JP2003096918A - Composite anchor bolt and its execution method - Google Patents

Composite anchor bolt and its execution method

Info

Publication number
JP2003096918A
JP2003096918A JP2001291739A JP2001291739A JP2003096918A JP 2003096918 A JP2003096918 A JP 2003096918A JP 2001291739 A JP2001291739 A JP 2001291739A JP 2001291739 A JP2001291739 A JP 2001291739A JP 2003096918 A JP2003096918 A JP 2003096918A
Authority
JP
Japan
Prior art keywords
anchor bolt
anchor
composite
bolt
connecting member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2001291739A
Other languages
Japanese (ja)
Other versions
JP3673898B2 (en
Inventor
Morio Suehiro
盛男 末廣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUEHIRO SYSTEM KK
Original Assignee
SUEHIRO SYSTEM KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUEHIRO SYSTEM KK filed Critical SUEHIRO SYSTEM KK
Priority to JP2001291739A priority Critical patent/JP3673898B2/en
Publication of JP2003096918A publication Critical patent/JP2003096918A/en
Application granted granted Critical
Publication of JP3673898B2 publication Critical patent/JP3673898B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide an anchor bolt capable of being accurately executed at the place of the anchor to be executed without changing the place when a drilling for the anchor bolt meets with a reinforcement in the case of the execution of the post-execution anchor bolt and having fixed strength, and its execution method. SOLUTION: In the composite anchor bolt, the axial center of a screw section for mounting projected outside a concrete skeleton and the axial center of an anchor bolt section buried into the concrete skeleton are made eccentric in the anchor bolt post-executed to the concrete skeleton. In the execution method, the suitable usage of the composite anchor bolt at a time when the anchor bolt meets with the reinforcement is provided.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、コンクリート床
面、壁面、天井面等にあと施工アンカーを施工する際に
使用するアンカーボルト及びその施工方法に関するもの
である。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an anchor bolt used when constructing a post-installed anchor on a concrete floor surface, a wall surface, a ceiling surface or the like, and a construction method thereof.

【0002】[0002]

【従来の技術】従来、あと施工アンカーは接着系アンカ
ーと本体打込みアンカーに区別され、各々その種類は多
数に及ぶ。図10は、従来の接着系アンカーのあと施工
アンカーの施工例を示す。図10(1)のようにコンク
リート躯体9に、接着剤を封入したカプセル15を埋め
込む穿孔をあけ、図10(2)のように専用ブラシ25
で穿孔を清掃し、図10(3)のようにカプセル15を
挿入後、図10(4)のようにアンカーボルト18を攪
拌しながら挿入し、図10(5)のように接着剤を硬化
させてコンクリート、アンカーボルトを固着させること
により、アンカーボルトの取付けが完了する。また、接
着材の種類によっては、アンカーボルトを攪拌する必要
がなく、ハンマーでアンカーボルトを打撃して接着剤を
混合し、アンカーボルトを固着させる方法もある。本発
明では、このハンマー打ち込み式の接着剤の入ったカプ
セル(例えばMUアンカー)を使用するか或いは、注入
ガンで接着材を穿孔に注入する方法を採用する。
2. Description of the Related Art Conventionally, post-installed anchors are classified into adhesive type anchors and main body driven anchors, each of which has many types. FIG. 10: shows the construction example of the post-construction anchor of the conventional adhesive type anchor. As shown in FIG. 10 (1), the concrete skeleton 9 is perforated with holes for embedding the capsule 15 in which the adhesive is enclosed, and as shown in FIG.
After cleaning the perforations with, insert the capsule 15 as shown in FIG. 10 (3), then insert the anchor bolt 18 with stirring as shown in FIG. 10 (4), and cure the adhesive as shown in FIG. 10 (5). Then, the concrete and anchor bolts are fixed to each other to complete the attachment of the anchor bolts. Depending on the type of adhesive, it is not necessary to stir the anchor bolt, and there is a method of hitting the anchor bolt with a hammer to mix the adhesive and fixing the anchor bolt. In the present invention, a capsule (for example, MU anchor) containing the hammer-driving type adhesive is used, or a method of injecting the adhesive into the perforation with an injection gun is adopted.

【0003】[0003]

【発明が解決しようとする課題】従来のあと施工アンカ
ーボルトの施工における最大の問題点は、コンクリート
の中に鉄筋が存在し、アンカーボルト用の穿孔がこの鉄
筋に遭遇すると、あと施工アンカーボルトが施工できな
いことである(但し、あと施工アンカーの長さが小さい
場合を除く)。あと施工アンカーボルトの強度を確保す
るためには、コンクリート中に所定の埋込み長さが必要
であるのだが、通常コンクリート表面より約30〜60
mmの深さに鉄筋が存在するため、アンカーボルト用の穿
孔がこの鉄筋に遭遇するとアンカーボルトの正規の長さ
をとることができない。これを図によって説明すると、
図11において、Dはアンカーボルト18が鉄筋12に
遭遇しない場合であり、アンカーボルト18の正規のア
ンカー長Lをとることができる。これに対しEは穿孔1
0が鉄筋12に遭遇して正規のアンカー長Lをとれない
場合を示す。なお、図中26は、コンクリート躯体9の
表面である。また、Fはかぶり代である。
The biggest problem in the conventional construction of post-installed anchor bolts is that if there is a reinforcing bar in the concrete and a hole for the anchor bolt encounters this reinforcing bar, the post-installed anchor bolt will be It can not be installed (except when the length of the post-installed anchor is short). In order to secure the strength of the post-installed anchor bolts, it is necessary to have a predetermined embedding length in the concrete.
Due to the presence of rebar at a depth of mm, when the anchor bolt drilling encounters this rebar, it cannot take the regular length of the anchor bolt. This can be explained using the figure
In FIG. 11, D is the case where the anchor bolt 18 does not encounter the reinforcing bar 12, and the regular anchor length L of the anchor bolt 18 can be taken. On the other hand, E is perforation 1
The case where 0 encounters the reinforcing bar 12 and cannot take the regular anchor length L is shown. In addition, 26 is a surface of the concrete skeleton 9. Further, F is a fogging allowance.

【0004】従来この問題を解決する方法は、図12
(1)のように、鉄筋に当った場所より離れて鉄筋12
をさけるように30°程斜めにアンカーボルト18を打込
むしかなかった。アンカーを打った後、図12(2)の
ように台直しといってアンカーボルトをコンクリート面
で垂直になるように力を加えて曲げることを行ってい
た。ところが、上記斜めにアンカーを打つとコンクリー
ト面での位置がずれやすい、施工が難しい、台直しによ
りアンカーボルトに局所的な残留応用を与え、強度上問
題がある等の色々な問題が生ずる。このような理由で、
かなりの熟練工でないと良い仕事ができず、施工に当た
りはずれが生じていた。なお、台直しはボルト径がM1
6の太さまでは容易であるが、M20以上では人力では
困難であり、現状では大口径のアンカーボルトはやむお
えずダイヤモンドカッターで鉄筋を切断する等の処置を
行って、アンカーを施工していた。
A conventional method for solving this problem is shown in FIG.
As shown in (1), rebar 12 is separated from the place where it hits the rebar.
There was no choice but to drive the anchor bolt 18 at an angle of about 30 ° to avoid it. After hitting the anchor, the anchor bolt was bent as shown in FIG. 12 (2) by applying force so that the anchor bolt was vertical to the concrete surface. However, when the above-mentioned anchors are slanted, the position on the concrete surface is likely to be displaced, the construction is difficult, and the anchor bolts are locally applied to the anchor bolts, causing various problems such as strength problems. For this reason,
Good work could not be done unless it was a fairly skilled worker, and there was a failure in construction. In addition, the bolt diameter is M1
Although it is easy with 6 thickness, it is difficult for human beings with M20 or more, and at present, unavoidably large anchor bolts are unavoidable and the anchor is constructed by cutting the reinforcing bar with a diamond cutter. .

【0005】本発明は、コンクリート床面、壁面、天井
面等にあと施工アンカーを施工する際に、コンクリート
中の鉄筋とアンカーボルト用の穿孔が鉄筋に遭遇した場
合に、施工したいアンカーの位置を変更しないでその位
置に正確に施工可能で、かつ所定の強度を有するアンカ
ーボルト及びその施工方法を提供することを目的とす
る。
According to the present invention, when a post-construction anchor is constructed on a concrete floor surface, a wall surface, a ceiling surface, etc., when the reinforcing bar in the concrete and the hole for the anchor bolt encounter the reinforcing bar, the position of the anchor to be constructed is set. It is an object of the present invention to provide an anchor bolt that can be accurately installed at the position without change and has a predetermined strength, and an installation method thereof.

【0006】[0006]

【課題を解決するための手段】本発明は、コンクリート
躯体にあと施工するアンカーボルトにおいて、コンクリ
−ト外に出ている取付け用ねじ部の軸芯とコンクリート
内に埋め込まれているアンカーボルト部の軸芯が偏芯し
ていることを特徴とする複合アンカーボルトである。
SUMMARY OF THE INVENTION The present invention provides an anchor bolt to be post-installed on a concrete skeleton, which comprises a shaft core of a mounting screw portion protruding outside the concrete and an anchor bolt portion embedded in concrete. A composite anchor bolt having an eccentric shaft center.

【0007】また、本発明は、鉄筋に遭遇した穿孔に施
工する、アンカー長がかぶり代よりも短い第1のアンカ
ーボルトと、アンカー長がかぶり代よりも長くかつコン
クリート外に出る取付け用ボルト部を持たない第2のア
ンカーボルトと、前記第1のアンカーボルトと前記第2
のアンカーボルトを連結する連結部材を有することを特
徴とする複合アンカーボルトである。
The present invention also provides a first anchor bolt, which has a shorter anchor length than the cover allowance, and a mounting bolt portion which is longer than the cover allowance and is exposed to the outside of the concrete. A second anchor bolt not having the first anchor bolt, the first anchor bolt and the second anchor bolt,
It is a composite anchor bolt characterized in that it has a connecting member for connecting the anchor bolts.

【0008】また、本発明は、第1のアンカーボルトの
埋め込み深さを調節可能とし、第2のアンカーボルトと
連結部材の一端部を一体的に形成し、前記連結部材の他
端部に前記第1のアンカーボルトのねじ部と螺合する雌
ねじ部を形成したことを特徴とする複合アンカーボルト
である。ここで、適宜第1のアンカーボルトの全面にわ
たりねじ部を形成するのがよい。
Also, according to the present invention, the embedding depth of the first anchor bolt can be adjusted, the second anchor bolt and one end portion of the connecting member are integrally formed, and the other end portion of the connecting member is formed. It is a composite anchor bolt characterized in that a female screw portion that is screwed with the screw portion of the first anchor bolt is formed. Here, it is preferable to appropriately form the threaded portion over the entire surface of the first anchor bolt.

【0009】第1のアンカーボルトと第2のアンカーボ
ルトの夫々の軸芯間の距離が約30〜150mmである
ことが好適である。連結部材の横断面は矩形、或いは上
部が平坦側の半円形、或いは円形であることが好適であ
る。
It is preferable that the distance between the respective axes of the first anchor bolt and the second anchor bolt is about 30 to 150 mm. It is preferable that the connecting member has a rectangular cross section, or a semi-circular shape having a flat upper side, or a circular shape.

【0010】また、本発明は、第1のアンカーボルト、
第2のアンカーボルト及び連結部材が一体的に形成され
ていることを特徴とする複合アンカーボルトである。こ
こで、適宜外周の全面にねじ部を形成してもよい。
The present invention also provides a first anchor bolt,
It is a composite anchor bolt in which the second anchor bolt and the connecting member are integrally formed. Here, a threaded portion may be formed on the entire outer circumference as appropriate.

【0011】また、本発明は、コンクリート躯体の外に
出ている取付け用ねじ部を中心として、所定の距離をお
いて、複数本のアンカーボルトを一体的に配置したこと
を特徴とする複合アンカーボルトである。
Further, the present invention is a composite anchor characterized in that a plurality of anchor bolts are integrally arranged at a predetermined distance centering on a mounting screw portion protruding from the concrete skeleton. It is a bolt.

【0012】また、本発明は、第1のアンカーボルト及
び第2のアンカーボルトのコンクリート埋設部が、丸棒
状又は鉄筋形状であることを特徴とする複合アンカーボ
ルトである。
Further, the present invention is the composite anchor bolt, wherein the concrete embedding portions of the first anchor bolt and the second anchor bolt have a round bar shape or a reinforcing bar shape.

【0013】そして、本発明の複合アンカーボルトの施
工方法は、コンクリート躯体にアンカーボルトをあと施
工する際に、鉄筋に遭遇した、正規の施工したいアンカ
ーの位置と鉄筋に遭遇しないアンカーの位置に夫々第1
及び第2の穿孔を設けるとともに、前記第1及び第2の
穿孔間に溝を設け、前記第1及び第2の穿孔と前記溝
に、2本のアンカーボルトを連結部材で一体に形成した
複合アンカーボルトを施工することを特徴とするもので
ある。
In the method of constructing the composite anchor bolt of the present invention, when the anchor bolt is post-constructed on the concrete frame, the anchor is encountered at the position where the anchor is to be properly constructed and the anchor where the reinforcement is not encountered. First
And a second perforation, a groove is provided between the first and second perforations, and two anchor bolts are integrally formed with the connecting member in the first and second perforations and the groove. It is characterized by constructing anchor bolts.

【0014】そして、コンクリート躯体にアンカーボル
トをあと施工する際に、鉄筋の位置が分からない場合
に、あと施工アンカーの第1の穿孔が鉄筋に遭遇した場
合に、前記第1の穿孔を覗いて、遭遇の状況が、(A)
穿孔が南北方向の鉄筋に当たったのか、或いは、(B)
穿孔が東西方向の鉄筋当たったのか、(C)穿孔が東西
南北方向の鉄筋に当たったのかを判別し、(A)の場合
には鉄筋の左右か左右斜め方向のうちの何れか一方向を
選択し、(B)の場合には鉄筋の上下か上下斜め方向の
うちの何れか一方向を選択し、(C)の場合には、鉄筋
の上下斜め方向のうちの何れか一方向を選択し、前記選
択された方向に、前記第1の穿孔から所定の距離をおい
た位置に、かぶり代より深い正規の深さに第2の穿孔を
あける工程と、前記第1の穿孔と第2の穿孔の間に複合
アンカーの連結部が嵌合する溝を形成する工程と、アン
カー長がかぶり代より短い第1のアンカーボルトと、ア
ンカー長がかぶり代より長くかつコンクリート外に出る
取付け用ねじ部を持たない第2のアンカーボルトと、前
記第1のアンカーボルトと前記第2のアンカーボルトを
連結する連結部材を有する複合アンカーボルトを夫々前
記第1の穿孔、前記第2の穿孔及び前記溝に施工する工
程を含むことを特徴とするものである。
When the anchor bolt is post-installed on the concrete frame and the position of the reinforcing bar is not known, when the first drilling hole of the post-installing anchor encounters the reinforcing bar, the first drilling hole is looked into. , The situation of the encounter is (A)
Whether the perforation hit the rebar in the north-south direction, or (B)
Determine whether the perforation hit the east-west rebar or (C) the perforation hit east-west north-south direction, and in the case of (A), either the left or right diagonal direction of the rebar is selected. In the case of (B), either one of the vertical and diagonal directions of the reinforcing bar is selected, and in the case of (C), one of the vertical and diagonal directions of the reinforcing bar is selected. Then, in the selected direction, at a position spaced apart from the first perforation by a predetermined distance, a second perforation is formed at a regular depth deeper than the fogging margin, the first perforation and the second perforation. Forming a groove into which the connecting portion of the composite anchor fits between the perforations of the first anchor bolt, the first anchor bolt whose anchor length is shorter than the cover allowance, and the mounting screw which is longer than the cover allowance and goes out of concrete Second anchor bolt having no portion, and the first anchor Belt and the second composite anchor bolt respectively the first having a coupling member for coupling the anchor bolt drilling, is characterized in that it comprises the step of construction in the second perforation and the grooves.

【0015】[0015]

【作用】通常、鉄筋は図1のように、碁盤の目のように
配筋されているので、鉄筋の位置が分からない場合、一
回目のあと施工アンカーの穿孔が鉄筋10に遭遇する位
置の種類は、図1のA、B、C、の3通りある。Aは南北方
向の鉄筋に穿孔が当った場合、Bは東西方向の鉄筋に穿
孔が当った場合、Cは東西南北方向の鉄筋クロス部に当
った場合である。図中黒丸は、アンカー用穿孔が鉄筋に
遭遇した位置を示す。なお、一般的な構造物の場合、鉄
筋の直径は約10〜22mm、鉄筋のピッチは約100〜25
0mmである。
[Function] Normally, as shown in Fig. 1, the reinforcing bar is arranged like a grid, so if the position of the reinforcing bar is not known, the position of the position where the piercing of the construction anchor will encounter the reinforcing bar 10 after the first time. There are three types, A, B, and C in Figure 1. A is the case where the rebar in the north-south direction hits the hole, B is the case where the rebar is hit in the east-west direction, and C is the case where the rebar cross section in the north-south direction is hit. The black circles in the figure indicate the positions where the anchor holes have encountered the reinforcing bars. In the case of a general structure, the diameter of the reinforcing bar is about 10 to 22 mm and the pitch of the reinforcing bar is about 100 to 25 mm.
It is 0 mm.

【0016】本発明者は、一回目のあと施工アンカーの
穿孔を覗けば、A、B、Cいずれのパターンか判別がつ
き、Aパターンでは左右か左右斜め方向、Bパターンで
は上下か上下斜め方向、Cパターンでは上下斜め方向か
左右斜め方向には、すぐ近くに鉄筋がないことが予想で
きることを見出した。そこで、これらの方向のうちの一
つを選択して、A、B、C、からある距離X(約30〜
150mm)をおいた位置に穿削孔をあけるようルール
づければ、必要なアンカー長の穿孔をほぼ100%の確
率で施工できることを見出した。図中白丸は、選択した
穿孔の位置を示す。本発明者は、この距離Xに着目し
て、以下に説明する複合アンカーボルト及びその施工方
法を発明した。
The present inventor can determine whether the pattern is A, B, or C by looking through the perforation of the first post-installed anchor. The pattern A can be laterally or diagonally left and right, and the pattern B can be vertically or vertically diagonally. In the C pattern, it was found that there could be no reinforcing bars in the immediate up and down directions or the left and right oblique directions. Therefore, one of these directions is selected, and a certain distance X (about 30 to 30) from A, B, and C is selected.
It has been found that drilling a hole having a required anchor length can be performed with a probability of almost 100% by setting a rule to drill a drilled hole at a position (150 mm). White circles in the figure indicate the positions of the selected perforations. Focusing on this distance X, the present inventor has invented a composite anchor bolt and a method of constructing the composite anchor bolt described below.

【0017】[0017]

【発明の実施の形態】以下本発明の一実施例を説明す
る。図2(1)は本発明の複合アンカーボルトの一実施
例を示す平面図、図2(2)は図2(1)のA矢視図、
図2(3)は図2(1)のB矢視図、図2(4)は図2
(1)のC〜C断面図である。これらの図において、1
は本発明の複合アンカーボルトである。2は鉄筋に遭遇
した穿孔に施工する、アンカー長がかぶり代より短い第
1のアンカーボルトであり、アンカーボルト2を固定す
るための外周面に溝が設けられている接着部3、及び連
結部材5の雌ねじ部6と螺合するボルト部4から成る。
BEST MODE FOR CARRYING OUT THE INVENTION An embodiment of the present invention will be described below. 2 (1) is a plan view showing an embodiment of the composite anchor bolt of the present invention, FIG. 2 (2) is a view taken in the direction of arrow A in FIG. 2 (1),
2 (3) is a view from the arrow B of FIG. 2 (1), and FIG. 2 (4) is FIG.
It is CC sectional drawing of (1). In these figures, 1
Is the composite anchor bolt of the present invention. Reference numeral 2 is a first anchor bolt having a shorter anchor length than the cover allowance, which is to be installed in a drilling hole that encounters a reinforcing bar, and an adhesive portion 3 having a groove on an outer peripheral surface for fixing the anchor bolt 2 and a connecting member. It is composed of a bolt portion 4 that is screwed into the female screw portion 6 of 5.

【0018】7はアンカー長がかぶり代より長くかつコ
ンクリート外に出る取付け用ねじ部を持たない第2のア
ンカーボルトであり、外周部にアンカーボルト7を固定
するための溝が設けられている接着部8から成り、先端
は連結部材5に固着されている。9はコンクリート躯体
である。
Reference numeral 7 is a second anchor bolt whose anchor length is longer than the cover allowance and which does not have a mounting screw portion which is exposed to the outside of the concrete, and which has a groove for fixing the anchor bolt 7 on its outer peripheral portion. It is composed of a portion 8 and the tip is fixed to the connecting member 5. 9 is a concrete frame.

【0019】この複合アンカーボルトにおいて、連結部
材5の上面より上の部分はコンクリート躯体9の表面よ
り外にでる。即ち、大気中或いは水中にでる。一方、連
結部材5の上面から下の部分は、コンクリート躯体9の
内部に埋め込まれ、接着部3、8において、接着剤によ
りコンクリート躯体9と一体的に固定される。コンクリ
ート躯体9との接着力の強さは、主に接着部8のアンカ
ーボルトの表面積×単位面積当たりの接着強度によって
決まる。つまり接着部8の長さが長いほど、接着力は大
きくなる。補助的には、第1アンカーボルトの接着部3
にも接着力は発生するが計算上は除外することとする。
この接着力により、第1のアンカーボルト2のボルト部
4に加わる引抜き力を求めることができる。また、ボル
ト部4に加わるせん断力は、ほとんどの場合、コンクリ
ート躯体中に埋め込まれたアンカーボルトの断面積によ
って求めることができる。アンカーボルトの材質は適
宜、SS400、ステンレス、アルミニウム、鋳鉄、S
CS等が使用される。
In this composite anchor bolt, the portion above the upper surface of the connecting member 5 is outside the surface of the concrete skeleton 9. That is, it goes out into the air or water. On the other hand, the lower part from the upper surface of the connecting member 5 is embedded inside the concrete skeleton 9, and is fixed integrally with the concrete skeleton 9 by an adhesive at the bonding portions 3 and 8. The strength of the adhesive force with the concrete skeleton 9 is mainly determined by the surface area of the anchor bolt of the adhesive portion 8 × the adhesive strength per unit area. That is, the longer the length of the adhesive portion 8, the greater the adhesive force. Supplementally, the adhesive portion 3 of the first anchor bolt 3
Adhesive force is generated, but it is excluded from the calculation.
With this adhesive force, the pull-out force applied to the bolt portion 4 of the first anchor bolt 2 can be obtained. Further, in most cases, the shearing force applied to the bolt portion 4 can be obtained by the cross-sectional area of the anchor bolt embedded in the concrete skeleton. The material of the anchor bolt is SS400, stainless steel, aluminum, cast iron, S
CS or the like is used.

【0020】次に、この複合アンカーボルトの施工例に
ついて、図により説明する。図3(1)、(2)、
(3)、(4)は順次施工工程を示す説明図である。先
ず、コンクリート躯体9にアンカーボルトをあと施工す
る際に、鉄筋の位置が分からない場合に、あと施工アン
カーの第1の穿孔10が鉄筋12に遭遇した場合、前記
第1の穿孔10を覗いて、遭遇の状況が、(A)穿孔が
南北方向の鉄筋に当たったのか、或いは、(B)穿孔が
東西方向の鉄筋に当たったのか、(C)穿孔が東西南北
方向の鉄筋に当たったのかを判別し、(A)の場合には
鉄筋の左右か左右斜め方向のうちの何れか一方向を選択
し、(B)の場合には鉄筋の上下か上下斜め方向のうち
の何れか一方向を選択し、(C)の場合には、鉄筋の上
下斜め方向のうちの何れか一方向を選択する。そして。
この選択した方向に、第1の穿孔10から所定の距離X
をおいた位置に、鉄筋12を超えた所定の深さに第2の
穿孔11をあける。この際、第1の穿孔10を中心にし
て、半径Xの円弧を描き、この円弧上に、選択された方
向に、次の穿孔11の位置をマーキングするのが便利で
ある。図3(1)において、P点があと施工アンカーを
打ちたい位置である。
Next, an example of construction of this composite anchor bolt will be described with reference to the drawings. 3 (1), (2),
(3) and (4) are explanatory views showing sequential construction steps. First, when the anchor bolt is post-installed on the concrete skeleton 9 and the position of the reinforcing bar is unknown, if the first drilling 10 of the post-installing anchor encounters the reinforcing bar 12, then the first drilling 10 is looked into. The situation of the encounter was (A) whether the perforation hit the north-south rebar, (B) the perforation hit the east-west rebar, or (C) whether the perforation hits the north-south rebar. In the case of (A), one of the left and right or diagonal directions of the reinforcing bar is selected, and in the case of (B), one of the vertical and diagonal directions of the reinforcing bar is selected. Is selected, and in the case of (C), one of the upper and lower diagonal directions of the reinforcing bar is selected. And.
A predetermined distance X from the first perforation 10 in the selected direction.
The second perforation 11 is drilled at a predetermined depth beyond the reinforcing bar 12 at the position where the bar is placed. At this time, it is convenient to draw an arc of radius X around the first perforation 10 and mark the position of the next perforation 11 on this arc in the selected direction. In FIG. 3 (1), the point P is the position where the construction anchor is to be hit.

【0021】次に、図3(2)のように、第1の穿孔1
0と第2の穿孔11の間に、ダイヤモンドカッター刃を
つけたディスクサンダーと振動ドリルで連結部材5が嵌
合する溝14を形成する。そして、第1の穿孔10、第
2の穿孔11及び溝14を清掃後、第1の穿孔10及び
第2の穿孔11に、前述の接着剤カプセル15を挿入
し、本発明の複合アンカーボルト1をハンマーで叩き込
む。そして、コンクリート躯体9と連結部材5の隙間を
コーキングし、接着剤の硬化を待つて施工が完了する。
Next, as shown in FIG. 3B, the first perforation 1
A groove 14 into which the connecting member 5 is fitted is formed between 0 and the second perforation 11 with a disc sander equipped with a diamond cutter blade and a vibration drill. Then, after cleaning the first perforation 10, the second perforation 11 and the groove 14, the above-mentioned adhesive capsule 15 is inserted into the first perforation 10 and the second perforation 11, and the composite anchor bolt 1 according to the present invention. Hammer in. Then, the construction is completed by caulking the gap between the concrete frame 9 and the connecting member 5 and waiting for the adhesive to harden.

【0022】図4は、本発明の複合アンカーボルト1を
壁面に施工した例を示し、16はコンクリート壁面、1
7はサポートアングルを示す。18は通常のアンカーボ
ルトである。
FIG. 4 shows an example in which the composite anchor bolt 1 of the present invention is applied to a wall surface, 16 is a concrete wall surface, and 1 is a concrete wall surface.
Reference numeral 7 indicates a support angle. 18 is a normal anchor bolt.

【0023】図5は、本発明の複合アンカーボルト1を
床面に施工した例を示し、19はコンクリート床面、2
0はサポート部を示す。図6(1)、(2)において、
第1のアンカーボルト2はその外周の全面にボルト部4
が形成された構造になっている。そして、第2のアンカ
ーボルト7と連結部材5の一端部は一体的に形成されて
おり、連結部材5の他端部に第1のアンカーボルト2の
ボルト部4と螺合する雌ねじ部6が形成されている。こ
のような構成にしたので、第1のアンカーボルト2と第
2のアンカーボルト7との相対位置を、施工に応じて調
節することが可能であり便利である。第1のアンカーボ
ルト2と連結材5を一体的に形成する場合は、第1アン
カーボルト2の長さを鉄筋までの深さに応じて切断し
て、長さを調整する。
FIG. 5 shows an example in which the composite anchor bolt 1 of the present invention is applied to a floor surface, 19 is a concrete floor surface, and 2 is a concrete floor surface.
0 indicates a support unit. In FIGS. 6A and 6B,
The first anchor bolt 2 has a bolt portion 4 on its entire outer surface.
Has a structure formed. The second anchor bolt 7 and one end of the connecting member 5 are integrally formed, and the other end of the connecting member 5 is provided with a female screw portion 6 that is screwed with the bolt portion 4 of the first anchor bolt 2. Has been formed. With such a configuration, the relative positions of the first anchor bolt 2 and the second anchor bolt 7 can be adjusted according to the construction, which is convenient. When the first anchor bolt 2 and the connecting member 5 are integrally formed, the length of the first anchor bolt 2 is cut according to the depth to the reinforcing bar and the length is adjusted.

【0024】本発明の複合アンカーボルトの形状は、以
上説明したものに限らず、例えば、第1のアンカーボル
ト、第2のアンカーボルト及び連結部材が一体的に形成
されているものや、図7のように、外周の全面にねじ部
21が形成されているもの、或いは、図8のように、コ
ンクリート躯体の外に出ている取付け用ボルト部22を
中心として、距離Xをおいて、2本のアンカーボルト2
3を一体的に配置したものを適宜使用してもよい。ま
た、第1のアンカーボルト及び第2のアンカーボルトの
コンクリート埋設部は、ねじ以外の形状例えば丸棒状或
いは鉄筋形状等でもよい。
The shape of the composite anchor bolt of the present invention is not limited to that described above, and for example, the first anchor bolt, the second anchor bolt, and the connecting member are integrally formed, and FIG. As shown in FIG. 8, or with the mounting bolt portion 22 protruding outside the concrete frame as a center, the screw portion 21 is formed on the entire outer periphery as shown in FIG. Book anchor bolt 2
You may use suitably what arrange | positioned 3 integrally. Further, the concrete embedded portions of the first anchor bolt and the second anchor bolt may have a shape other than a screw, for example, a round bar shape or a reinforcing bar shape.

【0025】以上、接着形のアンカーボルトを例につい
て説明したが、本発明の複合アンカーボルトは、打ち込
み式のあと施工アンカーボルトにも適用できる。図9
は、このような例を示したものである。図9において、
24は打ち込み式(くさび形)アンカーボルトである。
Although the adhesive type anchor bolt has been described above as an example, the composite anchor bolt of the present invention can also be applied to a post-installation anchor bolt of a driving type. Figure 9
Shows such an example. In FIG.
Reference numeral 24 is a driving type (wedge type) anchor bolt.

【0026】[0026]

【発明の効果】以上説明したように、本発明によれば、
コンクリート床面、壁面、天井面等に、あと施工アンカ
ーを施工する際に、コンクリート中の鉄筋とアンカーボ
ルト用の穿孔が遭遇した場合に、施工したいアンカー位
置を変更しないで、その位置に正確に施工でき、かつア
ンカー強度を十分に保つことができる。また、従来のよ
うに斜め打ちする必要がないので、熟練工でなくとも簡
便容易に施工でき、品質も向上することができる。
As described above, according to the present invention,
When installing a post-installation anchor on a concrete floor surface, wall surface, ceiling surface, etc., if the reinforcing bar in the concrete and the hole for the anchor bolt encounter, do not change the anchor position you want to install, but accurately to that position. It can be installed and can maintain sufficient anchor strength. In addition, since it is not necessary to perform diagonal driving as in the conventional case, it is possible to perform the construction easily and easily even without a skilled worker, and the quality can be improved.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明における施工の際に穿孔の位置を選択す
る方法の説明図である。
FIG. 1 is an explanatory diagram of a method for selecting a position of perforation during construction in the present invention.

【図2】(1)は本発明の複合アンカーボルトの実施例
を示す平面図、(2)は(1)のA矢視図、(3)は
(1)のB矢視図、(4)は(1)のC〜C断面図であ
る。
2 (1) is a plan view showing an embodiment of the composite anchor bolt of the present invention, (2) is a view as seen from an arrow A of (1), (3) is a view as seen from an arrow B of (1), and (4) ) Is a cross-sectional view taken along line C-C of (1).

【図3】本発明の複合アンカーボルトの施工工程を示す
説明図である。
FIG. 3 is an explanatory view showing a construction process of the composite anchor bolt of the present invention.

【図4】図4は本発明の複合アンカーボルトを壁面に施
工した例を示す一部断面図である。
FIG. 4 is a partial cross-sectional view showing an example in which the composite anchor bolt of the present invention is applied to a wall surface.

【図5】本発明の複合アンカーボルトを床面に施工した
例を示す一部断面図である。
FIG. 5 is a partial cross-sectional view showing an example in which the composite anchor bolt of the present invention is applied to the floor surface.

【図6】本発明の複合アンカーボルトの他の実施例を示
す平面図である。
FIG. 6 is a plan view showing another embodiment of the composite anchor bolt of the present invention.

【図7】本発明の複合アンカーボルトの他の実施例を示
す平面図である。
FIG. 7 is a plan view showing another embodiment of the composite anchor bolt of the present invention.

【図8】本発明の複合アンカーボルトの他の実施例を示
す平面図である。
FIG. 8 is a plan view showing another embodiment of the composite anchor bolt of the present invention.

【図9】本発明の複合アンカーボルトの他の実施例を示
す平面図である。
FIG. 9 is a plan view showing another embodiment of the composite anchor bolt of the present invention.

【図10】従来の接着系アンカーの施工例を示す説明図
である。
FIG. 10 is an explanatory view showing a construction example of a conventional adhesive anchor.

【図11】従来のあと施工アンカーの施工上の問題点の
説明図である。
FIG. 11 is an explanatory view of problems in construction of a conventional post-construction anchor.

【図12】穿孔が鉄筋に遭遇した場合の従来のあと施工
アンカーの施工例の説明図である。
FIG. 12 is an explanatory view of a construction example of a conventional post-construction anchor when the perforation encounters a reinforcing bar.

【符号の説明】[Explanation of symbols]

1………複合アンカーボルト、2………第1のアンカー
ボルト、3………接着部、4………ボルト部、5………
連結部材、6………雌ねじ部、7………第2のアンカー
ボルト、8………接着部、9………コンクリート躯体、
10………第1の穿孔、11………第2の穿孔、12…
……鉄筋、13………振動ドリル、14………溝、15
………接着材カプセル、16………コンクリート壁面、
17………サポートアングル、18………通常のアンカ
ーボルト、19………コンクリート床面、20………サ
ポート部、21………ねじ部、22………取付け用ボル
ト部、23………アンカーボルト、24………打ち込み
式アンカーボルト、25………専用ブラシ、26………
コンクリート躯体の表面。
1 ... Composite anchor bolt, 2 ... First anchor bolt, 3 ... Adhesive part, 4 ... Bolt part, 5 ...
Connection member, 6 ... Female thread, 7 ... Second anchor bolt, 8 ... Adhesive part, 9 ... Concrete skeleton,
10 ... 1st perforation, 11 ... 2nd perforation, 12 ...
…… Reinforcing bar, 13 ………… Vibration drill, 14 ………… Groove, 15
……… Adhesive capsule, 16 ……… Concrete wall,
17 ... Support angle, 18 ... Ordinary anchor bolt, 19 ... Concrete floor surface, 20 ... Support part, 21 ... Screw part, 22 ... Mounting bolt part, 23 ... … Anchor bolts, 24 ……… Striking anchor bolts, 25 ……… Special brushes, 26 …….
The surface of the concrete frame.

Claims (14)

【特許請求の範囲】[Claims] 【請求項1】コンクリート躯体にあと施工するアンカー
ボルトにおいて、コンクリ−ト躯体外に突出施工される
取付け用ねじ部の軸芯とコンクリート躯体内に埋め込み
施工されるアンカーボルト部の軸芯を偏芯させて形成さ
れてなることを特徴とする複合アンカーボルト。
1. An anchor bolt post-installed on a concrete skeleton, wherein an eccentricity is made between an axial center of a mounting screw portion projecting out of the concrete skeleton and an axial center of an anchor bolt portion embedded in the concrete skeleton. A composite anchor bolt characterized by being formed by
【請求項2】鉄筋に遭遇した穿孔に施工する、アンカー
長がかぶり代より短い第1のアンカーボルトと、アンカ
ー長がかぶり代より長くかつコンクリート躯体外に出る
取付け用ボルト部を持たない第2のアンカーボルトと、
前記第1のアンカーボルトと前記第2のアンカーボルト
を連結する連結部材を有することを特徴とする請求項1
記載の複合アンカーボルト。
2. A first anchor bolt having an anchor length shorter than a cover allowance and a second anchor bolt having an anchor length longer than the cover allowance and having no mounting bolt portion protruding out of the concrete skeleton, which is to be installed in a drilling hole which encounters a reinforcing bar. Anchor bolt of
The connecting member that connects the first anchor bolt and the second anchor bolt is provided.
The described composite anchor bolt.
【請求項3】第1のアンカーボルトの埋め込み深さを調
節可能とし、第2のアンカーボルトと連結部材の一端部
を一体的に形成し、前記連結部材の他端部に前記第1の
アンカーボルトのねじ部と螺合する雌ねじ部を形成した
ことを特徴とする請求項2記載の複合アンカーボルト。
3. An embedded depth of a first anchor bolt is adjustable, a second anchor bolt and one end of a connecting member are integrally formed, and the other end of the connecting member has the first anchor. The composite anchor bolt according to claim 2, wherein a female screw portion that is screwed with the screw portion of the bolt is formed.
【請求項4】第1のアンカーボルトの外周の全面にわた
り、ねじ部を形成したことを特徴とする請求項3記載の
複合アンカーボルト。
4. The composite anchor bolt according to claim 3, wherein a threaded portion is formed over the entire outer circumference of the first anchor bolt.
【請求項5】第1のアンカーボルトと第2のアンカーボ
ルトの夫々の軸芯間の距離が約30〜150mmである
ことを特徴とする請求項1〜3のいずれか1に記載の複
合アンカーボルト
5. The composite anchor according to claim 1, wherein the distance between the respective axes of the first anchor bolt and the second anchor bolt is about 30 to 150 mm. bolt
【請求項6】連結部材の横断面が矩形であることを特徴
とする請求項2または3に記載の複合アンカーボルト。
6. The composite anchor bolt according to claim 2, wherein the connecting member has a rectangular cross section.
【請求項7】連結部材の横断面が上部が平坦側の半円形
であることを特徴とする請求項2または3に記載の複合
アンカーボルト。
7. The composite anchor bolt according to claim 2 or 3, wherein the cross section of the connecting member has a semicircular shape having an upper flat side.
【請求項8】連結部材の横断面が円形であることを特徴
とする請求項2または3に記載の複合アンカーボルト。
8. The composite anchor bolt according to claim 2, wherein the connecting member has a circular cross section.
【請求項9】第1のアンカーボルト、第2のアンカーボ
ルト及び連結部材が一体的に形成されていることを特徴
とする請求項2に記載の複合アンカーボルト。
9. The composite anchor bolt according to claim 2, wherein the first anchor bolt, the second anchor bolt and the connecting member are integrally formed.
【請求項10】複合アンカーボルトの外周の全面にねじ
部が形成されていることを特徴とする請求項9記載の複
合アンカーボルト。
10. The composite anchor bolt according to claim 9, wherein a threaded portion is formed on the entire outer peripheral surface of the composite anchor bolt.
【請求項11】コンクリート躯体の外に出ている取付け
用ねじ部を中心として、所定の距離をおいて、複数本の
アンカーボルトを一体的に配置したことを特徴とする請
求項1記載の複合アンカーボルト。
11. A composite according to claim 1, wherein a plurality of anchor bolts are integrally arranged at a predetermined distance with a mounting screw portion protruding out of the concrete skeleton as a center. Anchor bolt.
【請求項12】第1のアンカーボルト及び第2のアンカ
ーボルトのコンクリート埋設部が、丸棒状又は鉄筋形状
であることを特徴とする請求項1〜3のいずれか1に記
載の複合アンカーボルト。
12. The composite anchor bolt according to claim 1, wherein the concrete embedded portions of the first anchor bolt and the second anchor bolt have a round bar shape or a reinforcing bar shape.
【請求項13】コンクリート躯体にアンカーボルトをあ
と施工する際に、鉄筋に遭遇した、正規の施工したいア
ンカーの位置と鉄筋に遭遇しないアンカーの位置に夫々
第1及び第2の穿孔を設けるとともに、前記第1及び第
2の穿孔間に溝を設け、前記第1及び第2の穿孔と前記
溝に、2本のアンカーボルトを連結部材で一体に形成し
た複合アンカーボルトを施工することを特徴とする複合
アンカーボルトの施工方法
13. When post-installing an anchor bolt on a concrete frame, first and second perforations are provided at the position of the anchor that is to be properly installed and the position of the anchor that does not encounter the reinforcing bar, respectively, when the reinforcing bar is encountered. A groove is provided between the first and second perforations, and a composite anchor bolt in which two anchor bolts are integrally formed by a connecting member is applied to the first and second perforations and the groove. Method for constructing composite anchor bolts
【請求項14】コンクリート躯体にアンカーボルトをあ
と施工する際に、あと施工アンカー用の第1の穿孔が鉄
筋に遭遇した場合に、前記第1の穿孔を覗いて、遭遇の
状況が、(A)穿孔が南北方向の鉄筋に当たったのか、
或いは、(B)穿孔が東西方向の鉄筋当たったのか、
(C)穿孔が東西南北方向の鉄筋に当たったのかを判別
し、(A)の場合には鉄筋の左右か左右斜め方向のうち
の何れか一方向を選択し、(B)の場合には鉄筋の上下
か上下斜め方向のうちの何れか一方向を選択し、(C)
の場合には、鉄筋の上下斜め方向のうちの何れか一方向
を選択し、前記選択された方向に、前記第1の穿孔から
所定の距離をおいた位置に、かぶり代より深い深さに第
2の穿孔をあける工程と、前記第1の穿孔と第2の穿孔
の間に複合アンカーの連結部が嵌合する溝を形成する工
程と、アンカー長がかぶり代より短い第1のアンカーボ
ルトと、アンカー長がかぶり代より長くかつコンクリー
ト外に出る取付け用ねじ部を持たない第2のアンカーボ
ルトと、前記第1のアンカーボルトと前記第2のアンカ
ーボルトを連結する連結部材を有する複合アンカーボル
トを夫々前記第1の穿孔、前記第2の穿孔及び前記溝に
施工する工程を含むことを特徴とする請求項13記載の
複合アンカーボルトの施工方法。
14. When post-installing an anchor bolt on a concrete skeleton, when the first drilling hole for the post-installed anchor encounters a reinforcing bar, the situation of the encounter is ) Whether the drill hit the rebar in the north-south direction,
Or (B) Perforation hit the east-west rebar,
(C) It is determined whether the perforation hits the reinforcing bars in the north, south, east, and west directions. In the case of (A), one of the left and right or diagonal directions of the reinforcing bars is selected, and in the case of (B) Select either one of the top and bottom or diagonal direction of the rebar, (C)
In the case of, any one of the up and down diagonal directions of the reinforcing bar is selected, and in the selected direction, at a position spaced apart from the first perforation by a predetermined distance, at a depth deeper than the cover allowance. A step of forming a second hole, a step of forming a groove into which the connecting portion of the composite anchor fits between the first hole and the second hole, and a first anchor bolt having an anchor length shorter than a cover allowance. And a second anchor bolt having an anchor length longer than the cover allowance and not having a mounting screw portion exposed to the outside of the concrete, and a composite anchor having a connecting member for connecting the first anchor bolt and the second anchor bolt The method for constructing a composite anchor bolt according to claim 13, further comprising the step of constructing a bolt in each of the first perforation, the second perforation and the groove.
JP2001291739A 2001-09-25 2001-09-25 Composite anchor bolt and its construction method Expired - Fee Related JP3673898B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001291739A JP3673898B2 (en) 2001-09-25 2001-09-25 Composite anchor bolt and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001291739A JP3673898B2 (en) 2001-09-25 2001-09-25 Composite anchor bolt and its construction method

Publications (2)

Publication Number Publication Date
JP2003096918A true JP2003096918A (en) 2003-04-03
JP3673898B2 JP3673898B2 (en) 2005-07-20

Family

ID=19113833

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001291739A Expired - Fee Related JP3673898B2 (en) 2001-09-25 2001-09-25 Composite anchor bolt and its construction method

Country Status (1)

Country Link
JP (1) JP3673898B2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006003724A1 (en) * 2004-06-30 2006-01-12 Suehiro-System Co., Ltd. Composite anchor bolt and construction method for the anchor bolt
JP2009041312A (en) * 2007-08-10 2009-02-26 Keiyo Aaki Metal Kk Method of erecting strut with anchor bolt
JP2012225037A (en) * 2011-04-19 2012-11-15 Seibu Polymer Corp Fixation structure for extension joint for concrete structure
JP2015151828A (en) * 2014-02-18 2015-08-24 三菱重工業株式会社 Apparatus attachment device and apparatus attachment method
JP2021075948A (en) * 2019-11-12 2021-05-20 東芝プラントシステム株式会社 Base plate, and fixing method of base plate
KR20220053794A (en) * 2020-10-23 2022-05-02 경상국립대학교산학협력단 Concrete surface tensile hardening method for joining external structures

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS612550U (en) * 1984-06-09 1986-01-09 株式会社明電舎 Foundation bolts for equipment installation
JPH1089334A (en) * 1996-09-11 1998-04-07 Sho Bond Constr Co Ltd Eccentric anchor bolt
JP2001107471A (en) * 1999-08-03 2001-04-17 Tsutsunaka Sheet Bosui Kk Erecting structure and erecting method of fixing bolt on waterproofed surface

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS612550U (en) * 1984-06-09 1986-01-09 株式会社明電舎 Foundation bolts for equipment installation
JPH1089334A (en) * 1996-09-11 1998-04-07 Sho Bond Constr Co Ltd Eccentric anchor bolt
JP2001107471A (en) * 1999-08-03 2001-04-17 Tsutsunaka Sheet Bosui Kk Erecting structure and erecting method of fixing bolt on waterproofed surface

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006003724A1 (en) * 2004-06-30 2006-01-12 Suehiro-System Co., Ltd. Composite anchor bolt and construction method for the anchor bolt
JPWO2006003724A1 (en) * 2004-06-30 2008-04-17 スエヒロシステム株式会社 Composite anchor bolt and its construction method
JP4697550B2 (en) * 2004-06-30 2011-06-08 スエヒロシステム株式会社 Composite anchor bolt and its construction method
US8087211B2 (en) 2004-06-30 2012-01-03 Suehiro-System Co., Ltd. Composite anchor bolt and method for installation
EP1767710B1 (en) * 2004-06-30 2015-10-07 Suehiro-System Co., Ltd. Composite anchor bolt and construction method for the anchor bolt
JP2009041312A (en) * 2007-08-10 2009-02-26 Keiyo Aaki Metal Kk Method of erecting strut with anchor bolt
JP2012225037A (en) * 2011-04-19 2012-11-15 Seibu Polymer Corp Fixation structure for extension joint for concrete structure
JP2015151828A (en) * 2014-02-18 2015-08-24 三菱重工業株式会社 Apparatus attachment device and apparatus attachment method
JP2021075948A (en) * 2019-11-12 2021-05-20 東芝プラントシステム株式会社 Base plate, and fixing method of base plate
JP7386669B2 (en) 2019-11-12 2023-11-27 東芝プラントシステム株式会社 Base plate and base plate fixing method
KR20220053794A (en) * 2020-10-23 2022-05-02 경상국립대학교산학협력단 Concrete surface tensile hardening method for joining external structures
KR102423545B1 (en) * 2020-10-23 2022-07-20 경상국립대학교산학협력단 Concrete surface tensile hardening method for joining external structures

Also Published As

Publication number Publication date
JP3673898B2 (en) 2005-07-20

Similar Documents

Publication Publication Date Title
US7475518B2 (en) Anchor bolt and installing method thereof
KR20070083474A (en) Shearing force reinforcing structure and shearing force reinforcing member
JP2009127231A (en) Continuous footing reinforcing structure, its construction method, and reinforcing metal
JP2006052633A (en) Structure and its reinforcing member and method
JP5113376B2 (en) Reinforcement structure of the frame
JP2003096918A (en) Composite anchor bolt and its execution method
KR101600679B1 (en) Socket shaped anchor
JP2020033698A (en) Hole-in anchor and construction method thereof
JP4420697B2 (en) Standing structure of steel pipe columns
JP4441731B2 (en) Synthetic underground wall
JP4697550B2 (en) Composite anchor bolt and its construction method
JP2010242392A (en) Seismic strengthening structure
KR20170046362A (en) Helix steel pipe pile for reinforcement of buckling and construction method of the same
KR100526277B1 (en) Anchor bolt and installing method thereof
JP6647778B2 (en) Post-installed anchor and its installation method
JP5963301B2 (en) Assembled blade member for steel pipe pile, steel pipe pile, composite pile and method for manufacturing composite pile
JPH10102600A (en) Execution method for post-execution anchor and grout cap
JPH11270092A (en) Attaching method for handrail
JP2002364078A (en) Anchor device using resin concurrently
JP2683872B2 (en) Concrete panels for buildings
JPH01299917A (en) Anchor head supporting part and construction thereof
JP3052622U (en) Architectural insert and its support
JP2004197413A (en) Expansion anchor device used together with adhesive
JP2022083204A (en) Pile foundation and base member
KR200315919Y1 (en) Head cover for a concrete pile

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20041104

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20041118

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050117

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050408

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050411

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080513

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090513

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090513

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140513

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees