CN104818726A - 钢管桩与钢筋混凝土承台的连接构造 - Google Patents
钢管桩与钢筋混凝土承台的连接构造 Download PDFInfo
- Publication number
- CN104818726A CN104818726A CN201510261250.5A CN201510261250A CN104818726A CN 104818726 A CN104818726 A CN 104818726A CN 201510261250 A CN201510261250 A CN 201510261250A CN 104818726 A CN104818726 A CN 104818726A
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- pipe pile
- pile
- steel
- connecting structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Piles And Underground Anchors (AREA)
- Foundations (AREA)
Abstract
本发明公开了一种钢管桩与钢筋混凝土承台的连接构造,包括埋入承台内的钢管桩及若干焊接于所述钢管桩的竖向连接钢筋,所述钢管桩包括钢管桩上节桩,在所述钢管桩上节桩的顶部焊接一加长钢管段,所述加长钢管段的顶面水平设置有一环形连接板,在所述环形连接板的板面上间隔焊接所述竖向连接钢筋。采用本发明,不仅施工更容易,接头连接更牢固,而且大幅减少了现场焊接工作量。
Description
技术领域
本发明涉及建筑和桥梁领域,特别涉及一种钢管桩与钢筋混凝土承台的连接构造。
背景技术
现有技术的钢管桩由于具有承载能力高,能适应桩端持力层的起伏变化,接长、切短方便,对环境的影响小等优点,成为建筑和桥梁领域经常采用的一种桩基形式。
如图1和图2所示,钢管桩20与承台10的刚性连接一般通过将钢管桩20埋入承台10内一定长度后,在钢管桩外壁21上焊接一圈竖向连接钢筋40并伸入承台10内,同时在钢管顶端一定长度内塞入钢筋笼30,钢筋笼30内纵向钢筋也伸入承台内,与承台钢筋绑扎成整体的钢筋笼,然后浇筑钢管顶部的填芯混凝土和承台混凝土,最终实现钢管桩20与承台10的刚性连接。
然而,由于钢管桩外壁21一般需要焊接较多数量的竖向连接钢筋40,加上沿钢管桩外壁面焊接时为线接触,因此操作起来很不方便,且现场的焊接工作量也较大。另外,在钢管桩外壁现场焊接钢筋,焊接时竖向连接钢筋焊接的长度及焊接质量均难以保证。而外壁焊接钢筋的焊接质量又恰恰是实现钢管桩与承台刚性连接的重要保证。
因此,需要提出一种更容易保证接头质量,方便现场施工的钢管桩与钢筋混凝土承台的连接构造。
发明内容
有鉴于现有技术的上述缺陷,本发明提供一种更容易保证接头质量,方便现场施工的钢管桩与钢筋混凝土承台的连接构造,其包括:埋入承台内的钢管桩及若干焊接于所述钢管桩的竖向连接钢筋,其特征在于,所述钢管桩包括钢管桩上节桩,在所述钢管桩上节桩的顶部焊接一加长钢管段,所述加长钢管段的顶面水平设置有一环形连接板,在所述环形连接板的板面上间隔焊接(例如采用现有技术中公知的螺柱焊的焊接方式)所述竖向连接钢筋。
在一些实施例中,所述钢管桩上节桩顶部嵌入钢筋笼,所述钢筋笼包括若干伸入承台内的纵向钢筋和箍筋。本实施例中钢筋笼及笼内设置纵向钢筋和箍筋部分可采用现有技术中公知的技术来实现,该钢筋笼部分非本发明的改进点所在,故在此不作赘述。
在一些实施例中,所述环形连接板为一水平环形钢板。当然,作为一种替换,还可以是其它具有一定连接强度并便于焊接的金属板。
在符合本领域常识的基础上,上述各优选条件,可任意组合,即得本发明各较佳实施例。
本发明的有益效果:本发明采用在钢管桩上节桩顶处连接一段加长钢管段,由于加长钢管段可在钢结构厂内事先整体加工成型,再拿到现场焊接,这样就不必再在现场环绕钢管柱的侧壁面一根根地侧面焊接连接钢筋。而只需通过螺柱焊将连接钢筋焊接在水平的环形钢板上,因此焊接操作十分方便,且现场焊接工作量比传统的侧壁焊接工作量大幅减少。
另外,本发明的电弧螺柱焊为组合梁钢结构顶剪力钉焊接时最常采用的一种焊接工艺,工艺成熟,连接性能可靠,施工方便,因此,本发明中将其用于普通钢筋与钢管桩顶钢板的连接,施工更容易,且接头连接更牢固。大大方便了现场施工的钢管桩与钢筋混凝土承台的连接。
以下将结合附图对本发明的构思、具体结构及产生的技术效果作进一步说明,以充分地了解本发明的目的、特征和效果。
附图说明
图1为传统做法的钢管桩立面图。
图2为图1中A-A的剖视图。
图3为本发明的钢管桩立面图。
图4为图3中的加长钢管段的结构图。
图5为图4中B-B的放大剖视图。
附图标记说明:传统技术:承台10、钢管桩20、钢管桩外壁21、钢筋笼30、竖向连接钢筋40、
本发明:承台1、钢管桩2、钢管桩上节桩201、顶部2011、钢筋笼3、纵向钢筋31、箍筋32、竖向连接钢筋4、加长钢管段5、水平环形钢板51
具体实施方式
下面举出较佳实施例,并结合附图来更清楚完整地说明本发明。
实施例
本发明的目的是通过以下技术方案来实现的:如图3~图5所示,本实施例提供的钢管桩与钢筋混凝土承台的连接构造包括:埋入承台1内的钢管桩2,所述钢管桩2包括钢管桩上节桩201,在钢管桩上节桩201的顶部2011焊接有一小节加长钢管段5,加长钢管段5的顶面设置水平环形钢板51,在水平环形钢板51的顶面采用电弧螺柱焊的方式焊接所需的竖向连接钢筋4,同时在从钢管桩上节桩201顶部一定长度内塞入钢筋笼3。
钢筋笼3设有若干纵向钢筋31和箍筋32,纵向钢筋31伸入承台1,与承台1内的钢筋绑扎固定,浇筑钢管桩填芯混凝土和承台混凝土后,则实现钢管桩2与承台1的刚性连接。
本发明由于钢管桩上节桩201处连接的一段加长钢管段5可在钢结构厂内事先整体加工成型,再拿到现场焊接,这样就不必再至现场绕钢管柱的侧壁面一根根地焊接竖向连接钢筋4。因此不仅焊接操作方便,且现场的焊接工作量比传统的现场侧壁焊接工作量大幅减少。
此外,本发明的电弧螺柱焊为组合梁钢结构顶剪力钉焊接时最常采用的一种焊接工艺,工艺成熟,连接性能可靠,施工方便。
因此,将本发明用于普通钢筋与钢管桩顶钢板的连接,施工更容易,接头连接更牢固;且大大方便了现场施工的钢管桩与钢筋混凝土承台的连接。
以上详细描述了本发明的各较佳具体实施例。应当理解,本领域的普通技术人员无需创造性劳动就可以根据本发明的构思作出诸多修改和变化。因此,凡本技术领域中技术人员依本发明的构思在现有技术的基础上通过逻辑分析、推理或者有限的实验可以得到的技术方案,皆应在由权利要求书所确定的保护范围内。
Claims (1)
1.一种钢管桩与钢筋混凝土承台的连接构造,其包括:埋入承台内的钢管桩及若干焊接于所述钢管桩的竖向连接钢筋,其特征在于,所述钢管桩包括钢管桩上节桩,在所述钢管桩上节桩的顶部焊接一加长钢管段,所述加长钢管段的顶面水平设置有一环形连接板,在所述环形连接板的板面上间隔焊接所述竖向连接钢筋;所述钢管桩上节桩的顶部嵌入钢筋笼,所述钢筋笼包括若干伸入承台内的纵向钢筋和箍筋;所述环形连接板为一水平环形钢板。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510261250.5A CN104818726A (zh) | 2015-05-21 | 2015-05-21 | 钢管桩与钢筋混凝土承台的连接构造 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510261250.5A CN104818726A (zh) | 2015-05-21 | 2015-05-21 | 钢管桩与钢筋混凝土承台的连接构造 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104818726A true CN104818726A (zh) | 2015-08-05 |
Family
ID=53729191
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510261250.5A Pending CN104818726A (zh) | 2015-05-21 | 2015-05-21 | 钢管桩与钢筋混凝土承台的连接构造 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104818726A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018000879A1 (zh) * | 2016-06-28 | 2018-01-04 | 广东中科华大工程技术检测有限公司 | 一种钢管灌注预应力稳压封桩装置 |
CN108239919A (zh) * | 2017-07-26 | 2018-07-03 | 北京九州动脉隧道技术有限公司 | 一种水下承台、构建水下承台的装置及施工方法 |
CN108914961A (zh) * | 2018-08-03 | 2018-11-30 | 福州铭林钢塔钢构制造有限公司 | 采用螺旋锚的通讯铁塔基础及施工方法 |
CN112045285A (zh) * | 2020-07-15 | 2020-12-08 | 中交第一航务工程局有限公司 | 一种钢管桩剪力键安装工艺 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1458345A (zh) * | 2003-04-29 | 2003-11-26 | 立基工程有限公司 | 可加强水平抗弯强度和刚度的组合桩段及其施工方法 |
KR20060064994A (ko) * | 2004-12-09 | 2006-06-14 | 노춘복 | 강관파일의 두부 보강 구조 |
CN202073111U (zh) * | 2011-05-04 | 2011-12-14 | 江苏建华管桩有限公司 | 一种混凝土桩与承台的连接结构 |
CN102720206A (zh) * | 2012-07-16 | 2012-10-10 | 南京工业大学 | 一种新型预应力混凝土桩与承台的连接结构 |
CN202809633U (zh) * | 2012-10-10 | 2013-03-20 | 上海市城市建设设计研究总院 | Phc管桩与承台的连接构造 |
CN204645072U (zh) * | 2015-05-21 | 2015-09-16 | 上海市城市建设设计研究总院 | 钢管桩与钢筋混凝土承台的连接构造 |
-
2015
- 2015-05-21 CN CN201510261250.5A patent/CN104818726A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1458345A (zh) * | 2003-04-29 | 2003-11-26 | 立基工程有限公司 | 可加强水平抗弯强度和刚度的组合桩段及其施工方法 |
KR20060064994A (ko) * | 2004-12-09 | 2006-06-14 | 노춘복 | 강관파일의 두부 보강 구조 |
CN202073111U (zh) * | 2011-05-04 | 2011-12-14 | 江苏建华管桩有限公司 | 一种混凝土桩与承台的连接结构 |
CN102720206A (zh) * | 2012-07-16 | 2012-10-10 | 南京工业大学 | 一种新型预应力混凝土桩与承台的连接结构 |
CN202809633U (zh) * | 2012-10-10 | 2013-03-20 | 上海市城市建设设计研究总院 | Phc管桩与承台的连接构造 |
CN204645072U (zh) * | 2015-05-21 | 2015-09-16 | 上海市城市建设设计研究总院 | 钢管桩与钢筋混凝土承台的连接构造 |
Non-Patent Citations (1)
Title |
---|
马福临: "《电弧螺柱焊理论基础与应用》", 30 November 2002, 北京理工大学出版社 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018000879A1 (zh) * | 2016-06-28 | 2018-01-04 | 广东中科华大工程技术检测有限公司 | 一种钢管灌注预应力稳压封桩装置 |
CN108239919A (zh) * | 2017-07-26 | 2018-07-03 | 北京九州动脉隧道技术有限公司 | 一种水下承台、构建水下承台的装置及施工方法 |
CN108914961A (zh) * | 2018-08-03 | 2018-11-30 | 福州铭林钢塔钢构制造有限公司 | 采用螺旋锚的通讯铁塔基础及施工方法 |
CN108914961B (zh) * | 2018-08-03 | 2024-04-26 | 福州铭林钢塔钢构制造有限公司 | 采用螺旋锚的通讯铁塔基础及施工方法 |
CN112045285A (zh) * | 2020-07-15 | 2020-12-08 | 中交第一航务工程局有限公司 | 一种钢管桩剪力键安装工艺 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110616808B (zh) | 拼装楼板式钢木组合节点及其组装方法 | |
CN104818726A (zh) | 钢管桩与钢筋混凝土承台的连接构造 | |
CN102535648B (zh) | 一种钢管柱环梁梁柱节点结构及其施工方法 | |
CN105064503A (zh) | 钢管核心筒混合结构 | |
KR100992529B1 (ko) | 조립식 강지보 | |
KR101368218B1 (ko) | 내부 보강구조를 가진 콘크리트 충전 강관기둥 | |
CN104499575A (zh) | 一种钢筋混凝土叠合梁与钢管柱抗震连接结构 | |
CN105064512A (zh) | 圆钢管混凝土柱与钢梁的连接结构 | |
CN103485333B (zh) | 波形空心钢管摩擦桩及施工方法 | |
CN105803939A (zh) | 一种开孔钢管钢混组合梁桥结构 | |
CN204645072U (zh) | 钢管桩与钢筋混凝土承台的连接构造 | |
CN103669720A (zh) | 一种预制梁及具有榫锚体系的钢筋混凝土结构 | |
CN103866921B (zh) | 预制钢筋混凝土构件之间的钢筋连接件、制作方法及施工方法 | |
CN109667385B (zh) | 一种钢筋混凝土超短柱 | |
CN104196023B (zh) | 一种带机械连接装置的混凝土预制管桩桩尖的使用方法 | |
KR102069419B1 (ko) | 내부가 강관으로 보강된 복합말뚝 | |
KR102276624B1 (ko) | 사선형 내다이어프램이 설치된 cft 기둥구조 | |
KR20110077140A (ko) | 금속관 이음부 구조체 | |
CN205134531U (zh) | 一种型钢及其钢混结构体系 | |
JP2012117328A (ja) | 鋼板コンクリート構造の構造部材 | |
JP2016089549A (ja) | 鉄筋コンクリート梁と鉄骨の柱又は鉄骨を備える柱との接合構造及び方法 | |
CN109252691A (zh) | 一种加固钢筋混凝土框架楼板结构及加固方法 | |
CN106639072A (zh) | 一种装配式保温墙体施工结构 | |
CN209211934U (zh) | 一种加固钢筋混凝土框架楼板结构 | |
CN203462651U (zh) | 一种***直埋式的钢桁连接结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150805 |
|
RJ01 | Rejection of invention patent application after publication |