JP2010043505A - 鉄塔の主柱材取替え工法 - Google Patents

鉄塔の主柱材取替え工法 Download PDF

Info

Publication number
JP2010043505A
JP2010043505A JP2008227606A JP2008227606A JP2010043505A JP 2010043505 A JP2010043505 A JP 2010043505A JP 2008227606 A JP2008227606 A JP 2008227606A JP 2008227606 A JP2008227606 A JP 2008227606A JP 2010043505 A JP2010043505 A JP 2010043505A
Authority
JP
Japan
Prior art keywords
temporary
main column
main pole
main
tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2008227606A
Other languages
English (en)
Other versions
JP5187627B2 (ja
Inventor
Masayoshi Yasutomi
正佳 安富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Denso Corp
Original Assignee
Denso Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Denso Corp filed Critical Denso Corp
Priority to JP2008227606A priority Critical patent/JP5187627B2/ja
Publication of JP2010043505A publication Critical patent/JP2010043505A/ja
Application granted granted Critical
Publication of JP5187627B2 publication Critical patent/JP5187627B2/ja
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)
  • Electric Cable Installation (AREA)

Abstract

【課題】 山形鋼の鋼材で構成された送電用の既設鉄塔において、電線を仮設鉄塔に移設しなくても腕金取付け箇所の主柱材の取替えが可能な主柱材取替え工法を提供する。
【解決手段】 本発明は、山形鋼の鋼材で構成された送電用の既設鉄塔において、腕金が取付いていない2面の塔体面に仮主柱材を取付ける工程と、仮主柱材の上端部と、仮主柱材取付面の斜材取付位置とを接続用仮主柱材で接続する工程と、仮主柱材の下端部と、仮主柱材取付面の斜材取付位置とを接続用仮主柱材で接続する工程と、2本の仮主柱材間にトラス構造を形成する工程と、仮主柱材間のトラス構造部から腕金の先端部に仮腕金吊材を取付ける工程と、により主柱材取替えパネルの補強を行い、主柱材を取替える工法である。
【選択図】図12

Description

本発明は、山形鋼の鋼材で構成された送電用の既設鉄塔において、電線を仮設鉄塔に移設しなくても腕金取付け箇所の主柱材の取替えが可能な主柱材取替え工法に関するものである。
送電用の既設鉄塔の一例を図17および図18に示す。鉄塔は4本の主柱材と、トラス構造を形成する複数の斜材および水平材からなる腹材と、電線を支持する複数の腕金とで構成されている。主柱材は、地盤に埋設され四角形状に配置された基礎体に支持されている。腹材は、4本の主柱材間を結ぶようにして、両端が各主柱材に固定され、4本の主柱材間にトラス構造の4面を構成している。鉄塔を構成する部材が、腐食した場合や地震などにより損傷を受けた場合には、部材の取替えを行う必要がある。
部材の取替え作業の中で、他の部材よりも応力の大きい主要構成材である主柱材の取替え作業は非常に困難な作業である。鉄塔の主柱材を取替える方法として、従来、次に示すものが提案されている。
鉄塔の主柱材を取替える場合に用いられるもので、取替え主柱材の上下に位置する健全な主柱材に取替え装置を取付け、油圧シリンダを押出して取替え主柱材に発生している応力を取替え装置で受けることで、主柱材の取替えを行う主柱材取替え装置が提案されている(例えば、特許文献1参照。)。
既設鉄塔の上部に被冠して仮設鉄塔を設け、既設鉄塔に支持された電線を仮設鉄塔に移設し、既設鉄塔上部の部材に発生している応力を低減して、仮設鉄塔に覆われた既設鉄塔上部の部材取替えを行う方法が提案されている(例えば、特許文献2参照。)。
特開平8−163729号公報 特開2002−147064号公報
しかしながら、従来の主柱材取替え装置を用いて、腕金取付け箇所の主柱材を取替える場合、一般的な鉄塔の主柱材は、鉄塔の頂部から最下部まで直線的でなく、下段腕金の下面位置に曲げ部が設けられており、主柱材取替え装置は取替え主柱材の上下に位置する健全な主柱材に取付けるため、曲げ部を挟んで装置を取付ける必要があり、装置を取付けることができないという問題があった。
既設鉄塔の上部に被冠して仮設鉄塔を設ける方法の場合、腕金取付け箇所の主柱材を取替えることは可能であるが、既設鉄塔に支持された電線を仮設鉄塔に移設する必要があるため、作業が大掛かりになるという問題があった。また、取替え対象となる主柱材を取外すために、取替え主柱材より上方の健全な部材も全て取外す必要があり、作業効率が悪く、作業に時間がかかるという問題があった。
前述の問題を有利に解決するために、本発明の鉄塔の主柱材取替え工法は、山形鋼の鋼材で構成された送電用の既設鉄塔において、既設鉄塔の4面の塔体面の内、腕金が取付いていない2面の中央位置に主柱材取替えパネルの上端と下端を結ぶように仮主柱材を取付ける工程と、仮主柱材の上端部と、仮主柱材の上端部より1パネル上方で仮主柱材取付面の既設主柱材の斜材取付位置とを接続用仮主柱材で接続し、同一塔体面の接続用仮主柱材の上端側の取付位置間に仮水平材を取付ける工程と、仮主柱材の下端部と、仮主柱材の下端部より1パネル下方で仮主柱材取付面の既設主柱材の斜材取付位置とを接続用仮主柱材で接続し、同一塔体面の接続用仮主柱材の下端側の取付位置間に仮水平材を取付ける工程と、2本の仮主柱材間にトラス構造を形成する工程と、取替え主柱材に取付いている腕金の既設腕金吊材を取外し、前記仮主柱材間のトラス構造部から腕金の先端部に仮腕金吊材を取付ける工程と、により主柱材取替えパネルの補強を行い、取替え対象の主柱材を取替える工法である。
本発明の鉄塔の主柱材取替え工法によれば、既設鉄塔の主柱材取替えパネルに仮主柱材などを取付けて主柱材取替えパネルの補強を行うことで、仮設鉄塔を設置して、電線を移設することなく、腕金取付け箇所の主柱材の取替えができることから、作業が大掛かりにならず、また作業時間も短縮できる。
送電用の既設鉄塔の一例を図17および図18に示す。鉄塔Aは4本の主柱材1と、トラス構造を形成する複数の斜材2および水平材3からなる腹材と、電線7を支持する複数の腕金4とで構成されている。主柱材1は、地盤に埋設され四角形状に配置された基礎体5に支持されている。腹材は、4本の主柱材間を結ぶようにして、両端が各主柱材1に固定され、4本の主柱材間にトラス構造の4面D1,D2,D3,D4を構成している。なお、図において、6は主柱材接続位置、C1〜C12はパネルを示している。
鉄塔を構成する部材が、腐食した場合や地震などにより損傷を受けた場合には、部材の取替えを行う必要がある。部材の取替え作業の中で、他の部材よりも応力の大きい主要構成材である主柱材の取替えは非常に困難な作業であり、特に腕金取付け箇所の主柱材については、電線7の移設を伴う非常に大掛かりな取替え方法しかない。本発明は、山形鋼の鋼材で構成された送電用の既設鉄塔Aにおいて、電線7を仮設鉄塔に移設しなくても腕金取付け箇所の主柱材の取替えが可能な主柱材取替え工法であり、本発明の例として図17のC5〜C8パネルの主柱材を取替える場合について以下に説明する。
図1は仮主柱材を取付けた既設鉄塔の正面図、図2は図1のa−a線に沿う断面図、図3は既設鉄塔の斜材取付け状態図、図4は内付け斜材を取り外した既設鉄塔の正面図、図5は内付け斜材を取り外し、仮主柱材を取付けた既設鉄塔の正面図である。図において、18は腕金吊材、C5〜C8パネルは主柱材取替えパネルB、平行斜線(ハッチング)の箇所は取替え主柱材8を示している。また、図中の円記号はボルト位置11を示している。
本発明の主柱材取替え工法の第1の工程では、図1〜図2に示すように、山形鋼の鋼材で構成された送電用の既設鉄塔Aにおいて、既設鉄塔Aの4面の塔体面D1,D2,D3,D4の内、腕金4が取付いていない2面D1,D3の中央位置に主柱材取替えパネルBの上端と下端を結ぶように仮主柱材9を取付ける。この時、斜材2が図3に示すように、主柱材1の内側(以下、内付け2a)または主柱材1の外側(以下、外付け2b)に取付けられている場合、仮主柱材9を塔体面D1,D3の中央位置に主柱材取替えパネルBの上端と下端を結ぶように取付けるために、図4に示すように、主柱材取替えパネルBの内付けの斜材2aを取外す。図5に示すように、仮主柱材9を腕金4が取付いていない塔体面D1,D3の中央位置に主柱材取替えパネルBの上端と下端を結ぶように取付けた後は、図1に示すように、取外した斜材2a位置に新規の斜材10を取付ける。新規斜材10は、既設主柱材1と仮主柱材9間を結ぶようにして、両端が各主柱材に固定される。
図6は接続用仮主柱材の取付け状態図、図7は図6のb−b線から見た接続用仮主柱材の取付け状態図、図8は図6のc−c線から見た接続用仮主柱材の取付け状態図である。
第2の工程では、図6および図7に示すように、第1の工程で既設鉄塔Aの主柱材取替えパネルBに取付けた仮主柱材9の上端部と、仮主柱材9の上端部より1パネル上方C4で仮主柱材取付面D1,D3の既設主柱材1の斜材取付位置と、を接続用仮主柱材12で接続し、同一塔体面の接続用仮主柱材12の上端側の取付位置間に仮水平材15を取付ける。まず、接続用仮主柱材12を取付けるために、仮主柱材9の上端部より1パネル上方C4の仮主柱材取付面D1,D3の既設斜材2を取外す。次に、図6に示すように、仮主柱材9の上端部と、仮主柱材9の上端部より1パネル上方C4で仮主柱材取付面D1,D3の既設主柱材1の斜材取付位置とを接続用仮主柱材12で接続する。同一塔体面の接続用仮主柱材12の上端側の取付位置間に仮水平材15を取付ける。また、図7に示すように、接続用仮主柱材12と対向する塔体面の接続用仮主柱材12との間には、クロス形状に断面部材13を取付ける。
第3の工程では、図6および図8に示すように、第1の工程で既設鉄塔Aの主柱材取替えパネルBに取付けた仮主柱材9の下端部と、仮主柱材9の下端部より1パネル下方C9で仮主柱材取付面D1,D3の既設主柱材1の斜材取付位置と、を接続用仮主柱材12で接続し、同一塔体面の接続用仮主柱材12の下端側の取付位置間に仮水平材15を取付ける。まず、接続用仮主柱材12を取付けるために、仮主柱材9の下端部より1パネル下方C9の仮主柱材取付面D1,D3の既設斜材2を取外す。次に、図6に示すように、仮主柱材9の下端部と、仮主柱材9の下端部より1パネル下方C9で仮主柱材取付面D1,D3の既設主柱材1の斜材取付位置とを接続用仮主柱材12で接続する。同一塔体面の接続用仮主柱材12の下端側の取付位置間に仮水平材15を取付ける。また、図8に示すように、接続用仮主柱材12と対向する塔体面の接続用仮主柱材12との間には、クロス形状に断面部材13を取付ける。
図9は図6のd−d線から見た仮主柱材間に形成したトラス構造を示す図、図10および図11は図9のe−e線に沿う断面図の例である。図10および図11の平行斜線(ハッチング)の水平材3は、取外される水平材3を示している。
第4の工程では、図9に示すように、2本の仮主柱材間に複数の仮斜材14および仮水平材15を用いてトラス構造E1,E2,E3,E4を形成し、仮主柱材9の補強を行う。図の仮主柱材間のトラス構造E1,E2,E3,E4は、既設鉄塔Aの腹材の結構に合わせた例を示している。この時、腕金取付け箇所の鉄塔断面は、図10および図11に示すように、取替え主柱材側の腕金取付面D4の既設水平材3を取外して、塔体付近の腕金主材間22を接続するように補強水平材16を取付け、鉄塔内部にはクロス形状に断面部材13を取付けて、腕金取付け箇所の鉄塔断面の補強を行う。
図12は仮腕金吊材を取付けた既設鉄塔の正面図、図13はトラス構造部への縦補強材取付け状態を示す図、図14は図13のf−f線から見た仮腕金吊材の取付け状態図である。第5の工程では、図12〜図14に示すように、主柱材取替えパネルBに取付いている腕金4の既設腕金吊材18を取外し、仮主柱材間に形成したトラス構造部E1,E4から腕金4の先端部に仮腕金吊材17を取付ける。まず、仮主柱材間に形成したトラス構造部E1,E4で腕金4を支持するため、図13に示すように、トラス構造部E1,E4には縦補強材20を取付ける。縦補強材20には、図14に示すように、仮腕金吊材17を取付けるための仮腕金吊材用金具19を取付け、取替え主柱材側の腕金4の既設腕金吊材18を取外し、縦補強材20に取付けられた仮腕金吊材用金具19を介してトラス構造部E1,E4と腕金4の先端部を結ぶように仮腕金吊材17を取付ける。
図15は取替え主柱材の取外し後の既設鉄塔の正面図、図16は取替え主柱材取外し後の鉄塔の構成を示す正面図である。図16に示すように、第1〜第5の工程で、仮主柱材9などにより主柱材取替えパネルBの補強を行うことで、主柱材取替え時は図16の実線で示すトラス構造として、応力が伝達されるようになるため、取替え主柱材8に発生する応力を仮主柱材9で負担するようになり、図15に示すように、既設主柱材1を取外しても、鉄塔Aが倒壊することはない。図16において、破線部は主柱材取替え時の既設鉄塔の形状を示している。
主柱材取替え時には、取替え主柱材8に取付いている部材のボルトを外して、取替え主柱材8を取外し、新規の主柱材を取付けた後は、仮主柱材9,接続用仮主柱材12,仮主柱材間のトラス構造部E1,E2,E3,E4,仮腕金吊材17などを取外す。次いで、第2および第3の工程で取外した既設斜材2、第4の工程で取外した既設水平材3、第5の工程で取外した既設腕金吊材18などを取付けて、主柱材の取替え作業が完了する。
このように、本発明の鉄塔の主柱材取替え工法によれば、仮主柱材9などで主柱材取替えパネルBの補強を行うことで、仮設鉄塔を設置して、電線7を移設することなく、腕金取付け箇所の既設主柱材の取替えが可能であり、また作業時間も短縮できる。
仮主柱材を取付けた既設鉄塔の正面図 図1のa−a線に沿う断面図 既設鉄塔の斜材取付け状態図 内付け斜材を取り外した既設鉄塔の正面図 内付け斜材を取り外し、仮主柱材を取付けた既設鉄塔の正面図 接続用仮主柱材の取付け状態図 図6のb−b線から見た接続用仮主柱材の取付け状態図 図6のc−c線から見た接続用仮主柱材の取付け状態図 図6のd−d線から見た仮主柱材間に形成したトラス構造を示す図 図9のe−e線に沿う断面図の例 図9のe−e線に沿う断面図の例 仮腕金吊材を取付けた既設鉄塔の正面図 トラス構造部への縦補強材の取付け状態図 図13のf−f線から見た仮腕金吊材の取付け状態図 取替え主柱材取外し後の既設鉄塔の正面図 取替え主柱材取外し後の鉄塔の構成を示す正面図 送電用の既設鉄塔の構成を示す正面図 送電用の既設鉄塔の構成を示す上面図
符号の説明
A 既設鉄塔
B 主柱材取替えパネル
C1〜C12 パネル
D1〜D4 塔体面
E1〜E4 トラス構造部
1 主柱材
2 斜材
2a 内付け斜材
2b 外付け斜材
3 水平材
4 腕金
5 基礎体
6 主柱材接続位置
7 電線
8 取替え主柱材
9 仮主柱材
10 新規斜材
11 ボルト位置
12 接続用仮主柱材
13 断面部材
14 仮斜材
15 仮水平材
16 補強水平材
17 仮腕金吊材
18 腕金吊材
19 仮腕金吊材用金具
20 縦補強材
21 腕金主材

Claims (1)

  1. 山形鋼の鋼材で構成された送電用の既設鉄塔において、
    既設鉄塔の4面の塔体面の内、腕金が取付いていない2面の中央位置に主柱材取替えパネルの上端と下端を結ぶように仮主柱材を取付ける工程と、
    仮主柱材の上端部と、仮主柱材の上端部より1パネル上方で仮主柱材取付面の既設主柱材の斜材取付位置とを接続用仮主柱材で接続し、同一塔体面の接続用仮主柱材の上端側の取付位置間に仮水平材を取付ける工程と、
    仮主柱材の下端部と、仮主柱材の下端部より1パネル下方で仮主柱材取付面の既設主柱材の斜材取付位置とを接続用仮主柱材で接続し、同一塔体面の接続用仮主柱材の下端側の取付位置間に仮水平材を取付ける工程と、
    2本の仮主柱材間にトラス構造を形成する工程と、
    取替え主柱材に取付いている腕金の既設腕金吊材を取外し、前記仮主柱材間のトラス構造部から腕金の先端部に仮腕金吊材を取付ける工程と、
    により主柱材取替えパネルの補強を行い、主柱材を取替えることを特徴とする鉄塔の主柱材取替え工法。
JP2008227606A 2008-08-09 2008-08-09 鉄塔の主柱材取替え工法 Expired - Fee Related JP5187627B2 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008227606A JP5187627B2 (ja) 2008-08-09 2008-08-09 鉄塔の主柱材取替え工法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008227606A JP5187627B2 (ja) 2008-08-09 2008-08-09 鉄塔の主柱材取替え工法

Publications (2)

Publication Number Publication Date
JP2010043505A true JP2010043505A (ja) 2010-02-25
JP5187627B2 JP5187627B2 (ja) 2013-04-24

Family

ID=42015081

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008227606A Expired - Fee Related JP5187627B2 (ja) 2008-08-09 2008-08-09 鉄塔の主柱材取替え工法

Country Status (1)

Country Link
JP (1) JP5187627B2 (ja)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102071822A (zh) * 2010-12-24 2011-05-25 广东省电力设计研究院 换流站用直流滤波器构架
CN102661057A (zh) * 2012-05-30 2012-09-12 衡水供电公司 电力转角塔拉腿主材更换方法以及专用主材卡具
JP2012251318A (ja) * 2011-06-01 2012-12-20 Chugoku Electric Power Co Inc:The 鉄塔の腕金メンテナンス方法
CN104612454A (zh) * 2015-02-05 2015-05-13 中国电力工程顾问集团西南电力设计院有限公司 一种用于输电铁塔无填板四组合角钢截面的主材开断节点
CN105317236A (zh) * 2015-11-25 2016-02-10 国家电网公司 一种输电线路轻便式更换铁塔主材包钢的装置
CN105370083A (zh) * 2015-11-24 2016-03-02 中国电力科学研究院 一种渗铝钢输电铁塔
CN105370084A (zh) * 2015-11-24 2016-03-02 中国电力科学研究院 一种耐候钢输电铁塔
CN105545066A (zh) * 2015-12-03 2016-05-04 重庆瑜煌电力设备制造有限公司 一种双避雷线角钢塔的施工方法
JP5948632B1 (ja) * 2015-06-04 2016-07-06 東京電力ホールディングス株式会社 山形鋼鉄塔の主柱材取替え工法
JP2019019560A (ja) * 2017-07-18 2019-02-07 東京電力ホールディングス株式会社 主柱材交換方法
CN109458001A (zh) * 2018-12-18 2019-03-12 徐州恒翔钢结构有限公司 钢网架杆件装配式置换装置
CN110306859A (zh) * 2019-07-23 2019-10-08 广东电网有限责任公司 一种输电塔及其交叉斜材节点板
JP2020159132A (ja) * 2019-03-27 2020-10-01 東京電力ホールディングス株式会社 鉄塔の曲げ点の水平材交換方法
CN113323132A (zh) * 2021-06-11 2021-08-31 中国五冶集团有限公司 一种大体积混凝土双层钢筋换撑安装施工方法
CN114439297A (zh) * 2022-01-12 2022-05-06 国网福建省电力有限公司经济技术研究院 一种紧凑型直线塔旧塔斜材加固装置及其施工方法

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08163729A (ja) * 1994-12-01 1996-06-21 Kansai Electric Power Co Inc:The 鋼管鉄塔の主柱材取替装置
JPH10102823A (ja) * 1996-09-30 1998-04-21 Toko Denki Koji Kk 送電鉄塔の腕金の取替え作業用デリック装置及びこれを用いた腕金の取替え工法
JPH10153015A (ja) * 1996-11-26 1998-06-09 Tokyo Electric Power Co Inc:The 鉄塔の主柱材取替え工法
JPH10153014A (ja) * 1996-11-26 1998-06-09 Tokyo Electric Power Co Inc:The 鋼管鉄塔の主柱材取替え工法
JP2002147064A (ja) * 2000-11-16 2002-05-22 Hokkaido Electric Power Co Inc:The 仮設鉄塔におけるねじり力補剛用平面トラス構造及び平面ラーメン構造
JP2005304241A (ja) * 2004-04-15 2005-10-27 Tokyo Electric Power Co Inc:The 鉄塔におけるジャンパー線の仮支持装置及びこれを用いた鉄塔の工事方法
JP2005350954A (ja) * 2004-06-10 2005-12-22 Kanden Engineering:Kk 鉄塔の腹材取替工法と鉄塔の腹材取替検討システム
JP2006138070A (ja) * 2004-11-10 2006-06-01 Chugoku Electric Power Co Inc:The 主柱材内部調査方法およびその調査方法に適した鉄塔
JP2006336371A (ja) * 2005-06-03 2006-12-14 Tokyo Electric Power Co Inc:The トラス構造物の部材取替工法

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08163729A (ja) * 1994-12-01 1996-06-21 Kansai Electric Power Co Inc:The 鋼管鉄塔の主柱材取替装置
JPH10102823A (ja) * 1996-09-30 1998-04-21 Toko Denki Koji Kk 送電鉄塔の腕金の取替え作業用デリック装置及びこれを用いた腕金の取替え工法
JPH10153015A (ja) * 1996-11-26 1998-06-09 Tokyo Electric Power Co Inc:The 鉄塔の主柱材取替え工法
JPH10153014A (ja) * 1996-11-26 1998-06-09 Tokyo Electric Power Co Inc:The 鋼管鉄塔の主柱材取替え工法
JP2002147064A (ja) * 2000-11-16 2002-05-22 Hokkaido Electric Power Co Inc:The 仮設鉄塔におけるねじり力補剛用平面トラス構造及び平面ラーメン構造
JP2005304241A (ja) * 2004-04-15 2005-10-27 Tokyo Electric Power Co Inc:The 鉄塔におけるジャンパー線の仮支持装置及びこれを用いた鉄塔の工事方法
JP2005350954A (ja) * 2004-06-10 2005-12-22 Kanden Engineering:Kk 鉄塔の腹材取替工法と鉄塔の腹材取替検討システム
JP2006138070A (ja) * 2004-11-10 2006-06-01 Chugoku Electric Power Co Inc:The 主柱材内部調査方法およびその調査方法に適した鉄塔
JP2006336371A (ja) * 2005-06-03 2006-12-14 Tokyo Electric Power Co Inc:The トラス構造物の部材取替工法

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102071822A (zh) * 2010-12-24 2011-05-25 广东省电力设计研究院 换流站用直流滤波器构架
JP2012251318A (ja) * 2011-06-01 2012-12-20 Chugoku Electric Power Co Inc:The 鉄塔の腕金メンテナンス方法
CN102661057A (zh) * 2012-05-30 2012-09-12 衡水供电公司 电力转角塔拉腿主材更换方法以及专用主材卡具
CN102661057B (zh) * 2012-05-30 2015-01-21 国家电网公司 电力转角塔拉腿主材更换方法以及专用主材卡具
CN104612454A (zh) * 2015-02-05 2015-05-13 中国电力工程顾问集团西南电力设计院有限公司 一种用于输电铁塔无填板四组合角钢截面的主材开断节点
JP5948632B1 (ja) * 2015-06-04 2016-07-06 東京電力ホールディングス株式会社 山形鋼鉄塔の主柱材取替え工法
CN105370083A (zh) * 2015-11-24 2016-03-02 中国电力科学研究院 一种渗铝钢输电铁塔
CN105370084A (zh) * 2015-11-24 2016-03-02 中国电力科学研究院 一种耐候钢输电铁塔
CN105317236A (zh) * 2015-11-25 2016-02-10 国家电网公司 一种输电线路轻便式更换铁塔主材包钢的装置
CN105545066A (zh) * 2015-12-03 2016-05-04 重庆瑜煌电力设备制造有限公司 一种双避雷线角钢塔的施工方法
JP2019019560A (ja) * 2017-07-18 2019-02-07 東京電力ホールディングス株式会社 主柱材交換方法
CN109458001A (zh) * 2018-12-18 2019-03-12 徐州恒翔钢结构有限公司 钢网架杆件装配式置换装置
CN109458001B (zh) * 2018-12-18 2023-11-21 江苏杜邦建设工程有限公司 钢网架杆件装配式置换装置
JP2020159132A (ja) * 2019-03-27 2020-10-01 東京電力ホールディングス株式会社 鉄塔の曲げ点の水平材交換方法
JP7205342B2 (ja) 2019-03-27 2023-01-17 東京電力ホールディングス株式会社 鉄塔の曲げ点の水平材交換方法
CN110306859A (zh) * 2019-07-23 2019-10-08 广东电网有限责任公司 一种输电塔及其交叉斜材节点板
CN113323132A (zh) * 2021-06-11 2021-08-31 中国五冶集团有限公司 一种大体积混凝土双层钢筋换撑安装施工方法
CN113323132B (zh) * 2021-06-11 2022-08-16 中国五冶集团有限公司 一种大体积混凝土双层钢筋换撑安装施工方法
CN114439297A (zh) * 2022-01-12 2022-05-06 国网福建省电力有限公司经济技术研究院 一种紧凑型直线塔旧塔斜材加固装置及其施工方法
CN114439297B (zh) * 2022-01-12 2023-07-28 国网福建省电力有限公司经济技术研究院 一种紧凑型直线塔旧塔斜材加固施工方法

Also Published As

Publication number Publication date
JP5187627B2 (ja) 2013-04-24

Similar Documents

Publication Publication Date Title
JP5187627B2 (ja) 鉄塔の主柱材取替え工法
CN102016195B (zh) 栅格型托板结构及其建造方法
CN103328820B (zh) 用于组装用于形成混合风力涡轮机塔的塔段的壳分段的方法
JP3184322U (ja) 太陽電池パネル用架台
CN106499247B (zh) 装配式框架梁柱连接的可更换耗能连接组件
JP5189546B2 (ja) 中路式アーチ橋の架設方法
KR100992529B1 (ko) 조립식 강지보
CN201475501U (zh) 组装式竖向管组支架及其与管组的安装结构
JP5033726B2 (ja) 型枠支保工および型枠支保工用水平力処理部材
CN2736474Y (zh) 青藏线高性能混凝土等径电杆
JP5927599B2 (ja) 仮設鉄塔ユニット及び仮設鉄塔
CN101633483B (zh) 一种钢结构网架整体提升装置
JP2017150248A (ja) 太陽光パネルの基礎構造
CN107975232A (zh) 一种圆柱形混凝土建筑模架***
CN105672677A (zh) 装配式建筑墙板安装用支撑工具及其使用方法
CN103615046B (zh) 双曲圆弧木质穹顶及其施工安装方法
CN104818726A (zh) 钢管桩与钢筋混凝土承台的连接构造
JP5844584B2 (ja) 塔状構造物
CN104947804B (zh) 一种钢托架及利用其构建梁柱节点结构的施工方法
CN105804418A (zh) 预制墙板固定支撑体系及构建方法
JP3990975B2 (ja) 複合構造送電用鉄塔及び嵩上げ工法による組立て工法
CN108277817B (zh) 高桩承台塔吊基础加固结构的施工方法
US20140224751A1 (en) Solar panel mounting stand
JP3999625B2 (ja) 鉄塔の最下構造
CN202012085U (zh) 钢支撑双拼管

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20110803

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20121128

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20121225

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130110

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160201

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees