JP2002121733A - Connecting structure of piles and connecting structure of pile head reinforcement - Google Patents

Connecting structure of piles and connecting structure of pile head reinforcement

Info

Publication number
JP2002121733A
JP2002121733A JP2000312922A JP2000312922A JP2002121733A JP 2002121733 A JP2002121733 A JP 2002121733A JP 2000312922 A JP2000312922 A JP 2000312922A JP 2000312922 A JP2000312922 A JP 2000312922A JP 2002121733 A JP2002121733 A JP 2002121733A
Authority
JP
Japan
Prior art keywords
pile
flange plate
plate
piles
joining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000312922A
Other languages
Japanese (ja)
Inventor
Tatsuya Yoshida
達哉 吉田
Yoshikazu Suzuki
良和 鈴木
Yusuke Honma
裕介 本間
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Geotop Corp
Original Assignee
Geotop Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Geotop Corp filed Critical Geotop Corp
Priority to JP2000312922A priority Critical patent/JP2002121733A/en
Publication of JP2002121733A publication Critical patent/JP2002121733A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a connecting structure of piles capable of easily and surely performing a connection independently from field welding. SOLUTION: Flange plates 4 larger in diameter than the diameter of existing piles 1a and 1b and having a plurality of small holes 4a in the peripheral part are integrally mounted on the end plates 2 of the piles 1a and 1b by welding or the like. The flange plates 4 of the vertically arranged existing piles 1a and 1b are mutually connected through bolts 5 by use of the small holes 4a. For the pile heads, pile head reinforcements are mounted by use of the small holes 4a of the flange plates 4 integrally mounted on the end plates 2 of the pile heads.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本願発明は、PC杭やPHC
杭などの既製コンクリート杭の接合構造および既製杭の
頭部とフーチングや基礎スラブ、地中梁などの構造体基
礎部とを連結一体化するための杭頭鉄筋の接合構造に関
するものである。
The present invention relates to a PC pile and a PHC.
The present invention relates to a joint structure of a ready-made concrete pile such as a pile and a joint structure of a pile head reinforcing bar for connecting and integrating a head of the ready-made pile with a structural foundation such as a footing, a foundation slab, and an underground beam.

【0002】[0002]

【従来の技術】既製コンクリート杭を上下に連結する方
法としては、従来、以下の方法が一般的である。 既製杭11a,11bの端部に設けられている端板1
2どうしを突合せ溶接する方法(図4(a) 参照、符号1
3は溶接部)。 連結する上下の杭11a,11bの端板12が納まる
溝を設けた鋼製リング14を杭接合部の外周に嵌め、こ
れをリング14の外側からボルト15で締め、杭11
a,11bに装着する方法(図4(b) 参照)。 連結する上下の杭11a,11bの端板12が納まる
溝を設けたオス型楔状断面の鋼製リング16を杭接合部
の外周に嵌め、その外側にメス型楔状断面の鋼製リング
17を嵌めて接合する方法(図4(c) 参照)。
2. Description of the Related Art Conventionally, the following methods are generally used to connect pre-made concrete piles vertically. End plate 1 provided at ends of ready-made piles 11a, 11b
2. A method of butt-welding two pieces (see FIG.
3 is a welded portion). A steel ring 14 provided with a groove for accommodating the end plates 12 of the upper and lower piles 11a and 11b to be connected is fitted on the outer periphery of the pile joint, and this is tightened with bolts 15 from the outside of the ring 14.
a, 11b (see FIG. 4 (b)). A male wedge-shaped steel ring 16 provided with a groove for accommodating the end plates 12 of the upper and lower piles 11a and 11b to be connected is fitted on the outer periphery of the pile joint, and a female wedge-shaped steel ring 17 is fitted on the outside thereof. (See FIG. 4 (c)).

【0003】また、地盤に打設した既製コンクリート杭
とフーチングや基礎スラブなどの構造体基礎部を連結一
体化する構造として、中空既製杭の場合、杭頭部に鉄筋
籠を挿入し、コンクリートの打設により一体化するもの
が知られている。
[0003] Further, as a structure for connecting and integrating a ready-made concrete pile placed on the ground with a structural base portion such as a footing or a foundation slab, in the case of a hollow ready-made pile, a reinforcing steel cage is inserted into a pile head, and concrete is removed. What is integrated by casting is known.

【0004】この他、例えば特開平6−330522号
公報には、環状の底板の上面に複数本の杭頭鉄筋を取り
付けた杭頭接合体を、既製コンクリート杭の端板に形成
されているプレストレス導入用のねじ孔にボルト接合す
るようにした杭頭接合構造が記載されている。また、こ
れに類するものとして、端板のプレストレス導入用のね
じ孔に杭頭鉄筋をカプラーなどを利用して、直接、取り
付ける構造も知られている。
[0004] In addition, for example, Japanese Patent Application Laid-Open No. Hei 6-330522 discloses a pile head joint in which a plurality of pile head reinforcing bars are attached to the upper surface of an annular bottom plate, which is formed on an end plate of a ready-made concrete pile. There is described a pile head joint structure in which a bolt is joined to a screw hole for introducing stress. Further, as a similar structure, a structure is also known in which a pile head reinforcing bar is directly attached to a screw hole for introducing a prestress in an end plate using a coupler or the like.

【0005】また、特開平6−108461号公報に
は、同様に、取付け板を備えた鉄筋籠を端板のプレスト
レス導入用のねじ孔にボルト接合した構造が記載されて
いる。
Japanese Patent Laid-Open Publication No. 6-108461 describes a structure in which a reinforcing bar provided with a mounting plate is similarly bolted to a screw hole for introducing prestress in an end plate.

【0006】[0006]

【発明が解決しようとする課題】既製コンクリート杭を
上下に連結する方法に関し、端板どうしを突合せ溶接す
る方法は、溶接が現場溶接とならざるを得ず、また下杭
を地盤内に貫入した状態での溶接作業となることから、
溶接の熟練工を必要とするだけでなく、施工手間が多
く、また現場溶接であるため溶接の信頼性の面でも不利
となる。
A method of butt-welding end plates with respect to a method of vertically connecting precast concrete piles is inevitably welding on site, and the lower pile has penetrated into the ground. Because it is a welding work in the state,
Not only does it require a skilled welding worker, but also requires a lot of work, and it is disadvantageous in terms of welding reliability due to the on-site welding.

【0007】各種鋼製リングを用いる接合方法は、現場
溶接の必要がない反面、わずかな寸法誤差で接合が困難
となったり、クリアランスが大きい場合には接合状態が
不安定となるといった問題がある。
[0007] The joining method using various steel rings does not require on-site welding, but has a problem that the joining becomes difficult due to a small dimensional error, and the joining state becomes unstable when the clearance is large. .

【0008】一方、杭頭鉄筋の接合に関し、杭頭部に鉄
筋籠を挿入する場合、先端が開放された中空既製杭を埋
設工法で施工する場合など、杭の中空部内にソイルセメ
ントなど入ってくるため、鉄筋籠を挿入することができ
ない場合がある。また、鉄筋籠の径が杭径以内に制限さ
れるため、フーチングなどの構造体基礎部との応力伝達
の面で不利となる。
On the other hand, regarding the joining of the pile head reinforcing bars, when cement bars are inserted into the pile head, when hollow precast piles with open ends are buried by the burial method, soil cement or the like is inserted into the hollow portion of the pile. Therefore, it may not be possible to insert a steel cage. Further, since the diameter of the reinforcing rod cage is limited to within the pile diameter, it is disadvantageous in terms of stress transmission with a structural base such as a footing.

【0009】また、端板のプレストレス導入用のねじ孔
を利用して、杭頭鉄筋をそのまま、あるいは環状の底板
と一体化した杭頭接合体、鉄筋籠などの形でボルト接合
する場合、杭の埋設施工の際に端板の上面側に開口する
ねじ孔にソイルセメントあるいは土砂が入り込み、ボル
ト接合が困難となる場合がある。
[0009] Further, in the case where bolts are connected by using a screw hole for introducing a prestress in the end plate, a pile head reinforcing bar as it is, or a pile head joint body integrated with an annular bottom plate, a reinforcing cage, or the like, When burying a pile, soil cement or sand may enter into the screw holes that open on the upper surface side of the end plate, making bolt joining difficult.

【0010】そのため、予めねじ孔に詰物をしておき、
あとから外してねじ孔を清掃して使用するといった方法
も取られているが、現場作業が煩雑となり、また詰まり
が残っている場合には接合が不安定となるといった欠点
がある。
[0010] Therefore, filling the screw holes in advance,
Although a method of removing the screw hole and cleaning the screw hole for use is also adopted, there are disadvantages that the work on site is complicated, and if a clog remains, the joining becomes unstable.

【0011】本願発明は上述のような課題の解決を図っ
たものであり、既製コンクリート杭の端板に一体的に取
り付けた杭径より大径で周縁部に複数の小孔を有するフ
ランジ板を利用して、現場溶接によらず、簡単にかつ確
実に接合できる杭の接合構造および杭頭鉄筋の接合構造
を提供することを目的としている。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problem, and has a flange plate having a diameter larger than the diameter of a pile and having a plurality of small holes in a peripheral portion integrally attached to an end plate of a ready-made concrete pile. It is an object of the present invention to provide a joint structure of a pile and a joint structure of a reinforcing steel of a pile head which can be easily and securely joined without using field welding.

【0012】[0012]

【課題を解決するための手段】本願の請求項1に係る杭
の接合構造は、既製杭の端部に杭径より大径で周縁部に
複数の小孔を有するフランジ板を一体的に取り付け、上
下に配置された既製杭の前記フランジ板どうしを前記小
孔を利用してボルト接合してなることを特徴とするもの
である。
According to a first aspect of the present invention, there is provided a pile joining structure in which a flange plate having a diameter larger than a diameter of a pile and having a plurality of small holes at a peripheral edge is integrally attached to an end of a ready-made pile. In addition, the flange plates of the ready-made piles arranged vertically are joined by bolts using the small holes.

【0013】既製杭としては、主としてPC杭、PHC
杭といった既製コンクリート杭を適用対象としており、
特にPC杭やPHC杭の場合、製造時にプレストレスを
導入するためのねじ孔を有する端板があるのが一般的で
あり、この端板に杭径より大径のフランジ板を一体的に
取り付けることとした。なお、端板を有するものであれ
ば、RC杭やSC杭(鋼管コンクリート複合杭)などで
もよい。また、杭の形態としては、丸杭に限らず、節杭
などにも適用される。
[0013] Precast piles are mainly PC piles, PHC
The target is ready-made concrete piles such as piles,
Particularly in the case of PC piles and PHC piles, there is generally an end plate having a screw hole for introducing prestress during manufacturing, and a flange plate having a diameter larger than the pile diameter is integrally attached to this end plate. I decided that. In addition, if it has an end plate, RC pile, SC pile (steel pipe concrete composite pile), etc. may be used. Further, the form of the pile is not limited to the round pile, but is also applied to a knotted pile and the like.

【0014】このような端板を有する上下の杭を接合す
る場合、従来の技術の項で述べた端板どうしの溶接によ
る接合が一般的であるが、本願発明では端板に取り付け
たフランジ板どうしをその周縁部に設けた小孔を利用し
てボルト接合できるようにしたものであり、現場溶接が
不要となる。また、ボルトとナットの締め付けなどによ
り簡単に接合することができる。
When joining the upper and lower piles having such end plates, welding by welding the end plates described in the section of the prior art is general, but in the present invention, the flange plate attached to the end plates is used. The bolts can be joined to each other by using small holes provided in the peripheral portion thereof, so that on-site welding is not required. Also, it can be easily joined by tightening a bolt and a nut.

【0015】この場合の上下の杭間に作用する引張力や
曲げについては、ボルトなどの締付け力とボルトの伸び
で持たせ、せん断力については、ボルトの締付けよるフ
ランジ板部分の摩擦接合で抵抗させることができる。
In this case, the tensile force and bending acting between the upper and lower piles are given by the tightening force of the bolt and the extension of the bolt, and the shear force is reduced by frictional joining of the flange plate portion by tightening the bolt. Can be done.

【0016】なお、フランジ板周縁部の小孔は、フラン
ジ板を貫通しているため、施工時に土砂などが詰まって
も容易に取り除くことができる。請求項2に係る発明
は、請求項1に係る杭の接合構造において、フランジ板
の取付け手段の一つとして、前記フランジ板が既製杭の
端部に設けられた端板に溶接されている場合を限定した
ものであり、その場合は予め工場で溶接しておくことが
望ましい。
Since the small holes at the peripheral edge of the flange plate penetrate the flange plate, they can be easily removed even if soil or the like is clogged during construction. According to a second aspect of the present invention, in the pile joining structure according to the first aspect, the flange plate is welded to an end plate provided at an end of a ready-made pile as one of the flange plate attaching means. Is limited, in which case it is desirable to weld in advance at a factory.

【0017】本願の請求項3に係る杭頭鉄筋の接合構造
は、既製杭の端部に杭径より大径で周縁部に複数の小孔
を有するフランジ板を一体的に取り付け、前記フランジ
板に杭と構造体基礎部とを結合する鉄筋を取り付けてな
ることを特徴とするものである。
According to a third aspect of the present invention, in the joint structure of a pile head reinforcing bar, a flange plate having a diameter larger than a pile diameter and having a plurality of small holes in a peripheral portion is integrally attached to an end of a ready-made pile. And a reinforcing bar for connecting the pile and the foundation of the structure.

【0018】フランジ板は、請求項1における上下の杭
どうしを接合するためのフランジ板と同様のものを用い
ることができる。ただし、設計条件に応じて、径や板
厚、あるいは材質の異なるものなどを用いることもでき
る。
As the flange plate, the same one as the flange plate for joining the upper and lower piles according to the first aspect can be used. However, it is also possible to use one having a different diameter, plate thickness, or material according to design conditions.

【0019】杭頭鉄筋はアンカー筋の役目をするもので
あり、通常は、異形鉄筋を用い、接合方法によっては端
部にねじ切りを施す。この鉄筋のフランジ板への接合手
段は、従来の端板に鉄筋を接合する場合と同様に考えれ
ばよく、フランジ板の小孔に雌ねじを切って、ナットあ
るいはカプラーなどを利用して鉄筋を個々に接合する場
合、複数の鉄筋を予め環状の接合板に取り付けておき、
接合板をフランジ板にボルト接合する場合などが考えら
れる。
The pile head rebar serves as an anchor rebar, and usually uses a deformed rebar, and depending on the joining method, the end is threaded. The means for joining the reinforcing bar to the flange plate may be considered in the same manner as when connecting the reinforcing bar to the conventional end plate.A female screw is cut into a small hole in the flange plate, and the reinforcing bar is individually joined using a nut or a coupler. When joining to multiple, rebar is attached to the annular joining plate in advance,
A case where the joining plate is bolted to the flange plate may be considered.

【0020】また、従来の端板に接合する場合は、鉄筋
の接合に利用されているねじ孔について、ソイルセメン
トあるいは土砂が詰まることに対する対策が必要である
が、フランジ板に接合する場合は、前述したように、フ
ランジ板周縁部の小孔がフランジ板を貫通していること
から、それらを容易に取り除くことができる。
In addition, in the case of joining to a conventional end plate, it is necessary to take measures against clogging with soil cement or earth and sand with respect to screw holes used for joining reinforcing bars. As described above, since the small holes in the peripheral portion of the flange plate penetrate the flange plate, they can be easily removed.

【0021】また、フーチング、基礎スラブ、あるいは
地中梁といった構造体基礎部との結合に関しては、アン
カー筋としての鉄筋を取り付ける径が大きい方が有利で
あるが、フランジ板の利用により杭径の外での接合も可
能であることから、杭頭中空部内に鉄筋籠を挿入する場
合や端板に鉄筋を接合する場合に比べ、本願発明の方が
有利となる。
In connection with a structural foundation such as a footing, a foundation slab, or an underground beam, it is advantageous to have a larger diameter for attaching a reinforcing bar as an anchor bar. Since joining outside is also possible, the present invention is more advantageous than a case where a reinforcing bar cage is inserted into a hollow portion of a pile head or a case where a reinforcing bar is joined to an end plate.

【0022】請求項4に係る発明は、請求項3に係る杭
頭鉄筋の接合構造において、前記複数の鉄筋が、予め前
記フランジ板の外径とほぼ同一で、前記フランジ板の小
孔と対応する位置に小孔を有する接合板に取り付けられ
ており、前記接合板を前記フランジ板にボルト接合して
ある場合を限定したものである。
According to a fourth aspect of the present invention, in the joint structure for a pile head rebar according to the third aspect, the plurality of rebars have substantially the same outer diameter as the flange plate in advance and correspond to the small holes of the flange plate. The present invention is limited to a case in which the joint plate is attached to a joint plate having a small hole at a position where the joint plate is bolted to the flange plate.

【0023】この請求項4は、請求項3について述べた
鉄筋のフランジ板への接合手段のうち、複数の鉄筋を予
め接合板に取り付けておき、接合板をフランジ板にボル
ト接合する場合であり、現場における取付け作業が簡略
化され、施工性が向上する。
According to a fourth aspect of the present invention, in the means for joining a reinforcing bar to a flange plate described in the third embodiment, a plurality of reinforcing bars are previously attached to the joining plate, and the joining plate is bolted to the flange plate. In addition, installation work on site is simplified, and workability is improved.

【0024】[0024]

【発明の実施の形態】図1は、本願の請求項1、2に係
る杭の接合構造の一実施形態を示したものである。な
お、この図では、接合部近傍のみを示している。
FIG. 1 shows an embodiment of a joint structure for piles according to claims 1 and 2 of the present application. In this figure, only the vicinity of the joint is shown.

【0025】本実施形態は、杭1がPC杭の場合を示し
ており、中空断面の杭1(下杭1aおよび上杭1b)本
体に軸方向のPC鋼材3が周方向に所定間隔をおいて複
数配置され、その両端が杭端部の端板2に定着されてい
る。図示しないが、この端板2には杭製造時にPC鋼材
3に緊張力を導入するためのねじ孔が形成されている。
This embodiment shows a case in which the pile 1 is a PC pile, and the PC steel members 3 in the axial direction are arranged at predetermined intervals in the circumferential direction on the pile 1 body (lower pile 1a and upper pile 1b) having a hollow section. And both ends are fixed to the end plate 2 at the end of the pile. Although not shown, the end plate 2 is formed with a screw hole for introducing tension into the PC steel material 3 at the time of manufacturing the pile.

【0026】この例では、この杭1の杭径より大きな径
を有するフランジ板4を、予め杭端部の端板2に溶接に
より一体的に取り付けておき、その状態で埋設工法など
により杭1の建込みを行う。
In this example, a flange plate 4 having a diameter larger than the pile diameter of the pile 1 is integrally attached to the end plate 2 at the end of the pile in advance by welding, and in this state the pile 1 is buried by a burial method or the like. Of the building.

【0027】このフランジ板4には、その周縁部に所定
間隔をおいて小孔4aが形成されており、埋設の途中で
上下の杭1どうしを継ぎ足す場合において、図1(b) に
示すように上下の杭1a,1bのフランジ板4どうしを
小孔4aを一致させて当接させ、小孔4aに通したボル
ト5により接合する。
The flange plate 4 is formed with small holes 4a at a predetermined interval in the peripheral portion thereof. When the upper and lower piles 1 are to be added during the embedding process, as shown in FIG. 1 (b). As described above, the flange plates 4 of the upper and lower piles 1a and 1b are brought into contact with the small holes 4a in alignment with each other, and are joined by the bolts 5 passed through the small holes 4a.

【0028】この場合、現場での接合作業は、小孔4a
の位置合わせとボルト接合のみであり、無溶接で迅速に
接合作業を行うことができる。なお、下杭1aの建込み
の際に小孔4aにソイルセメントあるいは土砂などが入
り込むことが考えられるが、小孔4aは上下方向に貫通
しており、かつ杭径の外側に位置するため、これらを簡
単に除去することができる。
In this case, the joining work on site is performed by the small holes 4a.
Only the positioning and bolt joining, joining work can be performed quickly without welding. In addition, it is conceivable that soil cement or earth and sand may enter the small hole 4a when the lower pile 1a is built. However, since the small hole 4a penetrates in the vertical direction and is located outside the pile diameter, These can be easily removed.

【0029】図2は、本願の請求項3に係る杭頭鉄筋の
接合構造の一実施形態を示したものである。杭1および
フランジ板4については、基本的には図1の実施形態の
場合と同じであり(ただし、小孔4の位置や板厚は、設
計に応じて同じものを用いてもよいし、異なるものを用
いてもよい)、杭径より大きい径を有するフランジ板4
を杭頭の端板2に溶接により一体的に取り付けてある。
FIG. 2 shows an embodiment of a joint structure of a pile head reinforcing bar according to claim 3 of the present application. The pile 1 and the flange plate 4 are basically the same as those in the embodiment of FIG. 1 (however, the positions and plate thicknesses of the small holes 4 may be the same depending on the design, Different ones may be used), the flange plate 4 having a diameter larger than the pile diameter.
Are integrally attached to the end plate 2 of the pile head by welding.

【0030】本実施形態では、このフランジ板4の周縁
部に形成された小孔4に対し、異形鉄筋などからなる杭
頭鉄筋(アンカー筋)6の端部に雄ねじを設け、ナット
7で取り付けている。
In this embodiment, a male screw is provided at an end of a pile head reinforcing bar (anchor bar) 6 made of deformed reinforcing bar or the like with respect to a small hole 4 formed in a peripheral portion of the flange plate 4 and attached with a nut 7. ing.

【0031】従来の端板2のねじ孔を利用する形式で
は、ねじ孔が貫通していないため、ソイルセメントある
いは土砂の詰まりに対する対策が必要であったのに対
し、本願発明の場合は、小孔4aが貫通孔であり、かつ
杭径の外側に位置するため、これらを簡単に除去するこ
とができ、面倒な作業がなくなる。また、杭頭鉄筋6を
ナット7などで上下から締め付けることができるので、
引張力や曲げ、せん断力に対しても有利である。
In the conventional type in which the screw hole of the end plate 2 is used, since the screw hole does not penetrate, it is necessary to take measures against clogging with soil cement or earth and sand. Since the hole 4a is a through hole and located outside the pile diameter, these can be easily removed, and troublesome work is eliminated. In addition, since the pile head reinforcing bar 6 can be tightened from above and below with the nut 7, etc.,
It is also advantageous for tensile, bending and shear forces.

【0032】図3は、本願の請求項4に係る杭頭鉄筋の
接合構造の一実施形態を示したもので、図2の実施形態
では杭頭鉄筋6をフランジ板4の小孔4aに直接取り付
けていたのに対し、図3のものでは複数の杭頭鉄筋6を
接合板8に溶接してユニット化したものを用い、接合板
8フランジ板4にボルト5により接合している。
FIG. 3 shows an embodiment of a joint structure of a pile head reinforcing bar according to claim 4 of the present application. In the embodiment of FIG. 2, the pile head reinforcing bar 6 is directly inserted into the small hole 4 a of the flange plate 4. On the other hand, in FIG. 3, a plurality of pile head reinforcing bars 6 are welded to the joining plate 8 to form a unit, and are joined to the joining plate 8 flange plate 4 by bolts 5.

【0033】この例では、接合板8として、フランジ板
4と同径で、フランジ板4の小孔4aに対応する位置に
小孔8aを形成したものを用いているが、必ずしもフラ
ンジ板と同じ形状のものとする必要はない。
In this example, the joining plate 8 has the same diameter as the flange plate 4 and has a small hole 8a formed at a position corresponding to the small hole 4a of the flange plate 4, but it is not necessarily the same as the flange plate. It need not be shaped.

【0034】[0034]

【発明の効果】本願の請求項1に係る杭の接合構造は、
上下の杭を接合する場合において、既製杭の端部に一体
的に取り付けたフランジ板どうしをその周縁部に設けた
小孔を利用してボルト接合できるようにしたものであ
り、現場溶接が不要となり、ボルトとナットの締め付け
などにより簡単に接合することができる。
According to the first aspect of the present invention, there is provided a pile joint structure comprising:
When joining upper and lower piles, flange plates that are integrally attached to the end of a ready-made pile can be bolted together using small holes provided on the peripheral edge, so no on-site welding is required It can be easily joined by tightening bolts and nuts.

【0035】また、上下の杭間に作用する引張力や曲げ
については、ボルトなどの締付け力とボルトの伸びで持
たせ、せん断力については、ボルトの締付けよるフラン
ジ板部分の摩擦接合で抵抗させることができ、信頼性の
高い接合構造が得られる。
The tensile force and bending acting between the upper and lower piles are given by the tightening force of a bolt or the like and the elongation of the bolt, and the shear force is resisted by frictional joining of the flange plate portion by tightening the bolt. And a highly reliable bonding structure can be obtained.

【0036】また、フランジ板周縁部の小孔は、フラン
ジ板を貫通しているため、施工時にソイルセメントある
いは土砂などが詰まっても容易に取り除くことができ
る。本願の請求項3に係る杭頭鉄筋の接合構造は、フー
チングや基礎スラブなどの構造体基礎部を結合するため
の杭頭鉄筋の取付けを、杭頭端部に一体的に取り付けた
フランジ板周縁部の小孔を利用して行うものであり、小
孔が上下方向に貫通しているため、小孔にソイルセメン
トあるいは土砂が入っても容易に取り除くことができ、
従来の端板のねじ孔を利用する場合のようなねじ孔の処
理の問題がない。
Further, since the small holes at the peripheral edge of the flange plate penetrate the flange plate, even if soil cement, earth and sand or the like is clogged at the time of construction, it can be easily removed. The joint structure of a pile head reinforcing bar according to claim 3 of the present application is a flange plate peripheral portion in which mounting of a pile head reinforcing bar for connecting a structural foundation such as a footing or a foundation slab is integrally attached to an end of the pile head. It is performed using the small hole of the part, because the small hole penetrates in the vertical direction, even if soil cement or earth and sand enters the small hole, it can be easily removed,
There is no problem of screw hole treatment as in the case of using the screw hole of the conventional end plate.

【0037】また、構造体基礎部との結合に関しては、
アンカー筋としての鉄筋を取り付ける径が大きい方が有
利であるが、フランジ板の利用により杭径の外側での接
合も可能であることから、杭頭中空部内に鉄筋籠を挿入
する場合や端板に鉄筋を接合する場合に比べ有利とな
る。
Regarding the connection with the structural base,
It is advantageous to have a larger diameter for attaching the reinforcing bar as an anchor bar.However, since it is possible to join the outside of the pile diameter by using a flange plate, it is possible to insert a reinforcing rod cage into the hollow part of the pile head or use an end plate. This is advantageous as compared with the case where a reinforcing bar is joined to the steel.

【0038】請求項4に係る発明は、請求項3に係る杭
頭鉄筋の接合構造において、杭頭鉄筋と接合板を一体化
したユニットを用いる場合であり、現場作業が簡略化さ
れ、施工性が向上する。
According to a fourth aspect of the present invention, in the joint structure of a pile head reinforcing bar according to the third aspect, a unit in which the pile head reinforcing bar and the joining plate are integrated is used, so that on-site work is simplified and workability is improved. Is improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本願の請求項1、2に係る発明の一実施形態
を示したもので、(a) は水平断面図、(b) は鉛直断面図
である。
FIG. 1 shows one embodiment of the invention according to claims 1 and 2 of the present application, where (a) is a horizontal sectional view and (b) is a vertical sectional view.

【図2】 本願の請求項3に係る発明の一実施形態を示
したもので、(a) は平面図、(b) は鉛直断面図である。
FIG. 2 shows an embodiment of the invention according to claim 3 of the present application, wherein (a) is a plan view and (b) is a vertical sectional view.

【図3】 本願の請求項4に係る発明の一実施形態を示
したもので、(a) は平面図、(b) は鉛直断面図である。
FIG. 3 shows an embodiment of the invention according to claim 4 of the present application, wherein (a) is a plan view and (b) is a vertical sectional view.

【図4】 (a) 〜(c) はそれぞれ従来の既製杭の接合構
造の例を示す鉛直断面図である。
FIGS. 4A to 4C are vertical sectional views each showing an example of a joint structure of a conventional ready-made pile.

【符号の説明】[Explanation of symbols]

1…既製杭、1a…下杭、1b…上杭、2…端板、3…
PC鋼材、4…フランジ板、4a…小孔、5…ボルト、
6…杭頭鉄筋、7…ナット、8…接合板、8a…小孔
DESCRIPTION OF SYMBOLS 1 ... Ready-made pile, 1a ... Lower pile, 1b ... Upper pile, 2 ... End plate, 3 ...
PC steel, 4 ... Flange plate, 4a ... Small hole, 5 ... Bolt,
6 ... Pile head reinforcement, 7 ... Nut, 8 ... Connection plate, 8a ... Small hole

───────────────────────────────────────────────────── フロントページの続き (72)発明者 本間 裕介 大阪府大阪市中央区高麗橋2丁目1番10号 株式会社ジオトップ内 Fターム(参考) 2D041 AA02 BA19 DB02 DB05 DB06 DB07 DB12  ────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Yusuke Honma 2-1-1, Komyo-bashi, Chuo-ku, Osaka-shi, Osaka F-term in Geotop Co., Ltd. (Reference) 2D041 AA02 BA19 DB02 DB05 DB06 DB07 DB12

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 既製杭の端部に杭径より大径で周縁部に
複数の小孔を有するフランジ板を一体的に取り付け、上
下に配置された既製杭の前記フランジ板どうしを前記小
孔を利用してボルト接合してなることを特徴とする杭の
接合構造。
1. A flange plate having a diameter larger than a pile diameter and having a plurality of small holes at a peripheral portion is integrally attached to an end of a ready-made pile, and the flange plates of the ready-made piles arranged vertically are connected to the small holes. A pile joining structure characterized by being bolted by utilizing a bolt.
【請求項2】 前記フランジ板が既製杭の端部に設けら
れた端板に溶接されている請求項1記載の杭の接合構
造。
2. The pile joint structure according to claim 1, wherein the flange plate is welded to an end plate provided at an end of the ready-made pile.
【請求項3】 既製杭の端部に杭径より大径で周縁部に
複数の小孔を有するフランジ板を一体的に取り付け、前
記フランジ板に杭と構造体基礎部とを結合する鉄筋を取
り付けてなることを特徴とする杭頭鉄筋の接合構造。
3. A flange plate having a diameter larger than the diameter of the pile and having a plurality of small holes at its periphery is integrally attached to an end of the ready-made pile, and a reinforcing bar for connecting the pile and the foundation of the structure to the flange plate. Connection structure of pile head rebar characterized by being attached.
【請求項4】 前記複数の鉄筋が、予め前記フランジ板
の外径とほぼ同一で、前記フランジ板の小孔と対応する
位置に小孔を有する接合板に取り付けられており、前記
接合板を前記フランジ板にボルト接合してある請求項3
記載の杭頭鉄筋の接合構造。
4. The bonding method according to claim 1, wherein the plurality of rebars are previously attached to a joining plate having a small hole at a position corresponding to the small hole of the flange plate and having substantially the same outer diameter as the flange plate in advance. 4. A bolt connection to the flange plate.
The joint structure of the pile head reinforcement described.
JP2000312922A 2000-10-13 2000-10-13 Connecting structure of piles and connecting structure of pile head reinforcement Pending JP2002121733A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000312922A JP2002121733A (en) 2000-10-13 2000-10-13 Connecting structure of piles and connecting structure of pile head reinforcement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000312922A JP2002121733A (en) 2000-10-13 2000-10-13 Connecting structure of piles and connecting structure of pile head reinforcement

Publications (1)

Publication Number Publication Date
JP2002121733A true JP2002121733A (en) 2002-04-26

Family

ID=18792416

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000312922A Pending JP2002121733A (en) 2000-10-13 2000-10-13 Connecting structure of piles and connecting structure of pile head reinforcement

Country Status (1)

Country Link
JP (1) JP2002121733A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113882360A (en) * 2021-10-12 2022-01-04 浙大宁波理工学院 Pile connecting structure and method for pouring tubular pile transverse partition plates

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113882360A (en) * 2021-10-12 2022-01-04 浙大宁波理工学院 Pile connecting structure and method for pouring tubular pile transverse partition plates

Similar Documents

Publication Publication Date Title
JP5213249B2 (en) Pile head structure of precast concrete pile and pile head formation method
KR100609184B1 (en) Joint Structure of Precast Concrete Beam and Column Unit
JP4506969B2 (en) Bonding structure between concrete and pile head of foundation or footing and structure having the bonding structure
JP3649717B2 (en) Joints and structures for joining steel pipe pile heads to concrete foundations
KR200201561Y1 (en) Head reinforcement structure of steel pipe pile
JP3914640B2 (en) Connection structure of steel underground continuous wall and reinforced concrete slab
JP5133650B2 (en) Joint structure of column and steel pipe pile
KR200386881Y1 (en) A pile head reinforcement structure of precast concrete pile
JP4452060B2 (en) Steel pipe pile head joint structure and steel pipe pile head construction method
JP4110729B2 (en) Foundation pile head structure
JP2002121733A (en) Connecting structure of piles and connecting structure of pile head reinforcement
JP5008683B2 (en) Pile head reinforcement member and pile head reinforcement structure using it
KR200422931Y1 (en) A pile head reinforcement structure of steel pile
KR102133449B1 (en) The construction method of structure using Super Speed PC System
KR200455415Y1 (en) Head reinforcement assembly of concrete pile for foundation work
JP2004162345A (en) Joining method and joint structure for prefabricated pile and foundation
JP3826348B2 (en) Construction method of composite wall with mountain retaining core and underground outer wall
JPH10219831A (en) Joined building construction between reinforced concrete column and steel frame beam and its joined part structure, and precast reinforced concrete column
JP4449595B2 (en) Column-beam joint structure, method for constructing column-beam joint structure, method for constructing underground structure, and building
JP2007051500A (en) Joint structure of column and pile
JP4239394B2 (en) Foundation pile head structure
JP3169887B2 (en) Column base structure of steel pipe column and its construction method
JP2000297480A (en) Reinforcing method for steel-pipe structure column base section
JP2004270416A (en) Pile with large-diameter bearing plate, and structure for joining pile head thereof
JP4045502B2 (en) Structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040712

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060613

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20061024