JP2002155907A - Priority circuit in working machinery - Google Patents

Priority circuit in working machinery

Info

Publication number
JP2002155907A
JP2002155907A JP2000356096A JP2000356096A JP2002155907A JP 2002155907 A JP2002155907 A JP 2002155907A JP 2000356096 A JP2000356096 A JP 2000356096A JP 2000356096 A JP2000356096 A JP 2000356096A JP 2002155907 A JP2002155907 A JP 2002155907A
Authority
JP
Japan
Prior art keywords
valve
turning
port
oil
hydraulic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000356096A
Other languages
Japanese (ja)
Inventor
Hitoshi Iwasaki
仁 岩崎
Kazuto Fujiyama
和人 藤山
Yoshikazu Urimoto
義和 瓜本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Caterpillar Japan Ltd
Kawasaki Heavy Industries Ltd
Caterpillar Mitsubishi Ltd
Original Assignee
Kawasaki Heavy Industries Ltd
Caterpillar Mitsubishi Ltd
Shin Caterpillar Mitsubishi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kawasaki Heavy Industries Ltd, Caterpillar Mitsubishi Ltd, Shin Caterpillar Mitsubishi Ltd filed Critical Kawasaki Heavy Industries Ltd
Priority to JP2000356096A priority Critical patent/JP2002155907A/en
Publication of JP2002155907A publication Critical patent/JP2002155907A/en
Pending legal-status Critical Current

Links

Landscapes

  • Operation Control Of Excavators (AREA)
  • Fluid-Pressure Circuits (AREA)

Abstract

PROBLEM TO BE SOLVED: To control the pressure oil limit quantity in relation to a second hydraulic actuator, and to reduce the number of parts items to simplify the structure in the structure for supplying the pressure oil from a hydraulic pump to a first hydraulic actuator with priority by limiting the pressure oil supply quantity to a second hydraulic actuator with a prior valve. SOLUTION: A priority valve for turning is formed of a spool valve to be operated by the pilot pressure output from a turning pilot valve in response to the operation quantity of a turning operation lever.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、建設機械等の複数
の油圧アクチュエータを備えた作業用機械の技術分野に
属するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention belongs to the technical field of a working machine having a plurality of hydraulic actuators such as a construction machine.

【0002】[0002]

【従来の技術】一般に、建設機械等の作業用機械には、
複数の油圧アクチュエータが備えられているが、例えば
油圧ショベルでは、走行用モータ、旋回用モータ、ブー
ム用シリンダ、アーム用シリンダ、バケット用シリンダ
等の油圧アクチュエータが設けられていると共に、これ
に油圧アクチュエータに圧油を供給する油圧ポンプが搭
載されている。ところで、前記油圧ショベルで溝掘削を
行う場合、断面を正確な矩形に仕上げるためには、バケ
ットを旋回力で壁面に押付けながら掘削しなければなら
ないが、この場合、旋回力が弱いと、バケットが壁面か
らの反力を受けて壁面と反対側に逃げてしまって、壁面
が垂直に仕上がらないことになる。そこで、例えば油圧
ショベルに二つの油圧ポンプが搭載されているものにお
いては、第一の油圧ポンプの圧油を旋回用モータに優先
的に供給して、壁面押付け力を確保できるようにする一
方、第二の油圧ポンプの圧油はブーム用、アーム用、バ
ケット用の各シリンダに供給するようにして、二つの油
圧ポンプの圧油を壁面押付け力と掘削作業とに適切に分
配できるようにしたものがある。この様な旋回用モータ
への圧油供給を優先するための旋回優先回路として、従
来、図7に示すようなものが知られている。該図7にお
いて、12、13は第一、第二メインポンプ、14はパ
イロットポンプ、15は油タンク、8は旋回用モータ、
10はアーム用シリンダ、16は旋回用モータ8の圧油
供給排出制御を行う旋回用制御バルブ、17、18はア
ーム用シリンダ10の圧油供給排出制御を行うアーム用
第一、第二制御バルブである。この回路は、第一メイン
ポンプ12からの圧油を、旋回用制御バルブ16、アー
ム用第一制御バルブ17を介して旋回用モータ8、アー
ム用シリンダ10に供給する一方、第二メインポンプ1
3からの圧油をアーム用第二制御バルブ18を介してア
ーム用シリンダ10に供給できるようになっているが、
第一メインポンプ12からアーム用第一制御バルブ17
への圧油供給油路のうちの一つの油路Gに、該油路Gを
開閉する旋回優先用バルブ42が設けられている。そし
て、溝掘削作業等を行う場合に、オペレータがスイッチ
43(例えば旋回優先モードスイッチ等)を操作して上
記旋回優先用バルブ42を閉じることでアーム用第一制
御バルブ17への圧油供給油路Gを閉鎖し、これにより
第一メインポンプ12の圧油を旋回用モータ8に優先的
に供給できるようになっている。このとき、第一メイン
ポンプ12からアーム用第一制御バルブ17への圧油供
給は、絞り44が設けられた油路Hを経由して僅かにな
されるが、該絞り44は旋回用制御バルブ16への圧油
供給路の下流側に位置しているため、旋回用モータ8に
は、高負荷に対応できる十分な圧力の圧油が供給される
ことになる。また、アーム用シリンダ10には、アーム
用第二制御バルブ18を経由して第二メインポンプ13
からの圧油が供給されるようになっている。
2. Description of the Related Art Generally, working machines such as construction machines include:
A plurality of hydraulic actuators are provided. For example, a hydraulic excavator is provided with hydraulic actuators such as a traveling motor, a turning motor, a boom cylinder, an arm cylinder, a bucket cylinder, and the like. Is equipped with a hydraulic pump that supplies pressurized oil. By the way, when excavating a groove with the hydraulic excavator, the bucket must be excavated by pressing the bucket against a wall surface with a swiveling force in order to finish the cross section with an accurate rectangular shape. Under the reaction force from the wall, it escapes to the opposite side of the wall, and the wall does not finish vertically. Therefore, for example, in the case where two hydraulic pumps are mounted on a hydraulic shovel, the hydraulic oil of the first hydraulic pump is supplied preferentially to the turning motor so that the wall pressing force can be secured. The hydraulic oil of the second hydraulic pump is supplied to each cylinder for the boom, the arm, and the bucket so that the hydraulic oil of the two hydraulic pumps can be appropriately distributed to the wall pressing force and the excavation work. There is something. As a turning priority circuit for giving priority to the supply of pressure oil to such a turning motor, a circuit as shown in FIG. 7 is conventionally known. 7, 12, 13 are first and second main pumps, 14 is a pilot pump, 15 is an oil tank, 8 is a turning motor,
Reference numeral 10 denotes an arm cylinder, reference numeral 16 denotes a turning control valve for controlling the supply and discharge of pressurized oil of the motor 8, and reference numerals 17 and 18 denote first and second control valves for the arm for controlling supply and discharge of pressure oil of the arm cylinder 10. It is. This circuit supplies the pressurized oil from the first main pump 12 to the turning motor 8 and the arm cylinder 10 via the turning control valve 16 and the arm first control valve 17, while the second main pump 1
3 can be supplied to the arm cylinder 10 via the second arm control valve 18.
From the first main pump 12 to the first control valve 17 for the arm
A turning priority valve 42 that opens and closes the oil passage G is provided in one of the oil passages G of the pressure oil supply oil passages. Then, when performing a trench excavation operation or the like, the operator operates a switch 43 (for example, a turning priority mode switch or the like) to close the turning priority valve 42, thereby supplying the pressure oil supply oil to the first arm control valve 17. The path G is closed, so that the pressure oil of the first main pump 12 can be preferentially supplied to the turning motor 8. At this time, the supply of pressure oil from the first main pump 12 to the first arm control valve 17 is made slightly via an oil passage H provided with a throttle 44. Since it is located on the downstream side of the pressure oil supply passage to the motor 16, the turning motor 8 is supplied with pressure oil of a sufficient pressure to cope with a high load. Further, the second main pump 13 is connected to the arm cylinder 10 via the second arm control valve 18.
Pressure oil is supplied.

【0003】[0003]

【発明が解決しようとする課題】ところで前記従来の旋
回優先回路において、旋回優先用バルブ42は、スイッ
チ43の操作に基づきON/OFF的に切換わる電磁弁
45からのパイロット圧により作動して圧油供給油路G
を開閉するよう構成されており、このため、オペレータ
がいちいちスイッチ43を操作する必要があって、煩雑
かつ面倒であった。また、上記旋回優先用バルブ42
は、ON/OFF的に切換わる電磁弁45からのパイロ
ット圧で作動するから開度量の調整ができないものであ
り、このため、オペレータが旋回用モータへの優先量を
コントロールできないことになって、例えば溝壁面の反
力が小さくて大きな旋回力を必要としない場合であって
も、第一油圧ポンプの圧油の殆どが旋回用モータに供給
されてしまうという無駄がある。そこで、前記旋回優先
用バルブを開度量可変式のものとし、旋回用モータへの
優先量をコントロールできるようにすることが提唱され
る。この場合、前記電磁弁に代えて減圧弁を用いると共
に、該減圧弁から旋回優先用バルブに出力されるパイロ
ット圧を、旋回用操作レバーの操作量に対応して増減で
きるように構成することが考えられる。しかるに、この
様に構成したものも前述した従来のものも、旋回優先用
バルブの他に、電磁弁や減圧弁等の他のバルブが必要で
あって、部品点数の削減化の妨げになるうえ、回路も複
雑になるという問題があり、ここに本発明が解決しよう
とする課題があった。
By the way, in the conventional turning priority circuit, the turning priority valve 42 is operated by a pilot pressure from an electromagnetic valve 45 which is turned ON / OFF based on the operation of a switch 43, so that the pressure is increased. Oil supply oil passage G
Is opened and closed, which requires the operator to operate the switch 43 each time, which is cumbersome and troublesome. The turning priority valve 42
Is operated by the pilot pressure from the electromagnetic valve 45 which is switched ON / OFF, so that the opening amount cannot be adjusted. Therefore, the operator cannot control the priority amount to the turning motor. For example, even when the reaction force on the groove wall surface is small and a large turning force is not required, most of the pressure oil of the first hydraulic pump is supplied to the turning motor. Therefore, it is proposed that the turning priority valve be of a variable opening amount type so that the priority amount for the turning motor can be controlled. In this case, a pressure reducing valve may be used instead of the solenoid valve, and the pilot pressure output from the pressure reducing valve to the turning priority valve may be increased or decreased in accordance with the operation amount of the turning operation lever. Conceivable. However, both the above-described structure and the above-mentioned conventional one require other valves such as a solenoid valve and a pressure reducing valve in addition to the turning priority valve, which hinders the reduction in the number of parts. However, there is a problem that the circuit becomes complicated, and there is a problem to be solved by the present invention.

【0004】[0004]

【課題を解決するための手段】本発明は、上記の如き実
情に鑑み、これらの課題を解決することを目的として創
作されたものであって、第一、第二の油圧アクチュエー
タと、これら両油圧アクチュエータに圧油を供給する油
圧ポンプとを備えた作業用機械において、油圧ポンプか
ら第二油圧アクチュエータに至る圧油供給路に優先用バ
ルブを設け、該優先用バルブにより第二油圧アクチュエ
ータに対する圧油供給量を制限することで油圧ポンプか
らの圧油を第一油圧アクチュエータに優先的に供給する
ことができるよう構成するにあたり、前記優先用バルブ
は、第一油圧アクチュエータ用操作具の操作量に対応し
て出力されるパイロット圧を受けて第二油圧アクチュエ
ータに対する圧油制限量を制御するべく作動するスプー
ル弁で構成されているものである。そして、この様にす
ることにより、第二油圧アクチュエータへの圧油制限量
を、第一油圧アクチュエータ用操作具の操作量に対応し
て制御できることになって、作業性、操作性の向上が計
れると共に、減圧弁や電磁弁等が不要であって、部品点
数の削減化に寄与できるうえ、回路も簡略化されるとい
う利点がある。そして本発明は、例えば、第一油圧アク
チュエータが、ショベル系建設機械に設けられる旋回用
モータである場合等に実施できる。
SUMMARY OF THE INVENTION The present invention has been made in view of the above-mentioned circumstances, and has been made for the purpose of solving these problems, and comprises a first and a second hydraulic actuator, and both of them. In a working machine provided with a hydraulic pump for supplying hydraulic oil to a hydraulic actuator, a priority valve is provided in a hydraulic oil supply path from the hydraulic pump to the second hydraulic actuator, and the priority valve controls the pressure on the second hydraulic actuator. In configuring so that the pressure oil from the hydraulic pump can be preferentially supplied to the first hydraulic actuator by restricting the oil supply amount, the priority valve is controlled by the operation amount of the first hydraulic actuator operation tool. A spool valve operable to receive a correspondingly output pilot pressure and control a hydraulic oil limit amount for the second hydraulic actuator. Is shall. By doing so, the amount of restricted hydraulic oil to the second hydraulic actuator can be controlled in accordance with the amount of operation of the operating tool for the first hydraulic actuator, thereby improving workability and operability. At the same time, there is no need for a pressure reducing valve, a solenoid valve, or the like, which contributes to a reduction in the number of parts and has an advantage that the circuit is simplified. The present invention can be implemented, for example, when the first hydraulic actuator is a turning motor provided in a shovel-based construction machine.

【0005】[0005]

【発明の実施の形態】次に、本発明の実施の形態を図面
に基づいて説明する。図1において、1は油圧ショベル
であって、該油圧ショベル1は、クローラ式の下部走行
体2、該下部走行体2に旋回自在に支持される上部旋回
体3、該上部旋回体3に装着されるフロントアタッチメ
ント4等の各部を備えており、さらにフロントアタッチ
メント4は、上部旋回体3に上下揺動自在に支持される
ブーム5、該ブーム5の先端部に前後揺動自在に支持さ
れるアーム6、該アーム6の先端部に前後揺動自在に支
持されるバケット7等の部材装置から構成されている。
また油圧ショベル1には、左右の走行用モータ(図示せ
ず)、旋回用モータ8、ブーム用シリンダ9、アーム用
シリンダ10、バケット用シリンダ11等の各種油圧ア
クチュエータが設けられており、これら油圧アクチュエ
ータは、エンジンを動力として駆動する油圧ポンプから
の圧油供給により作動する等の基本的構成は、従来通り
である。
Next, an embodiment of the present invention will be described with reference to the drawings. In FIG. 1, reference numeral 1 denotes a hydraulic excavator, which is a crawler type lower traveling body 2, an upper revolving body 3 that is rotatably supported by the lower traveling body 2, and mounted on the upper revolving body 3. The boom 5 is supported by the upper swing body 3 so as to be vertically swingable, and the front attachment 4 is supported by the tip of the boom 5 so as to be able to swing back and forth. The arm 6 includes a member device such as a bucket 7 which is supported at the tip of the arm 6 so as to be able to swing back and forth.
The hydraulic excavator 1 is provided with various hydraulic actuators such as a left and right traveling motor (not shown), a turning motor 8, a boom cylinder 9, an arm cylinder 10, a bucket cylinder 11, and the like. The basic configuration of the actuator is the same as the conventional one, such as operating by supplying hydraulic oil from a hydraulic pump driven by an engine as power.

【0006】扨、前記旋回用モータ8およびアーム用シ
リンダ10の油圧回路を図2、図3に示すが、図2にお
いて、12、13は第一、第二メインポンプ、14はパ
イロットポンプ、15は油タンク、16は旋回用制御バ
ルブ、17はアーム用第一制御バルブ、18はアーム用
第二制御バルブ、19は旋回優先用バルブであって、こ
れらバルブ16〜19は、左右の走行用制御バルブ2
0、21、ブーム用第一制御バルブ22、ブーム用第二
制御バルブ23、作業アタッチメント用制御バルブ2
4、バケット用制御バルブ25、合流用バルブ26、図
示しない自重降下防止用バルブや再生用バルブ、リリー
フバルブ等と共に、コントロールバルブユニット27に
組み込まれている。尚、上記バルブ16〜26のうち、
左右の走行用、ブーム用第一、ブーム用第二、作業アタ
ッチメント用、バケット用の制御バルブ20〜25およ
び合流用バルブ26については簡略化して図示すると共
に、その詳細な説明は省略するが、合流用バルブ26
は、第一、第二メインポンプ12、13の圧油を必要に
応じて合流するためのバルブである。また、図2、図3
において、と、と、と、と、と、
とはそれぞれ接続される。
FIGS. 2 and 3 show hydraulic circuits of the turning motor 8 and the arm cylinder 10. In FIG. 2, reference numerals 12 and 13 denote first and second main pumps, 14 denotes a pilot pump, and 15 Is an oil tank, 16 is a control valve for turning, 17 is a first control valve for arm, 18 is a second control valve for arm, 19 is a valve for turning priority, and these valves 16 to 19 are for left and right traveling. Control valve 2
0, 21, first control valve 22 for boom, second control valve 23 for boom, control valve 2 for work attachment
4, together with a bucket control valve 25, a merging valve 26, a self-weight drop prevention valve, a regeneration valve, a relief valve, and the like (not shown), are incorporated in a control valve unit 27. In addition, among the valves 16 to 26,
The control valves 20 to 25 for the left and right traveling, the first for the boom, the second for the boom, the work attachment, the control valves 20 to 25 for the bucket, and the merging valve 26 are shown in a simplified manner, and the detailed description thereof is omitted. Merging valve 26
Is a valve for joining the pressure oils of the first and second main pumps 12 and 13 as needed. 2 and 3
, And, and, and, and,
Are connected to each other.

【0007】前記コントロールバルブユニット27は、
第一メインポンプ12に接続される第一ポンプポート2
7a、第二メインポンプ13に接続される第二ポンプポ
ート27b、油タンク15に接続されるタンクポート2
7c、各油圧アクチュエータにそれぞれ接続される出力
ポート27d等の複数のポートが形成されると共に、第
一、第二センタバイパス油路A、B、第一、第二パラレ
ル油路C、D、タンク油路E等の油路が形成されてい
る。ここで、前記油路A〜Eについて簡単に説明する
と、第一センタバイパス油路Aは、第一ポンプポート2
7aから、左走行用制御バルブ20、旋回用制御バルブ
16、アーム用第一制御バルブ17、旋回優先用バルブ
19、およびブーム用第二制御バルブ23にそれぞれ形
成されるセンタバイパス用弁路を通って、タンクポート
27cに至る油路である。第一パラレル油路Cは、第一
ポンプポート27aから合流用バルブ26を経て、旋回
用制御バルブ16、アーム用第一制御バルブ17、旋回
優先用バルブ19、ブーム用第二制御バルブ23にそれ
ぞれ至る油路である。また第二センタバイパス油路B
は、第二ポンプポート27bから合流用バルブ26を経
て、右走行用制御バルブ21、ブーム用第一制御バルブ
22、作業アタッチメント用制御バルブ24、バケット
用制御バルブ25、アーム用第二制御バルブ18にそれ
ぞれ形成されるセンタバイパス用弁路を通って、タンク
ポート27cに至る油路である。第二パラレル油路D
は、第二ポンプポート27bから、ブーム用第一制御バ
ルブ22、作業アタッチメント用制御バルブ24、バケ
ット用制御バルブ25、アーム用第二制御バルブ18に
それぞれ至る油路である。さらにタンク油路Eは、制御
バルブ16、17、18、20、21、22、24、2
5等からタンクポート27cに至る油路である。尚、前
記各バルブ16〜25に形成されるセンタバイパス用弁
路は、対応する油圧アクチュエータ用の操作具が操作さ
れていないとき(中立位置に位置しているとき)に開度
量が最も大きく、操作具操作量が大きくなるにつれて開
度量が小さくなるように構成されている。
The control valve unit 27 includes:
First pump port 2 connected to first main pump 12
7a, a second pump port 27b connected to the second main pump 13, a tank port 2 connected to the oil tank 15
7c, a plurality of ports such as an output port 27d respectively connected to each hydraulic actuator are formed, and the first and second center bypass oil passages A and B, the first and second parallel oil passages C and D, and the tank are formed. An oil passage such as an oil passage E is formed. Here, the oil passages A to E will be briefly described. The first center bypass oil passage A is connected to the first pump port 2.
From 7a, it passes through the center bypass valve passages formed in the left traveling control valve 20, the turning control valve 16, the first arm control valve 17, the turning priority valve 19, and the boom second control valve 23, respectively. Thus, the oil passage reaches the tank port 27c. The first parallel oil passage C passes from the first pump port 27a to the turning control valve 16, the arm first control valve 17, the turning priority valve 19, and the boom second control valve 23 via the merging valve 26, respectively. It is an oilway that leads to. Second center bypass oil passage B
Is connected from the second pump port 27b to the control valve 21 for the right running, the first control valve 22 for the boom, the control valve 24 for the work attachment, the control valve 25 for the bucket, the second control valve 18 for the arm via the merging valve 26. These are oil passages that reach the tank port 27c through the center bypass valve passages formed respectively. Second parallel oil passage D
Is an oil passage extending from the second pump port 27b to the first control valve 22 for the boom, the control valve 24 for the work attachment, the control valve 25 for the bucket, and the second control valve 18 for the arm. Further, the tank oil passage E is provided with control valves 16, 17, 18, 20, 21, 22, 24, 2
It is an oil passage from 5th etc. to the tank port 27c. The center bypass valve paths formed in the valves 16 to 25 have the largest opening amounts when the corresponding hydraulic actuator operating tool is not operated (when they are located at the neutral position). The degree of opening is configured to decrease as the operation amount of the operating tool increases.

【0008】一方、前記旋回用制御バルブ16は、左旋
回用、右旋回用パイロットポート16a、16b、およ
び第一〜第六ポート16c〜16hを備えた三位置切換
えスプール弁であって、その第一ポート16cは前記第
一センタバイパス油路Aの流入側に、第二ポート16d
は第一チェック弁28を介して第一パラレル油路Cに、
第三ポート16eはタンク油路Eに、第四ポート16f
は第一センタバイパス油路Aの流出側に、第五ポート1
6gは出力ポート27dを介して旋回用モータ8の左旋
回側ポート8aに、第六ポート16hは出力ポート27
dを介して旋回用モータ8の右旋回側ポート8bにそれ
ぞれ接続されている。そして旋回用制御バルブ16は、
両パイロットポート16a、16bにパイロット圧が入
力されていない状態では、第一ポート16cから第四ポ
ート16fに至るセンタバイパス用弁路を開き、かつ第
二、第三、第五、第六ポート16d、16e、16g、
16hを閉じる中立位置Nに位置していて、第一センタ
バイパス油路Aの圧油を下流側に流す一方、旋回用モー
タ8に対する圧油供給排出を行わないようになってい
る。一方、左旋回用パイロットポート16aにパイロッ
ト圧が入力されると、旋回用制御バルブ16は、第二ポ
ート16dから第五ポート16gに至る供給用弁路、お
よび第六ポート16hから第三ポート16eに至る排出
用弁路をそれぞれ開く左旋回側位置Xに切換わる。これ
により、第一メインポンプ12から第一パラレル油路C
に入力された圧油が旋回用モータ8の左旋回側ポート8
aに供給される一方、右旋回側ポート8bからの排出油
がタンク油路Eを経て油タンク15に流れるようになっ
ている。また、右旋回用パイロットポート16bにパイ
ロット圧が入力されると、旋回用制御バルブ16は、第
二ポート16dから第六ポート16hに至る供給用弁
路、および第五ポート16gから第三ポート16eに至
る排出用弁路をそれぞれ開く右旋回側位置Yに切換わ
る。これにより第一メインポンプ12から第一パラレル
油路Cに入力された圧油が旋回用モータ8の右旋回側ポ
ート8bに供給される一方、左旋回側ポート8aからの
排出油がタンク油路Eを経て油タンク15に流れるよう
になっている。この場合、旋回用制御バルブ16は、入
力されるパイロット圧が高圧になるほどスプールの移動
ストロークが大きくなって、センタバイパス用弁路の開
度量が小さくなる一方、供給用弁路および排出用弁路の
開度量が大きくなるように構成されている。
On the other hand, the turning control valve 16 is a three-position switching spool valve having left turning and right turning pilot ports 16a and 16b, and first to sixth ports 16c to 16h. The first port 16c is connected to the second port 16d on the inflow side of the first center bypass oil passage A.
To the first parallel oil passage C via the first check valve 28,
The third port 16e is connected to the tank oil passage E and the fourth port 16f
Is the fifth port 1 on the outflow side of the first center bypass oil passage A.
6g is connected to the left turning port 8a of the turning motor 8 via the output port 27d, and the sixth port 16h is connected to the output port 27.
d are connected to the right turning port 8b of the turning motor 8 respectively. And the turning control valve 16 is
When the pilot pressure is not input to both pilot ports 16a and 16b, the center bypass valve path from the first port 16c to the fourth port 16f is opened, and the second, third, fifth, and sixth ports 16d are opened. , 16e, 16g,
It is located at a neutral position N that closes 16h, so that the pressure oil in the first center bypass oil passage A flows to the downstream side, and the supply and discharge of the pressure oil to the turning motor 8 is not performed. On the other hand, when the pilot pressure is input to the left turning pilot port 16a, the turning control valve 16 turns on the supply valve path from the second port 16d to the fifth port 16g and the sixth port 16h to the third port 16e. Is switched to the left turning side position X in which the discharge valve paths leading to are opened. As a result, the first parallel pump C
The hydraulic oil input to the left turning port 8 of the turning motor 8
a, while the oil discharged from the right turning port 8b flows to the oil tank 15 via the tank oil passage E. When the pilot pressure is input to the right turning pilot port 16b, the turning control valve 16 is connected to the supply valve path from the second port 16d to the sixth port 16h and from the fifth port 16g to the third port 16g. The position is switched to the right turning side position Y in which the discharge valve paths to 16e are opened. Thus, the pressure oil input from the first main pump 12 to the first parallel oil passage C is supplied to the right turning port 8b of the turning motor 8, while the oil discharged from the left turning port 8a is supplied to the tank oil. The oil flows into the oil tank 15 via the path E. In this case, the turning control valve 16 increases the movement stroke of the spool as the input pilot pressure becomes higher, so that the opening amount of the center bypass valve passage decreases, while the supply valve passage and the discharge valve passage Is configured to have a large opening amount.

【0009】さらに、アーム用第一制御バルブ17は、
前記旋回用制御バルブ16に対し、第一センタバイパス
油路Aおよび第一パラレル油路Cの下流側に配されてい
るが、該アーム用第一制御バルブ17は、伸長用、縮小
用のパイロットポート17a、17b、および第一〜第
六ポート17c〜17hを備えた三位置切換えスプール
弁であって、その第一ポート17cは第一センタバイパ
ス油路Aの流入側に、第二ポート17dは後述の合流油
路Fに、第三ポート17eはタンク油路Eに、第四ポー
ト17fは第一センタバイパス油路Aの流出側に、第五
ポート17gは出力ポート27dを介してアーム用シリ
ンダ10の伸長側ポート10aに、第六ポート17hは
出力ポート27dを介してアーム用シリンダ10の縮小
側ポート10bにそれぞれ接続されている。そしてアー
ム用第一制御バルブ17は、両パイロットポート17
a、17bにパイロット圧が入力されていない状態で
は、第一ポート17cから第四ポート17fに至るセン
タバイパス用弁路を開き、かつ第二、第三、第五、第六
ポート17d、17e、17g、17hを閉じる中立位
置Nに位置していて、第一センタバイパス油路Aの圧油
を下流側に流す一方、アーム用シリンダ10に対する圧
油供給排出を行わないようになっている。一方、伸長用
パイロットポート17aにパイロット圧が入力される
と、アーム用第一制御バルブ17は、第二ポート17d
から第五ポート17gに至る供給用弁路、および第六ポ
ート17hから第三ポート17eに至る排出用弁路をそ
れぞれ開く伸長側位置Xに切換わる。これにより、合流
油路Fの圧油がアーム用シリンダ10の伸長側ポート1
0aに供給される一方、縮小側ポート10bからの排出
油がタンク油路Eを経て油タンク15に流れるようにな
っている。また、縮小用パイロットポート17bにパイ
ロット圧が入力されると、アーム用第一制御バルブ17
は、第二ポート17dから第六ポート17hに至る供給
用弁路、および第五ポート17gから第三ポート17e
に至る排出用弁路をそれぞれ開く縮小側位置Yに切換わ
る。これにより合流油路Fの圧油がアームシリンダ10
の縮小側ポート10bに供給される一方、伸長側ポート
10aからの排出油がタンク油路Eを経て油タンク15
に流れるようになっている。この場合、アーム用第一制
御バルブ17は、入力されるパイロット圧が高圧になる
ほど、スプール17iの移動ストロークが大きくなっ
て、センタバイパス用弁路の開度量が小さくなる一方、
供給用弁路および排出用弁路の開度量が大きくなるよう
に構成されている。尚、上記アーム用第一制御弁17に
は、図4〜図5に図示した自重降下防止用バルブ41や
アーム用再生バルブ(図示せず)が接続されているが、
これらバルブについての説明は省略する。
Further, the first arm control valve 17 is
The first control valve 17 for the arm is disposed downstream of the first center bypass oil passage A and the first parallel oil passage C with respect to the turning control valve 16. A three-position switching spool valve having ports 17a, 17b and first to sixth ports 17c to 17h, the first port 17c being on the inflow side of the first center bypass oil passage A, and the second port 17d being A third port 17e is connected to a tank oil passage E, a fourth port 17f is connected to an outlet side of the first center bypass oil passage A, and a fifth port 17g is connected to an arm cylinder via an output port 27d. The ten extension-side ports 10a and the sixth port 17h are connected to the reduction-side ports 10b of the arm cylinder 10 via output ports 27d, respectively. The first control valve 17 for the arm is connected to both pilot ports 17.
In the state where the pilot pressure is not input to a and 17b, the center bypass valve path from the first port 17c to the fourth port 17f is opened, and the second, third, fifth and sixth ports 17d, 17e, It is located at a neutral position N that closes 17 g and 17 h, so that the pressure oil in the first center bypass oil passage A flows to the downstream side, and the supply and discharge of the pressure oil to the arm cylinder 10 is not performed. On the other hand, when the pilot pressure is input to the extension pilot port 17a, the first arm control valve 17 sets the second port 17d.
Is switched to the extension side position X in which the supply valve path from the first port to the fifth port 17g and the discharge valve path from the sixth port 17h to the third port 17e are opened. As a result, the pressure oil in the merged oil passage F flows to the extension side port 1 of the arm cylinder 10.
0a, the oil discharged from the reduction port 10b flows through the tank oil passage E to the oil tank 15. Further, when the pilot pressure is input to the contraction pilot port 17b, the first arm control valve 17
Is a supply valve from the second port 17d to the sixth port 17h, and a fifth valve 17g to the third port 17e.
Is switched to the reduction side position Y in which the discharge valve paths leading to are respectively opened. As a result, the pressure oil in the joining oil passage F
The oil discharged from the expansion port 10a is supplied to the oil tank 15 through the tank oil passage E.
It is flowing to. In this case, the first control valve 17 for the arm increases the movement stroke of the spool 17i and increases the opening amount of the center bypass valve passage as the input pilot pressure becomes higher.
The supply valve path and the discharge valve path are configured to have large opening amounts. The first control valve 17 for the arm is connected to the self-weight drop prevention valve 41 and the arm regeneration valve (not shown) shown in FIGS.
The description of these valves is omitted.

【0010】ここで、前記合流油路Fへの圧油供給は、
第一センタバイパス油路Aに第二チェック弁29を介し
て接続される第一供給油路F1、第一パラレル油路Cに
絞り30を備えた第三チェック弁31を介して接続され
る第二供給油路F2、旋回優先用バルブ19に接続され
る第三供給油路F3を経由してなされるようになってい
る。
Here, the supply of pressure oil to the junction oil passage F is as follows:
A first supply oil passage F1 connected to the first center bypass oil passage A via a second check valve 29, and a first supply oil passage F1 connected to the first parallel oil passage C via a third check valve 31 provided with a throttle 30. The second supply oil passage F2 and the third supply oil passage F3 connected to the turning priority valve 19 are provided.

【0011】また、旋回優先用バルブ19は、前記アー
ム用第一制御バルブ17に対し、第一センタバイパス油
路Aおよび第一パラレル油路Cの下流側に配されている
が、該旋回優先用バルブ19は、旋回用、アタッチメン
ト用のパイロットポート19a、19b、および第一〜
第四ポート19c〜19fを備えた三位置切換えスプー
ル弁であって、その第一ポート19cは第四チェック弁
32を介して第一パラレル油路Cに、第二ポート19d
は第一センタバイパス油路Aの流入側に、第三ポート1
9eは前記第三供給油路F3に、第四ポート19fは第
一センタバイパス油路Aの流出側にそれぞれ接続されて
いる。そして旋回優先用バルブ19は、両パイロットポ
ート19a、19bにパイロット圧が入力されていない
状態では、第二ポート19dから第四ポート19fに至
るセンタバイパス用弁路を開き、かつ第一ポート19c
から第三ポート19eに至る供給用弁路を開く中立位置
Nに位置していて、第一センタバイパス油路Aの圧油を
下流側に流すと共に、第一メインポンプ12から第一パ
ラレル油路Cに入力された圧油を第三供給油路F3に供
給するようになっている。一方、旋回用パイロットポー
ト19aにパイロット圧が入力されると、旋回優先用バ
ルブ19は、第二ポート19dから第四ポート19fに
至るセンタバイパス用弁路を開き、かつ第一ポート19
cから第三ポート19eに至る供給用弁路を閉じる旋回
優先位置Xに切換わり、これにより第一パラレル油路C
から第三供給油路F3への圧油供給が制限されるように
なっている。この場合、旋回優先用バルブ19は、旋回
用パイロットポート19aに入力されるパイロット圧が
高圧になるほど、スプール19gの移動ストロークが大
きくなって、第一ポート19cから第三ポート19eに
至る供給用弁路の開度量が小さくなり、第三供給油路F
3への圧油供給量が減少するように構成されている。ま
た、アタッチメント用パイロットポート19bにパイロ
ット圧が入力されると、旋回優先用バルブ19は、第二
ポート19dから第四ポート19fに至るセンタバイパ
ス用弁路を閉じ、かつ第一ポート19cから第三ポート
19eに至る供給用弁路を開くアタッチメント位置Yに
切換わる。これにより、第一パラレル油路Cの圧油が第
三供給油路F3に供給されると共に、第一センタバイパ
ス油路Aがアーム用第一制御弁17の下流側で閉鎖され
るようになっている。そして、該第一センタバイパス油
路Aが閉鎖されることにより、第一メインポンプ12の
圧油を外部配管33を経由して作業アタッチメント用制
御バルブ24に供給できるようになっている。
The turning priority valve 19 is disposed downstream of the first center bypass oil passage A and the first parallel oil passage C with respect to the first control valve 17 for the arm. Valves 19 for turning, attachment pilot ports 19a and 19b,
A three-position switching spool valve having fourth ports 19c to 19f, the first port 19c of which is connected to a first parallel oil passage C via a fourth check valve 32 and a second port 19d.
Is the third port 1 on the inflow side of the first center bypass oil passage A.
9e is connected to the third supply oil passage F3, and the fourth port 19f is connected to the outflow side of the first center bypass oil passage A. When no pilot pressure is input to both pilot ports 19a and 19b, the turning priority valve 19 opens a center bypass valve passage from the second port 19d to the fourth port 19f, and opens the first port 19c.
Is located at a neutral position N that opens a supply valve passage extending from the first main pump 12 to the third port 19e. The pressure oil input to C is supplied to the third supply oil passage F3. On the other hand, when the pilot pressure is input to the turning pilot port 19a, the turning priority valve 19 opens the center bypass valve passage from the second port 19d to the fourth port 19f, and
is switched to the swirling priority position X, which closes the supply valve passage extending from the first parallel oil passage C to the third port 19e.
The supply of pressurized oil to the third supply oil passage F3 is restricted. In this case, the turning priority valve 19 is such that the higher the pilot pressure input to the turning pilot port 19a is, the larger the moving stroke of the spool 19g is, and the supply valve extending from the first port 19c to the third port 19e. The opening degree of the passage becomes small, and the third supply oil passage F
3 is configured such that the supply amount of pressurized oil to the fuel cell 3 is reduced. Further, when pilot pressure is input to the attachment pilot port 19b, the turning priority valve 19 closes the center bypass valve passage from the second port 19d to the fourth port 19f, and closes the third bypass valve from the first port 19c to the third port 19c. The position is switched to the attachment position Y for opening the supply valve to the port 19e. Thereby, the pressure oil in the first parallel oil passage C is supplied to the third supply oil passage F3, and the first center bypass oil passage A is closed on the downstream side of the first control valve 17 for the arm. ing. By closing the first center bypass oil passage A, the pressure oil of the first main pump 12 can be supplied to the work attachment control valve 24 via the external pipe 33.

【0012】ここで、前記アタッチメント用パイロット
ポート19bには、アタッチメント用操作具(図示せ
ず)の操作に基づいて出力されるパイロット圧が入力さ
れる。つまり、アタッチメント用操作具が操作されると
アタッチメント用パイロットバルブ(図示せず)からパ
イロット圧が出力されるが、該パイロット圧は、作業ア
タッチメント用制御バルブ24に供給されると共に、旋
回優先用バルブ19のアタッチメント用パイロットポー
ト19bに入力されて該旋回優先用バルブ19をアタッ
チメント位置Yに切換える。これにより、前述したよう
に第一メインポンプ12の圧油が外部配管33を経由し
て作業アタッチメント用制御バルブ24に供給され、而
して、第一、第二の両メインポンプ12、13の圧油を
合流して作業アタッチメント(図示せず)に供給できる
ようになっている。
Here, a pilot pressure output based on the operation of an attachment operating tool (not shown) is input to the attachment pilot port 19b. That is, when the attachment operating tool is operated, a pilot pressure is output from an attachment pilot valve (not shown). The pilot pressure is supplied to the work attachment control valve 24 and the turning priority valve is provided. The rotation priority valve 19 is switched to the attachment position Y by being inputted to the attachment pilot port 19b of the attachment 19. As a result, as described above, the pressure oil of the first main pump 12 is supplied to the work attachment control valve 24 via the external pipe 33, and thus the first and second main pumps 12 and 13 Pressure oil can be combined and supplied to a work attachment (not shown).

【0013】一方、アーム用第二制御バルブ18は、伸
長側、縮小側のパイロットポート18a、18b、およ
び第一〜第六ポート18c〜18hを備えた三位置切換
えスプール弁であって、その第一ポート18cは第二セ
ンタバイパス油路Bの流入側に、第二ポート18dは第
五チェック弁35を介して第二センタバイパス油路Bに
接続されると共に、絞り36および第六チェック弁37
を介して第二パラレル油路Dに、第三ポート18eはタ
ンク油路Eに、第四ポート18fは第二センタバイパス
油路Bの流出側に、第五ポート17gは前記アーム用第
一制御バルブ16とアーム用シリンダ10の縮小側ポー
ト10bとを連結する油路に、第六ポート18hはアー
ム用第一制御バルブ16とアーム用シリンダ10の伸長
側ポート10aとを連結する油路にそれぞれ接続されて
いる。そしてアーム用第二制御バルブ18は、両パイロ
ットポート18a、18bにパイロット圧が入力されて
いない状態では、第一ポート18cから第四ポート18
fに至るセンタバイパス用弁路を開き、かつ第二、第
三、第五、第六ポート18d、18e、18g、18h
を閉じる中立位置Nに位置していて、第二センタバイパ
ス油路Bの圧油を下流側に流す一方、アーム用シリンダ
10に対する圧油供給排出を行わないようになってい
る。一方、伸長用パイロットポート18aにパイロット
圧が入力されると、アーム用第一制御バルブ18は、第
二ポート18dから第六ポート18hに至る供給用弁路
を開く伸長側位置Xに切換わる。これにより、第二セン
タバイパス油路Bおよび第二パラレル油路Dの圧油が、
アーム用シリンダ10の伸長側ポート10aに供給され
るようになっている。また、縮小用パイロットポート1
8bにパイロット圧が入力されると、アーム用第二制御
バルブ18は、第二ポート18dから第五ポート18g
に至る供給用弁路、および第六ポート18hから第三ポ
ート18eに至る排出用弁路をそれぞれ開く縮小側位置
Yに切換わる。これにより、第二センタバイパス油路B
および第二パラレル油路Dの圧油がアームシリンダ10
の縮小側ポート10bに供給される一方、伸長側ポート
10aからの排出油がタンク油路Eを経て油タンク15
に流れるようになっている。
On the other hand, the arm second control valve 18 is a three-position switching spool valve having pilot ports 18a and 18b on the extension side and contraction side, and first to sixth ports 18c to 18h. One port 18c is connected to the inflow side of the second center bypass oil passage B, the second port 18d is connected to the second center bypass oil passage B via the fifth check valve 35, and the throttle 36 and the sixth check valve 37
To the second parallel oil passage D, the third port 18e to the tank oil passage E, the fourth port 18f to the outflow side of the second center bypass oil passage B, and the fifth port 17g to the first control for the arm. The sixth port 18h is connected to the oil path connecting the valve 16 and the reduction port 10b of the arm cylinder 10, and the sixth port 18h is connected to the oil path connecting the extension port 10a of the arm cylinder 10 to the first port. It is connected. When the pilot pressure is not input to both pilot ports 18a and 18b, the second control valve 18 for the arm moves from the first port 18c to the fourth port 18c.
f, opening the valve path for the center bypass to f, and the second, third, fifth, and sixth ports 18d, 18e, 18g, and 18h.
Is located at the neutral position N, and the pressure oil in the second center bypass oil passage B is caused to flow downstream, while the supply and discharge of the pressure oil to the arm cylinder 10 are not performed. On the other hand, when the pilot pressure is input to the extension pilot port 18a, the first arm control valve 18 switches to the extension side position X that opens the supply valve passage from the second port 18d to the sixth port 18h. Thereby, the pressure oil in the second center bypass oil passage B and the second parallel oil passage D
The power is supplied to the extension side port 10 a of the arm cylinder 10. Also, pilot port 1 for reduction
When the pilot pressure is input to the second port 8b, the second control valve 18 for the arm moves from the second port 18d to the fifth port 18g.
And the discharge valve path from the sixth port 18h to the third port 18e is switched to the reduction side position Y. Thereby, the second center bypass oil passage B
And the pressure oil in the second parallel oil passage D
The oil discharged from the expansion port 10a is supplied to the oil tank 15 through the tank oil passage E.
It is flowing to.

【0014】さらに、図3において、38は旋回用パイ
ロットバルブであって、このものは、左旋回側パイロッ
トバルブ38Xと右旋回側パイロットバルブ38Yとか
ら構成されている。そして、旋回用操作レバー(図示せ
ず)を左旋回側または右旋回側に操作することに基づ
き、対応するパイロットバルブ38Xまたは38Yから
パイロット圧が出力されるが、左旋回側パイロットバル
ブ38Xから出力されたパイロット圧は、前記旋回用制
御バルブ16の左旋回用パイロットポート16aに入力
され、また右旋回側パイロットバルブ38Yから出力さ
れたパイロット圧は、旋回用制御バルブ16の右旋回用
パイロットポート16bに入力される。さらに、上記左
旋回用パイロットバルブ38Xおよび右旋回用パイロッ
トバルブ38Yから出力されたパイロット圧は、シャト
ル弁39を介して、前記旋回優先用バルブ19の旋回用
パイロットポート19aに入力される。
Further, in FIG. 3, reference numeral 38 denotes a turning pilot valve, which comprises a left turning pilot valve 38X and a right turning pilot valve 38Y. The pilot pressure is output from the corresponding pilot valve 38X or 38Y based on the operation of the turning operation lever (not shown) to the left turning side or the right turning side. The output pilot pressure is input to the left turning pilot port 16a of the turning control valve 16, and the pilot pressure output from the right turning side pilot valve 38Y is the right turning pilot valve 38Y of the turning control valve 16. It is input to pilot port 16b. Further, the pilot pressure output from the left turning pilot valve 38X and the right turning pilot valve 38Y is input to the turning pilot port 19a of the turning priority valve 19 via the shuttle valve 39.

【0015】また、40はアーム用パイロットバルブで
あって、このものは、伸長側パイロットバルブ40Xと
縮小側パイロットバルブ40Yとから構成されている。
そして、アーム用操作レバー(図示せず)を伸長側(ア
ーム・イン側)または縮小側(アーム・アウト側)に操
作することに基づき、対応するパイロットバルブ40X
または40Yからパイロット圧が出力されるが、伸長側
パイロットバルブ40Xから出力されたパイロット圧
は、前記アーム用第一制御バルブ17およびアーム用第
二制御バルブ18の各伸長側パイロットポート17a、
18aに入力され、また縮小側パイロットバルブ40Y
から出力されたパイロット圧は、アーム用第一制御バル
ブ17およびアーム用第二制御バルブ18の各縮小側パ
イロットポート17b、18bに入力される。ここで、
前記旋回用、アーム用のパイロットバルブ38X、38
Y、40X、40Yから出力されるパイロット圧は、対
応する操作レバーの操作量が大きくなるにつれて高圧に
なるように設定されている。
Reference numeral 40 denotes an arm pilot valve, which comprises an extension-side pilot valve 40X and a reduction-side pilot valve 40Y.
By operating an arm operation lever (not shown) to the extension side (arm-in side) or the contraction side (arm-out side), the corresponding pilot valve 40X
Or, the pilot pressure is output from 40Y, but the pilot pressure output from the extension-side pilot valve 40X is equal to each extension-side pilot port 17a of the first arm control valve 17 and the second arm control valve 18,
18a, and the reduction-side pilot valve 40Y
The pilot pressure output from is input to the reduction-side pilot ports 17b and 18b of the first arm control valve 17 and the second arm control valve 18, respectively. here,
Pilot valves 38X, 38 for turning and arm
The pilot pressure output from Y, 40X, and 40Y is set to increase as the operation amount of the corresponding operation lever increases.

【0016】次に、旋回用操作レバーとアーム用操作レ
バーを同時に操作した場合の旋回用モータ8、アーム用
シリンダ10に対する圧油供給制御について説明する。
この場合、走行用操作具は操作されていないものとす
る。まず、旋回用操作レバーの操作に基づき旋回用パイ
ロットバルブ38から出力されたパイロット圧により、
旋回用制御バルブ16が左旋回側位置Xまたは右旋回側
位置Yに切換わると共に、旋回優先用バルブ19が旋回
優先位置Xに切換わる。また、アーム用操作レバーの操
作に基づきアーム用パイロットバルブ40から出力され
たパイロット圧により、アーム用第一制御バルブ17お
よびアーム用第二制御バルブ18が伸長側位置Xまたは
縮小側位置Yに切換わる。このとき、第一センタバイパ
ス油路Aは、上記左旋回側位置Xまたは右旋回側位置Y
の旋回用制御バルブ16により略閉鎖された状態にな
り、而して、第一メインポンプ12から第一ポンプポー
ト27aに入力された圧油は、略全量が第一パラレル油
路Cに供給される。そして、該第一パラレル油路Cの圧
油が、旋回用制御バルブ16およびアーム用第一制御バ
ルブ17に供給されることになるが、この場合、アーム
用第一制御バルブ17には、絞り30が設けられた第二
供給油路F2からの圧油と、旋回優先位置Xの旋回優先
用バルブ19を経由する第三供給油路F3からの圧油と
が供給される。ここで、前記旋回優先位置Xの旋回優先
用バルブ19は、前述したように、旋回用パイロットポ
ート19aに入力されるパイロット圧が高圧になるほ
ど、つまり、旋回用操作レバーの操作量が大きくなるほ
ど開度量が小さくなって、第三供給油路F3への圧油供
給量が減少する。而して、旋回用操作レバーの操作量が
大きくなるほど、第三供給油路F3からアーム用第一制
御バルブ17への圧油供給量が少なくなると共に、第二
供給油路F2には絞り30が設けられているため、前記
第一メインポンプ12から第一パラレル油路Cに入力さ
れた圧油は、旋回用制御バルブ16に優先的に供給され
る。しかも、旋回用制御バルブ16の下流側に配された
絞り30により高い圧力が発生するため、旋回用モータ
8には高負荷に対応できる高圧の圧油が十分に供給され
ることになって、例えば溝掘削を行うような場合に、壁
面への押付け力を確実に確保することができるようにな
っている。一方、第二センタバイパス油路B、第二パラ
レル油路Dには、第二メインポンプ13からの圧油が供
給されるが、該第二センタバイパス油路B、第二パラレ
ル油路Dの圧油は、伸長側位置Xまたは縮小側位置Yの
アーム用第二制御バルブ18を経由して、アーム用シリ
ンダ10に供給される。而して、前述したように第一メ
インポンプ12の圧油が旋回用制御バルブ16に優先的
に供給されても、アーム用シリンダ10には第二メイン
ポンプ13の圧油が供給されることになって、アーム用
シリンダ10に対する圧油供給が不足してしまうような
不具合はない。そしてこのとき、アーム6と同時にブー
ム5やバケット7が操作されている場合には、第二メイ
ンポンプ13の圧油は、アーム用シリンダ10、ブーム
用シリンダ9、バケット用シリンダ11に分配されるこ
とになる。
Next, a description will be given of hydraulic oil supply control to the turning motor 8 and the arm cylinder 10 when the turning operation lever and the arm operation lever are simultaneously operated.
In this case, it is assumed that the traveling operation tool is not operated. First, the pilot pressure output from the turning pilot valve 38 based on the operation of the turning operation lever,
The turning control valve 16 is switched to the left turning side position X or the right turning side position Y, and the turning priority valve 19 is switched to the turning priority position X. The first arm control valve 17 and the second arm control valve 18 are switched to the extension side position X or the contraction side position Y by the pilot pressure output from the arm pilot valve 40 based on the operation of the arm operation lever. Be replaced. At this time, the first center bypass oil passage A is located at the left turning side position X or the right turning side position Y.
Of the hydraulic oil input from the first main pump 12 to the first pump port 27a is supplied to the first parallel oil passage C substantially in its entirety. You. Then, the pressure oil in the first parallel oil passage C is supplied to the turning control valve 16 and the first arm control valve 17. Pressure oil from the second supply oil passage F2 provided with 30 and pressure oil from the third supply oil passage F3 via the turn priority valve 19 at the turn priority position X are supplied. As described above, the turning priority valve 19 at the turning priority position X opens as the pilot pressure input to the turning pilot port 19a increases, that is, as the operation amount of the turning operation lever increases. The amount of pressure decreases, and the amount of pressurized oil supplied to the third supply oil passage F3 decreases. Thus, as the operation amount of the turning operation lever increases, the amount of pressurized oil supplied from the third supply oil passage F3 to the first control valve 17 for the arm decreases, and the throttle 30 is provided in the second supply oil passage F2. Is provided, the pressure oil input from the first main pump 12 to the first parallel oil passage C is preferentially supplied to the turning control valve 16. Moreover, since a high pressure is generated by the throttle 30 disposed downstream of the turning control valve 16, high pressure oil that can cope with a high load is sufficiently supplied to the turning motor 8. For example, when performing trench excavation, a pressing force against a wall surface can be reliably ensured. On the other hand, pressure oil from the second main pump 13 is supplied to the second center bypass oil passage B and the second parallel oil passage D. The pressure oil is supplied to the arm cylinder 10 via the arm second control valve 18 at the extension side position X or the reduction side position Y. As described above, even if the pressure oil of the first main pump 12 is preferentially supplied to the turning control valve 16, the pressure oil of the second main pump 13 is supplied to the arm cylinder 10. Thus, there is no problem that the supply of pressure oil to the arm cylinder 10 becomes insufficient. At this time, when the boom 5 and the bucket 7 are operated simultaneously with the arm 6, the pressure oil of the second main pump 13 is distributed to the arm cylinder 10, the boom cylinder 9, and the bucket cylinder 11. Will be.

【0017】これに対し、旋回用操作レバーの操作がな
されない状態でアーム用操作レバーが操作された場合、
旋回優先用バルブ19へのパイロット圧の供給はなく、
該旋回優先用バルブ19は中立位置Nに位置している。
この状態では、アーム用第一制御バルブ17には、第一
メインポンプ12から第一センタバイパス油路Aに入力
された圧油が、左走行用制御バルブ20および旋回用制
御バルブ16のセンタバイパス用弁路、第一供給油路F
1を経由して供給されると共に、第一メインポンプ12
から第一パラレル油路Cに入力された圧油が、第二供給
油路F2、さらに中立位置Nの旋回優先用バルブ19、
第三供給油路F3を経由して供給される。また、アーム
用第二制御バルブ18には、第二メインポンプ13から
の圧油が、第二センタバイパス油路B、第二パラレル油
路Dを経由して供給される。而してアーム用シリンダ1
0には、第一メインポンプ12からアーム用第一制御バ
ルブ16に供給された圧油と、第二メインポンプ13か
らアーム用第二制御バルブ18に供給された圧油とが合
流してされることになって、アーム6の伸縮作動を効率
良く行うことができる。
On the other hand, when the arm operating lever is operated without operating the turning operation lever,
There is no supply of pilot pressure to the turning priority valve 19,
The turning priority valve 19 is located at the neutral position N.
In this state, the pressure oil input to the first center bypass oil passage A from the first main pump 12 is supplied to the first control valve 17 for the arm by the center bypass of the left traveling control valve 20 and the turning control valve 16. Valve path, first supply oil path F
1 and the first main pump 12
From the first parallel oil passage C to the second supply oil passage F2, and further, the turning priority valve 19 at the neutral position N,
It is supplied via the third supply oil passage F3. The pressure oil from the second main pump 13 is supplied to the second arm control valve 18 via the second center bypass oil passage B and the second parallel oil passage D. Thus, arm cylinder 1
At 0, the pressure oil supplied from the first main pump 12 to the first arm control valve 16 and the pressure oil supplied from the second main pump 13 to the second arm control valve 18 are merged. As a result, the expansion and contraction operation of the arm 6 can be performed efficiently.

【0018】叙述の如く構成されたものにおいて、バケ
ット7を旋回力で壁面に押付けながら溝掘削作業を行う
ような場合には、旋回用操作レバーとアーム用操作レバ
ーとを同時に操作することになるが、この場合、第一メ
インポンプ12の圧油を旋回用モータ8に優先的に供給
するための旋回優先用バルブ19は、旋回用操作レバー
の操作に基づいて旋回用パイロットバルブ38から出力
されるパイロット圧を受けて、該パイロット圧の圧力が
高圧になるほどアーム用第一制御バルブ17に対する圧
油供給量を減少させるように作動することになる。この
結果、旋回用操作レバーの操作量に対応した適切な旋回
力が得られることになって、作業性、操作性の向上が計
れるが、このものにおいて、前記旋回優先用バルブ19
は、旋回用パイロットバルブ38から出力されるパイロ
ット圧を受けてアーム用シリンダ10に対する圧油供給
量を制御するべく作動するスプール弁であるから、旋回
優先用バルブ19の他に減圧弁や電磁弁を必要とするこ
とがなく、部品点数の削減化に寄与できると共に、コン
トロールバルブユニット27に容易に組込むことがで
き、回路も簡略化されるという利点がある。
When the trench 7 is excavated while the bucket 7 is pressed against the wall surface by the turning force in the above-described structure, the turning operation lever and the arm operation lever are simultaneously operated. However, in this case, the turning priority valve 19 for supplying the pressure oil of the first main pump 12 to the turning motor 8 preferentially is output from the turning pilot valve 38 based on the operation of the turning operation lever. In response to the pilot pressure, the higher the pilot pressure, the lower the supply amount of hydraulic oil to the first arm control valve 17. As a result, an appropriate turning force corresponding to the operation amount of the turning operation lever can be obtained, thereby improving workability and operability. In this case, the turning priority valve 19 is used.
Is a spool valve that operates to receive the pilot pressure output from the turning pilot valve 38 and control the amount of pressurized oil supplied to the arm cylinder 10. Therefore, in addition to the turning priority valve 19, a pressure reducing valve or an electromagnetic valve is used. This can contribute to the reduction in the number of parts without requiring the components, and can be easily incorporated into the control valve unit 27, and the circuit is simplified.

【0019】そのうえ、本実施の形態において、前記旋
回優先用バルブ19は、アタッチメント用操作具の操作
に基づいてアタッチメント用パイロットポート19bに
パイロット圧が入力された場合にはアタッチメント位置
Yに切換わって、第一メインポンプ12の圧油を必要に
応じて作業アタッチメントに供給するためのバルブとし
て機能するように構成されているから、一つのバルブで
二つの機能を有することになり、部品の兼用化が計れ
て、省スペース化やコストダウンの点でも有利である。
尚、本発明は、上記実施の形態に限定されないことは勿
論であって、油圧ショベルの旋回優先用回路だけでな
く、作業用機械に設けられる種々の油圧アクチュエータ
用の優先回路に用いることができる。
In addition, in the present embodiment, the turning priority valve 19 switches to the attachment position Y when a pilot pressure is input to the attachment pilot port 19b based on the operation of the attachment operating tool. Since it is configured to function as a valve for supplying the pressure oil of the first main pump 12 to the work attachment as needed, one valve has two functions, and This is advantageous in terms of space saving and cost reduction.
The present invention is, of course, not limited to the above embodiment, and can be used not only in the turning priority circuit of the hydraulic excavator but also in the priority circuits for various hydraulic actuators provided in the working machine. .

【図面の簡単な説明】[Brief description of the drawings]

【図1】溝掘削作業を行う油圧ショベルの概略図であ
る。
FIG. 1 is a schematic view of a hydraulic excavator performing a trench excavation operation.

【図2】旋回用モータおよびアーム用シリンダの油圧回
路の一半部である。
FIG. 2 shows one half of a hydraulic circuit of a turning motor and an arm cylinder.

【図3】旋回用モータおよびアーム用シリンダの油圧回
路の他半部である。
FIG. 3 shows the other half of the hydraulic circuit of the turning motor and the arm cylinder.

【図4】アーム、旋回が共に操作されていないときのア
ーム用第一制御バルブ、旋回優先用バルブの断面図であ
る。
FIG. 4 is a cross-sectional view of a first control valve for an arm and a turning priority valve when both the arm and the turning are not operated.

【図5】旋回、アームが共に操作されたときのアーム用
第一制御バルブ、旋回優先用バルブの断面図である。
FIG. 5 is a cross-sectional view of the first control valve for the arm and the valve for turning priority when both the turning and the arm are operated.

【図6】アームが単独で操作されたときのアーム用第一
制御バルブ、旋回優先用バルブの断面図である。
FIG. 6 is a cross-sectional view of a first control valve for an arm and a turning priority valve when the arm is operated alone.

【図7】従来例を示す旋回用モータおよびアーム用シリ
ンダの油圧回路である。
FIG. 7 is a hydraulic circuit of a turning motor and an arm cylinder showing a conventional example.

【符号の説明】[Explanation of symbols]

1 油圧ショベル 8 旋回用モータ 10 アーム用シリンダ 12 第一メインポンプ 19 旋回優先用バルブ 38 旋回用パイロットバルブ Reference Signs List 1 hydraulic excavator 8 turning motor 10 arm cylinder 12 first main pump 19 turning priority valve 38 turning pilot valve

───────────────────────────────────────────────────── フロントページの続き (72)発明者 藤山 和人 兵庫県神戸市西区櫨谷町松本234 川崎重 工業株式会社西神戸工場内 (72)発明者 瓜本 義和 兵庫県神戸市西区櫨谷町松本234 川崎重 工業株式会社西神戸工場内 Fターム(参考) 2D003 AA01 AB02 BA01 BA02 CA04 CA08 DA03 DA04 3H089 AA60 AA71 AA72 BB20 CC01 CC08 CC11 DA02 DA06 DB13 DB33 DB47 DB49 DB55 EE17 EE22 GG02 JJ02  ──────────────────────────────────────────────────の Continuing on the front page (72) Inventor Kazuto Fujiyama 234, Matsumoto, Hazeya-cho, Nishi-ku, Kobe-shi, Hyogo Kawasaki Heavy Industries, Ltd. F term in Kawasaki Heavy Industries Nishi-Kobe Plant (reference) 2D003 AA01 AB02 BA01 BA02 CA04 CA08 DA03 DA04 3H089 AA60 AA71 AA72 BB20 CC01 CC08 CC11 DA02 DA06 DB13 DB33 DB47 DB49 DB55 EE17 EE22 GG02 JJ02

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 第一、第二の油圧アクチュエータと、こ
れら両油圧アクチュエータに圧油を供給する油圧ポンプ
とを備えた作業用機械において、油圧ポンプから第二油
圧アクチュエータに至る圧油供給路に優先用バルブを設
け、該優先用バルブにより第二油圧アクチュエータに対
する圧油供給量を制限することで油圧ポンプからの圧油
を第一油圧アクチュエータに優先的に供給することがで
きるよう構成するにあたり、前記優先用バルブは、第一
油圧アクチュエータ用操作具の操作量に対応して出力さ
れるパイロット圧を受けて第二油圧アクチュエータに対
する圧油制限量を制御するべく作動するスプール弁で構
成されていることを特徴とする作業用機械における優先
回路。
1. A working machine comprising first and second hydraulic actuators and a hydraulic pump for supplying hydraulic oil to both hydraulic actuators, wherein a hydraulic oil supply path from the hydraulic pump to the second hydraulic actuator is provided. In providing a priority valve, by limiting the amount of pressure oil supplied to the second hydraulic actuator by the priority valve, it is possible to preferentially supply hydraulic oil from the hydraulic pump to the first hydraulic actuator, The priority valve is configured by a spool valve that receives a pilot pressure output in accordance with the operation amount of the first hydraulic actuator operation tool and operates to control the hydraulic oil restriction amount for the second hydraulic actuator. A priority circuit in a working machine, characterized in that:
【請求項2】 請求項1において、第一油圧アクチュエ
ータは、ショベル系建設機械に設けられる旋回用モータ
であることを特徴とする作業用機械における優先回路。
2. The priority circuit according to claim 1, wherein the first hydraulic actuator is a turning motor provided in the shovel-based construction machine.
JP2000356096A 2000-11-22 2000-11-22 Priority circuit in working machinery Pending JP2002155907A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000356096A JP2002155907A (en) 2000-11-22 2000-11-22 Priority circuit in working machinery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000356096A JP2002155907A (en) 2000-11-22 2000-11-22 Priority circuit in working machinery

Publications (1)

Publication Number Publication Date
JP2002155907A true JP2002155907A (en) 2002-05-31

Family

ID=18828401

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000356096A Pending JP2002155907A (en) 2000-11-22 2000-11-22 Priority circuit in working machinery

Country Status (1)

Country Link
JP (1) JP2002155907A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013146420A1 (en) * 2012-03-29 2013-10-03 カヤバ工業株式会社 Control valve device for power shovel
CN108884666A (en) * 2016-03-22 2018-11-23 住友建机株式会社 Excavator and excavator control valve

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6246802U (en) * 1985-09-12 1987-03-23
JPH05332320A (en) * 1992-06-02 1993-12-14 Hitachi Constr Mach Co Ltd Hydraulic circuit and valve structure for hydraulic working machine
JP2000227104A (en) * 1999-02-04 2000-08-15 Shin Caterpillar Mitsubishi Ltd Supply control method and device for hydraulic fluid

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6246802U (en) * 1985-09-12 1987-03-23
JPH05332320A (en) * 1992-06-02 1993-12-14 Hitachi Constr Mach Co Ltd Hydraulic circuit and valve structure for hydraulic working machine
JP2000227104A (en) * 1999-02-04 2000-08-15 Shin Caterpillar Mitsubishi Ltd Supply control method and device for hydraulic fluid

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013146420A1 (en) * 2012-03-29 2013-10-03 カヤバ工業株式会社 Control valve device for power shovel
CN104204546A (en) * 2012-03-29 2014-12-10 萱场工业株式会社 Control valve device for power shovel
CN104204546B (en) * 2012-03-29 2016-01-20 萱场工业株式会社 The control valve device of power digger
US9702378B2 (en) 2012-03-29 2017-07-11 Kyb Corporation Control valve apparatus of power shovel
CN108884666A (en) * 2016-03-22 2018-11-23 住友建机株式会社 Excavator and excavator control valve
KR20180125492A (en) * 2016-03-22 2018-11-23 스미토모 겐키 가부시키가이샤 Control valves for shovels and showbells
EP3434832A4 (en) * 2016-03-22 2019-07-17 Sumitomo (S.H.I.) Construction Machinery Co., Ltd. Excavator and control valve for excavator
US11060263B2 (en) 2016-03-22 2021-07-13 Sumitomo(S.H.I.) Construction Machinery Co., Ltd. Excavator and control valve for excavator
KR102333767B1 (en) * 2016-03-22 2021-11-30 스미토모 겐키 가부시키가이샤 Control valves for shovels and shovels

Similar Documents

Publication Publication Date Title
KR100225391B1 (en) Hydraulic circuit for hydraulic shovel
JP5564215B2 (en) Hydraulic system for construction machinery
JP5669448B2 (en) Hydraulic drive system for excavator
JP5996778B2 (en) Hydraulic drive unit for construction machinery
JP6200498B2 (en) Hydraulic drive unit for construction machinery
KR20100004049A (en) Hydraulic control system for excavator
KR20130108266A (en) Hydraulic drive device for hydraulic work machine
JP2004346485A (en) Hydraulic driving device
KR100475517B1 (en) Hydraulic drive device of working machine
KR102353675B1 (en) fluid pressure control device
KR19980038855A (en) Hydraulics for cylinders for work tools of construction machinery
JP4121466B2 (en) Hydraulic circuit of hydraulic working machine
KR20070069876A (en) Hydraulic control system for combined operation of en excavator
JP2002155907A (en) Priority circuit in working machinery
JP2002339908A (en) Hydraulic control circuit for attachment in construction machine
JP3794927B2 (en) Hydraulic control circuit for work machines
JP3898167B2 (en) Hydraulic circuit for construction machinery
JP3410365B2 (en) Hydraulic circuit of construction machinery that can use crusher etc.
JPH08232301A (en) Hydraulic system of construction machinery
JP6453820B2 (en) Directional control valve group for construction machinery
JP2020094643A (en) Hydraulic pressure control circuit of construction machine
JP3810263B2 (en) Hydraulic circuit in work machines
JP6763006B2 (en) Direction control valve group for excavators and construction machinery
JP7121641B2 (en) Fluid pressure controller
KR100985031B1 (en) hydraulic system of construction equipment

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20041007

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20041014

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20050303