JP2010237943A - System for managing construction of network installation - Google Patents

System for managing construction of network installation Download PDF

Info

Publication number
JP2010237943A
JP2010237943A JP2009084884A JP2009084884A JP2010237943A JP 2010237943 A JP2010237943 A JP 2010237943A JP 2009084884 A JP2009084884 A JP 2009084884A JP 2009084884 A JP2009084884 A JP 2009084884A JP 2010237943 A JP2010237943 A JP 2010237943A
Authority
JP
Japan
Prior art keywords
construction
management system
equipment
network
parent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2009084884A
Other languages
Japanese (ja)
Inventor
Shuntaro Kashihara
俊太郎 樫原
Masanori Miyazawa
雅典 宮澤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KDDI Corp
Original Assignee
KDDI Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KDDI Corp filed Critical KDDI Corp
Priority to JP2009084884A priority Critical patent/JP2010237943A/en
Publication of JP2010237943A publication Critical patent/JP2010237943A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To efficiently manage network equipment by consolidating construction process information and equipment information in cooperation with an operation management system. <P>SOLUTION: The system for managing the construction of network equipment includes: a means for managing the status of construction process management for managing processes for construction items of the network equipment and the status of equipment management for managing information on the equipment of a network device, and for maintaining the parent-child relationship and the connection relationship of the network device in the statuses; a means for transferring the parent-child relationship and the connection relationship to the operation management system; and a means for obtaining information about changes and updates to the network equipment from the operation management system, and changing and updating the parent-child relationship and the connection relationship. <P>COPYRIGHT: (C)2011,JPO&INPIT

Description

本発明は、ネットワーク設備建設管理システムに関する。より詳細には、ネットワーク設備の建設工程情報と設備情報を一元管理し、運用管理システムと連携することにより、ネットワーク設備を効率的に管理するネットワーク設備建設管理システムに関する。   The present invention relates to a network facility construction management system. More specifically, the present invention relates to a network equipment construction management system that efficiently manages network equipment by centrally managing construction information and equipment information of network equipment and linking with an operation management system.

図1は、従来のネットワーク設備建設での管理範囲を示す。従来のネットワーク設備建設(局舎工事、機材の設置、ファイバの接続等)では、工事業者の作業のみに限定した建設工事単体での管理が行われていた。例えば、図1の場合、工事案件1が管理するのは、破線で囲まれた範囲内であり、工事に関係する装置およびコネクタのみである。このコネクタが接続されるパッチパネルのコネクタとの接続状況は管理されていなかった。工事案件2の場合も同じであり、1点鎖線で囲まれた範囲内のみ管理されていた。   FIG. 1 shows a management range in the conventional network equipment construction. In the conventional network equipment construction (station building work, equipment installation, fiber connection, etc.), the construction work alone was limited to the work of the construction contractor. For example, in the case of FIG. 1, the construction project 1 manages only the devices and connectors related to the construction within the range surrounded by the broken line. The connection status with the connector of the patch panel to which this connector is connected has not been managed. The same applies to construction project 2, which was managed only within the area surrounded by the one-dot chain line.

このように、納入された設備と他の設備との接続状況の管理は行われていなかった。また、ネットワーク設備が運用管理部門へ納入された後の使用状況および設備更改の結果は、一元管理されていなかった。   As described above, the connection status between the delivered equipment and other equipment has not been managed. Moreover, after the network equipment was delivered to the operation management department, the usage situation and the result of equipment renewal were not centrally managed.

しかしながら、ネットワーク設備は他の設備と異なり、納入後の接続変更が頻繁に発生し、使用用途が外側からは見えにくいため、資産状態の管理が難しい。したがって、建設工事単体で完結せず、納入後の設備がどのような形で、どのように使われているかを管理しなければならないという課題があった。   However, unlike other equipment, network equipment frequently changes connections after delivery, and its usage is difficult to see from the outside, making it difficult to manage asset status. Therefore, the construction work alone is not completed, and there is a problem that it is necessary to manage how and how the equipment after delivery is used.

したがって、本発明は、建設工程情報と設備情報を一元管理し、運用管理システムと連携することにより、ネットワーク設備を効率的に管理するネットワーク設備建設管理システムを提供することを目的とする。   Therefore, an object of the present invention is to provide a network facility construction management system that efficiently manages network facilities by centrally managing construction process information and facility information and linking with operation management systems.

上記課題を解決するため、本発明によるネットワーク設備建設管理システムは、ネットワーク設備の建設案件の工程を管理している建設工程管理のステータスと、ネットワーク装置の設備情報を管理している設備管理のステータスを管理し、該ステータスにおけるネットワーク装置の親子関係と接続関係を保持する手段と、運用管理システムに前記親子関係と接続関係を引き渡す手段と、前記運用管理システムからネットワーク設備の変更および更新情報を取得し、前記親子関係と接続関係を変更および更新する手段とを備えている。   In order to solve the above-described problems, a network facility construction management system according to the present invention includes a status of construction process management for managing a process of a network facility construction project and a status of facility management for managing facility information of a network device. Means for maintaining the parent-child relationship and connection relationship of the network device in the status, means for transferring the parent-child relationship and connection relationship to the operation management system, and obtaining network facility change and update information from the operation management system And means for changing and updating the parent-child relationship and the connection relationship.

また、前記親子関係と接続関係を表示する手段をさらに備えていることも好ましい。   Further, it is preferable that the apparatus further includes means for displaying the parent-child relationship and the connection relationship.

また、前記親子関係と接続関係を編集する手段をさらに備えていることも好ましい。   In addition, it is preferable to further include means for editing the parent-child relationship and the connection relationship.

本発明により、ネットワーク設備建設管理システムが、運用管理システムと連携することにより、ネットワーク設備を一元管理することが可能になり、ネットワーク装置の建設工程情報と設備情報を親子関係および接続関係を持って管理することが可能になる。さらに各設備のステータスも管理することが可能になる。   According to the present invention, the network equipment construction management system can be integrated with the operation management system to centrally manage the network equipment, and the construction process information and equipment information of the network device have a parent-child relationship and a connection relationship. It becomes possible to manage. In addition, the status of each facility can be managed.

従来のネットワーク設備建設での管理範囲を示す。The management range in the conventional network equipment construction is shown. 本発明によるネットワーク設備建設管理システムの概要を示す。1 shows an overview of a network facility construction management system according to the present invention. ネットワーク設備の親子関係と接続関係の例を示す。An example of the parent-child relationship and connection relationship of network equipment is shown. インポート用CSVファイルの例を示す。An example of an import CSV file is shown. エクスポート用XMLファイルの例の一部を示す。A part of an example of an XML file for export is shown. ネットワーク設備建設管理システムの設備情報一覧画面を示す。The equipment information list screen of the network equipment construction management system is shown. ネットワーク設備建設管理システムの設備情報編集画面を示す。The equipment information edit screen of the network equipment construction management system is shown.

本発明を実施するための最良の実施形態について、以下では図面を用いて詳細に説明する。図2は、本発明によるネットワーク設備建設管理システムの概要を示す。ネットワーク設備建設管理システム1は、建設工程管理11と設備管理12を備えている。ネットワーク設備建設管理システム1は、1つまたは複数の局舎に設置されたネットワーク設備を管理している。また、運用管理システム2と連携し、ネットワーク設備に関する情報の同期を行っている。建設工程管理11は、建設案件の工程を管理している。図2の例では、2つの建設案件があり、それぞれの建設案件は2つの工事案件を有している。設備管理12は、ネットワーク装置(以下、装置と略する)の設備情報を管理している。図2では、局舎内に装置およびパッチパネルが設置されており、各装置は、パッチパネルを介して局舎内または局舎外の装置と接続されている。   The best mode for carrying out the present invention will be described in detail below with reference to the drawings. FIG. 2 shows an outline of a network facility construction management system according to the present invention. The network facility construction management system 1 includes a construction process management 11 and a facility management 12. The network facility construction management system 1 manages network facilities installed in one or a plurality of stations. In addition, in cooperation with the operation management system 2, information regarding network facilities is synchronized. The construction process management 11 manages the process of the construction project. In the example of FIG. 2, there are two construction projects, and each construction project has two construction projects. The facility management 12 manages facility information of network devices (hereinafter abbreviated as devices). In FIG. 2, a device and a patch panel are installed in the station building, and each device is connected to a device inside or outside the station building via the patch panel.

建設工程管理11および設備管理12は、それぞれのステータスを管理している。建設工程のステータスは、工事着手前、進行中、検収中、工事完了があり、工事が進むごとに、左から右に進んでいく。また、設備管理12のステータスは、調達中、検収待ち、検収済み、資産があり、工事が進むごとに、左から右に進んでいく。全体として、工事着手前→調達中→進行中→検収待ち→検収中→検収済み→工事完了→資産と進んでいき、資産となった段階で工事が終了し、運用管理部門に納入され、以降は、運用管理システム2で管理され、ネットワーク設備の運用が始まる。   The construction process management 11 and the equipment management 12 manage their statuses. The status of the construction process is from the left to the right as the construction progresses. In addition, the status of the facility management 12 is during procurement, waiting for acceptance, having been accepted, and having assets, and progresses from left to right as construction progresses. Overall, before starting construction → procurement → in progress → waiting for acceptance → acceptance acceptance → already accepted → construction completed → progressing to assets, construction is completed at the stage of becoming assets, delivered to the operation management department, and thereafter Are managed by the operation management system 2 and the operation of the network equipment starts.

それぞれのステータスにおいて、ネットワーク設備は、親子関係と接続関係を保持し、参照できるように管理されている。ここでの設備は、局舎、施設、地点、コンテナ、装置、ポート、コネクタ、ケーブル等である。図3は、ネットワーク設備の親子関係と接続関係の例を示す。親子関係は、図3の片方向矢印部分である。ただし、一部の設備は再帰構造を持つ。図3では、局舎内に施設があり、施設内に地点があることを示している。地点内に地点があることもあり、また、コンテナ内にコンテナがあることもある。これは、再帰構造により表されている。図3で接続関係は両方向矢印部分である。図3では、局舎間が接続され、コネクタ間がケーブルを媒介として接続されていることが示されている。   In each status, the network equipment is managed so that the parent-child relationship and the connection relationship are maintained and can be referred to. The facilities here are a station, a facility, a point, a container, a device, a port, a connector, a cable, and the like. FIG. 3 shows an example of a parent-child relationship and a connection relationship of network equipment. The parent-child relationship is the one-way arrow portion in FIG. However, some equipment has a recursive structure. FIG. 3 shows that there is a facility in the station building and a point in the facility. There may be a point in the point, and there may be a container in the container. This is represented by a recursive structure. In FIG. 3, the connection relationship is a double-headed arrow portion. FIG. 3 shows that the stations are connected and the connectors are connected via a cable.

工事終了後、資産となった後、ネットワーク設備は外部システム(例えば、運用管理システム2)によって管理される。設備引き渡しの際、ネットワーク設備建設管理システム1は、上記のネットワーク設備の親子関係と接続関係の設備情報をエクスポートして運用管理システム2に引き渡す。納入後、設備の変更または更新があった場合、運用管理システム2は例えば、CSVファイルで設備の変更または更新状況を通知する。   After the construction is completed, the network equipment is managed by an external system (for example, the operation management system 2) after becoming an asset. At the time of equipment delivery, the network equipment construction management system 1 exports the parent-child relationship and connection-related equipment information of the network equipment and delivers it to the operation management system 2. When the equipment is changed or updated after delivery, the operation management system 2 notifies the equipment change or update status by, for example, a CSV file.

図4は、インポート用CSVファイルの例を示す。局舎情報の例であり、運用管理システム2は、局舎情報に変更があった場合、ネットワーク設備建設管理システム1に通知する。図5は、エクスポート用XMLファイルの例の一部を示す。ネットワーク設備建設管理システム1が、運用管理システム2に設備を引き渡す際に用いられる。なお、本例は一部のみを表示しており、ポートに関する部分の詳細を示している。   FIG. 4 shows an example of an import CSV file. This is an example of station information, and the operation management system 2 notifies the network facility construction management system 1 when the station information is changed. FIG. 5 shows a part of an example of an export XML file. The network facility construction management system 1 is used when handing over facilities to the operation management system 2. In this example, only a part is displayed, and details of the part related to the port are shown.

図6は、ネットワーク設備建設管理システムの設備情報一覧画面を示す。本図は、ネットワーク設備建設管理システム1の設備情報として局舎の一覧を示している。画面左側の局舎をマウスでクリックすることにより表示される。また、画面左側の施設、地点、コンテナ、装置、ポート、コネクタ等をマウスでクリックすることにより、これらの情報が表示される。また、新規登録ボタンをクリックすることにより、設備情報を新規に登録することができる。インポートボタンをクリックすることにより、運用管理システム2からの通知により設備情報を更新することができる。エクスポートボタンをクリックすることにより、運用管理システム2へ通知する設備情報のXMLファイルを作成できる。   FIG. 6 shows a facility information list screen of the network facility construction management system. This figure shows a list of stations as equipment information of the network equipment construction management system 1. It is displayed by clicking the station on the left side of the screen with the mouse. In addition, by clicking a facility, point, container, device, port, connector, etc. on the left side of the screen with a mouse, these pieces of information are displayed. In addition, the facility information can be newly registered by clicking the new registration button. By clicking the import button, the facility information can be updated by a notification from the operation management system 2. By clicking the export button, an XML file of facility information to be notified to the operation management system 2 can be created.

図7は、ネットワーク設備建設管理システムの設備情報編集画面を示す。本図は、図6に表示された1行目の編集画面であり、局舎名、工事案件名等を修正することができる。   FIG. 7 shows an equipment information editing screen of the network equipment construction management system. This figure is the editing screen of the first line displayed in FIG. 6, and the station name, construction project name, etc. can be corrected.

本発明のネットワーク設備建設管理システムにより、ネットワークシステムの状態が一元管理され、ネットワーク設備が親子関係、接続関係を持って管理されているため、効率的に設備を管理できる。   With the network facility construction management system of the present invention, the state of the network system is centrally managed, and the network facility is managed with a parent-child relationship and a connection relationship, so that the facility can be managed efficiently.

また、以上述べた実施形態は全て本発明を例示的に示すものであって限定的に示すものではなく、本発明は他の種々の変形態様および変更態様で実施することができる。従って本発明の範囲は特許請求の範囲およびその均等範囲によってのみ規定されるものである。   Moreover, all the embodiments described above are illustrative of the present invention and are not intended to limit the present invention, and the present invention can be implemented in other various modifications and changes. Therefore, the scope of the present invention is defined only by the claims and their equivalents.

1 ネットワーク設備建設管理システム
11 建設工程管理
12 設備管理
2 運用管理システム
1 Network equipment construction management system 11 Construction process management 12 Equipment management 2 Operation management system

Claims (3)

ネットワーク設備の建設案件の工程を管理している建設工程管理のステータスと、ネットワーク装置の設備情報を管理している設備管理のステータスを管理し、該ステータスにおけるネットワーク装置の親子関係と接続関係を保持する手段と、
運用管理システムに前記親子関係と接続関係を引き渡す手段と、
前記運用管理システムからネットワーク設備の変更および更新情報を取得し、前記親子関係と接続関係を変更および更新する手段と、
を備えていることを特徴とするネットワーク設備建設管理システム。
Manages the status of construction process management that manages the process of network equipment construction projects and the status of equipment management that manages the equipment information of network devices, and maintains the parent-child relationship and connection relationship of network devices in that status Means to
Means for transferring the parent-child relationship and the connection relationship to the operation management system;
Means for obtaining network facility change and update information from the operation management system, and changing and updating the parent-child relationship and connection relationship;
A network facility construction management system characterized by comprising:
前記親子関係と接続関係を表示する手段をさらに備えていることを特徴とする請求項1に記載のネットワーク設備建設管理システム。   The network facility construction management system according to claim 1, further comprising means for displaying the parent-child relationship and the connection relationship. 前記親子関係と接続関係を編集する手段をさらに備えていることを特徴とする請求項1または2に記載のネットワーク設備建設管理システム。   The network facility construction management system according to claim 1 or 2, further comprising means for editing the parent-child relationship and the connection relationship.
JP2009084884A 2009-03-31 2009-03-31 System for managing construction of network installation Pending JP2010237943A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009084884A JP2010237943A (en) 2009-03-31 2009-03-31 System for managing construction of network installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009084884A JP2010237943A (en) 2009-03-31 2009-03-31 System for managing construction of network installation

Publications (1)

Publication Number Publication Date
JP2010237943A true JP2010237943A (en) 2010-10-21

Family

ID=43092198

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009084884A Pending JP2010237943A (en) 2009-03-31 2009-03-31 System for managing construction of network installation

Country Status (1)

Country Link
JP (1) JP2010237943A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6242443B1 (en) * 2016-07-19 2017-12-06 ソフトバンク株式会社 Article management system and program

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07123151A (en) * 1993-10-25 1995-05-12 Yokohama Union:Kk Line construction data generating system
JPH1127285A (en) * 1997-07-04 1999-01-29 N T T Data:Kk Network management system and recording medium
JP2001142952A (en) * 1999-11-11 2001-05-25 Nippon Telegr & Teleph Corp <Ntt> System and method for managing and operating passive component and recording medium program for management and operation
JP2004252851A (en) * 2003-02-21 2004-09-09 Nippon Telegr & Teleph Corp <Ntt> Processing method and device for operating passive component management, work support terminal, program for operating passive component management, and storage medium using it
JP2006236162A (en) * 2005-02-28 2006-09-07 Water Technology Institute Ltd Fixed property managing system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07123151A (en) * 1993-10-25 1995-05-12 Yokohama Union:Kk Line construction data generating system
JPH1127285A (en) * 1997-07-04 1999-01-29 N T T Data:Kk Network management system and recording medium
JP2001142952A (en) * 1999-11-11 2001-05-25 Nippon Telegr & Teleph Corp <Ntt> System and method for managing and operating passive component and recording medium program for management and operation
JP2004252851A (en) * 2003-02-21 2004-09-09 Nippon Telegr & Teleph Corp <Ntt> Processing method and device for operating passive component management, work support terminal, program for operating passive component management, and storage medium using it
JP2006236162A (en) * 2005-02-28 2006-09-07 Water Technology Institute Ltd Fixed property managing system

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
CSNG199900820004; 大畑 恵司: '交換機故障診断知識ベース構成方法の一考察' 電子情報通信学会技術研究報告 第89巻,第415号, 19900216, 第31-36頁, 社団法人電子情報通信学会 *
CSNG199901710001; 阿部 徹治: '線路保守OpSへのオブジェクト指向技術の適用とその特徴' 電子情報通信学会技術研究報告 第91巻,第462号, 19920131, 第1-6頁, 社団法人電子情報通信学会 *
JPN6012055450; 大畑 恵司: '交換機故障診断知識ベース構成方法の一考察' 電子情報通信学会技術研究報告 第89巻,第415号, 19900216, 第31-36頁, 社団法人電子情報通信学会 *
JPN6012055453; 阿部 徹治: '線路保守OpSへのオブジェクト指向技術の適用とその特徴' 電子情報通信学会技術研究報告 第91巻,第462号, 19920131, 第1-6頁, 社団法人電子情報通信学会 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6242443B1 (en) * 2016-07-19 2017-12-06 ソフトバンク株式会社 Article management system and program
JP2018013884A (en) * 2016-07-19 2018-01-25 ソフトバンク株式会社 Goods management system and program

Similar Documents

Publication Publication Date Title
US9785417B2 (en) Managing reusable artifacts using placeholders
CN103024544B (en) Interaction system of television
CN105830052A (en) Method for an integrated data handling for the engineering and operation of a plant
HK1151657A1 (en) Updating routing and outage information in a communications network
CN105338045A (en) Cloud computing resource processing device, method and cloud computing system
CN108513145A (en) A kind of control method and device of even wheat live streaming
CN102087599A (en) J2EE-based Web application system development method and device
CN102238032B (en) The system that a kind of system parameters based on caching server manages
CN109189431A (en) A kind of client side upgrading method, device, equipment and readable storage medium storing program for executing
CN104699034A (en) Managing design updates in a manufacturing execution system
JP2010237943A (en) System for managing construction of network installation
CN104035768B (en) The system and method for Android platform compatibility local code OpenGL programs
CN111708836A (en) Cluster management method, device and cluster system
CN111221547B (en) Client update progress monitoring method, storage medium, electronic device and system
JP5436971B2 (en) Power system equipment data management method
CN208156647U (en) A kind of auxiliary device for the upgrading of distribution apparatus program
CN102207880A (en) Software updating method and device
CN106648648B (en) Zookeeper-based configuration management method and system
JP2010181930A (en) Field-equipment engineering apparatus
CN102724436A (en) Method for updating caption list
CN104657168A (en) Client side and method for upgrading client side
CN103078784B (en) The method and system that a kind of User Status upgrades
CN103118008B (en) The method and system that a kind of User Status is synchronous
JP2011028352A (en) System design support device, system design support method, and system design support program
CN117113942B (en) Model synchronization method and device, electronic equipment and storage medium

Legal Events

Date Code Title Description
RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20100823

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20100730

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20110817

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20121011

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20121023

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20121225

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20130423

RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20130425

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20130426

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20130828