JP2008225012A - Examining device for internal structure of turbine and examining method using same - Google Patents

Examining device for internal structure of turbine and examining method using same Download PDF

Info

Publication number
JP2008225012A
JP2008225012A JP2007062625A JP2007062625A JP2008225012A JP 2008225012 A JP2008225012 A JP 2008225012A JP 2007062625 A JP2007062625 A JP 2007062625A JP 2007062625 A JP2007062625 A JP 2007062625A JP 2008225012 A JP2008225012 A JP 2008225012A
Authority
JP
Japan
Prior art keywords
carrier
turbine
internal structure
video probe
probe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2007062625A
Other languages
Japanese (ja)
Other versions
JP4966056B2 (en
Inventor
Kazuhiro Saito
和宏 齊藤
Kazunari Fujiyama
一成 藤山
Taiji Hirasawa
泰治 平澤
Satoshi Nagai
敏 長井
Hitoshi Kichise
仁志 吉瀬
Hirotsugu Kodama
寛嗣 児玉
Mitsuyoshi Okazaki
光芳 岡崎
Masanori Minowa
昌則 蓑和
Taro Kawabata
太郎 川端
Kenichiro Furuya
健一郎 古谷
Toshihiro Fujiwara
敏洋 藤原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP2007062625A priority Critical patent/JP4966056B2/en
Publication of JP2008225012A publication Critical patent/JP2008225012A/en
Application granted granted Critical
Publication of JP4966056B2 publication Critical patent/JP4966056B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Instruments For Viewing The Inside Of Hollow Bodies (AREA)
  • Endoscopes (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide an examining device for the internal structure of a turbine capable of reducing procedure of disassembly of a device and quantitatively examining circumstances of a turbine nozzle in the inspection of the inside of the device, especially, the inspection of a nozzle and a moving blade in a turbine. <P>SOLUTION: In the examining device constituted of a video probe and a carrier for carrying the video probe, and examining the internal structure of the turbine by inserting the video probe in the turbine, the carrier includes at least either a mechanism for deciding the advancing direction of the carrier and a facing angle of the tip of the video probe or a mechanism for deciding the positions of the axle of the carrier and the video probe. The circumstances of the turbine nozzle are quantitatively examined by making the carrier stably travel along a blade line in such a state that at least either the advancing direction of the carrier and the facing angle of the tip of the video probe or the positions of the axle of the carrier and the video probe is decided. <P>COPYRIGHT: (C)2008,JPO&INPIT

Description

本発明は、タービン構造物内にビデオプローブを挿入して、必要最小限の分解で、ノズルや動翼などの内部構造物の点検を有効に実施し得るタービン構造物の検査装置及びこの装置を用いた検査方法に関する。   The present invention relates to a turbine structure inspection device and a device for inserting a video probe into a turbine structure and effectively inspecting internal structures such as nozzles and moving blades with minimum necessary disassembly. It relates to the inspection method used.

従来、タービン構造物において、タービンノズル、あるいは動翼を点検するには、ケーシングを分解してから行われるのが一般的である。しかし、このような点検方法では、ケーシングの分解に多くの時間がかかることから、計画的に点検が行なわれている。   Conventionally, in order to inspect a turbine nozzle or a moving blade in a turbine structure, it is common to disassemble the casing. However, in such an inspection method, since it takes a lot of time to disassemble the casing, the inspection is performed systematically.

一方、ケーシングの分解を行なわずにタービン構造物を点検する方法として、例えば、蒸気管を通してタービンノズル、あるいは動翼近傍にビデオプローブを挿入して点検を実施する方法がある。   On the other hand, as a method for inspecting a turbine structure without disassembling the casing, for example, there is a method for inspecting by inserting a video probe in the vicinity of a turbine nozzle or a moving blade through a steam pipe.

この点検方法は、タービン内部や、外部を走行し、ビデオプローブを測定対象へ誘導する運搬具が必要になる。また、この運搬具には、計測用のセンサーを搭載し、マグネット車輪によりタービン内部の部材表面、あるいは外部表面を走行するようにコントロールする必要がある。しかし、マグネット車輪を備えた運搬具をコントロールするには、蒸気通路部のようなタービンケーシング外とタービンノズルや動翼とを結ぶ狭い通路を走行させることは困難であり、実用上限界がある。   This inspection method requires a vehicle that travels inside or outside the turbine and guides the video probe to the measurement target. Moreover, it is necessary to mount a sensor for measurement on this transporter and to control it so that it travels on the surface of a member inside the turbine or on the external surface by a magnet wheel. However, in order to control a transporter having a magnet wheel, it is difficult to run a narrow passage that connects the outside of the turbine casing, such as the steam passage portion, and the turbine nozzle or blade, which is practically limited.

そこで、最近ではビデオプローブ、ビデオプローブ運搬具に加えて、ビデオプローブを運搬具に対して伸長可能な構成とし、計測対象との位置をコントロール可能にして、検査を行うようにしたものがある(例えば、特許文献1)。   Therefore, recently, in addition to the video probe and the video probe carrier, there is a configuration in which the video probe is configured to be extendable with respect to the carrier and the position of the measurement object can be controlled to perform the inspection ( For example, Patent Document 1).

図15はかかるタービン構造物の検査方法を説明するための概略図である。   FIG. 15 is a schematic view for explaining such a turbine structure inspection method.

図15において、100は被検査対象となる多様な列を形成するタービン翼、80は車輪付きビデオプローブ運搬具で、このビデオプローブ運搬具80はビデオプローブ81を運搬具の進行方向に伸長可能に搭載されている。   In FIG. 15, 100 is a turbine blade that forms various rows to be inspected, 80 is a video probe carrier with wheels, and this video probe carrier 80 can extend the video probe 81 in the traveling direction of the carrier. It is installed.

このようなビデオプローブ運搬具80を用いて、例えばタービン動翼100の後縁部を検査する場合、タービン翼列はビデオプローブ運搬具80の走行線とは離れた場所に位置しているため、ビデオプローブ81をその位置にできる限り近付けるようにしている。   When such a video probe carrier 80 is used to inspect the trailing edge of the turbine blade 100, for example, the turbine blade row is located away from the travel line of the video probe carrier 80. The video probe 81 is as close to the position as possible.

即ち、ビデオプローブ運搬具80をノズルブロックのような狭い通路部まで走行させる第1のステップと、ビデオプローブ運搬具80の方向及び位置を微調整する第2のステップと、ビデオプローブ81を翼方向へ伸長させる第3のステップを経てから観察を行っている。
特開平7−218394号公報
That is, a first step in which the video probe carrier 80 travels to a narrow passage such as a nozzle block, a second step in which the direction and position of the video probe carrier 80 are finely adjusted, and the video probe 81 in the wing direction. Observation is carried out after passing through the third step.
JP 7-218394 A

しかしながら、このような方法で翼列の検査を行うには、各翼とビデオプローブの位置関係を一定に保つことが困難である。また、定量的な計測を行う場合には、ステレオスコープなどを用いることにより可能になるが、精度の高い計測を行うためには、ビデオプローブ先端を十分に翼に接近させる必要がある。   However, in order to inspect the blade rows by such a method, it is difficult to keep the positional relationship between each blade and the video probe constant. In addition, quantitative measurement can be performed by using a stereoscope or the like. However, in order to perform highly accurate measurement, it is necessary to bring the tip of the video probe sufficiently close to the wing.

このため、ビデオプローブを伸長させるステップが不可欠となるが、目視検査が可能な全ての翼について検査を行うには、上述した第1〜第3のステップを繰り返さなければならないため、手順の煩雑さから実用的ではない。   For this reason, the step of extending the video probe is indispensable. However, in order to inspect all the wings that can be visually inspected, the above-described first to third steps must be repeated. Not practical.

このようにビデオプローブを伸長させる方法では、ビデオプローブの位置コントロールにおいて、検査効率、位置決め精度において問題があり、例えば、タービンノズルの状況を検査する場合には、簡単な目視検査にしか適用することができない。   This method of extending the video probe has a problem in the inspection efficiency and positioning accuracy in the position control of the video probe. For example, when inspecting the state of the turbine nozzle, it is applied only to a simple visual inspection. I can't.

本発明は、ビデオプローブを装置内に挿入することで、装置の分解の手順を低減し、装置内部の点検、特にタービン内のノズルや、動翼の点検において、タービンノズルの状況を定量的に検査することができるタービン構造物の検査装置及びこの装置を用いた検査方法を提供することを目的とする。   The present invention reduces the procedure for disassembling the apparatus by inserting the video probe into the apparatus, and quantitatively determines the state of the turbine nozzle in the inspection inside the apparatus, particularly in the inspection of nozzles and blades in the turbine. It is an object of the present invention to provide an inspection apparatus for a turbine structure that can be inspected and an inspection method using the apparatus.

本発明は、上記の目的を達成するため、次のような装置及び方法によりタービン構造物を検査するものである。   In order to achieve the above object, the present invention inspects a turbine structure by the following apparatus and method.

請求項1に対応する発明は、ビデオプローブと、このビデオプローブを運搬するキャリアとから構成され、前記キャリアをタービン内に挿入して前記ビデオプローブによりタービン内部構造物を検査する装置において、前記キャリアには、該キャリアの進行方向と前記ビデオプローブの先端が向いている角度を決める機構、前記キャリアの車軸とビデオプローブとの位置を決める機構の少なくとも一方を備える。   The invention corresponding to claim 1 is composed of a video probe and a carrier for carrying the video probe, wherein the carrier is inserted into a turbine and the internal structure of the turbine is inspected by the video probe. Includes at least one of a mechanism for determining an angle in which the moving direction of the carrier and the tip of the video probe are directed, and a mechanism for determining a position between the axle of the carrier and the video probe.

請求項2に対応する発明は、請求項1に対応する発明のタービン内部構造物の検査装置において、前記キャリアには、走行方向を修正する複数台の電動機を有する。   According to a second aspect of the present invention, in the turbine internal structure inspection apparatus according to the first aspect of the present invention, the carrier has a plurality of electric motors for correcting the traveling direction.

請求項3に対応する発明は、請求項1又は請求項2に対応する発明のタービン内部構造物の検査装置において、前記キャリアには、強磁性体の走行輪、或いはキャタピラの如き無限軌道を備えた自走式の走行装置を有する。   According to a third aspect of the present invention, in the turbine internal structure inspection apparatus according to the first or second aspect of the present invention, the carrier is provided with an endless track such as a ferromagnetic traveling wheel or a caterpillar. A self-propelled traveling device.

請求項4に対応する発明は、請求項1に対応する発明のタービン内部構造物の検査装置において、前記キャリアには、走行路表面の曲率から決められた径の駆動輪を有する。   According to a fourth aspect of the present invention, in the turbine internal structure inspection apparatus according to the first aspect of the present invention, the carrier has a drive wheel having a diameter determined from the curvature of the traveling path surface.

請求項5に対応する発明は、請求項1に対応する発明のタービン内部構造物の検査装置において、前記キャリアには、走行路表面の曲率から決めた複数の異なる寸法、形状の駆動輪を有する。   The invention corresponding to claim 5 is the turbine internal structure inspection apparatus according to claim 1, wherein the carrier has drive wheels having a plurality of different sizes and shapes determined from the curvature of the traveling path surface. .

請求項6に対応する発明は、請求項1に対応する発明のタービン内部構造物の検査装置において、前記キャリアには、走行路表面に対して鉛直方向に沿って曲がることが可能な1つ以上のヒンジにより補助キャリアを連結する。   The invention corresponding to claim 6 is the turbine internal structure inspection device of the invention corresponding to claim 1, wherein the carrier is one or more capable of bending along the vertical direction with respect to the traveling path surface. The auxiliary carrier is connected by the hinge.

請求項7に対応する発明は、請求項1乃至請求項6に対応する発明のタービン内部構造物の検査装置において、前記キャリアには、冷却用の媒体を前記ビデオプローブ、キャリア本体へ供給可能なチューブが接続されている。   According to a seventh aspect of the present invention, in the turbine internal structure inspection apparatus according to the first to sixth aspects of the present invention, a cooling medium can be supplied to the video probe and the carrier body in the carrier. The tube is connected.

請求項8に対応する発明は、請求項1に対応する発明のタービン内部構造物の検査装置において、前記キャリアをタービン内の所定の位置まで搬送する装置を設け、この装置は前記キャリアの駆動輪がタービン内の所定の位置に向けて走行可能な走行面を有するガイドにより構成されている。   According to an eighth aspect of the present invention, there is provided the turbine internal structure inspection apparatus according to the first aspect of the present invention, wherein a device for transporting the carrier to a predetermined position in the turbine is provided, and the device is a driving wheel of the carrier. Is constituted by a guide having a traveling surface capable of traveling toward a predetermined position in the turbine.

請求項9に対応する発明は、請求項1乃至請求項8のいずれかに対応する発明のタービン内部構造物の検査装置を用いてタービン翼を検査する方法において、前記キャリアをタービン蒸気通路を通ってタービン翼列に運搬するステップと、前記キャリアをタービン翼列に沿ったキャリア走行開始位置へ移動させるステップと、このキャリア走行開始位置から前記キャリアをタービン翼列に沿って走行させるステップと、前記ビデオプローブにより得られた各タービン翼の画像と前記キャリアの走行位置を同時に記録するステップとを備える。   According to a ninth aspect of the present invention, there is provided a method for inspecting a turbine blade using a turbine internal structure inspection apparatus according to any one of the first to eighth aspects of the present invention, wherein the carrier is passed through a turbine steam passage. Carrying to the turbine blade row, moving the carrier to a carrier travel start position along the turbine blade row, running the carrier along the turbine blade row from the carrier travel start position, And simultaneously recording an image of each turbine blade obtained by the video probe and the traveling position of the carrier.

請求項10に対応する発明は、請求項9に対応する発明のタービン内部構造物の検査方法において、前記タービン翼列に沿って前記キャリアを走行させるステップと、前記ビデオプローブにより得られる画像を前記ビデオプローブの位置を変えた状態でタービン翼を撮影した画像データとして記録するステップと、このステップで得られた画像データと同じプローブ位置での過去の複数の画像データとを比較して、タービン翼の損傷状況を判定するステップとを備える。   According to a tenth aspect of the present invention, in the method for inspecting a turbine internal structure according to the ninth aspect of the present invention, the step of moving the carrier along the turbine cascade and the image obtained by the video probe are The step of recording as image data obtained by photographing the turbine blade with the position of the video probe changed is compared with a plurality of past image data at the same probe position with the image data obtained in this step. Determining the damage status of the.

請求項11に対応する発明は、請求項9に対応する発明のタービン内部構造物の検査方法において、同じタービン翼について得た複数の画像と、それらの画像を記録したときのビデオプローブの位置情報を用いて、タービン翼の損傷状況を判定するステップとを含む。   The invention corresponding to claim 11 is the method for inspecting a turbine internal structure according to claim 9, wherein a plurality of images obtained for the same turbine blade and the position information of the video probe when these images are recorded are recorded. And determining the damage status of the turbine blade.

本発明は、多様なタービン翼列の蒸気通路部形状、寸法にあわせて、ビデオプローブキャリアの進行方向とビデオプローブ先端が向いている角度、又はビデオプローブキャリアの車軸とビデオプローブとの位置の少なくとも一方を決定した状態で、ビデオプローブキャリアを安定的に翼列に沿って走行させることにより、点検用のビデオプローブを計測対象に対する位置を安定的にコントロールすることが可能となり、タービンノズルの状況を定量的に検査することができる。   According to the present invention, at least the angle of the video probe carrier traveling direction and the video probe tip direction, or the position of the video probe carrier axle and the video probe, in accordance with the shape and size of the steam passages of various turbine cascades. By moving the video probe carrier stably along the blade row with one determined, it becomes possible to stably control the position of the video probe for inspection with respect to the measurement target, and the status of the turbine nozzle. Can be examined quantitatively.

以下本発明の実施形態について図面を参照して説明する。   Embodiments of the present invention will be described below with reference to the drawings.

まず、本発明によるタービン構造物の検査方法を説明するにあたり、図1を用いて一般的な蒸気タービン設備の構造について述べる。   First, in describing the turbine structure inspection method according to the present invention, the structure of a general steam turbine facility will be described with reference to FIG.

図1において、作動流体である高温・高圧の蒸気は、図示しないボイラで生成され、図示しない主蒸気導入管を通って蒸気タービン設備1まで導かれる。蒸気タービンには、図示しない蒸気弁にて蒸気の量が制御された後、蒸気導入管2を通り蒸気通路部3にまで流入する。   In FIG. 1, high-temperature and high-pressure steam, which is a working fluid, is generated by a boiler (not shown) and guided to a steam turbine facility 1 through a main steam introduction pipe (not shown). After the amount of steam is controlled by a steam valve (not shown), the steam flows into the steam turbine through the steam introduction pipe 2 and into the steam passage section 3.

この蒸気導入管2の一端には前記蒸気弁が接続されるフランジ8が設けられており、一方、他端には蒸気通路部3へ蒸気がスムースに流れるようにノズルボックス4と呼ばれる一種の部屋のような構造物が接続されている。   One end of the steam introduction pipe 2 is provided with a flange 8 to which the steam valve is connected, while the other end is a kind of room called a nozzle box 4 so that steam smoothly flows to the steam passage portion 3. Such a structure is connected.

そして、このノズルボックス4の蒸気通路部3と対向する出口部には、この出口から流出する蒸気の流れる方向を変えるための第1段静翼5(以下第1段ノズル翼と称する)が設けられている。また、このノズルボックス4には通常4本の蒸気導入管2が結合されるとともに、これらの4本の蒸気導入管2に対応するようにノズルボックス4内にはタービンの回転方向にほぼ90°毎に4つの空間(部屋)に仕切られている。そして、この空間に対応するように、第1段静翼5もほぼ90°毎に群を成すような形で設置されている。   A first stage stationary vane 5 (hereinafter referred to as a first stage nozzle vane) for changing the flow direction of the steam flowing out from the outlet is provided at the outlet portion of the nozzle box 4 facing the steam passage portion 3. Yes. In addition, normally four steam introduction pipes 2 are coupled to the nozzle box 4, and the nozzle box 4 has approximately 90 ° in the rotational direction of the turbine so as to correspond to the four steam introduction pipes 2. Each is divided into four spaces (rooms). And corresponding to this space, the 1st stage stationary blade 5 is also installed in the form which forms a group about every 90 degrees.

蒸気タービンは、一般に図示しないタービンロータに植設されて回転する動翼6と、タービン内部ケーシング7aに固定され動翼6に流入する前の蒸気の流れ方向を変える静翼5a(ノズル翼)とからなり、これらの動翼6と静翼(ノズル翼)5aとが交互に配設されて対となり、段落を形成している。そして、通常は複数の段落により蒸気タービンが構成され、蒸気が流通する初段から最終段までの間を蒸気通路部3と呼ぶ。   The steam turbine generally includes a rotating blade 6 that is implanted in a turbine rotor (not shown) and rotates, and a stationary blade 5a (nozzle blade) that is fixed to the turbine inner casing 7a and changes the flow direction of steam before flowing into the moving blade 6. The rotor blades 6 and the stationary blades (nozzle blades) 5a are alternately arranged to form a pair. In general, a steam turbine is constituted by a plurality of paragraphs, and a portion from the first stage to the last stage where the steam flows is referred to as a steam passage portion 3.

このように第1段ノズル翼5は、蒸気タービンの中でもボイラからの高温・高圧の蒸気が最初に流入する部分に設置されているため、常に第1段ノズル翼5は高温蒸気に晒されることになる。加えて、ボイラからはスケールなどの微小固体が第1段ノズル翼5に衝突する場合もあり、その健全性の評価は蒸気タービン設備1の運転上欠かせない作業である。   As described above, the first stage nozzle blade 5 is installed in a portion of the steam turbine where the high-temperature and high-pressure steam from the boiler flows first, so that the first-stage nozzle blade 5 is always exposed to the high-temperature steam. become. In addition, a micro solid such as a scale may collide with the first stage nozzle blade 5 from the boiler, and the evaluation of the soundness is an indispensable operation for the operation of the steam turbine equipment 1.

本発明は、このような厳しい環境下に晒されている第1段ノズル翼5の損傷状況を実際にCCDカメラにて観察することにより、この段落より下流側の翼、すなわち動翼6及びノズル翼5aを含めて損傷程度を予測し、プラントとしてこの先の運転継続が可能か否か、さらには補修時期の判断等を行おうとするものである。   In the present invention, by actually observing the damage state of the first stage nozzle blade 5 exposed to such a severe environment with a CCD camera, the blades downstream of this paragraph, that is, the moving blade 6 and the nozzle. The degree of damage including the blades 5a is predicted, and it is determined whether or not the plant can continue the operation in the future, and further determine the repair timing.

図2及び図3は本発明によるタービン構造物の検査装置及び検査方法を説明するための第1の実施形態をそれぞれ示し、図2は本発明で使用されるビデオプローブキャリア(以下キャリアと呼ぶ)20がノズルボックス4内に侵入した際の状態を、ノズルボックス4出口部の第1段静翼5を平面的に展開した平面図、図3はキャリア20全体の概略構成を示す斜視図である。   2 and 3 respectively show a first embodiment for explaining a turbine structure inspection apparatus and inspection method according to the present invention, and FIG. 2 shows a video probe carrier (hereinafter referred to as a carrier) used in the present invention. FIG. 3 is a perspective view showing a schematic configuration of the carrier 20 as a whole when the first stage stationary blade 5 at the outlet portion of the nozzle box 4 is developed in a plan view.

図2及び図3において、キャリア20は、制御機器、駆動機器等を収納したキャリア本体(以下単に本体と呼ぶ)21に2軸計4本の駆動輪22が取付けられている。そして、本体21を移動可能とするため、その一方の軸もしくは両軸が本体21に収納されたモータにて駆動される。加えて、本体21の走行時の方向を制御するため、一方の軸もしくは両軸がステアリング可能となっている。   2 and 3, the carrier 20 has four drive wheels 22 mounted on a carrier main body (hereinafter simply referred to as “main body”) 21 containing control equipment, drive equipment, and the like. In order to make the main body 21 movable, one or both shafts thereof are driven by a motor housed in the main body 21. In addition, in order to control the traveling direction of the main body 21, one or both axes can be steered.

さらに、本体21の上面には、ノズル翼を撮影するためのCCDカメラ23を収納した略L字形状のプローブ24が本体21に対してプローブ回転部25を中心に回転可能に取付けられている。   Further, on the upper surface of the main body 21, a substantially L-shaped probe 24 that houses a CCD camera 23 for photographing the nozzle blades is attached to the main body 21 so as to be rotatable around the probe rotating portion 25.

なお、図示したプローブ24は固定された形状として、その動きとしては単に本体の周りに回転するだけのものを示しているが、プローブ24を多関節構造としてCCDカメラが、本体21が移動せずに本体に上下左右の視野を確保できるようにしてもよい。   The probe 24 shown in the figure is a fixed shape, and the movement is merely a rotation around the main body. However, the CCD camera with the probe 24 as an articulated structure, the main body 21 does not move. In addition, it may be possible to secure a vertical and horizontal visual field in the main body.

ところで、キャリア20は全体として、耐高温特性を有することが好ましい。なぜなら、蒸気タービンは通常高温部500℃以上、低温部でも少なくとも100℃程度の温度で運転されている。   By the way, it is preferable that the carrier 20 has high temperature resistance as a whole. This is because the steam turbine is usually operated at a temperature of about 500 ° C. or higher, and at least about 100 ° C. even in the low temperature portion.

また、保守点検時には、これらの温度が室温程度まで低下するのを待って行なわれるのが通常である。   Also, during maintenance inspections, it is usual to wait for these temperatures to drop to about room temperature.

しかし、この冷却期間は従来の保守点検の作業時間を長引かせる一因にもなっていた。さらに、ノズル翼やケーシング等に働く熱応力などは、温度の上昇時や低下時等の変化時に一番大きくなることが解析等から把握されている。これらの解析などから、ノズル翼等に形成されたクラックなどを実際に観察できるのは、この温度の変化時であることが分かる。   However, this cooling period has also contributed to prolonging the time required for conventional maintenance and inspection. Furthermore, it has been understood from analysis and the like that the thermal stress acting on the nozzle blades, the casing and the like becomes the largest when the temperature rises or falls. From these analyzes and the like, it can be seen that it is during this temperature change that the cracks formed in the nozzle blades and the like can actually be observed.

よって、キャリア20ができるだけ温度の高い時点で内部に入れることは、前記クラックなどの状態を観察でき、把握し易いというメリットがある。   Therefore, inserting the carrier 20 at the highest possible temperature has an advantage that the state such as the crack can be observed and grasped easily.

一方、本体21に搭載された各種機器の駆動のための電力供給、本体21の制御用ケーブル、CCDカメラ23からの画像情報等の電気信号の送受信及び高温のタービン内に侵入の際にCCDカメラ23等の冷却のための冷却媒体を供給するための配管類は、ケーブル回転部26を中心に回転可能に引出された接続ケーブル27を介して外部に設置された制御盤や冷却媒体供給設備と接続されている。   On the other hand, power supply for driving various devices mounted on the main body 21, transmission / reception of electric signals such as image information from the CCD camera 23, a control cable for the main body 21, and a CCD camera when entering a high-temperature turbine The piping for supplying a cooling medium for cooling, such as 23, is provided with a control panel and a cooling medium supply facility installed outside via a connection cable 27 that is drawn around the cable rotating portion 26 so as to be rotatable. It is connected.

ここで、前述したキャリア20に搭載される制御機器、駆動機器等の各部とタービンケーシングの外部に設置される制御盤等の各部の構成について図4により説明する。   Here, the configuration of each part such as a control device and drive device mounted on the carrier 20 and a part such as a control panel installed outside the turbine casing will be described with reference to FIG.

図4において、キャリア20には、電力供給系41、機器冷却系42、駆動輪電動機43、プローブ回転用駆動部44、CCDカメラ23で撮影された画像データ出力部45及び外部通信用I/F46を備えている。   In FIG. 4, a carrier 20 includes a power supply system 41, an equipment cooling system 42, a drive wheel motor 43, a probe rotation drive unit 44, an image data output unit 45 captured by the CCD camera 23, and an external communication I / F 46. It has.

一方、外部の制御盤には電力供給部47、冷却媒体供給部48、信号制御部49、通信用I/F50及び制御部51を備えている。制御部51は、電動機制御部52、プローブ回転制御部53、位置情報演算部54、画像処理演算部55、画像比較処理部56、現状ノズル翼撮影画像ファイル57及び新製時ノズル翼撮影画像ファイル58から構成されている。   On the other hand, the external control panel includes a power supply unit 47, a cooling medium supply unit 48, a signal control unit 49, a communication I / F 50, and a control unit 51. The control unit 51 includes an electric motor control unit 52, a probe rotation control unit 53, a position information calculation unit 54, an image processing calculation unit 55, an image comparison processing unit 56, a current nozzle blade photographed image file 57, and a newly produced nozzle blade photographed image file. 58.

また、制御盤にはCCDカメラで撮影された画像や各種データを表示するディスプレイ59及び入力装置60が接続されている。   In addition, a display 59 and an input device 60 for displaying images taken with a CCD camera and various data are connected to the control panel.

次に上記のように構成されたタービン構造物の検査装置において、キャリアを蒸気タービンの蒸気通路部に挿入してから実際にタービンノズルの撮影が開始されるまでの作業手順について図5及び図6により説明する。   Next, in the turbine structure inspection apparatus configured as described above, the work procedure from when the carrier is inserted into the steam passage portion of the steam turbine until the actual shooting of the turbine nozzle is started will be described with reference to FIGS. Will be described.

タービンケーシングを開けない通常の点検では、図1に示す蒸気タービン設備1に対して蒸気導入管2を介して上流側に配される図示しない蒸気弁については常に高圧に晒されるため、この蒸気弁を蒸気導入管2から外した状態で点検が行なわれることになる。   In a normal inspection in which the turbine casing is not opened, a steam valve (not shown) disposed upstream of the steam turbine equipment 1 shown in FIG. 1 via the steam introduction pipe 2 is always exposed to high pressure. Is inspected in a state in which is removed from the steam introduction pipe 2.

このような状態とすれば、ケーシング等に特別な開口部を設けなくても蒸気導入管2の開口部からキャリア20を挿入することが可能となる。   In such a state, the carrier 20 can be inserted from the opening of the steam introduction pipe 2 without providing a special opening in the casing or the like.

そこで、まずキャリア20を、蒸気導入管2を通して蒸気通路部に挿入する(ステップS1)。   Therefore, first, the carrier 20 is inserted into the steam passage portion through the steam introduction pipe 2 (step S1).

蒸気通路部に挿入されたキャリア20は、CCDカメラ23を稼動させることにより、ノズルボックス内の周囲状況が外部から確認できる。一方、設計図面とキャリア20の形状から、キャリア20を蒸気導入管2から挿入した際にこのキャリア20がノズルボックス4内のどの位置に挿入されるかを予測することは可能であり、またその時にノズルボックス4内のどのノズル翼5がCCDカメラ23に映し出されるかもおよそ特定できる。   The carrier 20 inserted in the vapor passage portion can confirm the surrounding situation in the nozzle box from the outside by operating the CCD camera 23. On the other hand, from the design drawing and the shape of the carrier 20, it is possible to predict where the carrier 20 is inserted in the nozzle box 4 when the carrier 20 is inserted from the steam introduction pipe 2. In addition, it is possible to specify approximately which nozzle blade 5 in the nozzle box 4 is projected on the CCD camera 23.

従って、これら両方の情報から、挿入されたキャリア20のノズルボックス4内での位置を特定することができる(ステップS2)。   Therefore, the position of the inserted carrier 20 in the nozzle box 4 can be specified from both pieces of information (step S2).

挿入された位置が目的とする位置か否か、すなわちキャリア20を挿入位置から移動するか否かを判断する(ステップS3)。これは、目的とするノズル翼5がCCDカメラ23の視野内にあるか否かだけで判断するのではなく、1つのノズル翼5を映した際の画像に、損傷を受け易いノズル後縁付近が映るか否かの判断も必要である。すなわち、キャリア上のCCDカメラ23があまりノズル翼5に近づきすぎても、離れすぎてもノズル後縁付近が映らなくなる可能性があるため、図2に示すノズル翼5の前縁とCCDカメラ23との間隔Wは適度に且つ移動時にはこの間隔Wをできるだけ保つようにしなければならない。   It is determined whether or not the inserted position is a target position, that is, whether or not the carrier 20 is moved from the insertion position (step S3). This is not based on whether or not the target nozzle blade 5 is within the field of view of the CCD camera 23, but in the vicinity of the nozzle trailing edge that is easily damaged in the image when one nozzle blade 5 is projected. It is also necessary to judge whether or not That is, even if the CCD camera 23 on the carrier is too close to the nozzle blade 5 or too far away, there is a possibility that the vicinity of the nozzle trailing edge may not be reflected, so the front edge of the nozzle blade 5 and the CCD camera 23 shown in FIG. The interval W must be moderate and kept as much as possible during movement.

次にステップS3にてキャリア20が移動すると判断された場合には、キャリア20の走行輪22を駆動させることにより、ノズルボックス4内を移動する。その際にCCDカメラ23にてノズル翼5を映しながら走行することにより、走行の際にキャリア20が通過するノズル翼5の枚数をカウントすることにより、移動距離の測定が可能となる(ステップS4)。従って、キャリア20には移動距離を測定するための特別のセンサ、距離計等の装備を備える必要がなくなる。   Next, when it is determined in step S <b> 3 that the carrier 20 moves, the traveling wheel 22 of the carrier 20 is driven to move in the nozzle box 4. At this time, the traveling distance can be measured by counting the number of nozzle blades 5 through which the carrier 20 passes during traveling by traveling while projecting the nozzle blades 5 with the CCD camera 23 (step S4). ). Accordingly, the carrier 20 does not need to be equipped with a special sensor for measuring the moving distance, a distance meter, or the like.

また、移動の際に映した各ノズル翼の画像を比較することにより、キャリア20がノズル翼列に対して平行に移動しているか否かの判断ができる(ステップS5)。すなわち、移動に伴い映し出されたノズル翼5が徐々に拡大していれば、キャリア20がノズル列に近づきながら走行していることになり、逆にノズル翼が徐々に縮小されて映し出されればキャリア20はノズル列から離れながら移動していることになる。このノズル翼にキャリア20が平行に移動しているか否かは、後述するノズル翼に生じた損傷の評価時に非常に重要になるため、この段階で調整しておく必要がある。   Further, by comparing the images of the nozzle blades displayed during the movement, it can be determined whether or not the carrier 20 is moving in parallel with the nozzle blade row (step S5). That is, if the nozzle blades 5 projected along with the movement are gradually expanding, the carrier 20 is traveling while approaching the nozzle row, and conversely if the nozzle blades are gradually contracted and projected, the carrier is moved. 20 is moving away from the nozzle row. Whether or not the carrier 20 is moving in parallel with the nozzle blade is very important when evaluating damage caused to the nozzle blade, which will be described later, and must be adjusted at this stage.

従って、キャリア20がノズル翼列に対して平行に移動していると判断されると、カウントされたノズル翼枚数からキャリアの位置を演算するとともに、現在の走行状況を維持するようにする(ステップS6)。   Therefore, if it is determined that the carrier 20 is moving in parallel with the nozzle blade row, the position of the carrier is calculated from the counted number of nozzle blades and the current traveling state is maintained (step). S6).

一方、キャリア20がノズル翼列に対して平行に移動していないと判断した場合には、キャリアの駆動輪22のステアリングを調整して平行に走行するように調整を行う(ステップS7)。そして、再度キャリアを走行させることにより、その走行状態の確認を行う(ステップS4に戻る)。   On the other hand, when it is determined that the carrier 20 is not moving in parallel with the nozzle blade row, the steering of the carrier driving wheel 22 is adjusted so that the carrier travels in parallel (step S7). Then, by running the carrier again, the running state is confirmed (return to step S4).

次にステップS6にてキャリアの位置を演算し、現在の走行状況を維持した状態で、移動した位置でのノズル翼の撮影が可能か否かの判断を行う(ステップS8)。これは、前記ステップS3やステップS5で判断したノズル翼に対する遠近状態や平行状態の判断ではなく、翼列に対するキャリア(CCDカメラ)の前後位置を調整するものであり、いわばCCDカメラと、対象とするノズル翼の位置関係の微調整を行うものである。この調整により、より鮮明にノズル翼後縁の撮影が可能となる。   Next, in step S6, the position of the carrier is calculated, and it is determined whether or not the nozzle blade can be photographed at the moved position while maintaining the current traveling state (step S8). This is not the determination of the perspective state or the parallel state with respect to the nozzle blades determined in step S3 or step S5, but rather the adjustment of the front and rear positions of the carrier (CCD camera) with respect to the blade row. Fine adjustment of the positional relationship of the nozzle blades is performed. This adjustment makes it possible to photograph the nozzle blade trailing edge more clearly.

ここで、特に問題なく撮影可能と判断された場合には、そのまま撮影を開始する(ステップS9)。なお、ステップS3にてキャリアを、その挿入された位置から移動を行わないと判断した場合には、直接このステップS9に移り、その場で撮影を開始する。   Here, if it is determined that photographing is possible without any particular problem, photographing is started as it is (step S9). If it is determined in step S3 that the carrier is not moved from the inserted position, the process directly moves to step S9 to start shooting on the spot.

一方、ステップS8にて撮影が不可で移動が必要と判断された場合には、キャリア自体をさらに移動させるかを判断する(ステップS10)。キャリアの移動までは必要ないと判断した場合には、CCDカメラを支持するプローブの回転を行うか否かの判断を行う(ステップS11)。このステップS11でプローブの回転のみにて撮影が可能と判断した場合には、プローブの回転角度の情報を保存する(ステップS12)。そして、ステップS9に戻って撮影を開始する。   On the other hand, if it is determined in step S8 that photographing is not possible and movement is necessary, it is determined whether the carrier itself is to be further moved (step S10). If it is determined that it is not necessary to move the carrier, it is determined whether or not to rotate the probe that supports the CCD camera (step S11). If it is determined in this step S11 that imaging can be performed only by rotating the probe, information on the rotation angle of the probe is stored (step S12). And it returns to step S9 and imaging | photography is started.

なお、ステップS10にてキャリアの移動が必要と判断した場合には、ステップSS4まで戻り、再度走行を開始する。   If it is determined in step S10 that the carrier needs to be moved, the process returns to step SS4 and starts running again.

一方、ステップS11にてCCDカメラのプローブの回転が必要でないと判断した場合には、キャリアの制御機器に不具合の発生状態を判断する(ステップS13)。これは、ステップS8で撮影不可能な位置であると判断したにもかかわらず、キャリアの移動もプローブの回転も必要でないと判断したことに対する診断を行うことにある。ここで、不具合が発生したと判断された場合には、キャリアは撮影を断念し、挿入位置まで戻る(ステップS14)。そして、修理のために蒸気導入管から引上げられる(ステップS15)。   On the other hand, if it is determined in step S11 that the rotation of the probe of the CCD camera is not necessary, it is determined whether or not a problem has occurred in the carrier control device (step S13). This is to diagnose that it is determined that neither the movement of the carrier nor the rotation of the probe is necessary even though it is determined in step S8 that the position cannot be photographed. If it is determined that a problem has occurred, the carrier gives up shooting and returns to the insertion position (step S14). Then, it is pulled up from the steam introduction pipe for repair (step S15).

また、ステップS13の診断の結果、制御機器に不具合の発生がなかった場合でも、制御機器以外の不具合が発生したと判断し、撮影不能として挿入位置まで戻り(ステップS14)、蒸気導入管から引上げられることになる(ステップS15)。   Further, as a result of the diagnosis in step S13, even if there is no failure in the control device, it is determined that a failure other than that in the control device has occurred, and the camera returns to the insertion position because it cannot be photographed (step S14). (Step S15).

ステップS9にて撮影されたノズル翼は、その画像データとともにキャリアの位置情報、CCDカメラ(プローブ)の回転角度情報などとともに保存データとして書き出される。   The nozzle blades photographed in step S9 are written as saved data together with the image data and carrier position information, CCD camera (probe) rotation angle information, and the like.

次に別のノズル翼を撮影するか否かの判断を行う(ステップS16)。   Next, it is determined whether or not another nozzle blade is to be photographed (step S16).

そして、別のノズル翼を撮影する場合には、キャリア自体をさらに移動させるかを判断(ステップS17)し、移動が必要な場合には前述したステップS4に戻って同様の手順を踏み、キャリアの移動が必要ない場合には、CCDカメラを支持するプローブの回転を行うか否かの判断(ステップS18)を行う。   If another nozzle blade is to be photographed, it is determined whether the carrier itself is to be further moved (step S17). If movement is necessary, the procedure returns to step S4 described above, and the same procedure is followed. When the movement is not necessary, it is determined whether or not to rotate the probe that supports the CCD camera (step S18).

また、プローブの回転が必要な場合はプローブを回転させると共に、プローブの回転角度の情報を保存し(ステップS12)、ステップS9に戻って撮影を開始し、プローブの回転が必要ない場合にはステップS13に戻って前述同様の判断がなされる。   If the probe needs to be rotated, the probe is rotated and the information on the probe rotation angle is stored (step S12), and the process returns to step S9 to start imaging. Returning to S13, the same determination as described above is made.

一方、ステップS16にて別のノズル翼の撮影は行なわないと判断した場合には、キャリアの現在位置を確認した後、キャリアの挿入位置まで戻り(ステップS14)、その後蒸気導入管から引上げられる(ステップS15)。それぞれのステップS14,S15での判断の後のステップは、既に上述した通りなので、その説明は省略する。   On the other hand, if it is determined in step S16 that another nozzle blade is not photographed, the current position of the carrier is confirmed, and then the carrier is returned to the insertion position (step S14). Step S15). Since the steps after the determinations in steps S14 and S15 have already been described above, the description thereof will be omitted.

このように図5及び図6に示す作業手順ではキャリアの挿入位置や撮影位置等の情報は、予め図面上での検討による予測情報とキャリアに設置されたCCDカメラからの実際の映像とから求める。   As described above, in the work procedure shown in FIGS. 5 and 6, information such as the insertion position and the photographing position of the carrier is obtained in advance from the prediction information based on the examination on the drawings and the actual video from the CCD camera installed on the carrier. .

従って、キャリア上には特別なセンサ類を設置する必要がないため、前記したように蒸気タービンが完全に冷却された状態である必要はなく、CCDカメラ、キャリアの駆動モータ及びプローブの回転モータなどが損傷を受けない程度の温度であれば、いつでも挿入可能である。   Therefore, since it is not necessary to install special sensors on the carrier, the steam turbine does not have to be completely cooled as described above, such as a CCD camera, a carrier drive motor, a probe rotation motor, etc. Can be inserted at any time as long as the temperature is not damaged.

なお、上記説明では、キャリアが静止してCCDカメラで翼1枚1枚の静止画像を撮影することを前提にしているが、それ以外にもキャリアをゆっくりと走行させながらそのとき通過する各ノズル翼を動画状態で順次撮影しても、その時に同時にキャリアの位置情報をその動画とシンクロさせて書き出すことができれば、特に問題はない。   In the above description, it is assumed that the carrier is stationary and a still image of each wing is taken with a CCD camera. In addition to this, each nozzle that passes through the carrier while slowly running the carrier is used. Even if the wings are sequentially photographed in a moving image state, there is no problem as long as the carrier position information can be synchronized with the moving image and written at the same time.

次に上記のような作業手順によりキャリアを蒸気タービンの蒸気通路部に挿入され、タービンノズルの撮影によりキャリアをゆっくりと走行させながらそのとき通過する各ノズル翼を順次撮影して得られる画像データと、その時得られるキャリアの位置情報をもとにタービン翼の損傷を判定する方法について述べる。   Next, image data obtained by sequentially shooting each nozzle blade passing through the carrier while slowly moving the carrier by photographing the turbine nozzle by photographing the turbine nozzle by the above-described work procedure, A method for determining damage to a turbine blade based on the carrier position information obtained at that time will be described.

図7はタービン翼の損傷を判定する方法の第1の実施例を示すブロック図である。   FIG. 7 is a block diagram illustrating a first embodiment of a method for determining turbine blade damage.

図7において、前述した作業手順により、タービン翼毎に撮影された画像データと、過去に撮影された同じ位置のタービン翼の画像データとを比べることで、損傷の有無を判定することができると共に、損傷量の評価も可能である。   In FIG. 7, by comparing the image data photographed for each turbine blade with the image data of the turbine blade at the same position photographed in the past by the above-described work procedure, it is possible to determine whether or not there is damage. The amount of damage can also be evaluated.

図8はタービン翼の損傷を判定する方法の第2の実施例を示すブロック図である。   FIG. 8 is a block diagram illustrating a second embodiment of a method for determining turbine blade damage.

図8において、前述した作業手順により、タービン翼毎に撮影された画像データと、キャリアの位置情報を記録した後、ある翼に対して得られた複数の画像を用いて、特定の部位の距離を計測し、それから損傷量を決定するものである。   In FIG. 8, after recording the image data photographed for each turbine blade and the position information of the carrier by the above-described work procedure, a plurality of images obtained with respect to a certain blade are used to determine the distance of a specific part. Is measured, and then the amount of damage is determined.

すなわち、タービン翼の画像データ及びキャリアの位置情報として、
タービン翼1〜nの画像とその記録位置A、タービン翼1〜nの画像とその記録位置Bをそれぞれ記録し、これらの画像データを用いて、記録位置AとBの距離・方向の差及び記録位置AとBの画像から計測対象物の寸法を計算し、その結果を基にタービン翼1〜nの損傷量を判定する。
That is, as turbine blade image data and carrier position information,
The images of the turbine blades 1 to n and their recording positions A, the images of the turbine blades 1 to n and their recording positions B are recorded, and using these image data, the difference in distance and direction between the recording positions A and B, and The dimensions of the measurement object are calculated from the images at the recording positions A and B, and the damage amount of the turbine blades 1 to n is determined based on the result.

この場合、ビデオプローブの位置が固定されているので、キャリアの走行に伴って記録した画像を用いると、ビデオプローブの移動量を基に距離計測が可能である。また、ビデオプローブの移動量の記録は、例えば、キャリアの移動距離と画像記録を同期させるか、又はビデオに録画した画像をその時間とキャリアの速度から距離を決めるなどの方法により可能である。   In this case, since the position of the video probe is fixed, distance measurement is possible based on the amount of movement of the video probe using an image recorded as the carrier travels. The moving amount of the video probe can be recorded, for example, by synchronizing the moving distance of the carrier and the image recording, or determining the distance of the image recorded on the video from the time and the speed of the carrier.

このように本発明の第1の実施形態によれば、多様なタービン翼列の蒸気通路部形状、寸法にあわせて、ビデオプローブキャリアの進行方向とビデオプローブ先端が向いている角度、又はデオプローブキャリアの車軸とビデオプローブとの位置の少なくとも一方を決定した状態で、デオプローブキャリアを安定的に翼列に沿って走行させることが可能となるので、点検用のビデオプローブを計測対象に対する位置を安定的にコントロールすることが可能となり、タービン翼の状況を定量的に検査することができる。   As described above, according to the first embodiment of the present invention, the angle at which the moving direction of the video probe carrier and the tip of the video probe are oriented, or the video probe according to the shape and size of the steam passages of various turbine blade rows Since at least one of the position of the carrier axle and the video probe is determined, the deo-probe carrier can be stably moved along the blade row. It becomes possible to stably control, and the state of the turbine blade can be inspected quantitatively.

以上はキャリアの挿入位置及びプローブの回転角度を人為的に確認しながら走査する場合について説明したが、次にこれらキャリアの挿入位置及びプローブの回転角度を自動的に制御する第2の実施形態を説明する。   The above is a description of the case where scanning is performed while artificially checking the carrier insertion position and the probe rotation angle. Next, a second embodiment for automatically controlling the carrier insertion position and the probe rotation angle will be described. explain.

まず、前述したキャリア20に搭載される制御機器、駆動機器等の各部とタービンケーシングの外部に設置される制御盤等の各部の構成について図9により説明するに、図4と同一部分には同一符号を付して述べる。   First, the configuration of each part such as the control device and drive device mounted on the carrier 20 and the control panel installed outside the turbine casing will be described with reference to FIG. It is described with a reference numeral.

図9において、キャリア20には、キャリア制御装置61、電力供給系41、機器冷却系42、駆動系62、演算処理系63、外部通信系64を備えている。駆動系61は、駆動輪電動機43、プローブ回転用駆動部44、CCDカメラ23で撮影された画像データ出力部45、プローブ関節回転機器65及びステアリング駆動機器66から構成され、演算処理系63は走行距離演算器67、自位置演算器68及びCCDカメラ位置演算器69から構成され、外部通信系64には外部通信用I/F46が設けられている。   In FIG. 9, the carrier 20 includes a carrier control device 61, a power supply system 41, a device cooling system 42, a drive system 62, an arithmetic processing system 63, and an external communication system 64. The drive system 61 includes a drive wheel motor 43, a probe rotation drive unit 44, an image data output unit 45 photographed by the CCD camera 23, a probe joint rotation device 65, and a steering drive device 66. The distance calculator 67, the own position calculator 68, and the CCD camera position calculator 69 are provided. The external communication system 64 is provided with an external communication I / F 46.

一方、外部の制御盤には電力供給部47、冷却媒体供給部48、信号制御部49、通信用I/F50、データ処理部70及び駆動制御部71を備えている。データ処理部70は位置情報演算部54、画像処理演算部55、画像比較処理部56、現状ノズル翼撮影画像ファイル57、新製時ノズル翼撮影画像ファイル58及び蒸気通路部設計情報データベース72から構成され、駆動制御部71は電動機制御部52、プローブ回転制御部53、ステアリング制御部73及びプローブ関節制御部74から構成されている。   On the other hand, the external control panel includes a power supply unit 47, a cooling medium supply unit 48, a signal control unit 49, a communication I / F 50, a data processing unit 70, and a drive control unit 71. The data processing unit 70 includes a position information calculation unit 54, an image processing calculation unit 55, an image comparison processing unit 56, a current nozzle blade photographed image file 57, a newly produced nozzle blade photographed image file 58, and a steam passage design information database 72. The drive control unit 71 includes an electric motor control unit 52, a probe rotation control unit 53, a steering control unit 73, and a probe joint control unit 74.

次に上記のように構成された自動制御によるタービン構造物の検査装置において、キャリアを蒸気タービンの蒸気通路部に挿入してから実際にタービンノズルの撮影が開始されるまでの作業手順を図10及び図11により説明するに、図5及び図6と同一ステップ部分の説明については省略し、ここでは異なる点についてのみ述べる。   Next, in the automatic control turbine structure inspection apparatus configured as described above, FIG. 10 shows an operation procedure from the insertion of the carrier into the steam passage portion of the steam turbine until the actual shooting of the turbine nozzle is started. 11 and FIG. 11, the description of the same step portion as that of FIG. 5 and FIG.

図10及び図11において、蒸気通路部からキャリアを挿入するステップS21については図5のステップS1と同じである。   10 and 11, step S21 for inserting the carrier from the steam passage is the same as step S1 in FIG.

次にキャリアは自分の位置情報を取得する。この位置情報は、次のようにして取得される。すなわち、キャリアの挿入前に予めキャリアの挿入位置を設計図面から予測すると共に、この予測位置を位置情報として計算しておく。そして、実際にキャリアが挿入された後に、キャリア上のCCDカメラからの情報に基づいて予め予測した位置と実際の位置との偏差を算出し、これを補正することにより挿入された正確な位置情報が得られる。その後、この位置情報を外部から送信することにより、キャリア20は正確な位置を得ることができ、以降外部からの位置情報を得ることなく走行が可能となる(S22)。   Next, the carrier acquires his / her position information. This position information is acquired as follows. That is, the carrier insertion position is predicted in advance from the design drawing before the carrier is inserted, and the predicted position is calculated as position information. Then, after the carrier is actually inserted, the accurate position information inserted by calculating the deviation between the position predicted in advance and the actual position based on the information from the CCD camera on the carrier and correcting it. Is obtained. Thereafter, by transmitting this position information from the outside, the carrier 20 can obtain an accurate position, and thereafter can travel without obtaining position information from the outside (S22).

次に図5のステップS3と同様に挿入された位置が目的とする位置か否か、すなわちキャリアを挿入位置から移動するか否かを判断する(S23)。このステップS23で移動すると判断した場合には、走行輪を駆動することによりノズルボックス内の移動を開始する。その際、駆動輪の回転数や駆動モータの回転数等の情報より、挿入位置からの移動量Lの情報を常にキャリア内部で演算している(ステップS24)。   Next, as in step S3 of FIG. 5, it is determined whether or not the inserted position is a target position, that is, whether or not the carrier is moved from the insertion position (S23). If it is determined in this step S23 that it moves, the movement in the nozzle box is started by driving the traveling wheels. At this time, information on the amount of movement L from the insertion position is always calculated inside the carrier based on information such as the rotational speed of the drive wheels and the rotational speed of the drive motor (step S24).

一方、キャリア20がノズルボックス4内に挿入された段階で、挿入状態にあるキャリア上のCCDカメラプローブの各関節の角度情報を取得する(ステップS25)。この情報により、CCDカメラがキャリア本体上でどの方向を向いているかの演算が可能となる(ステップS26)。   On the other hand, when the carrier 20 is inserted into the nozzle box 4, angle information of each joint of the CCD camera probe on the inserted carrier is acquired (step S25). With this information, it is possible to calculate which direction the CCD camera is facing on the carrier body (step S26).

ステップS24にてキャリアの移動の際には、図5のステップS5と同様にノズル翼列にキャリア本体が平行に移動しているか否かの判断を行う(ステップS27)。   When the carrier is moved in step S24, it is determined whether or not the carrier body is moving in parallel with the nozzle blade row in the same manner as in step S5 of FIG. 5 (step S27).

そして、キャリア本体が平行に移動していると判断された場合には、ステップS26で得られたCCDカメラの本体上での位置情報とキャリア本体の移動量Lとの情報から、蒸気通路部3内におけるCCDカメラの絶対位置の算出が可能となる(ステップS28)。   If it is determined that the carrier body is moving in parallel, the vapor passage section 3 is obtained from the positional information on the body of the CCD camera obtained in step S26 and the information on the movement amount L of the carrier body. The absolute position of the CCD camera inside can be calculated (step S28).

なお、これらの計算を行う際には、キャリア本体が挿入位置から移動した距離等キャリアが自立的に求める情報と、予め設計図面から求められた蒸気通路部設計情報DBとを比較参照して補正しながら正確な位置を演算する。   When performing these calculations, the information such as the distance that the carrier body has moved from the insertion position is determined by the carrier independently, and the steam passage design information DB previously obtained from the design drawing is compared and referenced for correction. While calculating the exact position.

一方、ステップS27でキャリアが平行に移動していないと判断された場合は、そのまま走行してもCCDカメラプローブの関節角度を変えることにより、実質的にCCDカメラがノズル翼に対して平行位置が保たれるような修正が可能か否かの判断を行う(ステップS29)。そして、平行位置が保たれると判断された場合には、そのままの走行状態としてステップS28に移る。   On the other hand, if it is determined in step S27 that the carrier has not moved in parallel, the CCD camera can be substantially parallel to the nozzle blades by changing the joint angle of the CCD camera probe even if the carrier travels as it is. It is determined whether or not such correction can be maintained (step S29). And when it is judged that a parallel position is maintained, it moves to step S28 as a driving state as it is.

一方、ステップS29で、カメラプローブの関節角度の調整のみでは平行位置が保たれないと判断した場合には、キャリア20のステアリングを調整することにより平行に移動可能なように調整する(ステップS30)。   On the other hand, if it is determined in step S29 that the parallel position cannot be maintained only by adjusting the joint angle of the camera probe, adjustment is made so that the carrier 20 can be moved in parallel by adjusting the steering of the carrier 20 (step S30). .

なお、ステップS27〜ステップS30までのノズル翼とキャリア20の本体21が平行に走行しているか否かの判断は、第1の実施形態と同様にCCDカメラからの映像を見て確認するのが確実である。しかし、本実施形態では、それに加えてキャリア20のステアリング角度情報αを得ること(ステップS31)により、この角度情報αとキャリアの移動量情報Lとから、移動方向を演算することが可能であり、この演算結果と蒸気通路部設計情報DBを参照することにより数値的にノズル翼列との平行状態の把握も可能である。   It should be noted that whether or not the nozzle blades and the main body 21 of the carrier 20 are traveling in parallel from step S27 to step S30 is confirmed by looking at the image from the CCD camera as in the first embodiment. Sure. However, in this embodiment, in addition to this, by obtaining the steering angle information α of the carrier 20 (step S31), it is possible to calculate the movement direction from the angle information α and the carrier movement amount information L. By referring to the calculation result and the steam passage design information DB, it is possible to numerically grasp the parallel state with the nozzle blade row.

ステップS32〜ステップS41については、第1の実施形態と同じであり、その移動やプローブの位置変更の際にキャリアが参照する情報が、単にCCDカメラからの情報のみか、キャリア自体が演算した位置情報によるかの違いがあるだけである。   Steps S32 to S41 are the same as in the first embodiment, and the information referred to by the carrier when moving or changing the position of the probe is only information from the CCD camera or the position calculated by the carrier itself. There is only a difference depending on the information.

前述した作業手順により得られたタービン翼画像データとキャリアの位置データを基にタービン翼の損傷を判定する方法については前述した第1の実施例及び第2の実施例と同様なので、ここではその説明を省略する。   The method for determining damage to the turbine blade based on the turbine blade image data and the carrier position data obtained by the above-described work procedure is the same as in the first and second embodiments described above. Description is omitted.

このように本発明の第2の実施形態によれば、キャリアの挿入位置及びプローブの回転角度を自動制御されるので、最小限の人為的な判断により点検用のビデオプローブを計測対象に対する位置を安定的にコントロールすることが可能となり、タービン翼の状況を定量的に検査することができる。   As described above, according to the second embodiment of the present invention, the insertion position of the carrier and the rotation angle of the probe are automatically controlled, so that the position of the video probe for inspection with respect to the measurement target can be determined with minimal human judgment. It becomes possible to stably control, and the state of the turbine blade can be inspected quantitatively.

上記第1の実施形態及び第2の実施形態において、本体21に取付けられる駆動輪22として強磁性体の駆動輪を取付けるか、駆動輪22に代えてキャタピラのような無限軌道を設けてタービン内部の走行面に高い密着性を持たせたるようにしてもよい。   In the first and second embodiments, a ferromagnetic drive wheel is attached as the drive wheel 22 attached to the main body 21, or an endless track such as a caterpillar is provided in place of the drive wheel 22 so that the interior of the turbine is The traveling surface may be provided with high adhesion.

また、上記第1の実施形態及び第2の実施形態では、本体21に取付けられる駆動輪22の一方の軸もしくは両軸がモータで駆動されるようにしたが、例えば4輪を別々のモータで駆動させるようにしてもよく、さらにステアリング用のモータを別途設けて駆動するようにしてもよい。   In the first embodiment and the second embodiment, one or both shafts of the drive wheels 22 attached to the main body 21 are driven by a motor. For example, four wheels can be driven by separate motors. It may be driven, and a steering motor may be separately provided and driven.

このようにすれば、ビデオプローブキャリアの走行方向に修正を加えるための舵取りを容易に行うことが可能となる。   In this way, it is possible to easily perform steering for correcting the traveling direction of the video probe carrier.

さらに、上記第1の実施形態及び第2の実施形態において、本体21に同じ径の駆動輪22を4輪取付けるようにしたが、キャリア20が走行するラインが図12(a)に示すように一様に傾いている場合、或いは同図(b)に示すノズルボックスのように湾曲している場合には駆動輪の内外輪の径を変更するか、径の異なる複数の駆動輪22a,22bを設けることにより、翼列に対して一定の距離を保ったまま、安定走行が可能である。   Further, in the first and second embodiments, four drive wheels 22 having the same diameter are attached to the main body 21, but the line on which the carrier 20 travels is as shown in FIG. 12 (a). When it is inclined uniformly or when it is curved like the nozzle box shown in FIG. 5B, the diameter of the inner and outer wheels of the driving wheel is changed or a plurality of driving wheels 22a and 22b having different diameters are used. By providing this, stable running is possible while maintaining a certain distance from the blade row.

一方、上記第1の実施形態及び第2の実施形態において、同じ径の駆動輪22を4輪取付けたキャリア20を傾斜面のラインを安定走行させるためには、進行方向に沿って各駆動輪が傾斜面に接していることが必要である。特に、傾斜面の径がキャリア20の長さに対して小さい場合には、図13に示すようにキャリア20に傾斜面に対して鉛直方向に沿って曲がることが可能なヒンジ28を介して補助キャリア29を連結することで、殆どの駆動輪20を安定した状態で傾斜面に接触させることができる。   On the other hand, in the first embodiment and the second embodiment, in order to make the carrier 20 on which the four drive wheels 22 of the same diameter are attached run stably on the line of the inclined surface, each drive wheel along the traveling direction. Must be in contact with the inclined surface. In particular, when the diameter of the inclined surface is smaller than the length of the carrier 20, the carrier 20 is assisted through a hinge 28 that can be bent along the vertical direction with respect to the inclined surface as shown in FIG. By connecting the carrier 29, most of the driving wheels 20 can be brought into contact with the inclined surface in a stable state.

また、上記第1の実施形態及び第2の実施形態において、キャリア20は、タービン翼列を撮影するため、蒸気通路部よりノズルボックスを通って撮影開始位置の近くまでビデオプローブを運搬するが、その際に駆動輪が走行面に対して確実に着地させる必要がある。そこで、図14に示すようにキャリア20をガイド30に沿って挿入し、且つガイドの先端からノズルボックス側に向けて屈曲する傾斜板31にキャリア20の駆動輪を着地させて走行可能にしておくことにより、キャリア20をタービン翼列の撮影位置に安定に走行させることができる。   In the first embodiment and the second embodiment, the carrier 20 conveys the video probe from the steam passage portion to the vicinity of the photographing start position through the nozzle box in order to photograph the turbine cascade. At that time, it is necessary to make sure that the drive wheels are landed on the traveling surface. Therefore, as shown in FIG. 14, the carrier 20 is inserted along the guide 30, and the driving wheel of the carrier 20 is landed on the inclined plate 31 that is bent from the tip of the guide toward the nozzle box side so that the carrier 20 can run. Thus, the carrier 20 can be stably driven to the photographing position of the turbine blade row.

本発明が適用される一般的な蒸気タービン設備の構造を示す断面図。Sectional drawing which shows the structure of the general steam turbine equipment with which this invention is applied. 本発明によるタービン構造物の検査装置及び検査方法を説明するための第1の実施形態を示す平面図。The top view which shows 1st Embodiment for demonstrating the inspection apparatus and inspection method of the turbine structure by this invention. 同実施形態において、キャリア全体の概略構成を示す斜視図。The perspective view which shows schematic structure of the whole carrier in the same embodiment. 同実施形態において、キャリアに搭載される制御機器、駆動機器等の各部とタービンケーシングの外部に設置される制御盤等の各部の構成を示すブロック図。The block diagram which shows the structure of each part, such as a control panel installed in the exterior of a turbine casing, and each part, such as a control apparatus and a drive apparatus mounted in a carrier, in the same embodiment. 同実施形態において、キャリアによりタービンノズルを撮影するまでの作業手順を示すフローチャート。In the same embodiment, the flowchart which shows the operation | work procedure until it image | photographs a turbine nozzle with a carrier. 図5に続く作業手順を示すフローチャート。The flowchart which shows the operation | work procedure following FIG. 同実施形態において、タービン翼の損傷を判定する方法の第1の実施例を示すブロック図。The block diagram which shows the 1st Example of the method of determining the damage of a turbine blade in the embodiment. 同実施形態において、タービン翼の損傷を判定する方法の第2の実施例を示すブロック図。The block diagram which shows the 2nd Example of the method of determining the damage of a turbine blade in the embodiment. 本発明の第2の実施形態において、キャリアに搭載される制御機器、駆動機器等の各部とタービンケーシングの外部に設置される制御盤等の各部の構成を示すブロック図。The block diagram which shows the structure of each part, such as a control panel installed in the exterior of a turbine casing, and each part, such as a control apparatus and a drive apparatus mounted in a carrier, in the 2nd Embodiment of this invention. 同実施形態において、自動制御によるキャリアによりタービンノズルを撮影するまでの作業手順を示すフローチャート。The flowchart which shows the operation | work procedure until imaging | photography of a turbine nozzle with the carrier by automatic control in the same embodiment. 図11に続く作業手順を示すフローチャート。The flowchart which shows the operation | work procedure following FIG. 本発明の第1の実施形態及び第2の実施形態において、キャリアに取付けられる駆動輪の他の構成例を示す図。The figure which shows the other structural example of the driving wheel attached to a carrier in the 1st Embodiment and 2nd Embodiment of this invention. 本発明の第1の実施形態及び第2の実施形態において、キャリアを傾斜面のラインを安定走行させるための構成例の説明図。Explanatory drawing of the structural example for making the carrier run stably on the line of an inclined surface in the 1st Embodiment and 2nd Embodiment of this invention. 本発明の第1の実施形態及び第2の実施形態において、キャリアの駆動輪を走行面に着地させてタービン翼列の撮影位置に安定に移動させるための構成例の説明図。In the 1st Embodiment of this invention and 2nd Embodiment, explanatory drawing of the structural example for making the driving wheel of a carrier land on a running surface, and moving to the imaging position of a turbine blade row stably. 従来のタービン構造物の検査方法を説明するための概略図。Schematic for demonstrating the inspection method of the conventional turbine structure.

符号の説明Explanation of symbols

20…キャリア、21…キャリア本体、22…駆動輪、23…CCDカメラ、24…プローブ、25…プローブ回転部、26…ケーブル回転部、27…接続ケーブル、28…ヒンジ、29…補助キャリア、30…ガイド、31…傾斜板、41…電力供給系、42…機器冷却系、43…駆動輪電動機、44…プローブ回転用駆動部、45…画像データ出力部、46…外部通信用I/F、47…電力供給部、48…冷却媒体供給部、49…信号制御部、50…通信用I/F、51…制御部、52…電動機制御部、53…プローブ回転制御部、54…位置制御部、55…画像処理演算部、56…画像比較処理部、57…現状ノズル翼撮影画像ファイル、58…新製時ノズル翼撮影画像ファイル、59…ディスプレイ、60…入力装置、61…キャリア制御装置、62…駆動系、63…演算処理系、64…外部通信系、65…ローブ関節回転機器、66…ステアリング駆動機器、67…走行距離演算器、68…自位置演算器、69…CCDカメラ位置演算器、70…データ処理部、71…駆動制御部、73…ステアリング制御部、74…プローブ関節制御部。   DESCRIPTION OF SYMBOLS 20 ... Carrier, 21 ... Carrier body, 22 ... Driving wheel, 23 ... CCD camera, 24 ... Probe, 25 ... Probe rotating part, 26 ... Cable rotating part, 27 ... Connection cable, 28 ... Hinge, 29 ... Auxiliary carrier, 30 DESCRIPTION OF SYMBOLS ... Guide, 31 ... Inclined plate, 41 ... Power supply system, 42 ... Equipment cooling system, 43 ... Drive wheel motor, 44 ... Probe rotation drive part, 45 ... Image data output part, 46 ... External communication I / F, DESCRIPTION OF SYMBOLS 47 ... Power supply part, 48 ... Cooling medium supply part, 49 ... Signal control part, 50 ... Communication I / F, 51 ... Control part, 52 ... Electric motor control part, 53 ... Probe rotation control part, 54 ... Position control part 55 ... Image processing calculation unit, 56 ... Image comparison processing unit, 57 ... Current nozzle blade photographed image file, 58 ... Newly produced nozzle blade photographed image file, 59 ... Display, 60 ... Input device, 61 ... Carry Control device, 62 ... drive system, 63 ... calculation processing system, 64 ... external communication system, 65 ... lobe joint rotation device, 66 ... steer drive device, 67 ... travel distance calculator, 68 ... local position calculator, 69 ... CCD Camera position calculator 70... Data processing unit 71... Drive control unit 73. Steering control unit 74.

Claims (11)

ビデオプローブと、このビデオプローブを運搬するキャリアとから構成され、前記キャリアをタービン内に挿入して前記ビデオプローブによりタービン内部構造物を検査する装置において、前記キャリアには、該キャリアの進行方向と前記ビデオプローブの先端が向いている角度を決める機構、前記キャリアの車軸とビデオプローブとの位置を決める機構の少なくとも一方を備えたことを特徴とするタービン内部構造物の検査装置。   An apparatus comprising a video probe and a carrier for carrying the video probe, wherein the carrier is inserted into a turbine and an internal structure of the turbine is inspected by the video probe. The carrier includes a traveling direction of the carrier. An inspection apparatus for an internal structure of a turbine, comprising at least one of a mechanism for determining an angle at which a tip of the video probe is directed and a mechanism for determining a position between an axle of the carrier and a video probe. 請求項1に対応する発明のタービン内部構造物の検査装置において、前記キャリアには、走行方向を修正する複数台の電動機を有する。   In the turbine internal structure inspection apparatus according to the first aspect of the present invention, the carrier has a plurality of electric motors for correcting the traveling direction. 請求項1又は請求項2記載のタービン内部構造物の検査装置において、前記キャリアには、強磁性体の走行輪、或いはキャタピラの如き無限軌道を備えた自走式の走行装置を有することを特徴とするタービン内部構造物の検査装置。   3. The turbine internal structure inspection device according to claim 1, wherein the carrier has a self-propelled traveling device having an endless track such as a ferromagnetic traveling wheel or a caterpillar. A turbine internal structure inspection device. 請求項1記載のタービン内部構造物の検査装置において、前記キャリアには、走行路表面の曲率から決められた径の駆動輪を有していることを特徴とするタービン内部構造物の検査方法。   2. The turbine internal structure inspection method according to claim 1, wherein the carrier has drive wheels having a diameter determined from a curvature of a traveling path surface. 請求項1記載のタービン内部構造物の検査装置において、前記キャリアには、走行路表面の曲率から決めた複数の異なる寸法、形状の駆動輪を有していることを特徴とするタービン内部構造物の検査装置。   2. The turbine internal structure inspection device according to claim 1, wherein the carrier has a plurality of drive wheels having different sizes and shapes determined from a curvature of a traveling path surface. Inspection equipment. 請求項1記載のタービン内部構造物の検査装置において、前記キャリアには、走行路表面に対して鉛直方向に沿って曲がることが可能な1つ以上のヒンジにより補助キャリアを連結したことを特徴とするタービン内部構造物の検査装置。   2. The turbine internal structure inspection apparatus according to claim 1, wherein an auxiliary carrier is connected to the carrier by one or more hinges that can be bent along a vertical direction with respect to a traveling path surface. Turbine internal structure inspection equipment. 請求項1乃至請求項6記載のタービン内部構造物の検査装置において、前記キャリアには、冷却用の媒体を前記ビデオプローブ、キャリア本体へ供給可能なチューブが接続されていることを特徴するタービン内部構造物の検査装置。   7. The turbine internal structure inspection apparatus according to claim 1, wherein a tube capable of supplying a cooling medium to the video probe and the carrier body is connected to the carrier. Structure inspection equipment. 請求項1記載のタービン内部構造物の検査装置において、前記キャリアをタービン内の所定の位置まで搬送する装置を設け、この装置は前記キャリアの駆動輪がタービン内の所定の位置に向けて走行可能な走行面を有するガイドにより構成されたことを特徴とするタービン内部構造物の検査装置。   2. The turbine internal structure inspection device according to claim 1, further comprising a device for transporting the carrier to a predetermined position in the turbine, wherein the drive wheel of the carrier can travel toward a predetermined position in the turbine. An inspection apparatus for a turbine internal structure, characterized by comprising a guide having a smooth running surface. 請求項1乃至請求項8のいずれかに記載のタービン内部構造物の検査装置を用いてタービン翼を検査する方法において、前記キャリアをタービン蒸気通路を通ってタービン翼列に運搬するステップと、前記キャリアをタービン翼列に沿ったキャリア走行開始位置へ移動させるステップと、このキャリア走行開始位置から前記キャリアをタービン翼列に沿って走行させるステップと、前記ビデオプローブにより得られた各タービン翼の画像と前記キャリアの走行位置を同時に記録するステップとを備えたことを特徴とするタービン内部構造物の検査方法。   A method for inspecting a turbine blade using the turbine internal structure inspection device according to any one of claims 1 to 8, wherein the carrier is conveyed to a turbine blade row through a turbine steam passage, and The step of moving the carrier to the carrier travel start position along the turbine blade row, the step of running the carrier along the turbine blade row from the carrier travel start position, and the image of each turbine blade obtained by the video probe And a step of simultaneously recording the traveling position of the carrier. A method for inspecting a turbine internal structure. 請求項9記載のタービン内部構造物の検査方法において、前記タービン翼列に沿って前記キャリアを走行させるステップと、前記ビデオプローブにより得られる画像を前記ビデオプローブの位置を変えた状態でタービン翼を撮影した画像データとして記録するステップと、このステップで得られた画像データと同じプローブ位置での過去の複数の画像データとを比較して、タービン翼の損傷状況を判定するステップとを備えたことを特徴とするタービン内部構造物の検査方法。   10. The method for inspecting a turbine internal structure according to claim 9, wherein the carrier is moved along the turbine blade row, and an image obtained by the video probe is used to change the position of the video probe. A step of recording as photographed image data, and a step of comparing a plurality of past image data at the same probe position with the image data obtained in this step to determine a damage state of the turbine blade A method for inspecting a turbine internal structure. 請求項9記載のタービン内部構造物の検査方法において、同じタービン翼について得た複数の画像と、それらの画像を記録したときのビデオプローブの位置情報を用いて、タービン翼の損傷状況を判定するステップとを含むことを特徴とするタービン内部構造物の検査方法。   The turbine internal structure inspection method according to claim 9, wherein the damage state of the turbine blade is determined by using a plurality of images obtained for the same turbine blade and position information of the video probe when the images are recorded. A method for inspecting a turbine internal structure.
JP2007062625A 2007-03-12 2007-03-12 Turbine internal structure inspection apparatus and inspection method using the apparatus Expired - Fee Related JP4966056B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007062625A JP4966056B2 (en) 2007-03-12 2007-03-12 Turbine internal structure inspection apparatus and inspection method using the apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007062625A JP4966056B2 (en) 2007-03-12 2007-03-12 Turbine internal structure inspection apparatus and inspection method using the apparatus

Publications (2)

Publication Number Publication Date
JP2008225012A true JP2008225012A (en) 2008-09-25
JP4966056B2 JP4966056B2 (en) 2012-07-04

Family

ID=39843716

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007062625A Expired - Fee Related JP4966056B2 (en) 2007-03-12 2007-03-12 Turbine internal structure inspection apparatus and inspection method using the apparatus

Country Status (1)

Country Link
JP (1) JP4966056B2 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013064242A3 (en) * 2011-11-02 2014-02-20 Rolls-Royce Deutschland Ltd & Co Kg Method for inspecting a gas turbine
EP2761140A1 (en) * 2011-09-30 2014-08-06 Lufthansa Technik AG Endoscopy system and corresponding method for examining gas turbines
JP2015513026A (en) * 2012-01-31 2015-04-30 シーメンス エナジー インコーポレイテッド System and method for automatic optical inspection of industrial gas turbines and other generators
JP2017221597A (en) * 2016-06-17 2017-12-21 株式会社Jvcケンウッド Imaging device, imaging method and imaging program
JP6334047B1 (en) * 2017-10-30 2018-05-30 三菱日立パワーシステムズ検査株式会社 Blade groove observation apparatus and blade groove observation method
WO2018102181A1 (en) * 2016-12-02 2018-06-07 General Electric Company Motorized apparatus for use with rotary machines
US10888216B2 (en) 2017-09-20 2021-01-12 Olympus Corporation Endoscope device, endoscope system and inspection method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60184014U (en) * 1984-05-15 1985-12-06 日立造船株式会社 Narrow space inspection device
JPH07113749A (en) * 1993-10-18 1995-05-02 Olympus Optical Co Ltd Turbine blade inspection system
JPH07218394A (en) * 1991-08-19 1995-08-18 Westinghouse Electric Corp <We> Method and equipment for inspection
JP2001501719A (en) * 1996-05-30 2001-02-06 サントル ド ピロリーズ ド マリノウ(セーペーエム) Endoscope inspection probe for coke oven
JP2001287502A (en) * 2000-04-07 2001-10-16 Osaka Gas Co Ltd Magnet wheel
JP2003042817A (en) * 2001-05-24 2003-02-13 Nippon Suiki Kk Flow rate measuring instrument for investigating common water and endoscope insert instrument
JP2005055756A (en) * 2003-08-06 2005-03-03 Olympus Corp Endoscopic instrument

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60184014U (en) * 1984-05-15 1985-12-06 日立造船株式会社 Narrow space inspection device
JPH07218394A (en) * 1991-08-19 1995-08-18 Westinghouse Electric Corp <We> Method and equipment for inspection
JPH07113749A (en) * 1993-10-18 1995-05-02 Olympus Optical Co Ltd Turbine blade inspection system
JP2001501719A (en) * 1996-05-30 2001-02-06 サントル ド ピロリーズ ド マリノウ(セーペーエム) Endoscope inspection probe for coke oven
JP2001287502A (en) * 2000-04-07 2001-10-16 Osaka Gas Co Ltd Magnet wheel
JP2003042817A (en) * 2001-05-24 2003-02-13 Nippon Suiki Kk Flow rate measuring instrument for investigating common water and endoscope insert instrument
JP2005055756A (en) * 2003-08-06 2005-03-03 Olympus Corp Endoscopic instrument

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2761140A1 (en) * 2011-09-30 2014-08-06 Lufthansa Technik AG Endoscopy system and corresponding method for examining gas turbines
JP2014528794A (en) * 2011-09-30 2014-10-30 ルフトハンザ・テッヒニク・アクチェンゲゼルシャフトLufthansa Technik Ag Endoscopic inspection system and corresponding method for inspecting a gas turbine
EP2761140B1 (en) * 2011-09-30 2021-07-07 Lufthansa Technik AG Endoscopy system and corresponding method for examining gas turbines
WO2013064242A3 (en) * 2011-11-02 2014-02-20 Rolls-Royce Deutschland Ltd & Co Kg Method for inspecting a gas turbine
JP2015513026A (en) * 2012-01-31 2015-04-30 シーメンス エナジー インコーポレイテッド System and method for automatic optical inspection of industrial gas turbines and other generators
JP2017221597A (en) * 2016-06-17 2017-12-21 株式会社Jvcケンウッド Imaging device, imaging method and imaging program
WO2018102181A1 (en) * 2016-12-02 2018-06-07 General Electric Company Motorized apparatus for use with rotary machines
US10717166B2 (en) 2016-12-02 2020-07-21 General Electric Company Motorized apparatus for use with rotary machines
US10888216B2 (en) 2017-09-20 2021-01-12 Olympus Corporation Endoscope device, endoscope system and inspection method
JP6334047B1 (en) * 2017-10-30 2018-05-30 三菱日立パワーシステムズ検査株式会社 Blade groove observation apparatus and blade groove observation method
JP2019082398A (en) * 2017-10-30 2019-05-30 三菱日立パワーシステムズ検査株式会社 Blade groove observation device and blade groove observation method

Also Published As

Publication number Publication date
JP4966056B2 (en) 2012-07-04

Similar Documents

Publication Publication Date Title
JP4966056B2 (en) Turbine internal structure inspection apparatus and inspection method using the apparatus
EP3179237B1 (en) System and method for locating a probe within a gas turbine engine
US10775315B2 (en) Probe insertion system
JP6223342B2 (en) Endoscopic inspection system and corresponding method for inspecting a gas turbine
US11536670B2 (en) System and method for engine inspection
US20160335761A1 (en) Apparatus and a method of inspecting a turbomachine
US10488349B2 (en) Automated borescope insertion system
US20210245362A1 (en) Mobile robot for inspecting a turbomachine
US11995815B2 (en) Method and device for inspecting hard-to-reach components
JPH11281897A (en) Endoscope
WO2008061365A1 (en) System and method for inspecting the interior surface of a pipeline
US20210231530A1 (en) Inspection tube drive control device, inspecting device, inspecting method, program for inspecting device, and guide jig
US20170167285A1 (en) System and Method for Locating a Probe within a Gas Turbine Engine
JP7012748B2 (en) Service equipment for use in rotary machines
US20200049564A1 (en) Systems and methods for thermal imaging systems
CN104655654B (en) Bearing calibration based on defect characteristic parameter in the micro cautery deferent of size distortion rate
KR20130035756A (en) Capsule check system for check in tube
RU2497074C1 (en) Device for diagnostics of wall of manifold pipelines with moire method
RU2624380C1 (en) State monitoring device inside turbine units and steam turbines parts
JP6621707B2 (en) Pump inspection method, inspection device, guide member and jig
RU2762269C1 (en) System and method for monitoring turbine line elements
KR102356888B1 (en) A System for Diagnosing a Underground Pipe Automatically And a Method for Verifying a Repairing Part with the Same
Mathison et al. A New Rotating Facility for Investigating Cooling Passage Internal Heat Transfer
JP2001083277A (en) Apparatus and method for inspection of tubing
JP2005037282A (en) Dimension measuring system and method of defect inside pipe

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090209

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20111124

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20111129

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120130

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120306

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120330

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150406

Year of fee payment: 3

LAPS Cancellation because of no payment of annual fees