JP2004138299A - Hot water supply device - Google Patents

Hot water supply device Download PDF

Info

Publication number
JP2004138299A
JP2004138299A JP2002302755A JP2002302755A JP2004138299A JP 2004138299 A JP2004138299 A JP 2004138299A JP 2002302755 A JP2002302755 A JP 2002302755A JP 2002302755 A JP2002302755 A JP 2002302755A JP 2004138299 A JP2004138299 A JP 2004138299A
Authority
JP
Japan
Prior art keywords
hot water
days
amount
period
variation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2002302755A
Other languages
Japanese (ja)
Other versions
JP4100126B2 (en
Inventor
Koji Senda
千田 孝司
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daikin Industries Ltd
Original Assignee
Daikin Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daikin Industries Ltd filed Critical Daikin Industries Ltd
Priority to JP2002302755A priority Critical patent/JP4100126B2/en
Publication of JP2004138299A publication Critical patent/JP2004138299A/en
Application granted granted Critical
Publication of JP4100126B2 publication Critical patent/JP4100126B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Heat-Pump Type And Storage Water Heaters (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a hot water supply device capable of preventing the running-out of the hot water and reducing the running cost by inhibiting the hot water to be excessively stored for a long time. <P>SOLUTION: This hot water supply device comprises a hot water storage tank 3 and a heating source. A plurality of levels of amounts of hot water are determined corresponding to the necessary hot water heat quantity for one day, and the heating source is operated to supply the hot water heat quantity corresponding to the selected level of the amount of hot water to the hot water storage tank 3. The hot water heat quantity used by a user is learned in a learning period, and the control for appropriating the level of the amount of hot water to determine the necessary hot water heat quantity is performed based on the hot water heat quantity used by the user in the learning period. The learning period is adjusted based on a degree of variation of the hot water heat quantity used by the user. <P>COPYRIGHT: (C)2004,JPO

Description

【0001】
【発明の属する技術分野】
この発明は、加熱源にて加熱される温湯を貯める貯湯タンクを有する給湯装置に関するものである。
【0002】
【従来の技術】
給湯装置には、例えば、図9に示すようなヒートポンプ式給湯装置がある。このヒートポンプ式給湯装置は、貯湯タンク70を有するタンクユニット71と、冷媒回路72を有する熱源ユニット73とを備える。また、冷媒回路72は、圧縮機74と水熱交換器75と膨張弁77と蒸発器78とを順に接続して構成される。そして、タンクユニット71は、上記貯湯タンク70と循環路79とを備え、この循環路79には、水循環用ポンプ80と熱交換路81とが介設されている。この場合、熱交換路81は水熱交換器75にて構成される。
【0003】
上記装置においては、圧縮機74を駆動させると共に、ポンプ80を駆動(作動)させると、貯湯タンク70の底部に設けた取水口から貯溜水(温湯)が循環路79に流出し、これが熱交換路81を流通する。そのときこの温湯は水熱交換器75によって加熱され(沸き上げられ)、湯入口から貯湯タンク70の上部に返流される。これによって、貯湯タンク70に高温の温湯を貯めるものである。そして、現状の電力料金制度は深夜の電力料金単価が昼間に比べて安価に設定されているので、近年では、この運転は低額である深夜時間帯(例えば、23時から7時までの時間帯)に行い、ランニングコストの低減を図るようにする場合が多くなっている。
【0004】
そして、このような給湯装置では、ユーザの湯の使用量に応じて必要な熱量(湯量)を沸き上げるものである。このため、例えば、1日の必要湯熱量に応じて複数の階級(例えば、10段階)の湯量レベルを定めておき、この複数の階級の湯量レベルから選択された湯量レベルに応じた湯熱量を沸き上げる必要湯量確保運転を行うものがある。ところが、貯湯タンク内の湯が使用されて規定量以下となれば、昼間にその不足分の湯切れ追い焚き運転(以下、追い焚き運転という)を上記必要湯量確保運転とは別に行う必要が生じる。
【0005】
このような場合には、貯湯タンク70の湯がなくなる「湯切れ」現象を生じさせないために、次回の必要湯量確保運転において、その補充した追い焚き運転の運転時間に応じて上記湯量レベルを上昇させていた。また、ユーザ使用湯量(使用湯熱量)に対して沸上湯量が多い場合、この状態が所定日数(判定期間)以上継続すれば、次回の沸上運転において湯量レベルを下げるようにしている。これによって、湯量レベルをユーザ使用湯量に対応する適正レベルに収束させていた。
【0006】
また、従来には、季節に関わらず湯量不足が発生することのない電気料金の節約機能を備えた電気温水器があった(例えば、特許文献1参照。)。この特許文献1に記載された電気温水器は、残湯量検出センサの出力に基づく残湯量が規定量以上となる日が所定の期間連続したときには沸き上げ温度の設定値を一定値だけ下げる設定値変更手段と、この設定値変更手段での沸き上げ温度変更の下限値を規制する下限値設定手段とを備える。そして、この下限値設定手段にて、貯湯タンクへ供給する水の温度(給水温度)の変動に対応して下限値を変更するものであって、下限値は、この給水温度が低のときには高く、給水温度が高のときには低く設定するものである。
【0007】
【特許文献1】
特開平6−317353号公報(第2−3頁、図1)
【0008】
【発明が解決しようとする課題】
ところで、湯の使用状況はユーザによって相違し、上記のように湯量レベルを設定するものでは、貯湯タンク70の湯がなくなる「湯切れ」現象が生じないように、上記判断期間(例えば、7日)を長く設定していた。そのため、使用状況によっては、湯が十分貯えられているにもかかわらず、不足があるとして、長期にわたって昼間の時間帯に湯切れ追い焚き運転(以下、追い焚き運転という)を行う場合がある。このようなときには、この無駄な運転のために、ランニングコスト高となると共に、運転による騒音にてユーザが不快感を抱く場合もあった。
【0009】
また、上記特許文献1に記載の電気温水器では、下限値設定手段にて、貯湯タンクへ供給する水の温度(給水温度)の変動に対応して下限値を変更するものであるので、残湯量が多い日が長期連続して、沸き上げ温度の設定値を設定値変更手段にて低下させる場合に、冬場等においてその低下量を少なくして、湯量不足になるのを解消しているものである。しかしながら、この場合、ユーザ等の湯使用量に基づいて沸き上げ量を変更(調整)するものでなく、ユーザ等の湯使用量によっては、湯切れや湯過多が発生することになる。
【0010】
この発明は、上記従来の欠点を解決するためになされたものであって、その目的は、湯切れを回避することができると共に、湯過多状態が長期にわたるのを抑制してランニングコストを低減することが可能な給湯装置を提供することにある。
【0011】
【課題を解決するための手段】
そこで請求項1の給湯装置は、貯湯タンク3と、加熱源とを備えた給湯装置において、1日の必要湯熱量に応じて複数の階級の湯量レベルを定めておき、上記加熱源は、選択された湯量レベルに応じた湯熱量を上記貯湯タンクへと供給すべく作動する給湯装置であって、学習期間においてユーザ使用湯熱量を学習して、この学習期間におけるユーザ使用湯熱量に基づいて上記必要湯熱量を決定する湯量レベル適正化制御を行うように構成し、かつ上記学習期間をユーザ使用湯熱量のばらつき度合いに基づいて調整することを特徴としている。
【0012】
請求項1の給湯装置では、湯量レベル適正化制御により、湯量レベルをユーザ使用湯熱量に近づけることができ、湯熱量における過不足の発生を防止することができる。しかも、学習期間をユーザ使用湯熱量のばらつき度合いに基づいて調整するので、湯量レベルをできるだけ短い期間で適正レベルに収束させる(近づける)ことができる。
【0013】
請求項2の給湯装置は、上記ばらつき度合いが小さい場合には大きい場合よりも学習期間を短くすることを特徴としている。
【0014】
上記請求項2の給湯装置では、ばらつき度合いが小さい場合には、その湯量レベルが適正レベルに接近しており、このようなときには、学習期間を短くしても適正レベルに収束させることができる。また、ばらつき度合いが大きい場合、その湯量レベルが適正レベルに接近しておらず、学習期間を長くして、適正レベルに収束させるようにしている。
【0015】
請求項3の給湯装置は、期間判定用日数を設定し、この期間判定用日数内における略同一の残湯熱量である日数、及び上記期間判定用日数内における残湯熱量の異種類の数の少なくともいずれか一方に基づいて上記ばらつき度合いを判断することを特徴としている。
【0016】
上記請求項3の給湯装置では、期間判定用日数を設定し、この期間判定用日数内における略同一の残湯熱量である日数や、上記期間判定用日数内における残湯熱量の異種類の数にてばらつき度合いを判断するので、このばらつき度合いの信頼性が高く、このばらつき度合いに基づいて設定した学習期間で湯量レベルを適正レベルに収束させることができる。
【0017】
請求項4の給湯装置は、上記期間判定用日数内における略同一の残湯熱量である日が、この期間判定用日数よりも短いばらつき判定日数以上のときに、ばらつき度合いを小として上記学習期間を短期日数とすることを特徴としている。
【0018】
上記請求項4の給湯装置では、期間判定用日数内における略同一の残湯熱量である日が、この期間判定用日数よりも短いばらつき判定日数以上のときに、ばらつき度合いを小と判定するので、この判定の信頼性は高く、このような場合に学習期間を短くしても湯量レベルを安定して収束させることができる。
【0019】
請求項5の給湯装置は、上記期間判定用日数内における異なる残湯熱量が2種類以内のときに、ばらつき度合いを小として上記学習期間を短期日数とすることを特徴としている。
【0020】
上記請求項5の給湯装置では、上記期間判定用日数内における異なる残湯熱量が2種類以内のときに、ばらつき度合いを小と判定するので、この判定の信頼性は高く、このような場合に学習期間を短くしても湯量レベルを安定して収束させることができる。
【0021】
【発明の実施の形態】
次に、この発明の給湯装置の具体的な実施の形態について、図面を参照しつつ詳細に説明する。図1はこの給湯装置(ヒートポンプ式給湯装置)の簡略図を示し、この給湯装置は、タンクユニット1とヒートポンプユニット2(加熱源)を備え、タンクユニット1の温湯をヒートポンプユニット2にて加熱するものである。このタンクユニット1は貯湯タンク3を備え、この貯湯タンク3に貯湯された温湯が図示省略の浴槽等に供給される。すなわち、貯湯タンク3には、その底壁に給水口5が設けられると共に、その上壁に出湯口6が設けられている。そして、給水口5から貯湯タンク3に市水が供給され、出湯口6から高温の温湯が出湯される。また、貯湯タンク3には、その底壁に取水口10が開設されると共に、周壁の上部に湯入口11が開設され、取水口10と湯入口11とが循環路12にて連結されている。そして、この循環路12に水循環用ポンプ13と熱交換路14とが介設されている。なお、給水口5には給水用流路8が接続されている。
【0022】
ところで、貯湯タンク3には、上下方向に所定ピッチで少なくとも4個の残湯量検出器(温度センサ)18a、18b、18c、18dが設けられている。上記各温度センサ18a・・は、例えば、それぞれサーミスタからなる。また、上記循環路12には、熱交換路14の入口側に取水サーミスタ20が設けられると共に、熱交換路14の出口側に出湯サーミスタ21が設けられている。
【0023】
次に、ヒートポンプユニット(熱源ユニット)2は冷媒回路を備え、この冷媒回路は、圧縮機25と、熱交換路14を構成する水熱交換器26と、減圧機構(膨張弁)27と、空気熱交換器28とを順に接続して構成される。すなわち、圧縮機25と水熱交換器26とを冷媒通路29にて接続し、水熱交換器26と膨張弁27とを冷媒通路30にて接続し、膨張弁27と空気熱交換器28とを冷媒通路31にて接続し、空気熱交換器28と圧縮機25とをアキュームレータ32が介設された冷媒通路33にて接続している。これにより、圧縮機25が駆動すると、水熱交換器26において熱交換路14を流れる水が加熱されることになる。なお、この冷媒回路の冷媒には、例えば、自然系冷媒として炭酸ガス等の超臨界冷媒を用いることができる。また、空気熱交換器28にはこの空気熱交換器28の能力を調整するファン34が付設されている。
【0024】
ところで、この給湯装置の制御部は、図3に示すように、残湯量検出手段37と、この検出手段37からのデータ(数値)が入力される制御手段38とを備える。すなわち、図1に示すように、残湯量検出手段37は、貯湯タンク3に付設された残湯量検出器18a、18b、18c、18dにて構成することができる。そして、図2に示すように、残湯量検出器18aの温度(タンク温度T1)、残湯量検出器18bの温度(タンク温度T2)、残湯量検出器18cの温度(タンク温度T3)、残湯量検出器18dの温度(タンク温度T4)、取水サーミスタ20の温度(入水温度T6)等が制御手段(コントローラ)38に入力され、これらのデータに基づいて、水循環用ポンプ13と圧縮機25とを駆動して、後述するような運転が行われる。なお、上記制御手段38は例えばマイクロコンピュータを用いて構成することができる。
【0025】
上記のように構成された給湯装置によれば、圧縮機25を駆動させると共に、水循環用ポンプ13を駆動(作動)させると、貯湯タンク3の底部に設けた取水口10から貯溜水(温湯)が流出し、これが循環路12の熱交換路14を流通する。そのときこの温湯は水熱交換器26によって加熱され(沸き上げられ)、湯入口11から貯湯タンク3の上部に返流される。このような動作を継続して行うことによって、貯湯タンク3に高温の温湯を貯湯することができる。
【0026】
この場合、深夜時間(23時から次の日の午前7時)帯のある時刻(例えば、深夜時間開始後の24時等)から所定時間の間運転して、所定時刻(深夜時間終了時刻、つまり午前7時)で所定容量(例えば、貯湯タンク3の容量)の湯を沸き上げる全量沸き上げ運転を行うものである。また、一日の必要湯量がこの貯湯タンク3の容量を越える場合には、深夜時間の全量沸き上げ運転を行った後、さらに深夜時間外の昼間において追加追い焚き運転(以下、追加運転という)を行って、その一日の必要湯量を確保するものである。すなわち、一日の必要湯量を沸き上げる運転を必要湯量確保運転と呼ぶものとすると、この場合、必要湯量確保運転には、深夜時間帯での全量沸き上げ運転のみを行う場合と、深夜時間帯での全量沸き上げ運転と追加運転との両者を行う場合がある。
【0027】
この場合、沸き上げ運転には、自動設定運転と、手動設定運転とがあり、自動設定運転では、1日の必要湯熱量に応じて複数の階級の湯量レベルを定めておき、加熱源(ヒートポンプユニット)は、選択された湯量レベルに応じた湯熱量を上記貯湯タンク3へと供給すべく自動的に作動するように設定される。
【0028】
ここで、湯量レベルとは、例えば次の表1のように、1〜10段階のレベルを備えるものである。すなわち、この表1において、レベル1は65℃の湯を所定量(貯湯タンク3の容量)分沸き上げるものであり、レベル2は70℃の湯を貯湯タンク3の容量分沸き上げるものであり、レベル3は75℃の湯を貯湯タンク3の容量分沸き上げるものであり、レベル4〜レベル6は80℃の湯を貯湯タンク3の容量分沸き上げるものであり、レベル7〜レベル9は85℃の湯を貯湯タンク3の容量分沸き上げるものであり、レベル10は90℃の湯を貯湯タンク3の容量分沸き上げるものである。また、レベル1〜レベル4までは深夜時間帯のみの運転であり、レベル5〜レベル10までは昼間の追加運転を行うが、レベル5では昼間の運転時間を1時間とし、レベル6及びレベル7では昼間の運転時間を2時間とし、レベル8では昼間の運転時間を3時間とし、レベル9及びレベル10では昼間の運転時間を4時間としている。このように、等級が上昇するほど湯熱量が多いことになる。
【0029】
【表1】

Figure 2004138299
【0030】
また、手動設定の場合、「少なめ」と、「標準」と、「多め」と、「連続」とがある。「少なめ」では、65℃の湯を所定量(貯湯タンク3の容量)分沸き上げるものであり、昼間の運転は行わない。「標準」と「多め」と「連続」では、85℃の湯を貯湯タンク3の容量分沸き上げるものである。また、「標準」では昼間の追加運転は行わず、「多め」では、2時間以内の昼間の追加運転を行い、「連続」では、昼間の追加運転に対して制限を行わない。
【0031】
そして、ある湯量レベルで運転した場合に、昼間に多く使用されて、この湯量レベルでの湯熱量では、湯切れを起こす場合には、この昼間において、この使用により不足分を補うために、上記追加運転とは別に湯切れ追い焚き運転(以下、追い焚き運転という)を行うことになる。上記追い焚き運転は、図4のフローチャート図に示すように行われる。この場合、まず、ステップS1でT1(貯湯タンク3の頂部側の温度センサ18aの温度)が低温側基準温度(例えば45℃)以下か否かを判定する。45℃を越えていれば、追い焚きする必要がなく、そのままの状態を維持する。T1が45℃以下であれば、追い焚き運転を行う必要があるので、ステップS2へ移行して追い焚き運転を開始する。
【0032】
その後、ステップS3へ移行して、T1が高温側基準温度(例えば60℃)以上か否かを判定する。60℃以上であれば、追い焚きする必要がないので、追い焚きを終了する。また、60℃未満であれば、追い焚き運転を継続する。
【0033】
そして、この追い焚き運転の運転時間から不足分を把握して、次回においては、この追い焚き運転に応じた不足分を補うために、湯量レベルを前回の湯量レベルよりも上昇させて、この上昇させた湯量レベルの供給湯熱量での沸き上げ運転を行うことになる。
【0034】
また、湯過多状態が基準判定期間(例えば、1週間)にわたって継続したときには、湯量レベルを1段階だけ低下させる。ところで、湯過多状態か否かは、例えば、追い焚き運転開始の基準となる温度センサ18aよりも下方の温度センサ18bの検出温度T2が、基準温度(例えば、45℃)以上かを判定することによって、判断することができる。
【0035】
このように、この給湯装置は、湯熱量に不足が生じたときには、次回の湯熱量をそれに応じて上記湯量レベルを上昇させ、また、湯熱量の過多状態が基準判定期間(学習期間)にわたって継続したときには、湯量レベルを低下させる湯量レベル適正化制御を行うように構成している。
【0036】
そして、この給湯装置では、上記学習期間をユーザ使用湯熱量のばらつき度合いに基づいて調整している。すなわち、ばらつき度合いが小さい場合には大きい場合よりも学習期間を短くしている。この際、期間判定用日数を設定し、この期間判定用日数内における略同一の残湯熱量である日数、及び上記期間判定用日数内における残湯熱量の異種類の数の少なくともいずれか一方に基づいて上記ばらつき度合いを判断する。そして、この学習期間は例えば図5のフローチャートのように決定される。
【0037】
この場合、まず、ステップS5のように、過去7日(上記期間判定用日数)中、3日(ばらつき判定日数)以上同一(ここでの同一とは、完全同一及び略同一を含む)余剰か否かを判断する。この余剰は、湯過多を意味し、残湯(湯熱量)−設定残湯(設定湯熱量)で求めることができる。そして、このステップS5で過去7日中、3日以上同一余剰であれば、ステップS6へ移行して、その使用状態が「安定」(ばらつき度合いが小)であると判断する。また、ステップS5で過去7日中、3日以上同一余剰でなければ、ステップS7へ移行して、過去7日の余剰が2パターン以内かを判断する。
【0038】
このステップS7で、過去7日の余剰が2パターン以内であれば、ステップS6へ移行し、過去7日の余剰が2パターン(期間判定用日数内における残湯熱量の異種類の数)以内でなければ、ステップS8へ移行して、その使用状態が「不安定」(ばらつき度合いが大)であると判断する。そして、上記ステップS6で「安定」と判断されれば、ステップS9へ移行して学習期間を短期日数(この場合3日)とする。また、上記ステップS8で「不安定」と判断されれば、ステップS10へ移行して学習期間を長期日数(この場合7日)とする。
【0039】
このように、学習期間をユーザ使用湯熱量のばらつき度合いに基づいて調整することになるが、この学習期間を調整しないときの湯量レベル適正化制御について図7を使用して説明する。この湯量レベル適正化制御の処理を開始して、ステップS11にて全量沸き上げ(例えば図8の▲1▼の全量沸き上げ)か否かを判定する。この場合、全量沸き上げでなければ、この沸き上げとなるまで待つ。また、全量沸き上げであれば、この全量沸き上げ運転を行う。次に、ステップS12へ移行して、この湯量レベルの運転で湯過多になるかを判定する。すなわち、湯過多(余剰)は、残湯(湯熱量)−設定残湯(設定湯熱量)で求めることができる。
【0040】
次に、ステップS13でこの余剰が0で有るか否かを判断する。余剰が0であれば、この湯量レベルが適正であるので、ステップS14へ移行して、前回の全量沸き上げ運転において余剰があるときにカウントするカウンタ(図示省略)の湯量カウントをクリアしてステップS18へ移行して次回(図8の▲2▼)の全量沸き上げを行う。また、ステップS13で余剰があれば、ステップS15へ移行して残湯カウントを「1」加え、ステップS16へ移行する。このステップS16では、残湯カウントが設定されている基準判定期間値(学習期間値)以上か否かを判断する。そして、ステップS16で残湯カウントが学習期間値以上であれば、ステップS17へ移行して湯量レベルを低下(ダウン)させて、ステップS18へ移行して次回(図8の▲2▼)の全量沸き上げを行う。また、ステップS16で残湯カウントが学習期間値未満であれば、ステップS18へ移行して湯量レベルをそのままとして次回の全量沸き上げを行う。そして、ステップS18へ移行後はステップS11に戻り、全量沸き上げ(この場合図8の▲3▼の全量沸き上げ)か否かを判定する。以下この制御が行われて、湯量レベルを適正レベルに収束させるものである。
【0041】
しかしながら、学習期間を調整しないものであれば、使用状況によっては、湯が十分貯えられているにもかかわらず、不足がありとして、昼間の時間帯に湯切れ追い焚き運転(以下、追い焚き運転という)を行う場合がある。そこで、この装置では、学習期間をユーザ使用湯熱量のばらつき度合いに基づいて調整することによって、湯量レベルをできるだけ短い期間で適正レベルに収束させようとしている。
【0042】
このため、図6に示すように、学習期間を判定するようにしている。すなわち、図7の場合と同様にステップS12までの処理を行い、その後、ステップS20へ移行して、上記図5の学習期間判定の処理を行う。このため、使用状態が安定していれば、この学習期間を3日とし、使用状態が不安定であれば、この学習期間を7日とする。その後、ステップS21へ移行して、ステップS21でこの余剰が0で有るか否かを判断する。余剰が0であれば、この湯量レベルが適正であるので、ステップS22へ移行して、湯量カウントをクリアしてステップS26へ移行して次回(図8の▲2▼)の全量沸き上げを行う。また、ステップS21で余剰があれば、ステップS23へ移行して残湯カウントを「1」加え、ステップS24へ移行する。このステップS24では、上記のステップS20で決定した基準判定期間値(学習期間値)以上か否かを判断する。そして、ステップS24で残湯カウントが学習期間値以上であれば、ステップS25へ移行して湯量レベルを低下(ダウン)させて、ステップS26へ移行して次回(図8の▲2▼)の全量沸き上げを行う。また、ステップS24で残湯カウントが学習期間値未満であれば、ステップS26へ移行して湯量レベルをそのままとして次回の全量沸き上げを行う。そして、ステップS26へ移行後はステップS11に戻り、全量沸き上げ(この場合図8の▲3▼の全量沸き上げ)か否かを判定する。以下この制御が行われて、湯量レベルを適正レベルに収束させるものである。
【0043】
このように、学習期間をユーザ使用湯熱量のばらつき度合いに基づいて調整することによって、湯量レベルをできるだけ短い期間で適正レベルに収束させることができ、無駄な沸き上げ運転を少なくでき、ランニングコストの低減を達成できる。また、ばらつき度合いが小さい場合には、その湯量レベルが適正レベルに接近しており、このようなときには、学習期間を短くしても適正レベルに収束させることができる。また、ばらつき度合いが大きい場合、その湯量レベルが適正レベルに接近しておらず、学習期間を長くして、適正レベルに収束させるようにしている。さらに、ばらつき度合いは、期間判定用日数を設定し、この期間判定用日数内における略同一の残湯熱量である日数や、上記期間判定用日数内における残湯熱量の異種類の数にてばらつき度合いを判断するので、信頼性が高く、このばらつき度合いに基づいて設定した学習期間で湯量レベルを適正レベルに収束させることができる。
【0044】
以上にこの発明の具体的な実施の形態について説明したが、この発明は上記形態に限定されるものではなく、この発明の範囲内で種々変更して実施することができる。例えば、学習期間として7日(長期日数)や3日(短期日数)に限るものではなく、また、図5のフローチャートにおいて、学習期間を判定する際の期間判定用日数が7であるが、この日数の増減は自由であり、ステップS5の同一余剰のカウント日数の変更も可能であり、ステップS7における余剰が相違するパターンとして3パターン以上であってもよい。また、学習期間を判定する場合の条件として、上記実施の形態では、期間判定用日数を設定し、この期間判定用日数内における略同一の残湯熱量である日数(上記実施の形態では、図5のステップS5における3日)、及び期間判定用日数内における残湯熱量の異種類の数(上記実施の形態では、図5のステップS7における2パターン)を使用したが、どちらか一方のみの使用であってもよい。すなわち、期間判定用日数内における略同一の残湯熱量である日数、及び上記期間判定用日数内における残湯熱量の異種類の数の少なくともいずれか一方に基づけばよい。また、湯量レベルも上記表1に示すものに限らず、種々のレベルのものに設定でき、10段階に限るものではない。さらに、追い焚き運転を開始する基準となる温度、追い焚き運転を停止する基準となる温度、及び湯過多状態の判定の基準となる温度としても、もちろんユーザ等の好みや季節等に応じて変更することができる。なお、給湯装置として、上記実施の形態のように、ヒートポンプ式給湯装置を使用した場合、冷媒回路の冷媒として炭酸ガスを用いるのが好ましいが、その他、ジクロロジフルオロメタン(R−12)やクロロジフルオロメタン(R−22)のような冷媒であっても、オゾン層の破壊、環境汚染等の問題から、1,1,1,2−テトラフルオロエタン(R−134a)のような代替冷媒であってもよい。また、給湯装置としては、電気式給湯装置やガス式給湯装置であってもよい。
【0045】
【発明の効果】
請求項1の給湯装置によれば、湯量レベル適正化制御により、湯量レベルをユーザ使用湯熱量に近づけることができ、湯熱量における過不足の発生を防止することができる。しかも、学習期間をユーザ使用湯熱量のばらつき度合いに基づいて調整するので、湯量レベルをできるだけ短い期間で適正レベルに収束させることができ、無駄な沸き上げ運転を少なくでき、ランニングコストの低減を達成できる。
【0046】
請求項2の給湯装置によれば、ばらつき度合いが小さい場合には、その湯量レベルが適正レベルに接近しており、このようなときには、学習期間を短くしても適正レベルに収束させることができる。また、ばらつき度合いが大きい場合、その湯量レベルが適正レベルに接近しておらず、学習期間を長くして、適正レベルに収束させようにしている。このため、湯量レベルを最適な学習期間で安定して適正レベルに収束させることができ、無駄な運転を確実に回避することができる。
【0047】
請求項3の給湯装置によれば、期間判定用日数を設定し、この期間判定用日数内における略同一の残湯熱量である日数や、上記期間判定用日数内における残湯熱量の異種類の数にてばらつき度合いを判断するので、このばらつき度合いの信頼性が高く、このばらつき度合いに基づいて設定した学習期間で湯量レベルを適正レベルに収束させることができる。
【0048】
請求項4又は請求項5の給湯装置によれば、判定の信頼性は高く、学習期間を短くしても湯量レベルを安定して収束させることができる。このため、無駄な運転の確実な回避が可能となって、ランニングコストの低減を有効に達成できる。
【図面の簡単な説明】
【図1】この発明の給湯装置の実施形態を示す簡略図である。
【図2】上記給湯装置の制御部に入力されるデータを示す簡略ブロック図である。
【図3】上記給湯装置の制御部の簡略ブロック図である。
【図4】上記給湯装置の追い焚き運転を示すフローチャート図である。
【図5】上記給湯装置の学習期間を決定するフローチャート図である。
【図6】上記給湯装置の湯量レベル適正化制御において学習期間を変更しない場合のフローチャート図である。
【図7】上記給湯装置の湯量レベル適正化制御を示すフローチャート図である。
【図8】全量沸き上げを行う時間帯を示すタイムチャート図である。
【図9】従来の給湯装置の簡略図である。
【符号の説明】
3 貯湯タンク[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a hot water supply device having a hot water storage tank for storing hot water heated by a heating source.
[0002]
[Prior art]
Examples of the hot water supply device include a heat pump type hot water supply device as shown in FIG. This heat pump hot water supply device includes a tank unit 71 having a hot water storage tank 70 and a heat source unit 73 having a refrigerant circuit 72. The refrigerant circuit 72 is configured by sequentially connecting a compressor 74, a water heat exchanger 75, an expansion valve 77, and an evaporator 78. The tank unit 71 includes the hot water storage tank 70 and a circulation path 79, and a water circulation pump 80 and a heat exchange path 81 are interposed in the circulation path 79. In this case, the heat exchange path 81 includes the water heat exchanger 75.
[0003]
In the above-described apparatus, when the compressor 74 is driven and the pump 80 is driven (operated), the stored water (hot water) flows out of the water intake port provided at the bottom of the hot water storage tank 70 into the circulation path 79, and this is used for heat exchange. The road 81 is distributed. At this time, the hot water is heated (boiled) by the water heat exchanger 75 and returned to the upper portion of the hot water storage tank 70 from the hot water inlet. Thus, the hot water is stored in the hot water storage tank 70. In the current power rate system, the unit price of the power rate at midnight is set lower than in the daytime. In recent years, this operation has been performed in a late night time zone (for example, a time zone from 23:00 to 7:00). ) To reduce the running cost.
[0004]
In such a hot water supply apparatus, a necessary amount of heat (amount of hot water) is heated in accordance with the amount of hot water used by the user. For this reason, for example, the water level of a plurality of classes (for example, 10 levels) is determined according to the required amount of hot water per day, and the amount of hot water corresponding to the water level selected from the water levels of the plurality of classes is determined. There is one that performs a required amount of hot water operation for boiling. However, if the amount of hot water in the hot water storage tank is used and becomes less than the prescribed amount, it becomes necessary to perform the shortage of hot water reheating operation (hereinafter, referred to as reheating operation) in the daytime separately from the above-described required amount of hot water securing operation. .
[0005]
In such a case, in order to prevent the phenomenon of running out of hot water from running out of hot water in the hot water storage tank 70, in the next necessary hot water securing operation, the above hot water level is increased in accordance with the operation time of the supplementary reheating operation. I was letting it. Further, when the amount of boiling water is larger than the amount of hot water used by the user (the amount of hot water used), if this state continues for a predetermined number of days (determination period) or more, the level of the hot water is reduced in the next boiling operation. This converges the hot water level to an appropriate level corresponding to the user's hot water usage.
[0006]
In addition, conventionally, there has been an electric water heater having a function of saving an electricity rate without a shortage of hot water regardless of the season (for example, see Patent Document 1). The electric water heater described in Patent Literature 1 has a set value for lowering the set value of the boiling temperature by a fixed value when a day when the remaining hot water amount based on the output of the remaining hot water amount detection sensor is equal to or more than a specified amount continues for a predetermined period. And a lower limit value setting unit that regulates a lower limit value of the boiling temperature change by the set value changing unit. The lower limit value is changed by the lower limit value setting means in response to a change in the temperature of the water supplied to the hot water storage tank (water supply temperature). , When the supply water temperature is high.
[0007]
[Patent Document 1]
JP-A-6-317353 (page 2-3, FIG. 1)
[0008]
[Problems to be solved by the invention]
By the way, the use condition of hot water differs depending on the user, and in the case of setting the hot water level as described above, the determination period (for example, 7 days) is used so that the phenomenon of running out of hot water in hot water storage tank 70 does not occur. ) Was set longer. For this reason, depending on the situation of use, there may be a case where a hot water replenishing operation (hereinafter referred to as a reheating operation) is performed over a long period of time in the daytime for a long period of time, even though the hot water is sufficiently stored. In such a case, the running cost increases due to the useless driving, and the user sometimes feels uncomfortable due to the noise caused by the driving.
[0009]
Further, in the electric water heater described in Patent Document 1, the lower limit value is changed by the lower limit value setting means in response to a change in the temperature of the water supplied to the hot water storage tank (water supply temperature). When the set value of the boiling temperature is reduced by the set value changing means for a long time on a day with a large amount of hot water for a long time, the amount of decrease is reduced in winter or the like to eliminate shortage of hot water. It is. However, in this case, the amount of hot water is not changed (adjusted) based on the amount of hot water used by the user or the like, and depending on the amount of hot water used by the user or the like, running out of hot water or excessive hot water may occur.
[0010]
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned conventional drawbacks, and an object of the present invention is to prevent running out of hot water and to reduce running costs by suppressing the excessive hot water state for a long time. It is to provide a hot water supply device capable of performing the above.
[0011]
[Means for Solving the Problems]
Therefore, in the hot water supply apparatus of the first aspect, in a hot water supply apparatus having a hot water storage tank 3 and a heating source, a plurality of levels of hot water levels are determined in accordance with the required amount of hot water per day, and the heating source is selected. A hot water supply device operable to supply a hot water amount corresponding to the determined hot water amount level to the hot water storage tank. The hot water supply device learns a user's hot water amount during a learning period, and performs the above operation based on the user's hot water amount during the learning period. The present invention is characterized in that the hot water level adjustment control for determining the required hot water amount is performed, and the learning period is adjusted based on the degree of variation of the hot water amount used by the user.
[0012]
In the hot water supply apparatus according to the first aspect, the hot water level adjustment control can make the hot water level close to the hot water amount used by the user, and can prevent an excess or deficiency in the hot water amount. Moreover, since the learning period is adjusted based on the degree of variation in the amount of hot water used by the user, the level of the hot water can be converged (closer) to an appropriate level in a period as short as possible.
[0013]
The hot water supply apparatus according to claim 2 is characterized in that the learning period is shorter when the degree of variation is small than when it is large.
[0014]
In the hot water supply apparatus according to the second aspect, when the degree of variation is small, the hot water level approaches an appropriate level. In such a case, even if the learning period is shortened, it is possible to converge to the appropriate level. When the degree of variation is large, the hot water level is not approaching the appropriate level, and the learning period is lengthened to converge on the appropriate level.
[0015]
The hot water supply device according to claim 3 sets the number of days for the period determination, and determines the number of days having substantially the same remaining amount of hot water in the number of days for the period determination, and the number of different types of the remaining amount of heat in the number of days for the period determination. It is characterized in that the degree of variation is determined based on at least one of them.
[0016]
In the hot water supply apparatus according to the third aspect, the number of days for the period determination is set, and the number of days having substantially the same remaining amount of hot water in the number of days for the period determination and the number of different types of the remaining amount of heat in the number of days for the period determination are set. , The reliability of the degree of variation is high, and the hot water level can be made to converge to an appropriate level in the learning period set based on the degree of variation.
[0017]
The hot water supply apparatus according to claim 4, wherein when the days having substantially the same remaining hot water calories within the period determination days are equal to or greater than the variation determination days shorter than the period determination days, the degree of variation is reduced and the learning period is reduced. Is a short term.
[0018]
In the hot water supply apparatus according to the fourth aspect, the degree of variation is determined to be small when the days having substantially the same remaining hot water calories within the number of days for period determination are equal to or more than the number of days for variation determination shorter than the number of days for period determination. The reliability of this determination is high, and in such a case, even if the learning period is shortened, the hot water level can be stably converged.
[0019]
The hot water supply apparatus according to claim 5 is characterized in that, when there are no more than two kinds of remaining hot water calories within the number of days for the period determination, the degree of variation is small and the learning period is a short number of days.
[0020]
In the hot water supply apparatus according to the fifth aspect, the degree of variation is determined to be small when there are no more than two types of remaining hot water calories within the number of days for the period determination, and thus the reliability of this determination is high. Even if the learning period is shortened, the hot water level can be stably converged.
[0021]
BEST MODE FOR CARRYING OUT THE INVENTION
Next, specific embodiments of the hot water supply apparatus of the present invention will be described in detail with reference to the drawings. FIG. 1 shows a simplified diagram of this hot water supply device (heat pump type hot water supply device). The hot water supply device includes a tank unit 1 and a heat pump unit 2 (heating source), and the hot water of the tank unit 1 is heated by the heat pump unit 2. Things. The tank unit 1 includes a hot water storage tank 3, and hot water stored in the hot water storage tank 3 is supplied to a bathtub (not shown). That is, the hot water storage tank 3 is provided with a water supply port 5 on its bottom wall and a water outlet 6 on its upper wall. Then, city water is supplied from the water supply port 5 to the hot water storage tank 3, and high-temperature hot water is supplied from the water supply port 6. In the hot water storage tank 3, a water inlet 10 is opened on a bottom wall thereof, and a hot water inlet 11 is opened on an upper part of a peripheral wall, and the water inlet 10 and the hot water inlet 11 are connected by a circulation path 12. . The circulation path 12 is provided with a water circulation pump 13 and a heat exchange path 14. The water supply port 5 is connected to a water supply channel 8.
[0022]
By the way, the hot water storage tank 3 is provided with at least four remaining hot water amount detectors (temperature sensors) 18a, 18b, 18c and 18d at a predetermined pitch in the vertical direction. Each of the temperature sensors 18a is composed of, for example, a thermistor. In the circulation path 12, a water intake thermistor 20 is provided on the inlet side of the heat exchange path 14, and a tapping thermistor 21 is provided on the outlet side of the heat exchange path 14.
[0023]
Next, the heat pump unit (heat source unit) 2 includes a refrigerant circuit. The refrigerant circuit includes a compressor 25, a water heat exchanger 26 forming the heat exchange path 14, a pressure reducing mechanism (expansion valve) 27, and air. The heat exchanger 28 is connected in order. That is, the compressor 25 and the water heat exchanger 26 are connected through the refrigerant passage 29, the water heat exchanger 26 and the expansion valve 27 are connected through the refrigerant passage 30, and the expansion valve 27 and the air heat exchanger 28 are connected. Are connected by a refrigerant passage 31, and the air heat exchanger 28 and the compressor 25 are connected by a refrigerant passage 33 in which an accumulator 32 is interposed. Thereby, when the compressor 25 is driven, the water flowing through the heat exchange path 14 in the water heat exchanger 26 is heated. In addition, as a refrigerant of this refrigerant circuit, for example, a supercritical refrigerant such as carbon dioxide gas can be used as a natural refrigerant. Further, the air heat exchanger 28 is provided with a fan 34 for adjusting the capacity of the air heat exchanger 28.
[0024]
By the way, as shown in FIG. 3, the control unit of the hot water supply device includes a remaining hot water amount detecting means 37 and a control means 38 to which data (numerical value) from the detecting means 37 is input. That is, as shown in FIG. 1, the remaining hot water amount detecting means 37 can be constituted by remaining hot water amount detectors 18a, 18b, 18c and 18d attached to the hot water storage tank 3. Then, as shown in FIG. 2, the temperature of the remaining hot water detector 18a (tank temperature T1), the temperature of the remaining hot water detector 18b (tank temperature T2), the temperature of the remaining hot water detector 18c (tank temperature T3), and the remaining hot water The temperature of the detector 18d (tank temperature T4), the temperature of the water intake thermistor 20 (water inlet temperature T6), and the like are input to the control means (controller) 38. Based on these data, the water circulation pump 13 and the compressor 25 are operated. By driving, an operation as described later is performed. The control means 38 can be constituted by using, for example, a microcomputer.
[0025]
According to the hot water supply apparatus configured as described above, when the compressor 25 is driven and the water circulation pump 13 is driven (operated), the stored water (hot water) is supplied from the water intake port 10 provided at the bottom of the hot water storage tank 3. Flows out, and flows through the heat exchange path 14 of the circulation path 12. At this time, the hot water is heated (boiled) by the water heat exchanger 26 and returned to the upper portion of the hot water storage tank 3 from the hot water inlet 11. By continuously performing such an operation, hot hot water can be stored in the hot water storage tank 3.
[0026]
In this case, the vehicle is driven for a predetermined time from a certain time (for example, 24:00 after the start of the midnight time) at a certain time (for example, 24:00 after the start of the midnight time) at a certain time (the midnight time end time, That is, at 7:00 a.m., a full-boiling operation is performed in which a predetermined amount of water (for example, the capacity of the hot water storage tank 3) is heated. If the required amount of hot water per day exceeds the capacity of the hot water storage tank 3, after performing the full-boiling operation at midnight hours, an additional reheating operation (hereinafter referred to as additional operation) during the daytime outside of midnight hours. To secure the required amount of hot water for the day. That is, assuming that the operation of boiling the required amount of hot water per day is referred to as the required amount of hot water operation, in this case, the required amount of hot water operation is performed only in the case of performing only the full amount boiling operation in the late night time zone and in the case of the late night time zone. In some cases, both the full-boiling operation and the additional operation are performed.
[0027]
In this case, the boiling operation includes an automatic setting operation and a manual setting operation. In the automatic setting operation, a plurality of levels of hot water levels are determined according to the required hot water amount per day, and a heating source (heat pump) is set. The unit) is set so as to automatically operate to supply the hot water quantity corresponding to the selected hot water level to the hot water storage tank 3.
[0028]
Here, the hot water level has, for example, 1 to 10 levels as shown in Table 1 below. That is, in Table 1, level 1 is for boiling hot water of 65 ° C. by a predetermined amount (capacity of hot water storage tank 3), and level 2 is for boiling 70 ° C. hot water by the capacity of hot water storage tank 3. Level 3 is for boiling hot water of 75 ° C. by the capacity of the hot water storage tank 3, Level 4 to Level 6 is for boiling hot water of 80 ° C. for the capacity of the hot water storage tank 3, and Levels 7 to 9 are for boiling The hot water of 85 ° C. is boiled by the capacity of the hot water storage tank 3, and the level 10 is that of 90 ° C. hot water is boiled by the capacity of the hot water storage tank 3. Levels 1 to 4 are driving only in the midnight hours, and level 5 to level 10 perform additional daytime driving. However, level 5 has daytime driving time of 1 hour, level 6 and level 7 In the example, the daytime driving time is 2 hours, the daytime driving time is 3 hours at level 8, and the daytime driving time is 4 hours at levels 9 and 10. Thus, the higher the grade, the greater the amount of hot water.
[0029]
[Table 1]
Figure 2004138299
[0030]
In the case of manual setting, there are “small”, “standard”, “large”, and “continuous”. In "less", the hot water at 65 ° C. is boiled by a predetermined amount (capacity of the hot water storage tank 3), and the daytime operation is not performed. “Standard”, “large” and “continuous” are those in which hot water of 85 ° C. is boiled by the capacity of the hot water storage tank 3. Further, in the "standard", no additional operation in the daytime is performed, in the "more", the additional operation in the daytime within two hours is performed, and in the "continuous", the additional operation in the daytime is not limited.
[0031]
And when it is operated at a certain hot water level, it is often used in the daytime, and in the hot water at this hot water level, when the hot water runs out, in this daytime, in order to make up for the shortage by this use, In addition to the additional operation, a hot-water reheating operation (hereinafter referred to as reheating operation) is performed. The reheating operation is performed as shown in the flowchart of FIG. In this case, first, in step S1, it is determined whether or not T1 (the temperature of the temperature sensor 18a on the top side of the hot water storage tank 3) is equal to or lower than the low-side reference temperature (for example, 45 ° C.). If the temperature exceeds 45 ° C., there is no need to reheat, and the state is maintained as it is. If T1 is equal to or lower than 45 ° C., it is necessary to perform the reheating operation. Therefore, the process shifts to step S2 to start the reheating operation.
[0032]
Thereafter, the process proceeds to step S3, and it is determined whether or not T1 is equal to or higher than the high-temperature side reference temperature (for example, 60 ° C.). If the temperature is equal to or higher than 60 ° C., the reheating is not necessary, and the reheating is ended. If the temperature is lower than 60 ° C., the reheating operation is continued.
[0033]
Then, the shortage is grasped from the operation time of the reheating operation, and in the next time, in order to compensate for the shortage corresponding to the reheating operation, the hot water level is raised from the previous hot water level, and The boiling operation is performed at the supplied hot water amount at the set hot water level.
[0034]
When the excess hot water state continues for the reference determination period (for example, one week), the hot water level is reduced by one step. By the way, whether or not there is an excessive amount of hot water is determined by, for example, determining whether or not the detected temperature T2 of the temperature sensor 18b below the temperature sensor 18a serving as the reference for starting the reheating operation is equal to or higher than a reference temperature (for example, 45 ° C.). Can be determined.
[0035]
In this way, when the amount of hot water is insufficient, the hot water supply apparatus raises the level of the hot water next time in response to the shortage, and the excessive amount of hot water continues for the reference determination period (learning period). In such a case, the system is configured to perform the hot water level adjustment control for reducing the hot water level.
[0036]
In this water heater, the learning period is adjusted based on the degree of variation in the amount of hot water used by the user. That is, the learning period is shorter when the degree of variation is small than when it is large. At this time, the number of days for the period determination is set, and at least one of the number of days having substantially the same remaining amount of hot water in the number of days for the period determination and the number of different types of the remaining amount of hot water in the number of days for the period determination is set. The degree of variation is determined based on the above. The learning period is determined, for example, as shown in the flowchart of FIG.
[0037]
In this case, first, as in step S5, out of the past seven days (the number of days for the period determination), three days (the number of days for determining the variation) are the same or more (the same here includes the completely same and substantially the same) surplus. Determine whether or not. This surplus means excess hot water, and can be obtained from remaining hot water (hot water amount) −set remaining hot water (set hot water heat amount). If it is determined in step S5 that there is the same surplus for three or more days in the past seven days, the process proceeds to step S6, and it is determined that the use state is “stable” (the degree of variation is small). If it is determined in step S5 that the surplus is not the same for three days or more in the last seven days, the process proceeds to step S7 to determine whether the surplus in the past seven days is within two patterns.
[0038]
In this step S7, if the surplus in the past seven days is within two patterns, the process proceeds to step S6, and the surplus in the past seven days is within two patterns (the number of different types of residual heat energy in the period determination days). If not, the process proceeds to step S8, and it is determined that the use state is "unstable" (the degree of variation is large). Then, if it is determined as "stable" in step S6, the process proceeds to step S9, and the learning period is set to a short number of days (three days in this case). If it is determined in step S8 that the state is "unstable", the process proceeds to step S10, and the learning period is set to the long days (in this case, 7 days).
[0039]
As described above, the learning period is adjusted based on the degree of variation in the amount of hot water used by the user. The control of adjusting the amount of hot water when the learning period is not adjusted will be described with reference to FIG. The process of the hot water level adjustment control is started, and it is determined in step S11 whether or not the entire amount is heated (for example, the entire amount is heated in (1) in FIG. 8). In this case, if the whole amount is not boiled, the process waits until this amount is reached. In addition, in the case of the full-boiling operation, this full-boiling operation is performed. Next, the process proceeds to step S12, and it is determined whether or not the operation at the hot water level causes an excessive amount of hot water. That is, the excess hot water (surplus) can be determined by remaining hot water (hot water amount) -set remaining hot water (set hot water amount).
[0040]
Next, in step S13, it is determined whether or not the surplus is zero. If the surplus is 0, the hot water level is appropriate, so the flow proceeds to step S14, and clears the hot water amount count of a counter (not shown) that counts when there is a surplus in the previous full-boiling operation. The process moves to S18, and the next ((2) in FIG. 8) total boiling is performed. If there is a surplus in step S13, the process proceeds to step S15, where the remaining hot water count is added by "1", and then the process proceeds to step S16. In this step S16, it is determined whether or not the remaining hot water count is equal to or longer than a set reference determination period value (learning period value). If it is determined in step S16 that the remaining hot water count is equal to or longer than the learning period value, the process proceeds to step S17 to lower (down) the hot water level, and then proceeds to step S18 to perform the next (2) in FIG. Perform boiling. Further, if the remaining hot water count is less than the learning period value in step S16, the process proceeds to step S18, and the next full boiling is performed while the hot water level remains unchanged. After the process proceeds to step S18, the process returns to step S11, and it is determined whether or not the entire amount is heated (in this case, the entire amount is heated in (3) in FIG. 8). Hereinafter, this control is performed to converge the hot water level to an appropriate level.
[0041]
However, if the learning period is not adjusted, depending on the situation of use, even though the hot water is sufficiently stored, it is judged that there is a shortage, and during the daytime, the hot-water reheating operation (hereinafter referred to as the reheating operation) ). Therefore, in this apparatus, the learning period is adjusted based on the degree of variation in the amount of hot water used by the user, so that the level of the hot water converges to an appropriate level in a period as short as possible.
[0042]
For this reason, as shown in FIG. 6, the learning period is determined. That is, the process up to step S12 is performed in the same manner as in the case of FIG. 7, and then the process proceeds to step S20 to perform the learning period determination process of FIG. Therefore, if the use state is stable, the learning period is set to 3 days, and if the use state is unstable, the learning period is set to 7 days. Thereafter, the process proceeds to step S21, and in step S21, it is determined whether or not the surplus is zero. If the surplus is 0, the hot water level is appropriate, so the flow proceeds to step S22, the hot water count is cleared, and the flow proceeds to step S26 to perform the next (2) of FIG. . If there is a surplus in step S21, the process proceeds to step S23 to add “1” to the remaining hot water count, and then proceeds to step S24. In step S24, it is determined whether or not the value is equal to or longer than the reference determination period value (learning period value) determined in step S20. If the remaining hot water count is equal to or greater than the learning period value in step S24, the process proceeds to step S25 to lower (down) the hot water level, and then proceeds to step S26 to perform the next ((2) in FIG. 8) total amount. Perform boiling. If the remaining hot water count is less than the learning period value in step S24, the process proceeds to step S26, and the next full amount boiling is performed while the hot water level remains unchanged. Then, after the process proceeds to step S26, the process returns to step S11, and it is determined whether or not the entire amount is heated (in this case, the entire amount is raised in (3) in FIG. 8). Hereinafter, this control is performed to converge the hot water level to an appropriate level.
[0043]
In this way, by adjusting the learning period based on the degree of variation in the amount of hot water used by the user, the level of the hot water can be converged to an appropriate level in a period as short as possible, and unnecessary boiling operation can be reduced, and running costs can be reduced. Reduction can be achieved. Further, when the degree of variation is small, the hot water level is approaching the appropriate level. In such a case, even if the learning period is shortened, it is possible to converge to the appropriate level. When the degree of variation is large, the hot water level is not approaching the appropriate level, and the learning period is lengthened to converge on the appropriate level. Further, the degree of variation is set by setting the number of days for the period determination, and varies depending on the number of days that are substantially the same remaining heat amount in the number of days for this period determination and the number of different types of the remaining heat amount in the number of days for the period determination. Since the degree is determined, the reliability is high, and the hot water level can be made to converge to an appropriate level in the learning period set based on the degree of variation.
[0044]
Although the specific embodiments of the present invention have been described above, the present invention is not limited to the above embodiments, and can be implemented with various modifications within the scope of the present invention. For example, the learning period is not limited to 7 days (long days) or 3 days (short days). In the flowchart of FIG. 5, the number of days for determining the learning period is seven. The number of days can be freely increased or decreased, and the same surplus count days in step S5 can be changed. Three or more patterns having different surpluses in step S7 may be used. In the above embodiment, the number of days for determining the learning period is set as a condition for determining the learning period, and the number of days of the remaining hot water that is substantially the same in this number of days for determining the period (in the above embodiment, FIG. 5 (3 days in step S5) and the number of different types of residual hot water calories within the number of days for period determination (two patterns in step S7 in FIG. 5 in the above embodiment), but only one of them is used. It may be used. In other words, it may be based on at least one of the number of days having substantially the same amount of residual hot water in the number of days for period determination and the number of different types of residual hot water in the number of days for period determination. Also, the hot water level is not limited to that shown in Table 1 above, but can be set to various levels, and is not limited to 10 levels. Further, the temperature used as the reference for starting the reheating operation, the reference temperature for stopping the reheating operation, and the temperature used as the reference for determining the excess hot water state are also changed according to the user's preference, season, and the like. can do. When a heat pump type hot water supply device is used as the hot water supply device as in the above embodiment, it is preferable to use carbon dioxide gas as the refrigerant of the refrigerant circuit. In addition, dichlorodifluoromethane (R-12) and chlorodifluoromethane are used. Even a refrigerant such as methane (R-22) is an alternative refrigerant such as 1,1,1,2-tetrafluoroethane (R-134a) due to problems such as destruction of the ozone layer and environmental pollution. You may. Further, the hot water supply device may be an electric hot water supply device or a gas hot water supply device.
[0045]
【The invention's effect】
According to the hot water supply device of the first aspect, the hot water level adjustment control can make the hot water level close to the hot water amount used by the user, and can prevent occurrence of excess or shortage in the hot water amount. In addition, since the learning period is adjusted based on the degree of variation in the amount of hot water used by the user, the level of the hot water can be made to converge to an appropriate level in as short a period as possible, and unnecessary boiling operation can be reduced, thereby reducing running costs. it can.
[0046]
According to the water heater of the second aspect, when the degree of variation is small, the level of the hot water is close to the appropriate level, and in such a case, it is possible to converge to the appropriate level even if the learning period is shortened. . When the degree of variation is large, the hot water level is not approaching the appropriate level, and the learning period is lengthened to converge on the appropriate level. Therefore, the hot water level can be stably converged to an appropriate level in an optimum learning period, and wasteful operation can be reliably avoided.
[0047]
According to the hot water supply device of the third aspect, the number of days for the period determination is set, and the number of days that is substantially the same as the remaining amount of hot water in the number of days for the period determination, and the different types of the remaining amount of heat in the number of days for the period determination are different. Since the degree of variation is determined based on the number, the reliability of the degree of variation is high, and the hot water level can be made to converge to an appropriate level in the learning period set based on the degree of variation.
[0048]
According to the hot water supply apparatus of the fourth or fifth aspect, the reliability of the determination is high and the level of the hot water can be stably converged even if the learning period is shortened. For this reason, useless driving can be reliably avoided, and the running cost can be effectively reduced.
[Brief description of the drawings]
FIG. 1 is a simplified diagram showing an embodiment of a hot water supply device of the present invention.
FIG. 2 is a simplified block diagram showing data input to a control unit of the water heater.
FIG. 3 is a simplified block diagram of a control unit of the water heater.
FIG. 4 is a flowchart showing a reheating operation of the water heater.
FIG. 5 is a flowchart for determining a learning period of the water heater.
FIG. 6 is a flowchart in the case where the learning period is not changed in the hot water level adjustment control of the water heater.
FIG. 7 is a flowchart showing hot water level adjustment control of the water heater.
FIG. 8 is a time chart showing a time zone in which the whole amount is heated.
FIG. 9 is a simplified diagram of a conventional hot water supply device.
[Explanation of symbols]
3 Hot water storage tank

Claims (5)

貯湯タンク3と、加熱源とを備えた給湯装置において、1日の必要湯熱量に応じて複数の階級の湯量レベルを定めておき、上記加熱源は、選択された湯量レベルに応じた湯熱量を上記貯湯タンク3へと供給すべく作動する給湯装置であって、学習期間においてユーザ使用湯熱量を学習して、この学習期間におけるユーザ使用湯熱量に基づいて上記必要湯熱量を決定する湯量レベル適正化制御を行うように構成し、かつ上記学習期間をユーザ使用湯熱量のばらつき度合いに基づいて調整することを特徴とする給湯装置。In a hot water supply device having a hot water storage tank 3 and a heating source, a plurality of levels of hot water levels are determined in advance according to the required hot water amount per day, and the heating source is configured to supply hot water amounts according to the selected hot water level. Is a hot water supply device that operates to supply the hot water to the hot water storage tank 3, and learns the amount of hot water used by the user during the learning period, and determines the required amount of hot water based on the amount of hot water used by the user during the learning period. A hot water supply apparatus configured to perform appropriateness control and adjusting the learning period based on a degree of variation in the amount of hot water used by the user. 上記ばらつき度合いが小さい場合には大きい場合よりも学習期間を短くすることを特徴とする請求項1の給湯装置。The hot water supply apparatus according to claim 1, wherein the learning period is shorter when the degree of variation is small than when it is large. 期間判定用日数を設定し、この期間判定用日数内における略同一の残湯熱量である日数、及び上記期間判定用日数内における残湯熱量の異種類の数の少なくともいずれか一方に基づいて上記ばらつき度合いを判断することを特徴とする請求項1又は請求項2の給湯装置。The number of days for the period determination is set, and based on at least one of the number of days having substantially the same remaining amount of hot water in the number of days for the period determination and the number of different types of the remaining amount of heat in the number of days for the period determination. The hot water supply apparatus according to claim 1, wherein the degree of variation is determined. 上記期間判定用日数内における略同一の残湯熱量である日が、この期間判定用日数よりも短いばらつき判定日数以上のときに、ばらつき度合いを小として上記学習期間を短期日数とすることを特徴とする請求項3の給湯装置。When the days having substantially the same amount of remaining hot water in the period determination days are equal to or greater than the variation determination days shorter than the period determination days, the degree of variation is reduced and the learning period is set to short-term days. The hot water supply apparatus according to claim 3, wherein 上記期間判定用日数内における異なる残湯熱量が2種類以内のときに、ばらつき度合いを小として上記学習期間を短期日数とすることを特徴とする請求項3の給湯装置。4. The hot water supply apparatus according to claim 3, wherein, when the amount of heat remaining in the remaining hot water within the number of days for the period determination is within two types, the degree of variation is small and the learning period is a short number of days.
JP2002302755A 2002-10-17 2002-10-17 Water heater Expired - Fee Related JP4100126B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002302755A JP4100126B2 (en) 2002-10-17 2002-10-17 Water heater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002302755A JP4100126B2 (en) 2002-10-17 2002-10-17 Water heater

Publications (2)

Publication Number Publication Date
JP2004138299A true JP2004138299A (en) 2004-05-13
JP4100126B2 JP4100126B2 (en) 2008-06-11

Family

ID=32450732

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002302755A Expired - Fee Related JP4100126B2 (en) 2002-10-17 2002-10-17 Water heater

Country Status (1)

Country Link
JP (1) JP4100126B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011149695A (en) * 2011-05-13 2011-08-04 Mitsubishi Electric Corp Heat pump device
US8015836B2 (en) 2007-03-27 2011-09-13 Mitsubishi Electric Corporation Heat pump system
JP2012149883A (en) * 2012-03-29 2012-08-09 Mitsubishi Electric Corp Heat pump device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8015836B2 (en) 2007-03-27 2011-09-13 Mitsubishi Electric Corporation Heat pump system
JP5197576B2 (en) * 2007-03-27 2013-05-15 三菱電機株式会社 Heat pump equipment
JP2011149695A (en) * 2011-05-13 2011-08-04 Mitsubishi Electric Corp Heat pump device
JP2012149883A (en) * 2012-03-29 2012-08-09 Mitsubishi Electric Corp Heat pump device

Also Published As

Publication number Publication date
JP4100126B2 (en) 2008-06-11

Similar Documents

Publication Publication Date Title
KR20100114022A (en) Heat-pump hot-water supply apparatus
JP2007198632A (en) Heat pump type water heater
JP3864768B2 (en) Heat pump type water heater
JP2009281658A (en) Water heater
JP3840573B2 (en) Heat pump type water heater
JP4525820B2 (en) Water heater
JP2004116891A (en) Heat pump type hot water supply machine
JP2007327728A (en) Heat pump hot-water supply system
JP2003222396A (en) Heat pump type water heater
JP2005300066A (en) Storage water heater
JP2004138299A (en) Hot water supply device
JP2004132628A (en) Hot-water supplier
JP3855938B2 (en) Hot water storage water heater
JP4710511B2 (en) Hot water storage water heater
JP3840574B2 (en) Water heater
JP5401946B2 (en) Hot water storage water heater
JP2003194407A (en) Hot water storage type hot water system
JP4304950B2 (en) Water heater
JP3760808B2 (en) Hot water storage water heater
JP2008082607A (en) Hot water storage type water heater
JP2006300383A (en) Hot water storage type water heater
JP2003287284A (en) Hot-water storage-type hot-water supply device
JP3869426B2 (en) Hot water storage water heater
JP3564687B2 (en) Hot water supply device
JP3876696B2 (en) Heat pump type water heater

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050922

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20071115

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080226

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080310

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110328

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110328

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120328

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120328

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130328

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140328

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees