JP2001323432A - Impervious structure of revetment - Google Patents

Impervious structure of revetment

Info

Publication number
JP2001323432A
JP2001323432A JP2000141279A JP2000141279A JP2001323432A JP 2001323432 A JP2001323432 A JP 2001323432A JP 2000141279 A JP2000141279 A JP 2000141279A JP 2000141279 A JP2000141279 A JP 2000141279A JP 2001323432 A JP2001323432 A JP 2001323432A
Authority
JP
Japan
Prior art keywords
water
layer
sheet
impervious
revetment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2000141279A
Other languages
Japanese (ja)
Other versions
JP4822375B2 (en
Inventor
Takatsu Wagi
多克 和木
Masami Origasa
正美 折笠
Mitsuru Nonoda
充 野々田
Takahiko Ito
隆彦 伊藤
Katsuo Matsuzaki
勝夫 松崎
Hiroshi Nakano
浩 中野
Mitsumasa Inomata
光正 猪俣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Road Co Ltd
Taisei Rotec Corp
Seibu Polymer Corp
Japan Sea Works Co Ltd
World Engineering Co
Original Assignee
Nippon Road Co Ltd
Taisei Rotec Corp
Seibu Polymer Corp
Japan Sea Works Co Ltd
World Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Road Co Ltd, Taisei Rotec Corp, Seibu Polymer Corp, Japan Sea Works Co Ltd, World Engineering Co filed Critical Nippon Road Co Ltd
Priority to JP2000141279A priority Critical patent/JP4822375B2/en
Publication of JP2001323432A publication Critical patent/JP2001323432A/en
Application granted granted Critical
Publication of JP4822375B2 publication Critical patent/JP4822375B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/30Landfill technologies aiming to mitigate methane emissions

Landscapes

  • Revetment (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

PROBLEM TO BE SOLVED: To enhance the reliability of an impervious layer for the surface of a filled revetment and the surface of the submarine ground and easily provide an impervious effect for sheet connections and damaged parts by stacking a plurality of impervious members for the construction of the impervious layer, in the construction of a waste disposal facility in an area of sea. SOLUTION: An impervious process layer 10, which is positioned on the inshore side of a revetment foundation 5 having the caisson 2 of the filled revetment 1 installed thereon, is constructed by stacking water blocking sheet and asphalt layers one after another over predetermined ranges of the surface of the foundation and the submarine ground. Corner connecting layers 15 with an asphalt mixture placed therein are constructed at the corners of the revetment foundation and the ends of the impervious sheets are connected together by the corner connecting layers. At the corner connecting layers 15, the asphalt mixture is placed after existing construction frames are arranged, and the frames are integrated with the asphalt mixture to integrate the corner connecting layer 15 with the impervious process layer 10.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、廃棄物海面処分場
等の埋立護岸、または、人工島の内部を外海から区画す
る護岸等の護岸表面に沿わせて敷設し、潮流・波浪、潮
汐変動もしくは、仕切られた区域内での残留水頭等によ
り、仕切り側内部の水が外洋に流出しないようにする、
多層に遮水部材を重ねて構築する埋立護岸の遮水構造
と、遮水構造に欠陥が発生した時の補修に関する。
BACKGROUND OF THE INVENTION The present invention relates to laying along a revetment seawall such as a waste sea surface disposal site, or a seawall such as a seawall dividing the inside of an artificial island from the open sea. Or, to prevent the water inside the partition from flowing out to the open ocean due to residual head in the partitioned area, etc.
It relates to the impermeable structure of reclaimed revetments constructed by stacking multiple impermeable members and repairing when a defect occurs in the impermeable structure.

【0002】[0002]

【従来の技術】廃棄物を埋め立て処分するために、従来
より山間僻地等に処分場を構築しており、前記処分場に
おいては、周囲の地山に対して遮水用シート等のシート
状遮水体を敷設する等の、遮水層の構築処理を行った上
で廃棄物を投棄している。ところが、前記処分場は大量
に廃棄物を排出する都市や工業地帯から遠く離れた場所
に立地されることが多く、廃棄物の運搬のための交通の
問題を抱えている。また、陸上の処分場は周囲の環境保
全等の観点から、または、住民の了解を得ることができ
にくい等の問題があり、大規模な廃棄物処分場を確保す
ることが困難となってきている。そこで、今後は、大量
に廃棄物が排出される都市等の近傍の海域を仕切って処
分場を構築し、廃棄物を用いて新たな陸地を構築すると
ともに、排出地域からの運搬距離を短くすることに対応
させ得るようにすることが考えられている。
2. Description of the Related Art In order to landfill and dispose of waste, a disposal site has conventionally been constructed in a mountainous remote place or the like. After the construction of the impermeable layer, such as laying water bodies, the waste is dumped. However, the above-mentioned disposal sites are often located far from cities and industrial areas that discharge a large amount of waste, and have a transportation problem for transporting waste. In addition, land-based disposal sites have problems from the viewpoint of environmental protection of the surroundings, and it is difficult to obtain the consent of residents, and it has become difficult to secure large-scale waste disposal sites. I have. Therefore, in the future, a landfill will be constructed by partitioning the sea area near cities and other places where large amounts of waste will be discharged, and new land will be constructed using waste and the transportation distance from the discharge area will be shortened. It is conceived to be able to deal with the situation.

【0003】前記廃棄物の処分場を海面に構築する場合
には、一般的には埋立地の護岸の構築場所で、海底地盤
を強化するための地盤改良工事を施工し、石積基礎を所
定の高さに構築してその上面を平らに均してから、その
基礎の上にケーソン等の既成の構造物を配置して構成し
ている。前記構造物と石積基礎に対して遮水性を持たせ
るためには、例えば、陸上の処分場の場合と同様に、遮
水用シートと保護マット等を重ねて敷設し、廃棄物によ
り遮水用シートを石積基礎に向けて押圧するようにして
安定させている。前記海面埋立て処分場の他に、海面を
所定の範囲で区画して人工島を構築する場合や、人工島
の構築と同様に、所定の海域を護岸により区画してその
区画された内部の海底地盤で工事を行う場合(人工島と
総称する)においても、前記埋立て処分場と同様な工事
を行って、遮水性を有する護岸を構築している。
[0003] When the waste disposal site is constructed on the sea surface, a ground improvement work for strengthening the seabed is generally carried out at a construction site of a revetment of a landfill, and a masonry foundation is constructed in a predetermined manner. It is constructed at a height and its upper surface is leveled, and then a caisson or other existing structure is placed on the foundation. In order to provide the structure and the masonry foundation with water impermeability, for example, as in the case of a land-based disposal site, water-impervious sheets and protective mats are laid one on top of another, and The sheet is pressed against the masonry foundation to stabilize it. In addition to the sea surface landfill, in the case of constructing an artificial island by dividing the sea surface in a predetermined range, or in the same manner as in the construction of an artificial island, a predetermined sea area is partitioned by seawall and the inside of the partitioned area is constructed. When construction is performed on the seabed (generally referred to as an artificial island), construction similar to that of the landfill site is performed to construct a seawall having water impermeability.

【0004】前記遮水用シート等のシートとしては、例
えば、薄いゴムシートや塩化ビニール等のプラスチック
製の水を通さない性質を有するシートを用いている。ま
た、前記石積基礎の上に設置するケーソン等の構造物の
間では、ケーソン間の目地部からの透水を防止する措置
として、一般的には弾性を有するゴム製の仕切り材をケ
ーソンの間に所定の間隔を介して配置し、前記仕切り材
の間にアスファルト混合物等を充填する等の処理を行っ
て、ケーソン等の目地間から内部の保有水が浸出しない
ような遮水層を構築している。
[0004] As a sheet such as the water-blocking sheet, for example, a thin rubber sheet or a sheet made of plastic such as vinyl chloride and having a water-impermeable property is used. In addition, between structures such as caissons installed on the masonry foundation, as a measure to prevent water permeation from joints between caissons, a rubber partition member having elasticity is generally provided between caissons. Arranged at a predetermined interval, by performing a process such as filling the asphalt mixture between the partitioning material and the like, to construct a water-impervious layer such that the retained water inside does not leach from between joints such as caisson. I have.

【0005】[0005]

【発明が解決しようとする課題】ところが、前記遮水性
を有するシートを海中で施工する場合には、前記シート
が比較的薄くて軽いものであることから、風や波浪にあ
おられること等により、必要とされる場所に正確に敷設
することが困難である。そして、前記遮水用シートを前
記埋め立て護岸の角部の広い面積を覆うように施工する
際には、海中で遮水用シートを角部の形状に合わせて加
工した上で、接続部を接続して一体化を図り、接続部で
の遮水性を確保する必要があるが、接続される遮水用シ
ートが安定しない状態とか、角部の形状が複雑であった
りしてその接続が面倒である。また、前記遮水用シート
を敷設するに際しては、おもり部材やその他の補助手段
を合わせて用いるために、施工コストが大幅に上昇する
原因ともなる。
However, when the sheet having the water barrier property is constructed in the sea, the sheet is relatively thin and light, so that the sheet is exposed to wind and waves, and so on. It is difficult to lay exactly where it is needed. Then, when constructing the water-impervious sheet so as to cover a large area of the corner of the landfill revetment, the water-impervious sheet is processed in the sea in accordance with the shape of the corner, and then the connection portion is connected. It is necessary to secure the water barrier at the connection part, but the connection of the water barrier sheet to be connected is unstable or the shape of the corner is complicated, so the connection is troublesome. is there. In addition, when laying the water-blocking sheet, a weight member and other auxiliary means are used together, which greatly increases construction cost.

【0006】また、海中で遮水用シートを敷設する際に
は、陸上の処分場のように土を平らに均すことができ
ず、大きな凹凸のある石積の堤体の表面に配置するの
で、その石の凸部に当った部分が破損しやすい等の問題
があり、遮水用シートによる遮水性を確保することが困
難である。前記問題の他に、ケーソンを支持する石積基
礎の下面では、海底地盤の改良工事を施工するので、構
造物本体に対する支持作用は安定して発揮できるが、埋
立地側では廃棄物の重量により地盤が圧密されるため
に、廃棄物により海底地盤が沈下するという問題が発生
しやすく、石積基礎の端部から海底地盤に向けて敷設し
たシートに引っ張り作用が加わり、遮水用シートが破損
する等の問題の発生が想定される。
Further, when laying a water-impervious sheet in the sea, the soil cannot be leveled as in a land-based disposal site, and it is placed on the surface of a masonry with large unevenness. However, there is a problem that the portion of the stone that hits the convex portion is easily damaged, and it is difficult to secure the water blocking by the water blocking sheet. In addition to the above-mentioned problems, the undersea ground improvement work is performed on the lower surface of the masonry foundation that supports the caisson, so the supporting action on the structure body can be stably exhibited. The seabed is likely to settle due to waste due to consolidation, and the sheet laid from the edge of the masonry foundation to the seabed will be pulled, and the waterproof sheet will be damaged. It is assumed that the problem will occur.

【0007】さらに、前記多層に構成する遮水層におい
ても、廃棄物を投棄する前の段階で、工事資材等の大き
なものが落下したりして破損する場合が考えられる。ま
た、廃棄物を投棄している際にも、何等かの衝撃が加え
られたりすることにより、遮水層に裂け目が形成され
て、遮水性能に欠陥が発生する場合がある。ところが、
遮水用シート等が破損した場合に、従来は、破れた遮水
用シートを引き上げて、船の上で補修用シートを貼付け
たりするような手段を用いているが、一度敷設し終えた
シートを再浮上させるには、多大な時間とコストがかか
る上に、そのような補修では、長期間の使用に耐えるこ
とは困難であり、より有効な補修手段の開発も望まれて
いる。
[0007] Further, even in the above-described multi-layered impermeable layer, it is conceivable that a large material such as construction material may fall or be damaged before the waste is dumped. In addition, even when the waste is dumped, a shock may be applied to the water impervious layer to form a crack in the impermeable layer, resulting in a defect in impermeable performance. However,
In the past, when the water-impervious sheet was damaged, the conventional method used was to pull up the torn water-impervious sheet and attach a repair sheet on the ship. It takes a lot of time and cost to resurfacing, and it is difficult for such repair to withstand long-term use, and it is desired to develop more effective repair means.

【0008】本発明は、前述したような海中での遮水処
理層を施工する場合と、補修の問題を解消するもので、
遮水層の構築を容易に行い得て、遮水の性能を長期間に
亘って確保でき、シートの継ぎ目の接続処理と、破損箇
所に対する補修作業を容易に行い得る、遮水処理層を設
けた管理型護岸を提供することを目的としている。
[0008] The present invention is to solve the problem of repairing and repairing the case where the above-mentioned water-impervious treatment layer is installed in the sea.
Provide a water-impervious treatment layer that can easily construct a water-impervious layer, secure water-impervious performance for a long period of time, and easily perform seam connection processing and repair work for damaged parts The purpose is to provide a managed seawall.

【0009】[0009]

【課題を解決するための手段】本発明は、遮水性を有す
る構造体で被覆された埋立護岸により区画された廃棄物
海面埋立処分場において、前記埋立護岸を透水性を有す
る石積マウンドや継手の隙間から漏水する矢板やセル、
もしくは目地間から漏水するケーソンやL型ブロックの
ような部材により構成してなる構造体に関する。本発明
の請求項1の発明は、前記埋立護岸を透水性を有する石
積マウンドや継手の隙間から漏水する矢板やセル、もし
くは目地間から漏水するケーソンやL型ブロックのよう
な部材により構成し、前記埋立護岸の埋立て側と外海側
の両面もしくは一方の表面と海底地盤の所定の範囲に亘
ってシート状遮水体とアスファルト混合物との多層の遮
水層を重ねた遮水処理層を構成することを特徴とする。
DISCLOSURE OF THE INVENTION The present invention relates to a landfill for reclaiming waste, which is divided by a landfill seawall covered with a structure having water-blocking properties. Sheet piles and cells that leak from gaps,
Alternatively, the present invention relates to a structure including a member such as a caisson or an L-shaped block that leaks water from between joints. The invention according to claim 1 of the present invention is characterized in that the landfill revetment is constituted by a sheet pile or cell that leaks water from a gap between permeable masonry mounds and joints, or a member such as a caisson or an L-type block that leaks water from between joints, A water-impervious treatment layer is formed by stacking a multi-layer water-impervious layer of a sheet-like water-impervious body and an asphalt mixture over both the landfill side and the open sea side or both surfaces of the landfill seawall and a predetermined range of the seabed ground. It is characterized by the following.

【0010】請求項2の発明は、前記遮水処理層におい
て、シート状遮水体を所定の範囲に亘って敷設した上
に、アスファルト混合物層を所定の厚さで打設して構成
することを特徴とする。請求項3の発明は、前記遮水処
理層を、埋立護岸の表面と海底地盤の所定の範囲に亘っ
て打設するアスファルト混合物層と、その上に重ねて敷
設するシート状遮水体により構成することを特徴とす
る。請求項4の発明は、前記遮水処理層を、埋立護岸の
表面と海底地盤の所定の範囲に亘って打設するアスファ
ルト混合物層と、その上に重ねて敷設するシート状遮水
体と、前記シート状遮水体の上にさらに重ねて打設する
アスファルト混合物層とから構成することを特徴とす
る。請求項5の発明は、前記遮水処理層を、埋立護岸の
表面と海底地盤の所定の範囲に亘って敷設するシート状
遮水体と、前記シート状遮水体の上に敷設するアスファ
ルト混合物層と、その上に重ねて敷設するシート状遮水
体とから構成することを特徴とする。
According to a second aspect of the present invention, in the water-impervious treatment layer, a sheet-like water-impervious body is laid over a predetermined range, and an asphalt mixture layer is cast at a predetermined thickness. Features. According to a third aspect of the present invention, the water-impervious treatment layer is constituted by an asphalt mixture layer that is cast over a predetermined area of the surface of the landfill revetment and the seabed, and a sheet-like water-impervious body that is laid thereon. It is characterized by the following. The invention according to claim 4, wherein the water-impervious treatment layer, an asphalt mixture layer cast over a predetermined area of the surface of the landfill revetment and the seabed, and a sheet-like water impervious body laid on the asphalt mixture layer, And an asphalt mixture layer which is further overlaid and cast on the sheet-like water shield. The invention according to claim 5 is characterized in that the water-impervious treatment layer is a sheet-like water impervious body laid over a predetermined range of the surface of the landfill seawall and the seabed ground, and an asphalt mixture layer laid on the sheet-like water impervious body. And a sheet-shaped impermeable body laid thereon.

【0011】請求項6の発明は、前記埋立護岸の埋立て
側と外海側の両面もしくは一方の表面と海底地盤の所定
の範囲に亘って、シート状遮水体とアスファルト混合物
とを重ねた遮水処理層もしくはシート状遮水体による遮
水処理層を構成するとともに、前記埋立護岸が所定の角
度で交わるように接続される角部に対して、前記埋立護
岸の角部の周囲を所定の広さで覆うようにアスファルト
混合物層を構築し、前記角部の両側の遮水処理層と一体
の接続層を構築することを特徴とする。請求項7の発明
は、前記埋立護岸の角部での遮水処理層の接続層を構築
するに際して、前記埋立護岸の角部を中心にして所定の
範囲に施工枠体を配置して固定し、前記施工枠体の中の
空間部にアスファルト混合物を施工して、前記角部の両
側の遮水処理層の上に密着させたアスファルト遮水処理
層を構築することを特徴とする。
According to a sixth aspect of the present invention, there is provided a water-impervious structure in which a sheet-like water-impervious body and an asphalt mixture are overlapped on both the landfill side and / or the outer sea side of the landfill seawall and over a predetermined area of the seabed ground. A water-impervious treatment layer composed of a treatment layer or a sheet-shaped water-impervious body, and a predetermined width around the corner of the reclamation seawall with respect to a corner connected to the reclamation seawall at a predetermined angle. And a connecting layer integral with the water-impervious treatment layers on both sides of the corner. The invention according to claim 7 is that, when constructing the connection layer of the water-impervious treatment layer at the corner of the landfill revetment, the construction frame is arranged and fixed in a predetermined range around the corner of the landfill revetment. An asphalt mixture is applied to a space in the construction frame to form an asphalt water-impervious treatment layer that is in close contact with the water-impervious treatment layer on both sides of the corner.

【0012】請求項8の発明は、埋立護岸の角部で接続
される両側のシート状遮水体の接続部に対して、前記両
側のシート状遮水体の上部を所定の範囲で覆うようにア
スファルト混合物を施工することを特徴とする。請求項
9の発明は、前記埋立護岸の角部で接続される両側のシ
ート状遮水体の接続部に対して、その下面に所定の範囲
に亘ってアスファルト混合物による下面の層を構築し、
前記下面の層の上で前記両側のシート状遮水体を配置
し、そのシート状遮水体の接続部の上面を所定の範囲で
覆うようにアスファルト混合物の上の層を施工すること
を特徴とする。請求項10の発明は、前記シート状遮水
体は、ゴムまたはプラスチック材料で構成した遮水性を
有するシートであることを特徴とする。
[0012] The invention according to claim 8 is an asphalt asphalt so as to cover an upper portion of the sheet-like water barrier on both sides with a predetermined range with respect to a connection portion of the sheet-like water barrier on both sides connected at the corner of the reclamation seawall. It is characterized by applying a mixture. The invention according to claim 9 is to construct a lower surface layer of an asphalt mixture over a predetermined range on a lower surface of the connection portion of the sheet-like impermeable bodies on both sides connected at the corner of the landfill seawall,
The sheet-like water barriers on both sides are arranged on the lower layer, and the upper layer of the asphalt mixture is constructed so as to cover the upper surface of the connection part of the sheet-like water barrier in a predetermined range. . A tenth aspect of the present invention is characterized in that the sheet-like water shield is a water-shielding sheet made of a rubber or plastic material.

【0013】請求項11の発明は、前記埋立護岸の埋立
て側と外海側の両面もしくは一方の表面と海底地盤の所
定の範囲に亘って、シート状遮水体、またはシート状遮
水体とアスファルト混合物との多層の遮水層を重ねた遮
水処理層を構成するに際して、前記遮水処理層に裂け目
が形成されたりして欠陥が生じた場合に、前記裂け目を
中心にした周囲を任意の広さと厚さを持って覆うように
アスファルト遮水処理層を構築し、前記遮水処理層によ
りシート状遮水体を、アスファルト遮水処理層と一体の
遮水処理層として構築することを特徴とする。請求項1
2の発明は、前記埋立護岸の遮水処理層が、シート状遮
水体と固化処理土、シート状遮水体とアスファルト混合
物、シート状遮水体と粘性土、シート状遮水体を複数層
重ねたもの、または、保護マット、固化処理土、粘性土
もしくはアスファルト混合物のような遮水性を有する遮
水層を各々単層として構成したものを対象とすることを
特徴とする。
[0013] The invention of claim 11 is a sheet-like water barrier, or a sheet-like water barrier and a mixture of asphalt, over a predetermined area of both the landfill side and the open sea side or one surface of the landfill seawall and the seabed ground. In forming a water-impervious treatment layer in which a plurality of water-impervious layers are overlapped with each other, when a crack is formed in the water-impervious treatment layer or a defect occurs, an area around the fracture is arbitrarily widened. And an asphalt water-impervious treatment layer is constructed so as to cover with a thickness, and the sheet-like water-impervious body is constructed by the water-impervious treatment layer as a water-impervious treatment layer integrated with the asphalt water-impervious treatment layer. . Claim 1
The invention of Claim 2 is that the water-impervious treatment layer of the reclamation seawall is formed by stacking a plurality of sheet-like water impervious bodies and solidified treated soil, sheet-like water impervious bodies and asphalt mixture, sheet-like water impervious bodies and viscous soil, and sheet-like water impervious bodies. Alternatively, the present invention is characterized in that a water-impervious layer having a water-impervious layer such as a protective mat, a solidified soil, a clayey soil, or an asphalt mixture is formed as a single layer.

【0014】請求項13の発明は、前記アスファルト補
修層を構築するに際して、シート状遮水体もしくは多層
の遮水処理層の裂け目を中心に施工枠体を配置して固定
し、前記施工枠体の中の空間部にアスファルト混合物を
施工して、前記遮水処理層の上面に密着させて設けるア
スファルト補修層を構築することを特徴とする。請求項
14の発明は、前記施工枠体にアスファルト混合物を施
工するに際して、前記施工枠体の外面に配置する仕切板
には網状の部材や多孔質の板状部材を設け、前記施工枠
体の中から水と加熱された気体を排出させ得るようにす
ることを特徴とする。請求項15の発明は、前記遮水処
理層護岸を構築する護岸が、人工島や海底地盤に対する
工事区域を囲む護岸であることを特徴とする。
According to a thirteenth aspect of the present invention, in constructing the asphalt repair layer, a construction frame is disposed and fixed around a crack in a sheet-like water barrier or a multilayer water barrier treatment layer. It is characterized in that an asphalt mixture is applied to an inner space portion to construct an asphalt repair layer provided in close contact with the upper surface of the water-impervious treatment layer. The invention according to claim 14, when the asphalt mixture is applied to the construction frame, a partition member disposed on the outer surface of the construction frame is provided with a net-like member or a porous plate-like member, It is characterized in that water and heated gas can be discharged from inside. The invention according to claim 15 is characterized in that the seawall for constructing the seawall of the impermeable treatment layer is a seawall surrounding an artificial island or a construction area for the seabed.

【0015】前述したように、遮水処理層を材質、性状
の相違する遮水部材を重ねて配置し、一体化した遮水処
理層として構成したことにより、埋立地の仕切護岸での
遮水性を良好に発揮できる。そして、内海側の水圧に対
して十分な遮水性を発揮し、投棄物を投下した時の衝撃
と、投棄物による押圧作用に対して良好に抵抗できる遮
水処理層を構築することができる。また、前記遮水処理
層の角部に対して角部接続層を構築することで、遮水性
が不安定となりやすいシート状遮水体やその他の構造を
有する遮水処理層の接続部での遮水性を強化することが
可能であり、その角部接続層の施工もアスファルト混合
物を接続部の上下面に打設するにより容易に行うことが
可能である。さらに、遮水処理層に裂け目が形成された
場合に、前記裂け目を広く覆うようなアスファルト補修
層を構築することにより、遮水処理層の遮水性を良好に
維持させることができる。したがって、前記角部接続層
やアスファルト補修層に対して施工枠体を取り外さずに
一体に設置することにより、アスファルト補修層の性能
を長期間に亘って維持でき、特に薄いシートのみを配置
した遮水処理層においても、その遮水性を良好に維持で
きる。
[0015] As described above, the water-impervious treatment layer is formed by arranging water-impervious members of different materials and properties on top of each other to form an integrated water-impervious treatment layer. Can be satisfactorily exhibited. In addition, it is possible to construct a water-impervious treatment layer that exhibits sufficient water-blocking against the water pressure on the inland sea side and can well resist the impact when the dumped material is dropped and the pressing action by the dumped material. Further, by constructing a corner connection layer with respect to the corner of the water-impervious treatment layer, the water-imperviousness of the sheet-like water-impervious body, which tends to be unstable, or the connection of the water-impervious treatment layer having another structure, is improved. It is possible to strengthen the water, and the corner connection layer can be easily formed by placing the asphalt mixture on the upper and lower surfaces of the connection portion. Furthermore, when a crack is formed in the water-impervious treatment layer, the water-impermeability of the water-impervious treatment layer can be favorably maintained by constructing an asphalt repair layer that widely covers the crack. Therefore, the performance of the asphalt repair layer can be maintained for a long period of time by integrally installing the corner connection layer and the asphalt repair layer without removing the construction frame body, and particularly, the shielding in which only a thin sheet is disposed. Even in the water treatment layer, the water shielding property can be favorably maintained.

【0016】[0016]

【発明の実施の形態】図示される例にしたがって、本発
明の多層の遮水部材を重ねて配置した埋立護岸の遮水構
造を説明する。図1に示す例は、一般的な埋立護岸をケ
ーソンを用いて構成する場合を示しているものである
が、前記埋立て護岸と同様に構築される人工島をも対象
とすることができる。前記護岸を構築するに際しては、
海底地盤6のケーソン構築区域の地盤に地盤改良工事を
施工した改良地盤7として構成し、その改良地盤7の上
に石を積重ねることにより、所定の高さと巾を有する基
礎捨石による護岸基礎5を構築した上にケーソン2を設
置して埋立護岸1を構築する。そして、前記埋立護岸1
により区切られた区域の内部に、廃棄物を投棄して埋立
地8を構築する。前記埋立地8に投棄した廃棄物から浸
出する有害物質を封じ込め、有害物質が外洋に流出する
ことを防止するために、ケーソン2の間にはゴムの筒状
のもので構成した仕切部材3a、3bを配置し、前記仕
切り部材3a、3bの間にはアスファルト混合物の充填
層3cを設けて、ケーソン間仕切としての遮水部3を構
築する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS In accordance with the illustrated example, a description will be given of a water-blocking structure of a reclaimed revetment in which multilayer water-blocking members of the present invention are arranged in an overlapping manner. The example shown in FIG. 1 shows a case where a general landfill revetment is formed using a caisson, but an artificial island constructed similarly to the landfill revetment can also be used. When constructing the revetment,
An improved ground 7 constructed by performing ground improvement work on the ground in the caisson construction area of the seabed ground 6, and stones are stacked on the improved ground 7 to form a seawall foundation 5 with a rubble foundation having a predetermined height and width. Then, a caisson 2 is installed and a reclaimed seawall 1 is constructed. And the landfill revetment 1
In the area delimited by, waste is dumped to construct a landfill 8. In order to contain the harmful substances leached from the waste dumped in the landfill 8 and prevent the harmful substances from flowing out into the open sea, a partition member 3a composed of a rubber cylindrical member is provided between the caisson 2; 3b, and a filling layer 3c of an asphalt mixture is provided between the partition members 3a and 3b to construct a water impervious portion 3 as a caisson partition.

【0017】なお、前記護岸基礎5を構築した上に、ケ
ーソンのような既成の構造物を載置して一体の埋立護岸
1を構成する場合の他に、比較的浅い海域や付近で入手
可能な石を大量に用いて護岸基礎を構築できる場合に
は、ケーソン等を用いずに護岸基礎のみで護岸を構築す
ることもできる。また、前記ケーソンに代えて、大型の
L型ブロック等を護岸基礎の上に構築して護岸構成する
ことも可能である。そして、前記ケーソンやL型ブロッ
クを護岸基礎の上に組み合わせて構築する護岸や、護岸
基礎のみによる護岸に対しても、以下に説明する構造の
遮水処理層を適用することができる。なお、前記遮水処
理層護岸を構築する護岸が、人工島や海底地盤に対する
工事区域を囲む護岸である場合にも、以下に説明する護
岸の遮水構造を適用することが可能である。
In addition to the case where an existing structure such as a caisson is mounted on the revetment foundation 5 to form an integrated landfill revetment 1, it can be obtained in a relatively shallow sea area or in the vicinity. If a large number of stones can be used to construct a revetment foundation, a revetment can be constructed using only the revetment foundation without using a caisson or the like. Instead of the caisson, a large L-shaped block or the like may be constructed on the revetment foundation to constitute a revetment. The water-impervious treatment layer having the structure described below can be applied to a revetment constructed by combining the caisson or L-shaped block on a revetment foundation or a revetment using only a revetment foundation. It should be noted that even if the revetment for constructing the revetment treatment layer revetment is a revetment surrounding a construction area for an artificial island or a seabed, the revetment water barrier structure described below can be applied.

【0018】前記護岸基礎5の埋立地の内面側の表面部
と、海底地盤6の所定の区間には、遮水処理層10を施
工して、前記遮水処理層10と海底地盤6を海水が流通
しないような処理を施している。そして、前記護岸で仕
切られた内海側に対して、外海側での潮の干満による海
水の圧力や、埋立地の内部に溜まった水の圧力により、
前記遮水処理層10が不安定となることを防止するため
に、上面保護層9を構築している。前記上面保護層9は
砂等の入手が容易で安価な材料を用いて構築し、遮水処
理層が前面潮汐変動圧にて持ち上がったり、埋立材の投
入による衝撃で破れないように保護して、遮水処理層に
よる遮水性能を確保できるようにしている。
A water-impervious treatment layer 10 is installed on the inner surface of the landfill of the revetment foundation 5 and a predetermined section of the seafloor ground 6, so that the water-impervious treatment layer 10 and the seafloor ground 6 are sealed with seawater. Has been treated to prevent distribution. And, against the inland sea side partitioned by the seawall, by the pressure of seawater due to the ebb and flow of the tide on the outer sea side, and the pressure of water accumulated inside the landfill,
In order to prevent the water shielding treatment layer 10 from becoming unstable, an upper surface protection layer 9 is constructed. The upper surface protective layer 9 is constructed by using an easily available and inexpensive material such as sand, and protects the impermeable layer from being lifted by the front tide fluctuating pressure and from being broken by the impact of the landfill material. In addition, it is possible to ensure the water blocking performance of the water blocking treatment layer.

【0019】図2に示す例は、埋立護岸1を平面視で直
角に交差するように接続するか、またはある角度を持た
せて構築する場合の例を示しているもので、図示するよ
うに、護岸基礎5の上に多数のケーソン2、2……を列
状に並べて配置し、各ケーソン2、2……の間に遮水部
3を構築してケーソン間での遮水処理を行っている。前
記護岸で仕切られた埋立地の内面側には、後述する遮水
処理層10を設けるが、前記遮水処理層10を直線部に
沿わせて配置する際には、遮水用シート等の敷設を容易
に行うことができるが、直線状の護岸を、所定の角度で
接続する部分(以下「角部」と呼ぶ)では、遮水用シー
トの接続が容易に行われ得ないという問題がある。そこ
で、前記護岸の角部4に対しては、遮水処理層10を施
工した後に角部接続層15を施工して、遮水性能を確保
できるようにしている。
The example shown in FIG. 2 shows an example in which the reclaimed revetment 1 is connected so as to intersect at right angles in plan view or is constructed with a certain angle. A number of caissons 2, 2, ... are arranged in a row on the revetment foundation 5, and a water impervious portion 3 is constructed between each caisson 2, 2, ... to perform water impermeability treatment between the caissons. ing. On the inner surface side of the landfill separated by the seawall, a water-impervious treatment layer 10 to be described later is provided. When the water-impervious treatment layer 10 is arranged along a straight portion, a sheet such as a water-impervious sheet is used. Although it can be laid easily, there is a problem that the connection of the sheet for waterproofing cannot be performed easily at the part where the straight seawall is connected at a predetermined angle (hereinafter referred to as “corner”). is there. Therefore, the corner connection layer 15 is applied to the corner 4 of the revetment after the water impervious treatment layer 10 is applied to ensure the water impermeability.

【0020】図3ないし図6には、前記遮水処理層10
の構造を説明しているが、本実施例では、従来より一般
に用いられている遮水用シートのみを1枚または2枚重
ねて敷設することに代えて、遮水用シートとアスファル
ト層とを重ねて遮水性能の信頼性を向上させた遮水処理
層として構成する場合を示している。まず、図3に示す
例は、護岸基礎5の上面と斜面部および海底地盤6の所
定の範囲に亘って遮水用シート11を敷設し、前記遮水
用シート11のシートの接続部には、従来の遮水用シー
ト11の場合と同様に、遮水性を発揮できるような接続
処理を施す。前記遮水用シート11の上には、アスファ
ルト混合物を所定の厚さで打設して、アスファルト層1
2を構築する。前記アスファルト層12は、埋立地8と
外洋との間で、遮水性を良好に発揮できる程度の厚さを
有するものとして構成されるもので、例えば、5〜15
cm程度の厚さを持たせるように施工する。
FIGS. 3 to 6 show the water-impervious treatment layer 10.
However, in this embodiment, instead of laying one or two sheets of a water-impervious sheet generally used in the past, a sheet for water-impervious and an asphalt layer are used instead. A case is shown in which a water-impervious treatment layer is formed in which the reliability of the water-impermeability is improved. First, in the example shown in FIG. 3, a water-impervious sheet 11 is laid over a predetermined range of the upper surface and the slope part of the seawall 5 and the seafloor ground 6. In the same manner as in the case of the conventional sheet 11 for water shielding, connection processing is performed so as to exhibit water shielding. An asphalt mixture is cast on the water-impervious sheet 11 at a predetermined thickness to form an asphalt layer 1.
Build 2. The asphalt layer 12 is configured to have a thickness between the landfill 8 and the open sea so as to exhibit good water shielding properties.
Work to have a thickness of about cm.

【0021】前記アスファルト混合物を施工する場合
に、遮水用シート11の表面が平滑なものである場合に
は、あらかじめ凹凸を設けるような処理を施す等の処理
を行って、打設したマスチックが斜面に沿って流れ落ち
ないようにすることができる。また、前記アスファルト
層12を護岸基礎の斜面部に施工するに際しては、斜面
に沿わせて所定の間隔でアスファルト製のブロック状や
マット状の部材を配置しておき、打設したアスファルト
混合物を小さい区画に区切るようにし、その上にアスフ
ァルト混合物を所定の厚さで一体に被覆するような手段
を用いることもできる。さらに、前記アスファルト層1
2を施工するに際しては、遮水用シート11のアスファ
ルト混合物と接する面に、アスファルトを付着させ得る
ような処理を施しておき、打設したアスファルト混合物
を遮水用シート11に一体の層に形成することができ
る。その他に、遮水用シート11を遮水性を有するシー
ト部材と、不織布等を重ねて一体化した複合シートとし
て構成する場合には、アスファルト層12を打設して2
つの層を一体化して遮水処理層10を構成でき、遮水性
を確保させることができる。
When the asphalt mixture is applied, if the surface of the impermeable sheet 11 is smooth, a treatment such as a process of providing irregularities in advance is performed, and It can be prevented from running down the slope. When the asphalt layer 12 is installed on the slope of the revetment foundation, asphalt block-shaped or mat-shaped members are arranged at predetermined intervals along the slope, and the cast asphalt mixture is reduced. It is also possible to use means for dividing into compartments, on which the asphalt mixture is integrally coated with a predetermined thickness. Further, the asphalt layer 1
2 is applied to the surface of the water-blocking sheet 11 that is in contact with the asphalt mixture so that asphalt can be attached to the surface, and the cast asphalt mixture is formed into a layer integral with the water-blocking sheet 11. can do. In addition, when the water-blocking sheet 11 is configured as a composite sheet in which a sheet member having a water-blocking property is laminated with a nonwoven fabric or the like, the asphalt layer 12 is cast thereon.
The water shielding treatment layer 10 can be configured by integrating the three layers, and water shielding can be ensured.

【0022】前述したようにして、遮水用シート11と
アスファルト層12とを重ねて構築した遮水処理層10
において、前記遮水用シート11は、例えば、ゴムや塩
化ビニール、ポリエチレン、ポリプロピレン等の、従来
より埋立地の遮水用シートとして用いられているゴム・
プラスチック材料により構成されるもので、厚さが1〜
5mmのものとして形成される。そして、前記遮水用シー
ト11を護岸基礎5の表面に敷設する場合に、護岸基礎
5の表面の凹凸ができるだけ小さい値となるように、小
さい石等を護岸基礎5の表面に配置することにより、遮
水用シート11を敷設した際に石の突部にあたった部分
が破損したりする事故を防ぐことができる。前記遮水用
シート11の上の構築するアスファルト層12は、遮水
用シート11の表面に凹凸があっても、その凹凸を埋め
て任意の厚さのアスファルトによる遮水層を構成するこ
とができる。
As described above, the water-impervious treatment layer 10 constructed by overlapping the water-impervious sheet 11 and the asphalt layer 12
In the above, the water-blocking sheet 11 is made of, for example, rubber, vinyl chloride, polyethylene, polypropylene or the like, which is conventionally used as a water-blocking sheet in a landfill.
It is made of plastic material and has a thickness of 1 to
It is formed as 5mm. When laying the water-blocking sheet 11 on the surface of the revetment foundation 5, small stones or the like are arranged on the surface of the revetment foundation 5 so that the unevenness on the surface of the revetment foundation 5 is as small as possible. In addition, it is possible to prevent an accident that a portion hitting a protrusion of a stone when the water-impermeable sheet 11 is laid is damaged. The asphalt layer 12 to be built on the water-blocking sheet 11 can form a water-blocking layer of asphalt having an arbitrary thickness by filling the unevenness even if the surface of the water-blocking sheet 11 has irregularities. it can.

【0023】図4には、護岸基礎5の表面に対してアス
ファルト混合物を所定の厚さで打設してアスファルト層
12を構築し、そのアスファルト層12の表面に遮水用
シート11を敷設して、遮水処理層10aを構築する場
合を示している。前記遮水処理層10aにおいては、護
岸基礎5の表面にアスファルト混合物を打設して、所定
の厚さのアスファルト層12を構築するので、その表面
は平滑な面として形成される。そして、前記アスファル
ト層12の上に遮水用シート11を重ねて敷設すること
で、アスファルト層表面に遮水用シート11を付着させ
るようにして一体化した遮水処理層10aを構築し、2
つの層を重ねた遮水処理層での遮水作用を良好に発揮さ
せることができる。
In FIG. 4, an asphalt mixture is cast at a predetermined thickness on the surface of the seawall 5 to form an asphalt layer 12, and a water-blocking sheet 11 is laid on the surface of the asphalt layer 12. Thus, the case where the water impervious treatment layer 10a is constructed is shown. In the water-impervious treatment layer 10a, the asphalt mixture is cast on the surface of the revetment foundation 5 to construct the asphalt layer 12 having a predetermined thickness, so that the surface is formed as a smooth surface. Then, the water-impervious sheet 11 is overlaid and laid on the asphalt layer 12 to construct the integrated water-impervious treatment layer 10a by attaching the water-impervious sheet 11 to the surface of the asphalt layer.
The water-impervious effect of the water-impervious treatment layer in which the three layers are stacked can be favorably exhibited.

【0024】図5、6に示す例は、3層の遮水部材を重
ねて敷設し、一体化した遮水処理層10b、10cを構
築する場合を示しており、図5に示す例では、前記図3
の遮水処理層10の上に、さらに遮水用シート11aを
重ねて配置して、遮水処理層10bを構成している。前
述したように、護岸基礎5の表面に遮水用シート11を
敷設することは、前記図3の遮水処理層10を構築した
後で、さらに、遮水用シート11aを追加施工するので
あるから、その遮水用シート11aの施工を容易に行う
ことができる。
The examples shown in FIGS. 5 and 6 show a case where three layers of water-impervious members are laid one on top of another to construct integrated water-impervious treatment layers 10b and 10c. In the example shown in FIG. FIG. 3
The water-impervious sheet 11a is further laminated on the water-impervious treatment layer 10 to form a water-impervious treatment layer 10b. As described above, laying the water-impervious sheet 11 on the surface of the revetment foundation 5 involves additionally constructing the water-impervious sheet 11a after the water-impervious treatment layer 10 of FIG. 3 is constructed. Accordingly, the construction of the water-blocking sheet 11a can be easily performed.

【0025】図6に示す例では、前記図4の遮水処理層
10aに対して、アスファルト層12aを追加施工する
ことで、遮水用シート11を間には挟む状態の3層の遮
水層を一体化して遮水処理層10cを構成している。前
記図5、6に示すように、3層の遮水層を重ねて構成す
る場合に、アスファルト層に接する遮水用シートの面に
は、アスファルトと親和性を発揮できるような表面処理
を施しておくと、遮水処理層を一体化させる上で有効で
ある。また、アスファルト層を打設する場合には、アス
ファルト混合物の層を一度に施工せずに、複数回に分け
て打設して、アスファルト混合物が斜面に沿って流れ落
ちることを阻止できれば、任意の厚さのアスファルト層
を構築することが可能である。
In the example shown in FIG. 6, an asphalt layer 12a is additionally provided on the water-impervious treatment layer 10a shown in FIG. 4 so that three layers of water-impervious sheets 11 are sandwiched therebetween. The layers are integrated to form a water-impervious treatment layer 10c. As shown in FIGS. 5 and 6, when the three water-impervious layers are stacked and configured, the surface of the water-impervious sheet that is in contact with the asphalt layer is subjected to a surface treatment that can exhibit affinity with asphalt. This is effective in integrating the water-impervious treatment layer. In addition, when the asphalt layer is cast, the layer of the asphalt mixture is not applied at once, but is divided into a plurality of times, and if the asphalt mixture can be prevented from flowing down along the slope, an arbitrary thickness can be attained. It is possible to build a layer of asphalt.

【0026】なお、前記遮水用シートを工場で製作する
際には、巾が2〜5mのものとして構成し、施工現場で
遮水用シートを接続して広い遮水用シートを形成しなが
ら、護岸基礎5の表面と改良地盤7の所定の範囲に亘っ
て遮水層を構築する必要がある。前記遮水用シートの接
続に際しては、従来より遮水用シートの接続に用いてい
るような、接着剤を用いることや熱融着による接続手段
や、両面テープ等を用いて接続することができる。ま
た、前記図5、6に示すような3層に重ねた遮水処理層
を構築する場合には、アスファルト混合物を用いて所定
の厚さの遮水層を構築することに代えて、アスファルト
マットを敷設して構築することもできる。前記アスファ
ルトマットを遮水用シートと組み合わせて配置する場合
に、アスファルトマットの継ぎ目には、任意の接続手段
を用いて接続し、アスファルト混合物等を充満させて遮
水性を発揮できるような接続処理を行うことで、シート
と同様なマットによる遮水性を確保できるようにすると
良い。
When manufacturing the water-impervious sheet at a factory, the sheet is configured to have a width of 2 to 5 m, and is connected to the sheet at the construction site to form a wide water-impervious sheet. It is necessary to construct a water barrier layer over a predetermined area of the surface of the revetment foundation 5 and the improved ground 7. When connecting the water-impervious sheet, it is possible to use an adhesive or a connecting means by heat fusion, or a double-sided tape or the like, as conventionally used for connecting the water-impervious sheet. . When constructing a water-impervious treatment layer having three layers as shown in FIGS. 5 and 6, instead of constructing a water-impervious layer having a predetermined thickness using an asphalt mixture, an asphalt mat is used. Can be laid and constructed. When arranging the asphalt mat in combination with a water-blocking sheet, the seam of the asphalt mat is connected by using any connecting means, and is filled with an asphalt mixture or the like to perform a water-blocking connection process. By doing so, it is preferable that the same water-shielding property as the sheet can be ensured.

【0027】前述したようにして、護岸基礎5の表面に
遮水処理層を施工する場合に、前記護岸基礎5の角部で
は、遮水用シートの接続部が形成され、その遮水用シー
トの接続部での遮水性を確保することが困難となる場合
が多くある。そこで、本実施例においては、図7に示す
ように、角部4をカバーするために広い範囲に角部接続
層15を構築し、直線状の護岸基礎5、5の角部4に対
する保護手段を構築することができる。前記図7に示す
例では、例えば、護岸基礎の斜面部5aと、上面5bお
よび地盤面6の各々に対しては、アスファルト混合物を
打設して一度に天端部16と斜面部17、下面部18と
を一体に構築できないという問題が発生する。つまり、
前記角部接続層15の斜面部17では、アスファルト混
合物を打設すると、そのアスファルト混合物が斜面に沿
って流れ落ちるという問題が生じやすい。
As described above, when a water-impervious treatment layer is applied to the surface of the seawall 5, a connection portion of a water-impervious sheet is formed at a corner of the seawall 5, and the water-impervious sheet is formed. In many cases, it is difficult to ensure the water shielding at the connection portion. Therefore, in this embodiment, as shown in FIG. 7, a corner connection layer 15 is constructed in a wide area to cover the corner 4, and the protection means for the corner 4 of the straight revetment foundation 5, 5 is provided. Can be built. In the example shown in FIG. 7, for example, the asphalt mixture is cast on the slope 5a of the revetment foundation, the upper surface 5b, and the ground surface 6, and the top 16 and the slope 17, and the lower surface at once. A problem arises that the unit 18 cannot be integrally formed. That is,
When the asphalt mixture is cast on the slope portion 17 of the corner connection layer 15, a problem that the asphalt mixture flows down along the slope is likely to occur.

【0028】記護岸基礎の斜面に沿ってアスファルト混
合物が流れ落ちるという問題は、前記遮水処理層を構築
する際にも発生する施工上の大きな課題ではあるが、前
記護岸基礎の斜面部にアスファルト混合物を打設する場
合には、非常に広い傾斜面に施工するので、アスファル
ト混合物の流下を阻止する手段を用いることが容易であ
る。ところが、前記角部4に対して遮水層の接続部を形
成する際には、他の直線状の部分よりもより確実な遮水
処理層を形成することが求められるので、図8に示すよ
うな施工枠体20を配置し、前記施工枠体20の内部に
アスファルト混合物を打設して充満させ、施工枠体と一
体化した角部接続層15を構築することが良いと考えら
れる。
The problem of the asphalt mixture flowing down along the slope of the revetment foundation is a major problem in the construction that occurs when the water-impervious treatment layer is constructed. However, the asphalt mixture falls on the slope of the revetment foundation. In the case of casting, since it is constructed on a very wide inclined surface, it is easy to use means for preventing the asphalt mixture from flowing down. However, when forming the connection portion of the water-impervious layer with respect to the corner portion 4, it is required to form a more reliable water-impervious treatment layer than other linear portions. It is considered that it is good to arrange such a construction frame 20 and to cast and fill the inside of the construction frame 20 with the asphalt mixture to construct the corner connection layer 15 integrated with the construction frame.

【0029】前記図8に示す施工枠体20は、上枠部2
1、下枠部22、側枠部23および斜面枠部24を、H
型鋼等を用いて組み合わせた枠体として構成し、その上
面と側面および下面に、金網26のような孔開き部材を
設けた籠状のものとして構成する。前記施工枠体20
は、図7に示す角部接続層15の斜面部17に対応させ
て配置するもので、護岸基礎の角部4に対応させてて斜
面枠部24を形成し、天端部16に対応させて上枠部2
1を位置させるように構成している。また、前記施工枠
体20と組み合わせて、前記施工枠体20と対称的に構
成される施工枠体を配置して、2つの施工枠体により角
部接続層15をアスファルト混合物により構築でき、施
工枠体20と一体化した均一な厚さのアスファルト混合
物の層を構成することができる。なお、前記施工枠体2
0は、後述するアスファルト補修層の構築に用いる施工
枠体と、ほぼ同様な性質を有するものであるから、その
詳細な構成は、図10以下の施工枠体の項で説明する。
The construction frame 20 shown in FIG.
1. The lower frame 22, side frame 23 and slope frame 24 are
It is configured as a frame body combined by using a mold steel or the like, and is configured as a basket-shaped one provided with a perforated member such as a wire mesh 26 on its upper surface, side surfaces, and lower surface. The construction frame 20
Is arranged corresponding to the slope 17 of the corner connection layer 15 shown in FIG. 7. The slope frame 24 is formed corresponding to the corner 4 of the revetment foundation, and the top end 16 is formed. Upper frame 2
1 is located. Also, in combination with the construction frame 20, a construction frame configured symmetrically with the construction frame 20 is arranged, and the corner connection layer 15 can be constructed of the asphalt mixture by the two construction frames. A layer of the asphalt mixture having a uniform thickness integrated with the frame body 20 can be formed. The construction frame 2
0 has substantially the same properties as the construction frame used for the construction of the asphalt repair layer described later, and the detailed configuration will be described in the section of the construction frame shown in FIG.

【0030】前記2つの施工枠体20を組み合わせて角
部接続層を構築する際には、前記施工枠体20の上部と
斜面枠部24に対応する斜面部には、金網を設けない開
口面として構成し、角部4を挟んで配置する2つの施工
枠体の間で、アスファルト混合物を一体のものとして打
設することができる。前記角部接続層15を構築する際
に、最初に地盤6の上に所定の厚さで下面部18を施工
し、その下面部18の端部に下面を支持させるように、
護岸基礎の斜面の角部に施工枠体20をセットし、前記
施工枠体20の内部に向けてアスファルト混合物を打設
する。前記施工枠体20の内部にアスファルト混合物が
充満された後で、護岸基礎5の上面の所定の範囲に天端
部16を施工して、角部接続層15として一体化した遮
水保護部材を構築することができる。
When the two connection frames 20 are combined to form a corner connection layer, the upper surface of the connection frame 20 and the slope corresponding to the slope frame 24 are provided with an opening surface without a wire mesh. , And the asphalt mixture can be cast as an integral unit between the two construction frames disposed so as to sandwich the corner 4. When constructing the corner connection layer 15, first, a lower surface portion 18 is constructed with a predetermined thickness on the ground 6, and an end of the lower surface portion 18 supports the lower surface,
The construction frame 20 is set at the corner of the slope of the revetment foundation, and the asphalt mixture is poured into the construction frame 20. After the asphalt mixture is filled in the inside of the construction frame 20, the top end 16 is constructed in a predetermined range on the upper surface of the seawall 5 and the water-impervious protection member integrated as the corner connection layer 15 is formed. Can be built.

【0031】図9に示す例は、前記角部接続層を構築す
る際の構造を横断面で示す説明図であり、護岸基礎5の
上に両側の遮水処理層の遮水用シート11、11を近接
させて配置し、前記遮水用シートの上部の所定の範囲に
またがるように、アスファルト混合物28を所定の厚さ
で打設する。そして、前記アスファルト混合物28の層
による角部接続層15を、前記図8に示すような枠体と
一体に構築することにより、遮水用シートと一体化した
角部接続層を形成することができる。
The example shown in FIG. 9 is an explanatory view showing a cross section of the structure when the corner connection layer is constructed. The sheet 11 for waterproofing of the waterproofing layers on both sides on the revetment foundation 5 is shown. 11 are arranged close to each other, and the asphalt mixture 28 is cast with a predetermined thickness so as to straddle a predetermined range on the upper part of the waterproof sheet. Then, the corner connection layer 15 made of the layer of the asphalt mixture 28 is integrally formed with the frame as shown in FIG. 8 to form the corner connection layer integrated with the water shielding sheet. it can.

【0032】図10に示す例は、前記角部接続層を遮水
シートの上にアスファルト混合物の打設により構築した
のみでは、遮水性能に信頼性が乏しいと想定される場合
の対策を示しているもので、遮水用シートの端部を上下
のアスファルト層の間に挿入する状態で構築する場合を
示している。前記図10に示す角部接続層15aにおい
ては、護岸基礎の角部4に対して最初に下部のアスファ
ルト混合物28aを所定の厚さに打設して、護岸基礎の
表面の凹凸を解消する。次いで、前記下部のアスファル
ト混合物の層の上に遮水処理層のシート11、11の各
々端部をできるだけ近接させる状態に配置して、前記下
部のアスファルト混合物の層28aの上に、両側の遮水
処理層の遮水シート11、11を密着させて配置する。
The example shown in FIG. 10 shows a countermeasure in a case where it is assumed that the reliability of the water blocking performance is poor if the corner connection layer is simply constructed by casting an asphalt mixture on the water blocking sheet. In this case, the construction is made in a state where the end of the sheet for waterproofing is inserted between the upper and lower asphalt layers. In the corner connection layer 15a shown in FIG. 10, the lower part of the asphalt mixture 28a is first cast into the corner 4 of the revetment foundation to a predetermined thickness to eliminate irregularities on the surface of the revetment foundation. Next, the ends of the water-impervious treatment sheets 11, 11 are arranged as close as possible to the lower asphalt mixture layer, and both sides of the lower asphalt mixture layer 28a are placed on the lower asphalt mixture layer 28a. The water-shielding sheets 11 of the water treatment layer are arranged in close contact with each other.

【0033】次いで、前記遮水用シートの上の所定の範
囲に亘って、アスファルト混合物を打設して上部の層2
8を所定の厚さで構築する。前記上部のアスファルト混
合物の層28を構築することにより、アスファルト混合
物で形成する上下の層28、28aの間に、遮水用シー
トの端部を挿入した状態で一体化して、遮水性能に信頼
性を発揮できる角部接続層15aを構築することができ
る。なお、前記上部のアスファルト混合物の層28を構
築するに際しては、前記図8に示すような施工枠体を用
いて、アスファルト混合物の打設を行うことにより上部
の層の厚さを一定に形成して、打設してから長時間経過
してもアスファルト層の厚さが変化しないように保持さ
せることが可能になる。
Next, an asphalt mixture is poured over a predetermined area on the water-shielding sheet to form an upper layer 2.
8 is constructed with a predetermined thickness. By constructing the upper asphalt mixture layer 28, the upper and lower layers 28 and 28a formed of the asphalt mixture are integrated with the end of the water-blocking sheet being inserted, and reliable in water-blocking performance. It is possible to construct the corner connection layer 15a that can exhibit the property. When the upper asphalt mixture layer 28 is constructed, the thickness of the upper layer is made constant by casting the asphalt mixture using a construction frame as shown in FIG. As a result, it is possible to maintain the thickness of the asphalt layer so that it does not change even if a long time has elapsed since the casting.

【0034】前記各実施例に示したように、シート類や
アスファルトマット、アスファルト混合物の層等を重合
させた状態で遮水処理層を構築した場合でも、工事中に
何等かの問題が発生して、前記遮水処理層が破損した
り、裂け目等が形成されて遮水性を良好に発揮できない
という問題が生じることが想定される。そこで、前述し
たような遮水処理層に裂け目等が生じた時には、その破
損箇所を覆うように、図11に示すようなアスファルト
のマット状部材を重ねて敷設することが考えられる。し
かしながら、前記アスファルトのマット状部材を追加し
て敷設する場所が、遮水用シートのみの層である場合に
は、アスファルトのマット状部材を重ねて敷設するのみ
では、シート類とアスファルトとの間に隙間が生じやす
く、十分な遮水性能を発揮できないことがある。前述し
たような問題を解決するために、以下に説明するよう
に、アスファルト混合物を所定の厚さで施工したマット
状部材を構築して、遮水処理層の裂け目の補修と遮水処
理を行うことが必要となる。
As shown in the above-mentioned embodiments, even when the water-impervious treatment layer is constructed in a state in which sheets, asphalt mats, layers of asphalt mixture and the like are polymerized, some problems occur during construction. Therefore, it is assumed that there is a problem that the water-impervious treatment layer is damaged, cracks or the like are formed, and the water-impermeability cannot be sufficiently exhibited. Therefore, when a tear or the like occurs in the water-impervious treatment layer as described above, an asphalt mat-like member as shown in FIG. 11 may be laid so as to cover the damaged portion. However, when the place where the asphalt mat-shaped member is additionally laid is a layer of only the water-impervious sheet, it is only necessary to lay the asphalt mat-shaped member on top of one another. In some cases, gaps are easily formed, and sufficient water blocking performance may not be exhibited. In order to solve the above-described problems, as described below, a mat-like member constructed by applying an asphalt mixture to a predetermined thickness is constructed, and repair of cracks in the water-impervious treatment layer and water-impervious treatment are performed. It is necessary.

【0035】前記各実施例に示される埋立護岸の遮水処
理層は、シート状遮水体とアスファルト混合物により構
成される場合の他に、シート状遮水体と固化処理土によ
る遮水処理層に対しても適用が可能である。前記固化処
理土としては、例えば、セメントを混合した土の層を所
定の厚さに被覆して構築するものであり、その土の層と
遮水用シートを重ねて施工する。また、前記固化土と同
様に、粘性土の層を所定の厚さで施工したものと遮水用
シートを重ねて施工することもある。さらに、遮水用シ
ートと保護マットを重ねた遮水処理層、またはシート状
遮水体を複数層重ねて構成したものもまたは、保護マッ
ト、固化処理土、粘性土もしくはアスファルト混合物の
ような遮水性を有する遮水層を各々単層として構成した
ものを対象とすることも可能である。前記各構成の遮水
処理層においても、遮水処理層のシートや角部の接続部
を構成する場合や、破損箇所に対する補修を行う必要が
あり、特に土を主要な成分として用いて遮水処理層を構
築する場合には、土が圧密されることや、水を含むこと
等により、割れ目が形成されやすい。そこで、そのよう
な破損箇所の補修等に際しては、前記遮水用シートとア
スファルト混合物の層で構成する遮水処理層の場合と同
様に、遮水処理を行うことができることは当然である。
The water-impervious treatment layer of the landfill revetment shown in each of the above-mentioned embodiments is not limited to a sheet-like water impervious body and a water-impervious treatment layer made of solidified treated soil, in addition to a sheet-like impermeable body and an asphalt mixture. It is also applicable. The solidified soil is, for example, constructed by covering a layer of soil mixed with cement to a predetermined thickness, and is constructed by layering the layer of soil and a sheet for waterproofing. Further, similarly to the above-mentioned solidified soil, there may be a case where a layer of cohesive soil is applied with a predetermined thickness and a water-impermeable sheet is overlapped. In addition, a water-impervious treatment layer in which a water-impervious sheet and a protective mat are stacked, or a sheet in which a plurality of sheet-like water-impervious bodies are stacked, or a water-impervious material such as a protective mat, solidified treated soil, viscous soil, or asphalt mixture It is also possible to use a structure in which each of the water-impervious layers having the above is configured as a single layer. Also in the water-impervious treatment layer of each of the above-mentioned structures, it is necessary to construct a sheet or a connection part of a corner portion of the water-impervious treatment layer, or to repair a damaged part, and particularly, to use the soil as a main component to prevent water impermeability. When constructing a treatment layer, cracks are likely to be formed due to the soil being compacted or containing water. Therefore, when repairing such a damaged portion, it is natural that the water shielding treatment can be performed in the same manner as in the case of the water shielding treatment layer composed of the layer of the water shielding sheet and the asphalt mixture.

【0036】図12以下に説明する例は、前記遮水処理
層10を護岸基礎5の表面に施工した後で、大きな石や
塊等の尖ったものが落下する等の事故が生じて、遮水処
理層10の一部に裂け目14が形成された場合の対応策
を示している。前記遮水処理層10に裂け目が形成され
た場合に、その裂け目を通って護岸の内外に海水が流通
するという問題が発生するので、その裂け目を塞ぐ必要
が生じる。そこで、例えば、前記アスファルトマットや
遮水用シート等を敷設した遮水処理層の上に、別の遮水
用シートやアスファルトマットを重ねて施工し、例え
ば、図11に示すような状態で、裂け目を塞ぐ処理を行
うことが考えられる。ところが、前記遮水処理層10の
上に直接アスファルトマットや遮水用シートを敷設する
場合に、既に施工している遮水処理層の上に水密に設け
ることは困難であり、その作業が水中作業であることか
ら、非常に面倒な工事を強いられることにもなる。ま
た、前記遮水処理層に裂け目が生じた部位に対して、ア
スファルト混合物を敷設して補修層を施工することは、
比較的容易であると考えられる。しかしながら、前記裂
け目の形成された位置が斜面部であると、アスファルト
混合物が斜面に沿って流れてしまうことと、時間の経過
とともにアスファルトの特性により、次第に斜面の下方
に流れて上部から厚さが変化すること等のアスファルト
に特有な問題が懸念される。そして、遮水処理層の上に
所定の厚さのアスファルト補修層を構築した状態を、長
い期間に亘って維持できないと想定される。
In the example described below with reference to FIG. 12, after the water-impervious treatment layer 10 is applied to the surface of the revetment foundation 5, an accident such as a sharp drop of large The countermeasure in the case where the crack 14 is formed in a part of the water treatment layer 10 is shown. When a breach is formed in the water-impervious treatment layer 10, a problem occurs in that seawater flows through the breach into and out of the revetment, so that the breach needs to be closed. Therefore, for example, on the water-impervious treatment layer on which the asphalt mat or the water-impervious sheet is laid, another water-impervious sheet or asphalt mat is superimposed and constructed, for example, in a state as shown in FIG. It is conceivable to perform a process of closing the rip. However, when laying an asphalt mat or a sheet for waterproofing directly on the waterproofing layer 10, it is difficult to provide watertight on the waterproofing layer which has already been constructed. Because it is an operation, it also requires very troublesome work. Further, laying an asphalt mixture and constructing a repair layer for a portion where a crack has occurred in the impermeable layer,
It is considered relatively easy. However, if the position where the crack is formed is a slope, the asphalt mixture flows along the slope, and due to the characteristics of the asphalt over time, the asphalt mixture gradually flows down the slope and the thickness from the top decreases. There are concerns about asphalt-specific problems such as changes. Then, it is assumed that the state in which the asphalt repair layer having the predetermined thickness is constructed on the impermeable layer cannot be maintained for a long period of time.

【0037】そこで、本発明においては、図12に示す
ように、裂け目14が形成された部分を中心にして、大
きな面積で施工枠体31を配置して、前記施工枠体31
の中にアスファルト混合物を施工し、一定の厚さを有す
るアスファルト補修層30を構築して裂け目を塞ぐよう
な手段を用いている。前記アスファルト補修層30を施
工するために用いる施工枠体31は、図13、14に示
すように構成することができるもので、高さを20〜3
0cmにして、その面積は裂け目の大きさ等に応じて任意
に形成することができる。前記施工枠体31を、既設の
遮水処理層10上に載置して位置決めするための下枠部
材35は、下方側と両側部に型鋼やH型鋼を配置して、
遮水処理層に対応する面を開口させる状態に設ける。ま
た、前記施工枠体31の上枠部材32と底枠部材36、
および側枠の各々は、所定の間隔に配置する縦枠鋼材や
横枠鋼材34を、型鋼やその他の太くて重い鋼材の骨組
み部材で構成し、遮水処理層の上に設置した状態での安
定性を高めている。
Therefore, in the present invention, as shown in FIG. 12, the construction frame 31 is arranged in a large area around the portion where the split 14 is formed.
The asphalt mixture is applied to the inside, and asphalt repair layer 30 having a certain thickness is constructed to use a means for closing the crevices. The construction frame 31 used for constructing the asphalt repair layer 30 can be constructed as shown in FIGS. 13 and 14, and has a height of 20 to 3 mm.
When the area is set to 0 cm, the area can be arbitrarily formed in accordance with the size of the tear. The lower frame member 35 for mounting and positioning the construction frame body 31 on the existing water-impervious treatment layer 10 includes a mold steel and an H-shaped steel disposed on the lower side and both sides,
It is provided so that the surface corresponding to the water-impervious treatment layer is opened. In addition, the upper frame member 32 and the bottom frame member 36 of the construction frame 31,
And each of the side frames, the vertical frame steel material and the horizontal frame steel material 34 arranged at a predetermined interval are configured by a frame member of a mold steel or other thick and heavy steel material, and are installed on the water-impervious treatment layer. Improves stability.

【0038】そして、前記骨組み部材により構成した枠
体に対して、アスファルト混合物の漏れ出しを阻止可能
で、空気や水の流出を可能にするような網状の部材や多
孔質の板状部材等のメッシュ部材を用いて、上面板3
7、側面板38および底面板39を設けている。前記メ
ッシュ部材としては、例えば、前記施工枠体20の場合
と同様に、目の細かい金網やパンチメタルのような金属
材料、またはプラスチック製の織布や不織布、もしく
は、織布と金網とを重ねた複合シート材料等を用いるこ
とができる。また、前記骨組みの間に鉄板等を取付けて
上面と下面が開口する箱を形成し、その鉄板の間に所定
の間隔で隙間を形成し、金網等の孔開き部材を配置する
こともできる。そして、前述したように施工枠体31を
構成することにより、遮水処理層10の上に施工枠体3
1を配置して、上部の開口からアスファルト混合物を流
し込んだ時に、高温のアスファルト混合物により熱せら
れた水と、その加熱により発生する水蒸気等が前記孔開
き部から外側に漏れ出して排除されるので、施工したア
スファルト混合物に空隙等が生じることがない。
[0038] A net-like member, a porous plate-like member, or the like which can prevent the asphalt mixture from leaking out to the frame constituted by the frame member and allows air or water to flow out. Using a mesh member, the top plate 3
7, a side plate 38 and a bottom plate 39 are provided. As the mesh member, for example, similarly to the case of the construction frame 20, a metal material such as a fine mesh or a punch metal, or a woven or nonwoven fabric made of plastic, or a woven fabric and a wire mesh are laminated. Composite sheet material or the like can be used. An iron plate or the like may be attached between the frameworks to form a box having an open upper surface and a lower surface, a gap may be formed at predetermined intervals between the iron plates, and a perforated member such as a wire mesh may be arranged. By constructing the construction frame 31 as described above, the construction frame 3
1 and when the asphalt mixture is poured from the upper opening, water heated by the high-temperature asphalt mixture and water vapor generated by the heating leak out to the outside from the perforated portion and are eliminated. In addition, no void or the like is generated in the asphalt mixture that has been constructed.

【0039】前述したように構成した施工枠体31は、
図14に示すように、遮水処理層10の所定の位置に設
置して、アスファルト補修層30の構築に対処させるこ
とができるが、前記施工枠体31を斜面に設置した状態
で、水中で波浪の影響を受けて移動することがないもの
として構成する。前記施工枠体31を遮水処理層の斜面
部に設置して安定させるためには、図示されるように、
斜面の下部と施工枠体の上の所定の範囲に捨石層を構築
して、アスファルト混合物を施工した際に、その流動圧
力により施工枠体31が移動しないように固定する。そ
して、施工枠体31の上側の開口からアスファルト混合
物をホース等を用いて注入し、施工枠体の内部空間に充
満させるようにするが、その際に、施工枠体の内部に充
満している水をメッシュ部材を通して排除しながら、内
部にアスファルト混合物を充満させて、アスファルト補
修層30を形成する。
The construction frame 31 configured as described above is
As shown in FIG. 14, it is possible to cope with the construction of the asphalt repair layer 30 by installing it at a predetermined position of the water impervious treatment layer 10. It is configured so as not to move under the influence of waves. In order to install and stabilize the construction frame 31 on the slope of the impermeable layer, as shown in the figure,
A rubble layer is constructed in the lower part of the slope and in a predetermined range above the construction frame, and when the asphalt mixture is constructed, the construction frame 31 is fixed so as not to move due to the flow pressure thereof. Then, the asphalt mixture is injected from the upper opening of the construction frame 31 using a hose or the like to fill the internal space of the construction frame, and at that time, the inside of the construction frame is filled. While the water is being removed through the mesh member, the inside is filled with the asphalt mixture to form the asphalt repair layer 30.

【0040】前述したようにして、施工枠体31の内部
にアスファルト混合物を充満させ、アスファルト補修層
30を施工枠体31と一体に形成することで、流動性の
大きいアスファルト混合物は、遮水処理層10の表面に
隙間なく貼り付いた状態となり、裂け目を完全に塞ぐ作
用を発揮する。しかしながら、前記アスファルト補修層
30を所定の厚さで構築してから施工枠体31を取り外
すと、アスファルト混合物は長い期間流動性を保持する
ので、アスファルト補修層30が変形すると考えられ、
裂け目の部分を塞ぐ性能を長期間に亘って維持させるこ
とが困難となると推定される。そこで、前記施工枠体3
1を用いてアスファルト補修層30を構築する場合に
は、施工枠体を取り外さないでそのままおくようにする
と、アスファルト補修層30の厚さを施工枠体31によ
り維持でき、裂け目に対する遮水性能を良好に発揮でき
るものとなる。
As described above, the inside of the construction frame 31 is filled with the asphalt mixture, and the asphalt repair layer 30 is formed integrally with the construction frame 31. The layer 10 is stuck to the surface of the layer 10 without any gap, and exerts the effect of completely closing the tear. However, when the asphalt repair layer 30 is constructed with a predetermined thickness and then the construction frame body 31 is removed, the asphalt mixture retains fluidity for a long time, so the asphalt repair layer 30 is considered to be deformed.
It is presumed that it will be difficult to maintain the performance of closing the breach for a long period of time. Therefore, the construction frame 3
When the asphalt repair layer 30 is constructed using No. 1, if the construction frame body is left unremoved, the thickness of the asphalt repair layer 30 can be maintained by the construction frame body 31, and the water barrier performance against rips can be improved. It can be exhibited well.

【0041】図15に示す例は、施工枠体31を斜面部
に設置する際の固定方法の別の例を示しているもので、
例えば、裂け目が比較的小さい場合や、斜面の上部で捨
石により下部を押さえることが困難な場合には、斜面の
上部の固定部材からワイヤ等の吊具40を用いて係止し
て設置する。そのような吊り下げ手段を用いる場合に
は、前記施工枠体31はアスファルト混合物の施工によ
り、斜面から浮き上がらないような重量の大きいものと
して形成する。また、前記吊具40は、アスファルト補
修層施工中に施工枠体の移動を阻止するために、多数本
のワイヤ等を配置することができる。前述したようにし
て、アスファルト補修層30を裂け目に対して施工する
場合に、そのような補修箇所に対しては、できるだけ早
期に廃棄物を投下して、その廃棄物の重さで押圧作用を
付与できるようにすれば、施工枠体の固定を容易に行う
ことができ、追加施工したアスファルト補修層30を安
定させる作用にも寄与できることは当然である。
The example shown in FIG. 15 shows another example of a fixing method when the construction frame 31 is installed on a slope.
For example, when the split is relatively small, or when it is difficult to hold down the lower part due to rubble at the upper part of the slope, the fixing member on the upper part of the slope is locked and installed using a hanging tool 40 such as a wire. When such a suspending means is used, the construction frame 31 is formed so as to have a large weight by the construction of the asphalt mixture so as not to rise from the slope. In addition, the hanger 40 can be provided with a large number of wires or the like in order to prevent movement of the construction frame during construction of the asphalt repair layer. As described above, when the asphalt repair layer 30 is applied to a breach, the waste is dropped on such a repair part as soon as possible, and the pressing action is performed by the weight of the waste. If it can be provided, it is natural that the construction frame body can be easily fixed and can contribute to the function of stabilizing the additionally constructed asphalt repair layer 30.

【0042】なお、前記施工枠体31を斜面部に固定配
置して、アスファルト混合物を施工する際には、従来よ
り海中に施工するために用いているパイプを使用するこ
とができるが、その他に、アスファルトに対応させて構
成したバケット等を用いることも可能である。前記裂け
目を補修するために構築するアスファルト補修層は、遮
水処理層がアスファルト材料により構成される場合、ま
たは、プラスチック製やゴム製のシートのみを用いて構
成された場合、改良固化土や粘土のみを用いて構成した
ものに対しても、有効に利用することができる。前記遮
水処理層をシートのみで構成する場合には、遮水処理層
の施工は容易であるが、小さな衝撃で容易に遮水性を損
なうという問題がある。そのような薄い遮水処理層に対
しても、同様なシートを隙間なく一体に貼り付けること
は困難であり、その補修部の信頼性を維持することが困
難である。そのような問題に対して、前記実施例に示し
たようなアスファルト補修層を設けることは、その施工
が容易で、単に施工枠体を配置してアスファルト混合物
を施工するのみで、容易に対処が可能となる。
When the construction frame 31 is fixedly arranged on the slope and the asphalt mixture is constructed, pipes conventionally used for construction in the sea can be used. It is also possible to use a bucket or the like configured corresponding to asphalt. The asphalt repair layer to be repaired to repair the crack, when the water-impervious treatment layer is composed of asphalt material, or when composed only of plastic or rubber sheets, improved solidified clay or clay It can be effectively used even for a configuration using only one. When the water-impervious treatment layer is composed of only a sheet, it is easy to apply the water-impervious treatment layer, but there is a problem that the water-imperviousness is easily impaired by a small impact. Even for such a thin water-impervious treatment layer, it is difficult to apply a similar sheet integrally without any gap, and it is difficult to maintain the reliability of the repaired portion. With respect to such a problem, providing the asphalt repair layer as shown in the above-described embodiment is easy to construct, and simply by arranging the construction frame and constructing the asphalt mixture, can be easily dealt with. It becomes possible.

【0043】前述したような廃棄物処理場の埋立護岸ま
たは、人工島を区画する護岸は、前記図1に示すよう
に、護岸基礎5の上にケーソンを設置して構成すること
の他に、図16ないし図19の各々に示すように構成す
ることができる。図16に示す埋立護岸1aは、石を積
重ねて石積護岸50として構築するもので、工事現場付
近から大きな石を入手可能な場合に、ケーソン等を用い
ずに構築することができる。前記高い石積護岸50を、
埋立護岸1aとして構築するためには、所定の高さ毎に
段部を形成して、石積護岸50の斜面の保護を行うこと
ができるようにしている。前記石積護岸50の埋立地8
側の斜面には、遮水用シートとアスファルト混合物の層
を複合した遮水処理層10aを配置し、信頼性の高い遮
水処理を構築することができる。
As described above, the revetment revetment of the waste disposal site or the revetment that divides the artificial island is constructed by installing a caisson on the revetment foundation 5 as shown in FIG. It can be configured as shown in each of FIGS. The landfill revetment 1a shown in FIG. 16 is constructed as a stone revetment 50 by stacking stones, and can be constructed without using a caisson or the like when large stones are available near the construction site. The high masonry seawall 50
In order to construct the revetment seawall 1a, steps are formed at predetermined heights so that the slope of the masonry seawall 50 can be protected. Reclaimed land 8 at the stone masonry seawall 50
On the slope on the side, a water-impervious treatment layer 10a in which a layer of a water-impervious sheet and a layer of asphalt mixture are combined is arranged, and a highly reliable water-impervious treatment can be constructed.

【0044】前記埋立護岸1aの埋立地8側に設けてい
る遮水処理層10aにおいても、前記図7に示した角部
接続層の施工と、破損部分に対するアスファルト補修層
の施工を行うことができる。なお、前記角部接続層の施
工に際しては、複数の段部の斜面部と水平部のそれぞれ
に対して、斜面部では施工枠体を用いたアスファルトマ
スチックの施工を行い、水平部に対しては、アスファル
トマスチックを所定の厚さに施工して斜面部と一体化す
ることができる。
Also in the water-impervious treatment layer 10a provided on the landfill site 8 side of the landfill revetment 1a, it is possible to perform the construction of the corner connection layer shown in FIG. 7 and the construction of the asphalt repair layer for the damaged part. it can. In the construction of the corner connection layer, for each of the slope portion and the horizontal portion of the plurality of steps, asphalt mastic using a construction frame in the slope portion, for the horizontal portion The asphalt mastic can be applied to a predetermined thickness and integrated with the slope.

【0045】図17には、前記図1に示したように護岸
基礎の上にケーソンを設置した埋立護岸1に加えて、埋
立地8側にシートパイルを列状に連続させて、遮水手段
を介して打設した内側の仕切壁55を構築し、前記仕切
壁55とケーソン2の間をタイロッドのような接続部材
56により接続して、強固な複合型の埋立護岸10bと
して構築する例を示している。前記図17の埋立護岸1
0bにおいて、埋立地8の外海側に構築するケーソン2
は、所定の高さで構築した護岸基礎5の上に、陸上で構
築したコンクリートや鋼製のケーソンを載置して、前記
図1の埋立護岸1の場合と同様に構成する。前記複合型
の埋立護岸1bは、大水深の海域での埋立護岸の信頼性
を向上させるため等の目的に対応させて構築するもので
ある。
In FIG. 17, in addition to the reclaimed revetment 1 in which a caisson is installed on the revetment foundation as shown in FIG. An example of constructing a strong composite type landfill revetment 10b by constructing an inner partition wall 55 that is cast through the inner wall and connecting the partition wall 55 and the caisson 2 with a connecting member 56 such as a tie rod. Is shown. Landfill revetment 1 in Fig. 17
0b, caisson 2 to be built on the open sea side of landfill 8
Is constructed by placing a concrete or steel caisson constructed on land on a revetment foundation 5 constructed at a predetermined height, and configured similarly to the case of the landfill revetment 1 in FIG. The composite type reclaimed revetment 1b is constructed for the purpose of improving the reliability of reclaimed revetment in a deep sea area.

【0046】そして、埋立地8を外海と遮断するための
遮水処理層10bは、前記シートパイル列による仕切壁
55の内側と海底地盤6の上の所定の範囲に亘って敷設
するが、前記遮水処理層10bにおいては、垂直面に沿
わせてシート状の遮水部材を配置することが可能である
としても、アスファルト混合物を打設してシートと組み
合わせた遮水処理層を構築することは困難である。そこ
で、前記海底地盤面に対しては、シートとアスファルト
混合物による遮水処理層を構築するが、仕切壁55の垂
直面に沿わせて配置する遮水処理層としては、複数枚の
遮水用シートを重ねて設けることができる。
A water-impervious treatment layer 10b for blocking the landfill 8 from the open sea is laid over a predetermined area on the inside of the partition wall 55 formed by the row of sheet piles and on the seafloor ground 6. In the water-impervious treatment layer 10b, even if it is possible to arrange a sheet-like water-impervious member along the vertical plane, it is necessary to cast an asphalt mixture and construct a water-impervious treatment layer combined with the sheet. It is difficult. Therefore, a water-impervious treatment layer made of a sheet and asphalt mixture is constructed on the seabed ground surface, and a plurality of water-impervious treatment layers arranged along the vertical surface of the partition wall 55 are used. The sheets can be provided in an overlapping manner.

【0047】図18に示す埋立護岸1cの例は、鋼管パ
イルを列状に打設し、遮水手段を介して構築した仕切壁
60を外海側に配置し、その仕切壁60の内側に石積層
65を構築している。また、前記仕切壁60から所定の
間隔をおいた内側に控え柱61を構築し、仕切壁60と
控え柱61の間を接続部材62により接続している。前
記控え柱61はH型鋼等の柱部材を打設して構築するも
ので、接続部材62としても前記図17の接続部材56
と同様に、タイロッド等の他に任意の接続手段を設ける
ことができる。前記鋼管パイル列による仕切壁60の内
側に構築する石積層65としては、付近で入手可能な石
を積重ねて構築するもので、前記護岸基礎を構築する場
合よりも小径の石を用いることができる。そして、前記
石積層の埋立地側の斜面部には、遮水処理層10cを配
置するが、前記遮水処理層10cには、前記図1や図1
6に示す例と同様に、遮水用シートとアスファルト混合
物の層とを複合した遮水処理層として設けることが可能
である。
In the example of the reclaimed revetment 1c shown in FIG. 18, a steel pipe pile is cast in a row, and a partition wall 60 constructed via a water-blocking means is arranged on the open sea side, and a stone is provided inside the partition wall 60. A stack 65 is being constructed. In addition, a stay column 61 is constructed inside the partition wall 60 at a predetermined distance from the partition wall 60, and the partition wall 60 and the stay column 61 are connected by a connecting member 62. The stay column 61 is constructed by driving a column member such as an H-shaped steel, and the connecting member 62 is also used as the connecting member 56 in FIG.
Similarly to the above, any connecting means other than the tie rod or the like can be provided. The stone stack 65 constructed inside the partition wall 60 formed by the steel pipe pile row is constructed by stacking stones available nearby, and a stone having a smaller diameter than when the seawall foundation is constructed can be used. . A water-impervious treatment layer 10c is disposed on the slope of the stone stack on the landfill side.
Similarly to the example shown in FIG. 6, it is possible to provide a water-impervious treatment layer in which the water-impervious sheet and the layer of the asphalt mixture are combined.

【0048】図19に示す埋立護岸1dは、所定の間隔
をおいて2段に鋼管パイル等を打設し、遮水手段を介し
て設けた仕切壁60、60aを配置し、前記仕切壁6
0、60aの間を接続部材62により接続している。前
記仕切壁60、60aの間には、埋め立て土やコンクリ
ート片、その他の有害物質が滲み出ない安定した性質を
有する廃棄物を充満させている。前記埋立護岸1dの内
側の面には、遮水処理層10dを壁に沿わせて敷設し、
その遮水処理層を海底地盤の所定の範囲に亘って延長し
て敷設した遮水処理を施している。前記遮水処理層10
dにおいて、仕切壁60aの垂直な壁面に沿わせる遮水
部材としては、複数枚のシート状の遮水部材を重ねて敷
設することができ、海底地盤6の上に対してはシート状
部材とアスファルト混合物の層とを重ねて設けることが
できる。
In the reclaimed revetment 1d shown in FIG. 19, steel pipe piles or the like are cast in two steps at a predetermined interval, and partition walls 60 and 60a provided via a water blocking means are arranged.
0 and 60a are connected by a connecting member 62. The space between the partition walls 60 and 60a is filled with waste having a stable property such that landfill, concrete pieces, and other harmful substances do not exude. On the inner surface of the landfill revetment 1d, a water-impervious treatment layer 10d is laid along the wall,
The water-impervious treatment is performed by extending the water-impervious treatment layer over a predetermined area of the seabed ground. The water shielding treatment layer 10
In (d), a plurality of sheet-like water-impervious members can be laid one on another as the water-impervious member along the vertical wall surface of the partition wall 60a. A layer of asphalt mixture can be provided overlying.

【0049】前記図17ないし図19に示すように、シ
ートパイル列または鋼管パイル列により仕切壁を構築す
るに際しては、前記仕切壁を構成するシートパイルや鋼
管パイル等の継ぎ目の部分で、水が漏れ出すことはさけ
られない。つまり、前記仕切壁等においても、石積基礎
の場合と同様に、仕切られた埋立地の内側と、外海の間
で水が流通するので、前記仕切壁等に対して、遮水処理
を施すことが求められる。そこで、各実施例では、略垂
直に構築された仕切壁やシートパイル列等に対して、遮
水用シートを配置して埋立地の内外に水が流通すること
を阻止できるようにする。
As shown in FIGS. 17 to 19, when a partition wall is constructed by a row of sheet piles or a row of steel pipe piles, water is formed at seams of the sheet pile, the steel pipe pile and the like constituting the partition wall. Leaks are inevitable. That is, as in the case of the masonry foundation, water flows between the inside of the divided landfill and the open sea, so that the partition wall and the like are subjected to the water shielding treatment. Is required. Therefore, in each embodiment, a water-blocking sheet is disposed on a partition wall, a sheet pile row, or the like constructed substantially vertically so that water can be prevented from flowing into and out of the landfill.

【0050】前記シートパイルや鋼管パイル等の仕切壁
のような垂直な壁部材に対して、シート状の遮水部材を
敷設する場合にも、遮水用シートが衝撃が加えられたり
して破損することがある。前記垂直に敷設したシート等
が破損した場合には、破損部に別の遮水用シートを重ね
て敷設して遮水処理を行うことや、前記図14等に示し
たように構成される垂直な枠体を破損部に設置して、ア
スファルト混合物を打設すること等の手段を用いて、破
損部の補修を行うことができる。また、海底地盤上に敷
設した遮水処理層の破損等に対しては、アスファルト混
合物を所定の範囲に打設することによって、その補修を
容易に行うことができ、遮水処理層の信頼性を向上させ
ることができる。
Even when a sheet-like water-impervious member is laid on a vertical wall member such as a partition wall such as the sheet pile or the steel pipe pile, the water-impervious sheet is damaged by impact or the like. May be. When the vertically laid sheet or the like is damaged, another water-impervious sheet is superimposed on the damaged portion to perform the water-impervious treatment, or the vertical structure as shown in FIG. The damaged portion can be repaired by using a means such as placing a simple frame at the damaged portion and pouring an asphalt mixture. In addition, if the water-impervious treatment layer laid on the seabed ground is damaged, it can be easily repaired by casting the asphalt mixture into a predetermined range, and the reliability of the water-impervious treatment layer can be improved. Can be improved.

【0051】なお、前記石積護岸の斜面の傾斜角度が大
きい場合には、単純にアスファルト混合物を打設するの
みでは、斜面に所定の厚さの遮水層を構築することは非
常に困難な場合がある。そこで、前記各実施例に示した
ような施工枠体を、斜面に沿わせて任意の間隔で配置し
てから、アスファルト混合物を打設して固定遮水層を構
築する等の手段を用いることも可能であり、前記施工枠
体の隙間には後でアスファルト混合物を打設して、隙間
のない遮水処理層を構築することができる。また、前記
アスファルト混合物の打設と合わせて、遮水用シート等
を重ねて配置することで、遮水処理層の信頼性を向上さ
せ得ることは当然である。さらに、アスファルト混合物
を直接打設することに代えて、アスファルトマットを遮
水用シートと重ねて配置し、前記アスファルトマットの
継ぎ目の間に遮水処理を施すことにより、信頼性の高い
遮水処理層を構築することもできる。
In the case where the slope angle of the slope of the masonry is large, it is very difficult to construct a water-impervious layer having a predetermined thickness on the slope by simply casting the asphalt mixture. There is. Therefore, using a means such as arranging the construction frame body as shown in each of the above-described embodiments at an arbitrary interval along the slope, and then pouring the asphalt mixture to construct a fixed impermeable layer. It is also possible, and an asphalt mixture can be cast later in the gaps of the construction frame to form a water-impervious treatment layer without gaps. In addition, it is natural that the reliability of the water-impervious treatment layer can be improved by arranging the water-impervious sheet and the like in combination with the casting of the asphalt mixture. Further, instead of directly casting the asphalt mixture, the asphalt mat is placed on the water-impervious sheet, and the water-impervious treatment is performed between the seams of the asphalt mat, so that a reliable water-impervious treatment is performed. Layers can also be built.

【0052】[0052]

【発明の効果】前述したように構成したことにより、本
発明においては、前記遮水用シートによる遮水作用と、
所定の厚さで形成するアスファルト混合物層とを重ね、
遮水処理層を2層または3層の遮水部材を重ねて配置し
て一体化した遮水処理層として構成することができ、埋
立地の仕切護岸での遮水性を良好に発揮できる。また、
前記アスファルト混合物を打設するに際しては、ネット
状部材を含むようにして打設することにより、所定の厚
さに形成されるマスチック層と、遮水用シートとを二重
または三重に重ねて遮水処理層を形成することで、遮水
性を良好に発揮させることができ、そして、外海側の水
圧に対して十分な遮水性を発揮し、投棄物を投下した時
の衝撃と、投棄物による押圧作用や衝撃に対して良好に
抵抗できる遮水処理層を構築することができる。
According to the present invention, as described above, in the present invention, the water blocking effect of the water blocking sheet is obtained.
Overlap with the asphalt mixture layer to be formed with a predetermined thickness,
The water-impervious treatment layer can be configured as an integrated water-impervious treatment layer by arranging two or three layers of water-impervious members, and can exhibit good water-impermeability at the partition seawall in the landfill. Also,
When the asphalt mixture is cast, the mastic layer formed to a predetermined thickness and the water-impermeable sheet are double- or triple-laid by water-impermeable treatment by embedding so as to include the net-shaped member. By forming a layer, it is possible to exhibit good water shielding, and also to exhibit sufficient water shielding against the water pressure on the open sea side, the impact when dropping the dumping material, and the pressing action by the dumping material And a water-impervious treatment layer that can satisfactorily resist shock and impact.

【0053】前記効果に加えて、前記遮水処理層の角部
に対して角部接続層を構築することで、遮水性が不安定
となりやすい遮水用シートの接続部での遮水性を強化す
ることが可能であり、その角部接続層の施工も容易に行
うことが可能である。前記角部接続層を構築するに際し
ては、遮水用シートの接続部を覆うように、アスファル
ト混合物を所定の厚さで打設することや、遮水用シート
の端部をアスファルト混合物の層の間に挟み込む状態で
構成して、遮水性能に信頼性を持たせることができる。
また、前記遮水処理層に裂け目が形成された場合に、前
記裂け目を広く覆うようなアスファルト補修層を構築す
ることにより、遮水処理層の遮水性を良好に維持させる
ことができる。そして、前記アスファルト補修層に対し
て施工枠体を取り外さずに一体に設置することにより、
アスファルト補修層の性能を長期間に亘って維持でき、
特に薄いシートのみを配置した遮水処理層においても、
その遮水性を良好に維持できる。
In addition to the above-described effects, by constructing a corner connection layer at the corner of the water-impervious treatment layer, the water-impermeability at the connection part of the water-impervious sheet, which tends to be unstable, is enhanced. It is possible to easily perform the construction of the corner connection layer. When constructing the corner connection layer, the asphalt mixture is cast at a predetermined thickness so as to cover the connection portion of the waterproof sheet, and the end of the waterproof sheet is formed of the asphalt mixture layer. It can be configured so as to be sandwiched between them, so that the water barrier performance can be made more reliable.
Moreover, when a crack is formed in the water-impervious treatment layer, the water-impermeability of the water-impervious treatment layer can be favorably maintained by constructing an asphalt repair layer that widely covers the crack. And by installing integrally without removing the construction frame body to the asphalt repair layer,
The performance of the asphalt repair layer can be maintained for a long time,
Especially in the water-impervious treatment layer where only thin sheets are arranged,
The water barrier can be maintained well.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 護岸の一般的な構成を示す説明図である。FIG. 1 is an explanatory diagram showing a general configuration of a revetment.

【図2】 図1の護岸の角部の構成を示す平面図であ
る。
FIG. 2 is a plan view showing a configuration of a corner portion of the revetment of FIG.

【図3】 遮水処理層を遮水用シートとアスファルト層
により構築する例の説明図である。
FIG. 3 is an explanatory diagram of an example in which a water-impervious treatment layer is constructed by a water-impervious sheet and an asphalt layer.

【図4】 図3と反対の組み合わせの説明図である。FIG. 4 is an explanatory diagram of a combination opposite to that of FIG. 3;

【図5】 遮水処理層を3層の遮水部材により構築する
例の説明図である。
FIG. 5 is an explanatory diagram of an example in which a water-impervious treatment layer is constructed by three layers of water-impervious members.

【図6】 図5とは異なる組み合わせの遮水処理層の説
明図である。
FIG. 6 is an explanatory view of a combination of water-impervious treatment layers different from that of FIG. 5;

【図7】 護岸基礎の角部に設ける角部接続層の説明図
である。
FIG. 7 is an explanatory diagram of a corner connection layer provided at a corner of a seawall.

【図8】 図7の角部接続層に組み合わせる施工枠体の
説明図である。
FIG. 8 is an explanatory diagram of a construction frame body combined with the corner connection layer of FIG. 7;

【図9】 角部に形成するシート状遮水体の接続処理層
の説明図である。
FIG. 9 is an explanatory diagram of a connection processing layer of a sheet-like water barrier formed at a corner.

【図10】 図9とは別の接続処理層の例の説明図であ
る。
FIG. 10 is an explanatory diagram of an example of a connection processing layer different from that of FIG. 9;

【図11】 遮水処理層に裂け目が形成された状態の説
明図である。
FIG. 11 is an explanatory view showing a state in which a tear is formed in the water-impervious treatment layer.

【図12】 アスファルト補修層の施工に用いる施工枠
体の説明図である。
FIG. 12 is an explanatory diagram of a construction frame used for construction of an asphalt repair layer.

【図13】 施工枠体の一部を拡大して示す斜視図であ
る。
FIG. 13 is an enlarged perspective view showing a part of the construction frame.

【図14】 施工枠体の設置例の説明図である。FIG. 14 is an explanatory diagram of an installation example of a construction frame.

【図15】 施工枠体の他の設置例の説明図である。FIG. 15 is an explanatory diagram of another installation example of the construction frame.

【図16】 石積護岸の構成を示す説明図である。FIG. 16 is an explanatory diagram showing a configuration of a masonry embankment.

【図17】 図1の護岸に仕切壁を組み合わせた構造の
説明図である。
FIG. 17 is an explanatory view of a structure in which a partition wall is combined with the revetment of FIG. 1;

【図18】 護岸の別の例の構成を示す説明図である。FIG. 18 is an explanatory diagram showing a configuration of another example of a revetment.

【図19】 複数の仕切壁により構成する護岸の例の説
明図である。
FIG. 19 is an explanatory diagram of an example of a revetment constituted by a plurality of partition walls.

【符号の説明】[Explanation of symbols]

1 埋立護岸、 2 ケーソン、 3 遮水部、
5 護岸基礎、6 海底地盤、 7 改良地
盤、 8 埋立地、 9 上面保護層、10 遮
水処理層、11 遮水用シート、 12 アスファ
ルト層、14 裂け目、 15 角部接続層、 1
6 天端部、17 斜面部、 18 下面部、
20 施工枠体、21 上枠部、 22 下枠
部、 23 側枠部、24 斜面枠部、 26
金網、 28 アスファルト層、30 アスファル
ト補修層、 31 施工枠体、 32 上枠部材、
33 縦枠鋼材、 34 横枠鋼材、 35 下
枠部材、36 底枠部材、 37 上面板、 38
側面板、39 底面板、 40 吊具、 42
捨石層、 50 石積護岸、55 仕切壁、
56 接続部材、 60 仕切壁。
1 reclamation revetment, 2 caisson, 3 impermeable part,
5 revetment foundation, 6 seabed ground, 7 improved ground, 8 landfill, 9 upper surface protection layer, 10 water shielding treatment layer, 11 water shielding sheet, 12 asphalt layer, 14 split, 15 corner connection layer, 1
6 Top end, 17 slope, 18 bottom,
Reference Signs List 20 construction frame, 21 upper frame, 22 lower frame, 23 side frame, 24 slope frame, 26
Wire mesh, 28 asphalt layer, 30 asphalt repair layer, 31 construction frame, 32 upper frame member,
33 vertical frame steel, 34 horizontal frame steel, 35 lower frame member, 36 bottom frame member, 37 top plate, 38
Side plate, 39 Bottom plate, 40 Hanging tool, 42
Rubble layer, 50 masonry seawall, 55 partition wall,
56 connecting members, 60 partition walls.

フロントページの続き (71)出願人 000230711 日本海上工事株式会社 東京都港区赤坂2丁目10番9号 (71)出願人 000196624 西武ポリマ化成株式会社 東京都豊島区池袋1丁目13番18号 (72)発明者 和木 多克 神奈川県横浜市旭区二俣川1−45−93 ワ ールドエンジニアリング株式会社内 (72)発明者 折笠 正美 神奈川県横浜市旭区二俣川1−45−93 ワ ールドエンジニアリング株式会社内 (72)発明者 野々田 充 東京都大田区多摩川2丁目11番20号 日本 道路株式会社内 (72)発明者 伊藤 隆彦 東京都中央区京橋3−13−1 大成ロテッ ク株式会社内 (72)発明者 松崎 勝夫 東京都港区赤坂2丁目10番9号 日本海上 工事株式会社内 (72)発明者 中野 浩 東京都港区赤坂2丁目10番9号 日本海上 工事株式会社内 (72)発明者 猪俣 光正 東京都豊島区池袋1−13−18 西武ポリマ 化成株式会社内 Fターム(参考) 2D018 DA00 DA03 4D004 AA46 AB01 BB04 BB05 CC16Continuation of the front page (71) Applicant 000230711 Nihon Marine Construction Co., Ltd. 2-10-9 Akasaka, Minato-ku, Tokyo (71) Applicant 000196624 Seibu Polymer Chemical Co., Ltd. 1-13-118 Ikebukuro, Toshima-ku, Tokyo (72 ) Inventor Tatsu Waki 1-45-93 Futamatagawa, Asahi-ku, Yokohama-shi, Kanagawa Prefecture Inside World Engineering Co., Ltd. (72) Inventor Masami Orikasa 1-45-93 Fumatatagawa, Asahi-ku, Yokohama-shi, Kanagawa Pref. Inside the company (72) Inventor Mitsuru Nonota 2-11-20 Tamagawa, Ota-ku, Tokyo Japan Road Co., Ltd. (72) Inventor Takahiko Ito 3-13-1, Kyobashi, Chuo-ku, Tokyo Taisei Rotec Co., Ltd. (72 ) Inventor Katsuo Matsuzaki 2-10-9 Akasaka, Minato-ku, Tokyo, Japan Sea Construction Co., Ltd. (72) Inventor Hiroshi Nakano 2-10-9 Akasaka, Minato-ku, Tokyo Nippon Marine Construction Co., Ltd. (72) Invention Mitsumasa Inomata 1-13-18 Ikebukuro, Toshima-ku, Tokyo Seibu Polymer Kasei Stock F term in the company (reference) 2D018 DA00 DA03 4D004 AA46 AB01 BB04 BB05 CC16

Claims (15)

【特許請求の範囲】[Claims] 【請求項1】 遮水性を有する構造体で被覆された埋立
護岸により区画された廃棄物海面埋立処分場において、 前記埋立護岸を透水性を有する石積マウンドや継手の隙
間から漏水する矢板やセル、もしくは目地間から漏水す
るケーソンやL型ブロックのような部材により構成し、 前記埋立護岸の埋立て側と外海側の両面もしくは一方の
表面と海底地盤の所定の範囲に亘ってシート状遮水体と
アスファルト混合物との多層の遮水層を重ねた遮水処理
層を構成することを特徴とする埋立護岸の遮水構造。
1. A waste sea surface landfill site defined by a landfill seawall covered with a structure having water-blocking properties, wherein a sheet pile or cell that leaks water from the landfill seawall through a gap between a masonry mound or a joint having water permeability. Or, it is constituted by a member such as a caisson or an L-shaped block that leaks water from between joints, and a sheet-shaped impermeable body extends over a predetermined range of both the landfill side and the open sea side or one surface of the landfill revetment and the seabed ground. A water-blocking structure for a reclaimed revetment, comprising a water-blocking treatment layer comprising a multi-layered water-blocking layer with an asphalt mixture.
【請求項2】 前記遮水処理層において、シート状遮水
体を所定の範囲に亘って敷設した上に、アスファルト混
合物層を所定の厚さで打設して構成することを特徴とす
る請求項1に記載の埋立護岸の遮水構造。
2. The water-impervious treatment layer, wherein a sheet-like water-impervious body is laid over a predetermined range, and an asphalt mixture layer is cast at a predetermined thickness. 2. The impermeable structure of the landfill revetment according to 1.
【請求項3】 前記遮水処理層を、埋立護岸の表面と海
底地盤の所定の範囲に亘って打設するアスファルト混合
物層と、その上に重ねて敷設するシート状遮水体により
構成することを特徴とする請求項1に記載の埋立護岸の
遮水構造。
3. The water-impervious treatment layer is constituted by an asphalt mixture layer cast over a predetermined area of the surface of the landfill revetment and the seabed, and a sheet-like water impervious body laid on the asphalt mixture layer. The impermeable structure of a reclaimed revetment according to claim 1.
【請求項4】 前記遮水処理層を、埋立護岸の表面と海
底地盤の所定の範囲に亘って打設するアスファルト混合
物層と、その上に重ねて敷設するシート状遮水体と、前
記シート状遮水体の上にさらに重ねて打設するアスファ
ルト混合物層とから構成することを特徴とする請求項1
に記載の埋立護岸の遮水構造。
4. An asphalt mixture layer in which the water-impervious treatment layer is cast over a predetermined area of the surface of a reclaimed revetment and the seabed, a sheet-like water-shielding body laid on the asphalt mixture layer, 2. An asphalt mixture layer which is further overlaid on the impermeable body.
The impermeable structure of landfill revetment described in.
【請求項5】 前記遮水処理層を、埋立護岸の表面と海
底地盤の所定の範囲に亘って敷設するシート状遮水体
と、前記シート状遮水体の上に敷設するアスファルト混
合物層と、その上に重ねて敷設するシート状遮水体とか
ら構成することを特徴とする請求項1に記載の埋立護岸
の遮水構造。
5. A sheet-like impermeable body laid over a predetermined area of the surface of a landfill revetment and the seabed, an asphalt mixture layer laid on the sheet-like impermeable body, The water-blocking structure of a landfill revetment according to claim 1, comprising a sheet-shaped water-blocking body laid on top of the land.
【請求項6】 遮水性を有する構造体で被覆された埋立
護岸により区画された廃棄物海面埋立処分場において、 前記埋立護岸を透水性を有する石積マウンドや継手の隙
間から漏水する矢板やセル、もしくは目地間から漏水す
るケーソンやL型ブロックのような部材により構成し、 前記埋立護岸の埋立て側と外海側の両面もしくは一方の
表面と海底地盤の所定の範囲に亘って、シート状遮水体
とアスファルト混合物とを重ねた遮水処理層もしくはシ
ート状遮水体による遮水処理層を構成するとともに、 前記埋立護岸が所定の角度で交わるように接続される角
部に対して、前記埋立護岸の角部の周囲を所定の広さで
覆うようにアスファルト混合物層を構築し、前記角部の
両側の遮水処理層と一体の接続層を構築することを特徴
とする埋立護岸の遮水構造。
6. In a waste sea surface landfill site defined by a landfill seawall covered with a structure having water-blocking properties, a sheet pile or cell that leaks water from the landfill seawall through a gap between a masonry mound or a joint having water permeability. Alternatively, a sheet-like impermeable body is formed by a member such as a caisson or an L-shaped block that leaks water from between joints, and covers a predetermined range of both the landfill side and the open sea side or one surface of the landfill revetment and the seabed ground. And a water-impervious layer made of a sheet-like water-impervious body in which the asphalt mixture is overlapped with the asphalt mixture. Constructing an asphalt mixture layer so as to cover the periphery of the corner with a predetermined area, and constructing a connection layer integral with a water-impervious treatment layer on both sides of the corner, Water structure.
【請求項7】 前記埋立護岸の角部での遮水処理層の接
続層を構築するに際して、 前記埋立護岸の角部を中心にして所定の範囲に施工枠体
を配置して固定し、前記施工枠体の中の空間部にアスフ
ァルト混合物を施工して、前記角部の両側の遮水処理層
の上に密着させたアスファルト遮水処理層を構築するこ
とを特徴とする請求項6に記載の埋立護岸の遮水構造。
7. When constructing a connection layer of a water-impervious treatment layer at a corner of the landfill seawall, a construction frame body is arranged and fixed in a predetermined range around the corner of the landfill seawall, The asphalt mixture is applied to a space in the construction frame to construct an asphalt water-impervious treatment layer which is in close contact with the water-impervious treatment layer on both sides of the corner. Impermeable structure of reclaimed seawall.
【請求項8】 前記埋立護岸の角部での遮水処理層の接
続層を構築するに際して、 前記埋立護岸の角部で接続される両側のシート状遮水体
の接続部に対して、前記両側のシート状遮水体の上部を
所定の範囲で覆うようにアスファルト混合物を施工する
ことを特徴とする請求項6または7に記載の埋立護岸の
遮水構造。
8. When constructing a connection layer of a water-impervious treatment layer at a corner of the reclamation seawall, the connection between the sheet-shaped water-impervious bodies on both sides connected at the corner of the reclamation seawall is performed on both sides. The water-blocking structure of a reclaimed revetment according to claim 6 or 7, wherein the asphalt mixture is applied so as to cover an upper portion of the sheet-shaped water-blocking body in a predetermined range.
【請求項9】 前記埋立護岸の角部での遮水処理層の接
続層を構築するに際して、 前記埋立護岸の角部で接続される両側のシート状遮水体
の接続部に対して、その下面に所定の範囲に亘ってアス
ファルト混合物による下面の層を構築し、前記下面の層
の上で前記両側のシート状遮水体を配置し、そのシート
状遮水体の上面を所定の範囲で覆うようにアスファルト
混合物の上の層を施工することを特徴とする請求項8に
記載の埋立護岸の遮水構造。
9. When constructing a connection layer of a water-impervious treatment layer at a corner of the landfill revetment, a lower surface of a connection part of the sheet-like water-impervious bodies on both sides connected at the corner of the landfill revetment is provided. Build a lower layer of the asphalt mixture over a predetermined range, arrange the sheet-like water barriers on both sides on the lower layer, so as to cover the upper surface of the sheet-like water barrier in a predetermined range. The impermeable structure of a reclamation revetment according to claim 8, wherein the upper layer of the asphalt mixture is applied.
【請求項10】 前記シート状遮水体は、ゴムまたはプ
ラスチック材料で構成した遮水性を有するシートである
ことを特徴とする請求項1ないし5のいずれかに記載の
埋立護岸の遮水構造。
10. The impermeable structure of a reclaimed revetment according to claim 1, wherein the sheet-like impermeable body is a sheet having a water-impermeability made of a rubber or a plastic material.
【請求項11】 遮水性を有する構造体で被覆された埋
立護岸により区画された廃棄物海面埋立処分場におい
て、 前記埋立護岸を透水性を有する石積マウンドや継手の隙
間から漏水する矢板やセル、もしくは目地間から漏水す
るケーソンやL型ブロックのような部材により構成し、 前記埋立護岸の埋立て側と外海側の両面もしくは一方の
表面と海底地盤の所定の範囲に亘って、シート状遮水
体、またはシート状遮水体とアスファルト混合物との多
層の遮水層を重ねた遮水処理層を構成するに際して、 前記遮水処理層に裂け目が形成されたりして欠陥が生じ
た場合に、前記裂け目を中心にした周囲を任意の広さと
厚さを持って覆うようにアスファルト遮水処理層を構築
し、前記遮水処理層によりシート状遮水体を、アスファ
ルト遮水処理層と一体の遮水処理層として構築すること
を特徴とする埋立護岸の遮水構造。
11. A waste sea surface landfill site defined by a landfill revetment covered with a water-blocking structure, wherein a sheet pile or a cell leaking water from the landfill mound or a joint between the landfill revetment, Alternatively, a sheet-like impermeable body is formed by a member such as a caisson or an L-shaped block that leaks water from between joints, and covers a predetermined range of both the landfill side and the open sea side or one surface of the landfill revetment and the seabed ground. When forming a water-impervious treatment layer in which a multilayer water-impervious layer of a sheet-like water-impervious body and an asphalt mixture is stacked, when a crack is formed in the water-impervious treatment layer or a defect occurs, the crack is formed. The asphalt impermeable layer is constructed so as to cover the area around the center with an arbitrary width and thickness, and the impermeable layer forms a sheet-like impermeable body with the asphalt impermeable layer. The impermeable structure of the landfill revetment, which is constructed as an impermeable layer for the body.
【請求項12】 前記埋立護岸の遮水処理層が、シート
状遮水体と固化処理土、シート状遮水体とアスファルト
混合物、シート状遮水体と粘性土、シート状遮水体を複
数層重ねたもの、または、保護マット、固化処理土、粘
性土もしくはアスファルト混合物のような遮水性を有す
る遮水層を各々単層として構成したものを対象とするこ
とを特徴とする請求項11に記載の埋立護岸の遮水構
造。
12. The water-impervious treatment layer of the landfill revetment is formed by stacking a plurality of layers of a sheet-like impermeable body and solidified soil, a sheet-like impermeable body and an asphalt mixture, a sheet-like impermeable body and a viscous soil, and a sheet-like impermeable body. The reclaimed revetment according to claim 11, characterized in that a water-impermeable layer having a water-imperviousness such as a protective mat, a solidified soil, a clayey soil or an asphalt mixture is formed as a single layer. Waterproof structure.
【請求項13】 前記アスファルト補修層を構築するに
際して、シート状遮水体もしくは多層の遮水処理層の裂
け目を中心に施工枠体を配置して固定し、前記施工枠体
の中の空間部にアスファルト混合物を施工して、前記遮
水処理層の上面に密着させて設けるアスファルト補修層
を構築することを特徴とする請求項11または12に記
載の埋立護岸の遮水構造。
13. When constructing the asphalt repair layer, a construction frame is arranged and fixed around a crack in a sheet-like water barrier or a multilayer water-impervious treatment layer, and is fixed to a space in the construction frame. 13. The impermeable structure of a reclaimed revetment according to claim 11, wherein an asphalt mixture is applied to construct an asphalt repair layer provided in close contact with the upper surface of the impermeable treatment layer.
【請求項14】 前記施工枠体にアスファルト混合物を
施工するに際して、前記施工枠体の外面に配置する仕切
板には網状の部材や多孔質の板状部材を設け、前記施工
枠体の中から水と加熱された気体を排出させ得るように
することを特徴とする請求項11ないし13のいずれか
に記載の埋立護岸の遮水構造。
14. When the asphalt mixture is applied to the construction frame, a mesh member or a porous plate member is provided on a partition plate disposed on an outer surface of the construction frame, and 14. The impermeable structure of a reclaimed revetment according to claim 11, wherein water and heated gas can be discharged.
【請求項15】 前記遮水処理層護岸を構築する護岸
が、人工島や海底地盤に対する工事区域を囲む護岸であ
ることを特徴とする請求項1ないし14のいずれかに記
載の埋立護岸の遮水構造。
15. The revetment for reclaiming a reclaimed revetment according to claim 1, wherein the revetment for constructing the revetment is a revetment surrounding a construction area for an artificial island or a seabed. Water structure.
JP2000141279A 2000-05-15 2000-05-15 Water-blocking structure of revetment Expired - Lifetime JP4822375B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000141279A JP4822375B2 (en) 2000-05-15 2000-05-15 Water-blocking structure of revetment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000141279A JP4822375B2 (en) 2000-05-15 2000-05-15 Water-blocking structure of revetment

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2010199473A Division JP5099728B2 (en) 2010-09-07 2010-09-07 Repair method for impermeable layer of landfill revetment

Publications (2)

Publication Number Publication Date
JP2001323432A true JP2001323432A (en) 2001-11-22
JP4822375B2 JP4822375B2 (en) 2011-11-24

Family

ID=18648416

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000141279A Expired - Lifetime JP4822375B2 (en) 2000-05-15 2000-05-15 Water-blocking structure of revetment

Country Status (1)

Country Link
JP (1) JP4822375B2 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6520720B1 (en) * 2000-05-15 2003-02-18 Vladimir Sandzhievich Boldurev Artificial island, artificial island support and method for building an artificial island
JP2007105618A (en) * 2005-10-13 2007-04-26 World Engineering Kk Water barrier structure of waste landfill site
JP2008080325A (en) * 2006-09-01 2008-04-10 World Engineering Kk Method of constructing impervious layer
JP2008223392A (en) * 2007-03-14 2008-09-25 Ohbayashi Corp Repair reinforcement method for existing quay wall and its repair reinforcement structure
JP2009011990A (en) * 2007-07-09 2009-01-22 Taiyo Kogyo Corp Water barrier structure in reclaimed land
JP2010005497A (en) * 2008-06-24 2010-01-14 World Engineering Kk Method of joining water-barrier layer
JP2011156534A (en) * 2006-09-01 2011-08-18 World Engineering Kk Method of constructing impervious layer

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4813662B1 (en) * 1969-07-08 1973-04-28
JPH06108436A (en) * 1991-12-18 1994-04-19 Seibu Polymer Kasei Kk Impervious construction in water filled ground and impervious construction method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4813662B1 (en) * 1969-07-08 1973-04-28
JPH06108436A (en) * 1991-12-18 1994-04-19 Seibu Polymer Kasei Kk Impervious construction in water filled ground and impervious construction method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6520720B1 (en) * 2000-05-15 2003-02-18 Vladimir Sandzhievich Boldurev Artificial island, artificial island support and method for building an artificial island
JP2007105618A (en) * 2005-10-13 2007-04-26 World Engineering Kk Water barrier structure of waste landfill site
JP2008080325A (en) * 2006-09-01 2008-04-10 World Engineering Kk Method of constructing impervious layer
JP4726147B2 (en) * 2006-09-01 2011-07-20 ワールドエンジニアリング株式会社 Construction method of impermeable layer
JP2011156534A (en) * 2006-09-01 2011-08-18 World Engineering Kk Method of constructing impervious layer
JP2011156535A (en) * 2006-09-01 2011-08-18 World Engineering Kk Method of constructing impervious layer
JP2008223392A (en) * 2007-03-14 2008-09-25 Ohbayashi Corp Repair reinforcement method for existing quay wall and its repair reinforcement structure
JP2009011990A (en) * 2007-07-09 2009-01-22 Taiyo Kogyo Corp Water barrier structure in reclaimed land
JP2010005497A (en) * 2008-06-24 2010-01-14 World Engineering Kk Method of joining water-barrier layer

Also Published As

Publication number Publication date
JP4822375B2 (en) 2011-11-24

Similar Documents

Publication Publication Date Title
JP4761780B2 (en) Construction method of impermeable layer
US8961073B2 (en) System and method for strengthening a sloped structure such as a berm, basin, levee, embankment, or the like
WO2018014069A1 (en) Sealing system for dam walls
JP4979228B2 (en) Additional construction method of impermeable layer
JP4293435B2 (en) Construction method of managed revetment
JP4822375B2 (en) Water-blocking structure of revetment
JP2011156534A (en) Method of constructing impervious layer
JP3578447B2 (en) Underwater impermeable construction method of asphalt mat
JP4562065B2 (en) Protection method for supporting ground of offshore structures
JP5099709B2 (en) Construction method of managed revetment
JP4315620B2 (en) Impermeable treatment method for managed waste landfill revetment
JP5728206B2 (en) Construction method of partition revetment
JP4410572B2 (en) Construction method of revetment for landfill
JP2001152425A (en) Impervious structure of revetment
JP5099728B2 (en) Repair method for impermeable layer of landfill revetment
JP4315616B2 (en) Waterproofing mat
JP2007247309A (en) Construction method of seepage control processing layer
JP4761386B2 (en) Construction method of impermeable walls
JP2007105618A (en) Water barrier structure of waste landfill site
JP2005048518A (en) Controlled type revetment
JP4749444B2 (en) Impermeable layer connection method
JP5131742B2 (en) Foundation construction method for revetment structures
KR200282674Y1 (en) Geo-composite mat
JP4482859B2 (en) Stabilization method behind the revetment
JP4606454B2 (en) Construction method of managed revetment

Legal Events

Date Code Title Description
A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20051207

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060216

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060710

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080310

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080318

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080519

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090414

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090601

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20100608

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100901

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100907

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20100922

A912 Re-examination (zenchi) completed and case transferred to appeal board

Free format text: JAPANESE INTERMEDIATE CODE: A912

Effective date: 20101224

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110808

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110808

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110902

R150 Certificate of patent or registration of utility model

Ref document number: 4822375

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140916

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term