JP2002271982A - Superfluous electric power managing system and its control method - Google Patents

Superfluous electric power managing system and its control method

Info

Publication number
JP2002271982A
JP2002271982A JP2001072998A JP2001072998A JP2002271982A JP 2002271982 A JP2002271982 A JP 2002271982A JP 2001072998 A JP2001072998 A JP 2001072998A JP 2001072998 A JP2001072998 A JP 2001072998A JP 2002271982 A JP2002271982 A JP 2002271982A
Authority
JP
Japan
Prior art keywords
power
power generation
company
surplus
management system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2001072998A
Other languages
Japanese (ja)
Other versions
JP3631967B2 (en
Inventor
Toshiro Hirai
敏郎 平井
Hirofumi Takahashi
弘文 高橋
Tsuneo Uekusa
常雄 植草
Noboru Suekuni
昇 陶国
Akihiko Matsuda
明彦 松田
Kazutaka Sakurai
一貴 櫻井
Tadashi Tamura
正 田村
Kiyoshi Tsutsui
清志 筒井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ennet Corp
Original Assignee
Ennet Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ennet Corp filed Critical Ennet Corp
Priority to JP2001072998A priority Critical patent/JP3631967B2/en
Publication of JP2002271982A publication Critical patent/JP2002271982A/en
Application granted granted Critical
Publication of JP3631967B2 publication Critical patent/JP3631967B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a superfluous electric power managing system excellent in reliability and its control method wherein an electric enterpriser ensues surely electric power or electric energy which power users need from an electric power generation enterpriser and can supply the energy stably to the energy users, payment of unnecessary charge due to power ensuring is evaded, business profitability of the electric enterpriser can be made sure, power supply to the energy users is enabled at a cost as low as possible, it is possible to make the power generation enterpriser recognize adequately with real time the value to supply superfluous power, and effective power generation of the power generation enterpriser and power generation cost reduction due to the effective power generation can be realized. SOLUTION: Electric power demand of demanders 20 is estimated, and a power generation plan for sending out the power corresponding to the estimated power demand to a power transmission network from the power generation enterpriser 10 is determined. The determined power generation plan is informed to the power generation enterpriser 10.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、発電事業者の余剰
電力を電気事業者が購入し、その購入電力を電力会社の
送電網を利用して発電事業者から電力使用者に直接的に
供給する、いわゆる電力小売り事業に適用する余剰電力
管理システムおよびその制御方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an electric power company that purchases surplus power of a power generation company and supplies the purchased power directly from the power generation company to a power user using a transmission network of a power company. The present invention relates to a surplus power management system applied to a so-called power retail business and a control method thereof.

【0002】[0002]

【従来の技術】近年、人間社会の発達とともに、情報産
業とこれに関わる生活物品の量産化と流通の拡大、各種
電子機器の製造、普及、商取引の活発化、交通システム
の高度化、量的拡大、食料の世界的規模での流通など生
産、流通を中心とした活動の活発化が特に顕著になって
きた。それに伴い、電力、エネルギー使用形態の多様化
や使用量の大幅な増大が起ってきた。
2. Description of the Related Art In recent years, with the development of the human society, the mass production and distribution of the information industry and related living goods have been expanded, the manufacture and spread of various electronic devices, the commerce has become more active, the transportation system has become more sophisticated, Activities such as expansion and production and distribution, such as distribution of food on a global scale, have become particularly prominent. Along with this, the diversification of power and energy usage forms and the drastic increase in usage have occurred.

【0003】一方で、化石燃料を中心とした現在のエネ
ルギー体系において、化石燃料の残存埋蔵量の枯渇が取
り沙汰され、かつ、排ガス、廃棄物による地球の汚染が
懸念されるようになり、地球規模での環境保全、エネル
ギーの有効利用が叫ばれるようになった。
On the other hand, in the current energy system centered on fossil fuels, the depletion of the remaining reserves of fossil fuels has been exhausted, and the pollution of the earth by exhaust gas and waste has been concerned. Environmental conservation and effective use of energy have come to be called out.

【0004】人間社会に発展に伴う電力を中心としたエ
ネルギーの使用形態の多様化、使用量の増大は今後も継
続するものと予測され、かつ、地球規模での環境保全、
エネルギーの有効利用も当然、ますます重要な課題とな
ってくることは論を待たない。
[0004] The diversification and increase in the use of energy, mainly electric power, accompanying the development of human society are expected to continue in the future.
It goes without saying that effective use of energy will naturally become an increasingly important issue.

【0005】こうした状況にあって、電力、ガスなどの
エネルギーの使用形態の多様化に対応した様々な形態の
エネルギー供給システムの提供や、エネルギー使用価格
の低減化を図り、より高度で満足のいくエネルギー供給
体制を構築していくために、電力、ガスなどのエネルギ
ー産業の規制が緩和され、自由化が端緒についた。
Under these circumstances, various types of energy supply systems, such as electric power and gas, have been provided, and various types of energy supply systems have been provided, and energy use prices have been reduced. In order to build an energy supply system, regulations on the energy industry, such as electricity and gas, were eased, and liberalization began.

【0006】電力事業の自由化に対しては、従来の一般
電気事業者(以下、電力会社という)だけでなく、電力
の供給を電力使用者(以下、需要家)に行う目的で、新
たな事業者、すなわち特定規模電気事業者(以下、電気
事業者という)が電力販売事業を行うことになる。
With respect to the liberalization of the electric power business, a new electric power company (hereinafter, referred to as a power company) as well as a new electric power user (hereinafter, referred to as a consumer) is provided for the purpose of supplying electric power to power users. An enterprise, that is, a specific-scale electric enterprise (hereinafter, referred to as an electric enterprise) performs an electric power sales business.

【0007】[0007]

【発明が解決しようとする課題】しかしながら、原子力
発電所、火力発電所、水力発電所などの多種類、かつ大
規模の発電所を多数保有し、各需要家の使用電力量の変
化に対して、いちいち発電量を仔細に調整する必要のな
い電力会社と異なり、限定された数量の発電所を保有
し、あるいは発電所を保有せずに契約発電事業者から電
力供給を受けるのみの電気事業者の場合は、需要家が必
要とする電力または電力量を推定し、これに合致した電
力または電力量を自己の発電所あるいは契約発電事業者
から需要家に供給するために、随時、その調整を実施し
なければならない。
However, a large number of various types and large-scale power plants such as a nuclear power plant, a thermal power plant, and a hydroelectric power plant are possessed, and the power consumption of each customer is changed. Unlike electric power companies, which do not need to adjust the amount of power generated in each case, electric utilities that have a limited number of power plants or only receive power from contracted power companies without owning power plants In the case of (1), the power or amount of electricity required by the customer is estimated, and adjustments are made from time to time in order to supply the customer with the power or amount of electricity that matches this from their own power plant or contract power generation company. Must be implemented.

【0008】なぜならば、需要家の推定必要電力または
推定必要電力量を確保するために、過剰な電力または電
力量を発電すれば、エネルギーの有効利用という世界規
模の課題に離反するばかりか、採算が取れずに事業の継
続が困難となる。
[0008] Because, if an excessive amount of electric power or electric power is generated in order to secure the estimated required electric power or the estimated required electric energy of the consumer, the problem is not only rejected to the worldwide problem of effective use of energy but also profitable. The continuity of the business is difficult due to the lack of security.

【0009】かといって、需要家の推定必要電力または
推定必要電力量に対してぎりぎりの電力または電力量を
供給する体制では、もし、予想外の気温の上昇や低下と
いった気象条件の変化あるいは娯楽に関する予想外の興
味の集中など、不測の事態が生じると、需要家の必要電
力量が増えて供給量不足を招くことがある。
On the other hand, in a system in which the estimated required electric power or the estimated required electric power amount of the customer is supplied to a marginal amount of electric power or electric power amount, if the weather condition such as an unexpected rise or fall in temperature or the entertainment is changed. If an unexpected situation occurs, such as an unexpected concentration of interest, the amount of power required by the consumer may increase, leading to a shortage of supply.

【0010】この場合、発電事業者から需要家への電力
供給が、委託した電力会社の送電網を借りて行われる状
況であれば、その送電網には当然ながら電力会社が所有
する電力も流れているために、供給量不足となった分の
電力または電力量が自動的に電力会社から賄われる形と
なり、需要家は困らないものの、電気事業者に電力会社
から高額の補償金が要求されてしまう。こうなると、電
気事業者にとっては、採算が取れずに事業の継続が困難
となる恐れがある。
In this case, if the power supply from the power generation company to the customer is performed by renting the power transmission network of the entrusted power company, the power owned by the power company naturally flows through the power transmission network. As a result, the amount of electricity or the amount of electricity that has become insufficient is automatically supplied by the electric power company, and although there is no problem for consumers, the electric power company requires a large amount of compensation from the electric power company. Would. In this case, there is a risk that the utility will be unable to continue business due to unprofitability.

【0011】従って、電気事業者にとっては、契約した
各需要家の、予想され得る必要電力または必要電力量の
総計を満たす発電機を自ら所有したり、あるいは発電事
業者と契約して必要電力または必要電力量を確保するこ
とで、需要家の要求を満足する供給体制を構築すること
が必要となる。同時に、電気事業者にとっては、発電事
業者や需要家が十分に満足できて、しかも自身の事業採
算を確実にし得る料金体系を構築することが、事業運営
において必須の条件となる。
Therefore, the electric power company owns a generator that satisfies the expected required power or the total amount of required power of each customer who has contracted, or contracts with the power company to obtain the required power or the required power. By securing the required amount of power, it is necessary to build a supply system that satisfies the demands of consumers. At the same time, it is an indispensable condition in the operation of the electric power company for the electric power company to build a tariff system that can satisfy the power generation company and the customer sufficiently and ensure their own business profits.

【0012】従来は、法的規制により、需要家に対する
電力供給は一部の限定された発電事業者が独占的にこれ
を実施している。これらの発電事業者は、契約した需要
家の使用する電力・電力量に対してそれを大幅に上回る
規模の発電電力・発電電力量を実現する多数の発電所を
建設し所有してはいるが、需要家の使用電力・使用電力
量にきめ細かく対応する技術を有していないのが現状で
ある。
[0012] Conventionally, due to legal restrictions, power supply to consumers is performed exclusively by some limited power generation companies. These generators have built and owned a number of power plants that can generate significantly more power than the contracted customers use. However, at present, there is no technology capable of precisely responding to the power consumption and the power consumption of the customer.

【0013】この発明は上記の事情を考慮したもので、
その目的とするところは、電力使用者が必要とする電力
または電力量を電気事業者が発電事業者から確実に確保
して電力使用者に安定供給することができ、かつ電力確
保に伴う不要な料金の支出を回避して電気事業者として
の事業採算を確実にすることができ、ひいては電力使用
者に対しできるだけ低料金での電力供給を可能とし、ま
た発電事業者に対して余剰電力を供給することの価値を
リアルタイムで適切に認識させることができ、ひいては
発電事業者の無駄の無い効率的な発電とそれに伴う発電
コストの低減などが図れる、信頼性にすぐれた余剰電力
管理システムおよびその制御方法を提供することにあ
る。
The present invention has been made in view of the above circumstances.
The purpose is to ensure that the electricity provider can secure the power or the amount of electricity required by the electricity user from the electricity generator and supply it stably to the electricity user. It is possible to avoid the expenditure of charges and to ensure the profitability of the business as an electric utility, thereby enabling the power supply to the power users at the lowest possible rate and supplying surplus power to the power generators Surplus power management system and its control, which can make it possible to appropriately recognize in real time the value of It is to provide a method.

【0014】[0014]

【課題を解決するための手段】請求項1に係る発明の余
剰電力管理システムは、電力使用者の電力需要を推定
し、この推定した電力需要に相当する電力を発電事業者
から前記送電網に送出させるための発電計画を決定す
る。そして、決定した発電計画を発電事業者に通知す
る。
A surplus power management system according to the first aspect of the present invention estimates a power demand of a power user, and supplies power corresponding to the estimated power demand from a power generation company to the power transmission network. Determine a power generation plan to send. Then, the determined power generation plan is notified to the power generation company.

【0015】請求項2に係る発明の余剰電力管理システ
ムは、電力使用者の電力需要を推定し、この推定した電
力需要に相当する電力を発電事業者から送電網に送出さ
せるための発電計画を決定する。そして、決定した発電
計画を発電事業者に通知する。一方、発電事業者から送
電網への電力供給状況を検出し、この電力供給状況と上
記発電計画との対照により、電気事業者の現時点の電力
購入料金を算定する。そして、算定した電力購入料金を
発電事業者に通知する。
A surplus power management system according to a second aspect of the present invention estimates a power demand of a power user and prepares a power generation plan for transmitting power corresponding to the estimated power demand from a power generation company to a power transmission network. decide. Then, the determined power generation plan is notified to the power generation company. On the other hand, the state of power supply from the power generation company to the power transmission network is detected, and the current power purchase price of the power company is calculated based on a comparison between the power supply state and the power generation plan. Then, the calculated power purchase fee is notified to the power generation company.

【0016】請求項3に係る発明の余剰電力管理システ
ムは、電力使用者の電力需要を推定し、この推定した電
力需要に相当する電力を発電事業者から送電網に送出さ
せるための発電計画を決定する。そして、決定した発電
計画を発電事業者に通知する。一方、発電事業者から送
電網への電力供給状況を検出し、この電力供給状況と上
記発電計画との対照により、電気事業者が発電事業者か
ら購入する電力の料金体系を選定する。さらに、選定し
た料金体系と上記検出した電力供給状況とに基づき、電
気事業者の電力購入料金を逐次に求めて積算する。そし
て、選定した料金体系または積算した電力購入料金を発
電事業者に通知する。
A surplus power management system according to a third aspect of the present invention estimates a power demand of a power user, and generates a power generation plan for transmitting power corresponding to the estimated power demand from a power generation company to a power transmission network. decide. Then, the determined power generation plan is notified to the power generation company. On the other hand, the state of power supply from the power generation company to the power transmission network is detected, and based on a comparison between the power supply state and the above-described power generation plan, the electric power company selects a fee structure for the power purchased from the power generation company. Further, based on the selected fee system and the detected power supply status, the power purchase price of the electric power company is sequentially obtained and integrated. Then, the power generation company is notified of the selected fee structure or the integrated power purchase fee.

【0017】請求項4に係る発明の余剰電力管理システ
ムは、発電事業者から送電網に供給される電力を検出す
る第1検出手段を設けるとともに、送電網から電力使用
者に取り込まれる電力を検出する第2検出手段を設け、
第2検出手段の検出結果に基づいて電力使用者の電力需
要を推定し、この推定した電力需要に相当する電力を発
電事業者から送電網に送出させるための発電計画を決定
する。そして、決定した発電計画を発電事業者に通知す
る。また、発電計画と第1検出手段の検出による電力供
給状況との対照により、電気事業者が発電事業者から購
入する電力の料金体系を選定し、選定した料金体系と第
1検出手段の検出による電力供給状況とに基づき、電気
事業者の電力購入料金を逐次に求めて積算する。そし
て、選定した料金体系または積算した電力購入料金を発
電事業者に通知する。一方、第1検出手段の検出による
電力供給状況と第2検出手段の検出による電力使用状況
との対比に基づいて、現時点より先の電力供給と電力使
用とのバランスを予測し、その予測結果に応じて発電事
業者の供給電力に対する増減値を設定する。そして、設
定した増減値を発電事業者に逐次に指令する。
A surplus power management system according to a fourth aspect of the present invention includes first detection means for detecting power supplied from a power generation company to a power transmission network, and detecting power taken in by a power user from the power transmission network. A second detecting means for performing
The power demand of the power user is estimated based on the detection result of the second detection means, and a power generation plan for transmitting the power corresponding to the estimated power demand from the power generation company to the power grid is determined. Then, the determined power generation plan is notified to the power generation company. Further, by comparing the power generation plan with the power supply status detected by the first detection means, the electric utility selects a tariff system for the electric power purchased from the power generation company, and determines the selected tariff system and the detection of the first detection means. Based on the power supply status, the power purchase fee of the electric power company is sequentially obtained and integrated. Then, the power generation company is notified of the selected fee structure or the integrated power purchase fee. On the other hand, based on a comparison between the power supply status detected by the first detection means and the power usage status detected by the second detection means, the balance between the power supply and the power usage beyond the current time is predicted, and the prediction result is obtained. The increase / decrease value for the power supply of the power generation company is set accordingly. Then, the set increase / decrease value is sequentially instructed to the power generation company.

【0018】請求項5に係る発明の余剰電力管理システ
ムは、発電事業者から送電網に供給される電力を検出す
る第1検出手段を設けるとともに、送電網から電力使用
者に取り込まれる電力を検出する第2検出手段を設け、
第2検出手段の検出結果に基づいて電力使用者の電力需
要を推定し、この推定した電力需要に相当する電力を発
電事業者から送電網に送出させるための発電計画を決定
する。そして、決定した発電計画を発電事業者に通知す
る。また、発電計画と第1検出手段の検出による電力供
給状況との対照により、電気事業者が発電事業者から購
入する電力の料金体系を選定し、選定した料金体系と第
1検出手段の検出による電力供給状況とに基づき、電気
事業者の電力購入料金を逐次に求めて積算する。そし
て、選定した料金体系または積算した電力購入料金を発
電事業者に通知する。一方、第1検出手段の検出による
電力供給状況と第2検出手段の検出による電力使用状況
との対比に基づいて、現時点より先の電力供給と電力使
用とのバランスを予測し、その予測結果に応じて発電事
業者の供給電力に対する増減値を設定する。そして、設
定した増減値を発電事業者に逐次に指令する。さらに、
第2検出手段の検出による電力使用状況に基づき、電力
使用者への電力販売料金を逐次に求めて積算し、その積
算した電力販売料金を定期的または必要に応じて電力使
用者に通知する。
A surplus power management system according to a fifth aspect of the present invention includes first detection means for detecting power supplied from a power generation company to a power transmission network, and detecting power taken by a power user from the power transmission network. A second detecting means for performing
The power demand of the power user is estimated based on the detection result of the second detection means, and a power generation plan for transmitting the power corresponding to the estimated power demand from the power generation company to the power grid is determined. Then, the determined power generation plan is notified to the power generation company. Further, by comparing the power generation plan with the power supply status detected by the first detection means, the electric utility selects a tariff system for the electric power purchased from the power generation company, and determines the selected tariff system and the detection of the first detection means. Based on the power supply status, the power purchase fee of the electric power company is sequentially obtained and integrated. Then, the power generation company is notified of the selected fee structure or the integrated power purchase fee. On the other hand, based on a comparison between the power supply status detected by the first detection means and the power usage status detected by the second detection means, the balance between the power supply and the power usage beyond the current time is predicted, and the prediction result is obtained. The increase / decrease value for the power supply of the power generation company is set accordingly. Then, the set increase / decrease value is sequentially instructed to the power generation company. further,
Based on the power usage status detected by the second detection means, the power sales fee to the power user is sequentially obtained and integrated, and the integrated power sales fee is notified to the power user periodically or as needed.

【0019】[0019]

【発明の実施の形態】以下、この発明の一実施形態につ
いて図面を参照して説明する。図1において、10は電
気事業者と契約した発電事業者で、発電機11、この発
電機11を制御するための制御装置12、発電機11か
ら後述の送電網1に供給される電力の値および電力量を
検出たとえば計測する計測器(第1検出手段)13、こ
の計測器13に接続されたコンピュータ等の端末14を
所有している。計測器13は、電力の値および電力量の
ほかに、力率を計測する。
DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the present invention will be described below with reference to the drawings. In FIG. 1, reference numeral 10 denotes a power generator contracted with an electric power company, a generator 11, a control device 12 for controlling the generator 11, and a value of electric power supplied from the generator 11 to a power transmission network 1 described later. And a measuring instrument (first detecting means) 13 for detecting and measuring the electric energy, for example, and a terminal 14 such as a computer connected to the measuring instrument 13. The measuring device 13 measures the power factor in addition to the power value and the power amount.

【0020】このような発電事業者10が複数あり、そ
れぞれの発電機11の発電電力うち、発電事業者10の
本来の操業に使用する電力を超える分のいわゆる余剰電
力が、特定規模電気事業者(以下、電気事業者と略称す
る)30に購入される形で電力会社送電網1に供給され
る。この送電網1は、電気事業者30とは別の電力会社
が所有する設備である。この送電網1を所有する電力会
社に電気事業者30が送電を委託することにより、電気
事業者30が各発電事業者10から購入した余剰電力
が、送電網1を介して各発電事業者10から複数の電力
使用者(以下、需要家と称する)20に直接的に供給さ
れる。
There are a plurality of such power generators 10, and of the power generated by each of the generators 11, so-called surplus power that exceeds the power used for the original operation of the power generator 10 is converted into a specific-scale power provider. (Hereinafter, abbreviated as an electric power company) 30 and supplied to the power company transmission network 1 in a purchased form. The power transmission network 1 is equipment owned by a power company different from the power company 30. When the electric power company 30 entrusts power transmission to the power company that owns the power transmission network 1, the surplus power purchased by the electric power company 30 from each power generation company 10 is transferred to each power generation company 10 via the power transmission network 1. From a plurality of power users (hereinafter, referred to as consumers) 20.

【0021】各電力使用者20は、送電網1から電力を
取り込んで内部の負荷設備の運転に使用する建物21、
この建物21に取り込まれる電力の値および電力量を検
出たとえば計測する計測器(第2検出手段)22、この
計測器22に接続されたコンピュータ等の端末23を所
有している。計測器22は、電力の値および電力量のほ
かに、力率を計測する。
Each power user 20 receives a power from the power transmission network 1 and uses the building 21 to operate the internal load equipment.
It has a measuring instrument (second detecting means) 22 for detecting, for example, measuring the value and amount of electric power taken into the building 21, and a terminal 23 such as a computer connected to the measuring instrument 22. The measuring device 22 measures the power factor in addition to the power value and the power amount.

【0022】電気事業者30は、各発電事業者10の余
剰電力を購入する契約を各発電事業者10と交わし、そ
の購入した電力を各需要家20に販売する契約を各需要
家20と交わし、かつ上記のように送電網1の所有者と
の間で送電委託の契約を交わし、余剰電力の購入から供
給までその管理を行うもので、制御装置としてサーバ3
1を備えている。サーバ31は、各発電事業者10の端
末14および各需要家20の端末23との間でインター
ネット2を介したデータ送受信が可能である。また、図
示していないが、サーバ31は、送電を委託している電
力会社の端末に対してもインターネット2を介したデー
タ送受信が可能となっている。
The electric power company 30 makes a contract with each of the power generating companies 10 to purchase surplus power, and makes a contract with each of the customers 20 to sell the purchased power to each of the customers 20. In addition, as described above, a contract for power transmission is concluded with the owner of the power transmission network 1 to manage the surplus power from purchase to supply.
1 is provided. The server 31 can transmit and receive data to and from the terminal 14 of each power generation company 10 and the terminal 23 of each customer 20 via the Internet 2. Although not shown, the server 31 is also capable of transmitting and receiving data via the Internet 2 to and from a terminal of a power company to which power transmission is entrusted.

【0023】なお、各発電事業者10において端末14
に制御装置12を信号線接続し、サーバ31から端末1
4への送信内容をそのまま発電機11に対する発電機制
御用データとして制御装置12に送るようにしてもよ
い。
It should be noted that each power generation company 10 has a terminal 14
The control device 12 is connected to the signal line from the server 31 to the terminal 1.
4 may be sent to the control device 12 as generator control data for the generator 11 as it is.

【0024】サーバ31は、主要な機能として次の
(1)〜(10)の手段を備える。 (1)各計測器22の計測結果に基づき、所定の電力供
給該当日における各需要家20の電力需要を推定する推
定手段。すなわち、サーバ31は、各需要家20の端末
23に定期的にデータ要求を指示することにより、各需
要家20の端末23から各計測器22の計測データ(電
力・電力量・力率)を需要家20ごとに固有のIDと共
に収集し、かつ必要に応じて各端末23から現地気象デ
ータを収集し、これら収集した計測データおよび現地気
象データを用い、さらに上記IDに基づいて当該サーバ
31の内部メモリから読み出される需要家基礎データ
(需要家ごとに固有)などを用いた所定の演算により、
現時点より先の所定の時期における各需要家20の電力
需要つまり使用電力および使用電力量を推定する。どの
時期の使用電力および使用電力量を推定するかは、予め
設定されている単位計測時間の次回分について行う場合
と、その次回分とそれに続く複数回の単位計測時間につ
いて行う場合があり、そのいずれでもよい。
The server 31 has the following means (1) to (10) as main functions. (1) Estimating means for estimating the power demand of each customer 20 on a predetermined power supply corresponding day based on the measurement result of each measuring device 22. That is, the server 31 periodically instructs the terminal 23 of each customer 20 to request a data, and thereby the measurement data (electric power, electric energy, power factor) of each measuring device 22 is transmitted from the terminal 23 of each consumer 20. It collects together with a unique ID for each customer 20, and collects local weather data from each terminal 23 as needed, uses these collected measurement data and local weather data, and furthermore, By a predetermined operation using customer basic data (unique for each customer) read from the internal memory,
The power demand of each customer 20 at a predetermined time before the present time, that is, the power consumption and the power consumption are estimated. Estimating the power consumption and the power consumption at which time may be performed for the next unit measurement time set in advance, or may be performed for the next minute and a plurality of subsequent unit measurement times. Either may be used.

【0025】(2)推定された電力需要に相当する電力
を、上記電力供給該当日において、各発電事業者10か
ら送電網1に送出させるための発電計画を決定する決定
手段。すなわち、各発電事業者10から通告される事前
発電計画、各発電事業者10に固有の発電事業者基礎デ
ータ、および各発電事業者10の現地気象データなどに
基づき、発電計画を決定する。この発電計画は、電力供
給該当日における予め設定されている単位計測時間ごと
に必要電力を対応付けたものである。
(2) Determining means for determining a power generation plan for transmitting power corresponding to the estimated power demand from each power generation company 10 to the power transmission network 1 on the power supply corresponding day. That is, the power generation plan is determined based on the prior power generation plan notified from each power generation company 10, the basic data of the power generation company specific to each power generation company 10, the local weather data of each power generation company 10, and the like. In this power generation plan, required power is associated with each preset unit measurement time on the power supply corresponding day.

【0026】(3)決定された発電計画を各発電事業者
10にインターネット2を介して通知する通知手段。
(3) Notification means for notifying each power generation company 10 of the determined power generation plan via the Internet 2.

【0027】(4)各計測器13の計測結果に基づき、
各発電事業者10から送電網1への電力供給状況を検出
する検出手段。すなわち、サーバ31は、各発電事業者
10の端末14に定期的にデータ要求を指示することに
より、各発電事業者10の端末14から各計測器13の
計測データ(電力・電力量・力率)を発電事業者10ご
とに固有のIDと共に収集し、この収集した計測データ
から電力供給状況を検出する。
(4) Based on the measurement result of each measuring device 13,
Detecting means for detecting the state of power supply from each power generation company 10 to the power transmission network 1. That is, the server 31 periodically instructs the terminal 14 of each power generation company 10 to request a data request, so that the measurement data (power, power amount, power factor) of each measuring device 13 is transmitted from the terminal 14 of each power generation company 10. ) Is collected together with a unique ID for each power generation company 10, and the power supply status is detected from the collected measurement data.

【0028】(5)上記決定された発電計画と上記検出
される電力供給状況との対照により、当該電気事業者3
0の現時点の電力購入料金を算定する算定手段。当該電
気事業者30の現時点の電力購入料金は、各発電事業者
10の電力売却料金に相当する。この算定手段は、具体
的には、上記決定された発電計画と上記検出された電力
供給状況との対照により、電気事業者30が各発電事業
者10から購入する電力の料金体系(電力供給状況が発
電計画および増減値に適合しているかどうかに応じて異
なる料金体系)を選定する選定手段と、この選定された
料金体系と上記検出された電力供給状況とに基づき、電
気事業者30の電力購入料金を逐次に求めて積算する積
算手段とからなる。
(5) By comparing the determined power generation plan with the detected power supply status, the electric power company 3
Calculation means for calculating the current power purchase fee of zero. The current power purchase fee of the electric power company 30 is equivalent to the power sale fee of each power generation business 10. Specifically, this calculating means is based on a comparison between the determined power generation plan and the detected power supply status, and based on a comparison between the power generation status and the detected power supply status. Means for selecting a different tariff system according to whether or not the electric power system conforms to the power generation plan and the increase / decrease value, and based on the selected tariff system and the detected power supply status, And an accumulating means for sequentially calculating and accumulating the purchase fee.

【0029】ここで、選定手段は、各発電事業者10の
うち、後述のベース発電事業者、ミドル発電事業者、ピ
ーク発電事業者、複合型発電事業者に対しては、電力供
給状況が制御許容範囲に収まっている場合は最高単価を
選定し、電力供給状況が制御許容範囲から外れている場
合は最高単価より低い単価または零単価を選定し、電力
供給状況が最低供給電力量を下回っている場合またはそ
の状態が一定時間以上継続した場合は発電事業者からペ
ナルティーとして徴収するための定額のペナルティー料
金を選定するとともに、後述の調整発電事業者に対して
は、月額一定または年額一定の基本料金を選定する。
Here, the selection means controls the power supply status for the base power generator, the middle power generator, the peak power generator, and the combined power generator described later among the power generators 10. If it is within the allowable range, select the highest unit price.If the power supply status is out of the control allowable range, select a unit price lower than the highest unit price or zero unit price. If the power generation status is maintained or the status continues for a certain period of time, a fixed penalty fee to be collected from the power generation company as a penalty is selected, and a fixed monthly or yearly Choose a fee.

【0030】(6)上記選定された料金体系または上記
前記積算された電力購入料金を各発電事業者10の端末
14にインターネット2を介して通知する通知手段。通
知内容は、端末14の表示部で表示されて、係員に報知
される。
(6) Notification means for notifying the terminal 14 of each power generation company 10 via the Internet 2 to the selected fee system or the integrated power purchase fee. The contents of the notification are displayed on the display unit of the terminal 14 and notified to the attendant.

【0031】(7)上記電力供給該当日の当日、発電計
画に基づく電力供給が実際に行われている状況におい
て、各計測器13の計測により検出される電力供給状況
と各計測器22の計測により検出される電力使用状況と
の対比に基づいて、かつ各発電事業者10に固有の発電
事業者基礎データおよび各発電事業者10の現地気象デ
ータなどに基づいて、現時点より先の電力供給と電力使
用とのバランスを予測し、その予測結果に応じて各発電
事業者10の供給電力に対する増減値を設定する予測手
段。
(7) On the day of the power supply, on the day of the power supply, in a situation where the power supply based on the power generation plan is actually performed, the power supply status detected by the measurement of each measuring device 13 and the measurement of each measuring device 22 Based on the comparison with the power usage status detected by the power generation system, and based on the power generation company basic data unique to each power generation company 10 and the local weather data of each power generation company 10, etc. Prediction means for predicting a balance with power use and setting an increase / decrease value with respect to supply power of each power generation company 10 according to the prediction result.

【0032】この場合、予め設定されている単位計測時
間の次回分について、またはその次回分とそれに続く複
数回の単位計測時間について、予測が行われる。
In this case, prediction is performed for the next unit measurement time set in advance, or for the next unit measurement time and a plurality of subsequent unit measurement times.

【0033】(8)上記設定された増減値を増減指令・
削減指令として各発電事業者10の端末14にインター
ネット2を介して送る指令手段。
(8) Increase / decrease command for the set increase / decrease value
Instruction means to send via the Internet 2 to the terminal 14 of each power generation company 10 as a reduction instruction.

【0034】(9)上記電力供給該当日の当日、発電計
画に基づく電力供給が実際に行われている状況におい
て、各計測器22の計測により検出される電力使用状況
に基づき、各需要家20への電力販売料金を逐次に求め
て積算する積算手段。
(9) On the day of the above-mentioned power supply, in a situation where the power supply based on the power generation plan is actually being performed, each customer 20 Accumulation means for sequentially calculating and accumulating electricity sales charges to

【0035】(10)積算された電力販売料金を定期的
または必要に応じて各需要家20の端末23にインター
ネット2を介して通知する通知手段。通知内容は、端末
23の表示部で表示される。
(10) Notification means for notifying the terminal 23 of each customer 20 via the Internet 2 to the terminal 23 of each customer 20 periodically or as necessary. The notification content is displayed on the display unit of the terminal 23.

【0036】図2に、各発電事業者10の端末14、各
需要家20の端末23、電気事業者30のサーバ31の
具体例を示している。
FIG. 2 shows specific examples of the terminal 14 of each power generation company 10, the terminal 23 of each customer 20, and the server 31 of the power company 30.

【0037】各発電事業者10の端末14は、制御部1
5、メモリ16、表示部17、操作部18、および送受
信部19を備えている。送受信部19は、制御部15と
サーバ31との間のインターネット2を介したデータ送
受信を行う。
The terminal 14 of each power generation company 10
5, a memory 16, a display unit 17, an operation unit 18, and a transmission / reception unit 19. The transmission / reception unit 19 performs data transmission / reception between the control unit 15 and the server 31 via the Internet 2.

【0038】メモリ16には、発電事業者10ごとに固
有のID(識別データ)、計測器13で計測される電力
の値を表わす発電データ、計測器13で計測される電力
量を表わす発電量データ、計測器13で計測される力率
を表わす力率データをまとめた送信用データファイル1
6aが記憶されるとともに、発電事業者10が自身の希
望で決定した事前発電計画あるいはその事前発電計画を
基に電気事業者30の決定が加味されて同電気事業者3
0から通知された発電計画などの発電計画データ16b
が記憶される。送信用データファイル16aのうち、I
D以外の発電データ、発電量データ、力率データについ
ては、計測器13の計測に応じて逐次に更新記憶され
る。
The memory 16 has an ID (identification data) unique to each power generation company 10, power generation data representing the value of power measured by the measuring device 13, and power generation amount representing the amount of power measured by the measuring device 13. Data file 1 for transmitting data and power factor data representing the power factor measured by measuring device 13
6a is stored, and the power generation company 10 decides on a prior power generation plan determined by his / her own request or the power generation company 3 based on the preliminary power generation plan, taking into account the decision of the power generation company 30.
Power generation plan data 16b such as a power generation plan notified from 0
Is stored. Of the transmission data file 16a, I
The power generation data, power generation amount data, and power factor data other than D are sequentially updated and stored according to the measurement by the measuring device 13.

【0039】事前発電計画は、発電事業者10が希望す
る基本供給電力、発電事業者10(発電機11)の発電
能力に基づく許容最大供給電力と許容最低供給電力との
範囲内において同発電事業者10が希望する最大供給電
力と最低供給電力などを、電力供給該当日における予め
設定されている単位計測時間ごとに対応付けたものであ
る。
The advance power generation plan is based on the basic supply power desired by the power generation company 10 and the allowable maximum supply power and the minimum allowable power supply based on the power generation capacity of the power generation company 10 (generator 11). The maximum supply power and the minimum supply power desired by the user 10 are associated with each of the preset unit measurement times on the power supply corresponding day.

【0040】各需要家20の端末23は、制御部25、
メモリ26、表示部27、操作部28、および送受信部
29を備えている。送受信部29は、制御部25とサー
バ31との間のインターネット2を介したデータ送受信
を行う。
The terminal 23 of each customer 20 includes a control unit 25,
A memory 26, a display unit 27, an operation unit 28, and a transmission / reception unit 29 are provided. The transmission / reception unit 29 performs data transmission / reception between the control unit 25 and the server 31 via the Internet 2.

【0041】メモリ26には、需要家20ごとに固有の
ID(識別用データ)、計測器22で計測される電力の
値を表わす発電データ、計測器22で計測される電力量
を表わす発電量データ、計測器13で計測される力率を
表わす力率データをまとめた送信用データファイル26
aなどが記憶される。送信用データファイル26aのう
ち、ID以外の発電データ、発電量データ、力率データ
については、計測器13の計測に応じて逐次に更新記憶
される。
The memory 26 has an ID (identification data) unique to each customer 20, power generation data representing the value of electric power measured by the measuring device 22, and power generation amount representing the amount of electric power measured by the measuring device 22. Data transmission data file 26 in which data and power factor data representing the power factor measured by measuring device 13 are summarized.
a and the like are stored. In the transmission data file 26a, the power generation data other than the ID, the power generation amount data, and the power factor data are sequentially updated and stored according to the measurement by the measuring device 13.

【0042】電気事業者30のサーバ31は、制御部3
2、メモリ33、表示部34、操作部35、およびネッ
トワーク処理部36を備えている。ネットワーク処理3
6は、インターネット2を利用して、各発電事業者10
の端末14および各需要家20の端末23との間の指示
・通知・指令等に関するデータ送受信を行う。なお、制
御部32に対し、各計測データ、電力供給状況、電力使
用状況、電力購入料金、電力販売料金などを履歴情報と
して記憶するための外部記憶装置40が接続されてい
る。
The server 31 of the electric power company 30 includes the control unit 3
2, a memory 33, a display unit 34, an operation unit 35, and a network processing unit 36. Network processing 3
6, each power generation company 10 using the Internet 2
The terminal 14 of each customer 20 and the terminal 23 of each consumer 20 transmit and receive data related to instructions, notifications, instructions, and the like. The control unit 32 is connected to an external storage device 40 for storing measurement data, power supply status, power usage status, power purchase fee, power sale fee, and the like as history information.

【0043】上記メモリ33には、発電事業者10ごと
に固有の発電事業者基礎データを集めた発電事業者基礎
データファイル33a、需要家20ごとに固有の需要家
基礎データを集めた需要家基礎データファイル33b、
各発電事業者10(または各発電機11)に対する各種
指示・通知・指令などのデータをメニューとしてまとめ
た指示データファイル33c、各発電事業者10から通
告される事前発電計画や当該サーバ31で決定した発電
計画などの発電計画データ(各端末14のメモリ16に
記憶される発電計画データ16bと同じ)をまとめた発
電計画データファイル33d、余剰電力の購入や売却に
関する各種料金体系がまとめられた料金体系データベー
ス33eなどが記憶されている。
The memory 33 includes a power generator basic data file 33a in which power generator basic data specific to each power generator 10 is collected, and a consumer basic data file in which specific customer basic data is collected in each customer 20. Data file 33b,
An instruction data file 33c in which data such as various instructions, notifications, and instructions for each power generation company 10 (or each generator 11) are compiled as a menu, a prior power generation plan notified from each power generation company 10 and determined by the server 31. Power generation plan data file 33d that summarizes power generation plan data such as the generated power generation plan (same as the power generation plan data 16b stored in the memory 16 of each terminal 14), and a fee that summarizes various fee systems related to the purchase and sale of surplus power A system database 33e and the like are stored.

【0044】上記発電事業者基礎データファイル33a
内の各発電事業者基礎データは、発電事業者10ごとに
固有のID(識別用データ)、発電機11の発電パター
ンデータ、発電機11の種類および負荷追随性を表わす
基礎パターンデータから成る。
The generator data file 33a
Each of the power generator basic data includes an ID (identification data) unique to each power generator 10, power generation pattern data of the generator 11, basic pattern data indicating the type of the generator 11 and the load followability.

【0045】上記需要家基礎データファイル33bに
は、需要家20ごとの需要家基礎データとして、図3に
示す基礎データシートが登録されている。すなわち、基
礎データシートには、各需要家20のID、電力使用者
の契約種別、契約電力、および必要ならば契約年間購入
電力量が記載され、さらに、過去情報として使用電力実
績データが年間・月間・週間・日別・時間帯別に記載さ
れている。必要ならば、関係気象データ(天候、気温、
雷発生時期、発生頻度など)、需要家20の事業種別な
ども記載される。
The basic data sheet shown in FIG. 3 is registered in the basic customer data file 33b as basic customer data for each customer 20. That is, the basic data sheet describes the ID of each customer 20, the contract type of the power user, the contract power, and the contract annual purchase power amount if necessary. It is listed by month, week, day, and time zone. If necessary, relevant weather data (weather, temperature,
Lightning occurrence time, occurrence frequency, etc.), the business type of the customer 20 and the like are also described.

【0046】サーバ31では、この基礎データシートの
内容と各需要家20から受けた計測情報とを用いた演算
により、各発電事業者10から確保するべき総必要供給
電力および総必要供給電力量が決定される。
The server 31 calculates the total required supply power and the total required supply power to be secured from each power generation company 10 by an operation using the contents of the basic data sheet and the measurement information received from each customer 20. It is determined.

【0047】各発電事業者10は、各需要家20が必要
とする電力・電力量に対応した効率的かつ安定的な電力
・電力量の供給を目的として、季節・日別・時間帯にか
かわらず一定の電力を送電網1に常に供給するベース発
電事業者10bと、複数の期間たとえば季節別・日別・
時間帯別に互いに異なる電力を送電網1に供給するミド
ル発電事業者10mと、特定期間たとえば特定日の特定
時間帯に特別の電力が必要とする状況に対応するために
その特別の電力を送電網1に供給するピーク発電事業者
10pと、これらベース発電事業者10b、ミドル発電
事業者10m、ピーク発電事業者10pのいずれか複数
の形態を組み合わせた複合型発電事業者10fと、需要
家20の使用電力の変化にきめ細かく対応するために短
時間ごとに調整可能な電力を送電網1に供給する調整発
電事業者10cと、に分類されている。
Each of the power generation companies 10 is to provide an efficient and stable supply of electric power and electric energy corresponding to the electric power and electric energy required by each customer 20 regardless of the season, day, and time zone. And a base generator 10b that constantly supplies constant power to the transmission network 1, and a plurality of periods, for example, seasonal, daily,
A middle power generation company 10m that supplies different power to the power transmission network 1 for each time zone, and a power transmission network that supplies the special power to cope with a situation where special power is required for a specific time period, for example, a specific time zone on a specific day. 1, a peak power generation company 10p that supplies any one of the base power generation company 10b, the middle power generation business 10m, and the peak power generation business 10p. It is classified into a regulated power generation company 10c that supplies power that can be adjusted in a short period of time to the power transmission network 1 in order to respond to a change in power consumption in detail.

【0048】このようにして分類された各発電事業者1
0の役割分担(ベース発電、ミドル発電、ピーク発電、
複合型発電、調整発電)は、契約あるいはそれに準じた
運用規定などによってあらかじめ個々の発電事業者10
に周知されるとともに、発電事業者10ごとのIDに対
応付けた形で電気事業者30のサーバ91に登録され
る。
Each power generation company 1 thus classified
Role sharing of 0 (base power generation, middle power generation, peak power generation,
Combined power generation and regulated power generation) are based on contracts or operating rules based on the contracts.
And registered in the server 91 of the electric power company 30 in a form associated with the ID of each power generating business 10.

【0049】また、各発電事業者10には、季節別・日
別・時間帯別に基本となる基本供給電力がそれぞれ設定
される。そして、この基本供給電力に対し、その基本供
給電力より特定の電力値だけ高い上限値、または基本供
給電力より特定の電力値だけ低い下限値、または基本供
給電力を中心として上限値と下限値で挟まれた特定の電
力幅が、それぞれ制御許容範囲として設定される。さら
に、この設定に加え、発電機11の発電能力を勘案した
最大供給電力が設定され、必要ならばこれに加えて最低
供給電力が設定される。
Further, basic power supply is set for each power generation company 10 for each season, each day, and each time zone. Then, with respect to this basic supply power, an upper limit value higher than the basic supply power by a specific power value, or a lower limit value lower than the basic supply power by a specific power value, or an upper limit value and a lower limit value around the basic supply power. Each of the specified power widths is set as a control allowable range. Further, in addition to this setting, the maximum supply power is set in consideration of the power generation capacity of the generator 11, and if necessary, the minimum supply power is set in addition thereto.

【0050】基本供給電力を含む発電基本条件の例を図
4ないし図7に示している。図4はベース発電事業者1
0bの発電基本条件の一例である。F4−1は昼間時間
帯、F4−2は夜間時間帯を示し、F4−3は契約最大
電力、F4−4は契約最低電力を示す。ベース発電で
は、昼夜一定の基本供給電力F4−5が設定され、この
基本供給電力F4−5を中心として一定の上限値と下限
値で挟まれた特定の電力幅が制御許容範囲F5−6とし
て設定される。なお、制御許容範囲は、上限値のみ、あ
るいは下限値のみでも構わない。また、上限値と基本供
給電力との差と、下限値と基本供給電力との差とは異な
っていても構わない。
FIGS. 4 to 7 show examples of basic power generation conditions including the basic supply power. Figure 4 shows the base generator 1
It is an example of a power generation basic condition of 0b. F4-1 indicates a daytime zone, F4-2 indicates a nighttime zone, F4-3 indicates a contract maximum power, and F4-4 indicates a contract minimum power. In the base power generation, a constant basic supply power F4-5 is set day and night, and a specific power width sandwiched between a constant upper limit and a lower limit around the basic supply power F4-5 is set as a control allowable range F5-6. Is set. Note that the control allowable range may be only the upper limit value or only the lower limit value. Further, the difference between the upper limit and the basic supply power may be different from the difference between the lower limit and the basic supply power.

【0051】図5はミドル発電事業者10mの発電基本
条件の一例である。F5−1は昼間時間帯、F5−2は
夜間時間帯であり、昼間、夜間別に契約最大電力F5−
3とF5−4が設定され且つ契約最低電力F5−5とF
5−6が設定される。契約最大電力および契約最低電力
は、終日一定値としてもよい。
FIG. 5 shows an example of the basic power generation conditions of the middle power generation company 10m. F5-1 is a daytime zone and F5-2 is a nighttime zone.
3 and F5-4 are set and contract minimum power F5-5 and F5
5-6 is set. The contract maximum power and contract minimum power may be constant throughout the day.

【0052】このミドル発電事業者10mに対しては、
昼間・夜間ごとに異なった基本給電電力F5−7を定め
るのが一般的である。この基本供給電力F5−7を中心
として一定の上限値と下限値で挟まれた特定の電力幅が
制御許容範囲F5−8およびF5−9として設定され
る。なお、制御許容範囲は、上限値のみ、あるいは下限
値のみでも構わない。また、上限値と基本供給電力との
差と、下限値と基本供給電力との差とは異なっていても
構わない。
For the middle power generator 10m,
Generally, a different basic power supply F5-7 is determined for each day and night. A specific power range sandwiched between a certain upper limit and a lower limit centering on the basic supply power F5-7 is set as the control allowable ranges F5-8 and F5-9. Note that the control allowable range may be only the upper limit value or only the lower limit value. Further, the difference between the upper limit and the basic supply power may be different from the difference between the lower limit and the basic supply power.

【0053】図6はミドル発電とピーク発電の複合型発
電事業者10fの発電基本条件の一例である。F6−1
は昼間時間帯、F6−2は夜間時間帯であり、昼間時間
帯F6−1上にさらにピーク時間帯F6−3が設定され
る。これら昼間時間帯F6−1、夜間時間帯F6−2、
ピーク時間帯F6−3ごとに、契約最大電力F6−4、
F6−5、F6−6と、契約最低電力F6−7、F6−
8、F6−9が設定される。契約最大電力と契約最低電
力は、終日一定値としてもよいし、昼間時間帯と夜間時
間帯とで設定しても構わない。
FIG. 6 shows an example of basic power generation conditions of a combined power generation company 10f of middle power generation and peak power generation. F6-1
Is a daytime zone, F6-2 is a nighttime zone, and a peak time zone F6-3 is further set on the daytime zone F6-1. These daytime zone F6-1, nighttime zone F6-2,
For each peak hour F6-3, the contracted maximum power F6-4,
F6-5, F6-6, contract minimum power F6-7, F6-
8, F6-9 are set. The contracted maximum power and the contracted minimum power may be constant throughout the day, or may be set in a daytime zone and a nighttime zone.

【0054】この複合型発電事業者10fに対しては、
昼間時間帯F6−1、夜間時間帯F6−2、ピーク時間
帯F6−3ごとに互いに異なる基本供給電力F6−10
が設定される。この場合、ピーク時間帯F6−3では、
ピーク時の推定使用電力値が季節や日別によって大きく
変動する可能性があるようなときには、基本供給電力の
設定を定めなくても構わない。この基本供給電力に対し
ては、一定の上限値と下限値で挟まれる特定の電力幅の
制御許容範囲F6−11、F6−12、F6−13が設
定される。なお、制御許容範囲は、上限値のみ、あるい
は下限値のみでも構わない。また、上限値と基本供給電
力との差と、下限値と基本供給電力との差とは異なって
いても構わない。
For the combined power generation company 10f,
Basic supply power F6-10 different from each other for daytime zone F6-1, nighttime zone F6-2, and peak time zone F6-3.
Is set. In this case, in the peak time zone F6-3,
When there is a possibility that the estimated power consumption value at the peak time may fluctuate greatly depending on the season or day, the setting of the basic power supply may not be determined. For this basic supply power, control allowable ranges F6-11, F6-12, and F6-13 of a specific power range sandwiched between a fixed upper limit and a lower limit are set. Note that the control allowable range may be only the upper limit value or only the lower limit value. Further, the difference between the upper limit and the basic supply power may be different from the difference between the lower limit and the basic supply power.

【0055】なお、電力会社などで一般的に呼称される
昼間時間帯とは8時から22時までの時間帯であり、夜
間時間帯とはそれ以外の時間帯である。また、ピーク時
間帯は、電力会社によって若干異なるが、一般的に10
時から16時までの時間帯、または、10時から17時
までの時間帯を示す。
The daytime period generally called by electric power companies and the like is a time period from 8:00 to 22:00, and the nighttime period is other time periods. The peak hours vary slightly depending on the electric power company, but are generally 10 hours.
The time zone from hour to 16:00 or the time zone from 10:00 to 17:00 is shown.

【0056】これらベース、ミドル、ピーク、複合型の
各発電事業者10については、季節別・日別・時間帯別
に設定される基本供給電力量、この基本供給電力量を基
準に設定される制御許容範囲、発電機11の発電能力を
勘案して設定される許容最大供給電力、発電機11の発
電能力を勘案して設定される許容最低供給電力などが、
発電計画の設定要素となる。
For each of the base, middle, peak, and combined power generation companies 10, the basic power supply amount set for each season, day, and time zone, and the control set based on this basic power supply amount The allowable range, the maximum allowable supply power set in consideration of the power generation capacity of the generator 11, the minimum allowable supply power set in consideration of the power generation capacity of the generator 11, and the like,
It is a setting factor of the power generation plan.

【0057】一方の調整発電事業者10cに対しては、
発電機11の発電能力を勘案した最大供給電力が設定さ
れ、必要ならこれにさらに最低供給電力が設定される
が、基本供給電力が予め設定されることはない。
For one regulated power generation company 10c,
The maximum supply power is set in consideration of the power generation capacity of the generator 11, and if necessary, the minimum supply power is further set. However, the basic supply power is not set in advance.

【0058】つまり、調整発電事業者10cに対して
は、運転営業日ごとに、電気事業者30のサーバ31で
決定される各発電事業者10の総必要供給電力からベー
ス、ミドル、ピーク、複合型の各発電事業者10の総供
給電力合計を減じた電力が単位計測時間(30分あるい
は1時間)ごとに求められ、その電力値あるいはそれに
一定の余裕を持った電力増加分を加えた電力値が基本供
給電力として設定される。要は、上記総供給電力合計で
は不足となる電力を補うためにサーバ31から調整値が
指令され、その調整値に応じて基本供給電力が可変設定
される。そして、この基本供給電力に対し、その基本供
給電力より特定の電力値だけ高い上限値、または基本供
給電力より特定の電力値だけ低い下限値、または基本供
給電力を中心として上限値と下限値で挟まれた特定の電
力幅が、それぞれ制御許容範囲として設定される。
That is, for the regulated generator 10c, the base, middle, peak, and composite powers are calculated for each operating business day from the total required supply power of each generator 10 determined by the server 31 of the electric utility 30. The power obtained by subtracting the total supply power of each type of power generation company 10 is obtained for each unit measurement time (30 minutes or 1 hour), and the power value or the power obtained by adding the power increase with a certain margin to it The value is set as the basic supply power. In short, an adjustment value is instructed from the server 31 in order to compensate for the power that is insufficient in the total supply power, and the basic supply power is variably set according to the adjustment value. Then, with respect to this basic supply power, an upper limit value higher than the basic supply power by a specific power value, or a lower limit value lower than the basic supply power by a specific power value, or an upper limit value and a lower limit value around the basic supply power. Each of the specified power widths is set as a control allowable range.

【0059】図7は調整発電事業者10cの発電基本条
件の一例である。F7−1は昼間時間帯、F7−2は夜
間時間帯を示すが、この例では昼間時間帯のみの調整発
電が実施される。あらかじめ調整発電事業者10cと
は、契約最大電力F7−3、契約最低電力F7−4が設
定される。発電機11の種類や余剰電力の条件によって
は、契約最低電力F7−4の設定が省略されることもあ
る。
FIG. 7 shows an example of the basic power generation conditions of the regulated power generation company 10c. F7-1 indicates a daytime zone and F7-2 indicates a nighttime zone. In this example, regulated power generation is performed only in the daytime zone. A contract maximum power F7-3 and a contract minimum power F7-4 are set in advance with the regulated power generation company 10c. Depending on the type of the generator 11 and the condition of the surplus power, the setting of the contract minimum power F7-4 may be omitted.

【0060】この調整発電事業者10cに対しては、サ
ーバ31において、各需要家20の推定使用電力・推定
使用電力量と、他の発電事業者10の発電計画とから算
出される電力が、給電指令として送信される。この電力
値が基本供給電力F7−5となる。基本供給電力F7−
5に対しては、それを中心として上限値と下限値で挟ま
れた特定の電力幅が、制御許容範囲F7−6として設定
される。なお、制御許容範囲は、上限値のみ、あるいは
下限値のみでも構わない。また、上限値と基本供給電力
との差と、下限値と基本供給電力との差とは異なってい
ても構わない。
For the regulated power generation company 10c, the server 31 calculates the estimated power consumption and the estimated power consumption of each customer 20 and the power calculated from the power generation plan of the other power generation companies 10 in the server 31. Sent as a power supply command. This power value becomes the basic supply power F7-5. Basic power supply F7-
For 5, the specific power range sandwiched between the upper limit and the lower limit with respect to 5 is set as the control allowable range F7-6. Note that the control allowable range may be only the upper limit value or only the lower limit value. Further, the difference between the upper limit and the basic supply power may be different from the difference between the lower limit and the basic supply power.

【0061】この調整発電事業者10cついては、ベー
ス、ミドル、ピーク、複合型の各発電事業者10の総供
給電力では不足となる分の電力を補うためにサーバ31
から指令される増減値に応じて可変設定される基本供給
電力、この基本供給電力量を基準に設定された制御許容
範囲、発電機11の発電能力を勘案して設定される許容
最大供給電力、発電機11の発電能力を勘案して設定さ
れる許容最低供給電力などが、発電計画の設定要素とな
る。
The regulated power generation company 10c is provided with a server 31 in order to supplement the shortage of the total supply power of the base, middle, peak, and combined power generation companies 10.
The basic supply power variably set according to the increase / decrease value instructed from the control, the control allowable range set based on this basic supply power, the allowable maximum supply power set in consideration of the power generation capacity of the generator 11, The allowable minimum supply power set in consideration of the power generation capacity of the generator 11 is a setting factor of the power generation plan.

【0062】電力供給該当日の当日は、発電計画に基づ
く電力供給が実際に行われている状況において、各計測
器13の計測により検出される電力供給状況と各計測器
22の計測により検出される電力使用状況との対比に基
づいて、かつ各発電事業者10に固有の発電事業者基礎
データおよび各発電事業者10の現地気象データなどに
基づいて、現時点より先の電力供給と電力使用とのバラ
ンスを予測し、その予測結果に応じてベース、ミドル、
ピーク、複合型の各発電事業者10の供給電力に対する
増減値が設定される。そして、この増減値が増減指令・
削減指令として各発電事業者10の端末14に送られ
る。
On the day of the power supply corresponding day, in the situation where the power supply based on the power generation plan is actually performed, the power supply situation detected by the measurement of each measuring instrument 13 and the power supply situation detected by the measurement of each measuring instrument 22 are detected. Power supply and power usage beyond the current time, based on comparisons with the power usage situation, and on the basis of the power generator basic data unique to each power generator 10 and the local weather data of each power generator 10. The base, middle,
An increase / decrease value with respect to the supply power of each of the peak and combined power generation companies 10 is set. And this increase / decrease value is
It is sent to the terminal 14 of each power generation company 10 as a reduction command.

【0063】さらに、上記予測結果から、単位計測時間
より短い単位給電指令時間における必要電力が予測さ
れ、その予測された必要電力に応じて調整発電事業者1
0cの供給電力に対する増減値が逐次に設定される。そ
して、この増減値が増減指令・削減指令として調整発電
事業者10cの端末14に送られる。
Further, from the above prediction result, the required power in the unit power supply command time shorter than the unit measurement time is predicted, and the regulated power generation company 1 is adjusted according to the predicted required power.
The increase / decrease value for the supply power of 0c is sequentially set. Then, the increase / decrease value is sent to the terminal 14 of the regulated power generation company 10c as an increase / decrease command / reduction command.

【0064】これらベース、ミドル、ピーク、複合、調
整の各電力事業者10からの電力供給の運用に関して基
礎データシートが作成され、それが電気事業者30のサ
ーバ31に登録される。
A basic data sheet is created for the operation of power supply from each of the base, middle, peak, composite, and adjustment power providers 10 and registered in the server 31 of the power provider 30.

【0065】すなわち、サーバ31におけるメモリ33
内の発電事業者基礎データファイル33aには、発電事
業者10ごとの発電事業者基礎データとして、図8に示
す基礎データシートが登録されている。この基礎データ
シートには、各発電事業者10のID、ベース・ミドル
・ピーク・調整の種別、契約最大電力が記載され、必要
ならば契約最低電力、基本供給電力、発電の制御許容範
囲などがが記載され、さらに、発電機11の種類や建設
時期などのその他の情報、前回の定期点検時期、過去の
発電実績データが年間・月間・週間・日別・時間帯別に
記載されている。必要ならば、関係気象データ(天候、
気温、雷発生時期、発生頻度など)、発電事業者10の
事業種別なども記載される。
That is, the memory 33 in the server 31
The basic data sheet shown in FIG. 8 is registered in the power generation company basic data file 33a as the power generation company basic data for each power generation company 10. This basic data sheet describes the ID of each power generation company 10, the type of base, middle, peak, and adjustment, and the maximum contracted power. If necessary, the minimum contracted power, the basic supply power, the allowable range of power generation, and the like are described. In addition, other information such as the type of the generator 11 and the construction time, the previous periodic inspection time, and past power generation result data are described for each year, month, week, day, and time zone. If necessary, relevant weather data (weather,
Temperature, lightning occurrence time, occurrence frequency, and the like, and the business type of the power generation company 10 are also described.

【0066】次に、料金体系について説明する。Next, a fee system will be described.

【0067】発電事業者10が指令された通りの電力ま
たはその指令された電力に対する制御許容範囲内の電力
供給を達成した場合には、その供給された電力に該当時
間を乗じた電力量に対して最高単価が選定され、その電
力量と最高単価とを乗算したものが、電力購入料金とな
る。発電事業者10にとっては、電力売却料金となる。
When the power generation company 10 achieves the power as instructed or the power supply within the control allowable range for the instructed power, the power amount obtained by multiplying the supplied power by the corresponding time is calculated. The highest unit price is selected, and the product of the amount of power and the highest unit price is the power purchase fee. For the power generation company 10, this is a power sale fee.

【0068】発電事業者10が指令された通りの電力ま
たはその指令された電力に対する制御許容範囲内の電力
供給を達成できない場合には、その供給された電力に該
当時間を乗じた電力量に対し、上記最高単価より低い単
価[価格が零(円/kWh)を含む]が選定され、その
電力量と単価とを乗算したものが、電力購入料金とな
る。
If the power generation company 10 cannot achieve the power as instructed or the power supply within the control allowable range for the instructed power, the electric power obtained by multiplying the supplied power by the corresponding time is calculated. , A unit price [the price includes zero (yen / kWh)] lower than the highest unit price is selected, and the product of the amount of power and the unit price is the power purchase fee.

【0069】また、発電事業者10からの電力供給が、
電気事業者30が送電託送している電力会社からペナル
ティー料金を課される恐れのある最低供給電力を大幅に
下回っている場合には、そのペナルティーを補填するか
もしくは最小限に抑制することのできるよう、一定時間
の制限が設定されて、その一定時間を超過して同じ状態
が継続した場合に発電事業者10からペナルティーとし
て徴収するための定額のペナルティー料金が選定され
る。あるいは、予め契約時、またはそれに相当する運用
規定において定めた基本供給電力と該当供給電力との電
力差に該当時間を乗じた電力量に対し、所定のペナルテ
ィー単価が選定される。ペナルティー料金の選定および
ペナルティー単価の選定の両方を組み合わせて課すパタ
ーンもある。
The power supply from the power generator 10 is
If the electric power company 30 is significantly lower than the minimum supply power at which a penalty fee may be imposed by the power transmission company, the penalty can be compensated for or minimized. As described above, a fixed time limit is set, and a fixed penalty fee to be collected as a penalty from the power generation company 10 when the same state continues after the fixed time is selected. Alternatively, a predetermined penalty unit price is selected for the amount of power obtained by multiplying the power difference between the basic power supply and the corresponding power supply specified in advance at the time of contract or an equivalent operation rule by the relevant time. Some patterns impose a combination of both penalty fee selection and penalty unit price selection.

【0070】さらに、ベース、ミドル、ピーク、複合型
の各発電事業者10とは別に、需要家20の使用電力・
使用電力量に対応して電気事業者30が意図したように
給電指令(増減値の指令)を実施することが可能なよう
に、調整発電事業者10cには、事業採算性を保証する
観点から、この他に別に月額一定または年額一定の基本
料金が選定される。
Further, separately from the base, middle, peak, and combined power generators 10,
In order to be able to execute a power supply command (a command for an increase or decrease value) as intended by the electric power company 30 in accordance with the amount of used electric power, the regulated power generation business 10c is provided with a viewpoint of guaranteeing business profitability. In addition, a fixed monthly or annual basic fee is selected separately.

【0071】一方、需要家20の使用電力・使用電力量
に対し、より効率的に対応して電力を供給するために、
調整発電事業者10cに対して、通常の単位計測時間と
は別に、その単位計測時間より短い単位給電指令時間が
設定される。サーバ31では、サーバ31のメモリ33
にあらかじめ記憶されている発電事業者基礎データの発
電パターンデータに基づき、調整発電事業者10cから
供給可能な電力が把握され、その把握結果に基づく給電
指令(増減値の指令)が、上記単位給電指令時間ごとに
該当する調整発電事業者10cに対して送信される、あ
るいは、必要ならば、調整発電事業者10cの所有する
端末14において、電力供給該当日の一定時間前までに
事前通告として、電気事業者30が希望する最大供給電
力以下の範囲で該当日の最大供給電力を、あるいは最低
供給電力以上、最大供給電力以下の範囲で該当日の最大
供給電力、最小供給電力を、単位計測時間ごとに決定・
集計し、それを電力供給該当日の事前通告値として、サ
ーバ31に申告させるようにしてもよい。この申告によ
り、電気事業者30側は、供給可能な電力を把握する。
On the other hand, in order to more efficiently respond to the power consumption and power consumption of the customer 20 and supply power,
A unit power supply command time shorter than the unit measurement time is set for the regulated power generation company 10c separately from the normal unit measurement time. In the server 31, the memory 33 of the server 31
Based on the power generation pattern data of the power generation company basic data stored in advance, the power that can be supplied from the regulated power generation company 10c is grasped, and a power supply command (command of increase / decrease value) based on the grasped result is sent to the unit power supply. It is transmitted to the corresponding regulated power generation company 10c every command time, or, if necessary, at the terminal 14 owned by the regulated power generation company 10c, as a prior notice by a certain time before the power supply corresponding day, The maximum supply power of the corresponding day in the range of less than the maximum supply power desired by the electric power company 30 or the maximum supply power and the minimum supply power of the corresponding day in the range of the minimum supply power or more and the maximum supply power or less, the unit measurement time Determined for each
The totalization may be performed, and the result may be reported to the server 31 as a prior notification value on the power supply corresponding day. With this report, the electric utility 30 grasps the power that can be supplied.

【0072】それとともに、ベース、ミドル、ピーク、
複合型の各発電事業者10の端末14と、各需要家20
の端末23と、電気事業者30のサーバ31との間でイ
ンターネット2を介して実施した、営業日ごとにおけ
る、ベース、ミドル、ピーク、複合型の各発電事業所1
0からの発電の事前通告値と、各需要家20からの推定
必要電力・推定必要電力量のデータとから比較演算し決
定した、ベース、ミドル、ピーク、複合型の各発電事業
者10の単位計測時間ごとの予定供給電力値に基づき、
サーバ31において集約した該当日の需要家20の推定
使用電力・推定使用電力量の合計と、同じくサーバ31
において集約し、増加、あるいは削減によって決定した
ベース、ミドル、ピーク、複合型の各発電事業者10の
予定供給電力・予定供給電力量の合計との差から調整発
電事業者10cの単位計測時間ごとの予定供給電力値を
決定し、これらをインターネット2を介して調整発電事
業者10cの端末14に送信し、あらかじめ周知する。
At the same time, bass, middle, peak,
Terminal 14 of each combined power generation company 10 and each customer 20
, Middle, peak, and combined power plants 1 for each business day implemented between the terminal 23 and the server 31 of the electric power company 30 via the Internet 2
A unit of each of the base, middle, peak, and combined power generators 10 determined by performing a comparison operation and determining from the advance notification value of power generation from 0 and the data of the estimated required power and the estimated required power amount from each customer 20 Based on the estimated power supply value for each measurement time,
The sum of the estimated power consumption and the estimated power consumption of the customer 20 on the day collected by the server 31 and the server 31
In each unit measurement time of the regulated generator 10c, the difference between the total, the planned supply power and the planned supply power of each of the base, middle, peak, and combined power generators 10 determined by the aggregation, increase, or reduction And supplies them to the terminal 14 of the regulated power generation company 10c via the Internet 2 to make them known in advance.

【0073】さらに、電力供給該当日における電力の供
給および電力の使用の運用において、各需要家20の端
末23によってモニタリングした消費電力および消費電
力量をインターネット2を介してサーバ31が随時収集
し、これを元に、調整発電事業者10cの発電機11の
発電特性、供給電力計画と比較演算して次の単位計測時
間後、あるいは、複数回の単位計測時間後の各発電事業
者10における必要供給電力を算出し、上記の予定供給
電力計画にかかわらず、単位給電指令時間ごとに、サー
バ31からインターネット2を介して調整発電事業者1
0cの端末14に給電指令として算出した必要電力値お
よび必要電力量を指示する。
Further, in the operation of power supply and power use on the power supply day, the server 31 collects the power consumption and the power consumption monitored by the terminal 23 of each customer 20 via the Internet 2 as needed. Based on this, the power generation characteristics of the generator 11 of the regulated power generation company 10c and the supply power plan are compared with each other and calculated after the next unit measurement time or after a plurality of unit measurement times. The supply power is calculated, and regardless of the above-mentioned planned supply power plan, the adjusted power generation company 1 via the Internet 2 from the server 31 for each unit power supply command time.
It instructs the required power value and the required power amount calculated as the power supply command to the terminal 14 at 0c.

【0074】電気事業者30が、サーバ31からインタ
ーネット2を介して調整発電事業者10cの端末14に
給電指令を送信する単位給電指令時間を電力購入料金に
関わる通常の単位計測時間と同等かより短時間にする理
由は、給電指令の単位時間を短時間にすることにより、
調整発電事業者10cからの供給電力の状況をきめ細か
く把握し、それに対応してきめ細かい発電調整を実施す
ることが可能となるからである。特に、需要家20の業
種、昼間時間帯、ピーク時間帯など使用電力の変動が激
しい条件においては、通常の単位計測時間より短時間、
より好ましくは単位計測時間の最大1/6、最小1/2
の時間を単位給電指令時間とする。このように単位給電
指令時間を設定し、この設定時間ごとにサーバ9から調
整発電事業者10cの端末14に給電指令を実施すれ
ば、需要家20の使用電力・使用電力量により的確に対
応した適正な電力を供給することができるようになる。
The unit power supply command time, in which the power company 30 transmits a power supply command from the server 31 to the terminal 14 of the regulated power generation company 10c via the Internet 2, is determined based on whether the unit power supply command time is equal to the normal unit measurement time related to the power purchase fee. The reason for the short time is to shorten the unit time of the power supply command,
This is because the situation of the power supply from the regulated power generation company 10c can be grasped in detail, and the power generation can be finely regulated in response to the situation. In particular, under conditions where the power consumption fluctuates greatly, such as the type of business of the customer 20, daytime hours, and peak hours, the unit measurement time is shorter than the normal unit measurement time.
More preferably, the maximum 1/6 and the minimum 1/2 of the unit measurement time
Is the unit power supply command time. In this manner, the unit power supply command time is set, and the power supply command is executed from the server 9 to the terminal 14 of the regulated power generation company 10c at each set time. Appropriate power can be supplied.

【0075】単位供給指令時間が単位計測時間の1/6
より小さいと、この単位供給指令時間の時間間隔に追随
できる発電機11はなく、実質上給電指令が有効とはな
らない。反対に、単位給電指令時間が単位計測時間の1
/2より長時間だと、一旦指令した値が不適切だった場
合、これを矯正する給電指令に対して発電機11が追随
するに十分な時間を確保できず需要家20の使用電力に
対する供給電力が不適正となって、場合によっては送電
を委託している電力会社から高額の電力補給を甘受しな
ければならず、事業採算の悪化を招くことになって好ま
しくない。
Unit supply command time is 1/6 of unit measurement time
If it is smaller, there is no generator 11 that can follow the time interval of the unit supply command time, and the power supply command is not effectively made effective. Conversely, the unit power supply command time is one of the unit measurement times.
If it is longer than / 2, if the commanded value is inappropriate once, the generator 11 cannot secure enough time to follow the power supply command to correct the value, and the supply to the power used by the customer 20 is not possible. The electric power becomes inappropriate, and in some cases, it is necessary to accept a large amount of power supply from a power company outsourcing power transmission, which is unfavorable because it leads to deterioration of business profitability.

【0076】本システムにおいては、また、電力供給該
当日の運用で、ベース、ミドル、ピーク、複合型の各発
電事業者10は、最低供給電力以上、最大供給電力以下
の範囲で電力供給該当日の最大、最小供給電力を決定す
るほかに、各発電事業者10内の操業状態によって余剰
電力が、あらかじめ決定した基本供給電力より過剰に、
あるいは不足して供給する事態が発生することを十分に
認識し、この余剰電力の変動に対処する機能を保有す
る。
In the present system, in the operation on the power supply day, each of the power generators 10 of the base, middle, peak, and combined types operates in the range of the minimum supply power or more and the maximum supply power or less. In addition to determining the maximum and minimum supply power, the surplus power depending on the operation state in each power generation company 10 is excessively larger than the predetermined basic supply power,
Alternatively, it is fully aware that a shortage of supply will occur and has a function to cope with the fluctuation of the surplus power.

【0077】本システムでは、契約したベース、ミド
ル、ピーク、複合型の各発電事業者10が、自己の事業
の操業状況に応じて、あらかじめ決定した基本供給電力
より過剰の、あるいは不足の電力を供給する可能性のあ
る場合、単位計測時間ごとに過剰のあるいは不足の電力
値を定め、発電事業者10の端末14からインターネッ
ト2を介してサーバ31に事前通告としてこの電力値デ
ータを送信し通知することができる。
In the present system, the contracted base, middle, peak, and combined power generators 10 generate excess or insufficient power than predetermined basic supply power according to the operation status of their own business. If there is a possibility of supply, an excessive or insufficient power value is determined for each unit measurement time, and this power value data is transmitted from the terminal 14 of the power generation company 10 to the server 31 via the Internet 2 as a preliminary notice and notified. can do.

【0078】サーバ31では、各需要家20の端末23
から随時にモニタリングした使用電力・使用電力量を元
に、発電事業者10の端末14から通知された事前通告
による単位計測時間ごとの電力に対し、この供給値に同
意するか、もしくは必要な値に変更し、これを事前通告
電力(事前発電計画)として定め、調整発電事業者10
cの端末14に送信し、通知する。
In the server 31, the terminal 23 of each customer 20
Based on the power consumption and the power consumption monitored from time to time, based on the power consumption per unit measurement time by the advance notice notified from the terminal 14 of the power generation company 10 And set this as the advance notification power (prior generation plan), and
c to the terminal 14 for notification.

【0079】本システムでは、さらに、この事前通告電
力に対して一定の上限値と下限値を、または上限値の
み、または下限値のみを設け、これを制御許容範囲とし
て設定し、発電事業者10が事前通告電力に対して設け
た制御許容範囲内で電力を供給した場合において、事前
通告電力が、基本供給電力より下回った電力値の場合
は、事前通告電力を基本供給電力と同等と見なして、基
本供給電力を対象に設定した料金と同じ、供給電力に該
当時間を乗じた電力量に対して、基本供給電力を対象に
設定した料金と同額の最高の発電単価を設定してこれに
乗じ、事前通告電力が基本供給電力より上回る電力値の
場合は、基本供給電力と、供給電力との差に該当時間を
乗じた電力量に、基本給電電力を対象とする料金単価よ
り安価な料金を設定してこれに乗じる料金体系を選定す
る。
In the present system, a predetermined upper limit and lower limit, or only the upper limit, or only the lower limit are provided for the advance notification power, and these are set as control allowable ranges. When the power is supplied within the control allowable range provided for the advance notice power, if the advance notice power is a power value lower than the basic supply power, the advance notice power is regarded as being equivalent to the basic supply power. For the amount of power obtained by multiplying the supply power by the applicable time, which is the same as the charge set for the basic supply power, set the highest unit price of generation equal to the charge set for the basic supply power and multiply this However, if the advance notification power is higher than the basic supply power, the amount of power obtained by multiplying the difference between the basic supply power and the supply power by the corresponding time is reduced by a charge that is lower than the unit price for the basic supply power. Set To select the fee structure to be multiplied to this.

【0080】このような料金体系を選定することによ
り、ベース、ミドル、ピーク、複合型の各発電事業者1
0は、電気事業者30との合意であらかじめ決定した基
本供給電力に従って電力を供給することが最も価値ある
ことであるとの認識を持つことになり、併せて、ベー
ス、ミドル、ピーク、複合型の各発電事業者10にとっ
ては、自己の操業状態によってあらかじめ基本供給電力
として定めた余剰電力の供給を加減できるメリットを亨
受することになり、需要家20の使用電力に対応した供
給電力の維持と、発電事業者10の事情の考慮とを両立
できる優れたシステムとなる。
By selecting such a charge system, each of the base, middle, peak, and combined power generation companies 1
0 recognizes that it is most valuable to supply power according to the basic supply power determined in advance with the agreement with the electric power company 30. In addition, the base, middle, peak, and hybrid type Each power generation company 10 receives the advantage that the supply of surplus power determined in advance as basic supply power can be adjusted according to its own operation state, and the supply power corresponding to the power used by the customer 20 is maintained. It is an excellent system that can balance the consideration of the situation of the power generation company 10.

【0081】さらに、本システムにおいては、電力供給
該当日の運用で、各需要家20の端末23から随時にモ
ニタリングした使用電力・使用電力量を元に、ベース、
ミドル、ピーク、複合型の各発電事業者10の発電機1
1の発電特性および供給電力計画と比較演算して次の単
位計測時間後、あるいは、複数回の単位計測時間後の各
発電事業者10における必要供給電力を算出し、必要な
らば、上記の予定供給電力計画から変更して改めて増加
指令電力または削減指令電力を決定し、サーバ31から
インターネット2を介して、対象となる発電事業者10
の端末14を通じて増加指令または削減指令を発した場
合、これらの増加指令や削減指令に対しては、該指令電
力値に対して特定の電力値の幅を上限、あるいは下限、
あるいは上限と下限にそれぞれ設けて制御許容範囲とす
る。そして、増加指令に基づく電力供給が制御許容範囲
内で満足された場合には、所定料金を加算するためのプ
レミアム単価を選定して、該当供給電力に増加指令の該
当時間を乗じた電力量にこれを乗じる。削減指令に基づ
く電力供給が制御許容範囲内で満足された場合には、事
前通告の基本供給電力から削減指令電力を減じた電力値
(削減後の電力と基本供給電力との差分)に対応する補
償電力量料金を加算するためのプレミアム単価を選定し
て、該電力差に削減指令の該当時間を乗じた電力量にこ
れを乗じた料金体系を作成する。
Further, in the present system, on the operation day of the power supply, based on the power consumption and the power consumption monitored from the terminal 23 of each customer 20 as needed, the base,
The generator 1 of each of the middle, peak and combined power generators 10
After calculating the power generation characteristics and the power supply plan of No. 1 and calculating the required power supply at each power generation company 10 after the next unit measurement time or a plurality of times after the unit measurement time, if necessary, the above schedule The power supply plan is changed from the power supply plan, and the increase command power or the reduction command power is determined again.
When an increase command or a reduction command is issued through the terminal 14 of the above, the width of a specific power value with respect to the command power value is an upper limit or a lower limit with respect to the increase command or the reduction command.
Alternatively, they are provided at the upper limit and the lower limit, respectively, to make the control allowable range. If the power supply based on the increase command is satisfied within the control allowable range, a premium unit price for adding a predetermined charge is selected, and the power amount obtained by multiplying the corresponding supply power by the corresponding time of the increase command is selected. Multiply this. When the power supply based on the reduction command is satisfied within the control allowable range, the power supply value corresponds to a power value obtained by subtracting the reduction command power from the basic notification power notified in advance (the difference between the reduced power and the basic power supply). A premium unit price for adding the compensation electric energy charge is selected, and a charge system is created by multiplying the electric energy obtained by multiplying the electric power difference by the corresponding time of the reduction command.

【0082】このプレミアムの料金体系は、ベース、ミ
ドル、ピーク、複合型の各発電事業者10の端末14に
予め入力される。各発電事業者10には、電気事業者3
0が受給した電力と、その受給電力に基づいて該料金体
系から算定された料金とが、インターネット2により端
末14に送られて表示される。この表示は発電事業者1
0に発電量の調整を促す喚起となり、これにより、需要
家20の使用電力・使用電力量に適切に対応した電力供
給が行われる。
The premium fee system is input in advance to the terminal 14 of each of the base, middle, peak, and combined power generation companies 10. Each power generation company 10 includes an electric power company 3
0 is received and the fee calculated from the fee system based on the received power is sent to the terminal 14 via the Internet 2 and displayed. This display is Power Generation 1
It is a reminder that the power generation amount is adjusted to 0, whereby power supply appropriately corresponding to the power consumption and power consumption of the customer 20 is performed.

【0083】つまり、このようなプレミアムの料金体系
を設定することによって、各発電事業者10は電気事業
者30の都合どおりに電力を供給することになり、需要
家20の使用電力・使用電力量に対してより効率的に且
つ精度よく対応する電力の供給が可能となる。
In other words, by setting such a premium rate system, each power generation company 10 supplies electric power according to the convenience of the electric power company 30, and the power consumption and the power consumption of the customer 20. Can be supplied more efficiently and accurately.

【0084】本システムでは、需要家20の使用電力・
使用電力量に対してより的確かつ効率的に対応した電力
の供給を行うために、サーバ31に収納する各発電事業
者10に関わる発電事業者基礎データとして、発電機1
1の種類、運用年数、発電に関わる周辺設備、必要なら
ば発電機11と周辺設備の製造メーカ、型式を入力する
とともに、発電特性と、前年、可能ならば複数年の過去
の発電実績(季節別、月別、平日、休日別、時間帯別の
発電パターン)、故障実績(季節別、月別、平日、休日
別、時間帯別の故障頻度、1回当たりの発電停止期
間)、気象データ(気温、天候、雷発生頻度など)を併
せて入力しておき、季節別、月別、平日、休日別、時間
帯別の故障発生危険率と、好ましくは運転パターン別
(発電電力レベル、電力の変動モードレベル、発電機1
1の振動モードレベル)の故障発生危険率を算定して入
力しておき、発電事業者10ごとの該当日の予定供給電
力計画と比較演算して単位計測時間ごとの故障発生危険
率を算出し、併せて故障発生時の各発電事業者10の供
給電力を算定して各発電事業者10の端末14の表示部
17に表示し把握させるとともに、電力供給該当日の運
用においては、各発電事業者10の端末14から随時受
信した供給電力・供給電力量のモニタリングデータをこ
れらの故障発生危険率データと比較演算して、故障の発
生率を算出するとともに、料金体系データベース33e
から故障発生に伴うペナルティー金額を算定し、これら
の情報をインターネット2を介して必要な発電事業者1
0の端末14に送信し、警告することも可能である。
In this system, the power consumption of the customer 20
In order to more accurately and efficiently supply electric power corresponding to the amount of used electric power, the generator 1 includes,
Enter the type, operating years, peripheral equipment related to power generation, if necessary, the maker of the generator 11 and peripheral equipment, and the model. , Monthly, weekday, holiday, and time-of-day power generation patterns), failure results (seasonally, monthly, weekday, holiday-based, time-of-day failure frequency, power generation outage per time), weather data (temperature , Weather, frequency of lightning occurrence, etc.), and the risk of failure occurrence by season, month, weekday, holiday, time zone, and preferably by operation pattern (power generation level, power fluctuation mode) Level, generator 1
(Vibration mode level of 1) is calculated and input, and the calculated value is compared with the planned power supply plan of the power generation company 10 on the corresponding day to calculate the failure risk rate for each unit measurement time. In addition, the power supply of each power generation company 10 at the time of occurrence of a failure is calculated and displayed on the display unit 17 of the terminal 14 of each power generation company 10 so as to be grasped. The monitoring data of the supplied power / supplied electric energy received from the terminal 14 of the user 10 at any time is compared with the failure occurrence risk rate data to calculate the failure occurrence rate, and the charge system database 33e.
The amount of the penalty associated with the occurrence of a failure is calculated from the
It is also possible to send a warning to the terminal 14 of the "0".

【0085】このような、故障率に関わるデータをサー
バ31にて解析し、かつ各発電事業者10の端末14に
送信し、通知することで、電気事業者30と各発電事業
者10とが故障に対する余地情報を共有し、かかる不測
事態により機敏、かつ効果的に対処できることになり、
より信頼性の高い電気事業を運営できることになる。
The data relating to the failure rate is analyzed by the server 31 and transmitted to the terminal 14 of each power generation company 10 to notify the terminal 14 of each power generation company 10 that the electric power company 30 and each power generation company 10 can communicate with each other. By sharing room for failure and being able to respond more quickly and effectively to such contingencies,
You will be able to run a more reliable electricity business.

【0086】本システムは、複数の需要家20と電力の
販売の契約をし、べース、ミドル、ピーク、複合型の各
発電事業者10の少なくとも1事業者と電力の購入の契
約をし、調整発電事業者10cの少なくとも1事業者と
電力の購入の契約をし、かつ、契約した需要家20と発
電事業者10とがインターネット2に接続した端末2
3,14を有し、かつこれら端末23,14および送電
の委託契約を行った電力会社とのインターネット2を介
したデータ送受信を行うサーバ31を有する電気事業者
30が電力小売り事業を運営する場合に適用される。し
かしながら、余剰電力購入制御、料金システムは、電力
の小売り事業、もしくはそれに類似した電力事業を運営
する事業者であれば何らそのシステムを適用し運用する
ことに問題はなく、しかも高信頼、的確で効率的な電力
の供給を実現することができるためこのシステムを使用
する利点はきわめて大きい。
This system makes a contract for the sale of electric power with a plurality of customers 20, and makes a contract for the purchase of electric power with at least one of the base, middle, peak, and combined power generators 10. A terminal 2 that has made a contract for power purchase with at least one of the regulated power generation companies 10c, and the contracted customer 20 and the power generation company 10 are connected to the Internet 2.
In the case where the electric power company 30 having the terminals 3 and 14 and the server 31 for transmitting and receiving data via the Internet 2 to the power companies that have contracted the power transmission contract with the terminals 23 and 14 operates the power retail business. Applied to However, the surplus power purchase control and fee system has no problem in applying and operating the system if it is a business that operates a power retail business or a similar power business, and is highly reliable and accurate. The advantage of using this system is very great because it can provide an efficient power supply.

【0087】以下、主要な作用についてフローチャート
を参照して説明する。
The main operation will be described below with reference to the flowchart.

【0088】図9は電気事業者30と発電事業者10と
の関係において、該当日の発電計画を作成する手段を示
している。
FIG. 9 shows a means for creating a power generation plan on the relevant day in the relationship between the electric power company 30 and the power generation business 10.

【0089】サーバ31は、各発電事業者10の端末1
4から規定時間前までに、電力供給該当日の事前発電計
画として、供給最大電力、供給最低電力、さらには、基
本供給電力の事前通告を受信する。サーバ31は、この
事前通告データを集計し、電力供給該当日の単位計測時
間ごとの供給電力・供給電力量の総計を把握する。さら
に、サーバ31は、需要家基礎データをもとに、電力供
給該当日の単位計測時間ごとの推定使用電力・推定使用
電力量の把握を行い、この推定使用量(推定使用電力・
推定使用電力量)と計画供給量とのバランスを把握す
る。サーバ31は、その上で改めて各発電事業者10の
単位計測時間ごとの発電計画を作成し、この計画値を各
発電事業者10の端末14に送信し、調整を行い、電力
供給該当日の発電計画を決定する。必要ならば、各発電
事業者10の要求を勘案し、再度推定使用量と計画供給
量との比較演算を行い、必要な修正を行って最終的な発
電計画を決定する。
The server 31 is connected to the terminal 1 of each power generation company 10.
From 4 to a specified time before, an advance notification of the maximum supply power, the minimum supply power, and the basic supply power is received as a pre-generation plan for the power supply corresponding day. The server 31 totals the advance notification data, and grasps the total of the supplied power and the supplied power amount for each unit measurement time on the power supply corresponding day. Further, the server 31 grasps the estimated power consumption and the estimated power consumption for each unit measurement time of the power supply corresponding day based on the basic customer data, and calculates the estimated power consumption (estimated power consumption and estimated power consumption).
Understand the balance between estimated power consumption) and planned supply. The server 31 then creates a power generation plan for each unit measurement time of each power generation company 10 again, transmits this plan value to the terminal 14 of each power generation company 10, makes adjustments, and Determine a power generation plan. If necessary, a comparison between the estimated usage amount and the planned supply amount is performed again in consideration of the request of each power generation company 10, and a necessary correction is performed to determine a final power generation plan.

【0090】図10は電力供給該当日の需要家20の使
用電力・使用電力量に対応した発電事業者10の供給電
力・供給電力量の調整手順を示している。
FIG. 10 shows a procedure for adjusting the supply power / supply power of the power generation company 10 corresponding to the power consumption / power consumption of the consumer 20 on the power supply corresponding day.

【0091】サーバ31は、各発電事業者10の端末1
4から供給電力・供給電力量などの発電データを受信
し、発電状況の把握を行うとともに、需要家20の端末
23から使用電力・使用電力量などの受電データを受信
し、使用状況の把握を行う。その上で、サーバ31は、
発電事業者10の発電事業者基礎データ、需要家20の
需要家基礎データ、および、これに必要ならば気温、天
候などの気象データなど必要情報データと比較演算し
て、電力供給量と電力使用量のバランス予測を行う。も
し、次期単位計測時間、あるいは複数の将来の単位計測
時間における推定使用量(使用電力・使用電力量)が計
画供給量を上回った場合、その程度に応じて、推定使用
量が大幅に上回る場合には、ミドルまたはピークの発電
事業者10の端末14と調整発電事業者10cの端末1
4に対してサーバ31から必要な電力の増加を指令し、
それでも供給量に不足が生じる可能性のある最悪の場合
には、送電委託している電力会社から必要な電力量を供
給してもらうよう、委託先の電力会社の端末に指令する
か、または適当な連絡手段により要請をする。推定使用
量に対して計画供給量の不足が小さい場合には、調整発
電事業者10cの端末14に対して必要な電力量の増加
指令を行えばよい。
The server 31 is connected to the terminal 1 of each power generation company 10.
4, the power generation data such as the supplied power and the supplied power amount are received and the power generation state is grasped, and the power reception data such as the used power and the used power amount is received from the terminal 23 of the customer 20 to grasp the use state. Do. Then, the server 31
The power supply amount and the power consumption are calculated by comparing the basic data of the power generator 10 with the basic data of the consumer 20 and the necessary information data such as temperature and weather data if necessary. Make volume balance predictions. If the estimated usage (power consumption / power consumption) in the next unit measurement time or multiple future unit measurement times exceeds the planned supply, if the estimated usage greatly increases depending on the degree The terminal 14 of the middle or peak power generation company 10 and the terminal 1 of the regulated power generation company 10c
4 instructs the server 31 to increase the required power,
In the worst case where there is still a possibility of a shortage of supply, the power transmission company may instruct the subcontractor's terminal to have the required amount of power supplied by the power transmission subcontractor, or Make a request by appropriate communication means. When the shortage of the planned supply amount is small relative to the estimated usage amount, a command to increase the necessary power amount may be issued to the terminal 14 of the regulated power generation company 10c.

【0092】もし、計画供給量が推定使用量を上回る場
合には、その過剰量が採算的に不良となる大きい場合に
はミドルまたはピークの発電事業者10の端末14と調
整発電事業者10cの端末14に対して必要な電力量分
の削減指令を送信する。過剰量がさほど大きくはないが
採算的には不良となる場合には、調整発電事業者10c
の端末14のみに必要な電力量分の削減指令を発信す
る。
If the planned supply exceeds the estimated amount of use, the excess amount becomes unprofitably bad. If the amount exceeds the estimated amount, the terminal 14 of the middle or peak power generator 10 and the terminal 14 of the regulated power generator 10c. A reduction command for the required amount of power is transmitted to the terminal 14. If the excess amount is not so large but is not profitable, the regulated power generation company 10c
Of the required amount of electric power is transmitted only to the terminal 14 of which

【0093】この操作手順を、単位計測時間ごとに、か
つ調整発電事業者10cに対しては単位給電指令時間ご
とに、繰り返す。
This operation procedure is repeated for each unit measurement time and for each unit power supply command time for the regulated power generation company 10c.

【0094】次に、発電事業者10から余剰電力を購入
する料金体系について具体例を示す。
Next, a specific example of a fee system for purchasing surplus power from the power generation company 10 will be described.

【0095】ベース発電事業者10bに対しては、基本
供給電力を維持して供給することが最も重要であり、料
金体系もこの観点から構成する。
It is of the utmost importance to maintain and supply the basic power supply to the base power generation company 10b, and the fee system is also constructed from this viewpoint.

【0096】すなわち、契約時の基本供給電力に対し
て、一定の上限値、下限値を定めて、あるいは、一定の
上限値のみ、あるいは一定の下限値のみを定めて制御許
容範囲とし、この許容範囲内で電力を供給した場合に、
最も高い料金単価(最高単価)である安定電力量料金を
設定する。安定電力量料金は、電力需要が最も高い夏季
を一番高額にし、次にその他季、そして平日・夜間を最
も安く設定するのが一般的である。また、料金単価の設
定には、電気事業者30の利益の確保、各発電事業者1
0の利益確保、送電委託している電力会社の設定単価な
どを参考にして行うのが一般的である。なお、夏季と
は、電力会社などで一般に、7月1日から9月末日まで
の期間を称し、それ以外をその他季と称す。
That is, a fixed upper limit and a lower limit are determined for the basic power supply at the time of contract, or only a certain upper limit or only a certain lower limit is determined to be a control allowable range. If power is supplied within the range,
Set the stable energy charge that is the highest unit price (the highest unit price). Generally, the stable electricity rate is set to be the highest in summer when power demand is highest, and then set to the lowest in other seasons and on weekdays and nights. In addition, the setting of the unit price includes securing the profit of the electric power company 30 and each power generation company 1
It is common practice to secure profits of 0 and to refer to the unit price set by the power company outsourcing power transmission. Note that the summer season generally refers to a period from July 1 to the end of September in power companies and the like, and the rest is referred to as other seasons.

【0097】この制御許容範囲を上回って給電した場合
には、その供給電力から制御許容範囲の上限値(許容範
囲が下限値のみの設定の場合は、基本供給電力)を減じ
た過剰分に対しては料金を支払わない。また、制御許容
範囲を下回って電力を供給した場合には、供給電力量に
対して、安定電力量料金を支払うが、基本供給電力と供
給電力との差に該当時間を乗じた電力量を不足電力量と
して、一定の単価を設定した未達電力量料金をペナルテ
ィーとして発電事業者10から徴収する。これは、電力
が計画どおりに供給されない場合、送電委託している電
力会社から電力の補給(いわゆる事故時補給)を受けな
ればならない可能性のリスクに対処するためである。未
達電力量料金単価は、例えば委託先電力会社から事故時
補給を受けた場合の電力量料金単価をこれに充当する。
さらに、委託先電力会社から事故時補給を受けなければ
ならない2時間を超えた長時間連続して不足電力量を発
生した場合には、未達電力量料金とは別に、一定の月額
料金を未達賦課金として徴収する。該未達賦課金は、電
力会社から事故時補給を受けた際に支払う事故時補給料
金、すなわち、基本料金の70%の料金(30%は事故
時補給発生の有無にかかわらず電気事業者30が委託先
電力会社に支払う)を参考にして設定する。ただし、1
月に複数回かかる事態が発生しても、未達賦課金は月ご
とに一定額である。
When the power is supplied beyond the control allowable range, an excess amount obtained by subtracting the upper limit value of the control allowable range (the basic supply power when the allowable range is set to only the lower limit value) from the supplied power is calculated. Do not pay. If the power is supplied below the control allowable range, a stable power fee is paid for the supplied power, but the amount of power obtained by multiplying the difference between the basic power and the supplied power by the corresponding time is insufficient. As an electric energy, an unattained electric energy charge with a fixed unit price is collected as a penalty from the power generation company 10. This is to cope with the risk that if the power is not supplied as planned, the power may be required to be resupplied by a power transmission company (so-called accident replenishment). As the unachieved power charge unit price, for example, the power charge unit price in the case of receiving accidental replenishment from a consignee power company is used.
In addition, in the event that a shortage of energy occurs continuously for more than two hours, which must be replenished by the subcontracting power company in the event of an accident, a certain monthly fee is charged separately from the unattained energy fee. Collected as a surcharge. The undelivered surcharge is an accidental replenishment charge paid when receiving an emergency replenishment from the power company, that is, a charge of 70% of the basic charge (30% is the electric utility 30 Will be paid to the contracted power company). However, 1
Even if a situation occurs several times a month, the unachieved surcharge is a fixed amount every month.

【0098】なお、発電事業者10は、もともと、自己
の操業への供給を目的として発電機11を建設してお
り、建設費の償却などの固定費は料金体系に考慮する必
要がなく、そのために、基本料金を設定しない。
[0098] The power generator 10 originally constructed the generator 11 for the purpose of supplying to its own operation, and fixed costs such as amortization of construction costs do not need to be considered in the fee system. Do not set a basic fee.

【0099】また、一般的に、ベース発電事業者10b
は、上述のように一定の電力を維持して供給するのが重
要な任務であるため、自社の操業状態に依存し、電力供
給状態の変化が起こる可能性のある余剰電力の発電事業
者10を、この任務に充当するのはできるなら回避する
ほうが信頼性向上のためには好ましい。しかし、効果的
で需要家の電力使用状況に即応可能な本システムを適用
すれば、余剰電力の発電事業者10をベース発電事業者
とすることは可能である。
Generally, the base power generation company 10b
As described above, since it is an important task to maintain and supply a certain amount of power as described above, a surplus power generation company 10 that depends on its own operation state and may cause a change in the power supply state Should be avoided if possible for this task to improve reliability. However, if the present system that is effective and can be adapted to the power usage situation of the customer is applied, it is possible to make the surplus power generator 10 the base power provider.

【0100】一例を下記の表1に示す。An example is shown in Table 1 below.

【0101】[0101]

【表1】 [Table 1]

【0102】ミドル発電事業者10mおよびピーク発電
事業者10pに対する料金設定は、基本供給電力を維持
して電力を供給することが最も重要である点はベース発
電事業者10bと同様であるが、その他に、需要家20
の使用電力・使用電力量に対応して電力供給を行うため
に、発電事業者10からの基本供給電力に対して増加、
または削減指令に従い、電力を供給することが同時に重
要となる。また、電気事業者30からの給電指令だけで
なく、発電事業者10から自社の操業状態に対応して一
定の過剰、あるいは不足供給を容認することも視野に入
れて対処する。
The rate setting for the middle generator 10m and the peak generator 10p is similar to that of the base generator 10b in that it is most important to supply the power while maintaining the basic power supply. And customer 20
In order to supply power in accordance with the used power and the used power amount of the power supply, the basic power supplied from the power generator 10 is increased,
Or, it is important at the same time to supply power in accordance with the reduction directive. In addition, not only a power supply command from the electric power company 30 but also a certain excess or shortage of power supply from the power generating business 10 in response to the operating state of the company is taken into consideration.

【0103】上記の観点から、ミドル発電事業者10m
およびピーク発電事業者10pの料金体系の一例として
以下を提案するものである。
From the above viewpoint, the middle power generation company 10m
The following is proposed as an example of the fee system of the peak power generation company 10p.

【0104】すなわち、契約時の基本供給電力に対し
て、一定の上限値、下限値を定めて、または一定の上限
値のみ、または一定の下限値のみを定めて制御許容範囲
とし、この許容範囲内で電力を供給した場合に最も高い
料金単価(最高単価)である安定契約電力量料金を設定
する。
That is, for the basic supply power at the time of the contract, a certain upper limit value and a certain lower limit value are determined, or only a certain upper limit value or only a certain lower limit value is defined as a control allowable range. A stable contract power rate that is the highest unit price (maximum unit price) when power is supplied within the unit is set.

【0105】発電事業者10が基本供給電力より上回っ
て、あるいは下回って電力を供給することを事前通告し
た場合(電気事業者30が同意することを前提とす
る)、その事前通告電力に対しても、基本供給電力の場
合と同様に一定の上限値と下限値、または上限値のみ、
または下限値のみを定めて制御許容範囲とする。
When the power generation company 10 gives advance notice of supplying power above or below the basic supply power (assuming that the electricity company 30 consents), the advance notice power is Also, as in the case of basic supply power, fixed upper and lower limits, or only the upper limit,
Alternatively, only the lower limit is determined to be the control allowable range.

【0106】発電事業者10が基本供給電力より過剰な
電力供給を事前通告した場合(電気事業者30が同意す
ることを前提とする)は、まず、契約最低電力に代わっ
て契約最低電力に、事前通告電力と基本供給電力との差
を加えた電力を最低電力として定める。
When the power generation company 10 gives advance notice of an excess power supply than the basic power supply (assuming that the power company 30 agrees), first, the contract minimum power is replaced with the contract minimum power, The power obtained by adding the difference between the advance notification power and the basic supply power is determined as the minimum power.

【0107】さらに、事前通告電力の許容範囲内で電力
を供給した場合には、基本供給電力に該当時間を乗じた
電力量に安定電力量料金を、供給電力から基本供給電力
を減じた電力値に該当時間を乗じた電力量には、安定電
力量料金より安価な、例えば80%の料金単価となる変
動電力量料金を設定する。変動電力量料金は、安定電力
量料金と同様、電力需要が最も高い夏季を一番高額に
し、次にその他季平日、そして休日、夜間を最も安く設
定するのが一般的である。また、料金単価の設定には、
電気事業者30の利益の確保、発電事業者10の利益確
保、委託先電力会社の設定単価などを参考にして行うの
が一般的である。
Further, when power is supplied within the allowable range of the advance notification power, a stable power charge is added to the power obtained by multiplying the basic supply power by the corresponding time, and a power value obtained by subtracting the basic supply power from the supply power. Is set to a variable power rate that is lower than the stable power rate, for example, a unit price of 80%. As in the case of the stable energy charge, the variable energy charge is generally set to be the highest in summer when power demand is highest, and then set to the lowest price on other weekdays, holidays and nights. Also, when setting the unit price,
It is common to secure the profits of the electric power company 30, secure the profits of the power generation business 10, and refer to the unit price set by the entrusted electric power company.

【0108】許容範囲を超えて電力を供給した場合に
は、供給電力から許容範囲の上限値(下限値のみの制御
許容範囲を設定した場合には、事前通告電力)を減じた
過剰分には料金を設定せず、許容範囲の上限値(下限値
のみの制御許容範囲を設定した場合には、事前通告電
力)以下の電力に対しては上述と同様の料金をそれぞれ
設定する。許容範囲を下回る電力を供給した場合、供給
電力に該当時間を乗じた電力量に上述した変動電力量料
金を設定する。
When the power is supplied beyond the allowable range, the excess amount obtained by subtracting the upper limit value of the allowable range (or the advance notification power when the control allowable range including only the lower limit value is set) from the supplied power is obtained. No charge is set, and charges similar to those described above are set for power below the upper limit value of the allowable range (prior notification power when a control allowable range including only the lower limit value is set). When power below the allowable range is supplied, the above-described variable power rate is set to the power amount obtained by multiplying the supplied power by the corresponding time.

【0109】発電事業者10が基本供給電力を下回る電
力供給を事前通告した場合(電気事業者30が同意する
ことを前提とする)は、契約最低電力は変更しない。発
電事業者10が制御許容範囲内の電力を供給した場合、
その供給電力に該当時間を乗じた電力量に安定電力量料
金を設定する。許容範囲を超えて電力を供給した場合に
は、供給電力から許容範囲の上限値(下限値のみの制御
許容範囲を設定した場合には、事前通告電力)を減じた
過剰分には料金を設定せず、許容範囲の上限値(下限値
のみの制御許容範囲を設定した場合には、事前通告電
力)以下の電力に対しては上述と同様の安定電力量料金
を設定する。供給した電力が制御許容範囲を下回った場
合は、供給電力に該当時間を乗じた電力量に上述した変
動電力量料金を設定する。
When the power generation company 10 gives advance notice of power supply below the basic supply power (assuming that the power company 30 agrees), the contract minimum power is not changed. When the power generation company 10 supplies power within the control allowable range,
A stable electric energy charge is set to the electric energy obtained by multiplying the supplied electric power by the corresponding time. If the power is supplied beyond the allowable range, the charge is set for the excess amount obtained by subtracting the upper limit value of the allowable range (or the advance notice power if the control allowable range of only the lower limit is set) from the supplied power. Instead, a stable power charge similar to that described above is set for power below the upper limit value of the allowable range (prior notification power when a control allowable range including only the lower limit value is set). When the supplied power falls below the control allowable range, the above-described variable power rate is set to the power amount obtained by multiplying the supplied power by the corresponding time.

【0110】上述した事前通告電力、基本供給電力とは
異なる、これを上回る、あるいは下回る電力の供給を電
気事業者が必要とする場合は、給電指令として、増加、
あるいは削減した電力の供給を当発電事業者10に要請
する。
When the electric power company needs to supply power different from, above, or below the advance notice power and the basic supply power, the power supply instruction increases,
Alternatively, the supply of the reduced power is requested to the power generation company 10.

【0111】基本供給電力、または事前通告電力に対し
て電気事業者30が増加指令を行った場合、その増加指
令電力には一定の上限値と下限値、または上限値のみ、
または下限値のみを設けた制御許容範囲を定め、この制
御許容範囲内で発電事業者10が電力を供給した場合に
は、その供給電力から基本供給電力、または事前通告電
力を減じた電力値、すなわち増加指令に応答してくれた
電力値に該当時間を乗じた電力量に対しては、安定電力
量料金を設定するとともに、これに一定額料金単価を設
けたプレミアム料金を付加して設定する。残りの基本供
給電力値、または事前通告電力値には上述と同様の料金
設定を行う。
When the electric utility 30 issues an increase command to the basic supply power or the advance notification power, the increase command power includes a certain upper limit and lower limit, or only the upper limit.
Or, a control allowable range in which only the lower limit value is provided is defined, and when the power generator 10 supplies power within the control allowable range, a power value obtained by subtracting the basic supply power or the advance notification power from the supplied power, That is, for the electric energy obtained by multiplying the electric power value responding to the increase command by the corresponding time, a stable electric energy charge is set, and a premium charge having a fixed unit price is added thereto. . For the remaining basic supply power value or the advance notification power value, the same charge setting as described above is performed.

【0112】基本供給電力、または事前通告電力に対し
て電気事業者30が増加指令を行い、発電事業者10が
制御許容範囲を上回った電力を供給した場合には、供給
電力から制御許容範囲の上限値(制御許容範囲が下限値
のみの設定の場合は増加指令電力)を減じた過剰分の電
力に対しては料金を設定しないで、残りの電力値に対し
ては増加指令を実現しない場合と同様の電力量料金を設
定する。
When the electric power company 30 issues an increase command to the basic supply power or the advance notification power, and the power generation company 10 supplies power exceeding the control allowable range, the power supply exceeds the control allowable range. When the charge is not set for the excess power after the upper limit value (increase command power if the control allowable range is set to only the lower limit value), and the increase command is not realized for the remaining power values The same electricity charge is set.

【0113】基本供給電力、または事前通告電力に対し
て電気事業者30が増加指令を行い、発電事業者10が
制御許容範囲を下回った電力を供給した場合には、供給
電力から基本供給電力、または事前通告電力を減じた電
力値には該当時間を乗じた電力量に安定電力量料金を設
定し、プレミアム料金は付加しない。また、残りの基本
供給電力値、または事前通告電力値に対しては該当時間
を乗じた電力量に対して増加指令を実施しない場合と同
様の料金設定を行う。
When the electric power company 30 issues an increase command for the basic supply power or the advance notification power, and the power generation company 10 supplies power below the allowable control range, the supply power is reduced to the basic supply power, Alternatively, a stable power rate is set to the power value obtained by multiplying the power value obtained by subtracting the advance notification power by the corresponding time, and the premium rate is not added. In addition, for the remaining basic supply power value or the advance notification power value, the same charge setting as in the case where the increase command is not performed for the power amount multiplied by the corresponding time is performed.

【0114】プレミアム料金の単価の決定根拠には様々
な要素を加味することができるが、需要家20への電力
販売利益、委託先電力会社からの自己時補給の支払料
金、発電事業者10への料金支払増加額などを勘案して
1(円/kWh)か、それ以下の単価に設定することが
好ましい。
Various factors can be added to the basis for determining the unit price of the premium fee. Profit from the sale of electricity to the customer 20, the fee for self-timed replenishment from the entrusted power company, and the It is preferable to set the unit price to 1 (yen / kWh) or less in consideration of the amount of increase in fee payment.

【0115】基本供給電力または事前通告電力に対して
電気事業者30が削減指令を行った場合、契約最低電力
(過剰通告の場合は最低電力)に代えて、契約最低電力
(または最低電力)から事前通告電力または基本供給電
力と契約最低電力(または最低電力)との差を減じた電
力値を新たな最低電力と定める。もし、最低電力が負の
値になった場合は、最低電力は零とする。
When the electric utility 30 issues a reduction command for the basic supply power or the advance notification power, the contract minimum power (or minimum power in the case of excessive notification) is used instead of the contract minimum power (or minimum power). A new minimum power is defined as the power value obtained by subtracting the difference between the advance notification power or basic supply power and the contracted minimum power (or minimum power). If the minimum power becomes a negative value, the minimum power is set to zero.

【0116】また、削減指令電力には一定の上限値と下
限値、または上限値のみ、または下限値のみを設けた制
御許容範囲を定める。
Further, a control allowable range in which a fixed upper limit and a lower limit, or only the upper limit, or only the lower limit is provided for the reduction command power is determined.

【0117】電気事業者30が削減指令を行い、削減指
令電力の制御許容範囲内で発電事業者10が電力を供給
した場合には、基本供給電力と供給電力との差、すなわ
ち削減指令に応えてくれた電力値に該当時間を乗じた電
力量に対してプレミアムとして保証電力量料金を設定す
る。残りの電力値に対しては、これに該当時間を乗じた
電力量に対して削減指令を実施しない場合と同様の料金
を設定する。
When the electric power company 30 issues a reduction command and the power generator 10 supplies power within the control allowable range of the reduction command power, the difference between the basic supply power and the supply power, that is, the reduction command is satisfied. A guaranteed power charge is set as a premium for the power obtained by multiplying the received power value by the corresponding time. For the remaining power value, the same charge as when no reduction command is executed for the power amount obtained by multiplying the remaining power value by the corresponding time is set.

【0118】保証電力量料金単価は、例えば発電事業者
10が削減指令を実現しなかったと仮定した場合に受け
る粗利益を推定して設定することができる。この保証電
力量料金を設定することにより、発電事業者10は利益
が保証され、電気事業者30の削減指令に応じることが
でき、電気事業者30はこれによって需要家20の使用
電力・使用電力量により効果的、かつ適正に対応した電
力の供給を行うことができるようになり好ましい。
The guaranteed electric energy unit price can be set, for example, by estimating the gross profit received when the power generation company 10 does not realize the reduction command. By setting the guaranteed power amount fee, the power generation company 10 is guaranteed profit, and can respond to the reduction command of the power company 30, and the power company 30 can use the power consumption / power consumption of the customer 20 by this. It is preferable that the power can be supplied more effectively and appropriately according to the amount.

【0119】供給電力が削減指令電力の制御許容範囲の
上限値(制御許容範囲が下限値のみで設定された場合は
削減指令電力)を上回る場合は、供給電力と上限値(あ
るいは削減指令電力)との差の過剰の電力に対しては料
金を設定せず、残りの電力量に対しては、上述と同様の
手順によって料金を設定する。
If the supplied power exceeds the upper limit value of the control allowable range of the reduction command power (reduction command power when the control allowable range is set only at the lower limit value), the supply power and the upper limit value (or the reduction command power) The fee is not set for the excess power of the difference from the above, and the fee is set for the remaining amount of power by the same procedure as described above.

【0120】供給電力が制御許容範囲を下回った場合に
は、供給電力に該当時間を乗じた電力量に変動電力量料
金を設定する。
When the supplied power falls below the control allowable range, a variable power rate is set to the power amount obtained by multiplying the supplied power by the corresponding time.

【0121】増加指令または削減指令が事前に取り決め
た時間以降に送信された場合には、増加指令のプレミア
ム料金設定対象となる電力量を対象に、プレミアム料金
に加えて、また、削減指令の保証電力量料金の設定対象
となる電力量に対して、この保証電力量料金に加えて、
別の料金単価を設けたプレミアム料金を設定する。プレ
ミアム料金の料金単価の決定根拠は増加指令のプレミア
ム料金と同様の考え方に基づいてよいが、増加指令の際
のプレミアム料金の半額程度とすることができる。
If the increase command or the reduction command is transmitted after the time determined in advance, the increase command premium rate is set in addition to the premium charge, and the reduction command guarantee is performed. In addition to the guaranteed power rate, the power rate for which the power rate
Set premium rates with different unit prices. The basis for determining the unit price of the premium charge may be based on the same concept as the premium charge of the increase command, but may be about half the premium charge at the time of the increase command.

【0122】ミドル発電事業者10mおよびピーク発電
事業者10pの供給した電力に対する料金体系のうち、
供給電力が、契約最低電力、または最低電力を下回った
場合は、基本供給電力、または事前通告電力、または増
加指令電力、または削減指令電力と供給電力との差の電
力値に該当時間を乗じた電力量を不足電力量と定める。
もし、不足電力量が連続して2時間を超えた場合には、
一定の月額の未達料金を発電事業者10から徴収する。
ただし、1月に複数回かかる事態が発生しても、未達料
金は月ごとに一定額である。
Among the fee structures for the electric power supplied by the middle power generation company 10m and the peak power generation company 10p,
If the supplied power is lower than the contracted minimum power or the minimum power, the corresponding time is multiplied by the power value of the basic supply power, or the advance notification power, or the increase command power, or the difference between the reduction command power and the supply power. The electric energy is defined as the energy shortage.
If the power shortage exceeds 2 hours in a row,
A certain monthly unachieved fee is collected from the power generation company 10.
However, even if a situation occurs more than once a month, the unachieved fee is a fixed amount every month.

【0123】未達料金の設定は、不足電力量を発生する
ことが委託先電力会社からの事故時補給を受ける可能性
となるリスク対処であり、該未達料金は、電力会社の事
故時補給基本料金の70%の額を充当することができ
る。
The setting of the unachieved fee is a measure against the risk that the generation of the shortage of electric power may result in the possibility of receiving the replenishment in the event of an accident from the entrusted power company. 70% of the basic fee can be applied.

【0124】ミドル発電事業者10mおよびピーク発電
事業者10pは、ベース発電事業者10bに比べて余剰
電力供給の安定性に劣ること、需要家の使用状況に応じ
て供給電力の増減を行うことを考慮して、ベース発電事
業者10bよりペナルティーを軽減することが好まし
い。しかしながら、ミドル発電事業者10mおよびピー
ク発電事業者10pに対してもベース発電事業者10b
と同様に、未達料金とは別に未達電力量料金を設定する
ことができる。
The middle power producer 10m and the peak power producer 10p determine that the stability of surplus power supply is inferior to the base power producer 10b, and that the supply power is increased or decreased according to the usage status of the consumer. In consideration of this, it is preferable to reduce the penalty more than the base power generation company 10b. However, the base power generation company 10b is also required for the middle power generation business 10m and the peak power generation business 10p.
Similarly to the above, the unachieved power amount charge can be set separately from the unachieved charge.

【0125】下記の表2にミドル発電事業者10mの料
金体系の一例を示す。ピーク発電事業者10pに対して
は、安定電力量料金、変動電力量料金に、さらに夏季ピ
ーク時間帯料金単価を設定することができる。
Table 2 below shows an example of a fee system for a 10 m middle power generation company. For the peak power generation company 10p, it is possible to further set a summer peak time zone rate unit price in addition to the stable power rate rate and the variable power rate rate.

【0126】[0126]

【表2】 [Table 2]

【0127】ミドル発電事業者10mおよびピーク発電
事業者10pも、ベース発電事業者10bの場合と同様
に、余剰電力の発電事業者10であり、もともと、自己
の操業への給電を目的として発電機11を建設してお
り、建設費の償却などの固定費は該電力事業における採
算性の要素とはならず、料金体系に考慮する必要がな
く、そのために、基本料金を設定しない。
[0127] The middle power generator 10m and the peak power generator 10p are also power generators 10 of surplus power, as in the case of the base power generator 10b. No. 11, fixed costs such as amortization of construction costs do not become a profitable factor in the electric power business, and do not need to be considered in the fee system, and therefore do not set a basic fee.

【0128】調整発電事業者10cに対しては、時々刻
々と変動する需要家の使用電力・使用電力量に即応した
適正な電力の供給を行うことが最も重要であり、料金体
系はこの観点から構成する。
It is most important for the regulated power generation company 10c to supply appropriate electric power in accordance with the power consumption and the amount of power used by the customer, which changes every moment. Constitute.

【0129】調整発電事業者10cに対しては、基本供
給電力は原則として設定しないか、設定しても、運用上
は重要視しない。調整発電事業者10cに対して重要な
のは、供給する電力の設定範囲である契約最大電力、契
約最低電力であり、この範囲が供給電力の能力を決定す
る一要素となる。
For the regulated generator 10c, the basic supply power is not set in principle, or even if it is set, it is not regarded as important in operation. What is important for the regulated power generation company 10c is a contracted maximum power and a contracted minimum power, which are setting ranges of power to be supplied, and this range is one factor for determining the power supply capability.

【0130】調整発電事業者10cに求める電力の供給
は、需要家の使用電力・使用電力量の状況に対応するも
のであり、概して、単位計測時間ごとに異なった電力と
なる。そのため、供給電力に応じた料金のみで料金体系
を構築すれば、調整発電事業者10cにとって、事業採
算の見通しが立たず、電気事業者30の意図する電力の
供給が実現しない恐れがある。従って、整発電事業者1
0の料金体系においては、一定の事業見通しを立てられ
るような固定料金、基本料金などと、供給電力の状態に
応じた電力量料金の2部料金制を採用するのが好まし
い。
The supply of electric power required of the regulated power generation company 10c corresponds to the state of the electric power used and the amount of electric power used by the customer, and generally becomes different for each unit measurement time. Therefore, if the tariff system is constructed only with a fee corresponding to the supplied power, the prospect of the profitability of the business for the regulated power generation company 10c is not established, and the power supply intended by the power company 30 may not be realized. Therefore, the power generation operator 1
In the zero charge system, it is preferable to adopt a two-part charge system, such as a fixed charge, a basic charge, and the like, for setting a certain business outlook, and a power charge according to the state of the supplied power.

【0131】本システムにおいては、基本料金と電力量
料金の2部料金制とし、基本料金については、年間購入
電力量を目安に月額料金を設定し、電力量料金について
は、電気事業者30から送信する給電指令に応じた供給
電力に課する料金の設定をすることを提案する。
In the present system, a two-part charge system of a basic charge and an electric energy charge is set, and a monthly charge is set for the basic charge based on an annual purchased electric energy. It is proposed to set a charge to be applied to the supply power according to the power supply command to be transmitted.

【0132】すなわち、基本供給電力を設定し、これに
年間の該当時間を乗じた年間総電力量に対し、一定の割
合、例えば40%を乗じて年間購入電力量とし、これに
料金単価を設定して乗じ、これを月数12で除した金額
を基本料金月額とする。基本給電電力は、従って、基本
料金月額を定める基準となる。
That is, the basic power supply is set, and the annual total power obtained by multiplying the basic power supply by the corresponding time of the year is multiplied by a certain ratio, for example, 40%, to obtain the annual purchase power, and the unit price is set. And multiplies the result by the number of months 12 to obtain the basic monthly fee. The basic power supply is therefore the basis for determining the basic monthly charge.

【0133】調整発電事業者10cにおける給電指令電
力の設定と、その料金設定は、本発明の対象となる電気
事業者30の電気事業運営の重要な要素の一つとなる。
すなわち、需要家20の推定使用電力、推定使用電力量
に対して、効果的、かつ適正な電力の供給の指令、実施
が実現するかどうかは、調整発電事業者10cに対する
指令の内容や頻度が大きく影響するからである。
The setting of the power supply command power in the regulated power generation company 10c and the setting of the charge are one of the important elements of the operation of the electric business of the electric business 30 to which the present invention is applied.
In other words, whether or not an effective and appropriate power supply command and execution are realized with respect to the estimated power consumption and the estimated power consumption of the consumer 20 depends on the content and frequency of the command to the regulated power generation company 10c. This is because it has a significant effect.

【0134】本システムでは、給電指令を以下のとおり
実施する。
In the present system, the power supply command is executed as follows.

【0135】すなわち、契約運用に関わる単位計測時間
とは別に単位給電指令時間を設け、該単位給電指令時間
を該単位計測時間の1/6以上1/2以下に設定し、必
要電力の供給を行う。一例として、単位給電指令時間を
単位計測時間の1/6に設定する。この単位給電指令時
間ごとに、電気事業者30はサーバ31を介して調整発
電事業者10cの端末14に給電指令を行う。
That is, a unit power supply command time is provided separately from the unit measurement time related to the contract operation, and the unit power supply command time is set to 1/6 or more and 1/2 or less of the unit measurement time to supply necessary power. Do. As an example, the unit power supply command time is set to 1/6 of the unit measurement time. At each unit power supply command time, the electric power company 30 issues a power supply command to the terminal 14 of the regulated power generation business 10c via the server 31.

【0136】図11に給電指令の実施概念を示してい
る。すなわち、電気事業者30のサーバ31において、
調整発電事業者10cの所有する発電機11の基礎デー
タから、一定の発電電力W1から次の単位計測時間t2
における計画供給電力W2、もしくは、それ以降の単位
計測時間、例えばその次の単位計測時間における計画供
給電力W3を実現するための出力曲線F11−1を算出
し、さらに、この出力曲線F11−1に従って、単位給
電指令時間ごとの電力量F11−2を算出し、この算出
結果に基づいて次の単位給電指令時間における計画供給
電力をW11と定め、この値の供給を調整発電事業者1
0cの端末14に指令する。
FIG. 11 shows the concept of the power supply command. That is, in the server 31 of the electric utility 30,
From the basic data of the generator 11 owned by the regulated power generation company 10c, the next unit measurement time t2 from the constant generated power W1
, Or an output curve F11-1 for realizing the planned supply power W3 in the unit measurement time after that, for example, the next unit measurement time, is further calculated according to the output curve F11-1. , The amount of power F11-2 for each unit power supply command time is calculated, the planned power supply in the next unit power supply command time is determined as W11 based on the calculation result, and the supply of this value is adjusted to the regulated power generation company 1
0c to the terminal 14.

【0137】出力曲線F11−1は、単位給電指令時間
ごとに演算して求め、この出力曲線F11−1に基づい
て単位給電指令時間ごとの電力量F11−2を算定し直
し、各給電指令の電力を指定する。
The output curve F11-1 is obtained by calculation for each unit power supply command time, and the power amount F11-2 for each unit power supply command time is recalculated based on the output curve F11-1, and the output power F11-1 of each power supply command is calculated. Specify the power.

【0138】図12は、その給電指令によって指定する
電力と、給電指令電力、供給電力の決定方法を示した図
である。縦軸は電力、横軸は時間を示しており、単位給
電指令時間は、単位計測時間の1/6の場合である。こ
の図において、ある単位計測時間t1における供給電力
W1から、電気事業者30のサーバ31からの給電指令
によって電圧W11、W12、W13、W14、および
W15で順次供給電力を制御していき、次の単位計測時
間t2における電力W2を実現する。
FIG. 12 is a diagram showing the power specified by the power supply command, the power supply command power, and the method of determining the power supply. The vertical axis indicates power, and the horizontal axis indicates time. The unit power supply command time is a case where the unit measurement time is 1/6. In this figure, from the supply power W1 at a certain unit measurement time t1, the supply power is sequentially controlled by the voltages W11, W12, W13, W14, and W15 according to the power supply command from the server 31 of the electric power company 30. The power W2 at the unit measurement time t2 is realized.

【0139】本システムでは、単位給電指令時間ごとに
調整発電事業者10cの端末14に指示、送信した各電
圧W11、W12、W13、W14、およびW15に該
当時間(t2−t1)を乗じた電力値の積算値が単位計
測時間における給電指令の電力量であり、これを単位計
測時間で除した値(図中の実線F12−1)を単位計測
時間t1における給電指令電力Wmとする。また、これ
ら、給電指令に従って調整発電事業者10cが供給した
電力F12−2の該当時間(t2−t1)における積分
値である電力量を該当時間(t2−t1)で除した値
(図中の実線F12−3)を、単位計測時間t1におけ
る供給電力W0とする。
In the present system, the voltage W11, W12, W13, W14, and W15 instructed and transmitted to the terminal 14 of the regulated power generation company 10c for each unit power supply command time are multiplied by the corresponding time (t2−t1). The integrated value is the power amount of the power supply command in the unit measurement time, and a value obtained by dividing the power amount by the unit measurement time (solid line F12-1 in the drawing) is defined as the power supply command power Wm in the unit measurement time t1. In addition, a value obtained by dividing the electric energy, which is the integral value of the power F12-2 supplied by the regulated power generation company 10c in accordance with the power supply command at the relevant time (t2-t1), by the relevant time (t2-t1) (see FIG. The solid line F12-3) is the supply power W0 at the unit measurement time t1.

【0140】本システムでは、上述した手法によって求
めた給電指令電力Wmに対して一定の上限値と下限値、
または上限値のみ、または下限値のみを設けて制御許容
範囲とし、この許容範囲内で調整発電事業者が電力W0
を供給した場合、この電力に該当時間を乗じた電力量に
安定電力量料金を設定する。
In this system, fixed upper and lower limits are set for the power supply command power Wm obtained by the method described above.
Alternatively, only the upper limit value or only the lower limit value is provided as a control allowable range, and within this allowable range, the regulated power generation company
Is supplied, a stable energy charge is set to the electric energy obtained by multiplying the electric power by the corresponding time.

【0141】制御許容範囲を上回って電力を供給した場
合には、該供給電力と制御許容範囲の上限値(許容範囲
を下限値のみで設定した場合は、給電指令電力)との差
である過剰の電力に対しては料金を設定せず、残りの電
力に対して該当時間を乗じた電力量に安定電力量料金を
設定する。
When the power is supplied beyond the control allowable range, the excess power which is the difference between the supplied power and the upper limit value of the control allowable range (the power supply command power when the allowable range is set only at the lower limit value). No charge is set for the remaining power, and a stable power charge is set to the amount of power obtained by multiplying the remaining power by the corresponding time.

【0142】制御許容範囲を下回る供給電力の場合に
は、供給電力に該当時間を乗じた電力量に安定電力量料
金を設定するとともに、給電指令電力と給電電力との差
の電力値に該当時間を乗じた電力量を不足電力量とし
て、これに未達電力量料金のペナルティーを課し、電気
事業者30は調整発電事業者10cから徴収する。
In the case of power supply below the allowable control range, a stable power charge is set to the power amount obtained by multiplying the power supply by the corresponding time, and the power value corresponding to the difference between the power supply command power and the power supply power is set to the corresponding time. The power amount multiplied by the power amount is defined as the shortage amount, and a penalty of the unachieved power amount charge is imposed on the shortage amount, and the electric power company 30 collects the power amount from the regulated power generation company 10c.

【0143】さらに、上記の不足電力量の発生が連続し
て2時間を超過し、委託先電力会社から事故時補給を受
ける恐れのある場合には、未達賦課金として、月当たり
の一定金額を設定し、調整発電事業者10cから徴収す
ることができる。なお、余剰電力の発生状態を考慮し
て、該ペナルティーは、未達電力量料金、未達賦課金の
いずれか一方とすることができる。
Further, in the case where the above-mentioned shortage of power exceeds 2 hours in a row and there is a risk of receiving a replenishment at the time of accident from the entrusted power company, a non-achievable surcharge is set as a fixed amount per month. Can be set and collected from the regulated power generation company 10c. The penalty can be any one of the unachieved power charge and the unachieved surcharge in consideration of the state of generation of surplus power.

【0144】すなわち、料金設定は、上述したベース発
電事業者10bと同様の考えに立っており、それは、ベ
ース発電事業者10bが基本供給電力を維持して電力を
供給することが最も重要であるのと同様、調整発電事業
者10cにおいては給電指令電力を維持して電力を供給
することが最も重要であるからである。
That is, the rate setting is based on the same idea as that of the base power generation company 10b described above. It is most important that the base power generation company 10b supplies the power while maintaining the basic supply power. This is because it is most important for the regulated power generation company 10c to supply power while maintaining the power supply command power.

【0145】下記の表3に調整発電事業者の料金体系の
一例を示す。
Table 3 below shows an example of the fee system of the regulated power generation company.

【0146】[0146]

【表3】 [Table 3]

【0147】安定電力量料金は、電力需要が最も高い夏
季を一番高額にし、次にその他季平日、そして休日・夜
間を最も安く設定するのが一般的である。また、料金単
価の設定には、電気事業者の利益の確保、発電事業者の
利益確保、電力会社の設定単価などを参考にして行うの
が一般的である。
In general, the stable energy charge is set to be the highest in summer when power demand is the highest, and then set to the lowest price on other weekdays, holidays and nights. Further, the unit price is generally set with reference to securing the profit of the electric power company, securing the profit of the power generating company, the set unit price of the electric power company, and the like.

【0148】未達電力量料金単価は、例えば委託先電力
会社から事故時補給を受けた場合の電力量料金単価をこ
れに充当する。
As the unattained electricity charge unit price, for example, the electricity charge unit price in the case of receiving accidental replenishment from the entrusted electric power company is used.

【0149】未達賦課金は、委託先電力会社から事故時
補給を受けた際に支払う事故時補給料金、すなわち、基
本料金の70%の料金(30%は事故時補給発生の有無
にかかわらず電気事業者30が委託先電力会社に支払
う)を参考にして設定する。ただし、1月に複数回かか
る事態が発生しても、未達賦課金は月ごとに一定額であ
る。
The unachieved surcharge is the accident replenishment charge paid when the consignee power company receives the replenishment at the time of the accident, that is, a charge of 70% of the basic charge (30% is irrespective of the occurrence of the replenishment at the time of the accident) The electric power company 30 pays the contracted electric power company). However, even if a situation occurs more than once a month, the unachieved surcharge is a fixed amount for each month.

【0150】このように、ベース、ミドル、ピーク、複
合型、調整の各発電事業者10にかかる料金体系を設定
することによって、電気事業者30は、需要家20の使
用電力・使用電力量に即応し、かつ適正な電力を供給す
ることができるようになり、かつ、各発電事業者10に
とっても、電気事業者30の制御に従って発電を実施す
ることにより、事業利益を保証されることになり極めて
好ましいシステム運用が可能になる。
As described above, by setting the fee system for each of the base, middle, peak, combined type, and adjustment power generators 10, the electric power supplier 30 can reduce the power consumption and power consumption of the customers 20. Prompt and appropriate power can be supplied, and business profits can be guaranteed for each power generation company 10 by performing power generation under the control of the power company 30. Extremely favorable system operation becomes possible.

【0151】上記の各発電事業者10に対する料金体系
の設定は、あくまでも本システムの運用に関わる具体的
な例を示したに過ぎず、本発明の該システムが実現され
れば何らこれらに限定されることはない。
The above-described setting of the fee system for each power generation company 10 is only a specific example related to the operation of the present system, and is not limited to these examples if the system of the present invention is realized. Never.

【0152】図13には、本システムを運用するため
の、各発電事業者10の端末14における表示部17の
ディスプレイ表示の一例を示している。
FIG. 13 shows an example of a display on the display unit 17 of the terminal 14 of each power generation company 10 for operating the present system.

【0153】ディスプレイ17aには、契約条件と該当
日の発電計画の表示101、基本供給電力、事前通告電
力、増加・削減指令電力、供給電力に対する制御許容範
囲の表示102、現在の発電状況と該当料金の表示10
3、次期単位計測時間の計画電力、給電指令の表示10
4、これに必要ならば気象状況などの表示105を行
い、情報選択部106をクリックすれば発電機11の故
障発生率など他の情報を表示105と同じ表示領域で表
示することができる。さらに、これまでの発電状況と料
金体系を一目で確認できるグラフ表示107を行う。グ
ラフ表示107では、簡単なキー操作によって、前日以
前の実績や翌日の計画値の確認をはじめ、特定の時間帯
を詳細に見るためのズーム表示機能も付加している。
On the display 17a, a display 101 of contract conditions and a power generation plan of the corresponding day, a display 102 of a basic supply power, a prior notification power, an increase / decrease command power, a control allowable range for supply power 102, a current power generation status and a corresponding Price display 10
3. Display of planned power and power supply command for next unit measurement time 10
4. If necessary, a display 105 such as a weather condition is displayed, and other information such as a failure occurrence rate of the generator 11 can be displayed in the same display area as the display 105 by clicking the information selection unit 106. Further, a graph display 107 is provided so that the current power generation status and the fee system can be checked at a glance. In the graph display 107, a zoom display function for viewing a specific time zone in detail, such as confirmation of results before the previous day and plan values of the next day, is added by simple key operations.

【0154】この他、さらに情報を詳細にするために、
ディスプレイ17aに、該当日の積算電力量と積算見込
み収入の表示も行うことできる。
In addition, in order to further detail the information,
The display 17a can also display the accumulated electric energy and the estimated expected income on the day.

【0155】これらの情報は、電気事業者30のサーバ
31内の発電事業者基礎データファイル33aに収納し
てある、発電機11の種類、運用年数、発電に関わる周
辺設備、必要ならば発電機11と周辺設備の製造メー
カ、型式、発電特性、前年、可能ならば複数年の過去の
発電実績(季節別、月別、平日、休日別、時間帯別の発
電パターン)、故障実績(季節別、月別、平日、休日
別、時間帯別の故障頻度、1回当たりの発電停止期
間)、気象データ(気温、天候、雷発生頻度など)、の
ほか、季節別、月別、平日、休日別、時間帯別の故障発
生危険率と、好ましくは運転パターン別(発電電力レベ
ル、電力の変動モードレベル、発電機の振動モードレベ
ル)の故障発生危険率データを、各発電事業者10が端
末14を操作することによって適宜、サーバ31から端
末14に送信することによって表示が実現される。
The above information is stored in the power generation company basic data file 33a in the server 31 of the electric power company 30. 11 and peripheral equipment manufacturers, model, power generation characteristics, previous year, if possible multiple years past power generation results (seasonal, monthly, weekday, holiday, time-based power generation patterns), failure results (seasonal, Failure frequency by month, weekday, holiday, time zone, power generation suspension period per time), weather data (temperature, weather, lightning frequency, etc.), seasonal, monthly, weekday, holiday, time Each power generation company 10 operates the terminal 14 based on the failure occurrence risk rate for each zone and preferably the failure occurrence risk rate data for each operation pattern (power generation level, power fluctuation mode level, generator vibration mode level). By doing Optionally, a display by transmitting from the server 31 to the terminal 14 is realized Te.

【0156】図13における表示105を故障率データ
に変換した場合に、グラフ表示107の表示領域で表示
される故障発生率データの一例を図14に示している。
FIG. 14 shows an example of the failure occurrence rate data displayed in the display area of the graph display 107 when the display 105 in FIG. 13 is converted into the failure rate data.

【0157】発電事業者10の所有する余剰電力を供給
する発電機11の基礎データは、サーバ31の発電事業
者基礎データファイル33a中に入力してあり、次期単
位計測時間における基本供給電力、事前通告電力、増加
指令電力、または削減指令電力値と、発電機11のこれ
までの発電実績や発電機11の製造年、製造メーカ、機
種と、当該時刻までの一定期間の発電電力の変動パター
ンから故障発生率を算出し、この結果をサーバ31から
インターネット2を介して発電事業者10の端末14に
送信し、これを表示する。
The basic data of the generator 11 that supplies the surplus power owned by the power generator 10 is entered in the power generator basic data file 33a of the server 31. From the notification power, the increase command power, or the reduction command power value, the past power generation results of the generator 11, the year of manufacture of the generator 11, the manufacturer, the model, and the fluctuation pattern of the power generation for a certain period up to the time. The failure occurrence rate is calculated, and the result is transmitted from the server 31 to the terminal 14 of the power generation company 10 via the Internet 2 and displayed.

【0158】表示は、次期単位計測時間における計画供
給電力に対して、変動率ごとの故障発生確率を示し、該
当時間までの一定期間における電力変動率を矢印で示
し、故障発生率を示す。
The display shows the failure occurrence probability for each variation rate with respect to the planned supply power in the next unit measurement time, the power variation rate in a certain period up to the corresponding time is indicated by an arrow, and the failure occurrence rate is shown.

【0159】もし、故障発生率が一定値以上となり、電
力供給停止の恐れがある場合にはこの矢印とは別に安全
域を示す矢印を別の色で表示して示し、発電電力の調整
を発電事業者10に促す。
If the failure occurrence rate becomes a certain value or more and there is a danger that the power supply will be stopped, an arrow indicating the safety zone is displayed in a different color from this arrow, and the generated power is adjusted. Prompt the business 10.

【0160】このグラフ表示107の表示領域には、具
体的に、安全であるか、もしくは出力調整を勧める旨の
メッセージを文字で表示することもできる。
In the display area of the graph display 107, a message indicating that it is safe or that output adjustment is recommended can be specifically displayed in characters.

【0161】このようなディスプレイ表示を行うことに
よって、発電事業者10は、現在までの電力供給実績と
収入(適用料金実績)を確認でき、かつ電力供給状況と
次期の計画電力、電気事業者30からの給電指令を確認
することが容易にでき、さらには、起こり得る危険性を
未然に防止できることによって本システムの効率的、か
つ高信頼の運用を実現することができる。
By performing such a display, the power generation company 10 can confirm the power supply performance and income (applicable charge performance) up to now, and also check the power supply status, the planned power for the next term, and the power company 30. It is possible to easily confirm the power supply command from the system, and prevent possible danger beforehand, thereby realizing efficient and highly reliable operation of the present system.

【0162】以上、余剰電力を発電事業者10から購入
し、この電力を需要家20に販売する電気事業を営むう
えで、本システムを採用することにより、需要家20の
使用電力・使用電力量の状況に即応した適正な電力供給
体制を確立することができ、電気事業運営の高信頼、収
益保証の観点においてきわめて大きな貢献を果たすこと
ができる。
As described above, this system is used in the operation of an electric power business in which surplus power is purchased from the power generation company 10 and this power is sold to the customer 20. In this way, an appropriate power supply system can be established in response to the situation described above, and it can make an extremely large contribution in terms of high reliability and profit guarantee of the operation of the electric power business.

【0163】すなわち、需要家20が必要とする電力ま
たは電力量を電気事業者30が発電事業者10から確実
に確保して需要家20に安定供給することができ、かつ
電力確保に伴う不要な料金の支出を回避して電気事業者
30としての事業採算を確実にすることができ、ひいて
は需要家20に対しできるだけ低料金での電力供給を可
能とし、また発電事業者10に対して余剰電力を供給す
ることの価値をリアルタイムで適切に認識させることが
でき、ひいては発電事業者10の無駄の無い効率的な発
電とそれに伴う発電コストの低減などが図れる。
That is, the electric power company 30 can reliably secure the electric power or the amount of electric power required by the customer 20 from the power generation company 10 and stably supply the electric power to the customer 20. It is possible to avoid the expenditure of charges and to ensure the profitability of the business as the electric utility 30, thereby enabling the power supply to the customer 20 at the lowest possible cost, and the surplus electric power to the power generator 10. The value of supplying the power can be appropriately recognized in real time, so that the power generation company 10 can efficiently generate power without waste and reduce the power generation cost.

【0164】なお、この発明は上記実施形態に限定され
るものではなく、要旨を変えない範囲で種々変形実施可
能である。
The present invention is not limited to the above embodiment, but can be variously modified without changing the gist.

【0165】[0165]

【発明の効果】以上の述べたように、この発明によれ
ば、電力使用者が必要とする電力または電力量を電気事
業者が発電事業者から確実に確保して電力使用者に安定
供給することができ、かつ電力確保に伴う不要な料金の
支出を回避して電気事業者としての事業採算を確実にす
ることができ、ひいては電力使用者に対しできるだけ低
料金での電力供給を可能とし、また発電事業者に対して
余剰電力を供給することの価値をリアルタイムで適切に
認識させることができ、ひいては発電事業者の無駄の無
い効率的な発電とそれに伴う発電コストの低減などが図
れる、信頼性にすぐれた余剰電力管理システムおよびそ
の制御方法を提供できる。
As described above, according to the present invention, the electric power company reliably secures the electric power or the amount of electric power required by the electric power user from the electric power generating company and stably supplies the electric power or the electric power user to the electric power user. And avoid unnecessary expenditures associated with securing electric power, thereby ensuring profitability of the business as an electric utility, and thereby enabling power supply to electric power users at the lowest possible cost, In addition, the power producers can be made to recognize the value of supplying surplus power appropriately in real time, and as a result, the power producers can efficiently generate power without waste and reduce the power generation costs. It is possible to provide a surplus power management system excellent in performance and a control method thereof.

【図面の簡単な説明】[Brief description of the drawings]

【図1】一実施形態の全体的な構成を示すブロック図。FIG. 1 is a block diagram showing an overall configuration of an embodiment.

【図2】一実施形態における各端末およびサーバの具体
的な構成を示すブロック図。
FIG. 2 is an exemplary block diagram illustrating a specific configuration of each terminal and a server according to the embodiment.

【図3】一実施形態における需要家の基礎データシート
の一例を示す図。
FIG. 3 is a diagram showing an example of a basic data sheet of a consumer in one embodiment.

【図4】一実施形態におけるベース発電事業者の発電基
本条件の一例を示す図。
FIG. 4 is a diagram illustrating an example of basic power generation conditions of a base power generation company according to one embodiment.

【図5】一実施形態におけるミドル発電事業者の発電基
本条件の一例を示す図。
FIG. 5 is a diagram showing an example of a basic power generation condition of a middle power generation company in one embodiment.

【図6】一実施形態におけるミドル発電とピーク発電の
複合型発電事業者の発電基本条件の一例を示す図。
FIG. 6 is a diagram showing an example of basic power generation conditions of a combined power generation company of middle power generation and peak power generation in one embodiment.

【図7】一実施形態における調整発電事業者の発電基本
条件の一例を示す図。
FIG. 7 is a diagram illustrating an example of basic power generation conditions of a regulated power generation company in one embodiment.

【図8】一実施形態における発電事業者の基礎データシ
ートの一例を示す図。
FIG. 8 is a view showing an example of a basic data sheet of a power generation company in one embodiment.

【図9】一実施形態における発電計画を作成する手順を
説明するためのフローチャート。
FIG. 9 is a flowchart illustrating a procedure for creating a power generation plan according to the embodiment.

【図10】一実施形態における供給電力の増減制御を説
明するためのフローチャート。
FIG. 10 is a flowchart illustrating control for increasing and decreasing supply power according to the embodiment;

【図11】一実施形態における給電指令を説明するため
の図。
FIG. 11 is a diagram illustrating a power supply command according to the embodiment.

【図12】一実施形態における給電指令によって指定す
る電力と、給電指令電力、供給電力の決定方法を説明す
るための図。
FIG. 12 is a view for explaining a power specified by a power supply command, a power supply command power, and a method of determining supply power according to the embodiment;

【図13】一実施形態における発電事業者の端末でディ
スプレイ表示される画面の一例を示す図。
FIG. 13 is a diagram showing an example of a screen displayed on a terminal of a power generation company according to one embodiment.

【図14】一実施形態における発電事業者の端末でディ
スプレイ表示される故障発生率データの一例を示す図。
FIG. 14 is a diagram showing an example of failure occurrence rate data displayed on a display of a terminal of a power generation company in one embodiment.

【符号の説明】[Explanation of symbols]

1…電力会社送電網、2…インターネット、10…発電
事業者、11…発電機、12…制御装置、13…計測
器、14…端末、15…制御部、16…メモリ、17…
表示部、20…需要家(電力使用者)、21…建物、2
2…計測器、23…端末、25…制御部、26…メモ
リ、30…電気事業者、31…サーバ、32…制御部、
33…メモリ、36…ネットワーク処理部、40…外部
記憶装置
DESCRIPTION OF SYMBOLS 1 ... Power company transmission network, 2 ... Internet, 10 ... Power generation company, 11 ... Generator, 12 ... Control device, 13 ... Measuring instrument, 14 ... Terminal, 15 ... Control part, 16 ... Memory, 17 ...
Display unit, 20: customer (electric power user), 21: building, 2
2: measuring instrument, 23: terminal, 25: control unit, 26: memory, 30: electric utility, 31: server, 32: control unit,
33 memory, 36 network processing unit, 40 external storage device

───────────────────────────────────────────────────── フロントページの続き (72)発明者 植草 常雄 東京都港区芝公園一丁目8番12号 株式会 社エネット内 (72)発明者 陶国 昇 東京都港区芝公園一丁目8番12号 株式会 社エネット内 (72)発明者 松田 明彦 東京都港区芝公園一丁目8番12号 株式会 社エネット内 (72)発明者 櫻井 一貴 東京都港区芝公園一丁目8番12号 株式会 社エネット内 (72)発明者 田村 正 東京都港区芝公園一丁目8番12号 株式会 社エネット内 (72)発明者 筒井 清志 東京都港区芝公園一丁目8番12号 株式会 社エネット内 Fターム(参考) 5G066 AA02 AA05 AA20 AE03 AE07 AE09  ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Tsuneo Uekusa 1-8-12 Shiba-koen, Minato-ku, Tokyo Inside Enet Co., Ltd. (72) Inventor Noboru 1-8-12 Shiba-koen, Minato-ku, Tokyo No. Within Enet Co., Ltd. (72) Inventor Akihiko Matsuda 1-8-12, Shiba-koen, Minato-ku, Tokyo, Japan Intranet Co., Ltd. (72) Kazuki Sakurai, 1-8-12, Shiba-koen, Minato-ku, Tokyo Inside Enet Co., Ltd. (72) Inventor Tadashi Tadashi 8-12 Shiba Park, Minato-ku, Tokyo Intranet Co., Ltd. (72) Inventor Kiyoshi Tsutsui 1-8-12 Shiba Koen, Minato-ku, Tokyo Stock Company 5G066 AA02 AA05 AA20 AE03 AE07 AE09

Claims (37)

【特許請求の範囲】[Claims] 【請求項1】 発電事業者の余剰電力を電気事業者が購
入し、その購入電力を送電網により前記発電事業者から
電力使用者へ直接的に供給する余剰電力管理システムに
おいて、 前記電力使用者の電力需要を推定する推定手段と、 前記推定された電力需要に相当する電力を前記発電事業
者から前記送電網に送出させるための発電計画を決定す
る決定手段と、 前記決定された発電計画を前記発電事業者に通知する通
知手段と、 を具備したことを特徴とする余剰電力管理システム。
1. A surplus power management system in which a power company purchases surplus power of a power generation company and supplies the purchased power directly from the power generation company to a power user via a power transmission network. Estimating means for estimating the power demand of the power generating apparatus, determining means for determining a power generation plan for transmitting the power corresponding to the estimated power demand from the power generation company to the power transmission network, and A surplus power management system, comprising: a notification unit that notifies the power generation company.
【請求項2】 発電事業者の余剰電力を電気事業者が購
入し、その購入電力を送電網により前記発電事業者から
電力使用者へ直接的に供給する余剰電力管理システムに
おいて、 前記電力使用者の電力需要を推定する推定手段と、 前記推定された電力需要に相当する電力を前記発電事業
者から前記送電網に送出させるための発電計画を決定す
る決定手段と、 前記決定された発電計画を前記発電事業者に通知する通
知手段と、 前記発電事業者から前記送電網への電力供給状況を検出
する検出手段と、 前記発電計画と前記検出される電力供給状況との対照に
より、前記電気事業者の現時点の電力購入料金を算定す
る算定手段と、 前記算定された電力購入料金を前記発電事業者に通知す
る通知手段と、 を具備したことを特徴とする余剰電力管理システム。
2. A surplus power management system in which a power company purchases surplus power of a power generation company and supplies the purchased power directly from the power generation company to a power user via a power transmission network. Estimating means for estimating the power demand of the power generating apparatus, determining means for determining a power generation plan for transmitting the power corresponding to the estimated power demand from the power generation company to the power transmission network, and Notifying means for notifying the power generation company, detection means for detecting the power supply status from the power generation company to the power transmission network, and the power business by comparing the power generation plan with the detected power supply status. A surplus power management system, comprising: a calculating means for calculating a current power purchase fee of a power supplier; and a notifying means for notifying the power generation company of the calculated power purchase fee. Temu.
【請求項3】 発電事業者の余剰電力を電気事業者が購
入し、その購入電力を送電網により前記発電事業者から
電力使用者へ直接的に供給する余剰電力管理システムに
おいて、 前記電力使用者の電力需要を推定する推定手段と、 前記推定された電力需要に相当する電力を前記発電事業
者から前記送電網に送出させるための発電計画を決定す
る決定手段と、 前記決定された発電計画を前記発電事業者に通知する通
知手段と、 前記発電事業者から前記送電網への電力供給状況を検出
する検出手段と、 前記発電計画と前記検出される電力供給状況との対照に
より、前記電気事業者が前記発電事業者から購入する電
力の料金体系を選定する選定手段と、 前記選定された料金体系と前記検出される電力供給状況
とに基づき、前記電気事業者の電力購入料金を逐次に求
めて積算する積算手段と、 前記選定された料金体系または前記積算された電力購入
料金を前記発電事業者に通知する通知手段と、 を具備したことを特徴とする余剰電力管理システム。
3. A surplus power management system in which a power company purchases surplus power of a power generation company and supplies the purchased power directly from the power generation company to a power user via a power transmission network. Estimating means for estimating the power demand of the power generating apparatus, determining means for determining a power generation plan for transmitting the power corresponding to the estimated power demand from the power generation company to the power transmission network, and Notifying means for notifying the power generation company, detection means for detecting the power supply status from the power generation company to the power transmission network, and the power business by comparing the power generation plan with the detected power supply status. Means for selecting an electricity tariff system to be purchased by the electric power company from the power generation company; and, based on the selected tariff system and the detected power supply status, the power purchase of the electric power company. A surplus power management system, comprising: an accumulating means for sequentially calculating and accumulating a fee; and a notifying means for notifying the power generation company of the selected fee structure or the accumulated power purchase fee. .
【請求項4】 発電事業者の余剰電力を電気事業者が確
保し、その電力を送電網により電力使用者に供給する余
剰電力管理システムにおいて、 前記発電事業者から前記送電網に供給される電力を検出
する第1検出手段と、 前記送電網から前記電力使用者に取り込まれる電力を検
出する第2検出手段と、 前記第2検出手段の検出結果に基づいて前記電力使用者
の電力需要を推定する推定手段と、 前記推定された電力需要に相当する電力を前記発電事業
者から前記送電網に送出させるための発電計画を決定す
る決定手段と、 前記決定された発電計画を前記発電事業者に通知する通
知手段と、 前記発電計画と前記第1検出手段の検出による電力供給
状況との対照により、前記電気事業者が前記発電事業者
から購入する電力の料金体系を選定する選定手段と、 前記選定された料金体系と前記第1検出手段の検出によ
る電力供給状況とに基づき、前記電気事業者の電力購入
料金を逐次に求めて積算する積算手段と、 前記選定された料金体系または前記積算された電力購入
料金を前記発電事業者に通知する通知手段と、 前記第1検出手段の検出による電力供給状況と前記第2
検出手段の検出による電力使用状況との対比に基づい
て、現時点より先の電力供給と電力使用とのバランスを
予測し、その予測結果に応じて前記発電事業者の供給電
力に対する増減値を設定する予測手段と、 前記設定された増減値を前記発電事業者に逐次に指令す
る指令手段と、 を具備したことを特徴とする余剰電力管理システム。
4. A surplus power management system in which a power company secures surplus power of a power generation company and supplies the power to a power user via a power transmission network, the power supplied from the power generation company to the power transmission network. First detecting means for detecting power consumption; second detecting means for detecting power taken into the power user from the power transmission network; and estimating the power demand of the power user based on a detection result of the second detecting means. Estimating means, and deciding means for deciding a power generation plan for causing the power corresponding to the estimated power demand to be transmitted from the power generation company to the power transmission network; and the determined power generation plan to the power generation company. A notifying unit for notifying, and a selection of a tariff system for the electric power purchased from the power generation company by the electric power company based on a comparison between the power generation plan and the power supply status detected by the first detection unit. Determining means; an accumulating means for sequentially calculating and accumulating a power purchase charge of the electric utility based on the selected charge system and a power supply status detected by the first detection means; and the selected charge Notification means for notifying the power generation company of the system or the integrated power purchase charge; power supply status detected by the first detection means;
Based on the comparison with the power usage state detected by the detection means, the balance between the current power supply and the current power usage is predicted, and an increase / decrease value for the power supply of the power generation company is set according to the prediction result. A surplus power management system, comprising: prediction means; and command means for sequentially commanding the set increase / decrease value to the power generation company.
【請求項5】 発電事業者の余剰電力を電気事業者が確
保し、その電力を送電網により電力使用者に供給する余
剰電力管理システムにおいて、 前記発電事業者から前記送電網に供給される電力を検出
する第1検出手段と、 前記送電網から前記電力使用者に取り込まれる電力を検
出する第2検出手段と、 前記第2検出手段の検出結果に基づいて前記電力使用者
の電力需要を推定する推定手段と、 前記推定された電力需要に相当する電力を前記発電事業
者から前記送電網に送出させるための発電計画を決定す
る決定手段と、 前記決定された発電計画を前記発電事業者に通知する通
知手段と、 前記発電計画と前記第1検出手段の検出による電力供給
状況との対照により、前記電気事業者が前記発電事業者
から購入する電力の料金体系を選定する選定手段と、 前記選定された料金体系と前記第1検出手段の検出によ
る電力供給状況とに基づき、前記電気事業者の電力購入
料金を逐次に求めて積算する積算手段と、 前記選定された料金体系または前記積算された電力購入
料金を前記発電事業者に通知する通知手段と、 前記第1検出手段の検出による電力供給状況と前記第2
検出手段の検出による電力使用状況との対比に基づい
て、現時点より先の電力供給と電力使用とのバランスを
予測し、その予測結果に応じて前記発電事業者の供給電
力に対する増減値を設定する予測手段と、 前記設定された増減値を前記発電事業者に逐次に指令す
る指令手段と、 前記第2検出手段の検出による電力使用状況に基づき、
前記電力使用者への電力販売料金を逐次に求めて積算す
る積算手段と、 前記積算された電力販売料金を定期的または必要に応じ
て前記電力使用者に通知する通知手段と、 を具備したことを特徴とする余剰電力管理システム。
5. A surplus power management system in which a power company secures surplus power of a power generation company and supplies the power to a power user via a power transmission network, the power supplied from the power generation company to the power transmission network. First detecting means for detecting power consumption; second detecting means for detecting power taken into the power user from the power transmission network; and estimating the power demand of the power user based on a detection result of the second detecting means. Estimating means, and deciding means for deciding a power generation plan for causing the power corresponding to the estimated power demand to be transmitted from the power generation company to the power transmission network; and the determined power generation plan to the power generation company. A notifying unit for notifying, and a selection of a tariff system for the electric power purchased from the power generation company by the electric power company based on a comparison between the power generation plan and the power supply status detected by the first detection unit. Determining means; an accumulating means for sequentially calculating and accumulating a power purchase charge of the electric utility based on the selected charge system and a power supply status detected by the first detection means; and the selected charge Notification means for notifying the power generation company of the system or the integrated power purchase fee; power supply status detected by the first detection means;
Based on the comparison with the power usage state detected by the detection means, the balance between the current power supply and the current power usage is predicted, and an increase / decrease value for the power supply of the power generation company is set according to the prediction result. Prediction means, command means for sequentially instructing the set increase / decrease value to the power generation company, based on the power usage status detected by the second detection means,
An accumulating means for sequentially calculating and accumulating the electric power sales charge to the electric power user; and a notifying means for notifying the electric power user of the integrated electric power sales charge periodically or as needed. A surplus power management system characterized by the following.
【請求項6】 請求項1ないし請求項5のいずれかに記
載の余剰電力管理システムにおいて、 前記送電網は、前記電気事業者から送電委託された電力
会社の所有であることを特徴とする余剰電力管理システ
ム。
6. The surplus power management system according to claim 1, wherein the power transmission network is owned by a power company entrusted with power transmission from the electric power company. Power management system.
【請求項7】 請求項1ないし請求項5のいずれかに記
載の余剰電力管理システムにおいて、 前記発電事業者は、発電機を有することを特徴とする余
剰電力管理システム。
7. The surplus power management system according to claim 1, wherein the power generation company has a power generator.
【請求項8】 請求項1ないし請求項5のいずれかに記
載の余剰電力管理システムにおいて、 前記発電事業者および前記電力使用者は、それぞれ複数
あることを特徴とする余剰電力管理システム。
8. The surplus power management system according to claim 1, wherein there are a plurality of said power producers and a plurality of said power users.
【請求項9】 請求項1ないし請求項5のいずれかに記
載の余剰電力管理システムにおいて、 前記送電網は、前記電気事業者から送電委託された電力
会社の所有であり、 前記決定された発電計画を前記電力会社に通知する通知
手段をさらに備える、ことを特徴とする余剰電力管理シ
ステム。
9. The surplus power management system according to claim 1, wherein the power transmission network is owned by a power company entrusted by the power company to transmit power, and the determined power generation is performed. A surplus power management system, further comprising a notification unit that notifies a plan to the power company.
【請求項10】 請求項1ないし請求項5のいずれかに
記載の余剰電力管理システムにおいて、 前記推定手段は、前記電力使用者に固有の基礎データ、
および同電力使用者の現地気象データなどに基づき、電
力需要を推定することを特徴とする余剰電力管理システ
ム。
10. The surplus power management system according to claim 1, wherein said estimating means includes: basic data unique to said power user;
And a surplus power management system for estimating power demand based on local weather data of the power user.
【請求項11】 請求項10に記載の余剰電力管理シス
テムにおいて、 前記基礎データは、前記電力使用者の契約種別、契約電
力、契約年間購入電力量、過去情報などであることを特
徴とする余剰電力管理システム。
11. The surplus power management system according to claim 10, wherein the basic data includes a contract type, a contract power, a contract annual purchased power amount, past information, and the like of the power user. Power management system.
【請求項12】 請求項1ないし請求項5のいずれかに
記載の余剰電力管理システムにおいて、 前記推定手段は、予め設定されている単位計測時間の次
回分について、またはその次回分とそれに続く複数回の
単位計測時間について、推定を行うことを特徴とする余
剰電力管理システム。
12. The surplus power management system according to claim 1, wherein the estimating unit is configured to determine a next unit measurement time set in advance, or the next unit measurement time and a plurality of unit measurement times subsequent thereto. A surplus power management system for estimating a unit measurement time.
【請求項13】 請求項1ないし請求項5のいずれかに
記載の余剰電力管理システムにおいて、 前記決定手段は、前記発電事業者から通告される事前発
電計画、前記発電事業者に固有の基礎データ、および同
発電事業者の現地気象データなどに基づき、発電計画を
決定することを特徴とする余剰電力管理システム。
13. The surplus power management system according to any one of claims 1 to 5, wherein the deciding means is a preliminary power generation plan notified by the power generation company, and basic data unique to the power generation company. And a surplus power management system for determining a power generation plan based on local weather data of the power generation company.
【請求項14】 請求項13に記載の余剰電力管理シス
テムにおいて、 前記決定される発電計画は、電力供給該当日における予
め設定されている単位計測時間ごとに必要電力を対応付
けたものであることを特徴とする余剰電力管理システ
ム。
14. The surplus power management system according to claim 13, wherein the determined power generation plan is obtained by associating required power with each preset unit measurement time on a power supply applicable day. Surplus power management system.
【請求項15】 請求項13に記載の余剰電力管理シス
テムにおいて、 前記事前発電計画は、前記発電事業者が希望する基本供
給電力、前記発電事業者の発電能力に基づく許容最大供
給電力と許容最低供給電力との範囲内において同発電事
業者が希望する最大供給電力と最低供給電力などを、電
力供給該当日における予め設定されている単位計測時間
ごとに対応付けたものであることを特徴とする余剰電力
管理システム。
15. The surplus power management system according to claim 13, wherein the preliminary power generation plan includes a basic supply power desired by the power generation company, an allowable maximum supply power based on a power generation capacity of the power generation company, and an allowable power supply. The maximum power supply and the minimum power supply desired by the power generation company within the range of the minimum power supply are associated with each preset unit measurement time on the power supply applicable day. Surplus power management system.
【請求項16】 請求項13に記載の余剰電力管理シス
テムにおいて、 前記基礎データは、前記発電事業者の発電種別、契約最
大電力、契約最低電力、基本供給電力、発電制御許容範
囲、発電機情報、定期点検情報、過去情報などであるこ
とを特徴とする余剰電力管理システム。
16. The surplus power management system according to claim 13, wherein the basic data includes a power generation type, a contract maximum power, a contract minimum power, a basic supply power, a power generation control allowable range, and generator information of the power generation company. Surplus power management system characterized in that it is information on periodic inspections, past information, etc.
【請求項17】 請求項16に記載の余剰電力管理シス
テムにおいて、 前記発電機情報は、発電機の種類、発電機の運用年数、
発電機の製造メーカ、発電機の型式、発電機の周辺設
備、同周辺設備の製造メーカ、同周辺設備の型式、発電
機の発電特性、発電機の過去における発電実績、発電機
の故障実績、発電機が設置されている地域の気象デー
タ、発電機の時期別の故障発生危険率、発電機の運転パ
ターン別の故障発生危険率などであることを特徴とする
余剰電力管理システム。
17. The surplus power management system according to claim 16, wherein the generator information includes a type of the generator, an operating year of the generator,
Generator manufacturer, generator type, generator peripheral equipment, peripheral equipment manufacturer, peripheral equipment type, generator power generation characteristics, generator power generation performance in the past, generator failure performance, A surplus power management system characterized by weather data of an area where a generator is installed, a failure risk rate for each time period of the generator, a failure risk rate for each operation pattern of the generator, and the like.
【請求項18】 請求項1ないし請求項5のいずれかに
記載の余剰電力管理システムにおいて、 前記通知手段および前記指令手段は、前記発電事業者が
有するサーバと前記発電事業者および前記電力使用者が
有する端末との間のインターネットを介したデータ送受
信により通知および指令を行うことを特徴とする余剰電
力管理システム。
18. The surplus power management system according to claim 1, wherein said notifying unit and said instruction unit include a server owned by said power generation company, said power generation company, and said power user. A surplus power management system for notifying and giving instructions by transmitting and receiving data to and from a terminal of the system via the Internet.
【請求項19】 請求項18に記載の余剰電力管理シス
テムにおいて、 前記発電事業者が有する端末は、前記電気事業者から通
知および指令される情報を表示する表示手段を有するこ
とを特徴とする余剰電力管理システム。
19. The surplus power management system according to claim 18, wherein the terminal of the power generation company has display means for displaying information notified and instructed by the electric power company. Power management system.
【請求項20】 請求項3ないし請求項5のいずれかに
記載の余剰電力管理システムにおいて、 前記選定手段は、電力供給状況が発電計画に適合してい
るかどうかに応じて料金体系を選定することを特徴とす
る余剰電力管理システム。
20. The surplus power management system according to claim 3, wherein the selection unit selects a fee system according to whether or not a power supply state conforms to a power generation plan. A surplus power management system characterized by the following.
【請求項21】 請求項4および請求項5のいずれかに
記載の余剰電力管理システムにおいて、 前記選定手段は、電力供給状況が発電計画および増減値
に適合しているかどうかに応じて料金体系を選定するこ
とを特徴とする余剰電力管理システム。
21. The surplus power management system according to claim 4, wherein the selection means changes a charge system according to whether the power supply status conforms to the power generation plan and the increase / decrease value. A surplus power management system characterized by selection.
【請求項22】 請求項4および請求項5のいずれかに
記載の余剰電力管理システムにおいて、 前記第1検出手段および前記第2検出手段は、電力の値
および電力量を検出することを特徴とする余剰電力管理
システム。
22. The surplus power management system according to claim 4, wherein said first detection means and said second detection means detect a value of power and a power amount. Surplus power management system.
【請求項23】 請求項4および請求項5のいずれかに
記載の余剰電力管理システムにおいて、 前記予測手段は、前記第1検出手段の検出による電力供
給状況と前記第2検出手段の検出による電力使用状況と
の対比に基づき、かつ前記発電事業者に固有の基礎デー
タおよび同発電事業者の現地気象データなどに基づい
て、現時点より先の電力供給と電力使用とのバランスを
予測し、その予測結果に応じて前記発電事業者の供給電
力に対する増減値を設定することを特徴とする余剰電力
管理システム。
23. The surplus power management system according to claim 4, wherein the predicting unit includes a power supply status detected by the first detecting unit and a power supply status detected by the second detecting unit. Based on the comparison with the use situation, and based on the basic data unique to the power producer and the local weather data of the power producer, etc., predict the balance between the power supply and the power use beyond the present time, and predict the A surplus power management system, wherein an increase / decrease value with respect to the power supplied by the power generator is set according to a result.
【請求項24】 請求項4および請求項5のいずれかに
記載の余剰電力管理システムにおいて、 前記予測手段は、予め設定されている単位計測時間の次
回分について、またはその次回分とそれに続く複数回の
単位計測時間について、予測を行うことを特徴とする余
剰電力管理システム。
24. The surplus power management system according to claim 4, wherein the prediction unit is configured to determine a next unit measurement time set in advance, or the next unit measurement time and a plurality of unit measurement times subsequent thereto. A surplus power management system for predicting a unit measurement time for each time.
【請求項25】 請求項1ないし請求項5のいずれかに
記載の余剰電力管理システムにおいて、 前記発電事業者は、一定の電力を送電網に常に供給する
ベース発電事業者と、複数の期間において互いに異なる
電力を送電網に供給するミドル発電事業者と、特定期間
のみ所定の電力を送電網に供給するピーク発電事業者
と、これらベース発電事業者、ミドル発電事業者、ピー
ク発電事業者のいずれか複数の形態を組み合わせた複合
型発電事業者と、短時間ごとに調整可能な電力を送電網
に供給する調整発電事業者と、に分類されていることを
特徴とする余剰電力管理システム。
25. The surplus power management system according to any one of claims 1 to 5, wherein the power generation company includes a base power generation company that constantly supplies constant power to a power transmission network, A middle power generator that supplies different power to the power grid, a peak power provider that supplies predetermined power to the power grid only during a specific period, and any of these base power generators, middle power generators, and peak power generators A surplus power management system characterized by being classified into a combined power generation company that combines a plurality of modes and a regulated power generation company that supplies power that can be adjusted in a short time to a power transmission network.
【請求項26】 請求項1ないし請求項5のいずれかに
記載の余剰電力管理システムにおいて、 前記発電事業者は、一定の電力を送電網に常に供給する
ベース発電事業者と、季節別・日別・時間帯別に互いに
異なる電力を送電網に供給するミドル発電事業者と、特
定日の特定時間帯のみ所定の電力を送電網に供給するピ
ーク発電事業者、これらベース発電事業者、ミドル発電
事業者、ピーク発電事業者のいずれか複数の形態を組み
合わせた複合型発電事業者と、短時間ごとに調整可能な
電力を送電網に供給する調整発電事業者と、に分類され
ていることを特徴とする余剰電力管理システム。
26. The surplus power management system according to claim 1, wherein the power generation company is a base power generation company that constantly supplies a fixed amount of power to a power transmission network, A middle power generation company that supplies different power to the transmission network according to different time periods, a peak power generation company that supplies predetermined power to the transmission network only at a specific time on a specific day, a base power generation company, and a middle power generation business Power generation companies that combine multiple forms of power generators and peak power generation companies, and regulated power generation companies that supply power that can be adjusted every short time to the power grid. And surplus power management system.
【請求項27】 請求項25および請求項26のいずれ
かに記載の余剰電力管理システムにおいて、 前記ベース発電事業者、前記ミドル発電事業者、前記ピ
ーク発電事業者、および前記複合型発電事業者は、季節
別・日別・時間帯別に設定される基本供給電力量、この
基本供給電力量を基準に設定される制御許容範囲、発電
機の発電能力を勘案して設定される許容最大供給電力、
発電機の発電能力を勘案して設定される許容最低供給電
力などを、発電計画の設定要素として有し、 前記調整発電事業者は、前記ベース発電事業者、前記ミ
ドル発電事業者、前記ピーク発電事業者、前記複合型発
電事業者の総供給電力では不足となる分の電力を補うた
めに前記電気事業者から指令される調整値に応じて可変
設定される基本供給電力、この基本供給電力量を基準に
設定された制御許容範囲、発電機の発電能力を勘案して
設定される許容最大供給電力、発電機の発電能力を勘案
して設定される許容最低供給電力などを、発電計画の設
定要素として有する、 ことを特徴とする余剰電力管理システム。
27. The surplus power management system according to claim 25, wherein the base power generation business, the middle power generation business, the peak power generation business, and the combined power generation business are: , The basic power supply amount set for each season, day, and time zone, the allowable control range set based on this basic power supply amount, the maximum allowable power supply set in consideration of the power generation capacity of the generator,
Having an allowable minimum supply power set in consideration of the power generation capacity of the generator as a setting element of the power generation plan, the regulated power generator is the base power generator, the middle power generator, and the peak power generator. The basic supply power variably set according to an adjustment value instructed by the electric utility to compensate for the power shortage in the total supply electric power of the enterprise and the combined power generation enterprise, the basic supply electric energy Set the power generation plan, such as the allowable control range set on the basis of the standard, the maximum allowable power supply that is set in consideration of the power generation capacity of the generator, and the minimum allowable power supply that is set in consideration of the power generation capacity of the generator. A surplus power management system characterized by having as an element.
【請求項28】 請求項25および請求項26のいずれ
かに記載の余剰電力管理システムにおいて、 前記予測手段は、前記第1検出手段の検出による電力供
給状況と前記第2検出手段の検出による電力使用状況と
の対比に基づき、かつ前記発電事業者に固有の予め登録
されている基礎データおよび同発電事業者の現地気象デ
ータなどに基づいて、現時点より先の電力供給と電力使
用とのバランスを予め設定されている単位計測時間の次
回分について、またはその次回分とそれに続く複数回の
単位計測時間について予測し、その予測結果に応じて前
記ミドル発電事業者、前記ピーク発電事業者、前記複合
型発電事業者の供給電力に対する増減値を設定するとと
もに、前記予測結果から、単位計測時間より短い単位給
電指令時間における必要電力を予測し、その予測した必
要電力に応じて前記調整発電事業者の供給電力に対する
増減値を逐次に設定することを特徴とする余剰電力管理
システム。
28. The surplus power management system according to claim 25, wherein the prediction unit is configured to detect a power supply state detected by the first detection unit and a power supply status detected by the second detection unit. Based on the comparison with the use situation, and based on the pre-registered basic data and the local weather data of the power generation company, etc., the balance between the power supply and the power usage beyond the current For the next unit measurement time set in advance, or for the next minute and subsequent multiple unit measurement times, the middle power generation company, the peak power generation company, and the composite In addition to setting the increase / decrease value with respect to the supply power of the power generation company, the required power in the unit power supply command time shorter than the unit measurement time is calculated from the prediction result. Surplus power management system, characterized in that predicted set sequentially increase and decrease values for supply power of the adjusted power producer in accordance with the required electric power that predicted.
【請求項29】 請求項25および請求項26のいずれ
かに記載の余剰電力管理システムにおいて、 前記選定手段は、前記各発電事業者に対し、電力供給状
況が前記制御許容範囲に収まっている場合は最高単価を
選定し、電力供給状況が前記制御許容範囲から外れてい
る場合は最高単価より低い単価または零単価を選定し、
電力供給状況が前記最低供給電力量を下回っている場合
またはその状態が一定時間以上継続した場合は発電事業
者からペナルティーとして徴収するための定額のペナル
ティー料金を選定することを特徴とする余剰電力管理シ
ステム。
29. The surplus power management system according to claim 25, wherein the selection unit is configured to determine whether the power supply status is within the control allowable range for each of the power generation companies. Select the highest unit price, if the power supply status is out of the control allowable range, select a unit price lower than the highest unit price or zero unit price,
Surplus power management characterized by selecting a fixed amount of penalty fee to be collected as a penalty from the power generator when the power supply status is below the minimum supply power amount or when the state continues for a certain period of time or more system.
【請求項30】 請求項25および請求項26のいずれ
かに記載の余剰電力管理システムにおいて、 前記選定手段は、前記ベース発電事業者、前記ミドル発
電事業者、前記ピーク発電事業者、前記複合型発電事業
者に対し、電力供給状況が前記制御許容範囲に収まって
いる場合は最高単価を選定し、電力供給状況が前記制御
許容範囲から外れている場合は最高単価より低い単価ま
たは零単価を選定し、電力供給状況が前記最低供給電力
量を下回っている場合またはその状態が一定時間以上継
続した場合は発電事業者からペナルティーとして徴収す
るためのペナルティー料金を選定するとともに、前記調
整発電事業者に対しては、月額一定または年額一定の基
本料金を選定することを特徴とする余剰電力管理システ
ム。
30. The surplus power management system according to claim 25, wherein the selection unit includes the base power generation company, the middle power generation company, the peak power generation company, and the hybrid power generation system. If the power supply status is within the control allowable range, select the highest unit price, and if the power supply status is out of the control allowable range, select a lower unit price or zero unit price for the power generation company. If the power supply status is below the minimum supply power amount or if the state continues for a certain period of time or more, select a penalty fee to be collected as a penalty from the power generation company, and On the other hand, a surplus power management system characterized by selecting a fixed monthly or annual basic fee.
【請求項31】 請求項25および請求項26のいずれ
かに記載の余剰電力管理システムにおいて、 前記選定手段は、前記各発電事業者に対し、電力供給状
況が発電計画の制御許容範囲に収まっている場合は最高
単価を選定し、電力供給状況が発電計画の制御許容範囲
から外れている場合は最高単価より低い単価または零単
価を選定し、電力供給状況が発電計画の最低供給電力量
を下回っている場合またはその状態が一定時間以上継続
した場合は発電事業者からペナルティとして徴収するた
めの定額のペナルティー料金を選定し、かつ増減値の指
令のうち増加指令に基づく電力供給が所定の制御許容範
囲内で満足された場合は所定料金を加算するためのプレ
ミアム単価を追加的に選定し、増減値の指令のうち削減
指令に基づく電力供給が所定の制御許容範囲内で満足さ
れた場合は削減後の電力と発電計画の基本供給電力との
差分に対応する補償電力量料金を加算するためのプレミ
アム単価を追加的に選定することを特徴とする余剰電力
管理システム。
31. The surplus power management system according to claim 25, wherein the selecting unit determines that the power supply status is within a control allowable range of a power generation plan for each of the power generation companies. If the power supply situation is out of the control allowable range of the power generation plan, select the highest unit price.If the power supply situation is out of the control allowable range, select a unit price lower than the maximum unit price or zero unit price. If the power is on or the condition continues for a certain period of time, a fixed penalty fee to be collected from the power generation company as a penalty is selected, and the power supply based on the increase If satisfied within the range, additionally select a premium unit price to add a predetermined fee, and the power supply based on the reduction command among the commands of increase / decrease value is specified A surplus characterized by additionally selecting a premium unit price for adding a compensation power charge corresponding to a difference between the reduced power and the basic supply power of the power generation plan if satisfied within the control tolerance range. Power management system.
【請求項32】 請求項1ないし請求項5のいずれかに
記載の余剰電力管理システムにおいて、さらに、 前記発電事業者の発電機の電力供給該当日における故障
発生危険率を求め、かつ実際に故障が発生した場合に発
電事業者からペナルティーとして徴収するペナルティー
料金を求める手段と、 前記求めた故障発生危険率およびペナルティー料金を警
告として前記発電事業者に通知する通知手段と、 を具備したことを特徴とする余剰電力管理システム。
32. The surplus power management system according to any one of claims 1 to 5, further comprising: obtaining a failure occurrence risk rate on a corresponding day of power supply of the generator of the power generation company; Means for obtaining a penalty fee to be collected as a penalty from the power generation company when a power failure occurs, and a notifying unit for notifying the power generation business operator of the calculated failure occurrence risk rate and penalty fee as a warning. And surplus power management system.
【請求項33】 発電事業者の余剰電力を電気事業者が
購入し、その購入電力を送電網により前記発電事業者か
ら電力使用者へ直接的に供給する余剰電力管理システム
において、 前記電力使用者の電力需要を推定するステップと、 前記推定された電力需要に相当する電力を前記発電事業
者から前記送電網に送出させるための発電計画を決定す
るステップと、 前記決定された発電計画を前記発電事業者に通知するス
テップと、 を備えることを特徴とする余剰電力管理システムの制御
方法。
33. A surplus power management system in which a power company purchases surplus power of a power generation company and directly supplies the purchased power from the power generation company to a power user via a power transmission network. Estimating the power demand, and determining a power generation plan for transmitting the power corresponding to the estimated power demand from the power generation company to the power transmission network; and A method of controlling a surplus power management system, comprising: notifying a business operator.
【請求項34】 発電事業者の余剰電力を電気事業者が
購入し、その購入電力を送電網により前記発電事業者か
ら電力使用者へ直接的に供給する余剰電力管理システム
において、 前記電力使用者の電力需要を推定するステップと、 前記推定された電力需要に相当する電力を前記発電事業
者から前記送電網に送出させるための発電計画を決定す
るステップと、 前記決定された発電計画を前記発電事業者に通知するス
テップと、 前記発電事業者から前記送電網への電力供給状況を検出
するステップと、 前記発電計画と前記検出される電力供給状況との対照に
より、前記電気事業者の現時点の電力購入料金を算定す
るステップと、 前記算定された電力購入料金を前記発電事業者に通知す
るステップと、 を備えることを特徴とする余剰電力管理システムの制御
方法。
34. A surplus power management system in which a power company purchases surplus power of a power generation company and supplies the purchased power directly from the power generation company to a power user via a power transmission network. Estimating the power demand, and determining a power generation plan for transmitting the power corresponding to the estimated power demand from the power generation company to the power transmission network; and Notifying the business operator, detecting the power supply status from the power generation business to the power transmission network, and comparing the power generation plan and the detected power supply status to determine the current status of the power business operator. Calculating a power purchase fee; and notifying the power generation company of the calculated power purchase fee. Control method systems out.
【請求項35】 発電事業者の余剰電力を電気事業者が
購入し、その購入電力を送電網により前記発電事業者か
ら電力使用者へ直接的に供給する余剰電力管理システム
において、 前記電力使用者の電力需要を推定するステップと、 前記推定された電力需要に相当する電力を前記発電事業
者から前記送電網に送出させるための発電計画を決定す
るステップと、 前記決定された発電計画を前記発電事業者に通知するス
テップと、 前記発電事業者から前記送電網への電力供給状況を検出
するステップと、 前記発電計画と前記検出される電力供給状況との対照に
より、前記電気事業者が前記発電事業者から購入する電
力の料金体系を選定するステップと、 前記選定された料金体系と前記検出される電力供給状況
とに基づき、前記電気事業者の電力購入料金を逐次に求
めて積算するステップと、 前記選定された料金体系または前記積算された電力購入
料金を前記発電事業者に通知するステップと、 を備えることを特徴とする余剰電力管理システムの制御
方法。
35. A surplus power management system in which an electric power company purchases surplus power of a power generation company and supplies the purchased power directly from the power generation company to a power user through a power transmission network. Estimating the power demand, and determining a power generation plan for transmitting the power corresponding to the estimated power demand from the power generation company to the power transmission network; and Notifying a business operator, Detecting the power supply status from the power generation business to the power transmission network, and comparing the power generation plan with the detected power supply status, the power business operator Selecting a tariff system for the electric power to be purchased from the utility; and, based on the selected tariff system and the detected power supply status, the power purchase of the electric utility. Controlling the surplus power management system, comprising: sequentially obtaining and integrating the incoming charges; and notifying the power generation company of the selected fee structure or the integrated power purchase fee. Method.
【請求項36】 発電事業者の余剰電力を電気事業者が
確保し、その電力を送電網により電力使用者に供給する
余剰電力管理システムにおいて、 前記発電事業者から前記送電網に供給される電力を検出
するステップと、 前記送電網から前記電力使用者に取り込まれる電力を検
出するステップと、 前記検出された取り込み電力に基づいて前記電力使用者
の電力需要を推定するステップと、 前記推定された電力需要に相当する電力を前記発電事業
者から前記送電網に送出させるための発電計画を決定す
るステップと、 前記決定された発電計画を前記発電事業者に通知するス
テップと、 前記発電計画と前記検出された電力供給状況との対照に
より、前記電気事業者が前記発電事業者から購入する電
力の料金体系を選定するステップと、 前記選定された料金体系と前記検出による電力供給状況
とに基づき、前記電気事業者の電力購入料金を逐次に求
めて積算するステップと、 前記選定された料金体系または前記積算された電力購入
料金を前記発電事業者に通知するステップと、 前記検出による電力供給状況と前記検出による電力使用
状況との対比に基づいて、現時点より先の電力供給と電
力使用とのバランスを予測し、その予測結果に応じて前
記発電事業者の供給電力に対する増減値を設定するステ
ップと、 前記設定された増減値を前記発電事業者に逐次に指令す
るステップと、 を備えることを特徴とする余剰電力管理システムの制御
方法。
36. A surplus power management system in which an electric power company secures surplus power of a power generation company and supplies the power to a power user through a power transmission network, the power supplied from the power generation company to the power transmission network. Detecting the power taken from the power grid by the power user; estimating the power demand of the power user based on the detected taken power; and Deciding a power generation plan for transmitting power corresponding to power demand from the power generation company to the power transmission network; and notifying the power generation company of the determined power generation plan; A step in which the electric utility selects a fee structure for the electric power purchased from the power generator, based on a comparison with the detected power supply status; and Calculating and accumulating a power purchase charge of the electric utility based on the selected charge system and the power supply status obtained by the detection, and calculating the selected charge system or the integrated power purchase charge by the power generation. Notifying the business operator, Based on a comparison between the power supply status based on the detection and the power usage status based on the detection, predicting a balance between power supply and power usage beyond the current time, and according to the prediction result. A method for controlling a surplus power management system, comprising: setting an increase / decrease value with respect to supply power of the power generation company; and sequentially instructing the power generation company with the set increase / decrease value.
【請求項37】 発電事業者の余剰電力を電気事業者が
確保し、その電力を送電網により電力使用者に供給する
余剰電力管理システムにおいて、 前記発電事業者から前記送電網に供給される電力を検出
するステップと、 前記送電網から前記電力使用者に取り込まれる電力を検
出するステップと、 前記検出された取り込み電力に基づいて前記電力使用者
の電力需要を推定する推定手段と、 前記推定された電力需要に相当する電力を前記発電事業
者から前記送電網に送出させるための発電計画を決定す
るステップと、 前記決定された発電計画を前記発電事業者に通知するス
テップと、 前記発電計画と前記第1検出手段の検出による電力供給
状況との対照により、前記電気事業者が前記発電事業者
から購入する電力の料金体系を選定するステップと、 前記選定された料金体系と前記検出による電力供給状況
とに基づき、前記電気事業者の電力購入料金を逐次に求
めて積算するステップと、 前記選定された料金体系または前記積算された電力購入
料金を前記発電事業者に通知するステップと、 前記検出による電力供給状況と前記検出による電力使用
状況との対比に基づいて、現時点より先の電力供給と電
力使用とのバランスを予測し、その予測結果に応じて前
記発電事業者の供給電力に対する増減値を設定するステ
ップと、 前記設定された増減値を前記発電事業者に逐次に指令す
る指令手段と、 前記検出による電力使用状況に基づき、前記電力使用者
への電力販売料金を逐次に求めて積算するステップと、 前記積算された電力販売料金を定期的または必要に応じ
て前記電力使用者に通知するステップと、 を備えることを特徴とする余剰電力管理システムの制御
方法。
37. A surplus power management system in which a power company secures surplus power of a power generation company and supplies the power to a power user via a power transmission network, the power supplied from the power generation company to the power transmission network. Detecting power captured by the power user from the power grid; estimating means for estimating power demand of the power user based on the detected captured power; and Determining a power generation plan for transmitting power corresponding to the generated power demand from the power generation company to the power transmission network; and notifying the power generation company of the determined power generation plan; and A step in which the electric utility selects a fee structure of electric power to be purchased from the power generator, based on a comparison with an electric power supply state detected by the first detecting means; Based on the selected fee structure and the power supply status based on the detection, sequentially obtaining and integrating the power purchase fee of the electric power company; and the selected fee structure or the integrated power purchase Notifying the power generation company of a charge, and, based on a comparison between the power supply status based on the detection and the power usage status based on the detection, predicting a balance between power supply and power usage beyond the current time, and predicting the balance. Setting an increase / decrease value for the power supply of the power generation company in accordance with the result; command means for sequentially instructing the power generation company with the set increase / decrease value; and Sequentially calculating and accumulating a power selling fee to the power user; and transmitting the integrated power selling fee to the power user periodically or as needed. The method of the surplus power management system comprising: the steps, the of.
JP2001072998A 2001-03-14 2001-03-14 Surplus power management system and control method thereof Expired - Fee Related JP3631967B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001072998A JP3631967B2 (en) 2001-03-14 2001-03-14 Surplus power management system and control method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001072998A JP3631967B2 (en) 2001-03-14 2001-03-14 Surplus power management system and control method thereof

Publications (2)

Publication Number Publication Date
JP2002271982A true JP2002271982A (en) 2002-09-20
JP3631967B2 JP3631967B2 (en) 2005-03-23

Family

ID=18930499

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001072998A Expired - Fee Related JP3631967B2 (en) 2001-03-14 2001-03-14 Surplus power management system and control method thereof

Country Status (1)

Country Link
JP (1) JP3631967B2 (en)

Cited By (31)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004274937A (en) * 2003-03-11 2004-09-30 Osaka Gas Co Ltd Electric power supply and demand management system
JP2005130658A (en) * 2003-10-27 2005-05-19 Hitachi Ltd Programming system and method for supply power purchase
JP2005135267A (en) * 2003-10-31 2005-05-26 Osaka Gas Co Ltd Electric power procurement charge deriving apparatus
JP2006172397A (en) * 2004-12-20 2006-06-29 Chugoku Electric Power Co Inc:The Energy charge determination system
JP2007141128A (en) * 2005-11-22 2007-06-07 Tokiko Techno Kk Maintenance management system
JP2010246306A (en) * 2009-04-08 2010-10-28 Ntt Facilities Inc Device, method and system for controlling power supply
JP2011217470A (en) * 2010-03-31 2011-10-27 Tokyo Electric Power Co Inc:The System control system and computer program
JP2011234558A (en) * 2010-04-28 2011-11-17 Toshiba Corp Power consumption management system, power consumption management device used therefor, power consumption management method, power supply management device and power supply management method
JP2011257948A (en) * 2010-06-08 2011-12-22 Chugoku Electric Power Co Inc:The Device and method for adjusting hydraulic power generation plan, and program
WO2012114372A1 (en) * 2011-02-23 2012-08-30 株式会社日立製作所 Power demand management system and power demand management method
WO2012131767A1 (en) * 2011-03-30 2012-10-04 株式会社日立製作所 System control apparatus for facilities
JP2012198891A (en) * 2011-03-21 2012-10-18 General Electric Co <Ge> Systems and methods for generating bill
JP2013009588A (en) * 2011-06-24 2013-01-10 General Electric Co <Ge> Methods and systems involving databases for electrical micro power generation data
CN103049798A (en) * 2012-12-05 2013-04-17 浙江大学城市学院 Short-period electric generation power forecasting method applied to photovoltaic electric generation system
KR101262126B1 (en) * 2010-11-29 2013-05-14 주식회사 준성이엔알 Small scale hybrid system for generating electricity
CN103136597A (en) * 2013-01-28 2013-06-05 山东电力集团公司电力经济技术研究院 Decision support system for company management based on statistical indicators and application method thereof
CN103178551A (en) * 2013-01-09 2013-06-26 中国海洋石油总公司 Offshore oilfield group power grid power optimization control method
CN103500997A (en) * 2013-09-16 2014-01-08 华南理工大学 Electric power system dispatching method based on hybrid multi-objective lambda iteration method and Newton method
JP2014002656A (en) * 2012-06-20 2014-01-09 Toko Electric Corp Planned power sales amount management device and computer program
JP2014178766A (en) * 2013-03-13 2014-09-25 Toyota Home Kk Energy consumption display system
CN104217017A (en) * 2014-09-24 2014-12-17 国家电网公司 Professional data service system for electric energy loss
CN104410109A (en) * 2014-12-02 2015-03-11 大连理工大学 Method for poor power transmission ability analysis and on-grid energy dynamic regulation in hydropower-enriched regions
JP2017211836A (en) * 2016-05-25 2017-11-30 株式会社日立製作所 Electric power consignment control system
WO2018168053A1 (en) 2017-03-17 2018-09-20 日本電気株式会社 Power management device, power management method, and program
CN108694271A (en) * 2017-03-31 2018-10-23 通用电气公司 Combustion gas turbine allocates optimization system and method and non-transitory computer-readable medium
CN110546842A (en) * 2017-06-14 2019-12-06 株式会社日立制作所 energy management device and method, energy management system, and operation planning method for energy management system
WO2020256056A1 (en) * 2019-06-19 2020-12-24 京セラ株式会社 Self-consignment system, and self-consignment method
CN112766797A (en) * 2021-01-30 2021-05-07 广东新华建工程有限公司 Photoelectric integrated building energy supply method and system
CN113487151A (en) * 2021-06-23 2021-10-08 广东润建电力科技有限公司 Intelligent power utilization and demand side response method, system and device based on 5G message
US11210749B2 (en) 2016-12-05 2021-12-28 Nec Corporation Power management apparatus, power management system, power management method, and non-transitory storage medium
US11841382B2 (en) 2018-03-20 2023-12-12 Honda Motor Co., Ltd. Information providing apparatus, information providing method, and system

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106327259A (en) * 2016-08-26 2017-01-11 华南理工大学 Power transmission network wheeling cost pricing method based on current and power flow tracking
CN106339952A (en) * 2016-08-26 2017-01-18 华南理工大学 Power transmission wheeling cost pricing method based on cross term and power flow tracing
CN106296309A (en) * 2016-08-26 2017-01-04 华南理工大学 A kind of transmission of electricity wheeling rates pricing method based on direct current factor and electricity-tracing method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11308771A (en) * 1998-04-24 1999-11-05 Hitachi Ltd Power supply controller
JP2000002153A (en) * 1998-06-16 2000-01-07 Mitsubishi Electric Corp Energy distribution system
JP2000078747A (en) * 1998-08-27 2000-03-14 Hitachi Ltd Selecting method of electric power company and selection supporting system
JP2000333369A (en) * 1999-05-20 2000-11-30 Hitachi Ltd Power system consumption-control apparatus

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11308771A (en) * 1998-04-24 1999-11-05 Hitachi Ltd Power supply controller
JP2000002153A (en) * 1998-06-16 2000-01-07 Mitsubishi Electric Corp Energy distribution system
JP2000078747A (en) * 1998-08-27 2000-03-14 Hitachi Ltd Selecting method of electric power company and selection supporting system
JP2000333369A (en) * 1999-05-20 2000-11-30 Hitachi Ltd Power system consumption-control apparatus

Cited By (44)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004274937A (en) * 2003-03-11 2004-09-30 Osaka Gas Co Ltd Electric power supply and demand management system
JP2005130658A (en) * 2003-10-27 2005-05-19 Hitachi Ltd Programming system and method for supply power purchase
JP2005135267A (en) * 2003-10-31 2005-05-26 Osaka Gas Co Ltd Electric power procurement charge deriving apparatus
JP2006172397A (en) * 2004-12-20 2006-06-29 Chugoku Electric Power Co Inc:The Energy charge determination system
JP2007141128A (en) * 2005-11-22 2007-06-07 Tokiko Techno Kk Maintenance management system
JP2010246306A (en) * 2009-04-08 2010-10-28 Ntt Facilities Inc Device, method and system for controlling power supply
JP2011217470A (en) * 2010-03-31 2011-10-27 Tokyo Electric Power Co Inc:The System control system and computer program
US8989911B2 (en) 2010-04-28 2015-03-24 Kabushiki Kaisha Toshiba Power consumption management system, and power consumption manager, power consumption management method, power supply manager, and power supply management method, which are used for the power consumption management system
JP2011234558A (en) * 2010-04-28 2011-11-17 Toshiba Corp Power consumption management system, power consumption management device used therefor, power consumption management method, power supply management device and power supply management method
JP2011257948A (en) * 2010-06-08 2011-12-22 Chugoku Electric Power Co Inc:The Device and method for adjusting hydraulic power generation plan, and program
US9639129B2 (en) 2010-06-08 2017-05-02 The Chugoku Electric Power Co., Inc. Hydroelectric power generation plan adjustment device, hydroelectric power generation plan adjustment method, and program
KR101262126B1 (en) * 2010-11-29 2013-05-14 주식회사 준성이엔알 Small scale hybrid system for generating electricity
JP5622924B2 (en) * 2011-02-23 2014-11-12 株式会社日立製作所 Power demand management system and power demand management method
JPWO2012114372A1 (en) * 2011-02-23 2014-07-07 株式会社日立製作所 Power demand management system and power demand management method
WO2012114372A1 (en) * 2011-02-23 2012-08-30 株式会社日立製作所 Power demand management system and power demand management method
JP2012198891A (en) * 2011-03-21 2012-10-18 General Electric Co <Ge> Systems and methods for generating bill
US9281693B2 (en) 2011-03-30 2016-03-08 Hitachi, Ltd. System control apparatus for equipment
WO2012131767A1 (en) * 2011-03-30 2012-10-04 株式会社日立製作所 System control apparatus for facilities
JPWO2012131767A1 (en) * 2011-03-30 2014-07-24 株式会社日立製作所 Equipment system controller
JP5531156B2 (en) * 2011-03-30 2014-06-25 株式会社日立製作所 Equipment system controller
JP2013009588A (en) * 2011-06-24 2013-01-10 General Electric Co <Ge> Methods and systems involving databases for electrical micro power generation data
JP2014002656A (en) * 2012-06-20 2014-01-09 Toko Electric Corp Planned power sales amount management device and computer program
CN103049798B (en) * 2012-12-05 2016-04-20 浙江大学城市学院 A kind of short-term power generation power Forecasting Methodology being applied to photovoltaic generating system
CN103049798A (en) * 2012-12-05 2013-04-17 浙江大学城市学院 Short-period electric generation power forecasting method applied to photovoltaic electric generation system
CN103178551A (en) * 2013-01-09 2013-06-26 中国海洋石油总公司 Offshore oilfield group power grid power optimization control method
CN103136597A (en) * 2013-01-28 2013-06-05 山东电力集团公司电力经济技术研究院 Decision support system for company management based on statistical indicators and application method thereof
JP2014178766A (en) * 2013-03-13 2014-09-25 Toyota Home Kk Energy consumption display system
CN103500997A (en) * 2013-09-16 2014-01-08 华南理工大学 Electric power system dispatching method based on hybrid multi-objective lambda iteration method and Newton method
CN104217017A (en) * 2014-09-24 2014-12-17 国家电网公司 Professional data service system for electric energy loss
CN104410109A (en) * 2014-12-02 2015-03-11 大连理工大学 Method for poor power transmission ability analysis and on-grid energy dynamic regulation in hydropower-enriched regions
JP2017211836A (en) * 2016-05-25 2017-11-30 株式会社日立製作所 Electric power consignment control system
US11210749B2 (en) 2016-12-05 2021-12-28 Nec Corporation Power management apparatus, power management system, power management method, and non-transitory storage medium
WO2018168053A1 (en) 2017-03-17 2018-09-20 日本電気株式会社 Power management device, power management method, and program
JP7154794B2 (en) 2017-03-31 2022-10-18 ゼネラル・エレクトリック・カンパニイ Real-time Command and Action of Gas Turbine Dispatch Optimizer
JP2018200682A (en) * 2017-03-31 2018-12-20 ゼネラル・エレクトリック・カンパニイ Real time command for dispatch optimizer for gas turbine and operation therefor
CN108694271A (en) * 2017-03-31 2018-10-23 通用电气公司 Combustion gas turbine allocates optimization system and method and non-transitory computer-readable medium
CN108694271B (en) * 2017-03-31 2023-09-29 通用电气公司 Gas turbine deployment optimization system and method and non-transitory computer readable medium
CN110546842A (en) * 2017-06-14 2019-12-06 株式会社日立制作所 energy management device and method, energy management system, and operation planning method for energy management system
US11841382B2 (en) 2018-03-20 2023-12-12 Honda Motor Co., Ltd. Information providing apparatus, information providing method, and system
WO2020256056A1 (en) * 2019-06-19 2020-12-24 京セラ株式会社 Self-consignment system, and self-consignment method
JP7492957B2 (en) 2019-06-19 2024-05-30 京セラ株式会社 Self-delivery system and self-delivery method
CN112766797A (en) * 2021-01-30 2021-05-07 广东新华建工程有限公司 Photoelectric integrated building energy supply method and system
CN112766797B (en) * 2021-01-30 2023-12-22 新华建集团(广东)建设有限公司 Photoelectric integrated building energy supply method and system
CN113487151A (en) * 2021-06-23 2021-10-08 广东润建电力科技有限公司 Intelligent power utilization and demand side response method, system and device based on 5G message

Also Published As

Publication number Publication date
JP3631967B2 (en) 2005-03-23

Similar Documents

Publication Publication Date Title
JP3631967B2 (en) Surplus power management system and control method thereof
Mohandes et al. A review of power system flexibility with high penetration of renewables
US11238474B2 (en) Distributed energy control
US11182714B2 (en) Building energy optimization system with capacity market program (CMP) planning
US9335747B2 (en) System and method for energy management
US20180356770A1 (en) Building energy optimization system with automated and dynamic economic load demand response (eldr) optimization
US9425620B2 (en) Nested, hierarchical resource allocation schema for management and control of an electric power grid
US10339602B2 (en) Power adjustment system, power adjustment method, and computer program
US20140148963A1 (en) Optimization of microgrid energy use and distribution
EP3032489B1 (en) Power adjustment device, power adjustment method, and program
AU2010204729A1 (en) Optimization of microgrid energy use and distribution
Wolak The role of efficient pricing in enabling a low-carbon electricity sector
JP2002123578A (en) Electric power retail system
JP2003134665A (en) Electric power supply method and supply system
Sadeghi Sarcheshmeh et al. A stochastic frequency security constrained optimization model for day‐ahead energy and reserve scheduling of islanded multi‐microgrids systems
Denholm et al. Summary of market opportunities for electric vehicles and dispatchable load in electrolyzers
US20220261929A1 (en) Method and system for decentralized energy forecasting and scheduling
WO2017035571A1 (en) Analysing smart meter data for solar or storage recommendation
JP2003235158A (en) System, method, and program for managing energy supply
JP2004048852A (en) Method for planning power generation
US12039558B2 (en) Distributed energy control
WO2023162771A1 (en) Information processing device, information processing method, and program
Singhal et al. Integration of hybrids into wholesale power markets
Lakouraj et al. Optimal power management of dependent microgrid considering distribution market and unused power capacity
Kärkkäinen et al. Integration of demand side management with variable output DG

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040129

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040203

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040405

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20041207

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20041220

R150 Certificate of patent or registration of utility model

Ref document number: 3631967

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081224

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091224

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101224

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101224

Year of fee payment: 6

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111224

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121224

Year of fee payment: 8

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131224

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees