JP2009149433A - Construction method for installing vessel elevator - Google Patents

Construction method for installing vessel elevator Download PDF

Info

Publication number
JP2009149433A
JP2009149433A JP2007331267A JP2007331267A JP2009149433A JP 2009149433 A JP2009149433 A JP 2009149433A JP 2007331267 A JP2007331267 A JP 2007331267A JP 2007331267 A JP2007331267 A JP 2007331267A JP 2009149433 A JP2009149433 A JP 2009149433A
Authority
JP
Japan
Prior art keywords
elevator
guide rail
bracket
work
nut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2007331267A
Other languages
Japanese (ja)
Inventor
Sadao Moriya
貞夫 守谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MORIYA YUSOKI KOGYO KK
Original Assignee
MORIYA YUSOKI KOGYO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MORIYA YUSOKI KOGYO KK filed Critical MORIYA YUSOKI KOGYO KK
Priority to JP2007331267A priority Critical patent/JP2009149433A/en
Publication of JP2009149433A publication Critical patent/JP2009149433A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Types And Forms Of Lifts (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To continuously conduct constructions by an elevator installation contractor, improve construction efficiency and reduce construction cost. <P>SOLUTION: An auxiliary bracket 104 is connected and fixed to a base bracket 102 fixed to a side wall 101 by welding 103 by bolts/nuts 109 with locking washers of a lock method having an wedge effect using tension. Then, a guide rail mounting bracket 105 is fixed to the auxiliary bracket 104 by welding 110, and a guide rail 106 is fixed to the guide rail mounting bracket 105 by a rail clip 107. <P>COPYRIGHT: (C)2009,JPO&INPIT

Description

本発明は、船舶用エレベータの設置工法に関するものである。   The present invention relates to a marine elevator installation method.

船舶用エレベータの設置工法は陸上のエレベータ設置工法とは異なり、長期にわたり船舶特有の波浪条件での使用に耐えるための工法が要求されている。
そのため従来はエレベータ設置にあたり、基部ブラケットを溶接して固定したものをエレベータ設置業者にいらしし、エレベータ設置をしていたが、ガイドレール取付用のブラケットは基部ブラケットに溶接固定しなければならないという前提で、この溶接は造船側の立会いの下に行なわれ、且つ昇降路の塗装工事も造船側で行うために、エレベータ設置業者の工事は、エレベータのレール取り付け所の仕事として定められ、エレベータ設置業者は、他のエレベータ設置にのみが仕事として役割分担が定められていた。
Unlike land-based elevator installation methods, marine elevator installation methods are required to withstand long-term use in wave conditions unique to ships.
Therefore, in the past, when installing the elevator, the base bracket was welded and fixed to the elevator installer, and the elevator was installed. However, the guide rail mounting bracket must be fixed to the base bracket by welding. Assuming that this welding is performed in the presence of the shipbuilding side, and that the hoistway is also painted on the shipbuilding side, the construction of the elevator installer is defined as the work of the elevator rail installation site, and the elevator installation As for the traders, the division of roles was determined only for the installation of other elevators.

その工事工程の概要は、予め側壁部に基部ブラケットを溶接して固定し、これをエレベータ設置業者に移管し、マシンルーム工事(ガイドレールの芯だし、ガイドレール取付用のブラケットの取り付けを含む)、各デッキドアの取り付け、ガイドレールの取り付け及びジャンクションボックスの取り付け工事を行い、前記の溶接工事を行うものである。一期工事を行い、次の段階で該エレベータ設置業者において基部ブラケットにガイドレール取付ブラケットを造船側の立会いの下に溶接し、且つエレベータの昇降路を塗装する工事を造船側において行ない、その後エレベータ設置業者において二期工事を行っていた。
例えばこのエレベータ設置作業は、代表的には、一期工事として、第1日目に打合せ現場確認した後、作業準備をし、第2日以降7日ぐらいかけてマシンルーム工事(ガイドレールの芯だし、ガイドレール取付用のブラケットの取り付けを含む)を行なう。次に4日ぐらいかけて各デッキドアの取り付け、5日ぐらいかけてガイドレールの取り付け及びジャンクションボックスの取り付けを行うものである。
又、ガイドレール取付ブラケットを造船側の立会いの下に溶接し、且つエレベータの昇降路を塗装する工事を造船側において行なうために、造船側単独で行なうエレベータの昇降路を塗装する工事中は約1週間エレベータ設置工事側は作業を中断し、その後、二期工事として、第1日目に打合せ現場確認した後、作業準備をし、カゴ組立て及びワイヤ取付工事を5日位、配線及び結線工事を6日位かけて行い、エレベータ調整に3日ぐらいかけ、その後荷重テストに1日最終確認に一日かけて終了していたのが現状である。
As for the outline of the construction process, the base bracket is welded and fixed to the side wall in advance, and this is transferred to the elevator installer, and machine room construction (including guide rail centering and mounting of the guide rail mounting bracket) The above-mentioned welding work is carried out by attaching each deck door, attaching a guide rail and attaching a junction box. In the next stage, the elevator installer will weld the guide rail mounting bracket to the base bracket in the presence of the shipbuilding side and paint the elevator hoistway on the shipbuilding side. The installation contractor was doing two-phase construction.
For example, this elevator installation work is typically a one-time work, after confirming the meeting site on the first day, preparing for the work, and taking about seven days from the second day to the machine room work (guide rail core) However, including bracket mounting for guide rail mounting). Next, it takes about 4 days to install each deck door, and about 5 days to install the guide rail and junction box.
Also, in order to weld the guide rail mounting bracket under the presence of the shipbuilding side and paint the elevator hoistway on the shipbuilding side, it is necessary during the work to paint the elevator hoistway on the shipbuilding side alone. The elevator installation work for one week suspended the work, and then, as the second phase work, after confirming the meeting site on the first day, preparing the work, car assembly and wire installation work around 5 days, wiring and connection work It took about 6 days, took about 3 days for elevator adjustment, and after that, it took 1 day for the final confirmation of the load test for 1 day.

船舶用エレベータの設置工法に関する特許公報類は見当たらず、陸上用エレベータ工事に関し、側壁にブラケットを埋め込みボルトで固定する提案がある。
特開平2003−48673号公報及び特開平2004−43135号公報に記載の発明は、陸上のエレベータにおけるガイドレール固定装置で、側壁部に直接ボルト止めすることが示されているが、船舶用エレベータの設置工事にこれを採用すると、ボルト止めに緩みを生じ事故の原因となることが避けられない。
まして船舶用エレベータ設置工事に関する発明は開示されていない。
There are no patent publications related to the installation method for marine elevators, and there is a proposal for embedding a bracket on the side wall with an embedded bolt in relation to land elevator construction.
The invention described in Japanese Patent Application Laid-Open No. 2003-48673 and Japanese Patent Application Laid-Open No. 2004-43135 is a guide rail fixing device for an on-shore elevator and is shown to be bolted directly to a side wall portion. If this is used for installation work, it is inevitable that the bolts will loosen and cause an accident.
Moreover, an invention relating to the installation work for a marine elevator is not disclosed.

特開平2003−48673号公報Japanese Patent Laid-Open No. 2003-48673 特開平2004−43135号公報Japanese Patent Laid-Open No. 2004-43135

陸上のエレベータ設置工事では船舶用のエレベータ設置工事と異なり、建築側とエレべータ工事業社の役割分担は厳しくないが、船舶用のエレベータ設置工事では、船舶本体に直結する溶接工事は、エレベータ工事業者には一任できない事情があり、又、基部ブラケットに、ガイドレール取付ブラケットを溶接以外の手段であるボルト留めにすることは船舶の安全を保障する観点から承認されない。
前記のようなエレベータ設置における役割分担は、船舶の安全性を保障するためには不可欠であるが、前記のように、従来の慣行であるエレベータ設置工事を一期と二期に分けて行い、その中間において造船側の塗装工事等が入ることは、エレベータ設置業者の行なう作業が中休みとなり、工事日程が長くなり、工事業者側で用意する人員の活用に無駄が生じるという点で問題があり、工事費の節減がしにくいなどの問題がある。
Unlike the elevator installation work for ships, the division of roles between the construction side and the elevator company is not strict, but in the elevator installation work for ships, welding work directly connected to the ship body is There are circumstances that cannot be left to the elevator contractor, and it is not approved from the viewpoint of ensuring the safety of the ship that the guide rail mounting bracket is bolted to the base bracket as a means other than welding.
The division of roles in the installation of elevators as described above is indispensable for ensuring the safety of the ship, but as described above, the conventional installation of elevators is divided into one and two phases, In the middle of this, painting work on the shipbuilding side, etc., has a problem in that the work performed by the elevator installer is suspended, the construction schedule becomes longer, and the use of personnel prepared by the construction company is wasted. There are problems such as difficulty in saving construction costs.

本発明は鋭意この問題を検討し、このような従来の船舶用エレベータ設置工事における問題点を解決し、前記した一期工事と二期工事とを連続化する方法を生み出したものである。
すなわち、前記の基部ブラケットにガイドレール取付ブラケットを溶接する従来の工法を見直し、基部ブラケットに補助ブラケットを用い固定することとし、且つその固定に当たっては張力を利用して楔効果のあるロック方式を備えた緩み止めワッシャーを有するボルトナットで連結固定し、次にこの補助ブラケットにガイドレール取付ブラケットを溶接することにより、十分に、強度の保障されたガイドレール取付工事が実施できることで、工事を合理的に改良したものである。
本発明を実施するために、造船側の塗装工事は最初の段階で行なわれ、その後、補助ブラケットにガイドレール取付ブラケットを溶接することから始まる一連のエレベータ設置工事は、従来の一期工事、二期工事を連続させ、特に二期工事の最初における現場確認を省略できるようにし、工事能率を著しく向上し、従来の一期工事、二期工事を別に分けて行なう問題点を解決し、工事を低コストで実施できるようになったものものである。
The present invention has intensively studied this problem, solved the problems in the conventional marine elevator installation work, and created a method for continuating the first-stage work and the second-stage work described above.
That is, the conventional construction method of welding the guide rail mounting bracket to the base bracket is reviewed, and the base bracket is fixed using an auxiliary bracket, and a locking method with a wedge effect using tension is provided for the fixing. By connecting and fixing with bolts and nuts with anti-loosening washers, and then welding the guide rail mounting bracket to this auxiliary bracket, the guide rail mounting work with sufficient strength can be carried out, making the work rational It is improved.
In order to carry out the present invention, the painting work on the shipbuilding side is carried out in the first stage, and then a series of elevator installation work starting from welding the guide rail mounting bracket to the auxiliary bracket is a conventional one-time work, two-stage work. Continuing the construction work, especially omitting the on-site confirmation at the beginning of the second construction work, significantly improving the construction efficiency, solving the problems of performing the separate first construction work and the second construction work separately, It can be implemented at low cost.

具体的には、本発明は以下の構成からなる。
船舶用エレベータの据付にあたり、設定箇所の側壁に溶接固定されている基部ブラケットに、補助ブラケットを固定するにあたり、張力を利用して楔効果のあるロック方式を備えた緩み止めワッシャーを有するボルトナットで連結固定し、次いで該補助ブラケットにガイドレール取付ブラケットを溶接により固定し、該ガイドレール取付ブラケットにガイドレールを固定するようにしたことを特徴とする船舶用エレベータの設置工法(請求項1)である。この工法により、船舶用エレベータの設置工事の連続化が実現できた。
溶接箇所の表面をスラグ除去、防食塗装したことを特徴とする請求項1に記載の船舶用エレベータの設置工法(請求項2)は、溶接箇所について常識的ではあるが、必ず実施される。
基部ブラケットに、補助ブラケットを張力を利用して楔効果のあるロック方式を備えた緩み止めワッシャーを有するボルトナットで連結固定するにあたり、丸穴を設け、これに緩み止めワッシャーを有するボルトを挿入することを特徴とする請求項1もしくは2に記載の船舶用エレベータの設置工法(請求項3)により、補助ブラケットの取り付けを容易に実施できる。
船舶用エレベータの据付工事に際し、基部ブラケットに補助ブラケットを溶接により固定した後、ガイドレール取付ブラケットの取付工事、マシンルーム工事、各デッキドア取付、補助ブラケット取付工事、ガイドレール取付工事及び各ジャンクションボックス取付工事を行う一期工事を施工し、次いでカゴ組立て及びワイヤー取付工事をした後、エレベータの調整、荷重テストの二期工事を連続して行うことを特徴とする請求項1、2もしくは3に記載の船舶用エレベータの設置工法(請求項4)により、エレベータ設置工事期間を最小にすることができた。
Specifically, the present invention has the following configuration.
When installing a marine elevator, a bolt nut with a locking washer equipped with a locking method with a wedge effect using tension to fix the auxiliary bracket to the base bracket welded and fixed to the side wall of the setting location. A marine elevator installation method characterized in that the guide rail mounting bracket is fixed to the auxiliary bracket by welding, and the guide rail is fixed to the guide rail mounting bracket (Claim 1). is there. By this construction method, it was possible to achieve continuous installation work for marine elevators.
The method for installing a marine elevator according to claim 1 (claim 2), wherein the surface of the welded portion is subjected to slag removal and anticorrosion coating, is always carried out although it is common sense for the welded portion.
When connecting and fixing the auxiliary bracket to the base bracket with a bolt and nut having a locking washer with a wedge effect locking mechanism using tension, a round hole is provided, and a bolt having a locking washer is inserted into this. With the marine elevator installation method (claim 3) according to claim 1 or 2, the auxiliary bracket can be easily attached.
When installing a marine elevator, fix the auxiliary bracket to the base bracket by welding, then install the guide rail mounting bracket, machine room, each deck door, auxiliary bracket installation, guide rail installation, and each junction box 4. The first stage construction is performed, and then the second stage construction of the elevator adjustment and load test is continuously performed after the basket assembly and the wire installation work are performed. The elevator installation work method (claim 4) of the present invention can minimize the elevator installation work period.

本発明は、従来エレベータ設置工法において、従来の公示方法では、一期工事と二期工事の間に船舶側における塗装工事を挟んで実施していたため、エレベータ設置工事側における組立て専門の作業員の稼動が中間で休みとなっていたが、陸上のエレベータ設置工事とは異なり、船舶という特殊な場所での作業であるから、専門の作業員を無駄なく活用できないためにコストがかかり、能率が悪くなったり、一期工事と二期工事のそれぞれにおいて、現場の確認で時間を要するなどの問題があった。
本発明によれば、一期工事と二期工事の間に造船側により、側壁に基部ブラケットを溶接していた作業に代えて、側壁に補助ブラケットを特殊なワッシャーを有するボルトナットを利用して固定することにより、造船側の行なっていた溶接工事をなくしても、船舶に影響なく、しかも強固な結合を実施することで、作業効率を上げ、工事期間の短縮に寄与できたものである。
このことは、本発明において、補助ブラケット及び特殊なワッシャーを有するボルトナットを用意することがあっても、工事能率の向上は変えがたいメリットである。
なお基部ブラケットに前記の特殊なワッシャーを有するボルトナットを用いて補助ブラケットを取り付けるために丸穴を設け、これに前記の緩み止めワッシャーを有するボルトを挿入することは作業性向上に寄与するものである。又補助ブラケットにガイドレール取付ブラケットを溶接により設けることは、比較的小さい箇所の溶接作業で、船舶側の手を煩わさなくても、問題が無いとの知見が得られた。なお、この部分の溶接後のスラグ除去、防食塗料の塗布などは、エレベータ設置業者に委任しても、船体への直接的影響のない箇所であることから了承されたところである。勿論、船舶本体に直結しない工事であるから、エレベータ工事業者の責任において実施しても何ら不安はない。
基部ブラケットにガイドレール取付ブラケットを溶接する溶接作業に伴う工期及び費用の削減ができる。
The present invention is a conventional elevator installation method. In the conventional announcement method, since the construction work on the ship side is sandwiched between the first-stage construction and the second-stage construction, the assembly specialist on the elevator installation construction side The operation was closed in the middle, but unlike land-based elevator installation work, work is carried out in a special place called a ship, so it is costly and inefficient because specialized workers cannot be used without waste. There was a problem that it took time to confirm the site in each of the first and second phase construction.
According to the present invention, instead of the work of welding the base bracket to the side wall by the shipbuilding side between the first phase construction and the second phase construction, the auxiliary bracket is used on the side wall by using a bolt and nut having a special washer. By fixing it, it was possible to increase work efficiency and contribute to shortening the construction period by eliminating the welding work that had been carried out on the shipbuilding side, without affecting the ship, and by implementing a strong connection.
In the present invention, even if a bolt and nut having an auxiliary bracket and a special washer is prepared, the improvement in construction efficiency is an advantage that cannot be changed.
The base bracket is provided with a round hole to attach the auxiliary bracket using the bolt and nut having the special washer, and inserting the bolt having the loosening washer into this contributes to improving workability. is there. Further, it was found that providing the guide rail mounting bracket to the auxiliary bracket by welding is a relatively small portion of the welding operation, and there is no problem even if the ship's hand is not bothered. It should be noted that removal of slag after welding of this part and application of anti-corrosion paint, etc. have been approved because they are places that do not directly affect the hull even if they are entrusted to an elevator installer. Of course, since it is a construction that is not directly connected to the ship body, there is no concern even if it is carried out at the responsibility of the elevator construction company.
The construction period and costs associated with the welding operation of welding the guide rail mounting bracket to the base bracket can be reduced.

発明を実施するための最良の形態を図面を参照しながら説明する。
図1は船舶用エレベータの基本型の形態の一例を示す概略斜視説明図である。
図1において、上方には、ガイドシーブ1、ガバナマシン2、制御盤3、ファイナルリミットスイッチ4、リミットスイッチ5、巻上機6が示されている。次にワイヤロープ7、ガイドシュー8、ドアマシン9、ゲートスイッチ10を備えたかご11が示されている。
その下部には上方から直立しているガイドレール16を支持するレール取付ブラケット12が、又、ケーブルを案内するケーブルガイド13、その下方にテールコード14、テールコードテンション装置15、カウンタウエイト17が示され、更に、出入口ドア19の上に、インターロックスイッチ18、上側に押しボタン・インジケータ20が取付けられ、最下部にはスプリングバッファ21が示されている。
The best mode for carrying out the invention will be described with reference to the drawings.
FIG. 1 is a schematic perspective view showing an example of a basic form of a marine elevator.
In FIG. 1, a guide sheave 1, a governor machine 2, a control panel 3, a final limit switch 4, a limit switch 5, and a hoisting machine 6 are shown above. Next, a car 11 having a wire rope 7, a guide shoe 8, a door machine 9, and a gate switch 10 is shown.
A rail mounting bracket 12 that supports a guide rail 16 that stands upright from above is shown at the bottom, a cable guide 13 that guides the cable, and a tail cord 14, a tail cord tensioning device 15, and a counterweight 17 below that. Further, an interlock switch 18 is mounted on the entrance door 19, a push button indicator 20 is mounted on the upper side, and a spring buffer 21 is shown at the bottom.

上記図1から理解されるように、エレベータの設置箇所は船舶という特殊な場所で、昇降路の側壁にガイドレール16が取付けられ、ワイヤロープ7で昇降するかご11が垂直に設置され、カウンタウエイト17によりつるべ式に昇降するようになっている。
本発明はこのような構成の船舶用エレベータを組立てる場合の工事方法に関するもので、特にエレベータ設置工事を円滑に行うための工法に関するものである。
As can be seen from FIG. 1 above, the elevator is installed in a special place called a ship, a guide rail 16 is attached to the side wall of the hoistway, a car 11 that is raised and lowered by the wire rope 7 is installed vertically, and a counterweight is installed. 17 is raised and lowered in a slidable manner.
The present invention relates to a construction method for assembling a marine elevator having such a configuration, and particularly to a construction method for smoothly performing elevator installation work.

本発明の理解のために、まず図6を参照して従来技術について説明する。
従来は側壁101に基部ブラケット102を溶接103で一体化する。この作業は当初
造船側において行い、エレベータ設置業者に引渡す前に行なう工程であり、この状態で引渡しを受けたエレベータ設置業者は、マシンルーム工事(ガイドレール芯だし及びブラケット取付)、デッキドア取付、ガイドレール取付ブラケット105にガイドレール106をクリップ107により固定する工事等を行ない、その後造船側において、エレベータ設置業者の準備したガイドレール取付ブラケット105を基部ブラケット102に溶接103し、溶接表面のスラグ除去と共に腐食防止のための防食塗装したり、昇降路の塗装工事を行っていた。
次いで再びエレベータ設置業者に引渡され、カゴ組立て及びワイヤー取付工事、配線及び結線工事を行った後、エレベータ調整、荷重テスト、最終確認をして、工事を終了していた。
なお、一期工事と二期工事の最初の段階で、現場確認と作業準備が行なわれている。
In order to understand the present invention, the prior art will first be described with reference to FIG.
Conventionally, the base bracket 102 is integrated with the side wall 101 by welding 103. This work is initially performed on the shipbuilding side and before delivery to the elevator installer. The elevator installer who has received the delivery in this state is responsible for machine room construction (guide rail centering and bracket installation), deck door installation, guide The construction of fixing the guide rail 106 to the rail mounting bracket 105 with the clip 107 is performed, and then, on the shipbuilding side, the guide rail mounting bracket 105 prepared by the elevator installer is welded 103 to the base bracket 102, and slag is removed from the welding surface. They had anti-corrosion coatings to prevent corrosion and painting work for hoistways.
Next, it was handed over to the elevator installer again, and after the car assembly, wire installation work, wiring and connection work, the elevator adjustment, load test, and final confirmation were completed.
At the first stage of the first and second phase construction, site confirmation and work preparation are carried out.

上記の溶接工事及び昇降路塗装工事は船体本体に直結するものであるためにエレベータ設置業者には一任できない工事であり、更にこの時期に昇降路の塗装工事を行っていたので、これがエレベータ設置業者側においては一期工事の後に溶接や昇降路の塗装工事を行っていたために、エレベータ設置業者は作業を1週間ないし10日位作業を中止して作業員を待機させる必要が生じ、結局一期工事と二期工事に分けて工事するという最大のあい路を生じていたのである。   The above welding work and hoistway painting work are directly connected to the hull body, so it cannot be entrusted to the elevator installer, and during this period the hoistway painting work was done, so this is the elevator installer On the side, because the welding work and the hoistway painting work were done after the first phase construction, it was necessary for the elevator installer to stop the work for about 1 week to 10 days and to wait for the workers. This created the biggest gap between construction and two-phase construction.

本発明はこの問題を解決するためになされたもので、その実施の形態を説明すれば、図2に示すように造船側では、側壁101に基部ブラケット102を溶接103で一体化し、昇降路塗装工事を行ない、次にエレベータ設置業者において補助ブラケット104を基部ブラケット102に、張力を利用して楔効果のあるロック方式を備えた緩み止めワッシャーを有するボルトナット109で締め付け固定する。
補助ブラケット104には、ガイドレール取付ブラケット105を溶接110により連結固定するが、船体に直結されてはいないが、溶接により固定した方がコスト的にも低く、且つ安全な一体化法であり、造船側の手を煩わすことなく採用されたものである。
The present invention has been made to solve this problem, and its embodiment will be described. As shown in FIG. 2, on the shipbuilding side, a base bracket 102 is integrated with a side wall 101 by welding 103, and hoistway coating is performed. Construction work is performed, and then the auxiliary bracket 104 is fastened and fixed to the base bracket 102 by a bolt nut 109 having a locking washer having a locking method having a wedge effect by using tension.
Although the guide rail mounting bracket 105 is connected and fixed to the auxiliary bracket 104 by welding 110, it is not directly connected to the hull, but fixing by welding is lower in cost and is a safe integration method. It was adopted without bothering the shipbuilding side.

なお、図3は、本発明において用いられる補助ブラケット104を基部ブラケット102(図示せず)に溶接した状態を示す部分正面図で、該張力を利用して楔効果のあるロック方式を備えた緩み止めワッシャーを有するボルトナット109(図示せず)の挿入固定位置を適正にするために、補助ブラケット104には丸穴111を設けてある。
ボルトの取付部は、穴あけ用機械(パンチャー)を使用し、容易に実施できる。
なお、図2と同様に105はガイドレール取付ブラケット、110は溶接を示す。
この張力を利用して楔効果のあるロック方式を備えた緩み止めワッシャー108を有するボルトナット109による結合は溶接に取って代わるものであるが、他のボルトナットより緩まずに取付けられ、溶接同等の効果があることが実験的にも確認された。
FIG. 3 is a partial front view showing a state in which the auxiliary bracket 104 used in the present invention is welded to the base bracket 102 (not shown), and is provided with a locking system having a wedge effect utilizing the tension. A round hole 111 is provided in the auxiliary bracket 104 to make the insertion and fixing position of a bolt nut 109 (not shown) having a locking washer appropriate.
The bolt mounting portion can be easily implemented using a punching machine.
2, 105 denotes a guide rail mounting bracket, and 110 denotes welding.
The connection by the bolt and nut 109 having the locking washer 108 having a locking method having a wedge effect using this tension replaces welding, but it is attached more loosely than other bolts and nuts, and is equivalent to welding. It was also confirmed experimentally that there is an effect.

図4は、楔効果のあるロック方式を備えた緩み止めワッシャーを有するボルトナットの取付状態の一部断面側面図で、基部ブラケット102と補助ブラケット104とを楔効果のあるロック方式を備えた緩み止めワッシャー108を介しボルト106aが下側に、楔効果のあるロック方式を備えた緩み止めワッシャー108を介しナット106bが上側に示されている。
上記構造で、張力を利用して楔効果のあるロック方式を備えた緩み止めワッシャーを有するボルトナットで連結固定したものは、通常のボルトナット止めと異なり、振動や衝撃で緩むことが無いものであるから、船舶が長期にわたり、激しい波浪、強風にさらされても緩むことが無いことが後述のボルト類の比較試験報告で確認された。
FIG. 4 is a partial cross-sectional side view of a bolt and nut mounting state having a locking washer with a locking method with a wedge effect, and the base bracket 102 and the auxiliary bracket 104 are loosened with a locking method with a wedge effect. A bolt 106a is shown on the lower side via a locking washer 108, and a nut 106b is shown on the upper side via a locking washer 108 with a locking method with a wedge effect.
A bolt and nut with a locking washer that has a locking method with a wedge effect using tension in the above structure is not loosened by vibration or impact unlike ordinary bolt and nut locking. Therefore, it was confirmed by the comparative test report of bolts described later that the ship does not loosen even if exposed to severe waves and strong winds over a long period of time.

図5は本発明で用いられる楔効果のあるロック方式を備えた緩み止めワッシャーを有するボルト止め構造を示す側面図である。楔効果のあるロック方式を備えた緩み止めワッシャー108を介しボルト106aが設けられ締付固定されている。これにより緩まない構造を理解できる。   FIG. 5 is a side view showing a bolting structure having a locking washer having a locking method with a wedge effect used in the present invention. A bolt 106a is provided via a locking washer 108 having a locking method with a wedge effect, and is fastened and fixed. Thereby, the structure which does not loosen can be understood.

図2の本発明の工事を実施することは、従来の工法におけるエレベータの設置工事を一期工事と二期工事に分けて行なうための問題点を解決するために、補助ブラケット104を用意し、その基部ブラケットへの取り付けを、張力を利用して楔効果のあるロック方式を備えた緩み止めワッシャー108を有するボルトナット109で連結固定することにより、材料の点数の増加があるけれども、造船側による溶接工事を消滅させ、全体的に一期工事と二期工事を分けずに連続して実施できるので、工事日程を無駄なく組むことができ、且つ工事期間も現場確認を2回行なっていた従来技術よりも現場確認を最初にだけ行なう本発明の方が有利でコストダウン寄与できるものである。   The implementation of the construction of the present invention in FIG. 2 is to prepare an auxiliary bracket 104 in order to solve the problem of performing the installation work of the elevator in the conventional construction method divided into the first-stage work and the second-stage work, By attaching and fixing the base bracket with a bolt and nut 109 having a locking washer 108 having a wedge-type locking system using tension, there is an increase in the number of materials. Previously, the welding work was eliminated, and the first and second work could be performed continuously without separation, so the work schedule could be assembled without waste and the site was checked twice during the work period. The present invention in which the field confirmation is performed only at the beginning of the technology is more advantageous and can contribute to cost reduction.

本発明において、基部ブラケット102に補助ブラケット104を楔効果のあるロック方式を備えた緩み止めワッシャー108を有するボルトナット109を用いて結合し、次いで該補助ブラケット104にガイドレール取付ブラケット105を溶接110により固定し、該ガイドレール取付ブラケット105にガイドレール106をレールクリップ107にて固定する。これによりガイドレールを組み立てられるが、その他カゴ設置工事、配線工事等は従来と変わらないので、説明を省略する。   In the present invention, the auxiliary bracket 104 is coupled to the base bracket 102 using a bolt and nut 109 having a locking washer 108 having a locking method with a wedge effect, and then the guide rail mounting bracket 105 is welded 110 to the auxiliary bracket 104. The guide rail 106 is fixed to the guide rail mounting bracket 105 with a rail clip 107. As a result, the guide rails can be assembled, but other car installation work, wiring work, and the like are the same as in the prior art, so the description thereof is omitted.

本発明の工事の一例は、エレベータガイドレールの芯出しを4箇所行ない、ボルト穴あけ位置用の治具を使用し、芯出し位置から穴あけ位置にケガキを付ける。ケガキ位置をパンチャー(穴あけ用機械)で船殻(基部ブラケット)に穴をあける。ファスナープレート
(補助ブラケット)を緩み止めボルト又は緩み止めワッシャーで閉め付ける。ことにより実施できる。
In an example of the construction of the present invention, the elevator guide rail is centered at four locations, and a jig for a bolt hole position is used to mark the hole position from the center position. Drill a hole in the hull (base bracket) with a puncher (drilling machine) at the marking position. Close the fastener plate (auxiliary bracket) with a locking bolt or locking lock washer. Can be implemented.

本発明によれば、造船側で、基部ブラケットを溶接し、必要な平滑化処理及び昇降路の防食塗装を施し、この後エレベータ設置業者が従来の一期工事と二期工事を分けることなく連続して行う。これによれば、中間において造船側の工事である溶接及び昇降路の塗装工事のためにエレベータ設置工事を休むことが強制される事が無くなり、この昇降路の塗装工事は一番最初に造船側で実施するこことで、従来のエレベータ設置工事における一期工事と二期工事を連続作業で実施できるものである。
すなわち、従来のエレベータ組立て作業では、一期工事と二期工事とが中断する結果、中断期間(塗装工事)中は組立て作業員は他に仕事を求めるか、休むかしなければならず、エレベータの組立て作業員の専門技術を有効活用していないことが理解される。
従って、本発明によるときは、最初に側壁への基部ブラケットの取付工事を造船側で行なう以外は、すべてのエレベータの設置工事をこの業者により連続して行なうので、日程的に無駄が無く、結局はコストダウンを実現することができる。
According to the present invention, on the shipbuilding side, the base bracket is welded, the necessary smoothing treatment and the anticorrosive coating of the hoistway are applied, and then the elevator installer continues continuously without separating the conventional one-stage construction and the second-stage construction. And do it. According to this, it is no longer compulsory to rest the elevator installation work for welding and hoistway painting work, which is construction on the shipbuilding side in the middle, and this hoistway painting work is the first to be done on the shipbuilding side By carrying out the above, it is possible to carry out the first and second phase construction in the conventional elevator installation work in a continuous work.
That is, in the conventional elevator assembly work, as a result of the interruption of the first-stage construction and the second-stage construction, during the suspension period (painting work), the assembly worker has to ask for other work or take a rest. It is understood that the expertise of assembly workers is not effectively utilized.
Therefore, according to the present invention, all the elevator installation work is carried out continuously by this contractor except that the installation work of the base bracket to the side wall is first done by the shipbuilding side, so there is no waste in terms of schedule, and eventually Can realize cost reduction.

なお、溶接工事を用いる場合、溶接表面のスラグ除去と共に腐食防止のための防食塗装は造船側の溶接でも、エレベータの設置側の溶接も当然実施するものである。   In addition, when using welding work, the anticorrosion coating for corrosion prevention with the removal of the slag of a welding surface naturally carries out welding on the shipbuilding side or welding on the elevator installation side.

本発明の実施において、特に緩み止めワッシャー(例えばノルトロックワッシャー)をボルト止めに活用することで、通常のボルト止めより強固で安定した結合ができる。
この実例を図5で示したが、ボルトの頭部の直下に用いられるワッシャーが噛み合うことにより、緩みが発生しないので、船舶の溶接に代えて、このような緩み止めワッシャーを有するボルト止めを採用することで、船舶の動揺においても緩みが発生せず、溶接同様な固定効果をもたらすことができる。
すなわち、図に示すロックワッシャーは錆びない鋼材を用いたゆるみ止めワッシャーであるので、塗装の必要が無く、通常のボルト止めよりも長期にわたり強固なレールの固定ができる。
本発明によれば、ボルトによる組立て部も比較的小型で、船舶の波浪による動揺にも緩みを生じることなく、エレベータの強固な構造維持に役立つものである。
In the practice of the present invention, particularly by using a locking washer (for example, a Nord lock washer) for bolting, a stronger and more stable connection than that of a normal bolting can be achieved.
Although this example is shown in FIG. 5, since the loosening does not occur when the washer used just below the head of the bolt is engaged, a bolt stopper having such a loosening washer is used instead of the welding of the ship. By doing so, loosening does not occur even when the ship shakes, and a fixing effect similar to welding can be achieved.
That is, the lock washer shown in the figure is a locking washer using a steel material that does not rust, so there is no need for painting, and the rail can be fixed more firmly than a normal bolt.
According to the present invention, the assembly portion by the bolt is also relatively small, and it is useful for maintaining a strong structure of the elevator without causing looseness in the vibration caused by the wave of the ship.

本発明で用いられる張力を利用して楔効果のあるロック方式を備えた緩み止めワッシャーを用いたボルト結合システムはノルド社のロックとして知られている。
このロックと他のロックとの比較試験データを記載したノルドロック社のテストレポートの一部を以下に転載するが、これにより振動試験でも極めて優れたデータがしめされており、十分溶接に変わる結合手段となることが理解できる。

トルク荷重の関連及び振動テストの結果を示せば次の通りである。
試験はドイツ規格:DIN65151に準じ比較振動テストである。
振動テスト条件
規格:ユンカー式(ドイツ規格:DIN65151)
周波数:40Hz
時間:10秒(振動回数:400回)
試験結果
テスト1 振幅±0.3mm
テスト2 振幅±0.5mm

締付状況
潤滑油: 無し(ドライ)
土台座ワッシャー スチール 硬度:HRC21=(HV210)
締付長さ 25mm
ボルト M8×35mm(強度:8.8)

緩み止め商品
ノルトロック・ワッシャー(No.6041)と標準ナット(強度:8)
ハードロック・ナット
フランジ・ナット
フォーマー・ナット=U・Nut=
スプリングワッシャー付ナット
スカート・ナット
ナイロン・ナット

テスト1
M6ボルト(強度:8.8)にて降伏点の約75%の荷重である9.5kNに締付けたトルク値の測定とDIN65151規格に準じた振動テスト(振幅:0.3mm)を行なった。

1.1:トルクと荷重・・・図7参照
ノルトロック・ワッシャー 13.5Nm
ハードロック・ナット 12.0Nm
フランジ・ナット 11.5Nm
フォーマー・ナット=U・Nut= 10.0Nm
スプリングワッシャー付ナット 10.0Nm
スカート・ナット 9.0Nm
ナイロン・ナット 8.5Nm

トルクと荷重の関係はほとんど一定化しており、1kNあたりのトルク・荷重比率は下記の通りである。
ノルトロック・ワッシャー 13.5/9.5=1.4Nm/kN
ハードロック・ナット 12.0/9.5=1.3Nm/kN
フランジ・ナット 11.5/9.5=1.2Nm/kN
フォーマー・ナット=U・Nut= 10.0/9.5=1.1Nm/kN
スプリングワッシャー付ナット 10.0/9.5=1.1Nm/kN
スカート・ナット 9.0Nm/9.5=0.9Nm/kN
ナイロン・ナット 8.5Nm/9.5=0.9Nm/kN

1.2:振動テスト・・・図8参照
ハードロック・ナットとノルトロック・ワッシャーを除くその他の全ての商品は緩んでしまった。
ハードロックとノルトロックの荷重=軸力=が約8%下降しておりますが、これはいわゆるネジ締結時の設置面における”初期なじみ”現象です。

10秒間の振動テスト後の荷重値=軸力=;

ノルトロック・ワッシャー 8.75kN(92%)
ハードロック・ナット 8.75kN(92%)
フランジ・ナット 7.75kN(82%)
フォーマー・ナット=U・Nut= 6.75kN(71%)
スプリングワッシャー付ナット 6.75kN(71%)
スカート・ナット 7.0kN(74%)
ナイロン・ナット 0.75kN(8%)

1.3締結解除時・・・図9参照
ノルトロックに関しては緩める時に締め付け力の荷重=軸力=が増えるという楔効果がわかります。

その他の全商品は締め付け荷重が増加することはありません。
又、ハードロックにおいては商品自体が変形して再利用ができないことがわかります。

テスト2
テスト1にてよい結果が現れました3商品のみを再使用して振動比較テストを行ない、M6ボルト(強度:8.8)にて降伏点の約55%の荷重である7.0kNに締め付けたトルク値の測定とDIN65151規格に準じた振動テスト(振幅:0.5mm)を行ないました。

2.1:トルクと荷重・・・図10参照
ノルトロック・ワッシャー 9.5Nm
ハードロック・ナット 6.5Nm
フランジ・ナット 8.5Nm

テスト1との比較値偏差値
ノルトロック・ワッシャー 4%
ハードロック・ナット 35%
フランジ・ナット 1%

2.2トルクと荷重・・・図11参照
ノルトロック・ワッシャーは前回の振動テスト同様に緩んで廻ってしまうことは無く、荷重=軸力=が7kNが5.5kNに下降しておりますが、これは所謂ネジ締結時の設置面における”初期なじみ”現象です。

ハードロックとフランジ・ナットは緩んでしまいました。ハードロックは7kNが4.5kNに、フランジ・ナットの方は1kNに減少しました。

2.3締付解除時・・・図12参照
ノルトロックに関しては緩める時に締付力の荷重=軸力=が増えるという楔効果がわかります。
ハードロックにおいては荷重=軸力=が増えることはありません。

結論
ノルトロックを取付けたナットを除きその他の全ての緩み止めナットが緩んでしまったことは明白でした。

ノルトロックは過酷な振動テストで緩んで回転するということはありませんでした。
振動がスタートした後に荷重(軸力)が下降しましたが、それは接地両面における”初期なじみ”現象です。所謂、戻り回転しない初期へたりであり、軸力低下数値内の螺子の緩み現象と言えます。

ノルトロックの緩み止め効果は摩擦抵抗力ではなく、軸力方向の張力を増やす作用ですので、統制された締付が行なわれます。
又、耐錆、最少締付けトルク値、摩擦力の減少効果として良質の潤滑油(GTLやMolykote1000)を使用することをお勧めいたします。

ハードロックナットはドライの条件で10kNの荷重にて締付けた際にしっかりと締結されていました。つまり、締付けた荷重に応じて緩んだりする問題が発生しますので使用においては不安定な状況です。

テスト結果を総合したものを示すと表1の通りであり、緩み止め効果はノルトロックすなわち、本発明でいう、張力を利用して楔効果のあるロック方式を備えた緩み止めワッシャーを有するボルトナットの結合のみが満足する結果を得られることが理解されます。
A bolt coupling system using a locking washer having a locking method with a wedge effect utilizing the tension used in the present invention is known as a Nord lock.
A part of Nord-Lock's test report describing the comparison test data between this lock and other locks is reproduced below, but this shows very good data in vibration tests, and it is a joint that can be transformed into a sufficient weld. It can be understood as a means.

The relationship between torque load and vibration test results are as follows.
The test is a comparative vibration test according to the German standard: DIN 65151.
Vibration test condition standard: Junker type (German standard: DIN65151)
Frequency: 40Hz
Time: 10 seconds (vibration frequency: 400 times)
Test result Test 1 Amplitude ± 0.3mm
Test 2 Amplitude ± 0.5mm

Tightening status Lubricant: None (dry)
Base washer Steel Hardness: HRC21 = (HV210)
Tightening length 25mm
Bolt M8 x 35mm (strength: 8.8)

Non-loosening products Nordlock washer (No.6041) and standard nut (strength: 8)
Hard Lock Nut Flange Nut Former Nut = U ・ Nut =
Nut with spring washer Skirt / Nut Nylon / Nut

Test 1
Measurement of the torque value tightened to 9.5 kN, which is a load of about 75% of the yield point with M6 bolt (strength: 8.8), and vibration test (amplitude: 0.3 mm) according to DIN 65151 standard were performed.

1.1: Torque and load: see Fig. 7 Nordlock washer 13.5 Nm
Hard lock nut 12.0Nm
Flange / Nut 11.5Nm
Former Nut = U ・ Nut = 10.0Nm
Nut with spring washer 10.0Nm
Skirt / Nut 9.0Nm
Nylon nut 8.5Nm

The relationship between torque and load is almost constant, and the torque / load ratio per 1 kN is as follows.
Nord-Lock washer 13.5 / 9.5 = 1.4 Nm / kN
Hard lock nut 12.0 / 9.5 = 1.3Nm / kN
Flange / Nut 11.5 / 9.5 = 1.2Nm / kN
Former / Nut = U / Nut = 10.0 / 9.5 = 1.1 Nm / kN
Nut with spring washer 10.0 / 9.5 = 1.1Nm / kN
Skirt / Nut 9.0Nm / 9.5 = 0.9Nm / kN
Nylon nut 8.5Nm / 9.5 = 0.9Nm / kN

1.2: Vibration test (see Fig. 8) All the products except for the hard lock / nut and the north lock / washer were loosened.
Hard lock and Nord lock load = axial force = about 8% lower, this is the so-called “initial familiarity” phenomenon on the installation surface when fastening screws.

Load value after vibration test for 10 seconds = Axial force =;

Nord-Lock washer 8.75kN (92%)
Hard lock nut 8.75kN (92%)
Flange nut 7.75kN (82%)
Former nut = U. Nut = 6.75kN (71%)
Nut with spring washer 6.75kN (71%)
Skirt / Nut 7.0kN (74%)
Nylon nut 0.75kN (8%)

1.3 When tightening is released ... See Fig. 9 With regard to the Nord lock, the wedge effect that the tightening force load = axial force = increases when loosening can be seen.

All other products will not increase the clamping load.
It can also be seen that the product itself is deformed and cannot be reused in hard rock.

Test 2
A good test result was obtained in Test 1. Only three products were reused, and a vibration comparison test was performed. The bolt was tightened to 7.0 kN, which is a load of about 55% of the yield point with M6 bolt (strength: 8.8). Torque measurement and vibration test (amplitude: 0.5 mm) in accordance with DIN 65151 standard.

2.1: Torque and load: see Fig. 10 Nordlock washer 9.5 Nm
Hard lock nut 6.5Nm
Flange / Nut 8.5Nm

Comparison value deviation from test 1 Nordlock washer 4%
Hard lock nut 35%
Flange nut 1%

2.2 Torque and load ... See Fig. 11. The Nord-Lock washer does not rotate loosely like the previous vibration test, but the load = axial force = decreases from 7kN to 5.5kN. This is the so-called “early familiarity” phenomenon on the installation surface when fastening screws.

Hard locks and flanges / nuts have come loose. Hard lock has been reduced from 7kN to 4.5kN, and flange and nut to 1kN.

2.3 When tightening is released ... See Fig. 12. With regard to the Nord lock, the wedge effect that the tightening force load = axial force = increases when loosening can be seen.
In hard rock, load = axial force = does not increase.

Conclusion
It was obvious that all the other locking nuts had been loosened, except the nuts with the Nordlock.

The Nordlock was not loose and rotated in a severe vibration test.
The load (axial force) dropped after the vibration started, which is an “initial familiarity” phenomenon on both sides of the ground. This is the so-called initial settling without return rotation, and it can be said that this is the loosening phenomenon of the screw within the axial force drop value.

The locking effect of the Nord-Lock is not a frictional resistance but an action that increases the tension in the axial force direction, so controlled tightening is performed.
In addition, it is recommended to use good quality lubricating oil (GTL or Mollykote 1000) as an effect of reducing rust resistance, minimum tightening torque value and friction force.

Hard lock nuts were tightened firmly when tightened with a load of 10 kN under dry conditions. In other words, there is a problem of loosening depending on the tightened load.

A summary of the test results is shown in Table 1, and the locking effect is a bolt lock nut having a locking mechanism with a locking mechanism that has a wedge effect using tension as in the present invention. It is understood that only a combination of can produce satisfactory results.

Figure 2009149433
Figure 2009149433

なお2枚の鋼板を溶接したものと、ノルトロックを用いて結合したものとを本年8月から3ヶ月間船にぶら下げて試験したがいずれも異常がなかった。   Although two steel plates welded and one bonded using a Nordlock were tested for 3 months from August this year, there was no abnormality.

本発明は、昇降路の塗装工事を、造船側で冒頭に行なう事の冒頭に行うことにより、エレベータ接地工事側で行う工事、すなわち従来分離していた一期工事と二期工事を連続実施することにより、船舶におけるエレベータの設置工事作業を合理化し、中間で作業を休止することなく連続化を実現し、工費の節減に効果を発揮するものである。   In the present invention, the hoistway painting work is performed at the beginning of the shipbuilding side at the beginning, so that the work performed on the elevator grounding side, that is, the first-stage work and the second-stage work that were separated in the past are continuously performed. As a result, the installation work of the elevator in the ship is streamlined, and it is possible to realize the continuation without stopping the work in the middle, which is effective in reducing the construction cost.

船舶用エレベータの設置状態の概略斜視説明図Schematic perspective view of the installed state of the marine elevator 本発明のレール取り付け部の構造を示す正面図The front view which shows the structure of the rail attachment part of this invention 本発明において用いられる補助ブラケットに丸穴を付した状態を示す一部正面図The partial front view which shows the state which attached | subjected the round hole to the auxiliary bracket used in this invention 本発明において用いられる張力を利用して楔効果のあるロック方式を備えた緩み止めワッシャーを有するボルトナットの取付状態の側面図The side view of the attachment state of the bolt nut which has a locking washer provided with the lock system with a wedge effect using tension used in the present invention 本発明において用いられる張力を利用して楔効果のあるロック方式を備えた緩み止めワッシャーを有するボルトナットの取付状態の拡大側面図The enlarged side view of the attachment state of the bolt nut which has a locking washer provided with the lock system with a wedge effect using tension used in the present invention 従来技術によるレール取り付け部の構造を示す正面図Front view showing the structure of a rail mounting portion according to the prior art 各種ロック、ナットのトルクと荷重のグラフGraph of torque and load of various locks and nuts 各種ロック、ナットのトルク振動テストの結果のグラフGraph of torque vibration test results for various locks and nuts 各種ロック、ナットの締結解除時のグラフGraph when various locks and nuts are released 各種ロック、ナットのトルクと荷重のグラフGraph of torque and load of various locks and nuts 各種ロック、ナットの振動テストのグラフGraph of vibration test of various locks and nuts ノルドロックとハードロックの締結解除時のグラフGraph when releasing the lock between Nord-lock and Hard-lock

符号の説明Explanation of symbols

1 ガイドシーブ1
2 ガバナマシン
3 制御盤
4 ファイナルリミットスイッチ
5 リミットスイッチ
6 巻上機
7 ワイヤロープ
8 ガイドシュー
9 ドアマシン
10 ゲートスイッチ
11 かご
12 レール取付ブラケット
13 ケーブルガイド
14 テールコード
15 テールコードテンション装置
16 ガイドレール
17 カウンタウエイト
18 インターロックスイッチ
19 出入口ドア
20 押しボタン・インジケータ
21 スプリングバッファ
101 側壁
102 基部ブラケット
103 溶接
104 補助ブラケット
105 ガイドレール取付ブラケット
106 ガイドレール
107 クリップ
108 張力を利用して楔効果のあるロック方式を備えた緩み止めワッシャー
109 ボルトナット
109a ボルト
109b ナット
110 溶接
111 丸穴
1 Guide sheave 1
2 Governor machine 3 Control panel 4 Final limit switch 5 Limit switch 6 Hoisting machine 7 Wire rope 8 Guide shoe 9 Door machine 10 Gate switch 11 Car 12 Rail mounting bracket 13 Cable guide 14 Tail cord 15 Tail cord tension device 16 Guide rail 17 Counterweight 18 Interlock switch 19 Entrance door 20 Push button / indicator 21 Spring buffer 101 Side wall 102 Base bracket 103 Weld 104 Auxiliary bracket 105 Guide rail mounting bracket 106 Guide rail 107 Clip 108 Locking washer 109 provided Bolt nut 109a Bolt 109b Nut 110 Welding 111 Round hole

Claims (4)

船舶用エレベータの据付にあたり、設定箇所の側壁に溶接固定されている基部ブラケットに、補助ブラケットを、張力を利用して楔効果のあるロック方式を備えた緩み止めワッシャーを有するボルトナットで連結固定し、次いで該補助ブラケットにガイドレール取付ブラケットを溶接により固定し、該ガイドレール取付ブラケットにガイドレールをレールクリップにて固定するようにしたことを特徴とする船舶用エレベータの設置工法。   When installing a marine elevator, the auxiliary bracket is connected and fixed to the base bracket that is welded and fixed to the side wall of the set point with a bolt and nut having a locking washer that has a locking method with a wedge effect using tension. Then, a guide rail mounting bracket is fixed to the auxiliary bracket by welding, and the guide rail is fixed to the guide rail mounting bracket with a rail clip. 溶接箇所の表面を、スラグ除去、防食塗装したことを特徴とする請求項1に記載の船舶用エレベータの設置工法。   The method for installing a marine elevator according to claim 1, wherein the surface of the welded portion is subjected to slag removal and anticorrosion coating. 補助ブラケットを、張力を利用して楔効果のあるロック方式を備えた緩み止めワッシャーを有するボルトナットで連結固定するにあたり、補助ブラケットに丸穴を設け、これに緩み止めワッシャーを有するボルトを挿入することを特徴とする船舶用エレベータの設置工法。   When the auxiliary bracket is connected and fixed with a bolt and nut having a locking washer that has a locking method with a wedge effect using tension, a round hole is provided in the auxiliary bracket, and a bolt having a locking washer is inserted into this. An installation method of a marine elevator characterized by this. 船舶用エレベータの据付工事に際し、側壁に基部ブラケットを溶接により固定した後、ガイドレール取付ブラケットの取付工事、マシンルーム工事、各デッキドア取付、補助ブラケット取付工事、ガイドレール取付工事及び各ジャンクションボックス取付工事を行う一期工事を施工し、次いでカゴ組立て及びワイヤー取付工事をした後、エレベータの調整、荷重テストの二期工事を連続して行うことを特徴とする請求項1、2もしくは3に記載の船舶用エレベータの設置工法。   When installing the marine elevator, fix the base bracket to the side wall by welding, then install the guide rail mounting bracket, machine room, install each deck door, install the auxiliary bracket, install the guide rail, and install each junction box. 4. The construction according to claim 1, wherein after the first-stage construction is performed and then the basket assembly and the wire installation work are performed, the second-stage construction of the elevator adjustment and the load test is continuously performed. Installation method for marine elevators.
JP2007331267A 2007-12-25 2007-12-25 Construction method for installing vessel elevator Pending JP2009149433A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007331267A JP2009149433A (en) 2007-12-25 2007-12-25 Construction method for installing vessel elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007331267A JP2009149433A (en) 2007-12-25 2007-12-25 Construction method for installing vessel elevator

Publications (1)

Publication Number Publication Date
JP2009149433A true JP2009149433A (en) 2009-07-09

Family

ID=40919070

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007331267A Pending JP2009149433A (en) 2007-12-25 2007-12-25 Construction method for installing vessel elevator

Country Status (1)

Country Link
JP (1) JP2009149433A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6364547A (en) * 1986-09-01 1988-03-23 Hitachi Ltd Commutator device
JPH08277076A (en) * 1995-04-06 1996-10-22 Toshiba Fa Syst Eng Kk Device and method for fixing guide rail
JP2001310886A (en) * 2000-04-27 2001-11-06 Mitsubishi Electric Corp Guide rail supporting structure for elevator device
JP2002167139A (en) * 2000-12-05 2002-06-11 Ishikawajima Harima Heavy Ind Co Ltd Method of installing elevator for ship
JP2006095155A (en) * 2004-09-30 2006-04-13 Shimonoseki Ryoju Engineering Kk Lifter for ferry

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6364547A (en) * 1986-09-01 1988-03-23 Hitachi Ltd Commutator device
JPH08277076A (en) * 1995-04-06 1996-10-22 Toshiba Fa Syst Eng Kk Device and method for fixing guide rail
JP2001310886A (en) * 2000-04-27 2001-11-06 Mitsubishi Electric Corp Guide rail supporting structure for elevator device
JP2002167139A (en) * 2000-12-05 2002-06-11 Ishikawajima Harima Heavy Ind Co Ltd Method of installing elevator for ship
JP2006095155A (en) * 2004-09-30 2006-04-13 Shimonoseki Ryoju Engineering Kk Lifter for ferry

Similar Documents

Publication Publication Date Title
CA2203579C (en) Self-drilling stud
US8646224B2 (en) Construction apparatus
US20070181384A1 (en) Method of Mounting a Support Means of an Elevator Car to an Elevator Car and to an Elevator Shaft as well as an Elevator Installation and a Support Means which are Mounted by Means of this Method
JP5269289B2 (en) Self-locking bolt fastening fastener
CN1882495B (en) Method for mounting elevator steering pulley, elevator and use of quick connector
JPH08277076A (en) Device and method for fixing guide rail
CN101525040B (en) Underwater leadfair of mooring winch
CN110526074B (en) Elevator counterweight receiving clamp and mounting method thereof
US7475867B1 (en) Fairleads for building platforms
AU2007201612A1 (en) Panel connection system
CN101581198B (en) Overhead hoisting and butt-joint method for box-type headframe
JP2009149433A (en) Construction method for installing vessel elevator
US11498807B2 (en) Fastening arrangement for elevator guide rails
US5119908A (en) Procedure for mounting the guide rails for an elevator car or counterweight, and a mounting system implementing the procedure
JP4365640B2 (en) Plate material joining bolt and method for joining plate material using the same
US11072941B1 (en) Load transfer arrangement
CN1034408C (en) Procedure for fixing the guide rails to an elevator shaft by emans of an intermediate member, and an termediate member
US11236474B2 (en) Railway fastener for use with crossties
JPH04182289A (en) Fixing device of elevator guide rail
JP2017115573A (en) Temporary structure and method of constructing the same
JP2748812B2 (en) Guide rail lifting device for elevators
JP7080648B2 (en) How to erection the bridge girder
JP3934015B2 (en) High strength bolt joint structure and nut holder
JP2006207116A (en) Method of joining bottom sheet steel in synthetic floor panel bridge or synthetic floor panel
JP4415658B2 (en) Rail cradle during bridge construction

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20091209

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20091209

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20091209

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120113

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120117

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20120515