JP2012113546A - Necessary power prediction device for vehicle - Google Patents

Necessary power prediction device for vehicle Download PDF

Info

Publication number
JP2012113546A
JP2012113546A JP2010262631A JP2010262631A JP2012113546A JP 2012113546 A JP2012113546 A JP 2012113546A JP 2010262631 A JP2010262631 A JP 2010262631A JP 2010262631 A JP2010262631 A JP 2010262631A JP 2012113546 A JP2012113546 A JP 2012113546A
Authority
JP
Japan
Prior art keywords
vehicle
power
power consumption
charging
prediction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2010262631A
Other languages
Japanese (ja)
Other versions
JP5158183B2 (en
Inventor
Hideomi Kawachi
秀臣 河内
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Denso Corp
Original Assignee
Denso Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Denso Corp filed Critical Denso Corp
Priority to JP2010262631A priority Critical patent/JP5158183B2/en
Priority to FR1160690A priority patent/FR2968107A1/en
Priority to DE102011086903A priority patent/DE102011086903A1/en
Priority to CN201110375688.8A priority patent/CN102529737B/en
Priority to FR1253343A priority patent/FR2971874A1/en
Publication of JP2012113546A publication Critical patent/JP2012113546A/en
Application granted granted Critical
Publication of JP5158183B2 publication Critical patent/JP5158183B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Landscapes

  • Secondary Cells (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Hybrid Electric Vehicles (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

PROBLEM TO BE SOLVED: To allow a power needed for a vehicle to be exactly predicted.SOLUTION: A charging system 1 comprises: a service center 2; a reference vehicle 3A and a general vehicle 3B. The reference vehicle 3A collects a reference power consumption in a section on a road and transmits the reference power consumption to the service center 2, the service center 2 provides the general vehicle 3B with the reference power consumption, and the general vehicle 3B predicts power needed for traveling up to a destination based on the reference power consumption and correction information specific to the vehicle 3B. The charging system 1 is capable of exactly calculating the power needed for the vehicle 3B, while properly dispersing processing load.

Description

本発明は、電動車両が走行するために必要な消費電力を予測する装置に関する   The present invention relates to an apparatus for predicting power consumption required for an electric vehicle to travel.

特許文献1、特許文献2、および特許文献3は、二次電池を搭載した車両に対して、系統電力網から給電し、二次電池を充電するシステムと装置とを開示している。このようなシステムにおいては、系統電力網に接続されて充電される複数の車両への充電電力を正確に予測し、系統電力網における配電計画を立案する必要がある。ところが、それぞれの車両による消費電力は種々の要因によって変動する。そして、それらの車両への充電電力も変動する。このため、それぞれの車両において必要とされる充電電力を正確に予測し、配電計画に反映することは困難であった。   Patent Document 1, Patent Document 2, and Patent Document 3 disclose a system and an apparatus for charging a secondary battery by supplying power from a grid power network to a vehicle equipped with a secondary battery. In such a system, it is necessary to accurately predict the charging power for a plurality of vehicles connected to the grid power network and to charge the power distribution plan in the grid power network. However, the power consumption of each vehicle varies depending on various factors. And the charging electric power to those vehicles also fluctuates. For this reason, it is difficult to accurately predict the charging power required for each vehicle and reflect it in the power distribution plan.

また、特許文献4、特許文献5、および特許文献6は、車両の運行計画に基づいて消費電力または消費動力を予測する技術を開示している。   Patent Literature 4, Patent Literature 5, and Patent Literature 6 disclose techniques for predicting power consumption or power consumption based on a vehicle operation plan.

特開2007−206889号公報JP 2007-206889 A 特開2008−136291号公報JP 2008-136291 A 特開2010−68704号公報JP 2010-68704 A 特許3539497号公報Japanese Patent No. 3539497 特許3385841号公報Japanese Patent No. 3385841 特開2001−183150号公報JP 2001-183150 A

例えば、特許文献4に記載の装置では、走行予定の経路に基づいて消費電力および充電電力を予測する。しかし、上記経路に関する情報は、地図データに基づく情報であるため、実際に車両が走行した場合に生じる変動を反映することができない。例えば、運転者のくせ(運転傾向)、経路の勾配、道路の種類、交通量、渋滞状況などの変動要因が反映されない。このため、消費電力または消費動力を正確に予測することが困難であった。   For example, in the apparatus described in Patent Document 4, power consumption and charging power are predicted based on a route planned to travel. However, since the information regarding the route is information based on the map data, it is not possible to reflect fluctuations that occur when the vehicle actually travels. For example, fluctuation factors such as a driver's habit (driving tendency), a route gradient, a road type, a traffic volume, and a traffic jam situation are not reflected. For this reason, it has been difficult to accurately predict power consumption or power consumption.

また、特許文献5に記載の装置では、過去の走行による消費電力を記憶し、次の走行へ反映する。しかし、これでは初めて走行する経路における消費電力を予測することができない。   Moreover, in the apparatus described in Patent Document 5, power consumption due to past travel is stored and reflected in the next travel. However, this makes it impossible to predict the power consumption on the route that travels for the first time.

また、特許文献6に記載の装置では、車両の停止回数を含む走行パターンを生成し、この走行パターンに基づいてエネルギー収支を計画している。しかし、この構成でも、運転者のくせ(運転傾向)、経路の勾配、道路の種類、交通量、渋滞状況などの変動要因を反映して消費電力または消費動力を予測することが困難であった。   Moreover, in the apparatus described in Patent Document 6, a travel pattern including the number of stops of the vehicle is generated, and an energy balance is planned based on the travel pattern. However, even with this configuration, it is difficult to predict power consumption or power consumption by reflecting fluctuation factors such as driver's habit (driving tendency), route gradient, road type, traffic volume, and traffic congestion. .

本発明は上記問題点に鑑みてなされたものであり、その目的は、車両の運行計画に基づいて車両の消費電力を高精度に予測することができる車両の必要電力予測装置を提供することである。   The present invention has been made in view of the above problems, and an object of the present invention is to provide a required power prediction apparatus for a vehicle that can predict the power consumption of the vehicle with high accuracy based on the operation plan of the vehicle. is there.

本発明の他の目的は、基地局と、複数の車両との間で、車両の走行に必要な電力を予測するための処理負荷を適切に分担することができる車両の必要電力予測装置を提供することである。   Another object of the present invention is to provide a required power prediction device for a vehicle capable of appropriately sharing a processing load for predicting power required for traveling of the vehicle between a base station and a plurality of vehicles. It is to be.

本発明は上記目的を達成するために以下の技術的手段を採用する。   The present invention employs the following technical means to achieve the above object.

請求項1に記載の発明は、走行用の電動機(31)に給電するバッテリ(34)を備える複数の車両(3)と、これら複数の車両(3)を管理する基地局(2)とを備え、車両(3)の走行に必要な必要電力を予測する必要電力予測装置において、基地局に設けられ、道路上の複数の区間のそれぞれを走行するための基準消費電力を記憶する記憶手段(23A)と、基準消費電力を基地局から車両に送信する通信手段(7、21、42)と、車両に設けられ、車両が走行するために要した実消費電力と基準消費電力との差に含まれ、車両における要因に起因して発生する車両誤差に対応する車両補正値(VCR)を算出する車両補正値算出手段(P9)と、車両に設けられ、基準消費電力(STPC)と車両補正値を含む情報に基づいて、将来の走行における必要電力を予測する予測手段(P8)とを備えることを特徴とする。   The invention described in claim 1 includes a plurality of vehicles (3) including a battery (34) for supplying electric power to the electric motor (31) for traveling, and a base station (2) that manages the plurality of vehicles (3). In the necessary power predicting apparatus for predicting necessary power required for traveling of the vehicle (3), a storage means (stored in the base station for storing reference power consumption for traveling in each of a plurality of sections on the road ( 23A), the communication means (7, 21, 42) for transmitting the reference power consumption from the base station to the vehicle, and the difference between the actual power consumption provided for the vehicle and the reference power consumption required for the vehicle to travel. Vehicle correction value calculating means (P9) for calculating a vehicle correction value (VCR) corresponding to a vehicle error that is included and caused by a factor in the vehicle, provided in the vehicle, and a reference power consumption (STPC) and vehicle correction Based on information including values Characterized in that it comprises a prediction means (P8) to predict the required power in the running of.

この構成によると、将来の走行における必要電力を予測するための処理を、基地局と車両とに分散して配置することができる。また、車両における要因に起因する誤差が車両補正値によって補正されるから、基準消費電力に基づいて正確に必要電力を予測することができる。   According to this configuration, it is possible to disperse and arrange the process for predicting the required power in the future travel between the base station and the vehicle. Moreover, since the error resulting from the factor in the vehicle is corrected by the vehicle correction value, the required power can be accurately predicted based on the reference power consumption.

請求項2に記載の発明は、車両補正値算出手段は、車両が所定区間を走行したときの実消費電力を計測する計測手段(112)と、車両が所定区間を走行したときの車両に搭載された補助機器の補助機器消費電力を計測する補助機器消費電力計測手段(113)と、車両が所定区間を走行したときの基準消費電力(STPC)と、実消費電力(CPC)と、補助機器消費電力(APC)とに基づいて車両補正値(VCR)を設定する設定手段(114,115)とを備えることを特徴とする。   According to the second aspect of the present invention, the vehicle correction value calculating means is mounted on the vehicle when the vehicle travels in the predetermined section and the measuring means (112) for measuring the actual power consumption when the vehicle travels in the predetermined section. Auxiliary device power consumption measuring means (113) for measuring the auxiliary device power consumption of the auxiliary device that has been used, reference power consumption (STPC) when the vehicle travels in a predetermined section, actual power consumption (CPC), and auxiliary device And setting means (114, 115) for setting a vehicle correction value (VCR) based on the power consumption (APC).

この構成によると、車両の補助機器が消費する消費電力を考慮して車両補正値を設定することができる。このため、補助機器の消費電力の影響を排除して基準消費電力から必要電力を予測することができる。   According to this configuration, the vehicle correction value can be set in consideration of the power consumption consumed by the auxiliary device of the vehicle. For this reason, it is possible to predict the required power from the reference power consumption while eliminating the influence of the power consumption of the auxiliary device.

請求項3に記載の発明は、予測手段は、将来の走行における補助機器の補助機器消費電力を予測する補助機器消費電力予測手段(146)を備え、補助機器消費電力予測手段によって予測された補助機器消費電力(EAPC)が予測手段(P8)における情報に含まれていることを特徴とする。この構成によると、補助機器の消費電力が予測される。さらに、予測された補助機器消費電力が、必要電力の予測処理に反映される。このため、将来の走行における補助機器の消費電力も加えた必要電力を予測することができる。   According to a third aspect of the present invention, the predicting means includes auxiliary equipment power consumption predicting means (146) for predicting auxiliary equipment power consumption of the auxiliary equipment in future travel, and the auxiliary means predicted by the auxiliary equipment power consumption predicting means. The apparatus power consumption (EAPC) is included in the information in the prediction means (P8). According to this configuration, the power consumption of the auxiliary device is predicted. Furthermore, the predicted auxiliary device power consumption is reflected in the required power prediction process. For this reason, it is possible to predict the required power including the power consumption of the auxiliary equipment in future travel.

請求項4に記載の発明は、さらに、道路上の複数の区間の渋滞状況に応じた渋滞補正値(TCR)を算出する渋滞補正値算出手段(91−93)を備え、渋滞補正値(TCR)が予測手段における情報に含まれていることを特徴とする。この構成によると、車両の消費電力に影響を与える道路の渋滞状況が、渋滞補正値として与えられ、必要電力の予測に反映される。このため、渋滞状況に応じた必要電力を予測することができる。   The invention described in claim 4 further includes a traffic jam correction value calculating means (91-93) for calculating a traffic jam correction value (TCR) according to the traffic jam status of a plurality of sections on the road, and the traffic jam correction value (TCR). ) Is included in the information in the prediction means. According to this configuration, the traffic congestion state on the road that affects the power consumption of the vehicle is given as the traffic congestion correction value and reflected in the prediction of the required power. For this reason, the required electric power according to the traffic jam situation can be predicted.

請求項5に記載の発明は、複数の車両には、基準車両(3A)が含まれており、基準車両は、道路上の複数の区間を走行することにより、それら区間における消費電力を計測する計測手段(61−78)を備え、通信手段は、消費電力を基地局に送信するよう構成され、記憶手段は、基準車両から得られた消費電力を基準消費電力として記憶するよう構成されていることを特徴とする。この構成によると、基準車両によって基準消費電力を計測し、収集することができる。   In the invention according to claim 5, the plurality of vehicles include the reference vehicle (3A), and the reference vehicle measures the power consumption in the sections by traveling in the plurality of sections on the road. Measuring means (61-78) are provided, the communication means is configured to transmit power consumption to the base station, and the storage means is configured to store power consumption obtained from the reference vehicle as reference power consumption. It is characterized by that. According to this configuration, the reference power consumption can be measured and collected by the reference vehicle.

請求項6に記載の発明は、さらに、予測手段により予測された必要電力に基づいて電力需要を予測する電力需要予測手段(175)を備えることを特徴とする。この構成によると、正確に予測された必要電力に基づいて、バッテリを充電するための電力の需要を正確に予測することができる。   The invention described in claim 6 further includes power demand prediction means (175) for predicting power demand based on the required power predicted by the prediction means. According to this structure, the demand of the electric power for charging a battery can be correctly estimated based on the required electric power estimated correctly.

なお、特許請求の範囲および上記手段の項に記載した括弧内の符号は、ひとつの態様として後述する実施形態に記載の具体的手段との対応関係を示すものであって、本発明の技術的範囲を限定するものではない。   Note that the reference numerals in parentheses described in the claims and the above-described means indicate the correspondence with the specific means described in the embodiments described later as one aspect, and are technical terms of the present invention. It does not limit the range.

本発明を適用した一実施形態に係る充電システムを示すブロック図である。It is a block diagram which shows the charging system which concerns on one Embodiment to which this invention is applied. サービスセンタの構成を示すブロック図である。It is a block diagram which shows the structure of a service center. 基準車両の構成を示すブロック図である。It is a block diagram which shows the structure of a reference | standard vehicle. 車両の構成を示すブロック図である。It is a block diagram which shows the structure of a vehicle. 充電システムの処理を示すフローチャートである。It is a flowchart which shows the process of a charging system. 基準消費電力を収集するための処理を説明するブロック図である。It is a block diagram explaining the process for collecting reference | standard power consumption. 基準消費電力を収集するための基準車両における処理を示すフローチャートである。It is a flowchart which shows the process in the reference | standard vehicle for collecting reference | standard power consumption. 車両補正値を算出するための処理を説明するブロック図である。It is a block diagram explaining the process for calculating a vehicle correction value. 複数の車両のためにサービスセンタが実行するデータ提供処理を示すフローチャートであるIt is a flowchart which shows the data provision process which a service center performs for several vehicles. 車両補正値を算出するための車両における処理を示すフローチャートである。It is a flowchart which shows the process in the vehicle for calculating a vehicle correction value. 充電期待値に関連する処理を説明するブロック図である。It is a block diagram explaining the process relevant to a charge expected value. 充電されるときの車両における処理を示すフローチャートである。It is a flowchart which shows the process in the vehicle when being charged. バッテリの残存電力と充電確率との関係の一例を示すグラフである。It is a graph which shows an example of the relationship between the residual electric power of a battery, and a charge probability. 必要電力を予測するための車両における処理を示すフローチャートである。It is a flowchart which shows the process in the vehicle for estimating required electric power. 充電期待値を算出するための車両における処理を示すフローチャートである。It is a flowchart which shows the process in the vehicle for calculating charge expectation value. 車両の走行と、車両への充電が期待される充電期待区間との関係を説明する説明図である。It is explanatory drawing explaining the relationship between driving | running | working of a vehicle and the charge expectation area where the charge to a vehicle is anticipated. バッテリの残存電力と車両への充電が期待される充電期待区間との関係の一例を示すグラフである。It is a graph which shows an example of the relationship between the remaining electric power of a battery, and the charge expectation area where the charge to a vehicle is anticipated. バッテリの残存電力と車両への充電が期待される充電期待区間との関係の他の例を示すグラフである。It is a graph which shows the other example of the relationship between the remaining electric power of a battery, and the charge expectation area where the charge to a vehicle is anticipated. ひとつの車両における充電期待値の一例を示す表である。It is a table | surface which shows an example of the charge expectation value in one vehicle. サービスセンタにおける充電期待値に関連する処理を示すフローチャートである。It is a flowchart which shows the process relevant to the charge expectation value in a service center. 充電期待値から電力推移を算出するためのサービスセンタにおける処理を示すフローチャートである。It is a flowchart which shows the process in the service center for calculating electric power transition from an expected charge value. ひとつの区間における充電期待値の推移の一例を示す表である。It is a table | surface which shows an example of transition of the charge expectation value in one area. ひとつの電力網における充電期待値の推移の一例を示す表である。It is a table | surface which shows an example of transition of the charge expected value in one electric power network. 充電期待値の推移と充電器との関連付けの一例を示す表である。It is a table | surface which shows an example of correlation with transition of a charging expected value, and a charger. 充電器毎の充電期待値の一例を示す表である。It is a table | surface which shows an example of the charge expectation value for every charger. 充電器の充電速度に応じて修正された充電期待値の一例を示す表である。It is a table | surface which shows an example of the charge expected value corrected according to the charging speed of the charger. 修正プロセスを説明するためのグラフである。It is a graph for demonstrating a correction process. 修正プロセスを説明するためのグラフである。It is a graph for demonstrating a correction process.

以下に、図面を参照しながら本発明を実施するための複数の形態を説明する。各形態において先行する形態で説明した事項に対応する部分には同一の参照符号を付して重複する説明を省略する場合がある。各形態において構成の一部のみを説明している場合は、構成の他の部分については先行して説明した他の形態を適用することができる。各実施形態で具体的に組合せが可能であることを明示している部分同士の組合せばかりではなく、特に組合せに支障が生じなければ、明示してなくとも実施形態同士を部分的に組み合せることも可能である。   A plurality of modes for carrying out the present invention will be described below with reference to the drawings. In each embodiment, parts corresponding to the matters described in the preceding embodiment may be denoted by the same reference numerals, and redundant description may be omitted. When only a part of the configuration is described in each mode, the other modes described above can be applied to the other parts of the configuration. Not only combinations of parts that clearly show that combinations are possible in each embodiment, but also combinations of the embodiments even if they are not explicitly stated unless there is a problem with the combination. Is also possible.

(第1実施形態)
図1は、本発明を適用した一実施形態に係る充電システム1を示すブロック図である。充電システム1は、複数の車両3の運行情報を管理する運行情報管理システムと、これら車両3へ電力を供給する電力網(GRID)5の電力管理システムとから構成されている。充電システム1は、電力網5の電力に関する情報を処理する電力情報装置を構成している。充電システム1は、複数の車両3に関する情報を管理する管理組織に属するサービスセンタ(SVCT)2を備える。サービスセンタ2は、基地局である。
(First embodiment)
FIG. 1 is a block diagram showing a charging system 1 according to an embodiment to which the present invention is applied. The charging system 1 includes an operation information management system that manages operation information of a plurality of vehicles 3, and a power management system of a power network (GRID) 5 that supplies electric power to these vehicles 3. The charging system 1 constitutes a power information device that processes information related to the power of the power network 5. The charging system 1 includes a service center (SVCT) 2 belonging to a management organization that manages information related to a plurality of vehicles 3. The service center 2 is a base station.

車両3は、二次電池であるバッテリを搭載した移動体である。車両3は、走行動力の少なくとも一部を車載のバッテリから供給される電動車両である。車両3は、バッテリのみを動力源とする電気車両、またはバッテリと燃料とを動力源とし、かつ外部からバッテリに充電可能なプラグイン型のハイブリッド車両である。複数の車両3には、管理組織によって運用される基準車両(EVH0)3Aと、運行情報管理システムに所属する一般の車両(EVH1、EVHn)3Bとが含まれている。車両3のバッテリは、充電スタンド(CGS1、CGS2、CGSn)4によって充電することができる。   The vehicle 3 is a moving body equipped with a battery that is a secondary battery. The vehicle 3 is an electric vehicle in which at least a part of the traveling power is supplied from a vehicle-mounted battery. The vehicle 3 is an electric vehicle that uses only a battery as a power source, or a plug-in hybrid vehicle that uses a battery and fuel as a power source and can charge the battery from the outside. The plurality of vehicles 3 include a reference vehicle (EVH0) 3A operated by the management organization and general vehicles (EVH1, EVHn) 3B belonging to the operation information management system. The battery of the vehicle 3 can be charged by a charging stand (CGS1, CGS2, CGSn) 4.

充電スタンド4は、電力網5に属している。充電スタンド4は、電力網5から電力を供給される。充電スタンド4は、車両3のバッテリを充電するための定置型の充電器である。車両3が所属する組織、または住宅も充電スタンド4として構成することができる。図示の例においては、目的地8Bである住宅にも充電スタンド4が設けられている。   The charging station 4 belongs to the power network 5. The charging station 4 is supplied with power from the power network 5. The charging stand 4 is a stationary charger for charging the battery of the vehicle 3. An organization or a house to which the vehicle 3 belongs can also be configured as the charging stand 4. In the illustrated example, the charging station 4 is also provided in the house which is the destination 8B.

電力網5は、系統電力網である。電力網5は、複数の車両3のバッテリへ充電される電力を供給する。電力網5は、商用電力を供給する管理組織に属する電力制御センタ(PSCM)6によって管理されている。電力制御センタ6は、電力網を制御する。電力制御センタ6は、変電所などの送電設備、および/または発電所を含むことができる。電力制御センタ6は、電力制御処理を実行することによって、電力網5における電力需要に応えるように、電力網5に電力を供給する。電力制御処理には、発電所における発電電力の調節、他の電力網からの電力の導入、送電電力の調節、発電施設の計画、送電施設の計画などが含まれる。通信ネットワーク7は、充電システム1を構成する要素間の情報通信を可能とする情報通信手段を提供している。   The power network 5 is a system power network. The power network 5 supplies power to be charged to the batteries of the plurality of vehicles 3. The power network 5 is managed by a power control center (PSCM) 6 belonging to a management organization that supplies commercial power. The power control center 6 controls the power network. The power control center 6 may include a power transmission facility such as a substation and / or a power plant. The power control center 6 supplies power to the power network 5 so as to meet the power demand in the power network 5 by executing power control processing. The power control process includes adjustment of generated power at a power plant, introduction of power from another power network, adjustment of transmission power, planning of a power generation facility, planning of a transmission facility, and the like. The communication network 7 provides information communication means that enables information communication between elements constituting the charging system 1.

サービスセンタ2と、複数の車両3とは、通信ネットワーク7を介して互いに情報通信できるように接続されることによって運行情報管理システムを構成している。運行情報管理システムは、サービスセンタ2から供給される基準消費電力に基づいて、各車両3が将来の走行のために必要とする必要電力を正確に予測する必要電力予測装置を提供する。つまり、サービスセンタ2と車両3とによって、必要電力予測装置が構成され、必要電力予測方法が実行される。さらに、運行管理システムは、複数の車両3が必要とする電力を集計し、電力網5における電力の需要を示す需要データを作成する手段を提供する。ここで、集計は、単なる加算処理を意味することがある。また、集計は、複数の数値情報を、時間軸上、および/または地図上における分布に編集することを意味することがある。また、運行情報管理システムは、充電が実施される時期および/または場所を予測し、その分布を示す需要分布データを作成する手段を提供する。需要分布データは、需要データに、充電が実施される時期および/または場所の分布を反映することによって作成される。また、運行情報管理システムは、充電スタンド4の充電速度を含む充電スタンド4に関する情報を収集する手段を提供する。運行情報管理システムは、需要分布データに、充電スタンド4の充電速度を反映する手段を提供する。   The service center 2 and the plurality of vehicles 3 constitute an operation information management system by being connected so as to be able to communicate information with each other via a communication network 7. The operation information management system provides a required power prediction device that accurately predicts the required power required for each vehicle 3 for future travel based on the reference power consumption supplied from the service center 2. That is, the service center 2 and the vehicle 3 constitute a required power prediction device, and the required power prediction method is executed. Further, the operation management system provides means for collecting the power required by the plurality of vehicles 3 and creating demand data indicating the power demand in the power network 5. Here, the aggregation may mean a simple addition process. Aggregation may mean editing a plurality of numerical information into a distribution on a time axis and / or a map. The operation information management system also provides means for predicting the timing and / or location where charging is performed and creating demand distribution data indicating the distribution. The demand distribution data is created by reflecting the distribution of the timing and / or place where charging is performed in the demand data. In addition, the operation information management system provides a means for collecting information about the charging station 4 including the charging speed of the charging station 4. The operation information management system provides a means for reflecting the charging speed of the charging station 4 in the demand distribution data.

サービスセンタ2と、複数の充電スタンド4と、複数の車両3とは、通信ネットワーク7を介して互いに情報通信できるように接続されている。これらの構成要素は、車両3への充電時期を予約する手段を提供する。   The service center 2, the plurality of charging stations 4, and the plurality of vehicles 3 are connected so as to be able to communicate information with each other via a communication network 7. These components provide a means for reserving the charging time for the vehicle 3.

さらに、サービスセンタ2と、電力制御センタ6とは、通信ネットワーク7を介して互いに情報通信できるように接続されることによって電力管理システムを構成している。通信ネットワークはサービスセンタ2と電力制御センタ6との間の専用通信でも良い。サービスセンタ2と、電力制御センタ6とは、電力の需要分布データに基づいて、電力網5の資源を調節することにより、電力需要に応える電力を電力網5に供給する手段を提供する。需要分布データは、サービスセンタ2を運営する組織から電力制御センタ6を運営する組織へ販売されることがある。また、サービスセンタ2と電力制御センタ6とが実質的に同一の組織によって運営されてもよい。   Further, the service center 2 and the power control center 6 constitute a power management system by being connected so as to be able to communicate information with each other via a communication network 7. The communication network may be dedicated communication between the service center 2 and the power control center 6. The service center 2 and the power control center 6 provide a means for supplying power to the power network 5 in response to power demand by adjusting resources of the power network 5 based on power demand distribution data. The demand distribution data may be sold from the organization that operates the service center 2 to the organization that operates the power control center 6. Further, the service center 2 and the power control center 6 may be operated by substantially the same organization.

基準車両3Aは、サービスセンタ2の管理の下で、管理対象となっている地区の道路を走行する。管理対象となる地区は、少なくとも電力網5の範囲を含んでいる。以下の説明では、車両3Bが電力網5の中の道路を走行する場合を想定する。例えば、出発地(STPS)8Aから、目的地(DSTN)8Bまで走行する。さらに、車両3Bは、複数の充電スタンド4のいずれかにおいて充電される。例えば、出発地8Aと目的地8Bとの間の充電スタンド4Aにおいて充電される。   The reference vehicle 3 </ b> A travels on a road in a district to be managed under the management of the service center 2. The district to be managed includes at least the range of the power grid 5. In the following description, it is assumed that the vehicle 3B travels on a road in the power grid 5. For example, the vehicle travels from a departure point (STPS) 8A to a destination (DSTN) 8B. Further, the vehicle 3B is charged at any one of the plurality of charging stations 4. For example, charging is performed at the charging station 4A between the departure point 8A and the destination 8B.

図2は、サービスセンタ2の構成を示すブロック図である。サービスセンタ2は、通信ネットワーク7と通信するための通信装置(COMN)21と、制御装置(CNDV)22と、データベース(DB)23とを備える。   FIG. 2 is a block diagram showing the configuration of the service center 2. The service center 2 includes a communication device (COMN) 21 for communicating with the communication network 7, a control device (CNDV) 22, and a database (DB) 23.

制御装置22は、複数の処理P1−P6を提供する。基準消費電力処理(STCT)P1は、基準車両3Aから基準消費電力STPCを含む情報を収集し、一般の車両3Bへ基準消費電力STPCを含む情報を提供する。消費電力補正処理(PCCT)P2は、種々の要因に基づいて基準消費電力STPCを補正する。また、消費電力補正処理P2は、基準消費電力STPCを補正するための補正情報を車両3へ提供する。   The control device 22 provides a plurality of processes P1-P6. The reference power consumption processing (STCT) P1 collects information including the reference power consumption STPC from the reference vehicle 3A, and provides information including the reference power consumption STPC to the general vehicle 3B. The power consumption correction process (PCCT) P2 corrects the reference power consumption STPC based on various factors. Further, the power consumption correction process P2 provides the vehicle 3 with correction information for correcting the reference power consumption STPC.

充電期待値集計処理(CHCT)P3は、複数の車両3から充電期待値CHXPを収集し、複数の充電期待値CHXPを集計する。充電期待値CHXPは、ひとつの車両3への充電の可能性と充電量とを、時間軸上、および/または地図上における分布として示したデータである。充電期待値CHXPは、車両3への充電量と、充電時期、および/または充電場所とを予測することによって作成される。複数の充電期待値CHXPを集計することにより、複数の車両3に充電するための電力需要を示す電力需要PCSDが提供される。   The expected charging value totaling process (CHCT) P3 collects the expected charging value CHXP from the plurality of vehicles 3 and totals the plurality of expected charging values CHXP. The expected charge value CHXP is data indicating the possibility of charging one vehicle 3 and the charge amount as a distribution on the time axis and / or on the map. The expected charge value CHXP is created by predicting the amount of charge to the vehicle 3, the charging time, and / or the charging location. The power demand PCSD indicating the power demand for charging the plurality of vehicles 3 is provided by counting the plurality of expected charging values CHXP.

電力推移処理(PSCT)P4は、複数の充電スタンド4において必要とされる電力を予測し、電力需要の推移を示す電力推移PCSDを作成する。電力推移PCSDは、充電期待値CHXPの集計によって求められる基礎電力推移PCSD1と、基礎電力推移PCSD1を充電速度CHSPに基づいて修正した修正電力推移PCSD2とを含むことができる。電力推移PCSDは、電力の需要の時間軸上、および/または地図上の分布を示す。電力推移PCSDは、電力制御センタ6に提供される。   The power transition process (PSCT) P4 predicts the power required in the plurality of charging stations 4 and creates a power transition PCSD indicating a transition of power demand. The power transition PCSD can include a basic power transition PCSD1 obtained by summing up the expected charging value CHXP and a corrected power transition PCSD2 obtained by correcting the basic power transition PCSD1 based on the charging speed CHSP. The power transition PCSD indicates a distribution of power demand on a time axis and / or on a map. The power transition PCSD is provided to the power control center 6.

充電予約処理(RVCT)P5は、車両3に対して充電に関するサービスを提供する。このサービスには、充電時期の通知、特定の充電スタンド4の提案、特定の充電スタンド4への経路案内、特定の充電スタンド4への充電予約などを含むことができる。さらに、他のサービス処理(OTSV)P6は、車両3への情報提供、充電スタンド4への情報提供、電力制御センタ6への情報提供を実行する。   The charge reservation process (RVCT) P <b> 5 provides a service related to charging to the vehicle 3. This service may include notification of charging time, proposal of a specific charging station 4, route guidance to a specific charging station 4, reservation for charging to a specific charging station 4, and the like. Further, the other service processing (OTSV) P <b> 6 executes information provision to the vehicle 3, information provision to the charging station 4, and information provision to the power control center 6.

データベース23は、メモリ、ハードディスクなどの記憶装置によって提供される。データベース23は、制御装置22において取り扱われるデータを記憶する複数のデータベース23A−23Fを含んでいる。データベース23Aは、基準消費電力STPCを含む車両3の消費電力に関連するデータを記憶する。基準消費電力STPCは、予め定められた道路の区間ごとに記憶されている。データベース23Aは、道路上の複数の区間のそれぞれを走行するための基準消費電力STPCを記憶する記憶手段を提供する。   The database 23 is provided by a storage device such as a memory or a hard disk. The database 23 includes a plurality of databases 23 </ b> A to 23 </ b> F that store data handled by the control device 22. The database 23A stores data related to the power consumption of the vehicle 3 including the reference power consumption STPC. The reference power consumption STPC is stored for each predetermined road section. The database 23A provides storage means for storing a reference power consumption STPC for traveling in each of a plurality of sections on the road.

データベース23Bは、渋滞状況TRFCを含む車両3の走行に影響を与える道路の状況に関するデータを記憶する。データベース23Cは、充電期待値CHXPを記憶する。データベース23Dは、充電スタンド4の充電速度CHSPを含む充電スタンド4に関する情報を記憶する。充電スタンド4に関する情報には、充電スタンド4の場所、特徴、そこで提供されるサービスなどを含むことができる。データベース23Dは、バッテリ34へ充電することができる複数の充電スタンド4の充電速度CHSPを記憶する記憶手段を提供する。データベース23Eは、電力推移PCSDを含む充電スタンド4での電力需要に関するデータを記憶する。データベース23Fは、車両3に提案した充電スタンド4の情報を記憶する記憶手段を提供する。   The database 23B stores data regarding road conditions that affect the traveling of the vehicle 3 including the traffic condition TRFC. The database 23C stores the expected charge value CHXP. The database 23D stores information related to the charging station 4 including the charging speed CHSP of the charging station 4. Information about the charging station 4 may include the location of the charging station 4, features, services provided there, and the like. The database 23D provides storage means for storing the charging rates CHSP of the plurality of charging stations 4 that can charge the battery 34. The database 23E stores data related to power demand at the charging station 4 including the power transition PCSD. The database 23 </ b> F provides storage means for storing information on the charging station 4 proposed for the vehicle 3.

図3は、基準車両3Aの構成を示すブロック図である。基準車両3Aは、管理対象となる複数の車両3の平均的な車種によって提供されている。例えば、5人乗り乗用車が選定される。基準車両3Aは、走行用の電動発電機(MG)31、インバータ(INV)32、遮断器(CTBR)33、バッテリ(BATT)34、遮断器(CTBR)35、充電回路(CHGR)36、および充電コネクタ37を備える。発電電動機31は、車両3Aの走行用の電動機である。車両3Aは、電動機31に給電するバッテリ34を備える。遮断器35が閉じ、遮断器33が開いているとき、充電コネクタ37に供給される電力が、充電回路36を経由して、バッテリ34に充電される。遮断器35が開き、遮断器33が閉じているとき、バッテリ34の電力が、インバータ32を経由して、電動発電機31に供給される。   FIG. 3 is a block diagram showing the configuration of the reference vehicle 3A. The reference vehicle 3A is provided by an average vehicle type of the plurality of vehicles 3 to be managed. For example, a five-seater passenger car is selected. The reference vehicle 3A includes a traveling motor generator (MG) 31, an inverter (INV) 32, a circuit breaker (CTBR) 33, a battery (BATT) 34, a circuit breaker (CTBR) 35, a charging circuit (CHGR) 36, and A charging connector 37 is provided. The generator motor 31 is a motor for traveling the vehicle 3A. The vehicle 3 </ b> A includes a battery 34 that supplies power to the electric motor 31. When the circuit breaker 35 is closed and the circuit breaker 33 is open, the power supplied to the charging connector 37 is charged to the battery 34 via the charging circuit 36. When the circuit breaker 35 is opened and the circuit breaker 33 is closed, the power of the battery 34 is supplied to the motor generator 31 via the inverter 32.

基準車両3Aは、走行制御装置(EVCU)38、バッテリ制御装置(BTCU)39、および充電制御装置(CGCU)41を備える。走行制御装置38は、基準車両3Aを運転者の指示に応答して走行させるようにインバータ32と遮断器33とを制御する。バッテリ制御装置39は、バッテリ34に流れる電流を検出する電流センサ(CRSN)40の出力に基づいて、バッテリ34を監視し、制御する。充電制御装置41は、充電コネクタ37が充電スタンド4と接続された時に、バッテリ34が所定の充電状態となるように充電回路36と遮断器35とを制御する充電量制御機能を備えている。充電制御装置41は、さらに、運行情報管理システムの一部としての制御機能を備えている。基準車両3Aの充電制御装置41は、基準となる消費電力を収集するための基準消費電力収集処理P7を備える。この処理P7は、道路上に予め設定された複数の区間のそれぞれにおいて消費される消費電力を計測し、記録する。   The reference vehicle 3A includes a travel control device (EVCU) 38, a battery control device (BTCU) 39, and a charge control device (CGCU) 41. The travel control device 38 controls the inverter 32 and the circuit breaker 33 so that the reference vehicle 3A travels in response to an instruction from the driver. The battery control device 39 monitors and controls the battery 34 based on the output of a current sensor (CRSN) 40 that detects the current flowing through the battery 34. The charging control device 41 has a charge amount control function for controlling the charging circuit 36 and the circuit breaker 35 so that the battery 34 is in a predetermined charging state when the charging connector 37 is connected to the charging stand 4. The charging control device 41 further includes a control function as a part of the operation information management system. The charging control device 41 of the reference vehicle 3A includes a reference power consumption collection process P7 for collecting power consumption that serves as a reference. In this process P7, power consumption consumed in each of a plurality of sections set in advance on the road is measured and recorded.

基準車両3Aは、通信ネットワーク7と通信するための車載の通信装置(VHCM)42を備える。よって、通信ネットワーク7と、通信装置21と、通信装置42とサービスセンタ2と車両3との間の通信手段を提供する。さらに、基準車両3Aは、通常の車両に搭載されることのある複数の制御装置を備えている。車載のナビゲーション制御装置(NAVI)43は、運転者に対して地図を提供し、さらに経路案内を提供する装置である。ナビゲーション制御装置43は、基準車両3Aの位置を示す位置データを提供する位置特定手段として機能する。さらに、ナビゲーション制御装置43は、基準車両3Aの走行経路を予測し経路データを提供する経路予測手段を提供する。ナビゲーション制御装置43は、位置特定手段の一部をなすGPS装置(GPSD)44から位置データを取得する。   The reference vehicle 3 </ b> A includes an in-vehicle communication device (VHCM) 42 for communicating with the communication network 7. Therefore, the communication means between the communication network 7, the communication device 21, the communication device 42, the service center 2, and the vehicle 3 is provided. Furthermore, the reference vehicle 3A includes a plurality of control devices that may be mounted on a normal vehicle. The vehicle-mounted navigation control device (NAVI) 43 is a device that provides a map to the driver and further provides route guidance. The navigation control device 43 functions as a position specifying unit that provides position data indicating the position of the reference vehicle 3A. Further, the navigation control device 43 provides route prediction means for predicting the travel route of the reference vehicle 3A and providing route data. The navigation control device 43 acquires position data from a GPS device (GPSD) 44 that forms part of the position specifying means.

基準車両3Aは、バッテリ34の消費電力に影響を与える車載の補助機器を備えている。補助機器は、例えば、空調装置と、車載の複数の電気負荷とを備える。空調制御装置(ACCU)45は、空調装置(ACDV)46を制御する。空調制御装置45は、空調装置46の作動状態を制御することによって、空調装置46による消費電力を示す補機消費電力データを提供することができる。例えば、補機消費電力データには、空調装置46の冷凍サイクル用の電動圧縮機の消費電力が含まれる。ボデー制御装置(BDCU)47は、車載の負荷(VHLD)48を制御する。ボデー制御装置47は、負荷48の作動状態を制御することによって、負荷48による消費電力を示す補機消費電力データを提供することができる。補機消費電力データには、車載の複数の電動機器、例えば、照明装置、および電動ワイパの消費電力が含まれる。   The reference vehicle 3 </ b> A includes an in-vehicle auxiliary device that affects the power consumption of the battery 34. The auxiliary equipment includes, for example, an air conditioner and a plurality of in-vehicle electric loads. The air conditioning control unit (ACCU) 45 controls the air conditioning unit (ACCD) 46. The air conditioning control device 45 can provide auxiliary machine power consumption data indicating the power consumption by the air conditioning device 46 by controlling the operating state of the air conditioning device 46. For example, the auxiliary machine power consumption data includes the power consumption of the electric compressor for the refrigeration cycle of the air conditioner 46. The body control device (BDCU) 47 controls a vehicle-mounted load (VHLD) 48. The body control device 47 can provide auxiliary machine power consumption data indicating the power consumption by the load 48 by controlling the operating state of the load 48. The auxiliary machine power consumption data includes power consumption of a plurality of in-vehicle electric devices, for example, lighting devices and electric wipers.

基準車両3Aに搭載された複数の制御装置38、39、41、42、43、45、47は、車載のネットワーク(LAN)49によって情報通信可能に接続されている。   A plurality of control devices 38, 39, 41, 42, 43, 45, 47 mounted on the reference vehicle 3 </ b> A are connected by an in-vehicle network (LAN) 49 so that information communication is possible.

図4は、一般の車両3Bの構成を示すブロック図である。車両3Bは、基準車両3Aと同じ構成要素を備えている。ただし、充電制御装置41には、一般の車両3Bとしての複数の制御処理P8−P11が搭載されている。車両3Bは、基準消費電力収集処理P7を備えない。消費電力予測処理(PCES)P8は、予測された経路を車両3Bが走行するために必要とすると予測される予測必要電力ESPCを算出する。消費電力予測処理(PCES)P8は、必要電力予測手段を提供する。必要電力予測手段は、基準消費電力STPCと後述の車両補正値VCRを含む情報に基づいて、将来の走行における必要電力を予測する。   FIG. 4 is a block diagram showing a configuration of a general vehicle 3B. The vehicle 3B includes the same components as the reference vehicle 3A. However, the charging control device 41 is equipped with a plurality of control processes P8-P11 as a general vehicle 3B. The vehicle 3B does not include the reference power consumption collection process P7. The power consumption prediction process (PCES) P8 calculates a predicted required power ESPC that is predicted to be necessary for the vehicle 3B to travel on the predicted route. The power consumption prediction process (PCES) P8 provides a required power prediction means. The required power prediction means predicts the required power for future travel based on information including the reference power consumption STPC and a vehicle correction value VCR described later.

補正値算出処理(CRVC)P9は、処理P8における予測精度を高めるために、車両3Bに特有の補正値VCRを算出する。この補正値VCRは、基準車両3Aと車両3Bとの差を補償して、基準消費電力STPCに基づいて車両3Bの消費電力を正確に予測するための値である。補正値算出処理P9は、車両補正値算出手段を提供する。車両補正値算出手段は、車両3Bが走行するために要した実消費電力と基準消費電力との差に含まれ、かつ車両3Bにおける車両3Bに特有の要因に起因して発生する車両誤差に対応する車両補正値VCRを算出する。例えば、車両の重量の差、乗員数の差、車載の機器の差、運転者の運転操作の差、車載の補助機器の作動状態の差などの変動要因が消費電力の差をもたらす。上記補正値VCRは、これらの変動要因を反映する補正値である。   The correction value calculation process (CRVC) P9 calculates a correction value VCR unique to the vehicle 3B in order to increase the prediction accuracy in the process P8. The correction value VCR is a value for compensating for the difference between the reference vehicle 3A and the vehicle 3B and accurately predicting the power consumption of the vehicle 3B based on the reference power consumption STPC. The correction value calculation process P9 provides vehicle correction value calculation means. The vehicle correction value calculation means is included in the difference between the actual power consumption and the reference power consumption required for the vehicle 3B to travel, and copes with a vehicle error caused by a factor specific to the vehicle 3B in the vehicle 3B. The vehicle correction value VCR to be calculated is calculated. For example, fluctuation factors such as a difference in vehicle weight, a difference in the number of passengers, a difference in in-vehicle devices, a difference in driving operation of a driver, and a difference in operating states of in-vehicle auxiliary devices cause a difference in power consumption. The correction value VCR is a correction value reflecting these fluctuation factors.

充電期待値算出処理(CXPC)P10は、車両3Bへの充電処理の履歴データを蓄積する履歴データ蓄積手段と、この履歴データに基づいて、車両3Bへの充電の可能性、すなわち充電期待値を予測する予測手段とを備える。充電処理の履歴は、車両3Bの運行者の傾向、好みなどを反映している。例えば、履歴には、バッテリ34の残存電力SOCと充電処理の頻度との関係を含むことができる。また、履歴には、充電処理と充電処理との間の車両3Bの運行時間、および/または走行距離を含むことができる。また、履歴には、充電処理が実行された充電スタンド4の種類、特徴、場所などの充電スタンド4に関する情報を含むことができる。これらの履歴は、時間軸上、および/または地図上における、次の充電処理が実行される可能性を算出するために利用される。充電期待値は、時間軸上、および/または地図上における充電に必要な電力と、充電可能性との積の分布として表現される。充電期待値算出処理P10により算出された充電期待値CHXPには、車両3Bが予測された経路を走行するために必要な予測必要電力ESPCが反映されている。さらに、充電期待値CHXPには、充電処理が実行される可能性の時間軸上の分布、および/または地図上の分布が反映されている。言い換えると、充電期待値は、予測必要電力ESPCを、時間軸上、および/または地図上に分散させて配置した情報とも見ることができる。また、充電期待値CHXPは、車両3Bに充電するために必要な電力需要を示しているともいえる。   The expected charge value calculation process (CXPC) P10 determines the history data storage means for storing the history data of the charging process for the vehicle 3B, and the possibility of charging the vehicle 3B, that is, the expected charging value based on the history data. Predicting means for predicting. The history of the charging process reflects the tendency and preference of the operator of the vehicle 3B. For example, the history can include the relationship between the remaining power SOC of the battery 34 and the frequency of the charging process. Further, the history can include the operation time and / or travel distance of the vehicle 3B between the charging process and the charging process. In addition, the history can include information on the charging station 4 such as the type, characteristics, and location of the charging station 4 on which the charging process has been executed. These histories are used to calculate the possibility of the next charging process being executed on the time axis and / or on the map. The expected charge value is expressed as a product distribution of the power required for charging on the time axis and / or the map and the chargeability. The expected charging power CHPC calculated by the expected charging value calculation process P10 reflects the predicted required power ESPC necessary for the vehicle 3B to travel on the predicted route. Further, the expected charging value CHXP reflects the distribution on the time axis and / or the distribution on the map of the possibility of executing the charging process. In other words, the expected charge value can also be viewed as information in which the predicted required power ESPC is distributed on the time axis and / or the map. Further, it can be said that the expected charging value CHXP indicates the power demand necessary for charging the vehicle 3B.

充電速度収集処理(CDPC)P11は、車両3Bへ実際に充電した充電スタンド4の充電速度CHSPに関するデータを収集する。充電速度収集処理P11は、充電速度CHSPの他の充電スタンド4に関する情報も収集するように構成されている。   The charging speed collection process (CDPC) P11 collects data related to the charging speed CHSP of the charging station 4 that has actually charged the vehicle 3B. The charging rate collection process P11 is configured to collect information related to other charging stations 4 of the charging rate CHSP.

以上に述べた複数の制御装置は、コンピュータによって読み取り可能な記憶媒体を備えるマイクロコンピュータによって提供される。記憶媒体は、コンピュータによって読み取り可能なプログラムを格納している。記憶媒体は、メモリによって提供されうる。プログラムは、制御装置によって実行されることによって、制御装置をこの明細書に記載される装置として機能させ、この明細書に記載される制御方法を実行するように制御装置を機能させる。制御装置が提供する手段は、所定の機能を達成する機能的ブロック、またはモジュールとも呼ぶことができる。   The plurality of control devices described above are provided by a microcomputer provided with a computer-readable storage medium. The storage medium stores a computer-readable program. The storage medium can be provided by a memory. By being executed by the control device, the program causes the control device to function as the device described in this specification, and causes the control device to function so as to execute the control method described in this specification. The means provided by the control device can also be called a functional block or module that achieves a predetermined function.

図5は、充電システム1の全体の処理を示すフローチャートである。基準車両3Aは、基準消費電力収集処理P7を実行する。基準車両3Aによって収集された基準消費電力STPCは、サービスセンタ2に送信される。基準車両3Aによって収集された基準消費電力STPCは、設定処理(STCT−1)P13によってサービスセンタ2内のデータベースに記録される。設定処理P13は、基準消費電力処理P1の一部を構成している。サービスセンタ2は、渋滞補正処理(PCCT−1)P14によって道路の渋滞状況TRFCに応じた渋滞補正値TCRを算出する。渋滞補正処理P14は、消費電力補正処理P2の一部を構成している。サービスセンタ2は、送信処理(TRNS)P15により、基準消費電力STPCと渋滞補正値TCRとを車両3Bに提供する。   FIG. 5 is a flowchart showing the overall processing of the charging system 1. The reference vehicle 3A executes the reference power consumption collection process P7. The reference power consumption STPC collected by the reference vehicle 3A is transmitted to the service center 2. The reference power consumption STPC collected by the reference vehicle 3A is recorded in the database in the service center 2 by the setting process (STCT-1) P13. The setting process P13 constitutes a part of the reference power consumption process P1. The service center 2 calculates a traffic congestion correction value TCR corresponding to the traffic congestion status TRFC of the road through a traffic congestion correction process (PCCT-1) P14. The traffic jam correction process P14 constitutes a part of the power consumption correction process P2. The service center 2 provides the reference power consumption STPC and the traffic jam correction value TCR to the vehicle 3B through transmission processing (TRNS) P15.

車両3Bでは、補機電力処理(PCES−1)P16が実行される。補機電力処理P16は、車両3Bの過去の走行における補助機器の過去消費電力APCに基づいて、将来の走行における補助機器の消費電力を予測し、予測補機電力EAPCを算出する。補機電力処理P16では、ナビゲーション制御装置43から車両3Bが今後走行しようとする経路を示す予測経路のデータを取得する。さらに、予測経路と、過去消費電力APCとに基づいて、予測経路において発生すると予測される補助機器の消費電力を予測補機電力ESPCとして算出する。補機電力処理P16は、消費電力予測処理P8の一部を構成する。また、車両3Bでは、車両補正値VCRの算出処理(CRVC)P9が実行される。処理P16および処理P9の後に、必要電力予測処理(PCES−2)P17が実行される。必要電力予測処理P17では、ナビゲーション制御装置43から車両3Bが今後走行しようとする経路を示す予測経路のデータを取得する。必要電力予測処理P17では、予測経路における基準消費電力STPCをサービスセンタ2から送信されたデータから取得する。さらに、必要電力予測処理P17では、予測経路と、基準消費電力STPCと、渋滞補正値TCRと、車両補正値VCRと、予測補機電力ESPCとから、予測経路を走行するために車両3Bが必要とすると予測される予測必要電力ESPCを算出する。さらに、車両3Bでは、充電期待値算出処理P10が実行される。ひとつの車両3Bの充電期待値CHXPは、サービスセンタ2に送信される。   In vehicle 3B, auxiliary power processing (PCES-1) P16 is executed. The auxiliary machine power processing P16 predicts the power consumption of the auxiliary equipment in the future travel based on the past power consumption APC of the auxiliary equipment in the past travel of the vehicle 3B, and calculates the predicted auxiliary power EAPC. In the auxiliary power processing P16, data of a predicted route indicating a route that the vehicle 3B is to travel in the future is acquired from the navigation control device 43. Further, based on the predicted route and the past power consumption APC, the power consumption of the auxiliary device predicted to occur in the predicted route is calculated as the predicted auxiliary power ESPC. The auxiliary power processing P16 constitutes a part of the power consumption prediction processing P8. Further, in the vehicle 3B, a vehicle correction value VCR calculation process (CRVC) P9 is executed. After the process P16 and the process P9, a required power prediction process (PCES-2) P17 is executed. In the required power prediction process P <b> 17, predicted route data indicating a route on which the vehicle 3 </ b> B will travel in the future is acquired from the navigation control device 43. In the required power prediction process P <b> 17, the reference power consumption STPC in the predicted route is acquired from the data transmitted from the service center 2. Further, in the required power prediction process P17, the vehicle 3B is required to travel on the predicted route from the predicted route, the reference power consumption STPC, the congestion correction value TCR, the vehicle correction value VCR, and the predicted auxiliary power ESPC. Then, the predicted required power ESPC to be predicted is calculated. Further, in the vehicle 3B, an expected charge value calculation process P10 is executed. The expected charging value CHXP of one vehicle 3B is transmitted to the service center 2.

サービスセンタ2では、充電期待値集計処理P3が実行される。充電期待値集計処理P3により、複数の車両3における充電期待値CHXPが集計される。ひとつの車両3Bの充電期待値CHXPは、その車両3Bの電力需要を示している。よって、複数の車両3の充電期待値CHXPを加算することによって複数の車両3に充電するための電力網5における電力需要を示す基礎電力推移PCSD1が求められる。基礎電力推移PCSD1は、少なくとも時間に対する電力需要の分布を示している。また、基礎電力推移PCSD1は、地図上における電力需要の分布を示してもよい。   In the service center 2, an expected charging value totaling process P3 is executed. The expected charge value CHXP in the plurality of vehicles 3 is totaled by the expected charge value aggregation process P3. The expected charge value CHXP of one vehicle 3B indicates the power demand of that vehicle 3B. Therefore, the basic power transition PCSD1 indicating the power demand in the power network 5 for charging the plurality of vehicles 3 by adding the expected charging values CHXP of the plurality of vehicles 3 is obtained. The basic power transition PCSD1 indicates the distribution of power demand with respect to at least time. Further, the basic power transition PCSD1 may indicate a distribution of power demand on the map.

上記の処理と並行して、または上記の処理の後に、サービスセンタ2は、充電予約処理P5を実行する。充電予約処理P5では、複数の充電スタンド4から特定の充電スタンド4Aを選定し、選定された充電スタンド4Aを車両3Bに送信する。車両3Bにおいては、選定された充電スタンド4Aがナビゲーション装置などに表示され、車両3Bの運行者によって充電スタンド4Aでの充電処理が予約される。予約処理は、サービスセンタ2によって実行されてもよい。特定の充電スタンド4Aを選定する処理は、充電期待値CHXPに基づいて実行することができる。例えば、予測経路上に位置する充電スタンド4、および/または予測経路の近傍に位置する充電スタンド4から、ひとつまたは複数の候補が、充電期待値CHXPに基づいて選定される。充電期待値CHXPは、充電が予測される充電時間帯を示している。一例においては、充電期待値CHXPが示す充電時間帯に予約が可能な充電スタンド4Aを選定することができる。また、充電期待値CHXPは、充電が予測される充電時間帯、および/または地図上の走行位置を示している。一例においては、充電期待値CHXPが示す充電時間帯または走行位置に基づいて利用可能な充電スタンド4Aを選定することができる。また、車両3Bに蓄積された履歴データに基づいて、運行者の好みに適合した充電スタンド4A、あるいは運行者に経済的な利益をもたらす充電スタンド4Aを選定してもよい。また、車両3Bの予定到着時刻と、充電スタンド4の充電速度CHSPとに基づいて、予定到着時刻までに他車への充電が実現可能となる充電速度CHSPをもつ充電スタンド4Aを選定するように構成することができる。   In parallel with the above process or after the above process, the service center 2 executes the charge reservation process P5. In the charging reservation process P5, a specific charging station 4A is selected from the plurality of charging stations 4, and the selected charging station 4A is transmitted to the vehicle 3B. In the vehicle 3B, the selected charging station 4A is displayed on a navigation device or the like, and a charging process at the charging station 4A is reserved by the operator of the vehicle 3B. The reservation process may be executed by the service center 2. The process of selecting a specific charging station 4A can be executed based on the expected charging value CHXP. For example, one or a plurality of candidates are selected based on the expected charging value CHXP from the charging station 4 positioned on the predicted path and / or the charging station 4 positioned in the vicinity of the predicted path. The expected charging value CHXP indicates a charging time zone in which charging is predicted. In one example, a charging station 4A that can be reserved in the charging time zone indicated by the expected charging value CHXP can be selected. Further, the expected charging value CHXP indicates a charging time zone in which charging is predicted and / or a travel position on a map. In one example, an available charging station 4A can be selected based on the charging time zone or travel position indicated by the expected charging value CHXP. Further, based on the history data stored in the vehicle 3B, a charging station 4A that suits the operator's preference or a charging station 4A that brings economic benefits to the operator may be selected. Further, based on the scheduled arrival time of the vehicle 3B and the charging speed CHSP of the charging station 4, a charging station 4A having a charging speed CHSP that enables charging to another vehicle by the scheduled arrival time is selected. Can be configured.

充電予約処理P5に応答して、車両3Bでは、充電処理(CHRG)P12が実行される。例えば、車両3Bの運行者は、サービスセンタ2から提案された充電スタンド4Aにおいて充電処理P12を実行する。充電処理P12では、車両3Bの充電コネクタ37に充電スタンド4Aのコネクタが接続され、バッテリ34への充電が実行される。この充電処理P12の間に、充電速度収集処理P11が実行される。充電速度収集処理P11によって収集された充電速度CHSPを含む充電スタンド4Aに関する情報は、サービスセンタ2に送信される。   In response to the charging reservation process P5, the charging process (CHRG) P12 is executed in the vehicle 3B. For example, the operator of the vehicle 3B executes the charging process P12 at the charging stand 4A proposed by the service center 2. In the charging process P12, the connector of the charging stand 4A is connected to the charging connector 37 of the vehicle 3B, and the battery 34 is charged. During this charging process P12, a charging speed collection process P11 is executed. Information regarding the charging station 4A including the charging rate CHSP collected by the charging rate collection process P11 is transmitted to the service center 2.

サービスセンタ2では、充電スタンドに関する情報を収集する充電情報収集処理(PSCT−1)P18が実行される。充電情報収集処理P18によって収集された充電スタンド4に関する情報は、充電予約処理P5に用いられる。さらに、充電情報収集処理P18によって収集された充電速度CHSPは、電力推移補正処理(PSCT−2)P19に用いられる。電力推移補正処理P19では、充電期待値集計処理P3によって得られた基礎電力推移PCSD1を、充電速度CHSPに基づいて修正し、修正電力推移PCSD2が算出される。ひとつの充電スタンド4に供給すべき最大の電力は、その充電スタンド4の充電速度CHSPに比例する。よって、ひとつの充電スタンド4に供給すべき電力は、充電速度CHSPに応じて制限することができる。そこで、電力推移補正処理P19では、基礎電力推移PCSD1によって示される電力需要を、充電速度CHSPに応じて分散させる。具体的には、電力推移補正処理P19は、基礎電力推移PCSD1を複数の充電スタンド4に割り当てる手段と、ひとつの充電スタンド4Aに割り当てられた電力をその充電スタンド4Aの充電速度CHSPに基づいて時間軸上に分散させる手段とを含む。これにより、それぞれの充電スタンド4の能力を反映した電力需要を示す修正電力推移PCSD2が得られる。サービスセンタ2は、送信処理(TRNS)P20により、基礎電力推移PCSD1と修正電力推移PCSD2とを電力制御センタ6へ送信する。以下の説明では、基礎電力推移PCSD1と修正電力推移PCSD2とを総称して、電力推移PCSDと呼ぶ。   In the service center 2, a charging information collection process (PSCT-1) P18 for collecting information related to the charging station is executed. Information on the charging station 4 collected by the charging information collecting process P18 is used for the charging reservation process P5. Furthermore, the charge rate CHSP collected by the charge information collection process P18 is used for the power transition correction process (PSCT-2) P19. In the power transition correction process P19, the basic power transition PCSD1 obtained by the expected charging value totaling process P3 is corrected based on the charging speed CHSP, and the corrected power transition PCSD2 is calculated. The maximum power to be supplied to one charging station 4 is proportional to the charging speed CHSP of the charging station 4. Therefore, the electric power to be supplied to one charging stand 4 can be limited according to the charging speed CHSP. Therefore, in the power transition correction process P19, the power demand indicated by the basic power transition PCSD1 is distributed according to the charging speed CHSP. Specifically, the power transition correction processing P19 is a unit for allocating the basic power transition PCSD1 to the plurality of charging stations 4 and the power allocated to one charging station 4A based on the charging speed CHSP of the charging station 4A. And means for dispersing on the shaft. Thereby, the corrected electric power transition PCSD2 which shows the electric power demand reflecting the capability of each charging station 4 is obtained. The service center 2 transmits the basic power transition PCSD1 and the corrected power transition PCSD2 to the power control center 6 by transmission processing (TRNS) P20. In the following description, the basic power transition PCSD1 and the corrected power transition PCSD2 are collectively referred to as a power transition PCSD.

電力制御センタ6は、電力推移PCSDに基づいて電力制御処理(PWCT)P21を実行する。電力制御処理P21には、電力推移PCSDに基づいて、電力網5における資源の配分を調節する処理が含まれる。例えば、電力制御処理P21は、電力推移PCSDが示す電力需要に応えるように発電所の発電電力を調節する。また、電力制御処理P21は、電力推移PCSDが示す電力需要に基づいて、電力網5内の複数の地区のそれぞれへの供給電力、または送電設備の配分を調節する処理を含むことができる。さらに、電力制御処理には、電力推移PCSDに基づいて、電力網5の設備を計画する処理を含むことができる。   The power control center 6 executes a power control process (PWCT) P21 based on the power transition PCSD. The power control process P21 includes a process of adjusting resource allocation in the power network 5 based on the power transition PCSD. For example, the power control process P21 adjusts the generated power of the power plant so as to meet the power demand indicated by the power transition PCSD. In addition, the power control process P21 can include a process of adjusting the supply power to each of a plurality of districts in the power network 5 or the distribution of power transmission equipment based on the power demand indicated by the power transition PCSD. Furthermore, the power control process can include a process for planning facilities of the power network 5 based on the power transition PCSD.

図6は、基準消費電力STPCを収集するための処理を説明するブロック図である。基準車両3Aが道路上の区間SA、SBを走行する過程が図示されている。通信ネットワーク7は、道路上に複数の路上局7A、7B、7Cを有している。路上局7A、7B、7Cは、交差点の信号機などに設置されている。ひとつの路上局は、ひとつの交差点に対応する通信可能範囲CRを有している。   FIG. 6 is a block diagram illustrating a process for collecting the reference power consumption STPC. The process in which the reference vehicle 3A travels the sections SA and SB on the road is illustrated. The communication network 7 has a plurality of road stations 7A, 7B, and 7C on the road. The road stations 7A, 7B, and 7C are installed at traffic lights at intersections. One roadside station has a communicable range CR corresponding to one intersection.

基準車両3Aは、自らが走行している区間SA、SBを特定する区間特定手段と、その区間における自らの消費電力を計測する計測手段と、基準消費電力STPCを算出する手段と、基準消費電力STPCをサービスセンタ2に送信する送信手段とを備える。サービスセンタ2は、基準車両3Aから基準消費電力STPCを受信する手段を備える。例えば、基準車両3Aは、区間SA、SBを走行した場合、区間SAにおける基準消費電力STPC(SA)と、区間SBにおける基準消費電力STPC(SB)とを送信する。一方、サービスセンタ2は、基準消費電力処理P1とデータベース23Aとによって、基準消費電力STPCを記憶し、蓄積する蓄積手段を提供している。   The reference vehicle 3A includes a section specifying means for specifying the sections SA and SB in which it is traveling, a measuring means for measuring its own power consumption in the section, a means for calculating a reference power consumption STPC, and a reference power consumption. Transmitting means for transmitting the STPC to the service center 2. Service center 2 includes means for receiving reference power consumption STPC from reference vehicle 3A. For example, when the reference vehicle 3A travels in the sections SA and SB, the reference vehicle 3A transmits the reference power consumption STPC (SA) in the section SA and the reference power consumption STPC (SB) in the section SB. On the other hand, the service center 2 provides storage means for storing and storing the reference power consumption STPC by the reference power consumption processing P1 and the database 23A.

図7は、基準消費電力STPCを収集するための基準車両3Aにおける処理60を示すフローチャートである。図7は、基準消費電力収集処理P7を示している。ステップ61では、走行前処理が実行される。ステップ62では、基準車両3Aの走行計画に基づいて走行が予定された区間と交差点とを特定するための複数の区間ID(SCID)と複数の交差点ID(CRID)とが設定される。ステップ63では、走行前の残存電力SOCを示す初期残存電力SOCiが計測される。   FIG. 7 is a flowchart showing a process 60 in the reference vehicle 3A for collecting the reference power consumption STPC. FIG. 7 shows the reference power consumption collection process P7. In step 61, pre-travel processing is executed. In step 62, a plurality of section IDs (SCID) and a plurality of intersection IDs (CRID) for specifying the section and the intersection scheduled to travel based on the travel plan of the reference vehicle 3A are set. In step 63, the initial remaining power SOCi indicating the remaining power SOC before traveling is measured.

基準車両3Aが走行し所定の交差点に到達すると、以下の処理が実行される。ステップ64では、路上局から交差点IDが受信される。ステップ65では、交差点の中央を特定し、自車が中央を通過したか否かが判定される。交差点の中央は、区間の両端を示す基準点として用いられる。交差点の中央は、ナビゲーション制御装置43から得られる自車の位置情報に基づき、または画像認識処理に基づき特定する。例えば、自車と交差点の中央との距離を算出し、自車がその距離を走行したら、交差点の中央に到達したものと判定する。また、路上局7A、7B、7Cは、通信可能範囲CRに基づいて交差点の中央を特定してもよい。なお、交差点の中央は、道路の厳密な中央地点である必要はない。交差点の中央は、交差点の通過を判別するための基準点として用いられるので、車両によって認識可能な種々の地点によって代替することができる。基準車両3Aが交差点の中央を通過するとステップ66へ進む。   When the reference vehicle 3A travels and reaches a predetermined intersection, the following processing is executed. In step 64, the intersection ID is received from the roadside station. In step 65, the center of the intersection is specified, and it is determined whether or not the vehicle has passed the center. The center of the intersection is used as a reference point indicating both ends of the section. The center of the intersection is specified based on the position information of the own vehicle obtained from the navigation control device 43 or based on image recognition processing. For example, the distance between the vehicle and the center of the intersection is calculated, and if the vehicle travels the distance, it is determined that the vehicle has reached the center of the intersection. The road stations 7A, 7B, and 7C may specify the center of the intersection based on the communicable range CR. Note that the center of the intersection need not be the exact center of the road. Since the center of the intersection is used as a reference point for determining the passage of the intersection, it can be replaced by various points that can be recognized by the vehicle. When the reference vehicle 3A passes through the center of the intersection, the process proceeds to step 66.

ステップ66では、新区間の消費電力SPC(i)の計測を開始する。これにより、バッテリ34の電流が計測され、記録される。バッテリ34の電流は、電動発電機31の必要トルクに応じて変動する。さらに、回生制御によって、基準車両3Aが減速されるときには、電動発電機31は発電機として使用される。よって、減速時には電力がバッテリ34へ供給され、バッテリ34が充電される。電流センサ40は、電流の方向と大きさとを検出する。ステップ67では、新区間の開始時の時刻、およびバッテリ34の電圧などのバッテリ34の状態が記録される。   In step 66, measurement of the power consumption SPC (i) in the new section is started. Thereby, the current of the battery 34 is measured and recorded. The current of the battery 34 varies according to the required torque of the motor generator 31. Furthermore, when the reference vehicle 3A is decelerated by regenerative control, the motor generator 31 is used as a generator. Therefore, at the time of deceleration, electric power is supplied to the battery 34 and the battery 34 is charged. The current sensor 40 detects the direction and magnitude of the current. In step 67, the time of the start of the new section and the state of the battery 34 such as the voltage of the battery 34 are recorded.

ステップ68では、前区間があったか否かが判定される。最初の区間である場合、区間カウンタiをカウントアップし、ステップ64へ戻る。これにより、ステップ66によるバッテリ状態の記録が継続される。やがて、基準車両3Aが次の交差点に到達すると、ステップ64からステップ67の処理が再び実行される。これにより、次の区間の消費電力SPC(i)の計測処理が開始される。一方、ステップ65を再び通過したことは、前区間の終了を意味している。ステップ68では、前区間があったことが判定されるから、ステップ69へ進む。   In step 68, it is determined whether or not there is a previous section. If it is the first section, the section counter i is incremented and the process returns to step 64. Thereby, recording of the battery state by step 66 is continued. When the reference vehicle 3A eventually reaches the next intersection, the processing from step 64 to step 67 is executed again. Thereby, the measurement process of the power consumption SPC (i) in the next section is started. On the other hand, passing through step 65 again means the end of the previous section. In step 68, since it is determined that there is a previous section, the process proceeds to step 69.

ステップ69では、前区間の消費電力SPC(i−1)の計測を終了する。これにより前区間における電流の計測が終了する。ステップ70では、前区間の終了時の時刻、およびバッテリ34の電圧などのバッテリ34の状態が記録される。ステップ71では、前区間の消費電力STPC(i−1)が算出され、記録される。消費電力STPC(i−1)は、区間走行中にバッテリ34から流出した電流の平均電流に基づいて算出される。消費電力STPC(i−1)は、計測開始時のバッテリ電圧と終了時のバッテリ電圧との平均電圧に基づいて算出される。消費電力STPC(i−1)は、STPC(i−1)=平均電流×平均電圧×区間走行時間に基づいて算出される。なお、区間の基準点として、一定の時間間隔を用いてもよい。例えば、一定の周期で消費電力を算出してもよい。また、一定周期で算出された消費電力を、交差点によって示される区間の終了後に合計してもよい。このような手法は、高速道路など区間が長距離の場合に有効である。高速道路などでは、消費電力量が多く、またバッテリ電圧の変化が直線的ではない場合が生じる。このため、上記手法は、消費電力の算出精度を高くするために有効である。   In step 69, the measurement of the power consumption SPC (i-1) in the previous section is terminated. Thereby, the current measurement in the previous section is completed. In step 70, the time of the end of the previous section and the state of the battery 34 such as the voltage of the battery 34 are recorded. In step 71, the power consumption STPC (i-1) of the previous section is calculated and recorded. The power consumption STPC (i-1) is calculated based on the average current that has flowed out of the battery 34 during traveling in the section. The power consumption STPC (i-1) is calculated based on the average voltage between the battery voltage at the start of measurement and the battery voltage at the end. The power consumption STPC (i−1) is calculated based on STPC (i−1) = average current × average voltage × section travel time. A fixed time interval may be used as the reference point of the section. For example, the power consumption may be calculated at a constant cycle. Further, the power consumption calculated at a constant cycle may be totaled after the section indicated by the intersection. Such a method is effective when the section is long distance such as an expressway. On an expressway or the like, there is a case where the amount of power consumption is large and the change in battery voltage is not linear. For this reason, the said method is effective in order to make the calculation precision of power consumption high.

ステップ72では、計画された区間の走行を終了したか否かを判定する。走行を継続する場合、ステップ64へ戻る。ステップ64からステップ72の処理を繰り返すことにより、複数の区間の消費電力が計測され、記録される。計画された区間をすべて走行した場合、ステップ73へ進む。   In step 72, it is determined whether or not the travel of the planned section has been completed. If the running is continued, the process returns to step 64. By repeating the processing from step 64 to step 72, the power consumption in a plurality of sections is measured and recorded. If all the planned sections have been traveled, the process proceeds to step 73.

ステップ73では、走行後処理を実行する。走行後処理73では、各区間における消費電力の誤差を抑制するために、全区間を含む走行全体の総合消費電力CPCに基づいて各区間の消費電力を補正して、各区間の基準消費電力STPCとして確定させる。   In step 73, post-travel processing is executed. In the post-travel processing 73, in order to suppress power consumption error in each section, the power consumption in each section is corrected based on the total power consumption CPC of the entire travel including all sections, and the reference power consumption STPC in each section is corrected. To be confirmed.

ステップ74では、走行後の残存電力SOCを示す終期残存電力SOCeが計測される。ステップ75では、初期残存電力SOCiと終期残存電力SOCeとに基づいて総合消費電力CPC(Wh)が算出される。総合消費電力CPCは、初期残存電力SOCiと終期残存電力SOCeとの差に基づいて算出することができる。ステップ76では、複数の区間の消費電力SPC(i)を合計することによって合計消費電力TPC(Wh)を算出する。合計消費電力TPCは、TPC=ΣSPC(i)によって算出される。   In step 74, the final remaining power SOCe indicating the remaining power SOC after traveling is measured. In step 75, the total power consumption CPC (Wh) is calculated based on the initial remaining power SOCi and the final remaining power SOCe. The total power consumption CPC can be calculated based on the difference between the initial remaining power SOCi and the final remaining power SOCe. In step 76, the total power consumption TPC (Wh) is calculated by summing the power consumption SPC (i) of a plurality of sections. The total power consumption TPC is calculated by TPC = ΣSPC (i).

ステップ77では、各区間の消費電力SPC(i)と、総合消費電力CPCと、合計消費電力TPCとに基づいて、各区間の区間補正値SCRを算出する。ステップ77は、各区間の消費電力量SPC(i)を合計消費電力TPCで割ることにより区間の消費電力比率(%)を算出する工程と、総合消費電力CPCと合計消費電力TPCとの差を算出する工程と、この差に消費電力比率を掛けることにより区間補正値SCR(i)を算出する工程とを含むことができる。この場合、区間補正値SCR(i)は、SCR(i)=(CPC−TPC)×SPC(i)/TPCによって算出される。   In step 77, the section correction value SCR of each section is calculated based on the power consumption SPC (i) of each section, the total power consumption CPC, and the total power consumption TPC. Step 77 calculates the power consumption ratio (%) of the section by dividing the power consumption amount SPC (i) of each section by the total power consumption TPC and the difference between the total power consumption CPC and the total power consumption TPC. The step of calculating and the step of calculating the section correction value SCR (i) by multiplying the difference by the power consumption ratio can be included. In this case, the section correction value SCR (i) is calculated by SCR (i) = (CPC−TPC) × SPC (i) / TPC.

ステップ78では、基準消費電力STPCの確定処理を実行する。ステップ78では、各区間の消費電力SPC(i)を区間補正値SCR(i)により補正し、各区間の基準消費電力STPC(i)を算出する。例えば、基準消費電力STPCは、STPC(i)=SPC(i)+SCR(i)によって算出される。ステップ61からステップ78の一連の処理により、基準車両3Aを道路上の複数の区間を走行することにより、それら区間における消費電力を計測する計測手段が提供される。   In step 78, a process for determining the reference power consumption STPC is executed. In step 78, the power consumption SPC (i) of each section is corrected by the section correction value SCR (i), and the reference power consumption STPC (i) of each section is calculated. For example, the reference power consumption STPC is calculated by STPC (i) = SPC (i) + SCR (i). By means of a series of processing from step 61 to step 78, a measuring means is provided that measures the power consumption in these sections by traveling the reference vehicle 3A through a plurality of sections on the road.

ステップ79では、確定された基準消費電力STPC(i)がサービスセンタ2に送信される。よって、通信手段は、基準車両3Aによって計測された消費電力をサービスセンタ2に送信するよう構成されている。   In step 79, the determined reference power consumption STPC (i) is transmitted to the service center 2. Therefore, the communication means is configured to transmit the power consumption measured by the reference vehicle 3A to the service center 2.

一方、サービスセンタ2では、基準車両3Aから送信される基準消費電力STPC(i)を受信し、データベース23Aに記録する処理が実行される。すなわち、データベース23Aは、基準車両3Aによって計測され、基準車両3Aから得られた消費電力を基準消費電力として記憶するよう構成されている。   On the other hand, in the service center 2, a process of receiving the reference power consumption STPC (i) transmitted from the reference vehicle 3A and recording it in the database 23A is executed. That is, the database 23A is configured to store the power consumption measured by the reference vehicle 3A and obtained from the reference vehicle 3A as the reference power consumption.

図8は、車両補正値VCRを算出するための処理を説明するブロック図である。車両3Bが道路上の区間SA、SBを走行する過程が図示されている。   FIG. 8 is a block diagram illustrating a process for calculating the vehicle correction value VCR. The process in which the vehicle 3B travels the sections SA and SB on the road is illustrated.

サービスセンタ2は、基準消費電力STPCを車両3Bに送信する手段を備える。車両3Bは、自らが走行している区間SA、SBを特定する区間特定手段と、その区間における自らの実消費電力CPCを計測する計測手段と、その区間における基準消費電力STPCを受信する受信手段と、少なくとも実消費電力CPCと基準消費電力STPCとに基づいて車両補正値VCRを算出する手段とを備える。例えば、車両3Aが、区間SA、SBを走行した場合、サービスセンタ2は、区間SAにおける基準消費電力STPC(SA)と、区間SBにおける基準消費電力STPC(SB)とを送信する。一方、車両3Aは、基準消費電力STPC(SA)と、基準消費電力STPC(SB)とを受信する。一方、を記憶し、蓄積する蓄積手段を提供している。   The service center 2 includes means for transmitting the reference power consumption STPC to the vehicle 3B. The vehicle 3B includes section specifying means for specifying the sections SA and SB in which the vehicle 3B is traveling, measuring means for measuring its own actual power consumption CPC in the section, and receiving means for receiving the reference power consumption STPC in the section. And means for calculating a vehicle correction value VCR based on at least the actual power consumption CPC and the reference power consumption STPC. For example, when the vehicle 3A travels in the sections SA and SB, the service center 2 transmits the reference power consumption STPC (SA) in the section SA and the reference power consumption STPC (SB) in the section SB. On the other hand, the vehicle 3A receives the reference power consumption STPC (SA) and the reference power consumption STPC (SB). On the other hand, storage means for storing and storing the information is provided.

図9は、複数の車両3のためにサービスセンタ2が実行するデータ提供処理90を示すフローチャートである。図9は、基準消費電力処理P1の一部を示している。ステップ91では、既存の交通管制システムから各区間の渋滞状況TRFCを入力する。例えば、渋滞状況TRFCは、ひとつの区間の年間の平均車速VSMYと、その区間の現在の車速VSPTとを入力する。ステップ92では、各区間の渋滞補正値TCRを算出し、渋滞状況TRFCとしてデータベース23Bに記録する。渋滞補正値TCRを算出するために、サービスセンタ2は、基準車両3Aの走行に使う消費電力と車速との関係を示すデータを記憶している。このデータにより、車速に基づいて消費電力を求めることができる。ステップ92では、各区間の車速情報に基づいて、各区間の渋滞補正値TCRを算出する。まず、現在の車速VSPTにおける消費電力SPC(VSPT)を求める。次に、平均車速VSMYにおける消費電力SPC(VSMY)を求める。渋滞補正値TCR(%)は、例えば、TCR=(SPC(VSPT))/(SPC(VAMY))×100によって求めることができる。   FIG. 9 is a flowchart showing a data providing process 90 executed by the service center 2 for a plurality of vehicles 3. FIG. 9 shows a part of the reference power consumption processing P1. In step 91, the traffic condition TRFC of each section is input from the existing traffic control system. For example, the traffic jam condition TRFC inputs the average vehicle speed VSMY for one section and the current vehicle speed VSPT for that section. In step 92, the traffic jam correction value TCR for each section is calculated and recorded in the database 23B as the traffic jam status TRFC. In order to calculate the traffic jam correction value TCR, the service center 2 stores data indicating the relationship between the power consumption and the vehicle speed used for traveling the reference vehicle 3A. With this data, the power consumption can be obtained based on the vehicle speed. In step 92, the congestion correction value TCR for each section is calculated based on the vehicle speed information for each section. First, the power consumption SPC (VSPT) at the current vehicle speed VSPT is obtained. Next, power consumption SPC (VSMY) at average vehicle speed VSMY is obtained. The traffic congestion correction value TCR (%) can be obtained by, for example, TCR = (SPC (VSPT)) / (SPC (VAMY)) × 100.

ステップ93では、渋滞補正値TCRを車両3Bに送信する。ステップ91からステップ93の一連の処理により、渋滞補正値算出手段が提供される。渋滞補正値算出手段は、道路上の複数の区間の渋滞状況に応じた渋滞補正値TCRを算出する。   In step 93, the traffic jam correction value TCR is transmitted to the vehicle 3B. The traffic jam correction value calculation means is provided by a series of processing from step 91 to step 93. The traffic jam correction value calculation means calculates a traffic jam correction value TCR corresponding to the traffic jam status of a plurality of sections on the road.

ステップ94では、基準消費電力STPCを車両3Bに送信する。ステップ94は、基準消費電力STPCをサービスセンタ2から車両3Bに送信する通信手段を提供する。ステップ93およびステップ94における送信処理は、車両3Bからの要求に応じて実行されてもよい。例えば、車両3Bから要求された区間の渋滞補正値TCRと基準消費電力STPCだけを送信することができる。また、一定期間毎に、あるいは一定の更新が生じた場合に、全区間の渋滞補正値TCRと基準消費電力STPCとを送信してもよい。   In step 94, reference power consumption STPC is transmitted to vehicle 3B. Step 94 provides a communication means for transmitting the reference power consumption STPC from the service center 2 to the vehicle 3B. The transmission processing in step 93 and step 94 may be executed in response to a request from the vehicle 3B. For example, only the traffic congestion correction value TCR and the reference power consumption STPC for the section requested from the vehicle 3B can be transmitted. Further, the congestion correction value TCR and the reference power consumption STPC for all sections may be transmitted at regular intervals or when a constant update occurs.

図10は、車両補正値VCRを算出するための車両3Bにおける処理100を示すフローチャートである。図10は、車両補正値VCRの算出処理P9を示している。ステップ101では、走行前処理が実行される。ステップ102では、補助機器の消費電力APCの計測処理と記録処理とが開始される。ステップ102では、充電制御装置41が、ネットワーク49を通して、他の制御装置45、47に消費電力の記録を指示する。補助機器の消費電力の記録は、消費電力に大きな影響を与える比較的電力消費が大きい負荷を制御する制御装置に指示され、実行される。ここでは、空調制御装置45とボデー制御装置47とに対して指示が出力される。制御装置45、47は、指示を受けると、消費電力の計測と記録とを開始し、終了指示を受けるまで継続する。ステップ103では、走行前の残存電力SOCを示す初期残存電力SOCiが計測される。   FIG. 10 is a flowchart showing a process 100 in the vehicle 3B for calculating the vehicle correction value VCR. FIG. 10 shows a vehicle correction value VCR calculation process P9. In step 101, a pre-travel process is executed. In step 102, measurement processing and recording processing of power consumption APC of the auxiliary device are started. In step 102, the charging control device 41 instructs the other control devices 45 and 47 to record the power consumption through the network 49. The recording of the power consumption of the auxiliary device is instructed and executed by a control device that controls a load having a relatively large power consumption that greatly affects the power consumption. Here, an instruction is output to the air conditioning control device 45 and the body control device 47. Upon receiving the instruction, the control devices 45 and 47 start measuring and recording power consumption and continue until receiving an end instruction. In step 103, the initial remaining power SOCi indicating the remaining power SOC before traveling is measured.

車両3Bが走行し所定の交差点に到達すると、以下の処理が実行される。ステップ104では、路上局から交差点IDを受信する。ステップ105では、車両3Bが走行している走行区間が特定される。ステップ106では、走行区間の基準消費電力STPCをサービスセンタ2から受信する。ステップ107では、走行区間の渋滞補正値TCRをサービスセンタ2から受信する。ステップ108では、合計消費電力TPCが算出される。合計消費電力TPCは、TPC=Σ(STPC×TCR)によって算出される。ここでは、区間の基準消費電力STPCに区間の渋滞補正値TCRをかけることにより区間の道路状況に応じた補正が実行される。   When the vehicle 3B travels and reaches a predetermined intersection, the following processing is executed. In step 104, the intersection ID is received from the roadside station. In step 105, the travel section in which the vehicle 3B is traveling is specified. In step 106, the reference power consumption STPC for the travel section is received from the service center 2. In step 107, the traffic congestion correction value TCR for the travel section is received from the service center 2. In step 108, the total power consumption TPC is calculated. The total power consumption TPC is calculated by TPC = Σ (STPC × TCR). Here, the correction according to the road condition of the section is executed by multiplying the reference power consumption STPC of the section by the congestion correction value TCR of the section.

ステップ109では、車両3Bが走行を終了したか否かを判定する。例えば、走行の終了は、車両3Bのパーキングブレーキの操作、シフトレバーのパーキング(P位置)への移動操作、またはキースイッチのオフ操作に基づいて判定することができる。走行を継続する場合、ステップ104へ戻る。ステップ104からステップ108の処理を繰り返すことにより、複数の区間の基準消費電力STPCが積算される。車両3Bが走行を終了するとステップ110へ進む。   In step 109, it is determined whether or not the vehicle 3B has finished traveling. For example, the end of traveling can be determined based on an operation of a parking brake of the vehicle 3B, an operation of moving the shift lever to parking (P position), or an operation of turning off a key switch. If the running is continued, the process returns to step 104. By repeating the processing from step 104 to step 108, the reference power consumption STPC of a plurality of sections is integrated. When vehicle 3B finishes traveling, the routine proceeds to step 110.

ステップ110では、走行後処理を実行する。走行後処理110では、消費電力の誤差を抑制するために、車両3Bに特有の補正値を算出する。ステップ111では、走行後の残存電力SOCを示す終期残存電力SOCeが計測される。ステップ112では、初期残存電力SOCiと終期残存電力SOCeとに基づいて総合消費電力CPC(Wh)が算出される。総合消費電力CPCは、初期残存電力SOCiと終期残存電力SOCeとの差に基づいて算出することができる。総合消費電力CPCは、車両3Bが所定区間を走行したときの実消費電力に相当する。ステップ112は、実消費電力を計測する計測手段を提供する。   In step 110, post-travel processing is executed. In the post-travel processing 110, a correction value specific to the vehicle 3B is calculated in order to suppress an error in power consumption. In step 111, the final remaining power SOCe indicating the remaining power SOC after traveling is measured. In step 112, the total power consumption CPC (Wh) is calculated based on the initial remaining power SOCi and the final remaining power SOCe. The total power consumption CPC can be calculated based on the difference between the initial remaining power SOCi and the final remaining power SOCe. The total power consumption CPC corresponds to the actual power consumption when the vehicle 3B travels in a predetermined section. Step 112 provides a measuring means for measuring the actual power consumption.

ステップ113では、ステップ102で開始された補助機器の消費電力の計測処理が停止され、補助機器の実消費電力APCが算出される。ここでは、空調制御装置45から充電制御装置41に送信される消費電力と、ボデー制御装置47から充電制御装置41に送信される消費電力とが合計され、補助機器の実消費電力APCとされる。車両3Bに搭載された補助機器の消費電力は、補助機器消費電力と呼ばれる。ステップ113は、車両3Bが所定区間を走行したときの補助機器消費電力を計測する補助機器消費電力計測手段を提供する。   In step 113, the measurement process of the power consumption of the auxiliary device started in step 102 is stopped, and the actual power consumption APC of the auxiliary device is calculated. Here, the power consumption transmitted from the air conditioning control device 45 to the charge control device 41 and the power consumption transmitted from the body control device 47 to the charge control device 41 are summed to obtain the actual power consumption APC of the auxiliary device. . The power consumption of the auxiliary equipment mounted on the vehicle 3B is called auxiliary equipment power consumption. Step 113 provides auxiliary device power consumption measuring means for measuring auxiliary device power consumption when the vehicle 3B travels in a predetermined section.

ステップ114では、総合消費電力CPCと、合計消費電力TPCと、補助機器の実消費電力APCとに基づいて、車両補正値VCRを算出する。ステップ114は、総合消費電力量CPCから、走行した区間における合計消費電力TPCを引き算し消費電力差を算出する工程と、この消費電力差から、さらに、補助機器の実消費電力APCを引き算し誤差を算出する工程とを含むことができる。消費電力差は、基準車両3Aと車両3Bとの定常的な特性差、運転者の特性差、および補助機器の作動状態の差を含んでいる。よって、消費電力差から補助機器の実消費電力APCを引き算することによって、基準車両3Aと車両3Bとの定常的な特性差、および運転者の特性差のような車両3Bに特有の誤差を算出することができる。この場合、車両補正値VCRは、VCR=(CPC−TPC−APC)/TPCによって算出される。すなわち車両補正値VCRは、基準消費電力STPCを渋滞補正値TCRによって補正した基準値TPCに対する係数として与えられる。   In step 114, a vehicle correction value VCR is calculated based on the total power consumption CPC, the total power consumption TPC, and the actual power consumption APC of the auxiliary device. Step 114 is a step of subtracting the total power consumption TPC in the traveled section from the total power consumption CPC to calculate a power consumption difference, and further subtracting the actual power consumption APC of the auxiliary device from this power consumption difference. A step of calculating. The power consumption difference includes a steady characteristic difference between the reference vehicle 3A and the vehicle 3B, a driver characteristic difference, and a difference in operating state of auxiliary equipment. Therefore, by subtracting the actual power consumption APC of the auxiliary device from the power consumption difference, a steady characteristic difference between the reference vehicle 3A and the vehicle 3B and an error peculiar to the vehicle 3B such as a driver characteristic difference are calculated. can do. In this case, the vehicle correction value VCR is calculated by VCR = (CPC−TPC−APC) / TPC. That is, the vehicle correction value VCR is given as a coefficient with respect to the reference value TPC obtained by correcting the reference power consumption STPC with the traffic congestion correction value TCR.

さらに、車両補正値VCRステップ115では、車両補正値VCRが車両3Bにおいて記録される。この結果、ステップ114、115により、車両補正値を設定する設定手段が提供される。設定手段は、車両3Bが所定区間を走行したときの基準消費電力STPC(TPC)と、実消費電力CPCと、補助機器消費電力APCとに基づいて車両補正値VCRを設定する。   Further, in vehicle correction value VCR step 115, vehicle correction value VCR is recorded in vehicle 3B. As a result, steps 114 and 115 provide setting means for setting the vehicle correction value. The setting means sets the vehicle correction value VCR based on the reference power consumption STPC (TPC) when the vehicle 3B travels in a predetermined section, the actual power consumption CPC, and the auxiliary device power consumption APC.

このように車両3Bに特有の車両補正値VCRが当該車両3Bにおいて算出され、当該車両3Bにおいて記録される。これにより、車両3Bに特有の構成、使用状態、運転者の操作の傾向を反映する車両補正値VCRを求めることができる。しかも、車両補正値VCRの算出処理を複数の車両3のそれぞれに分散することができる。   Thus, the vehicle correction value VCR unique to the vehicle 3B is calculated in the vehicle 3B and recorded in the vehicle 3B. Thereby, the vehicle correction value VCR reflecting the configuration, usage state, and driver's operation tendency peculiar to the vehicle 3B can be obtained. In addition, the calculation process of the vehicle correction value VCR can be distributed to each of the plurality of vehicles 3.

図11は、充電期待値CHXPに関連する処理を説明するブロック図である。車両3Bが出発地8Aから目的地8Bまで走行する過程が図示されている。車両3Bは、出発地8Aから走行を開始し、充電スタンド4Aにおいて充電した後、目的地8Bに到達する。この場合、出発地8Aにおいて、または出発地8Aの近傍において、路上局7Aを経由して、充電期待値CHXPがサービスセンタ2に送信される。また、充電スタンド4Aに到達する前に、路上局7Bを経由して、充電予約のための処理が実行される。   FIG. 11 is a block diagram illustrating processing related to the expected charge value CHXP. A process in which the vehicle 3B travels from the departure point 8A to the destination 8B is illustrated. The vehicle 3B starts traveling from the starting point 8A, charges at the charging station 4A, and then reaches the destination 8B. In this case, the expected charging value CHXP is transmitted to the service center 2 via the roadside station 7A at or near the departure point 8A. Further, before reaching the charging station 4A, processing for charging reservation is executed via the roadside station 7B.

車両3Bは、自らの充電処理に関する履歴情報を収集する充電履歴情報収集手段と、充電スタンド4の充電速度を含む充電スタンド4に関する情報を収集する充電器情報収集手段とを備える。さらに、車両3Bは、自らが今後走行する経路における区間を予測する区間予測手段と、それらの区間における基準消費電力STPCを受信する手段と、少なくとも基準消費電力STPCに基づいて予測必要電力ESPS、ESPCを予測する電力予測手段と、予測必要電力ESPS、ESPCの少なくとも一部を電力網5からの充電によって得るための電力需要を示す充電期待値CHXPを算出する手段と、この充電期待値CHXPを送信する送信手段とを備える。   The vehicle 3 </ b> B includes a charging history information collecting unit that collects history information about its own charging process, and a charger information collecting unit that collects information about the charging station 4 including the charging speed of the charging station 4. Further, the vehicle 3B includes a section prediction unit that predicts a section on a route that the vehicle 3 will travel in the future, a unit that receives the reference power consumption STPC in those sections, and at least the predicted required power ESPS and ESPC based on the reference power consumption STPC. A power predicting means for predicting power, a means for calculating a charge expectation value CHXP indicating power demand for obtaining at least a part of the prediction required power ESPS and ESPC by charging from the power network 5, and transmitting this charge expectation value CHXP. Transmitting means.

一方、サービスセンタ2は、基準消費電力STPCを車両3Bに送信する手段を備える。さらに、サービスセンタ2は、充電期待値CHXPに基づいて電力需要を示す電力推移PCSDを算出する手段と、電力推移PCSDを電力制御センタ6に送信する手段とを備える。電力制御センタ6は、電力推移PCSDに応じて電力網5への電力供給を制御する手段を備える。   On the other hand, the service center 2 includes means for transmitting the reference power consumption STPC to the vehicle 3B. Furthermore, the service center 2 includes means for calculating the power transition PCSD indicating the power demand based on the expected charge value CHXP, and means for transmitting the power transition PCSD to the power control center 6. The power control center 6 includes means for controlling power supply to the power network 5 in accordance with the power transition PCSD.

図12は、車両3Bが充電されるときに車両3Bにおいて実行される処理120を示すフローチャートである。図12は、充電期待値算出処理P10の一部と、充電速度収集処理P11とを示している。ステップ121では、充電処理の開始を示す充電コネクタ37の接続が検出される。   FIG. 12 is a flowchart showing a process 120 executed in the vehicle 3B when the vehicle 3B is charged. FIG. 12 shows a part of the expected charge value calculation process P10 and the charge rate collection process P11. In step 121, the connection of the charging connector 37 indicating the start of the charging process is detected.

ステップ122では、車両3Bの充電処理の履歴情報を蓄積する処理が実行される。履歴情報は、車両3Bへの充電が開始されたときのバッテリ34の残存電力SOCcによって示される。より具体的には、残存電力SOCに対する充電開始の頻度が履歴情報として蓄積される。この情報は、バッテリ34の残存電力SOCに対する充電開始の確率を示す。よって、この情報は、充電確率とも呼ぶことができる。すなわち、どれぐらいの残存電力SOCの時に、車両3Bの運転者が最も充電しようと判断するかという充電行動の傾向が示される。ステップ122は、バッテリ34への充電処理が実施される可能性を示す充電確率CHPBを算出する充電確率算出手段を提供する。この手段は、充電処理が実施されたときのバッテリ34の残存電力SOCに対する充電処理の頻度に基づき充電確率CHPBを算出している。   In step 122, a process of accumulating history information of the charging process of the vehicle 3B is executed. The history information is indicated by the remaining power SOCc of the battery 34 when charging of the vehicle 3B is started. More specifically, the charge start frequency for the remaining power SOC is accumulated as history information. This information indicates the probability of starting charging with respect to the remaining power SOC of the battery 34. Therefore, this information can also be called a charging probability. That is, the tendency of the charging behavior indicating how much remaining power SOC the driver of the vehicle 3B determines to charge most is shown. Step 122 provides a charge probability calculating means for calculating a charge probability CHPB indicating the possibility that the battery 34 is charged. This means calculates the charging probability CHPB based on the frequency of the charging process for the remaining power SOC of the battery 34 when the charging process is performed.

ステップ123では、充電開始時の初期残存電力SOCcが計測される。ステップ124では、充電確率CHPBのデータが更新される。充電確率CHPBは、車両3に搭載されたデータベースに記録される。   In step 123, the initial remaining power SOCc at the start of charging is measured. In step 124, the charge probability CHPB data is updated. The charge probability CHPB is recorded in a database mounted on the vehicle 3.

図13は、処理120によって集計される充電確率CHPBの一例を示すグラフである。充電確率CHPBは、残存電力SOCに対する充電処理の頻度分布として表現することができる。車両3Bへの充電が繰り返されることにより、頻度分布は、運転者の傾向を反映するようになる。図示された充電確率CHPBは、合計100%となるように設定されている。充電確率CHPBは、任意の残存電力SOCにおいて充電が実施される確率(%)を示している。このような充電確率CHPBのデータから、充電確率閾値CHthが設定される。充電確率閾値CHthは、充電処理の頻度が所定回数以上となる残存電力SOCによって示される。図示の例においては、残存電力SOC=50%を、充電確率閾値CHthとしている。充電確率閾値CHthの初期値は、例えば40%などの所定の値とすることができる。また、充電確率閾値CHthは、固定値としてもよい。   FIG. 13 is a graph illustrating an example of the charging probability CHPB that is aggregated by the process 120. The charge probability CHPB can be expressed as a frequency distribution of charge processing for the remaining power SOC. By repeatedly charging the vehicle 3B, the frequency distribution reflects the tendency of the driver. The illustrated charging probability CHPB is set to be 100% in total. The charging probability CHPB indicates the probability (%) that charging is performed with an arbitrary remaining power SOC. From such charge probability CHPB data, a charge probability threshold value CHth is set. The charge probability threshold CHth is indicated by the remaining power SOC at which the frequency of the charging process is equal to or greater than a predetermined number. In the illustrated example, the remaining power SOC = 50% is set as the charging probability threshold value CHth. The initial value of the charging probability threshold value CHth can be set to a predetermined value such as 40%, for example. Further, the charging probability threshold value CHth may be a fixed value.

図12に戻り、ステップ125では、充電処理が実行される。これにより、バッテリ34が充電される。   Returning to FIG. 12, in step 125, a charging process is executed. Thereby, the battery 34 is charged.

ステップ126では、充電スタンド4に関する情報を収集する処理が実行される。ステップ126は、充電スタンド4から前記バッテリ34へ充電するときに充電速度を計測する計測手段を提供する。ステップ127では、充電スタンド4Aを特定する情報が収集され、記録される。例えば、充電スタンド4Aを示す識別コード、充電スタンド4Aの地図上の位置、充電スタンド4Aが配置されている区間の区間IDなどにより充電スタンド4Aを特定することができる。   In step 126, processing for collecting information related to the charging station 4 is executed. Step 126 provides a measuring means for measuring the charging speed when charging the battery 34 from the charging stand 4. In step 127, information specifying the charging station 4A is collected and recorded. For example, the charging station 4A can be specified by the identification code indicating the charging station 4A, the position of the charging station 4A on the map, the section ID of the section where the charging station 4A is disposed, and the like.

ステップ128では、充電処理終了時の終期残存電力SOCfが計測される。ステップ129では、初期残存電力SOCcと終期残存電力SOCfとに基づいて実充電量ACPW(Wh)が算出される。実充電量ACPWは、バッテリ34の総電力量をTBPW(Wh)として、ACPW=TBPW×(SOCf−SOCc)/100によって求められる。総電力量TBPWは、TBPW=バッテリ容量(Ah)×電圧(V)によって求められる。なお、充電量は、充電スタンド4Aから車両3へ与えられてもよい。ステップ130では、充電速度CHSPが算出される。充電速度CHSPは、充電処理125に要した時間と、ステップ129で算出された充電量から求めることができる。ステップ131では、充電スタンド4Aを特定する情報と、充電速度CHSPとをサービスセンタ2に送信する。   In step 128, the final remaining power SOCf at the end of the charging process is measured. In step 129, the actual charge amount ACPW (Wh) is calculated based on the initial remaining power SOCc and the final remaining power SOCf. The actual charge amount ACPW is obtained by ACPW = TBPW × (SOCf−SOCc) / 100, where TBPW (Wh) is the total power amount of the battery 34. The total electric energy TBPW is obtained by TBPW = battery capacity (Ah) × voltage (V). The amount of charge may be given to the vehicle 3 from the charging stand 4A. In step 130, the charging rate CHSP is calculated. The charging speed CHSP can be obtained from the time required for the charging process 125 and the amount of charge calculated in step 129. In step 131, information specifying the charging station 4A and the charging rate CHSP are transmitted to the service center 2.

サービスセンタ2では、充電スタンド4Aを特定する情報と、充電速度CHSPとを受信し、データベース23Dに記録する。サービスセンタ2では、充電スタンド4に関する古い情報を削除し、新しい情報を記録する。特定の充電スタンド4について新しい情報が所定期間にわたって得られない場合、その充電スタンド4が廃止されたと判断して、その充電スタンド4に関する情報を削除してもよい。   The service center 2 receives the information specifying the charging station 4A and the charging rate CHSP and records them in the database 23D. The service center 2 deletes old information about the charging station 4 and records new information. When new information cannot be obtained for a specific charging station 4 over a predetermined period, it may be determined that the charging station 4 has been abolished, and information regarding the charging station 4 may be deleted.

図14は、車両3Bが出発地8Aから目的地8Bまで走行するために必要な必要電力を予測するための車両3Bにおける処理140を示すフローチャートである。図14は、消費電力予測処理P8を示している。消費電力予測処理P8が実行されるとき、サービスセンタ2では、図9に示したデータ提供処理90が実行される。   FIG. 14 is a flowchart showing a process 140 in the vehicle 3B for predicting the necessary power required for the vehicle 3B to travel from the departure point 8A to the destination 8B. FIG. 14 shows the power consumption prediction process P8. When the power consumption prediction process P8 is executed, the service center 2 executes the data provision process 90 shown in FIG.

ステップ141では、ナビゲーション制御装置43を利用して、出発地8Aと目的地8Bとを設定する処理が実行される。例えば、目的地8Aは、ナビゲーション装置43に備えられた現在地検出手段によって求めることができる。また、目的地8Bは、車両3Bの乗員からの設定操作によって設定することができる。また、目的地8Bは、車両3Bの運行履歴、運行時間などから予測されてもよい。ステップ142では、出発地8Aから目的地8Bまでの経路がナビゲーション制御装置43によって設定される。ステップ143では、ステップ142において設定された経路に基づいて、車両3Bが通過しようとしている区間を特定する。これにより、複数の区間が特定される。   In step 141, the navigation control device 43 is used to execute processing for setting the departure point 8A and the destination 8B. For example, the destination 8 </ b> A can be obtained by the current position detection means provided in the navigation device 43. Further, the destination 8B can be set by a setting operation from an occupant of the vehicle 3B. The destination 8B may be predicted from the operation history, operation time, etc. of the vehicle 3B. In step 142, the route from the departure point 8A to the destination 8B is set by the navigation control device 43. In step 143, based on the route set in step 142, a section in which the vehicle 3B is about to pass is specified. Thereby, a plurality of sections are specified.

ステップ144では、ステップ143において特定されたすべての区間のそれぞれの基準消費電力STPC(i)をサービスセンタ2から受信する。基準消費電力STPC(i)は、出発地8Aにおいて、もしくは出発地8Aからの出発後早急に、通信ネットワーク7を介して受信される。ステップ145では、ステップ143において特定されたすべての区間のそれぞれの渋滞補正量TCR(i)をサービスセンタ2から受信する。   In step 144, the reference power consumption STPC (i) of all the sections identified in step 143 is received from the service center 2. The reference power consumption STPC (i) is received via the communication network 7 at the departure point 8A or immediately after departure from the departure point 8A. In step 145, the traffic jam correction amount TCR (i) for all the sections identified in step 143 is received from the service center 2.

ステップ146では、ステップ143において特定されたすべての区間のそれぞれの補機消費電力EAPC(i)が予測される。補機消費電力EAPC(i)は、ステップ113において求められた補助機器の実消費電力APCに基づいて算出することができる。補機消費電力EAPC(i)は、補助機器を制御する制御装置45、47から充電制御装置41に提供され、集計されてもよい。また、充電制御装置41内に、補助機器毎の消費電力マップを記録し、補助機器の作動情報に基づいて補機消費電力EAPC(i)を算出してもよい。例えば、季節を示す情報に基づいて空調装置46の消費電力EAPC(i)が得られる。また、時刻を示す情報に基づいて照明装置などの負荷48の消費電力EAPC(i)が得られる。ステップ146により、将来の走行における補助機器の補助機器消費電力EAPCを予測する補助機器消費電力予測手段が提供される。   In step 146, the auxiliary machine power consumption EAPC (i) of all the sections specified in step 143 is predicted. The auxiliary machine power consumption EAPC (i) can be calculated based on the actual power consumption APC of the auxiliary device obtained in step 113. The auxiliary machine power consumption EAPC (i) may be provided from the control devices 45 and 47 that control the auxiliary equipment to the charge control device 41 and may be aggregated. Further, a power consumption map for each auxiliary device may be recorded in the charging control device 41, and the auxiliary machine power consumption EAPC (i) may be calculated based on the operation information of the auxiliary device. For example, the power consumption EAPC (i) of the air conditioner 46 is obtained based on the information indicating the season. Further, the power consumption EAPC (i) of the load 48 such as the lighting device is obtained based on the information indicating the time. Step 146 provides auxiliary device power consumption prediction means for predicting auxiliary device power consumption EAPC of the auxiliary device in future travel.

ステップ147では、それぞれの区間における必要電力を予測することにより、予測必要電力ESPS(i)が算出される。区間の予測必要電力ESPS(i)は、例えば、ESPS(i)=STPC(i)×TCR(i)×VCR+EAPC(i)によって求めることができる。区間の予測必要電力ESPS(i)は、当該区間における渋滞状況に起因する差が補償されている。また、区間の予測必要電力ESPS(i)は、車両3Bに特有の要素に起因する差が補償されている。さらに、区間の予測必要電力ESPS(i)は、当該区間における補助機器の消費電力に起因する差が補償されている。   In step 147, the predicted required power ESPS (i) is calculated by predicting the required power in each section. The prediction required power ESPS (i) of the section can be obtained by, for example, ESPS (i) = STPC (i) × TCR (i) × VCR + EAPC (i). In the prediction required power ESPS (i) of the section, the difference due to the traffic jam situation in the section is compensated. Moreover, the difference required by the element peculiar to the vehicle 3B is compensated for the prediction required electric power ESPS (i) of the section. Furthermore, the prediction required power ESPS (i) of the section is compensated for the difference caused by the power consumption of the auxiliary device in the section.

ステップ148では、出発地8Aから目的地8Bまでの全区間における予測必要電力ESPCが算出される。全区間の予測必要電力ESPCは、ESPC=ΣESPS(i)によって算出することができる。ステップ149では、それぞれの区間のための複数の予測必要電力ESPS(i)と、全区間のための予測必要電力ESPCとを車両3Bのデータベースに記録する。   In step 148, the predicted required power ESPC in all sections from the departure point 8A to the destination 8B is calculated. The predicted required power ESPC for all sections can be calculated by ESPC = ΣESPS (i). In step 149, the plurality of predicted required power ESPS (i) for each section and the predicted required power ESPC for all sections are recorded in the database of the vehicle 3B.

図15は、充電期待値CHXPを算出するための車両3Bにおける処理150を示すフローチャートである。図15は、充電期待値算出処理P10の一部を示している。ステップ151では、予測必要電力ESPS(i)、ESPCを読み出す。ステップ152では、バッテリ34の劣化状態を検出する。バッテリ34の劣化状態は、バッテリ34の充放電能力から検出することができる。ここで検出される劣化状態は、バッテリ34の残存電力SOCの減少の速さを示すものである。ステップ153では、残存電力SOCの推移を予測する。ステップ153での処理は、車両3Bが出発地8Aから目的地8Bへ向けて走行する過程における残存電力SOCの推移を予測する。ステップ153の処理は、出発地8Aにおける残存電力SOCから、各区間の予測必要電力ESPS(i)を順に減算することによって算出することができる。このステップ153においては、バッテリ34の劣化状態が考慮される。すなわち、バッテリ34の劣化が進行するほど、バッテリ34の残存電力SOCの減少量は大きくなる。例えば、同じ予測必要電力ESPS(i)を供給する場合、劣化が進行したバッテリ34の残存電力SOCの減少量は、劣化が少ないバッテリ34の残存電力SOCの減少量より大きい。そこで、残存電力SOCの推移は、各区間の予測必要電力ESPS(i)と、バッテリ34の劣化状態とに基づいて予測される。   FIG. 15 is a flowchart showing a process 150 in the vehicle 3B for calculating the expected charge value CHXP. FIG. 15 shows part of the expected charge calculation process P10. In step 151, predicted required power ESPS (i) and ESPC are read. In step 152, the deterioration state of the battery 34 is detected. The deterioration state of the battery 34 can be detected from the charge / discharge capability of the battery 34. The deterioration state detected here indicates the speed of decrease of the remaining power SOC of the battery 34. In step 153, the transition of the remaining power SOC is predicted. The process in step 153 predicts the transition of the remaining power SOC in the process in which the vehicle 3B travels from the departure point 8A toward the destination 8B. The process of step 153 can be calculated by sequentially subtracting the predicted required power ESPS (i) of each section from the remaining power SOC at the departure place 8A. In step 153, the deterioration state of the battery 34 is considered. That is, as the deterioration of the battery 34 progresses, the amount of decrease in the remaining power SOC of the battery 34 increases. For example, when the same predicted required power ESPS (i) is supplied, the reduction amount of the remaining power SOC of the battery 34 that has progressed deterioration is larger than the reduction amount of the remaining power SOC of the battery 34 that has less deterioration. Therefore, the transition of the remaining power SOC is predicted based on the predicted required power ESPS (i) in each section and the deterioration state of the battery 34.

ステップ154では、充電期待区間CHSCを予測する。充電期待区間CHSCは、充電処理の履歴を示す充電確率CHPBと、予測された残存電力SOCの推移とに基づいて予測される。   In step 154, the expected charging interval CHSC is predicted. The expected charging section CHSC is predicted based on the charging probability CHPB indicating the history of the charging process and the predicted transition of the remaining power SOC.

図16は、車両3Bの走行と、車両3Bへの充電が期待される充電期待区間CHSCとの関係を説明する説明図である。車両3Bが出発地8Aから目的地8Bへ走行する場合、残存電力SOCが充電確率閾値CHthを下回ると、運転者は車両3Bに充電する可能性があると判定できる。よって、充電期待区間CHSCは、残存電力SOCが充電確率閾値CHthを下回る地点Dth1と、目的地8Bとの間に設定することができる。   FIG. 16 is an explanatory diagram for explaining the relationship between the traveling of the vehicle 3B and the expected charging section CHSC in which charging of the vehicle 3B is expected. When the vehicle 3B travels from the departure point 8A to the destination 8B, if the remaining power SOC falls below the charging probability threshold value CHth, it can be determined that the driver may charge the vehicle 3B. Therefore, the expected charging section CHSC can be set between the point Dth1 where the remaining power SOC is lower than the charging probability threshold CHth and the destination 8B.

図17は、バッテリ34の残存電力SOCと充電期待区間CHSCとの関係の一例を示すグラフである。車両3Bの走行に伴って、残存電力SOCは徐々に減少する。この減少量は、区間の予測必要電力ESPS(i)に対応している。車両3Bが複数の区間を走行すると、区間の予測必要電力ESPS(i)に基づいて、図示されるような階段状の残存電力SOCの推移が予測される。ステップ153では、図示されるような残存電力SOCの推移が予測される。充電期待区間CHSCは、残存電力SOCが充電確率閾値CHthを下回る地点Dth1から始まる。   FIG. 17 is a graph showing an example of the relationship between the remaining power SOC of the battery 34 and the expected charge section CHSC. As the vehicle 3B travels, the remaining power SOC gradually decreases. This amount of decrease corresponds to the predicted required power ESPS (i) of the section. When the vehicle 3B travels through a plurality of sections, the transition of the stepped residual power SOC as shown in the figure is predicted based on the predicted required power ESPS (i) of the section. In step 153, the transition of the remaining power SOC as shown is predicted. The expected charging interval CHSC starts from a point Dth1 where the remaining power SOC falls below the charging probability threshold CHth.

図18は、バッテリ34の残存電力SOCと充電期待区間CHSCとの関係の他の例を示すグラフである。図18のバッテリは、図17のバッテリより劣化が進行している。図18の残存電力SOCの減少は、図17の残存電力SOCの減少より速い。このため、図18の充電期待区間CHSCは、図17の充電期待区間CHSCより近距離に設定される。例えば、充電期待区間CHSCは、走行距離Dth2から始まる。ステップ153では、バッテリの劣化状態が残存電力SOCの推移を予測する処理に反映される。すなわち、バッテリの劣化が進行するほど、残存電力SOCが早く減少するように、残存電力SOCの推移が予測される。この結果、バッテリの劣化状態に応じた充電期待区間CHSCを設定することができる。   FIG. 18 is a graph showing another example of the relationship between the remaining power SOC of the battery 34 and the expected charge interval CHSC. The battery in FIG. 18 is more deteriorated than the battery in FIG. The decrease in the remaining power SOC in FIG. 18 is faster than the decrease in the remaining power SOC in FIG. For this reason, the expected charging section CHSC in FIG. 18 is set closer to the expected charging section CHSC in FIG. For example, the expected charging section CHSC starts from the travel distance Dth2. In step 153, the deterioration state of the battery is reflected in the process of predicting the transition of the remaining power SOC. That is, the transition of the remaining power SOC is predicted so that the remaining power SOC decreases earlier as the battery deterioration progresses. As a result, it is possible to set the expected charge section CHSC according to the deterioration state of the battery.

図15に戻り、ステップ155では、充電期待区間CHSCにおける充電量CHPWを予測する。ここでは、充電期待区間CHSC内の複数の区間のそれぞれにおける充電量CHPW(i)が予測される。充電量CHPWは、充電期待区間CHSC内における残存電力SOCから求めることができる。例えば、バッテリ34を所定の目標値まで回復させるために必要な充電量CHPWを予測することができる。目標値は、車両3Bの過去の充電履歴から設定することができる。また、目標値は、目的地8Bまで走行できるように設定されてもよい。また、目標値は、例えば80%の固定値としてもよい。また、目的地8Bまで走行するために必要な予測必要電力ESPCを得るために必要な充電量CHPWを予測してもよい。ステップ155は、バッテリ34への充電量CHPWを予測する充電量予測手段を提供する。   Returning to FIG. 15, in step 155, the charge amount CHPW in the expected charge section CHSC is predicted. Here, the charge amount CHPW (i) in each of the plurality of sections in the expected charge section CHSC is predicted. The charge amount CHPW can be obtained from the remaining power SOC in the expected charge section CHSC. For example, the charge amount CHPW necessary for recovering the battery 34 to a predetermined target value can be predicted. The target value can be set from the past charging history of the vehicle 3B. Further, the target value may be set so that the vehicle can travel to the destination 8B. The target value may be a fixed value of 80%, for example. Further, the charge amount CHPW necessary for obtaining the predicted required power ESPC necessary for traveling to the destination 8B may be predicted. Step 155 provides a charge amount predicting means for predicting the charge amount CHPW to the battery 34.

図17において、車両3Bが距離Dth3において充電スタンド4Aに到達し、充電される場合、バッテリ34の残留電力SOCを約80%に回復させるために必要な充電量CHPWを予測することができる。残存電力SOCは、車両3Bが走行するほど減少するから、予測された充電量CHPWは、車両3Bが走行するほど増加する。車両3Bが距離Dth3で充電されると、残存電力SOCは、破線のように推移する。   In FIG. 17, when the vehicle 3B reaches the charging station 4A at the distance Dth3 and is charged, the charge amount CHPW required to recover the residual power SOC of the battery 34 to about 80% can be predicted. Since the remaining power SOC decreases as the vehicle 3B travels, the estimated charge amount CHPW increases as the vehicle 3B travels. When vehicle 3B is charged at distance Dth3, remaining power SOC changes as indicated by a broken line.

図15に戻り、ステップ156では、充電期待区間CHSC内の複数の区間のそれぞれにおける充電期待値CHXPが算出される。充電期待値CHXPは、CHXP(i)=CHPW(i)×CHPB(i)に基づいて求めることができる。充電期待値CHXPは、予測された充電量CHPW、すなわち車両3Bが必要とする電力を、充電期待区間CHSC内において時間軸上、および/または地図上に分布させた値ということができる。しかも、充電量CHPWは、充電確率CHPBを重み指標として、重み付けされて分布されている。ステップ156は、充電量CHPWを充電確率CHPBに基づき時間軸上、および/または地図上に分布させた充電期待値CHXPを算出する充電期待値算出手段を提供する。ステップ157では、充電期待値CHXPがサービスセンタ2に送信される。   Returning to FIG. 15, in step 156, expected charge value CHXP in each of a plurality of sections within expected charge section CHSC is calculated. The expected charge value CHXP can be obtained based on CHXP (i) = CHPW (i) × CHPB (i). The expected charge value CHXP can be said to be a value obtained by distributing the predicted charge amount CHPW, that is, the power required by the vehicle 3B, on the time axis and / or on the map in the expected charge section CHSC. In addition, the charge amount CHPW is weighted and distributed using the charge probability CHPB as a weight index. Step 156 provides an expected charge value calculation means for calculating an expected charge value CHXP in which the charge amount CHPW is distributed on the time axis and / or the map based on the charge probability CHPB. In step 157, the expected charging value CHXP is transmitted to the service center 2.

図19は、ひとつの車両における充電期待値の一例を示す表である。処理150の開始時刻をゼロ(0)とする。時刻が進むに従って、残存電力SOCが徐々に減少している。充電確率CHPBは、残存電力15%のときをピークとして、ほぼ正規分布を示している。時刻が進むに従って、車両3Bが走行するため、区間が順に切り替わっている。図示の例では、区間Aから充電期待区間CHSCが始まっている。区間Aから区間Eの複数の区間のそれぞれにおいて、充電量CHPWが予測されている。充電期待値CHXPは、区間Aから区間Eの複数の区間のそれぞれにおいて設定されている。図示の例においては、充電期待値CHXPは、時間軸上における電力需要の分布を示している。   FIG. 19 is a table showing an example of expected charge values in one vehicle. The start time of the process 150 is set to zero (0). As the time advances, the remaining power SOC gradually decreases. The charge probability CHPB has a substantially normal distribution with a peak when the remaining power is 15%. Since the vehicle 3B travels as the time advances, the sections are sequentially switched. In the illustrated example, the expected charging section CHSC starts from the section A. In each of a plurality of sections from section A to section E, the charge amount CHPW is predicted. The expected charge value CHXP is set in each of a plurality of sections from section A to section E. In the illustrated example, the expected charging value CHXP indicates the distribution of power demand on the time axis.

図20は、サービスセンタ2における充電期待値CHXPに関連する処理170を示すフローチャートである。ステップ171では、充電期待値CHXPを車両3Bから受信する。ステップ172では、充電スタンド4の予約処理を実行する。ステップ173では、充電期待値CHXPに基づいて利用可能な充電スタンド4を割り当てる。ステップ174では、利用可能な充電スタンド4を車両3Bの運転者に対して提案する。ステップ172は、ひとつの車両3Bの充電期待値CHXPに基づいてバッテリ34への充電処理に関する情報を提供する情報提供手段を提供する。この手段は、充電スタンドに関する情報を提供する。車両3Bには、サービスセンタ2から提案された充電スタンド4Aと、その充電スタンド4Aまでの経路とが表示される。運転者は、自らが所有する携帯電話、車載通信端末、またはサービスセンタ2を経由して充電スタンド4Aの利用を予約する。   FIG. 20 is a flowchart showing a process 170 related to the expected charge value CHXP in the service center 2. In step 171, the expected charging value CHXP is received from the vehicle 3B. In step 172, a reservation process for the charging station 4 is executed. In step 173, an available charging station 4 is allocated based on the expected charging value CHXP. In step 174, an available charging station 4 is proposed to the driver of the vehicle 3B. Step 172 provides information providing means for providing information related to the charging process for the battery 34 based on the expected charging value CHXP of one vehicle 3B. This means provides information about the charging station. The vehicle 3B displays a charging station 4A proposed by the service center 2 and a route to the charging station 4A. The driver reserves the use of the charging station 4 </ b> A via his / her own mobile phone, in-vehicle communication terminal, or service center 2.

ステップ174において提案される充電スタンド4は、車両3Bの充電期待値CHXPに基づいて設定されている。このため、車両3Bの運転者が充電したくなる可能性が高い時刻、および/位置における充電スタンド4を提案することができる。言い換えると、車両3Bの運転者が過去の運転履歴においてほとんど充電処理を実行したことがないような時刻、および/または位置に対応する充電スタンド4が提案されることを回避できる。   The charging stand 4 proposed in step 174 is set based on the expected charging value CHXP of the vehicle 3B. For this reason, the charging stand 4 at the time and / or position where the driver of the vehicle 3B is likely to be charged can be proposed. In other words, it can be avoided that the charging station 4 corresponding to the time and / or position where the driver of the vehicle 3B has hardly executed the charging process in the past driving history can be avoided.

ステップ175では、複数の車両3Bから提供された複数の充電期待値HCXPに基づいて、電力推移PCSDが作成される。ステップ175は、電力推移処理P4を示している。充電期待値CHXPには、予測手段により予測された必要電力が反映されている。よって、ステップ175は、必要電力に基づいて電力需要を予測する電力需要予測手段を提供する。ステップ175は、充電期待値CHXPに基づいて電力需要を予測する電力需要予測手段を提供するともいえる。電力需要は、複数の車両に関する複数の充電期待値を集計することによって得られる。ステップ176では、基礎電力推移PCSD1が作成される。ステップ177では、修正電力推移PCSD2が作成される。ステップ178では、基礎電力推移PCSD1と、修正電力推移PCSD2とを含む電力推移PCSDを示すデータがサービスセンタ2から電力制御センタ6へ送信される。ステップ178は、電力需要予測手段により予測された電力需要を、電力網5を制御する電力制御センタ6へ送信する電力情報提供手段を提供する。   In step 175, the power transition PCSD is created based on the plurality of expected charging values HCXP provided from the plurality of vehicles 3B. Step 175 shows the power transition process P4. The required power predicted by the prediction means is reflected in the expected charge value CHXP. Therefore, step 175 provides a power demand prediction means for predicting the power demand based on the required power. Step 175 can also be said to provide a power demand prediction means for predicting power demand based on the expected charge value CHXP. The power demand is obtained by summing up a plurality of expected charging values for a plurality of vehicles. In step 176, the basic power transition PCSD1 is created. In step 177, the corrected power transition PCSD2 is created. In step 178, data indicating the power transition PCSD including the basic power transition PCSD1 and the corrected power transition PCSD2 is transmitted from the service center 2 to the power control center 6. Step 178 provides a power information providing means for transmitting the power demand predicted by the power demand prediction means to the power control center 6 that controls the power network 5.

図21は、充電期待値CHXPから電力推移を算出するためのサービスセンタ2における処理180を示すフローチャートである。図21は、ステップ175を詳細に示している。図21は、電力推移処理P4を示している。処理180は、電力推移を示すデータに、複数の車両3を充電するための電力需要の変化を反映できるように定められた所定の時間間隔で実行される。ステップ181では、複数の車両3のそれぞれにおいて算出された複数の充電期待値CHXPが集計される。   FIG. 21 is a flowchart showing a process 180 in the service center 2 for calculating the power transition from the expected charge value CHXP. FIG. 21 shows step 175 in detail. FIG. 21 shows the power transition process P4. The process 180 is executed at predetermined time intervals determined so that the data indicating the power transition can reflect the change in the power demand for charging the plurality of vehicles 3. In step 181, a plurality of expected charging values CHXP calculated for each of the plurality of vehicles 3 are totaled.

ステップ182では、基礎電力推移PCSD1が作成される。ステップ183では、区間毎の充電期待値CHXPが集計される。すなわち、複数の車両3から提供された充電期待値CHXPを、ひとつの区間に着目して集計する。   In step 182, a basic power transition PCSD1 is created. In step 183, the expected charge value CHXP for each section is tabulated. That is, the expected charging value CHXP provided from a plurality of vehicles 3 is totaled focusing on one section.

図22は、ひとつの区間における充電期待値CHXPの推移の一例を示す表である。図中には、区間Aにおける複数の車両の充電期待値CHXPと、その合計値が図示されている。区間は、区間IDによって示されている。それぞれの車両3は、車両ID(VHID)によって示されている。ステップ183の処理により、ひとつの区間における電力需要の時間軸上の変化を得ることができる。   FIG. 22 is a table showing an example of the transition of the expected charge value CHXP in one section. In the drawing, the expected charging value CHXP of a plurality of vehicles in the section A and the total value thereof are shown. The section is indicated by the section ID. Each vehicle 3 is indicated by a vehicle ID (VHID). By the processing in step 183, a change in the power demand on the time axis in one section can be obtained.

図21に戻り、ステップ184では、電力網5内における充電期待値CHXPを集計する。すなわち、電力網5内に位置するすべての区間の充電期待値CHXPが集計される。それぞれの区間の充電期待値CHXPは、ステップ183の処理によって与えられる。   Returning to FIG. 21, in step 184, the expected charge value CHXP in the power network 5 is totaled. That is, the expected charge value CHXP of all sections located in the power network 5 is totaled. The expected charging value CHXP of each section is given by the processing of step 183.

図23は、ひとつの電力網5における充電期待値CHXPの推移の一例を示す表である。図中には、GRID=No.1によって表される電力網5に属する区間Aから区間ZZにおける充電期待値CHXPの集計値が図示されている。充電期待値CHXPの集計値は、複数の車両3を充電するために必要な充電電力の時間軸上の推移を示している。言い換えると、充電期待値CHXPの集計値は、電力網5内における複数の車両3の電力需要の推移を示している。充電期待値CHXPの集計値が、基礎電力推移PCSD1として設定される。ステップ182は、移動体である車両3Bに搭載されたバッテリ34へ充電するために必要な電力の推移を示す基礎電力推移PCSD1を算出する電力推移算出手段を提供している。   FIG. 23 is a table showing an example of the transition of the expected charge value CHXP in one power network 5. In the figure, GRID = No. The total value of the expected charging value CHXP from the section A to the section ZZ belonging to the power network 5 represented by 1 is illustrated. The total value of the expected charge value CHXP indicates the transition of the charging power necessary for charging the plurality of vehicles 3 on the time axis. In other words, the total value of the expected charge value CHXP indicates the transition of the power demand of the plurality of vehicles 3 in the power network 5. The total value of expected charge value CHXP is set as basic power transition PCSD1. Step 182 provides a power transition calculating means for calculating a basic power transition PCSD1 indicating a transition of power necessary for charging the battery 34 mounted on the vehicle 3B as a moving body.

図21に戻り、ステップ185では、修正電力推移PCSD2が作成される。複数の車両3への充電は、複数の充電スタンド4によって実行される。しかし、複数の充電スタンド4は互いに異なる充電能力をもつ場合がある。また、電力網5から充電スタンド4に至る送電機器の容量が異なる場合も想定される。このような場合、充電スタンド4から車両3に供給できる単位時間あたりの電力に差が発生する。例えば、充電速度の差が発生する。この結果、充電期待値CHXPで示される電力需要が、充電スタンド4の充電能力を超える場合がある。そこで、ステップ185では、充電スタンド4の充電速度に応じて基礎電力推移PCSD1を修正する。ステップ185は、基礎電力推移PCSD1を充電速度CHSPに基づいて修正し、修正電力推移PCSD2を算出する修正手段を提供する。   Returning to FIG. 21, in step 185, a corrected power transition PCSD2 is created. Charging the plurality of vehicles 3 is performed by the plurality of charging stations 4. However, the plurality of charging stations 4 may have different charging capabilities. Moreover, the case where the capacity | capacitance of the power transmission apparatus from the electric power network 5 to the charging stand 4 differs is assumed. In such a case, a difference occurs in the power per unit time that can be supplied from the charging station 4 to the vehicle 3. For example, a difference in charging speed occurs. As a result, the power demand indicated by the expected charging value CHXP may exceed the charging capacity of the charging station 4. Therefore, in step 185, the basic power transition PCSD1 is corrected in accordance with the charging speed of the charging station 4. Step 185 provides a correcting means for correcting the basic power transition PCSD1 based on the charging speed CHSP and calculating the corrected power transition PCSD2.

ステップ186では、区間毎に集計された充電期待値CHXPに、その区間において利用可能な充電スタンド4を割り当てる。   In step 186, the charging stand 4 that can be used in the section is assigned to the expected charging value CHXP that is aggregated for each section.

図24は、充電期待値CHXPの推移と充電スタンド4(充電器)との関連付けの一例を示す表である。充電スタンド4は、充電器ID(CHID)によって示されている。図示の例では、区間Aにおける充電期待値CHXPの推移に対して、区間Aに属する充電器CHID=1と、充電器CHID=10とが割り当てられている。区間Bにおける充電期待値CHXPの推移に対して、区間Bに属する充電器CHID=2が割り当てられている。また、区間Cにおける充電期待値CHXPの推移に対して、区間Cに属する充電器CHID=3が割り当てられている。   FIG. 24 is a table showing an example of an association between the expected charging value CHXP and the charging station 4 (charger). The charging stand 4 is indicated by a charger ID (CHID). In the illustrated example, the charger CHID = 1 and the charger CHID = 10 belonging to the section A are assigned to the transition of the expected charge value CHXP in the section A. The charger CHID = 2 belonging to the section B is assigned to the transition of the expected charge value CHXP in the section B. Further, the charger CHID = 3 belonging to the section C is assigned to the transition of the expected charging value CHXP in the section C.

図21に戻り、ステップ187では、充電スタンド毎、すなわち充電器毎の充電期待値CHXPを集計する。ステップ188では、充電器毎の充電期待値CHXPの集計値を、各充電器の充電速度CHSPに基づいて修正し、修正電力推移PCSD2を作成する。修正電力推移PCSD2は、後述する図26のような充電器毎の電力推移を示す形態とすることができる。また、修正電力推移PCSD2は、図23に図示されたような、電力網5における充電期待値CHXPの集計値の形態とすることもできる。   Returning to FIG. 21, in step 187, the expected charge value CHXP for each charging station, that is, for each charger is totaled. In step 188, the total value of the expected charging value CHXP for each charger is corrected based on the charging speed CHSP of each charger, and a corrected power transition PCSD2 is created. The corrected power transition PCSD2 can be configured to indicate a power transition for each charger as shown in FIG. Further, the corrected power transition PCSD2 may be in the form of a total value of the expected charge value CHXP in the power network 5 as shown in FIG.

図25は、充電器毎の充電期待値CHXPの一例を示す表である。この表には、充電スタンド4の充電速度CHSPが記載されている。例えば、充電器CHID=1には、1時間後には20kWhの充電期待値が割り当てられている。充電器CHID=1には、2時間後には80kWhの充電期待値が割り当てられている。よって、2時間後においては、充電器CHID=1の充電速度50kW/hを超える充電期待値CHXPが割り当てられている。これでは、充電器CHID=1は、電力需要として予定された80kWhを充電することができない。また、充電器CHID=2には、現在、すなわち0時間後に30kWhの充電期待値CHXPが割り当てられている。ところが、充電器CHID=2の充電速度CHSPは、3kW/hである。このため、充電器CHID=2は、電力需要として予定された30kWhを充電することができない。   FIG. 25 is a table showing an example of the expected charge value CHXP for each charger. In this table, the charging speed CHSP of the charging station 4 is described. For example, an expected charging value of 20 kWh is assigned to the charger CHID = 1 after 1 hour. Charger CHID = 1 is assigned an expected charge value of 80 kWh after 2 hours. Therefore, after 2 hours, the expected charging value CHXP exceeding the charging speed 50 kW / h of the charger CHID = 1 is assigned. In this case, the charger CHID = 1 cannot charge 80 kWh scheduled for power demand. Also, the charger CHID = 2 is currently assigned, that is, the expected charge value CHXP of 30 kWh after 0 hours. However, the charging speed CHSP of the charger CHID = 2 is 3 kW / h. For this reason, the charger CHID = 2 cannot charge 30 kWh scheduled for power demand.

図26は、充電スタンド4の充電速度CHSPに応じて修正された充電期待値CHXPの一例を示す表である。図27は、修正プロセスを説明するためのグラフである。2時間後に充電器CHID=1に割り当てられた80kWhの充電期待値CHXPのうち、充電速度50kW/hを超える30kWhが、後の時間にずらして設定されている。これにより、充電スタンド4の充電速度CHSPを超えないように充電期待値CHXPを修正することができる。   FIG. 26 is a table showing an example of the expected charge value CHXP corrected according to the charging speed CHSP of the charging station 4. FIG. 27 is a graph for explaining the correction process. Of the 80 kWh expected charge value CHXP assigned to the charger CHID = 1 after 2 hours, 30 kWh exceeding the charging speed of 50 kW / h is set to be shifted later. Thereby, the expected charge value CHXP can be corrected so as not to exceed the charging rate CHSP of the charging station 4.

図28は、修正プロセスを説明するためのグラフである。0時間後に充電器CHID=2に割り当てられた30kWhの充電期待値CHXPは、充電速度3kW/hずつに分割され、後の時間にずらして設定されている。これにより、充電スタンド4の充電速度CHSPを超えないように充電期待値CHXPを修正することができる。   FIG. 28 is a graph for explaining the correction process. The expected charge value CHXP of 30 kWh assigned to the charger CHID = 2 after 0 hours is divided by a charge rate of 3 kW / h and is set to be shifted later. Thereby, the expected charge value CHXP can be corrected so as not to exceed the charging rate CHSP of the charging station 4.

図21に戻り、ステップ189では、基礎電力推移PCSD1と、修正電力推移PCSD2とがサービスセンタ2から電力制御センタ6へ送信される。電力制御センタ6では、電力制御処理P21によって、基礎電力推移PCSD1と、修正電力推移PCSD2とに基づいて、電力網5が制御される。電力制御処理P21は、修正電力推移PCSD2に基づいて電力網5を制御する電力網制御手段を提供する。例えば、電力制御センタ6では、基礎電力推移PCSD1と、修正電力推移PCSD2とに基づいて、電力網5への電力供給が調節される。また、電力制御センタ6では、基礎電力推移PCSD1と、修正電力推移PCSD2とに基づいて、電力網5の設備計画が立案され、実行される。   Returning to FIG. 21, in step 189, the basic power transition PCSD 1 and the corrected power transition PCSD 2 are transmitted from the service center 2 to the power control center 6. In the power control center 6, the power network 5 is controlled by the power control process P21 based on the basic power transition PCSD1 and the corrected power transition PCSD2. The power control process P21 provides power network control means for controlling the power network 5 based on the corrected power transition PCSD2. For example, in the power control center 6, the power supply to the power network 5 is adjusted based on the basic power transition PCSD1 and the modified power transition PCSD2. In the power control center 6, an equipment plan for the power network 5 is drawn up and executed based on the basic power transition PCSD1 and the corrected power transition PCSD2.

この実施形態によると、サービスセンタ2は基準消費電力STPCを収集し、車両3Bに提供する。一方、車両3Bでは、基準消費電力STPCと車両3Bに特有の補正値VCRとに基づいて車両3Bの走行に必要な必要電力を予測する。このような処理の分担により、処理負担を適切に分散させながら、車両3Bの必要電力を正確に算出することができる。また、車両3Bが初めて走行する道路の区間においても必要電力を正確に算出することができる。さらに、必要電力の予測には、車両3Bにおける補助機器の消費電力EAPCが考慮される。このため、車両3Bに特有の補助機器の使用状況を反映して必要電力を正確に予測することができる。さらに、道路の渋滞状況TRFCに起因する消費電力の差を補償することができる。   According to this embodiment, the service center 2 collects the reference power consumption STPC and provides it to the vehicle 3B. On the other hand, in the vehicle 3B, the necessary power required for traveling of the vehicle 3B is predicted based on the reference power consumption STPC and the correction value VCR unique to the vehicle 3B. With such processing sharing, the required power of the vehicle 3B can be accurately calculated while appropriately distributing the processing load. Further, the required power can be accurately calculated even in the road section where the vehicle 3B travels for the first time. Further, the power consumption EAPC of the auxiliary equipment in the vehicle 3B is taken into account for the prediction of the required power. For this reason, required electric power can be correctly estimated reflecting the use condition of auxiliary equipment peculiar to vehicle 3B. Furthermore, it is possible to compensate for the difference in power consumption caused by the traffic congestion situation TRFC on the road.

また、車両3Bの充電確率CHPBに基づいて、車両3Bの走行に必要な電力を、時間軸上、および/または地図上に分布させた充電期待値を作成している。これにより、車両3Bの充電に必要な電力の需要を適切に評価することができる。また、充電期待値によって、車両3Bが充電される可能性が示される。このため、車両3Bの使用者に対して適切な時期、および/または位置において充電に関する情報を提供することができる。また、車両3Bの充電に必要な電力の需要に応じて、電力網5への電力供給を調節することができる。   Further, based on the charging probability CHPB of the vehicle 3B, an expected charging value is generated by distributing the power necessary for traveling of the vehicle 3B on the time axis and / or on the map. Thereby, the demand of the electric power required for charge of the vehicle 3B can be evaluated appropriately. Further, the possibility of charging the vehicle 3B is indicated by the expected charge value. For this reason, the information regarding charge can be provided to the user of the vehicle 3B at an appropriate time and / or position. In addition, the power supply to the power grid 5 can be adjusted according to the demand for power necessary for charging the vehicle 3B.

また、車両3Bの充電に必要な電力の需要を示すデータを、充電スタンド4の充電速度に基づいて設定している。このため、充電速度を超える過大な電力需要が設定されることを回避することができ無駄な発電を抑制できる。また、大容量の充電スタンド4における大きな電力需要を需要データに反映することができる。また、充電速度を含む充電スタンド4に関する情報が車両3Bによって収集される。このため、充電スタンド4の新設、廃止などに対応することができる。さらに、車両3Bの充電に必要な電力に応じて、電力網5を制御することができる。   In addition, data indicating the demand for electric power necessary for charging the vehicle 3 </ b> B is set based on the charging speed of the charging station 4. For this reason, it can be avoided that an excessive power demand exceeding the charging speed is set, and wasteful power generation can be suppressed. Further, a large power demand at the large-capacity charging station 4 can be reflected in the demand data. Further, information regarding the charging station 4 including the charging speed is collected by the vehicle 3B. For this reason, it is possible to cope with the establishment or abolition of the charging stand 4. Furthermore, the power grid 5 can be controlled according to the power required for charging the vehicle 3B.

(他の実施形態)
以上、本発明の好ましい実施形態について説明したが、本発明は上述した実施形態に何ら制限されることなく、本発明の主旨を逸脱しない範囲において種々変形して実施することが可能である。上記実施形態の構造は、あくまで例示であって、本発明の範囲はこれらの記載の範囲に限定されるものではない。本発明の範囲は、特許請求の範囲の記載によって示され、さらに特許請求の範囲の記載と均等の意味及び範囲内での全ての変更を含むものである。
(Other embodiments)
The preferred embodiments of the present invention have been described above, but the present invention is not limited to the above-described embodiments, and various modifications can be made without departing from the spirit of the present invention. The structure of the said embodiment is an illustration to the last, Comprising: The scope of the present invention is not limited to the range of these description. The scope of the present invention is indicated by the description of the scope of claims, and further includes meanings equivalent to the description of the scope of claims and all modifications within the scope.

例えば、電力網5は、系統電力網に代えて、事業所内などの構内電力網とすることができる。   For example, the power network 5 can be a local power network in a business office or the like instead of the system power network.

また、充電システム1は、車種が異なる複数の基準車両3Aを備えることができる。この場合、一般の車両3Bは、自車に最も類似する基準車両3Aによって収集された基準消費電力STPCを使用するように構成することができる。   The charging system 1 can include a plurality of reference vehicles 3A having different vehicle types. In this case, the general vehicle 3B can be configured to use the reference power consumption STPC collected by the reference vehicle 3A most similar to the own vehicle.

また、各区間の消費電力SPC(i)と、区間補正値SCR(i)とを基準車両3Aからサービスセンタ2ヘ送信し、基準消費電力STPCの確定処理78をサービスセンタ2において実行してもよい。   Also, the power consumption SPC (i) of each section and the section correction value SCR (i) are transmitted from the reference vehicle 3A to the service center 2, and the reference power consumption STPC determination process 78 is executed in the service center 2. Good.

また、複数の処理P7−P11の一部または全部を、充電制御装置41に代えて、他の制御装置、例えばバッテリ制御装置39によって実行させてもよい。   Further, some or all of the plurality of processes P7 to P11 may be executed by another control device, for example, the battery control device 39, instead of the charge control device 41.

また、経路予測手段は、車載ナビゲーションでなくても、携帯電話などのナビゲーション機能を用いてもよい。   In addition, the route prediction means may use a navigation function such as a mobile phone instead of the in-vehicle navigation.

上記実施形態では、渋滞状況TRFCに応じた渋滞補正値TCRを算出する処理をサービスセンタ2に設けたが、同処理を複数の車両3に設けてもよい。   In the above-described embodiment, the service center 2 is provided with a process for calculating the traffic congestion correction value TCR corresponding to the traffic jam condition TRFC.

上記実施形態では、ひとつの電力網5を対象として説明した。しかし、上記実施形態に説明した処理は、複数の電力網にわたる処理として実行することができる。例えば、複数の電力網の範囲内を走行する複数の車両3を対象として上記処理を実行する。この場合、複数の電力網のそれぞれの電力推移を区別して集計するように構成してもよい。例えば、ステップ187の処理において、ひとつの電力網に属する複数の充電スタンドを選定し、それら複数の充電スタンドの充電期待値CHXPを集計することにより、ひとつの電力網における電力需要を示す電力推移を提供することができる。このような処理を、複数の電力網のそれぞれに関して実行することにより、複数の電力網の電力推移を提供することができる。   In the embodiment described above, one power network 5 has been described. However, the process described in the above embodiment can be executed as a process across a plurality of power networks. For example, the above processing is executed for a plurality of vehicles 3 that travel within the range of a plurality of power grids. In this case, each power transition of a plurality of power networks may be distinguished and aggregated. For example, in the process of step 187, a plurality of charging stations belonging to one power grid are selected, and the expected power values CHXP of the plurality of charging stations are totaled to provide a power transition indicating the power demand in one power network. be able to. By executing such processing for each of the plurality of power networks, it is possible to provide power transitions of the plurality of power networks.

例えば、制御装置が提供する手段と機能は、ソフトウェアのみ、ハードウェアのみ、あるいはそれらの組合せによって提供することができる。例えば、制御装置をアナログ回路によって構成してもよい。   For example, the means and functions provided by the control device can be provided by software only, hardware only, or a combination thereof. For example, the control device may be configured by an analog circuit.

1 充電システム、2 サービスセンタ、3 電動の車両、3A 基準車両、3B 一般の車両、4 充電スタンド、5 電力網、6 電力制御センタ、7 通信ネットワーク。   DESCRIPTION OF SYMBOLS 1 Charging system, 2 Service center, 3 Electric vehicle, 3A reference vehicle, 3B General vehicle, 4 Charging stand, 5 Power network, 6 Power control center, 7 Communication network.

Claims (6)

走行用の電動機(31)に給電するバッテリ(34)を備える複数の車両(3)と、これら複数の前記車両(3)を管理する基地局(2)とを備え、前記車両(3)の走行に必要な必要電力を予測する必要電力予測装置において、
前記基地局に設けられ、道路上の複数の区間のそれぞれを走行するための基準消費電力を記憶する記憶手段(23A)と、
前記基準消費電力を前記基地局から前記車両に送信する通信手段(7、21、42)と、
前記車両に設けられ、前記車両が走行するために要した実消費電力と前記基準消費電力との差に含まれ、前記車両における要因に起因して発生する車両誤差に対応する車両補正値(VCR)を算出する車両補正値算出手段(P9)と、
前記車両に設けられ、前記基準消費電力(STPC)と前記車両補正値を含む情報に基づいて、将来の走行における前記必要電力を予測する予測手段(P8)とを備えることを特徴とする必要電力予測装置。
A plurality of vehicles (3) including a battery (34) for supplying power to the electric motor (31) for traveling, and a base station (2) for managing the plurality of the vehicles (3). In the required power prediction device that predicts the required power required for traveling,
A storage means (23A) provided in the base station for storing a reference power consumption for traveling in each of a plurality of sections on the road;
Communication means (7, 21, 42) for transmitting the reference power consumption from the base station to the vehicle;
A vehicle correction value (VCR) that is provided in the vehicle and is included in the difference between the actual power consumption required for the vehicle to travel and the reference power consumption, and that corresponds to a vehicle error caused by a factor in the vehicle. Vehicle correction value calculation means (P9) for calculating
Predicted means (P8) provided in the vehicle and for predicting the necessary power in future travel based on information including the reference power consumption (STPC) and the vehicle correction value Prediction device.
前記車両補正値算出手段は、
前記車両が所定区間を走行したときの前記実消費電力を計測する計測手段(112)と、
前記車両が所定区間を走行したときの前記車両に搭載された補助機器の補助機器消費電力を計測する補助機器消費電力計測手段(113)と、
前記車両が前記所定区間を走行したときの前記基準消費電力(STPC)と、前記実消費電力(CPC)と、前記補助機器消費電力(APC)とに基づいて前記車両補正値(VCR)を設定する設定手段(114,115)とを備えることを特徴とする請求項1に記載の必要電力予測装置。
The vehicle correction value calculation means includes
Measuring means (112) for measuring the actual power consumption when the vehicle travels in a predetermined section;
Auxiliary equipment power consumption measuring means (113) for measuring auxiliary equipment power consumption of auxiliary equipment mounted on the vehicle when the vehicle travels in a predetermined section;
The vehicle correction value (VCR) is set based on the reference power consumption (STPC), the actual power consumption (CPC), and the auxiliary device power consumption (APC) when the vehicle travels in the predetermined section. The required power predicting apparatus according to claim 1, further comprising setting means (114, 115) for performing the above operation.
前記予測手段は、
前記将来の走行における前記補助機器の補助機器消費電力を予測する補助機器消費電力予測手段(146)を備え、
前記補助機器消費電力予測手段によって予測された前記補助機器消費電力(EAPC)が前記予測手段(P8)における前記情報に含まれていることを特徴とする請求項1または請求項2に記載の必要電力予測装置。
The prediction means includes
Auxiliary equipment power consumption prediction means (146) for predicting auxiliary equipment power consumption of the auxiliary equipment in the future travel,
The necessity according to claim 1 or 2, wherein the auxiliary equipment power consumption (EAPC) predicted by the auxiliary equipment power consumption prediction means is included in the information in the prediction means (P8). Power prediction device.
さらに、
道路上の複数の区間の渋滞状況に応じた渋滞補正値(TCR)を算出する渋滞補正値算出手段(91−93)を備え、
前記渋滞補正値(TCR)が前記予測手段における前記情報に含まれていることを特徴とする請求項1から請求項3のいずれかに記載の必要電力予測装置。
further,
A traffic jam correction value calculating means (91-93) for calculating a traffic jam correction value (TCR) according to the traffic jam status of a plurality of sections on the road is provided,
The required power prediction apparatus according to any one of claims 1 to 3, wherein the congestion correction value (TCR) is included in the information in the prediction means.
複数の前記車両には、基準車両(3A)が含まれており、
前記基準車両は、
道路上の複数の前記区間を走行することにより、それら区間における消費電力を計測する計測手段(61−78)を備え、
前記通信手段は、前記消費電力を前記基地局に送信するよう構成され、
前記記憶手段は、前記基準車両から得られた前記消費電力を前記基準消費電力として記憶するよう構成されていることを特徴とする請求項1から請求項4のいずれかに記載の必要電力予測装置。
The plurality of vehicles include a reference vehicle (3A),
The reference vehicle is
The vehicle is provided with measuring means (61-78) for measuring power consumption in a plurality of sections on the road by traveling.
The communication means is configured to transmit the power consumption to the base station;
The required power prediction apparatus according to any one of claims 1 to 4, wherein the storage unit is configured to store the power consumption obtained from the reference vehicle as the reference power consumption. .
さらに、前記予測手段により予測された前記必要電力に基づいて電力需要を予測する電力需要予測手段(175)を備えることを特徴とする請求項1から請求項5のいずれかに記載の必要電力予測装置。   The required power prediction according to any one of claims 1 to 5, further comprising a power demand prediction means (175) for predicting a power demand based on the required power predicted by the prediction means. apparatus.
JP2010262631A 2010-11-25 2010-11-25 Vehicle required power prediction device Expired - Fee Related JP5158183B2 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
JP2010262631A JP5158183B2 (en) 2010-11-25 2010-11-25 Vehicle required power prediction device
FR1160690A FR2968107A1 (en) 2010-11-25 2011-11-23 DEVICE FOR ESTIMATING THE ELECTRICITY REQUIREMENT OF A VEHICLE, DEVICE FOR PROCESSING ELECTRICAL DATA AND CHARGING SYSTEM
DE102011086903A DE102011086903A1 (en) 2010-11-25 2011-11-23 Electricity demand estimation device for estimating consumption of electrical power during movement of electric car, has estimation portion provided in vehicle to estimate electricity demand for drive of vehicle
CN201110375688.8A CN102529737B (en) 2010-11-25 2011-11-23 Electricity demand estimation device for estimating consumption of electrical power during movement of electric car, has estimation portion provided in vehicle to estimate electricity demand for drive of vehicle
FR1253343A FR2971874A1 (en) 2010-11-25 2012-04-12 REFILL SYSTEM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010262631A JP5158183B2 (en) 2010-11-25 2010-11-25 Vehicle required power prediction device

Publications (2)

Publication Number Publication Date
JP2012113546A true JP2012113546A (en) 2012-06-14
JP5158183B2 JP5158183B2 (en) 2013-03-06

Family

ID=46497687

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010262631A Expired - Fee Related JP5158183B2 (en) 2010-11-25 2010-11-25 Vehicle required power prediction device

Country Status (1)

Country Link
JP (1) JP5158183B2 (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013242195A (en) * 2012-05-18 2013-12-05 Sumitomo Electric System Solutions Co Ltd Electric vehicle information processing device and computer program
JP2014138439A (en) * 2013-01-15 2014-07-28 Sumitomo Electric Ind Ltd Power consumption estimation device, power consumption estimation method, path search system, and computer program
WO2014132946A1 (en) * 2013-02-26 2014-09-04 三菱重工業株式会社 Onboard device and ev management system
WO2016071993A1 (en) * 2014-11-06 2016-05-12 株式会社日立システムズ Vehicle consumable item demand prediction system and vehicle consumable item demand prediction program
JP2016084633A (en) * 2014-10-27 2016-05-19 日立建機株式会社 Power supply system for construction machine
JP2016222133A (en) * 2015-06-01 2016-12-28 三菱電機株式会社 Vehicle traveling control device
CN106997504A (en) * 2016-10-25 2017-08-01 蔚来汽车有限公司 Vehicle energy recruitment behavior analysis method and analysis system
KR101868296B1 (en) * 2017-12-07 2018-06-15 김민수 Virtual money generation system using power of transportation
WO2019146263A1 (en) * 2018-01-29 2019-08-01 本田技研工業株式会社 Information processing system, information processing device, and information processing method
JP2019140840A (en) * 2018-02-14 2019-08-22 株式会社Nttドコモ Information processor and power control system
WO2022085362A1 (en) * 2020-10-23 2022-04-28 矢崎総業株式会社 Charging reservation system
JP7417701B1 (en) 2022-12-16 2024-01-18 Go株式会社 Information processing device, information processing method and program

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2659467C1 (en) 2015-06-09 2018-07-02 Ниссан Мотор Ко., Лтд. Development of representation of the reach areas of the vehicle and method of representation of reach areas of the vehicle
JP7241399B2 (en) 2019-08-23 2023-03-17 株式会社渡会電気土木 portable combustion equipment

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004145727A (en) * 2002-10-25 2004-05-20 Mazda Motor Corp Automobile energy consumption prediction system, automobile energy consumption prediction server, automobile energy consumption prediction method and automobile energy consumption prediction program
JP2006058085A (en) * 2004-08-18 2006-03-02 Denso Corp Fuel consumption prediction device
JP2007100671A (en) * 2005-10-07 2007-04-19 Toyota Motor Corp Drive state evaluation system and drive state evaluation method
JP2009031046A (en) * 2007-07-25 2009-02-12 Hitachi Ltd Fuel consumption estimation system of automobile, route searching system, and driving guiding system
JP2009067350A (en) * 2007-09-18 2009-04-02 Aisin Aw Co Ltd Device and method for estimating vehicle consuming energy, and computer program
JP2009137340A (en) * 2007-12-04 2009-06-25 Nissan Motor Co Ltd Power management system and power management method
WO2010113246A1 (en) * 2009-03-31 2010-10-07 パイオニア株式会社 Fuel consumption estimating device fuel consumption estimating method, fuel consumption estimating program and recording medium
JP2012503468A (en) * 2008-09-19 2012-02-02 ベター プレイス ,ゲーエムベーハー Electric vehicle operating system and method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004145727A (en) * 2002-10-25 2004-05-20 Mazda Motor Corp Automobile energy consumption prediction system, automobile energy consumption prediction server, automobile energy consumption prediction method and automobile energy consumption prediction program
JP2006058085A (en) * 2004-08-18 2006-03-02 Denso Corp Fuel consumption prediction device
JP2007100671A (en) * 2005-10-07 2007-04-19 Toyota Motor Corp Drive state evaluation system and drive state evaluation method
JP2009031046A (en) * 2007-07-25 2009-02-12 Hitachi Ltd Fuel consumption estimation system of automobile, route searching system, and driving guiding system
JP2009067350A (en) * 2007-09-18 2009-04-02 Aisin Aw Co Ltd Device and method for estimating vehicle consuming energy, and computer program
JP2009137340A (en) * 2007-12-04 2009-06-25 Nissan Motor Co Ltd Power management system and power management method
JP2012503468A (en) * 2008-09-19 2012-02-02 ベター プレイス ,ゲーエムベーハー Electric vehicle operating system and method
WO2010113246A1 (en) * 2009-03-31 2010-10-07 パイオニア株式会社 Fuel consumption estimating device fuel consumption estimating method, fuel consumption estimating program and recording medium

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013242195A (en) * 2012-05-18 2013-12-05 Sumitomo Electric System Solutions Co Ltd Electric vehicle information processing device and computer program
JP2014138439A (en) * 2013-01-15 2014-07-28 Sumitomo Electric Ind Ltd Power consumption estimation device, power consumption estimation method, path search system, and computer program
US9701203B2 (en) 2013-02-26 2017-07-11 Mitsubishi Heavy Industries, Ltd. On-board unit and electric vehicle management system
WO2014132946A1 (en) * 2013-02-26 2014-09-04 三菱重工業株式会社 Onboard device and ev management system
US10850630B2 (en) 2013-02-26 2020-12-01 Mitsubishi Heavy Industries, Ltd. On-board unit and electric vehicle management system
US10828996B2 (en) 2013-02-26 2020-11-10 Mitsubishi Heavy Industries, Ltd. On-board unit and electric vehicle management system
JP2016084633A (en) * 2014-10-27 2016-05-19 日立建機株式会社 Power supply system for construction machine
WO2016071993A1 (en) * 2014-11-06 2016-05-12 株式会社日立システムズ Vehicle consumable item demand prediction system and vehicle consumable item demand prediction program
JP2016222133A (en) * 2015-06-01 2016-12-28 三菱電機株式会社 Vehicle traveling control device
CN106997504A (en) * 2016-10-25 2017-08-01 蔚来汽车有限公司 Vehicle energy recruitment behavior analysis method and analysis system
KR101868296B1 (en) * 2017-12-07 2018-06-15 김민수 Virtual money generation system using power of transportation
WO2019146263A1 (en) * 2018-01-29 2019-08-01 本田技研工業株式会社 Information processing system, information processing device, and information processing method
JPWO2019146263A1 (en) * 2018-01-29 2021-01-28 本田技研工業株式会社 Information processing system, information processing device, and information processing method
JP2019140840A (en) * 2018-02-14 2019-08-22 株式会社Nttドコモ Information processor and power control system
WO2022085362A1 (en) * 2020-10-23 2022-04-28 矢崎総業株式会社 Charging reservation system
JP2022069173A (en) * 2020-10-23 2022-05-11 矢崎総業株式会社 Charging reservation system
JP7256158B2 (en) 2020-10-23 2023-04-11 矢崎総業株式会社 Charging reservation system
JP7417701B1 (en) 2022-12-16 2024-01-18 Go株式会社 Information processing device, information processing method and program

Also Published As

Publication number Publication date
JP5158183B2 (en) 2013-03-06

Similar Documents

Publication Publication Date Title
JP5158183B2 (en) Vehicle required power prediction device
CN102529737B (en) Electricity demand estimation device for estimating consumption of electrical power during movement of electric car, has estimation portion provided in vehicle to estimate electricity demand for drive of vehicle
JP5327207B2 (en) Charging system
US20180202825A1 (en) Apparatus and method for providing charging equipment information to vehicle
US8996213B2 (en) Charge control system for electric motor vehicle
JP5607427B2 (en) Charging vehicle allocation management server and charging vehicle allocation management system
JP5803547B2 (en) Charging vehicle allocation planning system
US8612082B2 (en) Device for calculating power consumption of vehicle, information providing device, and information providing method
JP5776017B2 (en) Storage battery charging plan support system
US20130261953A1 (en) Route search system and method for electric automobile
JP7294595B2 (en) Charging management device, wireless charging system, server, and method of providing wireless charging service
EP2689982A1 (en) Method of operating hybrid vehicles
US20120203409A1 (en) Information and telecommunications system, vehicular device, center device, and method for controlling the system
KR20140078623A (en) Estimation and management of loads in electric vehicle networks
KR20140000646A (en) Method for carrying out an energy management of a vehicle
CN104583719A (en) Charging management system
JP2021136182A (en) Information calculation system
JP6672589B2 (en) Power consumption prediction device, power consumption prediction method, server device
JP2013115873A (en) Vehicle-to-vehicle power transmitting/receiving system and in-vehicle power transmitting/receiving controller
US20150006002A1 (en) Transportation management system for battery powered vehicles
US10793018B2 (en) Server, vehicle, and method for providing charging information
JP2015161604A (en) Navigation device and navigation program
JP5327206B2 (en) Power information processing device
WO2022052043A1 (en) Vehicle charging method and apparatus
EP3941783B1 (en) A method for controlling an energy storage system of a vehicle

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20120405

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20121113

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20121126

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20151221

Year of fee payment: 3

LAPS Cancellation because of no payment of annual fees