JP5743250B1 - Demand target value changing device, demand target value changing device maintenance method, demand target value changing program, storage medium - Google Patents

Demand target value changing device, demand target value changing device maintenance method, demand target value changing program, storage medium Download PDF

Info

Publication number
JP5743250B1
JP5743250B1 JP2014266093A JP2014266093A JP5743250B1 JP 5743250 B1 JP5743250 B1 JP 5743250B1 JP 2014266093 A JP2014266093 A JP 2014266093A JP 2014266093 A JP2014266093 A JP 2014266093A JP 5743250 B1 JP5743250 B1 JP 5743250B1
Authority
JP
Japan
Prior art keywords
target value
demand target
demand
new
day
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2014266093A
Other languages
Japanese (ja)
Other versions
JP2016127688A (en
Inventor
英一 馬本
英一 馬本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nihon Techno KK
Original Assignee
Nihon Techno KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nihon Techno KK filed Critical Nihon Techno KK
Priority to JP2014266093A priority Critical patent/JP5743250B1/en
Application granted granted Critical
Publication of JP5743250B1 publication Critical patent/JP5743250B1/en
Publication of JP2016127688A publication Critical patent/JP2016127688A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Landscapes

  • Selective Calling Equipment (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

【課題】デマンド監視システムにおいて用いられるデマンド目標値を定期的に変更することにより電力使用者の省エネ意識を一年を通して向上させる。【解決手段】各日又は各単位時間帯の最大実績デマンド値と同各日又は各単位時間帯のデマンド目標値とを用いてデマンド目標値を変更するか判断するためのルールであるデマンド目標値変更ルールを保持するデマンド目標値変更ルール保持部と、デマンド目標値変更ルールを用いてデマンド目標値を変更すべきか判断するデマンド目標値変更判断部と、デマンド目標値変更判断部での判断結果がデマンド目標値を変更すべきとの判断結果である場合にデマンド目標値を変更する命令を生成するデマンド目標値変更命令生成部と、変更後のデマンド目標値である新デマンド目標値を算出するデマンド目標値変更演算部と、を有するデマンド目標値変更装置を提案する。【選択図】図3A demand target value used in a demand monitoring system is periodically changed to improve energy users' awareness of energy saving throughout the year. A demand target value which is a rule for determining whether to change a demand target value using a maximum actual demand value for each day or each unit time zone and a demand target value for each day or each unit time zone. The demand target value change rule holding unit that holds the change rule, the demand target value change determining unit that determines whether the demand target value should be changed using the demand target value change rule, and the determination result in the demand target value change determining unit are A demand target value change command generation unit that generates an instruction to change the demand target value when the demand target value is to be changed, and a demand that calculates a new demand target value that is the changed demand target value A demand target value changing device having a target value change calculating unit is proposed. [Selection] Figure 3

Description

本発明は、デマンド監視システムにおいて用いられるデマンド目標値を省エネに対して適した値へと変更することにより電力使用者の省エネ意識を一年を通して向上させるためのデマンド目標値変更装置、デマンド目標値変更装置メンテナンス方法、デマンド目標値変更プログラム、記憶媒体に関する。   The present invention relates to a demand target value changing device and demand target value for improving energy users' awareness of energy saving throughout the year by changing a demand target value used in a demand monitoring system to a value suitable for energy saving. The present invention relates to a change device maintenance method, a demand target value change program, and a storage medium.

デマンドを監視するための「デマンド監視システム」に関する技術が複数開示されている。「デマンド」とは、毎時00分から30分、同30分から00分までの30分単位における平均使用電力のことであり、電気料金の基本料金はこのデマンドに基づいて定められることが知られている。例えば一瞬でも大量の電力を消費し、その時間単位内で大きなデマンドが計測されてしまうと、その後長期間にわたり電気料金の基本料金は当該時間単位内で計測された大きなデマンドを参考に決定されてしまうために高額となる。そこで、例えば特許文献1や2に記載のように、消費電力量から以後計測が予定されるデマンドの値を予測し、予測値がデマンド目標値を上回る場合には、デマンド監視対象となる電力の電力使用者に警報したり、強制的にエアコンなどの電気設備を停止したりすることで、電気料金の基本料金の上昇を防止する技術が開発されている。   A plurality of techniques related to a “demand monitoring system” for monitoring demand are disclosed. "Demand" is the average power used in 30-minute units from 00 to 30 minutes per hour and from 30 to 00 minutes per hour, and it is known that the basic charge for electricity charges is determined based on this demand. . For example, if a large amount of power is consumed even for a moment and a large demand is measured within that time unit, then the basic charge for electricity charges is determined with reference to the large demand measured within that time unit for a long period of time. It will be expensive. Therefore, as described in Patent Documents 1 and 2, for example, when a demand value to be measured is predicted from the power consumption amount and the predicted value exceeds the demand target value, the power to be monitored for demand is calculated. Technology has been developed to prevent an increase in the basic charge of electricity charges by alerting power users or forcibly shutting down electrical equipment such as air conditioners.

特開2005−308729号公報JP-A-2005-308729 特許第4962813号公報Japanese Patent No. 4968213 特願2002−176728号公報Japanese Patent Application No. 2002-176728 特願2006−174582号公報Japanese Patent Application No. 2006-174582 特願2013−188078号公報Japanese Patent Application No. 2013-188078

図1は従来のデマンド監視システムを用いたデマンド監視の一例を示す概要図である。一般的にデマンドの値は消費電力量が増加する夏場や冬場には増加するため、電気料金の基本料金は夏場や冬場に計測される年間最大デマンド値をもとに定められる。そこで、従来のデマンド監視システムは年間最大デマンド値を参考に1つのデマンド目標値を設定し、電気料金の基本料金の上昇を防止する効果を得ることができていた。しかしながら、本方法では夏場や冬場にはデマンドの監視機能が働き、同時に電力使用者の省エネ意識を向上させることができるものの、春や秋など消費電力量が比較的少ない時期には計測されるデマンド値がデマンド目標値を大きく下回るため、デマンド監視システムが警報を発することがなく、電力使用者に省エネ意識を働かせることができなかった。   FIG. 1 is a schematic diagram showing an example of demand monitoring using a conventional demand monitoring system. In general, the demand value increases in summer and winter when the amount of power consumption increases, so the basic electricity rate is determined based on the annual maximum demand value measured in summer and winter. Therefore, the conventional demand monitoring system has been able to obtain the effect of preventing an increase in the basic charge of electricity charges by setting one demand target value with reference to the annual maximum demand value. However, although this method works in demand monitoring in summer and winter, and at the same time can improve energy users' awareness of energy saving, demand is measured during periods when the amount of power consumption is relatively low, such as in spring and autumn. Since the value is much lower than the demand target value, the demand monitoring system does not issue an alarm, and it is impossible to make the energy user aware of energy saving.

そこで特許文献3から5には、上記の問題点を解決するために、デマンド目標値を複数設定し、季節や気温に応じてデマンド目標値を変更する技術が開示されている。本技術において、デマンド目標値は年間最大デマンド値の監視のみならず、一年を通じたデマンド値の監視にも寄与することとなる。すなわち、デマンド監視システムにおいてデマンド目標値を用いて電気料金の基本料金の上昇を防止するのみならず、年間を通じてデマンド値を監視することにより一年を通して電力使用者に省エネ意識を働かせることも可能となった。   In order to solve the above problems, Patent Documents 3 to 5 disclose techniques for setting a plurality of demand target values and changing the demand target values according to the season and temperature. In the present technology, the demand target value contributes not only to monitoring the annual maximum demand value but also to monitoring the demand value throughout the year. In other words, in the demand monitoring system, it is possible not only to prevent an increase in the basic electricity bill by using the demand target value, but also to monitor energy demand throughout the year to make energy users aware of energy conservation throughout the year. became.

本発明者は、デマンド監視システムにおいて用いられるデマンド目標値を、事業所内で実際に消費されるデマンド値を適切に反映させることにより、さらに省エネに対して適した値へと変更するために、下記に示すようなデマンド目標値変更装置、デマンド目標値変更装置メンテナンス方法、デマンド目標値変更プログラム、記憶媒体を開発した。   In order to further change the demand target value used in the demand monitoring system to a value more suitable for energy saving by appropriately reflecting the demand value actually consumed in the office, Have developed a demand target value changing device, a demand target value changing device maintenance method, a demand target value changing program, and a storage medium.

本件発明の一態様として、各日又は各単位時間帯の最大実績デマンド値と同各日又は各単位時間帯のデマンド目標値とを用いてデマンド目標値を変更するか判断するためのルールであるデマンド目標値変更ルールを保持するデマンド目標値変更ルール保持部と、デマンド目標値変更ルールを用いてデマンド目標値を変更すべきか判断するデマンド目標値変更判断部と、デマンド目標値変更判断部での判断結果がデマンド目標値を変更すべきとの判断結果である場合に新たなデマンド目標値を算出する命令を生成する新デマンド目標値算出命令生成部と、生成された新デマンド目標値算出命令に応じて新デマンド目標値を算出する新デマンド目標値算出部と、算出された新デマンド目標値を出力する新デマンド目標値出力部と、を有するデマンド目標値変更装置を提案する。   As one aspect of the present invention, it is a rule for determining whether to change a demand target value using the maximum actual demand value of each day or each unit time zone and the demand target value of each day or each unit time zone. A demand target value change rule holding unit that holds a demand target value change rule, a demand target value change determination unit that determines whether a demand target value should be changed using a demand target value change rule, and a demand target value change determination unit A new demand target value calculation command generation unit that generates a command for calculating a new demand target value when the determination result is a determination result that the demand target value should be changed, and a generated new demand target value calculation command A demand target value calculation unit for calculating a new demand target value according to the demand, and a new demand target value output unit for outputting the calculated new demand target value. It proposes a target value changing device.

また、本件発明の別の態様として、電力供給者による電力供給状況を取得する電力供給状況取得部と、取得した電力供給状況がデマンド目標値を変更すべきものである場合には、デマンド目標値変更判断部の判断結果及びデマンド目標値変更算出部の算出結果によらず、取得した電力供給状況に応じて新デマンド目標値を算出する状況依存新デマンド目標値取得部と、を有するデマンド目標値変更装置を提案する。   Further, as another aspect of the present invention, a power supply status acquisition unit that acquires a power supply status by a power supplier, and if the acquired power supply status should change a demand target value, a demand target value change Demand target value change having a situation-dependent new demand target value acquisition unit that calculates a new demand target value according to the acquired power supply status regardless of the determination result of the determination unit and the calculation result of the demand target value change calculation unit Propose the device.

また、本件発明の別の態様として、新デマンド目標値算出部が算出した新デマンド目標値をデマンド監視対象となる電力の電力使用者に通知する新デマンド目標値通知部と、前記電力使用者から新デマンド目標値への変更の可否を受信する可否受信部と、可否受信部での受信結果に応じてデマンド目標値変更命令生成部における命令の生成又は生成した命令を有効又は無効とする有効無効出力部と、を有するデマンド目標値変更装置を提案する。   Further, as another aspect of the present invention, a new demand target value notifying unit for notifying a power user of power to be demand monitored a new demand target value calculated by the new demand target value calculating unit, and the power user Validity / invalidity for enabling / disabling the instruction generated or the generated instruction in the demand target value change instruction generation part according to the reception result in the availability reception part and the availability reception part for receiving the possibility of change to the new demand target value And a demand target value changing device having an output unit.

また、本件発明の別の態様として、新デマンド目標値出力部は、新デマンド目標値算出部により算出された新デマンド目標値が電力基本料金を定めるデマンド値である決定デマンド値を超えない場合にのみ新デマンド目標値を出力し、超える場合にアラームを出力するアラーム出力部を有するデマンド目標値変更装置を提案する。   Further, as another aspect of the present invention, the new demand target value output unit, when the new demand target value calculated by the new demand target value calculation unit does not exceed the determined demand value that is the demand value that determines the basic power charge A demand target value changing device having an alarm output unit for outputting a new demand target value only and outputting an alarm when exceeding is proposed.

以上のような構成のデマンド目標値変更装置を用いることにより、デマンド監視システムにおいて用いられるデマンド目標値を省エネに対してさらに適した値へと変更することで、電力使用者の省エネ意識を一年を通してより効率よく向上させることが可能となった。   By using the demand target value changing device configured as described above, the demand target value used in the demand monitoring system is changed to a value that is more suitable for energy saving. Through this, it became possible to improve more efficiently.

従来のデマンド監視システムを用いたデマンド監視の一例を示す概要図Schematic diagram showing an example of demand monitoring using a conventional demand monitoring system 本件発明のデマンド目標値変更装置を用いたデマンド監視システムの一例を示す概要図Schematic diagram showing an example of a demand monitoring system using the demand target value changing device of the present invention 実施形態1のデマンド目標値変更装置の機能ブロックの一例を示す図The figure which shows an example of the functional block of the demand target value change apparatus of Embodiment 1. 実施形態1の新デマンド目標値の算出方法の一例を示す概要図FIG. 4 is a schematic diagram illustrating an example of a method for calculating a new demand target value according to the first embodiment. 実施形態1の新デマンド目標値の算出方法の別の一例を示す概要図Schematic diagram showing another example of a new demand target value calculation method according to the first embodiment. 実施形態1の新デマンド目標値の算出方法の別の一例を示す概要図Schematic diagram showing another example of a new demand target value calculation method according to the first embodiment. 実施形態1の新デマンド目標値の算出方法の別の一例を示す概要図Schematic diagram showing another example of a new demand target value calculation method according to the first embodiment. 実施形態1の新デマンド目標値の算出方法の別の一例を示す概要図Schematic diagram showing another example of a new demand target value calculation method according to the first embodiment. 実施形態1の新デマンド目標値の算出方法の別の一例を示す概要図Schematic diagram showing another example of a new demand target value calculation method according to the first embodiment. 実施形態1のデマンド目標値変更装置を構成する基本的な各構成をハードウェアとして実現した際の構成の一例を示す概略図Schematic which shows an example of a structure when each basic structure which comprises the demand target value change apparatus of Embodiment 1 is implement | achieved as hardware. 実施形態1のデマンド目標値変更装置における処理の流れの一例を示す図The figure which shows an example of the flow of a process in the demand target value change apparatus of Embodiment 1. 実施形態2のデマンド目標値変更装置の機能ブロックの一例を示す図The figure which shows an example of the functional block of the demand target value change apparatus of Embodiment 2. 実施形態2のデマンド目標値変更装置を構成する基本的な各構成をハードウェアとして実現した際の構成の一例を示す概略図Schematic which shows an example of a structure when each basic structure which comprises the demand target value change apparatus of Embodiment 2 is implement | achieved as hardware. 実施形態2のデマンド目標値変更装置における処理の流れの一例を示す図The figure which shows an example of the flow of a process in the demand target value change apparatus of Embodiment 2. 実施形態3のデマンド目標値変更装置の機能ブロックの一例を示す図The figure which shows an example of the functional block of the demand target value change apparatus of Embodiment 3. 実施形態3のデマンド目標値変更装置を構成する基本的な各構成をハードウェアとして実現した際の構成の一例を示す概略図Schematic which shows an example of a structure when each basic structure which comprises the demand target value change apparatus of Embodiment 3 is implement | achieved as hardware. 実施形態3のデマンド目標値変更装置における処理の流れの一例を示す図The figure which shows an example of the flow of a process in the demand target value change apparatus of Embodiment 3. 実施形態4のデマンド目標値変更装置の機能ブロックの一例を示す図The figure which shows an example of the functional block of the demand target value change apparatus of Embodiment 4. 実施形態4のデマンド目標値変更装置を構成する基本的な各構成をハードウェアとして実現した際の構成の一例を示す概略図Schematic which shows an example of a structure at the time of implement | achieving each basic structure which comprises the demand target value change apparatus of Embodiment 4 as hardware. 実施形態4のデマンド目標値変更装置における処理の流れの一例を示す図The figure which shows an example of the flow of a process in the demand target value change apparatus of Embodiment 4. デマンド目標値変更装置のメンテナンス方法の処理の流れの一例を示す図The figure which shows an example of the flow of a process of the maintenance method of a demand target value change apparatus

以下、本発明の各実施形態について図面と共に説明する。実施形態と請求項の相互の関係は以下のとおりである。実施形態1は主に請求項1から3、8から10、15から17、22などに対応する。実施形態2は主に請求項4、11、18、22などに対応する。実施形態3は主に請求項5、12、19、22などに対応する。実施形態4は主に請求項6、7、13、14、20、21、22などに対応する。なお、本発明は本明細書の記載に何ら限定されるものではなく、その要旨を逸脱しない範囲内において、様々な態様で実施しうる。
<<実施形態1>>
<概要>
Embodiments of the present invention will be described below with reference to the drawings. The relationship between the embodiment and the claims is as follows. The first embodiment mainly corresponds to claims 1 to 3, 8 to 10, 15 to 17, 22 and the like. The second embodiment mainly corresponds to claims 4, 11, 18, 22 and the like. The third embodiment mainly corresponds to claims 5, 12, 19, 22 and the like. The fourth embodiment mainly corresponds to claims 6, 7, 13, 14, 20, 21, 22 and the like. In addition, this invention is not limited to description of this specification at all, and can be implemented with various aspects within the range which does not deviate from the summary.
<< Embodiment 1 >>
<Overview>

本実施形態は、デマンド監視システムにおいて用いられるデマンド目標値を変更するためのデマンド目標値変更装置、デマンド目標値変更装置メンテナンス方法、デマンド目標値変更プログラム、記憶媒体に関する。   The present embodiment relates to a demand target value changing device, a demand target value changing device maintenance method, a demand target value changing program, and a storage medium for changing a demand target value used in a demand monitoring system.

図2は本件発明のデマンド目標値変更装置を用いたデマンド監視システムの一例を示す概要図である。例えばデマンド監視システムが設置された事業所において、電源からエアコンや照明装置、パソコン、稼動装置などの事業所内の電気設備に供給され、電力が消費される。消費される電力量は電力量計により計測されており、デマンド監視システムは電力量計から事業所内で消費される電力量を取得する。また、デマンド監視システムは取得した電力量をもとに以後消費される電力量を予測し、予測された電力量がデマンド目標値を超えるようであれば、電力使用者に警告したり、電気設備を強制停止したりすることにより、デマンドを監視している。本件発明のデマンド目標値変更装置はデマンド監視システムと接続され、デマンド監視システムにおいて用いられるデマンド目標値を省エネに対して適した値に変更することを想定している。(本明細書を通じて同様である。)   FIG. 2 is a schematic diagram showing an example of a demand monitoring system using the demand target value changing device of the present invention. For example, in a business establishment where a demand monitoring system is installed, electric power is supplied from a power supply to electrical equipment in the business establishment such as an air conditioner, a lighting device, a personal computer, and an operating device. The amount of power consumed is measured by a watt hour meter, and the demand monitoring system acquires the amount of power consumed in the office from the watt hour meter. The demand monitoring system also predicts the amount of power that will be consumed thereafter based on the acquired amount of power, and if the predicted amount of power exceeds the demand target value, warns the power user, The demand is monitored by forcibly stopping. The demand target value changing device of the present invention is connected to a demand monitoring system and assumes that the demand target value used in the demand monitoring system is changed to a value suitable for energy saving. (The same applies throughout this specification.)

なお、一般に「デマンド目標値」とは、夏場や冬場に計測される年間最大デマンド値に対して定められ、電気料金の基本料金の上昇を防止することを目的としているが、本件発明において、デマンド目標値は季節や単位時間帯における事業所内での電力消費上限目標という意味で用いられる。例えば季節や単位時間帯とは3カ月毎、1カ月毎、1週間毎、1日毎、8時間毎、4時間毎、3時間毎、2時間毎、1時間毎、30分毎、15分毎、という具合である。従って、事業所内で消費されるデマンドを所定時間毎に管理することによって一年を通して電力消費量を低く抑えるように電力使用者に省エネ意識を働かせることも目的としている。(本明細書を通じて同様である。)   In general, the “demand target value” is set for the annual maximum demand value measured in summer and winter, and is intended to prevent an increase in the basic charge of electricity charges. The target value is used to mean a power consumption upper limit target in the office in the season or unit time zone. For example, the season and unit time zone are every 3 months, every month, every week, every day, every 8 hours, every 4 hours, every 3 hours, every 2 hours, every hour, every 30 minutes, every 15 minutes , And so on. Accordingly, it is also an object to make electric power users aware of energy conservation so as to keep the power consumption low throughout the year by managing the demand consumed in the office every predetermined time. (The same applies throughout this specification.)

また、本件発明において通常、「デマンド目標値」は、電力使用者によりあらかじめ設定されるデマンド目標値のことを、「新デマンド目標値」は本件発明のデマンド目標値変更装置が算出したデマンド目標値のことを示しており、両者は区別される。デマンド目標値はデマンド監視システムに保持されており、当該値を用いてデマンドが監視されるが、デマンド目標値変更装置が新デマンド目標値を算出した際には、新デマンド目標値をデマンド目標値として用いてデマンドが監視される。(本明細書を通じて同様である。)   In the present invention, the “demand target value” is usually a demand target value preset by the power user, and the “new demand target value” is the demand target value calculated by the demand target value changing device of the present invention. The two are distinguished. The demand target value is stored in the demand monitoring system, and the demand is monitored using the value. When the demand target value changing device calculates the new demand target value, the new demand target value is changed to the demand target value. As demand is monitored. (The same applies throughout this specification.)

また、本件発明において「デマンド目標値」とは通常デマンド監視システムが設置される事業所内で消費される電力に関するデマンドに対しての目標値のことを示しているが、例えばデマンド監視システムが事業所内のエリア毎にデマンドを監視している場合には、各々のエリアにおけるデマンド目標値のことを示していても良い。その場合には、本件発明のデマンド目標値変更装置は各エリア毎にデマンド目標値を省エネに適した値へと変更する。(本明細書を通じて同様である。)
<機能的構成>
Further, in the present invention, the “demand target value” indicates a target value for the demand related to the power consumed in the office where the demand monitoring system is usually installed. When demand is monitored for each area, the demand target value in each area may be indicated. In that case, the demand target value changing device of the present invention changes the demand target value to a value suitable for energy saving for each area. (The same applies throughout this specification.)
<Functional configuration>

図3は本実施形態のデマンド目標値変更装置の機能ブロックの一例を示す図である。例えば本実施形態のデマンド目標値変更装置は、「デマンド目標値変更ルール保持部」0301と、「デマンド目標値変更判断部」0302と、「新デマンド目標値算出命令生成部」0303と、「新デマンド目標値算出部」0304と、「新デマンド目標値出力部」0305と、から構成される。   FIG. 3 is a diagram illustrating an example of functional blocks of the demand target value changing device according to the present embodiment. For example, the demand target value changing device of the present embodiment includes a “demand target value change rule holding unit” 0301, a “demand target value change determining unit” 0302, a “new demand target value calculation command generating unit” 0303, The demand target value calculation unit 0304 and the “new demand target value output unit” 0305 are configured.

なお、以下に記載するデマンド目標値変更装置の機能ブロックは、いずれもハードウェア、ソフトウェア、又はハードウェア及びソフトウェアの両方として実現され得る。具体的には、コンピュータを利用するものであれば、CPUやメインメモリ、GPU、画像メモリ、グラフィックボード、バス、あるいは二次記憶装置(ハードディスクや不揮発性メモリ、CDやDVDなどの記憶メディアとそれらのメディアの読取ドライブなど)、情報入力に利用される入力デバイス、タッチパネル、専らタッチパネルをタッチする目的で利用する電子ペン、スキャナ装置、プリンタ、その他の外部周辺装置などのハードウェア構成部、またその外部周辺装置用のインターフェース、通信用インターフェース、それらハードウェアを制御するためのドライバプログラムやその他アプリケーションプログラムなどが挙げられる。そして、メインメモリ上に展開したプログラムに従ったCPUの演算処理によって、入力デバイスやその他インターフェースなどから入力されメモリやハードウェア上に保持されているデータなどが加工、蓄積されたり、前記各ハードウェアやソフトウェアを制御するための命令が生成されたりする。ここで、上記プログラムは、モジュール化された複数のプログラムとして実現されてもよいし、2以上のプログラムを組み合わせて一のプログラムとして実現されても良い。   Note that any of the functional blocks of the demand target value changing device described below can be realized as hardware, software, or both hardware and software. Specifically, if a computer is used, a CPU, a main memory, a GPU, an image memory, a graphic board, a bus, or a secondary storage device (a storage medium such as a hard disk, a nonvolatile memory, a CD, a DVD, and the like) Media reading drives, etc.), input devices used for information input, touch panels, hardware components such as electronic pens, scanner devices, printers, and other external peripheral devices used exclusively for touch panel touch Examples include an interface for an external peripheral device, a communication interface, a driver program for controlling the hardware, and other application programs. Then, by the arithmetic processing of the CPU in accordance with the program developed on the main memory, the data input from the input device or other interface etc. and held in the memory or hardware is processed and accumulated, or each of the hardware And commands for controlling the software are generated. Here, the program may be realized as a plurality of modularized programs, or may be realized as a single program by combining two or more programs.

本発明は一または複数の装置との組み合わせによりシステムとして実現可能である。そして、このような装置の一部をソフトウェアとして構成することも可能である。さらに、そのようなソフトウェアが記録された記録媒体も当然に本発明の技術的な範囲に含まれる。(本明細書を通じて同様である。)。   The present invention can be realized as a system in combination with one or a plurality of apparatuses. A part of such an apparatus can be configured as software. Furthermore, a recording medium on which such software is recorded is naturally included in the technical scope of the present invention. (The same applies throughout this specification.)

「デマンド目標値変更ルール保持部」0301は、各日又は各単位時間帯の最大実績デマンド値と同各日又は各単位時間帯のデマンド目標値とを用いてデマンド目標値を変更するか判断するためのルールであるデマンド目標値変更ルールを保持するよう構成される。「各日又は各単位時間帯の最大実績デマンド値」とは、デマンド監視対象となる電力の午前0時から午後12時までの1日当たりに計測される48個のデマンドのうちの最大値のことを示している。また、「同各日又は各単位時間帯のデマンド目標値」とは、各日又は各単位時間帯の最大実績デマンド値が計測された日と同期間内におけるデマンド目標値のことを示している。   The “demand target value change rule holding unit” 0301 determines whether to change the demand target value using the maximum actual demand value for each day or each unit time zone and the demand target value for each day or each unit time zone. It is comprised so that the demand target value change rule which is a rule for it may be hold | maintained. "Maximum actual demand value for each day or each unit time zone" refers to the maximum value of 48 demands measured per day from midnight to 12:00 pm for the power to be monitored. Is shown. In addition, “demand target value for each day or each unit time zone” indicates a demand target value within the same period and the day when the maximum actual demand value for each day or each unit time zone is measured. .

なお、「デマンド目標値変更ルール」は各日又は各単位時間帯の最大実績デマンド値と同各日又は各単位時間帯のデマンド目標値とを用いてデマンド目標値を変更するか判断するためのルール又は/及び各日又は各単位時間帯の最大実績デマンド値と同各日又は各単位時間帯のデマンド目標値とを用いて同各日又は各単位時間帯に演算された結果に基づいてデマンド目標値を変更するか判断するためのルールであっても良い。「各日又は各単位時間帯の最大実績デマンド値と同各日又は各単位時間帯のデマンド目標値とを用いてデマンド目標値を変更するか判断するためのルール」とは、例えば所定の期間において各日又は各単位時間帯の最大実績デマンド値が同各日又は各単位時間帯のデマンド目標値を常にもしくは同期間内で所定の割合以上超過又は不足している場合や、デマンド目標値に対して最大実績デマンド値が所定の割合以上又は以下である場合等にデマンド目標値を変更する判断を下す構成が考えられる。   The "demand target value change rule" is used to determine whether to change the demand target value using the maximum actual demand value for each day or each unit time zone and the demand target value for each day or each unit time zone. Demand based on the rule or / and the result calculated for each day or each unit time zone using the maximum actual demand value for each day or each unit time zone and the demand target value for each day or each unit time zone A rule for determining whether to change the target value may be used. “Rule for determining whether to change the demand target value using the maximum actual demand value for each day or each unit time zone and the demand target value for each day or each unit time zone” is, for example, a predetermined period If the maximum actual demand value for each day or unit time zone exceeds the target target value for each day or each unit time zone, or exceeds or falls below a predetermined percentage during the same period, or the demand target value On the other hand, when the maximum actual demand value is greater than or less than a predetermined ratio, a configuration for making a determination to change the demand target value is conceivable.

また、「各日又は各単位時間帯の最大実績デマンド値と同各日又は各単位時間帯のデマンド目標値とを用いて同各日又は単位時間帯に演算された結果に基づいてデマンド目標値を変更するか判断するためのルール」として、例えば所定の期間においてデマンド監視システムから警報が一度も発せられなかった場合、すなわちデマンド監視システムが予測する予測デマンド値がデマンド目標値を一度も超過しなかった場合にデマンド目標値を変更する判断を下す構成としても良い。「予測デマンド値がデマンド目標値を一度も超過しなかった場合」には、デマンド目標値が実際に計測されるデマンド値に比べて高すぎると考えられ、デマンド目標値を適切な値へと変更する必要がある。また、所定の期間内でデマンド監視システムから警報が一度も発せられないと、当該システムが設置されている事業所内の従業員に省エネ意識を働かせることができないため、デマンド目標値を変更するほうが好ましい。   Also, “Demand target value based on the result calculated for each day or unit time zone using the maximum actual demand value for each day or unit time zone and the demand target value for each day or unit time zone” As a rule for determining whether or not to change, for example, when no warning is issued from the demand monitoring system for a predetermined period, that is, the predicted demand value predicted by the demand monitoring system has never exceeded the demand target value. It may be configured to make a determination to change the demand target value when there is not. If the predicted demand value has never exceeded the demand target value, the demand target value is considered to be too high compared to the actual measured demand value, and the demand target value is changed to an appropriate value. There is a need to. In addition, it is preferable to change the demand target value, because if the alarm is not issued once from the demand monitoring system within a predetermined period, it will not be possible to exercise energy conservation awareness for the employees in the office where the system is installed. .

なお、デマンド目標値変更ルール保持部にて保持されるデマンド目標値変更ルールは複数であっても良い。その場合には、複数のルールのうちどのルールを使用するかを電力使用者にあらかじめ設定させる構成とすることが好ましい。また、季節や単位時間帯等に応じて用いるルールを自動的に変更する構成としても良い。   Note that there may be a plurality of demand target value change rules held by the demand target value change rule holding unit. In that case, it is preferable that the power user set in advance which of the plurality of rules is to be used. Moreover, it is good also as a structure which changes the rule used according to a season, a unit time slot | zone, etc. automatically.

また、上述した「所定の期間」は、後述するデマンド目標値変更判断部においてデマンド目標値を変更すべきか判断する日の直前の期間とするのが良い。なぜなら、本願発明のデマンド目標値変更装置の趣旨は、デマンド目標値が近々の実績デマンド値に対して適切な値であるかどうかを判断し、不適切な値であった場合には適切な値に変更するものであるためである。例えば所定の期間として、デマンド目標値変更判断部においてデマンド目標値を変更すべきか判断する日の一週間前から当該日の前日までの7日間としても良い。   In addition, the “predetermined period” described above is preferably a period immediately before the date when it is determined whether the demand target value should be changed by a demand target value change determination unit described later. The purpose of the demand target value changing device of the present invention is to determine whether the demand target value is an appropriate value for the recent actual demand value, and if it is an inappropriate value, an appropriate value This is because it is to be changed. For example, the predetermined period may be seven days from one week before the day on which the demand target value is determined to be changed by the demand target value change determination unit to the day before that day.

「デマンド目標値変更判断部」0302は、デマンド目標値変更ルールを用いてデマンド目標値を変更すべきか判断するよう構成される。「判断」は所定の期間ごとに自動的に行われる構成とすることが好ましいが、電力使用者からの入力操作により行われる構成としても良い。なお、デマンド目標値変更判断部における「所定の期間」はデマンド目標値変更ルールにおける所定の期間とは別のものであるが、期間が同じであっても異なっていても良い。   The “demand target value change determination unit” 0302 is configured to determine whether the demand target value should be changed using a demand target value change rule. The “determination” is preferably performed automatically every predetermined period, but may be configured by an input operation from the power user. The “predetermined period” in the demand target value change determination unit is different from the predetermined period in the demand target value change rule, but the period may be the same or different.

デマンド目標値変更ルールの内容によっては、各日又は各単位時間帯の最大実績デマンド値と同各日又は各単位時間帯のデマンド目標値を取得する必要がある。「各日又は各単位時間帯の最大実績デマンド値」を取得するには、各日又は各単位時間帯の実績デマンド値からその最大値のみを抽出しなければならないが、例えば各日又は各単位時間帯の実績デマンド値をデマンド目標値変更装置と接続されているデマンド監視システムから取得し、各日又は各単位時間帯の最大実績デマンド値を抽出して用いる構成としても良い。また、各日又は各単位時間帯の実績デマンド値を電力量計から直接取得し、各日又は各単位時間帯の最大実績デマンド値を抽出して用いる構成としても良い。   Depending on the content of the demand target value change rule, it is necessary to acquire the demand target value for each day or each unit time zone as well as the maximum actual demand value for each day or each unit time zone. In order to obtain “the maximum actual demand value for each day or each unit time zone”, only the maximum value must be extracted from the actual demand value for each day or each unit time zone. For example, each day or each unit The actual demand value in the time zone may be acquired from a demand monitoring system connected to the demand target value changing device, and the maximum actual demand value in each day or each unit time zone may be extracted and used. Moreover, it is good also as a structure which acquires the actual demand value of each day or each unit time slot | zone directly from a watt-hour meter, and extracts and uses the maximum actual demand value of each day or each unit time slot | zone.

「新デマンド目標値算出命令生成部」0303とは、デマンド目標値変更判断部での判断結果がデマンド目標値を変更すべきとの判断結果である場合に新たなデマンド目標値を算出する命令を生成するよう構成される。算出された命令は後述する新デマンド目標値算出部に送信されることが好ましいが、電力使用者に送信される構成としても良い。本構成をとることにより、電力使用者にデマンド目標値の変更の要否を確認することができる。例えばデマンド監視システムが設置されている事業所内でイベント等が開催されたために所定の期間内で実績デマンド値がデマンド目標値を常に超過してしまう場合がある。本場合には、電力使用者にとってデマンド目標値の更新は必要ない場合がある。その際に電力使用者がデマンド目標値の変更の要否を確認し、その結果をデマンド目標値変更装置が受信するような構成をとると、より効率的にデマンド監視システムのデマンド目標値を設定することができる。(詳しくは実施形態3で説明する。)   The “new demand target value calculation command generation unit” 0303 is an instruction for calculating a new demand target value when the determination result in the demand target value change determination unit is a determination result that the demand target value should be changed. Configured to generate. The calculated command is preferably transmitted to a new demand target value calculation unit described later, but may be configured to be transmitted to the power user. By taking this configuration, it is possible to confirm to the power user whether or not the demand target value needs to be changed. For example, since an event or the like is held in an office where a demand monitoring system is installed, the actual demand value may always exceed the demand target value within a predetermined period. In this case, it may not be necessary for the power user to update the demand target value. At that time, if the power user confirms whether the demand target value needs to be changed and the demand target value changing device receives the result, the demand target value of the demand monitoring system is set more efficiently. can do. (Details will be described in Embodiment 3.)

「新デマンド目標値算出部」0304は、生成された新デマンド目標値算出命令に応じて新デマンド目標値を算出するよう構成される。算出された新デマンド目標値は、算出された日時とともにデマンド目標値変更装置の所定の記憶領域に保持される構成とする構成としても良い。新デマンド目標値算出部の第一の態様として、新デマンド目標値DTnew(j)を所定の期間(n日間又はn個の単位単位時間帯間)の各日又は各単位時間帯の最大実績デマンド値D(i)と同期間の各日又は各単位時間帯のデマンド目標値D(i)と調整係数αと新デマンド目標値を設定すべき日又は単位時間帯の旧デマンド目標値D(j)を用いて式1を含む数式により算出する。すなわち、第一の態様において新デマンド目標値は、所定の期間内の各日又は各単位時間帯における最大実績デマンド値と同各日又は各単位時間帯のデマンド目標値の差の平均値に調整係数αをかけたものを旧デマンド目標値に加えることにより算出される。なお、iは所定の期間内のうちの一日又は一つの単位時間帯について示しており、jは新デマンド目標値を設定すべき日又は単位時間帯のうちの一日又は一つの単位時間帯について示している。 The “new demand target value calculation unit” 0304 is configured to calculate a new demand target value according to the generated new demand target value calculation command. The calculated new demand target value may be configured to be stored in a predetermined storage area of the demand target value changing device together with the calculated date and time. As a first aspect of the new demand target value calculation unit, the new demand target value D Tnew (j) is set to the maximum result of each day or each unit time zone in a predetermined period (n days or between n unit unit time zones). The demand target value D T (i) for each day or each unit time zone between the demand value D (i) and the same period, the adjustment factor α, and the old demand target value D for the day or unit time zone for which the new demand target value should be set It calculates by numerical formula containing Formula 1 using T (j). That is, in the first aspect, the new demand target value is adjusted to the average value of the difference between the demand target value for each day or each unit time zone and the maximum actual demand value for each day or each unit time zone within the predetermined period. It is calculated by adding the product of the coefficient α to the old demand target value. Note that i represents one day or one unit time zone within a predetermined period, and j represents one day or one unit time zone within a day or unit time zone for which a new demand target value should be set. Shows about.

Figure 0005743250
Figure 0005743250

なお、「式1を含む数式」としたのは「式1」のみとすると、第三者による実質的な特許侵害を許すことを危惧したためである。代表的には、各日又は各単位時間帯の最大実績デマンド値D(i)、同期間の各日又は各単位時間帯のデマンド目標値D(i)、新デマンド目標値を設定すべき日又は単位時間帯の旧デマンド目標値D(j)とほぼ同じ値(例えば0.99倍した値)を用いて式1を利用するような場合も権利範囲に含まれるようにするためである。また「含む」とした趣旨も同様であり、例えば第三者が式1に0.1を加えたような式を利用するような場合も権利範囲に含まれるようにするためである。(以後の態様についても同様である。) It should be noted that the reason why “the mathematical formula including formula 1” is used is that there is a concern that if only “formula 1” is used, substantial patent infringement by a third party is allowed. Typically, the maximum actual demand value D (i) for each day or each unit time zone, the demand target value D T (i) for each day or each unit time zone during the synchronization, and the new demand target value should be set. In order to ensure that the scope of rights is also included in the case where Formula 1 is used using a value (for example, a value multiplied by 0.99) that is almost the same as the old demand target value D T (j) of the day or unit time zone. is there. The meaning of “include” is also the same. For example, a case where a third party uses an expression obtained by adding 0.1 to Expression 1 is also included in the scope of rights. (The same applies to the subsequent embodiments.)

図4は第一の態様の新デマンド目標値の算出方法の一例を示す概要図である。図4(A)は各日又は各単位時間帯の最大実績デマンド値がデマンド目標値を超過している場合を、図4(B)は不足している場合を示している。また、各図において(2)は各日又は各単位時間帯の最大実績デマンド値とデマンド目標値の関係について、(1)は各日又は各単位時間帯の最大実績デマンド値とデマンド目標値の差について示している。図4(A)及び図4(B)において、新デマンド目標値(f)は、月曜から日曜までの7個の各日又は各単位時間帯の最大実績デマンド値と同各日又は各単位時間帯のデマンド目標値(a)との差(b)に関して平均値(c)を算出し、当該平均値に調整係数αをかけた値(e)を旧デマンド目標値(d)に加えることにより算出される。本構成をとることにより、新デマンド目標値に近々のデマンド値を反映させ、過度に省エネ意識の低すぎたり高すぎたりすることのない新デマンド目標値を算出することができる。   FIG. 4 is a schematic diagram showing an example of a method for calculating a new demand target value according to the first aspect. 4A shows a case where the maximum actual demand value for each day or each unit time zone exceeds the demand target value, and FIG. 4B shows a case where the maximum actual demand value is insufficient. In each figure, (2) shows the relationship between the maximum actual demand value and demand target value for each day or each unit time zone, and (1) shows the maximum actual demand value and demand target value for each day or each unit time zone. Shows the difference. In FIG. 4 (A) and FIG. 4 (B), the new demand target value (f) is the same for each day or each unit time as the maximum actual demand value of seven days or each unit time zone from Monday to Sunday. By calculating an average value (c) with respect to the difference (b) from the band demand target value (a), and adding the value (e) obtained by multiplying the average value by the adjustment coefficient α to the old demand target value (d). Calculated. By adopting this configuration, it is possible to calculate a new demand target value that reflects an immediate demand value in the new demand target value and that is not excessively low or too high in energy conservation awareness.

なお、新デマンド目標値算出部にて算出される新デマンド目標値は、新デマンド目標値算出時以降の全ての旧デマンド目標値を対象としても良い。図に示す例において説明すると、月曜から日曜までの7個の各日又は各単位時間帯の最大実績デマンド値と同各日又は各単位時間帯のデマンド目標値(a)との差(b)に関する平均値(c)は、翌日である月曜だけではなく火曜日以降の旧デマンド目標値(d)にも加えられ、後に新たな新デマンド目標値が算出されるまで用いられる構成としても良い。   Note that the new demand target value calculated by the new demand target value calculation unit may target all old demand target values after the new demand target value is calculated. Explaining in the example shown in the figure, the difference (b) between the maximum actual demand value of each of the seven days from Monday to Sunday or each unit time zone and the demand target value (a) of each day or each unit time zone The average value (c) may be used not only for the next Monday but also for the old demand target value (d) after Tuesday and used until a new new demand target value is calculated later.

しかしながら、例えばデマンド目標値変更判断部における判断が毎日行われる場合には、月曜日の新デマンド目標値が前週の月曜から日曜までの7個の各日又は各単位時間帯の最大実績デマンド値と同各日又は各単位時間帯のデマンド目標値を参考に定められ、火曜日の新デマンド目標値が前週の火曜から今週の月曜までの7個の各日又は各単位時間帯の最大実績デマンド値と同各日又は各単位時間帯のデマンド目標値を参考に定められても良い。なお、火曜日の新デマンド目標値算出の際に用いられる「各日又は各単位時間帯のデマンド目標値」とは、月曜日に算出された新デマンド目標値であっても良いし、もともと電力使用者により設定されていた旧デマンド目標値であっても良い。   However, for example, when the determination in the demand target value change determination unit is performed every day, the new demand target value for Monday is the same as the maximum actual demand value for each of seven days or each unit time zone from Monday to Sunday of the previous week. The demand target value for each day or each unit time zone is determined by reference, and the new demand target value for Tuesday is the same as the maximum actual demand value for each of the seven days or each unit time zone from Tuesday of the previous week to Monday of this week. It may be determined with reference to the demand target value of each day or each unit time zone. The “demand target value for each day or each unit time zone” used when calculating the new demand target value on Tuesday may be the new demand target value calculated on Monday, or originally the power user It may be the old demand target value set by.

第一の態様において、調整係数αは0<α≦kの範囲で任意に設定することができ、αが大きいほどデマンド目標値の変更時の変化が大きくなる。αはデマンド目標値変更装置が設置される地域、業種などにより適切に設定されることが好ましい。例えばαが大きすぎると、各日の実績デマンド値が増加傾向にある場合には新デマンド目標値が適切な値と比べて大きく算出されてしまうため、省エネ意識の低いデマンド目標値となって電力使用者の省エネ意識を向上させることができず、一方各日の実績デマンド値が減少傾向にある場合には新デマンド目標値が適切な値と比べて小さく算出されてしまうために、省エネ意識の高すぎるデマンド目標値となって非効率的なデマンド監視が行われてしまう。なお、kの値は2程度が好ましい。   In the first aspect, the adjustment coefficient α can be arbitrarily set within the range of 0 <α ≦ k, and the change when the demand target value is changed increases as α increases. α is preferably set appropriately depending on the region where the demand target value changing device is installed, the type of business, and the like. For example, if α is too large, the new demand target value will be calculated larger than the appropriate value if the actual demand value for each day is increasing. However, if the actual demand value for each day is on a decreasing trend, the new demand target value will be calculated smaller than the appropriate value. The demand target value is too high, and inefficient demand monitoring is performed. The value of k is preferably about 2.

なお、αは電力使用者により任意に設定可能であるが、例えば季節や外気温に応じて自動的に変更されるような構成としても良い。具体的には、夏場にはαが小さく、冬場にはαが大きく設定される構成とすると、αを一定とするよりも季節に応じて省エネに適したデマンド目標値を設定することが可能となる。   Note that α can be arbitrarily set by the power user, but may be configured to be automatically changed according to, for example, the season or the outside temperature. Specifically, if α is set to be small in the summer and α is set to be large in the winter, it is possible to set a demand target value suitable for energy saving according to the season rather than keeping α constant. Become.

第一の態様において、所定の期間は任意に設定することが可能であるが、一週間程度であることが好ましい。所定の期間が短すぎても長すぎても、新デマンド目標値に近々の各日又は各単位時間帯の最大実績デマンド値の変化の傾向を反映させることができず、効率的でない。なお、新デマンド目標値算出部における「所定の期間」は、デマンド目標値変更ルールやデマンド目標値変更判断部におけるものと異なるものであるが、期間は同じであっても異なっていても良い。   In the first aspect, the predetermined period can be arbitrarily set, but is preferably about one week. If the predetermined period is too short or too long, the new demand target value cannot reflect the tendency of the change in the maximum actual demand value in each day or each unit time zone, which is not efficient. The “predetermined period” in the new demand target value calculation unit is different from that in the demand target value change rule or the demand target value change determination unit, but the period may be the same or different.

新デマンド目標値算出部の第二の態様として、生成された新デマンド目標値算出命令に応じて、新デマンド目標値DTnew(j)を所定の期間(n日間又はn個の単位時間帯間)の各日又は各単位時間帯の最大実績デマンド値D(i)と同期間の各日又は各単位時間帯のデマンド目標値D(i)と調整係数βと新デマンド目標値を設定すべき日又は単位時間帯の旧デマンド目標値D(j)を用いて式2を含む数式により算出する。すなわち、第二の態様において新デマンド目標値は、所定の期間内における各日又は各単位時間帯の最大実績デマンド値の最大値と同各日又は各単位時間帯のデマンド目標値の差に調整係数βをかけたものを旧デマンド目標値に加えることにより算出される。なお、所定の期間内で各日又は各単位時間帯の最大実績デマンド値と同各日又は各単位時間帯のデマンド目標値が全く等しい場合には、新デマンド目標値が算出されずにデマンド目標値の変更が行われない構成や、同各日又は各単位時間帯のデマンド目標値をそのまま新デマンド目標値として算出する構成としても良い。また、iは所定の期間内のうちの一日又は一つの単位時間帯について示しており、jは新デマンド目標値を設定すべき日又は単位時間帯のうちの一日又は一つの単位時間帯について示している。 As a second aspect of the new demand target value calculation unit, the new demand target value D Tnew (j) is set to a predetermined period (n days or n unit time zones) according to the generated new demand target value calculation command. ) Of the maximum actual demand value D (i) for each day or each unit time zone, the demand target value D T (i) for each day or each unit time zone during the same period, the adjustment coefficient β, and the new demand target value. The old demand target value D T (j) of the power day or unit time zone is used to calculate the numerical value including Expression 2. That is, in the second aspect, the new demand target value is adjusted to the difference between the maximum actual demand value for each day or each unit time zone and the demand target value for each day or each unit time zone within a predetermined period. It is calculated by adding the product of the coefficient β to the old demand target value. If the maximum actual demand value for each day or each unit time zone within the specified period is exactly the same as the demand target value for each day or each unit time zone, the new demand target value is not calculated and the demand target value is not calculated. A configuration in which the value is not changed, or a configuration in which the demand target value for each day or each unit time zone is directly calculated as the new demand target value may be employed. Further, i represents one day or one unit time zone within a predetermined period, and j represents one day or one unit time zone among the days or unit time zones for which a new demand target value should be set. Shows about.

Figure 0005743250
Figure 0005743250

図5は第二の態様の新デマンド目標値の算出方法の一例を示す概要図である。図5(A)は各日又は各単位時間帯の最大実績デマンド値がデマンド目標値を超過している場合を、図5(B)は不足している場合を示している。また、各図において、(2)は各日又は各単位時間帯の最大実績デマンド値とデマンド目標値の関係について、(1)は各日又は各単位時間帯の最大実績デマンド値とデマンド目標値の差について示している。図5(A)及び図5(B)において、新デマンド目標値(f)は、月曜から日曜までの7個の各日又は各単位時間帯の最大実績デマンド値とデマンド目標値(a)の2つの値の差(b)の最大値(c)に調整係数βをかけた値(e)を、旧デマンド目標値(d)に加えることにより算出される。本構成をとることにより、近々の各日又は各単位時間帯の最大実績デマンド値を反映した新デマンド目標値を算出することが可能となり、第一の態様と比べて電力使用者が比較的達成しやすいデマンド目標値を設定することが可能となる。   FIG. 5 is a schematic diagram showing an example of a new demand target value calculation method according to the second aspect. FIG. 5A shows a case where the maximum actual demand value of each day or each unit time zone exceeds the demand target value, and FIG. 5B shows a case where it is insufficient. In each figure, (2) shows the relationship between the maximum actual demand value and demand target value for each day or each unit time zone, and (1) shows the maximum actual demand value and demand target value for each day or each unit time zone. The difference is shown. In FIG. 5A and FIG. 5B, the new demand target value (f) is the maximum actual demand value and demand target value (a) for seven days or unit time zones from Monday to Sunday. A value (e) obtained by multiplying the maximum value (c) of the difference (b) between the two values by the adjustment coefficient β is added to the old demand target value (d). By adopting this configuration, it is possible to calculate a new demand target value that reflects the maximum actual demand value of each day or each unit time zone in the near future, which is relatively achieved by power users compared to the first mode. It is possible to set a demand target value that is easy to do.

なお、第一の態様と同様、新デマンド目標値算出部における所定の期間は任意に設定することが可能であるが、一週間程度とすることが好ましい。所定の期間が短すぎても長すぎても、新デマンド目標値に近々の各日又は各単位時間帯の最大実績デマンド値の変化の傾向を反映させることができず、効率的でない。   As in the first aspect, the predetermined period in the new demand target value calculation unit can be arbitrarily set, but is preferably about one week. If the predetermined period is too short or too long, the new demand target value cannot reflect the tendency of the change in the maximum actual demand value in each day or each unit time zone, which is not efficient.

また、第二の態様において、調整係数βは0<β≦k'の範囲で自由に設定することができ、βが大きいほどデマンド目標値の変更時の変化が大きくなる。βはデマンド目標値変更装置が設置される地域、業種などにより適切に設定されることが好ましく、季節や外気温に応じて自動的に変更されるような構成としても良い。なお、βの値は2程度が好ましい。   In the second mode, the adjustment coefficient β can be freely set in the range of 0 <β ≦ k ′, and the larger the β is, the larger the change when the demand target value is changed. β is preferably set appropriately depending on the region where the demand target value changing device is installed, the type of business, and the like, and may be configured to be automatically changed according to the season and the outside temperature. The value of β is preferably about 2.

新デマンド目標値算出部の第三の態様として、生成された新デマンド目標値算出命令に応じて、新デマンド目標値DTnew(j)を所定の期間(n日間又はn個の単位単位時間帯間)の各日又は各単位時間帯の最大実績デマンド値D(i)と同期間の各日又は各単位時間帯のデマンド目標値D(i)と調整係数β'と新デマンド目標値を設定すべき日又は単位時間帯の旧デマンド目標値D(j)を用いて式3を含む数式により算出する。すなわち、第三の態様において新デマンド目標値は、所定の期間内における各日又は各単位時間帯の最大実績デマンド値の最小値と同各日又は各単位時間帯のデマンド目標値の差に調整係数β'をかけたものを旧デマンド目標値に加えることにより算出される。なお、所定の期間内で各日又は各単位時間帯の最大実績デマンド値と同各日又は各単位時間帯のデマンド目標値が全く等しい場合には、新デマンド目標値が算出されずにデマンド目標値の変更が行われない構成や、同各日又は各単位時間帯のデマンド目標値をそのまま新デマンド目標値として算出する構成としても良い。また、iは所定の期間内のうちの一日又は一つの単位時間帯について示しており、jは新デマンド目標値を設定すべき日又は単位時間帯のうちの一日又は一つの単位時間帯について示している。 As a third aspect of the new demand target value calculation unit, the new demand target value D Tnew (j) is set to a predetermined period (n days or n unit unit time zones) according to the generated new demand target value calculation command. Between the maximum actual demand value D (i) of each day or unit time zone, the demand target value D T (i) of each day or each unit time zone, the adjustment coefficient β ′, and the new demand target value Using the old demand target value D T (j) for the day or unit time zone to be set, the calculation is performed by a formula including Formula 3. That is, in the third aspect, the new demand target value is adjusted to the difference between the minimum value of the maximum actual demand value for each day or each unit time zone and the demand target value for each day or each unit time zone within a predetermined period. It is calculated by adding the product of the coefficient β ′ to the old demand target value. If the maximum actual demand value for each day or each unit time zone within the specified period is exactly the same as the demand target value for each day or each unit time zone, the new demand target value is not calculated and the demand target value is not calculated. A configuration in which the value is not changed, or a configuration in which the demand target value for each day or each unit time zone is directly calculated as the new demand target value may be employed. Further, i represents one day or one unit time zone within a predetermined period, and j represents one day or one unit time zone among the days or unit time zones for which a new demand target value should be set. Shows about.

Figure 0005743250
Figure 0005743250

図6は第三の態様の新デマンド目標値の算出方法の一例を示す概要図である。図6(A)は各日又は各単位時間帯の最大実績デマンド値がデマンド目標値を超過している場合を、図6(B)は不足している場合を示している。また、各図において、(2)は各日又は各単位時間帯の最大実績デマンド値とデマンド目標値の関係について、(1)は各日又は各単位時間帯の最大実績デマンド値とデマンド目標値の差について示している。図6(A)及び図6(B)において、新デマンド目標値(f)は、月曜から日曜までの7個の各日又は各単位時間帯の最大実績デマンド値とデマンド目標値(a)の2つの値の差(b)の最大値(c)に調整係数β'をかけた値(e)を旧デマンド目標値(d)に加えることにより算出される。本構成をとることにより、近々の各日又は各単位時間帯の最大実績デマンド値の最小値を反映した新デマンド目標値を算出することが可能となり、第一又は第二の態様において算出される新デマンド目標値と比べ、電力使用者に求める省エネ意識の高いデマンド目標値となる。   FIG. 6 is a schematic diagram illustrating an example of a method for calculating a new demand target value according to the third aspect. FIG. 6 (A) shows a case where the maximum actual demand value for each day or each unit time zone exceeds the demand target value, and FIG. 6 (B) shows a case where it is insufficient. In each figure, (2) shows the relationship between the maximum actual demand value and demand target value for each day or each unit time zone, and (1) shows the maximum actual demand value and demand target value for each day or each unit time zone. The difference is shown. In FIG. 6 (A) and FIG. 6 (B), the new demand target value (f) is the maximum actual demand value and demand target value (a) of seven days or unit time zones from Monday to Sunday. It is calculated by adding a value (e) obtained by multiplying the maximum value (c) of the difference (b) between the two values by the adjustment coefficient β ′ to the old demand target value (d). By adopting this configuration, it becomes possible to calculate a new demand target value that reflects the minimum value of the maximum actual demand value of each day or each unit time zone in the near future, and is calculated in the first or second mode. Compared to the new demand target value, it becomes a demand target value with high energy saving consciousness required for electric power users.

なお、第一又は第二の態様と同様、所定の期間は任意に設定することが可能であるが、一週間程度とすることが好ましい。所定の期間が短すぎても長すぎても、新デマンド目標値に近々の各日又は各単位時間帯の最大実績デマンド値の変化の傾向を反映させることができず、効率的でない。   As in the first or second aspect, the predetermined period can be arbitrarily set, but is preferably about one week. If the predetermined period is too short or too long, the new demand target value cannot reflect the tendency of the change in the maximum actual demand value in each day or each unit time zone, which is not efficient.

また、第三の態様において、調整係数β'は0<β'≦k''の範囲で自由に設定することができ、β'が大きいほどデマンド目標値の変更時の変化が大きくなる。β'はデマンド目標値変更装置が設置される地域、業種などにより適切に設定されることが好ましく、季節や外気温に応じて自動的に変更されるような構成としても良い。なお、k''の値は2程度が好ましい。   In the third mode, the adjustment coefficient β ′ can be freely set in the range of 0 <β ′ ≦ k ″, and the larger the β ′, the larger the change when the demand target value is changed. β ′ is preferably set appropriately depending on the region where the demand target value changing device is installed, the type of industry, etc., and may be configured to be automatically changed according to the season and the outside temperature. The value of k ″ is preferably about 2.

新デマンド目標値算出部の第四の態様として、所定の期間(n日間又はn個の単位単位時間帯間)の各日又は各単位時間帯の最大実績デマンド値D(i)と同期間の各日又は各単位時間帯のデマンド目標値D(i)に式4の関係が成立する場合に新デマンド目標値DTnew(j)を所定の期間(n日間又はn個の単位時間帯間)の各日又は各単位時間帯の最大実績デマンド値D(i)と同期間の各日又は各単位時間帯のデマンド目標値D(i)と調整係数β''と新デマンド目標値を設定すべき日又は単位時間帯の旧デマンド目標値D(j)を用いて式5を含む数式により算出する(複号同順)。すなわち、まず式4において所定の期間内で各日又は各単位時間帯の最大実績デマンド値と同各日又は各単位時間帯のデマンド目標値の大小関係を比較する。そして、所定の期間内でデマンド目標値と最も異なる各日又は各単位時間帯の最大実績デマンド値との差に調整係数β''をかけたものを、式4の大小関係に応じて旧デマンド目標値に加えるもしくは除することにより、新デマンド目標値が算出される。なお、所定の期間内で各日又は各単位時間帯の最大実績デマンド値と同各日又は各単位時間帯のデマンド目標値が全く等しい場合には、新デマンド目標値が算出されずにデマンド目標値の変更が行われない構成や、同各日又は各単位時間帯のデマンド目標値をそのまま新デマンド目標値として算出する構成としても良い。また、iは所定の期間内のうちの一日又は一つの単位時間帯について示しており、jは新デマンド目標値を設定すべき日又は単位時間帯のうちの一日又は一つの単位時間帯について示している。 As a fourth mode of the new demand target value calculation unit, the maximum actual demand value D (i) of each day or each unit time zone in a predetermined period (n days or between n unit unit time zones) and the same period The new demand target value D Tnew (j) is set to a predetermined period (n days or n unit time zones) when the relationship of Equation 4 is established for the demand target value D T (i) of each day or each unit time zone. ) Of the maximum actual demand value D (i) of each day or each unit time zone, the demand target value D T (i) of each day or each unit time zone during the same period, the adjustment coefficient β ″, and the new demand target value Using the old demand target value D T (j) of the day or unit time zone to be set, the calculation is performed by a formula including Formula 5 (compound order). That is, first, in Formula 4, the magnitude relationship between the maximum actual demand value for each day or each unit time zone and the demand target value for each day or each unit time zone within a predetermined period is compared. Then, the difference between the demand target value and the maximum actual demand value of each day or each unit time zone within the predetermined period multiplied by the adjustment coefficient β ″ is used to obtain the old demand according to the magnitude relationship of Equation 4. A new demand target value is calculated by adding to or subtracting from the target value. If the maximum actual demand value for each day or each unit time zone within the specified period is exactly the same as the demand target value for each day or each unit time zone, the new demand target value is not calculated and the demand target value is not calculated. A configuration in which the value is not changed, or a configuration in which the demand target value for each day or each unit time zone is directly calculated as the new demand target value may be employed. Further, i represents one day or one unit time zone within a predetermined period, and j represents one day or one unit time zone among the days or unit time zones for which a new demand target value should be set. Shows about.

Figure 0005743250
Figure 0005743250

Figure 0005743250
Figure 0005743250

図7は第四の態様の新デマンド目標値の算出方法の一例を示す概要図である。図7(A)は各日又は各単位時間帯の最大実績デマンド値がデマンド目標値を超過している場合を、図7(B)は不足している場合を示している。また、各図において、(2)は各日又は各単位時間帯の最大実績デマンド値とデマンド目標値の関係について、(1)は各日又は各単位時間帯の最大実績デマンド値とデマンド目標値の差について示している。図7(A)及び図7(B)において、新デマンド目標値(f)は、月曜から日曜までの7個の各日又は各単位時間帯の最大実績デマンド値とデマンド目標値(a)との2つの値の差(b)において絶対値の最も大きい値(c)に調整係数β''をかけた値(e)を旧デマンド目標値(d)に加えることにより算出される。本構成をとることにより、デマンド目標値が上昇傾向にある場合には第二の態様と同様の新デマンド目標値を、デマンド目標値が減少傾向にある場合には第三の態様と同様の新デマンド目標値を算出することができる。   FIG. 7 is a schematic diagram showing an example of a method for calculating a new demand target value according to the fourth aspect. FIG. 7A shows a case where the maximum actual demand value of each day or each unit time zone exceeds the demand target value, and FIG. 7B shows a case where it is insufficient. In each figure, (2) shows the relationship between the maximum actual demand value and demand target value for each day or each unit time zone, and (1) shows the maximum actual demand value and demand target value for each day or each unit time zone. The difference is shown. In FIG. 7A and FIG. 7B, the new demand target value (f) is the maximum actual demand value and demand target value (a) for each of seven days or unit time zones from Monday to Sunday. The value (e) obtained by multiplying the value (c) having the largest absolute value by the adjustment coefficient β ″ in the difference (b) between the two values is added to the old demand target value (d). By adopting this configuration, when the demand target value is on an upward trend, a new demand target value similar to that in the second mode is used. When the demand target value is on a decreasing trend, the same new demand target value as in the third mode is used. The demand target value can be calculated.

なお、第一から第三の態様と同様、所定の期間は任意に設定することが可能であるが、一週間程度とすることが好ましい。所定の期間が短すぎても長すぎても、新デマンド目標値に近々の各日又は各単位時間帯の最大実績デマンド値の変化の傾向を反映させることができず、効率的でない。   As in the first to third aspects, the predetermined period can be arbitrarily set, but is preferably about one week. If the predetermined period is too short or too long, the new demand target value cannot reflect the tendency of the change in the maximum actual demand value in each day or each unit time zone, which is not efficient.

また、調整係数β''は0<β''≦k'''の範囲で自由に設定することができ、β''が大きいほどデマンド目標値の変更時の変化が大きくなる。β''はデマンド目標値変更装置が設置される地域、業種などにより適切に設定されることが好ましく、季節や外気温に応じて自動的に変更されるような構成としても良い。なお、k'''の値は2程度が好ましい。   Further, the adjustment coefficient β ″ can be freely set within the range of 0 <β ″ ≦ k ′ ″. The larger the β ″, the larger the change when the demand target value is changed. β ″ is preferably set appropriately depending on the region where the demand target value changing device is installed, the type of business, etc., and may be configured to be automatically changed according to the season and the outside temperature. The value of k ′ ″ is preferably about 2.

新デマンド目標値算出部の第五の態様として、所定の期間(n日間又はn個の単位時間帯間)の各日又は各単位時間帯の最大実績デマンド値D(i)と同期間の各日又は各単位時間帯のデマンド目標値D(i)に式6の関係が成立する場合に新デマンド目標値DTnew(j)を所定の期間(n日間又はn個の単位時間帯間)の各日又は各単位時間帯の最大実績デマンド値D(i)と同期間の各日又は各単位時間帯のデマンド目標値D(i)と調整係数β'''と新デマンド目標値を設定すべき日又は単位時間帯の旧デマンド目標値D(j)を用いて式7を含む数式により算出する(複号同順)。すなわち、まず式6において所定の期間内で各日又は各単位時間帯の最大実績デマンド値と同各日又は各単位時間帯のデマンド目標値の大小関係を比較する。そして、所定の期間内でデマンド目標値と最も近い各日又は各単位時間帯の最大実績デマンド値との差に調整係数β'''をかけたものを、式6の大小関係に応じて旧デマンド目標値に加えるもしくは除することにより、新デマンド目標値が算出される。なお、所定の期間内で各日又は各単位時間帯の最大実績デマンド値と同各日又は各単位時間帯のデマンド目標値が全く等しい場合には、新デマンド目標値が算出されずにデマンド目標値の変更が行われない構成や、同各日又は各単位時間帯のデマンド目標値をそのまま新デマンド目標値として算出する構成としても良い。また、iは所定の期間内のうちの一日又は一つの単位時間帯について示しており、jは新デマンド目標値を設定すべき日又は単位時間帯のうちの一日又は一つの単位時間帯について示している。 As a fifth aspect of the new demand target value calculation unit, each of the maximum actual demand value D (i) of each day or each unit time zone in a predetermined period (n days or between n unit time zones) and the same period The new demand target value D Tnew (j) is set to a predetermined period (n days or between n unit time periods) when the relationship of Equation 6 is established for the demand target value D T (i) for each day or each unit time slot The maximum actual demand value D (i) for each day or unit time zone, the demand target value D T (i) for each day or each unit time zone during the same period, the adjustment coefficient β ′ ″, and the new demand target value Using the old demand target value D T (j) of the day or unit time zone to be set, the calculation is performed by a formula including Formula 7 (compound order). That is, first, in Formula 6, the magnitude relationship between the maximum actual demand value for each day or each unit time zone and the demand target value for each day or each unit time zone within a predetermined period is compared. Then, the difference between the demand target value and the maximum actual demand value of each day or each unit time zone within the predetermined period multiplied by the adjustment coefficient β ′ ″ is changed according to the magnitude relationship of Equation 6. A new demand target value is calculated by adding to or subtracting from the demand target value. If the maximum actual demand value for each day or each unit time zone within the specified period is exactly the same as the demand target value for each day or each unit time zone, the new demand target value is not calculated and the demand target value is not calculated. A configuration in which the value is not changed, or a configuration in which the demand target value for each day or each unit time zone is directly calculated as the new demand target value may be employed. Further, i represents one day or one unit time zone within a predetermined period, and j represents one day or one unit time zone among the days or unit time zones for which a new demand target value should be set. Shows about.

Figure 0005743250
Figure 0005743250

Figure 0005743250
Figure 0005743250

図8は第五の態様の新デマンド目標値の算出方法の一例を示す概要図である。図8(A)は各日又は各単位時間帯の最大実績デマンド値がデマンド目標値を超過している場合を、図8(B)は不足している場合を示している。また、各図において、(2)は各日又は各単位時間帯の最大実績デマンド値とデマンド目標値の関係について、(1)は各日又は各単位時間帯の最大実績デマンド値とデマンド目標値の差について示している。図8(A)及び図8(B)において、新デマンド目標値(f)は、月曜から日曜までの7個の各日又は各単位時間帯の最大実績デマンド値とデマンド目標値(a)との2つの値の差(b)において絶対値の最も小さい値(c)に調整係数β'''をかけた値(e)を旧デマンド目標値(d)に加えることにより算出される。本構成をとることにより、デマンド目標値が上昇傾向にある場合には第三の態様と同様の新デマンド目標値を、デマンド目標値が減少傾向にある場合には第二の態様と同様の新デマンド目標値を算出することができる。   FIG. 8 is a schematic diagram illustrating an example of a new demand target value calculation method according to the fifth aspect. FIG. 8A shows a case where the maximum actual demand value for each day or each unit time zone exceeds the demand target value, and FIG. 8B shows a case where it is insufficient. In each figure, (2) shows the relationship between the maximum actual demand value and demand target value for each day or each unit time zone, and (1) shows the maximum actual demand value and demand target value for each day or each unit time zone. The difference is shown. 8A and 8B, the new demand target value (f) includes the maximum actual demand value and demand target value (a) for each of seven days or unit time zones from Monday to Sunday. The value (e) obtained by multiplying the smallest absolute value (c) by the adjustment coefficient β ′ ″ in the difference (b) between the two values is added to the old demand target value (d). By adopting this configuration, a new demand target value similar to the third aspect is used when the demand target value is increasing, and a new new target similar to the second aspect when the demand target value is decreasing. The demand target value can be calculated.

なお、第一から第四の態様と同様、所定の期間は任意に設定することが可能であるが、一週間程度とすることが好ましい。所定の期間が短すぎても長すぎても、新デマンド目標値に近々の各日又は各単位時間帯の最大実績デマンド値の変化の傾向を反映させることができず、効率的でない。   As in the first to fourth aspects, the predetermined period can be arbitrarily set, but is preferably about one week. If the predetermined period is too short or too long, the new demand target value cannot reflect the tendency of the change in the maximum actual demand value in each day or each unit time zone, which is not efficient.

また、調整係数β'''は0<β'''≦k''''の範囲で自由に設定することができ、β'''が大きいほどデマンド目標値の変更時の変化が大きくなる。β'''はデマンド目標値変更装置が設置される地域、業種などにより適切に設定されることが好ましく、季節や外気温に応じて自動的に変更されるような構成としても良い。なお、k''''の値は2程度が好ましい。   Further, the adjustment coefficient β ′ ″ can be freely set within the range of 0 <β ′ ″ ≦ k ″ ″, and the larger the β ′ ″, the larger the change when the demand target value is changed. . β ″ ′ is preferably set appropriately depending on the area where the demand target value changing device is installed, the type of industry, etc., and may be configured to be automatically changed according to the season and the outside temperature. The value of k ″ ″ is preferably about 2.

新デマンド目標値算出部の第六の態様として、所定の期間(n日間又はn個の単位時間帯間)の各日又は各単位時間帯の最大実績デマンド値D(i)と同期間の各日又は各単位時間帯のデマンド目標値D(i)に式8の関係が成立する場合に変更後の各日の新デマンド目標値DTnew(j)を所定の期間の各日又は各単位時間帯の最大実績デマンド値の近似曲線f(i)と調整係数γを用いて式9と式10を含む数式により算出する(複号同順)。すなわち、まず式8において所定の期間内で各日又は各単位時間帯の最大実績デマンド値と同各日又は各単位時間帯のデマンド目標値の大小関係を比較する。そして、所定の期間内の最大実績デマンド値の近似曲線を用いて以後の最大実績デマンド値f(j)を予測し、各日又は各単位時間帯の最大実績デマンド値の近似曲線に対する各日又は各単位時間帯の最大実績デマンド値の標準偏差δに調整係数γをかけたものを、式8の大小関係に応じて近似曲線が示す最大実績デマンド値に加えるもしくは除することにより新デマンド目標値が算出される。なお、iは所定の期間内のうちの一日又は一つの単位時間帯について示しており、jは新デマンド目標値を設定すべき日又は単位時間帯のうちの一日又は一つの単位時間帯について示している。 As a sixth aspect of the new demand target value calculation unit, each day between a maximum actual demand value D (i) of each day or each unit time zone in a predetermined period (n days or between n unit time zones) and each period When the relationship of Formula 8 is established for the demand target value D T (i) for each day or each unit time zone, the new demand target value D Tnew (j) for each day after the change is changed to each day or each unit for a predetermined period. Using the approximate curve f (i) of the maximum actual demand value in the time zone and the adjustment coefficient γ, the calculation is performed using mathematical formulas including Formula 9 and Formula 10 (in the same order). That is, first, in Formula 8, the magnitude relationship between the maximum actual demand value for each day or each unit time zone and the demand target value for each day or each unit time zone within a predetermined period is compared. Then, a subsequent maximum actual demand value f (j) is predicted using an approximate curve of the maximum actual demand value within a predetermined period, and each day or each day with respect to the approximate curve of the maximum actual demand value of each unit time zone The new demand target value is obtained by adding or dividing the standard deviation δ of the maximum actual demand value in each unit time zone to the adjustment factor γ to or from the maximum actual demand value indicated by the approximate curve according to the magnitude relationship of Equation 8. Is calculated. Note that i represents one day or one unit time zone within a predetermined period, and j represents one day or one unit time zone within a day or unit time zone for which a new demand target value should be set. Shows about.

Figure 0005743250
Figure 0005743250

Figure 0005743250
Figure 0005743250

Figure 0005743250
Figure 0005743250

図9は第六の態様の新デマンド目標値の算出方法の一例を示す概要図である。図9(A)は各日又は各単位時間帯の最大実績デマンド値が上昇傾向にある場合を、図8(B)は減少傾向にある場合を示している。図9(A)及び図9(B)において、新デマンド目標値は、各日又は各単位時間帯の最大実績デマンド値(a)の近似曲線(b)が示す予測最大実績デマンド値(c)に対し、各日又は各単位時間帯の最大実績デマンド値の近似曲線に対する各日又は各単位時間帯の最大実績デマンド値の標準偏差に調整係数γをかけた値(d)を加えるもしくは除することにより算出される。本構成をとることにより、近似曲線を用いて精度良く最大実績デマンド値を予測し、予測された値をもとにして電力使用者の省エネ意識を向上させるのに適したデマンド目標値を設定することができる。   FIG. 9 is a schematic diagram illustrating an example of a new demand target value calculation method according to the sixth aspect. FIG. 9A shows a case where the maximum actual demand value for each day or each unit time zone tends to increase, and FIG. 8B shows a case where it tends to decrease. 9A and 9B, the new demand target value is the predicted maximum actual demand value (c) indicated by the approximate curve (b) of the maximum actual demand value (a) for each day or each unit time zone. In addition, a value (d) obtained by multiplying the standard deviation of the maximum actual demand value for each day or each unit time zone by the adjustment coefficient γ with respect to the approximate curve of the maximum actual demand value for each day or each unit time zone is added or removed. Is calculated by By adopting this configuration, the maximum actual demand value is accurately predicted using the approximate curve, and a demand target value suitable for improving the energy conservation awareness of the power user is set based on the predicted value. be able to.

第六の態様において、各日又は各単位時間帯の最大実績デマンド値の近似曲線は任意の方法で求めることができ、例えば回帰分析を用いて近似曲線を算出することができる。また、算出された近似曲線を用いて実績デマンド値の近似曲線に対する標準偏差が式9により求められる。「標準偏差」とは集団のばらつきを示す指標であり、本実施形態においては標準偏差の値が大きいほど各日又は各単位時間帯の最大実績デマンド値の近似曲線に対して各日又は各単位時間帯の最大実績デマンド値がばらついていることを示している。   In the sixth aspect, the approximate curve of the maximum actual demand value for each day or each unit time zone can be obtained by any method, and for example, the approximate curve can be calculated using regression analysis. Further, the standard deviation of the actual demand value with respect to the approximate curve using the calculated approximate curve is obtained by Equation 9. The “standard deviation” is an index indicating the variation of the group. In the present embodiment, the larger the standard deviation value is, the larger the standard deviation value is, each day or each unit with respect to the approximate curve of the maximum actual demand value of each day or each unit time zone. It shows that the maximum actual demand value in the time zone varies.

なお、第六の態様において、本実施形態の新デマンド目標値算出部における所定の期間は1ヶ月程度、すなわちnは30程度とすることが好ましい。本構成をとることにより、各日又は各単位時間帯の最大実績デマンド値の近似曲線と各日又は各単位時間帯の最大実績デマンド値の差に正規分布を仮定しやすくなり、正規分布が仮定されれば予測最大実績デマンド値の値は一定の信頼性を持つこととなる。   In the sixth aspect, it is preferable that the predetermined period in the new demand target value calculation unit of the present embodiment is about one month, that is, n is about 30. This configuration makes it easier to assume a normal distribution for the difference between the approximate curve of the maximum actual demand value for each day or each unit time zone and the maximum actual demand value for each day or each unit time zone. Then, the predicted maximum actual demand value has a certain reliability.

また、第六の態様において、調整係数γはk≦γ≦kの範囲で自由に設定することができ、γが大きいほどデマンド目標値の変更時の変化が大きくなる。γはデマンド目標値変更装置が設置される地域、業種などにより適切に設定されることが好ましく、季節や外気温に応じて自動的に変更されるような構成としても良い。なお、γの値は2ないし3であること、すなわちkは2に、kは3に設定されることが好ましい。例えばγの値を2として、各日又は各単位時間帯の最大実績デマンド値の近似曲線と各日又は各単位時間帯の最大実績デマンド値の差に正規分布が仮定できるとする。すると、各日又は各単位時間帯の最大実績デマンド値が上昇傾向にある場合に各日又は各単位時間帯の最大実績デマンド値が本態様によって算出される新デマンド目標値を超過する確率は2.275%となる。また、γの値を3とした場合には0.135%となり、デマンドを監視するのに適切な新デマンド目標値を算出することが可能となる。 Further, in the sixth aspect, the adjustment coefficient γ can be freely set in the range of k 1 ≦ γ ≦ k 2 , and the change when the demand target value is changed increases as γ increases. γ is preferably set appropriately depending on the region where the demand target value changing device is installed, the type of business, and the like, and may be configured to be automatically changed according to the season and the outside temperature. It is preferable that the value of γ is 2 to 3, that is, k 1 is set to 2 and k 2 is set to 3. For example, assuming that the value of γ is 2, a normal distribution can be assumed for the difference between the approximate curve of the maximum actual demand value for each day or each unit time zone and the maximum actual demand value for each day or each unit time zone. Then, when the maximum actual demand value for each day or each unit time zone is in an upward trend, the probability that the maximum actual demand value for each day or each unit time zone exceeds the new demand target value calculated by this aspect is 2 275%. Further, when the value of γ is 3, it becomes 0.135%, and it becomes possible to calculate a new demand target value suitable for monitoring demand.

なお、「新デマンド目標値算出部」は、第一から第六の態様にて説明した新デマンド目標値算出方法のいずれか一以上を実施可能であっても良い。すなわち、上述した数式や調整係数を複数保持していても良い。その場合には、電力使用者がどの態様の数式を用いて新デマンド目標値を算出するかをあらかじめ設定しておく構成としても良い。また、季節ごとに用いられる数式が自動的に変更されるような構成としても良い。   The “new demand target value calculation unit” may be capable of performing any one or more of the new demand target value calculation methods described in the first to sixth aspects. That is, a plurality of mathematical expressions and adjustment coefficients described above may be held. In that case, it is good also as a structure which presets beforehand which electric power user calculates new demand target value using numerical formula. Moreover, it is good also as a structure that the numerical formula used for every season is changed automatically.

「新デマンド目標値出力部」0305は、算出された新デマンド目標値を出力する。「算出された新デマンド目標値を出力する」とは、例えば算出された新デマンド目標値がデマンド監視システムに送信され、当該システムにおいて用いられているデマンド目標値を変更する構成が考えられる。また、算出された新デマンド目標値を変更前のデマンド目標値とともに電力使用者のパソコンのディスプレイやメール等に出力し、デマンド目標値の変化を電力使用者に認識させる構成としても良い。
<具体的な構成>
The “new demand target value output unit” 0305 outputs the calculated new demand target value. “Output the calculated new demand target value” may be a configuration in which, for example, the calculated new demand target value is transmitted to the demand monitoring system, and the demand target value used in the system is changed. Further, the calculated new demand target value may be output together with the demand target value before the change to the display or mail of the power user's personal computer so that the power user can recognize the change of the demand target value.
<Specific configuration>

図10は本実施形態のデマンド目標値変更装置を構成する基本的な各構成をハードウェアとして実現した際の構成の一例を示す概略図である。以下では、「デマンド目標値変更判断部」、「新デマンド目標値算出命令生成部」、「新デマンド目標値算出部」、「新デマンド目標値出力部」の具体的な処理について説明する。   FIG. 10 is a schematic diagram showing an example of a configuration when the basic components constituting the demand target value changing device of the present embodiment are realized as hardware. Hereinafter, specific processes of the “demand target value change determination unit”, “new demand target value calculation command generation unit”, “new demand target value calculation unit”, and “new demand target value output unit” will be described.

なおこの図にあるように、デマンド目標値変更装置を構成する各装置は、それぞれ各種演算処理を実行するための「CPU」1001と、「記憶装置(記憶媒体)」1002と、「メインメモリ」1003と、「出力インターフェース」1004と、「入力インターフェース」1005と、を備え、入出力インターフェースを介して、例えば「ディスプレイ」1006や「デマンド監視システム」1007などの外部周辺装置と情報の送受信を行う。なお、記憶装置には「デマンド目標値変更判断プログラム」1010、「新デマンド目標値算出命令生成プログラム」1020、「新デマンド目標値算出プログラム」1030、「新デマンド目標値出力プログラム」1040が格納されており、CPUはこれら各種プログラムをメインメモリのワーク領域内に読み出して展開、実行する。なお、これらの構成は、「システムバス」1008などのデータ通信経路によって相互に接続され、情報の送受信や処理を行う。   As shown in this figure, each device constituting the demand target value changing device includes “CPU” 1001, “storage device (storage medium)” 1002, and “main memory” for executing various arithmetic processes. 1003, “output interface” 1004, and “input interface” 1005, and transmit / receive information to / from external peripheral devices such as “display” 1006 and “demand monitoring system” 1007 via the input / output interface. . The storage device stores a “demand target value change determination program” 1010, a “new demand target value calculation instruction generation program” 1020, a “new demand target value calculation program” 1030, and a “new demand target value output program” 1040. The CPU reads out these various programs into the work area of the main memory, and develops and executes them. These components are connected to each other via a data communication path such as a “system bus” 1008 to transmit / receive information and process information.

(デマンド目標値変更判断部の具体的な処理)
CPUは、記憶装置から「デマンド目標値変更判断プログラム」1010をメインメモリに読み出して実行し、データ領域のデマンド目標値変更ルールを取り出し、さらに必要に応じてデータ領域の各日又は各単位時間帯の最大実績デマンド値と同各日又は各単位時間帯のデマンド目標値を取り出してデマンド目標値を変更すべきか判断し、判断結果をメインメモリのデータ領域に格納する。
(Specific processing of the demand target value change determination unit)
The CPU reads out and executes the “demand target value change determination program” 1010 from the storage device to the main memory, retrieves the demand target value change rule of the data area, and further, if necessary, each day or each unit time zone of the data area The demand target value for each day or each unit time zone is taken out from the maximum actual demand value of each and it is determined whether the demand target value should be changed, and the determination result is stored in the data area of the main memory.

(新デマンド目標値算出命令生成部の具体的な処理)
CPUは、記憶装置から「新デマンド目標値算出命令生成プログラム」1020をメインメモリに読み出して実行し、デマンド目標値変更判断プログラムの実行による判断結果がデマンド目標値を変更すべきとの判断結果である場合に新たなデマンド目標値を算出する命令を生成し、当該情報をメインメモリのデータ領域に格納する。
(Specific processing of the new demand target value calculation command generator)
The CPU reads the “new demand target value calculation instruction generation program” 1020 from the storage device and executes it, and the determination result obtained by executing the demand target value change determination program is a determination result indicating that the demand target value should be changed. In some cases, a command for calculating a new demand target value is generated, and the information is stored in the data area of the main memory.

(新デマンド目標値算出部の具体的な処理)
CPUは、記憶装置から「新デマンド目標値算出プログラム」1030をメインメモリに読み出して実行し、新デマンド目標値算出命令生成プログラムの実行により生成された新デマンド目標値算出命令に応じて上述した第一から第六の態様に記載の数式を用いて新デマンド目標値を算出し、算出された新デマンド目標値をメインメモリのデータ領域に格納する。
(Specific processing of the new demand target value calculation unit)
The CPU reads the “new demand target value calculation program” 1030 from the storage device into the main memory and executes it, and executes the above-described first demand target value calculation command generated by executing the new demand target value calculation command generation program. The new demand target value is calculated using the mathematical formulas described in the first to sixth aspects, and the calculated new demand target value is stored in the data area of the main memory.

(新デマンド目標値出力部の具体的な処理)
CPUは、記憶装置から「新デマンド目標値出力プログラム」1040をメインメモリに読み出して実行し、新デマンド目標値算出プログラムの実行により算出された新デマンド目標値を出力インターフェース等に提供する。
<処理の流れ>
(Specific processing of the new demand target value output unit)
The CPU reads the “new demand target value output program” 1040 from the storage device into the main memory and executes it, and provides the new demand target value calculated by executing the new demand target value calculation program to the output interface or the like.
<Process flow>

図11は、本実施形態のデマンド目標値変更装置における処理の流れの一例を示す図である。同図の処理の流れは以下のステップからなる。まずステップS1101において、デマンド目標値変更ルールを用いてデマンド目標値を変更すべきか判断する(デマンド目標値変更判断ステップ)。次に、デマンド目標値を変更すべきとの判断結果である場合に、ステップS1102において、新たなデマンド目標値を算出する命令を生成する(新デマンド目標値算出命令生成ステップ)。そして、ステップS1103において、新デマンド目標値を算出する(新デマンド目標値算出ステップ)。そして、ステップS1104において、算出された新デマンド目標値を出力する(新デマンド目標値出力ステップ)。
<メンテナンス方法>
FIG. 11 is a diagram illustrating an example of a processing flow in the demand target value changing device of the present embodiment. The flow of processing in the figure consists of the following steps. First, in step S1101, it is determined whether the demand target value should be changed using a demand target value change rule (demand target value change determination step). Next, if the determination result indicates that the demand target value should be changed, a command for calculating a new demand target value is generated in step S1102 (new demand target value calculation command generating step). In step S1103, a new demand target value is calculated (new demand target value calculating step). In step S1104, the calculated new demand target value is output (new demand target value output step).
<Maintenance method>

図21はデマンド目標値変更装置のメンテナンス方法の処理の流れの一例を示す図である。本件発明のデマンド目標値変更装置を使用する際には、デマンド目標値変更ルールや上述した各態様で用いる数式のパラメータ等を調整してメンテナンスを行う必要がある。その手順として、まずステップS2101において、デマンド目標値変更ルールを変更して変更後デマンド目標値変更ルールとする(デマンド目標値変更ルール変更ステップ)。次にステップS2102において、変更後デマンド目標値変更ルールを用いてデマンド目標値を変更すべきか判断する(デマンド目標値変更判断ステップ)。そして、デマンド目標値を変更すべきとの判断結果である場合に、ステップS2103において、新たなデマンド目標値を算出する命令を生成する(新デマンド目標値算出命令生成ステップ)。そして、ステップS2104において、新デマンド目標値を算出する(新デマンド目標値算出ステップ)。そして、ステップS2105において、算出された新デマンド目標値を出力する(新デマンド目標値出力ステップ)。その後出力された新デマンド目標値が適切かどうか判断し、適切でなければデマンド目標値変更ルールや新デマンド目標値の算出に用いる数式のパラメータ等を調整し、ステップS2101に戻る。
<効果>
FIG. 21 is a diagram illustrating an example of a processing flow of the maintenance method of the demand target value changing device. When using the demand target value changing apparatus of the present invention, it is necessary to perform maintenance by adjusting the demand target value changing rules, the parameters of the mathematical formulas used in the above-described aspects, and the like. As the procedure, first, in step S2101, the demand target value change rule is changed to be a changed demand target value change rule (demand target value change rule changing step). Next, in step S2102, it is determined whether the demand target value should be changed using the changed demand target value change rule (demand target value change determination step). If it is determined that the demand target value should be changed, a command for calculating a new demand target value is generated in step S2103 (new demand target value calculation command generating step). In step S2104, a new demand target value is calculated (new demand target value calculating step). In step S2105, the calculated new demand target value is output (new demand target value output step). Thereafter, it is determined whether or not the output new demand target value is appropriate. If it is not appropriate, the demand target value change rule, the formula parameter used for calculating the new demand target value, and the like are adjusted, and the process returns to step S2101.
<Effect>

以上のような構成をとることにより、効率的にデマンド目標値を変更し、デマンド監視システムを用いて年間最大デマンド値を監視するだけではなく、さらに電力の使用者の省エネ意識を一年を通して向上させることも可能となる。
<<実施形態2>>
<構成>
By adopting the configuration described above, the demand target value can be changed efficiently and the annual maximum demand value can be monitored using a demand monitoring system. It is also possible to make it.
<< Embodiment 2 >>
<Configuration>

本実施形態のデマンド目標値変更装置は、基本的には実施形態1のデマンド目標値変更装置と同様であるが、電力供給者による電力供給状況を取得し、取得した電力供給状況がデマンド目標値を変更すべきものである場合には、デマンド目標値変更判断部の判断結果及びデマンド目標値変更算出部の算出結果によらず、取得した電力供給状況に応じて新デマンド目標値を取得する点が異なる。
<機能的構成>
The demand target value changing device of the present embodiment is basically the same as the demand target value changing device of the first embodiment, but acquires the power supply status by the power supplier, and the acquired power supply status is the demand target value. If the demand target value change determination unit and the calculation result of the demand target value change calculation unit are not changed, the new demand target value is acquired according to the acquired power supply status. Different.
<Functional configuration>

図12は本実施形態のデマンド目標値変更装置の機能ブロックの一例を示す図である。例えば本実施形態のデマンド目標値変更装置は、「デマンド目標値変更ルール保持部」1201と、「デマンド目標値変更判断部」1202と、「新デマンド目標値算出命令生成部」1203と、「新デマンド目標値算出部」1204と、「新デマンド目標値出力部」1205と、「電力供給状況取得部」1206と、「状況依存デマンド目標値算出部」1207と、から構成される。なお、「新デマンド目標値算出部」には実施形態1において示した数式や調整係数が保持されている。以下実施形態1との相違点である「電力供給状況取得部」、「状況依存デマンド目標値算出部」について説明する。   FIG. 12 is a diagram showing an example of functional blocks of the demand target value changing device of the present embodiment. For example, the demand target value changing device according to the present embodiment includes a “demand target value change rule holding unit” 1201, a “demand target value change determining unit” 1202, a “new demand target value calculation command generating unit” 1203, A demand target value calculation unit 1204, a “new demand target value output unit” 1205, a “power supply status acquisition unit” 1206, and a “situation dependent demand target value calculation unit” 1207. The “new demand target value calculation unit” holds the mathematical formulas and adjustment coefficients shown in the first embodiment. Hereinafter, the “power supply status acquisition unit” and the “situation-dependent demand target value calculation unit” which are different from the first embodiment will be described.

「電力供給状況取得部」1206は、電力供給者による電力供給状況を取得するよう構成される。「電力供給者による電力供給状況」とは、電力供給者の電力供給量に対して電力供給者が電力を供給している地域内での電力需要者群の消費電力量の総量が所定の割合以下、又は所定の割合以上、あるいは超過している場合等に電力供給者から当該電力需要者群全てに対して発信される警告のことを示している。例えば夏場に冷房の需要が増加した際に、電力供給者の供給している電力量に対して、電力需要者の電力消費量がその供給量を上回る恐れが生じる。もし電力需要者の電力消費量が電力供給者の電力供給量を上回る事態となると、電力供給地域内の各地で停電が発生し不測の事態につながる可能性があるため、電力供給者は電力の供給が逼迫すると、電力需要者に節電を求めて消費電力量を削減するよう要請する。その要請をデマンド目標値に反映させることにより、電力使用者に事態を把握させ、一層省エネ意識を持たせることが本実施形態のデマンド目標値変更装置の趣旨である。   The “power supply status acquisition unit” 1206 is configured to acquire a power supply status by a power supplier. “Power supply status by the power supplier” means that the total amount of power consumed by a group of power consumers in a region where the power supplier supplies power to the power supplier's power supply is a predetermined percentage Hereinafter, it indicates a warning transmitted from the power supplier to all the power consumer groups when, for example, a predetermined ratio is exceeded or exceeded. For example, when the demand for cooling increases in summer, there is a risk that the amount of power consumed by the power supplier exceeds the amount of power supplied by the power supplier. If the power consumption of the power consumer exceeds the power supply of the power supplier, a power outage may occur in each area in the power supply area, leading to an unexpected situation. When supply is tight, it demands power consumers to save power and reduce power consumption. The purpose of the demand target value changing device of this embodiment is to reflect the request on the demand target value to make the electric power user grasp the situation and to have more energy saving awareness.

「状況依存新デマンド目標値取得部」1207は、取得した電力供給状況がデマンド目標値を変更すべきものである場合には、デマンド目標値変更判断部の判断結果及び新デマンド目標値算出部の算出結果によらず、取得した電力供給状況に応じて新デマンド目標値を取得するよう構成される。「新デマンド目標値を取得する」とは、例えば電力供給者が電力需要者に対して要請する電力削減目標を取得し、電力削減目標に応じて新デマンド目標値を取得することが考えられる。「電力削減目標」として、各事業所の電力需要者が消費している消費電力量に対して所定の割合の電力量を削減目標値として提示される場合には、状況依存新デマンド目標値取得部において、現在事業所内で消費されている消費電力量の所定の割合の電力量を算出し、新デマンド目標値として取得する。また、予め電力供給者と電力需要者の間で電力供給状況が逼迫した際の消費電力量の削減目標値を設定されている場合には、保持されている削減目標値を新デマンド目標値として取得する。
<具体的な構成>
The “situation-dependent new demand target value acquisition unit” 1207, when the acquired power supply status should change the demand target value, the determination result of the demand target value change determination unit and the calculation of the new demand target value calculation unit Regardless of the result, the new demand target value is acquired according to the acquired power supply status. “Acquiring a new demand target value” may be, for example, acquiring a power reduction target requested by the power supplier to the power consumer and acquiring a new demand target value according to the power reduction target. When the power consumption at a predetermined ratio to the power consumption consumed by the power consumers at each business location is presented as the reduction target value as the “electricity reduction target”, obtain a situation-dependent new demand target value In the department, the power amount of a predetermined ratio of the power consumption amount currently consumed in the office is calculated and acquired as the new demand target value. In addition, if a reduction target value for power consumption when the power supply situation is tight between the power supplier and the power consumer is set in advance, the held reduction target value is set as the new demand target value. get.
<Specific configuration>

図13は本実施形態のデマンド目標値変更システムを構成する基本的な各構成をハードウェアとして実現した際の構成の一例を示す概略図である。本実施形態のデマンド目標値変更装置は、記憶装置が「電力供給状況取得プログラム」、「状況依存新デマンド目標値算出プログラム」を記憶している点を除いて、実施形態1のデマンド目標値変更装置と同様である。以下では、これまで説明していない「電力供給状況取得部」「状況依存新デマンド目標値算出部」の具体的な処理について説明する。   FIG. 13 is a schematic diagram showing an example of a configuration when the basic components constituting the demand target value changing system of the present embodiment are realized as hardware. The demand target value changing device of this embodiment is the same as that of the first embodiment except that the storage device stores a “power supply status acquisition program” and a “situation-dependent new demand target value calculation program”. It is the same as the device. Hereinafter, specific processes of the “power supply status acquisition unit” and “situation-dependent new demand target value calculation unit” that have not been described so far will be described.

なおこの図にあるように、デマンド目標値変更装置を構成する各装置は、それぞれ各種演算処理を実行するための「CPU」1301と、「記憶装置(記憶媒体)」1302と、「メインメモリ」1303と、「出力インターフェース」1304と、「入力インターフェース」1305と、「情報インターフェース」1311を備え、入出力インターフェースを介して、例えば「ディスプレイ」1306や「デマンド監視システム」1307、「コンピュータ」1312などの外部周辺装置と情報の送受信を行う。なお、記憶装置には「デマンド目標値変更判断プログラム」1310、「新デマンド目標値算出命令生成プログラム」1320、「新デマンド目標値算出プログラム」1330、「新デマンド目標値出力プログラム」1340、「電力供給状況取得プログラム」1350、「状況依存新デマンド目標値取得プログラム」1360が格納されており、CPUはこれら各種プログラムをメインメモリのワーク領域内に読み出して展開、実行する。なお、これらの構成は、「システムバス」1308などのデータ通信経路によって相互に接続され、情報の送受信や処理を行う。   As shown in this figure, each device constituting the demand target value changing device includes a “CPU” 1301, a “storage device (storage medium)” 1302, and a “main memory” for executing various arithmetic processes. 1303, “Output Interface” 1304, “Input Interface” 1305, and “Information Interface” 1311, and for example, “Display” 1306, “Demand Monitoring System” 1307, “Computer” 1312, etc. via the input / output interface Send and receive information to and from external peripherals. The storage device includes “demand target value change determination program” 1310, “new demand target value calculation command generation program” 1320, “new demand target value calculation program” 1330, “new demand target value output program” 1340, “power”. A supply status acquisition program "1350 and a" situation-dependent new demand target value acquisition program "1360 are stored, and the CPU reads out these various programs in the work area of the main memory, and expands and executes them. Note that these components are connected to each other via a data communication path such as a “system bus” 1308 to perform transmission / reception and processing of information.

(電力供給状況取得部の具体的な処理)
CPUは、記憶装置から「電力供給状況取得プログラム」1350をメインメモリに読み出して実行し、コンピュータ等の情報インターフェースから電力供給者による電力供給状況を取得し、当該情報をメインメモリのデータ領域に格納する。
(Specific processing of the power supply status acquisition unit)
The CPU reads the “power supply status acquisition program” 1350 from the storage device and executes it, acquires the power supply status by the power supplier from an information interface such as a computer, and stores the information in the data area of the main memory. To do.

(状況依存新デマンド目標値取得部の具体的な処理)
CPUは、記憶装置から「状況依存新デマンド目標値取得プログラム」1360をメインメモリに読み出して実行し、電力供給状況取得プログラムの実行により取得した電力供給状況がデマンド目標値を変更すべきものである場合には、デマンド目標値変更判断部の判断結果及び新デマンド目標値算出部の算出結果によらず、取得した電力供給状況に応じて新デマンド目標値を取得し、当該値をメインメモリのデータ領域に格納する。
<処理の流れ>
(Specific processing of the situation-dependent new demand target value acquisition unit)
When the CPU reads the “situation-dependent new demand target value acquisition program” 1360 from the storage device and executes it, the power supply status acquired by executing the power supply status acquisition program should change the demand target value The new demand target value is acquired according to the acquired power supply status regardless of the determination result of the demand target value change determination unit and the calculation result of the new demand target value calculation unit, and the value is stored in the data area of the main memory. To store.
<Process flow>

図14は、本実施形態のデマンド目標値変更装置における処理の流れの一例を示す図である。同図の処理の流れは以下のステップからなる。まずステップS1401において、電力供給者の電力供給状況を取得する(電力供給状況取得ステップ)。次に、取得した電力供給状況がデマンド目標値を変更すべきものである場合には、ステップS1402において、取得した電力供給状況に応じて新デマンド目標値を取得する(状況依存新デマンド目標値取得ステップ)。一方、取得した電力供給状況がデマンド目標値を変更すべきものでない場合には、ステップS1403において、デマンド目標値変更ルールを用いてデマンド目標値を変更すべきか判断する(デマンド目標値変更判断ステップ)。次に、デマンド目標値を変更すべきとの判断結果である場合に、ステップS1404において、新たなデマンド目標値を算出する命令を生成する(新デマンド目標値算出命令生成ステップ)。そして、ステップS1405において、新デマンド目標値を算出する(新デマンド目標値算出ステップ)。そして、ステップS1406において、算出された新デマンド目標値を出力する(新デマンド目標値出力ステップ)。
<効果>
FIG. 14 is a diagram illustrating an example of a processing flow in the demand target value changing device of the present embodiment. The flow of processing in the figure consists of the following steps. First, in step S1401, the power supply status of the power supplier is acquired (power supply status acquisition step). Next, when the acquired power supply status is to change the demand target value, in step S1402, a new demand target value is acquired according to the acquired power supply status (situation-dependent new demand target value acquisition step). ). On the other hand, if the acquired power supply status should not change the demand target value, it is determined in step S1403 whether the demand target value should be changed using a demand target value change rule (demand target value change determination step). Next, when it is a determination result that the demand target value should be changed, in step S1404, a command for calculating a new demand target value is generated (new demand target value calculation command generating step). In step S1405, a new demand target value is calculated (new demand target value calculating step). In step S1406, the calculated new demand target value is output (new demand target value output step).
<Effect>

以上のような構成をとることにより、効率的にデマンド目標値を変更し、デマンド監視システムを用いて年間最大デマンド値を監視するだけではなく、さらに電力の使用者の省エネ意識を一年を通して向上させることも可能となった。また、電力供給者の電力供給状況に応じてデマンド目標値を変更することも可能となった。
<<実施形態3>>
<構成>
By adopting the configuration described above, the demand target value can be changed efficiently and the annual maximum demand value can be monitored using a demand monitoring system. It was also possible to make it. It is also possible to change the demand target value according to the power supply status of the power supplier.
<< Embodiment 3 >>
<Configuration>

本実施形態のデマンド目標値変更装置は、基本的には実施形態1又は2のデマンド目標値変更装置と同様であるが、算出した新デマンド目標値をデマンド監視対象となる電力の電力使用者に通知し、前記電力使用者から新デマンド目標値への変更の可否を受信し、可否受信部での受信結果に応じてデマンド目標値変更命令の生成又は生成した命令を有効又は無効とする点が異なる。
<機能的構成>
The demand target value changing device of the present embodiment is basically the same as the demand target value changing device of the first or second embodiment, but the calculated new demand target value is sent to the power user of the power to be monitored. Notification, receiving whether or not the power user can change to the new demand target value, and generating or generating the demand target value change command according to the reception result in the propriety receiving unit is valid or invalid Different.
<Functional configuration>

図15は本実施形態のデマンド目標値変更装置の機能ブロックの一例を示す図である。例えば本実施形態のデマンド目標値変更装置は、「デマンド目標値変更ルール保持部」1501と、「デマンド目標値変更判断部」1502と、「新デマンド目標値算出命令生成部」1503と、「新デマンド目標値算出部」1504と、「新デマンド目標値出力部」1505と、「新デマンド目標値通知部」1506と、「可否受信部」1507と、「有効無効出力部」1508と、から構成される。なお、「新デマンド目標値算出部」には実施形態1において示した式や調整係数が保持されている。また、本実施形態のデマンド目標値変更装置は実施形態2において説明した「電力供給状況取得部」、「状況依存新デマンド目標値算出部」を含んでいても良い。以下実施形態1又は2との相違点である「新デマンド目標値通知部」、「可否受信部」、「有効無効出力部」について説明する。   FIG. 15 is a diagram illustrating an example of functional blocks of the demand target value changing device according to the present embodiment. For example, the demand target value changing device according to the present embodiment includes a “demand target value change rule holding unit” 1501, a “demand target value change determining unit” 1502, a “new demand target value calculation command generating unit” 1503, Demand target value calculation unit 1504, “New demand target value output unit” 1505, “New demand target value notification unit” 1506, “Availability reception unit” 1507, and “Valid / invalid output unit” 1508 Is done. The “new demand target value calculation unit” holds the formulas and adjustment coefficients shown in the first embodiment. Further, the demand target value changing device of the present embodiment may include the “power supply status acquisition unit” and the “situation-dependent new demand target value calculation unit” described in the second embodiment. Hereinafter, the “new demand target value notification unit”, “allowability receiving unit”, and “valid / invalid output unit” which are different from the first or second embodiment will be described.

「新デマンド目標値通知部」1506は、新デマンド目標値算出部が算出した新デマンド目標値をデマンド監視対象となる電力の電力使用者に通知するよう構成される。「電力使用者に通知する」には、例えば電力使用者のパソコンのディスプレイに算出された新デマンド目標値を表示したり、電力使用者のメールアドレスに算出された新デマンド目標値を送信することが考えられる。なお、新デマンド目標値の他に元のデマンド目標値や直近数日間又は数時間の各日又は各単位時間帯の最大実績デマンド値の変化なども通知して、電力使用者にデマンド目標値の変更を判断する際に有用な情報を提供する構成としても良い。   The “new demand target value notification unit” 1506 is configured to notify the power user of the power to be monitored for demand, the new demand target value calculated by the new demand target value calculation unit. “Notify the power user” means, for example, displaying the new demand target value calculated on the display of the power user's personal computer or sending the new demand target value calculated to the power user's e-mail address. Can be considered. In addition to the new demand target value, notify the original demand target value and the change of the maximum actual demand value for each day or unit time zone for the last several days or hours, etc. It is good also as a structure which provides useful information when judging a change.

「可否受信部」1507は、前記電力使用者から新デマンド目標値への変更の可否を受信する。デマンド監視システムのデマンド目標値を新デマンド目標値に変更するかしないかを判断し、判断結果をデマンド目標値変更装置に送信するよう構成される。「変更の可否を受信する」には、例えば電力使用者によるパソコンや携帯電話からの入力操作などが考えられる。   The “permission / rejection receiving unit” 1507 receives whether or not the power user can change to the new demand target value. It is configured to determine whether or not to change the demand target value of the demand monitoring system to the new demand target value, and to transmit the determination result to the demand target value changing device. “Reception of change availability” may be, for example, an input operation by a power user from a personal computer or a mobile phone.

「有効無効出力部」1508は、可否受信部での受信結果に応じてデマンド目標値変更命令生成部における命令の生成又は生成した命令を有効又は無効とするよう構成される。「命令の生成又は生成した命令を有効又は無効とする」とは、すなわちデマンド監視システムに対してデマンド目標値変更装置が算出した新デマンド目標値を送信することを許可又は不許可とするということである。例えば電力使用者が算出された新デマンド目標値をデマンド監視システムの新たなデマンド目標値として採用する場合には、デマンド目標値変更装置は可否受信部を通じて電力使用者からデマンド目標値を新デマンド目標値への変更することを受信し、算出された新デマンド目標値は有効であると判断され、デマンド監視システムに送信される。   The “valid / invalid output unit” 1508 is configured to validate or invalidate a command generated in the demand target value change command generation unit or a generated command in accordance with a reception result in the availability receiving unit. “Invalidate or invalidate command generation or generated command” means that it is permitted or not permitted to transmit the new demand target value calculated by the demand target value changing device to the demand monitoring system. It is. For example, when the new demand target value calculated by the power user is adopted as a new demand target value of the demand monitoring system, the demand target value changing device obtains the demand target value from the power user through the enable / disable receiving unit. The change to value is received and the calculated new demand target value is determined to be valid and transmitted to the demand monitoring system.

本構成をとることにより、デマンド目標値の変更を最終的に電力使用者に判断させることができる。例えばイベントなどの開催により所定の期間内で通常以上の電力を消費してしまった場合に、デマンド目標値変更装置が算出する新デマンド目標値は省エネの観点で適切でない可能性がある。その際には、電力使用者がデマンド目標値の変更が不要であると判断し、デマンド目標値変更装置が算出した新デマンド目標値をデマンド監視システムの新たなデマンド目標値として採用しないようにすることが可能となる。
<具体的な構成>
By adopting this configuration, it is possible to cause the power user to finally determine the change of the demand target value. For example, when an electric power more than normal is consumed within a predetermined period due to an event or the like, the new demand target value calculated by the demand target value changing device may not be appropriate from the viewpoint of energy saving. In that case, it is determined that the power user does not need to change the demand target value, and the new demand target value calculated by the demand target value changing device is not adopted as a new demand target value of the demand monitoring system. It becomes possible.
<Specific configuration>

図16は本実施形態のデマンド目標値変更システムを構成する基本的な各構成をハードウェアとして実現した際の構成の一例を示す概略図である。本実施形態のデマンド目標値変更装置は、記憶装置が「新デマンド目標値通知プログラム」、「可否受信プログラム」、「有効無効出力プログラム」を記憶している点を除いて実施形態1又は2のデマンド目標値変更装置と同様である。以下では、これまで説明していない「新デマンド目標値通知部」「可否受信部」「有効無効出力部」の具体的な処理について説明する。   FIG. 16 is a schematic diagram showing an example of a configuration when the basic components constituting the demand target value changing system of the present embodiment are realized as hardware. The demand target value changing apparatus according to the present embodiment is the same as that of the first or second embodiment except that the storage device stores a “new demand target value notification program”, “availability reception program”, and “valid / invalid output program”. This is the same as the demand target value changing device. Hereinafter, specific processes of the “new demand target value notifying unit”, “allowability receiving unit”, and “valid / invalid output unit” that have not been described so far will be described.

なおこの図にあるように、デマンド目標値変更装置を構成する各装置は、それぞれ各種演算処理を実行するための「CPU」1601と、「記憶装置(記憶媒体)」1602と、「メインメモリ」1603と、「出力インターフェース」1604と、「入力インターフェース」1605と、を備え、入出力インターフェースを介して、例えば「ディスプレイ」1606や「携帯電話」1607、「デマンド監視システム」1608などの外部周辺装置と情報の送受信を行う。なお、記憶装置には「デマンド目標値変更判断プログラム」1610、「新デマンド目標値算出命令生成プログラム」1620、「新デマンド目標値算出プログラム」1630、「新デマンド目標値出力プログラム」1640、「新デマンド目標値通知プログラム」1650、「可否受信プログラム」1660が格納されており、CPUはこれら各種プログラムをメインメモリのワーク領域内に読み出して展開、実行する。なお、実施形態2で説明した「電力供給状況取得プログラム」、「状況依存新デマンド目標値出力プログラム」をさらに記憶していても良い。また、これらの構成は、「システムバス」1609などのデータ通信経路によって相互に接続され、情報の送受信や処理を行う。   As shown in this figure, each device constituting the demand target value changing device includes a “CPU” 1601, a “storage device (storage medium)” 1602, and a “main memory” for executing various arithmetic processes. 1603, “output interface” 1604, and “input interface” 1605, and external peripheral devices such as “display” 1606, “mobile phone” 1607, and “demand monitoring system” 1608 via the input / output interface Send and receive information. The storage device includes “demand target value change determination program” 1610, “new demand target value calculation command generation program” 1620, “new demand target value calculation program” 1630, “new demand target value output program” 1640, “new Demand target value notification program "1650 and" Availability reception program "1660 are stored, and the CPU reads out these various programs in the work area of the main memory, and develops and executes them. The “power supply status acquisition program” and the “situation-dependent new demand target value output program” described in the second embodiment may be further stored. These components are connected to each other through a data communication path such as a “system bus” 1609 to transmit / receive information and perform processing.

(新デマンド目標値通知部の具体的な処理)
CPUは、記憶装置から「新デマンド目標値通知プログラム」1650をメインメモリに読み出して実行し、新デマンド目標値算出プログラムの実行により算出された新デマンド目標値をディスプレイや携帯電話を通してデマンド監視対象となる電力の電力使用者に通知する。
(Specific processing of the new demand target value notification unit)
The CPU reads the “new demand target value notification program” 1650 from the storage device into the main memory and executes it, and sets the new demand target value calculated by executing the new demand target value calculation program as a demand monitoring target through a display or a mobile phone. Notify the power user of the power to be.

(可否受信部の具体的な処理)
CPUは、記憶装置から「可否受信プログラム」1660をメインメモリに読み出して実行し、前記電力使用者からディスプレイや携帯電話を通して新デマンド目標値への変更の可否を受信し、当該情報をメインメモリのデータ領域に格納する。
(Specific processing of the availability receiving unit)
The CPU reads and executes the “permission / rejection reception program” 1660 from the storage device, executes execution of the “permission / rejection reception program” 1660 from the power user, receives whether the power user can change to the new demand target value via the display or mobile phone, Store in the data area.

(有効無効出力部の具体的な処理)
CPUは、記憶装置から「有効無効出力プログラム」をメインメモリに読み出して実行し、可否受信プログラムの実行により受信した受信結果に応じてデマンド目標値変更命令生成部における命令の生成又は生成した命令を有効又は無効とする。
<処理の流れ>
(Specific processing of the valid / invalid output part)
The CPU reads the “valid / invalid output program” from the storage device and executes it, and generates a command in the demand target value change command generation unit or the generated command according to the reception result received by the execution of the acceptance / rejection program. Valid or invalid.
<Process flow>

図17は、本実施形態のデマンド目標値変更装置における処理の流れの一例を示す図である。同図の処理の流れは以下のステップからなる。まずステップS1701において、デマンド目標値変更ルールを用いてデマンド目標値を変更すべきか判断する(デマンド目標値変更判断ステップ)。次に、デマンド目標値を変更すべきとの判断結果である場合に、ステップS1702において、新たなデマンド目標値を算出する命令を生成する(新デマンド目標値算出命令生成ステップ)。そして、ステップS1703において、新デマンド目標値を算出する(新デマンド目標値算出ステップ)。次にステップS1704において、算出した新デマンド目標値をデマンド監視対象となる電力の電力使用者に通知する(新デマンド目標値通知ステップ)。そしてステップS1705において、前記電力使用者から新デマンド目標値への変更の可否を受信する(可否受信ステップ)。その後ステップS1706において、ステップS1702による命令の生成又は生成した命令を有効又は無効とする(有効無効出力ステップ)。そして、算出された新デマンド目標値が有効である場合には、ステップS1707において算出された新デマンド目標値を出力する(新デマンド目標値出力ステップ)。
<効果>
FIG. 17 is a diagram illustrating an example of a process flow in the demand target value changing device of the present embodiment. The flow of processing in the figure consists of the following steps. First, in step S1701, it is determined whether the demand target value should be changed using a demand target value change rule (demand target value change determination step). Next, when it is a determination result that the demand target value should be changed, in step S1702, a command for calculating a new demand target value is generated (new demand target value calculation command generating step). In step S1703, a new demand target value is calculated (new demand target value calculating step). Next, in step S1704, the calculated new demand target value is notified to the power user of the power to be demand monitored (new demand target value notification step). In step S1705, whether or not to change to the new demand target value is received from the power user (allowability receiving step). Thereafter, in step S1706, the instruction generated in step S1702 or the generated instruction is validated or invalidated (valid / invalid output step). If the calculated new demand target value is valid, the new demand target value calculated in step S1707 is output (new demand target value output step).
<Effect>

以上のような構成をとることにより、効率的にデマンド目標値を変更し、デマンド監視システムを用いて年間最大デマンド値を監視するだけではなく、さらに電力の使用者の省エネ意識を一年を通して向上させることも可能となった。また、デマンド目標値の変更を最終的に電力使用者に判断させることも可能となった。
<<実施形態4>>
<構成>
By adopting the configuration described above, the demand target value can be changed efficiently and the annual maximum demand value can be monitored using a demand monitoring system. It was also possible to make it. In addition, it has become possible for the power user to finally determine the change of the demand target value.
<< Embodiment 4 >>
<Configuration>

本実施形態のデマンド目標値変更装置は、基本的には実施形態1から3のデマンド目標値変更装置と同様であるが、新デマンド目標値は算出された新デマンド目標値が電力基本料金を定めるデマンド値である決定デマンド値を超えない場合にのみ出力され、超える場合にはアラームを出力する点が異なる。
<機能的構成>
The demand target value changing device of this embodiment is basically the same as the demand target value changing device of the first to third embodiments, but the calculated new demand target value determines the basic power charge for the new demand target value. It is output only when the determined demand value that is the demand value is not exceeded, and when it exceeds, an alarm is output.
<Functional configuration>

図18は本実施形態のデマンド目標値変更装置の機能ブロックの一例を示す図である。例えば本実施形態のデマンド目標値変更装置は、「デマンド目標値変更ルール保持部」1801と、「デマンド目標値変更判断部」1802と、「新デマンド目標値算出命令生成部」1803と、「新デマンド目標値算出部」1804と、「新デマンド目標値出力部」1805と、「アラーム出力部」1806から構成される。「新デマンド目標値出力部」は、「新デマンド目標値出力手段」1807を含んでいる。なお、「新デマンド目標値算出部」には実施形態1から3において示した数式や調整係数が保持されている。また、実施形態2で説明した「電力供給状況取得部」、「状況依存デマンド目標値保持部」、「状況依存デマンド目標値出力部」や、実施形態3で説明した「新デマンド目標値通知部」、「可否受信部」、「有効無効出力部」を含んでいても良い。以下実施形態1から3との相違点である「アラーム出力部」、「新デマンド目標値出力手段」について説明する。   FIG. 18 is a diagram showing an example of functional blocks of the demand target value changing device of the present embodiment. For example, the demand target value changing apparatus according to the present embodiment includes a “demand target value change rule holding unit” 1801, a “demand target value change determining unit” 1802, a “new demand target value calculation command generating unit” 1803, A demand target value calculation unit 1804, a “new demand target value output unit” 1805, and an “alarm output unit” 1806. The “new demand target value output unit” includes “new demand target value output means” 1807. The “new demand target value calculation unit” holds the mathematical formulas and adjustment coefficients shown in the first to third embodiments. Further, the “power supply status acquisition unit”, “situation dependent demand target value holding unit”, “situation dependent demand target value output unit” described in the second embodiment, and “new demand target value notification unit” described in the third embodiment. ”,“ Availability receiving unit ”, and“ Valid / invalid output unit ”. Hereinafter, “alarm output unit” and “new demand target value output means” which are different from the first to third embodiments will be described.

「アラーム出力部」1806は、算出された新デマンド目標値が電力基本料金を定めるデマンド目標値である決定デマンド値を超える場合にアラームを出力するよう構成される。「アラーム」としては、電力使用者のパソコンのディスプレイへの警告表示やメール送信、架電などによる通報が考えられる。アラームは新デマンド目標値算出部において新デマンド目標値が決定デマンド値を超えた場合にはすぐに出力されることが好ましい。   The “alarm output unit” 1806 is configured to output an alarm when the calculated new demand target value exceeds a determined demand value that is a demand target value that determines the basic power charge. As an “alarm”, a warning display on the display of a power user's personal computer, an email transmission, a call or the like can be considered. The alarm is preferably output immediately when the new demand target value exceeds the determined demand value in the new demand target value calculation unit.

「新デマンド目標値出力手段」1807は、算出された新デマンド目標値が電力基本料金を定めるデマンド目標値である決定デマンド値を超えない場合にのみ新デマンド値を出力する。「決定デマンド値を超えない場合にのみ新デマンド目標値を出力する」には、算出された新デマンド目標値と決定デマンド値の大小関係を比較する必要がある。そこで、デマンド目標値変更装置において決定デマンド値をあらかじめ保持しておき、新デマンド目標値出力手段において算出された新デマンド目標値と決定デマンド値の大小関係を比較する構成としても良い。   The “new demand target value output means” 1807 outputs the new demand value only when the calculated new demand target value does not exceed the determined demand value that is the demand target value that determines the basic power charge. To output the new demand target value only when the determined demand value is not exceeded, it is necessary to compare the magnitude relationship between the calculated new demand target value and the determined demand value. Therefore, the demand target value changing device may hold the determined demand value in advance and compare the magnitude relationship between the new demand target value calculated by the new demand target value output means and the determined demand value.

なお、算出された新デマンド目標値と決定デマンド値が等しい場合には、アラーム出力部にてアラームを出力する構成としても、新デマンド目標値出力手段にて新デマンド目標値を出力する構成としても良い。   In addition, when the calculated new demand target value is equal to the determined demand value, the alarm output unit outputs an alarm, or the new demand target value output means outputs the new demand target value. good.

「決定デマンド値」とは、例えば契約デマンド値のことを示す。「契約デマンド値」とは、毎時00分から30分、同30分から00分までの30分単位における平均使用電力であるデマンド値に関して電力使用者が電力供給者と契約した最大使用量である。本件発明のデマンド目標値変更装置において、デマンド監視システムのデマンド目標値の変更が行われるが、例えばデマンド目標値が契約デマンド値を超えてしまうと、電気料金の基本料金が増加する可能性があるにもかかわらず、電力使用者にそのような事態を把握させることができない。そこで、超えた場合にアラームを出力することにより、算出された新デマンド目標値が契約デマンド値を超えているという事態を電力使用者に把握させることができる。
<具体的な構成>
The “determined demand value” indicates, for example, a contract demand value. The “contract demand value” is the maximum usage amount contracted by the power user with the power supplier for the demand value, which is the average power consumption in units of 30 minutes from 00 minutes to 30 minutes and from 30 minutes to 00 minutes. In the demand target value changing device of the present invention, the demand target value of the demand monitoring system is changed. For example, if the demand target value exceeds the contract demand value, the basic charge of the electric charge may increase. Nevertheless, it is impossible for the power user to grasp such a situation. Therefore, by outputting an alarm when it exceeds, it is possible for the electric power user to grasp the situation that the calculated new demand target value exceeds the contract demand value.
<Specific configuration>

図19は本実施形態のデマンド目標値変更システムを構成する基本的な各構成をハードウェアとして実現した際の構成の一例を示す概略図である。本実施形態のデマンド目標値変更装置は、記憶装置が「アラーム出力プログラム」を記憶している点を除いて実施形態1から3のデマンド目標値変更装置と同様である。以下では、これまで説明していない「アラーム出力部」「新デマンド目標値出力手段」の具体的な処理について説明する。   FIG. 19 is a schematic diagram showing an example of a configuration when the basic components constituting the demand target value changing system of the present embodiment are realized as hardware. The demand target value changing device of this embodiment is the same as the demand target value changing device of the first to third embodiments except that the storage device stores an “alarm output program”. Hereinafter, specific processing of the “alarm output unit” and “new demand target value output unit” that have not been described so far will be described.

なおこの図にあるように、デマンド目標値変更装置を構成する各装置は、それぞれ各種演算処理を実行するための「CPU」1901と、「記憶装置(記憶媒体)」1902と、「メインメモリ」1903と、「出力インターフェース」1904と、「入力インターフェース」1905と、を備え、入出力インターフェースを介して、例えば「ディスプレイ」1906や「デマンド監視システム」1907、「電力量計」1908などの外部周辺装置と情報の送受信を行う。なお、記憶装置には「デマンド目標値変更判断プログラム」1910、「新デマンド目標値算出命令生成プログラム」1920、「新デマンド目標値算出プログラム」1930、「新デマンド目標値出力プログラム」1940、「アラーム出力プログラム」1950が格納されており、CPUはこれら各種プログラムをメインメモリのワーク領域内に読み出して展開、実行する。なお、実施形態2で説明した「電力供給状況取得プログラム」、「状況依存新デマンド目標値算出プログラム」や、実施形態3で説明した「新デマンド目標値通知プログラム」、「可否受信プログラム」、「有効無効出力プログラム」をさらに記憶していても良い。なお、これらの構成は、「システムバス」1909などのデータ通信経路によって相互に接続され、情報の送受信や処理を行う。   As shown in this figure, each device constituting the demand target value changing device includes a “CPU” 1901, a “storage device (storage medium)” 1902, and a “main memory” for executing various arithmetic processes. 1903, “output interface” 1904, and “input interface” 1905, and external peripherals such as “display” 1906, “demand monitoring system” 1907, and “watt hour meter” 1908 via the input / output interface Sends and receives information to and from the device. The storage device includes “demand target value change determination program” 1910, “new demand target value calculation command generation program” 1920, “new demand target value calculation program” 1930, “new demand target value output program” 1940, “alarm”. The “output program” 1950 is stored, and the CPU reads out these various programs into the work area of the main memory, and develops and executes them. It should be noted that the “power supply status acquisition program”, “situation-dependent new demand target value calculation program” described in the second embodiment, “new demand target value notification program”, “possibility reception program”, “ An “invalid / invalid output program” may be further stored. These components are connected to each other through a data communication path such as a “system bus” 1909 to transmit / receive information and process information.

(アラーム出力部の具体的な処理)
CPUは、記憶装置から「アラーム出力プログラム」1950をメインメモリに読み出して実行し、新デマンド目標値算出プログラムの実行により算出された新デマンド目標値が電力基本料金を定めるデマンド目標値である決定デマンド値を超える場合にアラームを出力する。
<処理の流れ>
(Specific processing of the alarm output unit)
The CPU reads the “alarm output program” 1950 from the storage device into the main memory and executes it, and the determined demand in which the new demand target value calculated by the execution of the new demand target value calculation program is the demand target value that determines the basic power charge An alarm is output when the value is exceeded.
<Process flow>

図20は、本実施形態のデマンド目標値変更装置における処理の流れの一例を示す図である。同図の処理の流れは以下のステップからなる。まずステップS2001において、デマンド目標値変更ルールを用いてデマンド目標値を変更すべきか判断する(デマンド目標値変更判断ステップ)。次に、デマンド目標値を変更すべきとの判断結果である場合に、ステップS2002において、新たなデマンド目標値を算出する命令を生成する(新デマンド目標値算出命令生成ステップ)。そして、ステップS2003において、新デマンド目標値を算出する(新デマンド目標値算出ステップ)。そして、算出された新デマンド目標値が電力基本料金を定めるデマンド目標値である決定デマンド値を超える場合には、ステップS2704においてアラームを出力する(アラーム出力ステップ)。一方、算出された新デマンド目標値が決定デマンド値を超えない場合には、ステップS2005において算出された新デマンド目標値を出力する。(新デマンド目標値出力ステップ)。
<効果>
FIG. 20 is a diagram illustrating an example of a processing flow in the demand target value changing device of the present embodiment. The flow of processing in the figure consists of the following steps. First, in step S2001, it is determined whether the demand target value should be changed using a demand target value change rule (demand target value change determination step). Next, when it is a determination result that the demand target value should be changed, a command for calculating a new demand target value is generated in step S2002 (new demand target value calculation command generating step). In step S2003, a new demand target value is calculated (new demand target value calculating step). If the calculated new demand target value exceeds the determined demand value, which is the demand target value that determines the basic power charge, an alarm is output in step S2704 (alarm output step). On the other hand, if the calculated new demand target value does not exceed the determined demand value, the new demand target value calculated in step S2005 is output. (New demand target value output step).
<Effect>

以上のような構成をとることにより、効率的にデマンド目標値を変更し、デマンド監視システムを用いて年間最大デマンド値を監視するだけではなく、さらに電力の使用者の省エネ意識を一年を通して向上させることも可能となった。また、デマンド目標値が決定デマンド値を超えた場合にアラームを出力することも可能となった。   By adopting the configuration described above, the demand target value can be changed efficiently and the annual maximum demand value can be monitored using a demand monitoring system. It was also possible to make it. It is also possible to output an alarm when the demand target value exceeds the determined demand value.

Claims (22)

デマンド監視システムにおいて用いられるデマンド目標値を変更するためのデマンド目標値変更装置であって、
デマンド目標値を変更するか判断するためのルールであるデマンド目標値変更ルールを保持するデマンド目標値変更ルール保持部と、
デマンド目標値変更ルールを用いてデマンド目標値を変更すべきか判断するデマンド目標値変更判断部と、
デマンド目標値変更判断部での判断結果がデマンド目標値を変更すべきとの判断結果である場合に新たなデマンド目標値を算出する命令を生成する新デマンド目標値算出命令生成部と、
生成された新デマンド目標値算出命令に応じて、新デマンド目標値DTnew(j)を所定の期間(n日間又はn個の単位時間帯間)の各日又は各単位時間帯の最大実績デマンド値D(i)と同期間の各日又は各単位時間帯のデマンド目標値D(i)と調整係数αと新デマンド目標値を設定すべき日又は単位時間帯の旧デマンド目標値D(j)を用いて式1を含む数式により算出する新デマンド目標値算出部と、
算出された新デマンド目標値を出力する新デマンド目標値出力部と、
を有するデマンド目標値変更装置。
Figure 0005743250
A demand target value changing device for changing a demand target value used in a demand monitoring system,
A demand target value change rule holding unit that holds a demand target value change rule that is a rule for determining whether to change a demand target value;
A demand target value change determination unit for determining whether the demand target value should be changed using the demand target value change rule;
A new demand target value calculation command generation unit that generates a command to calculate a new demand target value when the determination result in the demand target value change determination unit is a determination result that the demand target value should be changed;
In accordance with the generated new demand target value calculation command, the new demand target value D Tnew (j) is the maximum actual demand for each day or each unit time zone in a predetermined period (n days or between n unit time zones). the value D (i) and demand for each day or each interval of time for the same period target value D T (i) and the adjustment coefficient α and the old demand target value D T of day or interval of time should be set to new demand target value A new demand target value calculation unit that calculates the numerical value including Expression 1 using (j);
A new demand target value output unit for outputting the calculated new demand target value;
A demand target value changing device.
Figure 0005743250
デマンド監視システムにおいて用いられるデマンド目標値を変更するためのデマンド目標値変更装置であって、
各日又は各単位時間帯の最大実績デマンド値と同各日又は各単位時間帯のデマンド目標値とを用いてデマンド目標値を変更するか判断するためのルールであるデマンド目標値変更ルールを保持するデマンド目標値変更ルール保持部と、
デマンド目標値変更ルールを用いてデマンド目標値を変更すべきか判断するデマンド目標値変更判断部と、
デマンド目標値変更判断部での判断結果がデマンド目標値を変更すべきとの判断結果である場合に新たなデマンド目標値を算出する命令を生成する新デマンド目標値算出命令生成部と、
所定の期間(n日間又はn個の単位時間帯間)の各日又は各単位時間帯の最大実績デマンド値D(i)と同期間の各日又は各単位時間帯のデマンド目標値D(i)に式2の関係が成立する場合に変更後の各日の新デマンド目標値DTnew(j)を所定の期間の各日又は各単位時間帯の最大実績デマンド値の近似曲線f(i)と調整係数γを用いて式3と式4を含む数式により算出する(複号同順)新デマンド目標値算出部と、
算出された新デマンド目標値を出力する新デマンド目標値出力部と、
を有するデマンド目標値変更装置。
Figure 0005743250
Figure 0005743250
Figure 0005743250
A demand target value changing device for changing a demand target value used in a demand monitoring system,
Holds demand target value change rules, which are rules for determining whether to change demand target values using the maximum actual demand value for each day or each unit time zone and the demand target value for each day or each unit time zone A demand target value change rule holding unit,
A demand target value change determination unit for determining whether the demand target value should be changed using the demand target value change rule;
A new demand target value calculation command generation unit that generates a command to calculate a new demand target value when the determination result in the demand target value change determination unit is a determination result that the demand target value should be changed;
The maximum actual demand value D (i) for each day or each unit time zone in a predetermined period (n days or between n unit time zones) and the demand target value D T for each day or each unit time zone during the same period When the relationship of Formula 2 is established in i), the new demand target value D Tnew (j) for each day after the change is approximated to the maximum actual demand value for each day or each unit time zone for a predetermined period f (i ) And the adjustment coefficient γ, and a new demand target value calculation unit that calculates using a mathematical formula including Formula 3 and Formula 4
A new demand target value output unit for outputting the calculated new demand target value;
A demand target value changing device.
Figure 0005743250
Figure 0005743250
Figure 0005743250
デマンド目標値変更ルールは、各日又は各単位時間帯の最大実績デマンド値と同各日又は各単位時間帯のデマンド目標値とを用いてデマンド目標値を変更するか判断するためのルール又は/及び各日又は各単位時間帯の最大実績デマンド値と同各日又は各単位時間帯のデマンド目標値とを用いて同各日又は単位時間帯に演算された結果に基づいてデマンド目標値を変更するか判断するためのルールである請求項1又は2に記載のデマンド目標値変更装置。   The demand target value change rule is a rule for determining whether to change the demand target value using the maximum actual demand value of each day or each unit time zone and the demand target value of each day or each unit time zone. And the demand target value is changed based on the result calculated on each day or unit time zone using the maximum actual demand value of each day or unit time zone and the demand target value of each day or unit time zone. The demand target value changing device according to claim 1, wherein the demand target value changing device is a rule for determining whether to do. 電力供給者による電力供給状況を取得する電力供給状況取得部と、
取得した電力供給状況がデマンド目標値を変更すべきものである場合には、デマンド目標値変更判断部の判断結果及びデマンド目標値変更算出部の算出結果によらず、取得した電力供給状況に応じて新デマンド目標値を取得する状況依存新デマンド目標値取得部と、
をさらに有する請求項1から3のいずれか一に記載のデマンド目標値変更装置。
A power supply status acquisition unit for acquiring a power supply status by a power supplier;
If the acquired power supply status is to change the demand target value, depending on the acquired power supply status, regardless of the determination result of the demand target value change determination unit and the calculation result of the demand target value change calculation unit A situation-dependent new demand target value acquisition unit for acquiring a new demand target value;
The demand target value changing device according to any one of claims 1 to 3, further comprising:
新デマンド目標値算出部が算出した新デマンド目標値をデマンド監視対象となる電力の電力使用者に通知する新デマンド目標値通知部と、
前記電力使用者から新デマンド目標値への変更の可否を受信する可否受信部と、
可否受信部での受信結果に応じてデマンド目標値変更命令生成部における命令の生成又は生成した命令を有効又は無効とする有効無効出力部と、
をさらに有する請求項1から4のいずれか一に記載のデマンド目標値変更装置。
A new demand target value notifying unit for notifying a power user of the power to be monitored for the new demand target value calculated by the new demand target value calculating unit;
A propriety receiving unit that receives the propriety of the change to the new demand target value from the power user;
A valid / invalid output unit for validating / invalidating the generated command or the generated command in the demand target value change command generating unit according to the reception result in the availability receiving unit,
The demand target value changing device according to any one of claims 1 to 4, further comprising:
新デマンド目標値出力部は、新デマンド目標値算出部により算出された新デマンド目標値が電力基本料金を定めるデマンド値である決定デマンド値を超えない場合にのみ新デマンド目標値を出力する新デマンド目標値出力手段を有する請求項1から5のいずれか一に記載のデマンド目標値変更装置。   The new demand target value output unit outputs the new demand target value only when the new demand target value calculated by the new demand target value calculation unit does not exceed the determined demand value that is the demand value that determines the basic power charge. The demand target value changing device according to any one of claims 1 to 5, further comprising target value output means. 新デマンド目標値算出部により算出された新デマンド目標値が電力基本料金を定めるデマンド値である決定デマンド値を超える場合にアラームを出力するアラーム出力部を有する請求項1から6のいずれか一に記載のデマンド目標値変更装置。   7. An alarm output unit that outputs an alarm when the new demand target value calculated by the new demand target value calculation unit exceeds a determined demand value that is a demand value that determines a basic power charge. The demand target value changing device described. デマンド監視システムにおいて用いられるデマンド目標値を変更するためのデマンド目標値変更装置のメンテナンス方法であって、
デマンド目標値を変更するか判断するためのルールであるデマンド目標値変更ルールを保持するデマンド目標値変更ルール保持部に保持されているデマンド目標値変更ルールを変更して変更後デマンド目標値変更ルールとする変更ルール変更ステップと、
変更後デマンド目標値変更ルールを用いてデマンド目標値を変更すべきか判断するデマンド目標値変更判断ステップと、
デマンド目標値変更判断ステップでの判断結果がデマンド目標値を変更すべきとの判断結果である場合に新たなデマンド目標値を算出する命令を生成する新デマンド目標値算出命令生成ステップと、
生成された新デマンド目標値算出命令に応じて、新デマンド目標値DTnew(j)を所定の期間(n日間又はn個の単位時間帯間)の各日又は各単位時間帯の最大実績デマンド値D(i)と同期間の各日又は各単位時間帯のデマンド目標値D(i)と調整係数αと新デマンド目標値を設定すべき日又は単位時間帯の旧デマンド目標値D(j)を用いて式1を含む数式により算出する新デマンド目標値算出ステップと、
算出された新デマンド目標値を出力する新デマンド目標値出力ステップと、
を有するデマンド目標値変更装置メンテナンス方法。
Figure 0005743250
A maintenance method of a demand target value changing device for changing a demand target value used in a demand monitoring system,
Demand target value change rule held in the demand target value change rule holding unit that holds a demand target value change rule that is a rule for determining whether to change the demand target value A change rule change step and
A demand target value change determination step for determining whether the demand target value should be changed using the changed demand target value change rule;
A new demand target value calculation command generation step for generating a command for calculating a new demand target value when the determination result in the demand target value change determination step is a determination result that the demand target value should be changed;
In accordance with the generated new demand target value calculation command, the new demand target value D Tnew (j) is the maximum actual demand for each day or each unit time zone in a predetermined period (n days or between n unit time zones). the value D (i) and demand for each day or each interval of time for the same period target value D T (i) and the adjustment coefficient α and the old demand target value D T of day or interval of time should be set to new demand target value A new demand target value calculating step for calculating by a formula including Formula 1 using (j);
A new demand target value output step for outputting the calculated new demand target value;
A demand target value changing device maintenance method comprising:
Figure 0005743250
デマンド監視システムにおいて用いられるデマンド目標値を変更するためのデマンド目標値変更装置のメンテナンス方法であって、
デマンド目標値を変更するか判断するためのルールであるデマンド目標値変更ルールを保持するデマンド目標値変更ルール保持部に保持されているデマンド目標値変更ルールを変更して変更後デマンド目標値変更ルールとする変更ルール変更ステップと、
変更後デマンド目標値変更ルールを用いてデマンド目標値を変更すべきか判断するデマンド目標値変更判断ステップと、
デマンド目標値変更判断ステップでの判断結果がデマンド目標値を変更すべきとの判断結果である場合に新たなデマンド目標値を算出する命令を生成する新デマンド目標値算出命令生成ステップと、
所定の期間(n日間又はn個の単位時間帯間)の各日又は各単位時間帯の最大実績デマンド値D(i)と同期間の各日又は各単位時間帯のデマンド目標値D(i)に式2の関係が成立する場合に変更後の各日の新デマンド目標値DTnew(j)を所定の期間の各日又は各単位時間帯の最大実績デマンド値の近似曲線f(i)と調整係数γを用いて式3と式4を含む数式により算出する(複号同順)新デマンド目標値算出ステップと、
算出された新デマンド目標値を出力する新デマンド目標値出力ステップと、
を有するデマンド目標値変更装置メンテナンス方法。
Figure 0005743250
Figure 0005743250
Figure 0005743250

A maintenance method of a demand target value changing device for changing a demand target value used in a demand monitoring system,
Demand target value change rule held in the demand target value change rule holding unit that holds a demand target value change rule that is a rule for determining whether to change the demand target value A change rule change step and
A demand target value change determination step for determining whether the demand target value should be changed using the changed demand target value change rule;
A new demand target value calculation command generation step for generating a command for calculating a new demand target value when the determination result in the demand target value change determination step is a determination result that the demand target value should be changed;
The maximum actual demand value D (i) for each day or each unit time zone in a predetermined period (n days or between n unit time zones) and the demand target value D T for each day or each unit time zone during the same period When the relationship of Formula 2 is established in i), the new demand target value D Tnew (j) for each day after the change is approximated to the maximum actual demand value for each day or each unit time zone for a predetermined period f (i ) And an adjustment coefficient γ to calculate a new demand target value calculating step (compound order same order) including Formula 3 and Formula 4;
A new demand target value output step for outputting the calculated new demand target value;
A demand target value changing device maintenance method comprising:
Figure 0005743250
Figure 0005743250
Figure 0005743250

デマンド目標値変更ルールは、各日又は各単位時間帯の最大実績デマンド値と同各日又は各単位時間帯のデマンド目標値とを用いてデマンド目標値を変更するか判断するためのルール又は/及び各日又は各単位時間帯の最大実績デマンド値と同各日又は各単位時間帯のデマンド目標値とを用いて同各日又は単位時間帯に演算された結果に基づいてデマンド目標値を変更するか判断するためのルールである請求項8又は9に記載のデマンド目標値変更装置メンテナンス方法。   The demand target value change rule is a rule for determining whether to change the demand target value using the maximum actual demand value of each day or each unit time zone and the demand target value of each day or each unit time zone. And the demand target value is changed based on the result calculated on each day or unit time zone using the maximum actual demand value of each day or unit time zone and the demand target value of each day or unit time zone. 10. The demand target value changing device maintenance method according to claim 8 or 9, wherein the rules are for determining whether to do so. 電力供給者による電力供給状況を取得する電力供給状況取得ステップと、
取得した電力供給状況がデマンド目標値を変更すべきものである場合には、デマンド目標値変更判断ステップの判断結果及びデマンド目標値変更算出ステップの算出結果によらず、取得した電力供給状況に応じて新デマンド目標値を取得する状況依存新デマンド目標値取得ステップと、
をさらに有する請求項8から10のいずれか一に記載のデマンド目標値変更装置メンテナンス方法。
A power supply status acquisition step of acquiring a power supply status by a power supplier;
If the acquired power supply status should change the demand target value, it depends on the acquired power supply status regardless of the determination result of the demand target value change determination step and the calculation result of the demand target value change calculation step. A situation-dependent new demand target value acquisition step for acquiring a new demand target value;
The demand target value changing device maintenance method according to any one of claims 8 to 10, further comprising:
新デマンド目標値算出ステップが算出した新デマンド目標値をデマンド監視対象となる電力の電力使用者に通知する新デマンド目標値通知ステップと、
前記電力使用者から新デマンド目標値への変更の可否を受信する可否受信ステップと、
可否受信ステップでの受信結果に応じてデマンド目標値変更命令生成ステップにおける命令の生成又は生成した命令を有効又は無効とする有効無効出力ステップと、
をさらに有する請求項8から11のいずれか一に記載のデマンド目標値変更装置メンテナンス方法。
A new demand target value notifying step for notifying the power user of the power to be monitored for the new demand target value calculated by the new demand target value calculating step;
The availability receiving step of receiving the availability of the change to the new demand target value from the power user,
A valid / invalid output step of validating / invalidating the generated command or the generated command in the demand target value change command generating step according to the reception result in the availability receiving step;
The demand target value changing device maintenance method according to any one of claims 8 to 11, further comprising:
新デマンド目標値出力ステップは、新デマンド目標値算出ステップにより算出された新デマンド目標値が電力基本料金を定めるデマンド値である決定デマンド値を超えない場合にのみ新デマンド目標値を出力する請求項8から12のいずれか一に記載のデマンド目標値変更装置メンテナンス方法。   The new demand target value output step outputs the new demand target value only when the new demand target value calculated by the new demand target value calculation step does not exceed the determined demand value that is a demand value that determines the basic power charge. The demand target value change apparatus maintenance method as described in any one of 8 to 12. 新デマンド目標値算出ステップにより算出された新デマンド目標値が電力基本料金を定めるデマンド値である決定デマンド値を超える場合にアラームを出力するアラーム出力ステップを有する請求項8から13のいずれか一に記載のデマンド目標値変更装置メンテナンス方法。   14. The alarm output step of outputting an alarm when the new demand target value calculated by the new demand target value calculating step exceeds a determined demand value that is a demand value that determines a basic power charge. The demand target value changing device maintenance method described. デマンド監視システムにおいて用いられるデマンド目標値を変更するためのデマンド目標値変更プログラムであって、
デマンド目標値を変更するか判断するためのルールであるデマンド目標値変更ルールを保持するデマンド目標値変更ルール保持ステップと、
デマンド目標値変更ルールを用いてデマンド目標値を変更すべきか判断するデマンド目標値変更判断ステップと、
デマンド目標値変更判断ステップでの判断結果がデマンド目標値を変更すべきとの判断結果である場合に新たなデマンド目標値を算出する命令を生成する新デマンド目標値算出命令生成ステップと、
生成された新デマンド目標値算出命令に応じて、新デマンド目標値DTnew(j)を所定の期間(n日間又はn個の単位時間帯間)の各日又は各単位時間帯の最大実績デマンド値D(i)と同期間の各日又は各単位時間帯のデマンド目標値D(i)と調整係数αと新デマンド目標値を設定すべき日又は単位時間帯の旧デマンド目標値D(j)を用いて式1を含む数式により算出する新デマンド目標値算出ステップと、
算出された新デマンド目標値を出力する新デマンド目標値出力ステップと、
を計算機に読取り可能に記述したデマンド目標値変更プログラム。
Figure 0005743250
A demand target value changing program for changing a demand target value used in a demand monitoring system,
A demand target value change rule holding step for holding a demand target value change rule that is a rule for determining whether to change a demand target value;
A demand target value change determination step for determining whether the demand target value should be changed using a demand target value change rule;
A new demand target value calculation command generation step for generating a command for calculating a new demand target value when the determination result in the demand target value change determination step is a determination result that the demand target value should be changed;
In accordance with the generated new demand target value calculation command, the new demand target value D Tnew (j) is the maximum actual demand for each day or each unit time zone in a predetermined period (n days or between n unit time zones). the value D (i) and demand for each day or each interval of time for the same period target value D T (i) and the adjustment coefficient α and the old demand target value D T of day or interval of time should be set to new demand target value A new demand target value calculating step for calculating by a formula including Formula 1 using (j);
A new demand target value output step for outputting the calculated new demand target value;
Demand target value change program that is readable to the computer.
Figure 0005743250
デマンド監視システムにおいて用いられるデマンド目標値を変更するためのデマンド目標値変更プログラムであって、
各日又は各単位時間帯の最大実績デマンド値と同各日又は各単位時間帯のデマンド目標値とを用いてデマンド目標値を変更するか判断するためのルールであるデマンド目標値変更ルールを保持するデマンド目標値変更ルール保持ステップと、
デマンド目標値変更ルールを用いてデマンド目標値を変更すべきか判断するデマンド目標値変更判断ステップと、
デマンド目標値変更判断ステップでの判断結果がデマンド目標値を変更すべきとの判断結果である場合に新たなデマンド目標値を算出する命令を生成する新デマンド目標値算出命令生成ステップと、
所定の期間(n日間又はn個の単位時間帯間)の各日又は各単位時間帯の最大実績デマンド値D(i)と同期間の各日又は各単位時間帯のデマンド目標値D(i)に式2の関係が成立する場合に変更後の各日の新デマンド目標値DTnew(j)を所定の期間の各日又は各単位時間帯の最大実績デマンド値の近似曲線f(i)と調整係数γを用いて式3と式4を含む数式により算出する(複号同順)新デマンド目標値算出ステップと、
算出された新デマンド目標値を出力する新デマンド目標値出力ステップと、
を計算機に読取り可能に記述したデマンド目標値変更プログラム。
Figure 0005743250
Figure 0005743250
Figure 0005743250
A demand target value changing program for changing a demand target value used in a demand monitoring system,
Holds demand target value change rules, which are rules for determining whether to change demand target values using the maximum actual demand value for each day or each unit time zone and the demand target value for each day or each unit time zone A demand target value change rule holding step,
A demand target value change determination step for determining whether the demand target value should be changed using a demand target value change rule;
A new demand target value calculation command generation step for generating a command for calculating a new demand target value when the determination result in the demand target value change determination step is a determination result that the demand target value should be changed;
The maximum actual demand value D (i) for each day or each unit time zone in a predetermined period (n days or between n unit time zones) and the demand target value D T for each day or each unit time zone during the same period When the relationship of Formula 2 is established in i), the new demand target value D Tnew (j) for each day after the change is approximated to the maximum actual demand value for each day or each unit time zone for a predetermined period f (i ) And an adjustment coefficient γ to calculate a new demand target value calculating step (compound order same order) including Formula 3 and Formula 4;
A new demand target value output step for outputting the calculated new demand target value;
Demand target value change program that is readable to the computer.
Figure 0005743250
Figure 0005743250
Figure 0005743250
デマンド目標値変更ルールは、各日又は各単位時間帯の最大実績デマンド値と同各日又は各単位時間帯のデマンド目標値とを用いてデマンド目標値を変更するか判断するためのルール又は/及び各日又は各単位時間帯の最大実績デマンド値と同各日又は各単位時間帯のデマンド目標値とを用いて同各日又は単位時間帯に演算された結果に基づいてデマンド目標値を変更するか判断するためのルールである請求項15又は16に記載のデマンド目標値変更プログラム。   The demand target value change rule is a rule for determining whether to change the demand target value using the maximum actual demand value of each day or each unit time zone and the demand target value of each day or each unit time zone. And the demand target value is changed based on the result calculated on each day or unit time zone using the maximum actual demand value of each day or unit time zone and the demand target value of each day or unit time zone. 17. The demand target value changing program according to claim 15 or 16, wherein the demand target value changing program is a rule for determining whether to do so. 電力供給者による電力供給状況を取得する電力供給状況取得ステップと、
取得した電力供給状況がデマンド目標値を変更すべきものである場合には、デマンド目標値変更判断ステップの判断結果及びデマンド目標値変更算出ステップの算出結果によらず、取得した電力供給状況に応じて新デマンド目標値を取得する状況依存新デマンド目標値取得ステップと、
をさらに有する請求項15から17のいずれか一に記載のデマンド目標値変更プログラム。
A power supply status acquisition step of acquiring a power supply status by a power supplier;
If the acquired power supply status should change the demand target value, it depends on the acquired power supply status regardless of the determination result of the demand target value change determination step and the calculation result of the demand target value change calculation step. A situation-dependent new demand target value acquisition step for acquiring a new demand target value;
The demand target value changing program according to any one of claims 15 to 17, further comprising:
新デマンド目標値算出ステップが算出した新デマンド目標値をデマンド監視対象となる電力の電力使用者に通知する新デマンド目標値通知ステップと、
前記電力使用者から新デマンド目標値への変更の可否を受信する可否受信ステップと、
可否受信ステップでの受信結果に応じてデマンド目標値変更命令生成ステップにおける命令の生成又は生成した命令を有効又は無効とする有効無効出力ステップと、
をさらに有する請求項15から18のいずれか一に記載のデマンド目標値変更プログラム。
A new demand target value notifying step for notifying the power user of the power to be monitored for the new demand target value calculated by the new demand target value calculating step;
The availability receiving step of receiving the availability of the change to the new demand target value from the power user,
A valid / invalid output step of validating / invalidating the generated command or the generated command in the demand target value change command generating step according to the reception result in the availability receiving step;
The demand target value changing program according to any one of claims 15 to 18, further comprising:
新デマンド目標値出力ステップは、新デマンド目標値算出ステップにより算出された新デマンド目標値が電力基本料金を定めるデマンド値である決定デマンド値を超えない場合にのみ新デマンド目標値を出力する請求項15から19のいずれか一に記載のデマンド目標値変更プログラム。   The new demand target value output step outputs the new demand target value only when the new demand target value calculated by the new demand target value calculation step does not exceed the determined demand value that is a demand value that determines the basic power charge. The demand target value change program according to any one of 15 to 19. 新デマンド目標値算出ステップにより算出された新デマンド目標値が電力基本料金を定めるデマンド値である決定デマンド値を超える場合にアラームを出力するアラーム出力ステップを有する請求項15から20のいずれか一に記載のデマンド目標値変更プログラム。   21. The alarm output step of outputting an alarm when the new demand target value calculated by the new demand target value calculating step exceeds a determined demand value that is a demand value for determining a basic power charge. The demand target value change program described. 請求項15から21のいずれか一に記載のプログラムを計算機にて読み取り可能に保持する記憶媒体。   A storage medium that holds the program according to any one of claims 15 to 21 so as to be readable by a computer.
JP2014266093A 2014-12-26 2014-12-26 Demand target value changing device, demand target value changing device maintenance method, demand target value changing program, storage medium Active JP5743250B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014266093A JP5743250B1 (en) 2014-12-26 2014-12-26 Demand target value changing device, demand target value changing device maintenance method, demand target value changing program, storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014266093A JP5743250B1 (en) 2014-12-26 2014-12-26 Demand target value changing device, demand target value changing device maintenance method, demand target value changing program, storage medium

Publications (2)

Publication Number Publication Date
JP5743250B1 true JP5743250B1 (en) 2015-07-01
JP2016127688A JP2016127688A (en) 2016-07-11

Family

ID=53537062

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014266093A Active JP5743250B1 (en) 2014-12-26 2014-12-26 Demand target value changing device, demand target value changing device maintenance method, demand target value changing program, storage medium

Country Status (1)

Country Link
JP (1) JP5743250B1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7360005B2 (en) * 2019-02-13 2023-10-12 ダイキン工業株式会社 Target power calculation device, target power calculation method, and target power calculation program
JP7507730B2 (en) 2021-06-28 2024-06-28 ダイキン工業株式会社 Control device

Also Published As

Publication number Publication date
JP2016127688A (en) 2016-07-11

Similar Documents

Publication Publication Date Title
US10642241B2 (en) Systems, methods and apparatus for improved generation control of microgrid energy systems
JP4906368B2 (en) Energy saving support system
US20150371328A1 (en) Demand bidding operation and bid generation
JP2009180741A (en) Electric power consumption monitoring system
JP2006349483A (en) Electric power consumption monitoring system
JP2012019579A (en) Power management device, power management program and recording medium
JP2016170647A (en) Energy control unit, energy control system, and energy management method
JP5749092B2 (en) Power distribution system and power distribution method
WO2013157030A1 (en) Power monitoring device and power monitoring system
JPWO2015122196A1 (en) Home status determination device, delivery system, home status determination method, home status determination program, and delivery terminal
JP2021065097A (en) Demand monitoring device, demand monitoring system, demand monitoring method, and demand monitoring program
US10312685B2 (en) Device control apparatus
JP2012200138A (en) Systems and methods for managing energy distribution network
EP3716436A1 (en) System-operator-side computer, power-generation-company-side computer, power system, control method, and program
JP5743250B1 (en) Demand target value changing device, demand target value changing device maintenance method, demand target value changing program, storage medium
JP6481942B2 (en) Power management system, power management method, and program
JP2005308729A (en) Electric power consumption monitoring system
EP2937962A1 (en) Supply and demand control device and supply and demand control method
JP4725199B2 (en) Power system stop evaluation method and apparatus, and power system management method and apparatus
JP6437139B2 (en) Power management apparatus, server, power management system, power management method, and program
KR20150096833A (en) Peak Demand Control Method and System based on Bilateral Coordination and Successive Compensation
JP6376379B2 (en) Power management equipment
JP6143420B2 (en) System and method for generating billing
JP6816962B2 (en) Power monitor, display control method and display control program
JP6778891B2 (en) Power management system, power management method and program

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20150401

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20150401

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20150421

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20150423

R150 Certificate of patent or registration of utility model

Ref document number: 5743250

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250