JP2004346554A - Construction method of continuous wall - Google Patents

Construction method of continuous wall Download PDF

Info

Publication number
JP2004346554A
JP2004346554A JP2003142868A JP2003142868A JP2004346554A JP 2004346554 A JP2004346554 A JP 2004346554A JP 2003142868 A JP2003142868 A JP 2003142868A JP 2003142868 A JP2003142868 A JP 2003142868A JP 2004346554 A JP2004346554 A JP 2004346554A
Authority
JP
Japan
Prior art keywords
face
hole
pressure fluid
excavating
fluid jet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2003142868A
Other languages
Japanese (ja)
Other versions
JP4072956B2 (en
Inventor
Mitsuhiro Shibazaki
崎 光 弘 柴
Hiroshi Yoshida
田 宏 吉
Mitsuru Yokoo
尾 充 横
Miki Iwashita
下 幹 岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chemical Grouting Co Ltd
Tokyo Kizai Kogyou Co Ltd
Original Assignee
Chemical Grouting Co Ltd
Tokyo Kizai Kogyou Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chemical Grouting Co Ltd, Tokyo Kizai Kogyou Co Ltd filed Critical Chemical Grouting Co Ltd
Priority to JP2003142868A priority Critical patent/JP4072956B2/en
Publication of JP2004346554A publication Critical patent/JP2004346554A/en
Application granted granted Critical
Publication of JP4072956B2 publication Critical patent/JP4072956B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a construction method of a continuous wall for constructing an excellent continuous wall by allowing cutting of a concrete end face in a conventionally non-cuttable region to positively join concrete placed in a preceding hole, well to concrete placed in a succeeding hole. <P>SOLUTION: This construction method has a cutting process for cutting the end face Fc by jetting a high pressure fluid jet J from a jetting means N provided at an excavating means B, toward the end face Fc of a consolidating material placed in the preceding hole H1. In the cutting process, the high pressure fluid jet J is jetted toward the end face Fc of the consolidating material in a region below the excavating means B, and the jetting means N is operated to move a collision part of the high pressure fluid jet J from the region below the excavating means B to a region on the same level as the jetting means N. <P>COPYRIGHT: (C)2005,JPO&NCIPI

Description

【0001】
【発明の属する技術分野】
本発明は連壁工法に関する。
【0002】
【従来の技術】
図17の削孔工程を表した上面図で示す様に、連壁工法では、先ず先行孔H1を掘削し、先行孔H1にコンクリートCを打設した後、先行孔間を接続する様に後行孔H2を掘削する。そして、後行孔H2にコンクリートCを打設する。
【0003】
連壁工法において、先行孔H1及び後行孔H2の掘削は図18で示すようにバケットBで行い(バケット掘削による連壁工法)、図17で示した先行孔H1と後行孔H2との境界部分(或いは、先行孔に打設されたコンクリート端面Fc)に対して高圧水ジェットJを噴射し、当該境界部分の地山(土壌或いは土砂)を除去し、コンクリート端面Fcを洗浄する技術が提案されている(例えば特許文献1参照)。
先行孔H1に打設されたコンクリート端面Fcを洗浄することにより、後行孔H2にコンクリートを打設した際に先行のコンクリートCとの接着性を良好とならしめる為である。
【0004】
ここで、先行孔H1に打設されたコンクリートの端面Fcは劣化してしまう。そのため、先行孔H1に打設されたコンクリートと後行孔H2に打設されたコンクリートとの接合性を向上するには、先行孔H1に打設されたコンクリートの端面Fcを最低でも2cm程度切削して、除去することが好ましい。
しかし、上述した従来技術では、先行孔H1に打設されたコンクリートの端面Fcに付着した泥等を洗浄、除去するのみであって、当該コンクリート端面Fcを切削することについては、何等言及していない。
【0005】
また、上述した従来技術では、ジェットを噴射するノズルNよりも下方(深度が深い位置L)における先行孔のコンクリート端面(換言すれば、バケットの位置に対応するコンクリート端面)Fcについては、高圧水を衝突させることが出来ず、切削或いは切削することが出来ない、という問題を有している。
そして、コンクリート端面Fcを切削或いは切削しなかった部分については、先行孔H1側と後行孔H2側とのコンクリート同士の接合が不良となり、漏水等の危険を惹起してしまう可能性がある。
【0006】
【特許文献1】
特開平7−150549号公報
【0007】
【発明が解決しようとする課題】
本発明は上述した従来技術の問題点に鑑みて提案されたものであり、従来は切削或いは切削できなかった領域におけるコンクリート端面を切削可能であり、それにより、先行孔に打設されたコンクリートと後行孔に打設されたコンクリートとを確実且つ良好に接合して、良好な連壁を造成することが出来る様な連壁工法の提供を目的としている。
【0008】
【課題を解決するための手段】
本発明の連壁工法は、先行孔(H1)を掘削する先行孔掘削工程と、先行孔(H1)に固結材(コンクリート、セメントミルク、モルタル等C)を打設する工程と、固結材(C)を打設した先行孔(H1、H1)間の位置に後行孔(H2)を掘削する後行孔掘削工程と、(先行孔H1及び/又は後行H2孔を掘削する)掘削手段(B)に設けた噴射手段(例えばノズルN)から先行孔(H1)に打設された固結材の端面(Fc)に向けて高圧流体ジェット(J)を噴射して当該端面(Fc)を切削する切削工程とを有し、該切削工程では、掘削手段(B)よりも下方の領域における前記固結材の端面(Fc)に向けて高圧流体ジェット(J)を噴射し、噴射手段(N)を作動して高圧流体ジェット(J)が衝突する部位を掘削手段(B)よりも下方の領域から噴射手段(N)と同レベルの領域まで移動し、高圧流体ジェット(J)が衝突する部位が噴射手段(N)と同レベルの領域に到達した後は掘削手段(B)を地上(Gf)側に引き上げながら先行孔(H1)に打設された固結材の端面(Fc)に向かって高圧流体ジェット(J)を噴射することを特徴としている(請求項1)。
【0009】
ここで、前記噴射手段(例えばノズルN)は、当該噴射手段(N)の取り付け箇所より下方の領域(掘削機器、例えばバケットBの部分)のコンクリート端面(Fc)及びそこに付着した泥や土砂等を切削して除去出来る様に、上下方向に揺動可能に構成されているのが好ましい。
例えば、流体圧シリンダ(油圧シリンダ8)に流体圧源(油圧源)から圧力流体(圧油)を供給し、或いは、流体圧源(油圧源)へ戻すことにより、流体圧シリンダを伸縮して、噴射手段から噴射される高圧流体ジェットが下方から上方まで揺動する様に構成することが出来る。
【0010】
係る構成を具備する本発明によれば、掘削手段(B)よりも下方の領域における前記固結材の端面(Fc)に向けて高圧流体ジェット(J)を噴射するので、従来技術では切削、除去が不可能であった領域のコンクリート端面(Fc)及びそこに付着した泥等、すなわちノズル(N)下方のバケット(B)が位置している領域における先行孔コンクリートの端面(Fc)における劣化したコンクリート及びそこに付着した泥等は、ノズル(N)から下方に向けて噴射される高圧水噴流(J)により切削されて、除去される。
その結果、先行孔(H1)に打設されたコンクリート(であって、劣化した部分が切削除去された後のコンクリート)と後行孔(H2)に打設されたコンクリート同士の接合が良好に行われ、接合面或いは境界部分から漏水するという様な問題は発生しないのである。
【0011】
ここで、従来技術では、噴射された高圧流体ジェットが先行孔(H1)に打設された固結材の端面(Fc)の水平方向の全面に当たる様に、高圧流体ジェット(J)が固結端面(Fc)に衝突する位置を広範囲に亘って移動しながら(例えば、当該衝突位置が左右方向平行移動や、回転しながら)、掘削手段(バケット等)と共に上昇する。しかし、そのために掘削手段(B)の上昇速度が遅くなり、非効率である上、不経済である。
これに対して本発明の連壁工法では、前記切削工程で噴射手段(N)から噴射される高圧流体ジェット(J)は、垂直方向については固結材の端面全体には噴射されるが、水平方向(H:図10〜図12の左右方向)については固結材の端面Fc全体には噴射されない様に構成することが出来る(請求項2:図6〜図9)。
その様に構成すれば、掘削手段の上昇速度を遅くする必要が無いので、経済的である。
【0012】
ここで、固結材の端面(Fc)全面に高圧流体ジェットを噴射しなくても、本発明によれば、固結材の端面(Fc)全体を切削することが出来る。
高圧流体ジェット(J)を固結材の端面(Fc)に衝突すると、当該高圧流体は(J)当該端面(Fc)に沿って水平方向(H:図10〜図12の左右方向)に分流し、分流したジェットがコンクリート端面(Fc)の表面から所定寸法(δ:例えば2cm以上)だけ内側の領域を切削し、それと共に、当該端面(Fc)に付着した土砂を除去する。
したがって、固結材の端面(Fc)全面に高圧流体ジェット(J)を噴射しなくても、高圧流体は固結体の端面(Fc)全体を流れるので、当該端面(Fc)及びそこに付着した泥や土砂等を切削して除去することが出来るのである。
【0013】
ここで、固結材の端面(Fc)の凹凸如何によっては、高圧流体ジェット(J)が水平方向左右に分流せず、何れか一方(図11では右方へ)のみに流れる可能性が有る。そうなると、固結材の端面(Fc)に切削されない領域が発生してしまい、当該切削されない領域の固結材端面(Fc)に付着した泥等も除去されずに残留して、漏水等の原因となる恐れがある。
その様な事態を防止するため、本発明において、前記切削工程で噴射手段(N)から噴射される高圧流体ジェット(J)は水平方向(H:図7〜図9及び図12の左右方向)へ搖動(例えば左右にそれぞれ約5°程度)されるのが好ましい(請求項3:図7〜図9)。
僅かではあるが揺動して高圧流体ジェット(J)が噴射されることにより、固結材の端面(Fc)の凹凸にかかわらず、必ず高圧流体が当該端面に沿って水平方向(H:図7〜図9及び図12の左右方向)に分流し、分流したジェット(J)が固結材の端面(Fc)を切削し、そこに付着した土砂を除去するのである。
【0014】
ここで、高圧流体ジェット(J)を水平方向(H:図7〜図9及び図12の左右方向)へ搖動させるために、複数のノズル(N)の各々の一部を水平方向に延在する固定部材(21)に回動自在に支持(P1)し、該複数のノズル(N)の後端を前記固定部材(21)と並行して配置され水平方向に伸縮するシリンダ(22)のシリンダロッドの延長部材(25)に回動自在に支持し、当該シリンダ(22)を伸縮することにより、ノズル(N)を水平方向(左右方向)へ搖動することが好ましい。
【0015】
また、本発明において、前記切削工程では、高圧流体ジェット(J)噴射ノズル(N)が先行孔(H1)及び/又は後行孔(H2)の中心線と平行な方向(C1〜C3)について左右何れかに傾斜した状態で固結材の端面(Fc)に衝突せしめ、その状態で掘削手段(B)を垂直方向へ移動して固結体の端面(Fc)に高圧水ジェット(J)を噴射し、高圧流体ジェット(J)噴射ノズル(N)を先行孔(H1)及び/又は後行孔(H2)の中心線と平行な方向(C1〜C3)について先程とは逆の側へ傾斜した状態で固結材の端面(Fc)に衝突させつつ、再び掘削手段(B)を垂直方向へ移動するのが好ましい(請求項4:図13、図14)。
【0016】
例えば、最初は左側へ傾斜させて噴射すれば、全ての高圧水ジェットは左側に流れる。ついで、垂直方向に沿って、反対側、すなわち右側へ傾斜させて高圧流体ジェットを噴射すれば、全ての高圧水ジェットが右側へ流れる。
これにより、高圧水ジェット(J)は確実に固結体の端面(Fc)全体を流れて、当該端面(Fc)全面を切削して、そこに付着した土砂や泥を除去するのである。
【0017】
ここで、前記切削工程では、高圧流体ジェット噴射ノズル(N1、N3)が先行孔(H1)及び/又は後行孔(H2)の中心線と平行な方向(C1〜C3)について左右何れかに傾斜した状態と、当該ノズル(N1、N3)に隣接する高圧流体ジェット噴射ノズル(N2、N4)を先行孔(H1)及び/又は後行孔(H2)の中心線と平行な方向(C1〜C3)について先程とは逆の側へ傾斜した状態とで、当該ノズル(N1、N3)からの高圧流体ジェット(J1、J3)とそれに隣接するノズル(N2、N4)からの高圧流体ジェット(J2、J4)とを同時に固結材の端面(Fc)に衝突せしめ、それと共に掘削手段(B)を垂直方向へ移動するのが好ましい(請求項5:図13、図14)。
【0018】
この様に構成すれば、掘削手段(B)を一回引き上げるだけで、先行孔(H1)及び/又は後行孔(H2)の中心線と平行な方向(C1〜C3)について、左右双方に高圧流体ジェット(J1〜J4)が流れて、固結材の端面(Fc)全面に亘って当該端面及びそれに付着した泥等を切削、除去することが出来る。
【0019】
さらに本発明において、前記切削工程に先立って、掘削手段(B)の本体内に格納されている噴射手段(N)が掘削手段(B)本体内から外方に突出する工程を有するのが好ましい(請求項6)。
掘削手段(B)による掘削時は、土壌と噴射手段(N)とが干渉して噴射手段が(N)故障、損傷する可能性があるので掘削機器本体(の保護ケーシング)内に収容される。
切削工程時は高圧流体ジェット(J)の噴射位置を移動するのを容易にするため、掘削機(B)本体から突出させる。
【0020】
これに加えて、本発明の連壁工法は、先行孔(H1)を掘削する先行孔掘削工程と、先行孔(H1)に固結材(コンクリート、セメントミルク、モルタル等C)を打設する工程と、固結材(C)を打設した先行孔(H1、H1)間の位置に後行孔(H2)を掘削する後行孔掘削工程と、後行孔(H2)に流体切削手段(ボックス100及び噴射装置102)を挿入し、流体切削手段(100、102)に設けられた噴射手段(例えばノズルN)から先行孔(H1)に打設された固結材の端面(Fc)に向けて高圧流体ジェット(J)を噴射して当該端面(Fc)を切削しつつ、流体切削手段(100、102)を地上(Gf)側に引き上げる切削工程、とを有することを特徴としている(請求項7:図20〜図22)。
【0021】
係る構成を具備する本発明によれば、流体切削手段(ボックス100及び噴射装置102)を後行孔(H2)へ挿入する際に、噴射手段(例えばノズルN)が後行孔H2の底部に位置する様に構成することにより、噴射手段(N)の高圧流体ジェット(J)の噴射方向を水平方向から変化させる必要が無くなる。すなわち、流体切削手段(100、102)から高圧流体ジェット(J)を水平方向へ噴射しつつ地上側に引き上げれば、先行孔(H1)に打設された固結材の端面(Fc)を切削することが出来るのである。
【0022】
【発明の実施の形態】
以下、添付図面を参照して、本発明の実施形態について説明する。
【0023】
図1において、全体を符号1で示す掘削機のフレーム2の下端には、掘削手段である一対のバケットBが左右に揺動可能に装着されている。その掘削機1は図2に示すように地上Gfに設置されたクレーンKによって吊り下げられ、前記バケットBにより掘削箇所の土壌を取り込み、吊り上げて地上側の図示しない処理設備へ排出することにより、先行孔及び後行孔の掘削を行う。
【0024】
再び図1に戻り、左側のバケットBは掘削のために左方向に揺動して開いた状態であり、右側のバケットBは下垂した状態を保っている。その一対のバケットBの上方の水平部材3の左右両端部には、高圧水のジェットを噴射するための一対のノズルNが後述する態様で装着されている。
【0025】
図3〜図5を参照して、高圧水噴射用ノズルN周辺の詳細構成及びノズルNの噴射時の動きについて説明する。
前記水平部材3の端部には、水平方向移動手段である例えば図示しない油圧シリンダで水平移動させられる移動部材4が配置されている。
該移動部材4の端部にはブラケット5が固着されており、そのブラケット5の下方には第1のヒンジP1が、そしてその第1のヒンジP1の右上方には第2のヒンジP2が設けられている。
【0026】
前記第1のヒンジP1には緩衝装置6を支持する支持部材7の一端が枢着されており、第2のヒンジP2には軸方向に伸縮するシリンダ8の一端が枢着されている。
また、前記支持部材7の他端にはヒンジP3が設けられ、前記シリンダ8の他端を枢着させている。
【0027】
前記緩衝部材6の外方(図示の左方向)端部にはブラケット9を介して前記ノズルNが支持されている。更にそのノズルNの前方(図示の左方向)にはステイ10を介してプロテクタ11が前記ブラケット9に固着されている。該プロテクタ11は、前述のクレーンK(図2参照)に吊り下げられた掘削機1が揺れて、先行孔H1(図4参照)の壁部にプロテクタ11が当接した際には緩衝装置ごと図示の右方に縮むことによってノズルNを含む支持部材7、シリンダ8等の損壊を防ぐために設けられている。
尚、そのプロテクタ11には、図示では明確に示していないが、ノズルNからの高圧ジェットJが通過するように孔が設けられている。
【0028】
図4に示すように、高圧ジェットJを下向きにして、バケットBよりも下方のコンクリート端面Fcを切削するには、前記シリンダ8を縮める。すると、シリンダ8の他端のヒンジP3の点がヒンジP1点に対して半時計針方向に回転するように持ち上げられ、その結果ノズルNの図示しない噴射孔も斜め下方を向く。
【0029】
ノズルNを水平に戻すには、図5に示すように、前記シリンダ8を伸ばせばヒンジP3はヒンジP1の周りを時計針方向に回転しノズルNは水平に戻る。
【0030】
図4〜図5で示す作用により、従来技術では切削、除去が不可能であったコンクリートFcの端面及びそこに付着した泥等、すなわちノズルN下方のバケットBが位置している領域における先行孔コンクリートの端面Fc及びそこに付着した泥等は、ノズルNから下方に向けて噴射される高圧水噴流Jにより切削されて、除去される。
図5で示す段階から、バケットBを含む掘削機1全体を図2で示すクレーン装置により地上側へ引き上げれば、バケットBが上昇するに連れて、先行孔に打設されたコンクリート端面Fcの切削が行われる。
【0031】
ここで、従来は、ノズルからの高圧水ジェットが先行孔に打設されたコンクリートの端面全面に当たる様に、ノズルを広範囲に亘って移動していた。すなわち、高圧水ジェットが(コンクリート端面に衝突する箇所が)繰り返し往復移動する様に、或いは、円弧状の周回移動を行う様に、ノズルを動かしながら、バケット上昇に伴いコンクリート端面全面に高圧水ジェットを衝突させていた。
しかし、高圧水ジェットの繰り返し往復移動或いは円弧状の周回移動を行いつつ、バケットを上昇させたのでは、バケットの上昇速度が遅くなり、不経済であった。
【0032】
これに対して、図示の実施形態では、図6で示す様に、高圧水ジェットはコンクリート端面Fcの全面に衝突させていない(ノズルNをコンクリート端面Fcに直角に向けた場合は、Lで示す領域にはジェットJは衝突していない)。
しかし、図10で示す様に、高圧水ジェットJをコンクリート端面Fcに衝突させると、高圧水ジェットJはコンクリート端面Fcに沿って、水平方向Hに、概略左右均等に分流し、分流した高圧水ジェットJbがコンクリート端面Fc及びそこに付着した土砂を切削して剥離させる。
コンクリート端面Fc全面に高圧水ジェットJを当てなくても、コンクリート端面Fc及びそこに付着した土砂はコンクリート端面Fc全面に亘って切削、除去される。
【0033】
ここで、図11で示す様に、コンクリート端面Fcの凹凸如何によっては、高圧水ジェットJが左右に分流せず、何れか一方のみ(図11では右側)に流れてしまう。その様な事態を防止するため、図12で示す様に、高圧水ジェットJを矢印RH方向、すなわち左右方向(水平方向)へ、僅かに搖動(約5°〜10°程度)させる。
それにより、噴射された高圧水ジェットJは、コンクリート端面Fc全面に沿って流れて、当該端面Fc及びそこに付着した泥等を切削、除去する。
【0034】
次に、図7〜図9を参照してノズルNを左右方向(水平方向)へ、揺動させる方法について説明する。
図7から図9は、図6におけるE部を拡大して説明を容易にしたものである。
【0035】
図7において、左右端のブレード20を連結する固定部材21には、ノズルNを回動支持するヒンジP4がノズルNの数だけ設けられ、そのヒンジP4にノズルNの前端近傍が軸支されている。他方ブレード20の一方(図示の例では右方)にはピストン23及びピストンロッド24を有するシリンダ22が装着されており、そのピストンロッド24には左方の図示しない係合手段に係合され、左右に移動自在の牽引ロッド25が連結されている。
【0036】
そしてその牽引ロッド25には前記ノズルNの他端を枢着させるヒンジP5が設けられている。そして、図8に示すようにシリンダ22が縮む(ピストン23及びピストンロッド24が右方へ移動する)際にはノズルNの先端は左に傾き、従ってそのノズルNから噴射される高圧ジェットJも左方に揺動したように噴射される。
【0037】
図8とは反対側即ち図9に示すように高圧ジェットJを右方に揺動させて噴射したい場合には、シリンダ22が伸びるように作動させればよい。
【0038】
また、図12で示す様な場合、すなわちコンクリート端面Fcに衝突した高圧水ジェットJが左右へ分流せずに何れか一方のみに流れてしまう場合には、図13、図14を参照して、以下に説明する様に構成しても良い。
【0039】
先ず、造成するべき連壁(図13、図14では図示せず)の中心線と平行な方向C1〜C3について、図13では右(左でも良い)側に角度θだけ傾いた状態で(図13では直線C1〜C3の各々の右側から角度θを付けて)、コンクリート端面Fcに向かって高圧水ジェットJ(図13では3本の高圧水ジェット)を噴射する。噴射された全ての高圧水ジェットJは、コンクリート端面Fcに沿って全て同じ方向へ(図13では左側へ)流れ、当該コンクリート端面Fcを切削し、そこに付着している泥等を除去する。
その状態で、下方から上方まで(図13の紙面に垂直な方向)バケットを移動して、コンクリート端面Fcに高圧水ジェットJを噴射する(この段階については図示せず)。
【0040】
図13で示す状態でバケットBを下方から上方まで移動して、コンクリート端面Fcに高圧水ジェットJを噴射し終えたならば、次に、図14で示す操作を行う。すなわち、造成するべき連壁の中心線と平行な直線C1〜C3について、図13で示すのとは反対の側から(図14では左側から)、角度θを付けて高圧水ジェットJを噴射する。全ての高圧水ジェットJ(図14では3本)はコンクリート端面Fcとの衝突後に、上記したのとは反対側に流れ(図14では右側に流れ)、上記したのとは反対側の領域(直線C1〜C3に対して右側の領域)のコンクリート端面Fcを切削し、そこに付着した泥等を除去する。
そして、バケットを再度上下方向に移動すれば、コンクリート端面Fcが切削され、そこに付着した泥や土砂が除去される。
なお、上記角度θは、例えば5°〜30°程度である。
【0041】
なお、バケットは、図13の工程後、一度下降してから再び引き上げても良いし、図13で引き上げた後、地中に下降させながら図14の工程を行っても良い。
【0042】
或いは、図19で示す様に、隣接する一対のノズルN1、N2或いはN3、N4を、対となったノズル同士を左右逆方向に角度θだけ傾いた状態とせしめる。そして、各ノズルからジェットJ1、J2或いはJ3、J4を、途中で衝突しない様に噴射する。
この様に構成すれば、バケットを引き上げる際に、図13及び図14で示す直線C1〜C3の左右両側に付着した泥と、その奥にある先行孔に打設されたコンクリート端面とを、一度に切削することが出来るのである。
【0043】
上述の説明は、バケットBを用いて先行孔H1、後行孔H2を掘削する場合に関するものであるが、本発明の連壁工法は、バケット以外の掘削手段を用いて先行孔、後行孔を掘削する場合にも適用可能である。
【0044】
例えば、図15、図16で示す様に、垂直多軸型掘削機(垂直多軸オーガ機:図15)や、水平多軸型掘削機(水平多軸オーガ機:図16)で先行孔、後行孔を掘削する場合にも、上述と同様な処理を行うことにより、先行孔に打設されたコンクリートの端面を切削し、そこに付着した泥等を除去することが出来る。
【0045】
図15の垂直多軸型掘削機(垂直多軸オーガ機)30を用いて本発明を実施した状態では、垂直多軸削孔ビットの最外周のビット40の図示の左右に図1〜図5で説明したと同様のシリンダ駆動のノズルNが装備してあり、図1〜図5で説明したと同様の作動をする。
また、図16の水平多軸型掘削機(水平多軸オーガ機)50を用いて本発明を実施した状態では、水平多軸削孔ビット60の図示の上方左右に図1〜図5で説明したと同様のシリンダ駆動のノズルNが装備してあり、図1〜図5で説明したと同様の作動をする。
【0046】
図15及び図16の何れも、その掘削機器下方の領域のコンクリート端面及びそこに付着した泥等を切削・除去する構成及び作用と、先行孔に打設されたコンクリート端面の切削の態様、切削するための構成及び作用については、上述したバケットの場合と同様である。
【0047】
次に、図20〜図22を参照して、本発明のその他の実施形態について説明する
図1〜図19で説明した実施形態では、先行孔に打設されたコンクリートの端面を切削し、そこに付着した泥等を除去するジェットを噴射するノズルNは、バケットBや、垂直多軸型掘削機(垂直多軸オーガ機)30、水平多軸型掘削機(水平多軸オーガ機)50の様な掘削用機器に取り付けられている。
これに対して、図20〜図22の実施形態では、当該ノズルNは、掘削機器には取り付けられていない点が特徴となっている。
【0048】
図20において、先行孔に打設されたコンクリートFc1、Fc1の間の領域を、従来のバケットB1により後行孔H2を掘削する。ここで、バケットB1には、上述した切削用ジェット噴射用のノズルNは取り付けられていない。
【0049】
後行孔H2を掘削したならば、例えば鉄筋製のボックス100を当該後行孔H2に挿入する(図21)。
図21から明らかな様に、ボックス100の最下部には、噴射装置102が設けられており、噴射装置102には、先行孔に打設されたコンクリートFc1、Fc1の端面Fc切削用高圧ジェットJを噴射するためのノズルN、Nを取り付けられている。
明確には図示されていないが、図21、図22において、紙面に垂直な方向について、ノズルNは複数設けられている。
【0050】
ボックス100の(先行孔に打設された)コンクリートFc1、Fc1に面した側部には、スプリング部材112を介してガイド部材110が取り付けられている。
このスプリング部材112は、パンタグラフと同様な構成を具備しており、所定のスプリング反撥力でガイド部材110を後行孔H2の内壁面に押し付けることにより、ポックス100全体を後行孔H2の中央部に位置せしめている。
【0051】
そして、ノズルN、Nから高圧水ジェットJ、Jを噴射して、コンクリート端面Fc及びそこに付着した泥等を切削、除去しつつ、ポックス100を引き上げる(図22)。
ここで、コンクリート端面Fcは、そこから符号δで示す分(2cm以上)だけ切削される。
また、上述したガイド部材110(スプリング部材112を含む)の作用により、ボックス100は後行孔H2の中央部分に保持されるので、コンクリート端面Fc及びそこに付着した泥等は、概略左右均等に切削、除去されるのである。
【0052】
ノズルNから噴射した高圧水ジェットJによる掘削については、ノズルNから高圧水ジェットJを噴射するのは水平方向のみでよいことを除き、上述したのと同様である。
【0053】
ボックス100によるコンクリート端面Fcの切削及びそこに付着した泥等の除去を完了したならば、鉄筋籠或いはそれに代わる構造体を後行孔H2に挿入し、コンクリートを打設すれば良い(図示せず)。
【0054】
図示の実施形態はあくまでも例示であり、本発明の技術的範囲を限定する趣旨の記述ではない旨を付記する。
【0055】
【発明の効果】
本発明の作用効果を、以下に列挙する。
(1) 噴射手段は、噴射手段の取り付け箇所より下方の領域の固結材端面を切削し且つそこに付着した泥や土砂等を除去出来る様に、上下方向に揺動可能に構成されており、掘削手段よりも下方の領域における固結材の端面に向けて高圧流体ジェットを噴射するので、従来技術では切削が不可能であった固結材端面や、除去が不可能であった泥等、すなわちノズル下方のバケットが位置している領域における先行孔コンクリートの端面及びそこに付着した泥等は、ノズルから下方に向けて噴射される高圧水噴流により切削されて、除去される。
(2) 先行孔コンクリートの端面が切削され、そこに付着した泥等が除去されるので、先行孔に打設されたコンクリートと後行孔に打設されたコンクリート同士の接合が良好に行われ、接合面或いは境界部分から漏水するという様な問題は発生しない。
(3) 従来技術では、噴射された高圧流体ジェットが先行孔に打設された固結材の端面の水平方向の全面に当たる様に、高圧流体ジェットが固結端面に衝突する位置を広範囲に亘って移動しながら(例えば当該衝突位置が左右方向平行移動や回転しながら)、掘削手段(バケット等)と共に上昇していたので、掘削手段の上昇速度が遅くなり、非効率である上不経済であった。
これに対して本発明の連壁工法では、切削工程で噴射手段から噴射される高圧流体ジェットは、水平方向については固結材の端面全体には噴射されない様に構成しているので、掘削手段の上昇速度を遅くする必要が無いので、経済的である。
(4) 先行孔固結材端面の凹凸により当該端面全面が切削できない可能性が有る場合には、ノズル先端を左右の揺動させることによって(先行孔固結材端面の)水平方向の全域に亘る切削が可能となる。
(5) 高圧流体ジェットを噴射するノズルを、バケットその他の掘削機器以外に取り付けて、施工することが可能である。
【図面の簡単な説明】
【図1】本発明の実施形態における掘削機の全体構成を示す正面図。
【図2】図1で示す掘削機を用いた連壁工法の掘削における地上側設備を示す正面及び側面図。
【図3】本発明の実施形態の切削用ノズルの上下揺動の機構を説明する構成図。
【図4】本発明の実施形態の切削用ノズルの上下揺動機構においてノズルを下方に向けた様体図。
【図5】本発明の実施形態の切削用ノズルの上下揺動機構においてノズルを水平状態に戻した様体図。
【図6】本発明の実施形態の切削用ノズル周辺を示した上面図。
【図7】本発明の実施形態においてノズルの左右揺動用の機構を説明する上面図。
【図8】本発明の実施形態のノズルの左右揺動用の機構においてノズルを左側に揺動させる工程を説明する上面図。
【図9】本発明の実施形態のノズルの左右揺動用の機構においてノズルを右側に揺動させる工程を説明する上面図。
【図10】コンクリート端面に高圧ジェットが衝突した後左右に分流する様を示した態様図。
【図11】コンクリート端面に凹凸がある場合に高圧ジェットが右方のみに流れてしまう態様を示した図。
【図12】本発明の実施形態において高圧ジェットのノズル左右に揺動させて切削する工程の実施例。
【図13】本発明の実施形態において高圧ジェットのノズルを全て左方に傾斜させて切削する工程の実施例を説明する図。
【図14】本発明の実施形態において高圧ジェットのノズルを全て右方に傾斜させて切削する工程の実施例を説明する図。
【図15】垂直多軸形掘削機(垂直多軸オーガ機)を用いて本発明を実施した状態を示す図。
【図16】水平多軸形掘削機(水平多軸オーガ機)を用いて本発明を実施した状態を示す図。
【図17】連壁工法において、先行孔、後行孔の位置関係を示す上面図。
【図18】従来技術の連壁工法による一工程図。
【図19】図13、図14で示す実施例の変形例を説明する図。
【図20】本発明の他の実施形態を示す正面図。
【図21】図20の実施形態において、図20に連続する工程を示す正面図。
【図22】図20、図21の実施形態において、図21に連続する工程を示す正面図。
【符号の説明】
1・・・掘削機
2・・・フレーム
3・・・水平部材
4・・・移動部材
5・・・ブラケット
6・・・緩衝装置
7・・・支持部材
8・・・シリンダ
9・・・ブラケット
10・・・ステイ
11・・・プロテクタ
21・・・固定部材
22・・・シリンダ
25・・・牽引ロッド
B・・・バケット
J・・・高圧ジェット
N・・・ノズル
P1〜P5・・・ヒンジ
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a continuous wall method.
[0002]
[Prior art]
As shown in the top view showing the drilling process in FIG. 17, in the continuous wall method, first, the leading hole H1 is excavated, concrete C is poured into the leading hole H1, and then the leading hole H1 is connected to connect the leading holes. The hole H2 is excavated. Then, concrete C is poured into the trailing hole H2.
[0003]
In the continuous wall method, excavation of the leading hole H1 and the trailing hole H2 is performed in the bucket B as shown in FIG. 18 (separated wall method by bucket excavation), and the excavation of the leading hole H1 and the trailing hole H2 shown in FIG. A technique of jetting a high-pressure water jet J to a boundary part (or a concrete end face Fc placed in a preceding hole) to remove the ground (soil or sand) at the boundary part and wash the concrete end face Fc. It has been proposed (for example, see Patent Document 1).
This is because the concrete end face Fc placed in the preceding hole H1 is cleaned to improve the adhesiveness to the preceding concrete C when the concrete is placed in the following hole H2.
[0004]
Here, the end face Fc of the concrete poured into the preceding hole H1 is deteriorated. Therefore, in order to improve the bondability between the concrete poured into the preceding hole H1 and the concrete poured into the following hole H2, the end face Fc of the concrete poured into the preceding hole H1 is cut by at least about 2 cm. Then, it is preferable to remove.
However, in the above-mentioned prior art, only the washing and removal of mud and the like adhering to the end face Fc of the concrete poured into the preceding hole H1 are mentioned, and nothing is mentioned about cutting the end face Fc of the concrete. Absent.
[0005]
Further, in the above-described prior art, the concrete end face Fc of the preceding hole (in other words, the concrete end face corresponding to the position of the bucket) Fc below the nozzle N which jets the jet (the position L is deeper) is a high-pressure water. However, there is a problem that it is not possible to collide, and it is not possible to cut or cut.
Then, in the part where the concrete end face Fc is cut or not cut, the joint between the concrete at the leading hole H1 side and the trailing hole H2 side becomes defective, and there is a possibility that danger such as water leakage may be caused.
[0006]
[Patent Document 1]
JP-A-7-150549
[0007]
[Problems to be solved by the invention]
The present invention has been proposed in view of the above-described problems of the related art, and it is possible to cut a concrete end face in an area that could not be cut or cut in the past, so that concrete placed in a preceding hole can be cut. It is an object of the present invention to provide a continuous wall construction method capable of forming a favorable continuous wall by reliably and satisfactorily joining concrete poured into a trailing hole.
[0008]
[Means for Solving the Problems]
The continuous wall method according to the present invention includes a preceding hole excavating step of excavating the preceding hole (H1), a step of placing a compaction material (concrete, cement milk, mortar, etc. C) in the preceding hole (H1), and consolidating. A trailing hole excavation step of drilling a trailing hole (H2) at a position between the leading holes (H1, H1) in which the material (C) is cast, and (drilling a leading hole H1 and / or a trailing H2 hole). The high-pressure fluid jet (J) is jetted from the jetting means (for example, the nozzle N) provided in the excavating means (B) toward the end face (Fc) of the consolidated material cast in the preceding hole (H1), and the end face ( And cutting a high pressure fluid jet (J) toward an end surface (Fc) of the consolidated material in a region below the excavating means (B), Activating the injection means (N) and digging the part where the high pressure fluid jet (J) collides from the excavation means (B) After moving from the lower area to the area at the same level as the jetting means (N), and the part where the high pressure fluid jet (J) collides with the area at the same level as the jetting means (N), the excavating means (B) is The high-pressure fluid jet (J) is jetted toward the end face (Fc) of the consolidated material cast in the preceding hole (H1) while pulling up to the ground (Gf) side (claim 1).
[0009]
Here, the injection means (for example, the nozzle N) includes a concrete end face (Fc) in an area (a part of the excavating equipment, for example, the bucket B) below a mounting location of the injection means (N) and mud and earth and sand adhering thereto. It is preferable to be able to swing up and down so that it can be removed by cutting.
For example, the fluid pressure cylinder (hydraulic pressure source) is supplied with a pressurized fluid (pressure oil) from the fluid pressure source (hydraulic pressure source) or returned to the fluid pressure source (hydraulic pressure source) to expand and contract the fluid pressure cylinder. The high-pressure fluid jet ejected from the ejection means can swing from below to above.
[0010]
According to the present invention having such a configuration, the high-pressure fluid jet (J) is jetted toward the end face (Fc) of the consolidated material in a region below the excavating means (B). Deterioration of the concrete end face (Fc) in the area where removal was impossible and mud and the like adhering thereto, that is, the end face (Fc) of the preceding hole concrete in the area where the bucket (B) below the nozzle (N) is located. The concrete and the mud and the like adhering thereto are cut and removed by the high-pressure water jet (J) jetted downward from the nozzle (N).
As a result, the joint between the concrete cast in the preceding hole (H1) (and the concrete after the deteriorated portion has been cut and removed) and the concrete cast in the following hole (H2) is excellent. This does not cause a problem such as water leakage from the joint surface or the boundary portion.
[0011]
Here, in the prior art, the high-pressure fluid jet (J) is consolidated so that the jetted high-pressure fluid jet hits the entire horizontal surface of the end face (Fc) of the consolidated material cast in the preceding hole (H1). While moving over a wide range at the position where it collides with the end face (Fc) (for example, while the collision position is moving in the horizontal direction or rotating), it rises together with the excavating means (bucket or the like). However, the rising speed of the excavating means (B) is slow, which is inefficient and uneconomical.
On the other hand, in the continuous wall method of the present invention, the high-pressure fluid jet (J) jetted from the jetting means (N) in the cutting step is jetted to the entire end face of the consolidated material in the vertical direction. In the horizontal direction (H: left-right direction in FIGS. 10 to 12), it is possible to configure so as not to be sprayed on the entire end face Fc of the consolidated material (claim 2: FIGS. 6 to 9).
With such a configuration, there is no need to slow down the ascending speed of the excavating means, which is economical.
[0012]
Here, according to the present invention, the entire end face (Fc) of the consolidated material can be cut without jetting the high-pressure fluid jet over the entire end face (Fc) of the consolidated material.
When the high-pressure fluid jet (J) collides with the end face (Fc) of the consolidated material, the high-pressure fluid is divided in the horizontal direction (H: left-right direction in FIGS. 10 to 12) along the end face (Fc). The jet that has flowed and diverted cuts a region inside the concrete end face (Fc) by a predetermined dimension (δ: for example, 2 cm or more), and at the same time, removes earth and sand attached to the end face (Fc).
Therefore, even if the high-pressure fluid jet (J) is not sprayed on the entire end face (Fc) of the consolidated material, the high-pressure fluid flows over the entire end face (Fc) of the consolidated body, and the high-pressure fluid adheres to the end face (Fc) and the end face (Fc). Mud, earth and sand can be removed by cutting.
[0013]
Here, depending on the unevenness of the end face (Fc) of the consolidated material, there is a possibility that the high-pressure fluid jet (J) does not divide in the horizontal direction left and right, but flows only in one of them (to the right in FIG. 11). . In such a case, a region that is not cut is generated on the end surface (Fc) of the consolidated material, and mud and the like adhering to the consolidated material end surface (Fc) of the non-cut region remain without being removed, causing a cause of water leakage and the like. There is a possibility that.
In order to prevent such a situation, in the present invention, the high-pressure fluid jet (J) jetted from the jetting means (N) in the cutting step is horizontal (H: left-right direction in FIGS. 7 to 9 and FIG. 12). It is preferable to swing (e.g., about 5 [deg.] Left and right) (Claim 3: FIGS. 7 to 9).
The high-pressure fluid jet (J) is swayed, though slightly, so that the high-pressure fluid always flows in the horizontal direction (H: FIG. 7 to 9 and 12), the separated jet (J) cuts the end face (Fc) of the consolidated material and removes the earth and sand adhering thereto.
[0014]
Here, in order to oscillate the high-pressure fluid jet (J) in the horizontal direction (H: horizontal direction in FIGS. 7 to 9 and FIG. 12), a part of each of the plurality of nozzles (N) extends in the horizontal direction. A cylinder (22) rotatably supported (P1) on a fixing member (21) to be mounted and having rear ends of the plurality of nozzles (N) arranged in parallel with the fixing member (21) and extending and contracting in the horizontal direction. It is preferable that the nozzle (N) be swung in the horizontal direction (left-right direction) by rotatably supporting the extension member (25) of the cylinder rod and extending and contracting the cylinder (22).
[0015]
Further, in the present invention, in the cutting step, the high-pressure fluid jet (J) injection nozzle (N) is moved in a direction (C1 to C3) parallel to the center line of the leading hole (H1) and / or the trailing hole (H2). In a state where the end face (Fc) of the consolidated material is collided with the inclined surface to the right or left, the excavating means (B) is moved vertically in this state, and the high-pressure water jet (J) is applied to the end surface (Fc) of the consolidated body. And press the high-pressure fluid jet (J) injection nozzle (N) in a direction (C1 to C3) parallel to the center line of the leading hole (H1) and / or the trailing hole (H2) in a direction opposite to the above. It is preferable to move the excavating means (B) in the vertical direction again while colliding with the end face (Fc) of the consolidated material in an inclined state (claim 4: FIGS. 13 and 14).
[0016]
For example, if the jet is initially inclined to the left, all high pressure water jets will flow to the left. Then, when the high-pressure fluid jets are jetted in the vertical direction on the opposite side, that is, inclined to the right, all the high-pressure water jets flow to the right.
This ensures that the high-pressure water jet (J) flows over the entire end face (Fc) of the consolidated body, cuts the entire end face (Fc), and removes earth and sand and mud adhering thereto.
[0017]
Here, in the cutting step, the high-pressure fluid jet injection nozzles (N1, N3) are moved to the right or left in a direction (C1 to C3) parallel to the center line of the leading hole (H1) and / or the trailing hole (H2). The inclined state and the high pressure fluid jet injection nozzles (N2, N4) adjacent to the nozzles (N1, N3) are moved in the directions (C1 to C1) parallel to the center line of the leading hole (H1) and / or the trailing hole (H2). With regard to C3), in a state inclined to the opposite side to the above, the high-pressure fluid jet (J1, J3) from the nozzle (N1, N3) and the high-pressure fluid jet (J2) from the nozzle (N2, N4) adjacent thereto. , J4) simultaneously with the end face (Fc) of the consolidated material, and the excavating means (B) is preferably moved in the vertical direction (claim 5: FIGS. 13 and 14).
[0018]
With such a configuration, the excavating means (B) is pulled up only once, and in both directions (C1 to C3) parallel to the center line of the leading hole (H1) and / or the trailing hole (H2). The high-pressure fluid jets (J1 to J4) flow to cut and remove the end face and the mud attached to the end face (Fc) over the entire end face (Fc) of the consolidated material.
[0019]
Further, in the present invention, it is preferable that, prior to the cutting step, a step of projecting the injection means (N) stored in the main body of the excavating means (B) outward from the inside of the main body of the excavating means (B) is preferable. (Claim 6).
At the time of excavation by the excavation means (B), the soil and the injection means (N) interfere with each other and the injection means (N) may be damaged or damaged, so that it is accommodated in (the protective casing of) the excavation equipment main body. .
In the cutting step, the extruder is protruded from the excavator (B) main body in order to easily move the injection position of the high-pressure fluid jet (J).
[0020]
In addition to this, in the continuous wall method according to the present invention, a preceding hole excavation step of excavating the preceding hole (H1), and a solidifying material (concrete, cement milk, mortar, etc. C) is poured into the preceding hole (H1). A step of excavating a trailing hole (H2) at a position between the leading holes (H1, H1) in which the consolidated material (C) is cast, and a fluid cutting means in the trailing hole (H2). (The box 100 and the injection device 102) are inserted, and the end face (Fc) of the consolidated material cast into the preceding hole (H1) from the injection means (for example, the nozzle N) provided in the fluid cutting means (100, 102). And cutting the end face (Fc) by injecting a high-pressure fluid jet (J) toward the surface while raising the fluid cutting means (100, 102) to the ground (Gf) side. (Claim 7: FIGS. 20 to 22).
[0021]
According to the present invention having such a configuration, when the fluid cutting means (the box 100 and the ejection device 102) is inserted into the trailing hole (H2), the ejection means (for example, the nozzle N) is located at the bottom of the trailing hole H2. With such a configuration, it is not necessary to change the ejection direction of the high-pressure fluid jet (J) of the ejection means (N) from the horizontal direction. That is, when the high-pressure fluid jet (J) is ejected in the horizontal direction from the fluid cutting means (100, 102) and lifted to the ground side, the end face (Fc) of the consolidated material poured into the preceding hole (H1) is removed. It can be cut.
[0022]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings.
[0023]
In FIG. 1, a pair of buckets B, which are excavating means, are swingably mounted on the lower end of a frame 2 of an excavator generally indicated by reference numeral 1. The excavator 1 is suspended by a crane K installed on the ground Gf as shown in FIG. 2, the soil at the excavation point is taken in by the bucket B, lifted and discharged to a processing facility (not shown) on the ground side. Drill the leading and trailing holes.
[0024]
Returning to FIG. 1 again, the left bucket B is swung left and opened for excavation, and the right bucket B is kept hanging. A pair of nozzles N for jetting a jet of high-pressure water are mounted on both left and right ends of the horizontal member 3 above the pair of buckets B in a manner described later.
[0025]
With reference to FIGS. 3 to 5, a detailed configuration around the high-pressure water injection nozzle N and the movement of the nozzle N during injection will be described.
At an end of the horizontal member 3, a moving member 4 that is horizontally moved by a horizontal moving means, for example, a hydraulic cylinder (not shown) is disposed.
A bracket 5 is fixed to an end of the moving member 4, a first hinge P1 is provided below the bracket 5, and a second hinge P2 is provided above and to the right of the first hinge P1. Have been.
[0026]
One end of a support member 7 that supports the shock absorber 6 is pivotally attached to the first hinge P1, and one end of a cylinder 8 that expands and contracts in the axial direction is pivotally attached to the second hinge P2.
A hinge P3 is provided at the other end of the support member 7, and the other end of the cylinder 8 is pivoted.
[0027]
The nozzle N is supported at the outer (leftward in the figure) end of the buffer member 6 via a bracket 9. Further, a protector 11 is fixed to the bracket 9 via a stay 10 in front of the nozzle N (to the left in the drawing). When the excavator 1 suspended by the above-described crane K (see FIG. 2) swings and the protector 11 comes into contact with the wall of the preceding hole H1 (see FIG. 4), the protector 11 is moved together with the shock absorber. It is provided to prevent the support member 7 including the nozzle N, the cylinder 8 and the like from being damaged by contracting rightward in the drawing.
Although not clearly shown in the figure, the protector 11 is provided with a hole through which a high-pressure jet J from the nozzle N passes.
[0028]
As shown in FIG. 4, the cylinder 8 is contracted to cut the concrete end face Fc below the bucket B with the high-pressure jet J facing downward. Then, the point of the hinge P3 at the other end of the cylinder 8 is lifted so as to rotate in the counterclockwise direction with respect to the hinge P1, and as a result, the injection hole (not shown) of the nozzle N also faces obliquely downward.
[0029]
To return the nozzle N to the horizontal position, as shown in FIG. 5, if the cylinder 8 is extended, the hinge P3 rotates clockwise around the hinge P1 and the nozzle N returns to the horizontal position.
[0030]
By the operation shown in FIG. 4 and FIG. 5, the leading hole in the area where the bucket B below the nozzle N is located, such as the end face of the concrete Fc and the mud adhering thereto, which could not be cut and removed in the prior art. The concrete end face Fc and the mud and the like adhering thereto are cut and removed by the high-pressure water jet J jetted downward from the nozzle N.
From the stage shown in FIG. 5, when the entire excavator 1 including the bucket B is lifted to the ground side by the crane device shown in FIG. 2, as the bucket B rises, the concrete end face Fc placed in the preceding hole is removed. Cutting is performed.
[0031]
Here, conventionally, the nozzle has been moved over a wide range so that the high-pressure water jet from the nozzle hits the entire end face of the concrete placed in the preceding hole. That is, while moving the nozzle, the high-pressure water jet repeatedly moves back and forth (where the collision with the concrete end face) or makes an arc-like orbital movement, and the high-pressure water jet moves over the entire concrete end face as the bucket rises. Was colliding.
However, if the bucket is raised while the high-pressure water jet is repeatedly reciprocated or circularly moved, the rising speed of the bucket is slow, which is uneconomical.
[0032]
On the other hand, in the illustrated embodiment, as shown in FIG. 6, the high-pressure water jet does not collide with the entire surface of the concrete end face Fc (when the nozzle N is directed at a right angle to the concrete end face Fc, it is indicated by L). Jet J does not collide with the area).
However, as shown in FIG. 10, when the high-pressure water jet J collides with the concrete end face Fc, the high-pressure water jet J divides in the horizontal direction H along the concrete end face Fc approximately equally to the left and right, and the divided high-pressure water jet J The jet Jb cuts and separates the concrete end face Fc and the earth and sand adhering thereto.
Even if the high-pressure water jet J is not applied to the entire surface of the concrete end face Fc, the concrete end face Fc and the earth and sand adhered thereto are cut and removed over the entire concrete end face Fc.
[0033]
Here, as shown in FIG. 11, depending on the irregularities of the concrete end face Fc, the high-pressure water jet J does not divide into right and left, but flows into only one (right side in FIG. 11). In order to prevent such a situation, as shown in FIG. 12, the high-pressure water jet J is slightly swung (about 5 ° to 10 °) in the direction of arrow RH, that is, in the left-right direction (horizontal direction).
Thus, the injected high-pressure water jet J flows along the entire surface of the concrete end face Fc, and cuts and removes the end face Fc and mud and the like attached thereto.
[0034]
Next, a method of swinging the nozzle N in the left-right direction (horizontal direction) will be described with reference to FIGS.
FIGS. 7 to 9 are enlarged views of a portion E in FIG. 6 to facilitate the description.
[0035]
In FIG. 7, hinges P4 for rotating and supporting the nozzles N are provided by the number of the nozzles N on the fixing member 21 for connecting the blades 20 at the left and right ends. I have. A cylinder 22 having a piston 23 and a piston rod 24 is mounted on one of the other blades 20 (the right side in the illustrated example), and the piston rod 24 is engaged with an engagement means (not shown) on the left side. A traction rod 25 that is movable left and right is connected.
[0036]
The towing rod 25 is provided with a hinge P5 for pivotally connecting the other end of the nozzle N. Then, as shown in FIG. 8, when the cylinder 22 contracts (the piston 23 and the piston rod 24 move rightward), the tip of the nozzle N tilts to the left. Injected as if swinging to the left.
[0037]
When it is desired to eject the high-pressure jet J by swinging it to the right as shown on the opposite side of FIG. 8, that is, as shown in FIG. 9, the cylinder 22 may be operated so as to extend.
[0038]
In addition, in the case as shown in FIG. 12, that is, when the high-pressure water jet J colliding with the concrete end face Fc flows to only one of the right and left without diverting to the left and right, with reference to FIGS. It may be configured as described below.
[0039]
First, in directions C1 to C3 parallel to the center line of the continuous wall to be formed (not shown in FIGS. 13 and 14), in a state inclined at an angle θ to the right (or left) side in FIG. In FIG. 13, a high-pressure water jet J (three high-pressure water jets in FIG. 13) is jetted toward the concrete end face Fc at an angle θ from the right side of each of the straight lines C1 to C3. All the injected high-pressure water jets J flow in the same direction (to the left in FIG. 13) along the concrete end face Fc, cut the concrete end face Fc, and remove mud and the like adhering thereto.
In this state, the bucket is moved from below to above (in a direction perpendicular to the plane of FIG. 13), and a high-pressure water jet J is jetted onto the concrete end face Fc (this stage is not shown).
[0040]
When the bucket B has been moved from below to above in the state shown in FIG. 13 and the high-pressure water jet J has been jetted on the concrete end face Fc, the operation shown in FIG. 14 is performed next. That is, the high-pressure water jet J is jetted at an angle θ from the side opposite to that shown in FIG. 13 (from the left side in FIG. 14) with respect to the straight lines C1 to C3 parallel to the center line of the continuous wall to be formed. . All the high-pressure water jets J (three in FIG. 14) flow on the opposite side (the right-hand side in FIG. 14) after the collision with the concrete end face Fc, and in the region on the opposite side ( The concrete end face Fc (the area on the right side of the straight lines C1 to C3) is cut to remove mud and the like adhering thereto.
Then, when the bucket is moved in the vertical direction again, the concrete end face Fc is cut, and mud and earth and sand adhering thereto are removed.
The angle θ is, for example, about 5 ° to 30 °.
[0041]
The bucket may be lowered once after the step in FIG. 13 and then lifted up again, or the bucket shown in FIG. 13 may be lifted down in the ground and then the step in FIG. 14 may be performed.
[0042]
Alternatively, as shown in FIG. 19, a pair of adjacent nozzles N1, N2 or N3, N4 are set so that the paired nozzles are inclined by an angle θ in the left and right opposite directions. Then, the jets J1 and J2 or the jets J3 and J4 are jetted from each nozzle so as not to collide in the middle.
With this configuration, when the bucket is pulled up, the mud attached to the left and right sides of the straight lines C1 to C3 shown in FIGS. It can be cut to.
[0043]
The above description relates to the case where the leading hole H1 and the trailing hole H2 are excavated using the bucket B. However, the continuous wall method according to the present invention uses the excavating means other than the bucket to perform the leading hole and the trailing hole H2. It is also applicable when excavating.
[0044]
For example, as shown in FIGS. 15 and 16, a vertical multi-axis excavator (vertical multi-axis auger machine: FIG. 15) or a horizontal multi-axis excavator (horizontal multi-axis auger machine: FIG. 16) Also when excavating the trailing hole, by performing the same processing as described above, it is possible to cut the end face of the concrete cast in the preceding hole and remove mud and the like adhering thereto.
[0045]
When the present invention is carried out using the vertical multi-axis excavator (vertical multi-axis auger) 30 of FIG. 15, the outermost bit 40 of the vertical multi-axis drill bit is shown on the left and right of FIG. A nozzle N for driving a cylinder similar to that described above is provided, and the same operation as that described with reference to FIGS. 1 to 5 is performed.
When the present invention is carried out using the horizontal multi-axis excavator (horizontal multi-axis auger) 50 shown in FIG. 16, the horizontal multi-axis drill bit 60 will be described with reference to FIGS. A cylinder driving nozzle N similar to that described above is provided, and performs the same operation as that described with reference to FIGS.
[0046]
15 and 16 both show the configuration and operation of cutting and removing the concrete end face in the area below the excavating equipment and the mud and the like adhering thereto, the manner of cutting the concrete end face put into the preceding hole, and the cutting. The configuration and operation for performing the operation are the same as those of the bucket described above.
[0047]
Next, another embodiment of the present invention will be described with reference to FIGS.
In the embodiment described with reference to FIGS. 1 to 19, the nozzle N that cuts the end face of the concrete poured into the preceding hole and jets a jet for removing mud and the like adhering thereto is a bucket B or a vertical multi-axis. It is attached to excavating equipment such as a vertical excavator (vertical multi-axis auger machine) 30 and a horizontal multi-axial excavator (horizontal multi-axis auger machine) 50.
On the other hand, the embodiment of FIGS. 20 to 22 is characterized in that the nozzle N is not attached to the excavating equipment.
[0048]
In FIG. 20, a trailing hole H2 is excavated by a conventional bucket B1 in a region between concretes Fc1 and Fc1 cast in the preceding hole. Here, the above-described nozzle N for jetting for cutting is not attached to the bucket B1.
[0049]
When the trailing hole H2 is excavated, the box 100 made of, for example, a reinforcing bar is inserted into the trailing hole H2 (FIG. 21).
As is clear from FIG. 21, an injection device 102 is provided at the lowermost portion of the box 100. The injection device 102 is provided with a high-pressure jet J for cutting the end face Fc of the concrete Fc1 or Fc1 that has been cast into the preceding hole. Are mounted.
Although not clearly shown, in FIGS. 21 and 22, a plurality of nozzles N are provided in a direction perpendicular to the paper surface.
[0050]
A guide member 110 is attached via a spring member 112 to the side of the box 100 facing the concrete Fc1 (cast into the preceding hole).
The spring member 112 has a configuration similar to that of the pantograph, and presses the guide member 110 against the inner wall surface of the trailing hole H2 with a predetermined spring repulsion force to move the entire pox 100 to the central portion of the trailing hole H2. It is located in.
[0051]
Then, the high pressure water jets J, J are jetted from the nozzles N, N to cut and remove the concrete end face Fc and the mud adhering thereto, and pull up the pox 100 (FIG. 22).
Here, the concrete end face Fc is cut therefrom by an amount (2 cm or more) indicated by reference numeral δ.
Further, the box 100 is held at the central portion of the trailing hole H2 by the action of the above-described guide member 110 (including the spring member 112). It is cut and removed.
[0052]
Excavation by the high-pressure water jet J jetted from the nozzle N is the same as described above, except that the high-pressure water jet J is jetted from the nozzle N only in the horizontal direction.
[0053]
After the cutting of the concrete end face Fc by the box 100 and the removal of the mud and the like adhering thereto are completed, a reinforcing bar or a structure alternative thereto may be inserted into the trailing hole H2, and the concrete may be poured (not shown). ).
[0054]
It is to be noted that the illustrated embodiment is merely an example and is not intended to limit the technical scope of the present invention.
[0055]
【The invention's effect】
The effects of the present invention are listed below.
(1) The injection means is configured to be capable of swinging up and down so as to cut an end face of the consolidated material in a region below a mounting portion of the injection means and remove mud, earth and sand attached thereto. Since the high-pressure fluid jet is jetted toward the end face of the solidified material in a region below the excavation means, the solidified material end face that cannot be cut with the conventional technology, mud that cannot be removed with the prior art, etc. That is, the end face of the pre-perforated concrete in the region where the bucket below the nozzle is located and mud and the like adhering thereto are cut and removed by the high-pressure water jet jetted downward from the nozzle.
(2) Since the end face of the preceding hole concrete is cut and the mud and the like adhering thereto are removed, the concrete placed in the preceding hole and the concrete placed in the following hole are joined well. There is no problem that water leaks from the joint surface or the boundary.
(3) In the prior art, the position at which the high-pressure fluid jet collides with the solidified end face is spread over a wide range so that the injected high-pressure fluid jet hits the entire horizontal surface of the end face of the solidified material that has been driven into the preceding hole. (For example, while the collision position is moving or rotating in the left-right direction) while moving together with the excavating means (bucket, etc.), the ascending speed of the excavating means becomes slow, which is inefficient and uneconomical. there were.
On the other hand, in the continuous wall method according to the present invention, the high-pressure fluid jet injected from the injection unit in the cutting step is configured not to be injected over the entire end face of the consolidated material in the horizontal direction. It is economical because there is no need to slow down the climb speed.
(4) When there is a possibility that the entire surface of the preceding hole cannot be cut due to the unevenness of the end surface of the preceding hole consolidated material, the nozzle tip is swung right and left to cover the entire region in the horizontal direction (of the preceding hole consolidated material end surface). It is possible to cut over.
(5) The nozzle for jetting the high-pressure fluid jet can be attached to a bucket or other excavating equipment for construction.
[Brief description of the drawings]
FIG. 1 is a front view showing an entire configuration of an excavator according to an embodiment of the present invention.
FIGS. 2A and 2B are front and side views showing ground-side facilities in excavation using the excavator shown in FIG.
FIG. 3 is a configuration diagram illustrating a vertical swinging mechanism of the cutting nozzle according to the embodiment of the present invention.
FIG. 4 is a perspective view of the vertical swinging mechanism of the cutting nozzle according to the embodiment of the present invention, in which the nozzle is directed downward.
FIG. 5 is a perspective view of the vertical swinging mechanism of the cutting nozzle according to the embodiment of the present invention, in which the nozzle is returned to a horizontal state.
FIG. 6 is a top view showing the vicinity of a cutting nozzle according to the embodiment of the present invention.
FIG. 7 is a top view illustrating a mechanism for horizontally swinging the nozzle in the embodiment of the present invention.
FIG. 8 is a top view illustrating a step of swinging the nozzle to the left side in the nozzle swing mechanism according to the embodiment of the present invention.
FIG. 9 is a top view illustrating a process of swinging the nozzle to the right in the mechanism for swinging the nozzle left and right according to the embodiment of the present invention.
FIG. 10 is a view showing a state in which a high-pressure jet collides with a concrete end face and then diverges right and left.
FIG. 11 is a diagram showing a mode in which a high-pressure jet flows only to the right when the concrete end face has irregularities.
FIG. 12 shows an example of a step of cutting by swinging the nozzle of the high-pressure jet right and left in the embodiment of the present invention.
FIG. 13 is a diagram illustrating an example of a step of cutting the nozzle of the high-pressure jet by inclining all the nozzles to the left in the embodiment of the present invention.
FIG. 14 is a view for explaining an example of a step of cutting all the nozzles of the high-pressure jet to the right in the embodiment of the present invention.
FIG. 15 is a diagram showing a state where the present invention is implemented using a vertical multi-axis excavator (vertical multi-axis auger machine).
FIG. 16 is a diagram showing a state where the present invention is implemented using a horizontal multi-shaft excavator (horizontal multi-shaft auger).
FIG. 17 is a top view showing a positional relationship between a leading hole and a trailing hole in the continuous wall method.
FIG. 18 is a one-step diagram of a conventional wall connecting method.
FIG. 19 is a view for explaining a modification of the embodiment shown in FIGS. 13 and 14;
FIG. 20 is a front view showing another embodiment of the present invention.
21 is a front view showing a step that follows the step shown in FIG. 20 in the embodiment shown in FIG. 20;
FIG. 22 is a front view showing a step that follows the step shown in FIG. 21 in the embodiment shown in FIGS. 20 and 21;
[Explanation of symbols]
1 ... Excavator
2 ... frame
3 horizontal members
4. Moving member
5 ... Bracket
6 ... shock absorber
7 ... Support member
8 ... Cylinder
9 Bracket
10 ... Stay
11 ... Protector
21 ... fixing member
22 ・ ・ ・ Cylinder
25 Tow rod
B: Bucket
J ・ ・ ・ High pressure jet
N: Nozzle
P1 to P5 hinge

Claims (7)

先行孔を掘削する先行孔掘削工程と、先行孔に固結材を打設する工程と、固結材を打設した先行孔間の位置に後行孔を掘削する後行孔掘削工程と、掘削手段に設けた噴射手段から先行孔に打設された固結材の端面に向けて高圧流体ジェットを噴射して当該端面を切削する切削工程とを有し、該切削工程では、掘削手段よりも下方の領域における前記固結材の端面に向けて高圧流体ジェットを噴射し、噴射手段を作動して高圧流体ジェットが衝突する部位を掘削手段よりも下方の領域から噴射手段と同レベルの領域まで移動し、高圧流体ジェットが衝突する部位が噴射手段と同レベルの領域に到達した後は掘削手段を地上側に引き上げながら先行孔に打設された固結材の端面に向かって高圧流体ジェットを噴射することを特徴とする連壁工法。A preceding hole excavating step of excavating a preceding hole, a step of placing a consolidated material in the preceding hole, and a following hole excavating step of excavating a trailing hole at a position between the preceding holes in which the consolidated material is placed, A cutting step of injecting a high-pressure fluid jet toward the end face of the consolidated material poured into the preceding hole from the injection means provided in the excavation means to cut the end face, and in the cutting step, The high-pressure fluid jet is also jetted toward the end face of the consolidated material in the lower region, and the jetting means is operated to move the portion where the high-pressure fluid jet collides from the area below the excavating means to the same level as the jetting means. After the high-pressure fluid jet collides with the area of the same level as the injection means, the high-pressure fluid jet is directed toward the end face of the consolidated material poured into the preceding hole while raising the excavation means to the ground side. A continuous wall method characterized by injecting water. 前記切削工程で噴射手段から噴射される高圧流体ジェットは、垂直方向については固結材の端面全体には噴射されるが、水平方向については固結材の端面全体には噴射されない様に構成する請求項1の連壁工法。The high-pressure fluid jet injected from the injection means in the cutting step is configured to be injected to the entire end face of the consolidated material in the vertical direction but not to the entire end face of the consolidated material in the horizontal direction. The continuous wall method according to claim 1. 前記切削工程で噴射手段から噴射される高圧流体ジェットは水平方向へ搖動される請求項1、2の何れかの連壁工法。3. The continuous wall method according to claim 1, wherein the high-pressure fluid jet ejected from the ejection unit in the cutting step is swung in a horizontal direction. 前記切削工程では、高圧流体ジェット噴射ノズルが先行孔及び/又は後行孔の中心線と平行な方向について左右何れかに傾斜した状態で固結材の端面に衝突せしめ、その状態で掘削手段を垂直方向へ移動して、固結体の端面に高圧水ジェットを噴射し、高圧流体ジェット噴射ノズルを先行孔及び/又は後行孔の中心線と平行な方向について先程とは逆の側へ傾斜した状態で固結材の端面に衝突させつつ、再び掘削手段を垂直方向へ移動する請求項1、2の何れかの連壁工法。In the cutting step, the high-pressure fluid jet injection nozzle collides with the end face of the consolidated material in a state in which the high-pressure fluid jet injection nozzle is inclined leftward or rightward in a direction parallel to the center line of the leading hole and / or the trailing hole. Moving vertically, injecting a high-pressure water jet on the end face of the consolidated body, and tilting the high-pressure fluid jet injection nozzle in the direction parallel to the center line of the leading hole and / or trailing hole to the opposite side from the previous one The continuous wall construction method according to any one of claims 1 and 2, wherein the excavating means is moved in the vertical direction again while colliding with the end face of the consolidated material in the state of being made. 前記切削工程では、高圧流体ジェット噴射ノズルが先行孔及び/又は後行孔の中心線と平行な方向について左右何れかに傾斜した状態と、当該ノズルに隣接する高圧流体ジェット噴射ノズルを先行孔及び/又は後行孔の中心線と平行な方向について先程とは逆の側へ傾斜した状態とで、当該ノズルからの高圧流体ジェットとそれに隣接するノズルからの高圧流体ジェットとを同時に固結材の端面に衝突せしめ、それと共に掘削手段を垂直方向へ移動する請求項1、2の何れかの連壁工法。In the cutting step, the state in which the high-pressure fluid jet injection nozzle is inclined leftward or rightward in a direction parallel to the center line of the preceding hole and / or the following hole, and the high-pressure fluid jet injection nozzle adjacent to the nozzle is moved to the preceding hole and And / or in a state parallel to the center line of the trailing hole inclined in a direction opposite to the previous direction, the high-pressure fluid jet from the nozzle and the high-pressure fluid jet from the adjacent nozzle are simultaneously formed by 3. The continuous wall method according to claim 1, wherein the excavating means is caused to collide with the end face, and the excavating means is moved in the vertical direction. 前記切削工程に先立って、掘削手段の本体内に格納されている噴射手段が掘削手段本体内から外方に突出する工程を有する請求項1〜5の何れか1項の連壁工法。6. The continuous wall method according to claim 1, further comprising, prior to the cutting step, a step of projecting an injection unit stored in a body of the excavating unit outward from the inside of the excavating unit main body. 先行孔を掘削する先行孔掘削工程と、先行孔に固結材を打設する工程と、固結材を打設した先行孔間の位置に後行孔を掘削する後行孔掘削工程と、後行孔に流体切削手段を挿入し、流体切削手段に設けられた噴射手段から先行孔に打設された固結材の端面に向けて高圧流体ジェットを噴射して当該端面を切削しつつ、流体切削手段を地上側に引き上げる切削工程、とを有することを特徴とする連壁工法。A preceding hole excavating step of excavating the preceding hole, a step of placing a consolidated material in the preceding hole, and a trailing hole excavating step of excavating the succeeding hole at a position between the preceding holes in which the consolidated material is placed, Inserting the fluid cutting means in the trailing hole, while cutting the end face by jetting a high-pressure fluid jet from the jetting means provided in the fluid cutting means toward the end face of the consolidated material poured into the preceding hole, A cutting step of raising the fluid cutting means to the ground side.
JP2003142868A 2003-05-21 2003-05-21 Continuous wall method Expired - Fee Related JP4072956B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003142868A JP4072956B2 (en) 2003-05-21 2003-05-21 Continuous wall method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003142868A JP4072956B2 (en) 2003-05-21 2003-05-21 Continuous wall method

Publications (2)

Publication Number Publication Date
JP2004346554A true JP2004346554A (en) 2004-12-09
JP4072956B2 JP4072956B2 (en) 2008-04-09

Family

ID=33530810

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003142868A Expired - Fee Related JP4072956B2 (en) 2003-05-21 2003-05-21 Continuous wall method

Country Status (1)

Country Link
JP (1) JP4072956B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111894061A (en) * 2020-07-31 2020-11-06 广东水电二局股份有限公司 Grooving equipment with joint flushing device and construction method
JP2021067120A (en) * 2019-10-25 2021-04-30 鹿島建設株式会社 Construction method of underground continuous wall

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021067120A (en) * 2019-10-25 2021-04-30 鹿島建設株式会社 Construction method of underground continuous wall
JP7248558B2 (en) 2019-10-25 2023-03-29 鹿島建設株式会社 How to build a diaphragm wall
CN111894061A (en) * 2020-07-31 2020-11-06 广东水电二局股份有限公司 Grooving equipment with joint flushing device and construction method

Also Published As

Publication number Publication date
JP4072956B2 (en) 2008-04-09

Similar Documents

Publication Publication Date Title
JP6236632B2 (en) Ground improvement device and ground improvement method
NL9301465A (en) Universal type of method for reinforcement and consolidation in the ground and a device therefor.
JP2004346554A (en) Construction method of continuous wall
JP5717148B2 (en) Underground consolidated body construction method
JP4173161B2 (en) Excavation and excavation equipment for narrow spaces, excavation and excavation method and excavation and soil removal system for narrow areas
JP5305573B2 (en) Underground solid body forming device and underground solid body forming method
JP2005324283A (en) Spray nozzle and injection device using the same
JPH08254099A (en) Working device in tunnel
JP2005105727A (en) Continuous wall construction method
JP6405431B2 (en) Ground improvement device and ground improvement method
JP3905201B2 (en) Drilling rig
JP2963263B2 (en) Pneumatic soil rig
JP4462460B2 (en) Ditch drilling equipment
JPH07331652A (en) Method and equipment for forming consolidation pile
JP2018150774A (en) High pressure injection device and high pressure injection method
JPH0676689B2 (en) Method and device for removing existing piles
JPH09302659A (en) Construction method of drawing high pressure water injection type deformed place pile and device therefor
JP3429745B2 (en) Flexible boring type ground improvement method and its equipment
JPH03267492A (en) Underground hole excavator
KR102541969B1 (en) Bucket for excavator
JPH0665919A (en) Water jet device for joint steel plate cleaning device for underground continuous wall joint
JP2863157B1 (en) Hardening material injection method in sandy ground
JPH09228365A (en) Washing method of steel material for underground continuous wall, and washing device
JP2003025293A (en) Water jet injection nozzle device, and chipping method using it
JP3537191B2 (en) Multi-axis drilling rig

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060516

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20071017

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20071022

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20071120

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080118

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080118

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110201

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140201

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees