JP2010037085A - Installation work floor device of elevator and assembling method therefor - Google Patents

Installation work floor device of elevator and assembling method therefor Download PDF

Info

Publication number
JP2010037085A
JP2010037085A JP2008204481A JP2008204481A JP2010037085A JP 2010037085 A JP2010037085 A JP 2010037085A JP 2008204481 A JP2008204481 A JP 2008204481A JP 2008204481 A JP2008204481 A JP 2008204481A JP 2010037085 A JP2010037085 A JP 2010037085A
Authority
JP
Japan
Prior art keywords
vertical column
work floor
elevator
end side
installation work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2008204481A
Other languages
Japanese (ja)
Other versions
JP5169604B2 (en
Inventor
Takashi Harada
崇 原田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2008204481A priority Critical patent/JP5169604B2/en
Publication of JP2010037085A publication Critical patent/JP2010037085A/en
Application granted granted Critical
Publication of JP5169604B2 publication Critical patent/JP5169604B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To easily assemble an installation work floor device of an elevator from a landing hall side, by constituting the installation work floor device so that it can cope with various elevators, regardless of the size of a hoistway and the strength of the wall surface of the hoistway. <P>SOLUTION: A vertical column 7 is erected in a landing hall 2 of the elevator, and one end part of a horizontal beam 8 for supporting a work floor 9 is fixed on this vertical column 7. One end part of an oblique beam 10, having the other end part arranged on the horizontal beam 8, is fixed to a lower end part of the vertical column 7, and an auxiliary beam 11 is arranged in an intermediate part of this oblique beam 10 and the vertical column 7. The oblique beam 10 is constituted, divided into one-end side 10a and the other-end side 10b, and is turnably connected to the one end side 10a and the other end side 10b, and is respectively rotatably connected to the lower end part of the vertical column 7, the auxiliary beam 11 and the horizontal beam 8. <P>COPYRIGHT: (C)2010,JPO&INPIT

Description

この発明は、エレベータの据付のために使用される据付作業床装置、並びに据付作業床装置の組立方法に関するものである。   The present invention relates to an installation work floor device used for installing an elevator, and an assembly method of the installation work floor device.

エレベータを建物に据え付けるためには、エレベータの運転に必要な機器類、及びそれらの機器類を揚重及び取り付けるための機材等を、昇降路の頂部や中間部に設置(或いは、仮設)しなければならない。特に、昇降路の上方に機械室が備えられていない機械室エレベータの据付時や、エレベータのモダニゼーションでは、このような作業が多く発生する。   In order to install the elevator in the building, the equipment necessary for the operation of the elevator and the equipment for lifting and mounting these equipment must be installed (or temporarily) at the top or middle of the hoistway. I must. In particular, such work often occurs during installation of a machine room elevator that does not include a machine room above the hoistway or in modernization of the elevator.

上述のようなエレベータの据付作業において、昇降路のピットから足場を組み上げていたのでは、特に建物が高い場合に作業効率が著しく低下してしまう。このため、これまでにも、エレベータの乗場側から取り付けることができる据付作業床装置が、数多く提案されている。
エレベータの乗場側から組立可能な据付作業床装置の従来技術として、例えば、エレベータの乗場に立設された縦柱に2本の斜め梁(斜材、支持材)を連結し、据付作業員が乗るための作業床を、この2本の斜め梁によって支持するものが提案されている(特許文献1参照)。
In the installation work of the elevator as described above, if the scaffold is assembled from the pit of the hoistway, the work efficiency is remarkably lowered particularly when the building is high. For this reason, many installation work floor apparatuses which can be attached from the elevator landing side have been proposed so far.
As a conventional technology of an installation work floor device that can be assembled from the elevator landing side, for example, two diagonal beams (diagonal material, support material) are connected to a vertical column standing on the elevator landing, There has been proposed one that supports a working floor for riding by these two diagonal beams (see Patent Document 1).

他の従来技術として、作業床を水平梁上に組み立てるとともに、この水平梁を、乗場に立設された縦柱と昇降路奥側の壁面とによって支持するものが提案されている(例えば、特許文献2参照)。
また、他の従来技術として、上下二階床の乗場を使用して、作業床を昇降路内に設置するものも提案されている(例えば、特許文献3参照)。
As another conventional technique, a work floor is assembled on a horizontal beam, and the horizontal beam is supported by a vertical column standing on a landing and a wall surface on the back side of a hoistway (for example, a patent) Reference 2).
In addition, as another conventional technique, there is also proposed one in which a work floor is installed in a hoistway using a landing floor of upper and lower second floors (for example, see Patent Document 3).

特開2005−89148号公報JP 2005-89148 A 特開平9−194160号公報JP-A-9-194160 特開2000−328777号公報JP 2000-328777 A

特許文献1記載のものでは、昇降路が広くなる(即ち、昇降路の平面寸法が大きくなる)と、作業床を支持する水平梁や斜め梁(支持材9)の長さが必然的に長くなってしまい、所定の強度を確保するためにその重量も増加してしまう。このため、据付作業床装置の組み立てを行う作業員の人数を増やしたり、安全対策を強化したりしなければならず、作業効率が悪化するといった問題があった。   In the thing of patent document 1, when the hoistway becomes wide (namely, the plane dimension of the hoistway becomes large), the length of the horizontal beam and the diagonal beam (support material 9) which support a work floor inevitably becomes long. In other words, the weight increases to ensure a predetermined strength. For this reason, the number of workers for assembling the installation work floor device has to be increased or safety measures have to be strengthened, resulting in a problem that work efficiency deteriorates.

また、特許文献2記載のものでは、昇降路奥側の壁面によって据付作業床装置の一部を支持しているため、上記壁面の構成によっては、作用する荷重を支持できない場合があった。特に高層建物では、鉄骨や荷重支持力の弱い石膏ボード等によって昇降路が構成される場合が多い。したがって、かかる場合は、昇降路奥側の壁面によって据付作業床装置を支持することができず、特許文献2記載のものを適用できないことがあった。   Moreover, in the thing of patent document 2, since a part of installation work floor apparatus is supported by the wall surface of the hoistway back | inner side, depending on the structure of the said wall surface, the load which acts may not be supported. Particularly in a high-rise building, the hoistway is often constituted by a steel frame or a gypsum board having a weak load supporting ability. Therefore, in such a case, the installation work floor device cannot be supported by the wall surface on the back side of the hoistway, and the one described in Patent Document 2 may not be applied.

また、特許文献3記載のものでは、据付作業床装置を設置するために、上下二階床の乗場を使用しなければならない。このため、階間が長い場合やシャトルエレベータのように停止階が連続していない場合には、構成部材の寸法及び重量が著しく増加したり、据付作業床装置の設置が困難になったりするといった問題があった。   Moreover, in the thing of patent document 3, in order to install an installation work floor apparatus, you have to use the landing of the upper and lower two floors. For this reason, when the floors are long or when the stop floors are not continuous as in a shuttle elevator, the size and weight of the structural members are remarkably increased, or the installation work floor device is difficult to install. There was a problem.

この発明は、上述のような課題を解決するためになされたもので、その目的は、昇降路の広さや昇降路の壁面の強度等に関わらず種々のエレベータに対応することができ、更に、乗場側から簡単に組み立てることができるエレベータの据付作業床装置と、その組立方法とを提供することである。   The present invention has been made to solve the above-described problems, and its purpose can be applied to various elevators regardless of the width of the hoistway, the strength of the wall surface of the hoistway, and the like. It is an object to provide an elevator installation work floor device that can be easily assembled from a landing side, and an assembling method thereof.

この発明に係るエレベータの据付作業床装置は、エレベータの乗場に立設された縦柱と、一端部が縦柱に設けられ、乗場からエレベータ昇降路内に突出し、作業床を支持する水平梁と、一端部が縦柱の下端部に設けられ、乗場から斜め上方に昇降路内に突出し、他端部が水平梁に設けられた斜め梁と、一端部が斜め梁の中間部に、他端部が縦柱に設けられた補助梁と、を備え、斜め梁は、一端側と他端側とに分割構成されて一端側及び他端側が回動自在に連結されるとともに、縦柱の下端部、補助梁、水平梁に対してそれぞれ回動自在に連結されたものである。   An elevator installation work floor device according to the present invention includes a vertical column erected on an elevator landing, a horizontal beam provided at one end of the vertical column, protruding from the landing into the elevator hoistway, and supporting the work floor. , One end is provided at the lower end of the vertical column, protrudes into the hoistway obliquely upward from the landing, the other end is a horizontal beam, and one end is at the middle of the diagonal beam, the other end The diagonal beam is divided into one end side and the other end side, the one end side and the other end side are rotatably connected, and the lower end of the vertical column It is connected to each part, auxiliary beam, and horizontal beam so as to be freely rotatable.

この発明に係るエレベータの据付作業床装置の組立方法は、エレベータの乗場に縦柱を立設するステップと、一端側及び他端側が回動自在に連結された2分割構成からなる斜め梁の一端部を、縦柱の下端部に回動自在に連結するステップと、斜め梁の中間部に補助梁の一端部を回動自在に連結した後、斜め梁の一端側を乗場から斜め上方に昇降路内に突出させ、補助梁の他端部を縦柱に固定するステップと、斜め梁の他端部に水平梁を回動自在に連結した後、斜め梁の他端側を回転させて一端側に対して一直線状に配置し、水平梁の一端部を縦柱に固定するステップと、を備えたものである。   An elevator installation work floor device assembly method according to the present invention includes a step of standing a vertical column on an elevator landing, and one end of an oblique beam having a two-part configuration in which one end side and the other end side are rotatably connected. And connecting one end of the auxiliary beam to the middle part of the diagonal beam so that it can rotate freely, and then moving one end of the diagonal beam up and down diagonally from the landing Projecting into the road, fixing the other end of the auxiliary beam to the vertical column, and connecting the horizontal beam to the other end of the diagonal beam in a freely rotatable manner, and then rotating the other end of the diagonal beam to one end And a step of fixing one end of the horizontal beam to the vertical column.

この発明によれば、エレベータの据付作業床装置を、昇降路の広さや昇降路の壁面の強度等に関わらず種々のエレベータに対応させることができ、据付作業床装置を乗場側から簡単に組み立てることができるようになる。   According to the present invention, the elevator installation work floor device can be adapted to various elevators regardless of the width of the hoistway and the strength of the wall surface of the hoistway, and the installation work floor device is easily assembled from the landing side. Will be able to.

この発明をより詳細に説明するため、添付の図面に従ってこれを説明する。なお、各図中、同一又は相当する部分には同一の符号を付しており、その重複説明は適宜に簡略化ないし省略する。   In order to explain the present invention in more detail, it will be described with reference to the accompanying drawings. In addition, in each figure, the same code | symbol is attached | subjected to the part which is the same or it corresponds, The duplication description is simplified or abbreviate | omitted suitably.

実施の形態1.
図1はこの発明の実施の形態1におけるエレベータの据付作業床装置を示す側面図である。図1において、1はエレベータの昇降路、2はエレベータの乗場である。乗場2は、昇降路1と乗場2とを隔てる乗場壁3に形成された開口4を介して、昇降路1に通じている。なお、図1では、一例として最上階の乗場2を示している。
5は最上階の乗場2に組み立てられた据付作業床装置である。この据付作業床装置5は、エレベータの運転に必要な機器類、及びそれらの機器類を揚重及び取り付けるための機材等を、昇降路1の頂部に設置(或いは、仮設)するためのものである。即ち、エレベータの据付作業員は、この据付作業床装置5に乗って、昇降路1の頂部に対するエレベータの据付作業を行う。
Embodiment 1 FIG.
FIG. 1 is a side view showing an elevator installation work floor device according to Embodiment 1 of the present invention. In FIG. 1, 1 is an elevator hoistway and 2 is an elevator landing. The hall 2 communicates with the hoistway 1 through an opening 4 formed in a hall wall 3 that separates the hoistway 1 and the hall 2. In FIG. 1, the hall 2 on the top floor is shown as an example.
Reference numeral 5 denotes an installation work floor device assembled in the hall 2 on the top floor. This installation work floor device 5 is for installing (or temporarily installing) equipment necessary for operation of the elevator and equipment for lifting and attaching these equipment on the top of the hoistway 1. is there. That is, an elevator installation worker gets on the installation work floor device 5 and performs an elevator installation operation on the top of the hoistway 1.

上記据付作業床装置5は、基部6、縦柱7、水平梁8、作業床9、斜め梁10、補助梁11によってその要部が構成されている。
基部6及び縦柱7は、据付作業床装置5及びその積載荷重を乗場2に支持させるためのものである。具体的に、基部6は、乗場2の床面2aから突出するアンカーボルト12等により、乗場2に強固に固定されている。また、縦柱7は、その下端部が基部6に固定されることにより、乗場2に立設されている。そして、縦柱7の上端部は、開口4の上縁よりも更に上方に突出しており、開口4の上方に配置された乗場壁3に、支持部材13を介して乗場2側から支持されている。なお、上記基部6は、その機能的な観点から、縦柱7の一部(下端部)とみなすことも可能である。
The main part of the installation work floor device 5 is constituted by a base 6, a vertical column 7, a horizontal beam 8, a work floor 9, an oblique beam 10, and an auxiliary beam 11.
The base 6 and the vertical column 7 are used for supporting the installation work floor device 5 and its load on the landing 2. Specifically, the base 6 is firmly fixed to the landing 2 by anchor bolts 12 or the like protruding from the floor 2a of the landing 2. Further, the vertical column 7 is erected on the landing 2 by fixing a lower end portion thereof to the base portion 6. The upper end portion of the vertical column 7 protrudes further upward than the upper edge of the opening 4 and is supported from the landing 2 side via the support member 13 by the landing wall 3 disposed above the opening 4. Yes. In addition, the said base 6 can also be considered as a part (lower end part) of the vertical column 7 from the functional viewpoint.

水平梁8は、床板14及び手摺15からなる上記作業床9を支持する機能を有している。具体的に、水平梁8は、その一端部が縦柱7の上端部寄りに固定されるとともに、乗場2から昇降路1内に突出するように、昇降路1の奥側に向かって水平に配置される。そして、同じ高さに水平に配置された2本の水平梁8に床板14が架け渡され、この床板14の四方に手摺15が立設されている。   The horizontal beam 8 has a function of supporting the work floor 9 including the floor plate 14 and the handrail 15. Specifically, the horizontal beam 8 is fixed horizontally toward the back side of the hoistway 1 so that one end thereof is fixed near the upper end of the vertical column 7 and protrudes from the landing 2 into the hoistway 1. Be placed. A floor board 14 is bridged between two horizontal beams 8 that are horizontally arranged at the same height, and handrails 15 are erected on four sides of the floor board 14.

また、斜め梁10は、昇降路1内に突出した水平梁8を、下方から支持する機能を有している。この斜め梁10は、一端部が縦柱7の下端部に固定されるとともに、乗場2から斜め上方に昇降路1内に突出するように、昇降路1の奥側に向かって一直線状に配置されている。また、斜め梁10の他端部は、水平梁8の他端部寄り(先端側)に設けられている。   The diagonal beam 10 has a function of supporting the horizontal beam 8 protruding into the hoistway 1 from below. The oblique beam 10 is fixed in a straight line toward the back side of the hoistway 1 so that one end thereof is fixed to the lower end of the vertical column 7 and protrudes into the hoistway 1 obliquely upward from the landing 2. Has been. Further, the other end portion of the oblique beam 10 is provided closer to the other end portion (front end side) of the horizontal beam 8.

なお、上記斜め梁10は、一端側10aと他端側10bとに分割構成されており、一端側10a及び他端側10bが、所定の範囲内で回動可能に連結されている。具体的に、斜め梁10は、他端側10bが、一端側10aに対して一直線状に配置された状態から一方の方向に回転できないように構成されている。図1においては、斜め梁10は、昇降路1内に斜め上方に突出するように一直線状に配置された状態から、他端側10bが乗場2に接近する方向(図1に示すA方向)に回転することができ、反対方向(図1に示すB方向)には回転することができない機構を有している。   In addition, the said diagonal beam 10 is divided | segmented and comprised by the one end side 10a and the other end side 10b, and the one end side 10a and the other end side 10b are connected so that rotation within the predetermined range is possible. Specifically, the diagonal beam 10 is configured such that the other end side 10b cannot rotate in one direction from a state where it is arranged in a straight line with respect to the one end side 10a. In FIG. 1, the diagonal beam 10 is arranged in a straight line so as to protrude obliquely upward in the hoistway 1, and the direction in which the other end 10 b approaches the landing 2 (direction A shown in FIG. 1). And a mechanism that cannot rotate in the opposite direction (direction B shown in FIG. 1).

補助梁11は、乗場2の床面2aと水平梁8のほぼ中間高さに水平状態に配置されるとともに、一端部が斜め梁10の中間部に設けられ、他端部が縦柱7の中間部に固定されている。
なお、図1に示す16は乗場2と作業床9との間に架け渡された梯子である
The auxiliary beam 11 is disposed horizontally at a substantially intermediate height between the floor surface 2a of the landing 2 and the horizontal beam 8, one end is provided in the middle of the diagonal beam 10, and the other end is the vertical column 7. It is fixed to the middle part.
In addition, 16 shown in FIG. 1 is a ladder bridged between the hall 2 and the work floor 9.

据付作業床装置5は、水平梁8の一端部、補助梁11の他端部、斜め梁10の一端部がそれぞれ縦柱7に固定され、且つ斜め梁10が図1のB方向に回転することはないため、組立完了後は各構成要素が強固に固定され、積載荷重を支持するのに十分な構成を有している。一方、その組み立てを簡単且つ短時間で完了することができるように、上記据付作業床装置5は、斜め梁10が、縦柱7の下端部、補助梁11、水平梁8に対してそれぞれ回動自在に連結されている。   In the installation work floor device 5, one end of the horizontal beam 8, the other end of the auxiliary beam 11, and one end of the oblique beam 10 are fixed to the vertical column 7, respectively, and the oblique beam 10 rotates in the direction B in FIG. Therefore, after the assembly is completed, each component is firmly fixed and has a structure sufficient to support the load. On the other hand, in order to complete the assembly in a short time, the installation work floor device 5 has the oblique beam 10 rotated with respect to the lower end of the vertical column 7, the auxiliary beam 11, and the horizontal beam 8, respectively. It is connected freely.

次に、図2乃至図7に基づき、上記構成を有する据付作業床装置5の組立方法について具体的に説明する。図2乃至図7は図1に示す据付作業床装置の組立方法を説明するための図である。
エレベータの据付作業員は、据付作業床装置5を図1に示す状態に組み立てる場合、先ず、最上階の乗場2において、アンカーボルト12を利用して床面2aに基部6を強固に固定する。そして、縦柱7の下端部を基部6に固定して縦柱7を乗場2に立設し、その上端部を、支持部材13を介して開口4上方の乗場壁3に支持させる。
Next, based on FIG. 2 thru | or FIG. 7, the assembly method of the installation work floor apparatus 5 which has the said structure is demonstrated concretely. 2 to 7 are views for explaining a method of assembling the installation work floor apparatus shown in FIG.
When assembling the installation work floor device 5 in the state shown in FIG. 1, first, the elevator installation worker first firmly fixes the base 6 to the floor 2 a using the anchor bolts 12 at the landing 2 on the top floor. And the lower end part of the vertical column 7 is fixed to the base 6, the vertical column 7 is erected on the landing 2, and the upper end portion is supported by the landing wall 3 above the opening 4 via the support member 13.

据付作業員は、上記2分割構成からなる斜め梁10を、予め、一端側10aと他端側10bとを重ね合わせて半分に折り畳んだ状態にしておき、一端部を縦柱7の下端部に回動自在に連結する。また、斜め梁10の一端部を縦柱7の下端部に連結する前、或いは連結した後に、補助梁11の一端部を斜め梁10の中間部に回動自在に連結する。据付作業員は、斜め梁10の一端部を縦柱7の下端部に連結し、且つ補助梁11の一端部を斜め梁10の中間部に連結した後、補助梁11の一端部を昇降路1内に押し出して、斜め梁10をその一端部を中心に回転させる。そして、斜め梁10の一端側10aを、乗場2から斜め上方に向けて昇降路1内に突出させる。また、斜め梁10の上記配置を保持したまま補助梁11を水平に配置し、補助梁11の他端部を縦柱7の中間部に固定する(図3参照)。   The installation worker puts the oblique beam 10 having the above-described two-divided configuration in advance in a state where the one end side 10a and the other end side 10b are overlapped and folded in half, and one end portion is set to the lower end portion of the vertical column 7. It connects so that it can rotate freely. Further, before or after connecting one end portion of the diagonal beam 10 to the lower end portion of the vertical column 7, one end portion of the auxiliary beam 11 is rotatably connected to an intermediate portion of the diagonal beam 10. The installation worker connects one end portion of the diagonal beam 10 to the lower end portion of the vertical column 7 and connects one end portion of the auxiliary beam 11 to the middle portion of the diagonal beam 10, and then connects one end portion of the auxiliary beam 11 to the hoistway. 1 and the diagonal beam 10 is rotated around its one end. And the one end side 10a of the diagonal beam 10 is protruded in the hoistway 1 toward diagonally upward from the landing 2. Further, the auxiliary beam 11 is arranged horizontally while maintaining the above-described arrangement of the oblique beam 10, and the other end of the auxiliary beam 11 is fixed to the middle part of the vertical column 7 (see FIG. 3).

次に、据付作業員は、図4に示すように、斜め梁10の他端側10bを、一端側10aとの連結部分を中心に回転させるように持ち上げ、その他端部を水平梁8の先端側に回動自在に連結する。なお、乗場2の間口方向に所定の間隔を有して立設された2本の縦柱7(図1乃至図7においては、一方の縦柱7のみ図示されており、一方の縦柱7に重なって配置された他方の縦柱7は図示されていない)間には、補助梁11の設置高さよりも上方位置で、且つ水平梁8の設置高さよりも下方位置に、補助部材17が水平に設けられている。このため、据付作業員は、例えば、図4に示すように、水平梁8を補助部材17に立て掛けておき、その状態で、斜め梁10の他端側10bと水平梁8との連結作業を行う。   Next, as shown in FIG. 4, the installation worker lifts the other end side 10 b of the oblique beam 10 so as to rotate around the connecting portion with the one end side 10 a, and lifts the other end to the tip of the horizontal beam 8. It is connected to the side so that it can rotate freely. It should be noted that only two vertical pillars 7 (in FIG. 1 to FIG. 7, only one vertical pillar 7 is shown, and one vertical pillar 7 is erected at a predetermined interval in the frontage direction of the hall 2. (The other vertical column 7 arranged to overlap the vertical beam 7 is not shown), and the auxiliary member 17 is located above the installation height of the auxiliary beam 11 and below the installation height of the horizontal beam 8. It is provided horizontally. Therefore, for example, as shown in FIG. 4, the installation worker leans the horizontal beam 8 against the auxiliary member 17, and in that state, connects the other end side 10 b of the diagonal beam 10 and the horizontal beam 8. Do.

斜め梁10の他端部を水平梁8に連結した後、据付作業員は、水平梁8の先端側を昇降路1内に押し出して、斜め梁10の他端側10bを一端側10aとの連結部分を中心に回転させる。そして、斜め梁10が乗場2から斜め上方に向けて昇降路1内に突出するように、上記他端側10bを一端側10aに対して一直線状に配置する。また、斜め梁10の上記配置を保持したまま水平梁8を水平に配置し、水平梁8の一端部を縦柱7の上端部寄りに固定する(図5参照)。   After connecting the other end of the diagonal beam 10 to the horizontal beam 8, the installation worker pushes the distal end side of the horizontal beam 8 into the hoistway 1 so that the other end side 10b of the diagonal beam 10 is connected to the one end side 10a. Rotate around the connecting part. Then, the other end side 10b is arranged in a straight line with respect to the one end side 10a so that the oblique beam 10 projects into the hoistway 1 obliquely upward from the landing 2. Further, the horizontal beam 8 is arranged horizontally while maintaining the above arrangement of the oblique beam 10, and one end of the horizontal beam 8 is fixed near the upper end of the vertical column 7 (see FIG. 5).

なお、補助部材17が上記配置に設けられている場合には、図5に示すように、水平梁8を補助部材17に支持させた状態で水平梁8を昇降路1内に押し出せば、上記作業をより簡単に行うことができる。   In the case where the auxiliary member 17 is provided in the above arrangement, as shown in FIG. 5, if the horizontal beam 8 is pushed into the hoistway 1 with the horizontal beam 8 supported by the auxiliary member 17, The above operation can be performed more easily.

水平梁8を縦柱7に固定した後、据付作業員は、図6に示すように、縦柱7の下端部と水平梁8とに梯子16を固定する。そして、取り付けた梯子16を利用して床板14を手前側から順番に水平梁8に固定し、その後、床板14の四方を取り囲むように手摺15を立設する(図7参照)。
以上の手順によって、据付作業床装置5を図1に示す状態に組み立てることができる。
After fixing the horizontal beam 8 to the vertical column 7, the installation worker fixes the ladder 16 to the lower end portion of the vertical column 7 and the horizontal beam 8 as shown in FIG. 6. And the floor board 14 is fixed to the horizontal beam 8 in order from the near side using the attached ladder 16, and then the handrail 15 is erected so as to surround the four sides of the floor board 14 (see FIG. 7).
By the above procedure, the installation work floor device 5 can be assembled in the state shown in FIG.

この発明の実施の形態1によれば、据付作業床装置5を昇降路1の広さや昇降路1の壁面の強度等に関わらず種々のエレベータに対応させることができ、更に、乗場2側から簡単に組み立てることができるようになる。   According to the first embodiment of the present invention, the installation work floor device 5 can be adapted to various elevators regardless of the size of the hoistway 1 and the strength of the wall surface of the hoistway 1, and from the landing 2 side. Easy to assemble.

即ち、上記構成の据付作業床装置5は、従来技術のように、上下二階床の乗場を利用したり、昇降路1奥側の壁面を利用したりする必要はなく、1つの乗場2に自重及び積載荷重を支持させることができる。また、その組立において、補助梁11を縦柱7に固定して斜め梁10の一端側10aを動かないようにした後に、この斜め梁10の一端側10aを利用して水平梁8と斜め梁10の他端側10bとを所望の位置に配置する2段階の押し出し手順を採用しているため、据付作業員は、昇降路1が広い場合であっても、組立時に乗場2から乗り出したり、無理な姿勢で重量物を支えたりする必要もない。   That is, the installation work floor device 5 having the above-described configuration does not need to use the upper and lower second floor landings or the wall on the back side of the hoistway 1 as in the prior art, and does not have to use one weight on one landing 2. And the load capacity can be supported. Further, in the assembly, after the auxiliary beam 11 is fixed to the vertical column 7 so that the one end side 10a of the oblique beam 10 does not move, the horizontal beam 8 and the oblique beam are utilized using the one end side 10a of the oblique beam 10. 10 adopts a two-step extrusion procedure in which the other end side 10b is arranged at a desired position, so that the installation worker can get out of the landing 2 during assembly even when the hoistway 1 is wide, There is no need to support heavy objects in an unreasonable posture.

この発明の実施の形態1におけるエレベータの据付作業床装置を示す側面図である。It is a side view which shows the installation work floor apparatus of the elevator in Embodiment 1 of this invention. 図1に示す据付作業床装置の組立方法を説明するための図である。It is a figure for demonstrating the assembly method of the installation work floor apparatus shown in FIG. 図1に示す据付作業床装置の組立方法を説明するための図である。It is a figure for demonstrating the assembly method of the installation work floor apparatus shown in FIG. 図1に示す据付作業床装置の組立方法を説明するための図である。It is a figure for demonstrating the assembly method of the installation work floor apparatus shown in FIG. 図1に示す据付作業床装置の組立方法を説明するための図である。It is a figure for demonstrating the assembly method of the installation work floor apparatus shown in FIG. 図1に示す据付作業床装置の組立方法を説明するための図である。It is a figure for demonstrating the assembly method of the installation work floor apparatus shown in FIG. 図1に示す据付作業床装置の組立方法を説明するための図である。It is a figure for demonstrating the assembly method of the installation work floor apparatus shown in FIG.

符号の説明Explanation of symbols

1 昇降路
2 乗場
2a 床面
3 乗場壁
4 開口
5 据付作業床装置
6 基部
7 縦柱
8 水平梁
9 作業床
10 斜め梁
10a 一端側
10b 他端側
11 補助梁
12 アンカーボルト
13 支持部材
14 床板
15 手摺
16 梯子
17 補助部材
DESCRIPTION OF SYMBOLS 1 Hoistway 2 Platform 2a Floor surface 3 Platform wall 4 Opening 5 Installation work floor apparatus 6 Base 7 Vertical column 8 Horizontal beam 9 Work floor 10 Diagonal beam 10a One end side 10b Other end side 11 Auxiliary beam 12 Anchor bolt 13 Support member 14 Floor board 15 Handrail 16 Ladder 17 Auxiliary member

Claims (4)

エレベータの乗場に立設された縦柱と、
一端部が前記縦柱に設けられ、前記乗場からエレベータ昇降路内に突出し、作業床を支持する水平梁と、
一端部が前記縦柱の下端部に設けられ、前記乗場から斜め上方に前記昇降路内に突出し、他端部が前記水平梁に設けられた斜め梁と、
一端部が前記斜め梁の中間部に、他端部が前記縦柱に設けられた補助梁と、
を備え、
前記斜め梁は、一端側と他端側とに分割構成されて前記一端側及び前記他端側が回動自在に連結されるとともに、前記縦柱の下端部、前記補助梁、前記水平梁に対してそれぞれ回動自在に連結されたことを特徴とするエレベータの据付作業床装置。
A vertical pillar standing at the elevator hall,
One end is provided in the vertical column, protrudes from the landing into the elevator hoistway, and supports a work floor,
One end portion is provided at the lower end portion of the vertical column, protrudes into the hoistway obliquely upward from the landing, and the other end portion is an oblique beam provided on the horizontal beam,
An auxiliary beam provided with one end at the middle of the oblique beam and the other end at the vertical column;
With
The diagonal beam is divided into one end side and the other end side, and the one end side and the other end side are rotatably connected to each other, and the lower end of the vertical column, the auxiliary beam, and the horizontal beam An elevator installation work floor device characterized by being connected to each other in a freely rotatable manner.
乗場に立設された2本の縦柱間に設けられ、補助梁の設置高さ及び水平梁の設置高さの間に配置された補助部材と、
を備えたことを特徴とする請求項1に記載のエレベータの据付作業床装置。
An auxiliary member provided between two vertical pillars erected on the landing and disposed between the installation height of the auxiliary beam and the installation height of the horizontal beam;
The elevator installation work floor device according to claim 1, further comprising:
縦柱は、上端部が、乗場開口の上縁よりも上方に突出し、前記乗場開口の上方に配置された乗場壁に支持されたことを特徴とする請求項1又は請求項2に記載のエレベータの据付作業床装置。   3. The elevator according to claim 1, wherein an upper end of the vertical column protrudes above the upper edge of the hall opening and is supported by a hall wall disposed above the hall opening. Installation work floor equipment. エレベータの乗場に縦柱を立設するステップと、
一端側及び他端側が回動自在に連結された2分割構成からなる斜め梁の一端部を、前記縦柱の下端部に回動自在に連結するステップと、
前記斜め梁の中間部に補助梁の一端部を回動自在に連結した後、前記斜め梁の前記一端側を前記乗場から斜め上方に昇降路内に突出させ、前記補助梁の他端部を前記縦柱に固定するステップと、
前記斜め梁の他端部に水平梁を回動自在に連結した後、前記斜め梁の前記他端側を回転させて前記一端側に対して一直線状に配置し、前記水平梁の一端部を前記縦柱に固定するステップと、
を備えたことを特徴とするエレベータの据付作業床装置の組立方法。
Erecting a vertical column at the elevator hall;
A step of rotatably connecting one end portion of the oblique beam having a two-part configuration in which one end side and the other end side are rotatably connected to the lower end portion of the vertical column;
After pivotally connecting one end of the auxiliary beam to the middle portion of the diagonal beam, the one end side of the diagonal beam protrudes into the hoistway obliquely upward from the landing, and the other end of the auxiliary beam is Fixing to the vertical column;
After a horizontal beam is pivotally connected to the other end of the diagonal beam, the other end side of the diagonal beam is rotated and arranged in a straight line with respect to the one end side, and one end of the horizontal beam is Fixing to the vertical column;
A method of assembling an elevator installation work floor device, comprising:
JP2008204481A 2008-08-07 2008-08-07 Elevator installation work floor apparatus and its assembly method Expired - Fee Related JP5169604B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008204481A JP5169604B2 (en) 2008-08-07 2008-08-07 Elevator installation work floor apparatus and its assembly method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008204481A JP5169604B2 (en) 2008-08-07 2008-08-07 Elevator installation work floor apparatus and its assembly method

Publications (2)

Publication Number Publication Date
JP2010037085A true JP2010037085A (en) 2010-02-18
JP5169604B2 JP5169604B2 (en) 2013-03-27

Family

ID=42010018

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008204481A Expired - Fee Related JP5169604B2 (en) 2008-08-07 2008-08-07 Elevator installation work floor apparatus and its assembly method

Country Status (1)

Country Link
JP (1) JP5169604B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20150133163A (en) * 2015-11-09 2015-11-27 주식회사백상 The Boiler Superheater Platforms
JP2017065904A (en) * 2015-10-01 2017-04-06 三菱電機株式会社 Scaffold for installation work of elevator
WO2019207654A1 (en) * 2018-04-24 2019-10-31 三菱電機株式会社 Work floor apparatus for elevator and assembly method therefor

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63118464A (en) * 1986-11-06 1988-05-23 株式会社大林組 Method for transporting mold frame material and bracket scaffold used therein
JPH08301549A (en) * 1995-04-28 1996-11-19 Hitachi Building Syst Eng & Service Co Ltd Scaffolding device for elevator installation and assembling method thereof
JP2003112873A (en) * 2001-10-04 2003-04-18 Mitsubishi Electric Corp Workbench device for elevator
JP2005089148A (en) * 2003-09-19 2005-04-07 Mitsubishi Electric Corp Installation platform device of elevator

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63118464A (en) * 1986-11-06 1988-05-23 株式会社大林組 Method for transporting mold frame material and bracket scaffold used therein
JPH08301549A (en) * 1995-04-28 1996-11-19 Hitachi Building Syst Eng & Service Co Ltd Scaffolding device for elevator installation and assembling method thereof
JP2003112873A (en) * 2001-10-04 2003-04-18 Mitsubishi Electric Corp Workbench device for elevator
JP2005089148A (en) * 2003-09-19 2005-04-07 Mitsubishi Electric Corp Installation platform device of elevator

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017065904A (en) * 2015-10-01 2017-04-06 三菱電機株式会社 Scaffold for installation work of elevator
KR20150133163A (en) * 2015-11-09 2015-11-27 주식회사백상 The Boiler Superheater Platforms
KR101691752B1 (en) * 2015-11-09 2016-12-30 주식회사백상 The Boiler Superheater Platforms
WO2019207654A1 (en) * 2018-04-24 2019-10-31 三菱電機株式会社 Work floor apparatus for elevator and assembly method therefor
CN111989283A (en) * 2018-04-24 2020-11-24 三菱电机株式会社 Elevator work platform device and assembling method thereof

Also Published As

Publication number Publication date
JP5169604B2 (en) 2013-03-27

Similar Documents

Publication Publication Date Title
JP5174405B2 (en) Auxiliary work floor
JP5217073B2 (en) Car and elevator equipment
JP5169604B2 (en) Elevator installation work floor apparatus and its assembly method
JP2009057198A (en) Elevator car, assembly method of elevator car, and lifting tool
JP5825864B2 (en) Tower crane mast support structure and tower crane support method
JP6893188B2 (en) Demolition system and demolition method of existing structures
CN106006455A (en) Hydraulic elevator capable of achieving formwork erecting without scaffold
JP2015101440A (en) Stair lifting device and stair lifting method of heavy load
EP1647512B1 (en) Working scaffold system of elevator
JPH05340085A (en) Scaffold device for elevator shaft work
JP2002046951A (en) Scaffold apparatus for maintenance of elevator
JP4784167B2 (en) Scaffolding device for elevator installation work
JP2017071488A (en) Device and method for stair lifting of heavy load
JP2008063873A (en) Transfer mechanism of ceiling and execution method
JP2005082249A (en) Method for erection of exterior elevator
JP4245315B2 (en) Moving scaffold for elevator installation and elevator installation method
JP3328172B2 (en) Work floor equipment for elevator installation
JP2001335255A (en) Elevator installation construction method, and elevator installation unit
JP6984795B1 (en) How to install the elevator installation work floor device and the elevator installation work floor device
JP3994648B2 (en) Elevator apparatus and installation method thereof
JP5689273B2 (en) Temporary scaffolding and building construction method
JP2005089148A (en) Installation platform device of elevator
JP6956651B2 (en) Lifting method of escalator truss
JP6854970B2 (en) Elevator work floor equipment and its assembly method
JP2009067495A (en) Support device for installation of elevator

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20110523

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20121011

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20121016

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20121114

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20121204

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20121217

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees