JP2007202361A - Power demand monitoring system - Google Patents

Power demand monitoring system Download PDF

Info

Publication number
JP2007202361A
JP2007202361A JP2006020486A JP2006020486A JP2007202361A JP 2007202361 A JP2007202361 A JP 2007202361A JP 2006020486 A JP2006020486 A JP 2006020486A JP 2006020486 A JP2006020486 A JP 2006020486A JP 2007202361 A JP2007202361 A JP 2007202361A
Authority
JP
Japan
Prior art keywords
power consumption
machine
actual
plant
cumulative
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2006020486A
Other languages
Japanese (ja)
Inventor
Hiroaki Ota
宏明 大田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Meidensha Corp
Meidensha Electric Manufacturing Co Ltd
Original Assignee
Meidensha Corp
Meidensha Electric Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Meidensha Corp, Meidensha Electric Manufacturing Co Ltd filed Critical Meidensha Corp
Priority to JP2006020486A priority Critical patent/JP2007202361A/en
Publication of JP2007202361A publication Critical patent/JP2007202361A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To a power demand monitoring system, taking into consideration a machine to be subjected to additional running in a plant. <P>SOLUTION: From a recording group of cumulative actual use amount of electric power energy (S2) of which recording is started after the operation of each of a group of machines, constituting a plant starts, records of the cumulative actual use amount of electric power energy of the corresponding machine are selected. Before additional operation of the corresponding machine, the recorded cumulative actual use amount of electric power energy is incorporated, and estimated cumulative use amount of electric power energy of the whole plant is calculated (S5). <P>COPYRIGHT: (C)2007,JPO&INPIT

Description

本発明は、電力監視システムであって、例えば、電力デマンド監視システムに関するものである。   The present invention relates to a power monitoring system, for example, a power demand monitoring system.

プラント(もしくは工場)の電気使用では、該プラントが電力会社と最大使用電力量を取り決めて、電力料金の割引契約を締結している。その際に、前記最大使用電力量は少しでも小さい使用電力量値に設定され、前記の割引契約における割引料金が多くなるように契約されることが一般的である。   In the electricity use of a plant (or factory), the plant negotiates a maximum amount of power consumption with an electric power company and concludes a discount contract for a power charge. At that time, it is common that the maximum power consumption is set to a value that is as small as possible and that the discount fee in the discount contract is increased.

また、前記プラントの操業時には、前記の最大使用電力量(以下、契約使用電力量と称す)を超過することのないように、該プラントに電力デマンド監視システムを設備し、該電力デマンド監視システムに予測使用電力量を常に計算させて、監視する。そして、前記契約使用電力量を超過する恐れが発生した時には、前記電力デマンド監視システムは数種類の警報(例えば、1段警報,2段警報,高負荷警報,契約使用電力量逸脱警報)を前記プラントの運転員に対して発報し、自動もしくは手動で前記プラント内の稼動設備の負荷を軽減もしくは停止(抑制)することで使用電力量を制御している。   In addition, during operation of the plant, a power demand monitoring system is installed in the plant so that the maximum power consumption (hereinafter referred to as contract power consumption) is not exceeded. Always monitor the predicted power consumption. When the risk of exceeding the contracted power consumption occurs, the power demand monitoring system sends several types of alarms (for example, a first-stage alarm, a second-stage alarm, a high load alarm, and a contracted power consumption deviation alarm) to the plant. The power consumption is controlled by automatically or manually reducing or stopping (suppressing) the load on the operating equipment in the plant.

例えば、前記の予測使用電力量を算出する計算では、電力デマンド監視時限(例えば、1時間,30分のいずれか)内の使用電力量に、該時限開始から経過時間までの実使用電力量と監視タイミングを用いた短時間移動平均法を考慮に入れた処理を行う。   For example, in the calculation for calculating the predicted power consumption, the power consumption within the power demand monitoring time period (for example, 1 hour or 30 minutes) is set to the actual power consumption from the start of the time limit to the elapsed time. Performs processing taking into account the short-time moving average method using monitoring timing.

ここで、前述のような電力デマンド監視機能の概要をプラントの実績累積使用電力量推移の一例を示す図5に基づいて説明する。図5中の縦軸w1はプラント全体の電力デマンド監視時限開始からの累積使用電力量、横軸tは電力デマンド監視時限開始からの電力デマンド監視時限経過時間を示す。   Here, the outline | summary of the above power demand monitoring functions is demonstrated based on FIG. 5 which shows an example of the performance cumulative use electric energy transition of a plant. The vertical axis w1 in FIG. 5 indicates the accumulated power consumption from the start of the power demand monitoring time period for the entire plant, and the horizontal axis t indicates the elapsed time of the power demand monitoring time period from the start of the power demand monitoring time period.

また、図5中の符号1で示す線はプラント全体の目標累積使用電力量(前記の契約使用電力量を超えないように設定された累積使用電力量)、符号2で示す線は操業中のプラント全体の実績累積使用電力量、そして、符号3で示す線は電力デマンド監視時限内における予測時点(図5中の符号t1で示す時点)以降に予測されるプラント全体の累積使用電力量(以後、予測累積使用電力量)である。   Further, the line indicated by reference numeral 1 in FIG. 5 is the target cumulative power consumption of the entire plant (the cumulative power consumption set so as not to exceed the contract power consumption), and the line indicated by reference numeral 2 is in operation. The actual accumulated power consumption of the entire plant, and the line indicated by reference numeral 3 indicates the accumulated power consumption of the entire plant (hereinafter referred to as “predicted time” within the power demand monitoring period (time indicated by reference numeral t1 in FIG. 5)). , Predicted accumulated power consumption).

図5中の目標累積使用電力量1は電力デマンド監視時限経過時間に対して比例的に増加するように設定されている。また、実績累積使用電力量2は、前記の目標累積使用電力量1を超えないよう推移する状態が通常状態である。そして、図5中では、予測時点t1以後に前記の予測累積使用電力量3が前記の目標累積使用電力量1を超えないように、電力デマンド監視システムが監視を行っている。   The target accumulated power consumption 1 in FIG. 5 is set to increase in proportion to the power demand monitoring time limit elapsed time. Further, the actual accumulated power consumption 2 is in a normal state in which the actual accumulated power consumption 2 does not exceed the target accumulated power consumption 1. In FIG. 5, the power demand monitoring system performs monitoring so that the predicted cumulative power consumption 3 does not exceed the target cumulative power consumption 1 after the prediction time t1.

なお、このような電力デマンド監視システムには、季節要素(例えば、外気温)を取り入れて、稼動機械を制御する手段を備えた電力デマンド監視システムも知られている(例えば、特許文献1参照)。
特開2000−184590(段落[0011]〜[0017]等)。
In addition, in such a power demand monitoring system, there is also known a power demand monitoring system provided with means for controlling an operating machine by incorporating a seasonal element (for example, outside air temperature) (see, for example, Patent Document 1). .
JP 2000-184590 (paragraphs [0011] to [0017] etc.).

上述のような電力デマンド監視システムにおける予測累積使用電力量を算出する計算は、現在操業中のプラントにおける全体の実績累積使用電力量に基づいており、該プラントの機械を追加運転させた場合の累積使用電力量の変化(例えば、使用電力量の増大)を考慮できていない。このため、電力デマンド監視時限の残り時間が短くなってきてから、前記機械の運転を開始してしまうと、契約使用電力量を超過してしまうことがあった。   The calculation for calculating the predicted cumulative power consumption in the power demand monitoring system as described above is based on the total actual cumulative power consumption in the currently operating plant, and is cumulative when the plant machine is additionally operated. Changes in the power consumption (for example, increase in power consumption) cannot be taken into account. For this reason, if the operation of the machine is started after the remaining time of the power demand monitoring time period is shortened, the contracted power consumption may be exceeded.

例えば、電力デマンド監視時限経過時間に対して、実績累積使用電力量が図6中の実績累積使用電力量4aのように推移する機械(例えば、ポンプ)を図7中の予測時点t1付近で追加運転を開始したとする。なお、図8は、図7中の符号α部分の拡大図である。   For example, a machine (for example, a pump) in which the actual accumulated power consumption changes as the actual accumulated power consumption 4a in FIG. 6 with respect to the power demand monitoring time lapse time is added near the predicted time t1 in FIG. Suppose that operation has started. FIG. 8 is an enlarged view of a portion α in FIG.

図7中の予測時点t1からt2(即ち、図6中では時点tOからt2)付近では操業中のプラント全体の実績累積使用電力量2に対する影響は軽微であるため、操業中の実績累積使用電力量2から算出した予測累積使用電力量は目標累積使用電力量1を超えることにはならない。   Since the influence on the actual accumulated power consumption 2 of the entire plant in operation is slight in the vicinity of the predicted time t1 to t2 in FIG. 7 (that is, the time tO to t2 in FIG. 6), the actual accumulated power used during operation The predicted cumulative power consumption calculated from the amount 2 does not exceed the target cumulative power consumption 1.

しかし、図7中の時点t4(即ち、図6中の時点t3)で前記のポンプの実績累積使用電力量4aがピークに達するため、その影響を受けてプラント全体の実績累積使用電力量2が、予測累積使用電力量3の通りにならずに、目標累積使用電力量1を超過するようになってしまう。   However, since the actual cumulative power consumption 4a of the pump reaches a peak at the time t4 in FIG. 7 (that is, the time t3 in FIG. 6), the actual cumulative power consumption 2 of the entire plant is affected by the influence. The target cumulative power consumption 1 is exceeded instead of the predicted cumulative power consumption 3.

即ち、プラント全体の実績累積使用電力量2aに見られるように契約使用電力量を逸脱してしまうことになる。例えば、図8中の時点t6におけるプラント全体の実績累積使用電力量は、目標累積使用電力量を超過している。   In other words, the contracted power consumption deviates from the actual cumulative power consumption 2a of the entire plant. For example, the actual accumulated power consumption of the entire plant at time t6 in FIG. 8 exceeds the target cumulative power consumption.

なお、図6の縦軸w2は機械の累積使用電力量、横軸tは機械の運転開始からの電力デマンド監視時限経過時間である。そして、符号t5は、電力のデマンド時限である。また、符号tOは、各機械の運転開始時点である。そして、図7の縦軸及び横軸は図5中のものと同じであるため、詳細な説明を省略する。   In FIG. 6, the vertical axis w2 represents the accumulated power consumption of the machine, and the horizontal axis t represents the elapsed time for monitoring the power demand from the start of the machine operation. The symbol t5 is a power demand time limit. Further, the symbol tO is the operation start time of each machine. Since the vertical axis and horizontal axis in FIG. 7 are the same as those in FIG. 5, detailed description thereof is omitted.

本発明は、前記課題に基づいてなされたものであり、プラントに追加運転する機械の実績累積使用電力量を組み入れて、プラント全体の予測累積使用電力量を計算することを可能とする電力デマンド監視システムを提供することにある。   The present invention has been made on the basis of the above-mentioned problem, and incorporates the actual cumulative power consumption of the machine that is additionally operated in the plant, and calculates the predicted cumulative power consumption of the entire plant. To provide a system.

本発明は、前記課題の解決を図るために、請求項1記載の発明は、プラント全体の実績累積使用電力量を運転開始時点から記録し、そのプラント全体の実績累積使用電力量を取得し、その記録されたプラント全体の実績累積使用電力量に基づいて該プラント全体の予測累積使用電力量を計算し、その計算されたプラント全体の予測累積使用電力量が、プラント全体に設定された目標累積使用電力量を超過するか否か、を判定する判定手段から判定結果を取得する電力デマンド監視システムであって、前記のプラントを構成する各機械の実績累積使用電力量を該機械の運転開始時点から記録し、その機械の実績累積使用電力量の記録群から該機械の実績累積使用電力量の記録を選択できる手段と、該機械の追加運転前に、該機械の記録された実績累積使用電力量を組み入れて、前記のプラント全体の予測累積使用電力量を計算する手段と、を有することを特徴とする。   In order to solve the above-mentioned problem, the invention according to claim 1 records the actual accumulated power consumption of the entire plant from the start of operation, acquires the actual accumulated power consumption of the entire plant, Calculate the predicted cumulative power consumption of the entire plant based on the recorded actual power consumption of the entire plant, and the predicted cumulative power consumption of the calculated plant is the target cumulative power set for the entire plant. A power demand monitoring system that acquires a determination result from a determination unit that determines whether or not the power consumption is exceeded, and the actual cumulative power consumption of each machine that constitutes the plant is determined as the operation start time of the machine Means for selecting the record of the actual accumulated power consumption of the machine from the record group of the actual accumulated power consumption of the machine, and the recorded actual record of the machine before the additional operation of the machine Means for calculating the predicted cumulative power consumption of the entire plant by incorporating the cumulative power consumption.

請求項2記載の発明は、請求項1に記載の発明において、前記の判定結果を前記プラントの運転員に通知する通知手段を有することを特徴とする。   The invention according to claim 2 is characterized in that in the invention according to claim 1, there is provided a notifying means for notifying an operator of the plant of the determination result.

請求項3記載の発明は、請求項1または2に記載の発明において、前記の予測累積使用電力量が目標累積使用電力量を超過するものとなった場合に追加運転する機械の運転を抑制する手段を有することを特徴とする。   The invention according to claim 3 suppresses operation of a machine that performs additional operation in the invention according to claim 1 or 2 when the predicted cumulative power consumption exceeds the target cumulative power consumption. It has the means.

なお、前記の請求項1乃至3における電力デマンド監視システムは、電力デマンド監視装置、または、電力デマンドサーバと見做すこともできる。   The power demand monitoring system according to claims 1 to 3 can also be regarded as a power demand monitoring device or a power demand server.

また、前記の請求項1における記録は、常に記録しておいても良い。   Further, the recording according to the first aspect may be always recorded.

前記の請求項1記載の発明によれば、機械の実績累積使用電力量の記録群を選択されるものと、選択されないものと、に分類することができる。また、プラントの実績累積使用電力量に基づいた予測累積使用電力量を求める計算に関して、該機械の実績累積使用電力量を組み入れて計算した結果を得ることができる。   According to the first aspect of the present invention, it is possible to classify the record group of the actual accumulated power consumption of the machine into the selected group and the unrecorded group. Moreover, regarding the calculation for obtaining the predicted cumulative power consumption based on the actual cumulative power consumption of the plant, the calculation result obtained by incorporating the actual cumulative power consumption of the machine can be obtained.

前記の請求項2記載の発明によれば、判定結果をプラントの運転員に通知することができる。   According to the second aspect of the invention, the determination result can be notified to the plant operator.

前記の請求項3記載の発明によれば、予測累積使用電力量が該目標累積使用電力量を超過したことを認識できる。   According to the third aspect of the present invention, it can be recognized that the predicted cumulative power consumption exceeds the target cumulative power consumption.

以上示したように請求項1に記載の発明によれば、突発的で想定外の機械の追加運転開始時においても、高精度の予測が可能となる。   As described above, according to the first aspect of the present invention, it is possible to predict with high accuracy even at the start of additional operation of a sudden and unexpected machine.

請求項2に記載の発明によれば、前記プラント運転員は前記の判定に関する結果通知を受けることができる。   According to invention of Claim 2, the said plant operator can receive the result notification regarding the said determination.

請求項3に記載の発明によれば、追加運転する機械の運転を抑制できる。   According to the invention described in claim 3, it is possible to suppress the operation of the machine to be additionally operated.

これらを以って電力デマンド監視システムの分野に貢献できる。   These can contribute to the field of power demand monitoring systems.

以下、本発明の実施の形態における電力デマンド監視システムを図面等に基づいて詳細に説明する。本実施の形態における電力デマンド監視システムは、プラントを構成する機械群の各々の運転開始から記録された実績累積使用電力量の記録群から該機械の実績累積使用電力量の記録を選択し、該機械を追加運転する前に、該機械の記録された実績累積使用電力量を組み入れて、該プラント全体の予測累積使用電力量を計算する。   Hereinafter, a power demand monitoring system according to an embodiment of the present invention will be described in detail with reference to the drawings. The power demand monitoring system in the present embodiment selects the record of the actual cumulative power consumption of the machine from the record group of the actual cumulative power consumption recorded from the start of operation of each of the machine groups constituting the plant, Prior to additional machine operation, the recorded actual cumulative power usage of the machine is incorporated to calculate the predicted cumulative power usage for the entire plant.

本実施の形態における電力デマンド監視システムが有する電力デマンド監視のための手段を図1に基づいて説明する。図1中では、常に、予測対象である操業中のプラント全体の実績累積使用電力量を測定し、測定できた実績累積使用電力量データを操業中の実績累積使用電力量データ記録領域D1に対して記録する(S1)。さらに、常に、前記プラントを構成する機械個別の実績累積使用電力量も測定し、測定できた実績累積使用電力量データを個別機械の実績累積使用電力量データ記録領域D2に対して記録する(S2)。例えば、前記の個別機械には、電力デマンド監視時限経過時間に対して、実績累積使用電力量が図2中の実績累積使用電力量4bや図3中の実績累積使用電力量4cのように推移する機械が想定される。なお、図2及び図3中の縦軸と横軸は、図6中のものと同じであるため、詳細な説明を省略する。   The means for power demand monitoring which the power demand monitoring system in this Embodiment has is demonstrated based on FIG. In FIG. 1, the actual accumulated power consumption of the entire plant being operated as a prediction target is always measured, and the actual accumulated power consumption data that can be measured is recorded in the actual accumulated power consumption data recording area D1 during operation. (S1). Furthermore, the actual cumulative power consumption amount of each machine constituting the plant is always measured, and the actual cumulative power consumption data that can be measured is recorded in the actual cumulative power consumption data recording area D2 of the individual machine (S2). ). For example, in the individual machine, the actual accumulated power consumption changes as the actual accumulated power consumption 4b in FIG. 2 or the actual accumulated power consumption 4c in FIG. A machine to perform is assumed. 2 and 3, the vertical axis and the horizontal axis are the same as those in FIG.

次に、プラント全体の実績累積使用電力量に基づき、周期的に予測累積使用電力量を計算する(S3)。例えば、前記のプラント全体の実績累積使用電力量データ記録領域D1内の記録群から選択された実績累積使用電力量の記録に基づき予測累積使用電力量を計算する。なお、前記の予測累積使用電力量の周期的な計算結果の値が目標累積使用電力量を超える場合には、例えば、前記プラントの運転員に対して警告を発する(S7)。また、前記プラントに対して機械の追加運転がある場合には、符号S5で示すステップに進み、該機械の追加運転が無い場合には周期的に予測累積使用電力量を計算するステップ(符号S3で示すステップ)を繰り返す(S4)。   Next, the predicted cumulative power consumption is calculated periodically based on the actual cumulative power consumption of the entire plant (S3). For example, the predicted cumulative power consumption is calculated based on the record of the actual cumulative power consumption selected from the record group in the actual cumulative power consumption data recording area D1 of the entire plant. In addition, when the value of the periodic calculation result of the predicted cumulative power consumption exceeds the target cumulative power consumption, for example, a warning is issued to the plant operator (S7). Further, when there is an additional operation of the machine with respect to the plant, the process proceeds to a step indicated by reference numeral S5, and when there is no additional operation of the machine, a step of periodically calculating the predicted accumulated power consumption (reference numeral S3). Step S4) is repeated (S4).

一方、機械の追加運転がある場合には、その追加運転の直前における操業中のプラント全体の実績累積使用電力量に基づいた予測累積使用電力量を求める計算に関して、その追加運転する該機械の(過去の)運転開始からの実績累積使用電力量を組み入れて計算し、電力デマンド監視時限内に前記の予測累積使用電力量が目標累積使用電力量を超えるか否かを判定する(S5)。例えば、個別機械の実績累積使用電力量データ記録領域D2内の記録群から追加運転しようとしている機械の実績累積使用電力量を組み入れて、前記の予測累積使用電力量を計算し、前記の判定を行う。なお、前記の予測累積使用電力量の計算方法としては、様々な方法が知られているが、例えば、移動平均法や最小二乗法などがある。   On the other hand, when there is an additional operation of the machine, regarding the calculation for obtaining the predicted accumulated electric power consumption based on the actual accumulated electric energy consumption of the entire plant in operation immediately before the additional operation, It is calculated by incorporating the past cumulative power consumption from the start of operation, and it is determined whether or not the predicted cumulative power consumption exceeds the target cumulative power consumption within the power demand monitoring period (S5). For example, incorporating the actual cumulative power consumption of the machine that is going to be additionally operated from the record group in the actual cumulative power consumption data recording area D2 of the individual machine, calculating the predicted cumulative power consumption, and determining the determination. Do. Various methods are known as a method of calculating the predicted cumulative power consumption, and examples include a moving average method and a least square method.

また、前記の予測累積使用電力量が目標累積使用電力量を超える場合には、事前に、前記プラントに関する適切な処置を行う必要がある。例えば、前記プラントの運転者が前記追加運転する機械に対する運転指令を抑制したり、該運転者に対し警告を発したりすることになる(S6)。そうした後に、次の電力デマンド監視時限の開始時に、前記の抑制や警告が解除されることになる。   Further, when the predicted cumulative power consumption exceeds the target cumulative power consumption, it is necessary to take appropriate measures regarding the plant in advance. For example, the operator of the plant suppresses an operation command for the machine to be additionally operated or issues a warning to the operator (S6). After that, at the start of the next power demand monitoring period, the suppression and warning are released.

次に、前記の予測累積使用電力量の推移を図4に基づいて説明する。なお、図4中の縦軸と横軸は図5中のものと同じであるため、詳細な説明は省略する。図4中の電力デマンド監視時限内における予測時点t1までのプラント全体の目標累積使用電力量1及び実績累積使用電力量2は図5と同様に、該目標累積使用電力量1を超えないように該実績累積使用電力量2が推移している。   Next, the transition of the predicted cumulative power consumption will be described with reference to FIG. Note that the vertical axis and horizontal axis in FIG. 4 are the same as those in FIG. As shown in FIG. 5, the target cumulative power consumption 1 and the actual cumulative power consumption 2 of the entire plant up to the prediction time point t1 within the power demand monitoring time period in FIG. 4 do not exceed the target cumulative power consumption 1 as in FIG. The actual cumulative power consumption 2 is changing.

そして、予測時点t1以降のプラント全体の予測累積使用電力量の計算を行われることになるが、図5中に適応している予測累積使用電力量の計算では、機械の追加運転前、かつ、プラントの操業中の実績累積使用電力量に基づく計算になるため、図4中の予測累積使用電力量3のような予測結果となる。一方、本実施の形態における予測累積使用電力量を計算する手段によって計算を行うと、追加運転する機械に関する実績累積使用電力量が組み入れられて計算され、図4中の予測累積使用電力量3´のような予測結果となる。前記の予測結果によって予測累積使用電力量3´が目標累積使用電力量1を超過することが示される。   Then, calculation of the predicted cumulative power consumption of the entire plant after the prediction time t1 is performed, but in the calculation of the predicted cumulative power consumption adapted in FIG. 5, before the additional operation of the machine, and Since the calculation is based on the actual accumulated power consumption during operation of the plant, a prediction result such as the predicted accumulated power consumption 3 in FIG. 4 is obtained. On the other hand, when the calculation is performed by the means for calculating the predicted cumulative power consumption in the present embodiment, the actual cumulative power consumption related to the machine to be additionally operated is calculated, and the predicted cumulative power consumption 3 ′ in FIG. 4 is calculated. The prediction result is as follows. The prediction result indicates that the predicted cumulative power consumption 3 ′ exceeds the target cumulative power consumption 1.

以上示したように本実施の形態によれば、前記プラントの実績累積使用電力量が目標累積使用電力量を超えるような事態を未然に予測することができ、さらに、契約した電力料金を超過することを防止することもできる。   As described above, according to the present embodiment, it is possible to predict a situation in which the actual cumulative power consumption of the plant exceeds the target cumulative power consumption, and the contracted power charge is exceeded. This can also be prevented.

以上、本発明において、記載された具体例に対してのみ詳細に説明したが、本発明の技術思想の範囲で多彩な変形および修正が可能であることは、当業者にとって明白なことであり、このような変形および修正が特許請求の範囲に属することは当然のことである。   Although the present invention has been described in detail only for the specific examples described above, it is obvious to those skilled in the art that various changes and modifications can be made within the scope of the technical idea of the present invention. Such variations and modifications are naturally within the scope of the claims.

例えば、本実施の形態の変形例1としては、プラントを構成する機械の実績累積使用電力量が、該機械の使用方法によって分類されるような場合に、その分類による場合分けを組み入れて全体の予測累積使用電力量を計算する電力デマンド監視システムとしても良い。例えば、前記機械の実績累積使用電力量が該機械の使用方法によって、2パターンに分類される場合に、状況に合わせて該2パターンの実績累積使用電力量を選択して、プラント全体の予測累積使用電力量を計算する電力デマンド監視システムとしても良い。   For example, as a first modification of the present embodiment, when the actual accumulated power consumption of the machines constituting the plant is classified according to the usage method of the machines, the classification according to the classification is incorporated to A power demand monitoring system that calculates the predicted cumulative power consumption may be used. For example, when the actual accumulated power consumption of the machine is classified into two patterns according to the usage method of the machine, the actual accumulated power consumption of the two patterns is selected according to the situation, and the predicted cumulative total of the entire plant is selected. A power demand monitoring system for calculating the amount of power used may be used.

さらに、本実施の形態の変形例2としては、予め機械追加のスケジュールが判明しているならば、該スケジュールに基づいた予測累積使用電力量を計算する電力デマンド監視システムとしても良い。   Furthermore, as a second modification of the present embodiment, if a schedule for adding a machine is known in advance, a power demand monitoring system that calculates a predicted cumulative power consumption based on the schedule may be used.

そして、本実施の形態の変形例3としては、操業中の実績累積使用電力量を記録することなく、実時間で取得(例えば、オンラインで操業中の実績累積使用電力量を取得)した実績累積使用電力量に基づいて、図1の符号S3の手順を行う電力デマンド監視システムとしても良い。   And as the modification 3 of this Embodiment, the performance accumulation acquired in real time (for example, acquisition of the performance accumulation power usage during operation online), without recording the performance accumulation power usage during operation. A power demand monitoring system that performs the procedure of reference S3 in FIG. 1 based on the amount of power used may be used.

本実施の形態における追加運転する機械の実績累積使用電力量を組み入れた予測累積使用電力量計算の概略フローチャートSchematic flowchart of predictive cumulative power consumption calculation incorporating the actual cumulative power consumption of the machine to be additionally operated in the present embodiment 本実施の形態におけるプラントの個別機械の一般的な実績累積使用電力量推移図の一例An example of a general actual cumulative power consumption transition diagram of an individual machine of a plant in the present embodiment 本実施の形態におけるプラントの個別機械の一般的な実績累積使用電力量推移図の他の例Other examples of general results cumulative power consumption transition diagram of individual machine of the plant in this embodiment 本実施の形態における追加運転する機械の実績累積使用電力量を組み入れた予測累積使用電力量推移図の一例An example of a predicted cumulative power consumption transition diagram incorporating the actual cumulative power consumption of the machine to be additionally operated in the present embodiment 一般的なプラントの実績累積使用電力量推移図の一例Example of a transition diagram of the actual cumulative power consumption of a typical plant 一般的なプラントの個別機械の実績累積使用電力量推移図の一例An example of a transition diagram of the accumulated cumulative power consumption of individual machines in a general plant プラントの目標累積使用電力量の超過を示す推移図の一例Example of transition diagram showing excess of target cumulative power consumption of plant プラントの実績累積使用電力量が目標累積使用電力量を超過する時点付近の拡大図Enlarged view around the time when the actual accumulated power consumption of the plant exceeds the target accumulated power consumption

符号の説明Explanation of symbols

1…プラント全体の目標累積使用電力量
2…操業中のプラント全体の実績累積使用電力量
2a…契約使用電力量を逸脱する前後のプラント全体の実績累積使用電力量
3,3´…プラント全体の予測累積使用電力量
4a,4b,4c…個別機械の実績累積使用電力量
D1…操業中の実績累積使用電力量データ記録領域
D2…個別機械の実績累積使用電力量データ記録領域
t…電力デマンド監視時限開始からの電力デマンド監視時限経過時間
t1…予測時点
t2…個別機械の運転開始直後の時点
t3,t4…個別機械の実績累積使用電力量がピークとなる時点
t5…デマンド時限
t6…目標累積使用電力量を超過時点
tO…各機械の運転開始時点(起動時点)
w1…プラント全体の電力デマンド監視時限開始からの累積使用電力量
w2…個別機械の電力デマンド監視時限開始からの累積使用電力量
α…プラントの実績累積使用電力量が目標累積使用電力量を超過する時点付近
1 ... Target cumulative power consumption of the entire plant 2 ... Actual cumulative power consumption of the entire plant in operation 2a ... Actual cumulative power consumption of the entire plant before and after deviating from the contracted power consumption 3,3 '... Predicted cumulative power consumption 4a, 4b, 4c ... Actual cumulative power consumption of individual machines D1 ... Actual cumulative power consumption data recording area during operation D2 ... Actual cumulative power consumption data recording area of individual machines t ... Power demand monitoring Power demand monitoring time elapsed from the start of time limit t1 ... Predicted time t2 ... Time immediately after the start of operation of individual machine t3, t4 ... Time point when actual accumulated power consumption of individual machine reaches its peak t5 ... Demand time limit t6 ... Target cumulative use When the amount of electric power is exceeded tO: Operation start time (starting time) of each machine
w1 ... Cumulative power consumption from the start of the power demand monitoring time limit for the entire plant w2 ... Cumulative power consumption from the start of the power demand monitoring time limit for individual machines α ... The actual cumulative power consumption of the plant exceeds the target cumulative power consumption Near time

Claims (3)

プラント全体の実績累積使用電力量を運転開始時点から記録し、
そのプラント全体の実績累積使用電力量を取得し、
その記録されたプラント全体の実績累積使用電力量に基づいて該プラント全体の予測累積使用電力量を計算し、
その計算されたプラント全体の予測累積使用電力量が、プラント全体に設定された目標累積使用電力量を超過するか否か、を判定する判定手段から判定結果を取得する電力デマンド監視システムにおいて、
前記のプラントを構成する各機械の実績累積使用電力量を該機械の運転開始時点から記録し、その機械の実績累積使用電力量の記録群から該機械の実績累積使用電力量の記録を選択できる手段と、
該機械の追加運転前に、該機械の記録された実績累積使用電力量を組み入れて、前記のプラント全体の予測累積使用電力量を計算する手段と、
を有することを特徴とする電力デマンド監視システム。
Record the actual accumulated power consumption of the entire plant from the start of operation,
Get the actual accumulated power consumption of the entire plant,
Calculate the predicted cumulative power consumption of the entire plant based on the recorded actual power consumption of the entire plant,
In the power demand monitoring system for obtaining the determination result from the determination means for determining whether or not the calculated predicted cumulative power consumption of the entire plant exceeds the target cumulative power consumption set for the entire plant,
The actual cumulative power consumption of each machine constituting the plant can be recorded from the start of operation of the machine, and the record of the actual cumulative power consumption of the machine can be selected from the record group of the actual cumulative power consumption of the machine. Means,
Means for incorporating the recorded actual accumulated power usage of the machine prior to additional operation of the machine to calculate the predicted cumulative energy usage of the entire plant;
A power demand monitoring system comprising:
前記の判定結果を前記プラントの運転員に通知する通知手段を有することを特徴とする請求項1記載の電力デマンド監視システム。   The power demand monitoring system according to claim 1, further comprising notification means for notifying an operator of the plant of the determination result. 前記の予測累積使用電力量が目標累積使用電力量を超過するものとなった場合に追加運転する機械の運転を抑制する手段を有することを特徴とする請求項1または2記載の電力デマンド監視システム。   3. The power demand monitoring system according to claim 1, further comprising means for suppressing operation of a machine that is additionally operated when the predicted cumulative power consumption exceeds the target cumulative power consumption. .
JP2006020486A 2006-01-30 2006-01-30 Power demand monitoring system Pending JP2007202361A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006020486A JP2007202361A (en) 2006-01-30 2006-01-30 Power demand monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006020486A JP2007202361A (en) 2006-01-30 2006-01-30 Power demand monitoring system

Publications (1)

Publication Number Publication Date
JP2007202361A true JP2007202361A (en) 2007-08-09

Family

ID=38456370

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006020486A Pending JP2007202361A (en) 2006-01-30 2006-01-30 Power demand monitoring system

Country Status (1)

Country Link
JP (1) JP2007202361A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101264038B1 (en) * 2012-01-13 2013-05-21 현대위아 주식회사 Power control system for machine tools
WO2014010245A1 (en) * 2012-07-11 2014-01-16 京セラ株式会社 Server device, electrical power control device, and electrical power control system
JP2014045621A (en) * 2012-08-28 2014-03-13 Kyocera Corp Energy management system, energy management method and server device
CN115377975A (en) * 2022-10-24 2022-11-22 国网浙江省电力有限公司宁波市北仑区供电公司 Power distribution control method and power distribution control system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101264038B1 (en) * 2012-01-13 2013-05-21 현대위아 주식회사 Power control system for machine tools
WO2014010245A1 (en) * 2012-07-11 2014-01-16 京セラ株式会社 Server device, electrical power control device, and electrical power control system
JP2014018045A (en) * 2012-07-11 2014-01-30 Kyocera Corp Server device
US9893533B2 (en) 2012-07-11 2018-02-13 Kyocera Corporation Server apparatus, electrical power control apparatus, and electrical power control system
JP2014045621A (en) * 2012-08-28 2014-03-13 Kyocera Corp Energy management system, energy management method and server device
CN115377975A (en) * 2022-10-24 2022-11-22 国网浙江省电力有限公司宁波市北仑区供电公司 Power distribution control method and power distribution control system

Similar Documents

Publication Publication Date Title
US9476803B2 (en) Method and an apparatus for predicting the condition of a machine or a component of the machine
WO2013140781A1 (en) Method for monitoring storage cell, system for monitoring storage cell, and storage cell system
CN103282787B (en) Automatic emergency is for electrical testing
JP5127799B2 (en) Power demand monitoring apparatus and power demand monitoring method
JP2007195392A (en) Demand supervisory equipment
JP2004171586A5 (en)
CN112180851B (en) Method and device for controlling production line, computer equipment and storage medium
JP2007202361A (en) Power demand monitoring system
JPWO2018096969A1 (en) Monitoring system, server, terminal device, monitoring method, and storage medium
JP2009281985A (en) Power supply monitoring device
JP6098840B2 (en) Supply / demand control apparatus and supply / demand control method
CN109740191B (en) Method, device and equipment for predicting residual service life of wind sensor
JP2013059204A (en) Power demand method and power demand device
JP5743250B1 (en) Demand target value changing device, demand target value changing device maintenance method, demand target value changing program, storage medium
JP2005086880A (en) Demand monitoring device
JP6376965B2 (en) Facility monitoring apparatus and facility monitoring method
JP5794826B2 (en) Demand control system
JP2005071136A (en) Delivery time management support system, its program, recording medium recording its program and delivery time management method for product
JP2007143375A (en) Apparatus and method for controlling generator
JP2009238190A (en) Maintenance plan support system
US20130173030A1 (en) Method for the Computer-Assisted Monitoring of the Functional Performance of a Technical System
JP5991828B2 (en) Fuel cell system
JP5940956B2 (en) Electricity monitoring device
CN106655284B (en) Power generation dispatching control method and system
JP2008151711A (en) Core monitor