JP2007061871A - Method for manufacturing steel plate - Google Patents

Method for manufacturing steel plate Download PDF

Info

Publication number
JP2007061871A
JP2007061871A JP2005252672A JP2005252672A JP2007061871A JP 2007061871 A JP2007061871 A JP 2007061871A JP 2005252672 A JP2005252672 A JP 2005252672A JP 2005252672 A JP2005252672 A JP 2005252672A JP 2007061871 A JP2007061871 A JP 2007061871A
Authority
JP
Japan
Prior art keywords
line
steel plate
cooling bed
production
production amount
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2005252672A
Other languages
Japanese (ja)
Other versions
JP4492496B2 (en
Inventor
Kazuyoshi Kimura
和喜 木村
Yasunori Sumiya
泰則 角谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Sumitomo Metal Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Metal Industries Ltd filed Critical Sumitomo Metal Industries Ltd
Priority to JP2005252672A priority Critical patent/JP4492496B2/en
Publication of JP2007061871A publication Critical patent/JP2007061871A/en
Application granted granted Critical
Publication of JP4492496B2 publication Critical patent/JP4492496B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Metal Rolling (AREA)
  • Control Of Metal Rolling (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a method for manufacturing a steel plate, which method can effectively utilize a buffering function of a cooling bed. <P>SOLUTION: The method for manufacturing the steel plate is used in a manufacturing line 100 comprising a rolling line 1, a finishing line 2, and two cooling beds 3a, 3b which are arranged between the rolling line 1 and the finishing line 2, and have different processing speeds respectively. The method for manufacturing the steel plate comprises a reference value calculating step S12 for determining a reference value L0 concerning production quantity from X<SB>0</SB>, X<SB>1</SB>, X<SB>2</SB>, ... X<SB>n-1</SB>, and X<SB>n</SB>after calculating production quantities per time X<SB>0</SB>and X<SB>n</SB>in the finishing line 2 at the present time and at any time in the future, and production quantities per time X<SB>1</SB>, X<SB>2</SB>, ... X<SB>n-1</SB>in the finishing line 2 at every time between the present time and the time of the production quantity X<SB>n</SB>of the steel plate, and cooling bed selecting steps S13 to S17 for comparing X<SB>0</SB>with L0 afterward and for selecting the cooling bed 3a of high processing speed when X<SB>0</SB>≥L0, and for selecting the cooling bed 3b of low processing speed when X<SB>0</SB><L0. <P>COPYRIGHT: (C)2007,JPO&INPIT

Description

本発明は、鋼板の製造方法に関し、特に、冷却床の物流バッファ機能を十分に活かすことが可能な、鋼板の製造方法に関する。   The present invention relates to a method for manufacturing a steel sheet, and more particularly, to a method for manufacturing a steel sheet that can fully utilize the distribution buffer function of a cooling bed.

冷却床は、圧延工程と、精整工程との中間に配設され、工場能力を大きく左右する重要な設備である。圧延工程において所定の板厚および板幅、板長に調整され、その後の矯正作業を経た鋼板は、600〜800℃程度の高温下にあり、これを材質に影響のないゆるやかな冷却速度でかつ形状を損わない均一冷却を行なうため、冷却床において100〜200℃程度まで冷却される。   The cooling bed is an important facility that is disposed between the rolling process and the finishing process and greatly affects the factory capacity. The steel plate that has been adjusted to a predetermined plate thickness, plate width, and plate length in the rolling process and has undergone subsequent correction work is at a high temperature of about 600 to 800 ° C., and has a gentle cooling rate that does not affect the material and In order to perform uniform cooling without impairing the shape, the cooling bed is cooled to about 100 to 200 ° C.

一方で、冷却床は、圧延ライン(熱間圧延工程)と精整ライン(せん断加工工程)との処理能力の差を吸収するバッファとしての役割をも担っている。そのため、冷却床には、上記冷却を行い得る面積を有し、かつ、物流バッファとしての機能を有することが必要とされる。   On the other hand, the cooling bed also serves as a buffer that absorbs the difference in processing capacity between the rolling line (hot rolling process) and the finishing line (shearing process). Therefore, the cooling bed is required to have an area where the cooling can be performed and to have a function as a distribution buffer.

冷却床に関する技術は、これまでに開示されてきている。例えば、特許文献1には、鋼板冷却床の自動制御装置に関する技術が開示されており、かかる技術によれば、鋼板を冷却する冷却床の自動運転制御を行うことが可能になる、としている。
特開平9−108722号公報
Techniques relating to cooling beds have been previously disclosed. For example, Patent Document 1 discloses a technique related to an automatic control device for a steel sheet cooling floor, and according to such a technique, automatic operation control of a cooling bed for cooling a steel sheet can be performed.
JP-A-9-108722

しかし、特許文献1に開示されている技術では、冷却床の物流バッファとしての機能を十分に活かすことが困難であり、圧延ラインと精整ラインとの処理能力差や精整ラインの突発トラブルへの対応に劣るという問題があった。   However, with the technology disclosed in Patent Document 1, it is difficult to make full use of the function of the cooling bed as a physical distribution buffer, resulting in a difference in processing capacity between the rolling line and the finishing line and sudden troubles in the finishing line. There was a problem that the response of was inferior.

そこで、本発明では、冷却床の物流バッファ機能を十分に活かすことが可能な、鋼板の製造方法を提供することを課題とする。   Accordingly, an object of the present invention is to provide a method for manufacturing a steel plate that can fully utilize the distribution buffer function of the cooling bed.

以下、本発明について説明する。なお、本発明の理解を容易にするために添付図面の参照符号を括弧書きにて付記するが、それにより本発明が図示の形態に限定されるものではない。   The present invention will be described below. In order to facilitate understanding of the present invention, reference numerals in the accompanying drawings are appended in parentheses, but the present invention is not limited to the illustrated embodiment.

第1の発明(請求項1、2に係る発明)は、圧延ライン(1)及び精整ライン(2)、並びに、これらの間に配設される、処理速度が異なる2つの冷却床(3a、3b)を備えた製造ライン(100)で使用される、鋼板の製造方法であって、現在の時点における精整ライン(2)での時間当たりの鋼板生産量Xと、現在の時点から任意の時間将来の時点における精整ライン(2)での時間当たりの鋼板生産量とから生産量に関する基準値L0を定める、基準値算出工程と、基準値算出工程後に、Xと基準値L0とを比較して、処理速度が速い冷却床(3a)か処理速度が遅い冷却床(3b)を選択する、冷却床選択工程と、を有することを特徴とする、鋼板の製造方法により、上記課題を解決する。
より具体的には、現在の時点における精整ライン(2)での時間当たりの鋼板生産量Xと、現在の時点から任意の時間将来の時点における前記精整ライン(2)での時間当たりの鋼板生産量Xと、現在の時点と、鋼板生産量がXの時点との間の各時点における、精整ライン(2)での時間当たりの鋼板生産量X、X、…、及びXn−1と、を算出した後、X、X、X、…、Xn−1、及びXから生産量に関する基準値L0を定める、基準値算出工程と、基準値算出工程後に、Xと基準値L0とを比較して、X≧L0の場合には、処理速度が速い冷却床(3a)を選択し、X<L0の場合には、処理速度が遅い冷却床(3b)を選択する、冷却床選択工程と、を有することを特徴とする、鋼板の製造方法により、上記課題を解決する。
The first invention (inventions according to claims 1 and 2) includes a rolling line (1), a finishing line (2), and two cooling beds (3a) disposed between them and having different processing speeds. 3b) used in the production line (100) with the steel plate production amount X 0 per hour in the refining line (2) at the current time point and the current time point. determining a reference value L0 relating to production from a steel plate production per time in the finishing line the line (2) at any time future time, the reference value calculation process, after the reference value calculation process, X 0 and the reference value L0 And a cooling bed selection step of selecting a cooling bed (3a) having a high processing speed or a cooling bed (3b) having a low processing speed, by the method for producing a steel sheet, Solve the problem.
More specifically, a steel plate production X 0 per hour at finishing line line (2) at the current time point, per time at the at any time future time from the current time point finishing line line (2) and the steel sheet production X n of the current point in time, at each time point between the time point of the steel sheet production is X n, steel production per time in the finishing line the line (2) X 1, X 2 , ... and the X n-1, after calculating the, X 0, X 1, X 2, ..., determining a reference value L0 relating to production from X n-1, and X n, the reference value and the calculation step, a reference value After the calculation step, X 0 is compared with the reference value L 0, and if X 0 ≧ L 0 , the cooling bed (3a) having a high processing speed is selected, and if X 0 <L 0 , the processing speed is A method for producing a steel sheet, comprising: a cooling bed selection step of selecting a slow cooling bed (3b) The above problems are solved by law.

ここに、「処理速度が異なる2つの冷却床」とは、各冷却床内の鋼板搬送速度が異なる形態のほか、鋼板搬送速度は同じだが冷却床の長さが異なるため結果として処理速度に差が生じる形態をも含む概念である。さらに、「時間当たりの生産量」とは、圧延ライン(1)や精整ライン(2)の任意の位置において、単位時間当たりに通過する鋼板量を意味している。また、「現在の時点から任意の時間遡った時点」の具体例としては、現在の時点から60sec遡った時点等を挙げることができる。さらにまた、時間当たりの鋼板生産量(以下において、単に「鋼板生産量」と記述することがある。)がXである時点の具体例としては、鋼板生産量がXである現在の時点から60sec遡った時点を、鋼板生産量がXである時点の具体例としては、鋼板生産量がXである時点から60sec遡った時点を、鋼板生産量がXである時点の具体例としては、鋼板生産量がXn−1である時点から60sec遡った時点を、それぞれ挙げることができる。さらに、nの具体的な数値は特に限定されるものではないが、その具体的な数値の例としては、10〜20等を挙げることができる。加えて、「処理速度が速い(遅い)冷却床を選択する」とは、圧延ライン(1)から鋼板を搬送すべき冷却床を、鋼板生産量Xと生産量に関する基準値L0との大小関係に応じて選択することを意味している。 Here, “two cooling beds with different processing speeds” means that the steel plate conveyance speed in each cooling bed is different, and the steel plate conveyance speed is the same but the cooling bed length is different, resulting in a difference in the processing speed. It is a concept that includes a form in which the phenomenon occurs. Furthermore, the “production amount per hour” means the amount of steel sheet that passes per unit time at an arbitrary position on the rolling line (1) or the finishing line (2). Further, as a specific example of “a time point that is arbitrary time retroactive from the current time point”, a time point that is 60 seconds back from the current time point can be cited. Furthermore, as a specific example of the time point when the steel plate production amount per hour (hereinafter sometimes referred to simply as “steel plate production amount”) is X 1 , the current time point when the steel plate production amount is X 0. the timing predated 60sec, specific examples of the time the steel sheet production is X 2 from the time when the steel sheet production is back 60sec from the time it is X 1, a specific example of time the steel sheet production is X n Can be cited as the time points 60 sec from the time point when the steel plate production amount is Xn-1 . Furthermore, although the specific numerical value of n is not specifically limited, 10-20 etc. can be mentioned as an example of the specific numerical value. In addition, the "processing speed is fast (slow) cooling bed to select" the magnitude of the cooling bed to be transported to the steel plate from the rolling line (1), and steel production X 0 with a reference value L0 relating to production It means selecting according to the relationship.

第2の発明(請求項3、4に係る発明)は、圧延ライン(1)及び精整ライン(2)、並びに、これらの間に配設される、処理速度が異なる2つの冷却床(3a、3b)を備えた製造ライン(100)で使用される、鋼板の製造方法であって、現在の時点における前記精整ライン(2)での時間当たりの鋼板生産量X、及び、現在の時点における圧延ライン(1)での時間当たりの鋼板生産量Y、を算出する、生産量算出工程と、生産量算出工程後に、XとYを比較して、処理速度が速い冷却床(3a)か処理速度が遅い冷却床(3b)を選択する、冷却床選択工程と、を有することを特徴とする、鋼板の製造方法により、上記課題を解決する。
より具体的には、製造ライン(100)の過去の操業データから算出される生産量に関する基準値をK0とするとき、現在の時点における精整ライン(2)での時間当たりの鋼板生産量X、及び、現在の時点における圧延ライン(1)での時間当たりの鋼板生産量Y、を算出する、生産量算出工程と、生産量算出工程後に、(X−Y)と基準値K0とを比較して、(X−Y)≧K0の場合には、処理速度が速い冷却床(3a)を選択し、(X−Y)<K0の場合には、処理速度が遅い冷却床(3b)を選択する、冷却床選択工程と、を有することを特徴とする、鋼板の製造方法により、上記課題を解決する。
The second invention (inventions according to claims 3 and 4) includes a rolling line (1) and a finishing line (2), and two cooling beds (3a) disposed between them and having different processing speeds. 3b), which is used in the production line (100) with a steel plate production amount X 0 per hour in the refining line (2) at the present time point, and the present The steel plate production amount Y 0 per hour in the rolling line (1) at the time point is calculated, and after the production amount calculation step, X 0 is compared with Y 0 and the cooling bed has a high processing speed. (3a) or a cooling bed selection step of selecting a cooling bed (3b) having a low processing speed, and solving the above-mentioned problems by a method for producing a steel sheet.
More specifically, when the reference value regarding the production amount calculated from the past operation data of the production line (100) is K0, the steel plate production amount per hour on the finishing line (2) at the current time point X 0 and the production amount calculation step of calculating the steel plate production amount Y 0 per hour in the rolling line (1) at the current time point, and after the production amount calculation step, (X 0 −Y 0 ) and the reference value Compared with K0, if (X 0 −Y 0 ) ≧ K 0, the cooling bed (3 a) having a high processing speed is selected, and if (X 0 −Y 0 ) <K 0 , the processing speed is selected. The above problem is solved by a method for producing a steel sheet, comprising a cooling bed selection step of selecting a cooling bed (3b) that is slow.

以上、冷却床が2つの場合についての発明であるが、同様の考えにより冷却床がm個(m≧3)でも同様の効果を有する鋼板の製造方法を提供することができる。すなわち、
第3の発明(請求項5、6に係る発明)は、圧延ライン及び精整ライン、並びに、これらの間に配設される、処理速度が異なるm個(m≧3)の冷却床を備えた製造ラインで使用される、鋼板の製造方法であって、現在の時点における精整ラインでの時間当たりの鋼板生産量Xと、現在の時点から任意の時間将来の時点における精整ラインでの時間当たりの鋼板生産量とから生産量に関する基準値に関する基準値L1、…、及びLm−1を定める、基準値算出工程と、基準値算出工程後に、Xと基準値L1、…、及びLm−1とを比較して、冷却床を選択する、冷却床選択工程と、を有することを特徴とする、鋼板の製造方法により、上記課題を解決する。
より具体的には、現在の時点における精整ラインでの時間当たりの鋼板生産量Xと、現在の時点から任意の時間将来の時点における精整ラインでの時間当たりの鋼板生産量Xと、現在の時点と、鋼板生産量がXの時点との間の各時点における、精整ラインでの時間当たりの鋼板生産量X、X、…、及びXn−1と、を算出した後、X、X、X、…、Xn−1、及びXから生産量に関する基準値L1、…、及びLm−1を定める、基準値算出工程と、基準値算出工程後に、Xと基準値L1、…、及びLm−1とを比較して、X≧Lm−1の場合には、処理速度が最も速い冷却床を選択し、Lw≦X<Lw+1(w=1〜m−2)の場合には、処理速度がw+1番目に遅い冷却床を選択し、X<L1の場合には、処理速度が最も遅い冷却床を選択する、冷却床選択工程と、を有することを特徴とする、鋼板の製造方法により、上記課題を解決する。
As mentioned above, although it is invention about the case where there are two cooling beds, the manufacturing method of the steel plate which has the same effect can be provided even if m cooling beds (m> = 3) by the same idea. That is,
A third invention (inventions according to claims 5 and 6) includes a rolling line and a finishing line, and m cooling beds (m ≧ 3) disposed between them and having different processing speeds. was used in the production line, a manufacturing method of a steel plate, a steel plate production X 0 per hour at finishing line line at the current time point, in finishing line line at any time future time from the current time reference value L1 for the reference value relating to production from a steel plate production per time, ..., and defining the Lm-1, and the reference value calculation process, after the reference value calculation process, X 0 and the reference value L1, ..., and The above-mentioned problem is solved by a method for manufacturing a steel sheet, comprising: a cooling bed selection step of comparing Lm-1 and selecting a cooling bed.
More specifically, a steel plate production X 0 per hour at finishing line line at the current time point, and the steel sheet production X n per hour at finishing line line at any time future time from the current time , And steel sheet production amounts X 1 , X 2 ,..., And X n−1 per time on the finishing line at each time point between the current time point and the time point when the steel plate production amount is X n after, X 0, X 1, X 2, ..., X n-1, and X n reference value L1 on the production volume from ..., and defining the Lm-1, and the reference value calculation process, after the reference value calculating step , X 0 and the reference value L1, ..., and by comparing the Lm-1, in the case of X 0 ≧ Lm-1, the processing speed to select the fastest cooling bed, Lw ≦ X 0 <Lw + 1 (w = 1 to m-2), select a cooling bed with the processing speed w + 1 which is the slowest, and X 0 <L1 In this case, the above problem is solved by a method for producing a steel sheet, comprising a cooling bed selection step of selecting a cooling bed having the slowest processing speed.

第4の発明(請求項7、8に係る発明)は、圧延ライン及び精整ライン、並びに、これらの間に配設される、処理速度が異なるm個(m≧3)の冷却床を備えた製造ラインで使用される、鋼板の製造方法であって、現在の時点における精整ラインでの時間当たりの鋼板生産量X、及び、現在の時点における圧延ラインでの時間当たりの鋼板生産量Y、を算出する、生産量算出工程と、生産量算出工程後に、XとYを比較して、冷却床を選択する、冷却床選択工程と、を有することを特徴とする、鋼板の製造方法により、上記課題を解決する。
より具体的には、製造ラインの過去の操業データから算出される生産量に関する基準値をK1、…、及びKm−1とするとき、現在の時点における精整ラインでの時間当たりの鋼板生産量X、及び、現在の時点における圧延ラインでの時間当たりの鋼板生産量Y、を算出する、生産量算出工程と、生産量算出工程後に、(X−Y)と基準値K1、…、及びKm−1とを比較して、(X−Y)≧Km−1の場合には、処理速度が最も速い前記冷却床を選択し、Kw≦(X−Y)<Kw+1(w=1〜m−2)の場合には、処理速度がw+1番目に遅い前記冷却床を選択し、(X−Y)<K1の場合には、処理速度が最も遅い冷却床を選択する、冷却床選択工程と、を有することを特徴とする、鋼板の製造方法により、上記課題を解決する。
A fourth invention (inventions according to claims 7 and 8) includes a rolling line and a finishing line, and m cooling beds (m ≧ 3) disposed between them and having different processing speeds. Steel sheet production method used in the production line, steel sheet production amount X 0 per hour in the finishing line at the current time point, and steel sheet production amount per hour in the rolling line at the current time point Y 0 , a production amount calculation step, and after the production amount calculation step, a cooling bed selection step of comparing the X 0 and Y 0 and selecting a cooling bed is provided. The above-described problems are solved by the manufacturing method.
More specifically, when the reference values regarding the production amount calculated from the past operation data of the production line are K1,..., And Km-1, the steel plate production amount per hour on the finishing line at the current time point. X 0, and calculates the steel plate production Y 0, per hour in the rolling line at the current time, and the production amount calculation step, after the production amount calculation step, (X 0 -Y 0) and the reference value K1, .., And Km−1, and when (X 0 −Y 0 ) ≧ Km−1, the cooling bed having the fastest processing speed is selected, and Kw ≦ (X 0 −Y 0 ) < In the case of Kw + 1 (w = 1 to m−2), the cooling bed having the slowest processing speed is selected, and in the case of (X 0 −Y 0 ) <K1, the cooling bed having the slowest processing speed is selected. A method for producing a steel sheet, comprising: a cooling bed selection step Accordingly, to solve the above problem.

第1の発明および第3の発明に記載の発明によれば、精整ライン(2)における現在の鋼板生産量に応じて、鋼板を搬送すべき冷却床(3a、3b)を選択することができるので、冷却床(3a、3b)及び圧延ライン(1)における鋼板の待機時間を短縮しつつ、冷却床の物流バッファ機能を十分に活かすことが可能な、鋼板の製造方法を提供することができる。   According to the inventions described in the first invention and the third invention, it is possible to select the cooling beds (3a, 3b) to which the steel plates are to be transported according to the current steel plate production amount in the finishing line (2). Therefore, it is possible to provide a method for manufacturing a steel plate that can fully utilize the distribution buffer function of the cooling bed while shortening the standby time of the steel plate in the cooling bed (3a, 3b) and the rolling line (1). it can.

第2の発明および第4の発明によれば、精整ライン(2)のみならず圧延ライン(1)における現在の鋼板生産量に応じて、鋼板を搬送すべき冷却床(3a、3b)を選択することができるので、冷却床(3a、3b)及び圧延ライン(1)における鋼板の待機時間を短縮しつつ、冷却床の物流バッファ機能を十分に活かすことが可能な、鋼板の製造方法を提供することができる。   According to 2nd invention and 4th invention, according to the present steel plate production amount in not only the finishing line (2) but the rolling line (1), the cooling floor (3a, 3b) which should convey a steel plate is provided. A steel plate manufacturing method capable of making full use of the distribution buffer function of the cooling bed while shortening the standby time of the steel plate in the cooling beds (3a, 3b) and the rolling line (1). Can be provided.

以下、本発明の実施の形態について説明する。   Embodiments of the present invention will be described below.

1.2つの冷却床が備えられる場合
図1は、本発明の鋼板の製造方法を適用可能な、製造ラインの形態例を示す概略図である。図示の製造ライン100は、圧延ライン1及び精整ライン2と、これら圧延ライン1と精整ライン2との間に配設される2つの冷却床3a、3bと、圧延ライン1で圧延された鋼板が搬送されるべき冷却床を選択する冷却床選択制御手段4と、を備えている。そして、鋼板振り分け手段5により、圧延ライン1上を搬送されてきた鋼板が冷却床3a、3bへ振り分けられる。圧延ライン1には、加熱炉11、粗圧延機12、仕上圧延機13、及び、冷却装置14が備えられ、圧延ライン1上を搬送される鋼板の情報(例えば、位置情報、寸法情報等)は、圧延ライントラッキング装置15を介して取得されている。一方、精整ライン2には、切断機21、22、検査手段23、及び、倉庫24が備えられ、精整ライン2上を搬送される鋼板の情報(例えば、位置情報等)は、精整ライントラッキング装置25を介して取得されている。加えて、冷却床3aには、入側搬送手段31a、床内搬送手段32a、及び、出側搬送手段33aが、冷却床3bには、入側搬送手段31b、床内搬送手段32b、及び、出側搬送手段33bが、それぞれ備えられ、冷却床3bは冷却床3aよりも床長さが長く、冷却床3aの処理速度は、冷却床3bの処理速度よりも速い。
1. When Two Cooling Beds are Provided FIG. 1 is a schematic diagram showing an example of a production line to which the steel sheet production method of the present invention can be applied. The production line 100 shown in the figure is rolled by the rolling line 1 and the finishing line 2, the two cooling beds 3 a and 3 b disposed between the rolling line 1 and the finishing line 2, and the rolling line 1. Cooling bed selection control means 4 for selecting a cooling bed to which the steel plate is to be transported. And the steel plate which has been conveyed on the rolling line 1 is distributed by the steel plate distribution means 5 to the cooling beds 3a and 3b. The rolling line 1 includes a heating furnace 11, a rough rolling mill 12, a finish rolling mill 13, and a cooling device 14, and information (for example, position information, dimensional information, etc.) of a steel sheet conveyed on the rolling line 1. Is acquired via the rolling line tracking device 15. On the other hand, the finishing line 2 is provided with cutting machines 21 and 22, an inspection means 23, and a warehouse 24, and information (for example, position information) of the steel sheet conveyed on the finishing line 2 is adjusted. It is acquired via the line tracking device 25. In addition, the cooling bed 3a includes an entry-side transfer means 31a, an in-floor transfer means 32a, and an exit-side transfer means 33a, and the cooling bed 3b includes an entry-side transfer means 31b, an in-floor transfer means 32b, and The delivery side transport means 33b is provided, the cooling bed 3b has a longer floor length than the cooling bed 3a, and the processing speed of the cooling bed 3a is faster than the processing speed of the cooling bed 3b.

圧延ライン1上を搬送される鋼板は、鋼板振り分け手段5により、冷却床3a、3bへと振り分けられ、当該鋼板振り分け手段5の動作は、冷却床選択制御手段4によって制御されている。冷却床選択制御手段4には、鋼板振り分け手段5の動作制御を実行するCPU41と、そのCPU41に対する記憶装置とが設けられている。CPU41は、マイクロプロセッサユニットおよびその動作に必要な各種周辺回路を組み合わせて構成され、CPU41に対する記憶装置は、例えば、鋼板振り分け手段5の動作制御に必要なプログラムや各種データを記憶するROM42と、CPU41の作業領域として機能するRAM43等を組み合わせて構成される。当該構成に加えて、さらに、CPU41が、ROM42に記憶されたソフトウエアと組み合わされることにより、製造ライン100における冷却床選択制御手段4が機能する。   The steel plates conveyed on the rolling line 1 are distributed to the cooling floors 3a and 3b by the steel plate distribution means 5, and the operation of the steel sheet distribution means 5 is controlled by the cooling bed selection control means 4. The cooling floor selection control means 4 is provided with a CPU 41 that controls the operation of the steel plate sorting means 5 and a storage device for the CPU 41. The CPU 41 is configured by combining a microprocessor unit and various peripheral circuits necessary for its operation, and the storage device for the CPU 41 includes, for example, a ROM 42 for storing programs and various data necessary for operation control of the steel sheet sorting means 5, and the CPU 41. The RAM 43 and the like functioning as a work area are combined. In addition to the configuration, the CPU 41 is combined with software stored in the ROM 42, so that the cooling bed selection control means 4 in the production line 100 functions.

圧延ライントラッキング装置15及び精整ライントラッキング装置25からの出力信号は、入力ポート45を介して、入力信号としてCPU41へと到達する。ここに、圧延ライントラッキング装置15は、圧延ライン1上を搬送される鋼板の情報を取得するための装置であり、当該装置15によって定期的(例えば、60秒毎)に取得され送信された信号が冷却床選択制御手段4で解析されることにより、圧延ライン1の鋼板生産量Yが算出される(生産量算出工程)。一方、精整ライントラッキング装置25は、精整ライン2上を搬送される鋼板の情報を取得するための装置であり、当該装置25によって定期的(例えば、60秒毎)に取得され送信された信号が冷却床選択制御手段4で解析されることにより、精整ライン2の鋼板生産量Xが算出される(生産量算出工程)。CPU41は、上述の各種入力要素からの信号、及びROM42に記憶されたプログラムに基づいて、出力ポート46を介して、鋼板振り分け手段5に対する動作指令を制御する。鋼板振り分け手段5は、CPU41から与えられた動作指令に応じて、圧延ライン1上を搬送される鋼板を冷却床3a、3bへと振り分ける。 Output signals from the rolling line tracking device 15 and the finishing line tracking device 25 reach the CPU 41 as input signals via the input port 45. Here, the rolling line tracking device 15 is a device for acquiring information on the steel sheet conveyed on the rolling line 1, and the signal acquired and transmitted periodically (for example, every 60 seconds) by the device 15. There by being analyzed by cooling bed selection control means 4, the steel sheet production Y 0 of the rolling line 1 is calculated (production amount calculation step). On the other hand, the finishing line tracking device 25 is a device for acquiring information on a steel sheet conveyed on the finishing line 2, and is acquired and transmitted periodically (for example, every 60 seconds) by the device 25. by signal you are analyzed by cooling bed selection control means 4, the steel sheet production X 0 of finishing line line 2 is calculated (production amount calculation step). The CPU 41 controls an operation command to the steel sheet sorting means 5 through the output port 46 based on the signals from the various input elements described above and the program stored in the ROM 42. The steel plate distribution means 5 distributes the steel plate conveyed on the rolling line 1 to the cooling floors 3a and 3b according to the operation command given from the CPU 41.

本発明の鋼板の製造方法(以下において、単に「製造方法」と記述することがある。)における、鋼板振り分け手段5に対する動作指令の制御形態ついて、さらに具体的に説明する。   The control mode of the operation command for the steel sheet sorting means 5 in the steel sheet manufacturing method of the present invention (hereinafter sometimes simply referred to as “manufacturing method”) will be described more specifically.

1.1.第1実施形態
第1実施形態にかかる製造方法では、まず、上述のようにして算出されたXと現在の時点から任意の時間将来の時点における前記精整ラインでの時間当たりの鋼板生産量とから生産量に関する基準値L0を定める(基準値算出工程)。より具体的には、鋼板生産量X、X、X、…、Xn−1、及びXから生産量に関する基準値L0を定める。ここで、鋼板生産量Xは現在の時点から任意の時間将来の時点における前記精整ラインでの時間当たりの鋼板生産量であり、X、X、…、Xn−2及びXn−1は、現在の時点と、鋼板生産量がXの時点との間の各時点における、精整ラインでの時間当たりの鋼板生産量を意味する。
、X、…、Xn−1、及びXは、将来予測される鋼板生産量であり、例えば、精整ラインで切断される前の鋼板の長さl、板幅u、硬さh(抗張力TS)、切断回数(または分割数)pの関数により算出することができる。
1.1. First Embodiment In the manufacturing method according to the first embodiment, first, X 0 calculated as described above and the steel plate production amount per hour on the finishing line at a time point in the future at an arbitrary time from the current time point. A reference value L0 relating to the production amount is determined from the above (reference value calculation step). More specifically, a reference value L0 related to the production amount is determined from the steel plate production amounts X 0 , X 1 , X 2 ,..., X n−1 , and X n . Here, the steel plate production amount X n is the steel plate production amount per hour in the finishing line at an arbitrary time in the future from the current time point, and X 1 , X 2 ,..., X n-2 and X n -1 means the steel plate production amount per hour in the finishing line at each time point between the current time point and the time point when the steel plate production amount is Xn .
X 1 , X 2 ,..., X n−1 , and X n are the steel plate production predicted in the future, for example, the length l, the plate width u, the hard plate of the steel plate before being cut by the finishing line. It can be calculated by a function of the length h (tensile strength TS) and the number of cuttings (or the number of divisions) p.

Figure 2007061871
Figure 2007061871

なお、上記式においてkはXの時点に精整ラインにて処理対象となっている鋼板の数を示す。また、関数fは予測精度に応じて各種形態を採用してもよいが,たとえば簡略化し、1次式で計算しても良い。ここで、a、b、c、dはパラメータである。 Incidentally, k in the formula represents a number of steel sheets to be processed to a point X n at finishing line line. The function f may adopt various forms according to the prediction accuracy, but may be simplified and calculated by a linear expression, for example. Here, a, b, c, and d are parameters.

Figure 2007061871
Figure 2007061871

当該基準値L0の算出方法の具体例としては、L0=(X+X+X+…+Xn−1+X)/(n+1)とする方法や、X、X、X、…、Xn−1、Xの分布を正規分布と仮定したときの最頻値や中央値をL0とする方法等を挙げることができる。 Specific examples of the calculation method of the reference value L0 include a method of L0 = (X 0 + X 1 + X 2 +... + X n-1 + X n ) / (n + 1), X 0 , X 1 , X 2 ,. , X n−1 , X n , assuming that the distribution is a normal distribution, the mode value and the median value are set to L 0.

このようにして算出されたL0とXとを比較し、鋼板を装入すべき冷却床を選択する(冷却床選択工程)。X≧L0であれば、現時点における精整ライン2の鋼板生産量は、鋼板生産量X、X、X、…、Xn−1、Xから求めた生産量に関する基準値L0以上である。それゆえ、圧延ライン1から処理速度の大きい冷却床3aへ鋼板を装入しても、冷却床3aを経た鋼板を精整ライン2で効率良く処理することが可能になる。したがって、X≧L0の場合は、上記CPU41から鋼板振り分け手段5へ、鋼板を冷却床3aへ振り分ける旨の信号を出力し、この信号によって動作する鋼板振り分け手段5により、鋼板が冷却床3aへ振り分けられる。 Thus by comparing the L0 and X 0 which is calculated, selecting a cooling bed should instrumentation Nyusu steel plate (cooling bed selection step). If X 0 ≧ L0, the steel plate production amount of the finishing line 2 at the present time is the reference value L0 regarding the production amount obtained from the steel plate production amounts X 0 , X 1 , X 2 ,..., X n−1 , X n. That's it. Therefore, even if a steel plate is charged from the rolling line 1 to the cooling bed 3a having a high processing speed, the steel plate that has passed through the cooling bed 3a can be efficiently processed by the finishing line 2. Therefore, when X 0 ≧ L0, the CPU 41 outputs a signal indicating that the steel sheet is distributed to the cooling floor 3a to the steel sheet distribution means 5, and the steel sheet is distributed to the cooling floor 3a by the steel sheet distribution means 5 that operates according to this signal. Sorted.

これに対し、X<L0であれば、現時点における精整ライン2の鋼板生産量は、鋼板生産量X、X、X、…、Xn−1、Xから求めた生産量に関する基準値L0未満である。かかる場合に、圧延ライン1から処理速度の大きい冷却床3aへ鋼板を装入すると、精整ライン2で行われている鋼板の処理が終わるまで、冷却床3aの床内搬送手段32aを経た鋼板を冷却床3aの出側において待機させる必要が生じやすい。そうすると、鋼板の生産性が低下し、物流バッファ機能を有効に活用できない事態が生じる。そこで、第1実施形態にかかる製造方法において、X<L0である場合には、上記CPU41から鋼板振り分け手段5へ、鋼板を冷却床3bへ振り分ける旨の信号を出力し、この信号によって動作する鋼板振り分け手段5により、鋼板が冷却床3bへ振り分けられる。 On the other hand, if X 0 <L0, the steel plate production amount of the finishing line 2 at the present time is the production amount obtained from the steel plate production amounts X 0 , X 1 , X 2 ,..., X n−1 , X n. Is less than the reference value L0. In this case, when the steel plate is loaded from the rolling line 1 to the cooling bed 3a having a high processing speed, the steel plate that has passed through the in-floor conveying means 32a of the cooling bed 3a until the processing of the steel plate performed in the finishing line 2 is completed. Need to stand by on the exit side of the cooling floor 3a. If it does so, productivity of a steel plate will fall and the situation which a logistic buffer function cannot be utilized effectively will arise. Therefore, in the manufacturing method according to the first embodiment, when X 0 <L0, the CPU 41 outputs a signal indicating that the steel plate is distributed to the cooling floor 3b to the steel plate distribution means 5, and operates according to this signal. A steel plate is distributed to the cooling floor 3b by the steel plate distribution means 5.

すなわち、第1実施形態にかかる製造方法では、圧延ライントラッキング装置15と、精整ライントラッキング装置25と、冷却床選択制御手段4とを介して導出される、精整ライン2における鋼板生産量X及び生産量に関する基準値L0の大小関係と、冷却床3a、3bの処理速度とを対応させることで、冷却床3a、3bの物流バッファ機能を有効に活かし得る製造方法としている。 That is, in the manufacturing method according to the first embodiment, the steel plate production amount X in the finishing line 2 derived through the rolling line tracking device 15, the finishing line tracking device 25, and the cooling bed selection control means 4. The manufacturing method can effectively utilize the distribution buffer function of the cooling beds 3a and 3b by associating the magnitude relationship between 0 and the reference value L0 relating to the production amount with the processing speed of the cooling beds 3a and 3b.

図2は、第1実施形態にかかる製造方法を概略的に示すフローチャートである。第1実施形態にかかる製造方法では、精整ライン2の鋼板生産量X、並びに予測鋼板生産量X、X、…、Xn−1、Xを算出した後(工程S11)、これらX、X、X、…、Xn−1、Xから生産量に関する基準値L0を定める(工程S12:基準値算出工程)。そして、工程S12に引き続き、XとL0とを比較する(工程S13)。X≧L0であれば、工程S13で肯定判断されるため、冷却床選択制御手段4において、処理速度が速い冷却床3aが選択され(工程S14)、鋼板振り分け手段5により、鋼板が冷却床3aへ振り分けられる(工程S15)。これに対し、X<L0であれば、工程S13で否定判断されるため、冷却床選択制御手段4において、処理速度が遅い冷却床3bが選択され(工程S16)、鋼板振り分け手段5により、鋼板が冷却床3bへ振り分けられる(工程S17)。このように、第1実施形態にかかる製造方法では、基準値算出工程と、工程S13〜S17によって構成される冷却床選択工程とを備える構成とすることで、鋼板が装入されるべき冷却床を選別している。 FIG. 2 is a flowchart schematically showing the manufacturing method according to the first embodiment. In the manufacturing method according to the first embodiment, after calculating the steel plate production amount X 0 of the finishing line 2 and the predicted steel plate production amounts X 1 , X 2 ,..., X n−1 , X n (step S11), A reference value L0 related to the production amount is determined from these X 0 , X 1 , X 2 ,..., X n−1 , X n (step S12: reference value calculation step). Then, subsequent to step S12, and compares the X 0 and L0 (step S13). If X 0 ≧ L0, an affirmative determination is made in step S13, so the cooling bed selection control means 4 selects the cooling bed 3a having a high processing speed (step S14), and the steel sheet distribution means 5 causes the steel sheet to be cooled. It is distributed to 3a (step S15). On the other hand, if X 0 <L0, since a negative determination is made in step S13, the cooling bed selection control unit 4 selects the cooling bed 3b having a low processing speed (step S16), and the steel plate distribution unit 5 The steel plates are distributed to the cooling floor 3b (step S17). Thus, in the manufacturing method according to the first embodiment, the cooling bed to which the steel plate is to be charged is provided by including the reference value calculation step and the cooling bed selection step configured by steps S13 to S17. Are sorted out.

1.2.第2実施形態
第2実施形態にかかる製造方法では、過去の操業データから算出される生産量に関する基準値K0を用いて、鋼板振り分け手段5の動作を制御する。第2実施形態にかかる基準値K0の算出法の具体例としては、過去の実績値の平均値や、過去の実績値の分布を正規分布と仮定したときの最頻値や中央値をK0とする方法等を挙げることができる。そして、上記生産量算出工程により算出される、精整ライン2での鋼板生産量X及び圧延ライン1での鋼板生産量Yを用いて(X−Y)を算出した後、K0と(X−Y)とを比較し、鋼板を装入すべき冷却床を選択する(冷却床選択工程)。以下、K0=0と仮定して、説明を続ける。
1.2. Second Embodiment In the manufacturing method according to the second embodiment, the operation of the steel sheet sorting means 5 is controlled using a reference value K0 relating to the production amount calculated from past operation data. As a specific example of the calculation method of the reference value K0 according to the second embodiment, the average value of the past actual values, or the mode value and the median value when assuming the distribution of the past actual values as a normal distribution is K0. And the like. Then, is calculated by the production volume calculation step, after calculating using steel production Y 0 in steel production X 0 and rolling line 1 at finishing line line 2 (X 0 -Y 0), K0 And (X 0 -Y 0 ) are compared, and a cooling bed in which the steel plate is to be charged is selected (cooling bed selection step). Hereinafter, the description will be continued assuming that K0 = 0.

(X−Y)≧0(=K0)の場合には、精整ライン2における鋼板生産量Xが、圧延ライン1における鋼板生産量Y以上であるため、製造ライン100の生産効率は、圧延ライン1の鋼板生産量Yに依存する。したがって、かかる場合には、処理速度の速い冷却床3aへ鋼板を振り分けることにより、冷却床の入側及び出側において鋼板を待機させることなく鋼板の生産効率を向上させることが可能になる。 When (X 0 −Y 0 ) ≧ 0 (= K 0), the steel plate production amount X 0 in the finishing line 2 is equal to or greater than the steel plate production amount Y 0 in the rolling line 1, so the production efficiency of the production line 100 Depends on the steel plate production Y 0 of the rolling line 1. Therefore, in such a case, by distributing the steel plates to the cooling floor 3a having a high processing speed, it is possible to improve the production efficiency of the steel plates without causing the steel plates to wait on the entry side and the exit side of the cooling bed.

一方、(X−Y)<0(=K0)の場合には、精整ライン2における鋼板生産量Xが、圧延ライン1における鋼板生産量Yよりも少ない。そのため、圧延ライン1上を搬送される鋼板を処理速度の速い冷却床3aへ振り分けると、精整ライン2における鋼板の処理が終了するまで冷却床3aから精整ライン2へ鋼板を搬送することができず、冷却床3aの出側において鋼板を待機させる事態が生じる虞がある。かかる事態が生じると、鋼板の流れが停滞して、冷却床の物流バッファ機能を十分に活かすことができず、鋼板の生産効率が低下する。そこで、鋼板を待機させる事態の発生を抑制する等の観点から、(X−Y)<0(=K0)の場合には、処理速度の遅い冷却床3bへ鋼板を振り分ける。このようにすれば、冷却床の物流バッファ機能を十分に活かすことが可能になる。 On the other hand, when (X 0 −Y 0 ) <0 (= K 0), the steel plate production amount X 0 in the finishing line 2 is smaller than the steel plate production amount Y 0 in the rolling line 1. Therefore, when the steel sheet conveyed on the rolling line 1 is distributed to the cooling bed 3a having a high processing speed, the steel sheet can be conveyed from the cooling bed 3a to the finishing line 2 until the processing of the steel sheet in the finishing line 2 is completed. There is a possibility that a situation may occur in which the steel plate waits on the exit side of the cooling floor 3a. When such a situation occurs, the flow of the steel plate is stagnated, and the distribution buffer function of the cooling bed cannot be fully utilized, and the production efficiency of the steel plate is reduced. Therefore, from the viewpoint of suppressing the occurrence of a situation where the steel plate is put on standby, when (X 0 −Y 0 ) <0 (= K0), the steel plate is distributed to the cooling floor 3b having a low processing speed. In this way, it is possible to fully utilize the distribution buffer function of the cooling bed.

図3は、第2実施形態にかかる製造方法を概略的に示すフローチャートである。第2実施形態にかかる製造方法では、まず、過去の操業データから生産量に関する基準値K0を算出し(工程S21)、次に、現時点における精整ライン2の鋼板生産量X及び圧延ライン1の鋼板生産量Yを算出する(工程S22:生産量算出工程)。そして、工程S22に引き続き、(X−Y)とK0とを比較する(工程S23)。(X−Y)≧K0であれば、工程S23で肯定判断されるため、冷却床選択制御手段4において、処理速度が速い冷却床3aが選択され(工程S24)、鋼板振り分け手段5により、鋼板が冷却床3aへ振り分けられる(工程S25)。これに対し、(X−Y)<K0であれば、工程S23で否定判断されるため、冷却床選択制御手段4において、処理速度が遅い冷却床3bが選択され(工程S26)、鋼板振り分け手段5により、鋼板が冷却床3bへ振り分けられる(工程S27)。このように、第2実施形態にかかる製造方法では、生産量算出工程と、工程S23〜S27によって構成される冷却床選択工程とを備える構成とすることで、鋼板が装入されるべき冷却床を選別している。 FIG. 3 is a flowchart schematically showing a manufacturing method according to the second embodiment. In the manufacturing method according to the second embodiment, first, calculates a reference value K0 on the production volume from the past operation data (step S21), then, the steel plate of the finishing line the line 2 in the current production X 0 and rolling line 1 calculating a steel sheet production Y 0 of (step S22: production amount calculation step). Then, following the step S22, (X 0 -Y 0 ) and K0 are compared (step S23). If (X 0 −Y 0 ) ≧ K 0 , an affirmative determination is made in step S 23, and therefore, the cooling bed selection control unit 4 selects the cooling bed 3 a having a high processing speed (step S 24), and the steel plate distribution unit 5 The steel plates are distributed to the cooling floor 3a (step S25). On the other hand, if (X 0 −Y 0 ) <K 0 , a negative determination is made in step S 23, so the cooling bed selection control means 4 selects the cooling bed 3 b having a low processing speed (step S 26), and the steel plate The steel plate is distributed to the cooling floor 3b by the distribution means 5 (step S27). Thus, in the manufacturing method according to the second embodiment, the cooling bed in which the steel plate is to be charged is provided by including the production amount calculation step and the cooling bed selection step configured by steps S23 to S27. Are sorted out.

2.3つ以上の冷却床が備えられる場合
以上、2つの冷却床を備える製造ラインに適用可能な、本発明の鋼板の製造方法について記述したが、本発明の技術思想は、m個(m≧3)の冷却床を備える製造ラインにも適用可能である。そこで、以下に、処理速度がそれぞれ異なる3つの冷却床(3x、3y、3z)が備えられる製造ラインに、本発明の鋼板の製造方法を適用する場合について、説明する。なお、以下において、冷却床3xの処理速度が最も早く、冷却床3zの処理速度が最も遅いと仮定する。
2. When Three or More Cooling Beds are Provided Although the steel sheet manufacturing method of the present invention applicable to a manufacturing line including two cooling beds has been described above, the technical idea of the present invention is m (m It can also be applied to a production line having a cooling bed of ≧ 3). Therefore, a case where the steel plate manufacturing method of the present invention is applied to a manufacturing line provided with three cooling beds (3x, 3y, 3z) having different processing speeds will be described below. In the following, it is assumed that the processing speed of the cooling bed 3x is the fastest and the processing speed of the cooling bed 3z is the slowest.

図4は、3つの冷却床が備えられる製造ラインの形態例を示す概略図である。図4において、図1に示す製造ラインの各要素と同様の構成を採るものには、図1にて使用した符号と同符号を付し、その説明を適宜省略する。
図示の製造ライン200は、圧延ライン1及び精整ライン2と、これら圧延ライン1と精整ライン2との間に配設される3つの冷却床3x、3y、3zと、冷却床選択制御手段4と、を備え、鋼板振り分け手段5により、圧延ライン1上を搬送されてきた鋼板が冷却床3x、3y、3zへと振り分けられる。冷却床3xには、入側搬送手段31x、床内搬送手段32x、及び、出側搬送手段33xが、冷却床3yには、入側搬送手段31y、床内搬送手段32y、及び、出側搬送手段33yが、冷却床3zには、入側搬送手段31z、床内搬送手段32z、及び、出側搬送手段33zが、それぞれ備えられている。
FIG. 4 is a schematic view showing an example of a production line provided with three cooling beds. 4, components having the same configuration as the elements of the production line shown in FIG. 1 are denoted by the same reference numerals as those used in FIG. 1, and description thereof is omitted as appropriate.
The production line 200 shown in the figure includes a rolling line 1 and a finishing line 2, three cooling beds 3x, 3y, 3z disposed between the rolling line 1 and the finishing line 2, and cooling bed selection control means. 4, and the steel plates distributed on the rolling line 1 are distributed to the cooling floors 3x, 3y, and 3z by the steel plate distribution means 5. The cooling floor 3x has an entrance side transport means 31x, an in-floor transport means 32x, and an exit side transport means 33x, and the cooling bed 3y has an entrance side transport means 31y, an in-floor transport means 32y, and an exit side transport. The means 33y is provided on the cooling floor 3z with an entrance side transport means 31z, an in-floor transport means 32z, and an exit side transport means 33z, respectively.

2.1.第1実施形態
第1実施形態にかかる上記製造方法を、3つの冷却床が備えられる製造ライン200に適用する場合には、まず、2つの冷却床が備えられる製造ラインの場合と同様の方法で、精整ライン2の鋼板生産量X、X、X、…、Xn−1、Xを算出し、(m−1)個の生産量に関する基準値、すなわち、3−1=2個の生産量に関する基準値L1、L2を定める(基準値算出工程)。当該基準値L1、L2の算出方法の具体例としては、X、X、X、…、Xn−1、Xの分布を正規分布と仮定して、分布の上位1/3が含まれる鋼板生産量の値をL1、分布の下位1/3が含まれる鋼板生産量の値をL2とする方法等を挙げることができる。以下、L1<L2と仮定して、説明を続ける。
2.1. First Embodiment When the production method according to the first embodiment is applied to a production line 200 provided with three cooling beds, first, in the same manner as in the production line provided with two cooling beds. The steel plate production amounts X 0 , X 1 , X 2 ,..., X n−1 , X n of the finishing line 2 are calculated, and (m−1) reference values for the production amount, that is, 3-1 = Reference values L1 and L2 relating to two production quantities are determined (reference value calculation step). As a specific example of the calculation method of the reference values L1 and L2, assuming that the distribution of X 0 , X 1 , X 2 ,..., X n−1 , X n is a normal distribution, Examples include a method in which the value of the steel plate production included is L1, and the value of the steel plate production including the lower third of the distribution is L2. Hereinafter, the description will be continued assuming that L1 <L2.

このようにして算出されたL1、L2とXとを比較し、鋼板を装入すべき冷却床を選択する(冷却床選択工程)。L2≦Xであれば、精整ライン2の現時点における鋼板生産量Xが、過去の鋼板生産量の上位1/3に含まれるため、精整ライン2で多くの鋼板が生産(処理)されていることを意味している。そのため、かかる場合には、圧延ライン1から処理速度の大きい冷却床3xへ鋼板を装入しても、冷却床3xを経た鋼板を精整ライン2で効率良く処理することが可能になる。したがって、L2≦Xの場合は、CPU41から鋼板振り分け手段5へ、鋼板を冷却床3xへ振り分ける旨の信号を出力し、この信号によって動作する鋼板振り分け手段5により、冷却床3xへ鋼板が振り分けられる。 Thus comparing the been L1, L2 and X 0 calculated, the steel sheet to select the instrumentation Nyusu should cooling bed (cooling bed selection step). If L2 ≦ X 0, steel sheet production X 0 at the present time the finishing line line 2, for inclusion in the upper third of the past steel production, many steel plate finishing line line 2 production (processing) It means that Therefore, in such a case, even if a steel plate is charged from the rolling line 1 to the cooling bed 3x having a high processing speed, the steel plate that has passed through the cooling bed 3x can be efficiently processed by the finishing line 2. Therefore, in the case of L2 ≦ X 0, the steel sheet distributing means 5 from CPU 41, and outputs a signal indicating that distributes the steel sheet to a cooling bed 3x, the steel sheet distributing means 5 that is operated by this signal, distributing the steel sheet to a cooling bed 3x It is done.

一方、L1≦X<L2であれば、精整ライン2の現時点における鋼板生産量Xは、過去の平均的な鋼板生産量に相当することを意味している。そのため、かかる場合には、3つの冷却床の中で中間の処理速度を有する冷却床3yへ鋼板を装入することで、圧延ライン1上における鋼板の待機を抑制し、冷却床の物流バッファ機能を十分に活かすことが可能になる。したがって、L1≦X<L2の場合には、鋼板振り分け手段5により、鋼板が冷却床3yへと振り分けられる。 On the other hand, if L1 ≦ X 0 <L2, it means that the steel plate production amount X 0 at the present time of the finishing line 2 corresponds to the past average steel plate production amount. Therefore, in such a case, by waiting for the steel plate on the rolling line 1 by charging the steel plate into the cooling bed 3y having an intermediate processing speed among the three cooling beds, the distribution buffer function of the cooling bed Can be fully utilized. Therefore, in the case of L1 ≦ X 0 <L2, the steel plate distributing means 5 distributes the steel plate to the cooling floor 3y.

他方、X<L1であれば、精整ライン2の現時点における鋼板生産量Xは、過去の鋼板生産量の下位1/3に含まれるため、精整ライン2における鋼板処理量が少ないことを意味している。そのため、かかる場合には、鋼板の待機を抑制する等の観点から、鋼板を冷却床3zへ振り分ける。このようにすれば、処理速度の遅い冷却床3z内を鋼板が搬送されている間に、精整ライン2における鋼板の処理が終わり、冷却床の出側における鋼板の待機を抑制することが可能になる。したがって、X<L1の場合には、鋼板振り分け手段5により、鋼板が冷却床3zへと振り分けられる。 On the other hand, if X 0 <L1, since the steel plate production amount X 0 at the present time of the finishing line 2 is included in the lower third of the past steel plate production amount, the steel sheet processing amount at the finishing line 2 is small. Means. Therefore, in such a case, the steel plate is distributed to the cooling floor 3z from the viewpoint of suppressing standby of the steel plate. In this way, it is possible to suppress the standby of the steel plate on the exit side of the cooling bed by finishing the processing of the steel plate in the finishing line 2 while the steel plate is being conveyed in the cooling bed 3z having a low processing speed. become. Therefore, in the case of X 0 <L1, the steel plate distributing means 5 distributes the steel plate to the cooling bed 3z.

2.2.第2実施形態
第2実施形態にかかる上記製造方法を、3つの冷却床が備えられる製造ラインに適用する場合には、まず、過去の操業データから算出される生産量に関する基準値K1、K2を用いて、鋼板振り分け手段5の動作を制御する。第2実施形態にかかる基準値K1、K2の算出法の具体例としては、過去の実績値の平均値や,過去の実績値の分布を正規分布と仮定したときの最頻値や中央値をK1、K2とする方法等を挙げることができる。そして、上記生産量算出工程により算出される、精整ライン2での鋼板生産量X及び圧延ライン1での鋼板生産量Yを用いて(X−Y)を算出した後、K1、K2と(X−Y)とを比較し、鋼板を装入すべき冷却床を選択する(冷却床選択工程)。なお、以下において、0=K1<K2と仮定する。
2.2. Second Embodiment When the production method according to the second embodiment is applied to a production line provided with three cooling beds, first, reference values K1 and K2 relating to production amounts calculated from past operation data are set. It is used to control the operation of the steel plate sorting means 5. As a specific example of the calculation method of the reference values K1 and K2 according to the second embodiment, an average value of past actual values, or a mode value and a median value when the distribution of past actual values is assumed to be a normal distribution. Examples of the method include K1 and K2. Then, is calculated by the production volume calculation step, after calculating using steel production Y 0 in steel production X 0 and rolling line 1 at finishing line line 2 (X 0 -Y 0), K1 , K2 and (X 0 -Y 0 ) are compared, and the cooling bed to which the steel plate is to be charged is selected (cooling bed selection step). In the following, it is assumed that 0 = K1 <K2.

K2≦(X−Y)の場合には、精整ライン2における鋼板生産量Xが、圧延ライン1における鋼板生産量Yよりも多いため、製造ライン100の生産効率は、圧延ライン1の鋼板生産量Yに依存する。そのため、かかる場合には、処理速度の速い冷却床3xへ鋼板を振り分ける。このようにすれば、鋼板の待機を抑制して冷却床の物流バッファ機能を有効に活用し、鋼板の生産効率を向上させることが可能になる。 In the case of K2 ≦ (X 0 −Y 0 ), the steel plate production amount X 0 in the finishing line 2 is larger than the steel plate production amount Y 0 in the rolling line 1, so that the production efficiency of the production line 100 is the rolling line. It depends on the first steel plate production Y 0. Therefore, in such a case, the steel plates are distributed to the cooling floor 3x having a high processing speed. If it does in this way, it will become possible to improve the production efficiency of a steel plate by suppressing the waiting of a steel plate and utilizing the distribution buffer function of a cooling floor effectively.

一方、(K1=)0≦(X−Y)<K2の場合には、精整ライン2における鋼板生産量Xが、圧延ライン1における鋼板生産量Y以上ではあるものの、XとYとの差はそれほど大きくない。そのため、かかる場合には、3つの冷却床の中で中間の処理速度を有する冷却床3yへ鋼板を振り分けることにより、冷却床の物流バッファ機能を十分に活かすことが可能になる。 On the other hand, in the case of (K1 =) 0 ≦ (X 0 −Y 0 ) <K 2, the steel plate production amount X 0 in the finishing line 2 is equal to or greater than the steel plate production amount Y 0 in the rolling line 1, but X 0 and the difference between the Y 0 is not so large. Therefore, in such a case, the distribution buffer function of the cooling bed can be fully utilized by distributing the steel plates to the cooling bed 3y having an intermediate processing speed among the three cooling beds.

他方、(X−Y)<0(=K1)の場合には、精整ライン2における鋼板生産量Xが、圧延ライン1における鋼板生産量Yよりも少ない。そのため、圧延ライン1上を搬送される鋼板を処理速度の速い冷却床3xへ振り分けると、鋼板の待機が生じ、冷却床の物流バッファ機能を十分に活かすことが困難になる虞がある。そこで、かかる事態を回避する等の観点から、(X−Y)<0(=K1)の場合には、処理速度の遅い冷却床3zへ鋼板を振り分ける。このようにすれば、冷却床の物流バッファ機能を十分に活かすことが可能になる。 On the other hand, when (X 0 −Y 0 ) <0 (= K1), the steel plate production amount X 0 in the finishing line 2 is smaller than the steel plate production amount Y 0 in the rolling line 1. For this reason, if the steel plates conveyed on the rolling line 1 are distributed to the cooling bed 3x having a high processing speed, the steel plates may stand by, and it may be difficult to fully utilize the distribution buffer function of the cooling beds. Therefore, from the viewpoint of avoiding such a situation, when (X 0 −Y 0 ) <0 (= K1), the steel plates are distributed to the cooling floor 3z having a low processing speed. In this way, it is possible to fully utilize the distribution buffer function of the cooling bed.

本発明の鋼板の製造方法を適用可能な、製造ラインの形態例を示す概略図である。It is the schematic which shows the form example of a manufacturing line which can apply the manufacturing method of the steel plate of this invention. 第1実施形態にかかる本発明の鋼板の製造方法を概略的に示すフローチャートである。It is a flowchart which shows roughly the manufacturing method of the steel plate of this invention concerning 1st Embodiment. 第2実施形態にかかる本発明の鋼板の製造方法を概略的に示すフローチャートである。It is a flowchart which shows schematically the manufacturing method of the steel plate of this invention concerning 2nd Embodiment. 3つの冷却床が備えられる製造ラインの形態例を示す概略図である。It is the schematic which shows the example of a form of the manufacturing line provided with three cooling beds.

符号の説明Explanation of symbols

1 圧延ライン
2 精整ライン
3a、3b 冷却床
3x、3y、3z 冷却床
4 冷却床選択制御手段
5 鋼板振り分け手段
100、200 製造ライン
DESCRIPTION OF SYMBOLS 1 Rolling line 2 Refinement line 3a, 3b Cooling floor 3x, 3y, 3z Cooling floor 4 Cooling floor selection control means 5 Steel plate distribution means 100, 200 Production line

Claims (8)

圧延ライン及び精整ライン、並びに、これらの間に配設される、処理速度が異なる2つの冷却床を備えた製造ラインで使用される、鋼板の製造方法であって、
現在の時点における前記精整ラインでの時間当たりの鋼板生産量Xと、
現在の時点から任意の時間将来の時点における前記精整ラインでの時間当たりの鋼板生産量とから生産量に関する基準値L0を定める、基準値算出工程と、
前記基準値算出工程後に、前記Xと前記基準値L0とを比較して、処理速度が速い前記冷却床か処理速度が遅い前記冷却床を選択する、冷却床選択工程と、
を有することを特徴とする、鋼板の製造方法。
A method for producing a steel sheet, which is used in a production line having two cooling beds arranged between a rolling line and a finishing line and different processing speeds disposed between them,
A steel plate production X 0 per hour at the finishing line line at the current time point,
A reference value calculating step for determining a reference value L0 related to the production amount from the steel sheet production amount per hour in the finishing line at any time in the future from the current time point;
After said reference value calculating step, wherein X 0 and by comparing the reference value L0, the processing speed is faster the cooling bed or the processing speed to select slow the cooling bed, the cooling bed selection step,
The manufacturing method of the steel plate characterized by having.
圧延ライン及び精整ライン、並びに、これらの間に配設される、処理速度が異なる2つの冷却床を備えた製造ラインで使用される、鋼板の製造方法であって、
現在の時点における前記精整ラインでの時間当たりの鋼板生産量Xと、
現在の時点から任意の時間将来の時点における前記精整ラインでの時間当たりの鋼板生産量Xと、
前記現在の時点と、前記鋼板生産量がXの時点との間の各時点における、前記精整ラインでの時間当たりの鋼板生産量X、X、…、及びXn−1と、を算出した後、前記X、X、X、…、Xn−1、及びXから生産量に関する基準値L0を定める、基準値算出工程と、
前記基準値算出工程後に、前記Xと前記基準値L0とを比較して、X≧L0の場合には、処理速度が速い前記冷却床を選択し、X<L0の場合には、処理速度が遅い前記冷却床を選択する、冷却床選択工程と、
を有することを特徴とする、鋼板の製造方法。
A method for producing a steel sheet, which is used in a production line having two cooling beds arranged between a rolling line and a finishing line and different processing speeds disposed between them,
A steel plate production X 0 per hour at the finishing line line at the current time point,
Steel sheet production amount Xn per hour in the finishing line at any time in the future from the current time point,
Steel plate production amounts X 1 , X 2 ,..., And X n-1 per hour on the finishing line at each time point between the current time point and the steel plate production amount is X n , after calculating the said X 0, X 1, X 2 , ..., determining a reference value L0 relating to production from X n-1, and X n, a reference value calculating step,
After the reference value calculation process is compared with the reference value L0 and the X 0, in the case of X 0 ≧ L0 selects the processing speed is faster the cooling bed, in the case of X 0 <L0 is A cooling bed selection step of selecting the cooling bed having a low processing speed;
The manufacturing method of the steel plate characterized by having.
圧延ライン及び精整ライン、並びに、これらの間に配設される、処理速度が異なる2つの冷却床を備えた製造ラインで使用される、鋼板の製造方法であって、
現在の時点における前記精整ラインでの時間当たりの鋼板生産量X、及び、前記現在の時点における前記圧延ラインでの時間当たりの鋼板生産量Y、を算出する、生産量算出工程と、
前記生産量算出工程後に、XとYを比較して、処理速度が速い前記冷却床か処理速度が遅い前記冷却床を選択する、冷却床選択工程と、
を有することを特徴とする、鋼板の製造方法。
A method for producing a steel sheet, which is used in a production line having two cooling beds arranged between a rolling line and a finishing line and different processing speeds disposed between them,
A production amount calculating step of calculating a steel plate production amount X 0 per hour in the finishing line at a current time point and a steel plate production amount Y 0 per hour in the rolling line at the current time point;
A cooling bed selection step of comparing the X 0 and Y 0 after the production amount calculation step and selecting the cooling bed having a high processing speed or the cooling bed having a low processing speed;
The manufacturing method of the steel plate characterized by having.
圧延ライン及び精整ライン、並びに、これらの間に配設される、処理速度が異なる2つの冷却床を備えた製造ラインで使用される、鋼板の製造方法であって、
前記製造ラインの過去の操業データから算出される生産量に関する基準値をK0とするとき、
現在の時点における前記精整ラインでの時間当たりの鋼板生産量X、及び、前記現在の時点における前記圧延ラインでの時間当たりの鋼板生産量Y、を算出する、生産量算出工程と、
前記生産量算出工程後に、(X−Y)と前記基準値K0とを比較して、(X−Y)≧K0の場合には、処理速度が速い前記冷却床を選択し、(X−Y)<K0の場合には、処理速度が遅い前記冷却床を選択する、冷却床選択工程と、
を有することを特徴とする、鋼板の製造方法。
A method for producing a steel sheet, which is used in a production line having two cooling beds arranged between a rolling line and a finishing line and different processing speeds disposed between them,
When the reference value regarding the production amount calculated from the past operation data of the production line is K0,
A production amount calculating step of calculating a steel plate production amount X 0 per hour in the finishing line at a current time point and a steel plate production amount Y 0 per hour in the rolling line at the current time point;
After (X 0 -Y 0 ) and the reference value K0 are compared after the production amount calculation step, if (X 0 -Y 0 ) ≧ K0, the cooling bed having a high processing speed is selected, In the case of (X 0 −Y 0 ) <K0, a cooling bed selection step of selecting the cooling bed having a low processing speed;
The manufacturing method of the steel plate characterized by having.
圧延ライン及び精整ライン、並びに、これらの間に配設される、処理速度が異なるm個(m≧3)の冷却床を備えた製造ラインで使用される、鋼板の製造方法であって、
現在の時点における前記精整ラインでの時間当たりの鋼板生産量Xと、
現在の時点から任意の時間将来の時点における前記精整ラインでの時間当たりの鋼板生産量とから生産量に関する基準値に関する基準値L1、…、及びLm−1を定める、基準値算出工程と、
前記基準値算出工程後に、前記Xと前記基準値L1、…、及びLm−1とを比較して、冷却床を選択する、冷却床選択工程と、
を有することを特徴とする、鋼板の製造方法。
A method for producing a steel sheet, used in a production line having m (m ≧ 3) cooling beds with different processing speeds disposed between a rolling line and a finishing line, and between them,
A steel plate production X 0 per hour at the finishing line line at the current time point,
A reference value calculation step for determining reference values L1,..., And Lm-1 relating to a reference value related to the production amount from a steel sheet production amount per hour in the finishing line at an arbitrary time and a future time point from the current time point;
After said reference value calculating step, wherein X 0 and the reference value L1, ..., and by comparing the Lm-1, selects the cooling bed, the cooling bed selection step,
The manufacturing method of the steel plate characterized by having.
圧延ライン及び精整ライン、並びに、これらの間に配設される、処理速度が異なるm個(m≧3)の冷却床を備えた製造ラインで使用される、鋼板の製造方法であって、
現在の時点における前記精整ラインでの時間当たりの鋼板生産量Xと、
現在の時点から任意の時間将来の時点における前記精整ラインでの時間当たりの鋼板生産量Xと、
前記現在の時点と、前記鋼板生産量がXの時点との間の各時点における、前記精整ラインでの時間当たりの鋼板生産量X、X、…、及びXn−1と、を算出した後、前記X、X、X、…、Xn−1、及びXから生産量に関する基準値L1、…、及びLm−1を定める、基準値算出工程と、
前記基準値算出工程後に、前記Xと前記基準値L1、…、及びLm−1とを比較して、
≧Lm−1の場合には、処理速度が最も速い前記冷却床を選択し、
Lw≦X<Lw+1(w=1〜m−2)の場合には、処理速度がw+1番目に遅い前記冷却床を選択し、
<L1の場合には、処理速度が最も遅い前記冷却床を選択する、冷却床選択工程と、
を有することを特徴とする、鋼板の製造方法。
A method for producing a steel sheet, used in a production line having m (m ≧ 3) cooling beds with different processing speeds disposed between a rolling line and a finishing line, and between them,
A steel plate production X 0 per hour at the finishing line line at the current time point,
Steel sheet production amount Xn per hour in the finishing line at any time in the future from the current time point,
Steel plate production amounts X 1 , X 2 ,..., And X n-1 per hour on the finishing line at each time point between the current time point and the steel plate production amount is X n , after calculating the said X 0, X 1, X 2 , ..., the reference value L1 on the production volume from X n-1, and X n, ..., and defining the Lm-1, a reference value calculating step,
After said reference value calculating step, wherein X 0 and the reference value L1, ..., and by comparing the Lm-1,
If X 0 ≧ Lm−1, select the cooling bed with the fastest processing speed,
In the case of Lw ≦ X 0 <Lw + 1 (w = 1 to m−2), the cooling bed having the processing speed that is w + 1th slowest is selected,
In the case of X 0 <L1, a cooling bed selection step of selecting the cooling bed having the slowest processing speed;
The manufacturing method of the steel plate characterized by having.
圧延ライン及び精整ライン、並びに、これらの間に配設される、処理速度が異なるm個(m≧3)の冷却床を備えた製造ラインで使用される、鋼板の製造方法であって、
現在の時点における前記精整ラインでの時間当たりの鋼板生産量X、及び、前記現在の時点における前記圧延ラインでの時間当たりの鋼板生産量Y、を算出する、生産量算出工程と、
前記生産量算出工程後に、XとYを比較して、前記冷却床を選択する、冷却床選択工程と、
を有することを特徴とする、鋼板の製造方法。
A method for producing a steel sheet, used in a production line having m (m ≧ 3) cooling beds with different processing speeds disposed between a rolling line and a finishing line, and between them,
A production amount calculating step of calculating a steel plate production amount X 0 per hour in the finishing line at a current time point and a steel plate production amount Y 0 per hour in the rolling line at the current time point;
A cooling bed selection step of selecting the cooling bed by comparing X 0 and Y 0 after the production amount calculation step;
The manufacturing method of the steel plate characterized by having.
圧延ライン及び精整ライン、並びに、これらの間に配設される、処理速度が異なるm個(m≧3)の冷却床を備えた製造ラインで使用される、鋼板の製造方法であって、
前記製造ラインの過去の操業データから算出される生産量に関する基準値をK1、…、及びKm−1とするとき、
現在の時点における前記精整ラインでの時間当たりの鋼板生産量X、及び、前記現在の時点における前記圧延ラインでの時間当たりの鋼板生産量Y、を算出する、生産量算出工程と、
前記生産量算出工程後に、(X−Y)と前記基準値K1、…、及びKm−1とを比較して、
(X−Y)≧Km−1の場合には、処理速度が最も速い前記冷却床を選択し、
Kw≦(X−Y)<Kw+1(w=1〜m−2)の場合には、処理速度がw+1番目に遅い前記冷却床を選択し、
(X−Y)<K1の場合には、処理速度が最も遅い前記冷却床を選択する、冷却床選択工程と、
を有することを特徴とする、鋼板の製造方法。
A method for producing a steel sheet, used in a production line having m (m ≧ 3) cooling beds with different processing speeds disposed between a rolling line and a finishing line, and between them,
When the reference value regarding the production amount calculated from the past operation data of the production line is K1, ..., and Km-1,
A production amount calculating step of calculating a steel plate production amount X 0 per hour in the finishing line at a current time point and a steel plate production amount Y 0 per hour in the rolling line at the current time point;
After the production amount calculating step, (X 0 -Y 0 ) is compared with the reference values K1, ..., and Km-1,
In the case of (X 0 −Y 0 ) ≧ Km−1, the cooling bed with the fastest processing speed is selected,
In the case of Kw ≦ (X 0 −Y 0 ) <Kw + 1 (w = 1 to m−2), the cooling bed having the slowest processing speed is selected as w + 1,
In the case of (X 0 −Y 0 ) <K1, a cooling bed selection step of selecting the cooling bed having the slowest processing speed;
The manufacturing method of the steel plate characterized by having.
JP2005252672A 2005-08-31 2005-08-31 Steel plate manufacturing method Active JP4492496B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005252672A JP4492496B2 (en) 2005-08-31 2005-08-31 Steel plate manufacturing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005252672A JP4492496B2 (en) 2005-08-31 2005-08-31 Steel plate manufacturing method

Publications (2)

Publication Number Publication Date
JP2007061871A true JP2007061871A (en) 2007-03-15
JP4492496B2 JP4492496B2 (en) 2010-06-30

Family

ID=37924683

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005252672A Active JP4492496B2 (en) 2005-08-31 2005-08-31 Steel plate manufacturing method

Country Status (1)

Country Link
JP (1) JP4492496B2 (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62179801A (en) * 1986-01-31 1987-08-07 Kobe Steel Ltd Method for controlling billet flow for direct rolling
JPS63171216A (en) * 1987-01-08 1988-07-15 Nippon Steel Corp Manufacture of shape steel
JP2000015318A (en) * 1998-07-03 2000-01-18 Kawasaki Steel Corp Automatically charging method for cooling bed
JP2001205316A (en) * 2000-01-21 2001-07-31 Toshiba Corp Steel conveying system
JP2003200206A (en) * 2001-12-27 2003-07-15 Jfe Steel Kk Apparatus for manufacturing seamless steel tube
JP2003305508A (en) * 2002-04-08 2003-10-28 Jfe Steel Kk Method for determining outline of rolling
JP2007061874A (en) * 2005-08-31 2007-03-15 Sumitomo Metal Ind Ltd Method for manufacturing steel sheet
JP2007061873A (en) * 2005-08-31 2007-03-15 Sumitomo Metal Ind Ltd Method for manufacturing steel sheet

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62179801A (en) * 1986-01-31 1987-08-07 Kobe Steel Ltd Method for controlling billet flow for direct rolling
JPS63171216A (en) * 1987-01-08 1988-07-15 Nippon Steel Corp Manufacture of shape steel
JP2000015318A (en) * 1998-07-03 2000-01-18 Kawasaki Steel Corp Automatically charging method for cooling bed
JP2001205316A (en) * 2000-01-21 2001-07-31 Toshiba Corp Steel conveying system
JP2003200206A (en) * 2001-12-27 2003-07-15 Jfe Steel Kk Apparatus for manufacturing seamless steel tube
JP2003305508A (en) * 2002-04-08 2003-10-28 Jfe Steel Kk Method for determining outline of rolling
JP2007061874A (en) * 2005-08-31 2007-03-15 Sumitomo Metal Ind Ltd Method for manufacturing steel sheet
JP2007061873A (en) * 2005-08-31 2007-03-15 Sumitomo Metal Ind Ltd Method for manufacturing steel sheet

Also Published As

Publication number Publication date
JP4492496B2 (en) 2010-06-30

Similar Documents

Publication Publication Date Title
JP6641867B2 (en) Power consumption prediction method, apparatus and program
JP4983719B2 (en) Rolling order determination method and rolling order determination apparatus for hot rolling, and hot rolled steel sheet manufacturing method and manufacturing apparatus
JP4492496B2 (en) Steel plate manufacturing method
JP5463743B2 (en) Slab hot rolling schedule determination method and slab hot rolling schedule determination device
JP4289062B2 (en) Control method of material width in hot rolling
US6698266B2 (en) System and method for optimizing mill cuts
JP6652095B2 (en) Method of rolling steel sheet and method of manufacturing steel sheet
CN102234715B (en) Cross steel tapping control method for blooming furnace group
JP5126763B2 (en) Extraction pitch prediction method for continuous furnace
JP6460004B2 (en) Heating furnace extraction interval determination device, steel plate manufacturing apparatus, heating furnace extraction interval determination method, and steel plate manufacturing method
JP4407597B2 (en) Steel plate manufacturing method
JP6040760B2 (en) How to determine rolling procedure
JP2001205316A (en) Steel conveying system
JP6075309B2 (en) Heating furnace control method and control apparatus
JP4701927B2 (en) Steel plate manufacturing method
JP5487652B2 (en) Temperature control method in hot rolling
JP6822390B2 (en) Rough rolling time calculation method for thick steel sheets, rough rolling time calculation device for thick steel sheets, and manufacturing method for thick steel sheets
JP7424335B2 (en) Heating control method and device, hot-rolled steel plate manufacturing method, and transportation prediction model generation method
JP2017164758A (en) Method for controlling mill pacing of rolling line
JP4407596B2 (en) Steel plate manufacturing method
JP5581600B2 (en) Determination method of heating furnace extraction interval
JP2008254041A (en) Method of rolling rolled stock
JPH04182018A (en) Device for controlling mill pacing on rolling line
JP2003096519A (en) Method for controlling charge in continuous heating furnace
JP2006281280A (en) Method for operating slab heating furnace

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070919

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20091224

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100112

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100209

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100316

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100329

R150 Certificate of patent or registration of utility model

Ref document number: 4492496

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130416

Year of fee payment: 3

RD01 Notification of change of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7421

Effective date: 20101101

A072 Dismissal of procedure

Free format text: JAPANESE INTERMEDIATE CODE: A072

Effective date: 20110301

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130416

Year of fee payment: 3

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130416

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140416

Year of fee payment: 4

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350