JP2012105429A - Load sharing device, and construction method around steel tower using the same - Google Patents

Load sharing device, and construction method around steel tower using the same Download PDF

Info

Publication number
JP2012105429A
JP2012105429A JP2010250952A JP2010250952A JP2012105429A JP 2012105429 A JP2012105429 A JP 2012105429A JP 2010250952 A JP2010250952 A JP 2010250952A JP 2010250952 A JP2010250952 A JP 2010250952A JP 2012105429 A JP2012105429 A JP 2012105429A
Authority
JP
Japan
Prior art keywords
steel tower
load
tower
transmission line
power transmission
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2010250952A
Other languages
Japanese (ja)
Inventor
Kazumasa Yasujima
一雅 安島
Hiromitsu Takagi
博光 高木
Makoto Suzuki
鈴木  誠
Keita Nemoto
圭太 根本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Cable Ltd
Original Assignee
Hitachi Cable Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Cable Ltd filed Critical Hitachi Cable Ltd
Priority to JP2010250952A priority Critical patent/JP2012105429A/en
Publication of JP2012105429A publication Critical patent/JP2012105429A/en
Pending legal-status Critical Current

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a load sharing device which, at the time when assuring an electrically safe region around a steel tower prior to construction in the periphery of the steel tower, can reduce the load of a metal shielded cable applied on the steel tower by a simple technology, resulting in an expanded application range of a non-voltage region.SOLUTION: A load sharing device 1 shares a load W applied on a steel tower 100 at the time when a construction is performed in the periphery of the steel tower, which includes an overhead transmission line in which a steel tower side end of an overhead transmission line 101 arranged with the steel tower 100 in between is supported by the steel tower 100 through an insulator 103. The load sharing device includes a temporary support post 2 which is installed at a position adjacent to the steel tower 100 of the overhead transmission line, for sharing a load applied on the steel tower 100, a load adjuster 3 which is installed between the temporary support post 2 and an arm metal 104 of the steel tower 100, for making the temporary support post side share a part of or entire load W applied on the steel tower 100, and a load detector 4 which detects the load shared by the temporary support post side.

Description

本発明は、鉄塔を挟んで配置された架空送電線の鉄塔側端部が碍子を介して鉄塔にそれぞれ支持された架空送電線路を含む鉄塔周辺の工事を行う際に、鉄塔に加わる荷重を分担する荷重分担装置及びこれを用いた鉄塔周辺の工事方法に関するものである。   The present invention shares the load applied to the tower when the construction of the area around the tower including the overhead transmission line supported by the tower through the insulator is performed on the tower side end of the overhead transmission line arranged across the tower. The present invention relates to a load sharing device to be used and a construction method around a steel tower using the same.

近年、架空送電線路の老朽化や、市街地化の拡大による架空送電線と地上建造物との距離が近接する、いわゆる地上高不足などの理由から、架空送電線路を含む鉄塔周辺の工事、すなわち、補修工事(鉄塔建替・改造、電線張替、鉄塔の保守塗装作業、腕金の改造・交換など)が増加している。   In recent years, because of the aging of overhead power transmission lines, the distance between overhead power transmission lines and ground structures due to the expansion of urbanization, so-called ground clearance shortage, construction around the tower including overhead power transmission lines, Repair work (such as steel tower rebuilding / remodeling, wire replacement, steel tower maintenance painting work, armrest remodeling / exchange, etc.) is increasing.

従来、これらの補修工事を行う際は、補修工事に先立って鉄塔周辺に電気的に安全な領域、すなわち、作業安全スペースを確保しつつ停電期間を短縮するために、架空送電線路を仮鉄柱、仮鉄塔、仮腕金などに一時的に移設し、鉄塔から架空送電線路を離間させる仮工事が行われている。   Conventionally, when performing these repair work, in order to shorten the power outage period while securing the work safety space before the repair work, that is, an electrically safe area around the tower, Temporary work is being carried out to temporarily move it to a temporary tower, a metal arm, etc., and to separate the overhead power transmission line from the steel tower.

しかし、この仮工事には、仮鉄塔などの建設・撤去や用地交渉などに多くの費用と時間が掛かるという問題がある。更に、都市部においては仮鉄塔などを建設するスペースが無く、仮工事ひいては補修工事が実施困難な場所も存在する。   However, this temporary work has a problem that it takes a lot of cost and time to construct / remove the temporary towers and to negotiate the land. Furthermore, in urban areas, there is no space for constructing temporary towers, etc., and there are places where temporary work and thus repair work is difficult to implement.

そこで、本出願人は、気中終端部を有する金属遮蔽付ケーブル(移動用ケーブル)を架空送電線路のジャンパ線に利用し、金属遮蔽付ケーブルと架空送電線との接続部を鉄塔から十分に離間させることにより、仮鉄塔、仮鉄柱、仮腕金を用いなくとも鉄塔周辺に作業安全スペースを確保することができる仮工事工法を考案し、実用化している(例えば、特許文献1参照)。この工法は、一般的にCJ(ケーブルジャンパ)工法と呼ばれている。   Therefore, the present applicant uses a metal shielded cable (moving cable) having an air termination part as a jumper wire of the overhead power transmission line, and sufficiently connects the connection part between the metal shielded cable and the overhead power transmission line from the tower. A temporary construction method has been devised and put into practical use that can secure a work safety space around the steel tower without using a temporary steel tower, a temporary iron pillar, and a temporary arm metal by separating them (see, for example, Patent Document 1). This construction method is generally called a CJ (cable jumper) construction method.

本出願人が考案、実用化している仮工事工法を図6(a),(b)に示す。なお、図6(b)では、片側の架空送電線路を実線で示し、もう一方の架空送電線路は架空送電線のみを鎖線で示している(例えば、特許文献1、特許文献3)。   The temporary construction method devised and put into practical use by the applicant is shown in FIGS. 6 (a) and 6 (b). In FIG. 6B, the overhead power transmission line on one side is indicated by a solid line, and only the overhead power transmission line is indicated by a chain line on the other overhead power transmission line (for example, Patent Document 1 and Patent Document 3).

この仮工事工法では、図6(a),(b)に示すように、鉄塔100近傍の架空送電線101を絶縁被覆された金属遮蔽付ケーブル102でジャンパ化することにより、通電状態においても鉄塔建替などの作業を安全に施工することを可能にしたものである。   In this temporary construction method, as shown in FIGS. 6A and 6B, the overhead transmission line 101 in the vicinity of the tower 100 is jumpered by a metal-shielded cable 102 with an insulation coating, so that the tower is also energized. This makes it possible to safely perform work such as rebuilding.

すなわち、この仮工事工法では、架空送電線101の鉄塔側端部に設けられた碍子(碍子装置)103を、鉄塔100の腕金104に連結された鋼撚線などの支持線105によって、鉄塔100から10m〜15m程度引き離し、鉄塔100を挟んで配置された架空送電線101間を、絶縁被覆された金属遮蔽付ケーブル102を用いて電気的に接続することで、鉄塔100周辺を無電圧化している。   That is, in this temporary construction method, an insulator (insulator device) 103 provided at the tower side end of the overhead power transmission line 101 is connected to the tower by a support wire 105 such as a steel stranded wire connected to the arm metal 104 of the tower 100. The electrical power is electrically connected between the overhead power transmission lines 101 arranged 10 to 15 m apart from 100 and sandwiched between the towers 100 by using a metal-shielded cable 102 with insulation coating, so that the voltage around the tower 100 is reduced. ing.

金属遮蔽付ケーブル102の両端に設けられたケーブルヘッド106は、碍子103に吊り下げられ、金属遮蔽付ケーブル102はハンガ107により支持線105に吊り下げられている。   The cable heads 106 provided at both ends of the metal shielded cable 102 are suspended from the insulator 103, and the metal shielded cable 102 is suspended from the support wire 105 by the hanger 107.

こうして、通電状態においても鉄塔100周辺に作業安全スペースを確保することができ、鉄塔建替などの補修工事が可能になる。   In this way, a work safety space can be secured around the tower 100 even in the energized state, and repair work such as rebuilding of the tower can be performed.

特開2000−270454号公報JP 2000-270454 A 特開平6−38324号公報Japanese Patent Laid-Open No. 6-38324 特開2010−166640号公報JP 2010-166640 A

前述の気中終端部を有する金属遮蔽付ケーブル102を架空送電線路のジャンパ線として利用する工事方法では、金属遮蔽付ケーブル102を用いて鉄塔を挟んでジャンパ化するため、金属遮蔽付ケーブル102の荷重(長さによって異なるが約400kg〜500kg程度)が鉄塔の腕金に掛かることになる。   In the construction method using the above-described metal shielded cable 102 having an air termination as a jumper wire for an overhead power transmission line, the metal shielded cable 102 is used as a jumper by sandwiching a steel tower. A load (about 400 kg to 500 kg, depending on the length) is applied to the armature of the steel tower.

一方で、鉄塔の設計は年代時期によって異なり、メンテナンスが必要な比較的古い鉄塔は、荷重増に対する裕度が少なく、鉄塔の老朽化に基づく減肉が著しく、前記工事方法には適さないものである。   On the other hand, the design of steel towers varies depending on the era.Relatively old steel towers that require maintenance have little tolerance for load increases, and are not suitable for the construction method described above, because they are extremely thin due to aging of the steel tower. is there.

荷重に対する補強構造としては、例えば、架空送電線の張替え方法の一種である吊金車工法がある(例えば、特許文献2参照)。   As a reinforcing structure against a load, for example, there is a hanging car construction method which is a kind of a method for replacing an overhead power transmission line (see, for example, Patent Document 2).

この吊金車工法では、既設線と新設線を繋いで新設線を送りドラム(いわゆるドラム場)から送り出し、既設線を巻取ドラム(いわゆるエンジン場)に巻取り、腕金の先端付近に吊した吊金車を介して既設線と新設線を走行させる際に、この工法においても、既設線及び新設線の荷重が腕金に掛かってしまうため、これを補強する手段が採られている。   In this suspension car construction method, the existing line is connected to the new line, the new line is sent out from the feed drum (so-called drum field), the existing line is wound around the take-up drum (so-called engine field), and hung near the tip of the armrest. When running the existing line and the new line through the suspended wheel, the load of the existing line and the new line is applied to the arm metal even in this construction method, and means for reinforcing this is taken.

具体的には、図7に示すように、腕金104の先端と鉄塔100との間にワイヤ108を取り付け、ターンバックル若しくはレバーブロック109で締め付ける、支持点範囲を限定した補強方法が採られている。   Specifically, as shown in FIG. 7, a wire 108 is attached between the tip of the arm bracket 104 and the steel tower 100 and tightened with a turnbuckle or a lever block 109, and a reinforcing method with a limited support point range is adopted. Yes.

この補強構造を前記工事方法に応用して、金属遮蔽付ケーブル102の荷重を補強することも考えられるが、この補強構造によっても、鉄塔自体に金属遮蔽付ケーブル102の荷重が掛かってしまうことになるため、荷重増に対する裕度が少ない老朽化した鉄塔などに対して十分に対応できるものではない。   It is conceivable to apply this reinforcing structure to the construction method to reinforce the load of the metal shielded cable 102. However, even with this reinforcing structure, the load of the metal shielded cable 102 is applied to the steel tower itself. Therefore, it cannot fully cope with an aging steel tower with a small margin for load increase.

そこで、本発明の目的は、鉄塔周辺の工事に先立って鉄塔周辺に電気的に安全な領域を確保する際に、簡便な手法により鉄塔にかかる金属遮蔽付ケーブルの荷重を軽減することができ、無電圧領域の適用範囲を拡大することができる荷重分担装置及びこれを用いた鉄塔周辺の工事方法を提供することにある。   Therefore, the purpose of the present invention is to reduce the load of the metal shielded cable applied to the steel tower by a simple method when securing an electrically safe area around the steel tower prior to the construction around the steel tower. An object of the present invention is to provide a load sharing device capable of expanding the application range of the non-voltage region and a construction method around the steel tower using the load sharing device.

この目的を達成するために創案された本発明は、鉄塔を挟んで配置された架空送電線の鉄塔側端部が碍子を介して前記鉄塔にそれぞれ支持された架空送電線路を含む鉄塔周辺の工事を行う際に、前記鉄塔に加わる荷重を分担する荷重分担装置において、前記架空送電線路の前記鉄塔に隣接する位置に設置され、前記鉄塔に加わる荷重を分担する仮設支柱と、前記仮設支柱と前記鉄塔の腕金との間に設置され、前記鉄塔に加わる荷重の一部又は全部を前記仮設支柱側に分担させる荷重調整器と、前記仮設支柱側に分担させる荷重を検出する荷重検出器とを有する荷重分担装置である。   The present invention, which was created to achieve this object, is a construction around a steel tower including overhead power transmission lines in which the steel tower side ends of the overhead power transmission lines arranged across the steel tower are respectively supported by the steel tower via insulators. In the load sharing device that shares the load applied to the steel tower, the temporary support column that is installed at a position adjacent to the steel tower of the overhead power transmission line and shares the load applied to the steel tower, the temporary support column, and the A load adjuster installed between the arm of the steel tower and sharing a part or all of the load applied to the steel tower on the temporary support column side; and a load detector for detecting a load shared on the temporary support column side. It is the load sharing apparatus which has.

前記仮設支柱は腕金部を有し、前記腕金部が前記鉄塔の前記腕金よりも高い位置に設けられると良い。   The temporary support column has a brace part, and the brace part is preferably provided at a position higher than the brace part of the steel tower.

前記仮設支柱は腕金部を有し、前記腕金部が前記鉄塔の前記腕金よりも低い位置に設けられても良い。   The temporary support column may have a brace part, and the brace part may be provided at a position lower than the brace part of the steel tower.

また本発明は、鉄塔を挟んで配置された架空送電線の鉄塔側端部が碍子を介して前記鉄塔にそれぞれ支持された架空送電線路を含む鉄塔周辺の工事方法において、前記架空送電線路の前記鉄塔に隣接する位置に、前記鉄塔に加わる荷重を分担する仮設支柱を設置する工程と、前記碍子から前記架空送電線を外すと共に、前記架空送電線と前記碍子との間を、仮設碍子を有する支持ユニットで連結し、前記架空送電線を緊線状態で支持する工程と、前記仮設支柱と前記鉄塔の腕金との間に、前記鉄塔に加わる荷重の一部又は全部を前記仮設支柱側に分担させる荷重調整器と、前記仮設支柱側に分担させる荷重を検出する荷重検出器とを設置する工程と、前記鉄塔を挟んで配置され、前記支持ユニットによりそれぞれ緊線状態に支持された前記架空送電線間を、金属遮蔽付ケーブルを有するジャンパユニットを用いて電気的に接続する工程とを有し、これら工程の後に、鉄塔周辺の工事を行う鉄塔周辺の工事方法である。   Further, the present invention provides a construction method around a steel tower including an overhead power transmission line supported on the steel tower via an insulator, respectively, on the tower side end of the overhead power transmission line arranged across the steel tower. A step of installing a temporary support column for sharing the load applied to the tower at a position adjacent to the tower; removing the overhead power transmission line from the insulator; and having a temporary insulator between the overhead transmission line and the insulator A part of the load applied to the tower is connected to the temporary support column side between the step of connecting the support unit and supporting the overhead power transmission line in a tightly connected state, and the temporary support column and the armrest of the steel tower. A step of installing a load adjuster to be shared and a load detector for detecting a load to be shared on the temporary support column side; and the bridge disposed between the steel towers and supported in a tightly connected state by the support unit. Between power lines, and a step of electrically connecting with the jumper unit having a cable with metal shielding, after these steps, a work process around pylons performing work around pylons.

本発明によれば、鉄塔周辺の工事に先立って鉄塔周辺に電気的に安全な領域を確保する際に、簡便な手法により鉄塔にかかる金属遮蔽付ケーブルの荷重を軽減することができ、無電圧領域の適用範囲を拡大することができる。   According to the present invention, when securing an electrically safe area around the tower prior to the construction around the tower, it is possible to reduce the load of the metal shielded cable applied to the tower by a simple method, no voltage The application range of the area can be expanded.

本発明の実施の形態に係る荷重分担装置を示す側面図である。It is a side view which shows the load sharing apparatus which concerns on embodiment of this invention. 本発明の実施の形態に係る荷重分担装置を示す平面図である。It is a top view which shows the load sharing apparatus which concerns on embodiment of this invention. 本発明の変形例に係る荷重分担装置を示す側面図である。It is a side view which shows the load sharing apparatus which concerns on the modification of this invention. 鉄塔周辺の工事を行う前の状態(既設状態)における、鉄塔周辺の架空送電線路の一例を示す図である。It is a figure which shows an example of the aerial power transmission line around a steel tower in the state (existing state) before construction around a steel tower. 鉄塔周辺の工事(本工事)前に、鉄塔周辺に電気的に安全な作業領域を確保するための工事(仮工事)を行った後の架空送電線路の状態を示す図である。It is a figure which shows the state of an aerial transmission line after performing the construction (temporary construction) for ensuring the electrically safe work area | region around a steel tower before construction (main construction) around a steel tower. 金属遮蔽付ケーブルを架空送電線路のジャンパ線として利用する工事方法を説明する図であり、(a)は平面図、(b)は斜視図である。It is a figure explaining the construction method using a metal shielded cable as a jumper line of an aerial power transmission line, (a) is a top view, (b) is a perspective view. 腕金に掛かる荷重に対する補強方法を説明する図である。It is a figure explaining the reinforcement method with respect to the load concerning a bracelet.

以下、本発明の好適な実施の形態を添付図面にしたがって説明する。   Preferred embodiments of the present invention will be described below with reference to the accompanying drawings.

図1は、本発明の好適な実施の形態に係る荷重分担装置を示す側面図であり、図2は、その平面図である。なお、図1の紙面方向には、金属遮蔽付ケーブル102が鉄塔を跨ぐようにして掛け渡されており、この点は従来技術と同様であり、図6と同一の符号を付して説明を省略する。   FIG. 1 is a side view showing a load sharing apparatus according to a preferred embodiment of the present invention, and FIG. 2 is a plan view thereof. In addition, in the paper surface direction of FIG. 1, the cable 102 with a metal shield is spanned so as to straddle the steel tower, and this point is the same as the prior art, and the description is given with the same reference numerals as in FIG. Omitted.

図1,2に示すように、実施の形態に係る荷重分担装置1は、鉄塔100を挟んで配置された架空送電線101の鉄塔側端部が碍子を介して鉄塔100にそれぞれ支持された架空送電線路を含む鉄塔周辺の工事を行う際に、鉄塔100に加わる荷重Wを分担するためのものであり、金属遮蔽付ケーブル102を掛け渡す前に予め設置しておくものである。   As shown in FIGS. 1 and 2, the load sharing apparatus 1 according to the embodiment is an aerial in which the tower-side ends of the overhead power transmission lines 101 arranged with the tower 100 interposed therebetween are respectively supported by the tower 100 via insulators. This is for sharing the load W applied to the steel tower 100 when the work around the steel tower including the power transmission line is performed, and is installed in advance before the metal shielded cable 102 is handed over.

より具体的には、荷重分担装置1は、架空送電線路の鉄塔100に隣接する位置に設置され、鉄塔100に加わる荷重Wを分担する仮設支柱(支持物)2と、仮設支柱2と鉄塔100の腕金104との間に設置され、鉄塔100に加わる荷重Wの一部又は全部を仮設支柱側に分担させる荷重調整器3と、仮設支柱側に分担させる荷重を検出する荷重検出器4とを有する。   More specifically, the load sharing device 1 is installed at a position adjacent to the tower 100 of the overhead power transmission line, and a temporary support (support) 2 that shares the load W applied to the tower 100, the temporary support 2 and the tower 100. A load adjuster 3 that is installed between the arm brace 104 and distributes a part or all of the load W applied to the tower 100 to the temporary support column side, and a load detector 4 that detects the load to be shared to the temporary support column side, Have

仮設支柱2は腕金部5を有し、腕金部5が鉄塔100の腕金104よりも高い位置に設けられる。この仮設支柱2は、鉄塔100の腕金104に掛かる垂直荷重の負荷に関して鉄塔100とは独立して分担するものである。   The temporary support column 2 has a brace part 5, and the brace part 5 is provided at a position higher than the brace 104 of the steel tower 100. The temporary support column 2 shares the vertical load applied to the arm metal 104 of the steel tower 100 independently of the steel tower 100.

仮設支柱2の材質は、例えば、鋼材、繊維強化プラスチック(FRP;Fiber Reinforced Plastics)、炭素繊維強化プラスチック(CFRP;Carbon Fiber Reinforced Plastics)、銅のようなものを使用することができる。特に、FRPやCFRPを選択することで、仮設支柱2の軽量化を図ることが可能である。   As the material of the temporary support 2, for example, steel, fiber reinforced plastic (FRP), carbon fiber reinforced plastic (CFRP), or copper can be used. In particular, it is possible to reduce the weight of the temporary support column 2 by selecting FRP or CFRP.

仮設支柱2の形状も特に限定されるものではなく、例えば、トラス形状の鋼材や、鉄製のパイプ形状のものであっても良い。また、仮設支柱2の寸法は、鉄塔100の種類に応じて可変であるが、例えば、高さ約40〜50m、奥行30cm、幅30cm程度のものが使用可能である。   The shape of the temporary support column 2 is not particularly limited, and may be, for example, a truss-shaped steel material or an iron pipe shape. Moreover, although the dimension of the temporary support | pillar 2 is variable according to the kind of the steel tower 100, for example, about 40-50 m in height, 30 cm in depth, and about 30 cm in width can be used.

更に、仮設支柱2の本数は特に限定されるものではなく、例えば、3相の腕金104に対して、それぞれ対応した3本の仮設支柱2で支持することも可能であり、また図1,2のように、3相の腕金104に対して、1本の仮設支柱2で支持することも可能である。また、仮設支柱2は、必要に応じて支持材6によって鉄塔100と接合して鉄塔100により支えられる構造であっても良い。   Further, the number of the temporary support columns 2 is not particularly limited, and for example, it can be supported by the three temporary support columns 2 corresponding to the three-phase arm metal 104, respectively. As shown in FIG. 2, it is possible to support the three-phase brace 104 with a single temporary support 2. Moreover, the structure which the temporary support | pillar 2 joins the steel tower 100 with the support material 6 as needed, and is supported by the steel tower 100 may be sufficient.

荷重調整器3と荷重検出器4は、仮設支柱2の腕金部5とその下方に位置する鉄塔100の腕金104との間に設置される。荷重調整器3としては、例えば、レバーブロックなどを使用することができる。また、荷重検出器4としては、例えば、株式会社チルコーポレーション製のダイナホールを使用することができる。   The load adjuster 3 and the load detector 4 are installed between the arm metal part 5 of the temporary support column 2 and the arm metal 104 of the steel tower 100 located therebelow. As the load adjuster 3, for example, a lever block or the like can be used. Moreover, as the load detector 4, for example, a dyna hole made by Chill Corporation can be used.

荷重調整器3は、腕金104の先端付近に取り付けたワイヤ7の他端にチェーン8を介して取り付けられると共に、荷重検出器4を介して腕金部5に取り付けられる。   The load adjuster 3 is attached to the other end of the wire 7 attached in the vicinity of the distal end of the arm metal 104 via the chain 8 and is attached to the arm metal part 5 via the load detector 4.

本実施の形態においては、仮設支柱2の腕金部5が鉄塔100の腕金104よりも高い位置に設けられるものとしたが、図3に示すように、仮設支柱2の腕金部5が鉄塔100の腕金104よりも低い位置に設けられても良い。この場合、荷重調整器3としては、例えば、ジャッキを用い、荷重検出器4を介して鉄塔100の腕金104を押し上げるように構成すると良い。   In the present embodiment, the arm metal part 5 of the temporary support column 2 is provided at a position higher than the arm metal 104 of the steel tower 100. However, as shown in FIG. It may be provided at a position lower than the arm metal 104 of the steel tower 100. In this case, as the load adjuster 3, for example, a jack may be used and the arm metal 104 of the steel tower 100 may be pushed up via the load detector 4.

この形態では、前述のように鉄塔100の腕金104が仮設支柱2の腕金部5に吊下されるのではなく、腕金104が押し上げられる状態となり、鉄塔100の腕金104に掛かる荷重Wが仮設支柱側に分担されることとなり、前述の実施の形態と同様の効果を得ることができる。   In this form, the arm metal 104 of the steel tower 100 is not suspended from the arm metal part 5 of the temporary support column 2 as described above, but the arm metal 104 is pushed up, and the load applied to the arm metal 104 of the steel tower 100. W is shared by the temporary support column side, and the same effect as the above-described embodiment can be obtained.

次に、荷重分担装置1を用いた鉄塔周辺の工事方法を説明する。   Next, a construction method around the steel tower using the load sharing device 1 will be described.

図4は、鉄塔周辺の工事を行う前の状態(既設状態)における、鉄塔周辺の架空送電線路の一例を示す図である。   FIG. 4 is a diagram illustrating an example of an overhead power transmission line around the steel tower in a state (existing state) before construction around the steel tower.

図4に示すように、鉄塔100を挟んで配置された架空送電線101の鉄塔側端部にある圧縮型引留クランプ110が、碍子(碍子連装置)111を介して鉄塔100の腕金104にそれぞれ支持されている。鉄塔両側の圧縮型引留クランプ110,110のジャンパ用端子112,112間は、ジャンパ線113により接続されている。   As shown in FIG. 4, a compression-type retention clamp 110 at the tower-side end of the overhead power transmission line 101 arranged with the steel tower 100 interposed therebetween is attached to the arm metal 104 of the steel tower 100 via an insulator (lion-connecting device) 111. Each is supported. The jumper terminals 112 and 112 of the compression type retaining clamps 110 and 110 on both sides of the steel tower are connected by a jumper wire 113.

図5は、鉄塔周辺の工事、すなわち、鉄塔の保守塗装、碍子の塗装、碍子の交換、腕金の改造・交換、その他、鉄塔の建替・改造、送電線の張替などの工事(本工事)を行うに先立って、鉄塔周辺に電気的に安全な作業領域を確保するための工事(仮工事)を行った後の架空送電線路の状態を示す図である。図5では、鉄塔100(図5では省略)の一方の側の架空送電線路だけを図示しているが、図4に示すように鉄塔100の両側に鉄塔100の中心線に対して対称的に架空送電線路が配置される。図5において、碍子111は、図4に示す鉄塔周辺の工事前の、鉄塔100の腕金104に連結された既設の碍子111であり、架空送電線101も図4に示す既設の架空送電線101である。   Fig. 5 shows the construction around the tower, ie maintenance painting of the tower, painting of the insulator, exchanging the insulator, remodeling and replacement of the armor, and other works such as rebuilding and remodeling of the tower and replacement of the transmission line. It is a figure which shows the state of an aerial power transmission line after performing the construction (temporary construction) for ensuring an electrically safe work area | region around a steel tower prior to performing construction. In FIG. 5, only the overhead power transmission line on one side of the tower 100 (not shown in FIG. 5) is shown. However, as shown in FIG. An overhead power transmission line is arranged. In FIG. 5, an insulator 111 is an existing insulator 111 connected to the arm metal 104 of the tower 100 before construction around the tower shown in FIG. 4, and the overhead transmission line 101 is also an existing overhead transmission line shown in FIG. 4. 101.

既設の碍子111と、鉄塔100から離れた部位(後述する楔形引留クランプ120の取付部位)の架空送電線101との間には、これらを連結して前記部位より鉄塔100から離れる側の架空送電線101を緊線状態で支持する仮設碍子(長幹碍子)114を有する支持ユニット115が設けられている。なお、仮設碍子114の形状は、図5に示されるものに限定されるものではなく、既設の碍子111と同様の形状のものを使用することができる。   Between the existing insulator 111 and the overhead power transmission line 101 at a part away from the tower 100 (attachment part of a wedge-shaped retention clamp 120 described later), these parts are connected to each other, and the overhead transmission on the side away from the tower 100 from the part. A support unit 115 having a temporary insulator (long trunk insulator) 114 that supports the electric wire 101 in a tightly connected state is provided. The shape of the temporary insulator 114 is not limited to that shown in FIG. 5, and a shape similar to that of the existing insulator 111 can be used.

既設の碍子111から外された圧縮型引留クランプ110を含む前記部位より鉄塔側の架空送電線101の部分は、支持ユニット115により緊線状態にある架空送電線側へと引き戻されて、固定部材としての固定金具116、アルミバインド線117により、緊線状態にある架空送電線101に固定されている。   The portion of the overhead power transmission line 101 closer to the pylon than the portion including the compression type retaining clamp 110 removed from the existing insulator 111 is pulled back to the overhead power transmission line side in the tight connection state by the support unit 115, and the fixing member Are fixed to the overhead power transmission line 101 that is in a tight-wire state.

また、鉄塔100を挟んで配置され、支持ユニット115によりそれぞれ緊線状態に支持された架空送電線101,101間を、電気的に接続する金属遮蔽付ケーブル102としてのCJ−CVケーブル(架橋ポリエチレン絶縁ビニルシースケーブル)を有するジャンパユニット118が設けられている。   Further, a CJ-CV cable (cross-linked polyethylene) serving as a metal shielded cable 102 that is electrically connected between the overhead power transmission lines 101 and 101 that are arranged sandwiching the steel tower 100 and supported in a tight state by the support unit 115. A jumper unit 118 having an insulated vinyl sheath cable) is provided.

支持ユニット115は、中央に仮設碍子114を有し、鉄塔側には既設の碍子111端部に連結される地線用耐張クランプ119を、また鉄塔100と離れる送電線側には架空送電線101に取り付けられる楔形引留クランプ120を備えている。   The support unit 115 has a temporary insulator 114 in the center, a ground wire tension clamp 119 connected to the end of the existing insulator 111 on the steel tower side, and an overhead power transmission line on the power line side away from the steel tower 100. A wedge-shaped retention clamp 120 attached to 101 is provided.

仮設碍子114の鉄塔側端部には、落雷による仮設碍子114の損傷を防止するためのアークホーン121が設けられ、アークホーン121には、ホーン取付金具122、平行クレビス123、三角リンク124及び平行クレビス123を介して、圧縮クランプ125が設けられている。圧縮クランプ125と地線用耐張クランプ119との間には、接地線として亜鉛メッキ鋼撚線126が架け渡され、亜鉛メッキ鋼撚線126は更に地線用耐張クランプ119を経由して鉄塔100に接地されている。   An arc horn 121 for preventing damage to the temporary insulator 114 due to a lightning strike is provided at the end of the temporary insulator 114 on the steel tower side. The arc horn 121 includes a horn mounting bracket 122, a parallel clevis 123, a triangular link 124, and a parallel link. A compression clamp 125 is provided via the clevis 123. Between the compression clamp 125 and the ground wire tension clamp 119, a galvanized steel stranded wire 126 is bridged as a ground wire, and the galvanized steel stranded wire 126 further passes through the ground wire tension clamp 119. The steel tower 100 is grounded.

仮設碍子114の鉄塔100と離れる送電線側の端部には、例えば、アークホーン121が設けられ、アークホーン121には、特殊一枚リンク127、平行クレビス123、平行クレビスリンク128、一枚リンク129、Y型金具130及び一枚リンク129のような、適正な架線金具連を介して、楔形引留クランプ120が設けられている。   For example, an arc horn 121 is provided at the end of the temporary insulator 114 on the transmission line side away from the steel tower 100. The arc horn 121 has a special single link 127, a parallel clevis 123, a parallel clevis link 128, and a single link. 129, a Y-shaped bracket 130 and a single link 129 are provided with a wedge-shaped retention clamp 120 via an appropriate wire bracket series.

楔形引留クランプ120を通過し楔形引留クランプ120よりも鉄塔側に既設されていた架空送電線101は、支持ユニット115により緊線状態にある架空送電線側へと引き戻され、固定金具116により、緊線状態にある架空送電線101に固定され、また架空送電線101の鉄塔側端部にある圧縮型引留クランプ110は、アルミバインド線117により、緊線状態にある架空送電線101に固定されている。ここで、緊線状態とは、送電線を送電するに資する適正な張力で緊張した状態にあることをいう。   The overhead power transmission line 101 that has passed through the wedge-shaped retention clamp 120 and is already installed on the steel tower side of the wedge-shaped retention clamp 120 is pulled back to the overhead power transmission line side that is in a tight connection state by the support unit 115, and is fastened by the fixing bracket 116. The compression-type retention clamp 110 fixed to the overhead power transmission line 101 in the line state and at the tower side end of the overhead power transmission line 101 is fixed to the overhead power transmission line 101 in the tightly connected state by the aluminum binding wire 117. Yes. Here, the tight line state means a state in which the line is tensioned with an appropriate tension that contributes to power transmission through the transmission line.

ジャンパユニット118は、金属遮蔽付ケーブル102と、金属遮蔽付ケーブル102の両端に設けられた終端接続部としてのケーブルヘッド106と、ケーブルヘッド106の送電線側端部と緊線状態にある架空送電線101との間を接続するジャンパ線131とを備えている。   The jumper unit 118 includes a metal shielded cable 102, a cable head 106 as a terminal connection provided at both ends of the metal shielded cable 102, and an aerial transmission that is in a tight connection state with a power transmission line side end of the cable head 106. A jumper wire 131 is provided to connect the electric wire 101.

金属遮蔽付ケーブル102は、例えば、中心導体(可撓撚線導体(外径26.0mm)と、中心導体の周囲を覆う絶縁体(内部半導電層と外部半導電層とからなり、厚さ13.0mm)と、絶縁体の周囲を覆う編組構造遮蔽層(軟銅線編組シース(厚さ4.0mm))とを有し、編組構造遮蔽層の外周に押さえテープを巻き付けたケーブル(全ケーブル外径66mm)である。なお、このケーブル構造は一例にすぎず、また前記厚さ、外径は使用環境に応じて適宜変更される。   The cable 102 with a metal shield includes, for example, a central conductor (flexible stranded conductor (outer diameter 26.0 mm) and an insulator (an inner semiconductive layer and an outer semiconductive layer) covering the periphery of the central conductor. 13.0 mm) and a braided structure shielding layer (an annealed copper wire braided sheath (thickness: 4.0 mm)) that covers the periphery of the insulator, and a cable (all cables) wrapped around the outer periphery of the braided structure shielding layer Note that this cable structure is merely an example, and the thickness and outer diameter are appropriately changed according to the use environment.

ジャンパ線131の送電線側端部は、PGクランプ132により架空送電線101に電気的に接続されている。ジャンパ線131としては、特に限定するものではなく、裸線、絶縁被覆線、又は遮蔽層付ケーブルのいずれであっても良い。架空送電線101には、アルミ線、鋼心アルミ撚線などが用いられる。   The end of the jumper line 131 on the power transmission line side is electrically connected to the overhead power transmission line 101 by a PG clamp 132. The jumper wire 131 is not particularly limited, and may be any of a bare wire, an insulation coated wire, and a cable with a shielding layer. As the overhead power transmission line 101, an aluminum wire, a steel core aluminum stranded wire, or the like is used.

ケーブルヘッド106は、支持部材としてのターンバックル133とケーブルヘッド固定金具134とにより、支持ユニット115の仮設碍子114の下方に仮設碍子114とほぼ並行に吊り下げられている。   The cable head 106 is suspended substantially parallel to the temporary insulator 114 below the temporary insulator 114 of the support unit 115 by a turnbuckle 133 as a support member and a cable head fixing bracket 134.

ケーブルヘッド106には、一般的な電力設備に使用されている77kV用気中磁器碍子ケーブルヘッド(例えば、重量約200kg)や、軽量で取り扱い性の良い77kV移動用モールドケーブルヘッドなどが用いられる。   As the cable head 106, a 77 kV air porcelain insulator cable head (for example, a weight of about 200 kg) used in general power equipment, a 77 kV moving mold cable head that is light and easy to handle, and the like are used.

金属遮蔽付ケーブル102の金属遮蔽層(図示せず)に電気的に接続された接地線135の端部は、ボルトコネクタ136により、亜鉛メッキ鋼撚線126に接続されている。亜鉛メッキ鋼撚線126は、途中、地線用耐張クランプ119に固定され、鉄塔100へと接地されている。   The end of the ground wire 135 that is electrically connected to a metal shielding layer (not shown) of the metal shielded cable 102 is connected to a galvanized steel stranded wire 126 by a bolt connector 136. The galvanized steel stranded wire 126 is fixed to the ground wire tension clamp 119 on the way and is grounded to the steel tower 100.

さて、本実施の形態に係る鉄塔周辺の工事方法は、架空送電線路の鉄塔100に隣接する位置に、鉄塔100に加わる荷重Wを分担する仮設支柱2を予め設置する工程Aと、碍子103から架空送電線101を外すと共に、架空送電線101と碍子103との間を、仮設碍子114を有する支持ユニット115で連結し、架空送電線101を緊線状態で支持する工程Bと、仮設支柱2と鉄塔100の腕金104との間に荷重調整器3と荷重検出器4とを設置する工程Cと、鉄塔100を挟んで配置され、支持ユニット115によりそれぞれ緊線状態に支持された架空送電線101,101間を、金属遮蔽付ケーブル102を有するジャンパユニット118を用いて電気的に接続する工程Dとを有し、これら工程A〜Dの後に、鉄塔周辺の工事を行う方法である。   Now, the construction method around the steel tower according to the present embodiment is based on the process A in which the temporary support column 2 that shares the load W applied to the steel tower 100 is preliminarily installed at the position adjacent to the steel tower 100 of the overhead power transmission line, and the insulator 103. The step B of removing the overhead power transmission line 101 and connecting the overhead power transmission line 101 and the insulator 103 with the support unit 115 having the temporary insulator 114 to support the overhead power transmission line 101 in a tightly connected state, and the temporary support column 2 Step C for installing the load adjuster 3 and the load detector 4 between the steel tower 100 and the armature 104 of the steel tower 100; And a step D of electrically connecting the electric wires 101 and 101 using a jumper unit 118 having a metal shielded cable 102. After these steps AD, construction around the steel tower It is a way to do.

工程Aの時点では、図4に示したように、架空送電線101の鉄塔側端部の圧縮型引留クランプ110が、碍子111に取り付けられて鉄塔100の腕金104に支持され、鉄塔両側の圧縮型引留クランプ110,110間にはジャンパ線113が接続されている。   At the time of the process A, as shown in FIG. 4, the compression type retaining clamp 110 at the tower side end of the overhead power transmission line 101 is attached to the insulator 111 and supported by the arm metal 104 of the tower 100, and on both sides of the tower. A jumper wire 113 is connected between the compression type clamping clamps 110 and 110.

工程Bにおいては、地線用耐張クランプ119を既設の碍子111に取り付け、楔形引留クランプ120を既設の架空送電線101に取り付ける。このとき、架空送電線101を鉄塔側に引き寄せるなどして、既設の碍子111を基準に、支持ユニット115の全長よりも既設の架空送電線101の方が長くなるような位置に楔形引留クランプ120を取り付ける。これにより、楔形引留クランプ120よりも鉄塔100から離れる側の架空送電線101が、支持ユニット115によって緊線状態で支持される。また、亜鉛メッキ鋼撚線126を鉄塔100に接続する。   In step B, the ground wire tension clamp 119 is attached to the existing insulator 111, and the wedge-shaped retention clamp 120 is attached to the existing overhead power transmission line 101. At this time, the wedge-shaped retention clamp 120 is positioned at a position where the existing overhead power transmission line 101 is longer than the entire length of the support unit 115 with reference to the existing insulator 111 by pulling the overhead power transmission line 101 toward the tower. Install. Thereby, the overhead power transmission line 101 on the side farther from the steel tower 100 than the wedge-shaped retention clamp 120 is supported in a tightly connected state by the support unit 115. Further, the galvanized steel stranded wire 126 is connected to the steel tower 100.

既設の架空送電線101に取り付けられた圧縮型引留クランプ110を既設の碍子111から取り外す。このとき、支持ユニット115によって楔形引留クランプ120よりも鉄塔100から離れる側の架空送電線101が緊線状態で支持されており、碍子111の端部に取り付けられた圧縮型引留クランプ110から楔形引留クランプ120までの架空送電線101が緩んだ状態となっているため、圧縮型引留クランプ110を碍子111から容易に取り外すことができる。   The compression type retention clamp 110 attached to the existing overhead power transmission line 101 is removed from the existing insulator 111. At this time, the overhead transmission line 101 on the side farther from the tower 100 than the wedge-shaped retention clamp 120 is supported by the support unit 115 in a tightly connected state, and the wedge-shaped retention clamp 110 is attached to the compression-type retention clamp 110 attached to the end of the insulator 111. Since the overhead power transmission line 101 up to the clamp 120 is in a loose state, the compression type retention clamp 110 can be easily detached from the insulator 111.

工程Cにおいては、荷重調整器3を操作することによりワイヤ7を緊線状態とし、荷重検出器4の荷重表示画面を見ながら所望の張力に達していることを確認した時点で、荷重調整器3の操作を止め、荷重分担装置1を用いて鉄塔100に掛かる荷重Wを分担させる。   In step C, when the load adjuster 3 is operated to bring the wire 7 into a tight state, and when it is confirmed that the desired tension is reached while viewing the load display screen of the load detector 4, the load adjuster is confirmed. 3 is stopped, and the load W applied to the steel tower 100 is shared using the load sharing device 1.

工程Dにおいては、先ず、支持ユニット115の仮設碍子114の両端に、ケーブルヘッド固定金具134とターンバックル133を用いて、ケーブルヘッド106を吊り下げる。この構造であれば、金属遮蔽付ケーブル102が短いものであるため、特に支持線を設けず、ハンガを別途必要としない。ターンバックル133は、その長さが調節可能なので、仮設碍子114に対するケーブルヘッド106の端子部の上下位置を調節できる。また、金属遮蔽付ケーブル102の金属遮蔽層に電気的に接続された接地線135を、ボルトコネクタ136により、支持ユニット115の亜鉛メッキ鋼撚線126に接続する。   In step D, first, the cable head 106 is suspended from both ends of the temporary insulator 114 of the support unit 115 using the cable head fixing bracket 134 and the turnbuckle 133. With this structure, since the metal shielded cable 102 is short, no support wire is provided and a hanger is not required separately. Since the length of the turnbuckle 133 is adjustable, the vertical position of the terminal portion of the cable head 106 relative to the temporary insulator 114 can be adjusted. Further, the ground wire 135 electrically connected to the metal shielding layer of the metal shielded cable 102 is connected to the galvanized steel stranded wire 126 of the support unit 115 by the bolt connector 136.

次いで、既設の架空送電線101にジャンパユニット118を接続する。具体的には、ジャンパ線131の一端を、PGクランプ132を用いて、既設の緊線状態にある架空送電線101に取り付ける(図示省略の反対側も同様)。これにより、鉄塔100を挟んで両側の架空送電線101がジャンパユニット118によって電気的に接続された状態になる。その後に、図4に示した鉄塔100を跨いで取り付けられている既設のジャンパ線113を取り外す。   Next, the jumper unit 118 is connected to the existing overhead power transmission line 101. Specifically, one end of the jumper wire 131 is attached to the existing overhead power transmission line 101 in a tightly connected state using the PG clamp 132 (the same applies to the opposite side not shown). As a result, the overhead power transmission lines 101 on both sides of the steel tower 100 are electrically connected by the jumper unit 118. Thereafter, the existing jumper wire 113 attached across the steel tower 100 shown in FIG. 4 is removed.

圧縮型引留クランプ110から楔形引留クランプ120までの、取り外した架空送電線101は、切断・廃棄することなく、支持ユニット115によって緊線状態で支持された架空送電線側へと折り返すように曲げて引き回し、PGクランプなどの複数の固定金具116を用いて、緊線状態の架空送電線101に固定する。   The removed overhead power transmission line 101 from the compression-type tension clamp 110 to the wedge-shaped tension clamp 120 is bent so as to be folded back to the side of the overhead power transmission line supported by the support unit 115 without being cut or discarded. It is routed and fixed to the overhead power transmission line 101 in a tightly connected state using a plurality of fixing brackets 116 such as a PG clamp.

緊線状態で支持された架空送電線側へと折り返すように曲げられる、鉄塔100から取り外された架空送電線101の最小曲げ半径(許容曲げ半径)は電線外径の8倍以上とするのが良い。これは、架空送電線101を折り曲げる際に、架空送電線101の電線素線に折れ、曲り、笑い(電線素線の撚りが戻って、撚りに隙間が生じる)等が生じないようにするためであり、このようにすることで既設の架空送電線101はダメージを受けることなく、復旧に際して工事前と同じように使用できる。複数の固定金具116による架空送電線101同士の固定箇所の間隔は、2m以内とするのが良い。これは、1箇所の固定が外れた場合にも、他の架空送電線101等との離隔を確保できるからである。   The minimum bending radius (allowable bending radius) of the overhead power transmission line 101 removed from the tower 100, which is bent so as to be folded back to the side of the overhead power transmission line supported in the tightly connected state, is at least eight times the outer diameter of the electric wire. good. This is to avoid bending, bending, laughing (a twisting of the wire element returns and a gap occurs in the twist) or the like when the overhead power line 101 is bent. In this way, the existing overhead power transmission line 101 can be used in the same manner as before the construction at the time of restoration without being damaged. The interval between the fixed portions of the overhead power transmission lines 101 by the plurality of fixing brackets 116 is preferably 2 m or less. This is because the separation from other overhead power transmission lines 101 and the like can be ensured even when the fixation at one place is removed.

また、取り外した架空送電線101の端部の圧縮型引留クランプ110は、アルミバインド線117を用いて緊線状態の架空送電線101に固定する。   Further, the compression-type retention clamp 110 at the end of the removed overhead power transmission line 101 is fixed to the overhead power transmission line 101 in a tightly connected state using an aluminum bind wire 117.

以上説明した工程A〜Dにより、鉄塔100の腕金104が仮設支柱2の腕金部5に吊下された状態となり、金属遮蔽付ケーブル102の荷重Wの全部を鉄塔100自体だけに掛けるのではなく、仮設支柱2の方にも分担させることができる。よって、金属遮蔽付ケーブル102として長さが比較的長いものを使用しても、その荷重Wを鉄塔100だけに掛けることなく、鉄塔100への荷重負荷を軽減することができるので、鉄塔工事における無電圧領域の適用範囲の拡大のニーズにも対応することができる。   By the steps A to D described above, the arm metal 104 of the steel tower 100 is suspended from the arm metal part 5 of the temporary support column 2, and the entire load W of the metal shielded cable 102 is applied only to the steel tower 100 itself. Instead, it can also be shared by the temporary support column 2. Therefore, even if a cable with a relatively long length is used as the metal shielded cable 102, the load load on the steel tower 100 can be reduced without applying the load W only to the steel tower 100. It is possible to meet the needs of expanding the application range in the non-voltage region.

なお、上記実施の形態に係る鉄塔周辺の工事方法においては、架空送電線路の鉄塔に隣接する位置に仮設支柱を設置した後に、架空送電線と碍子との間を仮設碍子を有する支持ユニットで連結する方法を説明したが、これに限定されるものではなく、架空送電線と碍子との間に仮設碍子を有する支持ユニットで連結した後に、架空送電線路の鉄塔に隣接する位置に仮設支柱を設置することで対応することもできる。   In addition, in the construction method around the steel tower according to the above embodiment, after the temporary support column is installed at a position adjacent to the steel tower of the overhead power transmission line, the overhead power transmission line and the insulator are connected by a support unit having a temporary insulator. However, the present invention is not limited to this, and after connecting the overhead transmission line and the insulator with a support unit having a temporary insulator, a temporary support column is installed at a position adjacent to the tower of the overhead transmission line. You can also deal with it.

この作業(仮工事)が終わると、鉄塔周辺には電気的に安全な作業領域が確保されるので、鉄塔100の保守塗装作業、碍子111の塗装、碍子111の交換、腕金104の改造・交換などの実体的な作業(本工事)を開始する。   After this work (temporary work) is completed, an electrically safe work area is secured around the tower, so maintenance painting work for the tower 100, painting of the insulator 111, replacement of the insulator 111, modification of the arm bracket 104, Start substantive work (main work) such as replacement.

この本工事作業が終わると、前記仮工事の手順を逆に遡って作業することで、元の状態に戻す。例えば、以下の通りである。   When the main work is completed, the work is returned to the original state by working backwards from the temporary work procedure. For example, it is as follows.

固定金具116、アルミバインド線117を除去して、折り返して固定した架空送電線101を緊線状態の架空送電線101から取り外す。   The fixed metal fitting 116 and the aluminum binding wire 117 are removed, and the overhead power transmission line 101 that is folded back and fixed is removed from the overhead power transmission wire 101 in the tightly connected state.

その後、鉄塔100を跨いで圧縮型引留クランプ110,110間に、既設のジャンパ線113を取り付ける。   Thereafter, an existing jumper wire 113 is attached between the compression type retaining clamps 110 and 110 across the steel tower 100.

そして、緊線状態の架空送電線101からジャンパユニット118のジャンパ線131を取り外し、支持ユニット115からジャンパユニット118を取り外す。   Then, the jumper line 131 of the jumper unit 118 is removed from the overhead power transmission line 101 in the tight line state, and the jumper unit 118 is removed from the support unit 115.

次いで、既設の碍子111及び架空送電線101から支持ユニット115を取り外しながら、取り外した既設の圧縮型引留クランプ110を既設の碍子111の端部に取り付ける。   Next, while removing the support unit 115 from the existing insulator 111 and the overhead power transmission line 101, the removed existing compression type tension clamp 110 is attached to the end of the existing insulator 111.

最後に、仮設支柱2、荷重調整器3及び荷重検出器4等を撤去することにより、荷重分担装置1を取り外す。これにより、鉄塔周辺の工事が完了する。   Finally, the load sharing device 1 is removed by removing the temporary support column 2, the load adjuster 3, the load detector 4, and the like. Thereby, the construction around the steel tower is completed.

このように、本発明によれば、鉄塔周辺の工事に先立って鉄塔周辺に電気的に安全な領域を確保する際に、簡便な手法により鉄塔にかかる金属遮蔽付ケーブルの荷重を軽減することができ、無電圧領域の適用範囲を拡大することができる。   Thus, according to the present invention, it is possible to reduce the load of the metal shielded cable on the steel tower by a simple method when securing an electrically safe area around the steel tower prior to the construction around the steel tower. The application range of the non-voltage region can be expanded.

なお、本発明は、延線時のアーム補強や、懸垂鉄塔の電線仮あずけ工法にも適用することが可能である。   In addition, this invention is applicable also to the arm reinforcement | strengthening at the time of wire drawing, and the electric wire temporary arbor construction method of a suspended steel tower.

なお、本発明は、上記実施の形態に係る鉄塔周辺の工事方法では、鉄塔から取り外された架空送電線の先端を折り返して、緊線状態の架空送電線に固定する方法を説明したが、これに限定されるものではなく、余分な架空送電線を切断除去して、後に切断した距離分に相当する新たな送電線を取り付ける方法を採用することもできる。   In the construction method around the steel tower according to the above embodiment of the present invention, the method of folding the tip of the overhead power transmission line removed from the steel tower and fixing it to the overhead power transmission line is explained. The present invention is not limited to this, and it is also possible to adopt a method in which an extra overhead power transmission line is cut and removed, and a new power transmission line corresponding to the cut distance is attached later.

1 荷重分担装置
2 仮設支柱
3 荷重調整器
4 荷重検出器
5 腕金部
W 鉄塔に加わる荷重
DESCRIPTION OF SYMBOLS 1 Load sharing apparatus 2 Temporary support | pillar 3 Load adjuster 4 Load detector 5 Armrest part W The load added to a steel tower

Claims (4)

鉄塔を挟んで配置された架空送電線の鉄塔側端部が碍子を介して前記鉄塔にそれぞれ支持された架空送電線路を含む鉄塔周辺の工事を行う際に、前記鉄塔に加わる荷重を分担する荷重分担装置において、
前記架空送電線路の前記鉄塔に隣接する位置に設置され、前記鉄塔に加わる荷重を分担する仮設支柱と、
前記仮設支柱と前記鉄塔の腕金との間に設置され、前記鉄塔に加わる荷重の一部又は全部を前記仮設支柱側に分担させる荷重調整器と、
前記仮設支柱側に分担させる荷重を検出する荷重検出器とを有することを特徴とする荷重分担装置。
A load that shares the load applied to the tower when the construction of the area around the tower including the overhead transmission line supported by the tower through the insulator is performed on the tower side end of the overhead transmission line arranged across the tower. In the sharing device,
A temporary support column that is installed at a position adjacent to the steel tower of the overhead power transmission line and shares the load applied to the steel tower;
A load adjuster installed between the temporary support and the armature of the steel tower, and a part or all of the load applied to the steel tower is shared to the temporary support pillar;
A load sharing apparatus comprising: a load detector that detects a load to be shared on the temporary support column side.
前記仮設支柱は腕金部を有し、前記腕金部が前記鉄塔の前記腕金よりも高い位置に設けられる請求項1に記載の荷重分担装置。   The load sharing apparatus according to claim 1, wherein the temporary support column has a metal arm part, and the metal arm part is provided at a position higher than the metal arm of the steel tower. 前記仮設支柱は腕金部を有し、前記腕金部が前記鉄塔の前記腕金よりも低い位置に設けられる請求項1に記載の荷重分担装置。   The load sharing apparatus according to claim 1, wherein the temporary support column has a metal arm part, and the metal arm part is provided at a position lower than the metal arm of the steel tower. 鉄塔を挟んで配置された架空送電線の鉄塔側端部が碍子を介して前記鉄塔にそれぞれ支持された架空送電線路を含む鉄塔周辺の工事方法において、
前記架空送電線路の前記鉄塔に隣接する位置に、前記鉄塔に加わる荷重を分担する仮設支柱を設置する工程と、
前記碍子から前記架空送電線を外すと共に、前記架空送電線と前記碍子との間を、仮設碍子を有する支持ユニットで連結し、前記架空送電線を緊線状態で支持する工程と、
前記仮設支柱と前記鉄塔の腕金との間に、前記鉄塔に加わる荷重の一部又は全部を前記仮設支柱側に分担させる荷重調整器と、前記仮設支柱側に分担させる荷重を検出する荷重検出器とを設置する工程と、
前記鉄塔を挟んで配置され、前記支持ユニットによりそれぞれ緊線状態に支持された前記架空送電線間を、金属遮蔽付ケーブルを有するジャンパユニットを用いて電気的に接続する工程とを有し、
これら工程の後に、鉄塔周辺の工事を行うことを特徴とする鉄塔周辺の工事方法。
In the construction method around the steel tower including the overhead power transmission line supported by the steel tower through the insulator, the tower side end of the overhead power transmission line arranged across the steel tower,
Installing a temporary support column that shares the load applied to the tower at a position adjacent to the tower of the overhead power transmission line;
Removing the overhead power transmission line from the insulator, connecting the overhead power transmission line and the insulator with a support unit having a temporary insulator, and supporting the overhead power transmission line in a tight connection state;
Between the temporary support column and the armature of the steel tower, a load adjuster for sharing part or all of the load applied to the steel tower to the temporary support column side, and load detection for detecting the load shared to the temporary support column side The process of installing the vessel;
Electrically connecting the aerial power transmission lines arranged between the steel towers and supported by the support units in a tightly connected state using a jumper unit having a metal shielded cable, and
A construction method around the tower characterized by performing construction around the tower after these processes.
JP2010250952A 2010-11-09 2010-11-09 Load sharing device, and construction method around steel tower using the same Pending JP2012105429A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010250952A JP2012105429A (en) 2010-11-09 2010-11-09 Load sharing device, and construction method around steel tower using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010250952A JP2012105429A (en) 2010-11-09 2010-11-09 Load sharing device, and construction method around steel tower using the same

Publications (1)

Publication Number Publication Date
JP2012105429A true JP2012105429A (en) 2012-05-31

Family

ID=46395156

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010250952A Pending JP2012105429A (en) 2010-11-09 2010-11-09 Load sharing device, and construction method around steel tower using the same

Country Status (1)

Country Link
JP (1) JP2012105429A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103956680A (en) * 2014-05-06 2014-07-30 国网上海市电力公司 Safe and reliable crossing frame
CN104600629A (en) * 2015-02-12 2015-05-06 中国南方电网有限责任公司超高压输电公司百色局 Compact-circuit six-bundled conductor linkage plate fixture and application thereof
CN108616103A (en) * 2018-06-14 2018-10-02 安徽华电工程咨询设计有限公司 A kind of cable for built single time anchor support draws lower facility
CN115370216A (en) * 2022-09-19 2022-11-22 国网安徽省电力有限公司经济技术研究院 Bearing platform type cable terminal narrow-base angle steel tower

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103956680A (en) * 2014-05-06 2014-07-30 国网上海市电力公司 Safe and reliable crossing frame
CN104600629A (en) * 2015-02-12 2015-05-06 中国南方电网有限责任公司超高压输电公司百色局 Compact-circuit six-bundled conductor linkage plate fixture and application thereof
CN108616103A (en) * 2018-06-14 2018-10-02 安徽华电工程咨询设计有限公司 A kind of cable for built single time anchor support draws lower facility
CN115370216A (en) * 2022-09-19 2022-11-22 国网安徽省电力有限公司经济技术研究院 Bearing platform type cable terminal narrow-base angle steel tower
CN115370216B (en) * 2022-09-19 2024-05-17 国网安徽省电力有限公司经济技术研究院 Narrow base angle steel tower of cushion cap formula cable termination

Similar Documents

Publication Publication Date Title
RU2461935C1 (en) High-voltage overhead power transmission line and method of erection of high-voltage overhead power transmission line
DK2866320T3 (en) Apparatus and method for working on wiring
US7977571B2 (en) Method and apparatus for provision of temporary conductor tension support in transmission or distribution circuits
JP2012105429A (en) Load sharing device, and construction method around steel tower using the same
JP2010166640A (en) Overhead transmission line and construction method at periphery of steel tower
US8508081B2 (en) Live conductor stringing and splicing method and apparatus
RU2461939C1 (en) High-voltage overhead line and repair method for high-voltage overhead line
JP5794902B2 (en) Construction unit around the tower and construction method
JP2014045597A (en) Overhead wire construction method for branch steel tower and temporary jumper device
CN109253057A (en) The installation method of the lightning-protection system of permanent magnet direct-driving aerogenerator group
JP2007104788A (en) Overhead line
JP2013188060A (en) Repair method for transmission line
JP2012005263A (en) Overhead power line and construction method of surrounding of iron tower
JP5788033B2 (en) Overhead power transmission line support structure
GB2430016A (en) Four-to-three connector for replacing overhead cables
JP3367912B2 (en) Overhead power transmission line and method of construction of the tower
JP3514189B2 (en) How to rebuild overhead power transmission lines
JP2004080923A (en) Branch connection structure and its construction method for power transmission branched steel tower
RU2230412C1 (en) Redesigned anchor span of overhead power transmission line and method for redesigning anchor span of overhead power transmission line
JP2013146137A (en) Overhead power transmission line and steel tower construction method
JP2008278602A (en) Method for steel tower reconstruction
AU2007291912B2 (en) A method and apparatus for provision of temporary conductor tension support in transmission or distribution circuits
CN113904262B (en) Construction method for transferring large-span overhead line
JP4731621B2 (en) Jumper wire replacement connection method for overhead electric lines
JP3401752B2 (en) Overhead wire work method for suspended supports