着させた後に、PC鋼材であるPC鋼棒13を一方の新設基礎6の挿通孔12aから既存基礎2の挿通孔12に挿通し、他方の新設基礎6の挿通孔12aに挿通し、該他方の新設基礎6における端面で、PC鋼棒13の端部を、緊張ジャッキによりナットを締め付けて、既存基礎2と両新設基礎6とを一体的にせん断伝達状態に接合させる。
なお、この場合の新設基礎6は、プレキャストコンクリートとすることが最適であるが、現場打ちコンクリートとしても良い。また、PC鋼材としてPC鋼棒13の代わりにPC鋼線、PC鋼より線としてもよいし、高強度鋼棒としてもよい。さらに、PC鋼棒13と挿通孔12、12aとの隙間にPCグラウトを注入せずにアンポンドPC鋼材を使用してアンポンドとしてもよい。
Then, joints are provided between the new foundation 6, the existing foundation 2, and the underground beam 4 and filled with the filler 11, respectively. After the new foundation 6 is tension-fixed to the supporting ground by the ground anchor 7, the PC steel rod 13 which is a PC steel material is inserted from the insertion hole 12a of one new foundation 6 into the insertion hole 12 of the existing foundation 2, and the other new installation The existing foundation 2 and the two new foundations 6 are integrated with each other by inserting the end of the PC steel bar 13 at the end face of the other new foundation 6 by tightening the nut with a tension jack. Join to shear transfer state.
The new foundation 6 in this case is optimally precast concrete, but may be cast in place. The PC steel material may be a PC steel wire, a PC steel wire instead of the PC steel rod 13, or a high strength steel rod. Furthermore, it is good also as unpound by using unpound PC steel materials, without inject | pouring PC grout into the clearance gap between the PC steel rod 13 and the insertion holes 12 and 12a.

次に、図4(a)〜(c)に示した第4の実施の形態について説明する。この実施の形態に係る耐震補強構造は、前記第1の実施の形態に係る耐震補強構造をそのまま利用して、さらに強度アップを図るものであり、新設基礎6の構造については、同一符号を付してその詳細は省略する。即ち、隅部および側面の既存基礎2に、前記第3の実施の形態と同様に、予め複数の挿通孔12を削孔して設け、新設基礎6を構築する際に、挿通孔12と連通する位置に、それぞれシース等を配設して挿通孔12aを設ける。   Next, a fourth embodiment shown in FIGS. 4A to 4C will be described. The seismic reinforcement structure according to this embodiment uses the seismic reinforcement structure according to the first embodiment as it is to further increase the strength. The structure of the new foundation 6 is assigned the same reference numeral. The details are omitted. That is, when the new foundation 6 is constructed by previously drilling a plurality of insertion holes 12 in the corners and side surfaces of the existing foundation 2 in the same manner as in the third embodiment, the foundations 2 communicate with the insertion holes 12. The insertion hole 12a is provided at the position where the sheath is disposed.

そして、新設基礎6をアンカー7により支持地盤に緊張定着させてから、新設基礎6と既存基礎2との間の所要間隔内において、接合筋9と後施工アンカー筋8とを重ね継手としてつなぎ合わせ、該所要間隔内に後打ちコンクリート10を打設して、新設基礎6と既存基礎2とを一体化し、該後打ちコンクリート10が硬化した後に、PC鋼材であるPC鋼棒13を、各挿通孔12、12aを通して、一方の新設基礎6から既存基礎2を介して他方の新設基礎6まで挿通し、該他方の新設基礎6における端面で、PC鋼棒13の端部を、緊張ジャッキによりナットを締め付けて、既存基礎2と両新設基礎6とを一体的にせん断伝達状態に接合させるのである。   Then, after the new foundation 6 is tensioned and fixed on the supporting ground by the anchor 7, the joining bar 9 and the post-construction anchor bar 8 are joined together as a lap joint within the required interval between the new foundation 6 and the existing foundation 2. Then, the post-cast concrete 10 is placed within the required interval, the new foundation 6 and the existing foundation 2 are integrated, and after the post-cast concrete 10 is hardened, the PC steel bars 13 which are PC steel materials are inserted through the respective inserts. Through the holes 12, 12a, one new foundation 6 is inserted into the other new foundation 6 through the existing foundation 2, and the end of the PC steel rod 13 is tightened with a tension jack at the end face of the other new foundation 6. The existing foundation 2 and both new foundations 6 are integrally joined in a shearing transmission state by tightening.

図5−1〜2(a)〜(e)に示した第5の実施の形態について説明する。この実施例においても前記各実施例と共通する部分には、同一符号を付して詳細は省略する。まず、図5−1(a)、(b)に示した隅部の既存基礎2には、空いている2つの側面に、それぞれ所要(略L字状)の切欠部14を設け、該切欠部14に対面する位置で、既存基礎2に隣接して新設基礎6をそれぞれ設け、これら新設基礎6を構築する際に、前記切欠部14まで延びる複数本の接合筋9を突出させて形成する。そして、新設基礎6を地盤アンカー7で支持地盤に緊張定着させた後に、前記切欠部14内に後打ちコンクリート10を打設して新設基礎6と既存基礎2とを一体化するので、後打ちコンクリート10が、要するに、既存基礎2を押さえるコッター部分となるのでせん断伝達状態で一体化されるのである。なお、新設基礎6と既存基礎2との隙間には充填材11が充填される。   A fifth embodiment shown in FIGS. 5-1 to 2 (a) to (e) will be described. Also in this embodiment, the same reference numerals are given to portions common to the respective embodiments, and the details are omitted. First, the existing base 2 at the corner shown in FIGS. 5-1 (a) and (b) is provided with required (substantially L-shaped) notch portions 14 on two vacant side surfaces, respectively. At the position facing the portion 14, the new foundation 6 is provided adjacent to the existing foundation 2, and when the new foundation 6 is constructed, a plurality of joint bars 9 extending to the notch portion 14 are formed to protrude. . Then, after the new foundation 6 is tension-fixed to the supporting ground by the ground anchor 7, the post-cast concrete 10 is placed in the notch 14 to integrate the new foundation 6 and the existing foundation 2, so that In short, since the concrete 10 becomes a cotter portion for holding the existing foundation 2, the concrete 10 is integrated in a shear transmission state. The gap between the newly established foundation 6 and the existing foundation 2 is filled with the filler 11.

図5−2(c)〜(e)に示した外柱を支える外周側面の既存基礎2においては、一例として(c)に示したように、空いている1つの側面に1つの新設基礎6を設ける場合と、他の例として(d)(e)に示したように、半分空いている両側の側面に新設基礎6を構築する場合とがある。いずれの場合でも、新設基礎6が設けられる側の既存基礎2に、予め所要の切欠部14を設けること、新設基礎6に前記切欠部14まで延びる複数本の接合筋9を突出させて形成すること、さらに、後打ちコンクリート10の打設によって新設基礎6と既存基礎2とを一体化すること、後打ちコンクリート10がコッター部となる点では同じである。なお、1つの新設基礎6を設ける場合は、建物1の中間部に位置する既存基礎2に限られ、両側の側面に新設基礎6を設ける場合は、それ以外の場所の既存基礎2である。   In the existing foundation 2 on the outer peripheral side surface supporting the outer pillar shown in FIGS. 5-2 (c) to (e), as shown in FIG. 5 (c) as an example, one new foundation 6 is provided on one vacant side surface. As another example, as shown in (d) and (e), there are a case where the new foundation 6 is constructed on both side surfaces that are vacant. In any case, a necessary notch portion 14 is provided in advance on the existing foundation 2 on the side where the new foundation 6 is provided, and a plurality of joint bars 9 extending to the notch portion 14 are formed on the new foundation 6 so as to protrude. In addition, it is the same in that the new foundation 6 and the existing foundation 2 are integrated by placing the post-cast concrete 10 and that the post-cast concrete 10 becomes a cotter part. In addition, when providing one new foundation 6, it is limited to the existing foundation 2 located in the intermediate part of the building 1, and when providing the new foundation 6 on the side surface of both sides, it is the existing foundation 2 of the other place.

図6−1〜2(a)〜(e)に示した第6の実施の形態について説明する。この実施例においても前記各実施例と共通する部分には、同一符号を付して詳細は省略する。まず、図6−1(a)、(b)に示した隅部の既存基礎2には、空いている2つの側面に隣接して、既存基礎2よりも高く突出する新設基礎16をそれぞれ設け、これら新設基礎16を構築する際に、既存基礎2の上面で柱5の位置付近まで延びる複数本の接合筋9を突出させて形成する。そして、新設基礎16を地盤アンカー7で支持地盤に緊張定着させた後に、既存基礎2の上面と柱5との空間部分に後打ちコンクリート10を打設して新設基礎16と既存基礎2とを一体化するので、後打ちコンクリート10が既存基礎2を押さえるコッター部分となり、せん断伝達状態で一体化されるのである。なお、新設基礎16と既存基礎2との隙間にはそれぞれ充填材11が充填される。   A sixth embodiment shown in FIGS. 6-1 to 2 (a) to (e) will be described. Also in this embodiment, the same reference numerals are given to portions common to the respective embodiments, and the details are omitted. First, the existing foundation 2 at the corner shown in FIGS. 6-1 (a) and (b) is provided with a new foundation 16 that protrudes higher than the existing foundation 2 adjacent to two vacant side surfaces. When constructing these new foundations 16, a plurality of joint bars 9 extending to the vicinity of the position of the pillar 5 on the upper surface of the existing foundation 2 are formed to project. Then, after the new foundation 16 is tensioned and fixed to the supporting ground by the ground anchor 7, the post-cast concrete 10 is placed in the space between the upper surface of the existing foundation 2 and the pillar 5 to connect the new foundation 16 and the existing foundation 2. Since they are integrated, the post-cast concrete 10 becomes a cotter part that holds the existing foundation 2 and is integrated in a shear transmission state. The gaps between the new foundation 16 and the existing foundation 2 are filled with the filler 11 respectively.

また、図6−2(c)〜(e)に示した外柱を支える外周側面の既存基礎2においては、一例として(c)に示したように、空いている1つの側面に1つの新設基礎16を設ける場合と、他の例として(d)(e)に示したように、半分空いている両側の側面に新設基礎16を構築する場合とがある。いずれの場合でも、既存基礎2よりも高く突出する新設基礎16を設けると共に、新設基礎16に既存基礎2の上面で柱5の位置付近まで延びる複数本の接合筋9を突出させて形成することは同じである。そして、両側の側面に設けた新設基礎16の各接合筋9の間に、付加接合筋9aを介在させ、鉄筋重ね継手により両側の新設基礎16の各接合筋9を連結させる。また、新設基礎16を地盤アンカー7で支持地盤に緊張定着させた後に、既存基礎2の上面と柱5との空間部分、および両側の新設基盤16の間で既存基礎2の上面の空間に後打ちコンクリート10を打設して新設基礎6と既存基礎2とを一体化し、後打ちコンクリート10がコッター部となる点でも同じである。なお、1つの新設基礎16を設ける場合は、建物1の構造にもよるが、建物1の中間部に位置する既存基礎2に限られ、両側の側面に新設基礎16を設ける場合は、それ以外の場所の既存基礎2である。   Moreover, in the existing foundation 2 of the outer peripheral side surface which supports the outer pillar shown to FIGS. 6-2 (c)-(e), as shown in (c) as an example, one new installation is carried out to one side which is vacant. There are a case where the foundation 16 is provided and another example where the new foundation 16 is constructed on both side surfaces which are vacant as shown in (d) and (e). In any case, a new foundation 16 that protrudes higher than the existing foundation 2 is provided, and a plurality of joint bars 9 extending to the vicinity of the position of the pillar 5 on the upper surface of the existing foundation 2 are formed on the new foundation 16. Are the same. Then, an additional joint bar 9a is interposed between the joint bars 9 of the new foundation 16 provided on the side surfaces on both sides, and the joint bars 9 of the new foundation 16 on both sides are connected by reinforcing bar joints. Further, after the new foundation 16 is tensioned and fixed to the supporting ground by the ground anchor 7, the space between the upper surface of the existing foundation 2 and the pillar 5 and the space of the upper surface of the existing foundation 2 between the new foundations 16 on both sides are rearranged. The same is true in that the cast concrete 10 is cast to integrate the new foundation 6 and the existing foundation 2 so that the post-cast concrete 10 becomes a cotter part. In the case where one new foundation 16 is provided, although it depends on the structure of the building 1, it is limited to the existing foundation 2 located in the middle part of the building 1; It is the existing foundation 2 of the place.

図7(a)〜(c)に示した第7の実施の形態について説明する。この実施例においては前記第3の実施の形態と第5の実施の形態の一部とを組み合わせたものであり、これらの実施例と共通する部分には、同一符号を付して詳細は省略する。即ち、既存建物1の隅部に位置する既存基礎2の空いている1つの側面、および外周側面の既存基礎2の空いている側面に沿って水平方向に、PC鋼材であるPC鋼棒13用の複数の挿通孔12を削孔して予め設け、その挿通孔12が開口する両側面に隣接してそれぞれ新設基礎6を設けると共に、該新設基礎6が設けられる側の既存基礎2に、予め所要の切欠部14を設けること、また、新設基礎6を構築する際に、前記切欠部14まで延びる複数本の接合筋9を突出させて形成すると共に、前記挿通孔12と連通する位置に、それぞれシース等を配設して挿通孔12aを設けるのである。   A seventh embodiment shown in FIGS. 7A to 7C will be described. In this example, the third embodiment and a part of the fifth embodiment are combined, and parts common to these examples are denoted by the same reference numerals and details thereof are omitted. To do. That is, for the PC steel rod 13 which is a PC steel material in the horizontal direction along one vacant side surface of the existing foundation 2 located at the corner of the existing building 1 and the vacant side surface of the existing foundation 2 on the outer peripheral side surface. A plurality of insertion holes 12 are preliminarily drilled, and new foundations 6 are provided adjacent to both side surfaces where the insertion holes 12 are opened, and the existing foundation 2 on the side where the new foundation 6 is provided is provided in advance. When providing the required notch part 14 and constructing the new foundation 6, a plurality of joint bars 9 extending to the notch part 14 are formed to protrude, and at a position communicating with the insertion hole 12, The insertion hole 12a is provided by arranging a sheath or the like.

そして、新設基礎6を地盤アンカー7で支持地盤に緊張定着させた後に、コッター部となる後打ちコンクリート10を打設して新設基礎6と既存基礎2とを一体化し、該後打ちコンクリート10が硬化した後に、PC鋼材であるPC鋼棒13を一方の新設基礎6の挿通孔12aから既存基礎2の挿通孔12に挿通し、他方の新設基礎6の挿通孔12aに挿通し、該他方の新設基礎6における端面で、PC鋼棒13の端部を、緊張ジャッキによりナットを締め付けて、既存基礎2と両新設基礎6とを一体的に接合させ、後打ちコンクリート10のコッター部とPC鋼材とでせん断伝達状態になる。また、新設基礎6と既存基礎2および地中梁4との間にはそれぞれ充填材11を充填させる。   Then, after the new foundation 6 is tensioned and fixed on the supporting ground by the ground anchor 7, the post-cast concrete 10 serving as a cotter part is cast to integrate the new foundation 6 and the existing foundation 2, and the post-cast concrete 10 is After hardening, the PC steel rod 13 which is a PC steel material is inserted from the insertion hole 12a of one new foundation 6 into the insertion hole 12 of the existing foundation 2, and is inserted into the insertion hole 12a of the other new foundation 6, and the other At the end face of the new foundation 6, the nut of the end of the PC steel bar 13 is tightened with a tension jack so that the existing foundation 2 and the two new foundations 6 are joined together, and the cotter part of the post-cast concrete 10 and the PC steel material And a shear transmission state. Further, a filler 11 is filled between the new foundation 6 and the existing foundation 2 and the underground beam 4.

図8(a)〜(c)に示した第8の実施の形態について説明する。この実施例においては前記第3の実施の形態と第6の実施の形態の一部とを組み合わせたものであり、これらの実施例と共通する部分には、同一符号を付して詳細は省略する。即ち、既存建物1の隅部に位置する既存基礎2の空いている1つの側面、および外周側面の既存基礎2の空いている側面に沿って水平方向に、PC鋼材であるPC鋼棒13用の複数の挿通孔12を削孔して予め設け、その挿通孔12が開口する両側面に隣接してそれぞれ新設基礎16を設け、これら新設基礎16を構築する際に、既存基礎2の上面で柱5の位置付近まで延びる複数本の接合筋9を突出させて形成すると共に、前記挿通孔12と連通する位置に、それぞれシース等を配設して挿通孔12aを設けるのである。   The eighth embodiment shown in FIGS. 8A to 8C will be described. In this example, the third embodiment and a part of the sixth embodiment are combined, and parts common to these examples are denoted by the same reference numerals, and details thereof are omitted. To do. That is, for the PC steel rod 13 which is a PC steel material in the horizontal direction along one vacant side surface of the existing foundation 2 located at the corner of the existing building 1 and the vacant side surface of the existing foundation 2 on the outer peripheral side surface. The plurality of insertion holes 12 are preliminarily drilled, and new foundations 16 are provided adjacent to both side surfaces where the insertion holes 12 are opened. When these new foundations 16 are constructed, A plurality of joining bars 9 extending to the vicinity of the position of the column 5 are formed so as to protrude, and a sheath or the like is provided at a position communicating with the insertion hole 12 to provide an insertion hole 12a.

また、両側の側面に設けた新設基礎16の各接合筋9の間に、付加接合筋9aを介在させ、鉄筋重ね継手により両側の新設基礎16の各接合筋9を連結させる。そして、新設基礎16を地盤アンカー7で支持地盤に緊張定着させた後に、既存基礎2の上面と柱5との空間部分、および両側の新設基盤16の間で既存基礎2の上面の空間に後打ちコンクリート10を打設して新設基礎16と既存基礎2とを一体化し、後打ちコンクリート10がコッター部となるのである。   Further, an additional joint bar 9a is interposed between the joint bars 9 of the new foundation 16 provided on the side surfaces on both sides, and the joint bars 9 of the new foundation 16 on both sides are connected by reinforcing bar joints. Then, after the new foundation 16 is tensioned and fixed on the supporting ground by the ground anchor 7, the space between the upper surface of the existing foundation 2 and the pillar 5 and the space on the upper surface of the existing foundation 2 between the new foundations 16 on both sides are rearranged. The cast-in concrete 10 is cast and the new foundation 16 and the existing foundation 2 are integrated, and the post-cast concrete 10 becomes a cotter part.

コッター部となる後打ちコンクリート10が硬化した後に、PC鋼材であるPC鋼棒13を一方の新設基礎16の挿通孔12aから既存基礎2の挿通孔12に挿通し、他方の新設基礎16の挿通孔12aに挿通し、該他方の新設基礎16における端面で、PC鋼棒13の端部を、緊張ジャッキによりナットを締め付けて、既存基礎2と両新設基礎16とを一体的に接合させ、後打ちコンクリート10のコッター部とPC鋼材とでせん断伝達状態になる。また、新設基礎16と既存基礎2および地中梁4との間にはそれぞれ充填材11を充填させる。   After the post-cast concrete 10 serving as the cotter portion is hardened, a PC steel rod 13 which is a PC steel material is inserted from the insertion hole 12a of one new foundation 16 into the insertion hole 12 of the existing foundation 2, and the other new foundation 16 is inserted. The end of the PC steel rod 13 is inserted into the hole 12a and the end of the other new foundation 16 is tightened with a nut with a tension jack to integrally join the existing foundation 2 and the two new foundations 16 A shear transmission state is established between the cotter portion of the cast concrete 10 and the PC steel material. Further, the filler 11 is filled between the new foundation 16 and the existing foundation 2 and the underground beam 4.

図9−1〜2(a)〜(d)に示した第9の実施の形態について説明する。この実施例においては前記第1の実施の形態と第5の実施の形態とを組み合わせたものであり、これらの実施例と共通する部分には、同一符号を付して詳細は省略する。即ち、図9−1(a)、(b)に示した隅部の既存基礎2には、空いている2つの側面に、それぞれ所要(略L字状)の切欠部14を設けると共に、該切欠部14と側面とにそれぞれ複数本の後施工アンカー筋8を設け、該側面と対面する位置で、既存基礎2と所要間隔を置いて新設基礎6をそれぞれ設け、これら新設基礎6には、所要間隔内および前記切欠部14まで延びる複数本の接合筋9を突出させて形成する。   The ninth embodiment shown in FIGS. 9-1 and 2 (a) to (d) will be described. In this example, the first embodiment and the fifth embodiment are combined, and the same reference numerals are given to the parts common to these examples, and the details are omitted. That is, the existing foundation 2 at the corner shown in FIGS. 9-1 (a) and (b) is provided with required (substantially L-shaped) notch portions 14 on two vacant side surfaces, respectively, A plurality of post-installed anchor bars 8 are provided on each of the notch portion 14 and the side surface, and a new foundation 6 is provided at a position facing the side surface with a predetermined interval from the existing foundation 2. A plurality of joint bars 9 extending within a required interval and up to the notch portion 14 are formed to protrude.

そして、新設基礎6を地盤アンカー7で支持地盤に緊張定着させた後に、各後施工アンカー筋8と接合筋9とを鉄筋重ね継手としてつなぎ合わせ、前記所要間隔内および切欠部14内に後打ちコンクリート10を打設して新設基礎6と既存基礎2とを一体化するので、前記切欠部14内に打設した後打ちコンクリート10が、要するに、既存基礎2を押さえるコッター10aとなるのでせん断伝達状態で一体化されるのである。   Then, after the new foundation 6 is tension-fixed to the supporting ground with the ground anchor 7, each post-construction anchor bar 8 and the joint bar 9 are joined together as a steel lap joint, and are placed in the required interval and in the notch 14. Since the new foundation 6 and the existing foundation 2 are integrated by placing the concrete 10, the post-cast concrete 10 placed in the notch 14 becomes a cotter 10 a that holds the existing foundation 2, so that shear transmission is performed. It is integrated in a state.

図9−2(c)、(d)に示した外柱を支える外周側面の既存基礎2においては、半分空いている両側の側面に、所要間隔を置いて新設基礎6を構築する例を示したものである。新設基礎6が設けられる側の既存基礎2に、予め所要の切欠部14を設けると共に、該切欠部14と側面とにそれぞれ複数本の後施工アンカー筋8を設け、新設基礎6には、所要間隔内と前記切欠部14まで延びる複数本の接合筋9を突出させて形成し、さらに、新設基礎6を地盤アンカー7で支持地盤に緊張定着させた後に、各後施工アンカー筋8と接合筋9とを鉄筋重ね継手としてつなぎ合わせ、前記所要間隔内および切欠部14内に後打ちコンクリート10を打設して新設基礎6と既存基礎2とを一体化すること、後打ちコンクリート10がコッター部となる点では同じである。なお、空いている1つの側面に1つの新設基礎を設ける場合もあり得る。   In the existing foundation 2 on the outer peripheral side surface that supports the outer pillar shown in FIGS. 9-2 (c) and (d), an example is shown in which a new foundation 6 is constructed with a required interval on both side surfaces that are vacant. It is a thing. The existing foundation 2 on the side where the new foundation 6 is provided is provided with the required notches 14 in advance, and a plurality of post-installed anchor bars 8 are provided on each of the notches 14 and the side surfaces. A plurality of joint bars 9 extending into the interval and extending to the notch portion 14 are formed to protrude, and after the new foundation 6 is tensioned and fixed to the support ground by the ground anchor 7, each post-construction anchor bar 8 and the joint bar 9 are joined together as a reinforced lap joint, and post-cast concrete 10 is cast in the required interval and notch 14 to integrate the new foundation 6 and the existing foundation 2, and the post-cast concrete 10 is a cotter part. It is the same in that. In addition, one new foundation may be provided on one vacant side surface.

図10−1〜2(a)〜(d)に示した第10の実施の形態について説明する。この実施例においては前記第2の実施の形態の一部を利用したものであり、同実施例と共通する部分には、同一符号を付して詳細は省略する。即ち、図10−1(a)、(b)に示した隅部の既存基礎2において、空いている2つの側面に、それぞれ所要間隔をおいて新設基礎16を設け、該新設基礎16を地盤アンカー7で支持地盤に緊張定着させた後に、後施工アンカー筋8と接合筋9とをつなぎ合わせ、前記所要間隔内と既存基礎2の上面とに後打ちコンクリート20を打設し、新設基礎16と既存基礎2および柱5とを一体化させ、既存基礎2の上部にコッター20aが形成される。   A tenth embodiment shown in FIGS. 10-1 to 2 (a) to (d) will be described. In this example, a part of the second embodiment is used, and parts common to the example are given the same reference numerals and their details are omitted. That is, in the existing foundation 2 in the corner shown in FIGS. 10-1 (a) and (b), a new foundation 16 is provided on each of two vacant side surfaces with a required interval, and the new foundation 16 is grounded. After fixing the tension to the supporting ground with the anchor 7, the post-construction anchor bar 8 and the joint bar 9 are joined together, and the post-cast concrete 20 is placed within the required interval and the upper surface of the existing foundation 2. And the existing foundation 2 and the pillar 5 are integrated, and the cotter 20a is formed on the upper part of the existing foundation 2.

図10−2(c)、(d)に示した外柱を支える外周側面の既存基礎2においては、半分空いている両側の側面に、所要間隔を置いて新設基礎16を構築する例を示したものである。この場合に、既存基礎2に後施工アンカー筋8を設けると共に、柱5の下端部寄りには複数の後施工アンカー筋8を所要長さ突出させて設け、両側の新設基礎16をそれぞれ地盤アンカー7で支持地盤に緊張定着させた後に、新設基礎16の接合筋9と既存基礎の後施工アンカー8とをつなぎ合わせると共に、既存基礎2の上部において両新設基礎16の接合筋9の間に付加接合筋9aを配設してつなぎ合わせ、前記所要間隔内と既存基礎2との上面に後打ちコンクリート20を打設して、新設基礎16と既存基礎2および柱5とを一体化させるのである。そして、既存基礎2の上面に後打ちしたコンクリートがコッター20aとなるのである。   In the existing foundation 2 on the outer peripheral side surface supporting the outer pillar shown in FIGS. 10-2 (c) and (d), an example is shown in which a new foundation 16 is constructed with a required interval on both side surfaces that are vacant. It is a thing. In this case, the post-construction anchor bars 8 are provided on the existing foundation 2, and a plurality of post-construction anchor bars 8 are provided so as to protrude the required length near the lower end of the column 5. 7, after fixing the tension to the supporting ground, the joining bar 9 of the new foundation 16 and the post-construction anchor 8 of the existing foundation are joined together and added between the joining bars 9 of the two new foundations 16 above the existing foundation 2. The joint reinforcement 9a is arranged and joined together, and the post-cast concrete 20 is placed within the required interval and the upper surface of the existing foundation 2 so that the new foundation 16, the existing foundation 2 and the column 5 are integrated. . And the concrete laid after on the upper surface of the existing foundation 2 becomes the cotter 20a.

図11(a)〜(c)に示した第11の実施の形態について説明する。この実施例においては前記第7の実施の形態の一部と第9の実施の形態とを組み合わせたものであり、これら実施例と共通する部分には、同一符号を付して詳細は省略する。即ち、(a)、(b)に示した隅部の既存基礎2において、空いている2つの側面に、予め所要の切欠部14を設けると共に、該切欠部14と側面とにそれぞれ複数本の後施工アンカー筋8を設け、さらに、既存基礎2の内部を貫通する複数の挿通孔12を設けて置く。該既存基礎2と、所要間隔をおいて且つ前記挿通孔12と連通する挿通孔12aを有する新設基礎6を設け、該新設基礎6を地盤アンカー7で支持地盤に緊張定着させた後に、後施工アンカー筋8と接合筋9とをつなぎ合わせ、前記所要間隔内と前記切欠部14とに後打ちコンクリート10を打設し、該後打ちコンクリート10が硬化した後に、PC鋼材であるPC鋼棒13を一方の新設基礎6の挿通孔12aから既存基礎2の挿通孔12に挿通し、他方の新設基礎6の挿通孔12aに挿通し、該他方の新設基礎6における端面で、PC鋼棒13の端部を、緊張ジャッキによりナットを締め付けて、既存基礎2と両新設基礎6とを一体化させるのである。   The eleventh embodiment shown in FIGS. 11A to 11C will be described. In this example, a part of the seventh embodiment and the ninth embodiment are combined, and parts common to these examples are denoted by the same reference numerals, and details thereof are omitted. . That is, in the existing foundation 2 at the corner shown in (a) and (b), a required notch portion 14 is provided in advance on two vacant side surfaces, and a plurality of notches 14 and side surfaces are provided. Post-installed anchor bars 8 are provided, and a plurality of insertion holes 12 penetrating the inside of the existing foundation 2 are further provided. After the existing foundation 2 and a new foundation 6 having an insertion hole 12a communicating with the insertion hole 12 at a required interval are provided, and the new foundation 6 is tension-fixed to the supporting ground by the ground anchor 7, the post-construction is performed. The anchor bars 8 and the joint bars 9 are joined together, and a post-cast concrete 10 is placed in the required interval and in the notch 14, and after the post-cast concrete 10 is hardened, a PC steel rod 13 which is a PC steel material. Is inserted from the insertion hole 12a of one new foundation 6 into the insertion hole 12 of the existing foundation 2, and is inserted into the insertion hole 12a of the other new foundation 6, and at the end face of the other new foundation 6, the PC steel bar 13 The nut is tightened at the end with a tension jack, and the existing foundation 2 and the two newly installed foundations 6 are integrated.

図11(c)に示した外柱を支える外周側面の既存基礎2においては、前記隅部の既存基礎2と同様に、半分空いている両側の側面に、所要間隔を置いて新設基礎6を構築する例を示したものであり、実質的に前記隅部の既存基礎2を耐震補強する構成と略同じである。そして、切欠部14に打設した後打ちコンクリートがコッター10aとなる。   In the existing foundation 2 on the outer peripheral side surface supporting the outer pillar shown in FIG. 11 (c), the new foundation 6 is provided with a required interval on the side surfaces on both sides that are vacant, like the existing foundation 2 at the corner. An example of the construction is shown, which is substantially the same as the structure for the seismic reinforcement of the existing foundation 2 at the corner. The post-cast concrete placed in the notch 14 becomes the cotter 10a.

図12(a)〜(c)に示した第12の実施の形態について説明する。この実施例においては前記第4の実施の形態の一部と第10の実施の形態の一部とを組み合わせたものであり、これら実施例と共通する部分には、同一符号を付して詳細は省略する。即ち、(a)、(b)に示した隅部の既存基礎2において、空いている2つの側面にそれぞれ複数本の後施工アンカー筋8を設けると共に、柱5の下端部寄りには複数の後施工アンカー筋8を所要長さ突出させて設け、さらに、既存基礎2の内部を貫通する複数の挿通孔12を設けて置く。そして、既存基礎2と、所要間隔をおいて且つ前記挿通孔12と連通する挿通孔12aを有する新設基礎16を設け、該新設基礎16をそれぞれ地盤アンカー7で支持地盤に緊張定着させた後に、後施工アンカー筋8と接合筋9とをつなぎ合わせると共に、既存基礎2の上面において両新設基礎16の接合筋9の間に付加接合筋9aを配設してつなぎ合わせ、前記所要間隔内と既存基礎2との上面に後打ちコンクリート20を打設して、新設基礎16と既存基礎2および柱5とを一体化させるのである。そして、既存基礎2の上面に後打ちしたコンクリートがコッター20aとなるのである。   A twelfth embodiment shown in FIGS. 12A to 12C will be described. In this example, a part of the fourth embodiment and a part of the tenth embodiment are combined, and parts common to these examples are denoted by the same reference numerals and detailed. Is omitted. That is, in the existing foundation 2 at the corner shown in (a) and (b), a plurality of post-installed anchor bars 8 are provided on each of two vacant side surfaces, and a plurality of Post-installed anchor bars 8 are provided so as to protrude to a required length, and a plurality of insertion holes 12 penetrating the inside of the existing foundation 2 are provided. And after providing the new foundation 16 which has the insertion hole 12a which communicates with the existing foundation 2 and the said insertion hole 12 with a required space | interval, after fixing this new foundation 16 to the support ground with the ground anchor 7, respectively, The post-construction anchor bar 8 and the joint bar 9 are joined together, and an additional joint bar 9a is arranged between the joint bars 9 of the two newly installed foundations 16 on the upper surface of the existing foundation 2 and joined together. The post-cast concrete 20 is placed on the upper surface of the foundation 2 to integrate the new foundation 16 with the existing foundation 2 and the pillar 5. And the concrete laid after on the upper surface of the existing foundation 2 becomes the cotter 20a.

図12(c)に示した外柱を支える外周側面の既存基礎2においては、前記隅部の既存基礎2と同様に、半分空いている両側の側面に、所要間隔を置いて新設基礎16を構築する例を示したものであり、実質的に前記隅部の既存基礎2を耐震補強する構成と略同じであり、説明が重複するので、同一符号を付して詳細は省略する。   In the existing foundation 2 on the outer peripheral side surface supporting the outer column shown in FIG. 12C, the new foundation 16 is provided with a required interval on both side surfaces that are vacant, like the existing foundation 2 at the corner. An example of the construction is shown, which is substantially the same as the structure for seismic reinforcement of the existing foundation 2 at the corner, and since the description is duplicated, the same reference numerals are given and the details are omitted.

図13(a)、(b)に示した第13の実施の形態について説明する。この実施例においては前記第2の実施の形態の一部を利用したものであり、同実施の形態と共通する部分には、同一符号を付して詳細は省略する。即ち、隅柱5を支える隅部の既存基礎2において、空いている2つの側面に臨む柱5の下端部寄りに、複数の後施工アンカー筋8それぞれ設け、既存基礎2に隣接して新設基礎16を設け、該新設基礎16をそれぞれ地盤アンカー7で支持地盤に緊張定着させた後に、後施工アンカー筋8と接合筋9とをつなぎ合わせると共に、既存基礎2の上面に後打ちコンクリート20を打設して、新設基礎16と柱5とを一体化させ、柱5を介して新設基礎16と既存基礎2とが一体化されるのである。そして、既存基礎2の上面に後打ちしたコンクリート20がコッター部となるのである。   A thirteenth embodiment shown in FIGS. 13A and 13B will be described. In this example, a part of the second embodiment is used, and parts common to the second embodiment are denoted by the same reference numerals, and details thereof are omitted. That is, in the existing foundation 2 at the corner that supports the corner pillar 5, a plurality of post-installed anchor bars 8 are provided near the lower end of the pillar 5 facing two vacant side surfaces, respectively, and the newly installed foundation is adjacent to the existing foundation 2. 16, the new foundation 16 is tensioned and fixed on the supporting ground by the ground anchor 7, the post-construction anchor bar 8 and the joint bar 9 are joined together, and the post-cast concrete 20 is cast on the upper surface of the existing foundation 2. The new foundation 16 and the pillar 5 are integrated, and the new foundation 16 and the existing foundation 2 are integrated through the pillar 5. And the concrete 20 post-placed on the upper surface of the existing foundation 2 becomes a cotter part.

本発明に係る耐震補強構造は、既存基礎2の構造について、杭基礎3の上部に形成されたフーチングを対象として実施例を説明したが、これに限らず、例えば、勾配付きやベタ基礎、布基礎等の既存基礎であっても適用できることはいうまでもないのであり、要するに、補強しようとする既存基礎2と間に所要間隔または目地(隙間)を設けて新設基礎6、16を構築するかまたは既存基礎の両側に新設基礎を設け、該新設基礎を支持地盤中に延びた地盤アンカーで緊張定着させた後に、所要間隔をもって形成した場合には、その所要間隔内で既存基礎に設けた後施工アンカーと新設基礎に設けた接合筋とを鉄筋重ね継手としてつなぎ合わせて後打ちコンクリートを打設して一体化すること、および、目地を設けて両サイドに新設基礎を構築した場合には,目地充填材が硬化した後に、既存基礎と新設基礎とに設けた貫通孔にPC鋼材であるPC鋼棒を挿通させ両サイドの新設基礎に緊張定着して一体化するものであり、その新設基礎6,16を地盤アンカー7により支持地盤に緊張定着させてから、後打ちコンクリートまたはPC鋼棒により一体化するので、地盤アンカーによる高軸力が既存基礎に影響を与えないようにしたものであり、それによって既存基礎の地震時の引抜耐力を補強して、建物の転倒を防止するので、あらゆる既設建物の既存基礎に対して広く利用することができる。   The seismic reinforcement structure according to the present invention has been described with respect to the structure of the existing foundation 2 for the footing formed on the top of the pile foundation 3, but is not limited thereto. Needless to say, it can be applied even to existing foundations such as foundations. In short, is it necessary to construct the new foundations 6 and 16 by providing a necessary interval or joint (gap) between the existing foundation 2 to be reinforced? Or, if a new foundation is provided on both sides of the existing foundation, and the new foundation is tensioned and fixed with a ground anchor that extends into the supporting ground, then it is formed at the required interval, it must be installed on the existing foundation within that required interval. The construction anchors and the joint bars provided on the new foundation are joined together as a reinforced lap joint, and the post-cast concrete is cast and integrated, and a new foundation is constructed on both sides with joints. In this case, after the joint filler has hardened, the PC steel rod, which is a PC steel material, is inserted into the through holes provided in the existing foundation and the new foundation, and the tension is fixed and integrated with the new foundation on both sides. Yes, since the new foundations 6 and 16 are tensioned and fixed on the supporting ground by the ground anchor 7 and then integrated by post-cast concrete or PC steel rod, the high axial force by the ground anchor does not affect the existing foundation Since it is intended to reinforce the pullout strength of existing foundations during an earthquake and prevent the buildings from falling over, it can be widely used for existing foundations of all existing buildings.

1 既存建物
2 既存基礎
3 既存基礎杭
4 地中梁
5 柱
6、16 新設基礎
7 地盤アンカー
8 後施工アンカー筋
9、19 接合筋
9a 付加接合筋
10、20 後打ちコンクリート
10a、20a コッター
11 目地(充填材)
12、12a 挿通孔
13 PC鋼棒(PC鋼材)
14 切欠部
DESCRIPTION OF SYMBOLS 1 Existing building 2 Existing foundation 3 Existing foundation pile 4 Underground beam 5 Column 6, 16 New foundation 7 Ground anchor 8 Post-construction anchor reinforcement 9, 19 Joint reinforcement 9a Additional joint reinforcement 10, 20 Post-cast concrete 10a, 20a Cotter 11 Joint (Filler)
12, 12a Insertion hole 13 PC steel bar (PC steel)
14 Notch

Claims (9)

既存建物における既存基礎の少なくとも一側面に所要間隔を置いて新設基礎を設け、
該新設基礎には既存基礎と対面する側に予め接合筋を突出させて設けておくと共に、支持地盤中に延びて定着させる地盤アンカーを設け、
該地盤アンカーを緊張定着した後に、前記所要間隔内で前記既存基礎及び/又は柱に設けた後施工アンカー筋と前記新設基礎の接合筋とをつなぎ合わせ、
前記所要間隔内及び/又は既存基礎の上部にコンクリートを打設して前記新設基礎と既存基礎及び/又は柱とを一体化すること
を特徴とする既存建物の耐震補強方法。
Establish a new foundation at a required interval on at least one side of the existing foundation in the existing building,
The new foundation is provided with a joint anchor protruding in advance on the side facing the existing foundation, and a ground anchor that extends into the support ground and is fixed,
After fixing the ground anchor in tension, the post-construction anchor bar provided on the existing foundation and / or the pillar within the required interval is joined to the joint bar of the new foundation,
A method for seismic reinforcement of an existing building, wherein concrete is placed within the required interval and / or above the existing foundation to integrate the new foundation and the existing foundation and / or the pillar.
既存建物における既存基礎の両サイドに目地部を設けて新設基礎を設け、
該新設基礎に支持地盤中に延びて定着させる地盤アンカーを設け、
該地盤アンカーを緊張定着した後に、前記目地部に充填材を充填して硬化した後に、
予め既存基礎に設けてある貫通孔と新設基礎に設けた貫通孔とにPC鋼材を挿通し両サイドの新設基礎に緊張定着して新設基礎と既存基礎とを一体化すること
を特徴とする既存建物の耐震補強方法。
Establish new foundations with joints on both sides of the existing foundation in the existing building,
Provide a ground anchor that extends into the support ground and fixes to the newly established foundation,
After tension fixing the ground anchor, after filling the joint portion with a filler and curing,
An existing foundation characterized in that PC steel is inserted into the through hole provided in the existing foundation in advance and the through hole provided in the new foundation, and the new foundation and the existing foundation are integrated by fixing the tension to the new foundation on both sides. Seismic reinforcement method for buildings.
既存建物における既存基礎の両サイドに所要間隔を設けて新設基礎を設け、
該新設基礎には既存基礎と対面する側に予め接合筋を突出させて設けておくと共に、支持地盤中に延びて定着させる地盤アンカーを設け、
該地盤アンカーを緊張定着した後に、前記所要間隔内で前記既存基礎に設けた後施工アンカー筋と前記新設基礎の接合筋とをつなぎ合わせてコンクリートを打設し、
予め既存基礎に設けてある貫通孔と新設基礎に設けた貫通孔とにPC鋼材を挿通し両サイドの新設基礎に緊張定着して新設基礎と既存基礎とを一体化すること
を特徴とする既存建物の耐震補強方法。
Establish a new foundation with required intervals on both sides of the existing foundation in the existing building,
The new foundation is provided with a joint anchor protruding in advance on the side facing the existing foundation, and a ground anchor that extends into the support ground and is fixed,
After fixing the ground anchor in tension, the post-construction anchor bar provided on the existing foundation within the required interval is connected to the joint bar of the new foundation to place concrete,
An existing foundation characterized in that PC steel is inserted into the through hole provided in the existing foundation in advance and the through hole provided in the new foundation, and the new foundation and the existing foundation are integrated by fixing the tension to the new foundation on both sides. Seismic reinforcement method for buildings.
既存建物における既存基礎の少なくとも一側面の上部に切欠部を形成すると共に、目地部を設けて新設基礎を設け、
該新設基礎に支持地盤中に延びて定着させる地盤アンカーを設けると共に、前記切欠部に突出する接合筋を設けておき、
該地盤アンカーを緊張定着した後に、前記目地部に充填材を充填すると共に前記切欠部にコンクリートを打設してコッターを形成して新設基礎と既存基礎とを一体化する及び/又は予め既存基礎に設けてある貫通孔と新設基礎に設けた貫通孔とにPC鋼材を挿通し両サイドの新設基礎に緊張定着して新設基礎と既存基礎とを一体化すること
を特徴とする既存建物の耐震補強方法。
In addition to forming a notch in the upper part of at least one side of the existing foundation in the existing building, a joint foundation is provided to provide a new foundation.
In addition to providing a ground anchor that extends into the support ground and fixes to the new foundation, a joint bar that protrudes into the notch is provided,
After fixing the ground anchor in tension, the joint portion is filled with a filler and concrete is placed in the notch to form a cotter to integrate the new foundation and the existing foundation and / or the existing foundation in advance. Seismic resistance of an existing building, which is made by inserting PC steel into the through-hole provided in the building and the through-hole provided in the new foundation and fixing the tension to the new foundation on both sides to integrate the new foundation with the existing foundation. Reinforcement method.
既存建物における既存基礎の少なくとも一側面に目地部を設けて新設基礎を設け、
該新設基礎には既存基礎の上部に突出させて予め接合筋を設けておくと共に、支持地盤中に延びて定着させる地盤アンカーを設け、
該地盤アンカーを緊張定着した後に、前記目地部に充填材を充填して硬化した後に、
両サイドに新設基礎を設けた場合は両サイドの接合筋の間に付加接合筋を配置して接合筋とをつなぎ合わせ、既存基礎の上部にコンクリートを打設してコッターを一体的に形成すること
を特徴とする既存建物の耐震補強方法。
Establish a new foundation with joints on at least one side of the existing foundation in the existing building,
The newly established foundation is provided with a ground anchor that protrudes from the upper part of the existing foundation in advance and has a ground anchor that extends into the supporting ground and is fixed,
After tension fixing the ground anchor, after filling the joint portion with a filler and curing,
When a new foundation is installed on both sides, an additional joint bar is placed between the joint bars on both sides to connect the joint bars, and concrete is placed on top of the existing foundation to form the cotter integrally. A seismic reinforcement method for existing buildings.
既存建物における既存基礎の二側面の上部に切欠部を形成すると共に、所要間隔を設けて新設基礎を設け、
該新設基礎には既存基礎と対面する側にと切欠部に対応する側とに予め接合筋を突出させて設けておくと共に、支持地盤中に延びて定着させる地盤アンカーを設け、
該地盤アンカーを緊張定着した後に、前記所要間隔内で前記既存基礎と切欠部とに設けた後施工アンカー筋と前記新設基礎の接合筋とをつなぎ合わせてコンクリートを打設して一体化する及び/又は予め既存基礎に設けてある貫通孔と新設基礎に設けた貫通孔とにPC鋼材を挿通し両サイドの新設基礎に緊張定着して新設基礎と既存基礎とを一体化すること
を特徴とする既存建物の耐震補強方法。
In addition to forming notches at the top of the two sides of the existing foundation in the existing building, providing a new foundation with the required spacing,
The newly established foundation is provided with a ground anchor that protrudes in advance on the side facing the existing foundation and on the side corresponding to the notch, and is provided with a ground anchor that extends into the supporting ground and is fixed.
After fixing the ground anchor in tension, the post-construction anchor bar provided on the existing foundation and the notch portion within the required interval is joined to the joint bar of the new foundation and the concrete is cast and integrated. It is characterized in that PC steel is inserted into the through hole provided in the existing foundation in advance and the through hole provided in the new foundation, and the new foundation is integrated with the existing foundation by fixing the tension on the new foundation on both sides. Seismic reinforcement method for existing buildings.
既存建物における既存基礎の二側面に所要間隔を置いて新設基礎を設け、
該新設基礎には既存基礎と柱とに対面する側に予め接合筋を突出させて設けておくと共に、支持地盤中に延びて定着させる地盤アンカーを設け、
該地盤アンカーを緊張定着した後に、前記所要間隔内で前記既存基礎と柱とに設けた後施工アンカー筋と前記新設基礎の接合筋とをつなぎ合わせ、及び/又は両サイドに新設基礎を設けた場合は両サイドの接合筋の間に付加接合筋を配置して接合筋とをつなぎ合わせ、既存基礎の上部にコンクリートを打設してコッターを一体的に形成すること
を特徴とする既存建物の耐震補強方法。
Establishing new foundations at required intervals on two sides of existing foundations in existing buildings,
The new foundation is provided with a joint anchor protruding in advance on the side facing the existing foundation and the column, and a ground anchor that extends into the support ground and is fixed,
After fixing the ground anchor in tension, the post-construction anchor bar provided on the existing foundation and the column within the required interval was joined to the joint bar of the new foundation, and / or a new foundation was provided on both sides. In the case of an existing building, an additional joint is placed between the joints on both sides, joined to the joint, and concrete is placed on top of the existing foundation to form a cotter integrally. Seismic reinforcement method.
既存建物における既存基礎の少なくとも一側面に目地部を設けて新設基礎を設け、
該新設基礎には既存基礎の上部に突出させて予め接合筋を設けておくと共に、支持地盤中に延びて定着させる地盤アンカーを設け、
該地盤アンカーを緊張定着した後に、前記目地部に充填材を充填して硬化した後に、
柱に設けた後施工アンカー筋と前記新設基礎の接合筋とをつなぎ合わせ、
前記既存基礎の上部にコンクリートを打設してコッターを一体的に形成すること
を特徴とする既存建物の耐震補強方法。
Establish a new foundation with joints on at least one side of the existing foundation in the existing building,
The newly established foundation is provided with a ground anchor that protrudes from the upper part of the existing foundation in advance and has a ground anchor that extends into the supporting ground and is fixed,
After tension fixing the ground anchor, after filling the joint portion with a filler and curing,
After joining the post-construction anchor bar provided on the pillar and the joint bar of the new foundation,
A method for seismic reinforcement of an existing building, characterized in that concrete is placed on top of the existing foundation to integrally form a cotter.
前記請求項1乃至8のいずれかの耐震補強方法によって得られたこと
を特徴とする既存建物の耐震補強構造。
A seismic reinforcement structure for an existing building obtained by the seismic reinforcement method according to any one of claims 1 to 8.
JP2013181194A 2013-09-02 2013-09-02 Seismic reinforcement method and structure for existing buildings Active JP5509380B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013181194A JP5509380B1 (en) 2013-09-02 2013-09-02 Seismic reinforcement method and structure for existing buildings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013181194A JP5509380B1 (en) 2013-09-02 2013-09-02 Seismic reinforcement method and structure for existing buildings

Publications (2)

Publication Number Publication Date
JP5509380B1 JP5509380B1 (en) 2014-06-04
JP2015048643A true JP2015048643A (en) 2015-03-16

Family

ID=51031103

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013181194A Active JP5509380B1 (en) 2013-09-02 2013-09-02 Seismic reinforcement method and structure for existing buildings

Country Status (1)

Country Link
JP (1) JP5509380B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111779012A (en) * 2020-07-08 2020-10-16 王万连 Assembled foundation structure
JP7406476B2 (en) 2020-09-01 2023-12-27 鹿島建設株式会社 Existing building reinforcement structure and existing building reinforcement method
JP7502208B2 (en) 2021-01-20 2024-06-18 株式会社フジタ Building

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101683080B1 (en) * 2015-01-14 2016-12-08 (주)골든엔지니어링 Construction method for addition pile

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10292389A (en) * 1997-04-18 1998-11-04 Kyokuto Kogyo Kk Method for reinforcing pier and abutment
JP3855198B2 (en) * 2002-11-13 2006-12-06 清水建設株式会社 Seismic reinforcement structure for pile foundation structures
JP4571878B2 (en) * 2005-03-22 2010-10-27 五洋建設株式会社 Reinforcement method for underwater foundation of existing structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111779012A (en) * 2020-07-08 2020-10-16 王万连 Assembled foundation structure
JP7406476B2 (en) 2020-09-01 2023-12-27 鹿島建設株式会社 Existing building reinforcement structure and existing building reinforcement method
JP7502208B2 (en) 2021-01-20 2024-06-18 株式会社フジタ Building

Also Published As

Publication number Publication date
JP5509380B1 (en) 2014-06-04

Similar Documents

Publication Publication Date Title
KR100935096B1 (en) Prestressed-precast-segmental stone arch bridge and its constructing method
JP5955108B2 (en) Pile reinforcement structure of existing building and its construction method
KR101478131B1 (en) Construction Method of Precast Pier
JP5509380B1 (en) Seismic reinforcement method and structure for existing buildings
JP4599423B2 (en) Embankment structure and construction method thereof
JP2011246937A (en) Building structure using post with wall provided with earthquake control prestress
JP3690437B2 (en) Seismic reinforcement structure for existing buildings
JP3799036B2 (en) Building basic structure and construction method
JP5509374B1 (en) Seismic strengthening structure and seismic strengthening method for existing buildings
JP4472726B2 (en) Base-isolated building structure
KR101358878B1 (en) Reinforcement member and girder using the same
JP2002256571A (en) Reconstructing method for building, using method for existing pile and building
JP2009121051A (en) Method of re-constructing building
KR100919921B1 (en) Retaining Wall using Panel and Constructing Method thereof
JP6461690B2 (en) Foundation structure and foundation construction method
JP4612422B2 (en) Construction method of structure and foundation structure used for it
KR200263281Y1 (en) Apparatus for reinforcing a construction by enlarging its' size
JP6684088B2 (en) Seismic retrofitting structure and method for existing buildings
JP6340467B1 (en) Ramen structure using sleeve wall and joining method thereof
KR102553230B1 (en) Precast earthquake-resistant hollow slab and the connection method therefor
JP3037177U (en) Earthquake-proof structure in a detached house
KR101131630B1 (en) Prestressed concrete panel with prestress non-introducing portions provided in both slope ends, manufacturing method thereof, precasted Rahmen and construction method thereof using the same
KR101161993B1 (en) Reinforcement and method thereof
JP5889050B2 (en) Main column made of reinforced concrete
JP6091809B2 (en) External reinforcement structure for existing buildings

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20140225

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20140324

R150 Certificate of patent or registration of utility model

Ref document number: 5509380

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250