JP2004027516A - Composite truss segment and truss bridge for simultaneously using suspension cable by using this truss segment and its construction method - Google Patents

Composite truss segment and truss bridge for simultaneously using suspension cable by using this truss segment and its construction method Download PDF

Info

Publication number
JP2004027516A
JP2004027516A JP2002181464A JP2002181464A JP2004027516A JP 2004027516 A JP2004027516 A JP 2004027516A JP 2002181464 A JP2002181464 A JP 2002181464A JP 2002181464 A JP2002181464 A JP 2002181464A JP 2004027516 A JP2004027516 A JP 2004027516A
Authority
JP
Japan
Prior art keywords
truss
bridge
suspension cable
composite
suspension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2002181464A
Other languages
Japanese (ja)
Other versions
JP3881598B2 (en
Inventor
Shu Kakumoto
角本 周
Taku Yoshikawa
吉川 卓
Yuji Kamiya
神谷 裕司
Hiromitsu Yanagiuchi
柳内 博光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Oriental Construction Co
Original Assignee
Oriental Construction Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Oriental Construction Co filed Critical Oriental Construction Co
Priority to JP2002181464A priority Critical patent/JP3881598B2/en
Publication of JP2004027516A publication Critical patent/JP2004027516A/en
Application granted granted Critical
Publication of JP3881598B2 publication Critical patent/JP3881598B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a truss bridge for simultaneously using a suspension cable in a structural form of stiffening a truss beam by the suspension cable, its construction method and a composite truss segment. <P>SOLUTION: This composite truss segment is unitized by an upper floor slab 2 also serving as an upper chord member 1 and a lower chord member 6 integrally arranged via a web member of a truss structure having vertical materials 3 and 5 having a bridge shaft directional joining bolt hole 20 on this floor slab. The suspension cable 12 is tensioned between abutments 13 by using the composite truss segment 10 having a saddle 11 for the suspension cable. The saddle 11 for the suspension cable in a large number of composite truss segments 10 is placed on the suspension cable 12. A composite truss beam 23 is constituted by joining the mutual vertical materials 3 and 5 in the composite truss segments 10 adjacent in the bridge shaft direction. The composite truss beam 23 is also supported by the suspension cable 12. <P>COPYRIGHT: (C)2004,JPO

Description

【0001】
【発明の属する技術分野】
本発明は、トラス桁を吊ケーブルで補剛した構造形式の吊りケーブル併用トラス橋およびその施工方法ならびにこれらに使用される複合トラスセグメントに関する。
【0002】
【従来の技術】
従来、橋梁としては、吊りケーブルを使用した吊橋、またはトラス橋、あるいは特開平2001−182016号公報にも記載されている吊りケーブルを利用したトラス構造橋が知られている。
【0003】
一般的に橋梁構造形式としての、吊橋では、振動および垂れが大きく、吊床版式橋梁および上路式吊床版橋では、前記の吊橋ほどではないが、やはり振動および垂れが問題となる。
【0004】
一方、トラス橋では、構高が高くトラスが大きくなり、剛性が大きい利点があるが、施工コストも高くなり、周囲の景観が損なわれると言う問題もある。
【0005】
また、施工場所を考慮すると、山岳地帯の橋梁では、中間橋脚を施工するための工事用道路の工費が多大となる場合には、単径間の橋梁が選定され、この単径間の橋梁形式としては、例えば、鋼ニールセンローゼ橋や両端固定有ヒンジPCラーメン橋などが採用されているが、前者の鋼ニールセンローゼ橋の構造形式は、架設のためにケーブルクレーンを用いなければならず、橋梁後背の地形条件によっては架設が困難となる場合がある。また、後者の両端固定有ヒンジPCラーメン橋の構造形式は、クリープによる変形が過大となり使用性が損なわれる場合がある。
【0006】
さらに、最近では上路式PC吊床版橋が提案されているが、死荷重および活荷重ともに吊床版の張力で負担することから、支間が長くなると下部構造に作用する水平力が過大となり、また、鉛直材に支持された上床版が過度に横揺れする場合がある。
【0007】
橋梁施工形式としては、トラス構造の橋梁を架設する一般的な方法としては、支保工を組立て、その上にトラス構造を施工する方法がある。また、支保工を設けないで、橋脚または橋台より張出し架設方法により施工される場合もある。
【0008】
さらに、ケーブルを利用したトラス橋としては、特開平2001−182016号公報にも記載されているように、橋台間に張り渡したケーブル上に下床版、斜材となる側面三角形状のユニットを懸垂架設した後、上床版を架設する曲弦トラス橋の構築方法も知られている。
【0009】
【発明が解決しようとする課題】
前記特開平2001−182016号公報に示された曲弦トラス橋の場合には、側面三角形状のユニットおよび上床版を別個に架設する必要があり、側面三角形状のユニット相互間および上床版相互間を場所打ちコンクリートにより接合するようになるので、施工が煩雑であり、工期も長くなり施工コストが高くなるという問題がある。
【0010】
本発明は、吊りケーブル併用トラス橋に使用することができるユニット化された複合トラスセグメントを提供することを目的とする。可能な例えば、山岳地帯等における単径間の橋梁として、複合トラス単純桁等のトラス桁を吊ケーブルで補剛した構造形式の吊りケーブル併用トラス橋、およびその施工方法ならびに複合トラスセグメントを提供することを目的とする。
【0011】
また、本発明は、前記のユニット化された複合トラスセグメントを使用して、施工が容易で、短工期で施工可能な吊りケーブル併用トラス橋およびその施工方法を提供することを目的とする。
【0012】
【課題を解決するための手段】
前記の問題を有利に解決するために、本発明における請求項1の複合トラスセグメントにおいては、吊りケーブル併用トラス橋22に使用される複合トラスセグメント10であって、前記複合トラスセグメント10は、上弦材1を兼ねる上床版2と、これに橋軸方向の接合用の鉛直材3,5を備えたトラス構造の腹材Aを介して一体に設けられた下弦材4,6とによりユニット化されていると共に、吊りケーブル用のサドル11を備えていることを特徴とする。
【0013】
また請求項2の発明においては、請求項1に記載の複合トラスセグメントにおいて、前記腹材Aは、橋軸方向に間隔をおいて配置された鉛直材3,5とこれらの鉛直材3,5の間に配置されている斜材7とにより構成され、前記鉛直材3,5には、橋軸方向に隣合う複合トラスセングメント10相互を接合するためのボルト孔20が、鉛直材3,5の上下方向に間隔をおいて設けられていることを特徴とする。
【0014】
さらに請求項3の発明においては、請求項1または2に記載の複合トラスセグメントにおいて、上弦材1を兼ねるコンクリート製上床版2の下部における橋軸直角方向の両側における橋軸方向に間隔をおいた両端部に、それぞれ鉛直材3,5の上部が固定され、橋軸直角方向の一側部における前記各鉛直材3に渡って下弦材4が配置されて固定され、かつ橋軸直角方向の他側部における前記各鉛直材5の下部に渡って下弦材6が配置されて固定され、前記コンクリート製上床版2における橋軸直角方向の両側と、鉛直材3(5)および下弦材4(6)とにより囲まれた部分に斜材7が配置されて固定されて、かつ橋軸直角方向に対向する鉛直材3,5に、サドル支持部材9が架設固定され、前記サドル支持部材9の下部に、吊りケーブル12に載置される吊りケーブル用のサドル11が固定されていることを特徴とする。
【0015】
さらにまた、請求項4の吊りケーブル併用トラス橋においては、請求項1〜請求項3のいずれか1項に記載の複合トラスセグメントが使用されて、橋台13間に渡って張架された吊りケーブル12に、前記多数の複合トラスセグメント10における吊りケーブル用のサドル11が前記吊りケーブル12に載置され、かつ橋軸方向に隣り合う複合トラスセグメント10における鉛直材3,5相互が接合されて、複合トラス桁23が構成され、さらに複合トラス桁23が前記吊りケーブル12より支持されて、吊りケーブル12とトラス桁23とにより荷重を分配負担させていることを特徴とする。
【0016】
さらにまた、請求項5の吊りケーブル併用トラス橋においては、請求項4に記載の吊りケーブル併用トラス橋22において、複合トラス桁23の両端部に吊りケーブル12が定着されていると共に、橋台13側の吊りケーブル12の緊張力が開放されて、自碇式とされていることを特徴とする。
【0017】
なおまた、請求項6の吊りケーブル併用トラス橋の構築方法においては、橋台13間に渡って複数本の吊りケーブル12を張架した後、請求項1〜3のいずれか1項に記載の複合トラスセグメント10を順次前記吊りケーブル12に載置して、複合トラスセグメント10を順次送り出し、送り出された橋軸方向に隣り合う各複合トラスセグメント10における端部鉛直材相互を高張力ボルト21により接合して複合トラス桁23を構築する共に複合トラス桁端部を橋台13に載置し、かつ吊りケーブル12より支持された複合トラス桁23を構築することを特徴とする。
【0018】
また、請求項7の吊りケーブル併用トラス橋の構築方法においては、請求項6の吊りケーブル併用トラス橋22を構築した後、複合トラス桁23の両端部に前記吊りケーブル12を定着すると共に、前記橋台13に係合する吊りケーブル端部の緊張力を開放して、橋台13に作用している吊りケーブル12の反力を開放することを特徴とする。
【0019】
さらに、請求項8の発明においては、請求項6の吊りケーブル併用トラス橋の構築方法において、橋台13部分の前記吊りケーブル12を切断することなく残し、吊りケーブル併用トラス橋22を使用後に、吊りケーブル併用トラス橋の構築方法とは逆の手順により、吊りケーブル併用トラス橋を分解撤去可能にされていることを特徴とする。
さらに、請求項8の発明においては、請求項7の吊りケーブル併用トラス橋の構築方法において、橋台13部分の前記吊りケーブル12を切断することなく残し、吊りケーブル併用トラス橋22を使用後に、前記橋台13部分の吊りケーブル12を緊張させて橋台13に定着し、吊りケーブル併用トラス橋の構築方法とは逆の手順により、吊りケーブル併用トラス橋を分解撤去可能にされていることを特徴とする。
【0020】
本発明によると、次のような作用・効果を有する。
1.従来のようなトラスを併用しない吊橋などでは、振動が大きくまた垂れの問題があるが、吊りケーブルにトラス桁を併用することでトラス桁の特性である高い剛性により、吊り橋の振動および垂れを抑制し、上床版上を車両の通行上も、前記の問題のない道路として利用することができる吊りケーブル併用トラス橋とすることができる。
2.吊ケーブルとトラス桁を併用することにより、トラス桁の構高の高さを小さくすることができ、吊りケーブル併用トラス橋の築造コストを低減することができ、コストダウンになる。
3.平板状のコンクリート製下床版を使用しないで、これに代わって、直線状の下弦材を使用しているので、吊りケーブル併用トラス橋の自重の軽減になる。
4.上床版、斜材および鉛直材、下弦材をユニットにした構造が簡単な複合トラスセグメントとし、これを架設することで工期の短縮、およびコストダウンにつながる。
6.吊りケーブル併用トラス橋を、例えば施工手順とは逆の手順等により、簡単に撤去でき仮設道路として有利である。
7.吊りケーブルを端部付近で、トラス桁に定着すると共に、橋台側の吊りケーブルの緊張を開放させて、自碇式にすることにより本設の橋梁としても利用できる。(吊ケーブルを橋台(アバット)に定着ささせ、橋台(アバット)はグラウンドアンカーなどでアンカーさせて釣り合っているが、長い間アンカーさせておくと、少しずつアンカー力が弱くなる。そこで、吊りケーブルの橋台(アバットヘの定着を切り、橋梁に定着させる。これを自碇という。)
8.本発明の場合には、吊りケーブルの反力体としての橋台にアンカーを取らせたままで吊りケーブル併用トラス橋を使用する場合(他碇式の吊りケーブル併用トラス橋とする場合)と、橋台(必要に応じグランドアンカー)に作用している反力を開放し、橋体(トラス桁)に定着させる自碇式とする場合の2つの方式どちらでも可能であり、また他碇式から自碇式に(または自碇式から他碇式に)2つの方式間においての変更も可能であり、自碇式にするか、他碇式にするか、使用条件に応じて適宜選択することができる。また、自碇式にすると、本設の吊りケーブル併用トラス橋として有利であり、他碇式にすると、後に撤去が容易であるだけに、仮設の吊りケーブル併用トラス橋として有利である。また、他碇式または自碇式のいずれの場合も、使用条件等により、本設または仮設の吊りケーブル併用トラス橋とすることができる。
【0021】
【発明の実施の形態】
以下、本発明の実施形態について、図を参照して説明する。
まず、本発明の第1実施形態の吊りケーブル併用トラス橋に使用される複合トラスセグメント10の形態について、図5〜図7を参照して説明すると、上弦材1を兼ねる鉄筋コンクリート製の上床版2の下部における橋軸直角方向の両側における橋軸方向の両端部に、それぞれ鋼管製の鉛直材3,5の上部が埋め込み固定され、かつ橋軸直角方向の一側部における前記各鉛直材3の下部に渡って、橋軸方向に延長する下弦材4が配置されて固定され、かつ橋軸直角方向の他側部における前記各鉛直材5の下部に渡って、橋軸方向に延長する下弦材6が配置されて固定され、前記コンクリート製の上床版2の橋軸直角方向の両側の下部と、鉛直材3(5)または下弦材4(6)とにより囲まれた部分に一対の斜材7が逆V字状に配置されて、前記上床版2および鉛直材3(5)または下弦材4(6)に斜材7の上下部が固定され、かつ橋軸直角方向に対向する橋軸方向一端側の鉛直材3,5および橋軸方向他端側の鉛直材3,5に、鋼管製のサドル支持部材8,9が架設されてボルトまたは溶接により固定され、前記サドル支持部材8,9の下部に、吊りケーブルに載置される複数(図示の場合は6つ)の下向き開口溝形のサドル11が橋軸直角方向に間隔をおいて配置されて固定されている。前記の鉛直材3(5)および斜材7により腹材Aが構成されている。
複合トラスセグメント10における同一垂直面状に配置されている鉛直材3(5)と斜材7または下弦材4(6)の固定には、これらがコンクリート製の場合には、アンカーボルト等が使用され、鋼製の場合には、ボルトまたは溶接等の手段による。
【0022】
前記複合トラスセグメント10における橋軸方向の前部の鉛直材3,5および後部の鉛直材3,5に取り付けられるサドル支持部材8,9の取付位置は、複合トラスセグメント10が設置される吊りケーブルの曲線に沿ったレベルに予め取付られて、サドル支持部材8,9の取り付け位置によりサドル11のレベルが決まる。図5、図6、図7に示す形態の複合トラスセグメント10は、それぞれ、図3に示す築造途中の状態および図9に示す完成した吊りケーブル併用トラス橋おける、中間部、端部、中央部付近に位置する複合トラスセグメント10の形態を代表して示している。
【0023】
前記サドル11の橋軸方向に延長する断面円弧状の凹溝11aの内周面には、吊りケーブルとの摩擦を小さくするために、断面円弧状の四フッ化エチレン板が介在設置され、前記凹溝11a下面の橋軸方向に曲線状等のポリエチレン管の損傷が防止される。
【0024】
なお、鉛直材3,5とサドル支持部材8,9に固定された斜材等の補強材31によりサドル支持部材8,9は補強されている。また、前記複合トラスセグメント10の端部の適宜の位置には、図示を省略するが、複合トラスセグメント10を牽引用のロープにより牽引するための、固定式または着脱式の連結部が設けられる。
【0025】
前記の各複合トラスセグメント10は、施工現場付近において組立て構築されるとよく、予め工場または現場付近において、プレキャスト製上床版2、鋼管製またはプレキャストコンクリート製の鉛直材3,5、下弦材4,6を製作して、これらの部材を搬送してボルト接合等により組み立てるようにするとよい。また、既に築造された橋軸方向に隣り合う複合トラスセグメント10端面相互の接合面を一致させるために、現場付近において、図4に示すよう、既築造の複合トラスセグメント10(10A)の端面(特に上床版2)を型枠等として利用し、新規の複合トラスセグメント10(10B)(特に上床版2は、接合に有利なマッチキャストコンクリート版とするとよい)を築造した後、既築造の複合トラスセグメント10を、クレーン等より搬送する工程を繰り返して、すべての複合トラスセグメント10を構築するようにするとよい。前記下弦材4をコンクリート製とする場合には、後記の吊りケーブル併用トラス橋22を築造した場合に、後死荷重や活荷重等による張力を低減させるために、前記下弦材4内に橋軸方向にPC鋼材を埋め込み固定し、そのPC鋼材によりプレストレスを導入するようにするとよい。
【0026】
次に、前記の複合トラスセグメント10を使用して、本発明の吊りケーブル併用トラス橋およびその構築方法について、代表形態としての第1実施形態に基づいて説明する。第2〜4実施形態については、相違する部分を主に説明する。
まず、図1(a)に示すように、反力支承部となるアバットとしての間隔をおいて対向する橋台13を、複数のグランドアンカー14により地盤15にアンカーすると共に、各橋台13に、吊りケーブルの端部を挿通するための複数(図示の場合は6つ)の鋼製等のケーシング管16を、橋軸直角方向に間隔をおいて埋め込み固定すると共に橋軸方向に橋台13を貫通するように埋め込み固定する。
【0027】
次いで、図2に示すように、各橋台13に橋軸直角方向に複数のウインチ17,18を設けると共に、各ウインチ17,18のドラムに渡って鋼製ロープ等の支持線19を配置し、複数(図示の場合は6本)のプレハブケーブルからなる吊りケーブル12の先端側12aをそれぞれ、一方の橋台13におけるケーシング管16に挿通すると共に、図2に2点差線で示すように、各吊りケーブル12の先端部を前記支持線19により支持させながら、ウインチ17,18を駆動して前記支持線19をウインチ18のドラムに巻き取りながら各吊りケーブル12を繰り出し、各橋台13に各吊りケーブル12の端部を橋台13の背面側で、ジャッキ等により吊りケーブル12を予め設定された緊張した状態で、公知の吊りケーブル挿通用スリーブおよび楔を使用した楔式定着具等により吊りケーブル12を定着して、橋台13間に各吊りケーブル12を架設(張架)する。吊りケーブル12には、プレハブケーブルを使用することで、鋼製ケーシング管等からなる外套管16内へのグラウト作業が省略できる。
【0028】
次いで、図3に示すように、予め、施工現場付近において製作された図5〜図7の代表形態で示す端部側の複合トラスセグメント10(図6に示す形態)から順に、一方の橋台13(13a)側からクレーン等(図示を省略した)により複合トラスセグメント10を前記6本の吊りケーブル12に吊降ろして、各サドル11下面に四フッ化エチレン板等を介在させて、吊りケーブル12に載置すると共に、複合トラスセグメント10の連結部に連結させた牽引ロープ等により、他方の橋台13(13b)に向って移動させ、他方の橋台13(13b)まで到達させる。なお、端部側の複合トラスセグメント10の端部は、適宜、橋台13上の支承装置をレベルアップして係合載置させる。なお、図中符号30は足場である。
【0029】
以下、順に複合トラスセグメント10を、クレーン等により、吊りケーブル12に搬送載置し、図3に示すように、一方の橋台13(13A)から他方の橋台13(13B)に向って吊りケーブル12に乗せた複合トラスセグメント10を順次、牽引して送り出し、既に配置された複合トラスセグメント10の端面に合致させるように所定の位置に送り出し、所定の位置に送りだされた複合トラスセグメント10を、図8に示すように、隣接する複合トラスセグメント10における鉛直材3相互をこれらの上下方向に間隔をおいて設けられた各ボルト挿通孔20に渡って高張力ボルト21を挿通して、この高張力ボルト21により接合して、高張力ボルト21でせん断力を伝達させる構造とされている。高張力ボルトとしては、摩擦接合式あるいは打ち込み式高力ボルトを使用した接合としてもよい。
【0030】
以下、複合トラスセグメント10を、順次吊りケーブル12に載置して送り出し、所定の位置に配置した後、高張力ボルト21により接合し、最後の複合トラスセグメント10を吊りケーブル12に載置すると共に、高張力ボルト21により既設の複合トラスセグメント10に接合し、また、後端部側の複合トラスセグメント10の端部は、適宜、橋台13上の支承装置(図示を省略した)をレベルアップして係合載置させる。そして、図9に示すように、トラス桁23を構築すると共に、各吊りケーブル12を橋梁完成系の主ケーブルとして利用して、これらの吊りケーブル12によりトラス桁23を支持した、吊りケーブル併用トラス橋22を構築する。なお、トラス桁23を構築した後、適宜の時期に上床版2の上面に、道路用舗装が設けられる。
このように、ユニット化された複合トラスセグメント10を使用しているので、作業の省力化および工期の短縮が可能となっている。
なお、複合トラスセグメント10相互を高張力ボルト21で接合する場合、前記のように複合トラスセグメント10を順次接合してもよいが、3〜4ユニットの複合トラスセグメント10を直列にした状態で、最初の第1と第2の複合トラスセグメント10相互を高張力ボルト21により接合するようにすると、隣り合う複合トラスセグメント10のずれ、および開きがなく、比較的容易に複合トラスセグメント10相互を高張力ボルト21で接合することができる。また、隣り合う複合トラスセグメント10のずれ、および開きがないようにするために、全ての複合トラスセグメント10を吊りケーブル12に架設した後、隣り合う複合トラスセグメント10相互を高張力ボルト21により接合するようにしてもよい。したがって、鉛直材3(5)に設けるボルト挿通孔20の位置は、例えば、全ての複合トラスセグメント10が吊りケーブル12に載置された状態で、隣合う複合トラスセグメント10相互のボルト挿通孔20の位置ずれがないように、予め設定するとよい。
【0031】
なお、複合トラスセグメント10におけるコンクリート製上床版2(上弦材1)には、後死荷重により自動的に圧縮力が導入されるようになるが、場合によっては、コンクリート製上床版2内にPC鋼材を橋軸方向に配置し、そのPC鋼材により上床版2にプレストレスを導入するようにしてもよい。
【0032】
また、この吊りケーブル併用トラス橋22の構造は、複合トラス単純桁を吊りケーブルで補剛した構造形式で、吊りケーブル12を併用しないトラス桁だけの一般の複合トラス橋の構高がL/10〜L/8程度(ただし、Lは、吊りケーブル12による吊り支間である。)であるが、本発明の吊りケーブル併用トラス橋22の構高を、L/20程度とすることが可能になり、鉛直材3,5および斜材7等の部材を短尺部材にすることができる。なお、この吊りケーブル併用トラス橋22の形式では、死荷重は主として吊りケーブル12で支持し、活荷重は主としてトラス桁23の剛性で分担する構造とされている。このように、吊りケーブル12とトラス桁とにより荷重を分配負担させている構造とされていることを特徴としている。
【0033】
また、吊りケーブル12とトラス桁23を併用しているので、トラスの高い剛性により、上床版2上を車両の通行の可能な橋梁とすることができ、またトラス桁23を吊りケーブル12により支持する構造であるので、トラス桁23によりそのサドル11に係合する吊りケーブル12の挙動も安定させることができる。また、吊りケーブル12の端部を切断することなく、残しておくことにより、前記の吊りケーブル併用トラス橋22の構築手順とは、例えば、逆手順により、容易に吊りケーブル併用トラス橋22を解体撤去させることができる。
【0034】
また、吊りケーブル12を、そのまま橋梁完成系の主ケーブルとして使用されているので、吊りケーブル12と橋梁完成系の主ケーブルとを別個にする場合に比べて、使用材料の削減することができる。
【0035】
前記実施形態の吊りケーブル併用トラス橋23では、吊りケーブル12を橋台13に定着した状態としているが、図15に示すように、吊りケーブル12の端部をトラス桁23の端部の定着部29に定着し、橋台13側の吊りケーブル12の緊張状態を開放し、吊りケーブル12の反力体としての橋台13を開放して、自碇式とし、橋台13上の支承装置に載置され係合された本設の吊りケーブル併用トラス橋22としてもよい。この場合、必要に応じ、橋台13側のグランドアンカー14の緊張を開放してもよい。このようにトラス桁23の端部に定着するために、例えば、図10に示すように、各橋台側の端部に位置する複合トラスセグメント10の鉛直材3,5に渡って、予めまたは後付けにより鋼製定着板24を架設して定着部29とし、吊りケーブル12を各橋台13の手前においてトラス桁23に、例えば公知の吊りケーブル挿通用スリーブおよび楔を使用した楔式定着具により定着すればよい。
【0036】
<第2実施形態>
図11には、前記吊りケーブル併用トラス橋の構築方法と同様に構築された吊りケーブル併用トラス橋22の第2実施形態が示されている。この実施形態では、トラス桁23の端部側に位置する複数の複合トラスセグメント10における、吊りケーブル12よりも下側に位置する鉛直材3,5および斜材7を短くして、トラス桁23の端部側の構高寸法を小さくした形態であり、その他の構成および変形形態は、前記実施形態と同様であるので、同様な部分には、同様な符号を付して説明を省略する。
【0037】
このようにトラス桁23の端部側の複合トラスセグメント10の鋼材使用量を低く抑え、景観に合うようにしてもよい。
【0038】
<第3実施形態>
図13には、前記吊りケーブル併用トラス橋の構築方法と同様に構築された吊りケーブル併用トラス橋22の第3実施形態が示されている。トラス部分の構高を吊りケーブル12のサグよりも小さくすることも可能とした形態であり、下弦材格点部より吊りケーブル偏心用の下部鉛直材25,26を取り付け、複合トラスセグメント10を吊りケーブル12により支持させた形態である。さらに説明すると、この実施形態では、トラス桁23の中間部に位置する複数の複合トラスセグメント10を、図12に示すような形態のものを使用している。この複合トラスセグメント10では、各鉛直材3,5の下方延長上に、下弦材4,6の格点部下面に、4本の鋼管製部材からなる下部鉛直材25,26の上部を溶接またはボルトにより固定し、対向する前記下部鉛直材25,26の所定のレベルに、予めサドル支持部材8,9を溶接またはボルトにより固定し、前記サドル支持部材8,9に前記と同様に6つのサドル11を設けた形態である。
【0039】
このように、トラス桁23の構高を一定にして、下部鉛直材25,26により、吊りケーブル12をトラス桁23から偏心させるための偏心用鉛直材としてもよい。その他の構成および変形形態は、前記実施形態と同様であるので、同様な部分には、同様な符号を付して説明を省略する。
【0040】
<第4実施形態>
図14には、前記吊りケーブル併用トラス橋の構築方法と同様に構築された吊りケーブル併用トラス橋22の第4実施形態が示されている。この実施形態では、図7に示すような形態の複合トラスセグメント10がトラス桁23の全長に渡って使用された形態である。だだし、鉛直材3,5および斜材7の長さ寸法はトラス桁23の全長に渡って対称的に変化していると共に、下弦材4,6を必要に応じ直線状の下弦材から円弧状の下弦材にしている。そして、トラス桁23の全長に渡ってトラス桁23の構高を曲線状に変化させた形態である。その他の構成および変形形態は、前記実施形態と同様であるので、同様な部分には、同様な符号を付して説明を省略する。
【0041】
この実施形態のように、構高をトラス桁23の中央部で高くし、トラス桁23の全長に渡って変化させてもよい。前記第1実施形態から第4実施形態のように、適宜トラス桁23の構高を低くしたり、高くするようにしてもよく、一般的に、トラス桁23の構高を高くした場合には、トラスのような構造特性が支配的になり、トラス桁23の構高を低くして吊ケーブル12を大偏心とした場合には、吊構造としての構造特性が支配的となる。トラス桁23の構高は、周囲の自然景色との景観性、吊りケーブル併用トラス橋23のたわみ、振動、疲労などに対する観点から決定すればよい
【0042】
なお、前記実施形態1〜4のように、ユニット化された複合トラスセグメント10を使用し、上床版2が順次連続されて橋面が築造され、吊りケーブル併用トラス橋22が築造されていくので、橋面上での作業を減らせることから、従来のように、架設用足場などの架設材の使用も少なくすむ。
【0043】
また、前記複合トラスセグメント10において、下弦材4,6は引張部材となるため座屈の可能性はないが、載荷条件によっては下弦材4,6が圧縮状態となる可能性があるため、場合によっては、複合トラスセグメント10のねじれ剛性の増加、下弦材4,6の座屈防止のために、下弦材4,6の格点部に座屈防止のために横繋ぎ材を取り付けてもよい。
【0044】
なお、複合トラスセグメント10を吊りケーブル12に架設する場合、前記実施形態では、一方の橋台13から他方の橋台13に向って複合トラスセグメント10を牽引するようにしたが、複合トラスセグメント10を両橋台13から吊りケーブル12の中央部に牽引搬送して、吊りケーブル12の中央部から各橋台13に向って架設するようにしてもよい。また、図16に示すように、対向する両方の橋台13から吊りケーブル12の中央部に向って、順次、複合トラスセグメント10を吊りケーブル12に架設して、隣り合う複合トラスセグメント10における鉛直材3(5)相互を高張力ボルトにより結合し、複合トラスセグメント10上を走行する各クレーン27により複合トラスセグメント10を吊り下げ搬送して、吊りケーブル12に架設するようにしてもよい。このように両橋台13側から複合トラスセグメント10を吊りケーブル12に架設施工するようにすると、さらに短工期で、吊りケーブル併用トラス橋を構築することができ、施工コストを低減することができる。
【0045】
前記実施形態の複合トラスセグメントを使用して吊りケーブル併用トラス橋およびその構築方法の特徴を列挙すると、下記のようなことが言える。
▲1▼複合トラス桁23は、上弦材1を兼ねるコンクリート製上床版2、鋼製部材またはコンクリート部材の下弦材4,6、斜材7および鉛直材3,5の腹材Aから構成されている多数の複合トラスセグメント10の結合体から構成されている。
▲2▼吊ケーブル12には、プレハブケーブルを使用することで、グラウト作業が省略できる。
▲3▼トラス桁23の架設は、橋軸方向に分割した複合トラスセグメント10を吊ケーブル12上に載せ、送り出し架設することができる。
▲4▼複合トラスセグメント10は、予め工場または現場において製作された、プレキャストコンクリート製上床版2、下弦材4,6および腹材Aを現場で、容易に組立ててユニットに構築することができる。
▲5▼複合トラスセグメント10の接合(特にコンクリート部材)は、マッチキャスト構造とされており、下弦材4,6は,後死荷重や活荷重等による張力を低減させるために、PC鋼材によりプレストレスを導入するとよい。
▲6▼コンクリート上床版2(上弦材1)には、後死荷重により自動的に圧縮力が導入されるが、場合によっては、PC鋼材によりプレストレスを導入するようにしてもよい。
▲7▼複合トラスセグメントの接合面の鉛直材3,5は、HTボルト(高張力ボルト)でせん断力を伝達させる構造とする。
▲8▼単径間の鋼トラス橋22の構高は、一般にL/10〜L/8であるが、本発明の構造形式は、L/20程度とすることも可能となり、景観的に優れる。
▲9▼橋梁(吊りケーブル併用トラス橋22)が不要となった場合には、吊ケーブル12を利用して、容易に吊りケーブル併用トラス橋22の撤去が可能である。
【0046】
前記各実施形態において、仮設または本設の吊りケーブル併用トラス橋22を解体撤去する場合には、各吊りケーブル12の橋台13側を緊張した状態で定着されている状態から、順次端部側の複合トラスセグメント10とこれに結合されている複合トラスセグメント10における鉛直材3相互および鉛直材5相互を接合している高張力ボルト21を取り外した後、端部側の複合トラスセグメント10をクレーン等により、撤去し、以下、順次、複合トラスセグメント10相互を接合している高張力ボルト21を取り外し、分離された複合トラスセグメント10を橋台13側に、ウインチ等によりロープ等の条体を介して引き寄せて、クレーン等により複合トラスセグメント10を吊りケーブル12から取り除くようにする。複合トラスセグメント10を撤去した後、各橋台13に複数のウインチ17,18を設置した後、これらのドラムに各支持線19を張り渡して、一方の橋台13における各ケーシング管16から引き抜いた各吊りケーブル12の端部を前記支持線19に係止保持させて、前記ウインチ17(18)を駆動して、他方の橋台13側に搬送し、撤去することができる。このように前記の吊りケーブル併用トラス橋22の構築方法とは、逆の手順より、容易に吊りケーブル併用トラス橋22を解体撤去することができる。
【0047】
前記実施形態のようにすると、ユニット化された複合トラスセグメントを使用して、例えば、山岳地帯等における単径間の橋梁として、複合トラス単純桁等のトラス桁を吊ケーブルで補剛した構造形式の吊りケーブル併用トラス橋を容易に施工して、短工期で構築することができる。
【0048】
前記各実施形態に示すように、本発明の場合には、吊りケーブル12の反力体としての橋台13にアンカーを取らせたままで吊りケーブル併用トラス橋22を使用する場合(他碇式の吊りケーブル併用トラス橋とする場合)と、橋台13(必要に応じグランドアンカー14)に作用している反力を開放し、橋体(トラス桁23)に定着させる自碇式とする場合の2つの方式どちらでも可能であり、また他碇式から自碇式に(または自碇式から他碇式に)2つの方式間においての変更も可能であり、自碇式にするか、他碇式にするか、使用条件に応じて適宜選択するとよい。また、自碇式にすると、本設の吊りケーブル併用トラス橋として有利であり、他碇式にすると、後に撤去が容易であるだけに、仮設の吊りケーブル併用トラス橋として有利である。また、他碇式または自碇式のいずれの場合も、使用条件等により、本設または仮設の吊りケーブル併用トラス橋としてもよい。
【0049】
【発明の効果】
本発明によると、次のような効果を有する。
1.従来のようなトラスを併用しない吊橋などでは、振動が大きくまた垂れの問題があるが、吊りケーブルにトラス桁を併用することでトラス桁の特性である高い剛性により、吊り橋の振動および垂れを抑制し、上床版上を車両の通行上も、前記の問題のない道路として利用することができる吊りケーブル併用トラス橋とすることができる。
2.吊ケーブルとトラス桁を併用することにより、トラス桁の構高の高さを小さくすることができ、吊りケーブル併用トラス橋の築造コストを低減することができ、コストダウンになる。
3.平板状のコンクリート製下床版を使用しないで、これに代わって、直線状の下弦材を使用しているので、吊りケーブル併用トラス橋の自重の軽減になる。
4.上床版、斜材および鉛直材、下弦材をユニットにした構造が簡単な複合トラスセグメントとされ、これを架設することで工期の短縮、およびコストダウンにつながる。
6.吊りケーブル併用トラス橋を、例えば施工手順とは逆の手順により、簡単に撤去でき仮設道路として有利である。
7.吊りケーブルを端部付近で、トラス桁に定着すると共に、橋台側の吊りケーブルの緊張を開放させて、自碇式にすることにより本設の橋梁としても利用できる。(吊ケーブルを橋台(アバット)に定着ささせ、橋台(アバット)はグラウンドアンカーなどでアンカーさせて釣り合っているが、長い間アンカーさせておくと、少しずつアンカー力が弱くなる。そこで、吊りケーブルの橋台(アバットヘの定着を切り、橋梁に定着させる。これを自碇という。)
8.本発明の場合には、吊りケーブルの反力体としての橋台にアンカーを取らせたままで吊りケーブル併用トラス橋を使用する場合(他碇式の吊りケーブル併用トラス橋とする場合)と、橋台(必要に応じグランドアンカー)に作用している反力を開放し、橋体(トラス桁)に定着させる自碇式とする場合の2つの方式どちらでも可能であり、また他碇式から自碇式に(または自碇式から他碇式に)2つの方式間においての変更も可能であり、自碇式にするか、他碇式にするか、使用条件に応じて適宜選択することができる。また、自碇式にすると、本設の吊りケーブル併用トラス橋として有利であり、他碇式にすると、後に撤去が容易であるだけに、仮設の吊りケーブル併用トラス橋として有利である。また、他碇式または自碇式のいずれの場合も、使用条件等により、本設または仮設の吊りケーブル併用トラス橋とすることができる。
【図面の簡単な説明】
【図1】(a)は間隔をおいて対向する橋台をグランドアンカーにより地盤にアンカーすると共に、各橋台に吊りケーブルの端部を挿通するためのケーシング管を埋め込み固定されている状態を示す概略側面図、(b)は(a)の一部を拡大して示す図である。
【図2】図1(a)の状態から各橋台にウインチを設けると共に、各ウインチに渡って支持線を配置し、一方のウインチから他方ウインチに向って吊りケーブルを繰り出し、橋台間に吊りケーブルを架設した状態を示す概略側面図である。
【図3】吊りケーブルを架設した後、一方の橋台から他方の橋台に向って吊りケーブルに乗せた複合トラスセグメントを順次送り出し、送り出された複合トラスセグメントを接合している状態を示す概略側面図である。
【図4】現場において既設の複合トラスセグメントの端部を型枠として利用して、新設の複合トラスセグメントを構築している状態を示す概略側面図である。
【図5】本発明の複合トラスセグメントの第1形態を示すものであって、(a)は正面図、(b)は側面図である。
【図6】本発明の複合トラスセグメントの第2形態を示すものであって、(a)は正面図、(b)は側面図である。
【図7】本発明の複合トラスセグメントの第3形態を示すものであって、(a)は正面図、(b)は側面図である。
【図8】橋軸方向に隣合う複合トラスセグメント相互の接合部を示す側面図である。
【図9】本発明における第1実施形態の吊りケーブル併用トラス橋を示す概略側面図である。
【図10】複合トラス桁の端部に吊りケーブルを定着する場合の端部の複合トラスセグメント付近を示す側面図である。
【図11】本発明における第2実施形態の吊りケーブル併用トラス橋を示す概略側面図である。
【図12】本発明の複合トラスセグメントの第4形態を示すものであって、(a)は正面図、(b)は側面図である。
【図13】本発明における第2実施形態の吊りケーブル併用トラス橋を示す概略側面図である。
【図14】(a)は本発明における第3実施形態の吊りケーブル併用トラス橋を示す概略側面図、(b)はその一部を拡大して示す図である。
【図15】複合トラス桁に吊りケーブルを定着させると共に、橋台側の吊りケーブルの緊張を開放して、自碇式の吊りケーブル併用トラス橋とした形態を示す概略側面図である。
【図16】複合トラスセグメントを各橋台から吊りケーブルの中央部に向って架設している状態を示す概略側面図である。
【符号の説明】
1 上弦材
2 上床版
3 鉛直材
4 下弦材
5 鉛直材
6 下弦材
7 斜材
8 サドル支持部材
9 サドル支持部材
10 複合トラスセグメント
11 サドル
12 吊りケーブル
13 橋台
14 グランドアンカー
15 地盤
16 外套管
17 ウインチ
18 ウインチ
19 支持線
20 ボルト挿通孔
21 高張力ボルト
22 吊りケーブル併用トラス橋
23 トラス桁
24 定着板
25 下部鉛直材
26 下部鉛直材
27 クレーン
29 定着部
30 足場
31 補強材
[0001]
TECHNICAL FIELD OF THE INVENTION
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a truss bridge combined with a suspension cable having a structure in which a truss girder is stiffened by a suspension cable, a construction method thereof, and a composite truss segment used for these.
[0002]
[Prior art]
Conventionally, as a bridge, a suspension bridge using a suspension cable or a truss bridge, or a truss structure bridge using a suspension cable described in JP-A-2001-182016 is known.
[0003]
In general, a suspension bridge as a bridge structure type has large vibration and droop, and vibration and droop still pose a problem in the suspended floor slab type bridge and the upper road type suspended floor slab bridge, though not as much as the above-mentioned suspension bridge.
[0004]
On the other hand, a truss bridge has the advantages of a high tall structure, a large truss, and high rigidity, but also has a problem that the construction cost is high and the surrounding landscape is impaired.
[0005]
Considering the construction site, in the case of mountainous bridges, if the construction road for constructing the intermediate piers would be expensive, a single-span bridge would be selected. For example, a steel Nielsen-Rose bridge or a hinged PC frame bridge with fixed ends is used, but the former Nielsen-Rose bridge requires the use of a cable crane for erection. Installation may be difficult depending on the rear terrain conditions. Further, in the latter type of the rigid-frame PC frame bridge having both ends fixed, the deformation due to creep is excessive, and the usability may be impaired.
[0006]
Further, recently, a road-type PC suspension deck bridge has been proposed. However, since both dead load and live load are borne by the tension of the suspension deck, when the span is long, the horizontal force acting on the lower structure becomes excessive. The upper floor slab supported by the vertical material may roll excessively.
[0007]
As a bridge construction type, as a general method of erection of a bridge having a truss structure, there is a method of assembling a shoring structure and constructing a truss structure thereon. In some cases, the pier or abutment may be erected without a shoring.
[0008]
Further, as described in Japanese Patent Application Laid-Open No. 2001-182016, as a truss bridge using cables, a triangular side unit serving as a lower floor slab and a diagonal member is provided on a cable stretched between abutments. A method of constructing a curved truss bridge in which an upper floor slab is erected after being suspended is also known.
[0009]
[Problems to be solved by the invention]
In the case of the curved truss bridge disclosed in Japanese Patent Application Laid-Open No. 2001-182016, it is necessary to separately install a unit having a triangular side surface and an upper floor slab. Are joined by cast-in-place concrete, so that the construction is complicated, the construction period is lengthened, and the construction cost is increased.
[0010]
An object of the present invention is to provide a unitized composite truss segment that can be used for a truss bridge with a suspension cable. For example, as a bridge of a single span in a mountainous region or the like, a truss bridge combined with a suspension cable having a structure type in which a truss girder such as a simple girder of a composite truss is stiffened with a suspension cable, and a method of constructing the same and a composite truss segment are provided. The purpose is to:
[0011]
Another object of the present invention is to provide a truss bridge combined with a suspension cable, which can be easily constructed by using the unitized composite truss segment and can be constructed in a short construction period, and a construction method thereof.
[0012]
[Means for Solving the Problems]
In order to advantageously solve the above problem, a composite truss segment according to claim 1 of the present invention is a composite truss segment used for a truss bridge combined with a suspension cable, wherein the composite truss segment is a first chord. An upper floor slab 2 also serving as a member 1 and lower chord members 4 and 6 integrally provided through a trussed structure member A provided with vertical members 3 and 5 for joining in the bridge axis direction. And a saddle 11 for a suspension cable.
[0013]
Further, in the invention of claim 2, in the composite truss segment according to claim 1, the web member A is composed of the vertical members 3,5 arranged at intervals in the bridge axis direction and the vertical members 3,5. A bolt hole 20 for joining the composite truss segments 10 adjacent to each other in the bridge axis direction is formed in the vertical members 3 and 5. 5 are provided at intervals in the vertical direction.
[0014]
According to the third aspect of the present invention, in the composite truss segment according to the first or second aspect, a space is provided in a bridge axis direction on both sides in a direction perpendicular to the bridge axis in a lower portion of the concrete upper slab 2 also serving as the upper chord member 1. The upper portions of the vertical members 3 and 5 are fixed to both ends, respectively, and the lower chord member 4 is arranged and fixed over the respective vertical members 3 on one side in the direction perpendicular to the bridge axis. Lower chord members 6 are arranged and fixed over the lower portions of the respective vertical members 5 on the side portions, and both sides of the concrete upper slab 2 in the direction perpendicular to the bridge axis, the vertical members 3 (5) and the lower chord members 4 (6) ), A diagonal member 7 is arranged and fixed in a portion surrounded by the above, and a saddle support member 9 is erected and fixed to vertical members 3 and 5 facing in the direction perpendicular to the bridge axis. And the suspension cable 12 Saddle 11 for mounting to the suspension cable, characterized in that it is fixed.
[0015]
Furthermore, in the truss bridge with a suspension cable according to a fourth aspect, the composite truss segment according to any one of the first to third aspects is used, and the suspension cable stretched between the abutments 13. 12, the saddle 11 for the suspension cable in the multiple composite truss segments 10 is placed on the suspension cable 12, and the vertical members 3, 5 in the composite truss segment 10 adjacent in the bridge axis direction are joined to each other, A composite truss girder 23 is formed, and the composite truss girder 23 is supported by the suspension cable 12 and distributes and bears a load by the suspension cable 12 and the truss girder 23.
[0016]
Furthermore, in the truss bridge with suspension cable according to claim 5, in the truss bridge with suspension cable according to claim 4, the suspension cables 12 are fixed to both ends of the composite truss girder 23 and the abutment 13 side. The tension of the suspension cable 12 is released and the suspension cable 12 is of a self-anchoring type.
[0017]
Further, in the method of constructing a truss bridge with suspension cables according to claim 6, after a plurality of suspension cables 12 are stretched between the abutments 13, the composite according to any one of claims 1 to 3. The truss segments 10 are sequentially placed on the suspension cable 12, and the composite truss segments 10 are sequentially sent out, and the vertical ends of the composite truss segments 10 adjacent to each other in the direction of the bridge axis are joined to each other by high-tensile bolts 21. And the composite truss girder 23 is mounted on the abutment 13 and the composite truss girder 23 supported by the suspension cable 12 is constructed.
[0018]
In the method of constructing a truss bridge with a suspension cable according to claim 7, after constructing the truss bridge with suspension cable 22 of claim 6, the suspension cable 12 is fixed to both ends of a composite truss girder 23, and It is characterized in that the tension of the end portion of the suspension cable engaging with the abutment 13 is released to release the reaction force of the suspension cable 12 acting on the abutment 13.
[0019]
Further, in the invention of claim 8, in the method of constructing a truss bridge with suspension cable according to claim 6, the suspension cable 12 of the abutment 13 is left without being cut, and after the truss bridge 22 with suspension cable is used, the suspension is used. It is characterized in that the truss bridge with suspension cables can be disassembled and removed by the reverse procedure to the construction method of the truss bridge with cables.
Further, in the invention of claim 8, in the method of constructing a truss bridge with suspension cable according to claim 7, the suspension cable 12 of the abutment 13 is left without cutting, and after using the truss bridge 22 with suspension cable, The suspension cable 12 in the abutment 13 is tensioned and fixed to the abutment 13, and the truss bridge with suspension cable can be disassembled and removed by a procedure reverse to the method of constructing a truss bridge with suspension cable. .
[0020]
According to the present invention, the following operations and effects are obtained.
1. Conventional suspension bridges that do not use trusses have large vibrations and have the problem of dripping.However, by using a truss girder together with the suspension cable, the vibration and droop of the suspension bridge are suppressed due to the high rigidity characteristic of truss girder. In addition, a truss bridge with a suspension cable can be used that can be used as a road free of the above-mentioned problem even when a vehicle passes on the upper floor slab.
2. By using the suspension cable and the truss girder together, the height of the truss girder can be reduced, the construction cost of the truss bridge with the suspension cable can be reduced, and the cost can be reduced.
3. Instead of using a flat concrete lower deck, instead of using a straight lower chord, the weight of the truss bridge combined with suspension cables is reduced.
4. A composite truss segment with a simple structure consisting of an upper slab, diagonal material, vertical material, and lower chord material is used as a unit. By installing this truss segment, the construction period can be shortened and costs can be reduced.
6. The truss bridge with suspension cables can be easily removed, for example, by a procedure reverse to the construction procedure, which is advantageous as a temporary road.
7. The suspension cable is fixed to the truss girder near the end, and the tension of the suspension cable on the abutment side is released, so that it can be used as a permanent bridge by self-anchoring. (The suspension cable is fixed to the abutment, and the abutment is anchored with a ground anchor, etc., but the anchoring force is weakened little by little if it is anchored for a long time. Abutment (cut off the abutment and fix it on the bridge. This is called self-anchoring.)
8. In the case of the present invention, a case where a truss bridge with a suspension cable is used while an anchor is fixed to an abutment as a reaction body of a suspension cable (a case with a truss bridge with a suspension cable with another anchor) and an abutment ( The self-anchor type, which releases the reaction force acting on the ground anchor (if necessary) and fixes it to the bridge (truss girder), can be used. It is also possible to change between the two systems (or from the self-anchoring system to the other-anchoring system), and it is possible to appropriately select whether to use the self-anchoring system or the other-anchoring system according to the use conditions. In addition, a self-anchoring type is advantageous as a truss bridge with a suspension cable that is permanently installed, and an anchoring type is advantageous as a truss bridge with a temporary suspension cable because it is easily removed later. In addition, in any of the anchor type and the self-anchor type, a truss bridge combined with a permanent or temporary suspension cable can be used depending on use conditions and the like.
[0021]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
First, the form of the composite truss segment 10 used in the truss bridge with a suspension cable according to the first embodiment of the present invention will be described with reference to FIGS. The upper portions of the vertical members 3 and 5 made of steel pipe are respectively embedded and fixed at both ends in the bridge axis direction on both sides in the direction perpendicular to the bridge axis at the lower part of the bridge member, and the respective vertical members 3 on one side in the direction perpendicular to the bridge axis are fixed. A lower chord member 4 extending in the bridge axis direction is disposed and fixed over the lower portion, and a lower chord member extending in the bridge axis direction over the lower portion of each of the vertical members 5 on the other side in the direction perpendicular to the bridge axis. 6 is arranged and fixed, and a pair of diagonal members is provided at a portion surrounded by the lower part on both sides in the direction perpendicular to the bridge axis of the concrete upper slab 2 and the vertical member 3 (5) or the lower chord member 4 (6). 7 is arranged in an inverted V shape, The upper and lower portions of the diagonal members 7 are fixed to the upper floor slab 2 and the vertical members 3 (5) or the lower chord members 4 (6), and the vertical members 3, 5 and the bridge shaft at one end in the bridge axis direction opposed to the bridge shaft perpendicular direction. Saddle support members 8 and 9 made of steel pipes are erected on the vertical members 3 and 5 at the other end in the direction, fixed by bolts or welding, and mounted on suspension cables below the saddle support members 8 and 9. A plurality (six in the illustrated case) of downwardly opening groove-shaped saddles 11 are arranged and fixed at intervals in the direction perpendicular to the bridge axis. Abdominal material A is constituted by the vertical material 3 (5) and the diagonal material 7.
For fixing the vertical member 3 (5) and the diagonal member 7 or the lower chord member 4 (6) arranged in the same vertical plane in the composite truss segment 10, when these are made of concrete, anchor bolts or the like are used. In the case of steel, a bolt or welding is used.
[0022]
The mounting positions of the saddle supporting members 8 and 9 attached to the front vertical members 3 and 5 and the rear vertical members 3 and 5 in the bridge axis direction of the composite truss segment 10 are the suspension cables on which the composite truss segment 10 is installed. And the level of the saddle 11 is determined by the mounting positions of the saddle support members 8 and 9. The composite truss segments 10 in the form shown in FIGS. 5, 6 and 7 are respectively in the middle part, the end part, and the center part in the state of being constructed as shown in FIG. 3 and in the completed truss bridge with suspension cable shown in FIG. The configuration of the composite truss segment 10 located in the vicinity is shown as a representative.
[0023]
On the inner peripheral surface of the concave groove 11a having a circular cross section extending in the bridge axis direction of the saddle 11, a tetrafluoroethylene plate having a circular cross section is interposed to reduce friction with a suspension cable. The polyethylene pipe having a curved shape or the like in the bridge axis direction on the lower surface of the concave groove 11a is prevented from being damaged.
[0024]
The saddle supporting members 8 and 9 are reinforced by reinforcing members 31 such as diagonal members fixed to the vertical members 3 and 5 and the saddle supporting members 8 and 9. At an appropriate position at the end of the composite truss segment 10, although not shown, a fixed or detachable connecting portion for pulling the composite truss segment 10 by a tow rope is provided.
[0025]
The above-mentioned composite truss segments 10 are preferably assembled and constructed near a construction site. In advance, near a factory or a site, a precast upper slab 2, a steel pipe or a precast concrete vertical member 3, 5, a lower chord member 4, 6 is manufactured, and these members are conveyed and assembled by bolting or the like. In addition, in order to make the joining surfaces of the composite truss segments 10 that are already built adjacent to each other in the direction of the bridge axis coincide with each other, near the site, as shown in FIG. In particular, using the upper slab 2) as a formwork or the like, and constructing a new composite truss segment 10 (10B) (especially the upper slab 2 is preferably a match cast concrete slab that is advantageous for joining), the existing composite truss segment 10 (10B) is then used. The step of transporting the truss segments 10 from a crane or the like may be repeated to build all the composite truss segments 10. When the lower chord member 4 is made of concrete, a bridge shaft is provided in the lower chord member 4 in order to reduce a tension due to a post-dead load or a live load when a truss bridge 22 with a suspension cable described later is built. It is preferable to embed and fix a PC steel material in the direction, and to introduce prestress by the PC steel material.
[0026]
Next, using the composite truss segment 10, a truss bridge with a suspension cable according to the present invention and a method of constructing the same will be described based on a first embodiment as a representative embodiment. In the second to fourth embodiments, different parts will be mainly described.
First, as shown in FIG. 1A, an abutment 13 opposing at a distance as an abutment serving as a reaction force bearing portion is anchored to the ground 15 by a plurality of ground anchors 14, and suspended on each abutment 13. A plurality of (six in the illustrated case) steel casing tubes 16 for inserting the ends of the cables are embedded and fixed at intervals in the direction perpendicular to the bridge axis, and penetrate the abutment 13 in the bridge axis direction. Embedded and fixed as shown.
[0027]
Next, as shown in FIG. 2, a plurality of winches 17, 18 are provided on each abutment 13 in a direction perpendicular to the bridge axis, and a support wire 19 such as a steel rope is arranged over a drum of each winch 17, 18. Each of the distal ends 12a of the suspension cables 12 composed of a plurality of (six in the case of the drawing) prefabricated cables is inserted into the casing tube 16 of one of the abutments 13, and as shown by the two-dot line in FIG. While supporting the distal end of the cable 12 with the support wire 19, the winches 17, 18 are driven to wind up the support wire 19 around the drum of the winch 18, and the suspension cables 12 are paid out. A known suspension cable insertion sleeve is formed by setting the end of the suspension cable 12 to the rear side of the abutment 13 and tensioning the suspension cable 12 by a jack or the like at a preset tension. And by fixing a hanging cable 12 by the wedge type fixing member or the like using a wedge, erection each hanging cable 12 between abutments 13 (tension). By using a prefabricated cable for the suspension cable 12, grouting into the mantle tube 16 formed of a steel casing tube or the like can be omitted.
[0028]
Next, as shown in FIG. 3, one of the abutments 13 is sequentially formed from the composite truss segments 10 (form shown in FIG. 6) on the end side shown in the representative form in FIGS. (13a) The compound truss segment 10 is suspended from the six suspension cables 12 by a crane or the like (not shown) from the side, and the suspension cable 12 And is moved toward the other abutment 13 (13b) by a tow rope or the like connected to the connecting portion of the composite truss segment 10, and reaches the other abutment 13 (13b). At the end of the composite truss segment 10 on the end side, the bearing device on the abutment 13 is appropriately raised and engaged and mounted. In addition, the code | symbol 30 in a figure is a scaffold.
[0029]
Hereinafter, the composite truss segments 10 are sequentially transported and mounted on the suspension cables 12 by a crane or the like, and as shown in FIG. 3, the suspension cables 12 are moved from one abutment 13 (13A) to the other abutment 13 (13B). The composite truss segments 10 placed on the composite truss segments 10 are sequentially pulled and sent out, sent out to a predetermined position so as to match the end faces of the already arranged composite truss segments 10, and the composite truss segments 10 sent out to the predetermined positions are As shown in FIG. 8, a high tension bolt 21 is inserted between the vertical members 3 of the adjacent composite truss segments 10 through bolt insertion holes 20 provided at intervals in the vertical direction. It is configured to be joined by a tension bolt 21 and to transmit a shear force by the high tension bolt 21. As the high-tensile bolt, a joint using a friction joining type or a driving high-strength bolt may be used.
[0030]
Hereinafter, the composite truss segments 10 are sequentially placed on the suspension cable 12 and sent out, and are arranged at predetermined positions. Then, the composite truss segments 10 are joined with the high tension bolts 21, and the final composite truss segment 10 is placed on the suspension cable 12. The high-tensile bolt 21 is used to join the existing composite truss segment 10, and the end of the composite truss segment 10 on the rear end side raises the bearing device (not shown) on the abutment 13 as appropriate. And place it in engagement. Then, as shown in FIG. 9, a truss girder 23 is constructed, and each suspension cable 12 is used as a main cable of a bridge completion system, and the truss girder 23 is supported by these suspension cables 12. Build bridge 22. After the truss girders 23 are constructed, road pavement is provided on the upper surface of the upper slab 2 at an appropriate time.
As described above, since the unitized composite truss segment 10 is used, labor can be saved and the construction period can be shortened.
When the composite truss segments 10 are joined to each other with the high-tensile bolts 21, the composite truss segments 10 may be joined sequentially as described above. However, in a state where 3 to 4 units of the composite truss segments 10 are connected in series, When the first and second composite truss segments 10 are joined to each other by the high-tensile bolts 21, there is no displacement or opening of the adjacent composite truss segments 10, and the composite truss segments 10 can be relatively easily raised. The joining can be performed by the tension bolt 21. Further, in order to prevent the adjacent composite truss segments 10 from shifting and opening, all the composite truss segments 10 are laid on the suspension cables 12 and then the adjacent composite truss segments 10 are joined to each other by the high tension bolts 21. You may make it. Therefore, the position of the bolt insertion hole 20 provided in the vertical member 3 (5) is determined, for example, by setting the bolt insertion hole 20 between the adjacent composite truss segments 10 in a state where all the composite truss segments 10 are placed on the suspension cable 12. May be set in advance so that there is no displacement.
[0031]
A compressive force is automatically introduced to the concrete upper slab 2 (upper chord 1) in the composite truss segment 10 by a post-dead load. A steel material may be arranged in the bridge axis direction, and prestress may be introduced into the upper floor slab 2 by the PC steel material.
[0032]
The structure of the truss bridge 22 with a hanging cable is a structure in which a simple girder of a composite truss is stiffened with a hanging cable. LL / 8 (where L is a suspension span by the suspension cable 12), but the height of the truss bridge 22 with suspension cable of the present invention can be set to approximately L / 20. The members such as the vertical members 3 and 5 and the diagonal member 7 can be short members. In the truss bridge 22 with a suspension cable, the dead load is mainly supported by the suspension cable 12, and the live load is mainly shared by the rigidity of the truss girder 23. Thus, the structure is such that the load is distributed and burdened by the suspension cable 12 and the truss girders.
[0033]
In addition, since the suspension cable 12 and the truss girder 23 are used in combination, the high rigidity of the truss makes it possible to form a bridge on the upper floor slab 2 through which vehicles can pass, and the truss girder 23 is supported by the suspension cable 12. With this structure, the behavior of the suspension cable 12 engaging with the saddle 11 can be stabilized by the truss girders 23. Also, by leaving the end of the suspension cable 12 without cutting, the construction procedure of the truss bridge 22 with the suspension cable is easily dismantled by, for example, the reverse procedure. Can be removed.
[0034]
Further, since the suspension cable 12 is used as it is as the main cable for the bridge completion system, the material used can be reduced as compared with the case where the suspension cable 12 and the main cable for the bridge completion system are separated.
[0035]
In the truss bridge 23 with a suspension cable according to the embodiment, the suspension cable 12 is fixed to the abutment 13. As shown in FIG. 15, the end of the suspension cable 12 is fixed to the fixing portion 29 of the end of the truss girder 23. And the tension state of the suspension cable 12 on the abutment 13 side is released, and the abutment 13 as a reaction force body of the suspension cable 12 is released to be self-anchor type. The combined truss bridge 22 with a suspension cable may be used. In this case, if necessary, the tension of the ground anchor 14 on the abutment 13 side may be released. In order to fix to the end of the truss girder 23 in this way, for example, as shown in FIG. 10, before or after attaching to the vertical members 3 and 5 of the composite truss segment 10 located at the end on the abutment side, A fixing plate 29 made of steel is provided to form a fixing portion 29, and the suspension cable 12 is fixed to the truss girder 23 in front of each abutment 13 by, for example, a well-known wedge-type fixing device using a suspension cable insertion sleeve and a wedge. Just fine.
[0036]
<Second embodiment>
FIG. 11 shows a second embodiment of the truss bridge with suspension cables 22 constructed in the same manner as the method of constructing the truss bridge with suspension cables. In this embodiment, in the plurality of composite truss segments 10 located on the end side of the truss girder 23, the vertical members 3 and 5 and the diagonal members 7 located below the suspension cable 12 are shortened, and the truss girder 23 This is a mode in which the height of the end side is reduced, and other configurations and modifications are the same as those of the above-described embodiment. Therefore, the same components are denoted by the same reference numerals and description thereof is omitted.
[0037]
In this manner, the amount of steel material used for the composite truss segment 10 on the end side of the truss girder 23 may be suppressed to a low level so as to match the landscape.
[0038]
<Third embodiment>
FIG. 13 shows a third embodiment of the truss bridge with suspension cables 22 constructed in the same manner as the method of constructing the truss bridge with suspension cables. In this embodiment, the height of the truss portion can be made smaller than the sag of the suspension cable 12, lower vertical members 25 and 26 for suspension cable eccentricity are attached from the lower chord material point, and the composite truss segment 10 is suspended. This is a form supported by a cable 12. More specifically, in this embodiment, a plurality of composite truss segments 10 located at an intermediate portion of the truss girder 23 have a form as shown in FIG. In the composite truss segment 10, the upper portions of the lower vertical members 25 and 26 made of four steel pipe members are welded or welded on the lower extensions of the respective vertical members 3 and 5 and on the lower surfaces of the points of the lower chord members 4 and 6. The saddle supporting members 8 and 9 are fixed to the predetermined level of the lower vertical members 25 and 26 facing each other in advance by welding or bolts, and six saddles are attached to the saddle supporting members 8 and 9 in the same manner as described above. 11 is provided.
[0039]
In this way, the vertical height of the truss girder 23 may be constant, and the lower vertical members 25 and 26 may be used as eccentric vertical members for eccentricizing the suspension cable 12 from the truss girder 23. Other configurations and modifications are the same as those of the above-described embodiment, and thus, the same portions are denoted by the same reference numerals and description thereof will be omitted.
[0040]
<Fourth embodiment>
FIG. 14 shows a fourth embodiment of a truss bridge with suspension cables 22 constructed in the same manner as the method of constructing a truss bridge with suspension cables. In this embodiment, a composite truss segment 10 having a configuration as shown in FIG. 7 is used over the entire length of a truss girder 23. However, the lengths of the vertical members 3 and 5 and the diagonal members 7 vary symmetrically over the entire length of the truss girder 23, and the lower chord members 4 and 6 are formed from a linear lower chord material as necessary. It has an arcuate lower chord. In this embodiment, the height of the truss girder 23 is changed in a curved shape over the entire length of the truss girder 23. Other configurations and modifications are the same as those of the above-described embodiment, and thus, the same portions are denoted by the same reference numerals and description thereof will be omitted.
[0041]
As in this embodiment, the height may be increased at the center of the truss girder 23 and may be changed over the entire length of the truss girder 23. As in the first embodiment to the fourth embodiment, the height of the truss girder 23 may be appropriately reduced or increased. Generally, when the height of the truss girder 23 is increased, When the height of the truss girder 23 is reduced and the suspension cable 12 is largely eccentric, the structural characteristics of the suspension structure dominate. The height of the truss girder 23 may be determined from the viewpoint of the landscape with the surrounding natural scenery, the deflection, vibration, fatigue, and the like of the truss bridge 23 with the suspension cable.
[0042]
As in the first to fourth embodiments, the unit truss segments 10 are used, and the upper floor slabs 2 are successively connected to form a bridge surface, and the truss bridge 22 with the suspension cable is built. Since the work on the bridge surface can be reduced, the use of construction materials such as scaffolds for construction can be reduced as in the related art.
[0043]
In the composite truss segment 10, the lower chords 4 and 6 are tension members, so there is no possibility of buckling. However, depending on the loading conditions, the lower chords 4 and 6 may be in a compressed state. In some cases, in order to increase the torsional rigidity of the composite truss segment 10 and prevent the lower chords 4 and 6 from buckling, a horizontal connecting member may be attached to the point of the lower chords 4 and 6 to prevent buckling. .
[0044]
In the case where the composite truss segment 10 is installed on the suspension cable 12, the composite truss segment 10 is pulled from one abutment 13 toward the other abutment 13 in the above-described embodiment. The suspension cable 13 may be pulled and transported from the abutment 13 to the center of the suspension cable 12, and may be erected from the center of the suspension cable 12 toward each abutment 13. As shown in FIG. 16, the composite truss segments 10 are sequentially laid on the suspension cables 12 from both opposed abutments 13 toward the center of the suspension cables 12, and the vertical members of the adjacent composite truss segments 10 are connected to each other. 3 (5) The composite truss segments 10 may be connected to each other by high tension bolts, suspended and conveyed by the cranes 27 traveling on the composite truss segments 10, and installed on the suspension cables 12. When the composite truss segment 10 is installed on the suspension cable 12 from both abutments 13 in this way, a truss bridge with a suspension cable can be constructed in a shorter construction period, and the construction cost can be reduced.
[0045]
The following can be said when the features of the truss bridge with suspension cable and the method of constructing the same using the composite truss segment of the above embodiment are listed.
{Circle around (1)} The composite truss girder 23 is composed of a concrete upper slab 2 also serving as the upper chord 1, lower chords 4, 6, diagonal 7, and vertical members 3, 5 of steel members or concrete members. Of the composite truss segments 10.
(2) The grout work can be omitted by using a prefabricated cable for the suspension cable 12.
{Circle around (3)} The truss girder 23 can be installed by placing the composite truss segment 10 divided in the bridge axis direction on the suspension cable 12 and sending it out.
{Circle around (4)} The composite truss segment 10 can be easily assembled at the site by assembling the precast concrete upper slab 2, the lower chord members 4, 6 and the abdominal material A, which have been manufactured at the factory or the site in advance, to construct a unit.
{Circle around (5)} The joints (particularly concrete members) of the composite truss segment 10 are of a match cast structure, and the lower chords 4, 6 are made of PC steel in order to reduce the tension due to the post-dead load or live load. Stress should be introduced.
{Circle over (6)} The compressive force is automatically introduced into the concrete upper slab 2 (upper chord material 1) by the post-dead load. However, in some cases, a prestress may be introduced by a PC steel material.
{Circle around (7)} The vertical members 3, 5 on the joint surface of the composite truss segment have a structure in which shear force is transmitted by HT bolts (high tension bolts).
{Circle around (8)} The height of the steel truss bridge 22 having a single diameter is generally L / 10 to L / 8, but the structure type of the present invention can be set to about L / 20, which is excellent in view. .
(9) When the bridge (the truss bridge 22 with the suspension cable) becomes unnecessary, the truss bridge 22 with the suspension cable can be easily removed by using the suspension cable 12.
[0046]
In each of the above embodiments, when the temporary or permanent suspension cable combined truss bridge 22 is dismantled and removed, the suspension cables 12 are fixed in a state where the abutment 13 side of the suspension cables 12 is tensioned, and then sequentially moved to the end side. After removing the high tension bolts 21 joining the vertical members 3 and the vertical members 5 of the composite truss segment 10 and the composite truss segment 10 connected thereto, the composite truss segment 10 at the end side is removed by a crane or the like. Then, the high-tensile bolts 21 joining the composite truss segments 10 to each other are sequentially removed, and the separated composite truss segments 10 are moved to the abutment 13 side by a winch or the like via a strip such as a rope. Then, the composite truss segment 10 is removed from the suspension cable 12 by a crane or the like. After removing the composite truss segment 10 and installing a plurality of winches 17 and 18 on each abutment 13, each support wire 19 is stretched over these drums, and each of the drawn out from each casing tube 16 on one abutment 13. The end of the suspension cable 12 is locked and held by the support wire 19, and the winch 17 (18) can be driven to be conveyed to the other abutment 13 side and removed. As described above, the truss bridge 22 with the suspension cable can be easily dismantled and removed in a procedure reverse to the method of constructing the truss bridge 22 with the suspension cable.
[0047]
According to the above embodiment, using a unitized composite truss segment, for example, as a bridge of a single diameter in a mountainous region or the like, a structural form in which a truss girder such as a composite girder simple girder is stiffened with a suspension cable Truss bridges with suspension cables can easily be constructed and constructed in a short construction period.
[0048]
As shown in the above embodiments, in the case of the present invention, a case where the truss bridge 22 with the suspension cable is used while the anchor is fixed to the abutment 13 as the reaction force body of the suspension cable 12 (another anchor type suspension) A cable-combined truss bridge) and a self-anchoring type in which the reaction force acting on the abutment 13 (and the ground anchor 14 as necessary) is released and fixed to the bridge body (truss girder 23). Either method is possible, and it is also possible to change between the two methods from self-anchoring type to self-anchoring type (or from self-anchoring type to another anchoring type). Or it may be appropriately selected depending on the use conditions. In addition, a self-anchoring type is advantageous as a truss bridge with a suspension cable that is permanently installed, and an anchoring type is advantageous as a truss bridge with a temporary suspension cable because it is easily removed later. In addition, in either case of the other anchor type or the self anchor type, a truss bridge combined with a permanent or temporary suspension cable may be used depending on use conditions and the like.
[0049]
【The invention's effect】
According to the present invention, the following effects are obtained.
1. Conventional suspension bridges that do not use trusses have large vibrations and have the problem of dripping.However, by using a truss girder together with the suspension cable, the vibration and droop of the suspension bridge are suppressed due to the high rigidity characteristic of truss girder. In addition, a truss bridge with a suspension cable can be used that can be used as a road free of the above-mentioned problem even when a vehicle passes on the upper floor slab.
2. By using the suspension cable and the truss girder together, the height of the truss girder can be reduced, the construction cost of the truss bridge with the suspension cable can be reduced, and the cost can be reduced.
3. Instead of using a flat concrete lower deck, instead of using a straight lower chord, the weight of the truss bridge combined with suspension cables is reduced.
4. A simple composite truss segment composed of a unit consisting of an upper deck, diagonal members, vertical members, and lower chord members is a simple composite truss segment.
6. The truss bridge with suspension cables can be easily removed by, for example, a procedure reverse to the construction procedure, which is advantageous as a temporary road.
7. The suspension cable is fixed to the truss girder near the end, and the tension of the suspension cable on the abutment side is released, so that it can be used as a permanent bridge by self-anchoring. (The suspension cable is fixed to the abutment, and the abutment is anchored with a ground anchor, etc., but the anchoring force is weakened little by little if it is anchored for a long time. Abutment (cut off the abutment and fix it on the bridge. This is called self-anchoring.)
8. In the case of the present invention, a case where a truss bridge with a suspension cable is used while an anchor is fixed to an abutment as a reaction body of a suspension cable (a case with a truss bridge with a suspension cable with another anchor) and an abutment ( The self-anchor type, which releases the reaction force acting on the ground anchor (if necessary) and fixes it to the bridge (truss girder), can be used. It is also possible to change between the two systems (or from the self-anchoring system to the other-anchoring system), and it is possible to appropriately select whether to use the self-anchoring system or the other-anchoring system according to the use conditions. In addition, a self-anchoring type is advantageous as a truss bridge with a suspension cable that is permanently installed, and an anchoring type is advantageous as a truss bridge with a temporary suspension cable because it is easily removed later. In addition, in any of the anchor type and the self-anchor type, a truss bridge combined with a permanent or temporary suspension cable can be used depending on use conditions and the like.
[Brief description of the drawings]
FIG. 1A is a schematic view showing a state in which abutments facing each other at intervals are anchored to the ground by ground anchors, and a casing pipe for inserting an end of a suspension cable is embedded in each abutment and fixed. FIG. 2B is a side view, and FIG. 2B is an enlarged view of a part of FIG.
FIG. 2 shows a state in which a winch is provided on each abutment from the state of FIG. 1 (a), a support wire is arranged over each winch, a suspension cable is extended from one winch toward the other winch, and a suspension cable is provided between the abutments. It is a schematic side view which shows the state which installed.
FIG. 3 is a schematic side view showing a state in which composite truss segments mounted on a suspension cable are sequentially sent out from one abutment to the other abutment after a suspension cable is erected, and the sent out composite truss segments are joined. It is.
FIG. 4 is a schematic side view showing a state where a new composite truss segment is being constructed at the site by using an end of the existing composite truss segment as a formwork.
FIGS. 5A and 5B show a first embodiment of the composite truss segment of the present invention, wherein FIG. 5A is a front view and FIG. 5B is a side view.
FIG. 6 shows a second embodiment of the composite truss segment of the present invention, wherein (a) is a front view and (b) is a side view.
FIG. 7 shows a third embodiment of the composite truss segment of the present invention, wherein (a) is a front view and (b) is a side view.
FIG. 8 is a side view showing a joint portion between composite truss segments adjacent in the bridge axis direction.
FIG. 9 is a schematic side view showing a truss bridge with suspension cables according to the first embodiment of the present invention.
FIG. 10 is a side view showing the vicinity of the composite truss segment at the end when the suspension cable is fixed to the end of the composite truss girder.
FIG. 11 is a schematic side view showing a truss bridge with suspension cables according to a second embodiment of the present invention.
FIG. 12 shows a fourth embodiment of the composite truss segment of the present invention, wherein (a) is a front view and (b) is a side view.
FIG. 13 is a schematic side view showing a truss bridge with suspension cables according to a second embodiment of the present invention.
14A is a schematic side view showing a truss bridge with a suspension cable according to a third embodiment of the present invention, and FIG.
FIG. 15 is a schematic side view showing a form in which a suspension cable is fixed to the composite truss girder and the tension of the suspension cable on the abutment side is released to form a self-anchoring type truss bridge with suspension cable.
FIG. 16 is a schematic side view showing a state where a composite truss segment is erected from each abutment toward the center of a suspension cable.
[Explanation of symbols]
1 Upper chord material
2 Upper floor version
3 vertical materials
4 Lower chord material
5 vertical materials
6 Lower chord material
7 Diagonal lumber
8 Saddle support members
9 Saddle support members
10 Composite truss segment
11 saddle
12 Suspension cable
13 Abutment
14 Ground anchor
15 Ground
16 Mantle tube
17 winches
18 winches
19 Support line
20 bolt insertion hole
21 High tension bolt
22 Truss Bridge with Suspended Cable
23 Truss girder
24 Fixing plate
25 Lower vertical material
26 Lower vertical material
27 crane
29 Fixing unit
30 Scaffold
31 Reinforcement

Claims (9)

吊りケーブル併用トラス橋に使用される複合トラスセグメントであって、前記複合トラスセグメントは、上弦材を兼ねる上床版と、これに橋軸方向の接合用の鉛直材を備えたトラス構造の腹材を介して一体に設けられた下弦材とによりユニット化されていると共に、吊りケーブル用のサドルを備えていることを特徴とする複合トラスセグメント。A composite truss segment used in a truss bridge combined with a suspension cable, wherein the composite truss segment includes an upper floor slab also serving as an upper chord material, and a truss structure web member provided with a vertical material for joining in a bridge axis direction. A composite truss segment which is unitized by a lower chord material provided integrally with the truss, and has a saddle for a suspension cable. 前記腹材は、橋軸方向に間隔をおいて配置された鉛直材とこれらの鉛直材の間に配置されている斜材とにより構成され、前記鉛直材には、橋軸方向に隣合う複合トラスセングメント相互を接合するためのボルト孔が、鉛直材の上下方向に間隔をおいて設けられていることを特徴とする請求項1に記載の複合トラスセグメント。The web member is composed of a vertical member arranged at an interval in the bridge axis direction and a diagonal member disposed between these vertical members, and the vertical member has a composite adjacent to the bridge member in the bridge axis direction. The composite truss segment according to claim 1, wherein bolt holes for connecting the truss segments are provided at intervals in a vertical direction of the vertical member. 上弦材を兼ねるコンクリート製上床版の下部における橋軸直角方向の両側における橋軸方向に間隔をおいた両端部に、それぞれ鉛直材の上部が固定され、橋軸直角方向の一側部における前記各鉛直材に渡って下弦材が配置されて固定され、かつ橋軸直角方向の他側部における前記各鉛直材の下部に渡って下弦材が配置されて固定され、前記コンクリート製上床版における橋軸直角方向の両側と、鉛直材および下弦材とにより囲まれた部分に斜材が配置されて固定されて、かつ橋軸直角方向に対向する鉛直材に、サドル支持部材が架設固定され、前記サドル支持部材の下部に、吊りケーブルに載置される吊りケーブル用のサドルが固定されていることを特徴とする請求項1または2に記載の複合トラスセグメント。The upper portion of the vertical material is fixed to both ends of the concrete upper floor slab that also serves as the upper chord material at both ends in the bridge axis direction on both sides in the direction perpendicular to the bridge axis, and the upper portions of the vertical materials are fixed to each other on one side in the direction perpendicular to the bridge axis. A lower chord member is arranged and fixed over the vertical member, and a lower chord member is arranged and fixed over the lower part of each of the vertical members on the other side in the direction perpendicular to the bridge axis, and the bridge shaft in the concrete upper slab is formed. A diagonal member is arranged and fixed on both sides in the right angle direction and a portion surrounded by the vertical member and the lower chord member, and a saddle support member is erected and fixed on the vertical member facing in the direction perpendicular to the bridge axis. The composite truss segment according to claim 1, wherein a saddle for a suspension cable placed on the suspension cable is fixed to a lower portion of the support member. 請求項1〜請求項3のいずれか1項に記載の複合トラスセグメントが使用されて、橋台間に渡って張架された吊りケーブルに、前記多数の複合トラスセグメントにおける吊りケーブル用のサドルが前記吊りケーブルに載置され、かつ橋軸方向に隣り合う複合トラスセグメントにおける鉛直材相互が接合されて、複合トラス桁が構成され、さらに複合トラス桁が吊りケーブルより支持されて、吊りケーブルとトラス桁とにより荷重を分配負担させていることを特徴とする吊りケーブル併用トラス橋。The composite truss segment according to any one of claims 1 to 3, wherein a saddle for the suspension cable in the multiple composite truss segments is provided on a suspension cable stretched between abutments. The vertical members of the composite truss segments placed on the suspension cable and adjacent in the bridge axis direction are joined to each other to form a composite truss girder, and the composite truss girder is supported by the suspension cable, and the suspension cable and the truss girder are supported. A truss bridge combined with a suspension cable, characterized in that the load is distributed and burdened by: 請求項4に記載の吊りケーブル併用トラス橋において、複合トラス桁の両端部に吊りケーブルが定着されていると共に、橋台側の吊りケーブルの緊張力が開放されて、自碇式とされていることを特徴とする吊りケーブル併用トラス橋。The suspension cable combined truss bridge according to claim 4, wherein the suspension cable is fixed to both ends of the composite truss girder, and the tension of the suspension cable on the abutment side is released to be a self-anchoring type. A truss bridge combined with a suspension cable. 橋台間に渡って複数本の吊りケーブルを張架した後、請求項1〜3のいずれか1項に記載の複合トラスセグメントを順次前記ケーブルに載置して、複合トラスセグメントを順次送り出し、送り出された橋軸方向に隣り合う各複合トラスセグメントにおける端部鉛直材相互を高張力ボルトにより接合して複合トラス桁を構築する共に複合トラス桁端部を橋台に載置し、かつ吊りケーブルより支持された複合トラス桁を構築することを特徴とする吊りケーブル併用トラス橋の構築方法。After a plurality of suspension cables are stretched between the abutments, the composite truss segments according to any one of claims 1 to 3 are sequentially placed on the cables, and the composite truss segments are sequentially delivered and delivered. At the composite truss segments adjacent to each other in the axial direction of the bridge, the vertical members at the ends are joined together with high-tensile bolts to construct a composite truss girder, and the composite truss girder end is placed on the abutment and supported by suspension cables A method of constructing a truss bridge combined with suspension cables, characterized by constructing a composite truss girder. 請求項6の吊りケーブル併用トラス橋を構築した後、複合トラス桁の両端部に前記吊りケーブルを定着すると共に、前記橋台に係合する吊りケーブル端部の緊張力を開放して、橋台に作用している吊りケーブルの反力を開放することを特徴とする吊りケーブル併用トラス橋の構築方法。After the suspension cable combined truss bridge of claim 6 is constructed, the suspension cable is fixed to both ends of the composite truss girder, and the tension of the suspension cable end engaging with the abutment is released to act on the abutment. A method of constructing a truss bridge combined with suspension cables, characterized by releasing the reaction force of the suspended suspension cables. 請求項6の吊りケーブル併用トラス橋の構築方法において、橋台部分の前記吊りケーブルを切断することなく残し、吊りケーブル併用トラス橋を使用後に、吊りケーブル併用トラス橋の構築方法とは逆の手順により、吊りケーブル併用トラス橋を分解撤去可能にされていることを特徴とする吊りケーブル併用トラス橋の構築方法。In the method of constructing a truss bridge with a suspension cable according to claim 6, the suspension cable of the abutment portion is left without being cut, and after using the truss bridge with a suspension cable, the procedure is reverse to that of the method of constructing a truss bridge with a suspension cable. A method for constructing a truss bridge with suspension cables, wherein the truss bridge with suspension cables can be disassembled and removed. 請求項7の吊りケーブル併用トラス橋の構築方法において、橋台部分の前記吊りケーブルを切断することなく残し、吊りケーブル併用トラス橋を使用後に、前記橋台部分の吊りケーブルを緊張させて橋台に定着し、吊りケーブル併用トラス橋の構築方法とは逆の手順により、吊りケーブル併用トラス橋を分解撤去可能にされていることを特徴とする吊りケーブル併用トラス橋の構築方法。8. The method of constructing a truss bridge with a suspension cable according to claim 7, wherein the suspension cable in the abutment part is left without being cut off, and after using the truss bridge with a suspension cable, the suspension cable in the abutment part is tightened and fixed to the abutment. A method of constructing a truss bridge with suspension cables, characterized in that the truss bridge with suspension cables can be disassembled and removed by the reverse procedure to the method of constructing a truss bridge with suspension cables.
JP2002181464A 2002-06-21 2002-06-21 Composite truss segment and truss bridge with suspension cable using the same and its construction method Expired - Fee Related JP3881598B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002181464A JP3881598B2 (en) 2002-06-21 2002-06-21 Composite truss segment and truss bridge with suspension cable using the same and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002181464A JP3881598B2 (en) 2002-06-21 2002-06-21 Composite truss segment and truss bridge with suspension cable using the same and its construction method

Publications (2)

Publication Number Publication Date
JP2004027516A true JP2004027516A (en) 2004-01-29
JP3881598B2 JP3881598B2 (en) 2007-02-14

Family

ID=31178295

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002181464A Expired - Fee Related JP3881598B2 (en) 2002-06-21 2002-06-21 Composite truss segment and truss bridge with suspension cable using the same and its construction method

Country Status (1)

Country Link
JP (1) JP3881598B2 (en)

Cited By (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007063797A (en) * 2005-08-30 2007-03-15 Oriental Construction Co Ltd Extruding erection method for bridge
JP2009167791A (en) * 2009-03-16 2009-07-30 Sumitomo Mitsui Construction Co Ltd Construction method of upper deck type suspension floor slab bridge
CN102720138A (en) * 2012-06-29 2012-10-10 中铁大桥局集团有限公司 Steel truss girder erecting system and method and lifting station
CN103194973A (en) * 2013-04-02 2013-07-10 中铁大桥局股份有限公司 Novel spliced truss for bridge construction and construction method
CN103210148A (en) * 2010-09-27 2013-07-17 崔夏祯 Truss structure having an open-section upper chord member and a production method for the same, and a truss bridge using the truss structure having an open-section upper chord member and a method for constructing the same
JP2013155514A (en) * 2012-01-30 2013-08-15 Fuji Ps Corp Pre-stressed concrete truss structure and method for manufacturing the same and form device
CN103485275A (en) * 2013-10-11 2014-01-01 中铁第一勘察设计院集团有限公司 Continuous beam-joist combined bridge node structure
CN104032668A (en) * 2014-06-13 2014-09-10 重庆交通大学 Half-through steel truss-concrete combined continuous steel bridge
CN104278635A (en) * 2014-09-03 2015-01-14 中铁大桥局股份有限公司 Steering method of ground anchor type suspension bridge catwalk load bearing cable
CN104901247A (en) * 2015-06-19 2015-09-09 国家电网公司 Wide span cable tray
JP2015183351A (en) * 2014-03-20 2015-10-22 国立大学法人 名古屋工業大学 Structure for preventing collapse of truss bridge
JP2016017337A (en) * 2014-07-09 2016-02-01 日本車輌製造株式会社 Finished form adjustment method for steel bridge
JP2016121453A (en) * 2014-12-24 2016-07-07 オリエンタル白石株式会社 Dismantling and removal method of flip-up rotary bridge
CN107059593A (en) * 2017-04-25 2017-08-18 桑大勇 A kind of interior suspension cable compound section bridge and its construction method
KR101859389B1 (en) * 2016-03-15 2018-05-18 한국건설기술연구원 Girder with precast segment and composite upper flange and the bridge construction method therefor
CN109024226A (en) * 2018-09-05 2018-12-18 上海市城市建设设计研究总院(集团)有限公司 Using the steel girder bridge joint structure and construction method of rivet interlacement
CN110241727A (en) * 2019-07-29 2019-09-17 中交一公局第三工程有限公司 A kind of Sarasota structure and bridge
CN110258292A (en) * 2019-07-17 2019-09-20 中国电建集团成都勘测设计研究院有限公司 The continuous cable way bridge of unequal span
CN110565523A (en) * 2019-09-17 2019-12-13 广东迈诺工业技术有限公司 Suspension bridge main push-towing rope preforming strand manufacturing and saddle entering system
CN111472285A (en) * 2020-05-06 2020-07-31 中交二航局第四工程有限公司 Method for mounting main bridge variable-section continuous steel truss girder by using cable crane
CN112431112A (en) * 2020-10-23 2021-03-02 浙江大学 Assembled ground anchor through-type pedestrian cable bridge structure and construction method
CN112709155A (en) * 2021-01-21 2021-04-27 上海城建市政工程(集团)有限公司 Fish belly type suspension cable combined support and construction method thereof
CN113174831A (en) * 2021-04-30 2021-07-27 中铁大桥勘测设计院集团有限公司 Steel truss combined main beam structure of cable-stayed bridge of ballastless track of high-speed railway
CN113174849A (en) * 2021-04-02 2021-07-27 中铁大桥勘测设计院集团有限公司 Novel main cable anchoring system double-bundle anchor rod and installation method thereof
CN113215992A (en) * 2021-04-27 2021-08-06 中铁建大桥工程局集团南方工程有限公司 Assembling control method for sling tower frame for construction of steel truss arch bridge by inclined pulling buckling hanging method
CN113529570A (en) * 2021-06-26 2021-10-22 华设设计集团股份有限公司 Joint connection structure for connecting steel tower and concrete tower base and construction method thereof
CN113700152A (en) * 2021-09-02 2021-11-26 山东建筑大学 Construction method of three-fork or V-shaped web member combined string structure
CN114016374A (en) * 2021-12-16 2022-02-08 江苏交通工程咨询监理有限公司 Cliff steep wall hanging net type pedestrian suspension bridge of canyon river and construction method thereof
CN114703741A (en) * 2022-03-30 2022-07-05 中联西北工程设计研究院有限公司 Superimposed truss type bridge span structure based on braided structure and installation method thereof

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102808373B (en) * 2012-08-10 2015-08-19 南京工业大学 Quick assembled type truss string structure People's Bank of China steel bridge
CN105729063B (en) * 2016-02-26 2017-11-10 江苏中铁山桥重工有限公司 A kind of box external node chord member preparation method of double anchors
CN106638321B (en) * 2016-12-27 2018-11-02 北京市政路桥管理养护集团有限公司 A kind of beam body construction truss overhung construction

Cited By (39)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4558609B2 (en) * 2005-08-30 2010-10-06 オリエンタル白石株式会社 Extrusion construction method of bridge
JP2007063797A (en) * 2005-08-30 2007-03-15 Oriental Construction Co Ltd Extruding erection method for bridge
JP2009167791A (en) * 2009-03-16 2009-07-30 Sumitomo Mitsui Construction Co Ltd Construction method of upper deck type suspension floor slab bridge
CN103210148A (en) * 2010-09-27 2013-07-17 崔夏祯 Truss structure having an open-section upper chord member and a production method for the same, and a truss bridge using the truss structure having an open-section upper chord member and a method for constructing the same
CN103210148B (en) * 2010-09-27 2015-04-29 崔夏祯 Truss structure having an open-section upper chord member and a production method for the same, and a truss bridge using the truss structure having an open-section upper chord member and a method for constructing the same
JP2013155514A (en) * 2012-01-30 2013-08-15 Fuji Ps Corp Pre-stressed concrete truss structure and method for manufacturing the same and form device
CN102720138A (en) * 2012-06-29 2012-10-10 中铁大桥局集团有限公司 Steel truss girder erecting system and method and lifting station
CN103194973B (en) * 2013-04-02 2015-07-08 中铁大桥局集团有限公司 Novel spliced truss for bridge construction and construction method
CN103194973A (en) * 2013-04-02 2013-07-10 中铁大桥局股份有限公司 Novel spliced truss for bridge construction and construction method
CN103485275A (en) * 2013-10-11 2014-01-01 中铁第一勘察设计院集团有限公司 Continuous beam-joist combined bridge node structure
JP2015183351A (en) * 2014-03-20 2015-10-22 国立大学法人 名古屋工業大学 Structure for preventing collapse of truss bridge
CN104032668A (en) * 2014-06-13 2014-09-10 重庆交通大学 Half-through steel truss-concrete combined continuous steel bridge
JP2016017337A (en) * 2014-07-09 2016-02-01 日本車輌製造株式会社 Finished form adjustment method for steel bridge
CN104278635A (en) * 2014-09-03 2015-01-14 中铁大桥局股份有限公司 Steering method of ground anchor type suspension bridge catwalk load bearing cable
CN104278635B (en) * 2014-09-03 2016-04-13 中铁大桥局集团有限公司 The forward method of earth anchored suspension bridge cat road track cable
JP2016121453A (en) * 2014-12-24 2016-07-07 オリエンタル白石株式会社 Dismantling and removal method of flip-up rotary bridge
CN104901247A (en) * 2015-06-19 2015-09-09 国家电网公司 Wide span cable tray
KR101859389B1 (en) * 2016-03-15 2018-05-18 한국건설기술연구원 Girder with precast segment and composite upper flange and the bridge construction method therefor
CN107059593A (en) * 2017-04-25 2017-08-18 桑大勇 A kind of interior suspension cable compound section bridge and its construction method
CN109024226A (en) * 2018-09-05 2018-12-18 上海市城市建设设计研究总院(集团)有限公司 Using the steel girder bridge joint structure and construction method of rivet interlacement
CN110258292A (en) * 2019-07-17 2019-09-20 中国电建集团成都勘测设计研究院有限公司 The continuous cable way bridge of unequal span
CN110258292B (en) * 2019-07-17 2024-03-26 中国电建集团成都勘测设计研究院有限公司 Unequal-span continuous cableway bridge
CN110241727A (en) * 2019-07-29 2019-09-17 中交一公局第三工程有限公司 A kind of Sarasota structure and bridge
CN110565523A (en) * 2019-09-17 2019-12-13 广东迈诺工业技术有限公司 Suspension bridge main push-towing rope preforming strand manufacturing and saddle entering system
CN111472285A (en) * 2020-05-06 2020-07-31 中交二航局第四工程有限公司 Method for mounting main bridge variable-section continuous steel truss girder by using cable crane
CN112431112A (en) * 2020-10-23 2021-03-02 浙江大学 Assembled ground anchor through-type pedestrian cable bridge structure and construction method
CN112709155A (en) * 2021-01-21 2021-04-27 上海城建市政工程(集团)有限公司 Fish belly type suspension cable combined support and construction method thereof
CN113174849B (en) * 2021-04-02 2022-05-06 中铁大桥勘测设计院集团有限公司 Double-bundle anchor rod of main cable anchoring system and mounting method thereof
CN113174849A (en) * 2021-04-02 2021-07-27 中铁大桥勘测设计院集团有限公司 Novel main cable anchoring system double-bundle anchor rod and installation method thereof
CN113215992A (en) * 2021-04-27 2021-08-06 中铁建大桥工程局集团南方工程有限公司 Assembling control method for sling tower frame for construction of steel truss arch bridge by inclined pulling buckling hanging method
CN113174831B (en) * 2021-04-30 2023-01-31 中铁大桥勘测设计院集团有限公司 Steel truss combined main beam structure of cable-stayed bridge of ballastless track of high-speed railway
CN113174831A (en) * 2021-04-30 2021-07-27 中铁大桥勘测设计院集团有限公司 Steel truss combined main beam structure of cable-stayed bridge of ballastless track of high-speed railway
CN113529570A (en) * 2021-06-26 2021-10-22 华设设计集团股份有限公司 Joint connection structure for connecting steel tower and concrete tower base and construction method thereof
CN113529570B (en) * 2021-06-26 2023-02-28 华设设计集团股份有限公司 Joint connection structure for connecting steel tower and concrete tower base and construction method thereof
CN113700152A (en) * 2021-09-02 2021-11-26 山东建筑大学 Construction method of three-fork or V-shaped web member combined string structure
CN113700152B (en) * 2021-09-02 2022-11-25 山东建筑大学 Construction method of three-fork or V-shaped web member combined string structure
CN114016374A (en) * 2021-12-16 2022-02-08 江苏交通工程咨询监理有限公司 Cliff steep wall hanging net type pedestrian suspension bridge of canyon river and construction method thereof
CN114703741A (en) * 2022-03-30 2022-07-05 中联西北工程设计研究院有限公司 Superimposed truss type bridge span structure based on braided structure and installation method thereof
CN114703741B (en) * 2022-03-30 2023-09-19 中联西北工程设计研究院有限公司 Superimposed truss type bridge span structure based on woven structure and installation method thereof

Also Published As

Publication number Publication date
JP3881598B2 (en) 2007-02-14

Similar Documents

Publication Publication Date Title
JP2004027516A (en) Composite truss segment and truss bridge for simultaneously using suspension cable by using this truss segment and its construction method
CN109972517B (en) Construction method of main beam of cable-stayed bridge with steel-concrete composite beam
KR100565864B1 (en) Construction method of concrete arch through bridge combined with prestressed concrete box girder
JP3844743B2 (en) Box girder bridge structure and its construction method
KR100988074B1 (en) Girder bridge connected to abutment and the construction method thereof
JP2004137686A (en) Composite panel structure, panel bridge structure and construction method for continuous composite girder bridge
KR20140144035A (en) The hybrid girder structures prestressed by using the external prestressing mechanism, and the construction method by rigid connection
JP2005256341A (en) Corrugated steel-plate web u component bridge
JP2003253621A (en) Continuous beam structure for continuing existing simple beam bridge
JP2001098514A (en) Method for constructing arch rib of concrete arch bridge
JP2001182016A (en) Construction method of truss structure bridge
JP3737475B2 (en) Box girder bridge structure and construction method
JP2006265976A (en) Corrugated steel-plate web u component bridge and its construction method
JP3877995B2 (en) How to build a string string bridge
JP3885583B2 (en) Composite truss bridge and its construction method
JP4056540B2 (en) Bridge girder construction method
JP2963879B2 (en) Bridge girder
KR100403988B1 (en) Method for forming continuous p.s.c beams with steel plate girder splice and apparatus thereof
JP2997253B1 (en) Construction method of concrete structure
JP4493245B2 (en) Suspended floor slab bridge and method for reinforcing suspended floor slab
JP4375788B2 (en) Construction method of upper-floor type suspension floor slab bridge
JP3678719B2 (en) End separation type upper suspension type suspension floor slab bridge
JP2004011300A (en) Pc composite structure, pc bridge and prestressing method
JP2004156343A (en) Composite truss bridge and its construction method
JP2007211552A (en) Continuous viaduct

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20041027

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060929

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20061107

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20061110

R150 Certificate of patent or registration of utility model

Ref document number: 3881598

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091117

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091117

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101117

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101117

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111117

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111117

Year of fee payment: 5

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111117

Year of fee payment: 5

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121117

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121117

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131117

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees